HomeMy WebLinkAboutTIC 2020-03-02 Item 2A - Discussion - Public Works Fleet and Facilities Building Improvements Update / 30% Design ReviewTO:
FROM
BY:
CC:
DATE:
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Committee
Henry Hash, Public Works Director
Hari Ponnekanti, Deputy PW Director
Mayor Allan Ekberg
February 28, 2020
SUBJECT: Public Works Fleet & Facilities Building & Minkler Improvements
Project Nos. 91630601, 91930606
Project Update and 30% Design Review
ISSUE
Provide an update on the PW Fleet and Facilities tenant improvements (30% design review of schedule and cost
estimate) and Minkler Shop Improvements.
BACKGROUND
On 12/02/19, Council approved the PW Fleet and Facilities tenant improvements project budget in the amount of $9.5
million dollars and the Minkler Interim Improvements budget in the amount of $500,000. The total budget for PW Fleet
and Facilities Building is $35,700,000.00 with funding split 50/50 with the General Fund and Water/Sewer/Surface
Water Utilities.
DISCUSSION
PW Fleet and Facilities Tenant Improvement
1. SHKS Architect has reached the 30% design milestone. Please see the attached design drawing, project timeline
schedule, and cost estimates. 30% design and cost estimates are within the range of the estimated budgets.
Minkler Shops Interim Improvements
2. Saybr's (JOC) is re-evaluating the project scope and cost estimates.
PHASE 1 FINANCIAL IMPACT
Expenditures
2019/2020 Budget
Land & Master Plan (2017-2019)
$ 26,102,880.84
SHKS Design Am No. 2
570,768.00
Geotechnical Services
80,000.00
Estimate - Soft Costs
2,229,232.00
Estimate - Construction
6,700,000.00
Funding - General Fund
$ 17,850,000.00
Funding - Utilities
17,850,000.00
Estimate Minkler Interim Improvements
500,000.00
500,000.00
Total
$ 36,182,880.84
$ 36,200,0 00.00
DISCUSSION ONLY
Committee discussion only, forward 30% design update to the March 23, 2020 Committee of the Whole for full Council.
Attachments: Cost estimates
Design Drawing
Tentative Schedule
Master Plan
W1PW Eng1PROJECTSW BG Projects101 Public Safety Plari Shops First Phase (91630601)1lnfo Memo for PW F & F Update 03022020.docx
DCW Cost Management 30% Design Cost Plan February 21, 2020 4
Tukwila Public Works Facility
Fleets and Facilities Buildinq - Phase 1
Phase 1 - Fleets and Facilities Renovation
Sitework - No Work Phase 1
Alternate 1: Trench drains, associated
demo/trenching/infill/oil & water separator
Alternate 2: Emergency generator, concrete pad, bollads
43,200 104.73 4,524,329
NIC
35,885
382,852
2
1 2 3 4 5 6 y2V
10"+/
7' - 8" +/ 20' - 2" +/ 20' - 0" +/- 20' - 0" +/- 20' -1 " +/- 20' -1 " +/- 20' - 1 " +/-
I
I \\ I I I
I I I \\ I I
RECORD FILE STORA M ZZANINE STORAGE \
+ 655 SF (PROPOSED) 670 SF (PROPOSED) I
\ X \
497 SF (EXISTING) L
N SF GENDER NEUTRAL WC \
45 SF (PROPOSED) \
35 SF (EXISTING) \ \
+ 10 SF [+29%] \ \
SECOND FLOOR PLAN - PROGRAM AREA
3/32" = 1'-0"
FAC SUPER
116 SF (PROPOSED)
120 SF (EXISTING)
SF (-3%]
%C FOREMAN CUSTODIAL OFF C
SF (PROPOSED) SHARED OFFICE 180 SF (PROPOSED) LUNCH / LRIG MTG
�
170 SF (EXISTING) 510 SF (PROPJ
ED)
° 240 SF (EXISTI+270 SF [+ 1%]
1DMIN
5 SF (PROPOSED)
92SF (FXI_ STINal,-
105 SF[-55%] Xx M RR / LOCKER
OBBY 325 SF (PROPOSED)
445 SF (EXISTING) — —
5 SF (PROPOSED) -120 FI-27%1
5 SF (EXISTING) _—
SF (0%]
0 SF (PROPOSED) — —
0 SF (EXISTING) f I FILE STOR
10 SF(-20%] 120 SF (PROPOSE) W LOCKER
80 SF (EXISTING) 315 SF (PROPOSED)
:AC TECH +40 SF[+50%] 240 SF (EXISTING)
DEAD CUST +75 SFAft %]
15 SF (PROPOSED)
'00 SF (EXISTING)
'5 SF [-43%] —
VEHICLE
— LAUNDRY MAINTENANi
I
7
30' - 3" +/-
I
SURPLUS PARTS STORAGE
720 SF (PROPOSED)
450 SF (EXISTING)
1 270 SF [+60%]
8.1 9 10 11 12 13
2' - 2" +/-
31: 8" +; 18' - 9" +/- 20' -11, +/- 18' - 11" +/-
7
L
I I I I I I li I I I
I
II I
VEH CLE I IRE SHOP
MAINTE NAPCE I 450 SF (PROPOSED)
SEE NO E TO LEF I �85 SF (EXISTING)
165 SF I+58%]
I
15 SF (PROPOSED)
KEY EQUIP
30 SF (PROPOSED)
CUSTODIAL /
_ FACILITIES STORAGE j
1,915 SF (PROPOSED) MACHINE SHOP
1,440 SF (EXISTING)
� +475 SF (+33%] 1,060 SF (PROPOSED)
1,225 SF (EXISTING)
I I I I
-165SFI-13%] L 7
FLEET FLEX SPACE
1,385 SF (P OPOSED)
LAUNDRY
18 SF (PROPOSED)
I I
FACILITIES /
EQUIPMENT MAINT
640 SF (PROPOSED)
335 (EXISTING)
+305 SF [+91 %]
1>
I I I
I�
FLEET PART
920 SF (PROPOSED)
1,082 SF (EXISTING)
-162 SF [-15%]
VEHICLE MAINTENANCE
8,445 SF (PROPOSED)
5,865 SF (EXISTING)
+2, 580 SF [+44%]
I I I
I � I
I I I
FLEET OFFICE
690 SF (PROPOSED)
450 SF (EXISTING)
+240 SF [+53%]
I I
------------- -
WELDING SHOP
670 SF (PROPOSED)
400 SF (EXISTING)
+270 SF [+68%]
I I
I �
PRESSOR
170 SF
VM MAINT STORAGE
475 SF
VEHICLE
MAINTENANCE
SEE NOTE TO LEFT
I I I
I I I IF
I I I I I I
S
H K
S A R C H I T F C T S
1050 N.38th St.
Seattle, WA 98103
— PH:206.675.9151
— www.shksarchitects.com
TIRE STORAGE
285 SF (PROPOSED)
475 SF (EXISTING)
-
-190 SF [-400/.]
—
TUKWILA
- PUBLIC WORKS
- FLEETS &
FLEETS & FACILITIES BUILDING PROGRAM SUMMARY
FACILITIES
BUILDING
EXISTING AREA
PROPOSED AREA
DELTA
—
(GEORGE LONG)
—
30% DESIGN
FLEETS
10,322 SF
15,003 SF
+4,681 SF [+45%]
—
11210 TUKWILA INTERNATIONAL BLVD
FACILITIES / CUSTODIAL
2,345 SF
3,206 SF
+861 SF [+37%]
— TUKWILA, WA 98168
SHARED
2,463 SF
2,740 SF
+277 SF [+11 %]
—
(MEETING / LOCKER ROOM /
MEZZANINE STORAGE)
— Drawn by: MF
CIRCULATION / MECHANICAL
1,744 SF
3,475 SF
+1,731 SF [99%]
— Checked: AH
Date: 02/20/20
TOTAL
16,874 SF
24,424 SF
+7,550 SF [+45%]
— Scale: As indicated
— Revisions:
No. Date Remarks
LEGEND
I > VEHICLE ACCESS
Z
—
OFFICE + SUPPORT
o
—
SHOPS
V
® STORAGE
W
CIRCULATION MECHANICAL
c
—
PROGRAM
"
- COMPARISION
oc
-
0
u—
—
FIRST FLOOR PLAN - PROGRAM AREA
3/32" = 1'-0"
o — .
Z
0 1' 2' 4' 8' 16'
3
Tukwila PW Consolidated Facility - Phase 1 S H K S A R C H I T E C T S
ID
Task Name
Duration
Start
Finish
2 '20
M T W T F S
Feb 9 '20
S M T W T F S
Feb 16, '20
S M T W T F S
Feb 23, '20
S M T W T F S
Mar 1, '20
S M T W T F S
Mar 8, '20
S M T W T F S
Mar 15, '20
S M T W T F S
Mar 22, '20
S M T W T F S
Mar 29, '20
S M T W T F S
Apr 5, '20
S M T W
1
City of Tukwila Public Works Design Schedule
417 days Tue 10/8/19
Mon 6/14/21
I I I I I I I I I I
I I I I i I I I I
1 1 1 1 1 1 1
2
Master Plan Presentation
Owner Performed Work
Geotech Report
Hazmat Report of Heiser
Paint Booth Demolition
Equipment Inventory
40 daysl Tue 10/8/19
98 days Mon 12/9/19
45days, Wed 2/26/20
30 days Thu 2/6/20
15 days Mon 3/2/20
Fri 12/6/19
Tue 4/28/20
Tue4/28/20
Thu 3/19/20
11
..
�'.:•......... ............ ......... ::• • • • ::::::::• • • :•:.• :• ■
■ ■ • • • • ■ •
12
®
®
®
13
14
Fri 3/20/20
15
10 days
173 days
Mon 12/9/19
Fri 12/6/19
Fri 12/20/19
Wed 8/12/20
16
Design and Documentation
0-30% Design
17
42 days
Fri 12/6/19
Thu 2/6/20"V
27
30%-60% Design
Notice To Proceed to 60% Design
45 daysl Thu 2/6/20
0 days Thu 2/6/20
40daysl Fri2/7/20
0 days Thu 2/20/20
Fri 4/10/20
28
Thu 2/6/20
29
60% Design Documents
Core Team Meeting - Check -in
Fri4/3/20
Thu 2/20/20
••••••......••••••••... ............
...... ••••.
41
♦ 2/20
I I I I
•♦�2/27
_ I
♦ 3/12
I I I I I
I I I I I I I I
1 1 1 1 1 1 1 1
I I I I I I I I
I I I I I I I I
30
31
Pre -Application Meeting w/ City of Tukwila
DCD
1 day Wed 2/26/20
Wed 2/26/20
32
Progress Meeting
DRAFT Division 0 & 1 Spec to SHKS
1 day
Thu 2/27/20
Thu 2/27/20
Thu 2/27/20
33
0 daysl Thu 2/27/20
0 days Thu 3/12/20
5 days Mon 4/6/20
34
Progress Meeting
Tukwila PW 60% Milestone Review and NTP
Thu 3/12/20
Fri 4/10/20
35
36
Permit Submittal
Permit Review/Issuance
0 days Wed 5/27/20
8 wks Thu 5/28/20
Wed 5/27/20
Thu 7/23/20
37
38
60%-90% Design
Tukwila PW 90% Milestone Review Meeting
65 days Mon 4/13/20
1 day Wed 7/15/20
15 days Thu 7/16/20
0 days, Wed 8/5/20
Tue 7/14/20
39
Wed 7/15/20
40
Construction/Bid Documents
100% Submittal
Wed 8/5/20
Wed 8/5/20
41
42
Tukwila PW NTP to Bid
Bidding
5 days Thu 8/6/20
36 days, Thu 8/13/20
Wed 8/12/20
Fri 10/2/20
43
44
Bidding Period
City of Tukwila Contract Negotiations
Construction
15 days Thu 8/13/20
21 days Thu 9/3/20
168 days Fri 10/2/20
Wed 9/2/20
Fri 10/2/20
Mon 6/14/21
45
46
47
Notice To Proceed
Mobilization
0 days Fri 10/2/20
0 days Fri 10/2/20
Fri 10/2/20
48
Fri 10/2/20
49
Construction
Substantial Completion
Project Closeout
138 daysl Mon 10/5/20
0 days Fri 4/30/21
Fri 4/30/21
50
Fri 4/30/21
51
30 days Mon 5/3/21
Mon 6/14/21
52
Project: 20-0206-Design Schedule DID
Date: Thu 2/6/20
Task External Tasks Inactive Summary Start -only Deadline
Split External Milestone ♦ Manual Task Finish -only
Milestone ♦ Inactive Task Duration -only External Tasks
Summary Inactive Milestone Manual Summary Rollup ♦ External Milestone
Project Summary Inactive Milestone Manual Summary ♦ Progress
Page 1
a� TUKWILA PUBLIC WORKS FACILITY: !MASTER PLAN
f
s
.'
�
PELRNI
uginE �.
f
A
l+f'
J
-tQIEiEb fkfETNb7N6
f{J
�
f
- tWEtEb hfETiIb7N6
���miTO�ME j
�
5
uNCWf1RE6
'
Cb�f EFb RE'I GAPr. r� Siulls Lk
r
?r
"dll?5E6WE7lAMGhE
'4rCNlM
S H K S A R C H I T E C T S
a rreuEe srx�Fe�uElle 1
ll
o
VNtahllll6 � x
SEEYifi�
y,
n�
... _ ...... _ FLEETiWNTEFIANCEMLW4
Gk/fEAEB FLEET FAYff Ih5 '\{
,i81iN �VWTOE
MEgMd
ADM IN+SHOPS — —
f I
wETE►Mo
PROGRAM LEGEND
MADMIN + SHOPS
EFLEET MAINTENANCE
FLEET MAINTENANCE PARKING
INTERIOR FLEET PARKING
COVERED FLEET PARKING
UNCOVERED FLEET PARKING
DECANT+BRINE
SPOILS
ECOVERED STORAGE
BULK BINS
UNCOVERED STORAGE
ROM —ESTIMATED COSTS
CONSTRUCTION COSTS:
$ 53,000,000
SOFT COSTS:
$21,000,000
TOTALPROJECT COST:
$ 74, 00 0,0 00
17
5