Loading...
HomeMy WebLinkAboutPermit D16-0079 - STENSON RESIDENCE - GARAGESTENSON GARAGE 14112 57TH(jJ S D16-0079 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 3365900775 Permit Number: 14112 57TH AVE S Issue Date: Permit Expires On: STENSON GARAGE D16-0079 5/19/2016 11/15/2016 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: STENSON FRED LEE 155 A SW 152ND STREET, BURIEN, WA, 98166 LEE STENSON 155 SW 152 ST, BURIEN, WA, 98166 AFFIDAVIT - F. LEE STENSON LEE STENSON 155 SW 152 ST, BURIEN, WA, 98166 Phone: (206) 423-8425 Phone: Expiration Date: DESCRIPTION OF WORK: CONSTRUCT DETACHED GARAGE/SHOP. Project Valuation: $11,784.00 Type of Fire Protection: Sprinklers: NO Fire Alarm: NO Type of Construction: VB Electrical Service Provided by: TUKWILA FIRE SERVICE Fees Collected: $557.86 Occupancy per IBC: U Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 Permit Center Authorized Signature: Date: S —( (°1 5°" I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Date: 7/ /2VI This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 6: All wood to remain in placed concrete shall be treated wood. 7: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 8: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 10: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is placed unless a tremie is to be used or unless otherwise permitted by the building official. All debris and ice shall be removed from spaces to be occupied by concrete. 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0301 CONCRETE SLAB 0201 FOOTING 0409 FRAMING 0606 GLAZING 0401 ROOF SHEATHING 0412 UNDERFLOOR FRAMING 0413 WALL SHEATHING/SHEAR CITY OF TUKh Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. Project No. Date Application Accepted: Date Application Expires: (a — OOT1 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 14112 57th ave S Tenant Name: Lee Stenson (owner) PROPERTY OWNER Name: Lee Stenson Name: Lee Stenson City: Burien State: wa Zip: 98166 Address: 14112 57th ave south Email: fleestenson@gmail.com City: Tukwila State: wa Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Lee Stenson Address: 155 SW 152nd St City: Burien State: wa Zip: 98166 Phone: (206) 423-8425 Fax: (206) 241-7738 Email: fleestenson@gmail.com GENERAL CONTRACTOR INFORMATION Company Name: Owner Address: Company Name: N/A Address: Same Architect Name: N/A City: State: Zip: Phone: Fax: Phone: Fax: Contr Reg No.: Email: Exp Date: Tukwila Business License No.: H:\Applications\Forms-Applications On Linc\201 1 Applications\Permit Application Revised - 8-9.11.docx Revised: August 2011 hh King Co Assessor's Tax No.: 336590-0775 Suite Number: Floor: New Tenant: ❑ Yes j ..No ARCHITECT OF RECORD Name: N/A Address: Company Name: N/A — Architect Name: N/A Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: N/A Address: Company Name: N/A Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: N/A Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATIG 206-431-3670 Valuation of Project (contractor's bid price): $ 5,000 Existing Building Valuation: $ 400,000 Describe the scope of work (please provide detailed information): To construct a detached work shop in rear yard slab on grade Will there be new rack storage? ❑ Yes ®.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): 11,522 Floor area of principal dwelling: 2,250 Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 3 Compact: 0 Handicap: 0 Will there be a change in use? ❑ Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm ® None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8-1/2 " x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Rcviscd - 8-9-11.docz Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC t'` Floor 560 0 0 0 ri Floor 1,900 0 0 0 3rd Floor 0 0 0 0 Floors thru 0 0 0 0 Basement 0 0 0 0 Accessory Structure* 0 0 0 240 Attached Garage 680 0 0 0 Detached Garage 0 0 0 0 Attached Carport 0 0 0 0 Detached Carport 0 0 0 0 Covered Deck 154 0 0 0 Uncovered Deck 0 0 0 0 PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): 11,522 Floor area of principal dwelling: 2,250 Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 3 Compact: 0 Handicap: 0 Will there be a change in use? ❑ Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm ® None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8-1/2 " x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Rcviscd - 8-9-11.docz Revised: August 2011 bh Page 2 of 4 PUBLIC WORKS PERMIT INFC - 206-433-0179 Scope of Work (please provide detailed information): Construction of detached work shop in rear yard Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ...Tukwila ❑... Water District #I25 0 ...Water Availability Provided Sewer District ® ...Tukwila 0 ...Sewer Use Certificate ❑ .. Highline ❑...Valley View ❑ .. Renton 0...Sewer Availability Provided ❑ .. Renton ❑ .. Seattle Septic System: ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ® ...Civil Plans (Maximum Paper Size — 22" x 34") ❑ ...Technical information Report (Stone Drainage) ❑ .. Geotechnical Report 0 ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance Agreement(s) ❑...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): ❑ ...Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - Profit for less than 72 hours ❑ ...Right-of-way Use - No Disturbance ❑ .. Right-of-way Use — Potential Disturbance 0 ...Construction/Excavation/Fill - Right-of-way ❑ Non Right-of-way ❑ 0 ...Total Cut 10 cubic yards ❑ .. Work in Flood Zone 0 ...Total Fill 10 cubic yards ❑ .. Storni Drainage ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities 0 ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection irrigation Domestic Water ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ .. Grease Interceptor 0 .. Channelization ❑ .. Trench Excavation 0 .. Utility Undergrounding ❑ ...Permanent Water Meter Size... WO # 0 ...Temporary Water Meter Size .. WO # ❑ ...Water Only Meter Size WO # ❑ ...Deduct Water Meter Size ❑ ...Sewer Main Extension Public 0 Private 0 0 ...Water Main Extension Public 0 Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) V ...Water 0 ...Sewer ❑ ...Sewage Treatment Monthly Service Billing to: Name: Lee Stenson Day Telephone: (206) 423-8425 Mailing Address: 155 SW 152nd St Burien wa 98166 City State Zip Water Meter Refund/Billing: Name: Day Telephone: Mailing Address: City State Zip H:\Applications\Forms-Applications On Line\2011 Applications\Permit Application Revised - 8-9.1 Ldocx Revised: August 2011 bh Page 3 of 4 PERMIT APPLICATION NOTES — Value of Construction – In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review – Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official niay grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW ;R OR .% HORIZED AGENT: Signatu;�,� Print Name: (/2`G 77:7":- Mailing 7 Mailing Address: ACT- S GCJ / 2 S L\ 11:\Applications \Forms -Applications On Linc\201 I Applications \Permit Application Rcviscd - 8-9-11.docx cvisctl: August 2011 Date: 3/2 - Day / Z Day Telephone: City State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK I ACCOUNT I QUANTITY I PAID $346.28 D16-0079 Address: 14112 57TH AVE S Apn: 3365900775 $346.28 DEVELOPMENT $330.00 PERMIT FEE R000.322.100.00.00 0.00 $325.50 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $16.28 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R8521 R000.322.900.04.00 0.00 $16.28 $346.28 Date Paid: Thursday, May 19, 2016 Paid By: FREDERICK STENSON Pay Method: CREDIT CARD 06482D Printed: Thursday, May 19, 2016 2:28 PM 1 of 1 rSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $211.58 D16-0079 Address: 14112 57TH AVE S Apn: 3365900775 $211.58 DEVELOPMENT $211.58 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R8009 R000.345.830.00.00 0.00 $211.58 $211.58 Date Paid: Thursday, March 24, 2016 Paid By: STENSON FRED LEE Pay Method: CREDIT CARD 02440D Printed: Thursday, March 24, 2016 12:19 PM 1 of 1 erSYSTEMS C6 INSPECTION RECORD Retain a copy with permit INSPECTION Pte- 0079 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 r (20) 431-3670 Permit Inspection Request Line (206) 438-9350 F (IA c 1 Project: 3—TENS-ON 647q/V-70 Type of Inspection: FRAM/A/6' Ad/J/`2 Avi c/ i r Date Called: Special Instructions: Date Wanted: p.m�1 Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. MENTS: Inspector: Date: y REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pi6-0079 Project: Type of Innss+pection: Address: /q//2 57rh /410J S, Date Called: Special Instructions: Date Wanted: /-2577 a.m. cam: Requester: Phone No: 2 3._ - qz5-Zolo pproved per applicable codes. LJ Corrections required prior to approval. C6i'MI'MENTS: inspector: 7- Dater i 7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. VOAINSPECTION RECORD Retain a copy with permit INS ION I0N NO. D/t - 79 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: -TEA/6,11Z46‘ Type of Inspection: p ‹iiert114%A)6- Address: j4//l2 c?7AVE S Date Cat ed: Special Instructions: Date Want 12- / /�� // / „, p.m. Requester. Phone No: r4 Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: Inspector: Date:' 2 REINSPECTION FEE REQUIRED. Prior to next inspectio. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 bi&--6t17ci Project: Type of Inspection: --/61/-Ni SC 114 LL nJ6• / 1 h2 Address:// /4'// <-?Th Date Called: Special Instructions: Date Wanted: % / Z -2z /� p.m. R uester: eq Phone No: 266 -6/Z3- X125— Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date) 2 zaJ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. \N\s INSPECTION RECORD Wj Retain a copy with permit IN'T TION NO. PERMIT NO. "V6 - 0079 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Sprwsed OAh A -G2^ Type spection: /Ai Q - Address: /y//2 5"7 774 �= S Date Called: Special Instructions: Date Wante: // /0 //6 a.m. p.m. Req uestef: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Insp ector: Am.114 Date:////0- REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PLANNING APPROVED - No changes can be madeto these plans without approval from the Planninpivision of DCD ftp: oved By:_j-- Date: r Ems; ; ';7 ; L. PERMIT :aQL ! D FOR: fiechan cisctrical 'umbing 14,6as .. ng City of Tukwil Dili! D1UC DIVISION D oz l � 5.aot REVISIO h S No changes shall be made to the scope of r.fnr ‘Ifithout prior approval of i ~vs°"ila Building Division. NOTE: ;vv;C 13 will require a new plan submittal 1 and may incudo additional plan review fees. 1 3$ Common drive /9.0z/y s"b S-0 Permit No PI_\Poview approval is bject to errors and omissions. A:-.;-2ro,X11 of constr ntion a )cements does not au holize tY. violaki of any adopter, codo or ordinance. Receipt of approv3\ Field Copy and nditions is acknowledged: Eye Date. Z ' Za/ \ City of kwila giUILDING 1 !VISION COPY boVo— onct Existing House / q2 ,04/ New garden/shop r CORRECTION LTR# House address 14112 57th ave S. Legal Description Lot #4 Block 8 Hillmans Seattle Garden tract parcel # 336590-0775-07 New 10' x 24' Work Shop For Lee Stenson Owner 206 423-8425 .... Site Existing house Drive/paved area New shop storage 11,522.04 2,250.00 230.00 240.00 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1'72016 City of Tukwila BUILDING DIVISION square feet square feet square feet square feet RECEIVED CITY OF TUKWILA MAY 112016 PERMIT CENTER NORTH 1"=20' bl&oo7? Composition Roof With ridge vent LP Lap Siding n East Elevation o ►� North Elevation Comp Roofing Continuous roof vent Plate Line 6' Double door Safety glass 3' x 2' picture Window Safety glass Or Hartie Plank lap Siding ate, o, West Elevation 1/4" = 2" x 6" Fascia 9 " 1" x 4" Comer boards South Elevation. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 17 2016 City of Tukwila BUILDING DIVISION t(i' 00101 RECEIVED CITY OF TUKWILA MAY 112016 PERMIT CENTER 4"x8" ridge beam LU 26 each end of rafter 2 x 6 rafters 24" O.C. A-35 each end and top 2 x 4 collar ties each rafter \ Nailed with 3-10d nails each end Note change of Ridge beam to 6"x10" Collar ties to comply with IRC802.3.1 and Table R602.3 Loft area for wood storage/drying 4" x 6" beam 4' O.C. Decked with 2" x 6" T&G /g T Wall Sheathing to be '/z" CDX Nailed 6"O.0 to comply with I.R.0 Table R602.3(1) i Double 2 x 4 top plate 2 x 4 studs 16" o.c. 1/2" CDX over nailed 6" O.0 7/16 Hartie Plank lap siding over Approved vapor barrier 1/2" Galvanized anchor bolts 48" O.C. with 3"x3" bearing plates 2 x 4 PSI Treat plate 6" Soil separation / 1 2fr' 0 0 Li " ex s 4/441, ° 0 0 G. - 4 Granular fill material 0 #4 rebar schedule 40 3 runs Non -Heated area Correction #2 Double top plate 4"x6" floor joist to rest on 4"x4" post to concrete foundation 2"x4" trimmer stud nailed to each side of 4"x4" 12" o.c. with 16d nails/4nailes Each side to floor joists. Double 2"x4" or 4"x4" post 2"x4" nailed each side Where 4"x6" joist connect to header Use LU26-2s 4"x6" beam connection 1IIf All framing material to Be H/Fir #2 or better to comply with I,R.0 602.2 02 /-/ — REVIEWED FOR CODE COMPLIANCE APPROVED MAY 17 2016 Ci of Tukwila BUILD NG DIVISION e 4" Concrete Slab With thickened edge RECEIVED ITY OF TUKWILA MAY 112016 ERMIT CENTER Foundation Plan 1/4 = 1 ' 12' 0' Non Heated area 10' 0" 1/4 = 1' Loft area plan 4"x6" joist H/Fir 32" oc This area Decked with 2"x6" T&G / =1' 7' fiev/3z�- / x 8 ridge beam Secure hip rafters to valley Rafters with A-35 each end 4 x 6 headers 2 x 4 jack stud each side REVIEWED FOR CODE COMPLIANCE APPROVED Double 4 x 6 Joist at loft end With 4x4 post to ridge beam Connected with Simpson AC 4 Post caps 2 x 6 24"o.c With 1x4 collar ties 1/2 cdx plywood c BUIL 1AY172016 4 x 6 r dge beam Or double 2x8 ity of Tukwila DING DIVISION A-35 each end and at ridge Roof Plan 1/4» = 1 RECEIVED OF TUKWILA NAY 112016 RMIT CENTER CCX plywood at overhang ti1lR / 00'11 18" overhang. Typical 4 sides 1/2' CDX Plywood nailed 6" O.0 To comply with I.R.0 Table R602.3(1) 3 1/2 " minium Rafters nailed with 4 16d nails And supported with Simpson LU26 1 x 8 ridgc bcam x 6 rafters with 2 x 4 collar ties Nailed with 3-10d nails each end Note change of 4"x8" Ridge beam to 6"xl0" Continuous end to end s1appaH 8 X 17 2X6 block riped to 4" 2.5 each rafter H2.5 Installation Each rafter to be nailed With 4 16d nails - To top plate Wall Note Minium of 3 '/2 " rafter to remain with 18" over hang Minimum of 1 '/2 " Bearing on wall plate Not to include wall sheating 2 x 4 wall Construction Double top Plate Minium 4' between Joints / / _ slap -rack g x b 4 x 8 headers h' / 0 //F /14F/._ 2 L D REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 7 2016 City of Tukwila BUILDING DIVISION 00 te,co1G& RECEIVED CITY OF TUKWILA MAY 112016 PERMIT CENTER 6"x1O" Note ridge beam to be supported At each end with 4" x 6" post To foundation below Note 3' headers below ridge to Be 4'x 10" at south wall 4"x4" Post LSTA24 connection 4"x4" Post r -ii Simpson ABU 44 I 0 0 6 24"x 24" x 18" footing With 4/#4 bars each way Concrete foundation See sheet #3 Center ridge beam support Scale 1/2" = 1' 4"x 10" header Double top plate Jack stud Trimmer stud nailed 12"o.c With 5 16d nails to header Pns7- LSTA24 each side 4"X10" header 3 o 36" widow opening REVIEWED FOR CODE COMPLIANCE APPROVED MAY 17 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA ate- 001 °1 MAY 112016 PERMIT CENTER 6"x10" ridge 2"x6" common and hip rafters ti—24"o.c H2.5 each side of valley rafters 18" overhang Plan view 1/2" = 1' For rafter connection see sheet #5 3' window Safety glass l Elevation View 1/�" =1' H2.5 Installation (Nails into both lop plates) REVIEWED FOR CODE COMPLIANCE APPROVED MAY 17 2016 City of Tukwila BUILDING DIVISION D14100101 RECEIVED CITY OF TUKWILA MAY 112016 PERMIT CENTER October 27, 2016 Lee Stenson. 14112 57th Ave S Tukwila, WA 98168 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Request for Extension #1 Permit Number D16-0079 Dear Mr. Stenson, This letter is in response to your written request for an extension to Permit D16-0079. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through May 15, 2017. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, Bill Rambo Permit Technician File: Permit No. D16-0079 W.\Permit Cente/AExtension Letters\Permits\2016\D16-0079 Permit Extension in.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Lee Stenson 155 SW 152"d Street Suite A Burien, WA 98166 City of Tukwila Permit section Building Official Permit D 16-0079 extension Dear Sir or Madam I would like to request an extension of building permit No. D16-0079 for 14112 57th Ave South. I just ran out of time doing other people's work. Planning on starting construction Mid October. ou for the service Lee Stenson 1411257thAve S Tukwila WA 98168 206 423-8425 Request for Extension # Current Expiration. Date: 7 1 Extension Request: �j Approved for /0 days Denied (provide explanation) Signature/Initials_ RECEIVED CITY OF TUKWILA OCT 072016 PERMIT CENTER 10/3/2016 City of Tukwila Department of Community Development LEE STENSON 155 SW 152 ST BURIEN, WA 98166 RE: Permit No. D16-0079 STENSON GARAGE 14112 57TH AVE S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 11/15/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 11/15/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: D16-0079 (-3f-tj 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 May 06, 2016 City of Tukwila Department of Community Development LEE STENSON 155 SW 152 ST BURIEN, WA 98166 RE: Correction Letter # 2 DEVELOPMENT Permit Application Number D16-0079 STENSON GARAGE - 14112 57TH AVE S Dear LEE STENSON, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 1 lx17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Most the information previously requested has been satisfied. One of the items that were missing is the jack -stud under the "4x6 beam connection" (page 3). Please indicate that on the plan. Also be specific on that detail for clarification which framing members shall be used and specify the nailing or mechanical fastener method to be used. 2. The dormer framing shall require additional framing details for clarity. Will the roof framing extend down to the plate line at the window or will there be a wall each side of that dormer window with rafter cut for that opening? Any rafter framing supporting a dormer shall require additional double framing or method for supporting the dormer framing with the new roof system. Please provide specific details to show the dormer framing where the point loads for roof and dormer shall transfer down to the foundation. 3. The center post shown to support the ridge beam shall require more specific details with specifications where the point loads shall transfer down to the foundation or to a center support post and footing. All point loads shall be identified on the plan. All roof and dormer framing shall be sufficient to support a minimum 25 lb. per square foot snow load. Provide notes with new details that support the required design loads shall meet code or provide engineering for the roof construction. Please note that the rafters, beams and post shall be sufficient to support not only the snow load but also the loads of what will be stored in the loft. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. D16-0079 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 April 05, 2016 City of Tukwila Department of Community Development LEE STENSON 14112 57TH AVE S TUKWILA, WA 98188 RE: Correction Letter # 1 DEVELOPMENT Permit Application Number D16-0079 STENSON GARAGE - 14112 57TH AVE S Dear LEE STENSON, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. The rafters are shown to attach on the outer edge of the top wall plate. Notches on cantilevered portions of rafters are permitted provided the dimension of the remaining portion of the rafter is not less than 3-1/2 inches and the length of the cantilever do, not exceed 24 inches. The ends of each rafter (seat cut) shall have not less than 1-1/2 inches of bearing on wood (does not include the exterior sheathing thickness). Provide elevation details of roof framing and specify all nailing, fasteners show and specify hurricane ties to each rafter all of which shall be shown in the elevation details (page 3). The size of rafter shall meet the minimum 3-1/2 inches width of the rafter overhang and the required 1-1/2 inches bearing on the top plate may determine the minimum size of rafter materials. All fastener spacing, sizing and hardware shall comply with IRC TABLE R602.3 (1). 2. Collar ties sizing and fastening shall comply with IRC R802.3.1 & and details in addition to those already indicated. 3. Provide more specific details for the proposed loft rafters and how show a minimum of one jack stud under the loft joist or clearly show a mechanical fastener. TABLE R602.3 (1). Provide notes on the plan they are fastened, number of fasteners and a detail of how the joist shall be supported by 4. Provide a floor plan that shows the walls with all openings shown. Specify headers and sizes at each opening. 5. Specify exterior sheathing nailing for lateral wall bracing per code. (IRC R602.1) 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 6. Assuming this is an un -conditioned space; provide notes on the plan non -heated un -conditioned space. If the intent is to provide heating, energy code shall apply. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)431-3655. Sincerely, Bill Rambo Permit Technician File No. D16-0079 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 NERNiIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0079 PROJECT NAME: STENSON GARAGE SITE ADDRESS: 14112 57 AVE S Original Plan Submittal X Response to Correction Letter # 2 DATE: 05/11/16 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: s—lo—lco Building Division Public Works Fire Prevention Structural Planning Division nPermit Coordinator n 1 PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 05/12/16 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 06/09/16 Approved Corrections Required n Approved with Conditions n Denied (corrections entered in Reviews) (ie: Zoning Issues) v\a\ pelf Cs Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0079 PROJECT NAME: STENSON GARAGE SITE ADDRESS: 14112 57TH AVE S Original Plan Submittal DATE: 04/18/16 Revision # before Permit Issued X Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: c Building Division Public Works ❑ Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 04/19/16 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) Notation: DUE DATE: 05/17/16 Approved with Conditions ❑ Denied (ie: Zoning Issues) REVIEWER'S INITIALS: DATE: Permit Center Use Only j CORRECTION LETTER MAILED: 5^6-1 0 Departments issued corrections: Bldg Ta-- Fire ❑ Ping ❑ PW ❑ Staff Initials: oie 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0079 DATE: 03/26/16 PROJECT NAME: LEE STEVENSON GARAGE SITE ADDRESS: 14112 57TH AVE S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: AT 1-k--1.11° Building Division ublic Wo s "' Ayk AO- wq-lfr L.15 44) Fire Prevention Structural Planning Division ❑ Permit Coordinator El PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 03/29/16 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) Approved with Conditions Notation: DUE DATE: 04/26/16 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: S --\ 9 Departments issued corrections: Bldg' Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov VISION' SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: $7// /02-o// ❑ Response to Incomplete Letter # Response to Correction Letter # vZ ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: SS(�✓� �jc pj Project Address: [i( I -4» c S 7 Contact Person: 5 v$o Phone Number: 2Q4 z3 9i2-1 Summary of Revision: L. L oA,s Plan Check/Permit Number: /0/ 6— G O 7 9 -# PA c- /5 3 s.t s- 7 -vi✓ 3 No T7 C/Jilit/ 4 sMX, RECEIVED CITY OF TUKWILA MAY 1 1 2016 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision include, to of revi *o4v Received at the City of Tukwila Permit Center by: --Entered in TRAKiT on W:\Permit Center\Templates \ Forms \Revision Submittal Form.doc Revised: August 2015 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision .submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 431 zO/G Plan Check/Permit Number: 0—/G — C 0 7 2' Response to Incomplete Letter # __ Response to Correction Letter # / Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: �' Tom- � (S' J k/ RECEIVED CITY OF TUKWILA APR 15 2016 PERMIT CENTER Project Address: /L///„Z S`7 17/ . /11/ Contact Person: in /s.. .S re /✓ 4-1 Phone Number;, CSG s°1/2 6 S'11.747,- Summary of Revision: s / G2 v .f T A Cv 42 /i ,r; fir, D/1,7715/3 `2/4-- 0 5 /* „SW 7- cs-- s,./5_ y%- s,.F S 7 171 E.Z) Si s/,,F 7- sy Ai 0725 7— Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in TR.AKiT on wk/-///� \e:\Permit Center\Templates \Forme\Revision Submittal rorm.doc Revised: August 2015 Au) CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665 E-mail: tukplanpci.tukwila.wa.us Permit Center/Building Division 206 431-367o Public Works Department 206 433-0179 Planning Division 206 431-367o AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION PERMIT NO: bUo ^ 007d1 STATE OF WASHINGTON) ) ss. COUNTY OF KING / l-` G %, 5C)4 , states as follows: [please print name] 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number /% and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. LAURIE A. WERLE NOTARY PUBLIC STATE OF WASHINGTON COMMISSION EXPIRES MAY 29, 2018 er/Owner's Agent* Signed and sworn to before me this d.yof v U ,20/Y . NOTAY PUBLIC in and for the State of Washington A://ft, County l Name as commissioned: 14 ‘t;79""Pir/ Residing at My commission expires: 18.27.090 Exemptions. The registration provisions of this chapter do not apply to: 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds a valideleefrical''ecintra'cto'r, 's license under chapter 19.28 RCW that employs a cer'hfied journeyman electrician, a certified.fiesideritial specialty electrician, or an electrical trainee meeting the requirements of chapter 19.2.8 RCW to perform plumbing work that is incidentally, directly, and immediately appropriate to the like -in-kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. * Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions.