Loading...
HomeMy WebLinkAboutReg 2020-07-06 Item 5B - Resolution - 2021-2026 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS ---------------------------------- Initials Meeting Date Prepared b Mayor's review Council review 06/22/20 GL 07/06/20 GL ITEM INFORMATION ITEM NO. STAFF SPONSOR: CYNDY KNIGHTON ORIGINAL AGENDA DATE: 06/22/20 AGENDA ITEM TITLE Resolution for Six -Year Transportation Improvement Program (2021-2026) "To provide public hearing comments, please email citycouncil(&tukwilawa.gov, provide your first and last name, and reference the public hearing topic in the subject line, by 5:00 p.m. on June 22, 2020. Once you have signed up by email, your name will be called upon during the meeting to speak for up to five minutes. Call 1-253-292-9750, ACCESS CODE 670077847# at 7:00 p.m. on June 22 2020 to access the meetin ." CATEGORY ® Discussion ❑ Motion ® Resolution ❑ Ordinance ❑ Bid Award ® Public Hearing ❑Other Mtg Date 06122120 Mtg Date Mtg Date 07106120 Mtg Date Mtg Date Mtg Date 06122120 Mtg Date SPONSOR ❑Council ❑Mayor ❑HR ❑DCD ❑Finance ❑Fire ❑TS ❑P&R ❑Police ®P1V ❑Court SPONSOR'S The Transportation Improvement Program (TIP) is updated annually as required by the SUMMARY Revised Code of Washington (RCW). The TIP is adopted by Resoultion after a Public Hearing at the local agency level and incorporated into regional and state TIPs. Council is being asked to approve the Resolution for the 2021-2026 Six -Year Transportation Improvement Program and consider this item at the June 22, 2020 Committee of the Whole with a Public Hearing and subsequent July 6, 2020 Regular Meeting. REVIEWED BY ® Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev. ❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 06/01/20 COMMITTEE CHAIR: DELOSTRINOS JOHNSON RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0 $0 $0 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/22/20 07/06/20 MTG. DATE ATTACHMENTS 6/22/20 Informational Memorandum dated 05/29/20 Draft Resolution Draft 2021-2026 TIP Summaryr 2021-2026 "Draft" Transportation Improvement Program Current Adopted 2020-2025 TIP Minutes from the Transportation and Infrastructure Committee meeting of 06/01/20 07/06/20 Resolution in final form 37 w City of Tukwila Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2021- 2026), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2021-2026); and WHEREAS, on June 22, 2020, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2021 to 2026, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. VULegislative Development\TIP 2021-2026 5-20-20 CK:bjs Review and analysis by Barbara Saxton Page 1 of 2 39 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2020. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: Office of the City Attorney De'Sean Quinn, Council President Filed with the City Clerk:_ Passed by the City Council: Resolution Number: Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2021 to 2026 W:\Legislative Development\TIP 2021-2026 5-20-20 CK:bjs Review and analysis by Barbara Saxton i s Page 2 of 2 i Viasthiington State w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside _ 3 m < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 05 TUK-62 06/22/20 07/06/20 1993 11 0.100 DCE Yes 42nd Ave S Bridge Replacement 42nd Ave S over he Duwamish River at the intersection with Interurban Ave S Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement would require preliminary engineer design, right-of-way, and construction phases. The new structure would meet current road and bridge design standards. The replacement structure configuration would be two through lanes, possibly a turn pocket, and include sidewalks. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2021 0 0 500,000 500,000 P PE 2022 STP 1,500,000 0 234,000 1,734,000 P RW 2023 0 0 30,000 30,000 P CN 2023 0 0 250,000 250,000 P CN 2024 STP 3,000,000 0 468,200 3,468,200 P CN 2024 BR 12,500,000 0 2,950,800 15,450,800 Totals 17,000,000 0 4,433,000 21,433,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 500,000 1,734,000 0 0 0 RW 0 0 30,000 0 0 CN 0 0 250,000 9,460,000 9,459,000 Totals 500,000 1,734,000 280,000 9,460,000 9,459,000 Report Date: June 23, 2020 Page 1 i Via&lhiington State N w7AW Departnwnt of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m a 19 WA-1111:06/22/20 07/06/20 1993 05 0.370 Yes 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 SRTS 180,000 90,000 270,000 P RW 2022 0 SRTS 232,000 24,000 256,000 P CN 2023 0 SRTS 1,865,000 205,000 2,070,000 Totals 0 2,277,000 319,000 2,596,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 270,000 0 0 0 RW 0 256,000 0 0 0 CN 0 0 2,070,000 0 0 Totals 0 526,000 2,070,000 0 0 Report Date: June 23, 2020 Page 2 i Viasthiington state w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 00 WA-05405 06/22/20 07/06/20 1993 06 No Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2021 0 0 1,200,000 1,200,000 Totals 0 0 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 200,000 200,000 200,000 200,000 400,000 Totals 200,000 200,000 200,000 200,000 400,000 W Report Date: June 23, 2020 Page 3 i w7Via6llhin on state AW Departnwnt of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m a 16 WA-07746 06/22/20 07/06/20 1993 03 C G O P S No TW Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 0 134,000 134,000 P RW 2022 0 0 10,000 10,000 P CN 2023 0 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 134,000 0 0 0 RW 0 10,000 0 0 0 CN 0 0 1,570,000 0 0 Totals 0 144,000 1,570,000 0 0 Report Date: June 23, 2020 Page 4 i Viasthiington state w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside _ 3 m < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 14 WA-03731 06/22/20 07/06/20 1993 06 No Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2021 0 0 2,380,000 2,380,000 Totals 0 0 2,380,000 2,380,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 335,000 335,000 405,000 405,000 900,000 Totals 335,000 335,000 405,000 405,000 900,000 Cal Report Date: June 23, 2020 Page 5 i Via&lhiington state CY) w7AW Departnwnt of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 16 WA-03733 06/22/20 07/06/20 1993 06 C G O P S No TW Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2021 0 0 11,800,000 11,800,000 Totals 0 0 11,800,000 11,800,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,850,000 1,850,000 1,950,000 2,050,000 4,100,000 Totals 1,850,000 1,850,000 1,950,000 2,050,000 4,100,000 Report Date: June 23, 2020 Page 6 i Viasllhiington state w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside _ 3 m < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n m .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 00 WA05409 06/22/20 07/06/20 1993 08 EIS No BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 0 100,000 100,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 100,000 Totals 0 0 0 0 100,000 4 Report Date: June 23, 2020 Page 7 i 00 w7Via&lhiington State AW Departnwnt of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m a 00 WA-1111f 06/22/20 07/06/20 1993 28 0.140 DCE No Green River Trail Green River Trail Christensen Road to Green River Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and pedestrian plaza. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2022 0 Ped/Bike Program 1,146,000 128,000 1,274,000 Totals 0 1,146,000 128,000 1,274,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 74,000 1,200,000 0 0 0 Totals 74,000 1,200,000 0 0 0 Report Date: June 23, 2020 Page 8 i Viasthiington State w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n m .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m a 17 WA-1111( 06/22/20 07/06/20 1993 04 0.350 DCE No Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 Ped/Bike Program 360,000 40,000 400,000 P RW 2022 0 Ped/Bike Program 90,000 10,000 100,000 P CN 2023 0 Ped/Bike Program 2,800,000 300,000 3,100,000 Totals 0 3,250,000 350,000 3,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 400,000 0 0 RW 0 0 100,000 0 0 CN 0 0 0 3,100,000 0 Totals 0 0 500,000 3,100,000 0 c0 Report Date: June 23, 2020 Page 9 i C_nViasthiin on State C) w7AW Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n m .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m o. 14 WA-09873 06/22/20 07/06/20 1993 04 C G P S T 0.100 DCE Yes W S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 150,000 150,000 P RW 2023 0 0 50,000 50,000 P CN 2024 0 0 1,200,000 1,200,000 Totals 0 0 1,400,000 1,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 150,000 0 0 RW 0 0 50,000 0 0 CN 0 0 0 1,200,000 0 Totals 0 0 200,000 1,200,000 0 Report Date: June 23, 2020 Page 10 i Viasthiington State w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m a 17 WA03782 06/22/20 07/06/20 1993 28 0.250 No S 144th St Bridge Sidewalks S 144th Street 51 st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 SRTS 400,000 0 43,000 443,000 Totals 400,000 0 43,000 443,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 443,000 0 0 Totals 0 0 443,000 0 0 Cal Report Date: June 23, 2020 Page 11 i Via6t�in on state N w7AW Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside m _ 3 < o - A. PIN/Project No. B. STIP ID 0 3 c ° z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a o CD N 3 m a 19 WA-11112 06/22/20 07/06/20 1993 05 0.300 No S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2021 0 0 369,000 369,000 P CN 2022 0 SRTS 2,340,000 260,000 2,600,000 Totals 0 2,340,000 629,000 2,969,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 369,000 0 0 0 0 CN 0 2,600,000 0 0 0 Totals 369,000 2,600,000 0 0 0 Report Date: June 23, 2020 Page 12 i Viasthiington State w Departrnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside _ 3 m < o - A. PIN/Project No. B. STIP ID 0 3 c ° Z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 00 TUK-63 06/22/20 07/06/20 1993 24 0.000 No South King County Regional TDM for Centers and Corridors South King County Various to Various The project will focus on providing TDM services at selected activity centers (e.g. business parks, commercial and residential multi -tenant buildings, educational institutions) and/or congested corridors in Tukwila, Renton, SeaTac, and Kent to reduce drive alone travel and traffic congestion in south King County. A key strategy will include the development of partnerships with embedded organizations in the communities we are serving to facilitate more effective outreach and improve long- term program outcomes. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2021 0 OTHER 132,750 15,000 147,750 P ALL 2021 CMAQ 450,000 OTHER 1,029,860 0 1,479,860 Totals 450,000 1,162,610 15,000 1,627,610 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 352,100 312,100 444,600 357,100 161,700 Totals 352,100 312,100 444,600 357,100 161,700 Cal W Report Date: June 23, 2020 Page 13 i Via&lhin on State � w7AW Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2021 to 2026 Y Inside N Outside _ 3 m < o - A. PIN/Project No. B. STIP ID 0 3 c ° Z C. Project Title y CD , c D. Road Name or Number m c a o n � .0 _0 E. Begin & End Termini �'. m ' z 1< ° a 3 1 E N m F. Project Description G. Structure ID a M o CD N 3 m a 14 TUK-60 06/22/20 07/06/20 1993 28 0.170 DCE No West Valley Highway/Longacres Way Shared Use Pathways SR 181 & Longacres Way W end of planned Green River Bridge to Longacres Way Improvements will be completed on SR 181 from the west end of the planned Green River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. landscaped buffer strip on the west side of the highway. Design -only will be completed for future improvements on Longacres Way between SR 181 to the Tukwila Sound Transit Link Station. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2021 0 TIB 2,179,000 1,016,000 3,195,000 Totals 0 2,179,000 1,016,000 3,195,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 3,195,000 0 0 0 0 Totals 3,195,000 0 0 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 17,850,000 12,354,610 25,527,000 55,731,610 Report Date: June 23, 2020 Page 14