CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 4
DATE: April 11, 2024 BUDGET NO.: 412.98.594.382.65.00
PROJECT NO.: 99830103 CONTRACT NO.: 20-052
PROJECT NAME: Riverton Creek Flapgate Removal Project
TO: R.L. Alia Company
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not
included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the “Owner” and a notice to proceed is issued.
Conditions:
A. The following change, and work affected thereby, are subject to all contract stipulations and covenants;
B. The rights of the “Owner” are not prejudiced;
C. All claims against the “Owner” which are incidental to or as a consequence of this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change
orders.
CHANGE: See Attached Exhibit “A”
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
ACCEPTED: Date ________________________________ Contractor __________________________________
By _____________________________________________ Title _______________________________________
Original Contract (with tax) $ 1,503,267.15 APPROVED BY THE CITY OF TUKWILA
Previous Change Orders & Contingency $ 308,734.13 Date _______________________________________
This Change Order (with tax) $ 72,285.08 By _________________________________________
Mayor
REV. CONTRACT AMOUNT $ 1,884,286.36
Original Contract Time: 115 Working Days
Additional Contract Time for previous Change Orders: 63 Days City Engineer _________________________________
Additional Contract Time for this Change Order: 18 Days
Updated Contract Time: 196 Working Days
----------------------------------------------------------------------------------------------------------------------------------------
ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w/encumbrance)
Contractor (2 of 2) Project Management File
5/14/24 R. L. Alia Company
Office Manager
5/20/2024 | 12:04 PM PDT
20-052(d)
Council Approval 5/6/24
PROJECT NO.: 99830103 CONTRACT NO.: 20-052
PROJECT NAME: Riverton Creek Flapgate Removal Project
DESCRIPTION OF WORK
This change order accounts for overruns incurred in association with CO #3 Tasks 3.1 and 3.2; mark-ups on labor, equipment,
materials, and subcontractors for Tasks 3.1, 3.2, and 3.3 (not included in CO#3 Estimate); and sales tax for the overruns and mark-
ups.
3.1 Replacement Cover Plates for Tie-Back Penetrations by Force Account
3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment by Force Account
3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates by Lump Sum
3.1 Replacement Cover Plates for Tie-Back Penetrations
This work consists of mobilization, temporary pedestrian traffic control, site preparation and site restoration, temporary scaffolding,
removing existing cover plates, welding, and grout tubes, preparing sheet pile wall surface to bare metal, prime coat application, and
installing new cover plates per provided Cover Plate Details (Sheet 19A, File No. S1.3A).
3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge Southwest Bridge Abutment
This work consists of removing existing joint sealer and dirt from the joint and installing new joint sealer.
3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates
This work consists of mobilization, containment of abrasives, collecting, testing and disposal of containment waste,
preparing the sheet pile wall to bare metal, and application of coating system. This work shall comply with WSDOT 2020
Standard Specifications in Section 6-07.
MATERIALS
All materials shall be in accordance with the provided Cover Plate detail, current contract specifications or as approved by the
Engineer.
CONSTRUCTION REQUIREMENTS
The Contractor shall perform the work in accordance with the provided Cover Plate detail, current contract plans and specifications or
as approved by the Engineer.
MEASUREMENT AND PAYMENT
3.1 “Replacement Cover Plates for Tie-Back Penetrations” will be paid in accordance with WSDOT 2020 Standard Specification
Section 1-09.6
CONTRACT TIME
Contract time shall be extended by (18) working days as a result of this change order.
The total cost of Change Order #4 is $72,285.08.
Change Order #4 Summary: CO#3 Tasks 3.1 and 3.2 overruns amount to $34,339.83, an 80.8% increase in direct costs over
estimated costs, and accounts for 52% percent of CO#4. Mark-ups in the amount of $25,292.03 and sales tax in the amount of
$6,022.76 account for 39% and 9% of CO#4, respectively. Tasks 3.1 and 3.2 cost overruns were due to unforeseen complications with
production rates associated with site conditions and the complexity of fabricating and fitting custom replacement cover plates. Mark-ups
were inadvertently omitted from CO #3 Estimate. CO#4 Estimate includes 10% contingency ($6,631.06).
Table 1. CO#4 Summary – Three Invoice from RL Alia for Time and Materials
# Invoice Date Total
1 RL Alia Time & Materials 11/28/23 to 12/22/23 $39,072.85
2 RL Alia Time & Materials 01/03/24 to 02/26/24 $28,360.05
3 RL Alia Time & Materials 03/14/24 to 03/29/24 $4,057.39
Sub-Total: $71,490.29
Sales Tax 10.1% $7,220.52
Sub-Total: $78,710.81
CO#3 Credit Balance: -($13,056.79)
Sub-Total: $65,654.02
CO#4 Contingency: $6,631.06
CO#4 Total: $72,285.08
Table 2. Change Order #3 Summary of Quantities (in grey), Payments, and Balance
Item
#
Item Description Qty Unit Unit Price Item Cost
3.1 Replacement Cover Plates for Tie-Back
Penetrations
1 EST. $41,500.00 $41,500.00
3.2 Repair Expansion Joint between Existing Retaining
Wall and Tukwila Intl. Bridge SW Bridge Abutment
1 EST. $1,000.00 $1,000.00
3.3 Surface Preparation and Coating for Previously
Buried Portion of Wall #1 and Replacement Cover
Plates
1 LS $37,553.60 $37,553.60 - $9,508.80
(RL Alia’s Share) =
$28,044.20
Est. Total Coast: $70,544.20
CO#3 Sales Tax: $7,125.82
CO#3 Total: $77,669.82
CO#3 1st Payment (PE#16): $64,613.03
CO#3 Balance: $13,056.79
Table 3. CO #3 Summary of Quantities (in grey) and CO#4 Overruns, Mark-ups, and Sales Tax
Item
#
Item
Description
Qty Unit Unit Price Item Cost Overruns Mark-Up
(Original +
Overrun)
Sales Tax
(Original +
Overrun)
Grand
Totals:
3.1 Replacement
Cover Plates for
Tie-Back
Penetrations
1 EST. $41,500.00 $41,500.00
$34,339.83 $21,926.72 $9,975.42 $108,741.97
3.2 Repair
Expansion Joint
between
Existing
Retaining Wall
and Tukwila Intl.
Bridge SW
Bridge
Abutment
1 EST. $1,000.00 $1,000.00
3.3 Surface
Preparation and
Coating for
Previously
Buried Portion
of Wall #1 and
Replacement
Cover Plates
1 LS $37,553.60 $37,553.60
-
$9,508.80
(RL Alia’s
Share) =
$28,044.20
$0.00 $3,365.30 $3,172.36 $34,581.86
Est. Total Coast: $70,544.80 $34,339.83 $25,292.03 $13,147.78 $143,323.84
CO#3 Sales Tax: $7,125.02 $-7125.02
CO#3 Total: $77,669,82 -$77,669.82
CO#4 Sub-Totals: $34,339.83 $25,292.03 $6,022.76 $65,654.62
CO#4 Total: Verification: $65,654.02*
*= $0.60 difference not found.
CHANGE ORDER #3 - T&M BREAKDOWN
Project Name:Riverton Creek Flapgate Removal Project
Project Number:99830103
Owner:City of Tukwila
Date:11/28/2023 - 12/22/2023
Description:
Labor:
Name:Class:S/T Hours:OT Hours:DT Hours:S/T Rate:OT Rate:DT Rate:Total:
Joel Gallacher 42 0.5 $82.73 $110.36 $3,529.84
Parker Knaus 42 1 $51.48 $68.64 $2,230.80
Bobby Wadilove 2 0 $95.05 $128.48 $190.10
$0.00
$0.00
$0.00
Equipment:
Description:Equip. #:Reg. Hours:STBY Hours:Reg. Rate:STBY Rate:Total:
Foreman Truck 42.5 $28.32 $1,203.60
Foreman Truck 2 $27.41 $54.82
$0.00
Materials:
Supplier:Ticket/Invoice #:Material QTY Units Unit Price Total:
DTG Recycle 200144507 Portable Restroom 1 LS $167.84 $167.84
DTC Recycle 200149865 Portable Restroom 1 LS $167.84 $167.84
Grainger 9922003737 Viton Round Cord 1 LS $71.76 $71.76
Grainger 9922003745 Viton Round Cord 1 LS $266.96 $266.96
Mason's Supply 726427 NS Grout 1 LS $111.75 $111.75
Platt 4Q94168 Misc. PVC 1 LS $137.21 $137.21
Tacoma Screw 12031600 Consumables 1 LS $90.30 $90.30
White Cap 10019171443 Consumables 1 LS $29.62 $29.62
White Cap 50024948610 Straw (Erosion Control)1 LS $184.72 $184.72
Subcontractors:
Name:Ticket/Invoice #:Material/Service:QTY:Units:Unit Price:Total:
Purcell Painting & Coating Abrasive Blast & Coat 1 LS $25,240.01 $25,240.01
$0.00
Subtotal MU %Total
Labor:$5,950.74 31%$7,795.47
Equipment:$1,258.42 21%$1,522.69
Materials:$1,228.00 21%$1,485.88
Subcontractors:$25,240.01 12%$28,268.81
Grand Total:$39,072.85
Pick up coated plates from Purcell's shop.
Install cord stock between trumpet and tie-backs.
Pick up materials and construct grout forms.
Remove water from voids,build forms and install grout in voids.
Strip forms and finish grout surface.
Pick up and place sraw for erosion control.
CHANGE ORDER #3 - T&M BREAKDOWN
Project Name:Riverton Creek Flapgate Removal Project
Project Number:99830103
Owner:City of Tukwila
Date:1/03/24-2/26/24
Description:
Labor:
Name:Class:S/T Hours:OT Hours:DT Hours:S/T Rate:OT Rate:DT Rate:Total:
Kyle Bales 50 $91.05 $4,552.50
Joel Gallacher 74.5 $82.73 $6,163.39
Parker Knaus 74.5 $56.39 $4,201.06
$0.00
$0.00
$0.00
Equipment:
Description:Equip. Number:Reg. Hours:STBY Hours:Reg. Rate:STBY Rate:Total:
Foreman Truck 74.5 $28.32 $2,109.84
Service/Welding Truck 50 $35.04 $1,752.00
$0.00
Materials:
Supplier:Ticket/Invoice #:Material QTY Units Unit Price Total:
DTG Recycle 1/2/2024 Portable Restroom 1 EA $167.84 $167.84
Mason's Supply 1/11/2024 NS Grout 1 EA $61.52 $61.52
Mason's Supply 2/16/2024 Caulking Supplies 1 EA $127.45 $127.45
Tacoma Screw 2/16/2024 Clean/Prep Supplies 1 EA $97.59 $97.59
Tacoma Screw 2/19/2024 Wire Brushes 1 EA $35.75 $35.75
McLendon 2/26/2024 Caulking Supplies 1 EA $43.63 $43.63
McLendon 2/26/2024 Caulking Supplies 1 EA $51.24 $51.24
Tacoma Screw 2/26/2024 Wire Wheels/Brushes 1 EA $78.00 $78.00
DTG Recycle 2/26/2024 Portable Restroom 1 EA $167.84 $167.84
$0.00
Subcontractors:
Name:Ticket/Invoice #:Material/Service:QTY:Units:Unit Price:Total:
Purcell Blasting/Coating 1 LS $2,804.19 $2,804.19
$0.00
Subtotal MU %Total
Labor:$14,916.94 31%$19,541.19
Equipment:$3,861.84 21%$4,672.83
Materials:$830.86 21%$1,005.34
Subcontractors:$2,804.19 12%$3,140.69
Grand Total:$28,360.05
Complete grout work at tie-backs.
Weld cover plates to existing wall.
Grind welds flush with wall.
Caulk &seal between cover plates,wall,and trumpets.
Kyle's Time Other's Time Notes
Date Total Hrs Re-Work Billable Total Hrs Re-Work Billable
1/3/2024 8 0 8 0 0 0
1/4/2024 8 0 8 0 0 0
1/5/2024 8 0 8 0 0 0
1/11/2024 0 0 0 6 0 6 Joel, Parker
1/18/2024 8 0 8 0 0 0
1/19/2024 8 0 8 0 0 0
1/22/2024 8 0 8 0 0 0
1/23/2024 8 6 2 16 16 0 Erik Buholm, Jacob Mowry
1/24/2024 8 8 0 16 16 0 Erik Buholm, Jonathan Lennox
1/25/2024 8 8 0 8 8 0 Jonathan Lennox
1/26/2024 8 8 0 0 0 0
2/1/2024 8 8 0 0 0 0
2/2/2024 8 8 0 0 0 0
2/5/2024 8 8 0 0 0 0
2/6/2024 8 8 0 0 0 0
2/7/2024 8 8 0 0 0 0
2/9/2024 8 8 0 0 0 0
2/12/2024 6 6 0 0 0 0
2/13/2024 8 8 0 16 0 16 Joel, Parker
2/14/2024 8 8 0 16 0 16 Joel, Parker
2/15/2024 8 8 0 16 0 16 Joel, Parker
2/16/2024 8 8 0 16 0 16 Joel, Parker
2/19/2024 0 0 0 16 0 16 Joel, Parker
2/20/2024 0 0 0 13 0 13 Joel, Parker
2/21/2024 0 0 0 8 0 8 Joel, Parker
2/22/2024 0 0 0 10 0 10 Joel, Parker
2/23/2024 0 0 0 16 0 16 Joel, Parker
2/26/2024 0 0 0 16 0 16 Joel, Parker
Total 166 116 50 189 40 149
Sika Flex/Applicator
Weld cleaning
operations, 2nd time
Prepping Trumpets
to remove paint for
Sika Flex installation
Caulking for leaks
Caulking for leaks
Weld cleaning
operations, 2nd time
CHANGE ORDER #3 - T&M BREAKDOWN
Project Name:Riverton Creek Flapgate Removal Project
Project Number:99830103
Owner:City of Tukwila
Date:3/14/2024-3/29/2024
Description:
Labor:
Name:Class:S/T Hours:OT Hours:DT Hours:S/T Rate:OT Rate:DT Rate:Total:
John Deitchler 8 $91.05 $728.40
Joel Gallacher 14 $82.73 $1,158.22
Jacob Mowry 8 $56.39 $451.12
$0.00
$0.00
$0.00
Equipment:
Description:Equip. Number:Reg. Hours:STBY Hours:Reg. Rate:STBY Rate:Total:
Foreman Truck 8 $28.32 $226.56
Foreman Truck 14 $28.32 $396.48
$0.00
Materials:
Supplier:Ticket/Invoice #:Material QTY Units Unit Price Total:
McLendons Bark Mulch 1 EA $199.23 $199.23
$0.00
$0.00
$0.00
$0.00
$0.00
Subcontractors:
Name:Ticket/Invoice #:Material/Service:QTY:Units:Unit Price:Total:
$0.00
$0.00
Subtotal MU %Total
Labor:$2,337.74 31%$3,062.44
Equipment:$623.04 21%$753.88
Materials:$199.23 21%$241.07
Subcontractors:$0.00 12%$0.00
Grand Total:$4,057.39
Landscape Restoration
Troubleshoot &Seal two (2)wall penetrations
$199.23
(11/2014)
Sheet 1 of 1
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 3
DATE: August 30, 2023 BUDGET NO.: 412.98.594.382.65.00
PROJECT NO.: 99830103 CONTRACT NO.: 20-052
PROJECT NAME: Riverton Creek Flapgate Removal Project
TO: R.L. Alia Company
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not
included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the “Owner” and a notice to proceed is issued.
Conditions:
A.The following change, and work affected thereby, are subject to all contract stipulations and covenants;
B.The rights of the “Owner” are not prejudiced;
C. All claims against the “Owner” which are incidental to or as a consequence of this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change
orders.
CHANGE: See Attached Exhibit “A”
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
ACCEPTED: Date ________________________________ Contractor __________________________________
By _____________________________________________ Title _______________________________________
Original Contract (with tax) $ 1,503,267.15 APPROVED BY THE CITY OF TUKWILA
Previous Change Orders $ 80,737.60 Date _______________________________________
This Change Order (without tax) $ 77,669.82 By _________________________________________
Mayor
REV. CONTRACT AMOUNT $ 1,661,674.57
Original Contract Time: 115 Working Days
Additional Contract Time for previous Change Orders: 27 Days City Engineer _________________________________
Additional Contract Time for this Change Order: 36 Days
Updated Contract Time: 178 Working Days
----------------------------------------------------------------------------------------------------------------------------------------
ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w/encumbrance)
Contractor (2 of 2) Project Management File
!
20-052(c)
Council Approval N/A
PROJECT NO.: 99830103 CONTRACT NO.: 20-052
PROJECT NAME: Riverton Creek Flapgate Removal Project
DESCRIPTION OF WORK
This change order adds the following three new items to Bid Schedule A.
x 3.1 Replacement Cover Plates for Tie-Back Penetrations by Force Account
x 3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment by Force Account
x 3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates by Lump Sum
3.1 Replacement Cover Plates for Tie-Back Penetrations
This work consists of mobilization, temporary pedestrian traffic control, site preparation and site restoration, temporary scaffolding,
removing existing cover plates, welding, and grout tubes, preparing sheet pile wall surface to bare metal, prime coat application, and
installing new cover plates per provided Cover Plate Details (Sheet 19A, File No. S1.3A).
3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge Southwest Bridge Abutment
This work consists of removing existing joint sealer and dirt from the joint and installing new joint sealer.
3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates
This work consists of mobilization, containment of abrasives, collecting, testing and disposal of containment waste,
preparing the sheet pile wall to bare metal, and application of coating system. This work shall comply with WSDOT 2020
Standard Specifications in Section 6-07.
MATERIALS
All materials shall be in accordance with the provided Cover Plate detail, current contract specifications or as approved by the
Engineer.
CONSTRUCTION REQUIREMENTS
The Contractor shall perform the work in accordance with the provided Cover Plate detail, current contract plans and specifications or
as approved by the Engineer.
MEASUREMENT AND PAYMENT
3.1 “Replacement Cover Plates for Tie-Back Penetrations” will be paid in accordance with WSDOT 2020 Standard Specification
Section 1-09.6
3.2 “Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment” will be paid in accordance
with WSDOT 2020 Standard Specification Section 1-09.6
3.3 “Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates”, Section 6-07.4 of the
WSDOT 2020 Standard Specifications is supplemented with the following: There will be no separate measurement for lump sum
payment for the item “Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates”.
Payment for “Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates” shall be
per lump sum per Section 6-07 of the WSDOT 2020 Standard Specifications.
Item
#
Item Description Qty Unit Unit Price Item Cost
3.1 Replacement Cover Plates for Tie-Back Penetrations 1 EST. $41,500.00 $41,500.00
3.2 Repair Expansion Joint between Existing Retaining Wall
and Tukwila Intl. Bridge SW Bridge Abutment
1 EST. $1,000.00 $1,000.00
3.3 Surface Preparation and Coating for Previously Buried
Portion of Wall #1 and Replacement Cover Plates
1 LS $37,553.60 $37,553.60
Est. Total Coast: $80,053.60
R.L. Alia Portion (50% of Abrasive Blasting & Re-Painting): ($9,508.80)
Change Order #3 Total Estimate: $70,544.80
Tax: $7,125.02
Total: $77,669.82
CONTRACT TIME
Contract time shall be extended by (36) working days as a result of this change order.
CITY OF TUKWILA PUBLIC WORKS DEPARTMENT
6300 Southcenter Boulevard, Suite #200
Tukwila, Washington 98188
Phone: (206) 433-0179
FIELD DIRECTIVE # 5 Wall Repairs
To: R.L. Alia co.
10831 SE 181 st Street
Renton, WA 98055
Attn: Vito Alia, President
Work to be performed:
Date: May 9, 2023
Project Name: Riverton Creek Flapgate Removal
pro•ect
Project No.: 99830103
Contract No.: 20-052
Contract refers to 2020 WSDOT Standard Specifications
https:/_/wsdot.wa.gov/publications/manuals/fulltext/_M41-10/SS2020.pdf
Wall 1 Deficiencies: Paintinq System Surface Preparation, Trumpet Cover Plates. and Tieback
Protective Lid Greasina.
Re-submit Painting Plan per Section 6-07.3(2) for review and approval. Painting plan shall
address all requirements and include documents and samples listed in 2020 WSDOT
Standard Specification Section 6-07.3(2)A through 6-07.3(2)F. All components of the Painting
plan shall be Type 2 Working Drawings. Address all applicable construction requirements of
Section 6-07, and pay particular attention to Section 6-07.3(2)E - G, 6-07.3(3), and address
6-07.3(10), A Pre-Painting Conference per 6-07.3(5) is to be held with
Tukwila and WSDOT representatives.
Remove trumpet cover plates and PVC grout tubes (flush with Wall 1). Provide inspection and
documentation access for Engineer to inspect grout and soil conditions behind removed
trumpet cover plates.
Plan for grout repair procedure as required following engineer inspection of soil conditions
behind Wall 1 trumpet cover plates.
Abrasive Blast Wall 1 sections previously buried (prior to construction) including surfaces for
replacement trumpet cover plates to 1 foot below finish grade Containment shall be setup in
advance of blast operations.
Provide access for abrasive blast inspection and documentation. Save and protect planted
vegetation. If needed, restore mulch, grass, pavement, irrigation and/or any surfaces or
utilities or other items damaged as part of the operation associated with this Field Directive.
Install trumpet cover plates per Cover Plate Details 19A/32.
Apply coating system.
Provide inspection access for coating system inspection after each coat.
Apply caulking to gaps between cover plate, trumpet and Wall 1.
Provide inspection access for caulking inspection.
Remove tie-back anchor protective lids for grease inspection and documentation.
Address any grease deficiencies prior to restoring protective lids.
Gap between Existina Retaining Wall and South Abutment
• Remove displaced debris within the gap between the remaining retaining wall and south bridge
abutment.
• Install backer rod and photo document installation.
• Install caulking to seal backer rod and photo document installation.
Reason for modification:
Wall 1 Deficiencies: Paintinq System Surface Preparation, Trumpet Cover Plates, and Tieback
Protective Lid greasing.
Surface preparation deficiency — Wall 1 did not receive abrasive blasting preparation according
to Section 6-07.3(2)E prior to installing coating system. Defects have developed since the
coating system was installed.
Gap between Existing Retainina Wall and South Abutment
• Existing retaining wall has settled laterally away from the south bridge abutment. Material is
spilling out from the gap.
Work under this Field Directive modification will be accomplished:
With no change to the contract price.
C] For a lump sum increase/decrease of to the contract price.
On a unit price basis with a maximum allowable increase/decrease of
With work to start immediately and determination of any change to the contract price and/or
completion date to be negotiated. Any additional work will be tracked by force account
payment method, until the entitlement of additional payment is determined.
With no change in contract completion date.
With contract completion date extended/decreased TBD calendar days.
Performance of this Field Directive is authorized by all signatures below:
Accepted by:
Contractor's Rep — Name
PROS € c-r
Title
Approved by:
C,
City Construction Engineer
Verified by:
City Construction Inspector
Date
Date
5/9/2023
Date
S1
.
3
S1
.
3
A
19
19
A
WA
L
L
1
D
E
T
A
I
L
S
2
O
F
2
AS
S
H
O
W
N
XL XL
BD TH
C
I
T
Y
O
F
T
U
K
W
I
L
A
da
t
e
sc
a
l
e
fi
l
e
n
o
re
v
i
s
i
o
n
s
da
t
e
no
PU
B
L
I
C
W
O
R
K
S
D
E
P
T
.
pr
o
j
d
i
r
pr
o
j
e
n
g
ch
e
c
k
e
d
dr
a
w
n
de
s
i
g
n
e
d
da
t
e
by
fi
e
l
d
b
k
n
o
32 03
/
3
1
/
2
0
2
2
-E
N
G
I
N
E
E
R
I
N
G
-
S
T
R
E
E
T
S
-
W
A
T
E
R
-
S
E
W
E
R
-
P
A
R
K
S
-
B
U
I
L
D
I
N
G
-
11
2
4
1
W
i
l
l
o
w
s
R
o
a
d
N
E
,
S
u
i
t
e
2
0
0
Re
d
m
o
n
d
,
W
A
9
8
0
5
2
42
5
.
8
2
2
.
4
4
4
6
ww
w
.
o
t
a
k
.
c
o
m
RI
V
E
R
T
O
N
C
R
E
E
K
F
L
A
P
G
A
T
E
R
E
M
O
V
A
L
4/
2
8
/
2
0
4/
2
8
/
2
0
4/
2
8
/
2
0
4/
2
8
/
2
0
4/
2
8
/
2
0
R
E
C
O
R
D
D
R
A
W
I
N
G
P
R
E
L
I
M
I
N
A
R
Y
CO
V
E
R
P
L
A
T
E
D
E
T
A
I
L
S
August 3, 2023
City of Tukwila
6300 Southcenter Blvd.
Tukwila, WA 98188
Attn: Joshua Hopkins
Re: Riverton Creek Flap Gate Removal
Change Order Proposal Rev.1– FWD No.5_Wall Repairs
Mr. Hopkins,
RL Alia submits the following cost proposal for work associated with Field Directive No.5_Wall
Repairs, issued 5/09/2023.
Thank you,
ERIC ANDERSON
Office: 425-226-8100
Direct: 253-785-1477
eric@rlalia.com
ITEM DESCRIPTION UNIT UNIT QTY PRICE AMOUNT
1 Mobilization LS 1 6,000.00$ 6,000.00$
2 Bike Path Traffic Control EST. 4,000 1.00$ 4,000.00$
3 Prep Area & Install Scaffolding (Incl. Removals & Restoration) EST. 4,500 1.00$ 4,500.00$
4 Remove & Replace Cover Plates
4(a) Remove Tie-Back Cover Plates EST. 10,000 1.00$ 10,000.00$
4(b) Fill/Seal Any Voids Around Trumpets and Prep for Inspection EST. 2,000 1.00$ 2,000.00$
4(c) Install New Cover Plates EST. 15,000 1.00$ 15,000.00$
4(d) Coat New Cover Plates LS 1 3,920.00$ 3,920.00$
5 Abrasive Blasting and Surface Coating
5(a) Containment of Abrasives (Design, Construct, Maintain System) LS 1 12,320.00$ 12,320.00$
5(b) Abrasive Blasting LS 1 9,385.60$ 9,385.60$
5(c) Collecting, Testing and Disposal of Containment Waste LS 1 2,296.00$ 2,296.00$
6 Coat Wall 1 per Field Directive No.5 LS 1 9,632.00$ 9,632.00$
7 Wing Wall Repair EST. 1,000 1.00$ 1,000.00$
Est. Total Cost 80,053.60$
Alia Portion (50% Abrasive Blasting & Re-Painting) (9,508.80)$
Change Order Request 70,544.80$
August 2, 2023 REV1
RL Alia Company
10831 SE 181 Street
Renton, WA 98055
Re: Proposal for Abrasive Blasting and Coating at the Riverton Creek Project
INCLUSIONS:
1. QP1, QP2 & QS1 certifications.
2. Safety plan.
3. Containment.
4. Dust collection system installed.
5. Abrasive blasting to areas as indicated and highlighted on sheet S1.2.
(includes siding material only)
6. Disposal of spent abrasive.
7. Hand tool cleaning at areas of new plates and welds.
8. Install Coatings per WSDOT specifications.
QUALIFICATIONS:
1. Dirt to be removed at areas to be abrasive blasted is by others.
2. Ground made flat by others, so 3’ wide scaffolding can be safely installed.
3. 100% Payment to be made within ten days after project completion.
4. Tax is excluded from all prices.
COST:
1. Mobilization $7,000
2. Containment and design $11,000
3. Abrasive blasting $8,380
4. Collecting and disposal of waste $2,050
5. Installation of coating $8,600
TOTAL $37,030
Submitted by;
Dave Purcell Sr.
ID Task
Mode
Task Name Duration Start Finish
1 &ŝĞůĚŝƌĞĐƚŝǀĞEŽ͘ϱϯϳĚĂLJƐ DŽŶϴͬϭϰͬϮϯ &ƌŝϭϬͬϲͬϮϯ
2 WƌŽũĞĐƚ^ƚĂƌƚ ϬĚĂLJƐ DŽŶϴͬϭϰͬϮϯ DŽŶϴͬϭϰͬϮϯ
3 WƌĞƉƌĞĂΘ^ĞƚhƉdƌĂĨĨŝĐŽŶƚƌŽů ϰĚĂLJƐ DŽŶϴͬϭϰͬϮϯ dŚƵϴͬϭϳͬϮϯ
4 /ŶƐƚĂůů^ĐĂĨĨŽůĚŝŶŐ ϮĚĂLJƐ dŚƵϴͬϭϳͬϮϯ DŽŶϴͬϮϭͬϮϯ
5 džƉŽƐĞΘ/ŶƐƉĞĐƚdŝĞͲĂĐŬ'ƌĞĂƐĞ ϭĚĂLJ tĞĚϴͬϮϯͬϮϯ tĞĚϴͬϮϯͬϮϯ
6 ZĞŵŽǀĞdƌƵŵƉĞƚŽǀĞƌWůĂƚĞƐ ϱĚĂLJƐ dƵĞϴͬϮϮͬϮϯ DŽŶϴͬϮϴͬϮϯ
7 /ŶƐƉĞĐƚ'ƌŽƵƚͬ^ŽŝůŽŶĚŝƚŝŽŶƐ ϱĚĂLJƐ dƵĞϴͬϮϮͬϮϯ DŽŶϴͬϮϴͬϮϯ
8 'ƌŽƵƚZĞƉĂŝƌ;/ĨEĞĞĚĞĚͿ ϯĚĂLJƐ dŚƵϴͬϮϰͬϮϯ DŽŶϴͬϮϴͬϮϯ
9 ^ĞĂů'ĂƉƐĂƚWĞŶĞƚƌĂƚŝŽŶƐ ϮĚĂLJƐ dƵĞϴͬϮϵͬϮϯ tĞĚϴͬϯϬͬϮϯ
10 tŝŶŐtĂůůZĞƉĂŝƌƐ ϭĚĂLJ dŚƵϴͬϯϭͬϮϯ dŚƵϴͬϯϭͬϮϯ
11 ^ĞƚhƉŽŶƚĂŝŶŵĞŶƚ^LJƐƚĞŵ ϮĚĂLJƐ dƵĞϵͬϱͬϮϯ tĞĚϵͬϲͬϮϯ
12 ďƌĂƐŝǀĞůĂƐƚŝŶŐtĂůůϭ ϮĚĂLJƐ dŚƵϵͬϳͬϮϯ &ƌŝϵͬϴͬϮϯ
13 ZĞŵŽǀĞŽŶƚĂŝŶŵĞŶƚ^LJƐƚĞŵ ϭĚĂLJ DŽŶϵͬϭϭͬϮϯ DŽŶϵͬϭϭͬϮϯ
14 WƌĞƉΘŽĂƚtĂůůϭ ϱĚĂLJƐ dƵĞϵͬϭϮͬϮϯ DŽŶϵͬϭϴͬϮϯ
15 /ŶƐƚĂůůEĞǁŽǀĞƌWůĂƚĞƐ ϳĚĂLJƐ dƵĞϵͬϭϵͬϮϯ tĞĚϵͬϮϳͬϮϯ
16 WƌĞƉΘŽĂƚEĞǁŽǀĞƌWůĂƚĞƐ ϱĚĂLJƐ dŚƵϵͬϮϴͬϮϯ tĞĚϭϬͬϰͬϮϯ
17 ^ůŽƉĞZĞƐƚŽƌĂƚŝŽŶ ϮĚĂLJƐ dŚƵϭϬͬϱͬϮϯ &ƌŝϭϬͬϲͬϮϯ
18 WƌŽũĞĐƚŽŵƉůĞƚŝŽŶ ϬĚĂLJƐ &ƌŝϭϬͬϲͬϮϯ &ƌŝϭϬͬϲͬϮϯ
8/14
10/6
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M
Aug 13, '23 Aug 20, '23 Aug 27, '23 Sep 3, '23 Sep 10, '23 Sep 17, '23 Sep 24, '23 Oct 1, '23 Oct 8,
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: FD No.5_Construction S
Date: Wed 8/9/23
(11/2014)
Sheet 1 of 1
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 2
DATE: December 22, 2021 BUDGET NO.: 412.98.594.382.65.00
PROJECT NO.: 99830103 CONTRACT NO.: 20-052
PROJECT NAME: Riverton Creek Flapgate Removal Project
TO: R.L. Alia Company
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not
included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the “Owner” and a notice to proceed is issued.
Conditions:
A. The following change, and work affected thereby, are subject to all contract stipulations and covenants;
B. The rights of the “Owner” are not prejudiced;
C. All claims against the “Owner” which are incidental to or as a consequence of this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change
orders.
CHANGE: See Attached Exhibit “A”
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
ACCEPTED: Date ________________________________ Contractor __________________________________
By _____________________________________________ Title _______________________________________
Original Contract (without tax) $ 1,366,606.50 APPROVED BY THE CITY OF TUKWILA
Previous Change Order $ 47,808.17 Date _______________________________________
This Change Order (without tax) $ 25,522.98 By _________________________________________
Mayor
REV. CONTRACT AMOUNT $ 1,439,937.65
Original Contract Time: 115 Working Days
Additional Contract Time for previous Change Orders: 24 Days City Engineer _________________________________
Additional Contract Time for this Change Order: 3 Days
Updated Contract Time: 142 Working Days
----------------------------------------------------------------------------------------------------------------------------------------
ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w/encumbrance)
Contractor (2 of 2) Project Management File
PW Project Finance File
12/22/21
HP
12/29/2021
EXHIBIT “A”
CHANGE:
Geotextile Fabric
The geotextile is an integral component in the slope stability of the new creek channel. This item
is included in the contract but does not have an associated payment item. This change is to
provide a means of payment for the geotextile fabric that was installed per plan.
Cost And Time Considerations:
Cost
As requested by the City, the Contractor provided a price for this work. The City accepts the
proposed price of $10/SY for up to 516 SY of geotextile fabric that has been installed per plan.
The completion of this work has been verified by the city inspector and the final quantity is to be
determined. See Exhibit A.1
The total compensation due to the Contractor for the Geotextile fabric as part of this Change
Order is $5,160.00
Additional Working Days
No additional time is required or granted for this work.
Viewpoint
The City would like the Contractor to construct a small trailside space that will provide a place
for trail users to view the river and restoration work, to rest, gather and read informational
signage safely away from fast-moving bicycle traffic. See Exhibit A.2
The Contractor was asked to provide a price for viewpoint plan based on the attached Viewpoint
Plan Addendum #1. The item will be payed as a lump sum item, with the exception of
Commercial HMA and crushed surfacing base course, which have their own contract bid items
(#33 and 34, respectively). See Exhibit A.3
Cost And Time Considerations:
Cost
The total compensation due to the Contractor for the Viewpoint as part of this Change Order is
$20,362.98.
Additional Working Days
Three (3) additional working days are being granted for this work.
EXHIBIT A.1
E
X
H
I
B
I
T
A
.
2
R. L. Alia Company
Work for City of Tukwila Date
Riverton Creek Flap Gate Removal
Additional Viewpoint
LABOR Hrs/Units Rate Subtotal Total
Foreman - Bobby $85.30 $0.00
Foreman - Leith 16 $85.69 $1,371.04
Foreman - Raul 16 $81.92 $1,310.72
Cement Mason 24 $78.30 $1,879.20
Pipelayer $62.78 $0.00
Operator $81.08 $0.00
Carpenter $74.94 $0.00
Truck Driver 8 $72.07 $576.56
80% Cement Mason 12 $66.78 $801.36
Laborer $61.64 $0.00
90% Laborer $56.97 $0.00
TCS $63.55 $0.00
Flagger $52.31 $0.00
$5,938.88
31% markup $1,841.05 $7,779.93
COMPANY EQUIPMENT
Takeuchi Mini Ex $26.22 $0.00
938 Loader $52.01 $0.00
Truck 068 8 $57.29 $458.32
Leith Pickup 16 $28.32 $453.12
Bobby Pickup $24.24 $0.00
Concrete Pickup 28 $36.42 $1,019.76
F650 Pickup $37.60 $0.00
Foreman's Truck $28.32 $0.00
$1,931.20
21% markup $405.55 $2,336.75
SUCONTRACTORS
Sandblasting 1 $2,850.00 $2,850.00
$0.00
$2,850.00
12% markup $342.00 $3,192.00
MATERIALS, RENTALS, OTHER
Plastic and Forms 1 $300.00 $300.00
Concrete 1 $700.00 $700.00
Concete Sealer 1 $80.00 $80.00
Rental Bobcat Skid Steer 1 $300.00 $300.00
Seat Boulder 1 $1,000.00 $1,000.00
Info Sign Stand 1 $3,300.00 $3,300.00
Anti-Grafitti Coating 1 $150.00 $150.00
$5,830.00
21% markup $1,224.30 $7,054.30
Total $20,362.98
EXHIBIT A.3
&,7<2)78.:,/$&$3,7$/352-(&76800$5<
WR
352-(&7 5LYHUWRQ&UHHN)ODS*DWH5HPRYDO
3URMHFW1R
'(6&5,37,21
-867,),&$7,21
67$786
0$,17,03$&7
&200(17
),1$1&,$/ 7KURXJK (VWLPDWHG
LQ
V %(<21' 727$/
(;3(16(6
'HVLJQ
/DQG5:
0RQLWRULQJ
&RQVW0JPW
&RQVWUXFWLRQ
727$/(;3(16(6
)81'6285&(6
$ZDUGHG*UDQW5&2
.LQJ&RXQW\*UDQW
3HRSOHIRU3XJHW6
0LWLJDWLRQ([SHFWHG
8WLOLW\5HYHQXH
727$/6285&(6
&RQVWUXFWLRQIXQGLQJIURPWKH6WDWH5&26DOPRQ5HFRYHU\)XQGLQJ%RDUG.LQJ&RXQW\&RRSHUDWLYH:DWHUVKHG
0DQDJHPHQW.LQJ&RXQW\2SSRUWXQLW\)XQGVWKH:5,$5HJUHHQWKH*UHHQ3URJUDPDQG&LW\6XUIDFH:DWHU
)XQGV
5HPRYHWZRFXOYHUWVDQGIODSJDWHVWKDWFRQIOXHQFHZLWKWKH'XZDPLVK5LYHUGD\OLJKWFUHHNLQVWDOOWUDLOEULGJH
RYHUFUHHNKDELWDWLPSURYHPHQWVDQGSODQWLQJIRUOLQHDOIHHWRIFUHHNLQFDFUHEDFNZDWHUZHWODQG
KDELWDWDQGIWRIULYHUDVVRFLDWHGVWUXFWXUDOLPSURYHPHQWVIRU7,%URDGZD\DQGDGMDFHQWFRPPHUFLDO
SURSHUW\
,QFUHDVHDYDLODEOHVDOPRQLGUHDULQJKDELWDWDQGLQFUHDVHIORRGUHIXJHLQORZHU'XZDPLVK5LYHU
,PSURYHILVKDFFHVVWR5LYHUWRQ&UHHNDQGHQKDQFHVDOPRQUHDULQJDQGUHVWLQJDUHD
3URMHFWFRQVWUXFWLRQEHJDQLQ
([SHFWHGWRLQFUHDVHPDLQWHQDQFH
2021 - 2026 Capital Improvement Program
03/09/2021
CITY OF TUKWILA WASHINGTON
(Owner)
By:
Mayor
42// Zoo
cb-.14 °11#4t-v")
City Clerk
Attest:
This j day of , 2014'
20-052
Council Approval 6/15/20
C-1
AGREEMENT FORM
CONTRACT NO. 20-052
THIS AGREEMENT is made and entered into on this 4- day of -3-(Ine , 20 ZO, by and between
the City of Tukwila, Washington ("Owner") and R. L. ALIA Company ("Contractor"). Now,
therefore the parties agree as follows:
Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for
the project entitled RIVERTON CREEK FLAP GATE REMOVAL, Project No. 98-DR03, including all changes
to the Work and force account work, in accordance with the Contract Documents, as described in Section 1-
04.2 of the Supplemental General Requirements.
Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force account as
specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment.
The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work.
Completion Date. Contract time shall commence upon Owner's Notice to Proceed date. The Work
under this Agreement shall be completed within the time specified in the Proposal. If the Work under this
Agreement is not completed within the time specified, as detailed in the Contract Documents, Contractor shall
pay liquidated damages and all engineering inspection and supervision costs to Owner as specified in the
Proposal.
Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party
shall be entitled to recover its costs, including reasonable attorney's and expert witness fees.
Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this Agreement,
except as expressly provided in this Agreement.
Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of
which shall for all purposes be deemed an original.
R. L. 41/4 fty'il-Afy
Approved as to Form:
ci174-1/te k9eutee
KO, 7,1...k3 ',Lnc,54,1,211370,60,640ai
City Attorney
Address for giving notices:
6200 Southcenter Boulevard
WA 98188
(Contractor
By:
Title: PPEcihc•—Air
Attest:
This 5Y14 day of 1-(7/46 202-e)
vr
Contractor's License No.
RL 41. /a PT
Address for giving notices:
/ecS3/ 56 /K/sr SraEET
kcitrov, (Ain ?rocs —
Riverton Creek Flap Gate Removal Rev. 5-13-14
51- f ny i` CdS
C-2
PAYMENT AND PERFORMANCE BOND
Bond to City of Tukwila, Washington
Bond No. 2305021
We, R.L. Alia Company , and North American Specialty Insurance Compapy
(Principal) (Surety)
a New Hampshire corporation, and as a surety corporation authorized to become a surety upon
Bonds of Contractors with municipal corporations in Washington State, are jointly and severally
bound to the City of Tukwila, Washington ("Owner"), in the penal sum of
One Million Five Hundred Three Thousand Two Hundred Sixty Seven Dollars and 15/100 Dollars
($1,503,267.15 ), the payment of which sum, on demand, we bind ourselves and our
successors, heirs, administrators, executors, or personal representatives, as the case may be. This
Payment and Performance Bond is provided to secure the performance of Principal in connection
with a contract dated 3.%),r‘c Z`n , 2020, between Principal and Owner for a project
entitled RIVERTON CREEK FLAP GATE REMOVAL, Contract No. 10 —05Z ("Contract"). The
initial penal sum shall equal 100% of the Total Bid Price, including sales tax, as specified in the
Proposal submitted by Principal.
NOW, THEREFORE, this Payment and Performance Bond shall be satisfied and released only
upon the condition that Principal:
Faithfully performs all provisions of the Contract and changes authorized by Owner in the
manner and within the time specified as may be extended under the Contract;
Pays all laborers, mechanics, subcontractors, lower tier subcontractors, material men,
and all other persons or agents who supply labor, equipment, or materials to the Project;
Indemnifies and holds Owner, its officers, and agents harmless from and against all
claims, liabilities, causes of action, damages, and costs for such payments for labor,
equipment, and materials by satisfying all claims and demands incurred under the
Contract, and reimbursing and paying Owner all expenses that Owner may incur in
making good any default by Principal; and
Indemnifies and holds Owner harmless from all claims, liabilities, causes of action,
damages and costs, including property damages and personal injuries, resulting from any
defect appearing or developing in the material provided or workmanship performed under
the Contract.
The indemnities to Owner shall also inure to the benefit of the Consulting Engineers and other
design professionals retained by Owner in connection with the Project.
The liability of Surety shall be limited to the penal sum of this Payment and Performance Bond.
No change, extension of time, alteration, or addition to the terms of the Contract or to the Work to
be performed under the Contract shall in any way affect Surety's obligation on the Payment and
Performance Bond. Surety hereby waives notice of any change, extension of time, alteration, or
addition to the terms of the Contract or the Work, with the exception that Surety shall be notified if
the Contract time is extended by more than twenty percent (20%).
If any modification or change increases the total amount to be paid under the Contract, Surety's
obligation under this Payment and Performance Bond shall automatically increase in a like amount.
Any such increase shall not exceed twenty-five percent (25%) of the original amount of the
Payment and Performance Bond without the prior written consent of Surety.
Riverton Creek Flap Gate Removal Rev. 5-13-14
Payment & Performance Bond C-3
This Payment and Performance Bond shall be governed and construed by the laws of the State of
Washington, and venue shall be in King County, Washington.
IN WITNESS WHEREOF, the parties have executed this instrument in two (2) identical
counterparts this 2!Ik t' day of (71t)r)e. , 20 2 0.
R.L. Alia Company North American Specialty Insurance Company
Principal Surety
Signature of Authorized Official
PR6'S heist
Title Attorney in Fact
(Attach Power of Attorney)
Name and address of local office of Parker, Smith & Feek, Inc.
agent and/or Surety Company: 2233 112th Ave. N.E.
Bellevue, WA 98004
Surety companies executing bonds must appear on the current Authorized Insurance List in the State of
Washington per Section 1-02.7 of the Standard Specifications.
Signature of Authorized Official
By Deanna M. French