DEVELOPMENT PERMIT
Permit Number: D16-0154
Address: 9725 E MARGINAL WAY S BLDG 9-099 Issue Date: 11/8/2016
Permit Expires On: 5/7/2017
Project Name: BOEING #9-99
Owner:
Name: DESIMONE TRUST BOEING
Address: 1201 THIRD AVE STE #5010 C/0 BNY
MELLON NA, SEAITLE, WA, 98101
Contact Person:
Name: JOHN S MURDOCH
Address: PO BOX 3707 MC 46-88 , SEATTLE,
WA, 98124
Phone: (253) 740-0214
Contractor: �
�Name:, � � ' BOEING COMPANY, THE ; _ , ... �'Phone: (312) 544-2535,
Address: 100 N RIVERSIDE, M/C 5003-4027 , ' ,,` , \ �
CHICAGO, IL, 60606-1596 •
License No: BOEINC*294ML Expiration Date: 1/18/2017
Lender:
Name: BOEINGCOMPANYTHE
Address: PO BOX 3707 M/C 20-00 PROPERTY
TAX DEPT, SEATTLE, WA, 98124
DESCRIPTION OF WORK:
PROVIDE FOUNDATION PAD FOR (2) LN2 TANKS. ACTUAL PIPING AND UTILITY WILL BE UNDER SEPARATE
PERMITS. NO SPRINKLER CHANGES, THIS FOUNDATION PAD IS OUTSIDE THE 9-99 BUILDING. ALSO A SMALI
TRENCH FOR UTILITIES.
Project Valuation: $96,800.00 Fees Collected: $2,522.96
Type of Fire Protection: Sprinklers: YES
Fire Alarm: YES
Type of Construction: IIB Occupancy per IBC: F-1
Electrical Service Provided by: TUKWILA Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition: 2015 National Electrical Code: 2014
International Residential Code Edition: 2015 WA Cities Electrical Code: 2014
International Mechanical Code Edition: 2015 WAC 296-46B: 2014
Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015
International Fuel Gas Code: 2015
Public Works Activities:
Channelization/Striping:
Curb Cut/Access/Sidewalk:
Fire Loop Hydrant:
Flood Control Zone:
Hauling/Oversize Load:
Land Altering: Volumes: Cut: 0 Fill: 0
Landscape Irrigation:
Sanitary Side Sewer: Number: 0
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter: No
�
Permit Center Authorized Signature: Date: `` � *'
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting f this permit does not presume to give authority to violate or cancel the provisions of any other
state or loc I I w egulating construction or the performance of work. I am authorized to sign and obtain this
developme rq�it and agree_to the conditions attached to this permit.
Signatu . �� /�� �t�� Date:lJ�' �`�v�'` c.(/�CJ
Print Na e: �� �r
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***BUILDING PERMITCONDITIONS***
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: The special inspections and verifications for concrete construction shall be as required by IBC Chapter 17,
Table 1705.3.
5: The special inspection of bolts to be installed in concrete prior to and during placement of concrete.
6: When special inspection is required, either the owner or the registered design professional in responsible
charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to
the first building inspection. The special inspector shall furnish inspection reports to the Building Official in
a timely manner.
7: A final report documenting required special inspections and correction of any discrepancies noted in the
inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the
approved special inspection agency and shall be submitted to the Building Official prior to and as a
condition of final inspection approval.
8: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
9: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to
any requirements for special inspection.
10: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
11: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
12: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
13: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is
placed unless a tremie is to be used or unless otherwise permitted by the building official. All debris and ice
shall be removed from spaces to be occupied by concrete.
14: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
15: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
18: There are no fire comments on the scope of this permit which is the foundation construction. However the
installation of the actual liquid nitrogen tank will require an International Fire Code Cryogenic Fluids tank
construction permit per section 105.7.4. The tank must comply with International Fire Code Chapter 55.
Tank manufacturers data sheets, installation instructions, etc. will be required for permit review.
16: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply
approval of such condition or violation.
17: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention
Bureau at (206)575-4407.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL**
0201 FOOTING
4000 SI-CONCRETE CONST
4046 SI-EPDXY/EXP CONC
4028 SI-REINF STEEL-WELD
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Surte 100
Tukwila, WA 98188
http://www.TukwilaWA. gov
Building Permit Na _I� f �"�1�7
Project No.
Date Application Accepted: ��/�o
Date Application Expires: _��/o,/(,
use
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by far.
* *Please Print* *
SITE LOCATION ��� F�'(J ''
King Co Assessor's Tax No.:
Site Address: 9725 East Marginal Way Tukwila, WA 98108 Suite Number: 9-99 Floor: 1
Tenant Name: T�e Boeing Company New Tenant: ❑.....Yes �..No
PROPERTY OWNER
Name: �e Boeing Company - John S. Murdoch
Address: p,0. Box 3707 M/C 46-88
�'�'' Seattle state: Wp� zip: 98124
CONTACT PERSOI�T — person receiving all project
communication
Na'r'e: John S. Murdoch - The Boeing Company
Address: p.0. Box 3707 M/C 46-88
Ciry: Seattle state: WA zip: 98124
Phone: �253) 740-0214 F�''��
Email: �ohn.s.murdoch@boeing.com
GENERAL CONTRACTOR INFORMATION
Company Name: �e Boeing Company
Address: p O. Box 3707 M1C 46-88
City: Seattle state: WA Z'P� 98124
Phone: �253) 740-0214 F�`�'
Contr Reg No.: gOEINC*294ML Exp Date: O1/18/2017
Tukwila Business License No.:
H:Wpplicatiom\Forns-AppGcatiom On Lirc�201 I Applicatiore�Pemul Appliwtion Revised - 8-9-I l.docx
Revised: August 201 I .
bh
ARCHITECT OF RECORD
Company Name: EISI Ltd.
Architect Name: Douglas L. Condit
Address: 1900 West Emerson Pl
Ciry: Seattle state: WA Z'P� 98119
Phone: (206) 284-1181 F�'��
Email: doug@eisi-engrs.com
ENGINEER OF RECORD
Company Name: EISI Ltd.
Engineer Name: Douglas L. Condit
Address: 1900 West Emerson Pl
Ciry: Seattle state: Wp� zip: 98119
Phone: �206) 284-1181 F�`�'
Email: doug@eisi-engrs.com
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Nan'e: The Boeing Company - John S. Murdoch
Address: p,0. Box 3707 M/C 46-88
Ciry: Seattle State: WA zip: 98124
Page 1 of 4
BUILDING PERMIT INFORMATION — 206-431-3670
Valuation of Project (contractor's bid price): $ 96,800 Existing Building Valuation: $ 10,000,000
Describe the scope of work (please provide detailed information):
Provide Foundation Pad for (2) LN2 Tanks. Actual Piping and Utility will be under separate Permits. No Sprinkler Changes, this
Foundation Pad is Outside the 9-99 Building. Also a small Trench for Utilities.
Will there be new rack storage? ❑.....Yes m.. No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
Addition to Type of Type of
Existing Construction per Occupancy per
Existin Interior Remodel Structure New IBC IBC
t�' Floor II - N B/F-2
2 Floor
3 Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck 3,200 OutSiCle
PLANNING DNISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than ] 8 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use7 ❑....... Yes m....... No If "yes", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ ....... Sprinklers ❑ ....... Automatic Fire Alarm � ......None ❑ .......Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building7 ❑....... Yes �.......No
If "yes', attach list of materials and storage locations on a separate 8-1/2 " x 11 " paper including quanti[ies and Material Safety Data Sheets.
SEPTIC SYSTEM
❑....... On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applicatiore\Foms-Applicntiom On Lirc�201 I Applicatio�ssss�Pcrtnit Applicetion Revisod - 8-9-1 l.doca
x���ua: n��� 2ou Page 2 of 4
bh
PUBLIC WORKS PERMIT INFORMATION — 206-433-0179
Scope of Work (please provide detailed information):
D.N.A.
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Water District
❑ ...Tukwila ❑ ... Water District # 125 ❑ .. Highline
❑ ...Water Availability Provided
Sewer District
❑ ...Tukwila ❑ ... Valley View ❑ .. Renton
❑...Sewer Use Certificate ❑... Sewer Availability Provided
❑ .: Renton
❑ .. Seattle
Seatic Svstem•
❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Aaalication (mark boxes which aaplvl:
❑...Civil Plans (Maximum Paper Size — 22" x 34")
❑...Technical Information Report (Storm Drainage) ❑.. Geotechnical Report ❑... Traffic Impact Analysis
❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance Agreement(s) ❑ ... Hold Harmless — (SAO)
❑...Hold Harmless — (ROW)
Pr000sed Activities fmark boxes that annlvl:
❑...Right-of-way Use - Nonprofit for less than 72 hours ❑.. Right-of-way Use - Profit for less than 72 hours
❑...Right-of-way Use - No Distwbance ❑.. Right-of-way Use — Potential Disturbance
❑ ...Construction/Excavation/Fill - Right-of-way ❑
Non Right-of-way ❑
❑ ...Total Cut cubic yards
❑ ...Total Fill cubic yards
❑ ...Sanitary Side Sewer
❑ ...Cap or Remove Utilities
❑ ...Frontage Improvements
❑ ...Traffic Control
❑ ...Backflow Prevention - Fire Protection _
Irrigation
Domestic Water
❑ .. Work in Flood Zone
❑ .. Storm Drainage
❑ .. Abandon Septic Tank
❑ .. Curb Cut
❑ .. Pavement Cut
❑ .. Looped Fire Line
❑ ...Permanent Water Meter Size... " WO #
❑ ...Temporary Water Meter Size .. " WO #
❑ ...Water Only Meter Size............ " WO #
❑ ...Sewer Main Extension .............Public ❑ Private ❑
❑...WaterMainExtension .............Public ❑ Private ❑
FINANCE INFORMATION
Fire Line Size at Property Line
❑ ...Water ❑ ...Sewer
❑ .. Grease Interceptor
❑ .. Channelization
❑ .. Trench Excavation
❑ .. Utility Undergrounding
❑...Deduct Water Meter Size
Number of Public Fire Hydrant(s)
❑ ...Sewage Treatment
Monthlv Service Billin¢ to:
Name: Day Telephone:
Mailing Address:
City
Water Meter Refund/Billin¢:
Name: Day Telephone:
Mailing Address:
c�ry
H:\Applicatio�\Foma-Applicatiom On Lire�201 I Applicatio��Pernvt ApplicMion Re��sed - S-9-I l.docx
Revised: August 2011
bh
State 7.ip
Stete 7.ip
Page 3 of 4
PERMIT APPLICATION NOTES —
Value of Construction —1n all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The eaztension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 Intemational Building Code (current edition).
I HEREBY C�1�TIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF ER�IURY $j�%I'HE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
Print Name: �ohn S. M�frdoch - The Boeing
Mailing Address: P•O. Box 3707 M/C 46-88
�� ���� �����vate: 06f�/2016
H:�Applicntio�\Forns-AppGcetiom On Lirc1201 I Appl�ntiom�Pernrit Applicntion Revised - 8•9-] l.docx
����a: aU�n zoi i
bh
Day Telephone: (253) 740-0214
Seattle WA 98124
c��y sre,� z�P
Page 4 of 4
Date Paid: Friday, June 10, 2016
Paid By: JOHN S MURDOCH
Pay Method: CREDIT CARD 055987
Printed: Friday, June 10, 2016 2:47 PM 1 of 1 ����
SY57EM5
e
w
LN2 TANK FOUNDATIONS CALCULATIONS
FOR
BOEING 9-99
TUKWILLA, WASHINGTON
FOR
BOEING
BY :
EISI Ltd.
CONSULTING ENGINEERS
1900 WEST EMERSON PL.
SUITE 200
SEATTLE, WA. 98119
(206) 284-1181
JOB NO. 14-142Q
18-May-16
�.
��ETs t 7� -��-
�
RE-- VIE�p FOR
,OD� �QMP Ep CE
A�p���
� JUN 2 4 2016
;.
" Ci �Tukwila
, �UtLD�NG D
NISION
, ���'�� RECEIVED
CITY OF TUKWILA
JUN 10 2016
PERMtT C•ENTEFt
�
0
.
consulting engineers
1900 W Emerson Place #200 Seatile, WA 98119
Phone (206) 284-1181 • FAX (206) 284-1236
Job Na. (� �� Sheet � Of
Client: �1�,(�
Pro ject: �J1.�%(s a —�'4 �1
Sub ject: �.•� 2' �� �G
By. Date: .
a sir:nnN �
��
--�-- - -
Design Maps Sur�unary Report
.
� ! ��� Design Maps Summary Report
User-Specified Input
Building Code Reference Document ASCE 7-10 Standard
(ti�hich utilizes USGS hazard data availabie in 20o8)
Site Coordinates 47.516°N, 122.303°W
SiCe Soil Ciassification Site Class D-"Stiff Soil"
Risk Category I/II/III
� Zoomed View � Wide Area Location
USGS-Provided Output
S5= 1.518g S„S= 1.518g SoS= 1.012g
S3 = 0.575 g S„„ = 0.862 g Sol = 0.575 g
Page 1 of 1
�.J
For (nformation on how the SS and 51 values above have been caiculated from probabilistic (risk-targeted) and
deterministic ground motions in the direction of maximum horizontal response, piease return to the application and
select the "2009 NEHRP" building code reference document.
�
ie
u'I
�+iC�� Resp�nsa.Spectrum
6':00 �3.�0 �:.d�J �.�0 :.S�J '_..iJ77 �_20 .i..i1l ?.SO :.3!] 2.t1?
X�:2YIUd`r I�'A'5E''Cy'
Desi�n: R�sp�.rrse 5��e�rurn
�.ia=
a.sa-
a.es `.
t,T; '
�fT �.I:a �.
� U.$a '
a.31 '
�.33 •
�,�
!�, i l
�?.UG � _ 'Q . _. e . __- _. � y,,. :,,�. _. ,.i-'.`o.til_.'. .'�_�
' 0_a�rf U.Z�L R.°.� 9�.ufl 0:�^J Y:9G I_�G Y.dU E.50 e,SO- �.O�J
N£:CAfTC�`e r yS�Cp�
For PGA��, Tw CaS, and CR, values, please view the detailed report.
Although this informaCion is a product of the U.S. Geologicai Survey, we provide no �varran[y, expressed or• lmpiled, as to the
accuracy of the data containecl therein. This tooi is not a substitute for technicat subject-mafter knowiedge.
;.
http://ehp2-eai�thquake.wr.usgs. gov/design�naps/us/summary.php?template=mini�nal&latit... 9/23/2015
�
.
consultinq engineers
1900 W Emerson Place #200 Seattle, WA 98119
Phone (206) 284-1181 • FAX (206) 284-1236
Job No. ���� Sheet _�_Of
Client:
Pro ject:
Sub ject:
By. Date: .
��►��. �� �l,
L �- �
,�� �, � �=
� t� % �y�
�1� � . �,2�a �- / �o,c2� y��2 Co�3�
�
�� � ZR-'� � `� ,�
��� @ � �� �'� t �.___. _
l
��v� �' � ���� � � �.. �, la
� � �� � r
�°ol ���
�
4�`�� � �.��t� 2�� °� � � ���.� t
l`� t. �, � �^ � l�
1°��� � C� c� � � \2�� � �✓ = v �1 f� ��
� � ������ y ��'� � ��� ��
/�
�� �
--P � `��''iL��� .� '�aG,� � G'L �..� L 3 ,�i.C, �
�
� �,� �
1'`t�'��� + 5x2��•4
�'� (�ox2ti� `� y L
. C2�"'o ���
�G J�
�t��' C��,.Po,�, ��Z.� �c 2`t% �� - �j(,-,,g�� �
��
�,�2 Ci���,�����2 z 7,� �
?�� ��� � �, � ���
�
0
a
� eisi
CONSULTING ENG/NEERS_
CONCRETE ULTIMATE STRENGTH - FLEXURAL ver.5/5/05
PROJECT: BOEING 9-99 JOB # 14-142Q
ITEM: LN TANK - Foundation 26-Oct-15
CRITERIA:
Design Mu = 36.8 ft-kips Ro min @ Mu'1.33 = 48.94 ft-kips
Design Vu = 7.9 kips
Reinforcing #7
STIRRUPS
As = 0.60 sq. in. As 0 sq. in.
f c= 4 ksi fy = 60 ksi
fy = 60 ksi fct = ksi fctl6.7 <_(f'c)^:5
E = 29000 ksi
B1 = 0.85 (reduce by .05 for every 1000 psi over 4000 osi)
t= 18in S= 12in
d= 14.5 in d= 20,5 in
b= 12 in b= 12 in
FLEXURAL STRENGTH: SHEAR STRENGTN IN CONCRETE:
a= 0.88 in Vc = 31.12 kips eq (11=3)
Mn = 506.12 in-kips , Vs = 0.00 kips eq ('11-15)
or 42.18 ft-kips No Av Required
.9Mn = 37.96 ft-kips O.K.. .75Vn = 23.34 kips O.K.
Ro = 0.0034 Avmin = 50"b*s/fy = 0.12 sq. in.
Ro min = 0.0033 As = 0.58 sq. in.
rho max =.85B1"f'c/fy*(870001(87000+fy))*.75 = 0.021
SLAB TEMP. REINFORCEMENT: As = 0.002 *b*t = 0.43 sq. in./ft
USE: #7 .9Mn = 37.96 ft-kips
SHEAR: .85Vn = 23.34 kips
FLEXURAL
consultinq engineers
1900 W Emerson Place #200 Seattie, WA 98119
Phone (206) 284-1181 • FAX (2061 294-1236
l
Job No. '''_-�� Sheet �
Client:
Pro ject:
Sub ject:
Rv Ilntp•
�
21- ��' ��
(
Of
. .
° ' � �'.:as�
a � _.,
c� ,
_ _ __. ..
_ `���..� �
�
�.
__ ..
,� � Iti� �� �����z� �� i _ .
�F�l���;4GR �� �. l.5( n �, �� � t,� ' �?,7�� -122 3...
� � �
__.
% 4 '� r'� � �' � `f � 1.. �
� � � � � Z
� a �(.a x. :'��r !o ;�+'� � � � y---�--,✓ `����- -- �!� (�, F . ..
i.li ,� ` '`�„" r9 % , ....d.�
_._ _ . ._
_ . _.. ._��.._. _.__. . __....... _ _ .
,"�° �, � ��
.�-v- � '
,�;�dY�Z� ' �� c
i
'�ad�1 �U 1 � �i c� tti
�� � � W
f�.� � 2�� � � �� ,�� :.� yj�.��, �� �2
�
vl, � �i�(7 •� 2j� ._ �. � . � L Gir �
<,
�..
,; : � � : �
. `:''
I
.
consulting engineers
1900 W Emerson Piace #200 Seotile, WA 98119
Phone (2061 284-1181 • FAX 1206) 284-1236
Job No. �,'"1 ���Sheet �_Of
CI ien t:
Pro ject:
Sub ject:
Rv' (lntp•
�. �� , .
�� � . .
�l/� 2.- �� ., ' "�"�
��Vt �� f._...� t
� ^
��, � ��:� � IC i '� �4 2`.i�0� �" ' _
. _-.4 :� �'%. �
�(�, . �
..
f R 2� �y
U
._--�
� � � � ��
_ � _,
. �� -- . _�., •r� ¢ ��.(0...�/�.. _ ...
`
�
� i �, � � �-- c a, ��j �: ,� �
, � T+
.
� '��� Lf%L4'�' �
�� �— •�� � �ti: � � �c � � � . ���K� -- -�L -��i��1 � � �l
� �� �
�,� � ,����� � � a��'� � � 2� y�? F��.
C
♦ �
SEISMtC: NON BUiLDING STRUCTURE
ver 3/5/14
PROJECT: Boeing
ITEM: LN Tank - Nitrogen
eisi
CONSULTING ENGINEERS
29-Sep-15
PAGE 1
JOB NO. 14-142
CRITERIA: 2072 iBC ,
Ss = 1.518 Figure 1613.3.1(1), pg 368
S1 = 0.575
Fa = 1 Table 1613.3.3(1), pg 366
Fv= 1.5
Design Cat. D Table 11.6-1 pg 67
Use Group II Table 1.5-1, pg 2
Site Class D Table 11.8-1, pg 68
Vibration Isolation 1
Sms =Fa*Ss 1.52 11.4.1, pg 65
Sm1 =Fv"S1 0.86
Sds =2/3*Sms 1.017 11.4-3, pg 65
Sd1 =2/3*Sm1 0.58
R = 3 pg. 141
Omega, S� = 2
Cd = 3
Importance le = 1 Sec 15.4.1.1, 7able 1.5-2
Contents W = 92000 Ibs
W = 31000 Ibs
Total Weight, Wp = �� Ibs
Rigid Structure: ASCE 15.4.2, pg 144
V=.3*Sds'`W*I = eq 15.4.5 37530 Ibs V/1.4 = 26807 Ibs (WS)
Cs = 0.305 W 0.86
eq. 12.4-4 Ev ( Vp) _.2*Sds*W = 25020 Ibs Vp = 17871 Ibs (WS)
Period: eq. 12.8-6 Ta =Ct"hn^x = 0.077 sec. TI = 16 pg 224
Ct = 0.020 table 12.8-2, pg 90
x = 0.750
Hn = 6.000 ft, height .
eq. 15.4-1, min. Cs =.044*Sds*le = 0.045 pg.140
eq 15.4-2. Min if S1>.6 Cs=.85*S1/(R/le)= 0.164 Cs max = Sd1/(T*(R/i)) �= 2.512 eq 12.8-3, �
eq. 12.8-2, pg 89 Cs = Sds/(R/l) = 0.339 USE: Cs =, 0.339
eq. 12.8-2, pg 89 V= Cs*W = 41697 USE : 41697 Ibs
W/S, Vl1.4 = 29784 Ibs
0.242
SEISMICEQUIP12non building
/,:
\
`.J
SEISMIC: NON BUILDING STRUCTURE 29-Sep-15
ver 3/5/14 PAGE 2
PROJECT: Boeing JOB NO. 14-142
ITEM: LN Tank - Nitrogen
MAX A. ti. I tN51UN LUAU (Strenqtll)
CG, x= 88 in b= 81 I= 256 in.
No of Anchors(Legs), N= 4 No. of Bolts/Anchor, n= 2
Mo =(Fp*x)+Vp*b/2 = 4682633 in.-Ibs Added Mo = 0: in.-Ibs
Ibb = 6561
Angle = 0.306 radians or 17.56 degrees Ill = 65536
Arm = 268.51 in Tb =Mo*b/2/Ibb*cos= 27559 Ibs
TI =Mo*I/2/III*sin= 2759 Ibs
LC 7 Diagonal Tension, Tu = Mo/Arm -.9*Wp/N +Vp/N = -3981 Ibs NO TENSION
OR
LC 7 Orthogonal Ten., Tu = Mo/b/(N/2)-.9* Wp/N+Vp/N = 7485 Ibs TENSION
Shear, Vu = 10424 ibs
LOf�TGL"tUF7If-�tLL - �� 2 �� ��'��l2 �- 2dp �
•Gj
�u ���
SEISMICEQUIP12non building
ANCHOR BOLTS
(ACI 318 2011, Appendix D)
PROJECT: BOEING 9-99
ITEM LN Tank - Transverse
LOADS: Shear, Vu =
Tension Nu =
or phi per phi,tension, steel =
ESR reports phi, shear steel =
Concrete seismic mode .75,
Anchor bolt:
for: D5.2
D5.2
D62
ver. 9/16/13
eisi
CONSULTING ENGINEERS
PAGE 1/4
DATE 13-Oct-15
JOB NO. 14-142R
10.40 kips
7.50 kips
0.65. D4.3, pg 434 Conc. Mode phi = 0.7
0.6 D4.3 Conc. Mode phi = 0.7
0_75 D3.3.4,4 pg 426 Inv. Omega or Brittle = 0.4 D3.3.4.3-d, pg. 426
Grade ASTM F593 futa = 85 ksi (not to exceed 125ksi or 1.9*Fy)
Fy = 45 ksi 85.5 ksi (1.9�`Fy)
Size, dia., da = 1.5 in, Ase = 'f .37 in^2 Ase = 3.14/4"(do-.9743/nt)^2
Embed., hef = 15 in ha min =3/2*hef = 22.5 in., per D8.5, pg 462 for expansion
Abrg = 2.617 in^2 (bearing area of head)
No. Shear AB, n= 2 No. Tension AB, n= 2
Anchor Spacing, s1 = 0 in s2 = 3.75 in (s2 in direction of load)
smin = 4*da or 6*da for torque or post installed smin, see D8.1, pg 462
Post-Installed cmin = 6*da,undercut
12 cmin = 8'`da,torqued controAed =
15 cmin = 10*da,displacement controfled
Edge dist., cac = 12 in. critical cac, see D8.6, pg 463 (4"'hef except undercut anchors)
post-installed (see tested data): undercut, cacmin =2.5*hef
torque-controlled, cacmin = 4*hef
Per D8.3, pg 462 cast in: non torqued, min edge distance = min cover per ACI, Section 7.7
adhesive, cac = 2*da
ha = 22.5 D8.5, pg 462, hamin =1.5"hef = 22.5 in.
camin = 15 in. cmin = 3.75 in.
ca1(in direction of shear) = 18 in. for D6.2 18 in.
ca2 (in orthogonal Direction) = 12 in., other ca2 = 12 in (1.5*heflmax 22.5
ca2 {in orthogonal Direction) = 12 in., other ca2.1 = 12 in (1.5'`Ca1)max 27.00
eN (tension eccentricity) = 0 in. eV(shear eccentricity) = 0 in.
Appendix D
r
�
ANCHOR BOLTS
PROJECT: BOEING 9-99
kc =
Concrete strength , fc' _
Modification Factors:
U�ec,N U�1=1/(1+2*eN/3/hefl =
U�ed,N W2 =.7+.3"camin/1.5/hef =
wc,N U�3 =
U�cp,N w4 =
wc,p W=
Wec,V �5 = 1/(1+2*ev/(3*ca1)) =<.1.0
wed,V W6 = .7+.3''ca2/1.5/ca1 =
�c.V U�7 =
4�h,V 4�8 =(1.5*Ca1/ha)^.5
Nominal Bolt Tensile Strength: (D5.1)
Nsa = n"Ase*futa =
Concrete Breakout Strength: (D5.2)
ca1 =
Anco =9*hef"2 =
Anc =(ca1+s1+1.5*hef)"`(2"1.5*hef+s2) _
Anc =(2*Ca9 )"(2"Ca2) _
Anc =(ca1+s2+1.5"`hef)*(ca2.1+ca2+s1) _
Not to Exceed Nb = kc*(fc)^.5*hef^1.5 =
for 11<hef<25, Nb = 16*(fc)^.5"`hef^1:67 =
Nb =
Ncb = Anc/Anco*4�2*�3*W4*Nb =
Ncgb = Anc/Anco*w1*w2*�u3"4�4*Nb =
Use Nn =
eisi
CONSULTING ENGINEERS
DATE
PAGE
LN Tank - Transverse JOB NO.
17 D.5.2.2 (24 for cast in & 17 for post installed), pg 438
4000 psi _
13-Oct-15 :
2/4
14-142R
1.00 eq. D-8, pg 440
0.90 eq. D-10, pg 441 if camin<1.5"hef, otherwise 1, �2 = 0.90
1.25 D.5.2.5, pg 441 (1.25 for cast-in & 1.4 for post-installed) (1.00 per ESR)
1,00 D-12, �.5.2.7, pg 442 (1.0 max.)
�4=1.0 if camin=>cac eq D-11, pg 442 1.00
w4=camin/cac => 1.5*hef/cac if camin<cac eq D-12 1.88
1.00 D.5.3.6, pg 444 (1.4 for no cracking, otherwise 1)
1.00 D-36, D.6.2.5, pg 456 Use 1.00
0.83 eq D�8, D.6.2.6, pg 457 or 1 if ca2=> 1.5*ca1 Use 0.83
1.20 D6.2.7, pg 457 ( use 1.4 for no cracking) (1.2 w/ #4 rebar @ edge)
1.10 D6.2.7,pg 458
232.90 kips eq. D-2, pg 436
(verify hef if ca < 1.5*hef on 3 sides), D5.2.3, pg 439
18 in
2025 in^2
1974 in^2
864 in"2
1062 in^2
62.46 kips
103.86 kips
62.46 kips
68.50 kips
68.50 kips
68.50 kips
(1.5 hef max.)
eq. D-5, pg 437
(verify with bolt layout)
Narrow wall
Near edge:
eq. D-6, pg 438
eq. D-7, pg 439
eq. D-3, pg 437
eq. D-4, pg 437
Appendix D
pg 438
Use: Anc = 1974
(single anchor)
(single anchor)
Nn = 68.50
(Group)
0
�Q
ANCHOR BOLTS
PROJECT: BOEING 9-99
Concrete Pullout Strength: (D5.3)
Single Anchor Not to exceed, Npn =wcp`Np =
(headed stud) Np max =Abrg*8*fc' _
Use Np/boli =
Group Np =
Hooked anchor see pg 427
Concrete Side Face Tension: (D5.4)
for hef<2.5'`Ca1 =
Nsb = 160"ca1*(Abrg)^.5`(fc)^.5 =
If ca2<3*ca1, Nsb*(1+ca2/ca1)/4 (up to 3'ca1 max.)=
Group, Nsbg = (1+s1(6*ca1))"Nsb =
Steel Shear Strength: (D6.1)
grout base, g =
Non headed bo�ts or post-installed' p=
Vsa =.6*(n*Ase,v"futa''p)'`g=
Concrete Breakout Strength in Shear: (D6.2)
LN Tank - Transverse
eisi
CONSULTING ENGINEERS
DATE 13-Oct-15
PAG E 3/4
JOB NO. 14-142R
(for post-installed see test results)
83.74 kips eq D-13, pg 443
83.74 kips eq. D-14, pg 444 Pull-out = 9.145 kips, from Table
83.74 kips ( NpnExp. Anchor) =U�cp"Np = 11.57 kips
167.48 kips Nn = 68.50
ca1 = 18 ca2 = 12 s= 12 in.( Distance to edge)
45.00 in., then not applicable
294.66 kips eq. D-16, pg 444 (See ACI 355.2 for post installed anchors)
122.78 kips D.5.4,1, pg 444 Use Nsb = 110.50
122.78 kips eq. D-17, pg 445 Use Nsbg = 125.23
1(if grout w/ cast-in. headed bolt use .8, otherwise 1.0)
1(use p= 1,sleeves not in shear plane use .6)
139.74 kips eq. D-29, pg 450 Vn = 139.74
Ca1 = 18 Ca2 = 1.5*Ca1 = 27
Use: 1.10 D-39, pg 458 (not less than 1)
Shear Parallel to edge (2 otherwise 1) 1 D6.2.1c, pg 451
Avco = 4.5'`ca1^2 = 1458 in^2 eq. D-32, pg 451
Avc = ha'`(1.5*(ca1+s2)*2+s1)= 1468 in^2 (verify with bolt configuration)
If Ca2< 1.5"Ca1, ha = 1.5*Ca1 otherwise 1.5'`Ca1 max
Near edge: Avc=ha*(1.5(ca1+s2)+(ca2.1+s1))= 1004 in^2 Ca2.i = 12 .
lemax =8*do= 12.00 Use le = 12 see D6.2.2 or le = 2*do for torque controled Exp..Anchors
Vb=7"(I/do)^.2*do^.5*fc'^.5"ca1^1.5= 83.36 kips eq. D-33, pg 454 Use Avc = 1468
Vcb=(Avc/Avco)*w6`W7*U�8"Vb= 91.95 kips eq. D-30, pg 451
Group, Vcbg=(Avc/Avco)*W5*w6*U�7*�8*Vb= 91.95 kips eq. D-31, pg 451
Use V= 91.95 kips Un = 91.95
Appendix D
�
ANCHOR BOLTS
PROJECT: BOEING 9-99
Concrete Pryout Strength: (D6.3)
LN Tank -'i'ransverse
eisi
CONSULTING EIVGINEERS
DATE 13-Oct-15
PAGE 4/4
JOB NO. 'f4-142R .
kcp = 2 D.6.3.1 (kcp =1 for hef < 2.5, otherwise 2.0)
single Vcp = kcp'`Ncb = 137.00 kips eq. D-40, pg 460 (from D5.2)
group Vcp = kcp*Ncbg = 137.00 kips eq. D-41, pg 461 Vn = 91.95
Interaction: (D7) Vua/bolt = 5.20 kips Vn =
Nua/bolt = 3.75 kips Nn =
phii`Vn = 41.38 kips D4.7.2, pg 415 Vua=
phi"Nn = 35.96 kips D4.1.2 . Nua =
For No Combination Required
If Vua<.2*phi"1/n = 5 kips b.7.4, pg 461 Combine
If Nua<.2''phi*Nn = 4.68 kips D.7.2, pg 461 Combine
USE: 1.5" dia. ATR "ASTM 593" Anchors w/ 15 in. emb.
Summary phi Capacity
Nominal Bolt Tensile Strength: (D5.1) Nn = 232.9� kips 0.65 151.39
Concrete Breakout Strength: (D5.2) Nn = 68.50 kips 0.65 44.53
Concrete Pullout Strength: (D5.3) Nn = 167.48 kips 0.65 108.86
Concrete Side Face Tension: (D5.4) * Nn = 125.23 kips 0.65 81.40
Stee! Shear Strength: (D6.1) Vn = 139.74 kips 0.6 83.84
Concrete Breakout Strength in Shear: (D6.2) " Vn = 91.95. kips 0.6 55.17
Concrete Pryout Strength:,(D6.3) Vn = 137.00 kips 0.6 82.20
Vu = 10.4 Nu = 7.50 '
*NA if not near slab edge Vn = i6.55 Nn = 13.36
Combine = VuNn +Nu/Nn = 1.19 OK <= 1.2 eq D-42, pg 461
Allowable Va = 11.82 . kips Allowable Ta = 9.54
Appendix D
91.95
68.50
10.40
7.50
kips
kips
kips
kips
�•�
- -------�
� �
�
Formula Seismic Brittle
D-3 151.39
D-4/5 33.39 13.36
D-14 81.65 32.66
D-18 61.05 24.42
D-19l20 83.84
D-21/22 41.38 16.55
D-30/31 61.65 24.66
kips FS = 1.4
c.T�
ANCHOR BOLTS
(P,CI 318 2011, Appendix D)
PROJECT: BOEING 9-99
ITEM
LOADS:
or phi per
ESR reports
Anchor bolt:
for D5.2
D5.2
D6.2
LN2 Tank - Longitudinal
Shear, Vu =
Tension Nu =
phi,tension, steel =
phi, shear steel =
Concrete seismic mode _75,
ver. .9/16/13
eisi
CONSULTING ENGINEERS
PAGE
• DA7E
JOB NO.
1/4
4-Nov-15
14-142Q
20.80 kips
0.00 kips
0:65 D4.3, pg 434 Conc. Mode phi = 0.7
0.6 D4.3 Conc. Mode phi = 0.7
0.75 D3.3.4,4 pg 426 Inv. Omega or Brittle = 0.4 D3.3.4.3-d; pg. 426
--�_..
.
i
.
Grade ASTM F593 futa = 85 ksi (not to exceed 125ksi or 1.9"Fy)
Fy = 45 ksi 85.5 ksi (1.9"Fy)
Size, dia., da = 1.5 in, Ase = 1.37 in^2 Ase = 3.'14/4*(do-.9743/nt)^2
Embed., hef = 15 in ha min =3/2'`hef = 22.5 in., per D8.5, pg 462 for expansion
Abrg = 2.617 in^2 (bearing area of head)
No. Shear AB, n= 2 No. Tension AB, n= 2
Anchor Spacing, s1 = 18 in s2 = 21.5 in (s2 in direction of load) '
smin = 4�da or 6*da for torque or post installed smin, see D8.1, pg 462
Post-Installed cmin = 6'`da,undercut
12 cmin = 8*da,torqued. controlled =
15 cmin = 10*da,displacement controlled
Edge dist., cac = 6 in. critical cac, see D8.6, pg 463 (4*hef except undercut anchors)
post-installed (see tested data): undercut, cacmin =2.5*hef
torque-controlled, cacmin = 4�hef
Per D8.3, pg 462 cast in: non torqued, min edge distance = min cover perACl, Section 7.7
adhesive, cac = 2'da
ha = 18 D8.5, pg 462, hamin =1.5*hef = 22.5 in.
camin = 2 in. cmin = 3.75 in.
ca1(in direction of shear) = 2 in. for D6.2 22.5 in.
ca2 (in orthogonal Direction) = 22.5 in., othec ca2 = 3.5 in (1.5*he�max 22.5
ca2 (in orthogonal Direction) = 33.75 in., other ca2.1 = 3 in (1.5*Ca1)max 33.75
eN (tension eccentricity) = 0 in. eV(shear eccentricity) = 0 in.
Appendix D
ANCHOR BOLTS
PROJECT: BOEING 9-99
kc =
Concrete strength , fc' _
Modification Factors:
�uec,N �1=1/(1+2*eN/3/hefl =
U�ed,N w2 =.7+.3*camin/1.5/hef =
�uc,N w3 =
�cp,N W4 =
4�c,P . w=
4�ec,V W5 = 1/(1+2*ev/(3"ca1)) _< 1.0
�ed,V �6 = .7+.3'ca2/1.5/ca1 =
4�c.V W7 =
4�h,V 4�8=(1.5"Ca1/ha)^.5
Nominal Solt Tensile Strength: (D5.1)
Nsa = n"`Ase*futa =
Concrete Breakout Strength: (D5.2)
ca1 =
Anco =9*hef^2 =
Anc =(ca1+s1+1.5"hef)*(2*1.5"hef+s2) _
Anc =(2*Ca1)*(2*Ca2) _
Anc =(ca1+s2+1.5'`hefj*(ca2.1+ca2+s1) _
Not to Exceed Nb = kc"(fc)^.5"hef^1.5 =
for 11<hef<25, Nb = 16"`(fc)^.5*hef^1.67 =
Nb =
Ncb = Anc/Anco'`W2*w3*w4*Nb =
Ncgb = Anc/Anco"�U1*w2*�3*U�4�Nb =
Use Nn =
eisi
CONSULTING ENGINEERS
DATE 4-Nov-15
PAGE 2/4
LN2 Tank - Longitudinal , JOB NO. 14-142Q
17 D.5.2.2 (24 for cast in 8� 17 for post instailed), pg 438
4000 psi
1.00 eq. D-8, pg 440
0.73 eq. D-10, pg 441 if camin<1.5*hef, otherwise 1, 4�2 = 0.73
1.25 D.5.2.5, pg 441 (1.25 for cast-in & 1.4 for post-installed) (1.00 per ESR)
1.00 D-12, D.5.2.7, pg 442 (1.0 max.)
4�4=1.0 if camin=>cac eq D-11, pg 442 0.33
W4=camin/cac => 1.5"hef/cac if camin<cac eq D-12 0.33
1.00 D.5.3.6, pg 444 (1.4 for no cracking, otherwise 1)
1.00 D-36, D.6.2.5, pg 456 Use 1.00
2.95 eq D-38, D.6.2.6, pg 457 or 1 if ca2=> 1.5"ca1 Use 1.00
1:20 D6.2.7, pg 457 ( use 1.4 for no cracking) (1.2 w/ #4 rebar @ edge)
0.41 D6.2.7,pg 458
232.90 kips eq. D-2, pg 436
(verify hef if ca < 1.5"hef on 3 sides), D5.2.3, pg 439
2 in
2025 in^2
2826 in^2
104 in^2
2024 in^2
62.46 kips
103.86 kips
62.46 kips
79.18 kips
79.18 kips
79.18 kips
(1.5 hef max.)
eq. D-5, pg 437
(verify with bolt layout)
Narrow wall
Near edge:
eq. D-6, pg 438
eq. D-7, p9 �139
eq. D-3, pg 437
eq. D-4, P9 437
Appendix D
pg 438
Use: Anc = 2826 (Group)
(single anchor)
(single anchor)
Nn = 79.18.
��
ANCHO'R BOLTS
PROJECT: BOEING 9-99
Concrete Pyllout Strength: (D5.3)
Single Anchor Not to exceed, Npn =�cp*Np =
(headed stud) Np max =Abrg"8"fc' _
Use Np/bolt =
Group Np =
Hooked anchor see pg 427
Concrete Side Face Tension: (D5.4)
for hef<2.5"Ca1 =
Nsb = 160*ca1*(Abrg)^.5*(fc)^.5 =
Ifca2<3*ca1,Nsb''(1+ca2/ca1)/4 (upto3*ca1max.)=
Group, Nsbg = (1+s/(6*ca1))"Nsb =
Steel Shear Strength: (D6.1)
grout base, g =
Non headed bolts or post-installed' p=
Vsa =.6*(n*Ase,v*futa*p)*g=
Concrete Breakout Strength in Shear: (D6.2)
0
LN2 Tank - Longitudinal
eisi
CONSULTING ENGINEERS
DATE 4-Nov-15
PAGE 3/4
JOB NO. 14-142Q
(for post-installed see test results)
83.74 kips eq D-13, pg 443
83.74 kips eq. D-14, pg 444 Pull-out = 9.145 kips, from Table
83.74 kips { NpnExp. Anchor) =wcp'IVp = 14.57 kips
167.48 kips Nn = 79.18
ca1 = 2 ca2 = 3.5 s= 12 in.( Distance to edge)
5.00 in., then not applicable
32.74 kips eq. D-16, pg 444 (See ACI 355.2 for post installed anchors)
100.27 kips D.5.4.1, pg 444 Use Nsb = 100.27
200.54 kips eq. D-17, pg 445 Use Nsbg = 200.54
1(if grout w/ cast-in headed bolt use .8, otherwise 1.0)
1(use p= 1,sleeves not in shear plane use .6)
139.74 kips eq. D-29, pg 450 Vn = 139.74
Ca1 = 22.5 Ca2 = 1.5"'Ca1 = 33.75
Use: 1.00 D�9, pg 458 (not less than 1)
Shear Parallel to edge (2 otherwise 1) 1 D6.2.1c, pg 451
Avco = 4.5*ca1^2 = 2278 in"2 eq. D-32, pg 451
Avc = ha*(1.5"(ca1+s2)"2+s1)= 2700 in^2 (verify with bolt configuration)
If Ca2< 1.5"Ca1, ha = 1.5*Ca1 otherwise 1.5*Ca1 max
Nearedge: Avc=ha""(1.5(ca1+s2)+(ca2.1+s1))= 1566 in^2 Ca2.1 = 3
lemax =8"do= 12.00 Use le = 12 see D6.2.2 or le = 2*do for torque controled Exp: Anchors
Vb=7*(I/do)^.2''do^.5*fc'^.5*ca1^1.5= 93.63 kips eq. D-33, pg 454 Use Avc = 2700
Vcb=(Avc/Avco)*w6'`w7*w8'Vb= 133.16 kips eq. D-30, pg 451
Group, Vcbg=(Avc/Avco)*w5*U�6*w7"U�8*Vb= 133.16 kips eq. D-31, pg 451
Use V= 133.16 kips Vn = 133.16
Appendix D
ANCHOR BOLTS
PROJECT: BOEING 9-99
L.N2 Tank - Longitudinal
eisi
CONSULTING ENGINEERS
DATE
PAGE
JOB NO.
4-Nov-15
4/4
14-142Q
Concrete P .ryout Strength: (D6.3)
, kcp = 2 D.6.3.1 (kcp =1 for hef < 2_5, otherwise 2.0)
single Vcp = kcp"Ncb = 158.35 kips eq. D-40, pg 460 (from D5.2)
group Vcp = kcp*Ncbg = 158.35 kips eq. D-41, pg 461 Vn = 133.16
Interaction: (D7) Vua/bolt = 10.40 kips Vn =
Nua/bolt = 0.00 kips Nn =
phi'Vn = 59.92 kips D4.1.2, pg 415 Vua=
phi"Nn = 41.57 kips D4.1.2 Nua =
For No Combination Required,
If Vua<.2*phi*Vn = 7 kips D.7.1, pg 461 Combine
If Nua<2'phi"`Nn = 5.40 kips D.7.2, pg 461 O.K.
USE: 1 1/2" dia. ATR "ASTM 593" Anchors w/ 15 in. emb.
Summary phi Capacity
Nominal Bolt Tensile Strength: (D5.1) Nn = 232.90 kips �.65 151.39
Concrete Breakout Strength: (D5.2) Nn = 79.18 kips 0.65 51.47
Concrete Pullout Strength: (D5.3) Nn = 167.48 kips 0.65 108.86
Concrete Side Face Tension: (D5.4) *, cast in A. B. Nn = 200.54 kips 0.65 130.35
Steel Shear Strength: (D6.1) Vn = 139.74 kips 0.6 83.84
Concrete Breakout Strength in Shear: (D6.2) * Vn = 133.16 kips 0.6 79.90
Concrete Pryout Strength: (D6.3) Vn = 158.35 kips 0.6 95.01
Vu = 20.8 Nu = 0.00 '
*NA if not nesr slab edge Vn = 23.97 Nn = 15.44
Combine = VuNn +Nu/Nn = 0.87 OK <= 1.2 eq D-42, pg 461
Allowable Va = 17.12 kips Allowable Ta = 11.03
Appendix D
133.16
79.18
20.80
0.00
kips
kips
kips
kips
OK
OK
Formula Seismic Brittle
D-3 151.39
D-4/5 38.60 15.44
D-14 81.65 32.66
D-18 97.76 39.11
D-19/20 83.84
D-21/22 59.92 23.97
D-30/31 71.26 28.50
kips FS = 1.4
� FOUNDATION
� PROJECT: Boeing
� ITEM: LN Tank - Nitrogen
SP Allow = 1500 psf
Ftg Width = 8 ft Thickness, t= 18 in
, Ftg Length = 14 ft
Ftg Weight = 40 kips
� Ftg D+L = 101.5 kips
SP(D+L) = 906 psf OK
Hx = 9 ft. to CG
j Lateral, Fp = 29.78 kips
I Mo = Fp*Hx= 279 ft-kips
� Mr = 711 ft-lips
X = 4.25 ft
OTM 5P = 19$8 psf OK
e►s�
CONSULTING ENGINEERS
PAGE
JOB NO. 14-142
t
w
SEISMICEQUIP12non building.
�
consulting engineers
1900 W Emerson Ploce �200 Seattle, WA 98119
Phone (206) 284-1181 e FAX (206) 284-1236
�f f z q'•���
Job No. � `�'��'� Sheet �_Of
Client:
Project:
subje�t: �IIG�D�J�,.�l��� °�9�4�'�t—°
B y. ----_ D a te: .
� � ��
�-- c� 1�
SEISMIC: NON BUILDING STRUCTURE
ver 3/5/14
PROJECT: 8oeing
ITEM: Microbulk Tank
�
eisi
CONSULTING ENGINEERS
12-Oct-15
PAGE 1
J08 N0. 14-142
CRITERIA: 20�2 IBC
Ss = 1.518 Figure 1613.3.1(1), pg 368
S 1 = 0.575
Fa = 1 Table 1613.3.3(1), pg 366
Fv = 1.5
Design Cat. D Table 11.6-1 pg 67
� Us.e Group II Table 1.5-1, pg 2
S'ite Class D Table 11.8-1, pg 68
Vibration Isolation 1
Sms =Fa*Ss 1.52 11.4.1, pg 65
Sm1 =Fv*S1 0.86
Sds =2/3*Sms 1.017 11.4-3, pg 65
Sd9 =2/3*Sm1 0.58
R = 3 pg. 141
Omega, � = 2
Cd = 3
Importance !e = 1 Sec 15.4.1.1, Table 1.5-2
Contents W = 2651 Ibs
W = 2692 Ib5
Total V1/eight, Wp = 5�Ibs
Rigid Structure: ASCE 15.4.2, pg 144
V=.3*Sds*W"I = eq 15.4.5 1630 Ibs V/1.4 = 1164 Ibs (WS)
Cs = 0.305 W 0.43
eq. 12.4-4 Ev ( Vp) _.2"Sds*W = 1087 Ibs Vp = 776 Ibs (WS)
Period: eq. 92.8=6 Ta =Ct*hn"x = 0.091 sec. TI = 16 pg 224
Ct = 0.020 table 12.8-2, pg 90
x = 0.750
Hn = 7.500 ft, height
eq. 15.4-1, min. Cs =.044*Sds*le = 0.045 pg.140
eq 15.4-2. Min if S1>.6 Cs=.85"S1/(R/le)= 0.164 Cs max = Sd1/(T*(R/I)) = 2.125 eq 12.8-3, �
eq. 12.8-2, pg 89 . Cs = Sds/(R/l) = 0.339 USE: Cs = A.339
eq. 12.8-2, pg 89 V= Cs*W = 1811 USE : 1811 Ibs
. W/S, V/1.4 = 1294 Ibs
0.242
SEISMICEQUIP12non building
'; SEISMIC: NON BUILDING STRUCTURE
ver 3/5/14
PROJECT: Boeing
ITEM: Microbulk Tank
MAX A. B. TENSION LOAD (Strenqth)
CG, x= 46 in b= 48 � !_
No of Anchors(Legs), N= 4 No. of Bolts/Anchor, n= 1
Mo =(Fp*x)+Vp""b/2 = 909403 in.-ibs Added Mo = 0
Ibb =
Angle = 0.785 radians or 45.00 degrees III =
Arm = 67.88 in Tb =Mo*b/2/fbb*cos=
T1=Mo*I/2/lll"sin=
LC 7 Diagonal Tension, Tu = Mo/Arm -.9*Wp/N +Vp/N = 681 Ibs
OR
LC 7 Orthogonal Ten., Tu = Mo/b/(N/2)-.9'' Wp/N+Vp/N = 209 Ibs
Shear, Vu = 453 Ibs
OTM: ASD (for equipment)
Fp =
Fpv = .2'Sds'Wp/1.4
Mo = Fp"x + Fpv'b/2
.6Mr = (.6"Wp-Fpv)"b/2
F.S. = .6"Mr/Mo
Orthogonal .
UPL = (Mo-.6xMr)Ib/2+Fpv/N =
THRUST, Rh = (Mo)/(b/2)+Wp/N +�pv/N=
Diagonal
UPL = (Mo-.6"Mr)/arm+Fpv/N =
THRUST, Rh = (Mo)/arml2+Wp/N +i=pv/N=
1294 Ibs
776 lbs
12-Oct-15
PAGE 2
JOB NO. 14-142
48 in.
in.-Ibs
2304
2304
806 Ibs
806 Ibs
TENSION
TENSION
78145 in.-Ibs
58308 in.-Ibs
0.75 < 1.0, ADD HOLD-DOWN ANCHORS
1021 Ibs UpIifULeg
3158 Ibs/Leg
486 Ibs UpIifULeg
2105 IbslLeg
SEISMICEQUIP12non building
ANCHOR BOLTS
(ACI 318 2011, Appendix D)
PROJECT: BOEING 9-99
ITEM IVlicrobulk Tank
LOADS: Shear, Vu =
Tension Nu =
or phi per phi,tension, steel =
ESR reports phi, shear steel =
Concrete seismic mode .75,
Anchor bolt:
for D5.2
D5.2
D6.2
ver. 9/16/13
eisi
CONSULTING ENGINEERS
PAGE 1/4
DATE 4-Nov-15
JOB NO. 14-142Q
0.45 kips
0.68 kips
0.65 D4.3, pg 434 Conc. Mode phi = 0.7
0.6 D4.3 Conc. Mode phi = 0.7
0.75 D3.3.4,4 pg 426 Inv. Omega or Brittle = 0.4 D3.3.4.3-d, pg. 426
Grade KB-TZ futa = 106 ksi (not to exceed 125ksi or 1.9"Fy)
Fy = 84.8 ksi 161.12 ksi (1.9"Fy)
Size, dia., da = 0.625 in, Ase = 0.162 in^2 Ase = 3.14/4'`(do-.9743/nt)"2
Embed., hef = 4 in ha min =3/2�'hef = 6 in., per D8.5, pg 462 for expansion
Abrg = 0 in^2 (bearing area of head)
No. Shear AB, n= 1 No. Tension AB, n= 1
Anchor Spacing, s1 = 0 in s2 = 0 in (s2 in direction of load)
� smin = 4'�da or 6"da for torque or post installed smin, see D8.1, pg 462
Post-Installed cmin = 6*da,undercut
5 cmin = 8'`da,torqued controlled =
6.25 cmin = 10*da,displacement controlled
Edge dist., cac = 6 in. critical cac, see D8.6, pg 463 (4"hef except undercut anchors)
post-installed (see tested data): undercut, cacmin =2.5'"hef
torque-controlled, cacmin = 4"hef
Per D8.3, pg 462 cast in: non torqued, min edge distance = min cover per ACI, Section 7.7
adhesive, cac = 2'`da
ha = 18 D8.5, pg 462, hamin =1.5*hef = 6 in.
camin = 6 in. cmin = 4.75 in.
ca1(in direction of shear) = 6 in. for D6.2 6 in.
ca2 (in orthogonal Direction) = 6 in., other ca2 = 6 in (1.5*heflmax 6
ca2 (in orthogonal Direction) = 9 in., other ca2.1 = 9 in (1.5'*Ca1)max 9.00
eN (tension eccentricity) = o in. eV(shear eccentricity) = o in.
Appendix D
0
�
r
ANCHOR BOLTS
PROJECT: BOEING 9-99
kc =
Concrete strength , fc' _
Modification Factors:
U�ec,N U�1=1/(1+2"eN/3/hefl =
Wed,N W2 =.7+.3"camin/1.5/hef =
wc,N w3 =
Wcp,N W4 =
�c,p �_
wec,V w5 = 1/(1+2*ev/(3*ca1)) _< 1.0
U�ed,V w6 = .7+.3*ca2/1.5/ca1 =
wc.V w7 =
4�h,V W8 =(1.5*Ca1/ha)^.5
Nominal Bolt Tensile Strength: (D5.1)
Nsa = n*Ase*futa =
Concrete Breakout Strength: (D5.2) .
ca1 =
Anco =9*hef^2 =
Anc =(ca1+s1+1.5`hef)'"(2*1.5'hef+s2) =
Anc =(2*Ca1)"(2"Ca2) _
Anc =(ca1+s2+1.5"he�*(ca2.1+ca2+s1) _
Not to Exceed Nb = kc*(fc)^.5*hef^1.5 =
for 11<hefQ5, Nb = 16"(fc)".5*hef^1.67 =
Nb =
Ncb = Anc/Anco''w2'`w3"4�4*Nb =
Ncgb = Anc/Anco*�1*w2*�3*�4*Nb =
Use Nn =
■ .
e�s�
CONSULTING ENG/NEERS
DATE 4-Nov-15
PAGE 2/4
Microbulk Tank JOB NO. 14-142Q
17 D.5.2.2 (24 ior cast in 8 17 for post installed), pg 438
4000 psi
1.00 eq. D-8, pg 440
1.00 eq. D-10, pg 441 if camin<1.5"hef, otherwise 1, W2 = 1.00
1.00 D.5.2.5, pg 441 (1.25 for cast-in & 1.4 for post-installed) (1.00 per ESR)
1.00 D-12, D.5.2.7, pg 442 (1.0 max.)
�4=1.0 if camin=>cac eq D-11, pg 442 1.00
W4=camin/cac => 1.5*hef/cac if camin<cac eq D-12 1.00
1.00 D.5.3.�, pg 444 (1.4 for no cracking, otherwise 1)
1.00 D-36, D.6.2.5, pg 456 Use 1.00
0.90 eq D-38, D.6.2.6, pg 457 or 1 if ca2=> 1.5*ca1 Use 1.00
1.00 D6.2.7, pg. 457 ( use 1.4 for no cracking): (12 w/ #4 rebar @ edge)
0.71 D6.2.7,pg 458
17.17 kips eq. D-2, pg 436
(verify hef if ca < 1.5''hef on 3 sides), D52.3, pg 439
6 in
144 in^2
144 in^2
144 in^2
144 in^2
8.60 kips
11.47 kips
8.60 kips
8.60 kips
8.60 kips
8.60 kips
(1.5 hef max.)
eq. D-5, pg 437
(verify with bolt layout)
Narrow wall
Near edge:
eq. D-6, pg 438
eq. D-7, pg 439
eq. D-3, pg 437
eq. D-4, pg 437
Appendix D
pg 438
Use: Anc = 144 (Group)
(single anchor)
{single anchor)
Nn = 8.60
I
+ I
� ;
ANCHOR BOLTS
PROJECT: BOEING 9-99
Microbuik Tank
eisi
CONSULTING ENGlNEERS
Concrete Puilout Strength: (D5.3) (for post-installed see test results)
Single Anchor Not to exceed, Npn =Wcp"Np = 0.00 kips eq D-13, pg 443
(headed stud) Np max =Abrg"8*fc' = 0.00 kips eq. D-74, pg 444 Pull-out =
Use Np/bolt = 11.57 kips ( NpnExp. Anchor) =�cp'Np =
Group Np = 11.57 kips
Hooked anchor see pg 427
Concrete Side Face Tension: (D5.4) ca1 = 6 ca2 = 6 s=
for hef<2.5"Ca1 = 15.00 in., then not applicable
DATE 4-Nov-15 .
PAG E 3/4
JOB NO. 14-142Q
9.145 kips, from Table
11.57 kips
Nn = 8.60
12 in.( Distance to edge)
Nsb = 160*ca1'(Abrg)".5"`(fc)^.5 = 0.00 kips eq. D-16, pg 444 (See ACI 355.2 for post installed anchors)
If ca2�3"ca1, Nsb*(1+ca2/ca1)/4 (up to 3*ca1 max.)= 0.00 kips D.5.4.1, pg 444 Use Nsb = 11.57
Group, Nsbg =(1+s/(6*ca1))*Nsb = 15.43 kips eq. D-17, pg 445 Use Nsbg = 15.43
Steel Shear Strength: (D6.1)
grout base, g= 1(if grout w/ cast-in headed bolt use .8, otherwise 1.0)
Non headed bolts or post-installed' p= 1(use p= 1,sleeves not in shear plane use .6)
Vsa =.6*(n'Ase,v*futa*p)`g= 10.30 kips eq. D-29, pg 450 Vn =
Concrete Breakout Strength in Shear: (D6.2) Ca1 = 6 Ca2 = 1.5"Ca1 = 9
Use: 1.00 D-39, pg
Shear Parallel to edge (2 otherwise 1) 2
Avco = 4.5*ca1^2 = 162 in^2
Avc = ha*(1.5"(ca1+s2)*2+s1)= 324 in^2
If Ca2< 1.5*Ca1, ha = 1.5�Ca1 otherwise 1.5'`Ca1 max
Near edge: Avc=ha*(1.5(ca1+s2)+(ca2.1+s1))= 324 in^2
lemax =8"do= 5.D0 Use le =
Vb=7`(I/do)^.2*do^.5"fc'^.5*ca1^1.5= 7.46 kips
Vcb=(Avc/Avco)"�6'�W7*�u8*Vb= 29.83 kips
Group, Vcbg=(Avc/Avco)*w5*�6*4�7*w8*Vb= 29.83 kips
Use V = - 29.83 kips
458 (not less than 1)
D6.2.1c, pg 451
eq. D-32, pg 451
(verify with bolt configuration)
10.30
Ca2.1 = 9
4 see D6.2.2 or le = 2*do for torque controled Exp. Anchors
eq. D-33, pg 454 Use Avc = 324
eq. D-30, pg 451
eq.. D-31, pg 451
Appendix D
Vn = 10.30
0
�
� d
O d` 'd'
Z �t �
� �
�
Z
� QQ O
W o a- -�
W
Z
Z
�LI
C9
Z
�
�y �
.� Z
W O
U
Y
C
H
Y
�
�
0
U
�
rn
rn
i/� o�
,J Z
O W
m �
m
�
� ~
= U
U �
�
Z o
a a
� � � � � o
� (O N O M �
m r- N M Ln M
Y Y
OO
U
� � � � � � � � �
O '4 � d' � f� CO � f�
� N N N y
Q. Q. Q. Q :n
�`1 .Y .Y �G
� (p O N �
� �� O � 'ct (O E M � � � T N M
N � �
•� �� ao 0 0 �p �❑�� � � � �-
N -Y
�
o �
� II 11 �� �� d� V� p� N M� � N �
VN C c 3 7 .fl Q� Q.. r��j' � O�p I` p N
4-. ui > Z] z � N.- � � � '`�
r� OU •� U .
` � u
0
uo r, � Q c`"o c"'o � c`"o o �o �d �° � ��
Q. �� o 0 0 0 0 ��
�
.Y � �' r e- � � N
vaa `t �� c�.o
o � Q' a Q o n c�i Q
� � � N N ., � G �
M�C e=�
� N Z Z �
� ti o.. � n. Q n n Q
0 a�i aai � 0 0 0 ���� Y �� a�i
N
r
��� 7 �l; M 0�0 N tMf� � II
�
N Vf y tq v7 V1 cA tA �� � �� N � � m Y Q
aa naan. aa `
�C ..Y Y Y.Y �G �C SC � � Y
� N N d' CO � � � �
►� f� OO�f d' O L �� II II 11 II II II II 11 N.-
� �
s N N
� Z Z Z Z> >>>� o N
_
II II II II II II II "a II II � II II
Q. ��'''' "' C C� C C� C� C@
U U.� O O�Z'��Z N Z�
Y z U �.� � � ;x Q N
* Z N(� � L N L L � * Z.p
Y V" � Z ��� Q. n, � � � j �, f4
Y � N N N � C O
�� �� °��Y � � z
�- ��� � _ �Q
>� �>z'+-� � :.; � >
> ��- �.- �ri c:� v, d u
M � _ � � M � � � C
V ��� ca�
o z c� c� r� c-� t� E
� � � � o � � o
y � � i C"'' V/ �= r-�.+ U
� v� � c a�i �� c o�
L � °� � + � � N ;� �
N
� � p w ro c p� m
o � o � � af°i � � � a�°i ° �`o
a .y � _ � m � � ` � �' �
m a. tn � Ca 0. c
d g N�' .°,; °�,' °«,' r°.3 � o
L :% = G.' C L L V � L L�.� �
� � � ��� ��
�
o .°�' � o 0 0 0,°�' o o z
V c � Z U U V tn U U x
�
x
�
C
N
❑.
Q
�,J
, Footing Overturning Check EISI, Ltd.
; . CONSULTING ENGlNEERS
I PROJECT: Boeing 9-99 JOB # 14-142Q
� Item: Microbufk Tank 12-Oct-15
� Page
F. S. = 1.5 �
� Lateral load: Fp = 1.29 kips OTM = 6.47 ft-kips
i Vertical Load: Quanitity kips
DL 1 2.692 2.692 kips
LL 1 2.651 2.651 kips
L, ft W, ft T, ft Wt.
Footing, ft 8 x 8 x 1.00 x 0.145 kcf = 9.28 kips
� Total Vertical Load Wt = 14.62 kips
I CG = 4.00 ft
Center of Gravity = 5.00 ft from bot. of ftg. Fp = 1.29 kips
� Seismic OTM = 6.47 ft-kips
I
� Mr = .6'`Wt*W/2 = 35 ft-kips
' FS = 5.42 OK
Soils Pressure: Allow S. P. = 1500 psf
EQ Soil Pressure:
x =(.6*Mr-Mo)/V1! = 1.00 ft
SP = P/A+or-Mc/I = 304 psf or 153 psf OK
if x in first 1/3 1222 psf OK
D + L Soil Pressure:
SP = 228 psf OK
OTM
$
d�a
z U Q
X � 1 F �
a yz Z e0 X W 0¢
a p O a �� U
'� a � � a w(9zz '� �� E f E a� E E
p Q.¢ Q¢� 4U' i p O m N Psp � Z zQ z E_� 2 Z E> p Z=�
� 0 0$ m Y q t�4 i d Z o tZi Z� � W �
J O� Z> V Q � •� m Q t� t� [� V- d a
��" w A P, Q w '� � ¢oa � w � � � � m ¢ d � oi � n �
w � pQo m f- ii > LL � F �. LL z E
� w n ���� e� y a g�¢� u�i �i o> run uUi LL(J u W (� [� tLLa u�.
�1 tJ � N % N
z Q � g � � S � �N°a a � ¢ $ � � p � " � N
_ '?'� � a � � S < � o `��- "��' ^ $ o � � � 90,
N ' N
� j � �
¢ �
� o
� p w
a
z � g O ox p W
o O �
y > 'o z o 0
� u��i > 3 W � <a'J uTl � Z o w z Z � Z z
E O WW O F ¢ 2p � � d O a � j U' ¢ � T� m
�� ¢ � Z ~ Z � 2 O� U Z O¢ V 2 O G�
���
� � �
��
�r� �Q
U
H
Q
�
W
2
U
�
�
�
�
2�
� PE 1� 11/1A-Cl�!_�
. ON-SITE STORAGE SYSTEM - MICROBULK- SOLUTIONS � .
. . . ._ . . . � - _ _. _ . ... . . . __
Our technlcal and customer service teams are staffed with trafned specialists that are highiy qualified [o answer technical questions, order spare partsand provide training at customersftes.
All models can be configured to your needs - Choose your tank slze, reliefvalve pressure,operating pressure,application configuration, gas service and gauge option.
� � � ,�
', DESCRIPTION 230L C 23dC C� 230L C 230L � 265L 300L 450L 450L 450L 450L 7001 1.00OL - 1000L 750QL 1500L �2000L � i
MP,ICCM MP,LCCM HP,I.C.CM HV,LCCM MP MP HP' MP - HP VHP HP HP VHP : VHP VHP �
i� � Sq Basr. Rnd Dase Sq Oase Pnd Base � Sq Base Plule Plnte Plate Plate � Wate Piate Plate � Mate J Pallei . Pa(let . Papet .
w/CaS�ers w/Cascers w/Casters w/Caste�s w/Casters Base Base Base . Base Basr Base Base Base Base_.' Base Base. ..
i.:' .. .. . ..
j Gross Z40 240 240 240 276 330 450 450 450 450 688 i,056 1,D56 1,550 . 1,SSD . 2,04Z
� Net 23D �30 230 230 265 300_ 420 4�0 420 4Z0 645 950 950 1,455 1,455 1,945 �
i
psig 235 235 350 350 235 30U 350 250 350. 500 350 350 500 350 500 500 '
bar 16.2 16.2 24.1 24.1 16.2 20.7 Z4•1 17.2 24.1 . 34.5 24.1 24.1 345 24J 34.5 34.5
�
. ... - -
pstg 125 125 300 300 125 250 300 125 300 450 300 300 450 300 450 450 '
;`� bar 8.6 8.6 �OJ 20J 8.6 17.2 20J 8,6 20J 31.0 20J 20J 31A 20J . 31.0 31.0
� •
, � D07 DOT DOT DOT D'OT ASME DOT ASME . ASME -ASME ASME ASME ASME .ASME ASME ASME .• �
i f .
! Nitrogen
' SCF 5,024 5,024 4,734 4,734 5,764 7,380 8,875 10,332 10,332 10,332 95,860 24,350 24,350 35,790 35,790 47,847
�. Nm3 142 142 134 134- 152 193 271 272 272 272 449 689 689 1,013 1,013 1,257
I .:, Oxygen .
�.. SCF 6,244 6,244' S,930 5,930 7,186 . 9,100 1,1,724 72,76D 12y760 12,760. 19,600 30,070 30,070 44;220 44,220 59,089
j,. Nm' 177 177 ' 1b8 168 189 184 315 336 33b 336 554 850 850 1,250 1,250 7;553 �
- Argon. .
SCF 6,073 G,073 5,763 5,7G3 G,982 8,850 l0,Ei1� 12,478 12,478 12,475 19,760 29,400 �9,400 43,�20 43,220 57,78G
Nm' 772 172 163 163 183 234 306 328 328 328 54� 832 832 7,223 - 1,223 1,519 - •
CO,
SCF N!A N/A 4,500 4,500 N1A N/A 8,312 N/A 8,200 . 8,200 12,fi08 . t9,960 19,960 29,340 29,340 38,048
Nm3 N/A N/A 118 718 N/A N!A 235 N/A Z32 232 357 564 564 830 830 1,000
,� �.
Nz 1.8°m' 1.8°/n 1.8% 1.8°h 2% 1.2°iG 1.9°/n 1.6°!�i 1.6% 1.6% 1°� 1% 1°/n 1% 1% 1%
O� Ar 1.12% 1.12°/a 1.129b 1.7245 1.4% .74°/u 11°/n 1% 1% 1°/u :62°/n .629'0 .62% .62% .62°/a .62%
COz .6% .6°k .6% .6% N/A .4'Yo .6% .5�/u .5°h .5°k .3% 3% .3% .3% .3% 3%
� �
SCf/H 400 400 400 400 400 500 575 . 575 575 575 669 � 960 960. 1,350 1,350 2,000°'
Nm'h 10.5 10.5 7D.5 10.5 10.5 74.1 15.1 15.1 15.1 15.1 18.6 25.2 25.2. 35.4 35.4 52.4
� . ,
SCF/H N/A N/A 133 133 N/A N!A 192 192 192 19� 2�0 . 320 320 450 450 667 �
Nm'h N/A N/A 3.8 3.8 N/A N/A 5.4 5.4 5.4 5.4 6.2 4.0 9.0 12.7 1�.7 175
DiameteY
in 26 26 26 26 26 � 26
mm 660 660 660 660 660 660
Height .. �'"!' ' •
in 54.8 52,9 54.8 52.9 62 GS
mm 1392 1,344 1,392 1,344 1,575 1727
are Weight
Ibs 300 300 340 340 340 450
kg 13G 136 154 154 154 204
A!I spedficntias nrew6/ect to change wlthouf priarnotice.
I J Values are basedon net capaclryat 0 pslg (0 bar) for ASM[ vessels. CO�
ve3sefs nip 6ased an net capaclty at 300 ps! (20.7 boi). DOT vessels are per code.
1) Values are based on gross capac(ty.
310ptlonal3,S005CF/H (92 Nm'h) modelavailable.
Your Local Representative
30 30 30 30 42 42' ' 42 48 48 48
762 762 762 762 1,067 . 1,067 1,067 1,219 T,219 t,219
6B 68 68 68 60 81 81 91 97 117
72Z 1,727 1,727 1,727 1,524 2,058 2,058 2,311 2,311 2.970
688 , 605 688 812. 1,065 1,750 2,080 2,692 3,200 3,860
31� �'.274 '' 312 368.: 483 . 794 945 1;2Z1 1,451 1,751
Pateiits S,�H),942 • 5,954, J 01 • 5,13G,851 • 6,542,848 - OtherPatenuPendli
t
,
_ ..
y
(m�m�aiian. lixpni�ncc. t'ufninimia�'
Copyright � 2005 Chart Industries
CharC Industries, Inc.
U.5.:1-600-400-4683
Worldwide: l -952-882-5000
www.chart-ind.com
PN 1i000938
consulting engineers
1900 W Emerson Place �200 Seatile, WA 98tt9
Job No. ������ Sheet 2`� Of
Client: '��'i�1.T(:�
Project� 1�'1'�� — �Z
Subject: (��LtG�D�
eisi
CONSULTiNG ENGINEERS '
_ . _ _ __ . . . ... . �
POLE FOOTING 26-Oct-15 '
PAGE
JOB: Boeing 99-9 JOB N0. 14-142G1 �
IBC 2009 P I
NONCONSTRAINED: LN2 - Anchors
( IBC FORMULA 18-1, pg 398 )
ALLOW SOIL PRESSURE = 2000 PSF per Table 1806.2, pg 392
ALLOWABLE INCREASE = 1.33 per Sec.1806.3.3, pg 392
TRY D = 10 FEET
ALLOW. LATERAL SP = 250 PSF per Table 1806.2, pg 392
FOOTlNG DIAMETER, B= 1.5 FEET H
LATERAL LOAD, P= 6000 LB.S
EQ. HEIGHT, H= 1.41 FEET
S1 = 9108 PSF
Mo = 8460 FT-LBS
A =2.34*P/(S1*B) 8.45
D= A/2"(1+(1+4.36*H/A)^.5) 9.77 FEET O.K.
CONSTRAINED:
( UBC FORMULA 18-2, pg 398 )
ALLOWABLE INCREASE _
TRY D =
S3 = .
D^2 =4.25*P*H/S3/B D =
1.33
4 FEET
1330 PSF
4.25 FEET
POLEFTG IBC 09
DEPTH
ANCHOR BOLTS
(ACI 318 2011, Appendix D)
PROJECT: BOEING 9-99
ITEM LN Tank - Barrier
LOADS: Shear, Vu =
Tension Nu =
or phi per phi,tension, steel =
ESR reports phi, shear steel =
Concrete seismic mode .75,
eisi
CONSULTING ENGINEERS
ver. 9/16/13
6.00 kips
42.00 kips
0.65 D4.3, pg 434 Conc. Mode phi = 0,7
0.6 D4.3 Conc. Mode phi = 0.7
1 D3.3.4,4 pg 426 Inv. Omega or Brittle =
PAGE 1/4
DAl"E 26-Oct-15.
JOB NO. 14-142R
D3.3.4.3-d, pg. 426
Anchor bolt: Grade ASTM F593 futa = 85 ksi (not to exceed 125ksi or 1.9"Fy)
Fy = 45 ksi 85.5 ksi (1.9'`Fy)
Size, dia., da. = 0.625 in, Ase = 0.162 in^2 Ase = 3.14/4*(do-.9743/nt)^2
Embed., hef = 5 in ha min =3/2'hef = 7.5 in., per D8.5, pg 462 for expansion
Abrg = 0 in^2 (bearing area of head)
No_ Shear AB, n= 4 No. Tension AB, n= 2
Anchor Spacing, s1 = 7 in s2 = 7 in (s2 in direction of load)
smin = 4*da or 6'da for torque or post installed smin, see D8.1, pg 462
Post-Installed cmin = 6*da,undercut
5 cmin = 8*da,torqued controlled =
6.25 cmin = 10'`da,displacement controlled
Edge dist., cac = 6.75 in. critical cac, see D8.6, pg 463 (4*hef except undercut anchors)
for D5.2
D5.2
D6.2
post-insfalled (see tested data): undercut, cacmin =2.5*hef
torque-controlled, cacmin = 4*hef
Per D8.3, pg 462 cast in: non torqued, min edge distance = min cover per ACI, Section 7.7
adhesive, cac = 2*da
ha = 18 D8.5, pg 462, hamin =7.5*hef = 7.5 in.
camin = 8 in. cmin = 3.625 in.
ca1(in direction of shear) = 8 in. for D6:2 8 in.
ca2 (in orthogonal Direction) = 8 in., other ca2 = 8 in (1.5*heflmax
ca2 (in orth�gonal Direction) = 8 in., other ca2.1 = 8 in (1.5*Ca1)max
eN (tension eccenficity) = 0 in. eV(shear eccentricity) = 0 in.
Appendix D
7.5
12.00
��
ANCHOR BOLTS
PROJECT: BOEING 9-99
kc =
Concrete strength , fc' _
Modification Factors:
wec,N w1=1/(1+2'`eN/3/hefl =
wed,N W2 =.7+.3*caminl1.5/hef =
�c,N U�3 =
wcp, N w4 =
�c,p W=
�ec,V w5 = 1/(1+2"`ev/(3�ca1)) =< 1.0
wed,V W6 = .7+.3"ca2/1.5/ca1 =
Wc.V �u7 =
4�h,V 4�8 =(1.5*Ca1/ha)^.5
Nominal Bolt Tensile Strength: (D5.1)
Nsa = n"Ase'`futa =
Concrete Breakout Strength: (D5.2)
ca1 =
Anco =9`hef^2 =
Anc =(ca1+s1+1.5`hefl*(2*1.5*hef+s2) _
Anc =(2"Ca1)*(2`Ca2) _
Anc =(ca1+s2+1.5*hefl*(ca2.1+ca2+s1) _
Not to Exceed Nb = kc*(fc)^.5'`hef^1.5 =
for 11<hef<25, Nb = 16"(fc)^.5"hef^1.67 =
Nb =
Ncb = Anc/Anco"W2"�3*w4'Nb =
Ncgb = Anc/Anco*�U1*W2'`W3"w4*Nb =
Use Nn =
eisi
CONSULTING EIVGINEERS
DATE 26-Oct-15
PAGE 2/4
LN Tank - Barrier JOB NO. 14-142R
17 D.5.2.2 (24 for cast in & 17 for post installed), pg 438
4000 psi
1.00 eq. D-8, pg 440
1.02 eq. D-90, pg 441 if camin<1.5*hef, otherwise 1, w2 = 1.00
1.00 D.5.2.5, pg 441 (1.25 for cast-in & 1.4 for post-installed) (1.00 per ESR)
1.00 D-12, D.5.2.7, pg 442 (1.0 max.)
V�4=1.0 if camin=>cac eq D-11, pg 442 1.00
U�4=camin/cac => 1.5*hef/cac if camin<cac eq D-12 1.11
1.00 D.5.3.6, pg 444 (1.4 for no cracking, otherwise 1)
1.00 D-36, D.6.2.5, pg 456 Use 1.00
0.90 eq D-38, D.6.2.6, pg 457 or 1 if ca2=> 1.5'`ca1 Use 0.90
1.00 D6.2.7, pg 457 ( use 1.4 for no cracking� (1.2 w/ #4 rebar @ edge).
0.82 D6.2.7,pg 458
27.54 kips eq. D-2, pg 436
(verify hef if ca < 1.5*hef on 3 sides), D5.2.3, pg 439
8 in
225 in^2
495 in^2
256 in^2
518 in"2
12.02 kips
16.64 kips
12.02 kips
26.44 kips
26.44 kips
26.44 kips
(1.5 hef max.)
eq. D-5, pg 437
(verify with bolt layout)
Narrow wall
Near edge:
eq. D-6, pg 438
eq. D-7, pg 439
eq. D-3, pg 437
eq. D-4, pg 437
Appendix D
pg 438
Use: Anc = 495 (Group)
(single anchor)
(single anchor)
Nn = 26.44
f
��Q
ANCHOR BOLTS
PROJECT: BOEING 9-99
Concrete Pullout Strength: (D5.3)
Single Anchor Not to exceed, Npn =4�cp'`Np =
(headed stud) Np max =Abrg"'8"fc' _
Use Np/bolt =
Group Np =
Hooked anchor see pg 427
Concrete Side Face Tension: (D5.4)
for hef<2.5*Ca1 =
Nsb = 160*ca1*(Abrg)^.5"(fc)^.5 =
If ca2<3*ca1, Nsb'`(1+ca2/ca1)/4 (up to 3"`ca1 max.)=
Group, Nsbg = (1+s/(6"ca1))*Nsb =
Steel Shear Strength: (D6.9)
grout base, g =
Non headed bolts or post-installed' p=
Vsa =.6*(n*Ase,v*futa'p)*g=
Concrete Breakout Strength in Shear: (D6.2)
LN Tank - Barrier
eisi
CONSULTING ENGINEERS
DATE
PAGE
JOB NO.
26-Oct-15
3/4
14-142R
, , i
(for post-installed see test results)
0.00 kips eq D-13, pg 443
0.00 kips eq. D-14, pg 444 Pull-out = 9.145 kips, from Table
11.57 kips ( NpnExp. Anchor} =U�cp'Np = 11.57 kips
23.14 kips Nn = 23.14
ca1 = 8 ca2 = 8 s= 12 in.( Distance to edge}
20.00 in., then not applicable
0.00 kips eq. D-16, pg 444 (See ACI 3552 for post installed anchors)
0.00 kips D.5.4.1, pg 444 Use Nsb = 11.57
14.46 kips eq. D-17, pg 445 Use Nsbg = 14.46
1(if grout w/ cast-in headed bolt use .8, otherwise 1.0)
1(use p= 1,sleeves not in shear plane use .6)
33.05 kips eq. D-29, pg 450 Vn = 33.05
Ca1 = 8 Ca2 = 1.5*Ca1 = 8
� Use: 1.00 D-39, pg 458 (not less than 1)
Shear Parallel to edge (2 otherwise 1) 1 D6.2.1c, pg 451
Avco = 4.5'`ca1^2 = 288 in^2 eq. D-32, pg 451
Avc = ha*(1.5*(ca1+s2)"2+s1)= 936 in^2 (verify with bolt configuration)
If Ca2< 1.5'`Ca1, ha = 1.5"Ca1 otherwise 1.5"Ca1 max
Near edge: Avc=ha"`(1.5(ca1+s2)+(ca2.1+s1))= 675 in^2 Ca2.1 = 8
lemax =8�do= 5.00 Use le = 5 see D6.2.2 or le = 2*do for torque controled Exp. Anchors
Vb=7"(I/do)^.2*do^.5''fc'^.5*ca1^1.5= 30.82 kips eq. D-33, pg 454 Use Avc = 936
Vcb=(Avc/Avco)'w6*w7"4�8"Vb= 90.15 kips eq. D-30, pg 451
Group, Vcbg=(Avc/Avco)*U�5*w6*W7*w8*Vb= 90.15 kips eq. D-31, pg 451
Use V= 90.15 kips Vn = 33.05
Appendix D
;
ANCHOR BOLTS
PROJECT: BOEING 9-99
Concrete Pryout Strength: (D6.3)
LN Tank - Barrier
eisi
CONSULTlNG ENGINEERS
DATE
PAGE
JOB NO.
26-Oct-15
4/4
14-142R
kcp = 2 b.6.3.1 (kcp =1 for hef < 2.5, otherwise 2.0)
single Vcp = kcp*Ncb = 52.89 kips eq. D-40, pg 460 (from D5.2)
group Vcp = kcp"Ncbg = 52.89 kips eq. D-41, pg 461 Vn = 33.05
Interaction:.(D7) Vua/bolt = 1.50 kips Vn =
Nua/bolt = 3.00 kips Nn =
phi"Vn = 19.83 kips D4.1.2, pg 415 Vua=
phi'Nn = 16.20 kips D4.1.2 Nua =
For No Combination Required
If Vua<.2"phi*Vn = 2 kips D.7.7, pg 461 Combine
If Nua<.2"phi�Nn = 2.11 kips D.7.2, pg 461 Combine
USE: .625" dia. Hilti SS "KB-TZ" Anchors w/ 5 in. emb.
Summary phi Capacity
Nominal Bolt Tensile Strength: (D5.1) Nn = 27.54 kips 0.65 17.90
Concrete Breakout Strength; (D5.2) Nn = 26.44 kips 0.65 17.19
Concrete Pullout Strength: (D5.3) Nn = 23.14 kips 0.65 15.04
Concrete Side Face Tension: (D5.4) *, cast in A. B. Nn = 14.46 kips 0.65 9.40
Steel Shear Strength: (D6.1) Vn = 33.05 kips 0.6 19.83
Concrete Breakout Strength in Shear: (D6.2) * Vn = 9Q.15 kips 0.6 54.09
Concrete Pryout Strength: (D6.3) Vn = 52.89 kips 0.6 31.73
Vu = 6 Nu = 12.00 �
*NA if not near slab edge Vn = 19.83 Nn. = 15.04
Combine = VuNn +Nu/Nn = 1.10 OK <= q.2 eq D-42, pg 461
Allowable Va = 14.16 kips Allowable Ta = 10.74
Appendix D
33.05
23.14
6.00
12.00
kips
kips
kips
kips
OK
OK
Formula Seismic Brittle
D-3 17.90
D-4/5 17.19 17.19
D-14 15.04 15.04
D-18 9.40 9.40
D-19/20 19.83
D-21/22 54.09 54.09
D-30/31 31.73 31.73
kips FS = 1.4
I•
0
consulting engineers
1900 W Emerson Place #200 Seoiile, WA 98119
Phone (206) 284-1181 o FAX (206) 284-1236
T�2��G�,
�-���o— �Z���
P
v�, �
�,,� '►`" � ."/ /� � ��l+ ?L � it"J � � � 2�`J
Ei� �ni.�c-t �
Job No.���(. Sheet �� Of
Client:
Project:
Sub ject: � ��'��� �
By. Date: .
�� v
�
�
'� '�- � � � �2�c ¢ _ � �v `� �L �2�� -�-�2�=`)
. J
� C(� �-- �:aQv w � ��-Cc�
��-` �'�,�' �. �: � � � �- Z. l� �'
��, � '��.�P� �� 2 z t�O.�o�'
C
��/ � �`� �:_rf.
�v ��t� �� tZlZ�S U�',
� �. ► 1,�,�
�u L��;�2 � �2 � 2� 2)� 2.�� Z- 2,'�`z
���5� � �c61,� /',� � �,51� ��'�` ��
—�.
� c��-`�� � 2.��k l�c��1 � u� �� t
Y
�,C` w'� `�;�Z �. � � 6� /� � , �12 ��
G
e.r��,� �� �c2�.
�
�
�
eisi
CONSULT/NG ENG/NEERS
_ _ _.. _ _ .
CONCRETE ULTIMATE STRENGTH - FLEXURAL ver.5/5/05
PROJECT: BOEING 9-99 JOB # 14-142Q
ITEM: LN TANK - Trench Lid 4-Nov-15
CRITERIA:
Design Mu = 13.9 ft-kips Ro min @ Mu''1.33 = 18.49 ft-kips
Design Vu = 16.64 kips
Reinforcing #5
As = 0.93 sq. in. As 0 sq. in.
fc = 4 ksi fy = 60 ksi
fy = 60 ksi fct = ksi fctl6.7 <_(fc)^.5
E = 29000 ksi
B1 = 0.85 (reduce by .05 for every 1000 psi over 4000 osi)
t= 5.5 in S= 12 in
d= 4 in d= 4 in
b= 44in b= 44in
FLEXURAL STRENGTH: SHEAR STRENGTH IN CONCRETE:
a= 0.37 in Vc = 22.26 kips eq (11-3).
Mn = 212.79 in-kips Vs = 0.00 kips eq (11-15)
or 17.73 ft-kips Provide Avmin Except slabs and Footings
.9Mn = 15.96 ft-kips O.K. .75Vn = 16.70 kips O.K.
Ro = 0.0053 Avmin = 50*b*s/fy = 0.44 sq. in.
Ro min = 0.0033 As = 0.59 sq. in.
rho max=.85B1*fc/fy*(87000/(87000+fy))*.75 = 0.021
SLAB TEMP. REINFORCEMENT: As = 0.002 'b"t = 0.13 sq. in./ft
USE: #5 .9Mn = 15.96 ft-kips
SHEAR: .85Vn = 16.70 kips
FLEXURAL
eisi
_ _ .. _ _ _ _ _ _ _ __
CONSULT/NG ENG/NEERS
CONCRETE ULTIMATE STRENGTH - FLEXURAL ver.5/5/05
PROJECT: BOEING 9-99 JOB # 14-142Q
ITEM: LN TANK - Trench bottom 4-Nov-15
CRITERIA:
Design Mu = 0.84 ft-kips Ro min @ Mu"1.33 = 1.12 ft-kips
Design Vu = 0.72 kips
Reinforcing #4
STIRRUPS
As = 0.20 sq. in. As 0 sq. in.
f'c = 4 ksi fy = 60 ksi
fy = 60 ksi fct = ksi fct/6.7 <_(fc)^.5
E = 29000 ksi
61 = 0.85 (reduce by .05 for every 1000 psi over 4000 osi)
t= 5,5 in S= 12 in
d= 2 in d= 4 in
b= 12in b= 12in
FLEXURAL STRENGTH: SHEAR STRENGTH IN CONCRETE:
a= 0.29 in Vc = 6.07 kips eq (11-3)
Mn = 22.24 in-kips Vs = 0.00 kips eq (11-15)
or 1.85 ft-kips No Av Required
.9Mn = 9.67 ft-kips O.K. .75Vn = 4.55 kips O.K.
Ro = 0.0083 Avmin = 50'b*s/fy = 0.12 sq. in.
Ro min = 0.0033 As = 0.08 sq. in.
rho max =.85B1`fc/fy'"(87000/(87000+fy))*.75 = 0.021
SLAB TEMP. REINFORCEMENT: As = 0.002 '`b*t = 0.13 sq. in./ft
USE: #4 .9Mn = 1.67 ft-kips
SHEAR: .85Vn = 4.55 kips
FLEXURAL
R, .
- � ;;� _
� �� z �1 t � o
� � �"�� � � �
� �
� � �� � ���� o � :� �
: a y�� -
, � =� � � �p�� x e
3 � �' �s � �� �� . � jQ��x �� � o
iv C
¢� " s�g CC ' �' �o ��g� z¢owa4 t7
� �a a d .;� < r� �wi���a
Q .S„S �u Fy XT6�l���
°gy=�gF �b�` � i 6a i� �Ye ]i�" �IW-�NN�Wu
8 L ��p��� � o yx �-n i Y�~ JN6�"�..as
� �� �g ��"�`B, q�woa ��E c>
g � gp" � � �q Y"� 4 $ MB� ¢�rimN
3�.�� A��g��� �� Y�g � 5���� i �v�'iam X cl !'�
F' ��''�a��P � `' ��a ��� � � �yaUs
��8���$������ � � �tl � � �s ����� � a _ —
; � � � ��� � x° u���� � ` 3� N �'
Yp�Y���� � y g�^ �� k� &g��� � �,v��.��
���; � � ��� �� �E � � � �:,�..�
��`��� � � 4 ` ��� z� ����� � Q ��� �; -
a ��s�.����z ,� = �s£ a�� �� g�$€"s d �.._ .Y � ,
d ., ., edd_ a � > g ;.
og� _'� a a: - �9°�� ' E � �
� �oY��g ' � ± 1
�j L.. �n ��Y��K " 'r` .
I ��€ z �gg� � ': ii i
�� a �� 4��: oa =
' b � � ° _ � ������ � :: !
i _ � � ,
' ���� `„ ��
� ��� �
� � ����s:
SJ�I� b � � � �, . � -,;
Uu �� F %1 �
' ; �
�� i t
�qa S�� 4 i..�
� o ���� ;? . . �
W p W � . ,. I
� � §��� _��� � � � � - � � � .� j
u �� ���a � i
6 ��$_a m?�5n � x { :
a �� c �� � , � i i
� t, I
Hg e &6o Z. �' � b
�a��i u:d� � (
�d�� =aa"
�
� ���^ i
n 1 �� � m
� >I I�I� �,�I$li a jI�IjI ; �; j
i�I�.,��u=¢.yy"� �SI� i
F b �, y y�io ���� i a°�I ���a�;
�� � � �����"��I��I j �
Ir � '_ !
� � .l�__- �pxs�- 1 "j
�ib����aS��:��_`" �
i
� S �� i
V� �
�� �
e 9
�o �
� s� � t
�. .
1 Z �
C O�—
y uI
� „i
��
3�
I
�
SEISMIC ANCHORAGE OF EQUIPMENT
PROJECT: Boeing 9-99
CRITERIA: 20�2 iBc�ASCE 7-�0
Ss = 1.516 Figure 1613.3.1(1), pg 368
Fa = 1 Table 1613.3.3(1), pg 366
Seis. Design Cat. D Table 11.6-1 pg 67
Occ, Cat. ll Table 1.5-1, pg 2
Site Class D Table 11.8-1, pg 68
Sms =Fa'Ss 1.52 11.4.1, pg 65
Sds =2/3'Sms 1.011 11.4-3, pg 65
Vib, Isolation 1.00 Table 13.6-1, footnote b
�P = 1 13.1.3, pg 143
aP = 1 Table 13.6-1 or 13.5-1, pg 117
RP = 2.5 (for equipment, pg 117 or pg 120)
Working Stress Factor, a= 1.4
Eauipment: Pipe Rack
Equipment: 4 no. of anchor points
WP = 300 Ib.s (unit weight) Stand Wt. _
Stand ht = 0 in. Added Moment =
C.G., x = 24 in.
b = 11 in.(width)
� = 36 in.
Z= 1 ft/ Floor above grade
h = 1 ft/Roof
BASE SHEAR FOR ANCHOR BOLTS (allowable stress desian loadsl
(13.3-2) Fp(MAX) = 1.6'Sds*Ip"Wp/a(working stress)
(13.3-3) Fp(MIN) _ .3'Sds`Ip'Wp/a
(13.3-1) Fp=(.4"ap"Sds`Ip/Rp)(1+2'7Jh)*Wp/a Rp=2.5
(13.3-1) Fpv=2'Sds'Wp/a
MAX A B TENSION LOAD Ca� DIAGONAL (ior anchors)
No of Anchors(Legs), N= 4 No. of Bolts/Anch
Mo = (Fp'x)+Vp"b/2 2733 in.-ibs
Angie = 0.297 radians or 16.99 degrees
Arm = 37.64 in
Diagonal Tension, T= Mo/Arm/n -.6"Wp/N/n = 73 Ib
ASD, Rh = 205 lb
OR
Orthogonal Tension, T= Mo/(b/2)/(N/2)/n -.6" Wp/N/n =
ASD, Rh =
OTM: ASD (for equipment)
Fp =(.4•ap*Sds"Ip/Rp)(1+p*z/h)"Wp/1.4 for ASD
Fp(MIN) _ .3"Sds'Ip'Wpla
(13.3-1) Fpv=.2*Sds'Wp'Ip/'1.4
Orthogonal Mo = Fp'x + Fpv"b/2
.6Mr= (.6*Wp-Fvp)"b/2
F.S. _ .6*Mr/Mo
UPL = (Mo-.6'Mr)/b/2 = 360
THRUST, Rh = (Mo)/(b/2)+Wp/N= 323
Diagonal
UPL = (Mo-.6•Mr)/arm+Fpv/N = 63
THRUST, Rh = (Mo)larm/2+WplN +Fpv/N= 210
192 Ibs
323 ihs
104 Ibs
65 Ibs
43 Ibs
eisi
CONSULTING ENGINEERS
ver.08/27/07 9-Mar-16
PAGE �
JOB NO. 14-142Q
I
0 Ibs Totai W= 300 Ibs
0 in-Ibs
347 Ibs
65 Ibs orrigid Non-Building Sructure
104 Ibs
43 Ibs
, n= 1 Fp = 104 Ibs
Coef = 0.347
Ibb = 121 Tb =Mo*bl2/Ibb"Cos= 119 fbs
Iil = 1296 TI =Mo*I/2/III'sin= 11 Ibs
TENSION/BOLT
COMPRESSION/SUPPORT
TENSIONIBOLt
COMPRESSIONISUPPORT
USE Fp = 104 Ibs
Coef = 0.347
2733 in.-Ibs
752 in -1bs
0.28 < 1.0, ADD HOLD-DOWN ANCHORS
Ibs UpIift/Leg
Ibs/Leg
ibs Uplift/Leg
Ibs/Leg
SEISMICEflUIP12
AfVCHOR BOLTS FOR SEtSMlC
PROJECT: Boeing 9-99
EQUIPMENT Pipe Rack
EQUIP. WT. 300 Ibs STAND
Fp = 104 Ibs
C.G. = 24 in.
Mo = 2733 in.-Ibs Mr =
RESISTANCE ARM 11 in
NO. OF ANCHOR BOLTS (shear)
(tension)
LOAD/ A.B. Shear`"* = 26 Ibs
Minor Axis Tension*'* = 192 Ibs
Diagonal Tension*** = 73 Ibs
Base Ecc Tension*** = 0 Ibs
TRY: 1!2 Hilti KB-TZ
Va = 2839 ibs
Ta = 2386 Ibs
Bolt Spacing = 11 in.s
Edge Distance = 24 in.s
eisi
CONSULTING ENGINEERS
9-Mar-16
PAGE 2
JOB NO. 14-142Q
WT. 0 Ibs
752 in.-Ibs
bxl= 11 x 36
4
1 per Anchor
Max. Ten. = 192 Ibs per anchor
(V/(Va)= 0.01 O.K. Vu/Bolt = 36
(T/(Ta)= 0.08 O.K. Tu/Bolt = 269
Anchor Design : Vu = 36
Tu = 269
SEISMICEQUIP12.xis
3S
Page 2
' -- - - -
�._. - - - — -- - - - --..
�
� r ��
� D1GN0� 2834200 �'�T �"�- CAD OPoGINATED ORAWiNG. RENSION UPOATES ReSTRICIEO TO CAD SYSTEM ONLY. NO MANUAL UPDATES. ^ j �l.(, ►
� � v
m � � �.�
< � o o: �
� w � �
O'� � � � N a Q� O
0 0 = � c� =�d'
------------- °- o ¢ vi � z � Z � � �
, (�n Q � o . . W ¢ �NtO N
I I � � U J '� � � �
€ i � �Q � z � oN�Q � OU`tjg
� �n z w z cn = �� m � � N
a z� � � w > u. m-; � U fW/1 r�
� I � Z N� � a '�-' Z,o � M � -W.� �
�p � z � � N ,-,'-' W n
�' I ^ W N I !� t �'' �! l 0 O( 9 t` C9 J ~ C9
� M � "= a I� � Z �_ � i a� a a� nm
� N ' � a ' No ¢� �na 333 .
^ _ . .
I �oa I w�n �p �*invc� .JJJ oY� `l'\
� � o > ar a a . .
cp I � i x� wi? . ��'r'� pa \\o v,
zw o� �'::��.�"i �d'o � ��� �
I I O> W� �r�W� MM �, �� ay
<
'—'—'._'_'_"_' tn 2 No Z W I 1� o W � .,
Q .�� r' ��� Q N M�
^ Q � � ;� ._� - .I \r��p c0 2 vi�3�c �
o' �� a� �J �^ZQaa � o�5bg �
� I " w N f/I � \ J
u---�1 V7 =(/7 >� �.'V Z�� Ur' � U' CO g Z � B
O w �- li c� ,{
p. Z�' O I�" Z- pp u) d� aE. � �x �
N � Z � z � Q 6
gp� 0 �r �f%1 4.�� o� � �� �",
F- cn W o �� a x� i;.i -� ��� �i
r w� O. .,�Q � ,y� �
n o o� ¢w ��f �w I I I I �w ��� o
��� J3z F�� � -�o
F o��c=iia �'�z� >a� _ � «««�
p _ � o �"•��
� .- N 17 �
. _ .... . ... .. . .. .. � In
Z� eJ--� e
tD �t f=/1 J W U� V? � cn `h 3
O � 0 0� wZ� OW ��� �
�Z ��N �¢ av2 Uoa nn % . �
z�w .� i o a z ` l a / E
7
N
��o
x�m
ol lo
�
a
O
�'---�-
. a
� �
� w
W J
n �x
a�
`� n ~
F Z
G��N O
�
�"—' _
00 r-�
�
n ,ai,
r�
4. W C U m
Q
J
0
SEISMIC ANCHORAGE OF EQUIPMENT
PROJECT: Boeing s-99
CRITERIA: zo12 IBCIASCE 7-10
Ss = 1.516 Figure 1613.3.1(1), pg 368
Fa = 1 Tabie 1613.3.3(1), pg 366
Seis. Design Cat. D Table 11.6-1 pg 67
Occ. Cat. II Table 1.5-1, pg 2
Site Class D Table 11.8-1, pg 68
Sms =Fa'Ss 1.52 11.4.1, pg 65
Sds =213*Sms 1.011 11.4-3, pg 65
V(b. lsofation 1.00 Table 13.6-1, footnote b
�P = 1 13.1.3, pg 143
ap = 1 Table 13.6-1 or 13.5-1, pg 117
Rp = 2,5 (for equipment, pg 117 or pg 120)
Working Stress Factor, a= 1.4
Eauiqment: Superheater
Equipment: 4 no. of anchor points
N/P = 400 Ib.s (unit weight) Stand Wt. = 0 Ibs Total W= 400
Stand ht = 0 in. Added Moment = 0 in-{bs
C.G., x = 56 in.
b = 22 in. (width)
� = 26 in.
Z= 1 ft/ Floor above grade
h = '1 ft/Roof
BASE SHEAR FOR ANCHOR BOLTS (allowable stress desiqn loadsl
— 'Sd 'I "W /a(workm stress) 462 Ibs
eisi
CONSULTING ENGINEERS
ver.08/27/07 9-Mar-16
PAGE 1
JOB NO. 1M142Q
I
Ibs
(13.3-2) Fp(MAX) — 1.6 s p p g
F MIN — 3'Sds*I *W /a 87 Ibs or rigid Non-Building Sructure
(13.3-3) P� ) — . p p
(13.3-1) Fp=(.4"ap"Sds*Ip/Rp)(1+2"z/h)"Wp/a RP- 2'S 158 Ibs
(13.3-1) Fpv =.2'Sds"Wp/a
MAX A B TENSION LOAD (a� DIAGONAL (for anchors)
No of Anchors(Legs), N= 4 No. of Bolts/Anchor, n= } Fp =
Mo =(Fp*x)+Vp'b/2 8397 in: Ibs Coef =
Angie = 0.702 radians or 40.24 degrees Ibb = 484 Tb =Mo"b/2/Ibb*cos=
Arm = 34.D6 in III = 676 TI =Ma*U2/III'sin=
Diagonai Tension, T= Mo/Armin -.6*Wp/N/n = 174 Ibs TENSIONIBOLT
ASD, Rh = 350 Ibs COMPRESSIONlSUPPORT
OR
Orthogonal Tension, T= Mo/(b/2)/(N/2)/n -.6' Wp/N/n = 306 Ibs TENSION/BOLT
ASD, Rh = 482 Ibs COMPRESSION/SUPPORT
OTM: ASD (for equipment)
Fp =(.4`ap*Sds'Ip/Rpj(1+2*z/h)*Wp/1.4 for ASD
Fp(MIN) _ .3'Sds*Ip"Wp/a
(13.3-1) Fpv=.2"Sds*Wp*ip/'1.4
Orthogonal Mo = Fp"x + Fpv*b/2
.6Mr = (.6"Wp-Fvp)'b!2
F.S. _ .6*MdMo
UPL = (Mo-.6"Mr)/b/2 = 581
THRUST, Rh = (Mo)/(b/2)+Wp/N= 482
Diagonal
UPL = (Mo-.6*Mr)/arm+Fpv/N = 202
THRUST, Rh = (Mo)/arm/2+Wp/N +Fpv/N= 305
139 Ibs USE Fp =
87 Ibs Caef =
58 Ibs
8397 in: Ibs
2005 in. 1bs
0.24 < 1.0, ADD HOLD-DOWN ANCHOR5
Ibs UpIiftlLeg
Ibs/Leg
Ibs UpIiWLeg
Ibs/Leg
SEISMICEQUIP12
139 Ibs
0.347
146 Ibs
104 Ibs
139 Ibs
0.347
eisi
CONSULTING ENGINEERS
ANCHOR BOLTS FOR SEISMIC s-Mar-�s
PAGE 2
PROJECT: Boeing 9-99 JOB NO. 14-142Q
EQUIPMENT Superheater
EQUIP. WT. 400 Ibs STAND WT. 0 Ibs
Fp = 139 Ibs
C.G. = 56 in.
Mo = 8397 in: Ibs Mr = 2005 in.-Ibs
RESISTANCE ARM 22 in 6 x I= 22 x 26
N0. OF ANCHOR BOLTS (shear) 4
(tension) 1 per Anchor
LOAD/ A.B. Shear*** = 35 Ibs
Minor Axis Tension**" = 306 Ibs
Diagonal Tension*"* = 174 Ibs
Base Ecc Tension"*" = 0 Ibs Max. Ten. = 306 ibs per anchor
TRY: 1/2 Hilti KB-TZ
Va = 2839 Ibs (V!(Va)= 0.01 O.K. Vu/Bolt = 49
Ta = 2386 Ibs (T/(Ta)= 0.13 O.K. Tu/Bolt = 428
Bolt Spacing = 22 in.s Anchor Design : Vu = 49
Edge Distance = 24 in.s Tu = 428
SEISMICEQUfP12.xls Page 2
c
0
r!�� 4839410 ��m 1 ��E
fD
N
d
rn
�
uJ {
<�}
�=r
0
CAD OPoQNATED DRANING. REN90N UPUATES RESTRICTED TO CAD SYSiEA1 ONLY. NO MANUAL UP�ATES.
� W
� �
i� � m y g W �
n
�$ Y �. � � '�y� � � N o �
a
; �a� y�' z � 3�5 �° � Z j'QOMO
5p�."i ^"+ `� m o 0 o S ��' `� � h rc J N� �
ay �'�m y o o" � cy ���� �' 3 � 00 F-
�a �.pti. � w mi � S` n.r° '�mw`a3 O I Z$
mo �' �i� ���� ay�k�5� y 4 mey� � Q W
�� �� ��� y a 3�a ib���'� ��k iq��y� �� �
�'� �� n 7e a a���� F��e�`S� �� y� F�h;�H � a�
� �p �;� �4p �1� �a�� a0pF$;��r �Z90 �Fyppp,�,qq i�
5�{j Fp y��� Yi C �%.^.'�[4 J!���.\�ypp Cb�� ���[.�y� � ��
�2 �% ��11a � Z�w�G '.'jbtyNm� ���p� [�ymL��pq L
�O �� ��4 � � oi � 0.�jN��� Qr'Li� 4N����
�� ��, u.eR� �`� y m..yo,y <m�� qyvlyld � Q�m �
m �� ��," �' � „ga" `3�y�'��`d� :Ea� �"���� ° o" - >
o� "3 <zaiS � d `�..' ���am� " ��yy �`o �C '
x b:� °8zY o�. y�c: �c.ms�m �c: �4aa�� a
x� �w �r"oa° o o ° S i i � i t q S i i i i i � �� � �
a�� Zx yoy5 � k oZ a� ���
�ve yR o �.�Y 8 8 � g i
.. ; ; • = � g � � � o
����
_—_ W � ¢V � .�. � o
I � ~ o q�� �Z � y � � � 8 i�
� � '� �� ��� �o � � � i o �� �� a�* �«
�
: �
�..�..� � J �8 0�� �Zm � F oi ga � 'o U�� �� � e
I � F N
o �Z ��� ��� � �� � � „ � � �-=s
n n m 4m m�� �r�� y �' y u � y � z��� x��.
� •'�y �<� 5R� ° `�`� �u�. = a � 8 i o
I I --- I O E �� qy� � $ w,, � Q� - z .
I I ' _ ��� ��� �`�a � �w � � � � w � �
U c. a p a �. � u
1 1 i ar-, iI Q mo� ��o i�8 � a� �! m �'' o� � :
" � � o m
�^—"' n �'I �a�� aaa °a� � �� a� , r��n �"� y �� �
N u S�p k�< ��a ! om �y � q 7� o
• �hC L �V y
n o Zi' ����p �F� s mm :Z �$�oa � o� w
u ��q ���8 '�m � ��, o�, ''�° o `O� u�.
a �. F c. Z �, �,
yo�ak �
� 3�wp .�"a �ip$ q?' a� g�� �� � p:.n���y" aqgz n�,g �
b�i O�P?.. a4[7�1C C�` �'�^ �� n'��Cl��� g f.
_ �y$� ��C� �'c�o m� �'L'g �Zo � �y��'a� < a� �'.
G 5 �i2 �' '.�� o" a$ m
Q4 •�$ s��8 � �,�� ��� � �� �3 �� �
� ��o �s&°z �`°5� � :yy �xi � wmxyQ� o m! a
� m i m�a< nx�y �� �Z8 aZ8 � a��"���a `�°y �� `
y��..c�i c.<.�.� i� \ oo qc' yP' ��No�m� °'2 Q� w
� �y��" ���� ia�o �r ��� ��� y on E�� �y �� x
z � �i i�� �`�a i�g� `y� ° F" � o��h•e w� �m g
� a � �� [w„ $�� 5�s� ���� �� � � a � y �a�u �� o
1' R' x � O� N >i r Vi m I� � W �
V � N �
�
Z
_ O � �'"d
�
� '�"�'!� ��
�'i-� -; ��<�1
c,,ca_-,._-,',,� ���,��^;r
' �:?:,. -.�
�� �.a`:�:�;``�u�a:_�
�-w...�:, e;:. �
e� ��rL��,,�;�,.�
�Y�C;� C_:"s�I
L:::aYLi%... ;_'i�::'s�.:::
n
�y � W
p * U
r �� � 4839410
. � ..
�
tD
0
r F N
� < �
U � x
� p a
V �y N
z
�
F
a
M O Y �
�� �
U Np] �
� J N
C=7
�
C9
z
N a ^ n
= Y N
� '--' �
~ m N
= J n
(7
�
O �I
��
•r
� "E" C CAD OWGfNATED DRAN7NG. REwSiON UP�ATES RESIRIC7E� TO CAD SYSTEM ONLY. NO MANUAL UP�AlES.
ci
a �
Q m Q
M
N �.a� Qi j m
? i� � z �� �
°zF + a�� �? � �
a z o
^� � u�am �a � F
� � V m ^ Z � 1Nto� � �
aw? No u az��~1 �
� I. .. .oa� 3a��i�mvmi�-° �n�.1 .
a=y - �W d�i no��cr o0
M ~ So � av�i ���Z`°�no va
s zZ ¢ a+ "¢r�w�°`°i�o 3w
o�
F ••�Nmo at�iioa�'� Wr �ZF
� N W J M� N O � C� m O 7 N � 7 O
F � N 1 O N N 1 D
I � _-_ � a W O Z u O u� Q a N m m p Z
� Q��JUJUi o �y wm� aF
i i oawv�`�� .. s� � t5vi t�
a a a � �a z_� �
�w 3S3o� zpr N
a n I I 1— w� dv�ano aQ� a= ��
°� � i i .� 08 �i�i� isi i i i i
t0 N � O '�
m
M � _ - _ � W 17
O d Z� V lo M Omi N
� ' 2 a � o z w o'O m
�
V y z°� � � o a, a
w a oZ
� vr-, � Q °� . Q��N c�� j' aa
\ ,� � ce �n
�i"—'� a� �,7�� Wz � 3 0�u � a� �Z zg
� tD N 3 C� C7 6� � � N� ri � �' O Q $ o
W �
M''� �Q �a z �� � �' Lia W>. O� � '�
R; ,-, m m � � $ Q
�
N J M]
� �' n
Z M
6 � �
�J�
O
I
�
�g p o � � � < �i1 � S � p a
� � z � � >�
=o �c� � �� � `• � �"! zx �a � ��
00 �l�i. O Qz z..mj \ i N'I Q� o� � W Z
Q W U W 0 K� O� �<� N O� �� ~ W V
0o a� � a vZ Z � N j2 J� N��
a o� � a
�� uQ �y �Vw � r%i� u t�� aQ �W V Fz
N O W� =K NI- I 2 i Z � U� Qd KW � a
U a � 0 p� K O Y Z a Z V V7 W O V� � � C�
W j M\ j6 a1 nU 17U � alJ 7�.1m Q' � 0
v�"ir� a�d �a LLm ��y �w Z`�7'a� �o m° a��
�c�i`�`���`'09�0"��o�n�5�iaW�o ° o�
p a F3 �!!� � o om F 7d
�� ip~,� o� z� a�i F� F� 'n ��' ~j �+Z �=i
o� av�i �a F�,'d' a? a? o��i za �� �'o� ��
�v ri a ui � n od a; �
�
�
� � T
,� W
m '�
� �� �
d W tL a N;
�i Z � � �
� �,—�., w > '�
z o°°z=
� > m
� � M
� a X
�
�
���
N M
�u
: f � -L
a r,
\ N
M O
n
� ��
, �-L_T
�� �
�� N
N
W
n u
O * U � m
Q
J
��
. �—
�
- - -- -- ------ ------ -___ ... ._ .--_-- ------ ---- _ -
���_ i
�
, w , „ � o I -""_ �
�
� � £� � =z�
� ��P� g
� �� `'�:
- � ? $6
' � S ��^ � 'C�
- - € a� �
�� � ��� ^ � �
. i Y~� ��64�� 8m��o � I
'y 4'�� 7e {
� S ti
���gc " �� 3
I'� R e �'� � �Yp� �m��� N i
� , _ y & ���R �,�� �
� r � 4 z
-', . ,` _ � �� �G� � _ .
� °nA�,
i �^k
i
i
r
: ^
*� - �£
., � A 4_:.$ r_—
r.. a c
` �G
'$; x�: -
` ��a����$ �
� ���� ;
� 9
I � y p�� �pn C LL'LG�� �
g � �9 +�i
���Y � C r 5 $ �
'� V .e ��o��= � , y y �++ ��
`n � ����� � u
- �s�:g�� �.;,
,.i �c�6�4 gL�'s
�' � o L X F L =�� e �p �uu�N ±fl$
_ k, R..� � �a�S �'� ��� a � 9 "s � x� ���� �'
., } � � "&F a�+ s s ¢�.
. +de � q54 b�� �r� �FS � - � � ao� A�g �
ti: y..R^F3 � N �n9a� 9� C.+� p�� V � �sYyQT�F�
k�:� �+3�� E ' 7 E � �F ^ .
/ .• �.� �,� ;���.� �q �p�� '1�$ ; � A S k �p�ggLL � g � �i
d � � A d��l 5 � z"� i
, �,m �N� 4 � q�€�F �� �,� ��� � a ��� ��8�����
T m8�$� � �s��� • �x ��� e � �� ��� �;=�.n
� � � a
.�w�p�g ����� � C�� �� ; � Q��",��� �����
�R aomo
��'�u�ivi�tici { �
'f�c��i�x 37� � b �:7,'g���.$ $�F�g
A�imoa�i aF� � S� ^' � Y uB �E � ��
v^r-�� �a � g rz .�w�,- �� 3�3 ��
� � z�m's R��= � �� e� � �� � G �
.m-. ^ ?�s^ �'G i � 3 �' ? �
� O fi f� 37 A:F�` G��, � �
�ii �Ra� � �
�o�;��m� �
e V, F� r� v
€ �.
�
SEISMIC ANCHORAGE OF EQUIPMENT
PROJECT: Boeing 9-99
CRITERIA: 2012 IBC/ASCE 7-10
Ss = 1.516 Figure 1613.3.1(1), pg 368
Fa = 1 Tabie 1613.3.3(1), pg 366
Seis. Design Cat. D Tabie 11.6-1 pg 67
Occ. Cat. II Table 1.5-1, pg 2
Site Class D Table 11.8-1, pg 68
Sms =Fa'Ss 1.52 11.4.1, pg 65
Sds =2/3'Sms 1.011 11.4-3, pg 65
Vib. Isolation 1.00 Table 13.6-1, footnote b
�p = 1 13.1.3, pg 143
ap = 1 Table 13.6-1 or 13.5-1, pg 117
Rp = 2.5 (for equipment, pg 117 or pg 120)
Working Stress Factor, a= 1.4
eisi
CONSULTING ENGINEERS
ver.08127107 9-Mar-16
PAGE 1
JOB NO. 14-142Q
I
Eauioment: Vaporizer
Equipment: 4 no. of anchor points
�/p = 2180 Ib.s (unit weight) Stand Wt. = 0 Ibs
Stand ht = 0(n. Added Moment = 0 in-Ibs
C.G., x = 90 in.
b = 27 in.(width)
� = 32 in.
Z= 1 ft/ Floor above grade
h = 1 ft/Roof
BASE SHEAR FOR ANCHOR BOLTS (allowable stress desiqn loads)
(13.3-2) Fp(MAX) =1.6"Sds*Ip*Wp/a(working stress) 2518 Ibs
(13.3-3) Fp(MIN) _ .3*Sds*Ip*Wp/a 472 ibs
(13.3-1) Fp =(.4'ap"Sds"Ip/Rp)(1+2*yh)'Wp/a Rp = 2.5 315 Ibs
(13.3-1) Fpv =.2"Sds*Wpla
MAX A B TENSION LOAD (a� DIAGONAL (for anchors)
Total W = 2180 Ibs
or rigid Non-Building Sructure
No of Anchors(Legs), N= 4 No. of BoitslAnchor, n= 1 FP =
Mo =(Fp'x)+Vp"b/2 72235 in: Ibs Coef =
Angle = 0.701 radians or 40.16 degrees Ibb = 729 Tb =Mo*b/2/ibb'cos=
qRp = 41.87 in Iil = 1024 TI =Mo"I/2/ill*sin=
Diagonal Tension, T= Mo/Arm/n -.6"Wp/N/n = 1338 Ibs TENSIONIBOLT
ASD, Rh = 2295 Ibs COMPRESSION/SIfPPORT
OR
Orthogonal Tension, T= Mo/(b12)/(N/2)/n -.6' Wp/N/n = 2264 Ibs TENSION/BOLT
ASD, Rh = 3220 Ibs COMPRESSION/SUPPORT
OTM: ASD (for equlpment)
Fp =(.4"ap"Sds`IplRp)(1+2"�lh)"Wp/1.4 for ASD 755 Ibs
Fp(MIN) _ .3"Sds*Ip"Wp/a 472 ibs
(13.3-1) Fpv =.2"Sds'Wp"Ip/'1.4 315 Ibs
USE Fp =
Coef =
ORhogonal Mo = Fp*x + Fpv'b/2 72235 in.-Ibs
.6Mr = (.6"Wp-Fvp)'b/2 13409 in.-Ibs
F.S. _ .6'Mr/Mo 0.19 < 1.0, ADD HOLD-DOWN ANCHORS
UPL = (Mo-.6"Mr)lbl2 = 4358 Ibs Uplift/Leg
THRUST, Rh = (Mo)/(b/2)+�Up/N= 3220 Ibs/Leg
Diagonal
UPL = (Mo-.6*Mr)/arm+Fpv/N = 1484 Ibs Up1ifULeg
THRUST, Rh = (Mo)/arm/2+Wp/N +Fpv/N= 1961 Ibs/Leg
SEISMICEQUIP12
755 Ibs
0.347
1022 Ibs
728 Ibs
755 Ibs
0.347
ANCHOR BOLTS FOR SEISMIC
PROJECT: Boeing 9-99
EQUIPMENT Vaporizer
EQUIP. WT. 2180 ibs STAND
Fp - 755 Ibs
C.G. = 90 in.
Mo= 72235 in.-Ibs Mr=
RESISTANCE ARM 27 in
NO. OF ANCHOR BOLTS (shear)
(tension)
LOAD/ A.B. Shear*** = 189 Ibs
Minor Axis Tension'** = 2264 Ibs
Diagonal Tension**` = 1338 Ibs
Base Ecc Tension"*" = 0 Ibs
TRY: 3/4 Hilti KB-TZ
Va = 7396 Ibs
Ta = 4475 Ibs
Bolt Spacing = 22 in.s
Edge Distance = 24 in.s
���
eisi
CONSULTING ENGINEERS
9-Mar-16
PAGE 2 _
JOB NO. 14-942Q
WT. 0 Ibs
13409 in.-Ibs
b x 1= 27 x 32
4
1 perAnchor
Max. Ten. = 2264 ibs per anchor
(V/(Va)= 0.03 O.K. VulBolt = 264
(T/(Ta)= 0.51 O.K. Tu/Bolt = 3170
Anchor Design : Vu = 264
Tu = 3170
SEISMICEQUIP12.xls
Page 2
�
0
tASHF SfQION YN DIV I ID13 ED.
ENB REGISTATqN
rmc io�x vr acuioe LLI lOTGA
U�M !'0� UIIR11[ V{ i,A P�•e�/
QE�MV7PAU[DUAC �WlSf�� WIGY.Va(I Ys0! . t. Pal 1
/1(1 IC Ib I 4 MDlll/lp krvf M1iMKaI
NOZZLE LIST6 u #
MANIW� RE9hRf Wff110.YtYp({�y� [py��LNANE eptap cav¢cn�s�[�
HPSV2 WE[OING pk ftpfAlR �jqo e31,3.i.77
6 7/7' M'EIpNG kll uau7Niro9�v 1R6c e12.7.t,i5
t NP53/B WEIDING PeY �pppy�[ '�Cu e17.1�4.71
E 3/B" fNPi �/@ WSPIUS( �9gqyv 0957.1
NP53/! NEl01NG pr A1/fql IYIiCINIP87q p114� Pfl.fd31
I 3/B" FNPT A�@ VG�pL1R d8�iilllo 09.SiA
9 NPSI/7 WELDING f�� yg��yph� �y�j 07i7•7.17
h 3/4" WELDING uN pgWl �IHtlo e79.D5.1S
VB' FNPT M@ A[PJ.YWlG( MR4H /
j LS' / 1(I7LYWlPBOI 11.�40 /
F NP53/9 WELOMG pq 5AS4SE qp�ga ei),�,2,7�
i vr w¢tow� uN ttmw�am uAOKSa oit.i.i.ss
(� n f/1' FNP! h�k uomnaranvo �nne� no�..a
View A
RmrorF:201�.f.J �knp� i5V3 ell� PRV�H72 �� P�v g{n
�/RG/ i J ll NA � m �
ON45iM➢Y0, x4nE OTT �411EMAl p['uq
""" N�MONG N1C wI1N EOVBMEH�I�1 �4`0.
� . _ ,,,, �' I A514206-00
SEISMIC ANCHORAGE OF EQUIPMENT
' PROJECT:.
I
j CRITERIA:
� Ss =
' Fa =
� Sefs. Design Cat
Occ. Cat.
Site Class
Sms =Fa*Ss
Sds =2/3'Sms
Vib. (solation
Ip =
ap =
Rp =
Working Stress Factor, a
Boeing 9-99
2012 IBC/ASCE 7-10
1.516 Figure 1613.3.1(1), pg 368
1 Table 1613.3.3(1), pg 366
. D Ta61e 11.6-1 pg 67
II Table 1.5-1, pg 2
D Table 11.8-1, pg 68
1.52 11.4.1, pg 65
1.011 11.4-3, pg 65
1.00 Table 13.6-1, footnote b
1 13.1.3, pg 143
1 Table 13.6-1 or 13.5-1, pg 117
2.5 (for equipment, pg 117 or pg 120)
= 1.4
Eguiument: Microbuik Tank
Equipment: 4 no. of anchor points
Wp = 8300 Ib.s (unit weight) Stand Wt. = 0 Ibs Total W= 8300 Ibs
Stand ht = 0 in. Added Moment = 0 in-Ibs
eisi
CONSULTlNG ENGINEERS
ver.08/27/07 8-Mar-16
PAGE 1
JOB NO. 14-142Q
I
C.G., x = 42 in.
b = 59 in. (width)
I = 59 in.
z= 0 ff/ Floor above grade
h = 1 ftlRoof
BASE SHEAR FOR ANCHOR BOLTS (allowable stress desiqn loads)
(13.3-2) Fp(MAX) = 1.6"Sds'!p'Wp/a(working stress) 9587 Ibs
(13.3-3) Fp(MIN) _ .3"Sds*ip`Wp/a 1798 Ibs
(13.3-1) Fp =(.4"ap'Sds*Ip/Rp)(1+2"z/h)"Wp/a Rp = 2.5 959 Ibs
(13.3-1) Fpv =.2"Sds'Wp/a 1198 Ibs
MAX A. B. TENSION LOAD la� DIAGONAL (for anchors)
or rigid Non-Building Sructure
No of Anchors(Legs), N= 4 No. of Bolts/Anchor, n= 1 Fp = 1798 Ibs
Mo =(Fp"x)+Vp"b/2 110848 in.-Ibs Coef = 0.217
Angle = 0.785 radians or 45.00 degrees Ibb = 3481 Tb =Mo"b/2llbb'cos= 664 Ibs
Arm = 83.44 in III = 3481 TI =Mo*I/2/III'sin= 664 Ibs
Diagonal Tension, T= Mo/Arm/n -.6'Wp/N/n = -239 ibs NO TENSION
ASD, Rh = 3404 Ibs COMPRESSIONISUPPORT
OR
Orthogonal Tension, T= Ma/(b/2)/(N/2)/n -.6* Wp/N/n =
ASD, Rh =
OTM: ASD (for equipment)
Fp =(.4'ap"Sds"Ip/Rp)(1+2*Z/h)"Wp11.4 for ASD
Fp(MIN) _ .3"SdS'ip•Wp/a
(13.3-1) Fpv =.2*Sds*Wp*Ip/'1.4
Orthogonai Mo = Fp"x + Fpv"b/2 110848 fn.-ibs
.6Mr= (.6"UVp-Fvp)•b/2 1115581n.-Ibs
F.S. _ .6`MrlMo 1.01 O.K.
UPL = (Mo-.6"Mr)/b/2 = -24 Ibs
THRUST, Rh = (Mo)!(b/2)+Wp/N= 3954 IbslLeg
3111bs TENSIONlBOLT
39541bs COMPRESSION/SUPPORT
959 (bs
1798 Ibs
1198 Ibs
No Uplift
Dtagonal
UPL = (Mo-.6'Mr)/arm+Fpv/N = 291 Ibs Upiift/Leg
THRUST, Rh = (Mo)/arm/2+Wp/N +Fpv/N= 3314 Ibs/Leg
SEISMICEQUIP12
USE Fp = 1798 Ibs
Coef = 0.217
ANCHOR BOLTS FOR SEfSMiC
PROJECT: Boeing 9-99
EQUIPMENT Microbulk Tank
EQUIP. WT. 8300 Ibs STAND
Fp = 1798 Ibs
C.G. = 42 in.
Mo = 110848 in.-Ibs Mr =
RESISTANCE ARM 59 in
N0. OF ANCHOR BOLTS (shear)
(tension)
LOAD/ A.B. Shear**' = 449 Ibs
Minor Axis Tension*** = 311 Ibs
Diagonal Tension*"' _ -239 Ibs
Base Ecc Tension'** = 0 Ibs
TRY: 3/4 Hilti KB-TZ
Va = 7396 Ibs
Ta = 4475 Ibs
Bolt Spacing = 22 in.s
Edge Dista.nce = 24 in.s
eisi
CONSULTING ENGINEERS
9-Mar-16
PAGE 2
JOB NO. 14-142Q
WT. 0 Ibs
111558 in.-Ibs
b x I= 59 x 59
4
1 perAnchor
Max. 7en. = 311 Ibs per anchor
(V/(Va)= 0.06 O.K. Vu/Bolt = 629
(T/(Ta)= 0.07 O.K. TulBolt = 435
Anchor Design : Vu = 629
Tu = 435
e
SEISMICEQUIP12.xls
Page 2
50
I eisi
� CONSULTING ENGINEERS
� ANCHOR BOLTS FOR SEISMIC 9-Mar-16
i PAGE 2
i PROJECT: Boeing 9-99 JOB NO. 14-142Q
� EQUIPMENT Microbulk Tank
; EQUIP. WT. 8300 Ibs STAND WT. 0 Ibs
I
Fp = 1798 Ibs
� C.G. = 42 in.
� Mo = 110848 in.-Ibs Mr = 111558 in.-Ibs
� RESISTANCE ARM 59 in b x I= 59 x 59
N0. OF ANCHOR BOLTS (shear) 4
(tension) 1 per Anchor
LOAD/A.B. Shear***= 4491bs
Minor Axis Tension*** = 311 Ibs
Diagonal Tension"** _ -239 Ibs
Base Ecc Tension""" = 0 Ibs Max. Ten. = 311 ibs per anchor
TRY: 518 Hilti KB-TZ
Va = 4901 Ibs (V/(Va)= 0.09 O.K. Vu/Boit = 629
Ta = 3458 Ibs (T/(Ta)= 0.09 O.K. Tu/Bolt = 435
Bolt Spacing = 22 in.s Anchor Design : Vu = 629
Edge Distance = 24 in.s Tu = 435
SEISMICEQUIP12.xls Page 2
ANCHOR BOLTS
(ACI 318 2011, Appendix D)
PROJECT: Boeing 9-99
ITEM
LOADS:
or phi per
ESR reports
Anchor bolt:
for D5.2
D5.2
D6.2
Microbulk Tank
Shear, Vu =
Tension Nu =
phi,tension, steel =
phi, shear steel =
Concrete seismic mode .75,
ver. 9/16/13
. .
e�s�
CONSULTING ENG/NEERS
PAGE 1/4
DATE 23-Mar-16
JOB NO. 14-142Q
0:63 kips
0.44 kips
'0.65 D4.3, pg 434 Conc. Mode phi = 0:7
0:6 D4.3 Conc. Mode phi = 0.7
0.:75 D3.3.4,4 pg 426 Inv. Omega or Brittle = 0.4 D3.3.4.3-d, pg. 426
Grade KB'-TZ; futa = 106 ksi (not to exceed 125ksi or 1.9"Fy)
Fy = 84.8 ksi 161.12 ksi (1.9*Fy)
Size, dia., da = 0:625 in, Ase = 0.162 in^2 Ase = 3.14/4"`(do-.9743/nt)^2
Embed., hef = ;4 in ha min =3/2*hef = 6 in., per D8.5, pg 462 for expansion
Abrg = 0. in^2 (bearing area of head)
No. Shear AB, n= 1 No. Tension AB, n= 1
Anchor Spacing, s1 = 0. in s2 = 0 in (s2 in direction of load)
smin = 4*da or 6*da for torque or post installed smin, see D8.1, pg 462
Post-Installed cmin = 6*da,undercut
5 cmin = 8'`da,torqued controlled =
6.25 cmin = 10"da,displacement controlled
Edge dist., cac = 6 in. critical cac, see D8.6, pg 463 (4"hef except undercut anchors)
post-installed (see tested data): undercut, cacmin =2.5*hef
torque-controlled, cacmin = 4"hef
Per D8.3, pg 462 cast in: non torqued, min edge distance = min cover per ACI, Section 7.7
adhesive, cac = 2*da
ha = 12' D8.5, pg 462, hamin =1.5"hef = 6 in.
camin = 6 in. cmin = 5 in.
ca1(in direction of shear) = 6 in. for D6.2 6 in.
ca2 (in orthogonal Direction) _ ,;; , ; 6 in., other ca2 = 6. in (1.5*heflmax 6
ca2 (in orthogonal Direction) _ , 9 in., other ca2.1 = 9 in (1.5'"Ca1)max 9.00
eN (tension eccentricity) _.. 0 in. eV(shear eccentricity) = 0 in.
Appendix D
�
ANCHOR BOLTS
PROJECT: Boeing 9-99
kc =
Concrete strength , fc' _
Modification Factors:
U�ec,N �u1=1/(1+2*eNl3/hefl =
�ed,N W2 =.7+.3*camin/1.5/hef =
wc, N W3 =
4�cp,N w4 =
4�c,p �u=
�ec,V �5 = 1/(1+2*ev/(3*ca1)) _< 1.0
�ed,V 4�6 = .7+.3*ca2/1.5/ca1 =
Wc.V W7 =
4�h,V 4�8 =(1.5"Ca1/ha)^.5
Nominal Bolt Tensile Strength: (D5.1)
Nsa = n"Ase*futa =
Concrete Breakout Strength: (D5.2)
eisi
CONSULTING ENGlNEERS
DATE 23-Mar-16
PAGE 2/4
Microbulk Tank JOB NO. 14-142Q
17 D.5.2.2 (24 for cast in 8� 17 for post installed), pg 438
4000 psi
1.00 eq. D-8, pg 440
1.00 eq. D-10, pg 441 if camin<1.5`hef, otherwise 1, U�2 = 7.00
� 1.00 D.5.2.5, pg 441 (1.25 for cast-in & 1.4 for post-installed) (1.00 per ESR)
_:,.:1;..00 D-12, D.5.2-7, P9 442 (1.0 max.)
w4=1.0 if camin=>cac eq D-11, pg 442 1.00
w4=camin/cac => 1.5*hef/cac if camin<cac eq D-12 1.00
1:00:. D.5.3.6, pg 444 (1.4 for no cracking, otherwise 1)
1.00 D-36, D.6.2.5, pg 456 Use 1.00
0.90 eq D-38, D.6.2.6, pg 457 or 1 if ca2=> 1.5*ca1 Use 1.00
1.00 D6.2.7, pg 457 ( use 1.4 for no cracking) (1.2 w/ #4 rebar @ edge)
0.87 D6.2.7,pg 458
17.17 kips eq. D-2, pg 436
(verify hef if ca < 1.5"hef on 3 sides), D5.2.3, pg 439
ca1 = 6 in
Anco =9*hef^2 = 144 in^2
Anc =(ca1+s1+1.5'`hefl*(2''1.5"hef+s2) = 144 in^2
Anc =(2*Ca1)*(2"Ca2) = 144 in^2
Anc =(ca1+s2+1.5'hefl*(ca2.1+ca2+s1) = 144 in^2
Not to Exceed Nb = kc*(fc)^.5*hef^1.5 = 8.60 kips
for 11<hef<25, Nb = 16*(fc)^.5*hef^1.67 = 11.47 kips
Nb = - 8:60 kips
Ncb = Anc/Anco"`w2'�3*w4"Nb = 8.60 kips
Ncgb = Anc/Anco'`w1'`4�2*w3'�u�4"Nb = 8.60 kips
Use Nn = 8:60. kips
(1.5 hef max.)
eq. D-5, pg 437
(verify with bolt layout)
Narrow wall
Near edge:
eq. D-6, pg 438
eq. D-7, pg 439
eq. D-3, pg 437
eq. D-4, pg 437
Appendix D
pg 438
Use: Anc = 144
(single anchor)
(single anchor)
Nn = 8.60
(Group)
n
ANCHOR BOLTS
PROJECT: Boeing 9-99
Microbulk Tank
eisi
CONSULTING ENG/NEERS
DATE
PAGE
JOB NO
Concrete Pul[out Strength: (D5.3) (for post-installed see test results)
Single Anchor Not to exceed, Npn =wcp*Np = 0.00 kips eq D-13, pg 443
(headed stud) Np max =Abrg*8*fc' = 0.00 kips eq. D-74, pg 444 Pull-out =
Use Np/bolt = 19.57 kips ( NpnExp. Anchor) =wcp'`Np =
Group Np = 11.57 kips
Hooked anchor see pg 427
Concrete Side Face Tension: (D5.4) ca1 = 6 ca2 = 6 s=
for hef<2.5*Ca1 = 15.00 in., then not applicable
9.145
11.57
Nn =
18
23-Mar-16
3/4
14-142Q
kips, from Table
kips
8.60
in.( Distance to edge)
Nsb = 160`ca1'`(Abrg)^.5*(fc)^.5 = 0.00 kips eq. D-16, pg 444 (See ACI 355.2 for post installed anchors)
If ca2<3�ca1, Nsb*(1+ca2/ca1)/4 (up to 3"ca1 max.)= 0.00 kips D.5.4.1, pg 444 Use Nsb = 11.57
Group, Nsbg =(1+s/(6*ca1))"Nsb = 17.36 kips eq. D-17, pg 445 Use Nsbg = 17.36
Steel Shear Strength: (D6.1)
grout base, g=.. 1(if grout w/ cast-in headed bolt use .8, otherwise 1.0)
Non headed bolts or post-installed' p= ... 1(use p= 1,sleeves not in shear plane use .6)
Vsa =.6"(n*Ase,v"futa*p)*g= 10.30 kips eq. D-29, pg 450 Vn =
Concrete Breakout Strength in Shear: (D6.2) Ca1 = 6
Use: 1.00 D-39, pg 458 (not less than 1)
Shear Parallel to edge (2 otherwise 1) . 2 D6.2.1c, pg 451
Avco = 4.5*ca1^2 = 162 in^2 eq. D-32, pg 451
Avc = ha*(1.5*(ca1+s2)*2+s1)= 216 in^2 (verify with bolt configuration)
If Ca2< 1.5"Ca1, ha = 1.5"Ca1 otherwise 1.5*Ca1 max
10.30
Near edge: Avc=ha"(1.5(ca1+s2)+(ca2.1+s1))= 216 in^2 Ca2.1 = 9
lemax =8"do= 5.00 Use le = 4 see D6.22 or le = 2�`do for torque controled Exp. Anchors
Vb=7"(I/do)^.2"do^.5"`fc'^.5*ca1^1.5= 7.46 kips eq. D-33, pg 454 Use Avc = 216
Vcb=(Avc/Avco)*w6*W7"`4�8'`Vb= 19.88 kips eq. D-30, pg 451
Group, Vcbg=(Avc/Avco)'w5*�6*�7*�8"Vb= 19.88 kips eq. D-31, pg 451
Use V= 99:88 kips Vn = 10.30
Appendix D
• ,�
ANCHOR BOLTS
PROJECT: Boeing 9-99
Concrete Pryout Strength: {D6.3)
Microbulk Tank
eisi
CONSULTING ENGINEERS
DATE 23-Mar-16
PAGE 4/4
JOB NO. 14-142Q
kcp = 2 D.6.3.1 (kcp =1 for hef < 2.5, otherwise 2.0)
single Vcp = kcp`Ncb = 17.20 kips eq. D-40, pg 460 (from D5.2)
group Vcp = kcp*Ncbg = 17.20 kips eq. D-41, pg 461 Vn = 10.30
Interaction: (D7) Vua/bolt = 0.63 kips Vn =
Nua/bolt = 0.44 kips Nn =
phi*Vn = 4.64 kips D4.1.2, pg 432 Vua=
phi"Nn = 4.52 kips D4.1.2 Nua =
For No Combination Required
If Vua<.2"phi"Vn = 1 kips D.7.1, pg 461 Combine
If Nua<.2*phi'"Nn = 0.59 kips D.7.2, pg 461 O.K.
USE: 5/8" dia. Hilti "KB-TZ" Anchors w/ 4 in. emb.
Summary phi Capacity
Nominal Bolt Tensile Strength: (D5.1) Nn = 17.17 kips 0.65 11.16
Concrete Breakout Strength: (D5.2) Nn = 8.60 kips 0.65 5.59
Concrete Pullout Strength: (D5.3) Nn = 11.57 kips 0.65 7.52
Concrete Side Face Tension: (D5.4) *, cast in A. B. Nn = 17.36 kips 0.65 1128
Steel Shear Strength: (D6.1) Vn = 10.30 kips 0.6 6.18
Concrete Breakout Strength in Shear; (D6.2) * Vn = 19.88 kips 0.6 11.93
Concrete Pryout Strength: (D6.3) Vn = 1720 kips 0.6 10.32
Vu = 0.629 Nu = 0.44 '
*NA if not near slab edge Vn = 2.47 Nn = 1.68
Combine = VuNn +Nu/Nn = 0.51 OK <= 1.2 eq D-42, pg 461
Allowable Va = 1.76 kips Allowable Ta = 1.20
Appendix D
10.30
8.60
0.63
0.44
Formula
D-3
D-4/5
D-14
D-18
D-19/20
D-21/22
D-30/31
kips
kips
kips
kips
kips
Seismic
11.16
4.19
5.64
8.46
6.18
11.93
10.32
FS =
OK
OK
Brittle
4.46
1.68
2.26
3.39
2.47
4.77
4.13
1.4
� r
0
� 5�
Footing Overturning Check EISI, Ltd.
CONSULTING ENGINEERS
PROJECT: Boeing 9-99 JOB # 14-'f42Q
Item: Microbulk Tank 9-Mar-16
Page
F. S. = 1.5
Lateral load: Fp = 1.80 kips OTM = 9 ft-kips
Vertical Load: Quanitity kips
DL 1 4.1 4.1 kips
LL 1 4.2 4.2 kips
L, ft W, ft T, ft Wt.
Footing, ft 8 x 8 x 1.50 x 0.145 kcf = 13.92 kips
Total Vertical Load Wt = 22 kips
CG = 4.00 ft
Center of Gravity = 5.00 ft from bot. of ftg. Fp = 1.80 kips
Seismic OTM = 9.00 ft-kips
Mr = .6"Wt*W/2 = 53 ft-kips
FS = 6 OK
Soils Pressure: Aliow S. P. = 1500 psf
EQ Soil Pressure:
x =(.6*Mr-Mo)/VV = 1.03 ft
SP = P/A+or-Mc/f = 453 psf or 242 psf OK
if x in first 1/3 1789 psf OK
D + L Soil Pressure:
SP = 347 psf OK
OTM
�
consulting engineers
1900 W Emerson Place #200 Seoitle, WA 98119
Phone (206) 284-1181 � FAX (206) 284-1236
��11G�
U� � 43C�cF�
�� 22Z1�� l��
�
Job No.��-�� Sheet �� Of
Client:
Project: �.� 4.►^
Sub ject: ��1�.I1 �1�— l�►J-c�O�-S
By. Date: .
'��(�, 2 � 2'� �e� � ��� �� — t 1. � � �
�P� , �`�C L•�D� a �°1 t� �+�:�"1�,. !�'. �' � �I��j c7�
�1—� �- U�
��Z�,c,2� �.'�° ��
� _____---��
� �. �
> ��-�� ��.
, �
A
.
� SEISMIC ANCHORAGE OF EQUiPMENT
I PROJECT: Boeing 9-99
i
CRITERIA: 2012 tsC/aSCE 7•�0
Ss = 1.516 Figure 1613.3.1(1), pg 368
Fa = 1 Table 1613.3.3(1), pg 366
Seis. Design Cat. D Table 11.6-1 pg 67
Occ, Cat. II Table 1.5-1, pg 2
Site Class D Table 11.8-1, pg 68
Sms =Fa'Ss 1.52 11.4.1, pg 65
Sds =2/3*Sms 1.011 11.4-3, pg 65
Vib. Isoiation 1.00 Table 13.6-1, footnote b
�P = 1 13.1.3, pg 143
ap = 1 Table 13.6-1 or 13.5-1, pg 117
Rp = 2.5 (for equipment, pg 117 or pg 120)
Working Stress Factor, a= 1.4
Equioment: Zwick
Equipment: 4 no. of anchor points
Wp = 4364 Ib.s (unit weight) Stand Wt. = D Ibs Total W=
Stand ht = 0 in. Added Moment = 0 fn-Ibs
C.G., x = 156 in.
b = 54 in.(wfdth)
I = 86 fn.
z= 0 ft! Floor above grade
h = 1 ft/Roof
BASE SHEAR FOR ANCHOR BOLTS (allowable stress desiqn loads)
(13.3-2) Fp(MAX) = 1.6'Sds'Ip'1Np/a(working stress) 5041 fbs
(13.3-3) Fp(MIN) _.3'Sds'Ip"Wp/a 945 Ibs or rigid Non-Building Sructure
(13.3-1) Fp =(.4'ap'Sds'Ip/Rp)(1+2*zfi��VVp/a Rp = 2.5 504 Ibs
(13.3-1) Fpv =.2*Sds'Wpla 630 ibs
MAX A. B, TENSION LOAD C�a. DIAGONAL (for anchors}
No of Anchors(Legs), N= 4 No. of Bolts/Anchor, n= 9 Fp =
Mo = (Fp`x)+Vp*b/2 164450 in.-Ibs Coef =
Angle = 0.561 radlans or 32.13 degrees Ibb = 2916 Tb =Mo*b/2/ibb'cos=
Arm = 101.55 in III = 7396 TI =Mo*1/2/III*sin=
Diagonal Tension, T= Mo/Arm/n -.6"Wp/N/n = 974 Ibs TENSION/80LT
ASD, Rh = 2889 Ibs COMPRESSION/SUPPORT
OR
Orthogonai Tension, T= Mo/(b/2)/(N/2)/n -.6" Wp/N/n = 2221 Ibs TENSION/B�LT
ASD, Rh = 4136 fbs COMPRESSIONISUPPORT
51
eisi
CONSULTING ENGINEERS
ver.08/27/Q7 27-Apr-16
PAGE 1
JOB NO. 14-142Q
�
4364 Ibs
SEISMICEQUlP12
945 Ibs
0.217
1290 Ibs
508 Ib5
ANCHOR BOLTS FOR SEISMIC
PROJECT: Boeing 9-99
EQUIPMENT Zwick
EQUIP. WT. 4364 Ibs STAND WT
Fp = 945 Ibs
C.G. = 156 in.
Mo = 164450 in.-Ibs Mr =
RESISTANCE ARM 54 in
NO.OF ANCHOR BOLTS (shear)
(tension)
LOAD/ A.B. Shear*"* = 236 Ibs
Minor Axis Tension"`" = 2221 Ibs
Diagonal Tension*"* = 986 Ibs
Base Ecc Tension**' = 0 Ibs
TRY: 5/8 Hilti KB-TZ
Va = 4901 Ibs
Ta = 3458 Ibs
Bolt Spacing = 24 in.s
Edge Distance = 24 in.s
m
eisi
CONSULTING ENGINEERS
27-Apr-16
PAGE 2
JOB NO. 14-142Q
0 Ibs
53685 in.-Ibs
b x 1= 54 x 84
4
1 perAnchor
Max. Ten. = 2221 Ibs per anchor
(V/(Va)= 0.05 O.K. Vu/Bolt = 331
(T/(Ta)= 0.64 O.K. Tu/Bolt = 3109
Anchor Design : Vu = 331
7u = 3109
SEISMICEQUIP12.xls
[''JCj
Page 2
EPDXY ANCHOR BOLTS
(ACf 3'i8 2011, Appendix D)
PROJECT: Boeing 9-99 "
_ ,;. ;.:
ITEM Ztnnck..: _ , .
LOADS: Shear Vu= ;; 0:331 kips
Tension TU = 3 1:09 kips
Steel phi, tension = 0:65 D4.3, pg 434
Steel phi, shear = 0:65 D4.3
Concrete seismic mode .75, 0 75 e: D3.3.4,4 pg 426
Seismic Omega or Bnttle ; 0 d D3.3.4.3-d, pg. 426
eisi
CONSULTING ENGlNEERS
ver.09/16/13 DATE 18-Apr-'16
PAGE 1/4
JOB NO. : 14-142Q :
Condition B- W/O supplemental reinforcing
Working Stress Factor = 1.6
Concrete phi, tension =.. . 0 65 ' Brittle steel
Concrete phi, shear = 0.6 Brittle steel
Concrete phi, tension = 0.65 breakouf, etc
Concrete phi, shear ='., . 0:65 . breakout, etc
Bond, tension = - : 0.65 -
Anchor bolt: Grade " -A �93; 6-7 futa = 125 ksi (not to exceed 125ksi or 1.9*Fy)
Fy = 105 ksi 199.5 ksi (1.9*Fy)
� Size, dia. da = .: ,,;,,, 1;125. in, Ase = 0.763 iM2 Ase = 3.14/4"(do-.9743/n)^2
Abrg ' 0. in^2 (bearing area of head)
Embed., hef = '16 in limits 4da<hefQOda per D.42.3, pg 434
ha = 24 in (Conc. Thickness)
;: �
No. AB, shear n= 1. tension.n = - 1.:
Anchor Spacing, s'I ` 0 in s2 -� 0 in (s2 in direction of load)
smin = 6.75 in. smin, 6*da, see D8.1, pg 462 (4*da for cip)
cac, min. = 2*hef = 32 in., D8.5, pg 463
hamin = hef*1.5 24 in. D8.4. pg 462
_ . .___.
Camin 14 in.
Edge dist. (direction of load), ca1 ':. �4 in. max., 1.5"`hef =24
For Tension Breakout D5.2
ca2 =:14 in. perpendicularto ca1 ca2.1 =' 'i4 in.
_. . ...
� EccenEricity, eN i: 0 in. Shear, eV ,:: O in •.
Appendix D Epoxy
EPDXY ANCHOR BOLTS oATE 18-Apr-16
(ACI 318 20'11, Appendix D) PAGE 2/4
PROJE�T: Boeing 9-99 JOB NO. 14-142Q
kc 17 :.' Tabie 8(24 for uncracked 8� 17 for c�acked)
Concrete strength , fc' _;.'.d000;':° : psi see table D5.5.2, pg 447 or ESR report
tcr = • 730 psi '; 200 � seisimic factor= . .. : �j ," :8 for seismic
tuncr = 1860 psi ': 300 seisimic factor = _1 ' .4 for seismic
_ _
Modification Factors: Sustained Tension, factor - 1� .4 for sustained
Wec N W1=1/(1+2*eN/3/hefl = 1 00 D-8 440 •
�Ved,N �V2 =.7+.3*camin/1.5hef =
wc,N W3 =
U�cp,N W4 = • .
w/o supplemental rebar
�Vc,p
U�ec,V
wed,V
�Uc.V
4�h,v
�uec,Na
Wed,Na
Wcp,lVa
w=
W5 = 1/('1+2*ev/(3"ca1)) _< 4_0
W6 = .7+.3*ca2/1.5/ca =
4�7 =
�8 =(1.5*ca1/ha)^.5>=1.0 �
w9= 1/(1+eN/Cna) _
4�10 = .7+.3"`Camin/Cna =
4�11 = Camin/Cac =
. eq. , P9
0.88 eq. D-10, pg 441 if camin>1.5*hef then use 1, w2 = 0.88
i 00 D.5.2.6, pg 441 (1 for uncracked & 1.4 for cracked) ( 1.00 per 355.2)
0;75 .D.5.2J; pg 442 (1.0 max.)
W4=1.0 if camin=>cac eq U-12, pg 425 0.75
w4=camin/cac => 1.5'hef/cac •if.camin<.cac . •. . . �: . eq D-13 0.75
�..
1:00 D.5.3.6, pg.427 (1.4 for no cracking, otherwise 1) '
1.00 eq: D-3.6;. D.6:2c5, pg 456 Use 'I .
0.90 eq D-38, D.6.2.6, pg 457 or 1 if ca2=> 1.5`ca Use 0.90
�`.00 D6.2.7, pg 457 1.0 for no sup. Reinf., 1.4 for sup. Rebar
0.94 Use U�h,v = �.00 eq. D-39, D.6.2.8, pg 458
1.00 b.5.5.3, pg 449 :. not.greater than 1.0 � �
0.99 D.5.5.4, pg 449 if Camin>=Cna then =1.0
0.44 D.5.5.5, pg 449 if Camin>=Cacthen =1.0
Nomin�l Bolt 7ensile Strength: (D5.1.2)
Nsa = n*Ase"'futa= 95.38 kips
Concrete Breakout Tensile Strength: (D5.2)
(verify hef if ca < 1.5*hef on 3 sides), D5.2.3, pg.392
Anco =9*hef^2 = 2304 in"2
Anc =(ca1+s2+1.5*hefl*(ca2+1.5*hef+s1) = 1368 in^2
Nb = kc"'(fc*)^.5*hef"1.5 = 68.81 kips
iVcb = Anc/Anco"v�2*W3"w4"`Nb = 26.81 kips
Ncbg = Anc/Anco'W1 "W2*W3'w4"Nb = 26.81 kips
Use Ncbg 26.81 kips
Concrete Pullout Bond Strength: (D5.5), pg 445
Nba =tcr"3.14*da"hef = 41.26 kips
Cna = '10"da'`(tuncr/1100)^.5 = 14.63 in:
Anao = (2*Cna)"2 = 856.02 in^2
eq. D-2, pg 436
ca2 =1.5*hef = 24 max Use: hef = 16
eq. D-5, pg 437 Use ca2.1 12 -:
(verify w/ bolt layout) Use: Anc = 1368 ,(Group)
eq. D-6, pg 438 not exceed, single anchor
eq. D-3, pg 437 (single anchor)
eq. D-4, pg 437
eq D-22, pg 446
eq D-21, pg 445
eq D-20, pg 445.
Appendix D Epoxy
e �
i
;
i
�
� I
� i
I
EPDXY ANCHOR BOLTS oaTE
(ACI 318 2008, Appendix D) PAGE
PROJECT: Boeing 9-99 JOB NO.
Concrete Pullout Band Strength: (D5.5), pg 445, continued
Ana =(Cna+s1+ca1)"(Cna+s2+ca2) = 820 in^2 . for ca.1 & ca2 < Cn
Na = Ana/Anao"4�ed,Na*4�cp,Na*Nba = 17.06 kips eq D=18, pg 445 ca1 = 14.00
Nag = Ana/Anao"wec,Na*4�ed,Na"`4�cp,Na*Nba = 17.06 kips eq D-19,. pg 445 . ca2 =. 14.00
Use Nag 17:06 kips . . . .
Controlling Tensile Strengtli: phi W/ phi factors ' �
D5.1 Steel Strength, Nas = 95.38 0.65 24.80 kips
� D5.2 Conc. Breakout Strength, Ncbg = 26.8'i 0.65 5.23 kips
18-Apr-16
3/4
14-142Q
D5.5 Bond Strength, Nag = 17.06 Q.65 -. ,: 3:33 . kips Ult. Bond Stress = 59 psi
Use: phi Nn =;.:_;- :: ;;`� ;:;; 3:33 kips . Ws =. 2.08 kips
Nu = . , , 3.11,kips O.K. U.93 �
Steel Shear Strength: (D6.1), pg 450 -.
Vsa =.6*n*Ase*futa = 57.23 kips D-29, pg 450 : •.
Concrete Breakout Strength: (D6.2), pg 450
Avco = 4.5*ca1^2 = 882 D-32, pg 451
_ __ .... ..
� ha (1.5 ca max ) ; ;.18
Avc = (2*(1.5*(cai+s2)+s1)'ha= 756 USE ` 756 ' :
le =( 8*d)max or hef : i in. . 9 max
Vb =7*(le/d)^.2*d^.5"fc^.5"ca^1.5 = 35.46 kips Shear Parallel to edge (2 otherwise 1) 'I
Vcb = Avc/Avco"W6`W7"W8*Vb = 27.35 kips D-30, pg 451
Vcbg= Avc/Avco"w5*W6*W7"�u8'Vb = 27.35 kips D-31, pg 451
USE 27 35 ,'. ';. kips
Concrete Pryout Strength: D6.3, pg 460 kcp = 2: ' see pg 461 kcp = 1.0 for hef<2.5 otherwise 2.0
Ncp = 17.06 kips
Ncpg = 17.06 kips
, Vcp = kcp"Ncp = 34.12 kips
Vcpg = kcp''Ncpg = 34.12 kips ' .
USE '- 34 2 :: :: kips
Appendix D Epoxy
D6.2.1 c, pg 451
i
t �
c° a
T
L
Q � �
[- Qi
00 � � �
� T U N
�a Q'
a Y
m �
W W Z C `t
Q Q O r
❑ d � �
r II
� n N
, � � i-+
V Y d
� O �
�
d
�
�
�
aaa a-Q- c
�c �[ 1 �C .�L ' '�
;� ,r., •
. . . N �:.e- : M
. . � � �� �:.� � . 0
T ,T
� � r N. .
' � ;,� � � � � . . � .
Q ... - .. . � �..:
> '
. II II .
. � .�
. ��-c0 >> Y j
:c cfl , co :c O
a:.o o;o Q N �
y �- .c
. � v Q
O
N M N � t(�
�f N M '
O W
�
�
u u u =
m rn m _
� � .Z
� ; _ ... _ .
o °' �; 0 3 .
:?��,
�a �'@�- �
~ °�' `' :� Q
�f � m �'
QQ a;c u ►�
m � `�� m.
U
N � � � R
� � � V + '�
O-r � � � •
M Z p�
...
�
� Q m = Z �
� T
Z � r N M
� � t0 to <O jjJ
. .���� �
�. F.- v, - �
>C w = �
O -, = _
o � :�
W a � �
�2
t-
V
consulting engineers
1900 W Emerson P(ace #200 Seattle, WA 98119
Phone (206) 284-1181 e FAX (206) 284-1236
�
�
.� �. �
ll. ;
Job No.�`�'� 2� Sheet �% Of
Client:
Project: �� 2
Sub ject:
B� Date: .
���� � �� l�� �
��
2 � ��'� �--. ���
'� � �o�� oc �: ( �- 2�,.e� �`
r g����
� � ���
, �
� d �
.� � �
�1?.� � 51� q,\1 l �ls��� °��-� � c� � � � �
�
�
�a�a� i �i��2� �i�(� �� �� _�� ��,�L�
SEISMIC ANCHORAGE OF EQUIPMENT
PROJECT: Boeing 9-99
CRITERIA: 2012 isc/aSce 7-10
Ss = 1.516 Figure 1613.3.1(1), pg 368
Fa = 1 Table 1613.3.3(1), pg 366
5eis. Design Cat. D Table 11.6-1 pg 67
Occ. Cat. II Table 1.5-1, pg 2
Site Class D Table 1�.&1, pg 68
Sms =Fa"Ss 1.52 11.4.1, pg 65
Sds =2/3`Sms 1.011 11.4-3, pg 65 '
Vib. Isolation 1.00 Table 13.6-1, footnote b
Ip = 1 13.1.3, pg 143
aP = 2.5 Tabie 13.6-1 or 13.5-1, pg 117
Rp = 6 (for equipment, pg 117 or pg 120)
Working Stress Factor, a= 1.4
Eauioment: Pipe Support
Equipment: 4 no. of anchor points
Wp = 270 Ib.s (unit weight) Stand Wt. _
Stand ht = 0 in. Added Moment =
C.G., x = 96 in.
b = 9 in.(width)
I = 9 in.
z= 0 ft/ Floor above grade
h = 1 ff/Roof
BASE SHEAR FOR ANCHOR BOLTS (allowable stress desian loads)
(13.3-2) Fp(MAX) = 1.6`Sds'Ip'Wp/a(working stress)
(13.3-3) Fp(MIN)=.3`Sds'ip'Wpla
(13.3-1) Fp =(.4"ap"Sds"IplRP)(1+2*�Jh)"Wp/a Rp = 6
(13.3-1) Fpv =.2'Sds'Wp/a
MAX A. B. TENSION LOAD Ca� DIAGONAL (for anchors)
��
eisi
CONSULTING ENGINEERS
ver.08l27/07 27-Aprv16
PAGE 1
JOB N0. 14-142Q
i
0 Ibs Total W= 270 Ibs
0 in-Ibs
312 Ibs
58 Ibs or rfgid Non-8uilding Sructure
32 Ibs
39 tbs
No of Anchors(Legs), N= 4 No. of Bolts/Anchor, n= 1 Fp =
Mo = (Fp•x)+Vp*b/2 5789 in.-Ibs Coef =
Angle = 0.785 radians or 45.00 degrees Ibb = 81 Tb =Mo'b/2/Ibb`cos=
Arm = 12.73 in III = 81 TI =Mo"i/2/III*sin=
Diagonal Tension, T= Mo/Arm/n -.6"Wp/N/n = 404 Ibs TENSION/BOLT
ASD, Rh = 522 Ibs COMPRESSION/SUPPORT
OR
Orthogonal Tension, T= Mo/(b/2)/(N/2)/n -.6• Wp/N/n = 592 Ibs TENSION/BOLT
ASD, Rh = 711 !bs COMPRESSION/SUPPORT
SEISMICEQUIPI2
68 Ibs
0.217
227 Ibs
227 fbs
�
' eisi
CONSULTING ENGINEERS
ANCHOR BOLT$ FOR SEISMIC. 27-Apr-16
PAGE 2
PROJECT: 8oeing 9-99 JOB NO. 14-142Q
EQUIPMENT Pipe Support
EQUIP. WT. 270 Ibs STAND WT. 0 Ibs
Fp = 58 Ibs
C.G. = 96 in.
Mo = 5789 in.-Ibs Mr = 554 in.-Ibs
RESISTANCE ARM 9 in b x I= 9 x 9
N0. OFANCHOR BOLTS (shear) 4
(tension) 1 per Anchor
LOAD/A.B. Shear"**= 151bs
Minor Axis Tension**" = 592 Ibs
Diagonal Tension**" = 404 Ibs
Base Ecc Tension**" = 0 Ibs Max. Ten. = 592 Ibs per anchor
TRY: 5/8 Hilti KB-TZ
Va = 4901 Ibs (V/(Va)= 0.00 O.K. Vu/Bolt = 20
Ta = 3458 Ibs (T/(Ta)= 0.17 O.K. Tu/Bolt = 829
Bolt Spacing = 9 in.s Anchor Design : Vu = 20
Edge Distance = 24 in.s Tu = 829
SEISMICEQUIP12.xls Page 2
ANCHOR BOLTS
(ACI 318 2014, Chapter 17)
PROJECT: Boeing 99-9
ITEM
LOADS:
or phi per
ESR reports
Pipe Support
Shear, Vu =
Tension Nu =
phi,tension, steel =
phi, shear steel =
Concrete seismic mode .75,
eisi
CONSULTING EIVGINEERS
ver. 1/20/16
020 kips
0.83 kips
0.75 17.3.3, pg 233 Conc. Mode phi =
0.65 17.3.3 Conc. Mode phi =
0.75 17.2.3.4.4 pg 225
PAGE 1/4
DATE 27-Apr-16
JOB NO. 14-142Q
0.7 .65 for post-installed
0.7
Omega = 2 17.2.3.4.3(d), pg. 224
17.2.3.5.3(c), pg. 227
Anchor bolt: Grade KB-TZ futa = 106 ksi (not to exceed 125ksi or 1.9*Fy)
Fy = 84.8 ksi 161.12 ksi (1.9*Fy)
Size, dia., da = 0.625 in, Ase = 0.162 in^2 Ase = 3.14/4"(do-.9743/nt)"2
Embed., hef = 4 in ha min =3/2''hef = 6 in., per 17.7.5, pg 259 for expansion
Abrg = 0 in^2 (bearing area of head)
No. Shear AB, n= 1 No. Tension AB, n= 1
Anch�r Spacing, s1 = 0 in s2 = 0 in (s2 in direction of load)
smin = 4*da or 6*da for torque or post installed smin, 17.7.1, pg 258
Post-Instalfed cmin = 6`da,undercut 17.7.3
5 cmin = 8"da,torqued controlled
6.25 cmin = 10"da,displacement controlled
17.42, pg 236
D6.2
Edge dist., cac = 6.75 in. critical cac, 17.7.6, pg 259 (2.5*hef except undercut anchors)
post-installed (see tested data): undercut, cacmin =2.5"hef
torque-controlled, cacmin = 4�hef
non torqued, min edge distance = min cover per ACI, Section 20.6.1
adhesive, cac = 6*da
ha = 6 17.7.5, pg 259, hamin =1.5"hef = 6 in.
camin = 6.75 in. cmin = 3.625 in.
ca1(in direction of shear) = 6.75 in. for D6.2 6.75 in.
ca2 (in orthogonal Direction� = 6 in., other ca2 = 6 in (1.5*heflmax
ca2 (in orthogonal Direction) = 10.13 in., other ca2.1 = 10.13 in (1.5"Ca1)max
eN (tension eccentriciry) = 0 in. eV(shear eccentricity) = 0 in.
Chapter 17
6
10.13
t t.
ANCHOR BOLTS
PROJECT: Boeing 99-9
kc =
Concrete strength , fc' _
Modification Factors:
wec,N w1=1/(1+2*eN/3/hefl =
�ed,N �2 =.7+.3*camin/1.5/hef =
wc,N U�3 =
U�cp,N w4 =
wc,p 4�=
wec,V �5 = 1/(1+2*ev/(3*ca1)) _< 1.0
�ued,V w6 = .7+.3'`ca2/1.5/ca1 =
�uc.V w7 =
4�h,V 4�8 =(1.5*Ca1/ha)^.5
Nominal Bolt Tensile Strength: (17.4.1)
Nsa = n'`Ase*futa =
Concrete Breakout Strength: (17.4.2)
ca1 =
Anco =9"hef^2 =
Anc =(ca1+s1+1.5"'hef)*(2*1.5*hef+s2) =
Anc =(2�Ca1)*(2*Ca2) _
Anc =(ca1+s2+1.5*he�''(ca2.1+ca2+s1) =
Not to Exceed Nb = kc"`(Pc)^.5"hef^1.5 =
for 11<hef<25, Nb = 16*(fc)^.5�hef^1.67 =
Nb =
Ncb = Anc/Anco*W2*w3`W4'Nb =
Ncgb = Anc/Anco*�1*w2*w3''W4*Nb =
Use Nn =
eisi
CONSULTING ENGINEERS
DATE 27-Apr-16
PAGE 2/4
Pipe Support JOB NO. 14-142Q
17 17.4.2.2 (24 for cast in & 17 for post installed), pg 236
4000 psi
1.00 eq. 1i.4.2.4, pg 238
1.04 eq. 17.4.2.5, pg 239 if camin<1.5"hef, otherwise 1, W2 =
1.00 17.4.2.6, pg 239 (1.25 for cast-in & 1.4 for post-instafled)
1.00 17.4.2.7, pg 240 (1.0 max.)
w4=1.0 if camin=>cac eq 17.4.2.7a 1.00
U�4=camin/cac => 1.5*hef/cac if camin<cac eq 17.4.2.7b 0.89
1.00 eq. 17.4,3.6, pg 242 (1.4 for no cracking, otherwise 1)
1.00 eq. 17.5.2.5, pg 252 Use 1.00
1.00
(1.00 per ESR)
0.88 eq 17.5.2.6, pg 254 or 1 if ca2=> 1.5*ca1 Use 1.00
1.00 17.5.2.7, pg 254 ( use 1.4 for no cracking) (1.2 w/ #4 rebar @ edge)
1.30 17.5.2.8, pg 254
17.17 kips eq. 17.4.1.2, pg 234
(verify hef if ca < 1.5"hef on 3 sides), D5.2.3, pg 439
6.75 in
144 in^2
153 in^2
162 in^2
153 in^2
8.60 kips
11.47 kips
8.60 kips
9.14 kips
9.14 kips
9.14 kips
(1.5 hef max.)
eq. 17.4.2.1 c, pg 235
(verify with bolt layout) pg 236
Narrow wall Use: Anc = 153
Near edge:
eq. 17.4.2.2a, pg 236 (single anchor)
eq.17.4.2.2b, pg 237 (single anchor)
eq. 17.4.2.1a, pg 235
eq. 17.4.2.1 b, pg 235
N.A, if reinforced
Chapter 17
Nn = 9.14
(Group)
C' p
ANCHOR BOLTS
PROJECT: Boeing 99-9
Concrete Pullout Strength: (17.4.3)
Single Anchor Not to exceed, Npn =Wcp�Np =
(headed stud) Np max =Abrg*8*fc' _
Use Np/bolt =
Group Np =
Hooked anchor see pg 242, Np =.9'fc"`eh"da =
Concrete Side Face Tension: (17.4.4)
for hef>2.5"`Ca1 =
Nsb = 160"ca1'`(Abrg)^.5*(fc)^.5 =
If ca2<3"ca1, Nsb"(1+ca2/ca1)/4 (up to 3*ca1 max.)=
Group, Nsbg = (1+s/(6"ca1))'`Nsb =
Steel Shear Strength: (17.5.1)
grout base, g =
Non headed bolts or post-installed' p=
Vsa =.6"(n`Ase,v'"futa*p)''g=
Concrete Breakout Strength in Shear: (17.5.2)
Pipe Support
.
r ,
eisi
CONSULTING ENG/NEERS
DATE 27-Apr-16
PAGE 3/4
JOB NO. 14-142Q
(for post-installed see test results)
0.00 kips eq 17.4.3.1, pg 241 (hooked bolt see 17.4.3.5)
0.00 kips eq. 17.4.3.4, pg 242 Pull-out = 9.145 kips, from Table
11.57 kips ( NpnExp. Anchor) =�ucp"Np = 11.57 kips
11.57 kips Nn = 9.14
0 kips eh = 0 in
ca1 = 6.75 ca2 = 6 s= 18 in.( Distance to edge)
16.88 in., then not applicable
0.00 kips eq. 17.4.4.1, pg 242 (See ACl 355.2 for post installed anchors)
0.00 kips pg 242 Use Nsb = 11.57
16.71 kips eq. 17.4.4.2, pg 242 Use Nsbg = 16.71
1(if grout w/ cast-in headed bolt use .8, otherwise 1.0), 17.5_1.3
1(use p= 1,sleeves not in shear plane use .6)
10.30 kips eq. 17.5.1.2b, pg 246 Vn = 10.30
Ca1 = 6.75 Ca2 = 1.5*Ca1 = 6
Use: 1.30 D-39, pg 458 (not less than 1)
Shear Parallel to edge (2 otherwise 1) 2 77.5.2.1(c), pg 248
Avco = 4.5*ca1^2 = 205 in^2 eq. 17.5.2.1c, pg 248
Avc = ha*(1.5'(ca1+s2)*2+s1)= 122 in^2 (verify with bolt configuration)
If Ca2< 1.5*Ca1, ha = 1.5'`Ca1 otherwise 1.5"Ca1 max
Nearedge: Avc=ha"`(1.5(ca1+s2)+(ca2.1+s1))= 122 in^2 Ca2.1 = 10.13
lemax =8*do= 5.00 Use le = 4 see D62.2 or fe = 2*do for torque controled Exp. Anchors
Vb=7*(I/do)^.2"do^.5*fc'^.5"ca1^1.5= 8.90 kips eq. 17.5.2.2a, pg 251 Use Avc = 122
Vcb=(Avc/Avco)"`W6'U�7'4�8*Vb= 13.75 kips eq. 17.5.2.1a, pg 248
Group, Vcbg=(Avc/Avco)*w5"w6*w7*4�8"Vb= 13.75 kips eq. 17.5.2.1b, pg 248
Use V= 13.75 kips Vn = 10.30
`�c
Chapter 17
Y
�
�
O
Q
a
�
�
a�
n
d
� �
� �
�
J �
0/�/� c
.�
W O
m
O �
U W
i
Z N
Q a:
� �
• •
O
t+)
O
�' vi tn tn v�
aaaa
YY.YY
O
N II ��Oc'�
N C M�- N o0
.� � � � O O
� N
.�
� V' c'� N 1� � I� �t
� � N a0 O C'� � �
�` CO N N'ct M c! �f3
U
� Cfl �1' Ln O �1' �
� � '� � � ti � �
N
'� � �l' � OD CO OO �
�
fi1 O N �^
7 ci � d�" 0'�0 � � O
Ll � � � � 0 0 0
O N � T
� d' II II II (I d '� 00 CD o0
N r C C � � � � � � � � � � � � 00
V � � Z� Z � � �p � i1i I� � Cfl ao �
`1 = U
a� O o
�v OU
�
o��
� N N
nG'Q' N
� c0 .Q N � v�i
e- � OI N N
M M fl' ��
49 c0 �r r C. O.
� t� !� e- e- e- N
n1 �� M M CD GO
�� a' 1� I� f� I�
a d d � � � �
I I
�
LL.
y
a
:Y
W
�
�
u
�n �n �n �n �n � � c� c� �
� t I� CO Cfl CO CO (O Cfl QO N pp
Q" O O O O O O O O CV N�
f0
Q' O
M Q
II II �
� C �
(A (� fn f4 UJ fA tn Z Z T-
o. g n n a a a a.
�;C 1 Y �1 .Y .Y .Y d
N
r��� M ti N N O r
r op 11
c. �. a a n. n. a n. � a' � cfl o� ad o rn Y n
�L Y �G �C �G Y �1 ..Y � O Y
NN N Nom00o�0 � �
0000 00� V � L II II II II II II II II II C>O
O � � c c� c c� c r� o
,� ZZzz»»>.or�
II II II II II II tl � II II � m
Q. ..fl CT � ++ ++ C � � C C �
U U .Q O O
�cZ U .Q��Z a.>Z N Q «
a? c� m.c � a� r.c c ...
Y cni' >Z aa� an.l; � c`!
�
Y G N N m � ^
�Q II � N � � � �
C � 7 : r * � �
� � .n � z � �t N 'd: «S
M � v� M� S M
O
ui U 2 v d: � ��ri
~ o � � •.• __ ►�
� z N o� .c -- c �.c �
�. c � � o �i �
� � � i � � N t� C �
c
L
�
N
�
a� a �
o �' o G
a '�n m �
�, o
d V
L �
V L
c �
U �
_ � � � y � � �
00 a� y i� s fq `
6ii N 7� v � 3 tn
d Y 3 LL ` S�C 7
I- � o y � �v o
= L � '° � �
�jj �mma'v��ma
(n °: a' :: s c' .°:
� � C i L L N � i
o :.i � � � �
a�
t� Z U U V N U U
11 II
Z �
Z -Q
+ �
= O
3 Q
�
11
Gf
c
:a
0
V
a�
rn
�
N
�
(6
�
a�0i
�
0
C
Q
z
�
�
.•
consulting engineers
1900 W Emerson Place �200 Seattle, WA 98119
�� -- i.,��� .,�. ...,. _ �... � ....... ..... ....,,.
//' �
�. ; .
Job No.��'��`�2G� Sheet �.f� Of
Client:
Project: !'�� - �
Sub ject: �
ANCHOR BOLTS
(ACI 318 2011, Appendix D}
PROJECT: BOEING 9-99
ITEM LN2 Tank - Fence
LOADS: Shear, Vu =
Tension Nu =
or phi per phi,tension, steel =
ESR reports phi, shear steel =
Concrete seismic mode .75,
ver. 9/16/13
eisi
CONSULTING ENGINEERS
PAGE 1/4
DATE 16-Nov-15
JOB NO. 14-142Q
1.28 kips
8.20 kips
0.65 D4.3, pg 434 Conc. Mode phi = 0.7
0.6 D4.3 Conc. Mode phi = 0.7
1 D3.3.4,4 pg 426 Inv. Omega or Brittle = 1 D3.3.4.3-d, pg. 426
Anchor bolt: Grade KBTZ-SS futa = 115 ksi (not to exceed '125ksi or 1.9*Fy} '
Fy = 92 ksi 174.8 ksi (1.9''Fy}
Size, dia., da = 0.625 in, Ase = 0.162 in^2 Ase = 3.14/4''(do-.9743/nt)^2
Embed., hef = 5 in ha min =3/2"hef = 7.5 in., per D8.5, pg 462 for expansion
for D5.2
D52
D6.2
Abrg = 0 in^2 (bearing area of head)
No. Shear AB, n= 4 No. Tension AB, n= 2
Anchor Spacing, s1 = 7.5 in s2 = 0 in (s2 in direction of load)
smin = 4*da or 6*da for torque or post installed smin, see D8.1, pg 462
Post-Installed cmin = 6"da,undercut
5 cmin = 8'`da,torqued controlled =
625 cmin = 10*da,displacement controlled
Edge dist_, cac = 6.75 in. critical cac, see D8.6, pg 463 (4''hef except undercut anchors}
post-installed (see tested data): undercut, cacmin =2.5*hef
torque-controlled, cacmin = 4"`hef
Per D8.3, pg 462 cast in: non torqued, min edge distance = min cover per ACI, Section 7.7
adhesive, cac = 2`da
ha = 12 D8.5, pg 462, hamin =1.5*hef = 7.5 in.
camin = 2 in. cmin = 3.5 in_
ca1(in direction of shear) = 6.75 in. for D6.2 6.75 in.
ca2 (in orthogonal Direction) = 6 in., other ca2 = 6 in (1.5*heflmax
ca2 (in orthogonal Direction) = 10.13 in., other ca2.1 = 6 in (1.5"Ca1)max
eN (tension eccentncity) = 0 in. eV(shear eccentricity) = 0 in.
Appendix D
7.5
10.13
. � `
ANCHOR BOLTS
PROJECT: BOEING 9-99
kc =
Concrete strength , fc' _
Modification Factors:
U�ec,N w1=1/(1+2'`eN/3/he� _
wed,N w2 =.7+.3'`camin/1.5/hef =
U�c,N w3 =
wcp,N U�4 =
wc,P �_
wec,V w5 = 1/(1+2*ev/(3"ca1)) _< 1.0
U�ed,V w6 = .7+.3*ca2/1.5/ca1 =
wc.V w7 =
4�h,V �8 =(1.5*Ca1/ha)^.5
Nominal Bolt Tensile Strength: (D5.1)
Nsa = n'Ase*futa =
Concrete Breakout Strength: (D5.2)
ca1 =
Anco =9*hef"2 =
Anc =(ca1+s1+1.5*hefl*(2*1.5*hef+s2} _
Anc =(2*Ca1)*(2*Ca2) _
Anc =(ca1+s2+1.5"hefl`(ca2.1+ca2+s1) _
Not to Exceed Nb = kc*(fc)^.5"hef^1.5 =
for 11<hef<25, Nb = 16*(fc)^.5'hef^1.67 =
Nb =
Ncb = Anc/Anco"`w2"�3#W4"Nb =
Ncgb = Anc/Anco"4� 1 *4�2*U�3*w4'`Nb =
Use Nn =
eisi
CONSULTING ENG/NEERS
DATE 16-Nov-15
PAGE 2/4
LN2 Tank - Fence JOB NO. 14-142Q
17 D.5.2.2 (24 for cast in & 17 for post installed), pg 438
4000 psi
1.00 eq. D-8, pg 440
0.78 eq. D-10, pg 441 if camin<1.5*hef, otherwise 1, W2 = 0.78
1.00 D.5.2.5, pg 441 (125 for cast-in & 1.4 for post-installed) (1.00 per ESR)
1.00 D-12, D.5.2.7, pg 442 (1.0 max.)
4�4=1.0 if camin=>cac eq D-11, pg 442 0.30
4�4=camin/cac => 1.5*hef/cac if camin<cac eq D-12 0.30
1.00 D.5.3.6, pg 444 (1.4 for no cracking, otherwise 1)
1.00 D-36, D.6.2.5, pg 456 Use 1.00
0.88 eq D-38, D.6.2.6, pg 457 or 1 if ca2=> 1.5"ca1 Use 1.00
1.20 D6.2.7, pg 457 ( use 1.4 for no cracking) (1.2 w/ #4 rebar @ edge)
0.92 D6.2.7,pg 458
37.26 kips eq. D-2, pg 436
(verify hef if ca < 1.5�hef on 3 sides), D5.2.3, pg 439
6.75 in
225 in^2
326 in^2
162 in^2
278 in^2
12.02 kips
16.64 kips
12.02 kips
13.58 kips
13.58 kips
13.58 kips
(1.5 hef max.)
eq. D-5, pg 437
(verify with bolt layout)
Narrow wall
Near edge:
eq. D-6, pg 438
eq. D-7, pg 439
eq. D-3, pg 437
eq. D-4, pg 437
Appendix D
pg 438
Use: Anc = 326 (Group)
(single anchor}
(single anchor)
Nn = 13.58
• � r
ANCHOR BOLTS
PROJECT: BOEING 9-99
Concrete Pullout Strength: (D5.3)
Single Anchor Not to exceed; Npn =U�cp*Np =
(headed stud) Np max =Abrg"8*fc' _
Use Np/bolt =
Group Np =
Hooked anchor see pg 427
Concrete Side Face Tension: (D5.4)
for hef<2.5*Ca1 =
Nsb = 160'`ca1*(Abrg)^.5*(fc}^.5 =
If ca2<3*ca1, Nsb*(1+ca2/ca1)/4 (up to 3*ca1 max.)=
Group, Nsbg = (1+s/(6"ca1))'Nsb =
Steel Shear Strength: (D6.1)
grout base, g =
Non headed bolts or post-installed' p=
Vsa =.6*(n"Ase,v�futa"p)"g=
Concrete Breakout Strength in Shear: (D6.2)
LN2 Tank - Fence
eisi
CONSULTING ENGINEERS
DATE 16-Nov-15
PAGE 3/4
JOB NO. 14-142Q
(for posi-installed see test results)
0.00 kips eq D-13, pg 443
0.00 kips eq. D-14, pg 444 Pull-out = 9.145 kips, from Table
11.57 kips ( NpnExp. Anchor) =U�cp"`Np = 11.57 kips
23.14 kips Nn = 13.58
ca1 = 6.75 ca2 = 6 s= 6 in.( Distance to edge)
16.88 in., then not applicable
0.00 kips eq. D-16, pg 444 (See ACI 355.2 for post installed anchors)
0.00 kips D.5.4.1, pg 444 Use Nsb = 11.57
13.28 kips eq. D-17, pg 445 Use Nsbg = 13.28
1(if grout w/ cast-in headed bolt use .8, otherwise 1.0)
1{use p= 1,sleeves not in shear plane use .6)
44.71 kips eq. D-29, pg 450 Vn = 44.71.
Ca1 = 6.75 Ca2 = 1.5"`Ca1 = 10
Use: 1.00 D-39, pg 458 (not less than 1)
Shear Parallel to edge (2 otherwise 1) 1 D6.2,1c, pg 451
Avco = 4.5"ca1^2 = 205 in^2 eq. D-32, pg 451
Avc = ha'`(1.5*(ca1+s2)*2+s1)= 333 in^2 (verify with bolt configuration)
If Ca2< 1.5*Ca1, ha = 1.5*Ca1 otherwise 1.5*Ca1 max
Nearedge: Avc=ha*(1.5(ca1+s2)+(ca2.1+s1))= 284 in^2 Ca2.1 = 6
lemax =8#do= 5.00 Use le = 4 see D6.2.2 or le = 2''do for torque controled Exp. Anchors
Vb=7"(Ildo)^.2*do^.5*fc'^.5*ca1^1.5= 8.90 kips eq. D-33, pg 454 Use Avc = 284
Vcb=(Avc/Avco)'`�6�`�V7*4�8'Vb= 14.79 kips eq. D-30, pg 451
Group, Vcbg=(Avc/Avco)"`�u5"�6*U�7'w8*Vb= 14.79 kips eq. D-31, pg 451
Use V= 14.79 kips Vn = 14.79
Appendix D
ANCHOR BOLTS
PROJECT: BOEING 9-99
Concrete Pryout Strength: (D6.3)
LN2 Tank - Fence
eisi
CONSULTING ENGINEERS
DATE 16-Nov-15
PAG E 4!4
JOB NO. 14-142.Q
kcp = 2 D.6.3.1 (kcp =1 for hef < 2.5, otherwise 2.0)
single Vcp = kcp'`Ncb = 27.17 kips eq. D-40, pg 460 (from D5.2)
group Vcp = kcp*Ncbg = 27.17 kips eq. D-41, pg 461 Vn = 14.79
Interaction: (D7) Vua/bolt = 0.32 kips Vn =
Nua/bolt = 2.05 kips Nn =
phi*Vn = 8.87 kips D4.1.2, pg 415 Vua=
phi'Nn = 9.51 kips D4.4.2 Nua =
For No Combination Required
If Vua<.2*phi*Vn = 1 kips D.7.1, pg 461 Combine
If Nua�.2'phi*Nn = 1.24 kips D.7.2, pg 461 Combine
USE: 5/8" dia. Hilti "KB-TZ" SS Anchors w/ 5 in. emb.
Summary phi Capacity
Nominal Bolt 7ensile Strength: (D5.1) Nn = 37.26 kips 0.65 24.22
Concrete Breakout Strength: (D5.2) Nn = 13.58 kips 0.65 8.83
Concrete Pullout Strength: (D5.3) Nn = 23.14 kips 0.65 15.04
Concrete Side Face Tension: (D5.4) *, cast in A. B. Nn = 13.28 kips 0.65 8.63
Steel Shear Strength: (D6.1) Vn = 44.71 kips 0.6 26.83
Concrete Breakout Strength in Shear: (D6.2)' Vn = 14.79 kips 0.6 8.8.7
Concrete Pryout Strength: (D6.3) Vn = 27.17 kips 0.6 16.30
Vu = 1.28 Nu = 820 '
*NA if not near slab edge Vn = 8.87 Nn = 8.63
Combine = VuNn +Nu/Nn = 1.09 OK <= 1.2 eq D-42, pg 461
Allowable Va = 6.34 kips Allowable Ta = 6.16
Appendix D
14.79
13.58
1.28
8.20
kips
kips
kips
kips
OK
OK
Formula Seismic Brittle
D-3 2422
D-4/5 8.83 8.83
D-14 15.04 15.04
D-9 8 $.63 8.63
D-19/20 26.83
D-21 /22 8.87 8.87
D-30/31 16.30 16.30
kips FS = 1,4
:R � 4
4/3/2017
Clty Of TL�kWlZa Allan Ekberg, Mayor
Department of Community Development Jack Pace, Director
JOHN S MURDOCH
PO BOX 3707 MC 46-88
SEATTLE, WA 98124
RE: Permit No. D 16-0154
BOEING #9-99
9725 EAST MARGINAL WAY S
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 5/7/2017. •
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Officia} and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
I� the event you do not call for an inspection and/or receive an extension prior to 5/7/2017, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
�/l/ '
ac el e i ley
Permit Technician
File No: D16-0154
6300 Soutlicenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
11/1/2016
City of Tukwila Allan Ekberg, Mayor
Department of Community Development Jack Pace, Director
JOHN S MURDOCH
PO BOX 3707 MC 46-88
SEATTLE, WA 98124
RE: Permit Application No. D16-0154
BOEING #9-99
9725 EAST MARGINAL WAY S
Dear JOHN S MURDOCH,
In reviewing our current application files, it appears that your permit applied for on 6/10/2016, has not been issued by the City of
Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or
National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become
null and void. Currently your application has a status of APPROVED and is due to expire on 12/10/2016.
If you still plan to pursue your project, you are hereby advised to do one of the following:
1) If the plan review is complete for the project and your application is approved, you may pick up the application before
the date of expiration. At the time of permit issuance the expiration date will automatically be extended ] 80 days.
-or-
2) If the plan review is not completed submit a written request,far application extension (7) seven days in advance of the
expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your
application.
The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension
request is granted, you will be notified by mail.
In the event that we do not receive your written request for extension or request is denied, your permit application will expire and
your project will require a new permit application, plans and specifications, and associated fees.
Thank you for your cooperation in this matter.
Sincerely, �����
�
C -�1�
Bill Rambo
Permit Technician
File No: D16-0154
6300 Southcen.ter Boulevard Suite #100 • Tukwila Washington 98188 � Pho�ie 206-431-3670 • Fax 206-431-3665
PE���i G�4��a COP� �
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D16-0154 DATE: 06/10/16
PROJECT NAME: BOEING #9-99
SITE ADDRESS: 9725 EAST MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
DEPARTMENTS:
�� Av�c� �o�� � ��
Building Division
.JJ s �la (o � ��• ��
Public Works
Revision #
Revisiou #
q�y� ,�1G �.2�-I �
Fire Prevention �
Structural �
before Permit Issued
after Permit Issued
�� �'� (�•�b•�b
Planning Division �
Permit Coordinator ❑
PRELINIINARY REVIEW: DaTE: 06/14/16
Not Applicable ❑
(no approval/review required)
REVIEWER'S INITIALS:
Structural Review Required �
DATE:
APPROVALS OR CORRECTIONS: DUE DATE: O7/i2�iC)
Approved ❑ Approved with Conditions d
Corrections Required ❑
(corrections ef�tered iri Reviews)
Notation:
REVIEWER'S INITIALS:
Denied ❑
(ie: Zonirrg Issues)
DATE:
Pern:it Ceitler Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
ivisnoia
BOEING COMPANY, THE
Hotne i:spaiiol t;onts.ict.
5afety & Health
Washi�gtan State Department crf
��bar 8c I�dus�r'�es
�
BOEING COMPANY, THE
Owner or tradesperson
MCNERNEY, W (JAMES)
Principals
MCNERNEY, W (JAMES), PRESIDENT
LOHR, MICHAEL, SECRETARY
WOLTER, CHRISTOPHER, TREASURER
(End: 01 /16/2015)
READ,PAUL,SECRETARY
(End: 02/07/2013)
SHRONTZ, F A, SECRETARY
(End: 02/07/2013)
GIVAN, B E, SECRETARY
(End: 02/07/2013)
KING, C G, SECRETARY
(End: 02/07l2013)
BEIGHLE, D P, TREASURER
(End: 02/07/2013)
COLLINS, T J, TREASURER
(End: 02/07/2013)
BUDINICH, T M, TREASURER
(End: 02/07/2013)
WOODARD, R B, TREASURER
(End: 02/07/2013)
CRUZE, D D, TREASURER
(End: 02/07/2013)
CONDIT, P M, TREASURER
(End: 02/07/2013)
Page 1 of 9
Search L&I ��;�:s
A-1 Index llelp My T.,Szl
Claims & Insurance Workpiace Rights Trades & Licensing
700 N RIVERSIDE
M/C 5003-4027
CHICAGO, IL 60606-1596
312-544-2535
WA UBI No. Business type
178 005 030 Corporation
License
Verify the contractor's active registration / license ! certification (depending on trade) and any past violations.
Construction Contractor Active.
......................................................
Meets current requirements.
License specialties
GENERAL
License no.
BOEINC*294ML
Effective — expiration
07/13/1971— 01/18/2017
Bond
FEDERAL INS CO
$12,000.00
He6p us imprave
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=178005030&LIC=BOEINC*294ML&SAW= 11/8/2016
BOEING COMPANY, THE Page 2 of 9
Bond account no.
81312466 .
Received by L&I Effective date
01/14/2002 01/01/2002
Expiration date
Until Canceled
Insurance
......................
Ace American Insurance Company $1,000,000.00
Policy no.
HDOG27854990
Received by L&i Effective date
10/05/2016 70/0112016
Expiration date
10/01/2017
Insurance history
Savings
.......
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the�tiond��or savings accounts during the previous 6 year period.
L81 Tax debts
No C8l tax debts are recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
License Violations
......................................
No license violations during the previous 6 year period.
Workers' comp
Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums.
This company has multiple workers' comp accounts.
...._ _.. _ .._ ........... .... _...... ..... ........ ..,. .._ _....._ . . ..._ ...._ _ ...._......... ...... .. ... ........ .,.... __................
Active accounts
.............................
L&I Account ID Self Insured.
700,216-00 This business is certified to cover its own
workers' comp costs. No premiums due.
Doing business as
BOEING COMPANY THE
Estimated workers reported
N/A
L&I account representative
(360)902-4817
Track this contractor �,
Workplace safety and health
Check for any past safety and health violations found on jobsites this business was responsible for.
Inspection results date
10/04/2016 Violations
Inspection no.
317942065
Location
3003 W Casino Rd
Everett, WA 98203
Inspection results date
09/09/2016 No violations
Inspection no.
317941079
Location
2400 Perimeter Rd
Auburn, WA 98001
Help us imprave
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=178005030&LIC=BOEINC*294ML&SAW= 11/8/2016
1 I\VULIiI
WORK
LOCATION
�TlC � rTi�T��`1 �
��������
�
����� �� �E�����
� . ���
� �„� �� �,mu.�� � ����� � � �a�� � ��� �
, i ! ��� � �n ` ��, �,,„� ��� �" �
� ;
� �,�� � �� ���� �w
��'� �� �� �� � � ;
�� �� �n� hs �
�� � � �. ..�� . � _ �
!� �.� � ��,' ' � y� % � . �� ��,� : „�
��
. � py ,, �
+ �!^ �' � � ' �� �� � �� �a� Y " � -� � .. ,a � � �° ��. � � � � � .....✓�.
�'� ,� � � � _' � � �' � � �� � � �
��
� � �� �� �� �..�..� m
n
•``��*, �,
� � i j� ! � �"
��.�......�.. >
� �
SYM I REVISIdN
— ORIGINAL ISSUE
( BY ' APPROVED I DATE I SYM
W3469099 EISI TWH 05.16.16
�4 � � oar4��.� � �� 3 W��° e� � � ��� . �� ����y� ._� � � � �!� Ww� *�� �:� �.�� �:�
, ��
� ..�,�� . r�
�
�
CODE SU�l1M�lRY
TYPE OF APPLICATION: ❑ NEW ❑ ALTERATION ❑ ADDITION TENANT IMPROVEMENT
PROJECT DESCRIPTION:
PROVIDE FOUNDATION AND SUPPORTS FOR TWO OWNER–FURNISHED LN2 TANKS AND
MISC EQUIPMENT. COORDINATE INSTALLATION WITH TANK SUPPLIER. PROVIDE LN2 PIPING
FOR LIQUID AND GASEOUS NITROGEN. TEST ALL TANK/PIPING. PROVIDE MISC. UTILITY
CONNECTIONS AND EXISTING UTILITY RELOCATION. ASSIST WITH INITIAL TANK/PIPE FILL.
LAG NEW OWNER FURNtSHED EQUIPMENT AND PROVIDE SUPPORT UTILITIES INCLUDING
COMPRESSED AIR, COOLING WATER, LN2, GN2, POWER & DATA.
CODES:
2012 INTERNATIONAL BUILDING CODE 8� WAC 51-50
2012 INTERNATIONAL MECHANICAL CODE & WAC 51-52
2012 INTERNATIONAL FIRE CODE & WAC 51-54
2012 UNIFORM PLUMBING CODE & WAC 51-56
2012 UNIFORM PLUMBING CODE AMENDMENTS A, B 8� I& WAC 51-57
2014 NATIONAL ELECTRIC CODE, AMENDMENTS A, B& C& WAC 296-46B-010
2012 WASHINGTON STATE ENERGY CODE WAC 51–II
CURRENT CITY OF TUKWILA ZONING ORDINANCES
CONTRACTOR 8� STATE NUMBER; THE BOEING COMPANY (BOEINC *294ML I/18/2017)
BOEING PROJECT ENGINEER:
PROJECT DESIGNER/ARCHITEC:DOUGLAS CONDIT/EISI PHONE; 206-284-1181
BOEING CONTACT; JOHN MURDOCH PHONE: 253-740-0214
FAX NUMBER: 253-657-0858
E–MAIL: lohn.s.murdoch@boeinq,com
OCCUPANCY GROUP: GROUP B& GROUP F-2 (OFFICE & FACTORY)
CONSTRUCTION TYPE: TYPE II, NON—COMBUSTIBLE
ZONING:ALLOWABLE AREA �NCREASE:
OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE
(TABLE 10—A)
OFFICES —
STORAGE _
LABORATORY
GANOPY _
OTHER
OCC. BLDG GROSS
OCC. TUNNEL —
OCC. FIRST FLOOR
OCC. 2ND FLOOR
OCC, PENTHOUSE
PROJECT AREA
67,799 SF SQ FT
SQ FT
59,292 SF SQ FT
4,082 SF SQ FT
4,425 SF SQ FT
– SQ FT
3,200 SF SQ FT
BUILDING HEIGHT: (ACTUAL) 44 FT
STORIES; 3 MEZZANINE ?❑ (YES) (NO) SQ FT
FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NFPA 13 ? (YES� ❑(N0�
SEPARATION
EXTERIOR WALL (NON—BEARING) HOUR RATING
EXTTERIOR WALL (BEARING) HOUR RATING
INTERIOR WALL (NON—BEARING) HOUR RATING
INTERIOR WALL (BEARING) HOUR RATING
DEMOUNTABLE PARTITIONS HOUR RATING
STRUCTURAL FRAME HOUR RATING
FLOOR/CEILINGS HOUR RATING
ROOF CONSTRUCTION HOUR RATING
„ „
SEISMIC DESIGN: ZONE �
DESIGN LOADS: (CHAPTER 16)
ROOF: LIVE (SNOW)
FLOOR: OFFICE
MECH/STOR
STAIRS
CONCENTRATED:
WIND: EXPOSURE I10 MPH, EXPOSURE C
REVISION BY APPROVED
DATE
(PSF)
(PSF)
(PSF)
(PSF)
��� m ��� ��i
� � � � . }y, � �'"r� +�
PERMIT
SET
GE�IERAL i�OTES
A CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY THE CITY OF TUKWILA
BUILDING DEPARTMENT MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH
CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS.
1. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING
DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS WITHIN THE AREA OF WORK
BEFORE COMMENCING ANY WORK AND ENSURE THAT THE JOINING OF THE WORK OF
VARIOUS TRADES MEETS APPROPRIATELY. THE CONTRACTOR SHALL BRING DISCREPANCIES
ON THE DRAWINGS OR SPECIFICATIONS TO THE ATTENTION OF THE BOEING PROJECT
CONSTRUCTION MANAGER IMMEDIATELY UPON DISCOVERY ONLY IF THEY REQUIRE DESIGN
REVISIONS.
2. COORDINATE THE WORK OF ALL TRADES. REFER TO ARCHITECTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS IN DETAIL FOR COORDINATION OF SPECIFIC TRADE
REQUIREMENTS. COORDINATE ALL ROUGH–IN REQUIREMENTS FOR MATERIALS OR
EQUIPMENT FURNISHED BY CONTRACTOR OR BY OTHERS FOR THIS PROJECT.
3. ASBESTOS NOTIFICATION: A GOOD FAITH SURVEY OF THE WORK AREA HAS BEEN
CONDUCTED AND ASBESTOS CONTAINING MATERIAL WAS NOT DISCOVERED OR WILL BE
REMOVED PRIOR TO THE BEGINNING OF THE WORK FOR THIS PROJECT. A COPY OF THE
REPORT OF THE SURVEY WILL BE FURNISHED TO THE CONTRACTOR AT THE TIME OF BIDDING
OR NEGOTIATIONS. DO NOT REMOVE, DAMAGE OR DISTURB ANY ASBESTOS MATERIAL
ADJACENT TO THE WORK AREA. CONTACT BOEING FACILITIES DEPARTMENT IF ASBESTOS
CONTAINING MATERIAL IS DISCOVERED OR DAMAGED THAT IS REQUIRED TO BE REMOVED TO
SUPPORT THE WORK OF THIS PROJECT.
4. THE GENERAL CONTRACTOR SHALL OBTAIN AND MAINTAIN A FULL SET OF
CONSTRUCTION DOCUMENTS ON SITE. THIS SET SHALL BE MARKED UP (RED–LINED)
DAILY WITH ANY ACTUAL WORK OR INSTALLATIONS DIFFERING FROM THE CONSTRUCTION
DOCUMENTS. SAID SET SHALL BE TURNED OVER TO THE BOEING CONSTRUCTION
PROJECT MANAGER AT THE COMPLEfION OF THE WORK FOR INCORPORATION INTO BOEING
RECORD DOCUMENTS.
L.
��y�°� WAS
4�.Fii� 1�.�l4.
� � 15820 �'�i' ,F�
�� c�RAL ��'� s1�'v
SSjONAL �`—
_ _ _ _ _ _ _ _ __ _ _
> ����'',' ,�� `�
P�+.����� - �
�IQ change� ���� b¢ �����_ �� �����
pla�s �.►ithout ��o��val fr�� th�
Pb�nning ������o� o� ���
,���proved � : L
! �'�'��: . ; "--
.�—, -
SC ��p FOR:
t3EQ
Mechanica!
Electrical
lumbing
Gas Pipistg
City of Tukw11a
Qi }t� t�tNG D1VISl01
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFlCATION IS APPROVED
'PROVED BY DEPT. DATE
S��
PERMIT MASTER
COD�S Ai�ID PER�iITS
PROJECT TITLE: INSTALL NEW LN2 TANK �JOB N0: W3469099
QUANTITY SUBMITTED:
5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT
❑ 4 SETS: TENANT IMPROVEMENT (NON—STRUCTURAL)
❑ 3 SETS: FIRE PROTECTION/SPRINKLERS
❑ 2 SETS: TENANT IMPROVEMENT (REVISION)
SUBMITTED FOR PERMIT & REVIEW:
❑ BUILDING ❑ GRADING ❑ ELECTRICAL �E
❑ PLUMBING ❑ LANDSCAPE ❑ FIRE PROTECTION
❑ MECHANICAL �E ❑ DEMOLITION ❑ CANTILEVER RACKS
STRUCTURAL ❑ — ❑ —
� TO BE REVIEWED UNDER SEPARATE PERMIT
WASHINGTON STATE NON–RESIDENTIAL ENERGY CODE–APPROACHES
COMPLIANCE OPTION
❑ PRESCRIPTIVE ❑ LPA ❑ ANALYSIS N/A �
SPECIAL INSPECTIONS REQUIRED: .
❑ WELD CONCRETE
REBAR ANCHOR BOLTS
❑ STRUCTURAL BOLTING ❑ STRUCTURAL OBSERVATION
❑ OTHER
CALCULATIONS
TYPE: N �A ATTACHED (YES) (NO)
DRAWING NUMBER
09-99—AO
09-99-1Al2R
09-99—A515R
09-99-1Al2
09-99—A515
09-99—A516
DRAWING NUMBER
09-99—S599R
09-99—S599
09-99—S600
09-99—S601
09-99—S602
09-99—S603
09-99—S2E
DRAWIi\!G I��EX
ARCH ITECTU RAL - CIVI L
REV DRAWING TITLE
NEW COVER SHEET
R FLOOR PLAN — REMOUAL
NEW ARCHITECTURAL DETAILS — REMOVAL
M FLOOR PLAN
NEW ARCHITECTURAL DETAILS
NEW SECTIONS AND DETAILS
STRU CTU RAL
REV DRAWING TITLE
NEW PLAN — REMOVAL
NEW
A
NEW
NEW
NEW
NEW
PLAN
TANK FOUNDATION PLANS AND DETAILS
TANK FOUNDATION PLANS AND DEfAILS
�1SC. PIPING SUPPORTS
EQUIPMENT FOUNDATION PLANS AND DETAILS
STRUCTURAL NOTES
C1TY OF TUI��UILA
BLANKET PERMIT AGREEMENT NUMBER: 16-001–BPA
� �� oQ • 1
Flan r��i�t,v �a,�p�ov�1 i� �ubj��t to errors and ami��inr��.
i�ppPoval �f �on �'�10�1 d0�t1PYT�3�ifg dQ�3 R0� BLi�tilQYf?8
�he ��i�i�ii�� �f �� �da �ad e�d� �r ordinanee. R�c�i�i
of appro��d �i Id py nd �ondi�ions is ac�ir►vwled�d:
�v: �����i�'_.__--� C1������������f'
City � ��k�ri(�
BUILD[I�G DIVISEO�
-`–`A REVISIONS
es sha11 be made to thP scopP
No chang rior approval of
of work �vithout p p�vision.
Tu4:wila Buildin9 �an submittal
�`�TE� mav� ncfude�'add'►�t o'nai plan review fees.
and Y _
RECEIVED
CiTY OF TUKWILA
JUN 10 2016
•,,. •..f. ,1 ..*,.,,, ., ....
� � ' •
��Y.1 � 2Q�7;
PROJECT T I TLE :INSTALL NEW LN2 T�NK
cuRREKr�346909g SYMBOLO R I G
COVER SHEET
SHEEf
INSTALL NEW LN2 TANK �O
B U I L D I N G 9-99 JOB N0.
W3469099 =k�
DEV. CENTER, �Iq °wc No. 09-99–AO
05.16.15
�
�-
�
�
0
�
rn
0
N
�
0
�
z
_
��
2.5
„��
w
J
�
Q
Z
0
Q
�
�
0
�
�
z
�
LEGEND:
�
� NON SPECIFIC, NOTE APPLIES TO ROOM
� SPECIFIC, NOTE APPLIES TO SPECIFC ITEM
--- DENOTES WALL TO BE PAINTED, SEE
CORISPONDING FLAG NOTE.
CONSTRUCTION NOTES:
1� AFTER REMOVAL OF EXISTING FENCE MOUNTED
RECEPTACLES, LIGHTS & CONDUIT/WIRE. REMOVE
FENCE. CUT BOLTS FLUSH WITH FLOOR AND
GRIND SMOOTH.
SYM
L
R
C
D
E
KEY PLAN nI
SCALE: NONE I v
RE�/ISION
ROBOTIC 50 KIP TENSILE TESTER
INSTALL NEW LN2 TANK
B16 LAB (PERMIT PACKAGE)
B1 B LAB (CONSTRUCTION PACKAGE)
B1 B LAB (PERMIT/CONSTRUCTION PACKAGE)
W1238730
W3469099
J#180015-06
J#180015-06
J#180015-12
BY
ABKJ
EISI
GMM
GMM
GMM
APPROVED
TWH
DATE
09.28.12
05.16.16
11.03.98
11.17.98
11.25.98
SYM
F
G
H
J
K
REVISION
EXTRS: 21-03 R& E STORAGE RELOCATION
EXTRS: 21-03 R& E STaRAGE RELOCATION
RELOCATE GRAPHIC DESIGNERS
WAT LAB
RELOCATE LOCK & KEY
J#180138-00
J#180138-00
J#130413-00
J#130433-02
J#8534391
aY
MRM
MRM
TWH
TWH
LMC
APPROVED
DATE
04.07.99
06.03.99
11.14.03
02.03.04
04.27.09
,� � � � e=,
���
.: : �i�����a�����' t 3' � .n# ���.,�� ��.
L• co ACCEPTABILITY EDDIE P. DUARTE
hASxj�lii�� THIS DESIGN AND/OR CHECK D
��o SPECIFlCATION IS APPROVED T.H�AN SON
� (aPPROVED BY DEPT. DATE T.HANSON
_,��
j�NAL �
--- ���,fl�
SUBTITLE
12.18.96 � �
� REFER TO DRAWING S599R FOR DEMOLITION
WORK IN THIS AREA.
� UNLAG ANY ANCHORS ON VIDMAR TOOL CABINEI�.
CUT BOLTS FLUSH WITH FLOOR AND GRIND
SMOOTH.
� REFER TO DWG. S599R FOR DEMOLITION FOR
NEW EQUIPMENT FOUNDATION.
■ � � ■ v ■ � v �,
FLOOR PLAN - REMOVALS
INSTALL NEW LN2 TANK
BUILDINC 9-9�.1
ARCHITECTURAL MASTER COL. E—G/1-4
R�VI�y�r�4 F
�� A������� �E
�����D
, ���� 2 4 1016 �
BU�LDl��Tu�ita
�IVISlON
•• .�,r •,f � ,
� �:
��� i �� za ,
�� RECEIVED
CiTY OF TUKWILA
JUN 10 2016
CENTER
PERMIT
SET
� �. ���f, �. t
�`
� �a��� � �',
• :•
� � � , � • ;
05.16.16
SHEET
1 Al2R
JOB N0. COMP N0.
W1238730
DWG N0.
D.C. 9-99-1Al2R
�
�
�
0
�
rn
0
�
N
�
Z
O
N
Z
Q
S
��
2.5
w
J
N
Q
Z
0
Q
�
�
0
�
�
z
�
LEGEND:
� NON SPECIFIC, NOTE APPLIES TO ROOM
� SPECIFIC, NOTE APPLIES TO SPECIFC ITEM
--- DENOTES WALL TO BE PAINTED, SEE
CORRESPONDING FLAG NOTE.
CONSTRUCTION NOTES:
� LAG NEW ZWICK N�ACHINE. REFER TO DWG. S603.
SYM REVISION
L ROBOTIC 50 KIP TENSILE TESTER
M INSTALL NEW W2 TANK
C B1 B LAB (PERMIT PACKAGE)
D B18 LAB (CONSTRUCTION PACKAGE)
E B1B LAB (PERMIT/CONSTRUCTION PACKAGE)
BY
W1238730 ABKJ
W3469099 EISI
J#180015-06 GMM
J#180015-06 GMM
J�180015-12 GMM
APPROVED
TWH
DATE
09.28.12
05.16.16
11.03.98
11.17.98
11.25.98
SYM REVISION
F EXTRS: 21-03 R& E STORAGE RELOCATION
G EXTRS: 21-03 R& E STORAGE RELOCATION
H RELOCATE GRAPHIC DESIGNERS
J WAT LAB
K RELOCATE LOCK & KEY
BY
J#180138-00 MRM
J#180138-00 MRM
J#130413-00 TWH
J#130433-02 TWH
J�8534391 LMC
APPROVED
DATE
04.07.99
06.03.99
11.14.03
02.03.04
04.27.09
� � m ,�r ��� �f � �`���`��� ��� I�i
L• c0 ACCEPTABILITY EDDIE P. DUARTE
�Askt,1,� THIS DESIGN AND/OR HECKED
co SPECIFlCATION IS APPROVED T.N AN SON
:�,�(,t�3' � APPROVED BY DEPT. DATE T.HANSON
1562Q
°� ��rsx�
SSIONAL
S�BPnE
11TLE
12.18.96
ARCHITECTURAL MASTER
FLOOR PLAN
INSTALL NEW LN2 TANK
BUILDING 9-�9.1
COL. E-G/1-4
�
�
..�e�cvv�o FpR -
��t?DE COMPLIANC�
..
?� � ��Pf��'V�D
' JUN 2 4
' 2016 �
�V L ���D�tnrila
IV1SlON
. ;
• �
� ��
. . .
R �
1
�
� � �
�m.. � �. ` �►� � �
,� XS�'tW':��3fi;rCf�4?SS�v'�",�D°S�Sr.+��'St�i�n`�+�r,'t1�J^Q�'a'',.�'S'`A�'��"'?1�`"�I#N!�°+'A'��;'a��f,RCa�f��'.3
. � , �
�� � E �
2
I.URRCIVI RCVIJIVIV JIMOVL � ^ UHIC
W3469099 IVI 05.16.16
SHEET
1Al2
JOB N0. COMP N0.
W1238730
DiMG N0.
D.C. 9-99-1Al2
�
�!-
t0
rn
0
�
n
N
�
�
0
U
�
�
�
�t-
�'ri
�
0
\
rn
0
�
N
�
Z
O
N
Z
Q
2
_ _ _ _ _ -_ . _. _ _ .
P �AN � � _ _ _
. N
_ - -
SCALE. 1/4"= 1'-0" 1 Al2 S599 �— —
SYM I REVISION I BY I APPROVED I DATE I SYM I REVISION
- INSTALL NEW W2 TANK W3469099 EISI S. CHO 05.16.16
BY I APPROVED I DATE
�, , ��F �' ��� rx
,��� � .: �� °' ,�'� %� ` � " ����
�
L.
S
��ti °F WA`
4° �,��� �
�
. ACCEPTABILITY
� THIS DESIGN AND/OR
� SPECIFlCATION IS APPROVED
( PROVED BY DEPT. DATE
15820 � ,C�
'I�� ��,
)NAT. ��
t tp
EISI
41 t SUBTTTLE
10.28.15
STRUCTURAL MASTER
DRY WELL
2'-0"� CMP x4'-0"
FI LLED W/
1 1/2" GRAVEL
1
S599 S600
PLAN
INSTALL NEW LN2 TANK
BUILDING 9-9�.1
COL. E—G/1-4
GENERAL NOTES
1� AO SMITH #2630 FLOOR DRAIN.
2� ANCHOR W/ 4-1/2"� HILTI "KB—TZ" ANCHORS
W/ 3 1 /4" EMBEDMENT.
3� ANCHOR W/4-3/4"� HILTI "KB—TZ" ANCHORS W/
4" EMBEDMENT.
� ANCHOR TANK W/ 4-5/8"� HILTI "KB—TZ"
ANCHORS W/ 4" EMBEDMENT.
CONSTRUCTION NOTES
� INSTALL C.I.P. TRENCH OR PRECAST ALTERNATE.
2� TAKE PRECAUTION NOT TO DISTURB EXISTING
UTILITIES.
� INSTALL UTILITY SUPPORT, VERIFY WITH MECHANICAL.
� SEE MECHANICAL FOR LOCATION.
5� REPLACE CURB IF IT WAS REMOVED DURING
EXCAVATION. SEE DWG. S599R.
6. PRIOR TO STARTING CONSTRUCTION, VERIFY ALL
LOCATIONS AND DIMENSIONS OF EXISTING
FOOTINGS IN RELATION TO NEW PIPE TRENCH.
COORDINATE TRENCH AND VACUUM PIPE LENGTH
WITH MECHANICAL CONTRACTOR.
7� INSTALL DEIONZING SUPPORT FRAME.
8� PATCH PAVING TO MATCH EXISTING.
_�.�
REVIEWED FOR
� INSTALL NEW CONCREfE SLA .��p�+��}�It��.{A�l��
�qpp�OVED
JUN 2 4 2016
RECElVED
CITY OF TUKWILA
JUN 10 2016
PERtUIIT CENTER
PERMIT
SET
JOB N0.
DWG N0.
D.C.
0
Cify of Tukwila
�UlLDING Dl�/i���J�#
����� ���
������x���e
�599
W1238730 �
9-99—S599
05.16.16
u�a
�r
u-i
�
O
\
�
O
\
N
�
Z
O
�
Z
Q
_
�
I
�
rm. n.�rs�i�.�ma��
���
1
S599 S603
P LAN
SCALE: 1 /4"=1 '-0"
1
v
U
I �
� � ASSUMED LOCATION FOR
� I EXISTING 8" FIRE MAIN
� I
I I
� I
� I
� I
_�� I
o �
I
��
�x x I
II
o �
�-------� I
I I X I �
� ' � ' � i ASSUMED LOCATION OF
( I I I EXISTING 30" STORM DRAIN
I ,_ � � I
I i I I
I I �
� MICROBULK TANK � I I
�-------J I
� I I
x �
I I
�
O ( �
X
I I
I
x I
� I I
�—X X I
�•
�0 ;..��� �
; �
� .
, • • •' � \ `1 `\�\y�,��`'
�.\\S .,a
�
SECTION - MICROBU�{� TANK FOUNDATION
SCALE: 1 /2"=1 '-0"
SYM REVISfON
- ORIGINAL ISSUE
BY APPROVED DATE SYM
W3469099 EISI S. CHO 05.16.16
S601
�
REVISION
�
�
�
DRAIN PIPE
.,�
TRENCH
WIDTH
2
S599 S601
COMPACTED GRANULAR
BACKFILL (95% MAX. DENSITY)
COMPACTED BEDDING
WSDOT STD. SPEC.
9-03.12(3)
TRENCH �
SCALE: 3/4"=1'-0" S601
�
:����J:Zi�a�7
A
S�
11'-10"
#5 Q 1 �»
E.W., T �
0
I
�
O O O
EQ U I P M E NT LAYO UT P LAN
SCALE: 1 /2"=1'-0"
r� ;."� �,��.
:
.. �� � �
� o� ...�°�\�,,:
SEAL WITH HOT T� �
EXISTING ASPHALT
►'�.."' "" DOWEL C� 18"
W/ HILTI "HIT-RE 500-5D"
: W/ 6" EMBEDMENT
S LAB J 0 I NT �
SCALE: 3/4"=1'-0" S601
�
� � �i. GRAVEL FILL
� �,� -�� � � ��
� � .
� �
�� � ��� � � �•
` �: f• � \ � . � ,...� 1
� ��,� �,� �� ,�,� �
- t"� . � � � ho-e�a�, � � j1� � �� . V' ' � i � � � • ��
°��,� .jp � 1�l��� ,1�# + � � �
- � .c 1° � -.
� �� �
� • � ��
�'� ` URAL F�'1��,
SSIONAL ��
�/�. i4►
GROUND
GENERA� NOTES
CONSTRUCTION NOTES
1� INSTALL CONC. FTG. 1/4" HIGHER THAN ADJACENT
PAVING.
FENCE POST
3/16 V
TANK FND. REBAR
� a .
.: .� a-a :
. . -a
4d d ' a -
. �'d�'
. � .. ' IL
10"
I PL 10x3x0'-10" W/
(4)-5/8"� HILTI SS
� "KB-TZ" W/ 5" EMB.
.a
. o
I
� � ��� � �
�i�,�,�� '�'�� �#3x f� C� 16„
2-#4 T&B � � �2„
SQ.
TYP. FENCE POST BASE 3
SCALE: 3/4"=1'-0" A516 S601
CAUL
�ATED FELT
CO
�
�
S ECTI 0 N �
SCALE: 3/4"=1'-0" S601
�
�E,VIEVVI►E� F4R
�COD� CO �WE����
. �'�P�
v CUT ��� 2 4 20�6
TH. NEW ASPHALT
REQUIRED � Ciiy o�������
` �UILi�1������1���9�
COMPACTED GRANULAR
BACKFILL (95� MAX. DENSITY)
������'ACTED BEDDING
WSDOT STD. SPEC.
9-03.12(3)
GROUND WIRE TRENCH E
SCALE: 3/4"=1'-0" � S599 Sfi01
su�
TANK FOUNDATION PLAN AN
�'T� INSTALL NEW LN2 TANK
BUILDING 9-99
STRUCTURAL MASTER
IM �j �
S
� �y �
• f-0 / Sf � j �
� RECEIVED
CIT'Y OF TUKWILA
JUN 10 2016
,,�w . ...
�• �s'w��s� Ay+��Tl�P'1
i�'� ZQCi�
PERNIIT
SET
_ .._ �.•, .
���,� � � � ��, � ����� • ��, � �
� ��� s v trz,�a �� ,�s�' "�`" ������ �`�.
�
i ;� a� �� ��� � � � � ��t�k��
�,
05.16.16
�O �
JOB N0. COMP N0.
W3469099 �
DEV. CENTER, I�yq °wc Na 09-099—S601
�
n�nr u� / ninE CLAMP
V/ B—LINE
APE
4PS
�TRUTx 1'-2"
MTL SIDIN�
CONC. WALL
"� HILTI
"KB—TZ" W/ 4" EMB.
PIPE SUPPORT STAND
SCALE: 1 "=1'-0"
1 /2" MET�
HDG
PIPE W/ PIPE CLAMP
WRAP PIPE W/ B—LINE
"ISO—PIPE" TAPE
C� PIPE CLAMPS
B—LINE B3064-2
SPACED @ 10'-0" MA
B22x�
3/8"�
SS "KB
W/ 3
WALL BRACKET PIPE SUPPORT
S599 S602 SCALE: 1"=1'-0"
ci innnor nm� ci�� Tn �
C�
—IS602
B409 WALL BRACKET
SPACED C� 10'-0" M�
PIPE CLAMP
WRAP PIPE W/ B—LINI
"ISO—PIPE" TAPE
@ PIPE CLAMPS
B22A STRUTx1'—(
INSULATED PIPE
�ERTICA� PIPE SUPPORT
SCALE: 1 "=1'-0"
3/8"� HILTI SS "KB—TZ" B—LINE
W/ 2" EMB. B22 STRUT -
1/2"� STEEL
BOLTS TYP.
B—LINE B280FL GALVANIZED —
HILTI HIT—RE-500 EPDXY ANCHORS �
W/ 1/2"� ASTM F593 CW1
CONC. WALL (E) STAINLESS STEEL ATR.
2 3/4" MIN. EMBED. DEPTH.
INSTALL PER MANUFACTURES
INSTRUCTIONS (ESR-2322)
—IS602
1 /2"�
PIPE INSULATION
� AND JACKETING
f B2400 SERIES
PIPE STRAP,GALVANIZED.
� PIPE STRAP AROUND OUTSIDE
� OF INSULATION AND JACKETING.
,
WRAP PIPE W/ B—LINE "ISO—PIPE"
TAPE C� PIPE CLAMPS
.:: . - � ��.� . °� ._ _a: - . ..(
.a
�� � .a -� � - �.: �.
6 1 /4"
TYP. PIPE SUPPORT
SCALE: 1 "=1 '-0"
SYM REVISION
— ORIGINAL ISSUE
. - - - -- - - ---- , � � . ..
I BY I APPROVED I DATE I SYM
W3469099 EISI S. CHO 05.16.16
PARTIAL N 0 RTH WALL E LE�ATI 0 N
SCALE: 1 /4"=1'-0"
REVISION
BY I APPROVED
A5151S602
PER�IT
SET
�A� p,5 L• co ACCEPTABILITY
�� � �� WAs�t,��d THIS DESIGN AND/OR
40 �� � �o ,,,, SPECIFlCAl10N IS APPROVED
� � PROVED BY DEPT. DATE
156Z� �,: "
��� S�RAL E�'1�1,
jONAL �
� � 1•�
EXISTING PIPE
SUPPORT
(E) CONC. SLAB
S5991S602
1
SHEEf MEfAL WALL �
I
ADD (3) B22 STRUT
CHANNELS, EQ. SP.
W/ BEAM CLAMP
B-441-22 �
2'-10"
CONC. WALL
S ECTI 0 N �
SCALE: 1/4" = 1'-0" S602
�
suem�
TITLE
METAL SIDING
CONC. W�
CONSTRUCTION NOTES
1� REMOVE EXISTING SHEET METAL COVER.
2� CAULK AROUND PIPE.
'E CLAMP
STRUTx1'-0" W/
3/8"� HILTI
TZ" W/ 2" EMB.
ULATED PIPE
INSIDE PIPE SUPPORT
JI.NLt: IVUIVt —I S6�2
�
� a .� � � a 1 /2"� HILTI "KB—TZ"
FASTEN BASE OF ��. o: EXPANSION ANCHORS
a . INSTALL PER MANUF'S.
UNIT TO ANGLE FRAME �� INSTRUCTIONS. MIN.
WITH (4) #10 TEK _ _ _ _ � _ � ° 3 1 /4" EMBEDMENT
SCREWS, (1) EACH I,
CORNER. �� � (ESR-1917)
a��
I � .a _
a �-
TYP. � � \ � � � �- . - ��-,
� � � � a .Q
I � \ I ° a . �n
� \ � `—
' � �'I a a�� ' � a.
I � . , d
° — — — ° — . e �. ° REVIE
° . .� . �t?D� C flIIP � R
-. � ° . � �� : ��p�C��fL���E
a..
L 2"x2"x 3/16" 1'-5" �.a � ��JUN 2 4 2016
�u�L� N f �u��rir�
� QIVISION
� 1 /2"� VJ RIGID PIPE (LN2)
TYP.
3/16
L 2"x2"x3/16"
NOTE: DEBURR ALL SHARP
EDGESAND CHAMFER
ALL CORNERS 1 /4"
SD1-2
MIS�ELLANEOUS PIPE SUPPO
INSTALL NEW LN2 TANK
BUILDING 9-99
STRUCTURAL MASTER
ONIZIN
SDI-2 DEIONIZING SYSTEM
3 1 /4"
N
Q ... .
.d � d
. a.
Qd. .
1 1 . °.
1 � �a � � o
—I I . a .: . �
I .�° � . �
a.
IQ� � °� .
. �a
.a
a�
�a. �..e
.a � . .a .
a .
. � a�.
� R�CEIVED
�� `:: • (�;UKWILA
. :� � � �w:
.a �_ � �����;� . .a :. . .- 2016
. _ a� a
� _.a�� -
�'����..-� � Q � ; PERiNtT CENTER
PORT 6
A515, S599 S602
CfJRRE SI SYMBOL DATE
W3469099 I � 05.16.16
SHEET
��0�
�oB No. W3469099 cc
DEV. CENTER, �1�Iq °wc No. 09-099—S602
�
�i-i
�
0
�
rn
0
�
N
�
Z
O
N
z
Q
_
SYM
ORIGINAL ISSUE
GENERAL NOTES
GENERAL
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AT THE SITE.
UNLESS SHOWN OR NOTED OTHERWISE, TYPiCAL DETAILS AND GENERAL NOTES
SHALL BE USED WHEREVER APPLICABLE.
ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY OF TUKWILLA BUILDING
DEPARTMENT.
ALL CONSTRUCTION AND MATERIALS SHALL BE iN ACCORDANCE WITH THE IBC 2012.
SPECIAL INSPECTION PER IBC CHAPTER 17, MAJOR ITEMS OF REQUIRED INSPECTION
INCLUDE FOUNDATIONS, ANCHOR BOLTS, POST INSTALLED ANCHORS, STEEL ERECTION,
REINFORCING STEEL AND CAST—IN—PLACE CONCRETE WORK.
ANY DISCREPANCY FOUND AMONG THE DRAWINGS, THESE NOTES, AND THE SITE
CONDITIONS SHALL BE REPORTED TO THE ENGINEER, WHO SHALL CORRECT SUCH
DISCREPANCY IN WRITING. ANY WORK DONE BY THE CONTRACTOR AFTER DISCOVERY OF
SUCH DISCREPANCY SHALL BE DONE AT THE CONTRACTOR'S RISK. THE CONTRACTOR
SHALL VERIFY AND COORDINATE THE DIMENSIONS AMONG ALL DRAWINGS PRIOR TO
PROCEEDING WITH ANY WORK OR FABRICATION. THE CONTRACTOR IS RESPONSIBLE FOR
ALL BRACING & SHORING DURING CONSTRUCTION.
DESIGN CRITERIA:
IBC 2012 AND ACI 318.
LIVE LOADS:
FLOOR — 150 PSF
SEISMIC — SITE CAT "D", SS = 1.518, S� _.575, R= 2.5
REFERENCES:
A. IBC 2012 ACI 318 BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE
B. ACI 302 GUIDE FOR CONCRETE FLOOR AND SLAB
CONSTRUCTION
C. AISC STEEL CONSTRUCTION MANUAL, 14TH ED
D. ACI 301 SPECIFICATIONS FOR STRUCTURAL CONCRETE
SHOP DRAWINGS AND SUBMITTALS
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, MATERIAL COMPLIANCE
CERTIFICATES, CATALOG CUTS, AND OTHER ITEMS AS REQUIRED TO COMPLY WITH
CONSTRUCTION DOCUMENTS. SUBMITTAL REVIEWS BY THE ENGINEER SHALL NOT
RELIEVE THE CONTRACTOR'S RESPONSIBILITY FOR SAFEIY, BRACING AND SHORING,
MATERIAL QUANTITIES, AND DIMENSIONS. SUBMITTAL ITEMS SHALL INCLUDE BUT NOT
BE LIMITED T0:
SUBMIT T0: ENGINEER
CONCRETE DESIGN MIXES X
REINFORCING SHOP DRAWINGS X
STRUCTURAL STEEL SHOP DRAWINGS X
ACCEPTANCE OF SHOP DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR FROM
RESPONSIBILITY FOR DEVIATION FROM THE DRAWINGS OR SPECIFICATIONS UNLESS
THE CONTRACTOR HAS, IN WRITING, CALLED ATTENTION TO SUCH DEVIATION AT THE
TIME OF SHOP DRAWING SUBMISSION, AND SECURED WRITTEN APPROVAL FOR SUCH
DEVIATION FROM THE ENGINEER; NOR SHALL IT RELIEVE THE CONTRACTOR FROM
RESPONSIBILITY FOR ERRORS OR DELEfIONS IN SHOP DRAWINGS OR SCHEDULES.
TESTING:
ALL TESTING SHALL BE DONE BY AN APPROVED TESTING LABORATORY.
A. CONCREfE: THREE COMPRESSIVE STRENGTH SPECIMENS SHALL BE
MADE FOR EACH 75 CUBIC YARDS, OR EACH DAY CONCREfE IS
POURED. SAMPLING PROCEDURES SHALL CONFORM TO ASTM C172.
TEST CYLINDERS SHALL BE MADE AND CURED IN COMPLIANCE WITH
ASTM C31. CYLINDER TESTING PROCEDURES SHALL CONFORM TO ASTM
C39. TESTS SHALL BE MADE AT 7 DAYS AND 28 DAYS.
B. TESTING AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE
CONTRACTOR, OWNER AND ENGINEER.
FOUNDATIONS
BRICK OR POROUS MATERIAL SHALL NOT BE USED TO SUPPORT REINFORCING
STEEL OFF GROUND.
SOIL BEARING VALUE = 1500 PSF.
REINFORCING STEEL:
SPLICES IN REINFORCING STEEL SHALL BE 27" FOR �4 BARS, 34" FOR #5 BARS
AND 40" FOR #6 BARS.
ALL REINFORCEMENT SHALL CONFORM TO ASTM A-615 (LATEST PUBLICATION),
DEFORMED BARS OF BILLET STOCK. ALL BARS SHALL BE GRADE 60.
REVISION
W3469099
BY APPROVED DATE SYM
EISI S. CHO 05.16.16
REVISION
CONCREfE
USE TYPE I OR TYPE II PORTLAND CEMENT CONFORMING TO ASTM C-150 FOR ALL
CONCRETE WORK. PROCEDURES FOR FORMWORK ERECTION, REINFORCING STEEL
DETAILING AND PLACING, MIXING, PLACING, FINISHING AND CURING CONCREfE SHALL
CONFORM TO RESPECTIVE GOVERNING SECTION OF AND ACI 318, "SPECIFICATIONS
FOR STRUCTURAL CONCRETE" ACI SP-15 AND AC1 301.
CONCRETE SHALL OBTAIN THE FOLLOWING MINIMUM COMPRESSIVE STRENGTH C�
28 DAYS:
FOUNDATIONS:
GROUT:
SLAB:
PC CONCRETE:
STRENGTH
4000
5000
4000
6000
MAXIMUM
AGGREGATE
1"
3/4"
3/4"
MAXIMUM WC
SLUMP RATIO
4" .55
3 1 /2"
3 1 /2"
CONCRETE SHALL CONTAIN 5� AIR ENTRAINMENT, AIR ENTRAINMENT
ADMIXTURE SHALL CONFORM TO ASTM C260.
.42
.42
GROUT SHALL BE MASTERFLOW 100 OR EQUAL.
ALL CONCRETE SHALL HAVE A MINIMUM OF 5-1/2 SACK/CY.
ANCHOR BOLTS, DOWELS, METAL INSERTS, ETC. SHALL BE SECURELY ANCHORED
IN PLACE BEFORE CONCREfE IS POURED.
MAIN REINFORCING STEEL SHALL HAVE MINIMUM CONCRETE COVER AS FOLLOWS:
CONCREfE POURED AGAINST EARTH: 3"
CONCRETE BELOW GRADE AGAINST FORMS: 2"
AGGREGATES SHALL CONFORM TO ASTM C33.
FLY ASH: FLY ASH SHALL CONFORM TO ASTM C618 CLASS F OR C. MAXIMUM
LOSS ON IGNITION TO BE 1 PERCENT. NOT TO EXCEED 20� OF CEMENT CONTENT
BY WEIGHT.
CALCIUM CHLORIDE IS PROHIBITED.
WATER: SHALL ME� THE REQUIREMENTS SET FORTH IN ASTM C94 SECTION 5.1.3
"WATER".
CHAMFER ALL EXPOSED CORNERS 3/4".
CONCRETE SHALL BE MIXED AND PLACED PER AC1 318, ACI 301 AND ACI 304..
ALL COLD JOINTS SHALL BE CLEANED BY WATER BLASTING BEFORE PLACING NEW
CONCRETE. COLD JOINTS MAY BE LOCATED ONLY AS SHOWN ON THE DRAWINGS OR
AS APPROVED BY THE STRUCTURAL ENGINEER.
VIBRATORS SHALL BE LARGEST THAT CAN BE OPERATED IN THE PLACEMENT.
ADMIXTURES SHALL CONFORM T0: ASTM C494, TYPE A— WATER REDUCING, TYPE
D— WATER REDUCING AND RETARDING, TYPE E— WATER REDUCING AND
ACCELERATING, OR TYPE F— HIGH RANGE WATER REDUCING. ASTM C1017,
FLOWING CONCRETE ADMIXTURES.
FINISHING:
A. ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED, CLASS 2,
B. WALLS SHALL BE SMOOTH FORM FINISH.
CURING SHALL BE WITH THE APPLICATION OF SEALER CURING AGENT
MASTERKURE 123.
BY I APPROVED I DATE
S � RUCTURAL STEEL
STRUCTURAL STEEL W SHAPES SHALL CONFORM TO ASTM A992, OTHER SHAPES
AND PLATE SHALL CONFORM TO ASTM A36.
STEEL PLATE FOR TRENCH COVERS SHALL CONFORM TO ASTM A572 AND SHALL BE
COATED W/ SLIP—NOT.
STEEL TUBE SHALL CONFORM TO ASTM A500, GRADE B.
STEEL PIPE SHALL CONFORM TO ASTM A53, GRADE B.
THE FABRICATION AND ERECTION OF ALL STRUCTURAL STEEL SHALL CONFORM TO
THE PROVISIONS OF THE 14TH ED "SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS" OF THE A.I.S.C.
ALL WELDING SHALL BE PERFORMED BY W.A.B.O. CERTIFIED WELDERS. ALL
WELDING SHALL BE DONE BY THE SHIELDED ELECTRIC ARC PROCESS IN
CONFORMITY WITH THE LATEST EDITION OF THE "STRUCTURAL WELDING CODE, AWS
D1.1 OF THE AMERICAN WELDING SOCIEfY.
ELECTRODES FOR WELDING SHALL BE E-70XX LOW HYDROGEN OR E7XT—X FILLER
M=TAL. MINIMUM WELD SIZE SHALL BE 3/16".
BOLTED CONNECTIONS SHALL BE MADE WITH A325 HIGH STRENGTH BOLTS. INSTALL
BOLTS SNUG TIGHT.
STRUCTURAL STEEL SHALL BE SHOP PAINTED AND TOUCHED UP AFTER ERECTION
WITH AN APPROVED PRIMER.
EXTERIOR STEEL SHALL BE HOT DIPPED GALVANIZED PER ASTM A123.
DRILLED—IN CONCRETE ANCHORS: DRILLED—IN CONCRETE ANCHORS OF SIZE,
NUMBER AND SPACING AS SHOWN ON THE DRAWINGS SHALL BE HILTI—FASTENING
SYSTEMS "KB—TZ." ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S PUBLISHED RECOMMENDATIONS, AND ESR REPORT �1917,
INCLUDING MINIMUM EMBEDMENT LENGTHS AND TIGHTENING.
PAINTING
PREPARATION OF ALL SURFACES, GENERAL PAINTING, STAIN WORK, CABINETWORK,
AND PAINTING OF ELECTRICAL WORK NOT LISTED IN THEIR RESPECTIVE DIVISIONS,
STANDARDS OF PRACTICE, WORKMANSHIP AND APPLICATION SHALL COMPLY WITH THE
STANDARDS SET FORTH BY THE PAINTING AND DECORATING CONTRACTORS OF
AI�ERICA.
MATERIALS: KELLY MOORE COMPANY OR TNEMEC
COLOR: PAINT ALL STEEL SAFETY YELLOW
METAL (STRUCTURAL STEEL):
MATERIALS: TNEMEC PROTECTIVE COATINGS
PREP: SSPC—SP10
PRIME: ONE COAT ZINC RICH URETHANE (SERIES 90-97)
FINISH: ONE COAT EPDXY (SERIES 66)
�� � � �a����,�, �;,
� ���� �� � � ����
L • c ACCEPTABILITY
�As�i �'�'� THIS DESIGN AND/OR
�o SPECIFlCATION IS APPROVED
� A APPROVED BY DEPT. DATE
� 15820 �,�`v ,�
��°�tat �1 ��'
S�ONAL �
. --- 4��1 �c�
suem� �
STRUCTURAL NOTES
T"� INSTALL NEW LN2 TANK
BUILDING 9-�9
STRUCTURAL MASTER
CONSTRUCTION NOTES
REVIEUVED FOR
�pp� COMPLIANC�
- � ��p�0il�i3
I ` JUN 2 � 2016
�i�t �� `�u�ila
�ut�o�t�� oivisiorv
RECEIVED
CITY OFTUKW�LA
JUN 10 2016
�a. �nr � � •�r� �
� �. �� ° :a
P �.
�:r -
��}M�. �. �% �N � 1
..�.����,��IT
SET
CURRENT REVISION SYMB(7C p
W3469099 �I\�
SHEEf
�2E
�oa No. W3469099 c�
DEV. CENTER, INq °wc No. 09-099—S2E
05.16.16
�-
�
�
\
rn
0
N
�
0
N
Z
Q
_