HomeMy WebLinkAboutReg 2020-06-15 Item 3D - Bid Award/Contract - Riverton Flapgate Removal with RL Alia Company for $1,503,267.15COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Alggor's review
Council review
06/15/20
HK
ITEM INFORMATION
ITEM NO.
3.D.
STAFF SPONSOR: MIKE PERFETTI
ORIGINAL AGENDA DATE: 06/15/20_
AGENDA ITEM TITLE Surface Water Fund - Riverton Creek Flap Gate Removal Project
Bid Award for Construction to R.L. Alia Company
CATEGORY ❑ Discussion
Mtg Date
❑ Motion
Mtg Date
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
® Bid Amard
Mtg Date 06/15/20
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑Council ❑Mayor ❑HR ❑DCD ❑Finance ❑Fire ❑TV ❑P&R ❑Police ❑PiV ❑Court
SPONSOR'S The Riverton Creek Flap Gate Removal Project was advertised for bids on April 30 and May
SUMMARY 7, 2020. Six bids were opened May 21, 2020. The bids were checked and tabulated and
after correcting the bids, the low bid of $1,503,267.15 from R.L. Alia Company.
R.L. Alia Company has experience with projects of similar size and scope. Council is being
asked to award the bid to R.L. Alia Company in the amount of $1,503,267.15.
REVIEWED BY ® Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 06/01/20 COMMITTEE CHAIR: DELOSTRINOS JOHNSON
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,503,267.15 $1,653,593.86 $0.00
Fund Source: 412 SURFACE WATER FUND
Comments: Page 93 & 94, 2019 CIP
MTG. DATE
RECORD OF COUNCIL ACTION
06/15/20
MTG. DATE
ATTACHMENTS
06/15/20
Informational Memorandum dated 05/29/20
Page 93 & 94, 2019 CIP
Bid Tabulation
Minutes from Transportation and Infrastructure Committee meeting of 06/01/20
9
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director
BY: Mike Perfetti, Habitat Project Manager
CC: Mayor Ekberg
DATE: May 29, 2020
SUBJECT: Surface Water Fund - Riverton Creek Flap Gate Removal Project
Project No. 99830103
Bid Award for Construction
ISSUE
Award a contract to R.L. Alia Company for construction of the Riverton Creek Flap Gate Removal Project.
BACKGROUND
This project will restore fish access to Riverton Creek and reestablish previously inaccessible rearing habitat at the
confluence with the Duwamish River. Construction includes the removal of two culverts with flap gates and associated fill, wall
demolition, the installation of a new trail bridge, a new soldier pile wall, structural tie -backs along the adjacent road, channel
realignment, boulder, gravel and wood placement, native plant restoration and art work.
DISCUSSION
The Riverton Creek Flap Gate Removal Project was advertised for bids on April 30 and May 7, 2020. Six bids were received
and opened on May 21, 2020. The bids were checked and tabulated. After correcting the bids, the apparent low bidder is R.L.
Alia Company with an overall bid of $1,503,267.15. The engineer's estimate was $1,229,162.00.
FISCAL IMPACT (All amounts include sales tax)
The Riverton Creek Flap Gate Removal Project construction was initially budgeted at $918,000 but increased primarily in
response to cost increases associated with permit and granting agency comments. Project funding includes $295,000 in
Surface Water revenue and $1,021,894 in grants. The low bid exceeds the available project funding. To fund the balance,
staff proposes to transfer budget from the 205 Levee Certification Project, which is not currently needed since the City has
petitioned the King County Flood Control District to fund the rebuilding of the 205 Levee. Note that there will be a second
construction contract for the Riverton Creek project that will be advertised soon, focused on the upstream restoration work.
That work is currently valued at about $125,000 and has $50,000 in additional grant funds committed to it.
Bid Results Estimate Budget
Bid Amount (Schedule A)
$ 1,503,267.15 $1,229,162.00 $ 295,000.00
Contingency (10%)
150,326.71
Funding from 205 Levee Certification
336,699.86
Grants (CWM, Opp, RCO)
1,021,894.00
Total
$ 1,653,593.86 $1,229,162.00 $1,653,593.86
RECOMMENDATION
Council is being asked to award the construction
contract for the Riverton Creek Flap Gate Removal Project to R.L. Alia
Company in the amount of $1,503,267.15 and consider this item on the Consent Agenda at the June 15, 2020 Regular
Meeting.
Attachments: CIP Page 93
CIP Page 94
Bid Tabulation
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-01-2020/c. R C F Removal Project - Bid Award Const/1. Info Memo Bid Award —Riverton Creek.docx
7
S
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT:
Riverton Creek Flap Gate Removal Project No. 99830103
Remove two culverts and flap gates at Duwamish River; install pipe arch, create open channel
DESCRIPTION:
confluence, install trail bridge over new channel, restore/revegetate 200 feet of creek channel and
450 ft. of pond shoreline.
JUSTIFICATION:
Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River.
Improve fish access to Riverton Creek and enhance salmon rearing and resting area.
STATUS:
Design underway in 2018. Construction grant of $846k from WA State RCO.
MAINT. IMPACT:
Expected to increase maintenance.
COMMENT:
Project used as mitigation for East Marginal Way Pipe Replacement Project and HPA
Control #133763-1 requires work to be completed by June 11, 2019, which will need to be extended.
FINANCIAL Through Estimated
(in $000'sl 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL
EXPENSES
Design
204
100
40
344
Land (R/W)
0
Monitoring
15
15
15
15
15
15
90
Const. Mgmt.
184
184
Construction
918
918
TOTAL EXPENSES
204
1 100
1 1,142
1 15
15
15
15
15
15
1,536
FUND SOURCES
Awarded Grant
72
847
919
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
132
100
295
15
15
15
15
15
15
617
TOTAL SOURCES
204
100
1,142
15
15
15
15
15
15
1,536
y Project Locat►on 5 N
r _ ws
St s
•y S 1 8t 9
w
C�
611 t yc
� w s
1 s
N
Ly S1LEIF A s
$ '0128
S 3� St � ■
2019 - 2024 Capital Improvement Program
93
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: Tukwila 205 Levee Certification Project No. 91341203
DESCRIPTION: Obtain levee certification for the Tukwila 205 Levee.
The US Army Corps of Engineers no longer provides levee certification services to federally authorized
JUSTIFICATION: levees. The existing certification expired in August of 2013. Certification is required for the Federal
Emergency Management Agency to accreditate the levee system as providing a 100-year level of
flood protection.
STATUS: Phase I was a overview of entire levee system and Phase II includes identification of levee deficiencies.
MAINT. IMPACT: Certification process is expected to lead to additional levee repair projects that are required to meet the
certification criteria. Certification is valid for a 10-year period.
Costs listed in 2019 through 2022 are estimates for potential repairs that would be grant dependent. King
COMMENT: County Flood Control District's Opportunity Grant Program currently has $63k per year. The Army Corps of
Engineers is currently designing a levee repair project near Mitchell Moving, GACO, and Segale Properties with
construction in 2019. Overall costs for Corps/Flood District project is $55 million, with no City funding.
FINANCIAL Through Estimated
(in $000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL
EXPENSES
Certification Phase 1
350
350
Certification Phase 11
93
220
250
563
Design
275
275
Const. Mgmt.
30
115
600
745
Construction
200
750
4,000
4,950
TOTAL EXPENSES
443
220
525
230
865
4,600
0
0
0
6,883
FUND SOURCES
KC Flood Control
113
63
63
63
63
63
63
63
63
617
Proposed Grants
150
780
4,500
5,430
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
330
157
462
17
22
37
(63)
(63)
(63)
836
TOTAL SOURCES
443
220
525
230
865
1 4,600
0
01
01
6,883
Project Location: .--
Entire System '
s
10 2019 - 2024 Capital Improvement Program 94
Riverton Creek Flapgate Removal Project
Certified Bid Tab
Engineer's Estimate
RL Alia
Olson Brothers Excavating
Rivers Edge Environmental Srvcs
Stellar 1 Corporation
Orion Marine Contractors
Nordvind
ITEM NO.
ITEM
UNITS
QUANTITY
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
1
Mobilization
LS
1
1
103,000.00
28,000.00
103,000.00
82,000.00
18,000.00
82,000.00
94,000.00
16,000.00
94,000.00
136,600.00
136,600.00
160,666.66
10,000.00
160,666.66
10,000.00
200,000.00
200,000.00
30,000.00
18,000.00
30,000.00
2
Contractor Surveying
LS
28,000.00
18,000.00
16,000.00
17,250.00
17,250.00
35,000.00
35,000.00
18,000.00
3
Unexpected Site Changes
EST
15,000
1.00
15,000.00
1.00
15,000.00
1.00
15,000.00
1.00
15,000.00
1.00
15,000.00
1.00
15,000.00
1.00
15,000.00
a
Project Temporary Traffic Control for Roadway
LS
1
15,000.00
15,000.00
15,000.00
15,000.00
30,000.00
30,000.00
15,000.00
15,000.00
15,000.00
15,000.00
75,000.00
75,000.00
15,000.00
15,000.00
5
Project Temporary Traffic Control for Private Pr
LS
1
10,000.00
10,000.00
10,000.00
10,000.00
17,000.00
17,000.00
10,000.00
10,000.00
80,000.00
80,000.00
80,000.00
80,000.00
10,000.00
10,000.00
6
Spill Prevention, Control & Countermeasures (S
LS
1
11000.00
11000.00
500.00
500.00
1,800.00
11800.00
11000.00
1,000.00
2,000.00
2,000.00
10,000.00
10,000.00
500.00
500.00
7
Riverton Creek Bridge
LS
1
173,000.00
173,000.00
140,000.001
140,000.00
173,000.00
173,000.00
156,200.00
156,200.00
160,000.00
160,000.00
216,500.00
216,500.00
75,000.00
75,000.00
8
Cleaning And 5/16" Fillet Weld Of Sheet Piles 1
LF
10
200.00
2,000.00
250.00
2,500.00
600.00
6,000.00
550.00
5,500.00
400.00
4,000.00
200.00
2,000.00
250.00
2,500.00
9
Structural Carbon Steel
LS
1
8,000.00
81000.00
60,000.00
60,000.00
2,500.00
2,500.00
28,270.00
28,270.00
85,000.00
85,000.00
25,000.00
25,000.00
10,000.00
10,000.00
10
Furnishing And Driving Steel Pipe Test Pile
EA
1
12,500.00
12,500.00
71000.00
7,000.00
3,000.00
3,000.00
3,190.00
3,190.00
4,000.00
4,000.00
25,000.00
25,000.00
21000.00
2,000.00
11
Furnishing St. Piling
LF
306
90.00
27,540.00
50.00
15,300.00
50.00
15,300.00
38.50
11,781.00
45.00
13,770.00
60.00
18,360.00
15,300.00
4,681,800.00 1
12
Driving St. Pile
EA
11
1,000.00
11,000.00
2,000.00
22,000.00
2,200.00
24,200.00
1,650.00
18,150.00
2,500.00
27,500.00
51500.00
60,500.00
11000.00
11,000.00
13
Bridge Railing Type Chain Link Fence
LF
108
120.00
12,960.00
100.00
10,800.00
110.00
11,880.00
96.25
10,395.00
100.00
10,800.00
170.00
18,360.00
100.63
10,868.04
14
Cleaning and Painting - Wall 1
LS
1
16,000.00
16,000.00
30,000.00
30,000.00
10,000.00
10,000.00
13,997.50
13,997.50
25,000.00
25,000.00
35,000.00
35,000.00
10,000.00
10,000.00
15
Removing Soldier Pile Shaft Obstructions
EST
8,000
1.00
8,000.00
1.00
8,000.00
1.00
81000.00
1.00
8,000.00
1.00
81000.00
1.00
81000.00
1.00
8,000.00
16
Shaft -24In. Diameter
LF
530
85.00
45,050.00
212.55
112,651.50
240.00
127,200.00
396.00
209,880.00 2
200.00
106,000.00
275.00
145,750.00
216.20
114,586.00
17
Furnishing Soldier Pile - HP 12XB4
LF
710
90.00
63,900.00
123.00
87,330.00
104.00
73,840.00
88.00
62,480.00
100.00
71,000.00
125.00
88,750.00
94.30
66,953.00
18
Concrete Lagging
SF
1,020
50.00
51,000.00
70.00
71,400.00
104.00
106,080.00
107.13
109,272.60 2
75.00
76,500.00
100.00
102,000.00
57.03
58,170.60
19
Permanent Ground Anchor
EA
18
5,500.00
99,000.00
6,500.00
117,000.00
13,000.00
234,000.00
13,090.00
235,620.00
8,000.00
144,000.00
12,500.00
225,000.00
14,605.00
262,890.00
20
Permanent Ground Anchor Performance Test
EA
3
11000.00
3,000.00
1,250.00
3,750.00
2,500.00
7,500.00
3,300.00
9,900.00
1,200.00
3,600.00
3,500.00
10,500.00
1,725.00
5,175.00
21
Permanent Ground Anchor Verification Test
LS
2
1,500.00
31000.00
3,000.00
6,000.00
2,500.00
51000.00
91900.00
19,800.00
2,000.00
4,000.00
7,500.00
15,000.00
2,875.00
5,750.00
22
Clearing and Grubbing
LS
1
9,000.00
91000.00
10,000.00
10,000.00
35,000.00
35,000.00
8,924.00
8,924.00
30,000.00
30,000.00
15,000.00
15,000.00
10,000.00
10,000.00
23
Removal of Structure and Obstruction
LS
1
3,000.00
31000.00
2,500.00
2,500.00
10,000.00
10,000.00
2,700.00
2,700.00
7,000.00
7,000.00
5,000.00
51000.00
10,000.00
10,000.00
24
Removing Existing Retaining Wall
LS
1
21,000.00
21,000.00
10,000.00
10,000.00
21,000.00
21,000.00
7,209.00
7,209.00
20,000.00
20,000.00
5,000.00
51000.00
15,000.00
15,000.00
25
Channel Excavation Incl. Haul
CY
1,570
55.00
86,350.00
125.00
196,250.00
67.00
105,190.00
90.50
142,085.00
80.00
125,600.00
75.00
117,750.00
100.00
157,000.00
26
Select Grading (by Force Account)
EST
4,000
1.00
4,000.00
1.00
4,000.00
1.00
4,000.00
1.00
4,000.00
1.00
4,000.00
1.00
4,000.00
1.00
4,000.00
27
Gravel Borrow Incl. Haul
TN
30
40.00
1,200.00
75.00
2,250.00
70.00
2,100.00
55.74
1,672.20
80.00
2,400.00
110.00
3,300.00
100.00
3,000.00
28
Unsuitable Foundation Excavation Incl. Haul
CY
25
40.00
11000.00
100.00
2,500.00
90.00
2,250.00
90.50
2,262.50
125.00
3,125.00
175.00
4,375.00
150.00
3,750.00
29
Dewatering
LS
1
20,000.00
20,000.00
3,000.00
3,000.00
25,000.00
25,000.00
55,384.00
55,384.00
30,000.00
30,000.00
25,000.00
25,000.00
5,000.00
5,000.00
30
Structure Excavation Class A Incl. Haul
CY
110
110.00
12,100.00
75.00
8,250.00
90.00
91900.00
90.50
9,955.00
100.00
11,000.00
95.00
10,450.00
100.00
11,000.00
31
Shoring or Extra Excavation Class A
LS
1
10,000.00
10,000.00
3,000.00
3,000.00
9,000.00
9,000.00
10,800.00
10,800.00
10,000.00
10,000.00
15,000.00
15,000.00
10,000.00
10,000.00
32
Trimming and Cleanup
LS
1
5,000.00
5,00000
7,500.00
7,500.00
5,000.00
5,000.00
5,000.00
5,000.00
100.00
100.00
7,500.00
7,500.00
5,000.00
5,000.00
33
Crushed Surfacing Base Course
TN
54
46.00
2,484.00
100.00
5,400.00
90.00
4,860.00
56.95
3,075.30 2
90.00
4,860.00
110.00
5,940.00
100.00
5,400.00
34
Commercial HMA
TN
41
240.00
9,840.00
250.00
10,250.00
370.00
15,170.00
190.00
7,790.00
225.00
9,225.00
300.00
12,300.00
350.00
14,350.00
35
Temporary Stream Diversion
LS
1
38,000.00
38,000.00
90,000.001
90,000.00
31,000.00
31,000.00
14,800.00
14,800.00
200,000.00
200,000.00
65,000.00
65,000.00
25,000.00
25,000.00
36
Erosion Control and Water Pollution Prevention
LS
1
27,000.00
27,000.00
7,500.00
7,500.00
25,000.00
25,000.00
10,761.00
10,761.00
15,000.00
15,000.00
25,000.00
25,000.00
15,000.00
15,000.00
37
High Visibility Fence
LF
135
4.80
648.00
4.00
540.00
7.00
945.00
7.25
978.75
8.00
1,080.00
6.00
810.00
10.00
1,350.00
38
Coir Log
LF
360
4.80
1,728.00
6.00
2,160.00
7.00
2,520.00
10.00
3,600.00
15.00
5,400.00
20.00
7,200.00
10.00
3,600.00
39
Erosion Control Blanket
SY
180
14.00
2,520.00
2.50
450.00
10.00
11800.00
5.00
900.00
6.00
11080.00
20.00
3,600.00
10.00
1,800.00
40
PSIPE - Acer circinatum, 95
EA
2
150.00
300.00
60.00
120.00
43.00
86.00
55.00
110.00
50.00
100.00
75.00
150.00
40.00
80.00
41
PSIPE -Argentina egedii, 10" tube
EA
10
4.00
40.00
25.00
250.00
6.00
60.00
22.00
220.00
20.00
200.00
30.00
300.00
8.00
80.00
42
PSIPE - Aruncus dioicus, #1
EA
12
10.00
120.00
25.00
300.00
25.00
300.00
22.00
264.00
20.00
240.00
30.00
360.00
15.00
180.00
43
PSIPE - Carex Iyngbei, 10" tube
EA
10
4.00
40.00
20.00
200.00
6.00
60.00
16.50
165.00 2
15.00
150.00
25.00
250.00
8.00
80.00
44
PSIPE - Comus stolonifera,LS bundle
EA
15
45.00
675.00
25.00
375.00
43.00
645.00
22.00
330.00
20.00
300.00
30.00
450.00
60.00
900.00
45
PSIPE - Comus stolonifera, #1
EA
4
10.00
40.00
25.00
100.00
24.00
96.00
22.00
88.00
20.00
80.00
30.00
120.00
15.00
60.00
46
PSIPE - Eleocharis paulstrus, 10" tube
EA
10
4.00
40.00
20.00
200.00
6.00
60.00
16.50
165.00
15.00
150.00
25.00
250.00
8.00
80.00
47
PSIPE - Fraxinus Iatifolia, #2
EA
5
20.00
100.00
25.00
125.00
37.00
185.00
22.00
110.00
20.00
100.00
30.00
150.00
26.00
130.00
48
PSIPE - Gualtheria shallon, #1
EA
20
10.00
200.00
20.00
400.00
24.00
480.00
16.50
330.00
15.00
300.00
25.00
500.00
15.00
300.00
49
PSIPE - Holodiscus discolor, #1
EA
5
10.00
50.00
20.00
100.00
24.00
120.00
16.50
82.50
15.00
75.00
25.00
125.00
15.00
75.00
50
PSIPE - Lonicera involucrata, #1
EA
15
10.00
150.00
20.00
300.00
24.00
360.00
16.50
247.50
15.00
225.00
25.00
375.00
15.00
225.00
51
PSIPE - Malus fusca,#2
EA
5
20.00
100.00
20.00
100.00
37.00
185.00
16.50
82.50
15.00
75.00
25.00
125.00
26.00
130.00
52
PSIPE - Physocarpus capitatus,#1
EA
8
10.00
80.00
20.00
160.00
25.00
200.00
16.50
132.00
15.00
120.00
25.00
200.00
15.00
120.00
53
PSIPE - Picea sitchensis, 8-10'
EA
13
10.00
130.00
175.00
2,275.00
300.00
3,900.00
165.00
2,145.00
150.00
1,950.00
250.00
3,250.00
375.00
4,875.00
54
PSIPE - Polystichum munitum, #1
EA
20
10.00
200.00
20.00
400.00
25.00
500.00
16.50
330.00
15.00
300.00
25.00
500.00
15.00
300.00
55
PSIPE - Pseudotsuga menzesii,8'-10'
EA
3
275.00
825.00
175.00
525.00
240.00
720.00
165.00
495.00
150.00
450.00
250.00
750.00
375.00
1,125.00
56
PSIPE - Ribies sanguineum, #1
EA
8
10.00
80.00
20.00
160.00
24.00
192.00
16.50
132.00
15.00
120.00
25.00
200.00
15.00
120.00
57
PSIPE - Rosa pisocarpa, #1
EA
13
10.00
130.00
20.00
260.00
24.00
312.00
16.50
214.50
15.00
195.00
25.00
325.00
15.00
195.00
58
PSIPE - Rubus spectabilis, #1
EA
17
10.00
170.00
20.00
340.00
24.00
408.00
16.50
280.50
15.00
255.00
25.00
425.00
15.00
255.00
59
PSIPE - Salix hookeriana, Live Stake
EA
20
3.00
60.00
25.00
500.00
9.00
180.00
22.00
440.00
20.00
400.00
30.00
600.00
8.00
160.00
60
PSIPE - Salix hookeriana, LS Bundle
EA
20
45.00
900.00
50.00
11000.00
42.00
840.00
44.00
880.00
40.00
800.00
60.00
1,200.00
60.00
1,200.00
61
PSIPE - Salix Iucida (lasiandra), #2
EA
5
20.00
100.00
25.00
125.00
37.00
185.00
22.00
110.00
20.00
100.00
30.00
150.00
26.00
130.00
62
PSIPE - Salix scouleriana, Live Stake
EA
20
3.00
60.00
25.00
500.00
9.00
180.00
22.00
440.00
20.00
400.00
30.00
600.00
8.00
160.00
63
PSIPE - Salix scouleriana, LS Bundle
EA
20
45.00
900.00
25.00
500.00
43.00
860.00
22.00
440.00
20.00
400.00
30.00
600.00
60.00
1,200.00
64
PSIPE - Salix sitchensis, Live Stake
EA
20
3.00
60.00
25.00
500.00
9.00
180.00
22.00
440.00
20.00
400.00
30.00
600.00
8.00
160.00
65
PSIPE - Salix sitchensis, LS Bundle
EA
20
45.00
900.00
25.00
500.00
43.00
860.00
22.00
440.00
20.00
400.00
30.00
600.00
60.00
1,200.00
66
PSIPE - Sambucus racemosa, #1
EA
6
10.00
60.00
20.00
120.00
24.00
144.00
16.50
99.00
15.00
90.00
25.00
150.00
15.00
90.00
67
PSIPE - Symphoricarpos alba, Live Stake
EA
20
10.00
200.00
25.00
500.00
9.00
180.00
22.00
440.00
20.00
400.00
30.00
600.00
8.00
160.00
68
PSIPE -Symphoricarpos alba, #1
EA
20
30.00
200.00
25.00
500.00
24.00
480.00
22.00
440.00
20.00
400.00
30.00
600.00
15.00
300.00
69
PSIPE - Thuja plicata, 8'-10'
EA
2
275.00
550.00
200.00
400.00
300.00
600.00
165.00
330.00
150.00
300.00
250.00
500.00
375.00
750.00
N
Riverton Creek Flapgate Removal Project
Certified Bid Tab
ITEM NO.
ITEM
UNITS
QUANT
70
PSIPE - Tsuga heterophylla, 8'-10'
EA
4
71
Topsoil Type A
CY
7
72
Compost (Amendend Soil)
CY
13
73
Bark and Wood Chip Mulch
CY
13
74
Extruded Curb
LF
240
75
Light Loose Riprap
TN
400
76
Paint Line
LF
350
77
Woody Debris Structure Over Riprap
EA
4
78
Wetland Outlet Woody Debris - Single Log
EA
2
79
Wetland Woody Debris - Single Log
EA
10
80
Wetland Woody Debris - Double Log
EA
2
81
Floating Silt Curtain
LS
1
82
Streambed Gravel
TN
241
83
Streambed Cobbles 6 In.
TN
54
84
Streambed Boulder Two Man
EA
16
85
Streambed Boulder Three Man
EA
130
86
Filter Bag
EA
4
87
Habitat Snag
EA
3
88
Art Installation
LS
1
89
Property Restoration (bv Force Account)
EST
5.001
Subtotal:
Sales Tax
Total Construction Cost
Engineer's Estimate
RL Alia
Olson Brothers Excavating
Rivers Edge Environmental Srvcs
Stellar J Corporation
Orion Marine Contractors
Nordvind
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNITPRICE
AMOUNT
UNITPRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRICE I
AMOUNT
275.00
1,100.00
315.00
200.00
800.00
300.00
1,200.00
165.00
66.00
660.00
462.00 2
150.00
600.00
250.00
11000.00
375.00
11500.00
45.00
70.00
490.00
80.00
560.00
60.00
420.00
90.00
630.00
100.00
700.00
45.00
585.00
70.00
910.00
80.00
1,040.00
66.00
858.00
60.00
780.00
90.00
1,170.00
100.00
1,300.00
45.00
585.00
70.00
910.00
80.00
11040.00
66.00
858.00
60.00
780.00
90.00
1,170.00
100.00
1,300.00
15.00
3,600.00
30.00
7,200.00
25.00
6,000.00
25.00
6,000.00
35.00
8,400.00
9.00
2,160.00
10.00
2,400.00
54.00
21,600.00
80.00
32,000.00
67.00
26,800.00
91.50
36,600.00
100.00
40,000.00
190.00
76,000.00
100.00
40,000.00
3.80
1,330.00
10.00
3,500.00
7.00
2,450.00
3.50
1,225.00
5.00
1,750.00
7.00
2,450.00
10.00
3,500.00
4,200.00
16,800.00
1,400.00
5,600.00
4,900.00
19,600.00
1,320.00
5,280.00
1,200.00
4,800.00
3,750.00
15,000.00
11000.00
4,000.00
21000.00
4,000.00
1,400.00
2,800.00
3,100.00
6,200.00
1,320.00
2,640.00
1,200.00
2,400.00
2,500.00
5,000.00
2,200.00
4,400.00
1,800.00
18,000.00
1,400.00
14,000.00
3,100.00
31,000.00
1,320.00
13,200.00
1,200.00
12,000.00
2,500.00
25,000.00
1,000.00
10,000.00
3,200.00
6,400.00
3,000.00
6,000.00
6,700.00
13,400.00
2,640.00
5,280.00
2,400.00
4,800.00
51000.00
10,000.00
2,500.00
5,000.00
9,600.00
91600.00
6,000.00
6,000.00
7,800.00
7,800.00
3,959.37
3,959.37
5,000.00
5,000.00
10,000.00
10,000.00
5,000.00
5,000.00
85.00
20,485.00
60.00
14,460.00
98.00
23,618.00
83.30
20,075.30
100.00
24,100.00
140.00
33,740.00
100.00
24,100.00
60.00
3,240.00
80.00
4,320.00
88.00
4,752.00
83.30
4,498.20
150.00
81100.00
200.00
10,800.00
100.00
5,400.00
75.00
11200.00
200.001
3,200.00
230.00
3,680.00
156.00
2,496.00
100.00
1,600.00
550.00
8,800.00
125.00
2,000.00
130.00
16,900.00
300.00
39,000.00
175.00
22,750.00
156.00
20,280.00
100.00
13,000.00
550.00
71,500.00
150.00
19,500.00
2,350.00
9,400.00
200.00
800.00
1,600.00
6,400.00
1,230.00
4,920.00 2
200.00
800.00
1,500.00
6,000.00
450.00
1,800.00
1,000.00
3,000.00
2,000.00
6,000.00
2,000.00
6,000.00
1,320.00
3,960.00 2
1,200.00
3,600.00
1,500.00
4,500.00
500.00
1,500.00
4,000.00
4,000.00
2,000.00
2,000.00
2,500.00
2,500.00
3,500.00
3,500.00
1,000.00
1,000.00
2,500.00
2,500.00
5,000.00
5,000.00
1.00
5,000.00
1.00
5,000.00
1.00
5,000.00
1.001
5,000.00
1.001
5,000.00
1.00
5,000.00
1.001
5,000.00
1,117,420.00
111,742.00
1,229,162.00
1,366,606.50
136,660.65
1,503,267.15
1,496,383.00
149,638.30
1,646,021.30
1,541,357.22
154,135.72
1,695,492.94
1,654,111.66
165,411.17
1,819,522.83
2,050,370.00
205,037.00
2,255,407.00
5,871,662.64
587,166.26
6,458,828.90
Corrected bid
Errors in Contractor Bid Proposals:
1 Nordvind: Error in line item 11. Their proposal had $15,300 for both the unit price and amount. Per Specification Section 1.03-1 and the note on Schedule A of the Proposal form (P-2), the stated unit price has been entered in this tabulation.
2 Rivers Edge Environmental: Errors in items 16, 18, 33, 43, 71, 86 and 87. Discrepancy between unit price and amounts entered in proposal. Per Specification Section 1.03-1 and the note on Schedule A of the Proposal form (P-2), the stated unit price has been entered in this tabulation.
Certified by Date 5/26/2020
Mike Perfetti, Habitat Project Manager
Corrected bid
City of 1
City Council Transportation & Infrastructure Committee
Meeting Minutes
June 1, 2020 - 5:30 p.m. - Electronic Meeting due to COVID-19 Emergency
Councilmembers Present: Cynthia Delostrinos Johnson, Chair; Verna Seal, Kate Kruller
Staff Present: David Cline, Vicky Carlsen, Henry Hash, Hari Ponnekanti, Han Kirkland,
Gail Labanara, Cyndy Knighton, Jennifer Ronda, Ryan Larson, Mike
Perfetti, Charles Engle, Laurel Humphrey
Chair Delostrinos Johnson called the meeting to order at 5:30 p.m.
I. BUSINESS AGENDA
A. Resolution: 2020 Fire Surplus & Transfer
Staff is seeking approval of a resolution to surplus and transfer ownership of Fire's
HazMat/Decon Trailer to Renton's Regional Fire Authority active Zone 3 HazMat response
entity.
Committee Recommendation
Unanimous approval. Forward to June 15, 2020 Regular Consent Agenda.
B. Resolution: 2020 Fleet Surplus
Staff is seeking approval of a resolution to surplus 22 pieces of equipment in the total
value of $52,100 that have outlived their service life and are fully depreciated.
Committee Recommendation
Unanimous approval. Forward to June 15, 2020 Regular Consent Agenda.
C. Contract: Riverton Creek Flapgate Removal Project
Staff is seeking approval of a contract with the R.L. Alia Company in the amount of
$1,503,267.15 for construction of the Riverton Creek Flapgate Removal Project. Funding
includes surface water revenue, grants, and transfer from the 205 Levee Certification
Project not currently needed.
Committee Recommendation
Unanimous approval. Forward to June 15, 2020 Regular Consent Agenda.
D. Contract Amendment: Riverton Creek Flapgate Removal Project
Staff is seeking approval of Amendment No. 6 to Contract No. 17-070 with OTAK, Inc in the
amount of $199,965 for additional engineering services and a time extension for the
Riverton Creek Flapgate Removal Project. The total project remains under budget.
Committee Recommendation
Unanimous approval. Forward to June 15, 2020 Regular Consent Agenda.
13