City of Tukwila
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Committee
Henry Hash, Public Works Director
Scott Bates, Traffic Engineering Project Manager
Mayor Ekberg
July 17, 2020
SUBJECT: 2020 Overlay and Repair Program Project
Project No. 92010401
Bid Award to Miles Resources, LLC
ISSUE
Award the bid for construction of the 2020 Overlay and Repair Program.
BACKGROUND
Allan Ekberg, Mayor
The Overlay and Repair Program preserves and maintains the street structure in a safe and useable
condition. Due to budgetary impacts of Covid-19, this year's Overlay program was reduced to two
locations and advertising was delayed by three months. Construction will include pavement repairs
and an asphalt overlay on S158t" Street from 39t" PI S to 42nd Ave S and 54t" Ave South from S 166tn
St to Slade Way.
ANALYSIS
A call for bids was advertised for the 2020 Overlay and Repair Program on June 23 and 30, 2020
and three bids were opened on July 7, 2020. The confirmed lowest bidder was Miles Resources,
LLC. with a bid of $299,449.05 with an Engineer's Estimate was $296,735.00. There were no
bidding errors.
BUDGET AND BID SUMMARY (All amounts include sales tax)
Bid Results Engineer's Estimate 2020 Budget
Bid Schedule "A" Overlay $299,449.05 $296,735.00 $315,000.00
Contingency (5%) $14,972.45
Total $314,421.50 $296,735.00 $315,000.00
RECOMMENDATION
Council is being asked to award the construction contract for the 2020 Overlay and Repair
Program to Miles Resources, LLC in the amount of $299,449.05 and to consider this item
under New Business at the July 20, 2020 Regular Meeting.
ATTACHMENTS: Vicinity Map
Page 16, 2019 CIP
Bid Tabulation
https://tukwilawa.sharepoint.com/sites/publicworks/enginceringiPW Drop Box/01 TIC Agenda/Agenda Items/TIC 07-20-2020/2020 Overlay Bid Award/Info Memo_ 20200vertayBidAward.docx 25
S sBST
NU UM
R B96n 5�' OF
GHi
9IDD n 8. V �
^6IM n�qs s
� BOEING ACCLSS RD
F '
S I 51. IT
GOEFE&
COUNTRY a109
CLUB S 111 R ,yi S 112 IT I
g S I13 61 S S
Si j55t'� 14�1 ST d.
S 116n WA6 6116 a ~�V
2. m SBSI SWRW Si
S
5. � n6n
s R „ ?s
� S 124 6l tP ^5
S 127ST
S S 126 i„ SR R o
Yn 9 Gph"WPU S Y 15
�y SPECIALTY6139 n d' ST
R e a J c3 sqa r H
S 136n
S 1. IT „ i m S136n 0.^ $ FOSTER
C—SE
sun h sn9 sT"
OSTE
" IT
21426T � Tip, �St 4 a�
� S N4 S 143 Si
F SIM
' S146n G S1W 61
'^ 1148 n _ „ 147 ST
S I<95T DENT
BIB 616Dn m� „_ L 1 n 5 516D SL5149} 64
PARR
51625T 5151n 5116 Lt 161n
S 1}2 SL v 6I?IT S16 g yyU
,; 518 61
aSu S� C WS BIND'"
l) 51 Si
� a M PIRI;WAY _
z „� 4 „ S160u 16 IT dIN6 r16
S S164 IT „ SIRAtAER 9LW
S 158TH ST m 516� �
ME
_ I
OiiPoAAh
DRM1E N
O BJRAR
oPolf S MIN I£RA L
54TH AVE S Up- DR
- ulouxo oR � I
IRI
S3I LAND DR
916on -
J 2GAU Po DR ' a v
8 R1KR5
a
2a 9,
11rv-J �
2020 TUKWILA OVERLAY
VICINITY MAP
' • ' 92010401 07/08/2020
26
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: Annual Overlay and Repair Program Project No. 9xx10401
DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets.
JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also
minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects.
STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay.
MAINT. IMPACT: Reduces annual maintenance.
COMMENT: Ongoing project. Only one year actuals shown in first column.
FINANCIAL Through Estimated
(in $000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL
EXPENSES
Design
149
150
150
150
150
150
150
150
150
1,349
Land(R/W)
0
Const. Mgmt.
151
200
200
200
200
200
200
200
200
1,751
Construction
526
1,050
1,050
1,050
1,050
1,050
1,050
1,050
1,050
8,926
TOTAL EXPENSES
826
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
12,026
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
826
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
12,026
TOTAL SOURCES
826
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
12,026
2019 - 2024 Capital Improvement Program 16 27
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2020 Overlay Program
BID TABULATION
Tukwila Project # 92010401
Apparent Low Bid
July 07, 2020
Engineer's Estimate
Miles Resources, LLC
Tucci & Sons, Inc
Lakeside Industries
[NTo.Section
No.
Item
Qty
Unit
Unit Cost
Total Cost
Unit Cost
Total Cost -1L
Unit Cost
Total Cost
Unit Cost
Total Cost
SCHEDULE A - Overlay Program
ROADWAY
1
1-04
Unexpected Site Changes
1
FA
$ 6,000.00
$ 6,000.00
$ 6,000.00
$ 6,000.00
$ 6,000.00
$ 6,000.00
$ 6,000.00
$ 6,000.00
2
1-05
ADA Features Surveying
1
LS
$ 1,000.00
$ 1,000.00
$ 3,140.00
$ 3,140.00
$ 3,500.00
$ 3,500.00
$ 3,500.00
$ 3,500.00
3
1-07
Resolution of Utility Conflicts
1
FA
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
4
1-07
SPCC Plan
1
LS
$ 1,000.00
$ 1,000.00
$ 520.00
$ 520.00
$ 250.00
$ 250.00
$ 100.00
$ 100.00
5
1-09
Mobilization
1
LS
$ 15,000.00
$ 15,000.00
$ 16,500.00
$ 16,500.00
$ 60,000.00
$ 60,000.00
$ 54,500.00
$ 54,500.00
6
1-10
Project Temporary Traffic Control
1
LS
$ 5,500.00
$ 5,500.00
$ 43,000.00
$ 43,000.00
$ 35,000.00
$ 35,000.00
$ 60,000.00
$ 60,000.00
7
2-02
Asphalt Pavement Removal
70
SY
I $ 45.00
$ 3,150.00
$ 54.25
$ 3,797.50
$ 12.00
$ 840.00
$ 14.00
$ 980.00
8
2-02
Cement Conc. Sidewalk Removal Incl. Haul
60
SY
$ 55.00
$ 3,300.00
$ 41.00
$ 2,460.00
$ 25.00
$ 1,500.00
$ 75.00
$ 4,500.00
9
2-02
Cement Conc. Curb Removal Incl. Haul
130
LF
$ 25.00
$ 3,250.00
$ 20.50
$ 2,665.00
$ 30.00
$ 3,900.00
$ 30.00
$ 3,900.00
10
2-02
Removal of Structure and Obstruction
1
LS
$ 2,000.00
$ 2,000.00
$ 570.00
$ 570.00
$ 2,000.00
$ 2,000.00
$ 1,000.00
$ 1,000.00
11
2-02
Roadway Excavation Incl. Haul
40
CY
$ 90.00
$ 3,600.00
$ 66.40
$ 2,656.00
$ 25.00
$ 1,000.00
$ 50.00
$ 2,000.00
12
2-03
Unsuitable Foundation Excavation Incl. Haul
20
CY
$ 95.00
$ 1,900.00
$ 101.00
$ 2,020.00
$ 50.00
$ 1,000.00
$ 50.00
$ 1,000.00
13
2-03
Gravel Borrow Incl. Haul
50
TON
$ 25.00
$ 1,250.00
$ 24.50
$ 1,225.00
$ 50.00
$ 2,500.00
$ 20.00
$ 1,000.00
14
4-04
Crushed Surfacing Top Course
100
TON
$ 60.00
$ 6,000.00
$ 68.00
$ 6,800.00
$ 25.00
$ 2,500.00
$ 50.00
$ 5,000.00
15
5-04
Pavement Repair Excavation Incl. Haul
40
CY
$ 90.00
$ 3,600.00
$ 64.85
$ 2,594.00
$ 20.00
$ 800.00
$ 100.00
$ 4,000.00
16
5-04
HMA Cl. 1/2" PG 581-1-22
900
TON
$ 100.00
$ 90,000.00
$ 87.25
$ 78,525.00
$ 95.00
$ 85,500.00
$ 110.00
$ 99,000.00
17
5-04
HMA for Pavement Repair Cl. 1/2" PG 581-1-22
25
TON
$ 200.00
$ 5,000.00
$ 248.25
$ 6,206.25
$ 200.00
$ 5,000.00
$ 165.00
$ 4,125.00
18
5-04
Temporary Pavement
10
TON
$ 175.00
$ 1,750.00
$ 159.00
$ 1,590.00
$ 150.00
$ 1,500.00
$ 200.00
$ 2,000.00
19
5-04
Thickened Ede
1,800
LF
$ 4.00
$ 7,200.00
$ 0.70
$ 1,260.00
$ 1.50
$ 2,700.00
$ 1.00
$ 1,800.00
20
5-04
Planing Bituminous Pavement
5,570
SY
$ 5.00
$ 27,850.00
$ 4.95
$ 27,571.50
$ 5.00
$ 27,850.00
$ 6.00
$ 33,420.00
21
7-12
Adjust Water Valve
2
EA
$ 500.00
$ 1,000.00
$ 912.50
$ 1,825.00
$ 600.00
$ 1,200.00
$ 400.00
$ 800.00
22
8-01
Erosion/WaterPollution Control
1
FA
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
23
8-01
Inlet Protection
24
EA
$ 80.00
$ 1,920.00
$ 90.00
$ 2,160.00
$ 75.00
$ 1,800.00
$ 75.00
$ 1,800.00
24
8-04
Cement Conc. Curb and Gutter
50
LF
$ 40.00
$ 2,000.00
$ 45.60
$ 2,280.00
$ 175.00
$ 8,750.00
$ 40.00
$ 2,000.00
25
8-04
Extruded Curb
40
LF
$ 25.00
$ 1,000.00
$ 34.20
$ 1,368.00
$ 100.00
$ 4,000.00
$ 30.00
$ 1,200.00
26
8-06
Cement Conc. Driveway Entrance
40
SY
$ 80.00
$ 3,200.00
$ 74.00
$ 2,960.00
$ 225.00
$ 9,000.00
$ 65.00
$ 2,600.00
27
8-11
Raising Existing Beam Guardrail
450
LF
$ 75.00
$ 33,750.00
$ 28.68
$ 12,906.00
$ 30.00
$ 13,500.00
$ 25.00
$ 11,250.00
28
8-11
Beam Guardrail
270
LF
$ 100.00
$ 27,000.00
$ 103.10
$ 27,837.00
$ 100.00
$ 27,000.00
$ 40.00
$ 10,800.00
SIDEWALK
29 8-14
Cement Conc. Sidewalk 20
SY
$ 80.00
$ 1,600.00
$ 91.20
$ 1,824.00
$ 175.00
$ 3,500.00
$ 80.00
$ 1,600.00
30 8-14
Cement Conc. Curb Ramp 2
EA
$ 3,000.00
$ 6,000.00
$ 2,850.00
$ 5,700.00
$ 7,000.00
$ 14,000.00
$ 2,500.00
$ 5,000.00
31 8-14
Cement Conc. Pedestrian Curb 10
LF
$ 30.00
$ 300.00
$ 49.00
$ 490.00
$ 50.00
$ 500.00
$ 43.00
$ 430.00
32 8-26
Non -Skid Surface Treatment 20
SF
$ 25.00
$ 500.00
$ 74.00
$ 1,480.On
$ 125.00
$ 2,500.00
$ 65.00
$ 1,300.00
STORM SEWER
33
1 7-05
JAdjust Catch Basin
23
EA
$ 800.00
$ 18,600.00
$ 655.50
$ 15,076.50
$ 350.00
$ 8,050.00
$ 800.00
$ 18,400.00
34
7-05
Storm Drain Marker
23
EA
$ 30.00
$ 690.00
$ 22.80
$ 524.40 I
L$- 45.00
$ 1,035.00
1 $ 20.00
$ 460.00
SANITARY SEWER
35 1 7-05
JAdjustManhole 7 EA 7 $ 900.00 1 $ 6,300.00
$ 1,000.00 1 $ 7,000.00 1 $ 600.00 1 $ 4,200.00 1 $ 550.00 1 $ 3,850.00
TRAFFIC CONTROL
DEVICES
36
8-09
Raised Pavement Marker Type 2
3
EA
$ 5.00
$ 15.00
$ 5.70
$ 17.10
$ 100.00
$ 300.00
$ 5.00
$ 15.00
37
8-21
Permanent Signing
1
LS
$ 250.00
$ 250.00
$ 1,026.00
$ 1,026.00
$ 500.00
$ 500.00
$ 1.00
$ 1.00
38
8-22
Paint Line, 4 Inch
2,360
LF
$ 0.50
$ 1,180.00
$ 0.88
$ 2,076.80
$ 1.20
$ 2,832.00
$ 0.77
$ 1,817.20
39
8-23
ITemporary Pavement Markings
700
LF
$ 0.40
$ 280.00
$ 1.14
$ 798.00
$ 0.60
$ 420.00
$ 2.00
$ 1,400.00
ROADSIDE DEVELOPMENT
40 8-02 1 Property Restoration F 1 FA
$ 1,000.00 $ 1,000.00
$ 1,000.00 $ 1,000.00
$ 1,000.00 Is 1,000.00
$ 1,000.00 1 $ 1,000.00
TOTAL
ESTIMATE
$ 296,735.00
TOTAL BID
$ 299,449.05
TOTAL BID
$ 349,427.00
TOTAL BID
$ 355,548.20