HomeMy WebLinkAboutPermit D16-0281 - SSEBCO - OFFICE AND GARAGE DEMOLITIONSEBCO DEMOLITION 11060 TUKWILA INTERNATIONAL BLVD Dl 6=0281 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov DEVELOPMENT PERMIT Parcel No: 0323049029 Permit Number: D16-0281 Address: 11060 TUKWILA INTERNATIONAL Issue Date: 1/8/2018 BLVD BLDG Permit Expires On: 7/7/2018 Project Name: SEBCO DEMOLITION Owner: Name: SSEBCO INC Address: 720 RAINIER AVE S, RENTON, WA, 98057 Contact Person: Name: DAVID KEHLE Address: 1913 BONAIR DR SW, SEATTLE, WA, 98116 Contractor: Name: POE CONSTRUCTION INC Address: PO BOX 1838, AUBURN, WA, 98071- 1838 License No: POECOI*247QZ Lender: Name: SEBCOINC Address: 4020 E MADISON - SUITE 320, SEATTLE, WA, 98112 Phone: (206) 433-8997 Phone: (253) 833-2400 Expiration Date: 5/1/2019 DESCRIPTION OF WORK: DEMOLISH EXISTING 21,206 SQ FT OFFICE AND REPAIR GARAGE, ANCILLARY STRUCTURES AND ALL EXISTING SITE IMPROVEMENTS PW ACTIVITIES INCLUDE WATER CAPPING AT THE WATER MAIN, EROSION CONTROL. SANITARY SEWER CAPPING UNDER VALLEY VIEW PERMIT #7443. Project Valuation: $318,000.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: Type of Construction: VB Electrical Service Provided by: Fees Collected: $5,830.44 Occupancy per IBC: B Water District: Sewer District: ICurrent Codes adopted by the City of Tukwila: I International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition Uniform Plumbing Code Edition: International Fuel Gas Code: Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: 2015 National Electrical Code: 2017 2015 WA Cities Electrical Code: 2017 2015 WAC 296-4613: 2017 2015 WA State Energy Code: 2015 2015 Volumes: Cut: 0 Fill: 0 Number: 0 Storm Drainage: Street Use: Water Main Extension: Water Meter: No Permit Center Authorized Signature: Date: 014 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development per nd agr--e to the conditions attached to this permit. Signature: DatA\�Ob�kb- Print Name--nhw On&� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: 'BUILDING PERMIT CONDITIONS' 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 4: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 5: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. CONSTRUCTION CONTRACTOR'S RESPONSIBILITY (i) Before bidding or starting any construction work, you are required to obtain a written asbestos report from the building owner or owner's agent. The report must be based on a survey by an accredited AHERA building inspector unless the building owner assumes materials in the structure are asbestos or has other convincing documents showing asbestos is not present in the work area. A building owner may know asbestos has been removed during prior work or that a new building has been constructed using materials certified to be asbestos free. If you discover suspect asbestos materials, you must report them to the building owner within 24 hours. Asbestos materials may be found in enclosed structures or between other materials, where they are not accessible before work. State law specifies a minimum $250 per day fine for failure to obtain the asbestos report. This fine can be applied to both the contractor and building owner. Additional fines may be applied if workers are exposed to airborne asbestos. (i) Washington State Department of Labor & Industries regulations & policies with regards to asbestos removal. A Copy of the asbestos report must be made available to the building inspector prior to the first inspection. In addition, if asbestos has been found, confirmation of the completed abatement work must be provided to the building inspector. Inspection scheduling will not be accepted until this documentation is received by the building inspector. 9: Accumulation of combustible waste material is prohibited during the demolition phase of this project. Remove and properly dispose of all waste material prior to the close of the working day and as often throughout the day as needed. 10: All interior demo debris must be removed prior to demo of the automatic sprinkler system. Contact the Tukwila Fire Prevention Bureau at 206/575-4407 for an inspection of the building prior to shut down of the automatic sprinkler system. 11: Fire Department access and existing hydrants shall be constantly maintained during demolition and construction. 8: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 12: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 13: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 14: 'PUBLIC WORKS PERMIT CONDITIONS' 15: Call to schedule mandatory pre -construction meeting with Dave Stuckle, Public Works Inspector, (206) 433- 0179. 16: The applicant or contractor must notify the Public Works Inspector at (206) 433-0179 upon commencement and completion of work at least 24 hours in advance. All inspection requests for utility work must also be made 24 hours in advance. 27: Water service shall be capped at the water main and removal of the existing 2" WIVI shall be coordinated with Tukwila Water Dept. Fuel tank removal and contaminated dirt removal are not part of this demo permit. 28: Per Sound Transit all vehicles should enter the property via 112th Street or Tukwila International Blvd, and NOT EAST MARGINAL WAY to minimize impact to Sound Transit Easement Areas. Refer to Sound Transit December 1, 2017 Review and Assessment of Demolition letter, which is part of this permit approval. 17: Prior to construction, all utilities in the vicinity shall be field located. NOTE: For City of Tukwila utility locates, call 811 or 1-800-424-5555. 18: Permit is valid between the weekday hours of 7:00 a.m. and 5:00 p.m. only. Coordinate with the Public Works Inspector for any work after 5:00 p.m. and weekends. 19: No work under this permit during weekend hours without prior approval by Public Works. Coordinate with the Public Works Inspector. 20: Any material spilled onto any street shall be cleaned up immediately. 21: Hauling 6 loaded vehicles per hour/8 hours a day for 2 or more consecutive days or hauling hazardous waste shall require application for a Hauling Permit prior to any associated activity. 22: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off-site or into existing drainage facilities. 23: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 24: From October 1 through April 30, cover any slopes and stockpiles that are 3H:1V or steeper and have a vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period, cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and immediately before, during and following storms. 25: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction approval. 26: Maintain emergency, pedestrian, and vehicular access to buildings, trails and transit at all times. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL" 5210 EROSION MEASURES FNL 1400 FIRE FINAL 5040 LAND ALTERING 0101 PRE -CONSTRUCTION 1600 PUBLIC WORKS FINAL 5160 PUBLIC WORKS PRE -CON 5090 STORM DRAINAGE 5130 WATER METER - PERM CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Nv..TUk\N'J IaWA.gov SITE LOCATION Site Adi Tenant Building Permit No. (P — OA I Project No. Date Application Accepted: IDate Application Expires: (For offlce use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "Please Print" PROPERTY OWNER Name: fty IV,, Address:4w (At �740 City: %--ku Staw: 1h f-lPW71 CONTACT PERSON - person receiving all project conununication I Name: �64LV Address: 11 UP City:eall*, State% Zipftilp Phone:% 4?7, _� _,%-pFax.J&. Email*A64,,hl, , &X�WA rdA. &W t GENERAL CONTRACTOR INFORMATION Company Name: Address: city: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Co Assessor's Tax No.: V-1 !t!2!fL - L/1'T i -14 -API ,YV Suite Number: - Floor: 1 New Tenant: E) ..... Yes Eff..No ARCHITECT OF RECORD Name: W Company Name: ua-vo wa+w, Address: Architect Name"vtr) �e*o, Address: 1UP two- 910� City: "te Statol Zip:61�11(.O, Phone*� . 4-34 - mog Fax:ft.k,.!,� Email: 4�"e Q 4Whkcw�, 601K ENGINEER OF RECORD Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) 1 1 Name: W RWOEV Address: rE� State: Zip: H:\Appiieeliom\Forms-Applicelions On Line\2011 ApplicationsTerntit Application Revised -8-9-1l.docK Revised: August 2011 Page 1 of 4 bh BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): $ �1 b I Xr, CV Existing Building Valuation: $1,1 UIUACA Describe the scope of work (please provide detailed information): k-" NsT&4 4AJP 1AA, N6-tlQq Will there be new rack storage? ..... Yes No If yes, a separate permit and plan'submittal will be required. IProvide AD Building Arew in Square Footage Below PLANNING DIVISION: Single fianily building footprint (area of the foundation of all structum, plus any dec�s over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq fl)1g&.Qt Floor am of principal dwelling: Floor area of accessory dwelling- J4 A -- *Provide docurnentati6n that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Paricing Stalls Provided: Standard: 4 — Compact: Handicap: Will them be a change in use? 14 ...... Yes El ....... No If "yes", explain: &1XS; B(I,— A k4 FIRE PROTECTIONA11AZARDOUS MATERIALS: 10 ....... Sprinlders 0 ....... Automatic Fire Alarm D ....... None 0 ....... Other (specify)_ Will there be storage or use of flammable, combustible or hazardous materials in the building? El ....... Yes [3 ....... No If '5ws', attach list ofmaterials and storage locations on a separate 8-112 " x I I - paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM Ug y —Tb 61 - Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per I" Floor 2 nd Floor $ 3rd Floor Floors thru Basement Accessory Structur,* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single fianily building footprint (area of the foundation of all structum, plus any dec�s over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq fl)1g&.Qt Floor am of principal dwelling: Floor area of accessory dwelling- J4 A -- *Provide docurnentati6n that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Paricing Stalls Provided: Standard: 4 — Compact: Handicap: Will them be a change in use? 14 ...... Yes El ....... No If "yes", explain: &1XS; B(I,— A k4 FIRE PROTECTIONA11AZARDOUS MATERIALS: 10 ....... Sprinlders 0 ....... Automatic Fire Alarm D ....... None 0 ....... Other (specify)_ Will there be storage or use of flammable, combustible or hazardous materials in the building? El ....... Yes [3 ....... No If '5ws', attach list ofmaterials and storage locations on a separate 8-112 " x I I - paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM Ug y —Tb 61 - PERMrr APPUCATION WITS — Value of Construction — In all cases, a value of construction amount should be entered by the applicant This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issuedwithin 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (cunent edition). I HEREBY CERTEFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AIM10AUZED AGENT: Date: tb�oLp Print Name: Day Telephone: 4X& Mailing Address:. �11.Le 4mlc-' Wb I) LP City stft zip MAWficatiMMOMIS.-AWlication; On LineWl I Wcationewnit Application Revised - 9-9-1 I.dDCX Revised: August 2011 bb Page 4 of 4 DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $3,643.45 D16-0281 Address: 11060 TUKWILA INTERNATIONAL BLVD BLDG Apn:0323049029 $3,643.45 Credit Card Fee $106.12 Credit Card Fee ROOO.369.908.00.00 0.00 $106.12 DEVELOPMENT $3,369.10 PERMITFEE ROOO.322.100.00.00 0.00 $3,364.60 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $168.23 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R13240 ROOO.322.900.04.00 0.00 7---$168.23 $3,643.45 Date Paid: Monday, January 08, 2018 Paid By: DAVID E KEHLE Pay Method: CREDIT CARD 06356D Printed: Monday, January 08, 2018 2:02 PM I of 1 CIRWYSTEMS Date Paid: Thursday, October 13, 2016 Paid By: DAVID KEHLE Pay Method: CREDIT CARD 08082D Printed: Thursday, October 13, 2016 1:42 PM 1 of 1 WYSTEMS INSPECTION RECOIRD. I'D16-0281 INSPECTION NO. I Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project- Type - of Inspection: C> Pi yya L ->%A, inq Address: I y C) (0-o �-I' —14W X111lik-K" Date Called: r)"'L Special Instructions: 13 Lj& ys+ Date Wanted: a.m. -3-H-20e p.m. Requester: 50-6 Phone N ( --55 1 - 15 S/ — nApproved per applicable codes. 1-1 Corrections required prior to approval. REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedute reinspection. INSPECTION RECORD. Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: -!!�5r8CO Type of Inspection: R')tLJ)1N& FINAL - Address: //low 71-11 Date Called: Special Instructions: Date Wanted: a. rn. Requester: go L? Phone No: C - Approved per applicable codes. IffCorrections required prior to approval. COMMENTS: ALL PUJ3"C WOAK5 -?z-11qA /741),ST d1C Inspector: 11-1:2 4-1 Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Catl. to schedule reinspection. INSPECTION RECORD. -f Retain a copy with permit D I to J'?— INSPECTION NO. PERMIT NO. CITY OFTUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 77OW Type of Ins ection: PgE Z!0A/5T-R0C'rJCNW Address: A& 6 6 77 /1 B., Date Called: Special Instructions: Date Wanted* P.M. Requester: 905 AyV\ Phone No: 2-61e— I I Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. INSPECTION RECORD 6-2,(� Retain a copy wit��pl- eimit INSPECTION NUMBER PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: Type of Inspection: Address: 1(0670 77b Contact Person: Suite #: Pre -Fire: Special Instructions: Phone No.: ZApproved per applicable codes. FICorrections required prior to approval. COMMENTS: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: I Hrs.: Inspector: f Jtj 4�;� Date: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billina Address Attn: I Company Name: Address: City: EStat Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 EV—SouNDTRANsIT 1 RECEIVED December 1, 2017 DEL 0 1 2017 Peter von Reichbauer King Catairy Comic David Kehle Architect CHAIR 1916 Bondair Dr. SW TUKWILA Dave Somers Seattle, WA 98116 PUBLIC WORKS Snohomah Countv Erecative Property Management Manager VICE CHAIRS RE: Review and Assessment of Demolition of Existing Structure(s) at John Marchione Rechnotul AlaYar 11060 Tukwila International Blvd., Tukwila, WA Marilyn Strickland Tacoma Alamr Dear Mr. Kehle: BOARD MEMBERS Thank you for taking the time to meet with us to discuss the Sebco Nancy Backus Development Project — 11000 Building (the "Project") on November 15, 2017. Auburn Afa.vot Claudia Balducci Sound Transit has reviewed the drawings and plans prepared by Barghausen King Counti, Coundimember Consulting Engineers, Inc. dated 09/19/2016 and has determined that the Fred Butler demolition of the existing structures located at 11060 International Blvd. Iv,%aquah MaVor Tukwila, WA, will not impact Sound Transit's Traction Power Substation Dow Constantine Easement Area nor Sound Transit's Light Rail Guideway Easement Area. This King Countv r-%ec ittive letter will serve as our written confirmation of no impact for demolition Bruce Darnmeler activities Dgly. Pierre Comm E%ecutive Dave Earling When performing the demolition of the existing structures, all vehicles should Edinntulv Mayor enter the property via I I 2h Street or Tukwila International Blvd. and not East Rob Johnson Seattle Counc dinember Marginal Way to minimize impact to Sound Transit's Easement Areas. No equipment such as mobile cranes, scissor lifts, scaffolding or other lifting Kent Keel Univervin Place Mayor Pre) Tent devices shall be higher than Sound Transit's top of rail and have the potential Joe McDermott to fall and foul the light rail tracks or enter or swing over the Traction Power King Ciawtv Onvit il Chah Substation Easement Area. If the proposed demolition plan changes and there Roger Millar could be a potential impact to Sound Transit's Easements, please notify us Wa %hington State Sec retan- immediately so we can provide additional comments. (if Tiampartation Mary Mass Sound Transit is currently reviewing the plans for the proposed construction of Lukewcvxf Couric ilmember the new building at this location and will provide comments via an additional Paul Roberts letter. Thank you for your assistance. Please contact me at 206.398.5201 or Evererr Caumilmember Angie House at 206.398.5430 if you have any questions. Dave Upthegrove King Otuntv Countilinember c Si erely, Peter von Reichbauer King Catairy Comic go dinernher CHIEF EXECUME OFFICER Nancy Ben et Peter M. Ragoff Property Management Manager nancy.bennett@soundtransit.org Central Puget Sound Regional Transit Authority - Union Station 401 S. Jackson St., Seattle, WA 98104-2826 - Reception: (206) 398-5000 - FAX: (206) 398-5499 www.soundtransit.org D City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98118 Attn: Ms Joanna Spencer Re: Sebco Demo Permit D16-0332 11060 Tukwila International Blvd DearJoanna, I have finally had direct meetings with both City Light and Sound Transit. I also met with Valley View Sewer district and obtained the Capping permit which is attached. Per your correction letter #2 of February 8th, 2017 (attached), I have the following comments to resolve those issues: 1. Valley View Sewer Capping Permit see attached. I had previously submitted the site plan with the capping info as given to Valley View. 2. 1 met with City Light and have attached their meeting notes stating to just show the 14' clearance from the transmission line to my building. I have done that on sheets El and E2 which I showed to them and they want it submitted with the service application. I have also attached those to this response for your info. 3. 1 met with Sound Transit and they have no issue with the demo permit being issued because there is no adjacency to their easements. I have not received the letter yet, but you can talk with Angela House (206-398-5430) to confirm. 4. NO[ is a part of the Public Works permit PW1600161. I really need to get the Demo permit now as the tenant has been able to vacate the end of the month and the first step is the building demo and clean up. Please expedite your review and I trust we can obtain the Demo permit ASAP if you have any other concerns or comments, please let me know. DSincerel , a David Kehle Cc: Jay Ayers '�ORRECTIGN J R # IR E C E 1 V EEED C, ITY 0 F T U K VV ii!.- A kUV' 2 0 239 PERMITGENTER (206) 433-8997 1916 Bonair Drive S.W. fax (206) 246-8369 Seattle, WA 98116 t)l(e-- 0 n- I email: dkehle@dkehlearch.com Below, please find the minutes of the meeting at 11060 Tukwila International Blvd. In attendance, Ryan Tham, David Kehle, Alan Peterson, Abdu Issa, Percy Schlimm The first item discussed was the customer requesting a letter from Seattle City Light(SCL) for City of Tukwila verifying/approving the location of the building. Abdu explained that SCL will not give any letter saying the building is good to go. SCL can provide the standard showing our clearance requirement, then the appropriate authority can check if the clearance is met before issuing the permit. Abdu then discussed the purpose of the meeting; which is to assist the customer to provide a complete application for the service request so the project can be sent to SCL Engineering. We also explained the time frame- 5 to 6 months until it will be assigned to an engineer after a complete application is received. The materials requested are: site plan with details of where the electrical service will be located(cletailing the way the building meets SCL requirements maintaining the clearance from SCL infrastructure) — including how the customer wishes to be served (pad mount, underground vault or in - building vault transformer), a detailed riser diagram showing the type, size and number of customer cables coming to the SCL transformer, the size of switch gear, and Load Calcs — even though the cust does not have a tenant, we stated SCL Engineering needs the perspective tenant loads that may be needed — looking at the maximum potential cust. We need a clearly demarcated site plan, elevation plans and a surveyed plan showing that there is a minimum of 14' clearance between the edge of the building to the closest high voltage primary line along the customer's property. We then had a detailed discussion regarding the transformer. The cust suggested a padmount transformer. Abdu detailed what is required with a padmount transformer — (There is a requirement for an oil containment system, which the customer has to get designed, signed and stamped by a PE). Abdu also explained the other options; Padmount transformer, below grade transformer vault and in -building transformer vault for the customer to decide. The actual design and size to be decided by the project engineer). It was stated that SCL will need to know with the final submittal for the project all the details on the "hard copies" of the drawings. Abdu added that the load calcs can be changed (customer can ask for a revision of the service) if finalized numbers changed but that there be a cost for changing the loads due to engineering work completed. The customer would like to have power by next summer. Percy L Schlimm CORRECTION Electrical Service Representative, Senior Seattle City Light LTR# 206-386-1735 NUV 2 0 2017 E R 1`0 i T YE SIDE SEWER PERMIT APPLICATION ALLOW 24148 HOURS FOR ISSUANCE OWNER INFORMATION I PLEASE COMPLETE SERVICE ADDRESS: BILLING ADDRI For Office Use (Pre-Pennit Coinpkltion) PERMIT# -7L+4'2 RECEIPT # ACCOUNT# ICISS ACCOUNT # PACER CREDIT CHECK: YES NO DELINQUENT CHARGES. - 0 & METRO BILLING START DATE: DATE OF CONNECTION: Cirde: RESIDENTIAL / 4XV9EMW / AADU I DADU OWNER COMMENTS / LEGAL: PHONE NUMB .EMAIL ADDRESS: 4N hk a 40111cavvn.&PA TAX LOT NUMBER2M For Officd,USe CHARGES: COMMENTS I LEGAL: CHARGE IN LIEU OF ASSESSMENT $ GENERAL FACILITY CHARGE $ SYSTEM FACILITY CHARGE $ SWSSD / MIDWAY CHARGE $ UNIT CHARGE $ DEVELOPER EXTENSION PAYBACK $ METRO FORM: YESINO -PERMITS: $139.00 SIDE SEWER $100.00 SIDE SEWER (PRIVATE PUMP) $150.00 REPAIR (SPOT) $15.00 REPAIR (TRENCH) $100.00 CERT. OF FUTURE CONNECTION $70.00 y" RIGHT O� WAY PERMIT ITOTAL CHARGES RECORDING FEES IC CONTRACT + LIEN $139.00 SS CONTRACT + LIEN $140.00 IC + SS + LIEN $142.00 TEMP SVC AGREEMENT $112.00 EASEMENTS (2 PAGES) $74.00 CERT. OF FUTURE CONNECTION $73.00 • ULID 41 / $3856.00/5.5% ITOTAL CHARGES • ULID 45 / $6400.00/6.0% 1$ -70 CONTRACTPAYMENT RECORDING FEE PERMIT FEE OTHER • ULID 20 / $875.50 .-III Y UF 1 U AVII K • ULID 24 / $3387.00 • ULID 34 / $4335.90 Noy 2 0 2017 • ULID 33 / $7803.00 • CDS / $4875.00 . ERMIT CENTEk • ULID 43 / $8286.00/5.5% (2006) • ULID 41 / $3856.00/5.5% (2007) • ULID 45 / $6400.00/6.0% (2007) • CDBG (1) / $2000.0012.0% (2012) • W OF 33 / $3176.0013.0% (2014) *If residence was billed in ULID prior to UUD 18 (RVSD) or ULID20 (VVSD) no GFC Is collected unlessoutof bilring fbr5 years Inside ULID boundary or abutting property. Not complete list Check connection charge layer. C 0 R BE C T 10 N L T R # —1--- 4r DAVID KEHLE ARCHITECT 1916 SONAIR DR SW SFATnE WA 98116-1821 PAY TO THE ORDER OF 20575 19-2/1250 WA 31107 $ �6v Q --.,POLLARS Ban f America I-Sor"O" 125000024 FOR 61epx, 0 0020575,12 412SO000241: 000073&BS01131" City of Tukwila Department of Community Development. February 08, 2017 DAVID KEHLE 1913 BONAIR DR SW SEATTLE, WA 98116 RE: Correction Letter # 2 DEVELOPMENT Permit Application Number D 16-0281 SEBCO DEMOLITION - 11060 TUKWILA INTERNATIONAL BLVD Dear DAVID KEHLE, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: PW - DEPARTMENT: Joanna Spencer at 206-431-2440 if you have questions regarding these comments. 1) Subn-dt copy of Valley View Sewer Capping permit. 2) Applicant shall submit approval from SCL for work under high voltage power lines. 3) Submit approval from ST for work near their guideway. 4) If more than I acre of land is going to be disturbed as result of proposed construction, please obtain (NOI) Notice of Intent- Construction Storm Water Permit from the Dept. of Ecology. Please note that this demo permit shall not be issued without the erosion /sediment control permit PW16-0161 which is still pending. Please contact Barghausen Engineers, PW16-0161 permit applicant to avoid duplication in obtaining approvals from other agencies. A hauling permit shall be required for hauling contaminated dirt from the site. The hauling contractor shall submit a haul route map to Public Works. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised pl4n pages, specifications and/or other documentation be resubmitted with the appropriate revision block. ' I In order to better expedite your resubmittal, a'Revision Submittal Sheet'must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted throulih the mail or by a messenizer service. If you have any questions, I can be reached at (206)433-7165. Sincerely, Rachelle Ripley Permit Technician File No. DI 6-0281 6300 Southcenter Boulevard Suite #100 * Tukwila Washington 98188 * Phone 206-431-3670 * Fax 206-431-3665 C 0 *1-tv of Tukwila Department of Community Development - Jack Pace, Director October 9, 2017 David Kehle 1916 Bonair Dr. SW Seattle, WA 98116 RE: Request for Application Extension #2 Permit Number D16-0281 Dear Mr. Kehle, Allan Ekberg, Mayor This letter is in response to your written request for an extension to Application Number D 16-028 1. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through April 13, 2018. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, --I Bill Rambo Permit Technician File: Perrr�t No. D 16-0281 Tukwila City Hall - 6200 Southcenter Boulevard - Tukwila, WA 98188 # 206-433-1800 & Website: TukwilaWA.gov AP "— aq A d w..m d ffdfile September 20, 2017 City of Tukwila Request for Ex—nsion # 2 - Current Expiration Date: 17 Extension Request: YApproved for days El Denied (provide explanation) Ili,naturellnitials Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98118 Attn: Bill Rambo Re: Sebco Demolition Permit D16-0281 11060 Tukwila International Blvd Dear Bill, Thank you for your notification of the permit expiring soon. Back in March, we extended the permit because of the same reasons as below. I would like to extend that permit again, for several reasons: 1. The existing tenant is not able to relocate until after their lease is up in November 2017, and so we cannot do the demolition until they are gone. 2. 1 �m still working with the several other agencies adjacent to the property. I have submitted the capping application and did receive approval subject to a contractor, Sound Transit has the full civil package for the new curb cut work and has a couple of additional questions being answered; city light has given me some info on the wires and clearances and I am working on the sections for that. Thus, the reason for the extension. The primary reason is the tenant move out date is still November. Thank you for your review and I trust we can obtain the permit extension for the demo permit. If you have any other concerns or comments, please let me know. Sincerely, David Kehle Cc: Jay Ayers, Jason Hubble 1916 Bonair Drive S.W Seattle, WA 98116 RECEIVED CITY OF TUKWILA OCT 0 5 2017 PERMIT CENTER (206) 433-8997 fox (206) 246-8369 email: dkehle@dkehlearch.com 8/31/2017 City of Tukwila Allan Ekberz Mavor Department of Community Development Jack Pace, Director DAVID KEHLE 1913 BONAIR DR SW SEATTLE, WA 98116 RE: Permit Application No. D16-0281 SEBCO DEMOLITION 11060 TUKWILA INTERNATIONAL BLVD Dear DAVID KEHLE, In reviewing our current application files, it appears that your permit applied for on 10/13/2016, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Currently your application has a status of COMMENTS OUT and is due to expire on 10/13/2017. If you still plan to pursue your project, you are hereby advised to do one of the following: 1) If the plan review is complete for the project and your application is approved, you may pick up the application before the date of expiration. At the time of permit issuance the expiration date will automatically be extended 180 days. -or- 2) If the plan review is not completed submit a written request for application extension (7) seven days in advance of the expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your application. The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension request is granted, you will be notified by mail. In the event that we do not receive your written request for extension or request is denied, your permit application will expire and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, —&--V —��6j Bill Rambo Permit Technician File No: D 16-0281 6300 Southcenter Boulevard Suite #100 o Tukwila Washington 98188 * Phone 206-431-3670 e Fax 206-431-3665 C 0 itv of Tukwila Department of Community Development - Jack Pace, Director April 14, 2017 David Kehle, Architect 1916 Bonair Dr SW Seattle, WA 98116 RE: Request for Extension #1 Permit Application Number D16-0281 Dear Mr. Kehle, Allan Ekberg, Mayor This letter is in response to your written request for an extension to Permit Application 1) 16-028 1. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit application. It has been determined. that the City of Tukwila Building Division will be granting an extension to the permit through October 13, 2017. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, V) Rachellejip Permit Technician File: Permit No. D 16-0281 Tukwila City Hall - 6200 Southcenter Boulevard - Tukwila, WA 98188 - 206-433-1800 - Website: TukwilaWA.gov P—M qLe sk d d krhie March 28, 2017 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98118 Attn: Rachell Ripley Re: Sebco Demolition Permit D16-0281 11060 Tukwila International Blvd Dear Rachel, REC'EIVEO WY OF TUKWILA APR P, 5 2017 PERMIT CENTER Thank you for your notification of the permit expiring soon. I would like to extend that permit for several reasons: 1. The existing tenant is not able to relocate until after their lease is up in Novemeber 2017, and so we cannot do the demolition until they are gone. 2. 1 am still working with the several other agencies adjacent to the property. I have submitted the capping application and plan to Valley View but no formal answer; Sound transit now wants the full civil package for the new curb.cut work; city light has given me some info on the wires and clearances and I am working on the sections for that. These seem to be on a slow track for reviews. Thus, the reason for the extension. Thank you for your review and I trust we can obtain the permit extension for both the demo and the new building. If you have any other concerns or comments, please let me know. Sincerely, Request for Extension # Current Expiration Date: David Kehle Extension Request: Cc: Jay Ayers, Jason Hubb '. le Approved for days Denied (provide explanation) Signature/Initials (206) 433-8997 1916 Bonair Drive S.W fox (206) 246-8369 Seattle, WA 98116 email: dkehle@dkehlearch.com (0 3/1/2017 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director DAVID KEHLE 1913 BONAIR DR SW SEATTLE, WA 98116 RE: Permit Application No. D 16-0281 SEBCO DEMOLITION 11060 TUKWILA INTERNATIONAL BLVD Dear DAVID KEHLE, . In reviewing our current application files, it appears that your permit applied for on 10/13/2016, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Currently your application has a status of COMMENTS OUT and is due to expire on 4/13/2017. If you still plan to pursue your project, you are hereby advised to do one of the following: 1) If the plan review is complete for the project and your application is approved, you may pick up the application before the date of expiration. At the time of permit issuance the expiration date will automatically be extended 180 days. -or- 2) If the plan review is not completed submit a written request for application extension (7) seven days in advance of the expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your application. The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension request is granted, you will be notified by mail, In the event that we do not receive your written request for extension or request is denied, your permit application will expire and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: DI 6-0281 6300 Southcenter Boulevard Suite #100 9 Tuk,�vila Washington 98188 0 Phone " I 266431-3670 e Fax206-431-3665 "_ P A ki d d O'gle kec 1_4'06K November 29, 2016 City of Tukwila Department of Community Development 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 Attn: Mr. Bill Rambo RE: 11000 Building 11060 Tukwila International Blvd Development Permit D16-0281 Dear Bill, I am in receipt of your correction letter 1, dated 11-02-16. Sorry for the delay. The following reflect my answers to your comments: Planning: I have e-mailed directly to Max his questions of 11-08 and have attached a copy to this response. Public Works: 1. 1 have added the location of both underground and above ground storage tanks for removal. I will obtain a fire permit for the removal. 2. 1 have added the area of petroleum contamination based on the phase 2 report. 3. 1 have e-mailed the report of phase 2 to Max already. I will forward that to you in an e-mail (very large report). Phase I will not attach to an e-mail )1500 pages). 4. 1 have shown the location of the sanitary sewer connection needing to be capped and will forward to Dana at Valley View. 5. 1 am working with City Light on whom to copy the plans to. 6. 1 will submit plans to Sound Transit for work near their guide rail. I trust these will answer your questions and as I receive approvals from City Light and Sound Transit, I will forward those to you. Those can remain as conditions of approval. RECEIVED CITY OF TUKWILA CORRE TION HOV 30 2016 LTR#!f David Kehle PLRHIT CENTER 1b [&"W (206) 433-8997 1916 Bonair Drive S.W. fox (206) 246-8369 Seattle, WA 98116 email: dkehle@dkehlearch.com City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director February 08, 2017 DAVID KEHLE 1913 BONAIR DR SW SEATTLE, WA 98116 RE: Correction Letter # 2 DEVELOPMENT Permit Application Number D 16-0281 SEBCO DEMOLITION - 11060 TUKWILA INTERNATIONAL BLVD Dear DAVID KEHLE, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: PW - DEPARTMENT: Joanna Spencer at 206-431-2440 if you have questions regarding these comments 1) Submit copy of Valley View Sewer Capping permit. 2) Applicant shall submit approval from SCL for work under high voltage power lines. 3) Submit approval from ST for work near their guideway. 4) If more than I acre of land is going to be disturbed as result of proposed construction, please obtain (NOI) Notice of Intent- Construction Storm Water Permit from the Dept. of Ecology. Please note that this demo permit shall not be'issued without the erosion /sediment control permit PW16-0161'which is still pending. Please contact Barghausen Engineers, PW16-0161 permit applicant to avoid duplication in obtaining approvals from other agencies. A hauling permit shall be required for hauling contaminated dirt from the site. The hauling contractor shall submit a haul route map to Public Works. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)433-7165. Sincerely, Rachelle ipley Permit Technician File No. D 16-0281 6300 Southcenter Boulevard Suite #100 * Tukwila Washington 98188 * Phone 206-431-3670 *,-)Fax 206-431-3665 November 29, 2016 City of Tukwila Department of community Development 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 Attn: Mr. Maxwell Baker RE: 11000 Building 11060 Tukwila International Blvd SEPA Development Permit D16-0281 Dear Max, I am in receipt of your e-mail of Nov. 8 requesting additional items relative to the demolition permit and SEPA. The following reflect my answers to your comments: 1. Need a completed Traffic Concurrency Certificate: This is now attached. How does the existing traffic get credited back to the new project? 2. The project will comply with the geotechnical report which will accompany the permit submittal and will be noted on the structural notes. 3. The level one and two environmental reports will be sent via e-mail to both you and to Joanna Spencer in Public Works as they are extremely long. 4. The correction to the item #9, page 14 of the Environmental check list is attached listing the additional government approvals being required. Fire has asked for the transmission lines locations to be on the site plan along the southerly property line which I will try and show accurately. Building has commented that the building permit will not be issued until the demolition permit has final inspections. I agree to the above and can be conditions of the MDNS. M David Kehle 1916 Bonair Drive S.W Seattle, WA 98116 CORREC ION RECFIVED CITY OF TUMILA NOV 30 2016 PaRMST CENTER 0 *1 91 (206) 433-8997 fax (206) 246-8369 email: dkiahle@dkehlearch.com City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director November 02, 2016 DAVID KEHLE 1913 BONAIR DR SW SEATTLE, WA 98116 R I,: Correction Letter # I DEVELOPMENT Permit Application Number D16-0281 SEBCO DEMOLITION - 11060 TUKWILA INTERNATIONAL BLVD Dear DAVID KEHLE, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: PLANNING DEPARTMENT: MAX BAKER at (206)-431-3683 if you have questions regarding these comments. SEPA Planned Action will need to be completed before demolition can begjn. http://www.tukwilawa.gov/wp-content/uploads/DCD-Apps-SEPA-Planned-Action.pdf PW DEPARTMENT: Joanna Spencer at 206-431-2440 if you have questions regarding these comments. 1) Show location of any above ground or underground storage tank on your site plan. Obtain storage tank(s) removal permit from Tukwila Fire Dept. @ 206 971-8718.and submit copy to Public Works. 2) Show area of petroleum contamination. 3) Submit copy of Environmental Site Assessment reports mentioned in your SEPA application. 4) Show location of sanitary side sewer capping on your site plan. Submit the demo plan to Mr. Dana Dick, Valley View Sewer District at 206 433-1864 for sewer capping permit approval. 3) Submit Seattle City Light approval for working under or in the immediate vicinity of high voltage power lines. 4) Submit copy of Sound Transit permit for working under or in the vicinity of the Sound Transit guideway. Contact Nancy Clark at (206) 689-4936 or Angie Marmion at (206) 398-5430 to start the process. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two -(2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a'Revision Submittal Sheet'must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messen-ger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. D 16-0281 6300 Southcenter Boulevard Suite #100 o Tukwila Washington 98188 9 Phone 206-431-3670 9 Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0281 DATE: 10/22/17 PROJECT NAME: SEBCO DEMOLITION SITEADDRESS:- 11060 TUKWILA INTERNATIONAL BLVD Original Plan Submittal Revision # before Permit Issued x Response to Correction Letter # 2 Revision # after Permit Issued DEPARTMENTS: Building Division El Fire Prevention Planning Division E] Pul5lic Works Structural El Permit Coordinator PRELIMINARY REVIEW: DATE: 10/28/17 Not Applicable El Structural Review Required (no approvallreview required) REVIEWERc6 INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12/26/17 Approved 0 Corrections Required El (corrections entered in Reviews) Notation: Approved with Conditions Denied (ie: Zoning Issues) REVIEWERc6 INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg El Fire El PIng E] PW Staff Initials: 12/18/2013 PERMIT COORD CON PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0281 DATE: 11/30/16 PROJECT NAME: SEBCO DEMOLITION SITE ADDRESS: 11060 TUKWILA INTERNATIONAL BLVD Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # I Revision # after Permitlssued DEPARTMENTS: Ran oDivisi?�l Building Division F-1 Fire Prevention P ing jj� MW 'i Public Works Structural Permit Coordinator PRIELIMINARY RIEVIEW: DATE: 12/01/16 Not Applicable F-1 Structural Review Required (no approvallreview required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12/29/16 Approved F1 Approved with Conditions F-1 Corrections Required F] Denied 0 (corrections entered in Reviews) (ie: Zon ing Issues) Notation: REVIEWER'S INITIALS: DATE: Perinit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire El Ping El PW ld Staff Initials: 12/18/2013 rIERMIT COORD COR PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0281 DATE: 10/13/16 PROJECT NAME: SEBCO DEMOLITION SITE ADDRESS: 11060 TUKWILA INTERNATIONAL BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: ki I to�j� W � pu mp�, Builc MingDivisioh 10 Fire Prm Im Planning Division 'z cowp— W—)jmp Public Works 0 Structural El Permit Coordinator PRELIMINARY REVIEW: DATE: 10/18/16 Not Applicable F] (no approvallreview required) REVIEWER'S INITIALS: Structural Review Required 1:1 DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11/15/16 Approved Approved with Conditions F-1 Corrections Required N7 (corrections entered in Reviews) REVIEWER'S INITIALS: Denied F-1 (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg E] Fire E] Plng74V PW�5 Staff Initials: 12/18/2013 City of Tukwila Department of Community Devel 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: D16-0281 Response to Incomplete Letter # Response to Correction Letter # — 2 Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Deferred Submittal # Project Name: SEBCO DEMOLITION Project Address: 11060 TUKWILA Contact Person: Summary of ATIONAL BL Phone Number: Im —43 -3 — RECEIVED CITY OF TUKWILA NOV 2 0 210,167 PERMIT CENTER SheetNumber(s): 2 - 6t A. 62- VAOS C-u-6(ae40007 "Cloud" or highlight all areas of revision Received at the City of Tukwila Permit Cet F� Entered in TRAKiT on C:\Usci,s\Racholle-R\I)csktop\Revision Submittal Form - D]6-0305.doc Revised: August 2015 n City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://�ww.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: �11V- IV Plan Check/Permit Number: F� Response to Incomplete Letter # F� Response to Correction Letter # I F-1 Revision # after Permit is Issued F-1 Revision requested by a City Building Inspector or Plans Examiner Project Name: Sebco Demolition Project Address: 11060 Tukwila Intemational Blvd D16-0281 ZU -5 5 — . 1 -4 -Mq4 Contact Person . VQ �OM Phone Number: IP6 Summary of Revision: — 46 W?F-M-M-e RECEIVED CITY OF TUKWILA NOV 3 0 2016 PERM CENTER Sheet Number(s): T A — WIZI-Ille "Cloud" or highlight all areas of revision including date of revisiop Received at the City of Tukwila Permit Center by: k—Entered in TRAKiT on \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: POE CONSTRUCTION INC 1-1 arn 0, F.Spahol, Contact Safety & Health Claims & Insurance Aft Washington State Department of 4L.j Labor & Industries Page I of 3 ISearch L&I A -Z Index I I ell) My L&I Workplace Rights Trades & Licensing I POE CONSTRUCTION INC I Owner or tradesperson PO BOX 1838 AUBURN, WA 98071-1838 Principals 253-833-2400 WILLIAMS, WAYNE WALTER, PRESIDENT KING County PETERSON, ALAN DONALD, VICE PRESIDENT POE, CHARLES EARL, SECRETARY POE, FRED W (End: 0 1 /0 1 /1980) CLARK, DENNIS M, CHIEF OPERATING OFFICER (End: 01/16/2006) FRY, KYLE R, TREASURER (End: 02/18/2010) POE, CHARLES E, PRESIDENT (End: 04/10/2015) WILLIAMS, WAYNE W, VICE PRESIDENT (End: 04/10/2015) PETERSON, ALAN DONALD, SECRETARY (End: 04/10/2015) REIFSCHNEIDER, CAROL M, SECRETARY (End: 07/09/2003) WELFRINGER, SUZANNE M, TREASURER (End: 07/09/2003) Doing business as POE CONSTRUCTION INC VVA UBI No. Business type 171 004362 Corporation Governing persons ALAN PETERSON CHARLES POE; WAYNE WILLIAMS; KYLE RAY FRY; ILicense I Verify the contractors active registration / license / certification (depending on trade) and any past violations. Goln.sbructi,qn 9pri.1tractor. Active. Meets current requirements. License specialties GENERAL License no. POECOI*247QZ Help us improve https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=171004362&LIC=POECOI*247QZ&SAW= 01/08/2018 VICINITY Mi Asphalt Pavement I CAP EXISTING 5EWERAT MANHqLE AND PROVIDE FOR FUTURE RE USE NEW 15UILDING I C-) /" 61 'a- '�- �b 0 4�s Q3 Q a A!� PWR VAULT 6 CS z� " + 0 Ir t! G Cl) V6 "Ox 00 6 !k 7 Z Z�' - ? b1F I A P H A L T A R E A S These plans have been reviewed by the Public Works Department for conformance with current City standards. Acceptance is subject to errors and omissions which do not authorize violations of adopted standards or ordinances. The responsibility for the adequacy of the design rests totally with the Se APPROX. LOCATION OF LU5E OIL PLUME designer. Additions, deletions or revisions to these APPROX. 5' DEEP TO 5F_ REMOVED AND drawings after this date will void this acceptance REMEDIATEID. SEE LEVEL 2 A55ESMENT and will require a resubmittal of revised dmwings �_u for subsequent approval. Final acceptance i b ct to field inspection by WON= S S ie the Publi Works util ties inspector. Date: By - REMOVE EX15TING 5UILDINGS, STRUCTURES, _R FOUNDATIONS, ASPHALT, ETC. TO 5RING ANSIT GUIDEWAY EASEMENT M THE SITE TO A GRADED SU5 GRADE PER FOR CENTRAL PUGET SOUND REGIONA ENGINEERING DRAWINGS WITH TRANSIT AUTHORITY. REC. NO. 20040 CIVIL E TEMPORARY ER05ION CONTROL. 10' SANITARY SEWER EASEMENT 0 GRANTED TO ROBBLEE INVESTMENT CO. a, REC. NO. 8412210387 W z SERVICE AND PARTS DEPT SIGN TRUCK SIGN A S P H A L T A R E A YD'3 CB RIM=15.6' RIM=15.9' - VALVE) EXI NG GAS MAIN sum 6 PARKING STALLS ARKING SIGN Bom STALLS A S P H A L T A R E A 7, ,7 1^ Building 4e conc. Pavement COD Water Line _W— —G— Gas Line Sanitary Sewer Line —SS— —SD— Storm Drain Underground Power —P —T— Underground Telephone —TV — Underground Television 0 Ir t! G Cl) V6 "Ox 00 6 !k 7 Z Z�' - ? b1F I A P H A L T A R E A S These plans have been reviewed by the Public Works Department for conformance with current City standards. Acceptance is subject to errors and omissions which do not authorize violations of adopted standards or ordinances. The responsibility for the adequacy of the design rests totally with the Se APPROX. LOCATION OF LU5E OIL PLUME designer. Additions, deletions or revisions to these APPROX. 5' DEEP TO 5F_ REMOVED AND drawings after this date will void this acceptance REMEDIATEID. SEE LEVEL 2 A55ESMENT and will require a resubmittal of revised dmwings �_u for subsequent approval. Final acceptance i b ct to field inspection by WON= S S ie the Publi Works util ties inspector. Date: By - REMOVE EX15TING 5UILDINGS, STRUCTURES, _R FOUNDATIONS, ASPHALT, ETC. TO 5RING ANSIT GUIDEWAY EASEMENT M THE SITE TO A GRADED SU5 GRADE PER FOR CENTRAL PUGET SOUND REGIONA ENGINEERING DRAWINGS WITH TRANSIT AUTHORITY. REC. NO. 20040 CIVIL E TEMPORARY ER05ION CONTROL. 10' SANITARY SEWER EASEMENT 0 GRANTED TO ROBBLEE INVESTMENT CO. a, REC. NO. 8412210387 W z SERVICE AND PARTS DEPT SIGN TRUCK SIGN A S P H A L T A R E A YD'3 CB RIM=15.6' RIM=15.9' - VALVE) EXI NG GAS MAIN sum 6 PARKING STALLS ARKING SIGN Bom STALLS A S P H A L T A R E A 7, ,7 1^ 6S, '/WMH RIM=15.2 ox ASP H A L T A REA A S P H A L T A REA CB RIM=17.6' CB N 89*18'52" 646-64' EYJSnNG GAq MAIN EIRIM=17.4' CURB cam 'e - T 7 A S P H A L T A R E A CRASH BARRIER \7MM BWW CRASH "im 18 PARKING i4T L75 CB, SCO, HOLDING TANK, A S P H A L T A R E A AND SEM LINE PERx,,"* SIDE SEWER INFO, PROVIDED BY top Soo VAL VUE SEWER DISTRICT, PERMIT NO. 03498 FOUND 'b - 'J A R E A EP _gx HIGH Pyff)PW F CE W1 RAZOR CMCER71NA ON TOP G R A V EL 401 4�A L 9GX G\ A\J P\ A\E A N, 'A ICB 4.- 780 GAL HOLDIN CT\ A 1-TTANK % % \ OIL WATER SEPARATO I TO BE REMOVED VATH kv C' APPROXIMATE LOCATION FIRE DEPARTMENT PERMI�, _- i� - CL I 9 PARIONG STALLS I TO 5E REMOVED WTIH 1P. xop =RMIT FIRE DEPARTMENT Pr 55' PERMANENT EASEMENT AREA FOR ELECTRICAL TRACTION POWER SUBSTATION TO CENTRAL PUGET -- — --------- — - 4-A ------- SOUND REGIONAL TRANSIT AUTHORITY T REC. NO. 200440517003078 W_LARDSJ(TyPV) I NO A S P H A L T A R ASPHALT A'R E A BOLLARql: a YDP REMOVE OMMO ASPHALT �0 CO R1IM-17.9 SEE CIVIL PLANS 1P _0 REMOVE EXISTING ASPHALT A S P H A L T A R E A n SEE cIVIL PLANS A S P H A L T A R E A V '�4rS ASPHALT A R E A T rx- T .--x I I , x A S P H A L T A R E A o�x- x -W S70 k—. I I A INI IINSERTS A S P H A L T A R E A p RIM=16.7' C3 CB Cap --,,R I M 16.6' PARIONG STALLS 10 TRUCK PARIONG STALLS A S P H A L T A R E A (_8" SAN. SEwER roRcE MAIN 170 9 _SS--QI _SS F, 69 1; - im "I ___l. �ob. 3' H16i SINGLE STRAND CAME Ssi�—�7-!41- W b --�CONCRETE EXTRUDED CUR r4l I'-- -W 48_:_WATER MAIN CONCRETE EXTRUDED CURB QN( -70 -1-1 . I W —W N8918' low 60' WIDE CONDEMNED BY THE CITY OF SEATTLE =15.0' 4-�" - 0. fe, Q FOR PIPE LINE RIGHT OF WAY UNDER KING COUNTY 10 SUPERIOR COURT CAUSE NO. 121648, PURSUANT T6 CITY OF SEATTLE ORDINANCE NO. 37022. 4 3 4ATH W 1p�� 11C .0- A S P H A L T A R E A '90 A S P H A L T A R E A ASPHALT A R E A Op % 3 TRUCK pARMG ASPHALT AREA ENDS STALLS 7 T FENCE (TYP) 11 TRUCK PARION STALLS -F SD MH W/ GRATE RIM=19.9' ed. 011-1 20289 —8 wbxr�ww� / I n —X q�9?1 D11 —b- I ITC 127 CO C PIP CENTERLINE OULU QURS A'DUAI TR D D CURB W ER QW -OF SPEED LIMIT C8 SIGN 35 RIM=98.1' PLANNING APPROVED No changes can be made. to these plans without approval from the Planning Division of DCD Approved f3y.-Ii- L)n1tv of Tultmia BUILDIM Divisim REVISIONS No changes shall be made to the scope of work without prior approval of . Tukt!vila Building Division. NOTE: Revisions W11 require a new plan submittal and may include additional plan review fees. F -REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 6 2017 *'r W city of Tukwila "iANI .e: RECENED DEC 0 1 2016 -WKWILA PUBLIC WORKS CORRECTION DEMO NOTE6: LTR 1. D15CONNECT ALL UTILITIES TO THE EXISTING IBUILDING AND STRUCTURES,, 2. CAP ALL EXISTING UTILITIES I P ER RECEIVED !.�:' �. I , CITY OF TUKWIL GOVERNING AGENCY AT T LINE NOV 30 2016 3. RECYCLE AS MUCH AS P9.SSIR�E PERMIT CENTEI ASPHALT, CONCRETE, ETC�,'- SEE CIVIL ENGINEERING fz��,"AN FOR TEMPORARY ERROSION C� P, GRADr= AND FILL FOR FUTRUE CREDIT ON PLUMP, Fl� ;I <TURES, THIS IBUILDING HAS (o TOILET�," U INALS, (o SINKS, 3 FLOOR DRAINS, AND 4 HP�P, �I-P55. lu (L (L LU z 0 W LL \\VVKST-4\IDocurnents\CAD\2O15\.,J 5-03 SE.BC9 HOR!70N FORD\CD's 09-22-16\CD's 09-22-16\DEMO PLAN.dwg, DEMO 4e COD A S P H A L T A R E A CY N201 2'23"E N56*11'53"W 16.1 �' N89'18'52"E 28.68 NNRI� W 0 A S P H A L T A R E A 6S, '/WMH RIM=15.2 ox ASP H A L T A REA A S P H A L T A REA CB RIM=17.6' CB N 89*18'52" 646-64' EYJSnNG GAq MAIN EIRIM=17.4' CURB cam 'e - T 7 A S P H A L T A R E A CRASH BARRIER \7MM BWW CRASH "im 18 PARKING i4T L75 CB, SCO, HOLDING TANK, A S P H A L T A R E A AND SEM LINE PERx,,"* SIDE SEWER INFO, PROVIDED BY top Soo VAL VUE SEWER DISTRICT, PERMIT NO. 03498 FOUND 'b - 'J A R E A EP _gx HIGH Pyff)PW F CE W1 RAZOR CMCER71NA ON TOP G R A V EL 401 4�A L 9GX G\ A\J P\ A\E A N, 'A ICB 4.- 780 GAL HOLDIN CT\ A 1-TTANK % % \ OIL WATER SEPARATO I TO BE REMOVED VATH kv C' APPROXIMATE LOCATION FIRE DEPARTMENT PERMI�, _- i� - CL I 9 PARIONG STALLS I TO 5E REMOVED WTIH 1P. xop =RMIT FIRE DEPARTMENT Pr 55' PERMANENT EASEMENT AREA FOR ELECTRICAL TRACTION POWER SUBSTATION TO CENTRAL PUGET -- — --------- — - 4-A ------- SOUND REGIONAL TRANSIT AUTHORITY T REC. NO. 200440517003078 W_LARDSJ(TyPV) I NO A S P H A L T A R ASPHALT A'R E A BOLLARql: a YDP REMOVE OMMO ASPHALT �0 CO R1IM-17.9 SEE CIVIL PLANS 1P _0 REMOVE EXISTING ASPHALT A S P H A L T A R E A n SEE cIVIL PLANS A S P H A L T A R E A V '�4rS ASPHALT A R E A T rx- T .--x I I , x A S P H A L T A R E A o�x- x -W S70 k—. I I A INI IINSERTS A S P H A L T A R E A p RIM=16.7' C3 CB Cap --,,R I M 16.6' PARIONG STALLS 10 TRUCK PARIONG STALLS A S P H A L T A R E A (_8" SAN. SEwER roRcE MAIN 170 9 _SS--QI _SS F, 69 1; - im "I ___l. �ob. 3' H16i SINGLE STRAND CAME Ssi�—�7-!41- W b --�CONCRETE EXTRUDED CUR r4l I'-- -W 48_:_WATER MAIN CONCRETE EXTRUDED CURB QN( -70 -1-1 . I W —W N8918' low 60' WIDE CONDEMNED BY THE CITY OF SEATTLE =15.0' 4-�" - 0. fe, Q FOR PIPE LINE RIGHT OF WAY UNDER KING COUNTY 10 SUPERIOR COURT CAUSE NO. 121648, PURSUANT T6 CITY OF SEATTLE ORDINANCE NO. 37022. 4 3 4ATH W 1p�� 11C .0- A S P H A L T A R E A '90 A S P H A L T A R E A ASPHALT A R E A Op % 3 TRUCK pARMG ASPHALT AREA ENDS STALLS 7 T FENCE (TYP) 11 TRUCK PARION STALLS -F SD MH W/ GRATE RIM=19.9' ed. 011-1 20289 —8 wbxr�ww� / I n —X q�9?1 D11 —b- I ITC 127 CO C PIP CENTERLINE OULU QURS A'DUAI TR D D CURB W ER QW -OF SPEED LIMIT C8 SIGN 35 RIM=98.1' PLANNING APPROVED No changes can be made. to these plans without approval from the Planning Division of DCD Approved f3y.-Ii- L)n1tv of Tultmia BUILDIM Divisim REVISIONS No changes shall be made to the scope of work without prior approval of . Tukt!vila Building Division. NOTE: Revisions W11 require a new plan submittal and may include additional plan review fees. F -REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 6 2017 *'r W city of Tukwila "iANI .e: RECENED DEC 0 1 2016 -WKWILA PUBLIC WORKS CORRECTION DEMO NOTE6: LTR 1. D15CONNECT ALL UTILITIES TO THE EXISTING IBUILDING AND STRUCTURES,, 2. CAP ALL EXISTING UTILITIES I P ER RECEIVED !.�:' �. I , CITY OF TUKWIL GOVERNING AGENCY AT T LINE NOV 30 2016 3. RECYCLE AS MUCH AS P9.SSIR�E PERMIT CENTEI ASPHALT, CONCRETE, ETC�,'- SEE CIVIL ENGINEERING fz��,"AN FOR TEMPORARY ERROSION C� P, GRADr= AND FILL FOR FUTRUE CREDIT ON PLUMP, Fl� ;I <TURES, THIS IBUILDING HAS (o TOILET�," U INALS, (o SINKS, 3 FLOOR DRAINS, AND 4 HP�P, �I-P55. lu (L (L LU z 0 W LL \\VVKST-4\IDocurnents\CAD\2O15\.,J 5-03 SE.BC9 HOR!70N FORD\CD's 09-22-16\CD's 09-22-16\DEMO PLAN.dwg, DEMO POLE AT INTERNATION AL NO IBUILDING Lu w z LL -1 (L 1— w HIGH PC z 14' RAE) (Z r; III n POLE AT INTERNATION AL NO IBUILDING Lu w z LL -1 (L 1— -1 HIGH PC 14' RAE) (Z r; —O� )WE L IN lu US LE NCE NEXT HI HIGH POWER LINE WRADIU5 (fLE NGE 3H POW R LINE 'NEXT HIGH OW R LINE 14'RADIUS CLEARANCE (p 61 NEXT HIGH POWER LINE 17�r cq ct) POLE AT INTERNATION AL NO IBUILDING FOLE/WIRE SCALE: 1116" = V—Oil 6 TO 5IJ tu Lu 0 r2 Ile CL JII FF 20JI EX. AADEJ MID POLE kl� IN a HIGH POWER INE 14'RAIDIU5 C EAS J11 NEXT HIGH wrz� LINE lu HIGH POWER NI 14' RAE) I US C A 901-2111 //1' NEXT HIGH P �E V15 0 cq (q FF 2 0.5 W_ _'l_ EX. GRADEI i�'7 MID SPAN Lu Lu w z z -1 (L 1— -1 w (Z (Y_ )WE L IN lu US LE NCE HIGH POWE LIN HIGH POWER LINE WRADIU5 (fLE NGE 3H POW R LINE 'NEXT HIGH OW R LINE 14'RADIUS CLEARANCE cl) 61 NEXT HIGH POWER LINE 17�r cq ct) FF 10 EX. GRADE MID SPAN NO POLE FOLE/WIRE SCALE: 1116" = V—Oil 6 TO 5IJ tu Lu 0 r2 Ile CL JII FF 20JI EX. AADEJ MID POLE kl� IN a HIGH POWER INE 14'RAIDIU5 C EAS J11 NEXT HIGH wrz� LINE lu HIGH POWER NI 14' RAE) I US C A 901-2111 //1' NEXT HIGH P �E V15 0 cq (q FF 2 0.5 W_ _'l_ EX. GRADEI i�'7 MID SPAN Lu rA� POLE AT 112tW \1DI It RECEIVED NOV 2 2 2017 TUKWILA PUBLIC WORKS RECEIVED CORRECTION CITY OF TUKWILA LTR# —2w— Nuv 2 0 2017 PERMIT CENI*ER coop C:\Docu-fteTts aTd Seti-fosk DAM-& mz 0 F-1 F -i Z Iy F -i c) c) v_-1 Lu z -1 (L 1— -1 (Z (Y_ lu HIGH POWER LINE —INE 14'RADIUS CLEARANCE 61 NEXT HIGH POWER LINE 17�r CA m FF 20.51 EX.GRADE rA� POLE AT 112tW \1DI It RECEIVED NOV 2 2 2017 TUKWILA PUBLIC WORKS RECEIVED CORRECTION CITY OF TUKWILA LTR# —2w— Nuv 2 0 2017 PERMIT CENI*ER coop C:\Docu-fteTts aTd Seti-fosk DAM-& mz 0 F-1 F -i Z Iy F -i c) c) v_-1 NEW CONCRETE 51 WALK AND CUR5 AND GIJTTER, sE y 51 W, -UR5 ASPH ALT AREA A S P TING GAS MAIN 2—GAS VALVES N 89018'52" W G G � POURED IN PLACE CUR5 ON PROPERTY LINE .Z5 T 136a.51=110.51 11 -It 25 0 0 IV- Pl\* C'v (o' 20' 'ot %7// & c: HI 'CIV 'v I 0'5UILDI SET15AC Is 50, H.C. RAMPS AND 5IGNAGE SEE 5P-3 Xz (P 50, 101*.< 5'LANDS A -00' 4,Z 7/ 0 1'51DEWALK 15 DOCK DOORS LANDSCAP L 1 0 - A Fli 5.02 A( 0 A C'V C121 v CO * co co A S P H A L T A R E A jr 0 -7-t C4.)4 cid *t 4z ci NO, PP A S P H A L T A R E A PP N201 2'23"E c) N56*1 1'53"W N89*1 8'52"E 28.68' W BO E A Wv Z;� 1� is CO CZ Z' '��RETE EXTRUDED CURB WMH C) R1M=1 5.2'9---� W N89*18'52"W CD r10 LUMINAIRE 60' WIDE CONDEMNED BY THE CITY OF SEATTLE FOR PIPE LINE RIGHT OF WAY UNDER KING COUNTY SUPERIOR COURT CAUSE NO. 121648, PURSUANT TO CITY OF SEATTLE ORDINANCE NO. 37022. F\ C- U. IN U. L)t I Z- I U J 0 c 0 -50 1 DUMPSTER ENCLOSURE 5' ERMANENT EASEMENT AREA SEE la/5�-3 F R LECTRICAL TRACTION POWER STATION TO CENTRAL PUGET tOUND EGIONAL TRANSIT AUTHORITY A S P H A L T A R E A REC. NO. 200440517003078 in 0RIVE INAAMI 1 413' 3 HOUR FRE WALL TA5LE 106.4 MAX 25% CF WALL CAN 5E RATED 3 HOUf;Z OPENING (106-54116-511 OVEF 5ULc 4.13 OFF &.41 ffvwEirm MD141S) 70-59 -1 'A �)) 646-64' EXISTING GAS MAIN G G G -�Q TRUCK LOAD ING 130' MIN. 24' 6L CN 18, (01 111 2 IJ - Ln N05E OF 65' TRACTER TRAILER HCqHC t H.C. RAMPS AND 5IGNAGE SEE SD -3 401 0 51DEWAL 01 0. 00� 13 DOCK DOORS -Ir- 7- 4ND5CAPE 3� r 121 *-w-� VO\A 0. TENA�"WO -0�0 do .130 MAX. 12,055 5F SURVEY r -Ir m W V) y 00 00 I I z T- ALL It 04 V) 0 e-1111-1% < (c) (0 z oo 01. 0 Ld M -i 1-- 00 LLI z 0 x m < LLJ 80, co-) 0- LL- V) 0) FIRE DEPARTMENT ACCESS DOORS AT 100'O.C. 0 FIRE DEPARTMENT KNOX 5OX (00 _M\4\ ff 0I E�' LANID6CAPE -"��20' 5UILC)ING ID FRONT 51FT5Ac< i -n TRANer-ORME-R ----=77-:: ) . ........ j 2 j -Q�� 87*15 46 E PID x IL —W—N87*41'10"W W 110111. W— POWER POLE WITH SWITCH ATER BLOW—OF SOY TH 11 2TH STREET M351418)- FOWER,POLE WITH WITCH AND CONDUITS FO NPER ADD CONDUIT FOR . 1. 1- k"" 1, m �4 PRELIM 511 NORTH SCALE: I" = -30' 08-05-16 013-22-1(o AN 51X R ExPANc) EXISTVG CURIB C) CUT TO THE 50 H C) Rr=MOVE RAMP E X. CUR5 CU7�� RECEIVED EP CITY OF TUKWILA S 0 I'M 2 0 2017 E PERMIT CENTER CADocuments and Settings\All Users\Documents\CAD\2015\1 5-03 SEBCO HORIZON FORD\CD'S REV 08-14-17\SD-1,SD-3,Al-A7,El.dwg, poles plan, 11/20/2017 10:54:45 AM TENANT ONE 65.21ATA 2c343I,OFFr2.44v 25,all 8F 2 HOUR WALL N'e TA5LE 601 STA - 16201 ®r OFF 5h5 A S P H A L T A R E A STA OFF eft Ila C14 0 0 GA c2- 48" WATER MAIN W CONCRE 8 — 60' WIDE CONDEMNED BY THE CITY OF SEATTLE FOR PIPE LINE RIGHT OF WAY UNDER KING COUNTY SUPERIOR COURT CAUSE NO. 121648, PURSUANT TO CITY OF SEATTLE ORDINANCE NO. 37022. F\ C- U. IN U. L)t I Z- I U J 0 c 0 -50 1 DUMPSTER ENCLOSURE 5' ERMANENT EASEMENT AREA SEE la/5�-3 F R LECTRICAL TRACTION POWER STATION TO CENTRAL PUGET tOUND EGIONAL TRANSIT AUTHORITY A S P H A L T A R E A REC. NO. 200440517003078 in 0RIVE INAAMI 1 413' 3 HOUR FRE WALL TA5LE 106.4 MAX 25% CF WALL CAN 5E RATED 3 HOUf;Z OPENING (106-54116-511 OVEF 5ULc 4.13 OFF &.41 ffvwEirm MD141S) 70-59 -1 'A �)) 646-64' EXISTING GAS MAIN G G G -�Q TRUCK LOAD ING 130' MIN. 24' 6L CN 18, (01 111 2 IJ - Ln N05E OF 65' TRACTER TRAILER HCqHC t H.C. RAMPS AND 5IGNAGE SEE SD -3 401 0 51DEWAL 01 0. 00� 13 DOCK DOORS -Ir- 7- 4ND5CAPE 3� r 121 *-w-� VO\A 0. TENA�"WO -0�0 do .130 MAX. 12,055 5F SURVEY r -Ir m W V) y 00 00 I I z T- ALL It 04 V) 0 e-1111-1% < (c) (0 z oo 01. 0 Ld M -i 1-- 00 LLI z 0 x m < LLJ 80, co-) 0- LL- V) 0) FIRE DEPARTMENT ACCESS DOORS AT 100'O.C. 0 FIRE DEPARTMENT KNOX 5OX (00 _M\4\ ff 0I E�' LANID6CAPE -"��20' 5UILC)ING ID FRONT 51FT5Ac< i -n TRANer-ORME-R ----=77-:: ) . ........ j 2 j -Q�� 87*15 46 E PID x IL —W—N87*41'10"W W 110111. W— POWER POLE WITH SWITCH ATER BLOW—OF SOY TH 11 2TH STREET M351418)- FOWER,POLE WITH WITCH AND CONDUITS FO NPER ADD CONDUIT FOR . 1. 1- k"" 1, m �4 PRELIM 511 NORTH SCALE: I" = -30' 08-05-16 013-22-1(o AN 51X R ExPANc) EXISTVG CURIB C) CUT TO THE 50 H C) Rr=MOVE RAMP E X. CUR5 CU7�� RECEIVED EP CITY OF TUKWILA S 0 I'M 2 0 2017 E PERMIT CENTER CADocuments and Settings\All Users\Documents\CAD\2015\1 5-03 SEBCO HORIZON FORD\CD'S REV 08-14-17\SD-1,SD-3,Al-A7,El.dwg, poles plan, 11/20/2017 10:54:45 AM