Loading...
HomeMy WebLinkAboutPermit D16-0157 - BOEING #9-101 - STEAM CONVERTERBOEING #9-101 - STEAM CONVERTER 9725 E MARG I NAL WAY S BLDG 9-101 EXP/RED 09/02/17 D16-0157 .�. City of Tukwila • '' " � Department of Community Development � 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 '' ` Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.aov Parcel No: 0003400018 Address: Project Name: Owner: Name: Address: DEVELOPMENT PERMIT Permit Number: D16-0157 9725 E MARGINAL WAY S BLDG 9-101 Issue Date: 9/28/2016 Permit Expires On: 3/27/2017 BOEING #9-101- STEAM CONVERTER BOEING COMPANYTHE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATfLE, WA, 98124 Contact Person: Name: JOHN S MURDOCH Address: Contractor: Name: PO BOX 3707 MC 46-88 , SEATTLE, WA, 98124 BOEING COMPANY, THE Address: 100 N RIVERSIDE, M/C 5003-4027 , CHICAGO, IL, 60606-1596 License No: BOEINC*294ML Lender: Name: BOEING COMPANYTHE Address: PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 DESCRIPTION OF WORK: Phone: (253) 740-0214 Phone: (312) 544-2535 Expiration Date: 1/18/2017 REPLACEMENT OF STEAM PRESSURE REDUCING STATION. REPLACEMENT OF EXISTING SUPPORT, INCLUDING A NEW SHIPS LADDER FOR MAINTENANCE ACCESS OF CONVERTER STATION. Project Valuation: $147,955.00 Fees Collected: $3,267.82 Type of Fire Protection: Sprinklers: YES Fire Alarm: YES Type of Construction: IIB Occupancy per IBC: f-1 Electrical Service Provided by: TUKWILA Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electricai Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Volumes: Cut: 0 Fill: 0 Landscape Irrigation: Sanitary Side Sewer: Number: 0 Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: No ,�/ ' � ��' Permit Center Authorized Signature: W Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The grantin of th s permit does not presume to give authority to violate or cancel the provisions of any other state or lo I la re .�lating construction or the performance of work. I am authorized to sign and obtain this developm nt �ermit�a�d agree to th�e conditions attached to this permit. Date:� r� '--'^ � Print This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: The special inspections for steel elements of buildings and structures shall be required. All welding shall be done by a Washington Association of Building Official Certified welder. 5: Installation of high-strength bolts shall be periodically inspected in accordance with AISC specifications. 6: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 7: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval, 8: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4026 SI-STRUCT STEEL 4004 SI-WELDING 9: Structrual Observations in accordance with I.B.C. Section 1709 is required. At the conclusion of the work included in the permit, the structural observer shall submit to the Building Official a written statement that the site visits have been made and identify any reported deficiencies which, to the best of the structural observer's knowledge, have not been resoived. 10: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 11: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 12: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 13: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 14: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 18: Fire protection systems shall be maintained in accordance with the original instailation standards for that system. Required systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire protection systems shall be done in accordance with applicable standards. (IFC 901.4) 16: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide. (NFPA 13-8.6.5.3.3) 15: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2436). 20: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2437) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 17: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 21: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. , 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 1400 FIRE FINAL 0409 FRAMING 4046 SI-EPDXY/EXP CONC 4034 SI-METAL PLATE CONN 4023 SI-OBS-SEISMIC REST 4025 SI-STEEL CONST �.Nll.d y�, �J qJ, 4 y o z J 'n � 3s. r 2. 190a CITY OF TUKWILA Communiry Development Department Public Works Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 htto ://www. Tukwi l aW A. � Building Permit No. �1� Project No. Date Application Accepted: � �J —� {U Date Application Expires: ���� (For o�ce use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION • � �i� � �r`�j � .� � King Co Assessor's Tax No.: Site Address: 9725 East Marginal Way So Suite Number: 9-101 Floor: � Tenant Name: The Boeing Compally New Tenant: ❑.....Yes �..No PROPERTY OWNER � Na'Y'e: The Boeing Company - John S. Murdoch Address: p.0. Box 3707 M/C 46-88 City: Seattle State: WA zip: 98124 CONTACT PERSON — person receiving all project communication Nar"e: John S. Murdoch - The Boeing Company Address: p,0. Box 3707 M/C 46-88 City: Seattle State: �A zip: 98124 Phone: �253) 740-0214 F�`� Email: �ohn.s.murdoch@boeing.com GENERAL CONTRACTOR INFORMATION Company Name: �e Boeing Company Address: p O. Box 3707 M/C 46-88 City: Seattle State: WA Z'P• 98124 Phone: �253) 740-0214 F�'�' Contr Reg No.: gOEINC*294ML Exp Date: O1/18/2017 Tukwila Business License No.: H:\Applicatiore�Foms-Appficntiom On Liic�2011 ApplicMin��Pernut Applicetion Revised - S-9-1 I.docx x���ua: n��n zo i i bh ARCHITECT OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Coffinan Engineers Engineer Name: Emery S. Ojala Address: 1601 Sth Ave. Suite 900 �'n'� Seattle State: WA Zip: 98101 Phone: �206) 623-0717 F�' Emai1: ojalae@coffinan.com LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 1927.095) Nan'e: The Boeing Company Address: p,0. Box 3707 M/C 46-88 Ciry: Seattle State: WA zip: 98124 Page 1 of 4 BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): $ 147,955 Existing Building Valuation: $ 100,000,000 Describe the scope of work (please provide detailed information): Replacement of Steam Pressure Reducing Station. Replacement of Structural on Existing Support, including a New Ships Ladder for Maintenance access of Converter Station. Will there be new rack storage? ❑.....Yes m.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below Addition to Type of Type of Existing Construction per Occupancy per Existin Interior Remodel Structure New IBC IBC 1�' Floor 713,829 950 II-B B/ F1 z Floor 295,878 3 Floor 55,689 Floors thru Basement Accessory Structure* Attached Gazage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑....... Yes m....... No If "yes", explain: FIRE PROTECTION/HAZARD US MATERIALS: � ....... Sprinklers ....... Automatic Fire Alarm ❑ .......None ❑ .......Other (specify) Will there be storage or use of flammable, combustible or hazazdous materials in the building? ❑....... Yes .......No ]f `yes', attach list of»ra[erials and storage locations on a separate 8-1/2 "x 11 "paper including guantities and Materia! Safety Data Sheets. SEPTIC SYSTEM ❑....... On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:Wpplicatiom�Fornts-Applications On LimV.01 I Applications�Permit Applicetion Revised - S-9-1 l.docr x�v�ua: nu� 2ou Page 2 of 4 bh PUBLIC WORKS PERMIT INFORMATION — 206-433-0179 Scope of Work (please provide detailed information): D.N.A. Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ ...Tukwila ❑... Water District #l25 ❑ .. Highline ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila ❑ ... Valley View ❑ .. Renton ❑...Sewer Use Certificate ❑... Sewer Availability Provided ❑ .. Renton ❑ .. Seattle Seutic Svstem• ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Auulicadon (mark boxes which annlv): ❑...Civil Plans (Maximum Paper Size — 22" x 34") ❑...Technical Information Report (Storm Drainage) ❑.. Geotechnical Report ❑...Traffic Impact Analysis ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance Agreement(s) ❑ ... Hold Harmless — (SAO) ❑ ... Hold Harmless — (ROW) Prouosed Activities (mark boxes that anulv): ❑...Right-of-way Use - Nonprofit for less than 72 hours ❑.. Right-of-way Use - Profit for less than 72 hours ❑...Right-of-way Use - No Disturbance • ❑.. Right-of-way Use — Potential Disturbance ❑ ...Construction/Excavation/F'ill - Right-of-way ❑ Non Right-of-way ❑ ❑ ...Total Cut cubic yards ❑ ...Total Fill cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection _ lrrigation Domestic Water ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line � ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Permanent Water Meter Size... " WO # ❑ ...Temporary Water Meter Size .. " WO # ❑...Water Only Meter Size............ " WO # ❑...Deduct Water Meter Size ❑ ...Sewer Main Extension .............Public ❑ Private ❑ ❑ ...Water Main Extension .............Public ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer Monthlv Service Billing to: Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment Day Telephone: Mailing Address: c�ry s��e z�� Water Meter Refund/Billine: Day Telephone: Mailing Address: � City State 7ip H:\Applications\Fornss-Applicntio� On Li��2011 Applicntio1s�Pemtit Applicntion Revised - S-9d Ldoes xc��5oa: n��� zm t Page 3 of 4 bh PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be reGuested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREB TIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY F PE R�BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING �� �fi/�� �,�I�ik���1 l�ate� 06/15/2016 Print Nam��John S.1V�urdoch Day Telephone: (253) 740-0214 Mailing Address: P•O. Box 3707 M/C 46-88 Seattle WA 98124 Ciry State 7.ip H:\Applicntions\Foms•Applicntioin On Lim�201 I Applicatio��Pcrmil Application Revised - 5-9-] l.docx tte��ea: n��,n 2o i i Page 4 of 4 bh Date Paid: Wednesday, June 15, 2016 Paid By: JOHN S MURDOCH Pay Method: CREDIT CARD 078290 Printed: Wednesday, June 15, 2016 1:04 PM 1 of 1 ���`�'SysreMs INSPECTION RECORD � Retain a copy with permit �1 ���� �� INSPECTION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION . 6300 Southcenter Bfvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 � Approved per appiicabEe codes. � Gorrections required prior to approvai. � paid at 6300 Southcenter Btvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD � Retain a copy with permit �1��� L`�� IN ION N0. PERMIT N0. C1TY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (205) 431-367Q Permit inspection Request line (206) 438-9350 � Appr�oved per applicable codes. n Gorrections required prior to approval. .�_'�. � paid at 6300 Southcenter Blvd., Suite 100. Call to schedute reinspection. l 1NSPECTION RECORD � / Retain a copy with permit ��� ��f � 7 INSP ON N0. PERMIT N0. CITY OF TUKWICA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit lnspection Request Line (206) 438-9350 �tnspettor: /�eG Iuate:1�I���/� I J � REINSPECTION FEE REQUIRED. Prior to next inspectinn, fee must be paid at 6300 Southcenter Btvd., Suite 100. Call to schedute reinspection. sr„n�.ox�r�«.zm�.w:w�r.«.N.<.... �.�:r:�.+ .u%,�,4t,�k,...»�<s=m;.:=, .,e :..�::<. �a.,,��.:�s�.,,��<tuw'�3.w...n.. ��;:a�evu,�..,;.s;>p, <x.,,,. ,,,�ti>,... ��.,�...j-..>.% �..,.cx.....°'.�::�.{�s.+--'w�,'';�y�,a.ro. , n•" .�g#s :� +`� �d `::vn 4 � 3tr .. . � . . � � . .w �.. . . ..x . � . INSPEC�'IC1N RECO�D . �� ---p � �� Y Re�ain a copy with permit INSPECTION NUMBER PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Pro' . � Type of Inspection: � � � l� �Q �'..� � r n�l.�c,.. � �� �.;��.,; h�- L..,.._.._ Address ,,3 Conta Pe�sqn: Suite #: �� ,�� � � (.�-� Special Instructions Phone No.: I Approved per appiicable codes. COMMENTS: �2 �rv G� �i2-- ; /� � t,v �-�-�"` r�r-1 � �" ,� rJ � Corrections required prior to approval. - f�2 �- C.�(Z-��=Z.-7�7 �atl � l�5�% Inspector: �fvi ��'" Date: yt" ��--�j 2-- � Hrs.: � �$100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billin Address Attn: Com an Name: Address Ci State: Zi Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 �� INSPECTION RECORD I��� ��� ��-- Retain�a copy with`permit INSPECTION NUMBER PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Pxoject: � Type of Inspection: �/n1 �-lG � ��1����� �G'v�_ Address: � Contact Person: Suite #: %�2�' �yY1 � /Y1 �� Special Instructions: Phone No.: ) � Approved per applicable codes. ,� o ections required prior to approval. COMMENTS: f �� S P��.� L �^7z. �l�-�J s ,��3vv�' S� ��� s. �j n� ��.1 �- G a v�-�, �'. -- tij � � � � � � �1 � wt dv�-1'� �T" �`�'�-7v (J S : 7. �,�,� �r t�� � ��- . _ _ � p ���-�" �7��� �� sr� ��z �� Sr �-� � ►� v�-n��-- ��a w�. Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: � Monitor: Pre-Fire: Permits: Occu ancy T e: Inspector: � j� sr.�— Date: 'f���,�� �- Hrs.: � �$100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Address: Citv: Word/Inspection Record Form.Doc � Company Name: State: 3/14/14 Zlp: T.F.D. Form F.P. 113 3 ' BOEING 9- I 01 Replace Steam Converter Station #3 Tukwila, Washington Issue for Construction � Structural Calculations � _y April 20 I 6 r' '1� Boeing Project # I 6069-20 CEI Project # I 50990 � , ... SEATTLE � 1601 F�fthAve.,Suite 900 � Seattle,WA 98101-1620 � 206.623.0717 vrww.coftman.com REVIEWED FOR �ODE COMPLIANCE APPROVEQ JUl O 1 2016 Ci of `�ul�r� BUILD NG DIVISION ,�;���'�� � RECEIVED CI7Y OF TUKWILA JUN 15 2016 P.ERMIT CENTER �coF�aN NGIHEERS �� � ,�����Ma� N G I N E E R S REPLACE STEAM CONVERTER STATION #3 ISSUE FOR CONSTRUCTION , BOEING 9-101 STRUCTURAL PART 1 - STRUCTURAL ANALYSIS 1.1 INTRODUCTION AND SUMMARY OF RESULTS - A structural analysis has been performed to evaluate the structural adequacy of the steam converter station #3. The objective is to replace the existing steam converter units with new floor �' mounted steam conversion units. The steam converter station #3 is situated on top of the ceiling for the second floor restroom #5. Since the weight of the units and other miscellaneous ' mechanical weight exceeds the loading from the original usage for the space, an analysis for the ceiling of the restroom and a lateral analysis for the diaphragm and the walls is also necessary. The analysis will evaluate any structural element that is required to accommodate the new gravity and seismic loads for the new mechanical equipment. The analysis also includes the design of a new ship ladder northwest comer of the steam converter station #3 for the access to the steam converter room. 1.2 RESULTS `� ' When the new loading was applied to the existing ceiling bar joists of the restroom #5, the ,, analysis shows that the existing joists are adequate to support the anticipated gravity and seismic loading of the new mechanical equipment. The original floor diaphragm, which was 5/8" � plywood decking, exhibited major signs of water damage; therefore, the entire floor decking will need to be replaced with new 5/8" plywood decking as required and water tight floor pan. The lateral analysis on the restroom #5 walls showed that the existing CMiJ walls have adequate strength to resist the larger seismic load from the additional mass of the mechanical equipment. The new steam converter units will ship in two skids per unit. The most convenient way to accomplish the lift and transfer of the skid units is to lift the units adjacent to the platform on the west side access room. The units are too large to fit between the mechanical piping space; therefore, the existing stud wall will be required to be temporarily removed while the mechanical skids are transported to the final location. After the mechanical skids are in place, the wall will be replaced. An analysis of the stair well ceiling for the temporary condition was performed with 3D analysis software and showed that the ceiling structure is adequate to support the anticipated gravity loading for the temporary condition of the mechanical skid transportation. � Based on site visit as-built conditions for the 9-101 steam converter station #3 hoist beam, It can be concluded that the hoist beam is identical to a TC/American 325L Series Rail, Model number 3RL8-18, Part # 10-2652-01. This assumption is based on the information and measurements that � were taken of the hoist beam rail. The maximum skid load that was received from Spirax Sarco is a load of 2,3001bs. Based on the , attached load tables from TC/American for the assumed existing monorail beam from the field �'i measurements, the beam has a minimum allowable load of 6370 lbs. for the 9ft support ' spans. The monorail beam supports for the allowable loads, have adequate strength to support the equipment skid hoist. ; � Apri12016 Page 1 �CQ��MAN N G I N E E R S REPLACE STEAM CONVERTER STATION #3 ISSUE FOR CONSTRUCTION BOEING 9-101 STRUCTURAL � The hoist trolley is only rated for '/2 metric ton along with the electric hoist at a rated capacity of SOOIbs, therefore, to perform the hoist of the equipment skids, the trolley will need to be replaced or moved to the end of the monorail beam while a new temporary trolley is installed. The contractor can use the existing hoist beam with a new temporary hoist and trolley system " rated at a minimum allowable load of 3,000 lbs. (approximately 1.25*2,3001bs for impact load -"� factor) for the equipment skid lifts. After the equipment skids are in place, the contractor can remove the temporary hoist and leave the existing trolley and hoist in place for future use while �� keeping the rating of the hoist to 5001bs. � 1.3 CONCLUSIONS � The design analysis for the new decking diaphragm and the existing bar joist framing concludes "� that the restroom #5 ceiling and walls and the new ships ladder, as designed are adequate to ' support the anticipated gravity and seismic loads from the new mechanical equipment being installed in the 9-101 steam converter station #3. See Drawings 09-101-5458 and associated drawings for framing and anchorage details. END OF STRUCTURAL DESIGN REVIEW ,j ; �: � I Apri12016 Page 2 � Design Maps Summary Report ��, Design Maps Summary Report User—Specified Input Report Title 9-101 Steam Converter Station #3 Tue January 19, 2016 22:33:12 UTC Building Code Reference Document ASCE 7-10 Standard (which utilizes USGS hazard data available in 2008) Site Coordinates 47.51545°N, 122.29589°W Site Soil Classi�cation Site Class D-"Stiff Soil" Risk Category I/II/III �-- ---- - -� �C'JC'r.��'��:� �� ;'�,�I��'� — TT : i� . r��, r J �)�' � �. • 'r ` E3 UT 1 C.,n ��'� (` C'3 �Q� e 0 �r� '.C�a�e:.�� Page 1 of 2 � �ir� :' �Z L11� . . , � -w � i� , �.-- t_ � - -- --- --- --- - ----�_ ..._ IL��.l:f.alissa. _ � USGS-Provided Output Ss= 1.514g SMs= 1.514g Sos= 1.009g S, = 0.573 g S,,, = 0.859 g So, = 0.573 g For information on how the SS and S1 values above have been calculated from probabilistic (risk-targeted) and deterministic ground motions in the direction of maximum horizontal response, please return to the application and select the `�2009 NEHRP" building code reference document. �CE� �tes�r�n�� �,p��r�m �esig� Fte�pvnse. �pectr�m i. rc �.co ��.�o 1.44 - _ _ _ . Q�.99 1.�4 O.Ci 3.12 0.17 a o.�c � a.cc � o.ca � ass ac� a.r� 6.48 0.33 b_32 0.22 O,.1S 0.11 0.� 4,00 0,09 O.I9 O.tO 4 iA O.C9 l.q 1.2t1 1.f0 l.fn 1 p 2.00 O.Q� 0.2iD O.fO O.W O.C.9 l t9 I, lU 1+�0 1.60 I.CO 2.00 i�er►ad. T (�e�� Period, i (�c.c) For PGA„, T�, CRS, and Ca, values, please view the detailed renort. Page 3 of 83 http://ehp 1-earthquake.cr.usgs.gov/designmaps/us/summary.php?template=minimal&latitu... 1/19/2016 Design Maps Detailed Report � �����, Design Maps Detailed Report ASCE 7-10 Standard (47.51545°N, 122.29589°W) Site Class D-"Stiff Soil", Risk Category I/II/III Section 11.4.1 — Mapped Acceleration Parameters Note: Ground motion values provided below are for the direction of maximum horizontal spectral response acceleration. They have been converted from corresponding geometric mean ground motions computed by the USGS by applying factors of 1.1 (to obtain SS) and 1.3 (to obtain S,). Maps in the 2010 ASCE-7 Standard are provided for Site Class B. Adjustments for other Site Classes are made, as needed, in Section 11.4.3. From Figure 22-1 �1' From Figure 22-2 �Z' Section 11.4.2 — Site Class SS = 1.514 g 5,=0.573g The authority having jurisdiction (not the USGS), site-specific geotechnical data, and/or the default has classified the site as Site Class D, based on the site soil properties in accordance with Chapter 20. Page 1 of 6 Table 20.3-1 Site Classification Site Class vs N or N�„ s� ''` A. Hard Rock >5,000 ft/s N/A N/A B. Rock 2,500 to 5,000 ft/s N/A N/A C. Very dense soil and soft rock 1,200 to 2,500 ft/s >50 >2,000 psf � D. Stiff Soil 600 to 1,200 ft/s 15 to 50 1,000 to 2,000 psf E. Soft clay soil <600 ft/s <15 <1,000 psf � � Any profile with more than 10 ft of soil having the characteristics: • Plasticity index PI > 20, ' • Moisture content w>_ 40%, and • Undrained shear strength s� < 500 psf F. Soils requiring site response See Section 20.3.1 analysis in accordance with Section 21.1 For SI: lft/s = 0.3048 m/s ilb/ftz = 0.0479 kN/m2 Page 4 of 83 ' http://ehpl-earthquake.cr.usgs.gov/designmaps/us/report.php?template=minimal&latitude=... 1/19/2016 Design Maps Detailed Report Page 2 of 6 Section 11.4.3 - Site Coefficients and Risk-Targeted Maximum Considered Earthquake (MCER) Spectral Response Acceleration Parameters Table 11.4-1: Site Coefficient Fe Site Class Mapped MCE R Spectral Response Acceleration Parameter at Short Period SS <_ 0.25 SS = 0.50 SS = 0,75 SS = 1.00 SS >_ 1.25 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 C 1.2 1.2 1.1 1.0 1.0 D 1.6 1.4 1.2 1.1 1.0 E 2.5 1.7 1.2 0.9 0.9 F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of SS For Site Class = D and SS = 1.514 g, Fa = 1.000 Table 11.4-2: Site Coefficient F� ,` Site Class Mapped MCE R Spectral Response Acceleration Parameter at 1-s Period �� S,<_0.10 S1=0.20 SI=0.30 S1=0.40 S,>_0.50 ,- A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 C 1.7 1.6 1.5 1.4 1.3 � D 2.4 2.0 1.8 1.6 1.5 E 3.5 3.2 2.8 2.4 2.4 F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of S, For Site Class = D and S, = 0.573 g, F� = 1.500 Page 5 of 83 http://ehp 1-earthquake. cr.usgs.gov/designmaps/us/report.php?template=minimal&latitude=... 1/ 19/2016 � ;� n, Design Maps Detailed Report Equation (11.4-1): Equation (11.4-2): SMS = FaSs = 1.000 x 1.514 = 1.514 g SM, = F�SI = 1.500 x 0.573 = 0.859 g ' Section 11.4.4 — Design Spectral Acceleration Parameters Equation (11.4-3): Sos = 2/3 SMS — 2/3 x 1.514 = 1.009 g Equation (11.4-4): Section 11.4.5 — Design Response Spectrum From Figure 22-12 �3' Sol = 2/3 SMl = 2/3 x 0.859 = 0.573 g T� = 6 seconds Figure 11.4-1: Design Response Spectrum T<T�;S�=S��0.4*�_6T/T�j ' 1�}3fiSfia:�a." �o� S�,i l.f�ti9 - ; ' ���T���;S�'��r1T ; � ��p t 1+� 1�.'tl', ie?��LI 1� •r � F t f f f @ 1 f f 6 ( � � � � S�,=fi.573 _�__-------_+___-------. i i � � , , � , ; + , � � , � � , � � , � + , r , , t E � � ; X e + � e � � t f � t 1 � k 1 � F { � t I Ta=Q.114 Ts=�.568 �.CMOD Periud, T �sec} Page 3 of 6 Page 6 of 83 http://ehp 1-earthquake.cr.usgs.gov/designmaps/us/report.php?template=minimal&latitude=... 1 / 19/2016 � Design Maps Detailed Report Page 4 of 6 Section 11.4.6 — Risk-Targeted Maximum Considered Earthquake (MCER) Response Spectrum The MCER Response Spectrum is determined by multiplying the design response spectrum above by 1.5. � � � 6n C Q �0 r � I� 1/ � $ a � c 0 a � � � � �, m a sn �',. ; P-: �.���r �-_•, = 0.�59 fi= 4�113 1`� = f1.5b7 I.t4a0 Period. T I.se¢� Page 7 of 83 http: //ehp l-earthquake. cr.usgs. gov/designmaps/us/report.php?template=minimal&latitude=... 1/ 19/2016 Design Maps Detailed Report Page 5 of 6 Section 11.8.3 - Additional Geotechnical Investigation Report Requirements for Seismic Design Categories D through F From Pigure 22-7 �4' PGA = 0.632 Equation (11.8-1): PGAM = FP�APGA = 1.000 x 0.632 = 0.632 g Table 11.8-1: Site Coefficient F,�A Site Mapped MCE Geometric Mean Peak Ground Acceleration, PGA Class PGA <_ PGA = PGA = PGA = PGA >_ 0.10 0.20 0.30 0.40 0.50 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1,0 1.0 1.0 1.0 C 1.2 1.2 1.1 1.0 1.0 D 1.6 1.4 1.2 1.1 1.0 E 2.5 1.7 1.2 0.9 0.9 F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of PGA For Site Class = D and PGA = 0.632 g, F�A = 1.000 Section 21.2.1.1 - Method 1(from Chapter 21 - Site-Specific Ground Motion Procedures for Seismic Design) From Figure 22-17 `5' CRS = 0.937 From Figure 22-18 `6' CRl = 0.919 Page 8 of 83 � http://ehpl-earthquake.cr.usgs.gov/designmaps/us/report.php?template=minimal&latitude=... 1/19/2016 � Design Maps Detailed Report Section 11.6 — Seismic Design Category i� Table 11.6-1 Seismic Design Category Based on Short Period Response Acceleration Parameter , RISK CATEGORY w VAWE OF Sos I or II III IV Sos < 0.167g A A A 0.167g <_ Sos < 0.33g B B C '� 0.33g <_ Sos < 0.50g C C D � 0.50g 5 Sos D D D -- For Risk Category = I and Sos = 1.009 g, Seismic Design Category = D Table 11.6-2 Seismic Design Category Based on 1-S Period Response Acceleration Parameter RISK CATEGORY � VALUE OF Sol , I or II III IV Soi < 0.067g A A A , 0.067g <_ Sbl < 0.133g B B C 0.133g 5 Soi < 0.20g C C D � 0.20g 5 Soi D D D . For Risk Category = I and Sp, = 0.573 g, Seismic Design Category = D Note: When Sl is greater than or equal to 0.75g, the Seismic Design Category is E for �_ � buildings in Risk Categories I, II, and III, and F for those in Risk Category IV, irrespective of the above. � Seismic Design Category -"the more severe design category in accordance with Table 11.6-1 or 11.6-2" = D Note: See Section 11.6 for alternative approaches to calculating Seismic Design Category. References Page 6 of 6 1. Figure 22-1: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22-i.pdf 2. Figure 22-2: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22-2.pdf 3. Figure 22-12: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22- � � 12.pdf 4. Figure 22-7: "�i http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22-7.pdf � 5. Figure 22-17: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22- 17.pdf �-' 6. Figure 22-IS: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22- � 18.pdf Page 9 of 83 http: //ehp l-earthquake. cr.usgs. gov/designmaps/us/report.php?template=minimal&latitude=... 1/ 19/2016 i � r 325 Series Rail 325 Series Rail "325L" and "325H" Series Rail Continuous Welds, Both Sides Crane and Monorail Systems Catalog TC/FIIIIERICRI'1 Raised Riding Tread TC/American "325L° and "325H" Series Patented Track Rails are 3-piece composite beams consisting of an ASTM A36 Top Flange, ASTM A36 Web and a load carrying Tee Section rolled from high carbon- manganese alloy steel. All 325 Series Tee Sections are 3'/" wide with a raised riding tread. The 325L Tee Section is �/�s" thick, measured at the riding tread; the 325H Tee Section is ��/�s" thick. The rail components are simultaneously joined together in TC/American's fabrication shop by an automatic, continuous submerged arc welding process to provide uniformly strong sections. Standard rail sizes are available from 8" to 40" depth. See the 325L and 325H Series Specification Sheets and the Equivalent Center Load (ECL) Tables for the load capacity of each size rail, as based upon distances between supports (span) and allowable deflection criteria. Also see the "General Engineering" section of this Systems Catalog for more information about ECL's. Contact the factory for special rail sizes. All rail, splice assemblies and end stops are factory cleaned to SSPC-SP2 (solvent and hand tool cleaned), and painted with one coat of TC/American high quality, dark green (gray-green) low luster industrial enamel. Contact the factory for primer and special paint options. A36 ange ASTM A36 Web Tee Section Specifications Metallurgical Data Carbon 0.48-0.55 Manganese 0.60-0.90 Phosphorous 0.04 Max. Sulphur 0.05 Max. Silicon 0.15-0.30 Vanadium 0.05-0.10 Physical Properties Tensile Strength 125,000 P.S.I. Min. Yeld Strength 65,000 P.S.I. Nom. Brinell Hardness 235 Avg. Maximum Wheel Loading "L" Series Rail 2750 Pounds Per Wheel "H" Series Rail 5000 Pounds Per Wheel Note Total load on each fro/ley wheel includes ifs share of the Live Load, lmpact, Hoist Weight, Crane Weight if applicable, plus any handling equipment weights. Forrail ends with diagonal cuts (i.e., in switches), the allowable wheel loading is reduced. See the Switches and Curves section of this catalog for limitations. Revision Date:1/1/15 TNESE DIMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. DATA AND SPECIFICATIONS SHOWN ARE SUBJECT TO CHANGES OR IMPROVEMENTS IN DESIGN OR �UALITY OF MANUFACTURING WITHOUT NOTICE OR OBLIGATION. B-13 Page 10 of 83 r "325L" Series Data TC/FIItIERICRi'1 "325L" Series Specifications 325 Series Rail Part # Model Weight A a B C D Max." It Sc# St� (Ibs.lft.) E In4 In3 In3 10-2651-01 3RL8-16# 16.3 713/16" 73/s" 4" 3/8" Y<" 2'/2' 48.6 12.43 12.43 10-2652-01 3RL8-18 17.6 713hs" 73/s" 5" 3/8" '/<" 2'/." 53.4 14.67 12.78 10-3725-01 3RL11-19 19.0 1013/ts" 103/s" 4" 3/8" Y<" 2'/" 102.8 18.97 19.03 10-2653-01 3RL11-21 21.4 1013/�6" 103/8" 6" 3/s" '/<" 3" 120.8 25.21 20.06 10-2654-01 3RL11-24 24.0 1015/�s" 10'/i' 6" '/z' '/4' 3" 136.6 31.04 20.89 10-2655-01 3RL13-22 22•3 1215/as" 12'/i' 4" '/s" '/a" 2Yi' 171.9 28.42 24.96 10-2656-01 3RL13-27 27.4 1215/�s" 12'/2" 7" Yi' '/<" 5Y�' 213.0 42.88 26.72 10-2657-01 3RL14-35 35.0 1315/�s" 13%z" 8" '/Z' 3/8" 5'/z" 286.0 53.89 33.13 * All top flanges need to be evaluated for proposed loading conditions. t I= Moment of inertia $ Sc = Section in compression § St = Section in tension # Standard curve rail B-14 B � E� � I � C A a Fp '/ s" � 3'/a"� � Maximum Wheel Loading "L" Series Rail = 2750 Pounds Per Wheel Note Tofal load on each trolley wheel includes its share of the Live Load, Impact, Hoist Weight, Crane Weighf if applicable, plus any handling equipment weights. Forrail ends with diagonal cuts (i.e., in switches), the allowable whee! loading is reduced. See the Switches and Curves section of fhis catalog for limitations. Note A suffix of �C', �T" or D" denotes whether the ECL is limited by Compression Tension or Deflecfion. THESE DIMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. DATA AND Revision Date:1/1/15 SPECIFICATIONS SNOWN ARE SUBJECT TO CHANGES OR IMPROVEMENTS IN DESIGN OR QUALITY OF MANUFACTURING WITHOUT NOTICE OR OBLIGATION. Page 11 of 83 325 Series Rail .., Crane and Monorail Systems Catalog T��mEAi�An "L" Series Equivalent Center Load Table (ECL)-1/450th Deflection Span 3RL8-18 (ft.) 10-2652-01 6 17,553 C 7 15,029 C 3RL11-21 10-2653-01 27,802 T 23,810 T 20,814 T 3RL11-24 10-2654-01 28,947 T 24, 790 T 21,669 T 3RL13-27 10-2656-01 37,034 T 31,798 T 27, 727 T 3RL14•35 10-2657-01 45,916 T 39,324 T 34, 375 T 9 11,658 C� 18,481 T 19,238 T 24,621 T 30,523 T , 16,613 T 17,292 T 22,133 T 27,437 T 11 9476 D 14,330 C 15,697 T 20,095 T 24,910 T 12 7963 D 12,012 C 14,366 T 18,394 T 22,800 T 13 6785 D 10,205 C 13,238 T 16,953 T 21,013 T 14 5850 D 8770 C 12,269 T 15,715 T 19,478 T 15 5083 C 7609 C 11,428 T 14,641 T 18,146 T 16 4443 C 6658 C 10,691 T 13,700 T 16,978 T 17 3911 C 5867 C 9615 C 12,867 T 15,945 T 18 3463 C 5203 C 8543 C 11,685 C 15,025 T 19 3083 C 4639 C 7633 C 10,449 C 13,947 C 20 2758 C 4156 C 6855 C 9391 C 12,537 C 21 3739 C 6183 C 8479 C 11,321 C 22 3377 C 5599 C 7686 C 10,265 C 23 3059 C 5089 C 6993 C 9342 C 24 2778 C 4639 C 6383 C 8529 C 25 2530 C 4241 C 5843 C 7810 C 26 2308 C 3886 C 5363 C 7170 C 27 2109 C 3569 C 4934 C 6598 C 28 1930 C 3284 C 4548 C 6085 C 29 3027 C 4200 C 5622 C 30 3885 C 5202 C 31 3599 C 4821 C 32 3338 C 4474 C 33 3098 C 4156 C 34 2879 C 3864 C 35 3595 C 36 3347 C 37 3118 C Note This table was developed for allowable Equivalent Center Loads (ECL) in pounds, with rai/ deflection limited to no more than 1/450 of the span or unsupported length, or 1'4", whichever is less. The weight of the rail is included in the allowable ECL. Maximum 60:1 Span to Top �lange ratio on spans or unsupported lengths over 16 ff. Maximum 32:1 Span to Depth ratio. A suffix of "C'; "T" or "D° denotes whefher the ECL is limited by Compression, Tension or Deflection. Revision Date:1/1/15 THESE DIMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. DATA AND B-15 SPECIFICATIONS SHOWN ARE SUBJECT TO CHANGES OR IMPROVEMENTS IN DESIGN OR QUALITY OF MANUFACTURING WITHOUT NOTICE OR OBLIGATION. Page 12 of 83 � � Span (ft.) 6 7 8 � 9 11 12 13 14 15 16 17 18 19 20 21 � 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 325 Series Rail TC/R�IIERICRII "L" Series Equivalent Center Load Table (ECL)-1/600th Deflection 3RL8-18 10-2652-01 17,553 C 15, 029 C 10,617 D 7107 D 5972 D 5089 D 4388 D 3822 D 3359 D 2976 D 2654 D 2382 D 2150 D 3RL11-21 10-2653-01 27, 802 T 23,810 T 20,814 T 18,481 T 16,613 T 14,330 C 12,012 C 10,205 C 8770 C 7609 C 6658 C 5867 C 5203 C 4639 C 4156 C 3739 C 3377 C 3059 C 2778 C 2530 C 2308 C 2109 C 1930 C 3RL11-24 10-2654-01 28, 947 T 24,790 T 21,669 T 19,238 T 17,292 T 15, 697 T 14,366 T 13,025 D 11,230 D 9783 D 8598 D 7616 D 6794 D 6097 D 5503 D 4991 D 4548 D 4161 D 3821 D 3522 D 3256 D 3019 D 2808 D 2617 D 3RL13-27 10-2656-01 37, 034 T 31,718 T 27, 727 T 24,621 T 22,133 T 20,095 T 18,394 T 16, 953 T 15,715 T 14,641 T 13,407 D 11,876 D 10,593 D 9507 D 8580 D 7783 D 7091 D 6488 D 5959 D 5491 D 5077 D 4708 D 4378 D 4081 D 3813 D 3571 D 3338 C 3098 C 2879 C 3R114•35 10-2657-01 45,916 T 39, 324 T 34,375 T 30, 523 T 27,437 T 24,910 T 22, 800 T 21,013 T 19,478 T 18,146 T 16,978 T 15, 945 T 14,223 D 12,766 D 11,521 D 10,450 D 9521 D 8711 D 8001 D 7373 D 6817 D 6321 D 5878 D 5480 D 5120 D 4795 D 4474 C 4156 C 3864 C 3595 C 3347 C 3118 C Note This tabie was developed for allowable Equivalent Center Loads (ECL) in pounds, with rail deflection limited to no more than 1/600 of the span or unsupported length, or 1'/<", whichever is less. The weight of the rail is inc/uded in the allowable ECL. B-16 Maximum 60:1 Span to Top Flange ratio on spans or unsupported lengths over 16 ft. Maximum 32:1 Span to Depth ratio. A suffix of "C'; "T" or D" denotes whether the ECL is limited by Compression, Tension or Deflection. THESE DIMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. DATA AND Revision Date:1/1/15 SPECIFICATIONS SHOWN ARE SUBJECT TO CHANGES OR IMPROVEMENTS IN DESIGN OR QUALITY OF MANUFACTURING WITHOUT NOTICE OR OBLIGATION. Page 13 of 83 325 Series Rail ., Crane and Monorail Systems Catalog TC/Al11ERICRt7 "L" Series Equivalent Center Load Table (ECL)-1/1000th Deflection Span 3RL8-18 3RL11-21 3RL11-24 3RL13-27 3RL14-35 (ft.j 10-2652-01 10-2653-01 10-2654-01 10-2656-01 10-2657-01 6 14,333 D 27,802 T 28,947 T 37,034 T 45,916 T 7 10,530 D 23,810 T 24,790 T 31,718 T 39,324 T 8 18,249 D 20,636 D 27,727 T 34,375 T 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 4264 D 3583 D 3053 D 2633 D 2293 D 2016 D 1785 D 1593 D 1429 D 1290 D 14,419 D 16,305 D 24,621 T 30,523 T 11,680 D 9653 D 8111 D 6911 D 5959 D 5191 D 4562 D 4041 D 3605 D 3235 D 2920 D 2648 D 2413 D 2208 D 2028 D 1869 D 1728 D 1602 D 1490 D 13, 207 D 10,915 D 9172 D 7815 D 6738 D 5870 D 5159 D 4570 D 4076 D 3658 D 3302 D 2995 D 2729 D 2497 D 2293 D 2113 D 1954 D 1812 D 1685 D 1570 D 20,593 D 17,019 D 14,301 D 12,185 D 10,507 D 9152 D 8044 D 7126 D 6356 D 5704 D 5148 D 4670 D 4255 D 3893 D 3575 D 3295 D 3046 D 2825 D 2627 D 2449 D 2288 D 2143 D 2011 D 1891 D 1781 D 27, 437 T 22,851 D 19,202 D 16,361 D 14,107 D 12,889 D 10,801 D 9568 D 8534 D 7659 D 6913 D 6270 D 5713 D 5227 D 4800 D 4424 D 4090 D 3793 D 3527 D 3288 D 3072 D 2877 D 2700 D 2539 D 2392 D 2257 D 2134 D 2020 D Note This fable was developed for allowable Equivalent Center Loads (ECL) in pounds, with rail deflecfion limited to no more than 1/1000 of the span or unsupporfed length, or 1'/." whichever is 1ess. The weight of the rail is included in fhe ailowable ECL. Maximum 60:1 Span to Top Flange ratio on spans or unsupporfed lengfhs over 16 ft. Maximum 32:1 Span to Depth ratio. A su�x of "C'; "T" or `D" denotes whether the ECL is limited by Compression, Tension or Deflection. Revision Date:1l1/15 THESE �IMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. DATA AND SPECIFICATIONS SHOWN ARE SUBJECT TO CHANGES OR IMPROVEMENTS IN DESIGN OR QUALITY OF MANUFACTURING WITHOUT NOTICE OR OBLIGATION. B-17 Page 14 of 83 f ' �Cf, '���� L �' �.: I � . � �� l �+�. � , � � !j- "�,. . �� v �, , ."�,�' : 'x � •Y... . �..k.. , . �/Za1� N t � � �:H � ���" � c.. . 13�� _.. � � � � a • .�".� �"�r{� -; :c.... � ; !� , ';a '� , , p �� � �:. a {.: ��;��,,�.,,:,� � ,;� �.< 1 ;;�:� , l ' e � ::. ;� 1Z ✓ W `� X Y �: I �Ld Page 16 of 83 r Page 17 of 83 Page 18 of 83 Company Designer �f� Job Number � � � �` TECNNOtOGIEB ModelName Coffman Engineers KPJ Hoist 8eam G/obal Hoist Beam Support Apr 14, 2016 Checked By: RISA-3D Version 12.0.0 (P:i...\...\...\...\5.14 STRUCTURALl5.14.5 Design Calculations\Hoist Beam.r3d] Page 1 Page 19 of 83 Company � Designer � Job Number ^_� �� r E c x N o� o a i e s MOdelNaltte G/obal. Continued Coffman Engineers KPJ Hoist Beam Hot Rolled Steel Properties Apr 14, 2016 Checked By: Hot Rolled Steel Secfion Sets Labei Sha e T e Desi n Li t Material Desi n Rules A in2 I in4 Izz in4 J in4 [.1 __ H R 1 A W 8x 10 Beam W�de Flange A36 G r.36 � Typical 2.96 2.09 30.8 i.043 Joint Coordinates and Temaeratures RISA-3D Version 12.OA [P:\...�...\...\...\5.14 STRUCTURA�\5.14.5 Design Calculations\Hoist Beam.r3d] Page 2 Page 20 of 83 Company : Coffman Engineers � Apr 14, 2016 �` �'� Designer : KPJ � Job Number . Checked By. �. ��� r e c N N o i o c � e s Model Name : Hoist Beam Hot Rolled Steel Desiarn Parameters ' Joint Loads and Entorced Disnlacements BLC 2: Lateral) Joint Label L D M Direction Ma nitude k k-ft in rad k`s^2/ft... � N3 � Y 2.3 Joint Loads and Enforced Disalacements (BtC 3: lonaitudinal) _._ __.. ... Joint Label_ L D ir t' Ma nitude k k-ft in rad k*s^2/ft... � 1� N3 L X 2 3 Movina Loads a Pattem Increment ft Both ... i s Joint2nd Joint rd Joint 4th J int 5th Joint 6th Joint 7th Joint 8th Joint 9kh Joint 1 h Jo... 1 Mi SK{D 1 N1 N2 � Movincr Load Patterns Pattern Label Load Direction Distance - _ ik)_ ft r SKID -------- -_�- -- ---- -2.3 z p Load Combinations EnveloQe A/SC 14fh(360-10): LRFD Stee/ Code Checks RISA-3D Version 12.0.0 (P:\...\..,\...\...\5.14 STRUCTURAL\5.14.5Design Caiculations�-loist Beam.r3d] Page 3 Page 21 of 83 � Company : Coffman Engineers Apr 14, 2016 � Designer : KPJ � � . � Job Number . Checked By: r e C H N o�o�c � e s Model Name : Hoist Beam _ Envelope Joinf Disalacements Joint X in LC Y in LC Z in LC X Rotation ..: LC Y Rotation ... LC Z Rotatio:..LC 1 N1 �max .021 1-9 .069 1-1 0 1-15 2.115e-3 1-13 4.737e-4 �->> 7.3�8e-3 1-5 : ' 2 : � min. : -:01��...: . 19. `;..., : 0 '; 1-15' :03 �� :� .3.982e 4 'a=i� 3.54.�� 4_. -1 .1 T�;629e-3 �=14' 3 N2 �max .021 1-9 .059 1-19 �-.002 1-5 2.115e-3 1-13 4.373e-4 �-1s i.ss�e-3 1-6 ' q, ; -; : . rriin " �: 9` ` 1-19 "`' ....{}02`. . ..1T :04� . a'=i9 =3:9$2�=41�ji 4:6 2� 4 =3 9 �.36e 3 �;:i.5 5 N3 max .021 1-9 .067 1-y0 -.005 3 2.115e- 1-t3 2.161e-4 1-19 4.75e-3 1-14 _ 6 . `: >?. >.:� .... .:: min -�0�9...- - 1.. .9, -. .dil$`a. , . ..�:. `�=:03$ ,. �t.10 ,3.98 e � �-17 1:547e-4 ::i. 1 4,�'S1e 3.:1=6: 7 N4 max .008 3 0 1-19 -.002 1-5 5.229e-4 �-j s 0 1-5 9.783e-5 3 RISA-3D Version 12.0.0 [P:\...\...\...\...\5.14 5TRUCTURAL\5.14.5 Design Calculations\Hoist Beam.r3d] Page 4 Page 22 of 83 ���-. Sir�'.::.,.. '6 �����F �- _ SEA-87204 {� f ��, oµ� 9 � � rr� � � � � ��.. � � �. �. . � ;��. sEa-��zoe ; � �;. ��! , ���:-; ' �:. �, SEA-Ri'X14 G�'xE3 �='�r � _��,� �ie�e�d� Cl,�cc�c s�rc��' C�r�.,. � = ��r'r� �t%r,. ;t'�t� �'t (J/� w' �rfp�c�- ,�.,,a�c L«.. � t1L�-= ' �c�asda,: t�.��, � A'e! ����.i ,�d' ���y �T y 9� �. 5 , � _, L�x�S � �S lc.w, �iK s�', n,i/�t r P!'a�—i ,1�i �',� �.�/...��.�./.� -- _ T'MYY7��j�MT S�o OiGkr✓i H7j ..oi�` 1,I�ew � G�vr,�-, ��y_- �L�„��� �' ��•t� �.,��,�.��<w-v. /o-� �COFFMAN NG1NEEftS pro�y� � �/C3 � ��t �7'"sh � a� Ixation �"� � �6/��' . a+'6/�'� Clien? �7a �r� Li, ���., sneei �w. 5y date j�/y"%i �' Jab no. checked t�� �� / da� Page 27 of 83 sea-ni�nn � � � � � � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATIONS CALCULATION SHEET Calculation Title: F1oorBquipment Anchorage Analysis Job No. : 150990 Page 1 of 9 Prepared By: JA Vollanan Date: 4/14/2016 Checked By: Date: Determine The Floor Loading for the Steam Converter Station #3 Determine the Dead Load of the Floor w�b:= 16in The steel joist spacing. DLfloorpl �- 0.04in• 490pcf = 1.63• psf The dead load the 20Ga steel plate flooring. DLPIy := 2.6psf = 2.6 psf The dead load the 5/8" plywood flooring. DL�S�:= 3psf = 3•psf The misc dead load. DLtotal �— DLfloorpl + Dl.ply + DL�S� = 7.23• psf The total superimposed distributed dead load on the floor. �'dl �- DLtotal' wmb = 9.64• plf The tributary dead load on the floor joist. Determine the Dead Load of the Steam Conversion Skid Wsk �- 35501bf d:= 9ft+ Sin w:= Sft h:= 68.Sin DLsk := Wsk = 75.4• psf d• w �'dlsk � — DLsk' �'trib — 100.53• plf Determine the Floor Live Load LL:= 60psf wll := LL• wmb = 80• plf The weight of the skid. The depth of the unit. The width of the unit. The height of the unit. The distributed load for the Skid. The tributary dead load on the floor joist due to the Skid. The floor live load The tributary live load on the floor joist. Page 28 of 83 � �' � �' IR � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Determine The Anchorage for the Steam Converter Unit Determine Seismic Force Which Acts at the Center-of-Gravity of the Equipment This structure will be analyzed as a"mechanical component" according to ASCE 7-10, Section 13.3. SDS h �— 1.011 �:_ 1.0 1.5 Rp := 2.5 37.5 z over h : _ — = 0.74 – – 51 Job No. : 150990 Page 2 of 9 Prepared By: JA Vollmian Date: 4/14/2016 Checked By: Date: The design spectral horizontal acceleration pazameter at short periods. The component ampliiication factor. ASCE 7-10, Table 13.5-1. Seismic Importance Factor. Per IBC 2012 use group II. Response Modification Factor. ASCE 7-10, Section 13.5.1. The height of the attachment point on the support structure (z) over the height of the structure (h). z/h need not be greater than 1.0 per ASCE 7-10, Section 13.3.1. 0.4ap•SDS h'W'Ip Fp(V� := 0.3• SDS h' Ip' R' if 03• SDS b• Ip• W> – •(1 + 2• z_over_h) – – � 0.4 ap SDS h' W' Ip � �– •(1 + 2• z_over h), 1.6 SDS h' Ip' V� I otherwise J The seismic design force centered at the component's center of Fp(V� = 0.599 W gravity and distributed relative to the component's mass distribution. ASCE 7-10, Section 13.3.1 p := 1.0 Eh_w ' – �' Fp� Wsk� - 2128.0961bf a�, := 0.2• SDS h �, = 0.2 Redundancy Factor. ASCE 7-10, Section 13.3.1 Horizontal seismic load effect of the equipment. ASCE 7-10, Section 12.4.2.1 Recommended vertical acceleration. ASCE 7-10, Section 13.3.1 Determine the Approzimate Location of the Center of Gravity of the Equipment CG� :_ � = 34.25• in Vertical distance fmm base to center of gravity of the equipment. Page 29 of 83 � � � �' � � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Check Overturning Effects of the Steam Converter Unit h�,`,:= w �0.7a� WSk•h�,�,) Mo := 0.7Eh �; CG� + — 2 + Mo = 5508• lbf• ft �0.6WSk• h�,�,� MI : _ 2 Mr = 5325• lbf• ft � �. � i � � Job No. : 150990 Page 3 of 9 Prepared By: JA Volkman Date: 4/14/2016 Checked By: Date: Width of the equipment anchor bolt pattern parallel to the seismic force. Overturning moment due to the applied loads on the Steam Converter Unit. Resistive moment of the Steam Converter Unit. M DCR�T:= �= 1.03 The DCR is greater than 1.0, Therefore, the skid unit will Mr overturn. Anchorage is required. Determine the Anchor Force on the Steam Converter Unit na:= 8 The number of anchors. Va:= Eh—W = 266.O1 lbf na Shear force per anchor. �0.7• a�,• Wsk• h�,) �0.6WSk• h�,)1 0.7• Eh �,�; CG� + — Ta:= m 2 2 = 9.151bf h�; 4 J Tension force per anchor. �0.7• a�,• Wsk• h�,) � 1.OWSk• h�,�,) � 0.7• Eh `,�; CG� + + Ca:= ma 2 2 = 305.48•pif h�; d J Compression Force per linear foot. Page 30 of 83 �. 0 �� � � �' � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Determine The Anchorage for the Expansion Tank Determine Seismic Force Which Acts at the Center-of-Gravity of the Equipment This structure will be analyzed as a"mechanical component" according to ASCE 7-10, Section 13.3. W•- 5651bf + 211 al• 62 4 cf - 2325 091bf �' g ' p - ' The mass of the Ex ansion Tank ' SDS h�- 1.011 �:_ 1.0 Ip := 1.5 2.5 37.5 z over h :_ — = 0.74 - - 51 � � Job No. : 150990 Page 4 of 9 Prepared By: JA Volkman Date: 4/14/2016 Checked By: Date: P • The design spectral horizontal acceleration pazameter at short periods. The component amplification factor. ASCE 7-10, Table 13.5-1. Seismic Importance Factor. Per IBC 2012 use group II. Response Modification Factor. ASCE 7-10, Section 13.5.1. The height of the attachment point on the support structure (z) over the height of the structure (h). 7Jh need not be greater than 1.0 per ASCE 7-10, Section 13.3.1. 0.4 aP SDS h' W' Ip Fp(V� := 0.3• SDS h' Ip' W if 0.3• SDS h' Ip' W� - •(1 + 2• z_over h) - - � - 0.4 ap• SDS h' W' Ip � �- •(1 + 2• z_over h), 1.6 SDS_h' Ip' V� I otherwise J The seismic design force centered at the component's center of Fp(V� = 0.599 W gravity and distributed relative to the component's mass distribution. ASCE 7-10, Section 13.3.1 p:= 1.0 Redundancy Factor. ASCE 7-10, Section 13.3.1 Eh �,:= p•Fp�W�) = 1393.8081bf Horizontal seismic load effect of the equipment. ASCE 7-10, - Section 12.4.2.1 a�, := 0.2• SDS h av = 0•2 Recommended vertical acceleration. ASCE 7-10, Section 13.3.1 D:= 30in H:= 82in The width of the base. The height of the tank. Determine the Approzimate Location of the Center of Gravity of the Equipment H CG�:=—=41•in 2 Vertical distance fmm base to center of gravity of the equipment. Page 31 of 83 � � � � � 1 � � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET CalculaHon Title: Floor/Equipment Anchorage Analysis Check Overturning Effects of the Expansion Tank Ih�,:= D (0.7a�,• W� h"�,) Mo := 0.7Eh �; CG� + — 2 Mo = 3745• lbf• ft (o.6w� t�,� Mr:= 2 Mr = 17441bf• ft Mo DCR�T : _ — = 2.15 Mr Determine the Anchor Force on the Ezpansion Tank na:= 4 Va:= Eh—W = 348.451bf na Job No. : 150990 Page 5 of 9 Prepared By:JA Vollanan Date: 4/14/2016 Checked By: Date: Width of the equipment anchor bolt pattern pazallel to the seismic I force. Overtuming moment due to the applied loads on the Expansion Tank. Resistive moment of the Expansion Tank. The DCR is greater than 1.0, Therefore, the tank will overturn. Anchorage is required. The number of anchors. Shear force per anchor. �0.7ad Wta hv�,� 10.6Wta h�,�,)1 0.7Eh `,`; CG� + - Ta2:= ma 2 2 = 800.431bf hW � Tension force per anchor. �0.7• a"• W� h�,�,) � 1.OW� h�,`,) � 0.7• Eh_"�; CG� + + Ca2:= m 2 2 = 2660.5 lbf hW J Compression Force. Page 32 of 83 � 1�' �I �' �' � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: F1oorBquipment Anchorage Analysis Job No. : 15099C Page 6 of S Prepared By: JA Vollcmac Date: 4/14/201f Checked By: Date: Determine the Adequacy of the 3/4" Plywood Spanning the Sleepers for the Mechanical Pad The following section analyzes the 3/4" plywood for bending and shear. The plywood is treated as a 16" (hPly) long, 12" wide, pinned pinned beam. Determine the Adequacy of the Plywood in Bending 11 := 12in – 3.Sin = 8.5• in The span spacing for the plywood. F 1 f•= Ca2 = 2660.5� plf , `'`'�' � 1 ft , Fb�1:= 1190psi _ -, KS := 0.418in3 ,� 120• Fb�l• KS �'b : _ /11\2 � � wb = 9913.98• plf F DCRb :_ �lf DCRb = 0.27 �'b Determine the Adequacy of the Plywood in Shear Ws �– Fwplf WS = 2660.5• plf FS:= 63psi .2 IbQ : = 4.047 ft � 20• FS IbQ� 12in �'s:- , 11 , 1 WS DCRS : _ — ' �'s ws = 7198.9• plf DCRS = 0.37 The load pound per linear foot value (per 12" width). The allowable bending stress for a 5-ply sheet, which is outdoors. (Plywood Design Specification 1997, Y510, Table 3) It is assumed that the plywood is of group 2 species. Effective Section Modulus when stress is applied perpendicular to face grain. (Plywood Design Specification 1997, Table 2) Conservatively, this value will be used since it is smaller than the section modulus when stress is applied parallel to face grain. The allowable pound per linear foot value in bending for 3/4", 5-ply plywood. (Plywood Design Specification 1997, Section 4.1.1) The demand to capacity ratio for bending is less than 1; therefore, the plywood is adequate in bending. The distributed load for bending is also used for shear. The allowable shear strength for rolling shear. (Plywood Design 5pecification 1997, Table 3) The shear strength for rolling shear will conservatively be used since the values are smaller than sheaz through the thickness. Rolling Shear Constant. (Plywood Design Specification 1997, Table 3) The allowable pound per lineaz foot value in shear for 3/4", 5-ply, plywood. (Plywood Design Specifcation 1997, Section 4.1.1) The demand to capacity ratio for shear is less than 1; therefore, the plywood is adequate in bending. Page 33 of 83 � �� �7 � �' � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Determine the Adequacy of the Plywood for Deflection Determine the Adequacy of the Plywood for Bending Deflection .4 m Job No. : 150990 Page 7 of 9 Prepared By: JA Volkman Date: 4/14/2016 Checked By: Date: I:= 0.108 ft Moment of Inertia when stress is applied perpendicular to face P1 d 'i ' E�,:= 1500000psi , , 0 gram. ( ywoo Design Speci icahon 1997, Table 2) Conservatively, this value will be used since it is smaller than the moment of inertia when stress is applied parallel to face grain. The allowable modulus of elasticity for a 5-ply sheet, which is outdoors. (Plywood Design Specification 1997, Y510, Table 3) It is assumed that the plywood is of group 1 species. WS 114 Ob :_ = 0• in The bending deflection. 1 ft• 1743• E�; I Determine the Adequacy of the Plywood for Shear Deflection C�,:= 60 tP := 0.75in WS C`,`; t 2• 112 OS:= p = 0.003•in 1 ft• 1270• E�; I �t : _ �b + OS = 0.01 • in Shear deflection constant. (Plywood Design Specification 1997, Section 4.1.1) The thickness of the panel. The shear deflection. The total deflection. 11 = 1263.68 The span deflection ratio. This is greater than 240; therefore OK. �t Determine the Adequacy of the 1/2" Lag bolt for Uplift T� = 800.431bf � Wls �= 367 lbf in DCRIs :— Ta2 � Wls' 2.25in DCRIs = 0.97 The uplift load on the expansion tank anchor. The lag screw Withdrawal Design Ualue for lag screws in Douglas I Fir-Larch. NDS 2010, Table 11.2A The demand to capacity ratio for the lag screw anchor is less than 1; therefore, the connection is adequate. Determine the Adequacy of the Simpson Strong T�e Type BA Hangers for Uplift Ta2 = 800.43 Ibf WuP := 11701bf T� DCRup:= W DCRup = 0.68 up The uplift load on the expansion tank anchor. The allowable uplift load for a Type BA hanger on a wood nailer. The demand to capacity ratio for the hanger is less than 1; therefore, the connection is adequate. Page 34 of 83 � � � �' � � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: F1oorBquipment Anchorage Analysis Job No. : 150990 Page 8 of 9 Prepared By: JA Vollcman Date: 4/14/2016 Checked By: I Date: ' Determine the Adequacy of the 3/8" Plywood for the rest of the tlooring for the Steam Converter Station #3 The following section analyzes the 3/8" plywood for bending and shear. The plywood is treated as a 16" (hp�y) long, 12" wide, pinned pinned beam. Determine the Adequacy of the Plywood in Bending 11 := 16in – 3.Sin = 12.5• in F�I f:= Ca = 305.48• plf , Fb�1:= 1190psi � KS:= 0.033in3 , � 120• Fb�l• KS �'b : _ /11`2 ll wb = 361.91•plf The span spacing for the plywood. The load pound per linear foot value (per 12" width). The allowable bending stress for a 5-ply sheet, which is outdoors. (Plywood Design Specification 1997, Y510, Table 3) It is assumed that the plywood is of group 2 species. Effective Section Modulus when stress is applied perpendicular to face grain. (Plywood Design Specification 1997, Table 2) Conservatively, this value will be used since it is smaller than the section modulus when stress is applied parallel to face grain. The allowable pound per linear foot value in bending for 3/8", 5-ply plywood. (Plywood Design Speciiication 1997, Section 4.i.i� F DCRb :_ �lf DCRb = 0.84 The demand to capacity ratio for bending is less than 1; therefore, �'b the plywood is adequate in bending. Determine the Adequacy of the Plywood in Shear Ws �- Fwplf FS:= 63psi .2 IbQ : = 4.927 ft 20• FS IbQ� 12in �'s : – 11 Ws DCRS:= — �'s WS = 305.48• plf ws = 5959.7• plf DCRS = 0.05 The distributed load for bending is also used for shear. The allowable shear strength for rolling sheaz. (Plywood Design Specification 1997, Table 3) The shear strength for rolling shear will conservatively be used since the values are smaller than shear through the thickness. Rolling Shear Constant. (Plywood Design Specification 1997, Table 3) The allowable pound per linear foot value in shear for 3/8", 5-ply, plywood. (Plywood Design Specifcation 1997, Section 4.1.1) The demand to capacity ratio for shear is less than 1; therefore, the plywood is adequate in bending. Page 35 of 83 a � � � I' � � � �4 � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Determine the Adequacy of the Plywood for Deflection Determine the Adequacy of the Plywood for Bending Deflection .4 m Job No. : 150990 Page 9 of 9 Prepared By:JA Vollanan Date: 4/14/2016 C6ecked By: Date: I:= 0.002 ft Moment of Inertia when stress is applied perpendicular to face Pl d E�,:= 1500000psi 60p1f• 114 �b :_ = 0.02• in 1 ft• 1743• E�; I gram. ( ywoo Design Speciiication 1997, Table 2) Conservatively, this value will be used since it is smaller than the moment of inertia when stress is applied parallel to face grain. The allowable modulus of elasticity for a 5-ply sheet, which is outdoors. (Plywood Design Speci�cation 1997, Y510, Table 3) It is assumed that the plywood is of group 1 species. The bending deflection. Determine the Adequacy of the Plywood for Shear Deflection ' C�,:= 60 tp := 0.375in WS C�,�; t 2• 112 OS := P = 0.009• in 1 ft• 1270• E�; I �t:= �b + OS = 0.03•in 11 — = 388.76 �t Shear deflection constant. (Plywood Design Specification 1997, Section 4.1.1) The thickness of the panel. The sheaz deflection. The total deflection. The span deflection ratio. This is greater than 240; therefore OK. Page 36 of 83 ��� ? :�; SEa-R1�na � SEA-872o4 Page 39 of 83 Typical Floor Bar Joist Analysis � � � � � � � r U J m � � O J Page 40 of 83 Typical Floor Bar Joist Analysis � > N U � m iri a � 0 � Page 41 of 83 , Company : CEI - Apr 14, 2016 � � Designer : KPJ - Job Number : 150990 Checked By: r E C M w o� n s � e s Modei Name : 9-101 Steam Converter Floor Joist � Typical Floor Bar Joist Analysis Report Giobal D�splay Sections for Member Calcs 10 Ma3c'Ir�terrtal $ectio�is for Member;Calc� .. ;' 104 , < ; ..,: �.. _ .,.. > �<. .... Include Shear Deformation? Yes • incl`utle Wa _ in � Y�s � >. 4 . ,-� - . ,.: . �: �.. .::: . ; . ,. , . . .:.. Trans Load Btwn Intersectin Wood Wall? Yes lncrease`.Nailin .0 "�ci, ftir.Wind?;. ..�.�,; .Y�s.;.:� ..;.�` .. ;; .4:: K _ � Area Load Mesh iM2 144 Mer e-:'foleraric� in ;�x . �.z�.- ;t. . 12y'::� _�> _ � .... . . ..,� ,. � . , .r .. .:�. . � .. :_ P-Delta Anal sis Tolerance 0.50% _ . In�lud"e P �elta.for Vllaxl,s? �. ° _ - �;s��v. Automaticl Iterate Stiffness for Walls? Yes M�xir��m 1ter�tior�.Number=#orWall��tiffne" s3 _'�::. �.... ..: . . ; . „ , � ��3�.� :.. ..,.,, ; . ........� ....� � ,�� . Gravi Acceleration in/sec^2 386.4 - V1►all:(v�esh �Size m , '�� , `� 12 ,��,,, .�� Ei ensolution Conver ence Tol. 1.E- � 4 1/ertifi,al f�iXfs: . .. x . ,,.; . . . . ' ','' ;;. . ; Y s ' :, , ,, � .....:. , , :. . ... . Global Member Orientation Plane XZ Static 'Solver �'; , . . .. `' , �_;, �� . ... "; . . .:. S",arse ftccel2eate� `� _, � Y „ �:;� .. - : D n� rvwu vvuc r�rarr� ivvo- ic. r�ov WoodxTem '�r�ture.:�-�� ... ��_. .�. w; �. : c'i`t3fiF�=.. ri..� � ....:'. �� �e: Concrete Code ACI 318-11 IVl�son . �.�ode ��. . �_ �� �,... ACI ��U 11.�:,�4�� Aluminum Code AA ADMi-10: ASD - Buildin Number of Shear Re ions 4 . , . _ :. _ �.. k .. '�: u ' 3 ,, - "xz . . Re' ion S acin Incr�ment; arr ,.,_ ,: . ��,m .4� . :�,�, . ..: . ... � -� . ; � Biaxial Column Method Exact Inte ration Parrr�e-Be#� �actor PCA = : . ., s����.. .� :.;; 4����; � ��. ::. � _. s ...,: : .:: Concrete Stress Block Rectan ular Use .C"rackec�'Se�tton�?. . •' {-. �°� ; M . _ ;k Yes� �. _. �, z - t ; h � w... . ,:,. ,� .:,, . ...,: _ ,... . ; Use Cracked Sections Slab? Yes Bad Framan` °-1Narr►iri`` s�.�..�.. .. ..,,, �; .� No.;,�'�. . ._�. �. � , ;,, °� � _: � � Unused Force Warnin s? Yes M�n .a �;Bar-Diain...5 a�m ? .. `r . . < :. _- s ;_ No ��:.. ` ' .,n. :�:� ..��...._: ,.. . ,... .... . .. Concrete Rebar Set REBAR SET ASTMA615 M��r %: S#�et for.Catumn ;t 1 ;:� a' Max % Steel for Column 8 RISA-3D Version 12.0.0 [P:\...\...\...\...\...\...\Converter Station Floor Joist D+100psfL.r3d] Page i Page 42 of 83 Company : CEI Apr 14, 2016 �'� Designer : KPJ �= . Job Number : 150990 Checked By: r e c x N o� o c � e s Model Name : 9-101 Steam Converter Fioor Joist Global. Continued Hot Rolled Steel Proaerties Joint Coordinates and Temneratures RISA-3D Version 12.0.0 [P:1...\...\...\...\...\...\Converter Station Flaor Joist D+100psfL.r3d] Page 2 Page 43 of 83 _ _ Company : CEI Apr 14, 2016 �� � Designer : KPJ - Job Number : 150990 Checked By: r e c e n o i o s �4e s Model Name : 9-101 Steam Converter FloorJoist _ _ Joint Coordinates and Temverafures lContinued) . �. � . �. f .,r..,� �. v ��..� . . . . v ��..i � r..i r...,,... rrr . .. n,....,.w r....,., n:__ . �. �. Hot Rolled Steel Desian Paramefera Labe( Shaae Lenothfinl Lbwfinl Lbzztinl Lcomn toofinlLcomo botfinlL-torau._ Kw Kzz Cb Funr.tinn RISA-3D Version 12A,0 [P:\...\...\...\...\...\...\Converter Sfation Floor Joist D+100psfL.r3d] Page 3 Page 44 of 83 Company : CEI Apr 14, 2016 Designer : KPJ �,� . � Job Number : 15U990 Checked By: T Ec c-�x « o� a s i e s Model Name : 9-101 Steam Converter Floor Joist Hot Rolled Stee! Desian Parameiers (Confinued) Member Distributed Loads (BLC J: dead) RISA-3D Version 12.0.0 [P:\...�...\...\...\...1...\Converter Station Floor Joist D+100psfL.r3d] Page 4 Page 45 of 83 Company : CEI Apr 14, 2016 � Designer : KPJ ����, ,�- Job Number : 150990 Checked By: r e c x N o� o G 1 EYS Model Name : 9-101 Steam Converter FborJoist Member Distributed Loads (BLC i: deadl (Continued) Member Distrihuted Loads BLC 2: live? Load Combinations Descri tion Sol... PD... SR... BL Fa tor BLC FactorBLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 D Yes Y � 1 1 Enveloae AISC 14th(360-10): ASD Stee/ Code Checks RISA-3D Version 12.0:0 [P:\...\...1...\...\...�...\Converter Station Floor Joist D+100psfL.r3dJ Page 5 Page 46 of 83 �. Company : CEI Apr 14, 2016 _- - � � Designer : KPJ Job Number : 150990 Checked By: r e c H N o� o�s � e s Model Name : 9-101 Steam Converter FloorJoist Envelope A/SC 14th(360-101: ASD Sfeel Code Checks (Continued) RISA-3D Version 12.0.0 [P:\...\...\...1...\...\...\Converter Station Floor Joist D+100psfL.r3d] Page 6 Page 47 of 83 ,. Company : CEI Apr 14, 2016 Designer : KPJ �-• �j Job Number : 150990 Checked By: r e c N N o � o s � e s �odel Name : 9-101 Steam Converter Fioor Joist Envelope Joint Displacements RISA-3D Version 12.0.0 [P:1...�...\...\...\...\...\Converter Station Floor Joist D+100psfL.r3d] Page 1 Page 48 of 83 _ _. Company : CEI Apr 14, 2016 Designer : KPJ `;� �; � Job Number : 150990 Checked By: r e c x a a�o c � e s Model Name '. 9-101 Steam Converter Fioor Joist _ _ _ _ _ _ _ Enve/ope Joint Disa/acements (Continued) Join X in LC Y in LC Z in LC XRotation ... LC Y Rotation ... LC Z Rot io... LC 57 N29 max -.023 2 -.293 2 0 1 0 1 0 1-3.549e-4 2. _ , '. 58,. : : :,_�`� .. mir� � .,::057 : :�, 3�... r� .�?36<. 3:�; :-1 -9.766e 4 .Q �,�. X �" ;1 ��. � � 1 �� ,. . .. . ... . 59 „ N30 max 019 2 297 2 0 1 0 ' 1 0 1 0 3 60 i'r'im... ;:048 �3. �' .i45` � --�0 � '1. ` .-:t} ;� � :� .U. ` :' 1, 0 .;2.� _ ,<.. ..�. . ,.. < ,: 61 N31 _ max -.016 2 .,•.293 2 0 1 � � ", . 1 � 0 1 s.�sse-a 3 'L.�.:;` . _�.,.., .,... �'11C1 .. :0 '9 .. �i. �3� r �`.�'7� � �: ° .s.{i � >::#. <.,;> ;� � :1 3:5d9e-4 .:'�3..; .... _ . .. , . . �. 63 N32 max -.012 2 -.282 � 2 0 1 0 1 0 1 1.94e-3 3 . 6�.. : .: ;-a ;::`. �. � - , ' m ': 3.,.,. � .70�; �- 3� # . � 7.�se-a �` ' ,. .:{3.. .. .. ...�:ti ,. . . ':�� � . ..:0 _.. :-1 ` . :'�: 6cr5 N3 max -.0! 2~ , -.�2�+6 ���2 0 1 0 1 0 ,1 2.s67e-3 3 'a"VV :l;l;t�l/ k �OGLs,. �v.V%�'1.`� i. V �.�W� � ..,�.� .a ��� i'..£� -�C..'"��i .ti�. ...ai%. ::� x�..',�r • �: i ♦ 1_�.'JA� u.�,e s:;� ... ... .:�! .. , ::�> • .. _ , ... �� 67 N34 max -.006 2 -.237 ' 2 0 1 0 1 0 � 1 3J29e-3 3 �; A ». ;: < ��_ ���, -:a. a . x. .� -: ���, �. �� � � ,:�o�e � IG. .. ... , �.. � . �w,r � � �i .��2 �YS z �.._, n:� �c 1 .k._;'{� . . . ......., .. . , :. . :.... .... .. ,.r. . . ...:� .: .,. ,.... : 69 N35 max -.003 �. �..2 -.204 2 0 1 0 1 0 1 4.494e-3 g ��a.�Y= .3. .�: . .` ��,.,,.:oa��.. �r.: ��:� ,� �i:. j x ��: t....:o.�� � ;�� :�.....� ;� ;:o � � �,.r�s�� ,:�� 71 N36 max 0 1 -.166 2 0 1 . 0 1 0 1 5.188e=3 ' 3 '�2._ ::�rtut �t.: 1. 3 :4�3� ' . 3:r 0 ` �:Y , � .:4.. 1 �„{�, ; � 2.o26e-3 :'2 x .,.. �, �. :-. .... : . . . . _ . . .... 73 N37 max .004 3 -.123 2 0 1 0 1 0: 1 5.644e-3 3 74.. _;� �� . :;:� � `., .''u� � �.;{�01 ,- �.,,�. �. �. .3fl4�. _ ..�:'. �, _:1'� C? �' `1' 2t218e•3. ';,2" .;�0 75 N38 max .007 3 -.076 2 0, . 1,� 0� 1 ~tl 0 1 6.42e-3 3 ; �5 : ; . . . ' , i'ritrt. ,a :0 3 :^ ��" '....,s185': . .' �: ,. ..�....� �1 <_b . :`I° p s =1... =2: '9e=3 77 N39 max .008 3 -.049 2 0 1 0 1 0 ' 1 6.722e-3 3 �g _ .' _rri�.,� :oo� . :: ��: .:.�. .�� � .�:; o. .� � ��. `m:�.�, �:a �._ �7�s�-� .:� -- -_ _ RISA-3D Version 12.OA [P:\...\...\...\...\...\...\Converter Station Floor Joist D+100psfL:r3d] Page 2 Page 49 of 83 :�.;�' ���-� :� ��,�• -'��; SFA-qi204 � ,���. ,�� � , X� .: � :�� ,., I� � SEA-B12M _ � - , = -., , �J _ , �' _ � . F . . .. � Yr,,.,, '�___ + Table 4.2A Nominal Unit Shear Capacities for Wood-Frame Diaphragms � Shoalhing Cammon � Grade Nall Slze 1 ( �• ! gd 1 Structurai I � 8d i �� 6d Sheathmg � and I &1 Singie-Fhwr 10d Blocked Wood Structural Panel Diaphragms (Excluding Ptywood for G,)1,2.3.'' Mfnlmum Minimum I Minimum Factener Nominal �minal Penatrallon Panel , Framing in Fram(ng Thieknesa W��h �in.) (in.) (in.j 1•1W 5r16 2 3 t-3�8 3l8 2 3 t-1/2 t5/32 2 3 � 5/tc 2 1-t14 --- 3 3I8 2 3 3I8 2 3 t•3f8 7l76 2 3 15l32 Z 3 t 5/32 Z 1 • 112 3 19132 ? L Nvmin:al unit iheer capacitics sh�ll be uJ,justed in a«urdunce with 4.2.3 lo deter- mme ASD alluwable uni� shear �upacrtq and LRFD fxcturtd unit resiswnce. Fur gencral cunsin�ction reyuiremenic see 4.^_.6. Fnr speciti. reyuiremenC,, see 3.2.7.1 !i>r wiwJ ;w�wral p:uicl diaphrabitL�. 2. F�r tr�ming gr,uk, u�her �h�n Duugla< Fir-Larch ��r Suulhem I'm�, reduced nominal ui�i� ,he�r �apa�i���� �hall bc det�rnunrd by multiplying thc t�bulaced nominal �i��ii shear �ap�i�i�y b�• �hc Sp�:c�ti� Cra�•ii� .ad�usmicn[ Fuctor =[ 1-(0.5 - G�I, Kh�rc G= Sp.:: ilic Gravu�• nl ihc ir.mung lumhcr t7om thc ND.S. 'I'hc S�ecih� l.�ra�u� 4dju5tmeni Fairor �h;ill not Ix grcatcr ihan I. 3. App.ucnt ihcat ,tifinra� �;iluc�, G„. arc h.iscd un n�i! slip in fr:uiung µ iih moix- tw'c nmtrnt lrs� lh�n ur �:yual tu 19�3L at uu�c uf f'abrirauun ;uid pancl stiffnes, �.+lur: tor di:�ptvagms conswcicd wi[h OSB p:uich. ��'hcn pl}•wood pancls arc uud. C, �alur� shafl ix d�trnnmed m i1C�ORI:fI1CC KI(}1 AP�)C11lJI.0 A. J. �Vbere nu�uturc cantcnt uf lhe fra�rung u greater than 19�;;, at time uf Fabrirahon. G, �:�lu�� tih:ill bo multiplicd by 0.5 � N t� N cn w 0 � W Cese 1 Casu 2 Load - -- Framing � �'ll._r,l.� �f � i ( I� �.. � _.� .��; L . _,` .. �. ; �-I t � ��_ , �. . �.._� :.�._�C��_ _r' �k� ( � �__'� �T��.�I��; -- Dit+phragm bounclary Cese 5 SW3iSAS JNl1SIS32!-3�a0� 1V2i31V1 Case 3 �,��..�...�� �TT:=:..=.*--- � r� �� l' �`_ --- ;—.. ;, ,,, ��-.:: i t �-- t �-' . -, .� . r_,._ l , � � � i : � �_ _� �� L_ _ __ . . Case 6 � •-Framing �_��.� .�__.�. ` . . . , � � �r...._,__ � �! �� t ' '.;..--�-.—� ' ` ' ' -�� �.-_� _ -�, � � , � �, E � � ' _t �. �� : '•.� � Continuoue panel joint�� r � Page 54 of 83 Company : CEI Apr 13, 2016 � � � ��� Designer : JAV ! Job Number : 150990 Checked By: • r e c N N o� o a � f s Model Name : Boeing 9-101 Steam Converter #3 Stair �' New Ship Ladder Stair Analysis Report � G/obal � � RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 1 Page 55 of 83 Company : CEI Apr 13, 2016 ������ ob Number : 15 990 Checked By: r e c H N a � a � � E s Model Name : Boeing 9-101 Steam Converter #3 Stair G/obal. Coniinued Seismic Code ASCE 7-10 Seismic Base Elevation ft Not Entered Add Base Wei ht? Yes Ct Z .02 Ct X .02 T Z sec Not Entered T X sec Not Entered RZ 3 RX 3 Ct Ex . Z .75 Ct Ex . X .75 SD1 1 SDS 1 S1 1 TL sec 5 Risk Cat I or II eismic Detailin Code ASCE 7-05 mZ 1 Om X 1 ho Z 1 Rho X 1 Hot Rolled Steel Proverties ,+ Hot Rolled Steel Section Sets ' Label Sha e T e Desi n List Material Desi n R... A in2 I in4 Izz in4 J in4 1 HR1A W8x10 Beam Wide Flan e A36 Gr.36 T ical 2.96 2.09 30.8 .043 �- � � , Joint Coordinates and Temaeratures Label X ft Y ft Z ft Tem F Detach From Dia hra m 1 N1 0 0 0 0 2 N2 0 2.5 3 N3 2 0 0 0 4 N4 2 0 2.5 0 5 N5 2 8 .5 0 6 N6 0 8 0 0 7 N7 0 8 2.5 0 8 NS 2 8 0 0 9 N9 2 8 2.5 0 10 N10 5.979 0 .5 0 11 N11 5.979 0 2.5 0 12 N 12 0 12.958 5.5417 0 13 N13 2 12.958 5.5417 0 RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 2 Page 56 of 83 � ,� r , e Company � � ���� Designer Job Number T�cHNO►oc�Es ModelName Joint Boundarv Conditions CEI JAV 150990 Boeing 9-101 Steam Converter #3 Stair Apr 13, 2016 Checked By: Hot Rolled Steel Desiun Parameters Label Sha e Len th ... Lb ft Lbzz ft Lcom to ft Lcom bot..L-to ... K Kzz Cb Functi... 1 M 1 W8x24 2.5 �ateral 2 M2 W8x24 2 �ateral 3 M3 W8x24 2.5 Lateral 4 M4 W8x24 2 �ateral 5 M5 HSS4x4x4 8 �ateral 6% M6 HSS4x4x4 8 �aterai 7 M7 HSS4x4x4 8 Lateral 8 M8 HSS4x4x4 8 �ateral 9 M9 MC10x8.4 8.935 Lateral 10 M10 MC10x8.4 8.935 Lateral 11 M11 MC10x8.4 5.817 Lateral 12 M12 MC10x8.4 5.817 �ateral Member Distributed Loads (BLC 1: Deadl Member Distributed Loads fBLC 2; Live) Member Distributed Loads (BLC 3: Ex) RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 3 Page 57 of 83 I ��e���� Company : CEI Apr 13, 2016 Designer : JAV Job Number : 150990 Checked By: , r e c N w o� o c � E s Model Name : Boeing 9-101 Steam Converter #3 Stair , 0 Member Distributed Loads (BLC 3: Ex) (Continued) Member Distributed Loads (BLC 4: Ez) Basic Load Cases Load Combinations � Envelope Joint Reactions RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 4 Page 58 of 83 r '� ������� Company : CEI Apr 13, 2016 Designer : JAV Job Number : 150990 Checked By: T E c N r, o► o c� E s Model Name : Boeing 9-101 Steam Converter #3 Stair EnveloQe Joint Reacfions (Continued) Enveloae Member Section Forces , RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 5 Page 59 of 83 � „ B���� � Company : CEI Apr 13, 2016 Designer : JAV Job Number : 150990 Checked By: . r e c N„ o � o c � E s Model Name : Boeing 9-101 Steam Converter #3 Stair , Enveloae Member Section Forces (Continued) � r RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 6 Page 60 of 83 Company ~ ������ Designer Job Number TEcxNo�oc�Es ModelName .� . CEI JAV 150990 Boeing 9-101 Steam Converter #3 Stair EnveloQe Member Section Forces (Continued) Apr 13, 2016 Checked By: Envelope A1SC 14th(360-101: LRFD Stee/ Code Checks RISA-3D Version 12.0.0 [�...\...\...\...\...\...\...\...\5.14.5 Design Calculations\Ship Ladder Stair.r3d] Page 7 Page 61 of 83 , e ������ CALCULATION I�G1'NE��'� SHEET Project: Boeing 9-101 Steam Conversion Upgrade Calculation Title: Floor/Equipment Anchorage Analysis Job No. : 150990 Page 1 of 4 Prepared By: JA Voll�►an Date: 4/14/2016 Checked By: Date: CALCULATIONS Determine The Ship Ladder Stair Loading for the Steam Converter Station #3 Determine the Dead Load of the Platform/Stair w�b:= 24in The steel platform joist/stair stringer spacing. DLfloorpl=- 0.25in•490pcf = 10.21•psf The dead load the 1/4" steel plate flooring. DLtotal �— DLflootpl— 10.21• psf �'�'dl �- DLtotaT w�b = 20.42• plf Determine the Stair Live Load LL:= 100psf �'�'ll � — LL w�b = 200• plf The total superimposed distributed dead load on the floor. The tributary dead load on the floor joist. The stair live load The tributary live load on the floor joist. Page 62 of 83 � � � � 1� � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Job No. : 150990 Page 2 of 4 Prepared By: JA Volkman Date: 4/14/2016 Checked By: Date: Determine The Seismic Loading on the Ship Ladder Stairs Determine the Affects of Seismic Loading on the Platform in Accordance with ASCE 7-10, Ch. 15 SDS h�- 1.009 The design spectral horizontal acceleration parameter at short — periods. SD1 h�- 0.573 Horizontal response spectra at 1.0 seconds. . IS:= 1.0 p := 1.0 � Rp:= 1.5 ; SZ�:= 1 ' Ct:= 0.02 , I hn�= 38 Seismic importance factor. Redundancy Factor. ASCE 7-10, Section 15.6 Response modifcation factor per ASCE 7-10, Table 15.4-1 for Steel ordinary conceentrically braced frame detailed to AISC 360. Overstrength Factor. ASCE 7-10, Table 15.4-1. x:= 0.75 Approximate Period Parameters per all other structural systems, Table 12.8-2, ASCE 7-10. The top of the stair attachment height above the base. T:=Cthn"•s=0.31s The period of the stair platform. TL:= 6s Long period transition period. (ASCE 7-10, Section 11.4.5 and _ I Cs �— , Figure 22-15) m mi SDS_h SD1_h 1� 0.044• SDS h' IS, 0.0 � if T<_ TL Per ASCE 7-10, Equations i2.8-1 through 12.8-5. �l T � - � IS J S IS J J TL 1 1 SDS h SD1 h' S ma 1, , 0.044• SDS h' IS, 0.0 otherwise � T12 � _ IS �� S� IS J J CS = 0.67 The seismic response coefficient. (ASCE 7-10, Section 12.8.1.1) ahor cur �- P' CS g= 0.67• g The lateral acceleration per ASCE 7-10. avert cur �- P' 0�2' SDS h' g— 0•2' g The vertical acceleration per ASCE 7-10, Equation 12.14-6. Page 63 of 83 �� � �' � � � � � Project: Boeing 9-101 Steam Conversion Upgrade CALCULATION SHEET Calculation Title: Floor/Equipment Anchorage Analysis Determine the Adequacy of the All Around Weld End of the HSS4x4 Columns X— Job No. : 150990 Page 3 of 4 Prepared By: JA Vollcrnan Date: 4/14/2016 Checked By: Date: Weld Geometry: b:= 4• in Weld width. d:= 4• in Weld length. �'act � – 3 ' � Weld size. 16 �weld �- �0000• psi Ultimate stress of the weld metal. I Y Connection forces and moments (ensure that orientations are correct from weld to iigure above). FX := 2kip = 2000 Ibf MX := 2kip• 8 Fy := 2kip = 20001bf FZ:= 2kip = 20001bf Weld Properties Per Blodgett 1991, Table 5, Page 7.4-7. CX := b CX = 2• in 2 CY:= � Cy = 2•in Ay�,:= 2• (b + d) A�, = 16• in My := 2kip• ft MZ:= 2kip•ft The distance from the Neutral Alcis (NA) to the outer fiber in the x-direction. The distance from the Neutral Axis (NA) to the outer fiber in the y-direction. The linear azea of the weld. 2 S� := b• d+ 3 S� = 2133• in2 The linear section modulus about the x-�is. 2 5�,3, := b• d+ 3 5�,�,3, = 21.33• in2 The linear section modulus about the y-axis. 3 J�,:= �b 6 d� J�,�, = 85.33•in3 The linear polar moment of inertia. Fz Mx My �2 Fx Mz' Cy 12 Fy Mz' Cx 12 lbf A1�:= — + — + — + — + + — + Al� = 256631•— Linear Weld Stress: A�, S� S�,3, J Au, J�, ) A�, J�, J in Page 64 of 83 ,������� CALCULATION N �i I' �1 E � �, :� SHEET I Project: Boeing 9-101 Steam Conversion Upgrade Calculation Title: F1oorBquipment Anchorage Analysis ``,lin �'�' � 0.707wact �F�, : = 0.75• 0.6 6�,eld DCR:= � = 0.61 �F�, 0 f�, = 19.4� ksi Actual stress in the weld. Job No. : 150990 Page 4 of 4 Prepared By: JA Vollcman Date: 4/14/2016 Checked By: Date: The factored weld stress per AISC 14th Ed. Table J2.5, �F"�,= 31.S�ksi page 16.1-100. fW «Fw; therefore, OK. DCR for weld. DCR is less than 1.0; therefore, OK. Page 65 of 83 www.hilti.us Company: Specifier. Address: Phone I Fax: E-Mail: Specifier's comments: 1 Input data Anchor type and diameter: Effective embedment depth: Material: Evaluation Service Report: Issued I Valid: Proof: Stand-off installation: Anchor plate: Profile: Base material: Installation: Reinforcement: Seismic loads (cat. C, D, E, or F) Geometry [in.] 8 Loading [Ib, in.lb] Profis Anchor 2.6.4 Page: 1 Project: Sub-Project I Pos. No.: Date: 4/14/2016 Kwik Bolt TZ - CS 1/2 (2) hef,aet = 2•000 In., h�m = 2.375 I�. Carbon Steel ESR-1917 10/1/2015 � 5/1/2017 Design method ACI 318-11 / Mech. eb = 0.000 in. (no stand-0f�; t= 0.500 in. Ix x lY x t= 10.000 in. x 10.000 in. x 0.500 in.; (Recommended plate thickness: not calculated Square HSS (AISC); (L x W x T) = 4.000 in. x 4.000 in. x 0.250 in. cracked concrete, 3000, f� = 3000 psi; h= 5.000 in. hammer drilled hole, Installation conditlon: Dry tension: condition B, shear: condition B; no supplemental splitting reinforcement present edge reinforcement: none or < No. 4 bar Tension load: yes (D.3.3.4.3 (d)) Shear load: yes (D.3.3.5.3 (c)) ,x Input date and results must be checked for agreement wifh the existing conditions and for plausib(liryl PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hi�i is a registered Trademark of Hilti AG, Schaan Page 66 of 83 www.nilti.us Company: Specifier. Address: Phone I Fax: � E-Mail: 2 Load case/Resuiting anchor forces Load case: Design loads Anchor reactions [Ib] � Tension force: (+Tension, -Compression) Anchor Tension force Shear force Shear force x Shear force 1 533 14 10 10 2 418 14 10 10 3 543 14 10 10 4 658 14 10 10 max. concrete compressive strain: - [900] max. concrete compressive stress: - [psi] resulting tension force in (�y)=(-0.374/0.406): 2151 [Ib] resulting compression force in (x/y)=(0.000/0.000): 0[Ib] 3 Tension load Page: Project: Sub-Project I Pos. No.: Date: Profis Anchor 2.6.4 2 4/14/2016 Y �4 �3 � Tensi X 0 2 Load N1e [Ib] Capacity �N„ [Ib] Utilization �N = N„�/4N„ Status Steel Strength* 658 8029 9 OK ' Pullout Strength* N/A N/A N/A N/A Concrete Breakout Strength" 2151 4022 54 OK * anchor having the highest loading "•anchor group (anchors in tension) 3.1 Steel Strength Nsa = ESR value refer to ICC-ES ESR-1917 � N� 2 N�a ACI 318-11 Table D.4.1.7 Variables �a,N Iin.21 f� IPS7 0.10 106000 Calculations N� [Ib] 10705 Results Nse ��b� �steel �nonductile � Nsa ��b� Nua l�bJ 10705 0.750 1.000 8029 658 Input data and results must be checked for agreement with the exis6ng cond'Rions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hitti AG, FL-9494 Schaan Hilti is a registered Tredemark of Hilti AG, Schaan Page 67 of 83 www.nilti.us Company: Specifier: Address: Phone I Fax: � E-Mail: 3.2 Concrete Breakout Strength N�'a -\ Nc0/ wet�N l�ed,N W��N W�P�N Nb � Nopg Z Nua AN� seeACl318-11, Part D.5.2.1, Fig. RD.5.2.1(b) AN�o = 9 het 1 We�,N � e 51.0 3 h� yred,N = 0.7 + 0.3 � Ca,min � 5 1.0 1.5hef WeP N= M�r�a,m�n 1.5hef� 5 1.0 . \., �Cac � Cac Nb = ^c %,a � �c hef5 ACI 318-11 Eq. (D-4) ACI 318-11 Table D.4.1.1 ACI 318-11 Eq. (D-5) ACI 318-11 Eq. (D-8) ACI 318-11 Eq. (D-10) ACI 318-11 Eq. (D-12) ACI 318-11 Eq. (D-6) Page: Project: Sub-Project I Pos. No.: Date: Variables heT �I�.� ec1�N �III.� ec2�N �In.� Ca.min �Ifl.� �IcN 2.000 0.374 0.406 � 1.000 �e� [in.] � �,a f� [PS7 5.500 17 1.000 3000 Profis Anchor 2.6.4 3 4/14/2016 Calculations z e�� z7 ANc �In• � ^Nc0 �In• 1 �Iec1,N l�lec2,N l�ed.N �lcp N Nn I�bl 144.00 36.00 0.889 0.881 1.000 1.000 2634 Results N� [Ib] �concrete �seismic �nonducille � N�9 [Ib] ni�e [Ib] 8250 0.650 0.750 1.000 4022 2151 Input data and resuks must be checked for agreement with the exisfing conditions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Tredemark of Hilti AG, Schaan Page 68 of 83 � www.nilti.us Company: Specifier. Address: Phone I Fax: E-Mail: 4 Shear load Page: Project: Sub-Project I Pos. No.: Date: Profis Anchor 2.6.4 4 4/14/2016 Load V1e [Ib] Capacity �V„ [Ib] Utilization �� = V„�/�V„ Status Steel Strength* 14 3572 1 OK Steel failure (with lever arm)` N/A N/A N/A N/A Pryout Strength•" 57 7374 1 OK Concrete edge failure in direction *` N/A N/A N/A N/A " anchor having the highest loading "anchor group (relevant anchors) 4.1 Steel Strength Vse,eq = ESR value refer to ICC-ES ESR-1917 � Vsteel Z Vua ACI 318-11 Table D.4.1.1 Varlables %4a,v [in.21 f�� IPS7 0.10 106000 Calculations Vsa.eQ ��b� 5495 Results Vsa,aq I�b� �stee� �nonducu�e � usa ��b� Vua ��b� 5495 0.650 1.000 3572 14 4.2 Pryout Strength v`� —� L\A co/ �ec,N Wad,N Wo,N Wov,N NbJ w \/cpg 2 Vua AN� see ACI 318-11, Part D.5.2.1, Fig. RD.5.2.1(b) s ANtO = 9 hef � WeL N 2 eN 5 1.0 �+3her W�,N = 0.7 + 0.3 Ca,min 5 1.0 1.5hef W�0.N — MAX�Ca—m�n 1.5h8�� 5 1.0 '. �Cac � Cac Nb — � �,a v'C hefs ACI 318-11 Eq. (D-41) ACI 318-11 Table D.4.1.1 ACI 318-11 Eq. (D-5) ACI 318-11 Eq. (D-8) ACI 318-11 Eq. (D-10) ACI 318-11 Eq. (D-12) AC1318-11 Eq.(D-6) Variables � har [in.] e��,N Iin.] e�,N [in.] Ca�min [in.] 1 2.000 0.000 0.000 � Wc.N �ac �If1.J ^c %,a �c �PS�J 1.000 5.500 17 1.000 3000 Calculations ^Nc ��n 2J AN�o I��?1 l�lecl,N 1�1ec2.N l�led.N l�lcp,N Nn I�bl 144.00 36.00 1.000 1.000 1.000 1.000 2634 Results V�pA [Ib] �concrete �seismic �nonduetile � V�Pe [Ib] V�a [Ib] 10535 0.700 1.000 1.000 7374 57 Input data and resuMs must be checked for agreement with the exisbng conditions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hiw is a registered Trademark of Hilti AG, Schaan Page 69 of 83 www.nilti.us Profis Anchor 2.6.4 Company: Page: 5 Specifier: Project: Address: Sub-Project I Pos. No.: Phone I Fax: � Date: 4/14/2016 E-Mail: 5 Combined tension and shear loads jiN R� C Utilization pN,v (%] Status 0.535 0.008 5/3 36 OK jiHv=R�+j3v<=1 6 Warnings • Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered. The anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the loading! Input data and results must be checked for agreement with the existing conditions and for plausibility! • Condition A applies when suppiementary reinforcement is used. The � factor is increased for non-steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength. Refer to your local standard. • Refer to the manufacturer's product literature for cleaning and installation instructions. • Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! • An anchor design approach for structures assigned to Seismic Design Category C, D, E or F is given in ACI 318-11 Appendix D, Part D.3.3.4.3 (a) that requires the goveming design strength of an anchor or group of anchors be limited by ductile steel failure. If this is NOT the case, the connection design (tension) shall satisfy the provisions of Part D.3.3.4.3 (b), Part D.3.3.4.3 (c), or Part D.3.3.4.3 (d). The connection design (shear) shall satisiy the provisions of Part D.3.3.5.3 (a), Part D.3.3.5.3 (b), or Part D.3.3.5.3 (c). • Part D.3.3.4.3 (b) / part D.3.3.5.3 (a) require the attachment the anchors are connecting to the structure be designed to undergo ductile yielding at a load level corresponding to anchor forces no greater than the controlling design strength. PaR D.3.3.4.3 (c) / part D.3.3.5.3 (b) waive the ductility requirements and require the anchors to be designed for the maximum tension / shear that can be transmitted to the anchors by a non-yielding attachment. Part D.3.3.4.3 (d) / part D.3.3.5.3 (c) waive the ductility requirements and require the design strength of the anchors to equal or exceed the maximum tension / shear obtained from design load combinations that include E, with E increased by �o. • Hilti post-installed anchors shall be installed in accordance with the Hilti Manufacturer's Printed Installation Instructions (MPiI). Reference ACI 318-11, Part D.9.1 Fastening meets the design criteria! Input data and results must be checked for agreement with the euisting conditions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Tredemaric of Hilti AG, Schaan Page 70 of 83 vwvw.hilti.us Company: Specifier: Address: Phone I Fax: E-Mail: 7 Installation data Page: Project: Sub-Project I Pos. No.: Date: Profis Anchor 2.6.4 6 4/14/2016 Anchor plate, steel: - Anchor type and diameter: Kwik Bolt TZ - CS 1/2 (2) Profile: Square HSS (AISC); 4.000 x 4.000 x 0.250 in. Installation torque: 480.001 in.lb Hole diameter in the fixture: df = 0.563 in. Hole diameter in the base material: 0.500 in. Piate thickness (input): 0.500 in. Hole depth in the base material: 2.625 in. Recommended plate thickness: not calculated Minimum thickness of the base material: 4.000 in. Driliing method: Hammer drilled Cleaning: Manual cleaning of the drilled hole according to instructions for use is required. 7.1 Recommended accessories • Suitable Rotary Hammer • Properly sized drill bit Coordinates Anchor in. • Manual blow-out pump • Torque wrench „ • Hammer Anchor x y c.x c.= c�, c.,, 1 -3.500 -3.500 - - - - 2 3.500 -3.500 - - - - 3 3.500 3.500 - - - - 4 -3.500 3.500 - - - - Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor ( c) 2003-2009 Hiltl AG, FL-9494 Schaan Hitti is a registered Trademark of Hild AG, Schaan Page 71 of 83 www.nilti.us Company: Specifier: Address: Phone I Fax: E-Mail: Speciflers comments: 1 Input data Anchor type and diameter: Effective embedment depth: Material: Evaluation Service Report: Issued I Valid: Proof: Stand-off installation: Anchor plate: Profile: Base material: Installation: Reinforcement: Seismic loads (cat. C, D, E, or F) Geometry [in.] & Loading [Ib, in.lb] Profis Anchor 2.6.4 Page: 1 Project: Sub-Project I Pos. No.: Date: 4N 4/2016 Kwik Bolt TZ - CS 112 (2) . ��� het,act = 2•000 i�., h�m = 2.375 I�. Carbon Steel ESR-1917 10/1/2015 � 5/1/2017 Design method ACI 318-11 / Mech. eb = 0.000 in. (no stand-of�; t= 0.500 in. I, x lY x t= 10.000 in. x 7.000 in. x 0.500 in.; (Recommended plate thickness: not calculated Square HSS (AISC); (L x W x T) = 4.000 in. x 4.000 in. x 0.250 in. cracked concrete, 3000, f� = 3000 psi; h= 5.000 in. hammer drilled hole, Installatton condition: Dry tension: condition B, shear: condition B; no supplemental splitting reinforcement present edge reinforcement: none or < No. 4 bar Tension load: yes (D.3.3.4.3 (d)) Shear load: yes (D.3.3.5.3 (c)) Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Tredemark of Hilti AG, Schaan Page 72 of 83 www.hilti.us Company: Specifier: Address: Phone I Fax: E-Mail: 2 Load case/Resulting anchor forces Load case: Design loads Anchor reactions [Ib] Tension force: (+Tension, -Compression) Anchor Tension force Shear force Shear force x Shear force y 1 140 16 8 13 2 89 11 8 7 3 541 14 12 7 4 592 18 12 13 max. concrete compressive strain: 0.03 (%o) max. concrete compressive stress: 137 [psi] resulting tension force in (x/y)=(-0.264/1.329): 1362 [Ib] resulting compression force in (x/y)=(1.926/-3.295): 231 [Ib] 3 Tension load Page: Project: Sub-Project I Pos. No.: Date: Profis Anchor 2.6.4 2 4/14/2016 m Load N1e [Ib] Capacity �N„ [Ib] Utllization �N = N„�I�N„ Status Steel Strength' 592 8029 8 OK Pullout Strength* Concrete Breakout Strength`* N/A 1362 * anchor having the highest loading "anchor group (anchors in tension) 3.1 Steel Strength Nga = ESR value refer to ICC-ES ESR-1917 � N� 2 N�a ACI 318-11 Table D.4.1.1 N/A 2726 Vartables ASB,N [in?] f„� [psi] 0.10 106000 Calculations N� [Ib] 10705 Results Nsa ��b� �steel �nonductlle � Nsa Pb� N�e ��b� 10705 0.750 1.000 8029 592 N/A N/A 50 OK Input data and results must be checked for agreement with the existlng conditions and for plausibility! PROFIS Anchor ( c) 2003-2009 Hiw AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 73 of 83 www.nllti.us Company: Specifier: Address: Phone I Fax: E-Mail: 3.2 Concrete Breakout Strength 1/AA�N�o N� —\^NcO� �at�N WeO�N W��N W�P�N Nb � N� z Nua AN� seeACl 318-11, Part D.5.2.1, Fig. RD.5.2.1(b) ANoo = 9 he� 1 y,e�,N �+ 2 eN s 1.0 3 hef W�,N = 0.7 + 0.3 � �a,min � 5 1.0 1.5hef W�v,N = MAX�Ca=m�n 1.5h�� 5 1.0 �� ��ac � �ae Nb = k� �,a YT� hefs ACI 318-11 Eq. (D-4) ACI 318-11 Table D.4.1.1 ACI 318-11 Eq. (D-5) ACI 318-11 Eq. (D-8) ACI 318-11 Eq. (D-10) ACI 318-11 Eq. (D-12) AC1318-11 Eq.(D-6) Page: Project: Sub-Project I Pos. No.: Date: Variables her [in.l e��.N Iin.l e�z,N Iin.] Ca.min [in.] W�,N 2.000 0.264 1.329 � 1.000 Cac �I�.� kc %,a fc �PS�� 5.500 17 1.000 3000 Profis Anchor 2.6.4 3 4/14/2016 Calculations ^Nc l�� 2J AN�o I�n.2l l�lec7,N Wec2�N l4/ed,N �lcp N Nn [�bl 120.00 36.00 0.919 0.693 1.000 1.000 2634 Results N�� [Ib] �concrete �selsmic �nonductile � N�ng [Ib] N�e [�b] 5592 0.650 0.750 1.000 2726 1362 Input data and resuMs must be cliecked for agreement with the existlng conditions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a repistered Trademark of Hitti AG, Schaan Page 74 of 63 www.nilti.us Company: Specifier: Address: Phone I Fax: � E-Mail: 4 Shear load Page: Project: Sub-Project I Pos. No.: Date: Profis Anchor 2.6.4 4 4/14/2016 Load V1e [Ib] Capacity �V„ [Ib] Utilization �� = V„�/¢V„ Status Steel Strength' 18 3572 1 OK Steel failure (with lever arm)* N/A N/A N/A N/A Pryout Strength** 57 3933 2 OK Concrete edge failure in direction " N/A N/A N/A N/A " anchor having the highest loading ""anchor group (relevant anchors) 4.1 Steel Strength V�,Bq = ESR value refer to ICC-ES ESR-1917 � Vb�e1 z V�a ACI 318-11 Table D.4.1.1 Variables %�,v [in.Zl f� [PS7 0.10 106000 Calculations VSe,eQ [Ib] 5495 Results Vsa,eq [�bl �steel �nonductile � Vsa l�bl Vua ��bl 5495 0.650 1.000 3572 18 4.2 Pryout Strength v0� —� L\��o/ Wec,N yred,N Wo,N Woa.N NeJ � V� Z Vua AN� see ACI 318-11, Part D.5.2.1, Fig. RD.5.2.1(b) AN� = 9 h� 1 yr�,N �+ 2 eN 5 1.0 3 hef y��,N = 0.7 + 0.3 � Ca,min � 5 1.0 1.5hef 'Y�v.N = MAX�Ca-min 1.5hef1 5 1.0 �ao ' �ao J Nb = kc �,a � hefs ACI 318-11 Eq. (D-41) ACI 318-11 Table D.4.1.1 ACI 318-11 Eq. (D-5) ACI 318-11 Eq. (D-8) ACI 318-11 Eq. (D-10) ACI 318-11 Eq. (D-12) ACI 318-11 Eq. (D-6) Variables �c her [in.] e��,N [in.] e�.N [in.] Ca.min [in.] 1 2.000 0.750 0.750 � W�,N �e� [in.] � �,a f� IPS�1 1.000 5.500 17 1.000 3000 Calculations ANc ��n?J ^Nc0 ��n?J l�/ec1.N 1�fec2,N l�ed,N 1J�cp N Nb I�bl 120.00 36.00 0.800 0.800 1.000 1.000 2634 Results V�Pe [Ib] ����� �saismic �nonductile � V�pA [Ib] V�a [Ib] 5618 0.700 1.000 1.000 3933 57 Input data and results must be checked for agreement with the exisfing conditions and for plausibility! PROFIS Anchor ( c) 2003-2009 Hiltl AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 75 of 83 www.hilti.us Profis Anchor 2.6.4 Company: Page: 5 Specifier: Project: Address: Sub-Project I Pos. No.: Phone I Fax: � Date: 4/14/2016 E-Mail: 5 Combined tension and shear loads �iN R� � Utilization RN,v [%] Status 0.500 0.014 5/3 32 OK RN�=a�+R�`=� 6 Warnings • Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered. The anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the loading! Input data and results must be checked for agreement with the existing conditions and for plausibility! • Condition A applies when supplementary reinforcement is used. The � factor is increased for non-steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength. Refer to your local standard. • Refer to the manufacturer's product literature for cleaning and installation instructions. • Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! • An anchor design approach for structures assigned to Seismic Design Category C, D, E or F is given in ACI 318-11 Appendix D, Part D.3.3.4.3 (a) that requires the goveming design strength of an anchor or group of anchors be limited by ductile steel failure. If this is NOT the case, the connection design (tension) shall satisfy the provisions of Part D.3.3.4.3 (b), Part D.3.3.4.3 (c), or Part D.3.3.4.3 (d). The connection design (shear) shall satisTy the provisions of Part D.3.3.5.3 (a), Part D.3.3.5.3 (b), or Part D.3.3.5.3 (c). • Part D.3.3.4.3 (b) / part D.3.3.5.3 (a) require the attachment the anchors are connecting to the structure be designed to undergo ductile yielding at a load level corresponding to anchor forces no greater than the controlling design strength. Part D.3.3.4.3 (c) / part D.3.3.5.3 (b) waive the ductility requirements and require the anchors to be designed for the maximum tension / shear that can be transmitted to the anchors by a non-yielding attachment. Part D.3.3.4.3 (d) / part D.3.3.5.3 (c) waive the ductility requirements and require the design strength of the anchors to equal or exceed the maximum tension / shear obtained from design load combinations that include E, with E increased by ,{Zo. • Hilti post-installed anchors shall be installed in accordance with the Hilti Manufacturer's Printed Installation Instructions (MPII). Reference ACI 318-11, Part D.9.1 Fastening meets the design criteria! Input data and resulfs must be checked for agreement with the exisGng conditions and for plausibilityl PROFIS Anchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 76 of 83 www.hilti.us Profis Anchor 2.6.4 Company: Page: 6 Specifier: Project: Address: Sub-Project I Pos. No.: Phone I Fax: � Date: 4/14/2016 E-Mail: 7 Installation data Anchor plate, steel: - Anchor type and diameter: Kwik Bolt TZ - CS 1/2 (2) Profile: Square HSS (AISC); 4.000 x 4.000 x 0.250 in. Installation torque: 480.001 in.lb Hole diameter in the fixture: df = 0.563 in. Hole diameter in the base material: 0.500 in. Plate thickness (input): 0.500 in. Hole depth in the base material: 2.625 in. Recommended plate thickness: not calculated Minimum thickness of the base material: 4.000 in. Drilling method: Hammer drilled Cleaning: Manual cleaning of the drilled hole according to instructions for use is required. 7.1 Recommended accessories • Suitable Rotary Hammer • Manual blow-out pump • Torque wrench • Properly sized drill bit „ • Hammer 0 0 � Coordinates Anchor in. Anchor x y c.x c„� c�y c.y 1 -3.500 -2.000 - - - - 2 3.500 -2.000 - - - - 3 3.500 2.000 - - - - 4 -3.500 2.000 - - - - Input data and results must be checked for agreement with the existlng conditions and for plausibiliry! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 77 of 83 www.nflti.us Company: Specifier: Address: Phone I Fax: E-Mail: Specifler's comments: 1 Input data Anchor type and diameter: Effective embedment depth: Material: Evaluation Service Report: Issued I Valid: Proof: Stand-0ff installation: Anchor plate: Profile: Base material: Installation: Reinforcement: Seismic loads (cat. C, D, E, or F) Geometry [in.] & Loading [Ib, in.lb] Profis Anchor 2.6.4 Page: 1 Project: Sub-Project I Pos. No.: Date: 4/14/2016 Kwik Bolt TZ - CS 112 (2) �I her,e� = 2•000 in., h,�m = 2.375 in. Carbon Steel ESR-1917 10/1/2015 � 5/1/2017 Design method ACI 318-11 / Mech. eb = 0.000 in. (no stand-of�; t= 0.500 in. I, x ly x t= 7.000 in. x 7.000 in. x 0.500 in.; (Recommended plate thickness: not calculated Square HSS (AISC); (L x W x T) = 4.000 in. x 4.000 in. x 0.250 in. cracked concrete, 3000, f� = 3000 psi; h= 5.000 in. hammer drllled hole, Installatfon condltion: Dry tension: condition B, shear: condition B; no supplemental splitting reinforcement present edge reinforcement: none or < No. 4 bar Tension load: yes (D.3.3.4.3 (d)) Shear load: yes (D.3.3.5.3 (c)) '� X Input data and resulfs musl be checked for agreement with the existing conditions and for plausibilily! PROFIS Mchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 78 of 83 www.hilti.us Company: Specifier: Address: Phone I Fax: � E-Mail: 2 Load case/Resulting anchor forces Load case: Design loads Anchor reactions [Ib] Tension force: (+Tension, -Compression) Anchor Tension force Shear force Shear force x Shear force 1 448 35 2 35 2 29 3 2 3 3 462 34 34 3 max. concrete compressive strain: 0.10 [%o] max. concrete compressive stress: 431 [psi] resuiting tension force in (x/y)=(0.093/-0.031): 939 [Ib] resulting compression force in (x/y)=(2.807/-2.830): 534 [ib] 3 Tension load Page: Project: Sub-Project I Pos. No.: Date: O 1 Profis Anchor 2.6.4 2 4/14/2016 Y O 3 Tension X Load N1e [Ib] Capacity +N„ [Ib] Utilization �N = N,,,/�N„ Status Steel Strength* 462 8029 6 OK Pullout Strength' N/A N/A N/A N/A Concrete Breakout Strength** 939 2075 46 OK ' anchor having the highest loading "anchor group (anchors in tension) 3.1 Steel Strength N� = ESR value refer to ICC-ES ESR-1917 � Nsa z Nua ACI 318-11 Table D.4.1.1 Variables ASe,N (in.2] f,rt� [psi] 0.10 106000 Calculations Nsa ��bJ 10705 Results Nse ��bl �steal �nonducllle � Nsa (�b] Nue [�b] 10705 0.750 1.000 8029 462 Input data and results must be checked for agreement with the e�tis6ng conditions and for plausibility! PROFIS Anchor ( c) 2003-2009 Hil6 AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 79 of 83 www.nilti.us Company: Specifier: Address: Phone I Fax: E-Mail: 3.2 Concrete Breakout Strength Nwg -(��1 lVec.N 1�ed,N 1�e,N 1�ep.N Nb � Nebg Z Nua AN� see ACI 318-11, Part D.5.2.1, Fig. RD.5.2.1(b) z ANcO = 9 hef 1 w�,N �+ 2 eN) 5 1.0 3 hBr/ Wea,N = 0.7 + 0.3 � Ca�min � 5 1.0 1.5hef W�D�N = MAX�ca—min 1.5h�15 1.0 '� �Cac � �ac J Nb = kc �,a ��e hef ACI 318-11 Eq. (D-4) ACI 318-11 Table D.4.1.1 ACI 318-11 Eq. (D-5) ACI 318-11 Eq. (D-8) ACI 318-11 Eq. (D-10) ACI 318-11 Eq. (D-12) ACI 318-11 Eq. (D-6) Page: Project: Sub-Project I Pos. No.: Date: Variables hef ll�.l ec1.N ll�.l ec2�N LIn.J Ca�min lln.J Wc.N 2.000 0.574 0.635 � 1.000 �ac �I(1.� kc %,a fc �PS�� 5.500 17 1.000 3000 Profis Anchor 2.6.4 3 4/14/2016 Calculations ANc �In•2� AN�o I�� Zl l�lecl,N 1�lec2,N �/ed N l�Icp,N Nn I�bl 84.00 36.00 0.839 0.825 1.000 1.000 2634 Results N,�g [Ib] �concrete �seismic �nonductile � N�g [Ib] N�e [�b] 4257 0.650 0.750 1.000 2075 939 Input data and results must be checked for agreament with the existing conditions and for plausibility! PROFIS Mchor ( c) 2003-2009 Hiltl AG, FL-9494 Schaan Hitti is a registered Trademark of Hilti AG, Schaan Page 80 of 83 www.nilti.us Company: Specifier: Address: Phone I Fax: � E-Mail: 4 Shear load Page: Project: Sub-Project I Pos. No.: Date: Profis Anchor 2.6.4 4 4/14/2016 Load V1e [Ib] Capacity �V„ [Ib] Utilization �� = V„�/¢V„ Status Steel Strength' 35 3572 1 OK Steel failure (with lever arm)* N/A N/A N/A N/A Pryout Strength" 56 1451 4 OK Concrete edge failure in direction'" N/A N/A N/A N/A ' anchor having the highest loading **anchor group (relevant anchors) 4.1 Steel Strength V�,eQ = ESR value refer to ICC-ES ESR-1917 � VS�� z V„a ACI 318-11 Table D.4.1.1 Variables �a,v Iin.21 f�r� [PS7 0.10 106000 Calculations Vsa.eQ ��b� 5495 Results Vse.aq ��b� �sreel �nonductlle � Vse ��b� Vua ��b� 5495 0.650 1.000 3572 35 4.2 Pryout Strength v`� —� L\A co/ Wao,N Wea,N Wo,N Wcr,N NbJ � Vcpg Z Vua AN� see AC1318-11, Part D.5.2.1, Fig. RD.5.2.1(b) �co = 9 her 1 w�,N �+ 2 eN 5 1.0 3 hef �led�N = O.% t O.3 � Ce,min 1 5 �.� 1.5hefJ W�v,N = MAX�ca.min 1.Shef1 5 1.0 �� ��ao ' �a� � Nb — �%a �VTC hef5 ACI 318-11 Eq. (D-41) ACI 318-11 Table D.4.1.1 ACI 318-11 Eq. (D-5) ACI 318-11 Eq. (D-8) ACI 318-11 Eq. (D-10) ACI 318-11 Eq. (D-12) ACI 318-11 Eq. (D-6) � Variables �a har [in.] e��,N [in.j e�,N [in.] �a,min [in.] 1 2.000 2.194 2.139 ^� Wc,N Cac [i11.] kc %,a fc �PS�� 1.000 5.500 17 1.000 3000 Calculations ANc I�n?J AN�o I��?1 l�lacl,N 1�let2 N 1�led,N 1�/cp N Nn I�bl 84.00 36.00 0.578 0.584 1.000 1.000 2634 Results V�Pe [Ib] �concrete �seismic �nonduetile � V�a [Ib] V�a [Ib] 2072 0.700 1.000 1.000 1451 56 Input data and results must be checked for agreement with the existing conditlons and for plausibiliry! PROFIS Anchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 81 of 83 www.hilti.us Profis Anchor 2.6.4 Company: Page: 5 Specifier: Project: Address: Sub-Project I Pos. No.: Phone I Fax: � Date: 4/14/2016 E-Mail: 5 Combined tension and shear loads pN R� C Utilization pN,v [%] Status 0.452 0.039 5/3 28 OK aN� = a� + a� �_ � 6 Warnings • Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered. The anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the loading! Input data and results must be checked for agreement with the existing conditions and for plausibility! • Condition A applies when supplementary reinforcement is used. The � factor is increased for non-steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength. Refer to your local standard. • Refer to the manufacturer's product literature for cleaning and installation instructions. • Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! • An anchor design approach for structures assigned to Seismic Design Category C, D, E or F is given in ACI 318-11 Appendix D, Part D.3.3.4.3 (a) that requires the goveming design strength of an anchor or group of anchors be limited by ductile steel failure. If this is NOT the case, the connection design (tension) shall satisiy the provisions of Part D.3.3.4.3 (b), Part D.3.3.4.3 (c), or Part D.3.3.4.3 (d). The connection design (shear) shall satisiy the provisions of Part D.3.3.5.3 (a), Part D.3.3.5.3 (b), or Part D.3.3.5.3 (c). • Part D.3.3.4.3 (b) / part D.3.3.5.3 (a) require the attachment the anchors are connecting to the structure be designed to undergo ductile yielding at a load level corresponding to anchor forces no greater than the controlling design strength. Part D.3.3.4.3 (c) / part D.3.3.5.3 (b) waive the ductility requirements and require the anchors to be designed for the maximum tension / shear that can be transmitted to the anchors by a non-yielding attachment. Part D.3.3.4.3 (d) / part D.3.3.5.3 (c) waive the ductility requirements and require the design strength of the anchors to equal or exceed the maximum tension / shear obtained from design load combinations that include E, with E increased by i2u. • Hilti post-instalied anchors shall be installed in accordance with the Hilti Manufacturer's Printed Installation Instructions (MPII). Reference ACI 318-11, Part D.9.1 Fastening meets the design criteria! Input data and results must be checked for agreement with the exis6ng conditions and for plausibilityl PROFIS Mchor ( c) 2003-2009 Hitti AG, FL-9494 Schaan Hilti is a registered Trademark of Hiltl AG, Schaan Page 82 of 83 www.nilti.us Profis Anchor 2.6.4 Company: Page: 6 Specifier: Project: Address: Sub-Project I Pos. No.: Phone I Fax: � Date: 4/14/2016 E-Mail: 7 Installation data Anchor plate, steel: - Anchor type and diameter: Kwik Bolt TZ - CS 1/2 (2) Profile: Square HSS (AISC); 4.000 x 4.000 x 0.250 in. Installation torque: 480.001 in.lb Hole diameter in the fixture: df = 0.563 in. Hole diameter in the base material: 0.500 in. Plate thickness (input): 0.500 in. Hole depth in the base material: 2.625 in. Recommended plate thickness: not calculated Minimum thickness of the base material: 4.000 in. Drilling method: Hammer driiled Cleaning: Manual cleaning of the drilled hole according to instructions for use is required. 7.7 Recommended accessories Drilling Cleaning Setting • Suitable Rotary Hammer • Manual blow-out pump • Torque wrench • Properly sized drill bit „ • Hammer 0 0 � Coordinates Anchor in. Anchor x y c_x c.,, c.y c,�, 1 -2.000 -2.000 - - - - 2 2.000 -2.000 - - - - 3 2.000 2.000 - - - - Input data and results must be checked for agreement w'rfh the existing conditions and for plausibility! PROFIS Anchor ( c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan Page 83 of 83 8/1/2017 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director JOHN S MURDOCH PO BOX 3707 MC 46-88 SEATTLE, WA 98 ] 24 RE: Permit No. D16-0157 BOEING #9-101 - STEAM CONVERTER 9725 E MARGINAL WAY S Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shatl expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 9/2/2017. Based on the above, you are hereby advised to: l) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule far the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 9/2/2017, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, �� Rachelle Ripley Permit Technician File No: D16-0157 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 ����I� �O�R� COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D 16-0157 DATE: 06/15/16 PROJECT NAME: BOEING #9-101— STEAM CONVERTER SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # DEPARTMENTS: B��Uu� G •2� � � ding Div�sion ��tM. �{,�. !c• ! • t� Public Works PRELIMINARY REVIEW: Not Applicable � (no approval/f°eview required) REVIEWER'S INITIALS: Revision # Revision # PrM �'�I� �'ti�• I� Fire Prevention � Structural � before Permit Issued after Permit Issued L� r►.�,, G•��•cv Plamiing Division � Permit Coordinator � DaTE: 06/16/16 Structural Review Required � DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07�14�16 Approved ❑ Approved with Conditions d Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: Denied � (ie: Zoning Issues) DATE: Perj�zit Center Use Only CORRECTION LETTER MAiLED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Stafflnitials: 12/18/2013 BOEING COMPANY, THE � Washin�tan State OepartmenL of �a�7�t' $t ��1C�US�C1�5 BOEING COMPANY, THE Owner or tradesperson MCNERNEY, W (JAMES) Principals MCNERNEY, W (JAMES), PRESIDENT LOHR, MICHAEL, SECRETARY WOLTER, CHRISTOPHER, TREASURER (End: 01 /16/2015) READ, PAUL, SECRETARY (End: 02/07/2013) SHRONTZ,FA,SECRETARY (End:02/07/2013) GIVAN, B E, SECRETARY (End: 02/07/2013) KING, C G, SECRETARY (End: 02/07/2013) BEIGHLE, D P, TREASURER (End: 02/07/2013) COLLINS, T J, TREASURER (End: 02/07l2013) BUDINICH, T M, TREASURER (End: 02/07/2013) WOODARD, R B, TREASURER (End: 02/07/2013) CRUZE, D D, TREASURER (End:02/07/2013) CONDIT, P M, TREASURER (End: 02/07/2013) WA UBI No. 178 005 030 License Home ��Spa�iol Corrtact Safety & Health Claims & Insurance 100 N RIVERSIDE M/C 5003-4027 CHICAGO, IL 60606-1596 312-544-2535 Business type Corporation Page 1 of 9 Search L&I x � 3c;�". 1�-lIitdex 11e1p �I;�'I..&�I Workplace Rights Trades & Licensing Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ...................................................... Meets current requirements. License specialties GENERAL License no. BOEINC*294ML Effective — expiration 07/13/1971— 01/18/2017 Bond FEDERAL INS CO $12,000.00 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=178005030&LIC=BOEINC*294ML&SAW= 7/5/2016 swau s;arre�,;u��n4���v�s�;r�s�u va�nrms;�a�r�w�Psx�a��nc �' k�� � � ���m��,«�}n��.,�+��<R,� � i:�s����zm��� � � � � wh�?.�z�a`�i;�r,����,�,+ �y;�,�r�cs�s�n�,,;.;� . aretarri�n�rts.a . s^�i2 1�1�s�v��ix,a,:rr�;r��.e u, u� "'�ri4li�; �sf�'S�� � } �t{� �7?� , ���`,1��p� ��� +� t � } � �� �� y�� c � � �� s�° � � �i �y ��y�� ��� � � <� � � br �j''� � � � d k��} �,1 � �4� �� 1���m�*������� a �� ���5 �� ���$ �� ' ��,���, D" �iY i i �, �ti �,a. h;4� +5 }C� �� �� � p t� , � � 7 � �t � r y 2s ;^�, � { s`$�t �$ 2�� �s� � �'��"s�� � 4, � �i �sG w�" � ��m+m�s�, ��z�au�� � ��S ��Yt� ��: ; �£ r��'� rt�� s� � ,.,.��..,,.,,� .�,�.�r».�. �..,.�u,b�»� „ ��,�Nu.wa�:,en. � w���.,,,,�.���u�,.��.��.«wa�u �:::�.�,,,,�.,.�,.s,:�� . �,��,��,y,� �,.^,.:.,� wux�rcf� . roanarcsap,n p . ; ��pro �, , �„+.au.:,�.. w.wuse,�,,� �,;ryv ��k �„v; � x,yey�. � � ;c �, � �; �� �� . ..fOH � � �. � ��� rit� �� S �� � aa�, � �� "��a a��. � +� � as � ixs�, :�� �� � ,�,� ,r£r�fi� ��rcw � �,�x>nN; � � �, �,� ��� � � ���b � � �' � � 3�:qr,v,�:�.�R v�,����� .,� � n., �,�, n,,,, n n�y�mv„, �rt��;�������� � � �;�, m.,bm.�.*"" u�w�u.� >�>�w"i" �a t�u,.wm„�w�,,,c�s-"`� ��� �� �'wwa�,.��.mw',"� aw�xr.��..,��attm,. Y' � w . d� � W �1� tY,ws� �� !� ��� ���'�� � ' i4�� ��� � fr �� �� ,,& � 4 ���� A,$�� s� ��'° � �� ,� ;¢; � . p �xi,�fla�xi �^k t"'� ��' ���1�k, �"'c�.u,,.w . �„y4'� '"�kwx�w.a,;;. xrf..�" � � � wmxann�m�.aa�s;umq.. � r�^"f'��""'w"'a;�x,y, W,uu+;mrv�;roau�m p,ym�.wsse+m��.�q .xuw�o �,��+�+`+' ew+sna�xeu.wixro�w4 .�xxrc..:. �„�.w:n•,,.;�c;�.,, � aax,.m'b.wrmrom�ww�� www.ui.. xix es'.� �u.m„�.ixa Y �rvw.n�wamrma,w�. ;��p � w.�.�.a.,rewekr �M ° ^»ey„ �x.• .� •u,�,� o�.� ,.�...�..,.,�+.� reimw�w•.sav, � . � � � � � v,,.,�:.�. h:. � �� �+.�n,,, ,� , ..,,� � re, 3' �?b�� �'�,� ; �,~ �: �� ,� �� V�,. � � `�� ��, � "',,.. ��.���� �,��f � {t ��` � � � �£xs �"� ��''� � .,.:FR .s��li.�.. � ;.�� � � ; u„ . K< j� �; $ S ro � � e nr� '� � � � � m� `�tp� � m � n,: �,, � � .s ,.��,�.,�,�,�:. ;� : �, �?'„. , , o �,,;�.��..;�,�_.�.� e::,;;, � �,�:.,�.�:,.� ' � " ' � . '''�. � � a-�.u� s U �'?,,�, wa�e ��.��w.... �rw, xx«,:asc ,���� � �� "'1. � I .,a� ��a g��„ r,,,,,'�i';, "�,�, ,�,...�,,. Y b. � �. .F t�i.�.....,....v�. � � a,,� ��' 7} � t� 5 � '� �oyy,. '� � y� � �,+ w��,:...�,.�;n.... '" 'i ,,r �r "q �� �:. n �i � 4. � � ��� � �. r� � �a� � � �e � � �:s r� �. t�. N .��� t '3i. F� � � a � �� ��,�v�.��#u� � „� �' � � � `y ��w x��'�' � i � � ��, i., �� ���u�� � � .�� � , � � � � � � j� �I C i N ITY MAP FROM DOWNTOWN SEATfLE wnrvnni� rn�r� FROM SEATTLE-TACOMA AIRPORT DE�ELOPMENTAL CENTER � � ��r —� ,� ,� ,"� �" � �"�¢ ���� ���° �`°°��, 4, �'` �� �� � �'� , � � �� ' � � � �" �' ry,� n� � � � � � , e �° , � , �� , '� � , �.,� „�� � �'`,..�" a, ,, ; ��n, �''.,�` ��'��„ � �' �, � °`�4w� � � . � wu . ' � � � , � � ���� � �� � !� �' � � j � � � �. � �,�° � � �,� ��a � � � � x� °`m� �,r " ; � ��i� �,� � � � � '� �� `� �,. <, � � '",� a` °� �`��, � ��� � � � � � . � „4 � � ; r, , , � �' �, � ° � �. � 1 � '� '.. �` '� , � ' � a, s f r Y , . , � � , � ,. , t � �•� � a � F'� � t �'' '�. � � �?,. � � � $ �.'¢ { ; i��,u TYPE OF APPLICATION CO D E S U i�/i �ARY ❑ NEW ❑ ALTERATION ❑ ADDITION TENANT IMPROVEMENT PROJECT DESCRIPTION: PROJECT IS TO REPLACE STEAM CONVERTER STATION #3 IN BU{LD{NG 9-101. THIS REPLACEMENT INCLUDES INSTALLAT{ON OF A NEW STEAM PRESSURE REDUCING STATION, (3) THREE HEAT EXCHANGER MODULES. THE REPLACEMENT INCLUDES STRUCTURAL SUPPORT FOR THE INSTALLATION OF THE STEAM CONVERTER EQUIPMENT, INCLUDING NEW SHIPS LADDER ACCESS FOR THE CONVERTER STATION. CODES; 2012 WA WITH AMENDMENTS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. CONTRACTOR & STATE NUMBER; THE BOEING C0. BOEINC � 294ML(01182017) BOEING PROJECT ENGINEER: BRIAN HARR BOEING CONTACT;JOHN MURDOCH PHONE; 253-740-0214 FAX NUMBER�206-662-0861 E-MAIL; lohn,s,murdoch@boeinq,com OCCUPANCY GROUP: GROUP B AND GROUP F, DIVISION I(OFFICE AND FACTORY) CONSTRUCTION TYPE:TYPE II—B, NON-COMBUSTIBLE SEPARATION 60 FEET (MINIMUM ALL SIDES) ZONING:ALLOWABLE AREA INCREASE;FULLY AUTOMATIC. FfS CLASS I SPRINKLERS THROUGHOUT SYM REVISION BY APPROVED DATE SYM RE1/ISION BY — REPLACE STEAM CONVERTER STATION #3 16069-20 CEI EO 04.22.16 OCCUPANT LOAD: (ALLOWABLE) NO CHANGE (TABLE 10—A) OFFICES OCC, STORAGF , OCC, LABORATORY OCC, CANOPY OCC, OTHER OCC. BUILDING HEIGHT: (ACTUAL)III FT FLOOR AREA: (ACTUAL) NO CHANGE BLDG GROSS 1,116,306 SF SQ FT TUNNEL 50,910 SF SQ FT FIRST FLOOR 713,829 SF SQ FT IST FLR MEZZ 55,689 SF SQ FT 2ND FLOOR 295,878 SF SQ FT 2ND FLOOR MEZZ SQ FT PROJECT AREA 950 SF SQ FT STORIES: 2 MEZZANINE ? (YES) ❑(NO) SQ FT 55,689 SF FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NFPA 13 ? (YES� ❑(N0� SEPARATION EXTERIOR WALL (NON—BEARING) HOUR RATING EXTTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON—BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR/CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING »„ SEISMIC DESIGN: ZONE � DESIGN LOADS: (CHAPTER 16) ROOF: LIVE (SNOW) (PSF) FLOOR: OFFICE EXISTING, NO CHANGES (PSF) MECH/STOR (PSF) STAIRS (PSF) CONCENTRATED: WIND: EXPOSURE � APPROVED DATE �� � �1`��tY" �' w Zp R.�` 3y�.."`;��II'� �ji s�i�?.�� �' zf� 4.� t� �.. iyx�� , a �11��� y���§ �2 4`i� �,�'�i,�;a� ..z �y��a � � � n� �� ���u ��� �� � � � ���s� ��� w� � � �,Aa� ���1t� CODES Af\1 D PE�RM ITS PROJECT TITLE; 9-101.2 REPLACE STEAM CONVERTER STATION �3 JOB NUMBER: 16069-20 QUANTITY SUBMITTED: ❑ 5 SETS; GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT ❑ 4 SETS; TENANT IMPROVEMENT (NON-STRUCTURAL) ❑ 3 SETS; FIRE PROTECTION/SPRINKLERS 2 SETS; TENANT IMPROVEMENT (REVISION) SUBMITTED FOR PERMIT 8� REVIEW: BUILDING ❑ GRADING ❑ ELECTRICAL ❑ PLUMBING ❑ LANDSCAPE ❑ FIRE PROTECTION ❑ MECHANICAL ❑ DEMOLITION ❑ CANTILEVER RACKS STRUCTURAL ❑ - ❑ - �E TO BE REVIEWED UNDER SEPARATE PERMIT WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE-APPROACHES COMPLIANCE OPTION PRESCRIPTIVE ❑ LPA ❑ ANALYSIS ❑ N/A WELD ❑ CONCRETE ❑ REBAR � ANCHOR BOLTS STRUCTURAL BOLTING . STRUCTURAL OBSERVATION OTHER POST-INSTALLED ANCHORAGE SYSTEMS CALCULATIONS . . TYPE: STRUCTURAL ATTACHED. x (YES) (NO) DRAWII�IG INDEX f � ARCHITECTURAL #' 0 DRAWING NUMBER REV DRAWING TITLE 09-101—GO — COVER SHEET 09-101-2A23R H SECOND FLOOR PLAN — REMOVAL 09-101—A403R A STAIRWAY N0.7 PLANS AND DETAILS — REMOVAL 09-101—A461 R A MEZZANINE PLAN 2M2E12 — REMOVAL 09-101-2A23 H SECOND FLOOR PLAN 09-101—A403 A STAIRWAY N0.7 PLANS AND DETAILS 09-101—A461 A MEZZANINE PLAN 2M2E12 09-101—A581 A ARCHITECTURAL DETAILS STRUCTURAL DRAWING NUMBER REV DRAWING TITLE 09-101—S2W ORIG STRUCTURAL NOTES & ABBREVIATIONS 09-101—S2X ORIG STRUCTURAL NOTES 09-101—S2Y ORIG STRUCTURAL NOTES .� 09-101—S458R ORIG ENLARGED PLAN — REMOVAL � . 09-101—CWS23 A CATWALK PLAN . 09-101—RFS23 A ROOF PLAN 09-101—S458 ORIG ENLARGED PLAN 09-101—S684 ORIG MISCELLANEOUS SECTIONS 8c DETAILS ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE CEI CHECKED E. OJALA al t SUBTITLE 04.22.16 04.22.16 TITLE ���rC PCRMIi �i�Qu��►rn �oF% �Mocrianicai �E►ectric�i Iumbing Gas Piping �i�y ofi Tukwit��, REVISIONS No changes shafi be made to the scopP of ��for�c �^�ithout prior approval of Tu�:�vila Building Division. PnOi'E: ��visicns vri0 require a ne�v plan submittat and may incSudw ad�itianal plan review fees. � �� �t �. � 'I€�n ��vi�w app����J ie suhj�ct #o errors �nd omi��io�s. t ��prov�i af con�truc-tion dt��mer�ts does not au�hori�� �e yio(�ti�n �f , y do _ d ��i� �r �rdin�rtce. ����i�'t f app�o��e� �ie �ditia°�s i acknowla�d�ad: �� � � R�1fI�UV�p FOR ���" �� �Pl,IAi�CE ��l��� JUL 0 � �016 �i � � �UlLD t�� ��ila SION 1 � ��I,�' , �G ' ," � �` �i - �' / , / Clfj/ �� �U�i1 BUIL���G DtVtSlt� „ . . � . �.���� � ` � � �f �� �, �,.� � A��� � �,��� �� ��� �,.. m �..�, � - ..r� �� »� a V � �A`:. �, ` i��i4N� ,� �. � �� �� .. �.. �� . . y . ��� ��� ���� � � COVER SHEET REPLACE STEAM CONVERTER STATION #3 BUILDING 9-101 ARCHITECTURAL MASTER ��'�� RECEIVED ���. CiTY OF TUKWtLq JUN 15 2016 PER�11tT CENTER � G I H E E R S 1601 Fifth Avenue, Suite 900 � Seattle, WA 98101 ph 206.623.0717 � fax 206.624.3775 cofEman.com LASnNG ueaWriy � results � relationships `� � 1 � , � �• • __��� DEV. CENTER, wq owc No. 16069-20 � 0 16069-20 9-101-GO DATE 04.22.16 COMP N0. ,7 2 2A23 A408 2A231A408 N N N w w � z 0 Q � z � z 0 U � 0 w z J _ U Q � 2A231A408 OFFICE 23D11 2 D11 �- N OFFICE 25D11 ._—� , , , . � ; � ��?��� . . � ",�W�"' fl m I . • �� _ '�'�,-,-'.�"�' - - - -- - ---- - - __. - -- -�--- --- --- -_-. I w_ n� .���P�'� � -- ===-� �, ��� :�� ���1 � � � I t i� � -- � ' ' !� � . � � � , � �� �� ' I �� � ' �C � ?� �� � �� � I � ;��� �_� o r � � „ . I! e ������ . �� `i"I�WI �� c= i� • � . ;,, o . O O I� ' j �'.��� ' ;!'� � � _ .: �i� �iY� � I _, �� N 0 WORK ROOM 21 D12 N 21D12 � � FE OFFICE 24D12 24D12 23D12 OFFICE 23D12 139SF TO SPOKANE CONFERENCE ROOM 23D13 2A23 22D14 � OFFICE 22D14 SYM REVISION A INSTALL DOOR/SWIPES B F22 PERIM. OH. DOOR REWORK C iNSTALL DOOR SWIPES D JSF SOUND WALL REVISION E F22 RESTROOM MODS CONFERENCE ROOM 21D14 21D14 25D12 21E13 JANITOR 25E12 _� STORAGE 24E12 .�_� A D�_ 21 E13 26E12 U F H � � 2A23R A461R MATCHLINE - FOR CONTINUATION SEE 2A17 — — — — — — — — — I21F11 A A 21G11 � PRIVACY D 1 OFFICE 0 1 ROOM � 21G11 I � 21 F11 � ' I C C B — — — — � — — 1 3, _ �» C I - - -� - � � � �' I N CONFERENCE 21 E13 5'-�" � B1 4E13 HALL . M MOTHERS PLOT � 22E13 N i ROOM ROOM � � � 23E13 24E13 � i 22D13 � 21E13 � 22E13 11'-6" OPEN OFFICE 21 E14 H 5�_$» C1 C1 i' 22F13 HLINE - FOR CONTINUATION SEE 2A29 SECOf�D FLOOR PLAN SCALE: 1 /8" = 1'-0" BY APPROVED DATE SYM REVISION BY APPROVED DATE J#180243-00 MRM 02.05.99 F OFFICE RENOVATION J# 160530-00 DLR GROUP LS 12.20.06 J#180244-00 MRM 02.10.99 G OFFICE RENOVATION — OCN 01 J� 160530-00 DLR GROUP JJ 01.15.07 J�180243-00 RM/K.SMIT 03.04.99 H REPLACE STEAM CONVERTER STATION #3 J#16069-20 BUFFALO 04.22.16 J�110353-00 EAC 07.27.01 J�555959-00 TWH 09.21.05 2A231A454 OPEN OFFICE 21F11 r�'�' �r � v� , i� '��' 3`� : r 1F��` Yun�' 1'1 . r, r � � �L �,n �f�� «�� ,x����,� �t�� �_ ��,� ��.����� ��^Ve �"Sfi'M�.., H �� I 2 2A23 A454 LEG E N D REFER TO SHEET 9-101-G2 FOR SYMBOLS, ABBREVIATIONS AND NOTES. J Ja GENERAL NOTES I O`� 1 STUD WALL, SOR FINISH Do FACE OF EMOUNTABDE OF — — — — — — WALL UNLESS NOTED OTHERWISE. �� —r� � � 2. PROVIDE A SEPARATION BARRIER (SOUND, SMELL, q � I I VAPOR, SMOKE) AS NECESSSARY AT THE PERIMEfER 21 H 11 � OF THE WORK AREA. IWORK ROOM , � 11 ° � 3. FOR WALL TYPES INDICATED ASQ REFER TO A355. C 21H11 I I o , I I 4. REFER TO A353 FOR WINDOW TYPE. C1 5. REFER TO 2L01-F FOR FINISHES. C — — — — — — � � ���������� ������ ��r � ��� �� �§� z3 ;'� }r �l , v� i� � � � � � � �t� � � i � � 1 � � � � � � � ��saw� ��ati' "���,�rm„ar� � `� ' i � � v a� � � � � �� � _ � � �� t �${� � F n� � '�{ � >'y;,. ,' �; �,� � � � �� �,63'�a�ik°�".U,Nwiv`Sa°'��1Wfts +�. '�3.�t { �`�14&',.,ic,k�.xA� sL,.�� ;�� �� t�„:tiL�Y�3i;:?!S��k�� N N W w cr� z 0 ¢ � z �—_ lo � 0 � � W z � _ I-U-- Q .� - 12 21H13 i i — 14 A� REFERENCE DRAWINGS C 0 f� STR U CTI 0 N f� OTES 1� SEE ENLARGED PLAN DRAWINGS A461R FOR EXTENT OF REMOVAL. 0 . .�..-- . �,. - , a � � <i ".•.,, '4� : � t . .,. � � �. � .� r- , � . � 0 � �,�r�°, ���' 5 100°10 SIJBMITTAL ISSUE FOR PERMIT R�VIEVII�Q FfJR CQ�IE �Q�'tF[�If�t��E APR�C���D JUL O 1 2016 Cify �f Tulcwila BUILDING DIVISION 2A1� 2Attl 2Al2 2A13 2A14 2A15 6 2A1 2A17 2A18 2A19 2A20 2A21 I >> 2A2 2A2 2A24 2A25 2A26 2A27 15 2A28 2A29 2A30 2A31 2A32 2A33 19 20 - - z� — 22 23 K EY P LAN ,,,� N scA�: NONE RECEIVED �� rTv oF Tu�cwi�a - JUN 15 2016 PERtNIT CENTER � � � ACCEPTABILITY EDDIE P. DUARTE �03.09.9Z S�BTRLE CURRENT REVISION SYM80L DATE \ 3973 REGISTERED THIS DESIGN AND/OR CHECKED SECOND FLOOR PLAN J� 16069-20 H 04.22.� 6 N ARCHITECT SPECIFlCATION IS APPROVED SHEET � APPROVED BY DEPT. DATE T� REPLACE STEAM CONVERTER STATION #3 � 2A2 � R z CHECKED o BUILDING 9-101.2 `� CHRIS EDWARD CARLSON STATEOFWASHINGTON APPROVED JOB N0. COMP N0. 0 � 180243-00 � APPROVED DW6 N0. � ARCHITECTURAL MASTER COL. D-JA/10.9-15 DEV: CENTER, WA 9-101-2A23R � ¢ a- N � M � � O N \ � N � W � � Q � � 21E11 22E11 I 24E12 i 21D13 A4611A485 ����-�, �, T01 LET ROOM PLAN 24E 11 1/4"=1'-0" NOTE: SEE SHEET A465 ELEVATIONS 1 AND 2 FOR WOMENS AND MENS TOILET ROOM ELEVATIONS SYM REVISION BY APPROVED DATE SYM - RECORD DRAWING LB RK/GC 01.11.93 A REPLACE STFAM CONVERTER STATION #3 16069-20 BUFFALO 04.22.16 I:�a/�y[�l► 2A231A461 BY I APPROVED 10�9 DATE � ,:: � � i � i 3 ► � 1 Q 4��_On MECHANICAL SPACE 2M1 E11 2M1E12 2 �------� I I �I I V-� I I I � � L___—_J I�l 5 CONVERTER STATION 2M2E12 � CON�ERTER STATION PLAN (2M2E12 1 /4„=1,_0» � �``}�„'}� � :: � `�} �� r 1 � f�" r�W }G�SI�fi'� i,i � � s „ .,k,� �. - t, � s�YF. u �� .�.v� � �tHS;,m�' �'r�.;�'#���,,. �Y�' �iU�".msrr �� 4 �--------- 8 I I 1 �--------- ACCEPTABILITY 3973 REGISTERED THIS DESIGN ANDjOR \ ARCHITECT SPECIFICATION IS APPROVED / APPROVED BY DEPT. DATE � CHRIS EOWARD CARLSON I STATE OF WASHINGTON - _ _ _ _ i L I I 5 -----� � :�' �r������ �� ��� ���/ 10.9 11 � LEGEND: 21 D11 ROOM NUMBER 26Di2 DOOR NUMBER FEO- PORTABLE FIRE EXTINGUISHER � ELECTRICAL PANEL LOCATION :.r.;.:•.:....:�,... :.:�:�:•:_.�....,�. CONCRETE WALL STEEL STUD AND GWB PARTITION WOOD STUD AND GWB PARTITION. PARTITION 3" "VANGUARD" DEMOUNTABLE WALL ------------------ CMU WALLS � WALL—FROM FLOOR SLAB TO ROOF DECK ABOVE GENERAL NOTES: 1. ALL DIMENSIONS ARE T0: FACE OF STUD � OF COLUMNS & VAGUARD DEMOUNTABLE WALLS. (UNLESS NOTED OTHERWISE) 2. ALL SYSTEMS FURNITURE & FURNISHINGS ARE OWNER FURNISHED, OWNER INSTALLED. 3. THE NUMBERS FOR INTERIOR DOORS ARE COMPOSITE NUMBERS BASED ON THE FLOOR NUMBER, THE DOOR NUMBER, AND THE BAY NUMBER. FOR EXAMPLE, DOOR 11 A2 WOULD BE ON THE FIRST FLOOR, DOOR ONE, (N BAY A2. THE NUMBERING OF INTERIOR DOORS BEGINS IN THE NORTHWEST CORNER OF EACH BAY AND CONTINUES IN ASCENDING ORDER CLOCKWISE AROUND THE BAY. DOORS ON A COLUMN ARE ASSIGNED TO THE BAY THAT THEY OPEN INTO. CONSTRUCTION NOTES: 12 1� REMOVE WALL AS REQUIRED FOR INSTALLATION OF NEW 30" X 30" SUPPLY GRILLE 2� REMOVE SECTION OF WALL AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT 3� REMOVE (E) ACCESS LADDER 4� PROTECT (E) CURB TO REMAIN, TYPICAL � REMOVE (E) FLOOR DRAIN TO BE REPLACEQ. � REMOVE (E) SHEET METAL FLOOI� AND BITUMINOUS MEMBRANE. INSPECT PLYWOOD SUBFLOOR, REMOVE ANY DAMAGED OR DETERIORATED SECTIONS. � MONORAIL HOIST BEAM ABOVE TO REMAIN. � REMOVE MECHANICAL PAD. SEE STRUCTURAL � REMOVE (E) WALL. REMOVE/RELOCATE CONDUIT. ��V���a F0� PATCH AND REPAIR WHERE WALL TO REMAIN. ���������p 10 REMOVE DOOR, FRAME AND HARDWARE, SAVE FOR ��R�� RELOCATION. JUL 01 �016 1� REMOVE CEILING SYSTEM AND STRUCTURE TO PROVIDE CLEAR ��t� ofi.�.����a PATH FOR EQUIPMENT INSTALLATION, ROOM 25E11. �UIL�it�� ������ � REMOVE MAIL SHELVES, SAVE FOR RELOCATION. � REMOVE CARPET, ROOM 25E11. � "` 4 REMOVE REMOVABLE GUARDRAIL TEMPORARILY FOR 1 � �``�� ���� � EQUIPMENT TRANSFER r w,�� .,� +�� � � ..., •' , `� � ,��, a• � �,. `�� ��y� � :: ��'�-� RECEIVED Ct'3�Y O� TU({WIlA f s�� n �� arrt ��r� ����aF�o '� � ,�' � b � � .�(a� �S�L�, i � ��'? � � � � 4 .y� 9q: � � Z � �� 1 � �� � � �� �� � Il�} i x 14 � � �� � � �� , � �� , � �� fis�� � � �1` ,� `� ,�i� .;,,,��. .n �� � � ��T�.�;�ns�3�� �i�� tt 3?: ��.�,b63c..�si 100°Io SUBMITTAL ISSUE F4R PER�IT ���`�`� � TOILET ROOM PLAN (24E11) AND CURRENT MEZZANINE PLAN 2M2E12 SHEEf TITLE REPLACE STEAM CONVERTER STATION �3 BUILDING 49-101 JOB N0. ARCHITECTURAL MASTER COL. E—F�10.9-13 DEV. CENTER, WA °wc No. Q M N N O ai 16069-20 % 04.22.16 � N � N A461 R ' {.1..� W COMP N0. ¢ � 0 09-101—A461 R D —\ N N Q N W w � z 0 Q � z � z 0 U � 0 � i w Z J _ U Q � OFFICE 23D11 23D11 � N OFFICE 25D11 OFFICE 22D11 22D11 OPEN oFFicE 25D11 N 0 WORK ROOM 21 D12 N 21D12 � -O FE OFFICE 24D12 24D12 23D12 OFFICE 23D12 139SF TO SPOKANE CONFERENCE ROOM 23D13 CONFERENCE ROOM 21D14 21D14 22D14 OFFICE 22D14 SYM REVISION A INSTALL DOOR/SWIPES B F22 PERIM. OH. DOOR REWORK C INSTALL DOOR SWIPES D JSF SOUND WALL REVISION E F22 RESTROOM MODS ,�� � � m � . . .. �� s�� .� ...,.�., - -____ -- - -- - -- - -- -- - -- - - - 7! w_ _ i■ 1��� .___.� � e� �I � � ' '� •��l ' � � � ' ii - ; ' �� _ � � � ► � ��� � � � . � � ��, � • a� ' a �� �i � I �I� ° �r �� ll�lll 'j� ' � � � o o ��� �� °' �� �� ;�� p . � � I, � d i I�� , j �►j►:�� �� _ �► � ��,� .- ..— ..— ..- ..- ..— . ��� � � I �r�==�==i0+==rAi__rAr«�i:: a �� � � � � i . � � I' � I O_'•_ .: _ III�. : 1 �! n�u n� - �� _: � . ►`' ���, � � ��- - 1 � � � � �� ��������� --- i, . _. �- -----�, � � �� .:�� 1r��ii� - _ _--- �� ';,� 1 24E12 � 25D12 4 2� �T RA( 2 E1; 2 21E13 F I■. 2A23 A461 MATCHLINE — FOR CONTINUATION SEE 2A17 IA 21 F11 PRIVACY IROOM � � 21 F11 I C CONFERENCE 21 E13 5�—��� � B� 4E13 HALL • � MOTHERS PLOT � 22E13 N i ROOM ROOM �•— � 23E13 24E13 i 22D13 � 21E13 � 22E13 11'-6" OPEN OFFICE 21E14 H HLINE — FOR CONTINUATION SEE 2A29 SECOND FLOOR PLAN SCALE: 1/8" = 1'-0" BY APPROVED DATE SYM REVISION BY APPROVED DATE J�180243-00 MRM 02.05.99 F OFFICE RENOVATION J� 160530-00 OLR GROUP LS 12.20.06 J#180244-00 MRM 02.10.99 G OFFICE RENOVATION — DCN 01 J# 160530-00 DLR GROUP JJ 01.15.07 J�180243-00 RM/K.SMI 03.04.99 H REPLACE STEAM CONVERTER STATION #3 J#16069-20 BUFFALO 04.22.16 J#110353-00 EAC 07.27.01 J�555959-00 11MH 09.21.05 G A 21G11 ( D 1 OFFICE 0 21G11 I 0 C I C B I I 3,_�„ � 2A231A454 OPEN OFFICE 21 F11 � „� , �� � v� � �,t �r �� � �z �yi�>.m���,. �` ��,<�v,. H �� 2A231A454 21H11 �� WORK ROOM C 21H11 C .�� LEGEND REFER TO SHEEf 9-101—G2 FOR SYMBOLS, ABBREVIATIONS AND NOTES. J Ja . GENERAL NOTES I O``� 1 STUD WALLNSOR FIN SH D� FACE OFF EMOUNTABDE OF WALL UNLESS NOTED OTHERWISE. _- - - 11 2. PROVIDE A. SEPARATION BARRIER (SOUND, SMELL, � � VAPOR, SMOKE) AS NEGESSSARY AT THE PERIMETER � � ` � OF THE WORK AREA. I 3: FOR WALL TYPES INDICATED ASQ REFER TO A355. I I 4. REFER TO A353 FOR WINDOW TYPE. C1 5. REFER T0 2L01—F FOR FINISHES. � � �- N Q N W W � z 0 Q � z � IZ 0 � � O � � w z J _ U Q .� 12 21H13 ��� I I - 14 REFERENCE DRAWINGS CONSTRUCTION NOTES 1� SEE ENLARGED PLAN DRAWINGS A461 FOR EXTENT OF WORK. I I 0 D E H J Ja O O O O I I REVI�VV�'� FOR . �C}A� �t��'1��tAt�CE , .� ��P�4��� u� �> > vr� 2 v�� 3 2a� 4 2a� s �,. : • '� �u� o � �t�r� . 6 , �, �,� �,$ �,9 �o �, � � �� `��i,���t� " �� `� 2A2 2A2 2A24 2A25 2A26 2A27 �������� ��`������ 15 I ' . . .::, 2A28 2A29 2A30 2A31 2A32 2A33 19 .- ...�"', � � . ✓ T ; ZO r"' ,..� ;' � — - 2, '` �� � 22 _ � _ ��� . - . • �v 23 �`�:; �,�5� � ���� KEY PLAN ^I SCALE: NONE Iv Q RECEIVED 100 /o S U B M� TTAL CIT'Y OF TUKWIL� JUN 15 20t6 ISSI� _C� ERM - . PERiUI1T CENTER � q� , � ,e,� � . i� ,;C � DRAWN DATE SUBTITLE CURRENT REVISION SYM80L DATE ACCEPTABILITY EDDIE P. DUARTE 03.09.92 c � p 0 3973 REGISTERED THIS DESIGN AND/OR CHECKED SEC i�LOOR L/'1N �# � 6O69—ZO H O4.ZZ.� 6 N ARCHITECT SPECIFICATION IS APPROVED sHEEr � � APPROVED BY DEPT. DATE "� REPLACE STEAM CONVERTER STATION �3 � ����� CHECKED ��2 ,� z CHRIS EDWARD CARLSON B U I L D I N G 9 101. 2 � STATE OF WASHINGTON APPROVED � JOB N0. COMP N0. o 180243-00 -, APPROVED DWG N0. � ARCHITECTURAL MASTER COL. D—JA/10.9-15 DEV. CENTER, WA 9-101-2A23 A� SYM A REVISION RECORD DRAWING REPLACE STEAM CONVERTER STATION #3 BY APPROVED LB RK/GC 16069-20 BUFFALO DATE I SYM 01.11.93 04.22.16 REVISION BY I APPROVED DATE 0 LEGEND: 21D11 ROOM NUMBER 26D12 DOOR NUMBER FEo- PORTABLE FIRE EXTiNGUISHER � ELECTRICAL PANEL LOCATION � - -�� �,.: •.:_ .•..:- : : :.�: : �:•: -. .'-.• �. CON CRETE WALL STEEL STUD AND GWB PARTITION WOOD STUD AND GWB PARTITION. PARTITION 3" "VANGUARD" DEMOUNTABLE WALL , � CMU WALLS ------------------ WALL—FROM FLOOR SLAB TO ROOF DECK ABOVE 0 GENERAL NOTES: 1. ALL DIMENSIONS ARE T0: FACE OF STUD � OF COLUMNS & VAGUARD DEMOUNTABLE WALLS. (UNLESS NOTED OTHERWISE) 2. ALL SYSTEMS FURNITURE & FURNISHINGS ARE OWNER FURNISHED, OWNER INSTALLED. 3. THE NUMBERS FOR INTERIOR DOORS ARE COMPOSITE NUMBERS BASED ON THE FLOOR NUMBER, THE DOOR NUMBER, AND THE BAY NUMBER. FOR EXAMPLE, DOOR �11 A2 WOULD BE ON THE FIRST FLOOR, DOOR ONE, IN BAY A2. THE NUMBERING OF INTERIOR DOORS BEGINS IN THE NORTHWEST CORNER OF EACH BAY AND CONTINUES IN ASCENDING ORDER CLOCKWISE AROUND THE BAY. DOORS ON A COLUMN ARE ASSIGNED TO THE BAY THAT THEY OPEN INTO. CONSTRUCTION NOTES: � FRAME OPENING FOR 30" x 30" SUPPLY GRILLE. SEE 10 & 11 /A581 AND MECHANICAL. � INFILL WALL: WHERE REMOVED, MATCH ADJACENT. � REPLACE ANY DETERIORATED SECTIONS OF PLYWOOD SUBFLOOR WITH MARINE GRADE PLYWOOD, MATCH (E) THICKNESS. SLOPE SUBFLOOR TO NEW AND EXISTING FLOOR DRAINS (1/8" / FOOT MIN.) AND PREP. INSTALL NEW BITUMINOUS MEMBRANE AND SHEEf MEfAL FLOORING. SEE 3/A581. 5� INSTALL NEW SHIPS LADDER, SEE STRUCTURAL. � INSTALL NEW FLOOR DRAIN. SEE 5/A581 AND MECHANICAL. � INSTALL NEW FLOOR DRAIN AT EXISTING LOCATION. SEE 5/A581 AND MECHANICAL � INSTALL NEW HOUSEKEEPING STAND. SEE STRUCTURAL. 9� REPLACE REMOVABLE GUARDRAIL. 10 NEW WALL, ALIGN WITH MAIL ROOM WALL. COORDINATE LENGTH W/ RELOCATED DOOR FRAME TO BE INSTALLED. SEE WALL DETAIL 8/A581 AND HEADER DETAIL 7/A581. WALL BASE & PAINT TO MATCH ADJACENT. 1� REINSTALL FRAME, DOOR AND HARDWARE AT THIS LOCATION. SEE 7/A581. 1� RELOCATE MAIL SHELVES. � INSTALL NEW SAFEfY SWING GATE. CO�I�ERTER STATION PLAN (2M2E12 1 /4"=1'-0" ��,w�a s � �� � £� �} � � iDF.;3�� Xs�ta� 1�7 s� ` � � � '' `'�� , �� �t z, .�n�,� :�{rwrw„�,,, � , �i7r r3`°� K� �' �ir�,u i�.m,cA�%'� s a ��" '�tt&.v 3973 FiEGiSTERED \ ARCHITECT / � D CHRIS EDWARD CARLSON STATE OF WASHINGTON ACCEPTABILIlY THIS DESIGN AND/OR SPECIFlCATION IS APPROVED APPROVED BY DEPT. DATE 2A231A461 � �� r �d�, . r �., REV C4 PL ANCE ���� ����d��� i Ju� 012oti6 �� ` RECEIVED Ct7�Y OF TUKWIL.A ��� o� �'ul�wila J U N 15 2016 BUILDING'�IVIS��N PERMIT CENTER � 104% SUBMITTAL S�e-� TOILET�00`�il PL�N {24E1 � ) AND ' MEZZANINE PLAN 2M2E12 TITLE REPLACE STEAM CONVERTER STATION �3 B�UILDING 09-101 � � ARCHITECTURAL MASTER COL E—F/10.9-13 DEV. CENTER, WA � � ■r ■ ■ ' ENT REVISION SYMBOL DATE 16069-20 A 04.22.16 r A4 1 � V0. COMP N0. No. 09-101-A461 � � M N N O � r� 0 � � N W � ¢ � 0 (E) WALL LOUVER FRAME (2) STUDS AT HFAD AND JAMB 5/8" TYPE X GWB LOU �ER H EAD - JAM B SI M. A581 S�AL�.: S""=1 �—U"� � LOUVER FRAME (E) WALL 11 �OU �ER SI LL --� A581 SCALE: 3"=1'-0" � 5/8" TYPE X GWB (1) STUD AT SILL SYM REVISION BY APPROVED DATE - REPLACE STEAM CONVERTER STATION �2 16069 BUFFALO 10.06.14 A REPLACE STEAM CONVERTER STATION #3 16069-20 BUFFALO 04.22.16 SYM � WALL TYPE CONSTRUCTION � 16 GA METAL JDS AT HEAD DERWMS� NOTEDS 4" SHIM SPACE .ENCER SECTION AT INTERIOR DOOR � HEAD JAMB SIMILAR A581 SCALE: 3"=1 ' —0" � (1) LAYER 5/8" GWB EA. SIDE, ALL JOINTS FINISHED 25 GA. STL. STUD AT 16" O.C., TYP. SIZE VARIES - SEE PLAN 3-1/2" BATT INSULATION VARIES WALL TYPE B � NON-ACOUSTICAL WALL CONSTRUCTION A581 SCALE: 1-1 /2°= 1'-0" � REVISION � BY I APPROVED I DATE INTAKE !-'^^n crr ucr�u (8) Y"� A32; BOLT PENETF SEALANT ASHING DETAIL SEE 1 /A581 ►R CURB DEfAIL SEE 1 /A581 )OFING (E) CONC ROOF DECK ..10 BEAM SUPPORT, TYP � SECTION AT ROOFTOP CURB A581 SCALE: NONE „��/ � FL00 R D RAI N A581 SCALE: 6" = 1'-0" � SEAIANT DRAWBAND LEAD FLASHING BOOT - SET FLANGE IN ADHESfVE, TYP PIPE ASSEMBLY / PER MECH BITUMINOUS MEMBRANE. EXTEND INTO OPENING METAL FLOOR PAN. SEE 2/A581. SLOPE FLOOR TOWARD EACH DRAIN 1 /8" PER FOOT, TYP. FLOOR DRAIN ASSEMBLY AS SPECIFIED, SEE MECHANICAL. SET FLANGE IN SEALANT. MARINE GRADE PLYWOOD. ROUT/ CHAMFER AT OPENING AS REQUIRED FOR FLUSH INSTALLATION BLOCKING AS REQUIRED SBS MODIFIED FLASHING PLY SHEEf SEf IN FULL BED OF COLD-APPLIED ADHESIVE. EXTEND 6" BEYOND TOE OF CANT SBS MODIFIED CAP FLASHING PLY SEf IN FULL BED OF COLD-APPLIED ADHESIVE. EXTEND 8" BEYOND TOE QF CANT COVER INSTALLED MEMBRANE W/ HEAVY COAT OF ADHESIVE, EXTENDING ONTO (E) MEMBRANE . . . _� :� . � ; 1 HR FIRE SEALANT SBS MODIFIED BASE SHEET SET IN (E) RIGID INSULATION FULL BED OF COLD-APPLIED ADHESIVE. (E) ROOF STRUCTURE ROLL TO ACHIEVE UNIFORM ADHESION. EXTEND BASE SHEET AND ADHESIVE 6" ONTO (E) MEMBRANE REPLACE INSULATION & SUBSTRATE BOARD AS REQUIRED � �ENT PENETRATION AT ROOF A�� JI,HLt: IV.I.J. "�'e�r v..� t� .;,� 4�z � �;�f ` n'` &�`a� 3Y'Sk6� �! � �r;��.',r�. � � s,a,rvmA� � a7� a�� ��aF� ��'��a��t �� '�r�,�. ACCEPTABILITY 3973 REGISTERED THIS DESIGN AND/OR ARCHITECT SPECIFlCATION IS APPROVED APPROVED BY DEPT. DATE CHfiIS EDWARD CARLSON STATE OF WASHINGTON BUFFALO BEND F' ""'^� FOR SE RECEPT� SLOPE � 1-1/2" � � z � � 3/4" HEM 6" MIN. � 6" MIN. � NOTE: ROOF MATERIALS AND CONSTRUCTION MAY VARY. NOTIFY ARCHITECT OF FIELD CONDITIONS PRIOR TO INSTALLATION OF FIASHING SEALANT ALL AROUND SHEET MEfAL SCREW WITH INTEGRAL NEOPRENE WASHER AT 8" O.C., TYP BUiYL TAPE - CONTINUOUS � F.F. SHT. MTL. DUCT FLASHING - MECHANICALLY FASTEN AND SOLDER CORNERS, TYP. F.F. SHT. MTL. COUNTERFLASHING - FASTEN AT TOP OF CURB AT 8" O.C. - MECH. FASTEN AND SOLDER CORNERS, TYP. -� P.T. 2X CURB 3" CANT 1-1 /2" X 12" TAPERED EDGE STRIP 6" MIN. � � N �- SBS MODIFIED FLASHING PLYS SEt IN FULL MOPPING OF 1/2" TYP. HOT ASPHALT. FEATHER PLYS AS SHOWN - SEE NOTE �(E) BUILT-UP ASPHALTIC ROOFING - SEE NOTE NEATLY CUT ROOFING AT CURB LOCATION AND REMOVE ANY GRANULES OR GRAVEL SURFACING. PRIME SURFACE PRIOR TO INSTALLATION OF BASE FLASHING DUCT PENETRATI0�1 AT ROOF A581 ��ALt: NUNt � r� r� r� r� --—+—�-- --��-----— -----------�------ MARINE PLYW00� MECHANICALLY FASTEN AND SOLDER ALL JOINTS WATERTIGHT r� CLEAT ---��--- r� r� ------}-}-- ---!-i--- FLAT SEAM FLOOR PAN M ETAL FL00 R PAN D ET A581 ��ALt: N. � .�. � �00°10 SUBMITTAL ' �� � � � 1 ��'yi'; �1�?i�§�,��;� � �� �it � ,�`;;m�w� �,.. _.,v _ � . . . ..... . .... � j� �'���� �����= � �n�d���, �� � �.,,..��_._._�a_ z � � � — �,��� $� 3 r���{� s����f������ � �sa�m ry �h��� :�w 4�� �� � � � ������,;�� ��� �41��?�� va��� _ �. •� � � _ ' � � � , . . � � _ i � 1• 1 _ _ �. ., , . 0 � DUCT OPN'G. 12„ FLOORING SHEET (E) WALL SELF-ADHERING BITUMINOUS MEMBRANE (E) CURB � -�-.. ��• '"' `.� , i.�� � �k. � `� r ���'��,_��`t� � - 1 /2" 20GA GALVANIZED SHEEf MEfAL R�VI�V11�1� �4R �ODE Ct��PLIAN�C ��P�t�i��� �JL�� O �. L��G ���y af iu{cvtrifa c BUILDING DIVISIOIV RECEiVED CITY OF TUKWILA JUN 1 5 2016 PERMIT CEMTER C ENT REVISION SYMBOL DATE 16069-20 A 04.22.16 SHEET ��� � JOB N0. COMP N0. 16069 DEV. CENTER, Wq DWG N0. 09-101—A581 STR U CTU RAL AB B R E�IATI 0 N S & — AND @ — AT , DEG — DEGREE , DIA — DIAMETER (E), EXIST— EXISTING #, NO — NUMBER #, LB — POUND AB — ANCHOR BOLT ABV — ABOVE ADDL — ADDITIONAL ADH — ADHESIVE ADJ — ADJACENT AFS — ABOVE FINISHED SLAB ALT — ALTERNATE ALUM — ALUMINUM APPROX — APPROXIMATE AR — AS REQUIRED ARCH — ARCHITECTURAL ASPH — ASPHALT ASSY — ASSEMBLY B PL — BASE PLATE BLDG — BUILDING BLKG — BLOCKING BLW — BELOW BM(S) — BEAM(S) BO xxx — BOTTOM OF xxx BOT — BOTTOM BRB — BUCKLING RESTRAINED BRACE BRG — BEARING BS — BOTH SIDES BTWN — BETWEEN C — CHANNEL CANT — CANTILEVER CDF — CONTROLLED DENSITY FILL CEM PLAS — CEMENT PLASTER CIP — CAST—IN—PLACE CJ — CONSTRUCTION JOINT/CONTROL JOINT CJP — COMPLETE JOINT PENETRATION WELD CL — CENTER LINE CLR — CLEAR(ANCE) CMU — CONCRETE MASONRY UNIT COL — COLUMN CONC — CONCRETE CONN — CONNECT(ION) CONSTR — CONSTRUCTION CONT — CONTINUOUS CONTR — CONTRACTOR COORD — COORDINATE CSK — COUNTER SUNK CTR — CENTER(ED) D — DEPTH/DEEP DC — DEMAND CRITICAL DBL — DOUBLE DEG — DEGREE DEMO — DEMOLITION DET — DETAIL DIA — DIAMETER DIAG — DIAGONAL/DIAGRAM D!M — DIMENSION DIR — DIRECTION DIST — DISTANCE DN — DOWN DWG — DRAWING DWL — DOWEL (E) — EXISTING EA — EACH EF — EACH FACE EJ — EXPANSION JOINT EL — ELEVATION ELEC — ELECTRICAL ELEV — ELEVATOR EMBED — EMBEDMENT/EMBEDDED EOR — ENGINEER OF RECORD EOS — EDGE OF SLAB EQ — EQUAL EQL SP — EQUALLY SPACED EQUIP — EQUIPMENT ES — EACH SIDE ESCAL — ESCALATOR EW — EACH WAY EXIST — EXISTING EXP — EXPANSION EXT — EXTERIOR FIN FLG FLR FO xxx FOC FOF FOS FP FRT FS FT FTG GA GALV GEN GLU LAM GR GR BM GYP BD H HDR HGR HLDN HORIZ HSS HT HVAC ID IF IJ IN INFO INSUL INT JST JT KIP KSI KWY L LBR LLH LLV LOC LONG LSH LSV LT LWC MAX MB MBR MECH MEZZ MFR MFR REC MH MID MIN MISC (N) NA NIC NIP NORM NO NS NTS 0 OC OD OF OFS OPH OPNG OPP OVS — FINISH(ED) — FLANGE — FLOOR — FACE OF xxx — FACE OF CONCRETE — FACE OF FINISH — FACE OF STEEL — FIREPROOF(ING)/FIRE PROTECTION — FIRE RETARDANT TREATED — FAR SIDE — FOOT, FEET — FOOTING — GAGE/GAUGE — GALVANIZED — GENERAL — GLUE LAMINATED TIMBER — GRADE — GRADE BEAM — GYPSUM BOARD — HIGH — HEADER — HANGER — HOLDDOWN — HORIZONTAL — HOLLOW STRUCTURAL SECTIONS — HEIGHT — HEATING, VENTILATING AND AIR CONDITIONING — INSIDE DIAMETER — INSIDE FACE — ISOLATION JOINT — INCHES — INFORMATION — INSULATE/INSULATION — INTERIOR — JOIST — JOINT — KIP (I,000 POUNDS) — KIPS PER SQUARE INCH — KEYWAY — ANGLE/LENGTH — LUMBER — LONG LEG HORIZONTAL — LONG LEG VERTICAL — LOCATION — LONGITUDINAL — LONG SLOTTED HOLE /LONG SIDE HORIZONAL — LONG SIDE VERTICAL — LIGHT — LIGHTWEIGHT CONCRETE — MAXIMUM — MACHINE BOLT — MEMBER — MECHANICAL — MEZZANINE — MANUFACTURE(R/D) — MANUFACTURER'S RECOMMENDATIONS — MANHOLE — MIDDLE — MINIMUM — MISCELLANEOUS — NEW — NOT APPLICABLE — NOT IN CONTRACT — NOT IN PERMIT — NORMAL — NUMBER — NEAR SIDE — NOT TO SCALE — OVER — ON CENTER — OUTSIDE DIAMETER — OUTSIDE FACE — OUTSIDE FACE OF STUDS — OPPOSITE HAND — OPENING — OPPOSITE — OVERSIZED (HOLES) SYM REVISION BY APPROVED DATE SYM REVISION ORIG REPLACE STEAM CONVERTER STATION #3 16069-20 CEI EO 04.22.16 PAF PAR PCC PEN PIL PJP PL PLCS PNL PRCST PREFAB PSF PSI PT PUR R RC RD REF REINF REQD RO RST SC SCHED SECT SLRS SHT SHTHG SIM SL SMS SPEC SPCS SQ SSH SST STAG STD STIF STIR STL STL JST STRUCT SUPT SYMM TB TBC TBR TD THK TO xxx TOC TOF TOGB TOS TOSL TOW TRANSV TRTD TYP T/C T&B T&G UON VAR VIF VNR VRFY VERT W WD WF WHS WO WP WPM WT WWF W/ W/0 XFMR YD — POWDER ACTUATED FASTENER — PARALLEL/PARAPET — PRECAST CONCRETE — PENETRATE/PENETRATION — PILASTER — PARTIAL JOINT PENETRATION WELD — PLATE — PLACES — PANEL — PRECAST — PREFABRICATED — POUNDS PER SQUARE FOOT — POUNDS PER SQUARE INCH — POST TENSIONED/PRESSURE TREATED — PURLINS — RADIUS ' — REINFORCED CONCRETE — ROOF DRAIN — REFERENCE — REINFORCING — REQUIRED — ROUGH OPENING — REINFORCING STEEL — SLIP CRITICAL — SCHEDULE — SECTION — SEISMIC LOAD RESISTING SYSTEM — SHEET — SHEATHING — SIMILAR — SLOPE — SHEET METAL SCREW — SPECIFICATION — SPACES — SQUARE — SHORT SLOTTED HOLE — STAINLESS STEEL — STAGGERED — STANDARD — STIFFENER — STIRRUP — STEEL — STEEL JOIST — STRUCTURAL — SUPPORT — SYMMETRICAL — THROUGH BOLT — THREADED BAR COUPLER — TO BE REMOVED — TRENCH DRAIN — THICK(NESS) — TOP OF xxx — TOP OF CONCRETE — TOP OF FOOTING — TOP OF GRADE BEAM — TOP OF STEEL — TOP OF SLAB — TOP OF WALL — TRANSVERSE — TREATED — TYPICAL . — TENSION/COMPRESSION CORD — TOP AND BOTTOM — TONGUE AND GROOVE — UNLESS OTHERWISE NOTED — VARIATION/VARIES — VERIFY IN FIELD — VENEER — VERIFY — VERTICAL — WIDE/WIDTH — WOOD — WIDE FLANGE — WELDED HEADED STUDS — WHERE OCCURS — WATERPROOFING/WORK POINT — WATERPROOF MEMBRANE — WEIGHT — WELDED WIRE FABRIC — WITH — WITHOUT — TRANSFORMER — YARD BY I APPROVED I DATE GENERAL NOTES I, THE STRUCTURAL DRAWINGS REPRESENT THE DESIGN OF THE PRIMARY STRUCTURE BASED ON PRESCRIBED LOADS, (SEE "DESIGN CRITERIA" SECTION), IMPOSED ON THE STRUCTURE PER THE BUILDING CODE, SEE "APPLICABLE CODES AND STANDARDS", THE PRIMARY STRUCTURE OF THE BUILDING IS DEFINED AS THE FOUNDATIONS, BEARING WALLS, SHEAR WALLS, COLUMNS, BEAMS, SLABS, FLOOR FRAMING AND LATERAL FORCE RESISTING ELEMENTS REQUIRED TO MAINTAIN THE STABILITY OF THE COMPLETED STRUCTURE AS A WHOLE, 2. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF THE DRAWINGS, SPECIFICATIONS, AND THE CODES, RULES AND REGULATIONS OF THE BUILDING CODE AS DEFINED IN THE BUILDING CODE SECTION. 3, THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED T0, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS. 4, THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY BRACING AS REQUIRED FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL MEMBERS ARE IN PLACE AND FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS, 5. CONSTRUCTION TOLERANCES SHALL CONFORM TO THE BUILDING STANDARDS SPECIFIED IN THE "BUILDING CODE" SECTION. 6, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES, 7. IF ANY ERRORS OR OMISSIONS APPEAR TO EXIST IN THESE DRAWINGS, SPECIFICATIONS, OR OTHER CONTRACT DOCUMENTS; THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF SUCH OMISSION OR ERROR BEFORE PROCEEDING WITH THE WORK, 8, NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS, WHERE NOTES AND DETAILS ON DRAWINGS AND THESE GENERAL NOTES AND TYPICAL DETAILS ARE IN CONFLICT WITH THE PROJECT SPECIFICATIONS, THE MOST STRINGENT SHALL APPLY. CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE CONSTRUCTED AS SHOWN FOR SIMILAR WORK, SUBJECT TO REVIEW BY THE ARCHITECT AND STRUCTURAL ENGINEER. 9. MANUFACTURED MATERIALS SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO THEIR USE, ALL REQUIREMENTS OF THOSE APPROVALS SHALL BE FOLLOWED. 10, SEE MECHANICAL AND OTHER SPECIALTY DRAWINGS AND PROJECT SPECIFICATIONS FOR THE FOLLOWING: A. PIPE RUNS, SLEEVES, HANGERS, TRENCHES, SUMPS, WALL, LID AND FLOOR OPENINGS, ETC., NOT SHOWN OR NOTED, B, ANCHORAGE AND BRACING FOR MECHANICAL EQUIPMENT TO THE STRUCTURE. C. ANCHOR BOLTS FOR MOTOR MOUNTS, D. SIZE, WEIGHT AND LOCATION OF MACHINES AND EQUIPMENT BASES. II, FRAMING MEMBERS WHICH ARE NOT DIMENSIONED SHALL BE EQUALLY SPACED BETWEEN DIMENSIONED POINT OF MEMBERS, 12. OPENINGS, POCKETS, ETC. SHALL NOT BE PLACED IN STRUCTURAL MEMBERS UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS. 13, MATERIAL SPECIFICATIONS ARE ASTM LATEST EDITION, BUILDING CODE I. ALL CONSTRUCTION, MATERIALS, AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF THESE DRAWINGS, SPECIFICATIONS, AND THE CODES, RULES AND REGULATIONS OF THE INTERNATIONAL BUILDING CODE (IBC), 2012 EDITION, AS ADOPTED AND AMENDED BY THE CITY OF TUKWILA, WA. HEREINAFTER REFERRED TO AS THE BUILDING CODE, 2, WHERE NOTED IN THE STRUCTURAL NOTES, CONSTRUCTION, MATERIALS, AND WORKMANSHIP SHALL ALSO CONFORM TO THE FOLLOWING STANDARDS, WHERE THESE STANDARDS CONFLICT WITH THE BUILDING CODE, THE CODE SHALL GOVERN, GENERAL ASCE7 "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES" AMERICAN SOCIETY OF CIVIL ENGINEERS ASCE/SEI 7 — 2010 EDITION HOT ROLLED STEEL AISC "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" AMERtCAN INSTITUTE OF STEEL CONSTRUCTION ANSI/AISC360 — 2010 EDITION AISC "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS" RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS June 30, 2004 AISC-303 "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES" AMERICAN INSTITUTE OF STEEL CONSTRUCTION AISC303 — 2010 EDITION �.s ��� � �z��� ��t� �' � ,�n�;�r�� i=,� {,'41I�� s t�c�rt f ( s¢� ��� r y��'�' �a�tiY� �i� , �r'� !������' ���,� ��r ���x� ��' a� ���r �� wd���� � ��nN. �. � ACCEPTABILITY CEI ��� THIS DESIGN AND/OR CHECKED SPECIFlCATION IS APPROVED R. REEVES ENG E R APPROVED BY DEPT. DATE J. VOLKMAN CHECKED E. OJALA 4TE SUBTITLE 04.22.16 04.22.16 TITLE 04.22.16 04.22.16 DESIGN CRITERIA LIVE LOADS ROOF CATWALKS AND PLATFORMS SNOW LOAD CODE GROUND SNOW LOAD ROOF SEISMIC DESIGN OCCUPANCY CATEGORY SITE CLASS IMPORTANCE FACTOR I = SS = SI = SDS = SDI = SEISMIC DESIGN CATEGORY LATITUDE LONGITUDE DEAD LOAD EQUIPMENT WEIGHT; STEAM CONVERTER SKIDS: 0 i �n � � 20 PSF 60 PSF 15 PSF 25 PSF II D I,00 1.516 0,574 I.011 0,574 D 47 30'53" N 122 18'00" W 10'-7Y" 2 EXISTING STRUCTURE AND MEMBER SIZES EXISTING STRUCTURAL DIMENSIONS AND MEMBER SIZES ARE FOR REFERENCE ONLY, CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD PRIOR TO FABRICATION, THE CONTRACTOR SHALL VERIFY THE ACTUAL CONFIGURATION OF EXISTING CONSTRUCTION AND THE CONDITION OF THE STRUCTURE BEFORE BEGINNING WORK, ANY DISCREPANCIES OR UNSOUND CONDITIONS SHALL BE REPORTED TO THE ENGINEER FOR RESOLUTION BEFORE BEGINNING WORK, TEMPORARY SHORING/BRACING IS NECESSARY IN ORDER TO PERFORM THE NECESSARY STRUCTURAL MODIFICATIONS TO THE EXISTING STRUCTURE SHOWN ON THE DRAWINGS, THE CONTRACTOR MUST RETAIN A LICENSED STRUCTURAL ENGINEER WHO SHALL INVESTIGATE WHERE THIS TEMPORARY SHORING/BRACING IS REQUIRED AND SHALL DESIGN ALL NECESSARY TEMPORARY SHORING/BRACING. ���� �,- --•- � ° � �,� � ';,;: � f �� ; � ��� � e � + � � ���, � ; � �- :>- 2�f� �- ; . ��� 0 �, �. � 100% SUBMITTAL ISSUE FOR PERMIT STRUCTURAL NOTES & ABBREVIATIONS REVIEWED FO� �(�DE C�I�PL.IAt��� A�P�C�►'V��i JUL 4 �. 2a16 ! �ity of7ukwila BUILDlNG DIVISION . ��� RECEtVED CITY OF TUKWILA JUN 15 2016 PERN1tT CENTER N G I� E E R S 1601 Fifth Avenue, Suite 900 � Seattle, WA 98101 ph 206.623.0717 � fax 206.624.3775 coffman.com . LASTING creativNy � results � reiationshlps CURRENT REVISION SYM80L DATE 16069-20 O R I G 04.22.16 SHEET REPLACE STEAM CONVERTER STATION �3 ���� B U! L D I N G 09-101 �oe No. 160 9 COMP N0. STRUCTURAL MASTER 6 —20 DEV. CENTER, Wq owc No. 09-101—S2W STRUCTURAL STEEL, MISC, METAL I, STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION SHALL CONFORM TO THE BUILDING CODE AND AISC STANDARDS USING LOADS AS DEFINED IN AISC-360 SECTION B3-3 DESIGN FOR STRENGTH USING LOAD AND RESISTANCE FACTOR DESIGN (LRFD), 2, STRUCTURAL STEEL FABRICATION AND ERECTION SHALL CONFORM TO AISC REQUIREMENTS AND THE PROJECT SPECIFICATIONS, 3, STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION OF ELEMENTS AND CONNECTIONS MARKED SLRS SHALL CONFORM TO AISC-341, 4, STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING; TYPE OF MEMBER ASTM SPECIFICATION Fy WIDE FLANGE SHAPES A992 50 KSI PLATES, CHANNELS, ANGLES, AND BARS A36 36 KSI (UON) HOLLOW STRUCTURAL SECTIONS (ROUND) A500 (GRADE B) 42 KSI HOLLOW STRUCTURAL SECTIONS (SQUARE OR RECTANGLE) A500 (GRADE B) 46 KSI PIPE A53 (GRADE B) 35 KSI ANCHOR RODS (EMBEDDED IN CONCRETE) F1554-36 (UON) 36 KSI CONNECTION BOLTS A325-N-STD (UON) 5, HEADED STEEL STUD CONNECTORS SHALL BE NELSON GRANULAR FLUX-FILLED HEADED ANCHOR STUDS OR AN APPROVED EQUAL AND BE MADE FROM COLD ROLLED CARBON STEEL AND SHALL CONFORM TO ASTM A-108, GRADE 1015 OR 1020 WITH A MINIMUM TENSILE STRENGTH OF 60,000 PSI, STUD WELDING, INSPECTION AND TESTING SHALL CONFORM TO AWS REQUIREMENTS, 6, THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO THE START OF FABRICATION. 7, WELDING SHALL BE PERFORMED IN ACCORDANCE WITH AWS REQUIREMENTS, ALL WELDS SHALL BE PREQUALIFIED IN ACCORDANCE WITH AWS AND AISC STANDARDS, USE E70XX ELECTRODES, UON, 8, ALL WELDS SHALL BE PERFORMED BY WELDERS CERTIFIED IN THE JURISDICTION HAVING AUTHORITY OVER THIS PORTION OF THE WORK. 9. WELD LENGTHS CALLED FOR ON THE PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WELD SIZE SHALL BE AISC MINIMUM, UON, 10, BEAM PENETRATIONS MAY BE CREATED PER THE TYPICAL DETAIL WITHOUT PRIOR APPROVAL OF STRUCTURAL ENGINEER. PENETRATIONS OF ANY SIZE IN ANY OTHER AREA OF THE MEMBER MUST BE REVIEWED AND APPROVED BY THE STRUCTURAL ENGINEER. II, CONNECTIONS SHOWN FIELD WELDED MAY BE FIELD BOLTED AT OPTION OF FABRICATOR. SUBMIT PROPOSED CONDITION TO STRUCTURAL ENGINEER FOR REVIEW PRIOR TO SUBMISSION OF SHOP DRAWINGS AND FABRICATION, 12, TENSION CONTROL BOLTS MAY BE SUBSTITUTED FOR THE BOLTS SPECIFIED IN THESE PLANS AT THE DISCRETION OF THE CONTRACTOR, ASTM F1852 TC BOLTS MAY BE SUBSTITUTED FOR ASTM A325 BOLTS AND ASTM F2280 TC BOLTS MAY BE SUBSTITUTED FOR ASTM A490, 13, ASTM A325 GRADE B BOLTS SHALL BE USED AND TIGHTENED WITHIN THE BELOW MIN AND MAX TORQUE (FT-LBS); ASTM A325 GRADE B BOLT TORQUE REQUIRMENTS BOLT SIZE MIN TORQUE MAX TORQUE Y" 37 50 %" 70 95 %4" 125 165 %" 185 250 1" 275 375 14, BEAM CLAMPS SHALL BE BY LINDAPTER OR APPROVED EQUAL AND CONSIST OF TYPE A CLAMPS AT THE TOP FLANGE WITH NYLOCK SELF-LOCKING NUTS AND TYPE B (RECESSED) CLAMPS AT THE BOTTOM, $" DIA A325-N BOLTS AND �" LOCATION PLATE (uoN). SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG REPLACE STEAM CONVERTER STATION �3 16069-20 CEI EO 04.22.16 WOOD I, LUMBER AND MANUFACTURED WOOD PRODUCTS SHALL CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE AND NDS SPECIFICATIONS 3. FRAMING LUMBER SHALL BE GRADED AND MARKED IN CONFORMANCE WITH WCLB STANDARD GRADING AND DRESSING RULES FOR WEST COAST LUMBER N0, 16, LATEST EDITION, UNLESS OTHERWISE NOTED ON THE DRAWINGS, 3, LUMBER SHALL BE DOUGLAS FIR-LARCH WITH GRADES AS FOLLOWS; A, JOISTS: UP TO 4 INCH NOMINAL THICKNESS, N0, 2, B. BEAMS AND STRINGERS: NO, I, C, POST AND TIMBERS: N0. I. D, PLATES AND MISCELLANEOUS LIGHT FRAMING: STANDARD, E, STUDS: N0, 2. 4. MINIMUM NAILING REQUIREMENTS: UNLESS OTHERWISE NOTED, MINIMUM NAILING SHALL CONFORM TO THE GOVERNING CODE AND AS FOLLOWS: A, JOISTS OR RAFTERS TO SIDES OF STUDS 8 INCH OR LESS B, FOR EACH ADDITIONAL 4 INCH IN DEPTH OF JOISTS C. JOISTS OR RAFTERS AT ALL BEARINGS-TOENAILS EACH SIDE D, STUDS TO BEARING - TOENAILS EACH SIDE E, BLOCKING BETWEEN JOISTS OR RAFTERS: TO JOIST OR RAFTERS-TOENAILS EACH SIDE EACH END TO JOIST OR RAFTER BEARINGS-TOENAILS EACH SIDE F, CROSS-BRIDGING BETWEEN JOISTS OR RAFTERS TOENAILS EACH END G. BLOCKING BETWEEN STUDS - TOENAILS EACH END H, DOUBLE TOP PLATES - LOWER PLATE TO TOP OF STUD J, UPPER TO LOWER PLATE - STAGGERED 3-16D I-16D 2-IOD 2-IOD 2-IOD 2-IOD 2-8D 2-IOD 2-16D 16D @ 16" OC K, MULTIPLE JOISTS - STAGGERED 16D @ 12" OC L, MULTIPLE JOISTS - STAGGER FOR WIDTHS MORE THAN 4 INCHES 16D @ 12" OC 5, INDIVIDUAL MEMBERS OF BUILT-UP POSTS AND BEAMS SHALL EACH BE ATTACHED WITH 16D SPIKES AT 12" OC STAGGERED, MIN, 6, ALL NAILS SHALL BE COMMON WIRE NAILS, WHENEVER POSSIBLE, NAILS DRIVEN PERPENDICULAR TO THE GRAIN SHALL BE USED, THERE SHALL BE A MINIMUM OF Z NAtLS AT ALL WOOD CONTACTS AND JOINTS USING 8D NAILS FOR I INCH THICK MATERIAL, 16D NAILS FOR 2 INCH THICK MATERIAL, AND 40D NAILS FOR 3 INCH THICK MATERIAL. ALL CONTINUOUS CONTACTS PROVIDE MINIMUM NAILS AT 12" OC WITH NAIL SIZES AS CALLED ABOVE. 7. NOTATIONS ON DRAWINGS RELATING TO FRAMING CLIPS, JOIST HANGERS, AND OTHER CONNECTING DEVICES REFER TO CATALOG NUMBERS OF STRONG-TIE CONNECTORS MANUFACTURED BY THE SIMPSON COMPANY, EQUIVALENT DEVICES BY OTHER MANUFACTURERS MAY BE SUBSTITUTED PROVIDED THAT THEY HAVE ICC APPROVAL FOR EQUAL OR GREATER LOAD CAPACITIES AND ARE SUBMITTED FOR REVIEW AND APPROVAL BY THE STRUCTURAL ENGINEER, 8, AT SAWN TIMBER JOISTS WITH A THICKNESS-TO-DEPTH RATIO OF 1;6 AND GREATER, PROVIDE CROSS-BRIDGING AT 12'-0" OC, 9, MACHINE APPLIED NAILING IS SUBJECT TO A SATISFACTORY DEMONSTRATION AND THE APPROVAL OF THE CHECKING AGENCY AND THE ARCHITECT, NAIL HEADS SHALL NOT PFNETRATE THE OUTER PLY MORE THAN WOULD BE NORMAL FOR A HANDHAMMER, EDGE DISTANCES SHALL BE MAINTAINED. SHINERS SHALL BE REMOVED AND REPLACED, THE APPROVAL IS SUBJECT TO CONTINUED SATISFACTORY PERFORMANCE, MACHINE APPLIED NAILING ONLY ON PLYWOOD GREATER THAN 5/16", 10, ALL FRAMING CONNECTORS TO BE SIMPSON STRONG TIE COMPANY OR AS REQUIRED BY THE STRUCTURAL PLANS. SUBSTITUTIONS FOR EQUIVALENT PRODUCTS MAY BE USED, CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROOF OF EQUIVALENCY, TO INCLUDE BUT NOT LIMITED TO THE ICC/IAPMO REPORT. PROVIDE THE TYPE OF NAILS SPECIFIED BY THE MANUFACTURER AND FULLY DRIVE NAILS INTO ALL HOLES CONNECTOR UNLESS OTHERWISE NOTED ON THE PLANS. ALL CONNECTORS SHALL BE GALVANIZED OR HAVE ANOTHER FACTORY APPLIED FINISH. ALL STEEL FRAMING HANGERS TO BE TORSIONAL RESTRAINT, SOLID BLOCKING REQUIRED BETWEEN JOISTS WHERE TORSIONAL RESTRAINT HANGERS DO NOT OCCUR, II. ALL STRUCTURAL SHEATHING SHALL BE MARINE GRADE I PLYWOOD SHEATHING OR ORIENTED STRAND BOARD (OSB) & SHALL CONFORM TO PRODUCT STANDARD PSI-95 OR PS2-99, TYPE 8� THICKNESS SHALL BE AS SPECIFIED ON THE PLANS, �, i1�1 f�� �4�� �s��° �yzt`�?° 2��a` t� 1i,�.��;� ��i � � !x§�u���?�� �.W 1u2� � � ���4�'��t �'�� ��; �;u?av���� ��� �?���. ���. 0 � ��� ACCEPTABILITY CEI�� �� THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED R. REEVES NGINE APPROVED BY DEPT. DATE J. VOLKMAN CHECKED E. OJAIA 4TE SUBTITLE 04.22.16 04.22.16 TITLE 04.22.16 04.22.16 STATEMENT OF SPECIAL INSPECTION I, SPECIAL INSPECTION BY A REGISTERED DEPUTY BUILDING INSPECTOR, IN CONTRACT WITH THE OWNER AND APPROVED BY THE EOR AND THE BUILDING OFFICIAL, SHALL BE REQUIRED FOR THE FOLLOWING TYPES OF WORK (SEE THE PROJECT SPECIFICATIONS FOR FURTHER REQUIREMENTS); ITEM BUILDING CODE REFERENCE STEEL 1705.2 DETAIL VERIFICATION WELDING OF STRUCTURAL STEEL SHEAR CONNECTORS AND ANCHOR STUDS HIGH STRENGTH BOLTING 2. SPECIAL INSPECTIONS SHALL NOT BE REQUIRED WHEN THE WORK IS DONE ON THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED BY THE BUILDING OFFICIAL TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION, 3, NONDESTRUCTIVE INSPECTION OF ALL WELDS, SHOP AND FIELD, OF THE MOMENT-RESISTING FRAMES SHALL BE PROVIDED IN ACCORDANCE WITH THE 2012 IBC AND THE AISC 341-10, 4, SUMMARY REPORTS OF ALL INSPECTIONS AND TEST RESULTS SHALL BE DISTRIBUTED TO THE OWNER, ARCHITECT, STRUCTURAL ENGINEER, AND BUILDING OFFICIAL WITH DEFICIENCIES CLEARLY NOTED, 5, DEFICIENCIES SHALL BE REPORTED TO THE CONTRACTOR ON A DAILY BASIS, 6, REPORTS, CERTIFICATES AND OTHER DOCUMENTS RELATED TO SPECIAL INSPECTIONS SHOULD BE SUBMITTED BY CONTRACTOR TO THE CITY OF EVERETT PRIOR TO ALL WORK BEING PERFORMED INCLUDING: A, ALL MILL TESTS, B, CERTIFICATES OF COMPLIANCE FROM THE MANUFACTURER FOR PREFABRICATED STRUCTURAL STEEL MEMBERS AT COMPLETION OF MANUFACTURE, C, WELDING PROCEDURE SPECIFICATIONS, D, MILL TESTS FROM THE MANUFACTURERS OF ASTM A307, GRADE A, STEEL THREADED RODS VERIFYING COMPLIANCE WITH SUPPLEMENTARY REQUIREMENTS SI OF ASTM A307. 7. DEFINITIONS OF SPECIAL INSPECTIONS AND TESTING FREQUENCY: "CONTINUOUS" - THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED, "PERIODIC" - THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION OF THE WORK, 8, THE FREQUENCY OF INSPECTIONS AND TESTING SHALL OCCUR AS SHOWN: .� AISC 360 TABLE N5.4-1 INSPECTION TASKS PRIOR TO WELDING QC QA WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE P P MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES P P AVAILABLE MATERIAL IDENTIFICATION (1YPE/GRADE) 0 0 WELDER IDENTIFICATION SYSTEM1 0 0 "FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMEfRY) -JOINT PREPARATION -DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL) 0 0 -CLEANLINESS (CONDITION OF STEEL SURFACES) -TACKING (TACK WELD QUALI-fY AND LOCATION) -BACKING TYPE AND FIT (IF APPLICABLE)" CONFIGURATION AND FINISH OF ACCESS HOLES 0 0 "FIT-UP OF FILLET WELDS -DIMENSIONS (ALIGNMENT, GAPS AT ROOTS) 0 0 -CLEANLINESS (CONDITION OF STEEL SURFACES) -TACKING (TACK WELD QUALITY AND LOCATION)" CHECK WELDING EQUIPMENT .� - 0 - .<..-� 1. THE F �;e �# R'�. �_�T '�, � S APPLICABLE, SHALL MAINTAIN A SYSTEM B I A,� f' R��, '��� LDED A JOINT OR MEMBER CAN BE ID F E._��AM �' "�D SHALL BE THE LOW-STRESS TYPE. � �,: y,,.:.,w , � ::� r�- !�r�} � r�t.^-;� V l•� 1L �°� _ i ���' � R�VIEWEQ FQK �4�� GQMPLIANCE .. A�P�4VEt� � ,��l�.012016 �00°lo SUB�IITT�L ISSUE FOR PER�IT STRUCTURAL NOTES & ABBREVIATlONS REPLACE STEAM CONVERTER STATION �3 BUI�DING 09-101 STRUCTURAL MASTER DEV. CENTER, WA �� � RECEIVED CIT`Y OF TUf�1NILA JUN 15 2016 �ti� ��"C��tt�t�� PER�tT CENTER F3U11.C�tk�� ���ISION � 6 I� E E R S 1601 Fifth Avenue, Suite 900 � Seattle, WA 98101 ph 206.623.0717 � fa�c 2U6.624.3775 coffman.com LAS�NG aeativity � rewlu � relatlonships CURRENT REVISION SYMBOL DATE 16069-20 0 R I G 04.22.16 SHEEf � �� J08 N0. COMP N0. 16069-20 owc No. 09-101-S2X SYM ORIG i:aa�������►i REPLACE STEAM CONVERTER STATION #3 I BY I APPROVED I DATE I SYM 16069-20 CEI EO 04.22.16 � REVISION BY I APPROVED I DATE 0 AISC 360 TABLE N5.4-2 INSPECTION TASKS DURING WELDING QC QA USE OF QUALIFIED WELDERS 0 0 "CONTROL AND HANDLING OF WELD CONSUMABLES —PACKAGING 0 0 —EXPOSURE CONTROL" NO WELDING OVER CRACKED TACK WELDS 0 0 "ENVIRONMENTAL CONDITIONS —WIND SPEED WITHIN LIMITS 0 0 —PRECIPITATION AND TEMPERATURE" "WPS FOLLOWED —SETTING ON WELDING EQUIPMENT —TRAVEL SPEED —SELECTED WELDING MATERIALS —SHIELDING GAS TYPE/FLOW RATE 0 0 —PREHEAT APPLIED —INTERPASS TEMPERATURE MAINTAINED (MIN./MAX.) —PROPER POSITION (F,V,H2OH)" "WELDING TECHNIQUES —INTERPASS AND FINAL CLEANING 0 0 —EACH PASS WITHIN PROFILE LIMITATIONS —EACH PASS MEEfS QUALITY REQUIREMENTS" AISC 360 TABLE N5.4-3 INSPECTION TASKS AFTER WELDING QC QA WELDS CLEANED 0 0 SIZE, LENGTH AND LOCATION OF WELDS P P "WELDS MEET VISUAL ACCEPTANCE CRITERIA —CRACK PROHIBITION —WELD/BASE—METAL FUSION —CRATER CROSS SECTION P P —WELD PROFILES —WELD SIZE —UNDERCUT —POROSI�iY" ARC STRIKES P P K—AREA 1 P P BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED) P P REPAIR ACTIVITIES P P DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR P P MEMBER 1. WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE K—AREA, VISUALLY INSPECT THE WEB K—AREA FOR CRACKS WITHIN 31N OF THE WELD. 0—OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. P—PERFORM THESE TASKS FOR EACH WELDED JOINT OR MEMBER. AISC 360 TABLE N5.6-1 INSPECTION TASKS PRIOR TO BOLTING QC QA MANUFACTURER'S CERTIFICATIONS AVAIIABLE FOR FASTENER 0 P MATERIALS FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS 0 0 PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM 0 0 SHEAR PLANE) PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL 0 0 CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, 0 0 MEET APPLICABLE REQUIREMENTS PRE—INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER P 0 ASSEMBLIES AND METHODS USED PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND 0 0 OTHER FASTENER COMPONENTS ,„���f����'7�r �t���4�� t`��� b��� 4x�s�'6 t't'��+ ���'" sr� +r� 1:� ,e.�' ;s��'��"�4,�k�£ �''�,t;w,�e�°�' .z$i��"�,�. ,`�,�� :,��'�' �ava�^" abi;��u,�:���x�= �' ���.. � i�i ACCEPTABILITY CEI THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED R. REEVES E G APPROVED BY DEPT. DATE J. VOLKMAN CHECKED E. OJALA AISC 360 TABLE N5.6-2 INSPECTION TASKS DURING BOLTING QC QA FASTENERS ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS 0 0 REQUIRED JOINT BROUGHT TO THE SNUG—TIGHT CONDITION PRIOR TO THE 0 0 PRETENSIONING OPERATION FASTENER COMRONENT NOT TURNED BY THE WRENCH 0 0 PREVENTED FROM ROTATING FASTENERS ARE PREfENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST 0 0 RIGID POINT TOWARD THE FREE EDGES AISC 360 TABLE N5.6-3 INSPECTION TASKS AFTER BOLTING QC QA DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED P P CONNECTIONS 0—OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. P—PERFORM THESE TASKS FOR EACH BOLTED CONNECTION. SUBMITTALS I. THE FOLLOWING ITEMS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION/ERECTION/INSTALLATION, THESE ITEMS ARE IN ADDITION TO ANY SUBMITTAL REQUIREMENTS SPECIFIED ON THESE PLANS, IN THE PROJECT SPECIFICATION OR BY THE CITY ITEM PROD SHOP TEST CALCS BLDG DATA DWGS RESULTS DEPT A, STRUCTURAL STEEL X B. EPDXY X C. EXPANSION ANCHORS X D. GROUT X 2, "PROD DATA" — SUBMIT ADEQUATE DOCUMENTATION THAT THE PRODUCT PROPOSED TO BE USED MEETS THE REQUIREMENTS ON THESE PLANS AND THE PROJECT SPECIFICATIONS. 3, "SHOP DWGS" — SUBMIT COMPLETE SHOP DRAWINGS SUFFICIENT TO SHOW QUANTITIES AND KINDS OF MATERIALS, METHODS OF ASSEMBLY, AND ALL DATA REQUIRED FOR FABRICATION, ERECTION, AND INSTALLATION, THE PURPOSE OF THESE DRAWINGS IS TO DEMONSTRATE THAT THE CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT DOCUMENTED HEREIN, SUBMITTALS CONSISTING OF DRAWINGS TAKEN DIRECTLY FROM THESE PLANS WILL NOT BE APPROVED. 4, "TEST RESULTS" — SUBMIT RESULTS FOR ANY TESTING REQUIRED BY BUILDING CODE, SPECIFICATIONS, OR THESE PLANS, 5, "CALCS" — SUBMIT CALCULATIONS SIGNED AND SEALED BY A DESIGN PROFESSIONAL AUTHORIZED TO PERFORM WORK IN THE PROJECT JURISDICTION, 6. "BLDG DEPT" — IF CHECKED, THE SUBMITTALS SHALL BE REVIEWED AND APPROVED BY THE BUILDING OFFICIAL PRIOR TO FABRICATION AND/OR INSTALLATION, .<:.-- , -. --` , ,� w,e� •'�� a � Y� � '�,'. . * , ;_ � ` ����� � � ��y � .� � � >� �;; ��,., �- �, ''` � 1 r� " ��A � 140% SUB�ITTAL ISSIJE Ft�R PERMIT - ��v«vv�� Fa� ��i�� �OMPLIA(�CE � . A�P�OV�i� JUL 01 2016 ` �i� ��'�ut<w'tl� �UlLbf€�� C�tVtS10N . •�' RECEtVED CiTY OF TUKWILA JUN 15 2016 PERiUitT CENTER N G i N E E R S 1601 Fifth Avenue, Suite 900 � Seattle, WA 98101 ph 206.623.0717 � fax 206.624.3775 coffman.com LASTING creatNiry � resWts � relaGonships alt SUBTITLE CURRENT1 60S�19N 20 SYMBOLO R I G DATE 04.22.� 6 04.22.,s STRUCTURAL NOTES & ABBREVIATIONS 04.22.16 SHEET 04.22.i s�� REPLACE STEAM CONVERTER STATION �3 ��� °4.22.,6 gUILDiNG 09 101 � JOB N0. COMP N0. 16069-20 STRUCTURAL MASTER — DEV. CENTER, Wq °wc No. 09-101—S2Y , SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG REPLACE STEAM CONVERTER STATION #3 16069-20 CEI EO 04.22.16 � E I I rvic�r nnn ���is�i%i�'� �;���� �iS� ,� ttf�� ���,r� ��,�� ���^ ,r�s� �;i �� �h�'�r'� ���? y£ j �� � e 1���� �� ���r�P` ��t��i �,���'� ��A��� ����� ����� �� ���� PARTIAL P LAN SCALE: 1 /4"=1'-0" (TOP - CON�ERTER OF JOIST EL 53'-2 1/2") �"Rlw�",3�Y��%1 . ffh�.�3k1 fi�� A�`t�"`�'aYIDp�4 �kyi � �� � ` y � � �� �� �i � � ;�` � � � � F� �� }Y'Vs4:,, '��' a�" +2ti�.5�?..� 4 '2� r�,' � i s {y� li �Y�I,} p, (� fr � � Y Y ;�'J �d� J�,�i t MmtU�{� �� ` � ��. � �� � � �� a t � �?mm:a�� � � �'�+�x�w�„�,�s� �q�� &� ��'� ��+a�a�a��sae�st� ACCEPTABILITY CEI� �� THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED R. REEVES � N I E APPROVED BY DEPT. DATE J. VOLKMAN CHECKED ,�s '� ) E. OJALA �l� '�� � ����'���, `� , ;. � �� .�,,,�,�..,. !P �EGEND � INDICATES EXTENT OF DEMO/REMOVAL. GEI�ERA� NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES 1� REMOVE MECHANICAL EQUIPMENT PAD. 2� REMOVE EXISTING GALVANIZED PLATE. 3� REMOVE EXISTING 5/" PLYWOOD W/ WATER DAMAGE AS REQUIRED. 4� REMOVE EXISTING LADDER, HOIST STEAM CONVERTER STATION EQUIPMENT, THEN INSTALL NEW SHIPS LADDER SYSTEM. 5� EXISTING GUARDRAIL TO REMAIN. � REMOVE EXISTING TEMPORARY GUARDRAIL TEMPORARILY FOR EQUIPMENT TRANSFER. REATTACH •�_•� � ` �"� WHEN COMPLETE :e» •�'" ' � � �'- t ������ ��� �:� , [, � /� St'v. ��� �"i � 'MI' ` � ,r.L .��� ,, REVIE,V11�1� � :��-'�9� � r ��W�i � �s��� �0 Q�'�� C� . ���� JUL o 1 2016 . `. � � =• t � ` ��� �`� `-� k � �i��� � �Y � t� t���� !�F1��� �� �� �r���` �� �i;9��'�� � � �� �„� ,���� rv�°"`��'W , ��{ �� u � ��, ��L 100% SUBMITTAL ISSIJE FOR PER�IT . •�'��� RECEtVED CtTY OF TUI{W(LA JUN 15 2016 PERRfIfT CENTER � G I N E E R S 1601 Fifth Avenue, Suite 9U0 � Seattle, WA 98101 ph 206.623.0T1T � fax 206.624.3775 cofftnan.com l./�STING creativity � results � rela6onships ai t SUBTITLE CURRENT REVISION SYMBOL DATE 04.22.,s ENLARGED PLAN 16069-20 0 R I G o4.22.� 6 04.ZZ.� Fi SHEET 04.22.�s �`� REPLACE STEAM CONVERTER STATION #3 ��.�SR °4.22.,6 gUILDING 09 101 � JOB N0. COMP N0. 16069-20 STRUCTURAL MASTER DEV. CENTER, �iq °wc No. 09-101—S458R TYF PL3�6; PLATE TUBE .' :► 1 ANCHOR EQUIPMENT W/ (4) Y"�x3", SEAL ANCHORAGE PENETRATIC W/ WATERPROOF SEALANT 20 GA SHEEf MEfAL — FfASHING SEAL JOINTS W/ WATERPROOF SEALANT / �%4" MARINE GRADE I PLYWOOD SHEATHING PRESSURED TREATED SLEEPERS SEE PLAN `: � %" MARINE GRADE I PLYWOOD SHEATHING 20 GA "J" FLASHING N0.12x8"LG SIMPSON STRONG—TIE STRONG 4x4 ANCHORAGE SUPPORT DRIVE SDWS TIMBER SCREW MODEL� SEE B/S684 SDWS22800DB—RC12 OR EQUIVALENT COUNTERSUNK WOOD SCREWS @ 6" OC TYP ;; (E) JOIST -` SECTION AT EQUIPMENT STAND � SCALE: 1 1 /2"=1'-0" S4581S684 I II 2.2,�..6„ �I 3,_�y„ I 5,_�,» 2 NOTES: ' 1. FOR INFORMATION NOT SHOWN SEE SECTION AT SHIPS LADDER SCALE: 3/4"=1'-0" SYM REVISION BY APPROVED ORIG REPLACE STEAM CONVERTER STATION �3 16069-20 CEI EO DATE SYM 04.22.16 �AFEfI' = OR � PRE—MANUF. 6"x24" GRATING TREADS W/ SAFETY NOSINGS, TYF IPS LADDER IS TO BE SIGNED & BUILT BY Tf �, LEL FABRICATOR & SH, MEET THE CRITERIA PROV S4581S684 REVISION SHEET MEfAL FLO� SIMPSON STRONGTIE TYPE BA PURLIN HANGER EQUIPMENT SKID ANCHOR EQUIPMENT W/ Y" LAG BOLT SEE MECH FOR ANCHOR LOCATION SEAL ANCHORAGE PENEfRATION W/ SILICONE WATERPROOF SEALANT 5/" PLYWOOD (E) 2x4 NAILER (E) JOIST SECTION AT EQUIPMENT ANCHORAGE SCALE: 1 1/2"=1'-0" S458 S684 SECTION AT SHIPS LADDER SCALE: 3/4"=1'-0" � }i����:z����a�����.ria S4581S684 ��; ICK ) '���`�t�� '��� ��� jt$����a� S�R�"� S'�£,R'"y� u�" ¢�""" Si�;C� i�i o��° ,�� �"�' �; '�� ��� , ���, ���� „�� ��'�t�� �����,�a�� � �Y' ���A I %" MARINE GRADE I PLYWOOD SHEATHING 10D � �" OC EDGE NAILING — ALL SUPPORTED PANEL EDGES & DIAPHRAGM PERIMEfER 10D C� 4" OC FIELD NAILING AT INTERMEDIATE SUPPORTS 2x BLOCKING AT ALL PANEL EDGES C� BLOCKED PLYWOOD DIAPHRAGMS NOTES: 1. MIN EDGE DISTANCE FOR NAILS SHALL BE 3/8". 2. MIN SHEATHING SHEET SIZE SHALL BE 2'-0"x4'-0". 3. NAILS SHALL NOT BE OVERDRIVEN. 4. NAILS SHALL BE COMMON WIRE TYPE OR APPROVED EQUAL. 5. VERIFY EXISTING NAIL SPACING MATCHES ABOVE DETAIL. PROVIDE ADDITIONAL NAILS AS REQD PER DETAIL TYPICAL SHEATHED FLOOR DIAPHRAGM SCALE: 3/4"=1'-0" STRINGER SEE PLAN s Y L3x3x3/ SHIPS �ADDER SCALE: 3/4"=1'-0" Y" DIAMOND PLATE %6 4-12 NP /s 4-12 � T�S FOR TYP SHEAR TAB CONN SEE G/S684 WF BM BEYOND SEE PLAN TOP CONI�ECTION STRINGEn c�rr �� ��� 3 SIDE' S4581S684 S684 �� LJXJX%$XU —J IIV/ �� ) Y��� TZ EXPANSION ANCHOR EMBED 2" SHIPS �ADDER BOTTOM CONNECTION SCALE: 3/4"=1'-0" ���A� L���11�� ACCEPTABILITY CEi����� THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED R. REEVES EN INEE APPROVED BY DEPT. DATE J. VOLKMAN CHECKED E. OJALA TYF STRINC SEE P ri..�2x�xv —� vv/ (2) %"� A325 THRU BOLTS SHIPS LADDER CONNECTION SCALE: 3/4"=1'-0" HSS4x4 0 o P�x7x0'-10" W/ (4) � Y"� HILTI KWIK BOLT TZ � �� � EXPANSION ANCHORS �; j EMBED �" 0 0 � 1y" TYP � BASEPLATE A � 1y" lYP � � 1Y2" TYP 3" ��� C8x11.5 REVIEVIJED FC1F� �C}�E C�SMPLIANCE a4�P�OVEC? JUL O 1 2016 Cify of i'ukwila BUILDING DIVISION 0 0 0 0 1y" lYP BASEPLATE C 2 SIDES �• ��»� ...- . 4 ,.�. � . ' ; � � ; ;� ,.. � i i � �� �'''� ��� P�x7X — ' ,� 3� i� `;s,'w;; ;�v,�.�i � � �. S684 �� HSS4x4 P�x10x0'-10" W/ (4) Y"� HILTI KWIK BOLT TZ EXP ANCHORS EMBED 3Y4" Y„S� HIL I`i''�,0'��f T��'`-` "" CITY OF T VED 2 SIDES U° EXPANSI } 1�C�i0RS �> '"; UKW(�q � ) EMBED �" ;C�.,��Or-`�dt JUN 15 2016 HSS4x4 gASEPLATE B PERfVttT CENTER � - 0 � � ' '' �' �' '' v�� � �„ .� � • i' �`�� ' � � � ���� � � �� , • • , ��¢ � � . .. A , ' � s �% �git"" kR � t� �� ,� � � �� ���m 4TE SUBTITLE 04.22.16 04.22. � s ' TITLE 04.22.16 04.22.15 100% SUB�ITTAL ISSUE FOR PERMIT MISCELLANEOUS SECTIONS & DETAILS REPLACE STEAM CONVERTER STATION #3 STRUCTURAL MASTER N G I H E E R S 1601 Fifth Avenue, Suite 900 � Seattle, WA 98101 ph 206.623.0717 � fax 206.624.3775 coffman.cam LASTING creativtty � rewlts � relatlonships JRRENT REVISION SYM80L DATE 16069-20 0 R I G 04.22.16 �i1 8 U I L D I N� 09-101 JOB N0. COMP 16069-20 DEV. CENTER, N1q °wc No. 09-101—S684 ,