HomeMy WebLinkAboutReg 2020-07-06 Item 5B - Resolution - 2021-2026 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS
---------------------------------- Initials
Meeting Date
Prepared b
Mayor's review
Council review
06/22/20
GL
07/06/20
GL
ITEM INFORMATION
ITEM NO.
STAFF SPONSOR: CYNDY KNIGHTON
ORIGINAL AGENDA DATE: 06/22/20
AGENDA ITEM TITLE Resolution for Six -Year Transportation Improvement Program (2021-2026)
"To provide public hearing comments, please email citycouncil(&tukwilawa.gov, provide your first
and last name, and reference the public hearing topic in the subject line, by 5:00 p.m. on June 22,
2020. Once you have signed up by email, your name will be called upon during the meeting to
speak for up to five minutes. Call 1-253-292-9750, ACCESS CODE 670077847# at 7:00 p.m. on
June 22 2020 to access the meetin ."
CATEGORY ® Discussion
❑ Motion
® Resolution
❑ Ordinance
❑ Bid Award
® Public Hearing
❑Other
Mtg Date 06122120
Mtg Date
Mtg Date 07106120
Mtg Date
Mtg Date
Mtg Date 06122120
Mtg Date
SPONSOR ❑Council ❑Mayor ❑HR ❑DCD ❑Finance ❑Fire ❑TS ❑P&R ❑Police ®P1V ❑Court
SPONSOR'S The Transportation Improvement Program (TIP) is updated annually as required by the
SUMMARY Revised Code of Washington (RCW). The TIP is adopted by Resoultion after a Public
Hearing at the local agency level and incorporated into regional and state TIPs. Council is
being asked to approve the Resolution for the 2021-2026 Six -Year Transportation
Improvement Program and consider this item at the June 22, 2020 Committee of the Whole
with a Public Hearing and subsequent July 6, 2020 Regular Meeting.
REVIEWED BY ® Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 06/01/20 COMMITTEE CHAIR: DELOSTRINOS JOHNSON
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0 $0 $0
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
06/22/20
07/06/20
MTG. DATE
ATTACHMENTS
6/22/20
Informational Memorandum dated 05/29/20
Draft Resolution
Draft 2021-2026 TIP Summaryr
2021-2026 "Draft" Transportation Improvement Program
Current Adopted 2020-2025 TIP
Minutes from the Transportation and Infrastructure Committee meeting of 06/01/20
07/06/20
Resolution in final form
37
w
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2021-
2026), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2021-2026); and
WHEREAS, on June 22, 2020, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2021 to 2026, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington.
VULegislative Development\TIP 2021-2026 5-20-20
CK:bjs Review and analysis by Barbara Saxton Page 1 of 2
39
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2020.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
De'Sean Quinn, Council President
Filed with the City Clerk:_
Passed by the City Council:
Resolution Number:
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2021 to 2026
W:\Legislative Development\TIP 2021-2026 5-20-20
CK:bjs Review and analysis by Barbara Saxton
i s
Page 2 of 2
i
Viasthiington State
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
_
3
m
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
05
TUK-62
06/22/20
07/06/20
1993
11
0.100
DCE
Yes
42nd Ave S Bridge Replacement
42nd Ave S over he Duwamish River at the intersection with Interurban Ave S
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement would require
preliminary engineer design, right-of-way, and construction phases. The new
structure would meet current road and bridge design standards. The replacement
structure configuration would be two through lanes, possibly a turn pocket, and
include sidewalks.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2021
0
0
500,000
500,000
P
PE
2022
STP
1,500,000
0
234,000
1,734,000
P
RW
2023
0
0
30,000
30,000
P
CN
2023
0
0
250,000
250,000
P
CN
2024
STP
3,000,000
0
468,200
3,468,200
P
CN
2024
BR
12,500,000
0
2,950,800
15,450,800
Totals
17,000,000
0
4,433,000
21,433,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
500,000
1,734,000
0
0
0
RW
0
0
30,000
0
0
CN
0
0
250,000
9,460,000
9,459,000
Totals
500,000
1,734,000
280,000
9,460,000
9,459,000
Report Date: June 23, 2020 Page 1
i
Via&lhiington State
N w7AW Departnwnt of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
a
19
WA-1111:06/22/20
07/06/20
1993
05
0.370
Yes
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
90,000
270,000
P
RW
2022
0
SRTS
232,000
24,000
256,000
P
CN
2023
0
SRTS
1,865,000
205,000
2,070,000
Totals
0
2,277,000
319,000
2,596,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
270,000
0
0
0
RW
0
256,000
0
0
0
CN
0
0
2,070,000
0
0
Totals
0
526,000
2,070,000
0
0
Report Date: June 23, 2020 Page 2
i
Viasthiington state
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
00
WA-05405
06/22/20
07/06/20
1993
06
No
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
0
1,200,000
1,200,000
Totals
0
0
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200,000
200,000
400,000
Totals
200,000
200,000
200,000
200,000
400,000
W Report Date: June 23, 2020 Page 3
i
w7Via6llhin on state
AW Departnwnt of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
a
16
WA-07746
06/22/20
07/06/20
1993
03
C G O P S
No
TW
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
134,000
0
0
0
RW
0
10,000
0
0
0
CN
0
0
1,570,000
0
0
Totals
0
144,000
1,570,000
0
0
Report Date: June 23, 2020 Page 4
i
Viasthiington state
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
_
3
m
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
14
WA-03731
06/22/20
07/06/20
1993
06
No
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
0
2,380,000
2,380,000
Totals
0
0
2,380,000
2,380,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
335,000
405,000
405,000
900,000
Totals
335,000
335,000
405,000
405,000
900,000
Cal Report Date: June 23, 2020 Page 5
i
Via&lhiington state
CY) w7AW Departnwnt of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
16
WA-03733
06/22/20
07/06/20
1993
06
C G O P S
No
TW
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
0
11,800,000
11,800,000
Totals
0
0
11,800,000
11,800,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,850,000
1,850,000
1,950,000
2,050,000
4,100,000
Totals
1,850,000
1,850,000
1,950,000
2,050,000
4,100,000
Report Date: June 23, 2020 Page 6
i
Viasllhiington state
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
_
3
m
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
m
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
00
WA05409
06/22/20
07/06/20
1993
08
EIS
No
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
0
0
100,000
100,000
Totals
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
100,000
Totals
0
0
0
0
100,000
4 Report Date: June 23, 2020 Page 7
i
00 w7Via&lhiington State
AW Departnwnt of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
a
00
WA-1111f
06/22/20
07/06/20
1993
28
0.140
DCE
No
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved
trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2022
0
Ped/Bike Program
1,146,000
128,000
1,274,000
Totals
0
1,146,000
128,000
1,274,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
74,000
1,200,000
0
0
0
Totals
74,000
1,200,000
0
0
0
Report Date: June 23, 2020 Page 8
i
Viasthiington State
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
m
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
a
17
WA-1111(
06/22/20
07/06/20
1993
04
0.350
DCE
No
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40,000
400,000
P
RW
2022
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2023
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
400,000
0
0
RW
0
0
100,000
0
0
CN
0
0
0
3,100,000
0
Totals
0
0
500,000
3,100,000
0
c0 Report Date: June 23, 2020 Page 9
i
C_nViasthiin on State
C) w7AW Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
m
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
o.
14
WA-09873
06/22/20
07/06/20
1993
04
C G P S T
0.100
DCE
Yes
W
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
150,000
150,000
P
RW
2023
0
0
50,000
50,000
P
CN
2024
0
0
1,200,000
1,200,000
Totals
0
0
1,400,000
1,400,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
150,000
0
0
RW
0
0
50,000
0
0
CN
0
0
0
1,200,000
0
Totals
0
0
200,000
1,200,000
0
Report Date: June 23, 2020 Page 10
i
Viasthiington State
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
a
17
WA03782
06/22/20
07/06/20
1993
28
0.250
No
S 144th St Bridge Sidewalks
S 144th Street
51 st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
SRTS
400,000
0
43,000
443,000
Totals
400,000
0
43,000
443,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
443,000
0
0
Totals
0
0
443,000
0
0
Cal
Report Date: June 23, 2020 Page 11
i
Via6t�in on state
N w7AW Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
_
3
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
o
CD
N
3
m
a
19
WA-11112
06/22/20
07/06/20
1993
05
0.300
No
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2021
0
0
369,000
369,000
P
CN
2022
0
SRTS
2,340,000
260,000
2,600,000
Totals
0
2,340,000
629,000
2,969,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
369,000
0
0
0
0
CN
0
2,600,000
0
0
0
Totals
369,000
2,600,000
0
0
0
Report Date: June 23, 2020 Page 12
i
Viasthiington State
w Departrnent of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
_
3
m
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
Z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
00
TUK-63
06/22/20
07/06/20
1993
24
0.000
No
South King County Regional TDM for Centers and Corridors
South King County
Various to Various
The project will focus on providing TDM services at selected activity centers (e.g.
business parks, commercial and residential multi -tenant buildings, educational
institutions) and/or congested corridors in Tukwila, Renton, SeaTac, and Kent to
reduce drive alone travel and traffic congestion in south King County. A key strategy
will include the development of partnerships with embedded organizations in the
communities we are serving to facilitate more effective outreach and improve long-
term program outcomes.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
OTHER
132,750
15,000
147,750
P
ALL
2021
CMAQ
450,000
OTHER
1,029,860
0
1,479,860
Totals
450,000
1,162,610
15,000
1,627,610
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
352,100
312,100
444,600
357,100
161,700
Totals
352,100
312,100
444,600
357,100
161,700
Cal
W Report Date: June 23, 2020 Page 13
i
Via&lhin on State
� w7AW Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
_
3
m
<
o
-
A. PIN/Project No. B. STIP ID
0
3
c
°
Z
C. Project Title
y
CD
,
c
D. Road Name or Number
m
c
a
o
n
�
.0
_0
E. Begin & End Termini
�'.
m
'
z
1<
°
a
3
1
E
N m
F. Project Description G. Structure ID
a
M
o
CD
N
3
m
a
14
TUK-60
06/22/20
07/06/20
1993
28
0.170
DCE
No
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
W end of planned Green River Bridge to Longacres Way
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated
shared use path with a 5 ft. landscaped buffer strip on the west side of the highway.
Design -only will be completed for future improvements on Longacres Way between
SR 181 to the Tukwila Sound Transit Link Station.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2021
0
TIB
2,179,000
1,016,000
3,195,000
Totals
0
2,179,000
1,016,000
3,195,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
3,195,000
0
0
0
0
Totals
3,195,000
0
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
17,850,000
12,354,610
25,527,000
55,731,610
Report Date: June 23, 2020 Page 14