HomeMy WebLinkAboutTIC 2020-07-20 Item 2C - Bid Award - Strander Boulevard - Andover Park East Sewer Repair with RL Alia CompanyCity of Tukwila Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director BY: Adib Altallal, Utilities Engineer CC: Mayor Ekberg DATE: July 17, 2020 SUBJECT: Sewer Fund - 2020 Strander Boulevard and Andover Park East Sewer Repair Project No. 91140203 Bid Award to R.L. Alia Company ISSUE Award the bid for construction of the 2020 Strander Boulevard and Andover Park East Sewer Repair Project. BACKGROUND This project is for a vital sewer repair at the intersection of Andover Park East and Costco Drive and along Strander Boulevard. The pipe at both sites are failing and in need of urgent repair. DISCUSSION The 2020 Strander Boulevard and Andover Park East Sewer Repair call for bids was posted on June 18, 2020 to the Builders Exchange of Washington, Seattle Times, and the Daily Journal for three weeks. Four bids were received via City Hall's drop box by the due date of July 9, 2020. The bids were checked and tabulated. The apparent low bidder is R.L. Alia Company with a bid of $258,830.00 and the Engineer's Estimate was $250,003.00. FISCAL IMPACT (All amounts include sales tax) The 2020 Strander Boulevard and Andover Park East Sewer Repair Project construction is funded under the Annual Sewer Repair Program CIP. The $559,000 construction budget will cover the value of the contract and leave funds for any upcoming sewer repairs before the end of the year. Bid Results Estimate Budget Bid Amount $258,830.00 $250,003.00 $284,713.00 Contingency (10%) $25,883.00 $25,000.30 Total $ 284,713.00 J275 003.30 284 713.00 RECOMMENDATION Council is being asked to award the construction contract for the 2020 Strander Boulevard and Andover Park East Sewer Repair Project to R. L. Alia Company in the amount of $258,830.00 and to consider this item under New Business at the July 20, 2020 Regular Meeting. Attachments: Page 76, 2019 CIP Bid Tabulation https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 07-20-2020/2020 Strander Boulevard and Andover Park East Sewer Repair/Info Memo Bid Award-2020 Strander Blvd and APE Sewer Repair_20200720.docx 29 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Annual Sewer Repair Program Project No. Varies DESCRIPTION: Reduce sewer line infiltration and inflow (I & 1) through groundwater intrusion or storm events as a result of damaged deteriorating systems or illicit connections. Include small repairs and capital maintenance. JUSTIFICATION: Decrease treatment, discharge, and pumping costs. STATUS: Annual program is determined after pipeline TV inspection reports are completed. MAINT. IMPACT: Less maintenance costs through rehabilitation of aging system. COMMENT: Ongoing project, only one year actuals shown in first column. FINANCIAL Through Estimated (in 1000'sl 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL EXPENSES Design 3 15 10 10 38 Land (R/W) 0 Const. Mgmt. 0 Construction 0 359 200 200 200 200 200 200 1,559 TOTAL EXPENSES 1 3 1 15 369 1 210 1 200 1 200 1 200 1 200 1 200 1 1,597 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 3 15 369 210 200 200 200 200 200 1,597 TOTAL SOURCES 3 15 369 210 200 200 200 200 200 1,597 Ertjet Locat irec5ystemion. -� a G15 2019 - 2024 Capital Improvement Program 76 30 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2020 Strander Boulevard and Andover Park East Sewer Repair BID TABULATION Tukwila Proiect # 91140203 Apparent Low Bid July 09, 2020 11 Engineer's Estimate R. L. Alia Company IF Northwest Cascade Inc. Rodarte Construction Inc. Highland Civil No. Item Qty Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Base Bid 1 Mobilization/Demobilization 1 LSl$E29,71100.00 $ 29,700.00 $ 20,000.00 $ 20,000.00 $ 38,000.00 $ 38,000.00 $ 31,000.00 $ 31,000.00 $ 36,770.00 $ 36,770.00 2 Traffic Control - Flagger Labor (Minimum Bid of $43.11) 160 HR75.00 $ 12,000.00 $ 70.00 $ 11,200.00 $ 62.00 $ 9,920.00 $ 55.00 $ 8,800.00 $ 120.00 $ 19,200.00 3 Tem ora Traffic Control 1 LS00.45 $ 14,000.45 $ 500.00 $ 500.00 $ 29,975.00 $ 29,975.00 $ 36,000.00 $ 36,000.00 $ 29,890.00 $ 29,890.00 4 Temporary Erosion Control 1 LS0.00 $ 4,000.00 $ 4,500.00 $ 4,500.00 $ 5,400.00 $ 5,400.00 $ 15,000.00 $ 15,000.00 $ 20,350.00 $ 20,350.00 5 Trench Safety and Shoring 1 LS $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 9,100.00 $ 9,100.00 $ 500.00 $ 500.00 $ 20,670.00 $ 20,670.00 6 Dewatering Using Sumping Only - Andover Park East Project Site 1 LS $ 5,000.00 $ 5,000.00 $ 2,000.00 $ 2,000.00 $ 21,350.00 $ 21,350.00 $ 15,000.00 $ 15,000.00 $ 25,140.00 $ 25,140.00 7 Dewatering Using Sumping Only - Strander Boulevard Project Site 1 LS $ 5,000.00 $ 5,000.00 $ 2,000.00 $ 2,000.00 $ 11,200.00 $ 11,200.00 $ 15,000.00 $ 15,000.00 $ 25,140.00 $ 25,140.00 8 Pothole Existing Utilities 9 EA $ 1,000.00 $ 9,000.00 $ 850.00 $ 7,650.00 $ 1,100.00 $ 9,900.00 $ 825.00 $ 7,425.00 $ 1,420.00 $ 12,780.00 9 Provide, Install, and Manage Temporary Wastewater Bypasses 1 LS $ 10,000.00 $ 10,000.00 $ 3,500.00 $ 3,500.00 $ 12,500.00 $ 12,500.00 $ 20,000.00 $ 20,000.00 $ 44,520.00 $ 44,520.00 10 8- and 12-Inch PVC Gravity Sewer Pipe 115 LF $ 460.00 $ 52,900.00 $ 800.00 $ 92,000.00 $ 230.00 $ 26,450.00 $ 500.00 $ 57,500.00 $ 1,320.00 $ 151,800.00 11 Connect to Existing Sewer Main 2 EA $ 1,500.00 $ 3,000.00 $ 500.00 $ 1,000.00 $ 725.00 $ 1,450.00 $ 4,000.00 $ 8,000.00 $ 2,110.00 $ 4,220.00 12 Reestablish MH Penetrations 2 EA $ 2,500.00 $ 5,000.00 $ 500.00 $ 1,000.00 $ 1,945.00 $ 3,890.00 $ 3,000.00 $ 6,000.00 $ 940.00 $ 1,880.00 13 1 Crushed Surfacing Base Course Backfill 450 TONS $ 40.00 $ 18,000.00 $ 40.00 $ 18,000.00 $ 48.00 $ 21,600.00 $ 55.00 $ 24,750.00 $ 55.30 $ 24,885.00 14 1 Foundation Material 100 CY $ 84.00 $ 8,400.00 $ 75.00 $ 7,500.00 $ 115.00 $ 11,500.00 $ 65.00 $ 6,500.00 $ 190.00 $ 19,000.00 15 HMA for Trench Paving 90 TONS 1 $ 225.00 $ 20,250.00 $ 425.00 $ 38,250.00 $ 340.00 $ 30,600.00 $ 425.00 $ 38,250.00 $ 170.00 $ 15,300.00 16 6-Inch Thick Crushed Surfacing Top Course Subgrade Layer 135 SY $ 15.00 $ 2,025.00 $ 20.00 $ 2,700.00 $ 25.00 $ 3,375.00 $ 30.00 $ 4,050.00 $ 38.20 $ 5,157.00 17 Post= Con struction Sewer Main Cleaning and Video Inspection 1 LS $ 2,000.00 1$ 2,000.00 $ 4,000.00 1$ 4,000.00 $ 3,000.00 $ 3,000.00 $ 4,000.00 1$ 4,000.00 $ 10,160.00 1 $ 10,160.00 18 Restoration 1 LS $ 11,000.00 $ 11,000.00 $ 4,000.00 $ 4,000.00 $ 24,000.00 $ 24,000.00 $ 10,000.00 $ 10,000.00 $ 26,160.00 $ 26,160.00 19 Force Account - Minor Changes L 1 LS $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,Oo0.o0 $ 15,000.00 $ 15,ono.on $ 15,000.00 $ 15,000.00 Bid ALTERNATE No. 1 A6 Dewatering Vacuum Wellpoint System, if Needed to Support Sumping - Andover Park East Project Site 1 LS $ 10,000.00 $ 10,000.00 $ 1,000.00 $ 1,000.00 $ 21,750.00 $ 21,750.00 $ 75,000.00 $ 75,000.00 $ 21,380.00 $ 21,380.00 A7 Dewatering Vacuum Wellpoint System, if Needed to Support Sumping - Strander Boulevard Project Site 1 LS $ 10,000.00 $ 10,000.00 $ 1,000.00 $ 1,000.00 $ 21,750.00 $ 21,750.00 $ 65,000.00 $ 65,000.00 $ 11,650.00 $ 11,650.00 Bid ALTERNATE No. 1 11 Sale Tax 10.0% 1 $ 22,727.55 $ 23,530.00 $ 28,821.00 $ 32,277.50 $ 50,802.20 TOTAL ESTIMATE $ 250,003.00 TOTAL BID $ 258,830.00 TOTAL BID $ 317,031.00 TOTAL BID $ 355,052.50 TOTAL BID $ 558,824.20 1 of 1 31