Loading...
HomeMy WebLinkAboutTIC 2020-04-06 Item 2D - Grant Application - Nelsen Side ChannelCity of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director BY: Mike Perfetti, Habitat Project Manager CC: Mayor Ekberg DATE: April 3, 2020 SUBJECT: Nelsen Side Channel Project No. 91641203 Grant Applications Allan Ekberg, Mayor ISSUE Authorize the submittal of a grant application to the Washington State Department of Ecology's (DOE) Floodplains by Design (FbD) grant program and other future grant opportunities to fund the Nelsen Side Channel project. BACKGROUND The Nelsen Side Channel is a remnant section of the Green River as it existed prior to the construction of 1-405 in the 1960s. The remnant channel is separated from the mainstem of the river by a constructed levee but offers potential for an off -channel rearing habitat for threatened Puget Sound Chinook salmon and Steelhead. Rearing habitat in the lower Green River and Duwamish River is limited, forcing fry migrants into Puget Sound much too early. Recent research by the Washington Department of Fish and Wildlife (WDFW) shows that less than 1 % of fry forced out into Puget Sound return as adults, the lowest of inventoried Puget Sound rivers. The Nelsen Side Channel project will set the levee back to create a ±1.2-acre side channel, restore an acre of riparian forest, provide additional flood storage, and provide public access to the shore. DISCUSSION DOE is currently seeking applications for its 2021-2023 FbD Program. Staff submitted a pre - application to obtain design funding and was invited to submit a grant application. City policy requires approval by the appropriate Committee before applying for grants. FISCAL IMPACT There is no specified limit for requesting funding, and the City meets the Disadvantaged Community Criteria, thus waiving match requirements. RECOMMENDATION Committee approval to submit for the FbD Program grant and other grant opportunities that may become available for the Nelsen Side Channel project. Attachments: Page 98, 2019 CIP https //tukwilawa sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/TIC 04-06-2020/d. Nelsen Side Channel/Info Memo Nelsen Side Channel grant app_20200403 docx 29 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Nelsen Salmon Habitat Side Channel Project No. 91641203 Create an off -channel salmon rearing habitat side channel by connecting a segment of historic river DESCRIPTION: channel with the Green River. JUSTIFICATION: WRIA 9 has identified this project a proposed action in the Salmon Habitat Plan. The project area is primarily within State lands. The project will involve adjacent properties, and the need STATUS: for flood protection will need to be analyzed. The Project scope and project area, including any potential property acquisition, needs to be defined and a feasibility study performed. MAINT. IMPACT: Expected to increase maintenance Property acquisition to the north could create the opportunity for a side channel and additional flood storage. COMMENT: Grant funding proposed from King County Flood Control District and State. FINANCIAL Through Estimated (in $000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL EXPENSES Design 50 200 250 Land (R/W) 0 Monitoring 15 15 15 45 Const. Mgmt. 100 100 200 Construction 500 500 1,000 TOTAL EXPENSES 1 01 01 50 1 200 1 600 1 600 1 151 151 151 1,495 FUND SOURCES Awarded Grant 0 Proposed Grant 150 500 500 1,150 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 50 50 100 100 15 15 15 345 TOTAL SOURCES 1 01 01 50 1 200 1 600 1 600 1 151 15 151 1,495 ;D Project Location 8, 9 2019 - 2024 Capital Improvement Program W 30