HomeMy WebLinkAboutTIC 2020-05-04 COMPLETE AGENDA PACKETCity of Tukwila Transportation and Infrastructure Committee ❖ Cynthia Delostrinos Johnson, Chair ❖ Verna Seal ❖ Kate Kruller AGENDA Distribution: City Attorney C. Delostrinos A. Youn Johnson Clerk File Copy V. Seal 2 Extra K. Kruller K. Hougardy Place pkt pdf on SharePoint: D. Quinn Z Trans & Infra Agendas L. Humphrey H. Hash e-mail cover to: F. Ayala, H. Ponnekanti A. Le, C. O'Flaherty, A. H. Kirkland Youn, B. Saxton, S. Norris, G. Labanara L. Humphrey B. Still MONDAY, MAY 04, 2020 - 5:30 PM Virtual Meeting - Members of the public may listen by dialing 1-253-292-9750 and entering conference ID 705 230 389 # (6300 BUILDING, SUITE 100) Item Recommended Action Page 1. PRESENTATIONS 2. BUSINESS AGENDA a) BAR over Airport Way Bridge Seismic Retrofit a) Same night, forward to 5/4/20 Pg. 1 Bid Award to Razz Construction (Adam Cox) Regular Consent Agenda, per Council President's approval b) Surface Water Fund - S 1315t Place Drainage b) Committee approval Pg. 5 Grant Applications (Ryan Larson) 3. MISCELLANEOUS Future Agendas: Concurrency Next Scheduled Meeting: Monday, May 18, 2020 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. TO: FROM BY: CC: DATE: Ctyi of Tukwila Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM Transportation and Infrastructure Committee Henry Hash, Public Works Director Adam Cox, Transportation Project Manager Mayor Ekberg May 1, 2020 SUBJECT: Boeing Access Road over Airport Way Bridge Seismic Retrofit Protect Project No. 91310407 Bid Award ISSUE Award the construction bid to Razz Construction, Inc. (Razz) for the Boeing Access Road over Airport Way Bridge Rehabilitation Project. BACKGROUND A call for bids was advertised on March 3 and 10, 2020 and three addenda were issued addressing clarifications in the bid documents. Five bids were opened on April 7, 2020, and the apparent low bid was from Razz Construction. DISCUSSION The submitted construction bids were reviewed and tabulated and no irregularities were observed. There were no errors in the bid submitted by Razz. WSDOT concurrence is required to award the bid for a federally funded project, including a review of Disadvantaged Business Enterprise (DBE) requirements. WSDOT has concurred that the DBE requirements has been fulfilled. Razz completed the seismic upgrades in Tukwila on the Frank Zepp Bridge (S 180th Street Bridge) in 2017 and has experience with projects of similar size and scope. Razz does not have any exceptions and has not been debarred from working on federally funded projects. FISCAL IMPACT Bid Eng. Estimate Budget Razz Construction $ 1,442,505.00 $ 1,610,538.00 $ 2,094,000.00 Contingency (25%) 360,626.00 Total $ 1,803,131.00 $ 1,610,538.00 $2 094 0 00.00 RECOMMENDATION Council is being asked to award the construction bid to Razz Construction, Inc. in the amount of $1,442,505.00 for the Boeing Access Road over Airport Way Bridge Seismic Retrofit Project and to consider this item that same night on the Consent Agenda at the May 4, 2020 Regular Meeting. Attachments: Page 13, 2019 CIP Bid Tabulation https://tukwilawa.sharepointcomisiteslpublicworks/engineedng/PW Drop Box/01 TIC Agenda/Agenda ItemsRlC 05-04-2020/BAR over Airport Way Bid Award/Info Memo Bid Award BAR over Airport Way_2020 05 04.docx 1 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Boeing Access Rd over Airport Way Seismic Retrofit Project No. 91310407 Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to allow it to withstand DESCRIPTION: earthquake forces. The Boeing Access Road over Airport Way Bridge is the final bridge on the corridor from 1-5 to the King JUSTIFICATION: County Airport and Boeing facilities that has not been seismically upgraded. This improvement would allow the entire corridor to be seismically resistant during an earthquake. New Project for 2019 - 2024 CIP. Design is scheduled to begin in the second quarter of 2018 with STATUS: construction in 2020. MAINT. IMPACT: Maintenance should remain the same after the seismic items are installed. Design requires a 13.5% match. If construction is not authorized by December 2020, the City would be COMMENT: required to provide a 13.5% match. If construction is authorized prior to that date, there would be no City match. We believe that the project can obtain the construction authorization so no City funding is listed below. FINANCIAL Through Estimated (in $000'sl 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL EXPENSES Design 100 267 367 Land (R/W) 0 Const. Mgmt. 520 520 Construction 2,094 2,094 TOTAL EXPENSES 1 0 100 1 267 2,614 0 0 0 0 0 2,981 FUND SOURCES Awarded BRAC Grant 87 231 2,614 2,932 Proposed Grant 0 Fund Balance -Bond 0 Mitigation 0 City Oper. Revenue 0 13 36 0 0 0 0 0 0 49 TOTAL SOURCES 0 100 267 2,614 0 0 0 0 0 2,981 Project Locat►on _ ' -- -- 5 --- - W E i - r o noa1 C.e i Y � a ti s i se a N a � ■ ` s 7 c hs F ■ m m '6 L N s 3D st � 2019 - 2024 Capital Improvement Program 13 2 S Boeing Access Road over Airport Way Bridge Seismic Retrofit Certified Bid Tab Engineer's Estimate I Razz Construction, Inc. I Kraemer North America, I.I.C. I Combined Construction, Inc. I Stellar Corporation I Massana Construction, Inc. ITEM NO. ITEM UNITS QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 MOBILIZATION LS 1 $ 146,413 $ 146,413 $ 144,000 $ 144,000 $ 150,000 $ 150,000 $ 180,000 $ 180,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 2 STRUCTURE SURVEYING LS 1 $ 18,000 $ 18,000 $ 12,000 $ 12,000 $ 6,500 $ 6,500 $ 20,000 $ 20,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000 3 TYPE B PROGRESS SCHEDULE LS 1 $ 10,000 $ 10,000 $ 3,000 $ 3,000 $ 5,000 $ 5,000 $ 2,500 $ 2,500 $ 5,000 $ 5,000 $ 5,000 $ 5,000 4 UNEXPECTED SITE CHANGES FA 1 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 5 RESOLUTION OF UTILITY CONFLICTS FA 1 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 6 AS -BUILT RECORDING LS 1 $ 10,000 $ 10,000 $ 1,500 $ 1,500 $ 2,500 $ 2,500 $ 4,700 $ 4,700 $ 1,000 $ 1,000 $ 2,500 $ 2,500 7 CONTRACTOR'S DAILY DIARY LS 1 $ 25,000 $ 25,000 $ 2,000 $ 2,000 $ 5,000 $ 5,000 $ 5,100 $ 5,100 $ 1,000 $ 1,000 $ 2,500 $ 2,500 8 REIMBURSEMENT FOR THIRD PARTY DAMAGE EST 1 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 9 SPCC PLAN LS 1 $ 20,000 $ 20,000 $ 2,000 $ 2,000 $ 2,500 $ 2,500 $ 5,000 $ 5,000 $ 2,000 $ 2,000 $ 4,000 $ 4,000 10 PORTABLE ILLUMINATION EA 4 $ 2,500 $ 10,000 $ 5,300 $ 21,200 $ 1,000 $ 4,000 $ 2,000 $ 8,000 $ 1,500 $ 6,000 $ 2,500 $ 10,000 11 CONTRACTOR PROVIDED UNIFORMED POLICE OFFICER HR 120 $ 125 $ 15,000 $ 105 $ 12,600 $ 158 $ 18,960 $ 140 $ 16,800 $ 125 $ 15,000 $ 120 $ 14,400 12 TRAFFIC CONTROL SUPERVISOR LS 1 $ 60,000 $ 60,000 $ 7,400 $ 7,400 $ 12,500 $ 12,500 $ 50,000 $ 50,000 $ 30,000 $ 30,000 $ 80,000 $ 80,000 13 TEMPORARY EROSION & SEDIMENT CONTROL AND WATER POLLUTION PREVENTION (INCLUDING SWPPP IMPLEMENTATION) LS 1 $ 20,000 $ 20,000 $ 21,000 $ 21,000 $ 65,000 $ 65,000 $ 23,400 $ 23,400 $ 25,000 $ 25,000 $ 35,000 $ 35,000 14 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 $ 225,000 $ 225,000 $ 363,500 $ 363,500 $ 330,000 $ 330,000 $ 276,900 $ 276,900 $ 400,000 $ 400,000 $ 479,500 $ 479,500 15 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1 $ 75,000 $ 75,000 $ 25,000 $ 25,000 $ 35,000 $ 35,000 $ 56,000 $ 56,000 $ 50,000 $ 50,000 $ 60,000 $ 60,000 16 STRUCTURE EXCAVATION CLASS A INCL. HAUL CY 200 $ 105 $ 21,000 $ 120 $ 24,000 $ 110 $ 22,000 $100.0 $ 20,000 $ 250 $ 50,000 $60.0 $ 12,000 17 SHORING OR EXTRA EXCAVATION CL. A LS 1 $ 45,000 $ 45,000 $ 13,000 $ 13,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 1,500 $ 1,500 $ 90,000 $ 90,000 18 CRUSHED SURFACING BASE COURSE TON 30 $ 155 $ 4,650 $ 25 $ 750 $ 325 $ 9,750 $ 175 $ 5,250 $ 200 $ 6,000 $ 65 $ 1,950 19 WORK PLATFORM AND CONTAINMENT SYSTEM LS 1 $ 115,000 $ 115,000 $ 12,000 $ 12,000 $ 60,000 $ 60,000 $ 70,000 $ 70,000 $ 30,000 $ 30,000 $ 75,000 $ 75,000 20 CONC. CLASS 4000 FOR BRIDGE CY 28 $ 2,500 $ 70,000 $ 2,000 $ 56,000 $ 3,500 $ 98,000 $ 9,800 $ 274,400 $ 4,000 $ 112,000 $ 4,500 $ 126,000 21 ST. REINF. BAR FOR BRIDGE LB. 3,900 $ 2 $ 7,215 $ 2 $ 7,410 $ 2 $ 7,800 $ 3 $ 9,750 $ 3 $ 11,700 $ 3 $ 11,700 22 EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTR. LF 115 $ 150 $ 17,250 $ 133 $ 15,295 $ 55 $ 6,325 $ 70 $ 8,050 $ 40 $ 4,600 $ 120 $ 13,800 23 BRIDGE APPROACH SLAB SY 342 $ 400 $ 136,800 $ 425 $ 145,350 $ 400 $ 136,800 $ 740 $ 253,080 $ 300 $ 102,600 $ 400 $ 136,800 24 TRANSVERSE STOP BEARING EA 16 $ 135 $ 2,160 $ 300 $ 4,800 $ 425 $ 6,800 $ 325 $ 5,200 $ 500 $ 8,000 $ 200 $ 3,200 25 EPDXY DOWELS EA 580 $ 40 $ 23,200 $ 40 $ 23,200 $ 40 $ 23,200 $ 50 $ 29,000 $ 100 $ 58,000 $ 50 $ 29,000 26 COLUMN JACKETING LS 1 $ 405,000 $ 405,000 $ 393,500 $ 393,500 $ 509,000 $ 509,000 $ 330,000 $ 330,000 $ 780,000 $ 780,000 $ 545,000 $ 545,000 27 DRAIN PIPE 4 IN, DIAM. LF 70 $ 55 $ 3,850 $ 100 $ 7,000 $ 90 $ 6,300 $ 200 $ 14,000 $ 100 $ 7,000 $ 70 $ 4,900 28 FA -SITE CLEANUP OF BIO. AND PHYSICAL HAZARDS FA 1 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,0001 $ 15,000 $ 15,000 $ 15,0001 $ 15,000 1 $ 15,000 $ 15,000 29 ROADSIDE CLEANUP FA 1 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 1 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 30 PROPERTY RESTORATION FA 1 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 1 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 Subtotal: $ 1,610,538 $ 1,442,505 $ 2,672,935 $ 1,817,130 $ 2,043,400 $ 2,079,250 Contingency and Miscelllaneous $ 515,372 Total Construction Cost: $ 2,125,910 Errors in Contractor Bid Proposals: 1 No errors observed i the tabulation Certified by Date April 9, 2020 Adam Cox, P.E., r msportation Project Manager 3 City of Tukwila Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director BY: Ryan Larson, Senior Program Manager CC: Mayor Ekberg DATE: May 1, 2020 SUBJECT: Surface Water Fund - S 131st PI Drainage Improvements Project No. 91641204 Grant Application ISSUE Authorize the submittal of grant applications to the King County Flood Control District (2020 Flood Reduction Grants) and other future grants that become available. BACKGROUND Southgate Creek flows along the western shoulder and under S 131st Place and then onto the Normed site (also near Far West Paint). During large storm events, the Southgate creek overflows its bank and flows over S 131st Place and through the Normed access road, resulting in debris deposition on the roadway and the private access road. This flooding is the result of a combination of excessive sedimentation within the downstream private property portion of the stream and within the roadway cross culvert, as well as a lack of sufficient freeboard to contain the creek during high flows. DISCUSSION Storm drainage improvements to S 131It Place are required to increase the available creek freeboard as well as replacing the existing cross culvert. All stormwater improvements to the existing creek and cross culvert will require a Hydraulic Project Approval (HPA) from the Washington Department of Fish and Wildlife. Grant applications are being sought from various organizations and the King County Flood Control District. Design consultant selection is anticipated to begin in the Summer of 2020 and construction is planned for 2022. FISCAL IMPACT The S 131s' Place Drainage Improvement project has $790,000 available in surface water funding for design and construction. The proposed grant funds will provide additional funding for the project. Matching funds are encouraged, but not required for the 2020 Flood Reduction Grants. RECOMMENDATION Committee approval to seek available grant funding through King County Flood Control District and other grant opportunities that may become available for the South 131It Place Drainage Improvement Project. Attachment: Pg.100, 2019 CIP Mips://tukwilawa.sharepoint.com/sites/publicworks/enginecringfPW Drop Box/01 TIC Agenda/Agenda Items/TIC 05-04-2020/S. 131st Drainage Improvements/Info Memo_S 131st PI Drainage Improvements grant app.docx 5 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: S 131st Place Drainage Improvements Project No. 91641204 DESCRIPTION: Design and replace an existing 36" culvert under S. 131 st Pl. Raise the roadway approximately 18" and/or provide a concrete wall or other means to keep Southgate Creek within its banks during storm events. JUSTIFICATION: Southgate Creek overtops its bank several times per year during storm events and runs through private property. Debris is deposited within a private driveway and storm system. STATUS: Maintenance is performed annually on the creek to remove excess sedimentation to reduce the likelihood of flooding. MAINT. IMPACT: Reduce the frequency of stream sediment removal and storm cleanup. COMMENT: Project will require an HPA. Look at combining with a future overlay project to reduce overall costs. FINANCIAL Through Estimated (in $000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL EXPENSES Design 100 100 Land (R/W) 0 Const. Mgmt. 90 90 Construction 600 600 TOTAL EXPENSES 1 01 01 01 100 1 690 1 01 01 01 01 790 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 100 690 0 0 0 0 790 TOTAL SOURCES 1 01 01 01 100 1 690 1 01 01 01 01 790 :r Ito 11I 2019 - 2024 Capital Improvement Program 100 6