HomeMy WebLinkAboutTIC 2020-06-15 COMPLETE AGENDA PACKETCity of Tukwila
Transportation and
Infrastructure Committee
•;• Cynthia Delostrinos Johnson, Chair
•••• Verna Seal
•;• Kate Kruller
AGENDA
Distribution:
City Attorney
C. Delostrinos
A. Youn
Johnson
Clerk File Copy
V. Seal
2 Extra
K. Kruller
K. Hougardy
Place pkt pdf on SharePoint:
D. Quinn
Z Trans & Infra Agendas
L. Humphrey
H. Hash
e-mail cover to: F. Ayala,
H. Ponnekanti
A. Le, C. O'Flaherty, A.
H. Kirkland
Youn, B. Saxton, S. Norris,
G. Labanara
L. Humphrey
B. Still
MONDAY, JUNE 15, 2020 — 5:30 PM
Virtual Meeting - Members of the public may listen by dialing 1-253-292-9750 and entering conference ID 437 065 682#
(6300 BUILDING, SUITE )
Item
Recommended Action
Page
1. PRESENTATIONS
2. BUSINESS AGENDA
a) Surface Water - 2018 Small Drainage Program
a) Forward to 07/06/2020 Regular
Pg. 1
Project Closeout and Acceptance (Mike Perfetti)
Consent Agenda
b) PW Fleet & Facilities Building Improvements
b) Committee discussion
Pg. 5
Project Update and 60% Design Review
(Hari Ponnekanti)
c) Green River Trail Improvements and
c) Committee approval
Pg. 11
S 152" d St Safe Routes to School
Grant Applications (Cyndy Knighton)
d) Service and Staffing Changes Resulting From
d) Committee discussion
Pg. 15
COVID-19 Financial Impacts (Laurel Humphrey)
3. MISCELLANEOUS
Future Agendas:
• Gilliam Creek Fish Barrier
Removal Project
• 2019 Small Drainage Closeout
Next Scheduled Meeting: Monday, July 06, 2020
SThe City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206-433-0179 for assistance.
TO:
FROM
BY:
CC:
DATE:
City of Tukwila l Aldan Ekberg, Mayor
Public Works Ocporrnreftr Henry Hash,. Director
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Committee
Henry Hash, Public Works Director
Mike Perfetti, Habitat Project Manager
Mayor Ekberg
June 12, 2020
SUBJECT: Surface Water Fund - 2018 Annual Small Drainage Program
Project No. 91841201, Contract No. 18-127
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage.
BACKGROUND
The Small Drainage Program constructs drainage projects throughout the City that are too large for city
staff to complete but are smaller than a typical capital improvement project. The 2018 Annual Small
Drainage Program provided drainage improvements at seven locations:
1) Tukwila Int'I Blvd —Pipe abandonment 5) S 180t" St — Catch basin retrofit
2) Interurban Ave S — Catch basin retrofits 6) S 180t" St Abutment Wall — Levee repair
3) Strander Blvd Bridge — Levee drainage repair 7) Todd Blvd — Catch basin retrofit
4) Gilliam Creek Flap Gate — Outfall maintenance access
DISCUSSION
The Notice to Proceed for Contract Number 18-127 with Ceccanti, Inc. of Tacoma, WA was issued on
September 19, 2018 and construction was physically completed on April 12, 2019. The final affidavits of
Wages Paid were received in April 2020.
FINANCIAL IMPACT
The 2018 construction budget was $600,000, which included a 10% contingency. King County Flood Control
District contributed $65,378 to the project. The original contract amount was $543,836.40, and one change
order was executed for $48,957.66. Retainage is being held by the City in the amount of $26,830.47.
Expenses
Construction Contract Amount (pre-tax) $520,304.00
Change Order No. 1 44,061.89
Unit Price Underruns (27,756.37)
WA State Sales Tax 26,235.42
Total Contract Amount $562,844.94
RECOMMENDATION
Council is being asked to formally accept the 2018 Annual Small Drainage Program with Ceccanti, Inc. in
the amount of $562,844.94 as complete and authorize the release of retainage subject to standard claim
and lien release procedures, and to consider this item on the Consent Agenda at the July 6, 2020 Regular
Council Meeting.
Attachment: DRAFT Notice of Completion, Contract #18-127
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-15-2020/2018 Small Drainage Program Closeout/Info Memo 2018 SDP closeout hk_060520.docx
d Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: June 2, 2020
Contractor's UBI Number: 602 271 532
Name & Mailing Address of Public Agency Department Use Only
City of Tukwila Assigned to.
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number: 602286020
Notice is hereby given relative to the completion of contractor project described below
Project Name
Contract Number
Job Order Contracting
2018 Annual Small Drainage - Project #91841201
118-127
❑ Yes d No
Description of Work Done/Include Jobsite Address(es)
Construct the following drainage improvements: 1) Catch basin retrofits on Interurban Ave S., S 180th St and Todd
Blvd; 2) Pipe abandonment on T.I.B. 3) Gilliam Creek outfall access, 4) S 180th St bridge retaining wall (flood
protection) and 5) Levee 205 pipe lining
Federally funded transportation project? ❑ Yes d No (if yes, provide Contract Bond Statement below)
Contractor's Name
E-mail Address
Affidavit ID*
Ceccanti Inc
ijake@ceccantiinc.com
not filed
Contractor Address
Telephone #
4116 Brookdale Rd. E., Tacoma, WA 98446
253-537-2990
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
❑ Retainage Bond ❑ Contract/Payment bond (valid for federally funded transportation projects)
Name:
I Bond Number:
Date Contract Awarded
Date Work Commenced
Date Work Completed
Date Work Accepted
June 19, 2017
September 19, 2018
April 12, 2019
Were Subcontracters used on this project? If so, please complete Addendum A. Yes ❑ No
Affidavit ID* - No L&I release will be granted until all affidavits are listed.
Contract Amount
Additions ( + )
Reductions (- )
Sub -Total
Sales Tax Rate 10 %
(If various rates apply, please send a breakdown)
Sales Tax Amount
Comments:
$ 520,304.00
$ 48,957.66
$ 32,652.14
$ 536,609.52
26235.42
TOTAL $ 562-844.94
iyujL: Znese two totals must ve
Liquidated Damages $
0.00
Amount Disbursed $
536,014.47
Amount Retained $
26,830.47
TOTAL $ 562,844.94
The contract had two schedules, Schedule A, which was tax exempt per Rule 171, and Schedule B,
which was taxed. The change order was included in Schedule B, and was also taxed.
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name: Mike Perfetti
Email Address: mike.perfetti@tukwilawa.gov
/ Department of Revenue
washingrnn state Department of
Public Works Section
Labor & Industries
I (360) 704-5650
Contract Release
PWC@dor.wa.gov
(855) 545-8163, option # 4
ContractRelease@LN I. WA.GOV
1 �
REV 31 0020e (10/26/15) F215-038-000 10-
Reset This Form i
Title: Habitat Project Manager
Phone Number: 206-433-7192
Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360)902-9450
publicworks@esd.wa.gov
2
Print This Form
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
Apply -A -Line LLC
600553941
846002
Glacer Northwest DBA CalPortland
601301145
839313
Michels Corp
601061071
822941
Old Mack LLC
604216260
not filed
Olson Brothers Pro -Vac LLC
602170975
847706
Ralph's Concrete Pumping
578085430
838377
RamJack West
603499720
not filed
Roadrunner Concrete Cutting LLC
602908125
846781
Sebastian Construction Inc
604274200
875180
Old Mack LLC
604216260
921253
For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (10/26/15) F215-038-000 10-2014 3
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director
BY: Hari Ponnekanti, Deputy PW Director
CC: Mayor Allan Ekberg
DATE: June 12, 2020
SUBJECT: Public Works Fleet & Facilities Building Tenant Improvements
Project No. 91630601
Project Update and 60% Design Review
ISSUE
Provide an update on the PW Fleet and Facilities Tenant Improvements at 60% design, schedule, and cost estimate.
BACKGROUND
On 12/02/19, Council approved the PW Fleet and Facilities tenant improvements project budget in the amount of $9.5
million dollars with funding split 50/50 with the General Fund and Water/Sewer/Surface Water Utilities.
DISCUSSION
SHKS Architect has reached the 60% design milestone. Please see the attached design drawing, project timeline
schedule, and cost estimates. 60% design cost estimates are within the range of the estimated budgets. The following
are some of the highlights of the design progress.
• Geo-technical explorations have been completed and seismic bracing design is advancing forward.
• Plumbing, HVAC, vehicle exhaust connection, lighting, tire storage facility, office and kitchen area design is
advanced in this design period.
Project specifications and bid documents are created.
More detailed cost estimates are prepared as part of the 60% design.
Paint booth removal contract is signed, and permit application is submitted to DCD.
PHASE 1 FINANCIAL IMPACT
Expenditures
2019/2020 Budget
SHKS Design Am No. 2
570,768.00
Misc Consultant Services
105,460.00
Estimate - Soft Costs
2,108, 772.00
Estimate - Construction
6,715,000.00
Funding - General Fund
$ 4,750,000.00
Funding - Utilities
4,750,000.00
Total
$ 9,500,000.00
$ 9,500,000.00
DISCUSSION ONLY
Committee discussion only
Attachments: Cost estimates
Tentative Schedule
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-15-2020/FRF 60%/Info Memo for PW F F Update 051820.docx
5
Public Works Fleet and Facilities Building - Phase 1
Cost Estimates
Expenditures to Estimates at 30% Estimates at 60%
Budget date 12/31/19 Design Design
Land Purchases $ 24,706,348.00
SHKS Master Plan 1,398,437.09
Design
SHKS Design Fee
Geo-Tech Design Fee
Hazard Study Fee
Mayes Testing
Soft Costs
Demolition of Out Buildings
Construction
Phase 1 Building Renovation
Remoal of Paint Booths
Fence and Security Gates
Outside Structural Repair and Paint
Covered Storage - Outside
Civil Site Work
Trench Drains (Alternate)
Emergency Generator (Alternate)
Grand Total
$ 26,105,000.00 $ 26,104,785.09
$ 17,547.68
$ 553,220.32
80,000.00
3,450.00
$ 553,220.32
80,000.00
11,160.00
14,300.00
$ 2,880,000.00 $
636,670.32
$
658,680.32
$
81,077.70
$
81,077.70
$
4,524,329.00
$
5,237,611.00
106, 615.54
168, 000.00
300,000.00
212,560.72
280,000.00
750,000.00
750,000.00
750,000.00
750,000.00
35,885.00
35,885.00
382,852.00
382,852.00
$ 6,715,000.00 $ 404,163.22 $
6,992,143.70
$
7,449,986.42
$ 35,700,000.00 $ 26,122,332.77 $ 7,628,814.02 $ 8,108,666.74
$ 34,031,146.79 $ 34,230,999.51
https://tukwiIawa.share point. cam/sites/puhlicworks/engineering/PWDrop Box/01 TIC Agenda/Agend a Item s/TIC06-15-2020/F&F60%/Cost Estimates04142020 6 Page 1
DCW Cost Management
60% Design Cost Plan April 17, 2020
Tukwila Public Works
Fleets & Facilities Buildina
Fleets and Facilities Renovation
Alternate 1: Emergency generator
43,200 114.08 4,928,268
368,277
7
DCW Cost Management
Tukwila Public Works
Fleets & Facilities Building
A10 Foundations
Substructure
Desigr Superstructure
B20 Exterior Enclosure
B30 Roofing
C10 Interior Construction
C20 Stairways
C30 Interior Finishes
D20 Plumbing Systems
D30 Heating, Ventilation & Air Conditioning
D40 Fire Protection
D50 Electrical Lighting, Power & Communications
E10 Equipment
E20 Furnishings
Equipment
F20 Selective Demolition
60% Design Cost Plan April 17, 2020 8
Gross Area:
40,255 SF
6%
7.88
7%
9.10
1 %
1.67
0%
0.29
3%
1%
4%
7%
15%
2%
14%
9
3%
1%
4%
3.74
0.68
4.42
8.59
17.88
2.53
17.44
3.16
1.21
4.76
317,358
366,210
67,160
11,568
150,569
27,475
178,050
345,678
719,616
101,758
702,132
127,040
48,528
191,580
Z10
Contingency
15.00%
10%
12.50
503,208
BUILDING
ELEMENTAL COST INCLUDING CONTINGENCIES
78%
95.84
3,857,930
Z20
General Requirements
6.50%
5%
6.23
250,765
Z21
General Conditions
9.88%
8%
10.08
405,939
Z22
Office Overhead & Profit
5.00%
5%
5.61
225,732
Z23
Bonds and insurance
1.50%
1 %
1.44
57,869
Z24
Permit by owner
0.00%
0%
0.00
0
BUILDING
CONSTRUCTION COST BEFORE ESCALATION
97%
119.20
4,798,236
Z30
Escalation to Midpoint (Jan 2021)
2.71 %
3%
3.23
130,032
A
10
City of Tukwila Allan Ekberg, Mayor
Public Yorks Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO:
Transportation and Infrastructure Committee
FROM:
Henry Hash, Public Works Director
BY:
Cyndy Knighton, Senior Program Manager
CC:
Mayor Ekberg
DATE:
June 12, 2020
SUBJECT: Green River Trail Improvements & S 152' St Safe Routes to School
Project No. 91810406 and 91710303
Pedestrian and Bicycle Program and Safe Routes to School Grant Applications
ISSUE
Authorize the submittal of grant applications to the two WSDOT Active Transportation Division grant
programs.
BACKGROUND
The Washington State Department of Transportation Active Transportation Division (WSDOT) has issued
a Call for Projects inviting applicants to submit projects for funding through the Pedestrian and Bicycle
Program (PBP) and Safe Routes to School (SRTS). Current City policy requires approval by the
appropriate Committee before applying for grants. Grant applications are due by July 13, 2020 for the
PBP and July 20, 2020 for the SRTS.
DISCUSSION
WSDOT typically issues call for projects for these two fund sources every -other year. There is no match
required for these grants, but preference will be given to projects that provide some match, whether cash
or in -kind. Staff recommends the City submit applications for two projects:
Project Description Source Total Cost Grant Amt. City Match
Construct widening,
$10 0,000
Green River
illumination, wayfinding,
PBP
$1,000,000
$900,000
(10%n-
In-
Trail Project
Ped Bridge to
Kind)
Christensen
Construct curb, gutter,
$200,000
S 152nd Street
sidewalk on both sides,
SRTS
$3,000,000
$2,800,000
(7% In -Kind)
on -street parkin
The Green River Trail project is "shovel -ready" as the design, permitting, and mitigation was completed as
part of the Pedestrian Bridge Project. Construction would begin in early 2021. S 152nd Street design has
been fully funded by a System Access Fund grant through Sound Transit. Design will begin this summer
with construction beginning in 2021 but would more likely be in 2022.
FINANCIAL IMPACT
The estimated total project cost may change as both projects are still being updated. With reductions of
available revenue limited due to COVID-19 impacts, staff recommends the grant applications include an
in -kind match of staff time for the construction management. Existing staff is available with the necessary
skills to provide the majority of the construction management and inspection for both projects with a small
amount of support from outside consultants. If the grants are awarded, there could be a negative
financial impact to either the general fund or the arterial street fund, depending on what staff is assigned
to the project. It needs to be clearly noted that the S 152nd St project is accounted for in the Residential
Street fund and that no staff are budgeted in this fund. If this grant is awarded, labor costs for any staff
assigned to this project would need to be reallocated from their home fund to the residential street fund.
RECOMMENDATION
Committee approval to submit grant applications to the Pedestrian and Bicycle Program for the Greet River
Trail Improvements Project and S 152nd Street Safe Routes to School Project.
Attachments: Page 25, 2019 CIP, Green River Trail Improvements
Page 6, 2019 CIP, S 152nd Street Safe Routes to School
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/pw drop box/01 tic agenda/agenda items/tic 06-15-2020/pbp & srts grant applications/info memo - 2021 srts &
pbp grant application.docx 11
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: Green River Trail Improvements Project No. 91810403
Construct a widened trail section between the west landing of the Southcenter Pedestrian Bridge and the
DESCRIPTION: shared use path on Christensen Road. Includes illumination, CCTV, and provides the fiber connection to
the Pedestrian Bridge for operation of CCTV and communication to the light controllers and ped/bike counter.
JUSTIFICATION: Wider trail section is needed to accommodate the intermingling of trail and bridge users by providing a
wider trail and improved safety features.
STATUS: New project for 2019 - 2024 CIP. Designed and permitted as part of the TUC Pedestrian/Bicycle Bridge.
MAINT. IMPACT: Reduced pavement repairs, increased maintenance for illumination and CCTV upkeep
Project is a subset of the TUC/TOD Pedestrian Improvements Project (90710405) and related to the TUC
COMMENT: Pedestrian/Bicycle Bridge Project (90510403) and Baker Boulevard Non -Motorized (91610409). All
permitting and mitigation was completed as part of the Ped Bridge project. Permitting expires
by 2022, delays past this date would need new permit approvals. PSRC grant application in 2018.
FINANCIAL Through Estimated
(in $000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL
EXPENSES
Design
74
74
Land (R/W)
0
Const. Mgmt.
0
Construction
962
962
TOTAL EXPENSES
0
0
0
0
74
962
0
0
0
1,036
FUND SOURCES
Awarded Grant
0
Proposed Grant
64
832
896
Mitigation Actual
0
Traffic Impact Fees
0
City Oper. Revenue
10
130
0
0
0
140
TOTAL SOURCES
0
0
0
0
74
962
0
0
0
1,036
Project Location
615891 b
�
s �
Q
8 TEQ SI �
YukwN� PkM'
r
S ;
f
1
r
i
1
1
r
Tre
Dr
5 1
�
1
N 1—
uaigrg
r
�+a�sarr
i
w E
a —�
r
TnM.w] Ih
S
slog
r
r
t
ro
�
�
reIL
M1--
2019 - 2024 Capital Improvement Program 25 12
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: S 152nd St Safe Routes to School Project No. 91710303
DESCRIPTION: Install curb, gutter, and sidewalks on both sides of S 152nd St, including widening pavement width by three
feet to construct an on -street parking lane as a buffer between the roadway and sidewalk on the north side.
JUSTIFICATION: Enhance safety for students walking to Foster High School, Showalter Middle School, and Thorndyke
Elementary School and encourage transportation choices for the neighborhood.
STATUS: New project for the 2019 - 2024 CIP.
MAINT. IMPACT: New sidewalk and pavement will need to be maintained.
COMMENT: Safe Routes to School grant submitted in April 2018.
FINANCIAL Through Estimated
(in $000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL
EXPENSES
Design
121
122
243
Land (R/W)
0
Const. Mgmt.
200
183
383
Construction
1,300
900
2,200
TOTAL EXPENSES
1 01
01
121
1 1,622
1 1,083
1 01
01
01
01
2,826
FUND SOURCES
Awarded Grant
0
Proposed Grant
121
1,622
1,083
2,826
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
0
0
0
0
0
0
0
0
TOTAL SOURCES
0
01
121
1,622
1 1,083
1 0
0
01
0
1 2,826
:D Project Location
2019 - 2024 Capital Improvement Program 6 13
14
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Transportation & Infrastructure Committee
FROM: Laurel Humphrey, Council Analyst
DATE: June 12, 2020
SUBJECT: Service and Staffing Changes resulting from COVID-19 Financial Impacts
ISSUE:
Councilmember Delostrinos Johnson has requested a discussion of staffing and service
impacts from COVID-19 related budget cuts.
BACKGROUND
The City has been implementing the staff -related reductions associated with the budget
shortfall associated with the coronavirus pandemic. Three of the bargaining groups in the
Teamsters voted for furloughs, reducing the workweek to 36 hours with an associated 10%
pay reduction, and one of the bargaining groups voted to implement the contract terms
resulting in the layoff of five employees. Non -represented staff are also being furloughed
with a 10% pay reduction and associated hour reduction. The staff leadership team members
are taking a 10% salary reduction with no reduction in hours.
City services will be impacted. The 6300 Building, home to Public Works staff, will be closed to
the public every Friday through the end of the year. Due to staff reductions in the
maintenance and trades unit, and the associated hiring freeze necessary to achieve needed
expenditure savings, there will be a reduction in services in the Streets Division. The
Department will prioritize safety -related projects and tasks, but there will most certainly be
delays in normal departmental duties. Here are some examples of the work done by the
Streets Department:
Vegetation control
Road pavement
Signal work
Snow plow and brine
Homeless camp clean up
Litter and large item roadside
pick up
Potholes
Installing mailboxes through
City program
Roadway striping
Landscape maintenance in
medians
Traffic calming installations
Large event response
supporting PD and Fire
Street sign maintenance
RECOMMENDATION
Committee discussion.