HomeMy WebLinkAboutCOW 2020-04-13 Item 3A - Public Safety Plan - Fire Station 52 Contract Amendment with Weinstein A+U for $191,697.71COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared b
Mayor's review
Council review
04/13/20
RB
04/20/20
ITEM INFORMATION
ITEM NO.
3.A.
STAFF SPONSOR: RACHEL BIANCHI
ORIGINAL AGENDA DATE: 04/13/20
AGENDA ITEM TITLE Weinstein A+U Contract Amendment
CATEGORY ® Discussion
Mtg Date 4113120
® Motion
Mtg Date 4120120
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑Council ®Mayor ❑HR ❑DCD ❑Finance ❑Fire ❑TS ❑P&R ❑Police ❑PTV ❑Court
SPONSOR'S Council is being asked to amend the Weinstein A+U contract to cover additional services
SUMMARY associated with Fire Stations 52 construction. These costs are within the project budget
and staff is not asking for additional budget authority.
REVIEWED BY ❑ C.O.W. Mtg. ❑ CDN Comm ❑ Finance Comm. ❑ Public Safety Comm.
❑ Trans &Infrastructure ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE CHAIR:
RECOMMENDATIONS:
SPONSOR/ADMIN. Administrative Services
COMMITTEE
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
04/13/20
MTG. DATE
ATTACHMENTS
04/13/20
Informational Memorandum dated March 24, 2020
Contract amendment
Public Safety Plan Budget
04/20/20
2
City of Tukwila Allan Ekberg, Mayor
Administrative Services Department- Rachel Bianchi, Deputy CityAdministrator
INFORMATIONAL MEMORANDUM
TO: Tukwila City Council/Committee of the Whole
FROM: Rachel Bianchi, Deputy City Administrator
BY: Justine Kim, Senior Project Manager, Shiels Obletz Johnsen, Inc.
CC: Mayor Allan Ekberg
DATE: March 24, 2020
SUBJECT: Public Safety Plan — Fire Station 52
Project No. 90830405 (FS52), Contract 17-068 (g)
Weinstein Architectural Design & Planning Amendment No. 7
ISSUE
Execute contract amendment no. 7 to cover FS 52 additional geotechnical Construction Administration (CA),
extended civil CA and architectural CA and administrative fees. Hart Crowser, geotech consultant, was previously
contracted for construction observation services only within the building footprint. Due to site complexities,
observation for the installation of all site work is required. The original Owner -Architect contract fees were based
on generic site data and a 15- month construction schedule and now have been reconciled with the existing
conditions of the site and the project. Due to the complexity of the selected building site and the phasing of site
construction work, the current construction schedule reflects a duration of 18 months. The complexity of both the
site and regulatory environment of this project have also resulted in significant, unanticipated work for our Civil
Engineer. These costs are well within the project budget and staff is not asking for additional budget authority.
BACKGROUND
In April 2017, the Council approved an initial contract for design services with Weinstein AU for $2,089,717.00.
This is well within the combined design budget for the three stations of $3,275,000.00. September 2018,
Amendment No 1. for $395,537.00 was due to modified budgets and eliminated FS 54 from Weinstein AU
contract. December 2018, Amendment No 2 for $383,462.00, for design of the driveway. In April 2019,
Amendment No 3 for $20,950, for acoustical analysis and final driveway design. In May 2019, Amendment No. 4
to provide stormwater detention vault design, shoring and retaining wall design and an inadvertent discovery
plan for $20,840. Amendment No. 5 covered additional soils testing scope in the amount of $29,183.
Amendment No. 6 covered FS 52 Driveway Design, CIP retaining wall design and vault shift, and FS 51 Wetland
Mitigation Coordination in the amount of $67,059, bringing the new contract amount to $3,006,748.
FISCAL IMPACT
Amendment No. 7 is in the amount of $191,697.71 to Fire Station 52. The total contract amount will now be
$3,198,445.71. The amount is well within the project budgets. The following table shows the original
contract amount, all previous amendments, the new contract amount, the owner's contingency and the total.
The Project Management Quality Assurance (PMQA) consultant has reviewed these documents and
provided his concurrence.
Original Contract Amount —
$2,089,717.00
Amendment No. 1
$395,537.00
Amendment No. 2
$383,462.00
Amendment No. 3
$20,950.00
Amendment No. 4
$20,840.00
Amendment No. 5
$29,183.00
Amendment No. 6
$67,059.00
Amendment No. 7
$191,697.71
New Contract Amount
$3,198,445.71
Contingency from Amendment No 3 & Amendment No 4 ($6,285+$2,084)
$8,369.00
Total
$3,206,814.71
W12020 Info MemosMeinstein Amd Nocx
3
RECOMMENDATION
Approve the additional services, Weinstein AU's Amendment No. 7 to Contract No. 17-068, in the amount of
$191,697.71.
ATTACHMENTS
Weinstein AU contract amendment, scope of work and fee
Phone: 206-433-I800 • Email: Mayor@TukwilaWA.gov + Website: TukwilaWA.gov
4
City of Tukwila Agreement Number: 17-068(g)
6200 Southcenter Boulevard, Tukwila WA 98188
CONTRACT FOR SERVICES
Amendment No. 7
Between the City of Tukwila and Weinstein AU, LLC.
That portion of Contract No. 17-068 between the City of Tukwila and Weinstein AU, LLC. is
hereby amended as follows:
Section 1 Project Designation: The Consultant is retained by the City to perform
Architectural Design and Planning services in connection with the project titled Tukwila Public
Safety Plan, Fire Station 51 site.
Section 2 Scope of Services: The Consultant agrees to perform the services, identified on
Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and
supplies.
Section 4 Payment: The Consultant shall be paid by the City for completed work and for
services rendered under this Agreement as follows:
Payment for the work provided by the Consultant shall be made as provided on Exhibit "A"
attached hereto, provided that the total amount of payment to the Consultant shall not exceed
$3,198,445.71 (including estimated expenses) without express written modification of the
Agreement signed by the City. The total amount for this amendment is $191,697.71.
All other provisions of the contract shall remain in full force and effect.
Dated this day of 12020
CITY OF TUKWILA WEINSTEIN AU, LLC
Allan Ekberg, Mayor
ATTEST/AUTHENTICATED
Christy O'Flaherty, MMC, City Clerk
By:
Printed Name:
Title:
APPROVED AS TO FORM
Office of the City Attorney
CA Revised December 2016
Page 1 of 1
5
9
EXHIBIT A
WEINSTEINA+U
ARCHITECTS+URBAN DESIGNERS
March 16, 2020
Tukwila Fire Stations - Contract Amendment #7 Summary
AS32: FS52 Additional Geotechnical CA Scope $124,964.40
AS33: FS52 Extended CA Civil and Architectural Fees $68,937.00
AS34: FS52 Signalization Design - pending scope add, not included
AS35: FS52 Administrative Alternate CA Fee $10,996.31
Credit: Reduced Fire Station Specialist Fee ($12,000.00)
WAU 10%Mark-up ($1,200.00)
TOTAL
$191,697.71
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU.com T 206 443 8606 F 206 443 1218
7
EXHIBIT A
WEINSTEINA+U
ARCHITECTS+URBAN DESIGNERS
March 16, 2020
Justine Kim
Shiels I Obletz I Johnsen
101 Yesler Way, Suite 606
Seattle, WA 98104
RE: Tukwila Fire Stations —FS52 Geotechnical Construction Scope Revision
Dear Justine:
Additional Services Request 32 requests additional fee to cover additional testing scope for the Geotechnical Engineer for the
Fire Station 52 construction phase. Hart Crowser had previously been contracted to do construction observation for elements
solely within the building footprint, but has now been requested to perform that observation for the installation of all site
work. Their original fees, based on a generic site and project schedule, have also now been reconciled with the realities of the
project. Please refer to their attached proposal for more detail.
Fee requested for the above services is as follows:
Task Description
Hart Crowser
Geotechnical Engineer
Additional Service 32
Proposed Fee
$113,604.00
10% Markups
$11,360.40
AS 32 Total
$124,964.40
We understand from previous discussions with the team that the costs incurred for this Additional Service will be included in
the upcoming Contract Amendment 7.
Sincerely,
C�? -
Emma Nowinski, AIA
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU.com T 206 443 8606 F 206 443 1218
EXHIBIT A
A
�r
MUCR0 WSM ?
CONTRACT CHANGE
CHANGE NO.: 3 — Revised
CLIENT: Emma Nowinski — Weinstein A+U
JOB NO. 19297-01
www.hartcrowser.com
DATE: January 20, 2020
PROJECT: Tukwila Fire Station 52 — Design and Construction, Tukwila, Washington
Description of Work
Construction Budget Update
Our authorized scope for Fire Station 52 includes geotechnical construction observation for the elements within
the building footprint (foundations, slabs -on -grade, and underslab utilities).
We understand the City is requesting that we also observe the backfill and compaction for the surrounding site
work, including mass grading, utilities, and flatwork subgrade preparation. Our original budget for construction
($26,480) was just a placeholder and not based on any construction schedule. Since preparing that placeholder
amount, we have received several schedules from the general contractor, with the most recent one dated January
5, 2020. Based on the durations in that schedule, we have prepared an estimate of the associated construction
observation effort. The total cost for the geotechnical construction observation effort is approximately $165,084.
We have approximately $25,000 remaining from the Fire Station 51 budget. We will adjust the budget for that
project and credit the Fire Station 52 budget.
We have received verbal authorization to perform this work and direction to bill against our current authorization.
Based on the contractor's schedule, our current authorization is not sufficient to perform both the authorized
scope and the requested additional scope. This Contract Change 3 increases our authorization to provide these
construction services.
Previous Construction Authorization $26,480
Credit from Fire Station 51 $25,000
Change Order #3 $113,604
Total Construction Authorization $165,084
3131 Elliott Avenue, Suite 600
Seattle, Washington 98121
206.324.9530
9
EXHIBIT A
A
ALr
Weinstein A+U
January 20, 2020
19297-01
Page 2
This change amends the contract between Weinstein A+U and Hart Crowser dated April 19, 2017. Except
as amended above, all terms and conditions apply to this Contract Change. To indicate your
authorization, please return one signed copy or prepare a similar document for our signature.
ACCEPTED FOR Weinstein A+U
By:
Printed Name:
Date:
HART CROMER, INC.
By: L/ Date
Printed Name: Douglas D. Lindquist, Principal
January 20, 2020
\\seafs\Projects\Noteboo ks\1929701_TukwiIa_Fire_Station_52\Deliverables\Proposal\CO_03 Rev\Tukwila Fire Station 52 - Change Order CO3 -
Revised 1-20.docx
10
EXHIBIT A
WEINSTEINA+U
ARCHITECTS+URBAN DESIGNERS
February 7, 2020
Justine Kim
Shiels I Obletz I Johnsen
101 Yesler Way, Suite 606
Seattle, WA 98104
RE: Tukwila Fire Station 52 —Additional Service 33: Extended CA Schedule
Dear Justine:
The original Owner -Architect contract for this project was predicated on a 15-month construction duration. Due to the
complexity of the selected building site and the phasing of site construction work, the current construction schedule shows a
duration of 18 months, with Lydig mobilizing in July of 2019 and Final Inspection anticipated in December of 2020. The fees
below reflect an extension of our average CA fees for the additional three months.
The complexity of both the site and regulatory environment of this project have also resulted in significant, unanticipated
work for our Civil Engineer - please refer to their attached proposal for more detail. Additional Services Request 33 requests
additional fee to cover the extra CA phase work for both the Architect and Civil Engineer.
Fee requested for the above services is as follows:
Task Description
WAU
Architect
LPD Engineering
Civil Engineer
Total
Additional Service 33
Proposed Fee
$57,299.00
$10,580.00
$67,879.00
10%Markups
$0.00
$1,058.00
$1,058.00
AS 33 Total
$57,299.00
$11,638.00
$68,937.00
We anticipate that the costs incurred for this Additional Service will be included in a Contract Amendment 7.
Sincerely,
CP -
Emma Nowinski, AIA
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU.com T 206 443 8606 F 206 443 1218
11
EXHIBIT A
engineering 1p
Proposal for Additional Civil Engineering Services
Additional Services Agreement (ASA) #6
Date: November 27, 2019
To: Weinstein A+U
2200 Western Avenue, Suite 301
Seattle, WA 98121
Attn: Emma Nowinski, AIA, Project Manager
From: Marc Servizi, PE, Project Manager I Laurie J. Pfarr, PE, Principal
Project: Tukwila Fire Station 52
Additional Construction Administration
1932 First Avenue, Suite 201
Seattle, Washington 98101
P. 206.725.121 1
F. 206.973.5344
Ipdengineering.com
Thank you for the opportunity to provide this additional services proposal, which is an amendment to our Original
Contract dated April 19, 2017 and revised Proposal for Civil Engineering Services dated June 26, 2018. This
proposal is to confirm our understanding of the additional scope of services and compensation for this project. We
look forward to continued work with you on this project.
Description of Additional Services
This proposal is for additional civil engineering services associated with Construction Administration for Fire
Station #52. LPD Engineering's assumed scope of services as described in our June 26, 2018 proposal includes a
pre -construction meeting, review project submittals, up to (8) site meetings and up to (8) RFI's.
Through November 27, 2019, LPD Engineering has supported construction with a number of services that are out
of our previously described scope, including responding to 52 RFI's, designing the PSE/ gas and electric route,
preparing easement exhibits, and making 6 site visits to date.
Construction commenced in Aug 2019. Construction is anticipated to complete at the end of December, 2020 (16
month construction period). As of November 27, 2019 (4 months, 25% of the construction schedule), LPD
Engineering has provided $22,690 related to the Construction Administration Task Items (Basic and CA
services). Our current budget is $22,788.
We have estimated that the contractor has completed approximately 68% of the civil related site work, and has 12
months remaining on the work schedule.
This project has required significantly more services on our part than we normally experience, including, but not
limited to the complexity of the project, sub -contractor methods, contractor methods, requirements to provide
RFI's for all communication, and Inspector requirements.
12
engingopceerin
Additional Scope of Services
EXHIBIT A
November 27, 2019
Proposal for Additional Civil Engineering Services - ASA #6
Fire Station 52 - Additional Construction Administration
Page 2
Based on the aforementioned schedule and work completed, we are estimating three months will include
significant civil work, and the remaining 10 months will include primarily Building work. Estimate to complete:
Tukwila FS #52
Construction Administration Support
Rate
Est Hours
/ month
Months
Marc Servizi, PE
Project Mgr IV
$180.00
121
3
$6,480
Jack Reinhardt
Design Engineer II
1 $85.001
201
3
$5,100
Estimated Sub -Total during Months of Civil Work
$11,580
Marc Servizi, PE
Project Mgr IV
$180.00
2
10
$3,600
Jack Reinhardt
Design Engineer II
$85.00
4
10
$3,400
Est Sub -Total during Months of Primarily Building Work
$7,000
Total
$18,580
LPD Engineering will provide the scope of work outlined below:
1. Provide responses to RFI's as provided by the Contractor. As of November 27, we have provided
responses to 52 RFI's. Continue to provide responses, as needed.
2. Provide coordination with City Inspector and Engineer, and other agencies as needed.
3. Provide coordination with Project team, including Contractor, Architect, SOJ, Lydig.
4. Provide updates to easement exhibits, gas and power routes.
5. Provide updates to plans, as requested.
6. We estimate 6 more site visits.
Proposed Fee for Additional Services
Our fee for services is based upon the information that we have at this time. We propose to provide civil
engineering consulting and drafting services on a lump sum basis. This estimate is meant to be a budget only and
is not a guaranteed maximum.
*The fees provided above will remain valid for six months from the date of this proposal.
Assumptions
■ Unless otherwise noted, the same assumptions and exclusions from our Original Contract dated April 19,
2017 and revised Proposal for Civil Engineering Services dated June 26, 2018, apply.
13
engingopceerin
EXHIBIT A
November 27, 2019
Proposal for Additional Civil Engineering Services - ASA #6
Fire Station 52 - Additional Construction Administration
Page 3
■ All notifications to the Architect of additional services by LPD will be forwarded to the Owner in a timely
manner.
Please notify us if you have any concerns or disagree with any of the scope, terms, or conditions. We request that
you sign and return a copy of this document to confirm that you have read and agree with the content of this
additional services proposal. This proposal constitutes the entire agreement for ASA #6 between the client and
LPD Engineering and supersedes any prior understanding or representation of any kind preceding the date of this
proposal. This proposal will serve as an amendment to our original contract dated April 19, 2017 and revised
Proposal for Civil Engineering Services dated June 26, 2018. We look forward to continuing our work with you
on this project.
Sincerely,
LPD Engineering PLLC
aurie J. farr, P.E.
Principal I Owner
Mar ervizi, PE
Sr. Project Manager I Sr. Civil Engineer
cc: File
For Weinstein A+U
Printed Name
Date
14
EXHIBIT A
WEINSTEINA+U
ARCHITECTS+URBAN DESIGNERS
March 16, 2020
Justine Kim
Shiels I Obletz I Johnsen
101 Yesler Way, Suite 606
Seattle, WA 98104
RE: Tukwila Fire Station 52 —Additional Service 35: Administrative Alternate CA Fee
Dear Justine:
When the design fees for this project were reconciled against the final construction cost estimate in 2018 (WAU Contract
Amendment #2), the team decided to reduce the MACC that the fee was based on in anticipation that Weinstein A+U would
not have to perform CA on the Administrative wing of the building. The bid alternate that included that work was ultimately
accepted by the Owner and Weinstein A+U is currently performing Construction Contract Administration for the entirety of
the project. This Additional Service Request reinstates that fee based on same construction cost estimate on which the
remainder of the fee was predicated, and at the same rate, as dictated by the Washington State Fee Schedule.
Please refer to the attached breakdown of the original fee revision, which has been marked up to show the corresponding
fee calculations for the deleted Administrative CA work. The total addition to our contract for this work should be $10,996.31.
We anticipate that the costs incurred for this Additional Service will be included in a Contract Amendment 7.
Sincerely,
CP -
Emma Nowinski, AIA
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU.com T 206 443 8606 F 206 443 1218
15
EXHIBIT A
TUKWILA FIRE STATIONS
Weinstein A+U
FS52 Additional Services Summary, Amendment #2
11/26/18
FS52 MACC Calculation (per Lydig conceptual estimate of 8/23/18)
Total cost of work
$8,996,885
Admin Build -out
$450,000
-27010 for CA phase
- $121, 500
$121, 500.00
TOTAL
$9, 325, 385
Sub bonds
1.50%
$139,881
$1,822.50
SUBTOTAL
$9,465,266
$123,322.50
Design Contingency
10.00%
$946,527
$12,332.25
SUBTOTAL
$10,411,792
$135,654.75
L&M Escalation - January 2020
$460,310
L&M Escalation - Early Start July 2019
$154,971
SUBTOTAL
$11,027,073
CM Contingency
3.00%
$330,812
$4,069.64
Neg. Support Services
$300,000
MACC TOTAL
$11,657,886
$139,724.39
" Fee Rate = 7.87%
Admin CA Fee = $10,996.31
Basic Fee Change
Fee Increase per MACC
$213,762
Reduced CA Fee
-$10,000
$203,762
AS17 FS52 Drive -Through Added Drilling
Hart Crowser
$9,200
WAU Mark-up
$920
TOTAL
$10,120
AS18b FS52 Additional Civil Scope
LPD
$15,000
WAU Mark-up
$1,500
TOTAL
$16,500
TOTAL $230,382
16
EXHIBIT A
WEINSTEINA+U
ARCHITECTS+URBAN DESIGNERS
March 16, 2020
Brian Harris
TCA Architecture
6211 Roosevelt Way NE
Seattle, WA 98115
RE: Tukwila Fire Stations — Contract Revision
Dear Brian:
We are writing to confirm the revision to your contract that we discussed over the phone and via email on March 2"d and V.
We agreed to a $12,000.00 reduction in your total contract amount and we anticipate that amount being credited back to the
project in the following way:
Task Description
TFS51
GC/CM Coordination
TFS51
Design / CCA
TFS52
GC/CM Coordination
TFS52
Design / CCA
Total
Current Fee Remaining
$1,500.00
$2,781.50
$1,650.00
$14,537.50
$20,469.00
Reduction
$1,500.00
$0
$1,650.00
$8,850.00
$12,000.00
Final Fee Remaining
$0
$2,781.50
$0
$5,687.50
$8,469.00
Credit to the Project $1,500.00 $0 $1,650.00 $8,850.00 $12,000.00
Thank you again for your continued contributions to these stations — we look forward to seeing you on site at the next
reasonable opportunity!
Sincerely,
Emma Nowinski, AIA
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU.com T 206 443 8606 F 206 443 1218
17
in
O V vOi M O
V
M
R
- s --- » ---
s5
' r V N '
o ri r a
O 7 N
7
N
� V1 N V1
W
Vi
N ^
R
M W N^ M^
N
f5
69
O O N h N vi O �O O
R
69 69 fA fA fA 69 69 69 69
Y3
m O oo r r ^ O r O
V
O
r n 'n
r
VO
'Mn
^ V N N N N
�D
f9 69 fA 69 69 £A 69 69 69
fi9
N O r M r M O
_ ^ O lO lO oo r' cO
n
M
00 O o0 N v1 r M O
r O ^ O
b
M
69 fA 69 69 69 69 69 fA fA
Y3
q�
� o y
q o v o U
O
gOU °=
0 A
y � A n a
a
p F
P. U U W U U U
F» vs » F» sa zz vj
es
iD V1 N 'n GT
W
N
69 69 69 69 69 69 69
Ni
�o a�orr
r
V r 'Nn M
^ O N N
r
69 69 69 69 V3 69 69
W
o0
W
fi9
r
OOi O M r .N.
t� N cn l� M
Vi
Ni
69 fA 69 69 69 69 69
Y3
O M M O N
O o0 O ^
M
�O
O� O Oro OOi M
69 69 £A 69 69 69 V3
69
O O O O O O
O
69 69 69 69 fA fA 69
Y
o
U 01
Q U O U
F
d ti d y T
i i
e
`
Q a P. U U 0.. U
OOi o0 ll
'+
N
c»vs vs sn z�z��
v
can _r OOi N O
M
O O r N o0
T
fA fA 69 69 69 69 69
N
fA
69 69 69 V3 V3 69 69
69
01 l� O\ M CD M
i0 M O �D vl
^
M
N
69 69 fA fA 69
%9
00
^
fA fA 69 69 69 69 69
M
N
fA
O 7 �O O D1N
O
vi Q\ O vi N O
O
7
Vi
ca9 £A EA 69 69 69 69
69
O O O O O O O
O O O O O O O
O
O
69 fA 69 69 fA fA fA
fA
7 y
I - 'a
m °o — a
U 01 a
Q U POUF"
P.
9. U U U
V
�o
N
r
vv vs sn s�z��F»
n
'
N
00 ri O
M ^ N
69 69 69 69 fA 69 69
7
r
fA
z9 V3 V3 V3 V3 V3 59
69
O r r 0 0 lO
lD '
O
O
V cn V �D N iD
O.
69 fA fA 69 69
Y9
iD
O� r n O O O
O
69 69 69 69 69 (A fA
fA
cO
v1 N OD M 00 Ct
N V N
^ N
V3 EA fA 69 69 69 EA
69
O m 0 0 0 0 n
0
O NO 0 0 0 0 7
0
fA 69 fA fA fA fA 69
fA
b 'o
m °o � a
O
a m Q
�l
❑
�
y
U V C. U
M
M
Q�
M
69 69 69 69 69 69 69
f/9
D 7 N M ONO
Q
�D r
00
N M ^
T
N
N
N
V3 V3 V3 V3 V3 59 Vf
69
ONO M N O V
W
m M o0 0o
M N
r
O
vi
N
�D
N
69 fA fA 69 69
d9
M
N
69 69 69 69 69 fA fA
O
M
b9
O T O O r a iD
V3 fA 69 69 69 fA 69
b9
l� O O O ct 00 'r
�D O vl N iD l
O
O
N �
M
69 69 fA fA 69 69 69
fA
i J
O
❑ Uo
W
Q'
2 VO4' ❑
U U 0.. U