HomeMy WebLinkAboutTIC 2020-03-02 Item 3F - Discussion - 2020 Transportation and Infrastructure Committee Work PlanCn
Cn
a)
Tukwila City Council Transportation & Infrastructure Committee - 2020 Work Plan
Cynthia Delostrinos Johnson, Chair; Verna Seal, Kate Kruller
Description
Qtr
Action orBriefing
Status
Transportation
1.
42nd Avenue South Phase III/Gilliam Creek Culvert
Project Closeout
1
A
Finishing up punch list items.
2.
53rd Avenue S (S 1371h — S 1441h St) & Water/Sewer/SSWM
Project Closeout
2
A
Utility undergrounding ongoing. Punch list
works and Physical completion to follow.
3.
Traffic Calming/Residential Safety
Various activities/updates
As
needed
B
Consultant Agreement for On -Call Engineering
1
A
Complete
4.
Residential Streets Grant Applications
• 46t" Ave S Safe Routes to School
• Macadam Rd. South Complete Street
• S. 152nd St Safe Routes to School
As
needed
A
5.
TIB Rechannelization
Final Report with alternative options
1
B
6.
Annual Overlay and Repair Program
2019 Project Closeout
1
A
Complete
Pavement Management Design
2
A
Bid Award for 2020 Project
2
A
2021 Design Contract
4
A
7.
Annual Bridge Inspections and Repairs
Annual contract
A
8.
West Valley Hwy (1-405-Strander)
Project Update
3
B
Bid Award
4
A
9.
Boeing Access Road over Airport Way Seismic Retrofit
Bid Award
A
10.
TUC Ped/Bike Bridge
City of Tukwila Updated February 20, 2020
0 0' Tukwila City Council Transportation & Infrastructure Committee - 2020 Work Plan
Project Closeout
1
A
Complete
11.
42"d Ave S Bridge Replacement
Direction on next steps
1
A
Complete (proceed with inspection/initial
design)
13.
Transportation Element of the Comp Plan/Walk & Roll
Consultant Agreement
3
A
14.
BNSF Access
Preferred alternative
1
B
15.
OTHER
Grant Applications and Acceptances
1-4
A
Transportation Demand Management Programs Updates & Grants
1-4
A,B
Transportation Improvement Program Resolution
A
Traffic Impact Fees Update (Bi-annual)
4
A
Surplus Equipment Resolution - Fleet
A
2021-2022 Budget Components: Residential Street, Arterial Street,
Public Works Dept., Fleet, Debt Service Funds, PW Shops Fund,
Street Dept.
City of Tukwila Updated February 20, 2020
a)
Tukwila City Council Transportation & Infrastructure Committee - 2020 Work Plan
Utilities
1.
5811 Avenue South Water Main Replacement
Bid Award
A
TBD
2.
Macadam Rd S Water Upgrade
Bid Award
A
TBD —grant dependent
3.
CBD Sanitary Sewer Rehabilitation
Design 2020
A
TBD
2020 Bid Award
A
TBD
4.
Water & Sewer Comprehensive Plans
5.
Fort Dent Park BNSF Sewer Relocation
Bid Award
A
TBD
Project Closeout
A
TBD
6.
GIS Inventory of Water/Sewer/SWM System
Consultant Agreement
2
A
TBD
7.
Annual Small Drainage Program
Closeout 2018
2
A
Closeout 2019
3
A
2020 Project List Review/ Design Contract
1
A
Bid Award 2020
2
A
8.
Tukwila 205 Levee Certification
Status Update
2
B
9.
Stormwater Quality Retrofit Project Updates and grants
Grant Application
3
A
10.
East Marginal Wy S Stormwater Outfalls
Bid Award
2
A
11.
Chinook Wind
Consultant Agreement
3
A
12.
Gilliam Creek Fish Barrier Removal
Grant Application
2
A
13.
Riverton Creek Flapgate Removal
Bid Award
2
A
Permit Approval Dependent
14.
Nelson Side Channel
City of Tukwila Updated February 20, 2020
0 °o Tukwila City Council Transportation & Infrastructure Committee - 2020 Work Plan
Grant Application
1
A
15.
S. 131" Place Drainage Improvements
Consultant Agreement
2
A
16.
OTHER
Resolution for Water, Sewer, Surface Water Utility Rates 2021-2022
2021-2022 Enterprise Fund Budget Components
4
A
Metropolitan Water Pollution Abatement Advisory Committee
contract
Public comment from
11/25/19 Council meeting
Flood prevention and utility infrastructure
1
B
Complete
Franchise utility agreements and approvals (SCL, Century Link,
Comcast, Cascade Water, Sewer district)
As needed
Sewer services in Duwamish neighborhood
1
B
Hand out/discussion on 2/3
15.
Standard Reports/Briefings
Frequency
Dept.
Facility Tours
As needed
PW
SCATBD
Monthly
CM Hougardy/Laurel
Committee Work Plan
2-4X
Council, Staff
Waste Management Update
Annual
PW
NPDES
Annual
PW
Public Safety Plan — Fleet & Facilities Building
16.
1 Monthly overview
1-4
B
17.
SCL Temporary Construction Permit
1 1
A
Complete
18.
Consultant Agreement — Geotechnical Engineering Soil Exploration
1 1
A
Complete
City of Tukwila Updated February 20, 2020