Loading...
HomeMy WebLinkAboutPermit M16-0002 - AEROGO - ROOFTOP GAS PACKAEROGO 1170 ANDOVER PARK W EXPIRED 07124116 M16-0002 City of Tukwila Department of Community Development y • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov MECHANICAL PERMIT Parcel No: 3523049099 Permit Number: M16-0002 Address: 1170 ANDOVER PARK W Issue Date: 1/26/2016 WA Cities Electrical Code: 2014 Permit Expires On: 7/24/2016 Project Name: AEROGO 2014 Owner: 2012 WA State Energy Code: Name: PHILLIPS JAMES W MR AND MRS 2012 Address: PO BOX 603, MEDINA, WA, 98039 Contact Person: Name: DAVE ANDRINGA Phone: (206) 779-6636 Address: 340 UPLAND DR, TUKWILA, WA, 98188 Contractor: Name: SEA AIRE INC Phone: (206) 575-8051 Address: 340 UPLAND DR, TUKWILA, WA, 98188-3801 License No: SEAAII*206JQ Expiration Date: 4/26/2016 Lender: Name: Address: DESCRIPTION OF WORK: REPLACE 7 1/2 TON GOODMAN GAS PACK WITH TRANE 7 1/2 TON ROOFTOP GAS PACK IN SAME LOCATION. NEW UNIT WEIGHT IS LESS THAN PREVIOUS UNIT. INSTALL ECONOMIZER AND RETUEN AIR SMOKE DETECTOR. THE UNIT SERVES THE SOUTH END OF THE SECOND FLOOR. Valuation of Work: $14,500.00 Fees Collected: $389.62 Type of Work: REPLACEMENT Electrical Service Provided by: PUGET SOUND ENERGY Fuel type: GAS Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Signature: / ` � � Date: a 14" I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature:--��},,Date: Print Name:Ary, d C s h This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. 12: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 16: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 17: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 18: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 19: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 20: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 21: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST CITY OF TUKWIL_ y Community Development Department • 7 Permit Center Lam✓ 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 r littp://www.Tukwi]aWA.Qgov SITE LOCATION Mechanical Permit No. Project No. Date Application Accepted: Q Date Application Expires: T use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" © King Co Assessor's Tax No.: Site Address: I © d 0 V e- 11W k w Suite Number: Floor: Tenant Name: 4690 G o New Tenant: El ..... Yes �.. No PROPERTY OWNER Name: 6A -o Address: 11 7C3 ^__ 4a Imo/ [C� 1 o k w ` State: Zip: CONTACT PERSON — person receiving all project communication Name: Address: L -AIA 'OR O City:V Sta NAZA ip: AB Phone: 4, 7 '7 9' (06 b Fax: 206 --57-79- 66 S Email: 00-C'A905P-Q Com MECHANICAL CONTRACTOR INFORMATION Company Name: Address: UP L cL City:TV w' lh tate: Zip: Phonez �7S-S0 S 1 Fax: (0 S 4 (0 Contr Reg No. CA 6-Txp Date:_ Tukwila Business License No.: oiao' Valuation of project (contractor's bid price): $ I, SO ® _ Describe the scope of work in detail: REPLAC,e Cry1,dnn A n % yz rJy n GA 5 QA f6k n e 7 it - me JOcAi/ !;Lhfr4il CC*rtoM)ze,r OZ1%A lr"e'-„e'n C1irr Svrfok aLAec-4-are L)h14-J-e.rves A,,4h Eab a -0 Fkc g— Use: Residential: New.......... ❑ Replacement........ ❑ Commercial: New.......... ❑ Replacement........ CES Fuel Type: Electric...... ❑ Gas........ 2 Other: H:Wpplications\Forms-Applications On Line\2011 ApplicationsWechanical Permit Application Revised 8.9.1 Ed= Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace 2100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit 210,000 cfm —Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial PERMIT APPLICATION NOTES - Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency enerator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ h /1,750,000 btu Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT BUILDING OWNER OR AGENT: Signature: _!,� SA" lJwtPlaAjn 4 q.— Print Name: V 4 f- I n Date: Day Telephone:lZ-C� 179 4 0:16 Mailing Address: 240 VP I c+ x A _0 k— 7 U K W t LA— W& 9"s1 p City State Zip H:Wpplications\Forms-Applications On Line\2011 ApplicationsWechanical Permit Application Revised 8-9-1 Ldocx Revised: August 2011 Page 2 of 2 bh DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $389.62 M16-0002 Address: 1170 ANDOVER PARK W Apn: 3523049099 $389.62 MECHANICAL $374.63 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $267.20 PLAN CHECK FEE R000.322.102.00.00 0.00 $74.93 TECHNOLOGY FEE $14.99 TECHNOLOGY FEE TOTAL FEES PAID R000.322.900.04.00 0.00 $14.99 Date Paid: Wednesday, January 06, 2016 Paid By: DAVID ANDRINGA Pay Method: CREDIT CARD 06948G Printed: Wednesday, January 06, 2016 2:22 PM 1 of 1 LJ L1 "fSYS7EM5 ���►►Rri PRODUCT SPECIFICATIONS ' i' ! r (yL,tz►G t Specifications - (1) Sensible capacity is gross, with no deduction for indoor motor heat (2) BTU/Watt @ 80/67 T inside; 95 T outside air (3) IPLV is integrated part load valve (4) Minimum Input is first stage input (5) "ACR breakers may be used in place of fuses up to 60 amps i 'Oj]E C050LIAZCS &'40V - JA1 2 1 2016 Cii�+ ofTukwila DIVISIO 1/I RECEIVEU ^I Y OF Y U:ZWILA JAN 0 6 2016 L'2Q' Com`!! aR PGC090195-3A PGC0901954A PGC120225-3A PGC120225-4A Total Cooling (BTUH) 86,000 86,000 116,000 116,000 Sensible Cooling (BTUH)' 63,600 63,600 85,000 85,000 EER,2 10.3 10.3 10.3 10.3 IPLV2 10.7 10.7 10.7 10.7 Maximim Heating Input 193,000 193,000 225,000 225,000 Minimum Heatinglnput' 133,000 133,000 153,000 153,000 Output Capacity 154,400 154,400 180,000 180,000 Steady State Efficiency 80% 8076 80% 80% Temperature Rise Range 35-65 35-65 30-60 30-60 Indoor Blower (Quantity) 2 - 2 2 2 Type Belt Belt Belt Belt Size (D"xW") 12x12 12x12 12x15 12x15 Motor Horsepower 1'/2 1'/2 3 3 Indoor CFM Nominal 3,000 3,000 3,800 3,800 Evaporator Coil Quantity 1 1 1 1 Face Area (ft2) 11.2 11.2 14.0 14.0 Rows/Fins per Inch 3/16 3/16 3/16 3/16 Tube Diameter/Material %/Copper %/Copper %/Copper %/Copper Filters Size& Quantity (3)25x25x2 (3)25x25x2 (3)16x25 x2 (3)16 x25 x2 3 20x25x2 3 20x25x2 Outdoor Fan Quantity) 2 _ .., n 2 -2 2 Fan Diameter 24" 24" 24" 24" Motor Horsepower 1/2 1/2 1/2 1/2 Outdoor CFM Nominal 5,500 5,500 6,400 6,400 Condenser Coil (Quantity) l f. .:. Face Area (Totalft2) 15.6 15.6 23.8 23.8 Rows/Fins per Inch 2/21 2/21 2/21 2/21 Tube Diameter/Material %/Co er %/Co er %/Co er %/Copper Electrical Ph 3 3 3 3 Volts 208/230 460 208/230 460 Compressor RLA 12.5 5.9 17.4 6.8 Compressor LRA 88.0 44.0 123.0 49.5 Indoor Blower FLA 4.2 2.1 8.4 4.2. Outdoor Blower FLA 2.6 1.3 2.6 1.3 Minimum Circuit Ampacity 38.1 18.2 54.5 22.5 Maximum Fuse Sizes 60 30 70 35 Net "Ot (pounds) : 1,080 1,080 1,380 1,380 Stopping Weight (pounds) 1,100 1 1,100 1 1,400 1 1,400 (1) Sensible capacity is gross, with no deduction for indoor motor heat (2) BTU/Watt @ 80/67 T inside; 95 T outside air (3) IPLV is integrated part load valve (4) Minimum Input is first stage input (5) "ACR breakers may be used in place of fuses up to 60 amps i 'Oj]E C050LIAZCS &'40V - JA1 2 1 2016 Cii�+ ofTukwila DIVISIO 1/I RECEIVEU ^I Y OF Y U:ZWILA JAN 0 6 2016 L'2Q' Com`!! aR Customer: SEA AIRE Project : Name:AEROGO Unit function Airflow Design Airflow Fresh air selection Evaporator face area Evaporator face velocity Cooling Entering DB Cooling Entering WB ASHRAE 90.1 Rated capacity (AHRI) Heating EAT Desian ESP Tonnage Cooling Entering WB Ambient Temp Evap Coil Leaving Air Temp (WB) Cooling Leaving Unit WB Gross Sensible Capacity Net Total Capacity Net Sensible Heat Ratio Dew Point Saturated Discharae TemD Circuit 1 Heating capacity Output Heating Capacity Heating EAT Heating Delta T t'"MVVED FOR uODE COMPLIANCE .aA ' APPROVED JAN 2 1 2016 LBUILDING Of Tukwila DIVISION 71LE Model Number YSC090F4RMA**D000000003A0000000000000000 Y4C DX cooling, gas heat Convertible configuration 3000 cfm Econ -dry bulb 0-100% w/ bar relief 3ph 9.89 sq ft 303 ft/min 80.00 F 67.00 F Yes 83.00 MBh 70.00 F 0.500 in H2O 7.5 Ton Single compressor 67.00 F 95.00 F 57.46 F 58.09 F 66.61 MBh 84.55 MBh 0.74 Number 56.19 F 116.85 F Medium gas heat 3ph 120000.00 Btuh 70.00 F 37.30 F Unit efficiency Airflow Application Evaporator rows Evaporator fin spacing Tonnage Min. unit operating weight Max. unit operating weight Ent Air Relative Humidity Ambient Temp Heating capacity Voltage Cooling Entering DB Ent Air Relative Humidity Evap Coil Leaving Air Temp (DB) Cooling Leaving Unit DB Gross Total Capacity Gross Latent Capacity Net Sensible Capacity Fan motor heat Refrig charge (HFC -410A) - ckt 1 Saturated Suction Temp Circuit 1 Input Heating Capacity Output Heating Cap. w/Fan Heating LAT M I 6,illw 0002 Standard efficiency Downflow 4.00 Each 192 Per Foot 7.5 Ton Single compressor 767.0 Ib 1020.0 Ib 51.08% 95.00 F Medium gas heat 3ph 460/60/3 F - R-41 OA With Microchannel 80.00 F 51.08 % 59.44 F 61.10 F 89.00 MBh 22.39 MBh 62.16 MBh 4.45 MBh 5.9 Ib 49.91 F 150000.00 Btuh 124452.45 Btuh 107.30 F RECEIVED CITY OF TUKWILA JAN 0 6 2016 PERMIT CENTER Voltage 460/60/3 Design ESP 0.500 in H2O Component SP 0.140 in H2O Total Static Pressure 0.640 In H2O Field supplied drive kit required None Indoor mtr operating power 1.432 hp Indoor RPM 1005 rpm Indoor Motor Power 1.07 kW Outdoor Motor Power 501.5 W Compressor Power 6.14 kW System Power 7.71 kW EER @ AHRI Conditions 11.2 EER MCA 19.50 A MOP 30.00 A Compressor 1 RLA 12.80 A Compressor 2 RLA 0.00 A Condenser fan FLA 1.80 A Evaporator fan FLA 1.70 A Exhaust fan power 0.870 hp IEER 12.20 Unit controls Smoke detector Microprocessor controls 3ph Refrigeration controls Frostat and crankcase heater 3ph Return air smoke detector 3ph Page, 2 a Y4C Job Information Oftwh TA A OGO AER E� SEOGO AAIRE Tag Y4C Quantity 1 Model number YSC090F4RMA**D00000 0003A000000000000000 0 Unit Information Tonnage 7.5 Ton Single Unit function DX cooling, gas heat compressor Min. unit operating weight 767.0 Ib Max. unit operating weight 1020.0 Ib Design Airflow 3000 cfm Cooling Information Gross Total Capacity 89.00 MBh Gross Sensible Capacity 66.61 MBh Gross Latent Capacity 22.39 MBh Net Total Capacity 84.55 MBh Net Sensible Capacity 62.16 MBh Net Sensible Heat Ratio 0.74 Number Cooling Entering DB 80.00 F Cooling Entering WB 67.00 F Cooling Leaving Unit DB 61.10 F Cooling Leaving Unit WB 58.09 F Ambient Temp 95.00 F Evaporator fan FLA 1.70 A Heating Information Heating capacity Medium gas heat 3ph Input Heating Capacity 150000.00 Btuh Output Heating Capacity 120000.00 Btuh Heating EAT 70.00 F Heating LAT 107.30 F Heating Delta T 37.30 F Moto r/Electrical Information Voltage 460/60/3 Design ESP 0.500 in H2O Indoor Motor Power 1.07 kW Indoor mtr operating power 1.432 hp Indoor RPM 1005 rpm Outdoor Motor Power 501.5 W Compressor Power 6.14 kW System Power 7.71 kW MCA 19.50 A MOP 30.00 A Compressor 1 RLA 12.80 A Evaporator fan FLA 1.70 A Condenser fan FLA 1.80 A Electrical values provided are estimated only and are subject to change without notice and may differ from nameplate values . Field installed low or high static drive kits may be needed. Please check the fan performance tables in the product catalog for application ranges. 12/8/2015 Page 1 of 1 Pate 3 EVAPORATOR SECTION ACCESS PAN CONDENSATE GRAIN (ALT) 314"-14 NPT DIA. H OLE — TOP PANEL 41W \, e 27 518" 47 718" ao 0 112"NPT GAS CONNECTION (80flBH & 120148H) 314"NPT GAS CONNECTION (1501MBIi,200IMBH &250MSH) THROUGH THE BASE CONDENSATE 5!8"—�{ i. 41+8" I I I I I I I 1 I I I I I I I I I I I I I 33" 1 32118" I SUPPLY I RETURN' I I I I I I 97112" 9718' 17112"3 51B" PLAN VIEW UNIT DIM EN SION DRAWING RETURN 32 114" SUPPLY 2371W 00 4 314" 19114" 9318" 16314" 3718". CONDENSATE 88 .; v 40 CONDENSER FAN R COIL ---UN IT CONTROL WIRE 718' DIA. HOLE IMCE GAUGE P'0RTACCESSI 318"DIA HOLE POWER WIRE AND CO4MPRESS0R ACCE SS PANEL NOTES: 1. THRU -THE -BASE ELE CTR ICAL AND GAS IS NOT STANDARD ON ALL U NIT S. 2.VERIFYWEIGHT,CONNECTION,ANDALLDII4ENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION PACKAGE} GAS / ELECTRICAL DIMENSION DRAWING HORIZONTAL .AIR FLOW Page 4 ?W-1.4 D IA HO LE CONDENSATE DRAN SUPPLY RETURN 27 SM - 4 �tk" ISOMETRIG-PAGKAGED COOLING Page 5 'ELECTRICAL / GENERAL DATA 'GENERAL (2)(4 XS) HEATING PERFORMANCE Model: YSCO90F Oversized 14 ofor HEATING - GENERAL DATA Unit Operating Voltage: 414-506 MCA: MIA Unit Primary Voltage: 460 MFS: MIA Heating Model: Medium Unit Secondary Voltage — MCB: N/A H eating Input (BTU): 150,0001105,000 Unit Hertz: 60 H eating Output (BTU): 120,000184,000 Unit Phs Be: 3 N 0. Bum ers: 3 No. Stages 2 EER 11.2 StandfirdfActor Field Installed Oversized Motor Gas Inlet Pressure MCA 19.5 MCA M /A IN atufa I Gas (F4 1 nsfM *Y. 4.511 4.0 MFS: 30.0 MFS: N/A LP (FA infMax) 11.0114.0 MCB: :30.0 MCB: WA Gas Pipe Connection Size: 3/4" INDOOR MOTOR Standard Motor Oversized Motor Field installed Oversized Motor Number. I Number: MIA Number: MIA Horsepower. 1.0 Horsepower. 14/A Horsepower: MIA M otar Speed (RP M): — Motor Spa ad (RP M N)A M o toy Speed (R P M NIA Phase 3 Phase X/A Phase N /A Full Load Amps: 1:7 Full Load Amps: N 1A Full Load Amp a: NIA Lo dke d Rotor Am ps: 12_5 Lo dked Rotorgvn ps: NIA Locked RotorAmpa: MIA COMPRESSOR Circ".112 OUTDOORMOTOR Number I Number. I Horsepower: 6.7 H orsepo,.wr. 0.7 Phase: 3 IA otor Speed (RP IA): 1100 Rated Load Amps: 12.6 Phase: I Locked Rotor Amps: 100.0 F u 0 Load Amps: 1.8 Locked Rotor Amps: 5.5 POWER EXHAUST ACCESSORY FILTERS REFRIGERANT (Field Installed Power Exhaust) Type Phase: MIA Type: Throwaway Horsepowar, MIA furnished: yes factory Charge Motor Speed (RPIA): MFA Number A CircAlit#1 5.5 Ib Full Lead Amps: MIA Recommended 16'x25'x2' C ircuit #2 NIA Locked Rotor Amps; MIA NOTES. 1. 14 aximum (HACR) Circuit Breaker sizin g is for installatia no in the U nited States only. 2. Refrigerant charge is an approximate value. Fora More precise value, see unit no meplate and service instructions. 3. Value does'not include Power Exhaust Accessory. 4- Value includes oversized motor. S. Value does not include Power Exhaust Accessory. 6. E E R is Wed at AH R I conditions and in accordance vAh DOE test procedures. flage 6 a PACKAGED GAS f ELECTRICAL CORNER WEIGHT INSTALLED ACCESSORIES NET WEIGHT DATA ACCESSORY WEIGHTS E CONOM IZER M.4 lb MOTORIZED OUTSIDE AIR DAM PER MANUAL OUTSIDE AIR:DAIA'PER BAROMETRIC RELIEF OVERSIZED MOTOR BE LT DRIVE MOTOR f POWER EXHAUST THROUGH TTHE BASE ELECTRiCAUtGAS(FIOPS) UNIT MOUNTED CIRCUITBREAKER (FIOPS) UNIT MOUNTED DISCONNECT (FLOPS) POWERED CONVENIENCEOUT:LET (FIOPS) HINGED DOORS (FIOPS) HAIL GO ARD SMOKE DETECTOR, SUPPLYI RETURN 7,416 NOVAR CONTROL STAINLE SS STEE L HEAT EXCHANGE R REHEAT ROOFCURB BASIC UNIT WEIGHTS SHIPPING NE7 CORNER WEIGHTS O 243.DIb © 155.416 CENTER OF GRAVITIY (E)LENGHT (F)WIDTH M.0 Ib 7fi1.01b 221.616 1d4.41b NOTE: 1. CORNER ATIGHTS ARE GIVENFOR INFORMATION ONLY. 2. TO ESTIMATE SHIPPING WEIGHT ADD 5 LBS TO NET WEIGHT. 1 BASIC UNIT WEIGHT DOES NOT INC LODE ACC ESSO RY WEiGHT.'TO OBTAIN' TOTAL WEIGHT, ADD ACCESSORYNET WEIGHT TO BASIC UNIT WEIGHT. 4. WEIGHTS FOR OPTIONS NOT LISTED ARE: rSLBS. Page 7 mm CLEARANCE 36" CLEARANCE 48" DOWNFLOW CLEARANCE 36" HORIZONTAL CLEARANCE 98" A•zliffi•iaWl UNIT OUTLINE CLEARANCE 36" PACKAGED GAS/ELECTPJC CLEARANCE CLEARANCE FROM TOP OF UNIT 72" I 53 IW 467 88 50 PACKAGED GAS/ELECTRIC 6OWN'FLOW TYPICAL ROOF OPENING Page mw, BAROMETRIC RELIEF HOOD BAROMETRIC RELIEF HOOD ACCESSORY -BAROMETRIC RELIEF DAMPER HOOD Page 9 0 ACCESSORY - ECONOMZER HOOD MIZER HOOD Page 10 Page Y f General The units shall be convertible airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for units with microprocessor controls. Operating range for units with electromechanical controls shall be between 115°F and 40°F. Cooling performance shall be rated In accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation, and control sequence before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance for Central Cooling Air Conditioners. Casing Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM B717. Cabinet construction shall allow for all maintenance on one side of the unit. Service panels shall have lifting handles and be removed and reinstalled by removing two fasteners while providing a water and air tight seal. All exposed vertical panels and top covers In the indoor air section shall be Insulated with a cleanable foil -faced, fire -retardant permanent, odorless glass fiber material. The base of the unit shall be insulated with 118 Inch, foil -faced, closed -cell insulation. All insulation edges shall be either captured or sealed. The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8 inch high downflow supply/return openings to provide an added water integrity precaution, if the condensate drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift capabilities on three sides of the unit. Unit Top The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top. Filters Throwaway filters shall be standard on all units. Optional 2 -inch MERV 8 and MERV 13 filters shall also be available. Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors. Dual compressors are outstanding for humidity control, light load cooling conditions and system back-up applications. Dual compressors are available on 7%-10 ton models and allow for efficient cooling utilizing 3 -stages of compressor operation for all high efficiency models. Notes: Crankcase heaters are optional on YSC (036, 048, 060, 072, 090,102,120); standard on YHC (036, 048, 060, 072, 092, 102, 120). Indoor Fan The following units shall be equipped with a direct drive plenum fan design (T/YSC120E, T/YHC092,102, 120E). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. 3-5 ton units (standard efficiency 3-phase or high efficiency 3-phase with optional motor) are belt driven, FC centrifugal fans with adjustable motor sheaves. 3-5 ton units (1 -phase or high efficiency 3-phase) have multispeed, direct drive motors. All 6-8% ton units (standard efficiency) shall have belt drive motors with an adjustable Idler -arm assembly for quick -adjustment to fan belts and motor sheaves. All motors shall be thermally protected. All 10 tons and 7'/z-8% (high efficiency) have variable speed direct drive motors. All Indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal overload protection. Evaporator and Condenser Coils Internally finned, 5/16" copper tubes mechanically bonded to a configured aluminum plate fin shall be standard. The microchannel type condenser coil is standard for the T/YSC 10 ton models and 7% ton high efficiency models. The microchannel type condenser coil is not offered on the 7% ton dehumidification model. Due to flat streamlined tubes with small ports, and metallurgical tube -to -fin bond, microchannel coil has better heat transfer performance. Microchannel condenser coil can reduce system refrigerant charge by up to 50% because of smaller internal volume, which leads to better compressor reliability. Compact all -aluminum microchannel coils also help to reduce the unit weight. All -aluminum construction improves re-cyclability. Galvanic corrosion is also minimized due to all aluminum construction. Strong aluminum brazed structure provides better fin protection. In addition, flat streamlined tubes also make microchannel coils more dust resistant and easier to clean. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil and condenser coil shall be leak tested to 600 psig. The assembled unit shall be leak tested to 465 psig. The condenser coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A removable, reversible, double -sloped condensate drain pan with through the base condensate drain is standard. Page 12 Controls Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls provide for all 24V control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized microprocessor shall provide anti -short cycle timing and time delay between compressors to provide a higher level of machine protection. 24 -volt electromechanical control circuit shall Include control transformer and contactor High Pressure Control All units Include High Pressure Cutout as standard. Phase monitor Phase monitor shall provide 100% protection for motors and compressors against problems caused by phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that provides an ON or FAULT indicator. There are no field adjustments. The module will automatically reset from a fault condition. Refrigerant Circuits Each refrigerant circuit offer thermal expansion valve as standard. Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall be provided for replacement suction line driers. Gas Heating Section The heating section shall have a progressive tubular heat exchanger design using stainless steel burners and corrosion resistant steel throughout. An induced draft combustion blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark ignition (DSI) system. On Initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds before ignition After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually reset at the thermostattzone sensor. Units shall be suitable for use with natural gas or propane (field -installed kit) and also comply with the California requirement for low NOx emissions (Gas/Electric Only). Economizer This accessory shall be available with or without barometric relief. The assembly includes fully modulating 0-100 percent motor and dampers, minimum position setting, preset linkage, wiring harness with plug, spring return actuator and fixed dry bulb control. The barometric relief shall provide a pressure operated damper that shall be gravity closing and shall prohibit entrance of outside air during the equipment off cycle. Optional solid state or differential enthalpy control shall be available for either factory or field installation. The economizer arrives in the shipping position and shall be moved to the operating position by the installing contractor. Supply and/or Return Air Smoke Detector Smoke detector shall be factory Installed photoelectric smoke detector mounted in the return air section (with or without the economizer or motorized damper option), AND/OR In the supply air fan compartment. The detector will be wired for continuous power whenever the unit Is energized. Upon detection of smoke, the detector will shut down all unit operations. Local codes may dictate the location of detectors. Note: Due to the shipping position of the economizer or motorized damper, the return air smoke detector will not be completely factory Installed. The wiring harness for the detector will be routed and tied off in the fan compartment for shipping. The smoke detector and barometric damper hood will also be installed in a shipping position in the fan compartment. Frostat This option is to be utilized as a safety device. The Frostat opens when temperatures on the evaporator coil fall below 10"F. The temperature will need to rise to 50°F before closing. This option should be utilized in low airflow or high outside air applications. (Cooling with Electric Heat Only.) Frostat This option Is to be utilized as a safety device.The Frostat opens when temperatures on the evaporator coil fall below 10'F.The temperature will need to rise to 50°F before closing.This feature should be utilized in low airflow or high outside air applications (cooling only). Supply, Return, and Plenum Air Smoke Detector With this option installed, if smoke Is detected, all unit operation will be shut down. Reset will be manual at the unit. In order for the supply air smoke detector or return air smoke detector to properly sense smoke in the supply air stream or the return air stream, the air velocity entering the smoke detector unit must be between 500 - 4000 feet per minute. Equipment covered in this manual will develop an airflow velocity that falls within these limits over the entire airflow range specified In the evaporator fan performance table. Supply and/or Return Smoke Detectors may not be used with the Plenum Smoke Detector. Page 13 6/1/2016 City of Tukwila Allan Ekberg, Mavor Department of Community Development Jack Pace, Director DAVE ANDRINGA 340 UPLAND DR TUKWILA, WA 98188 RE: Permit No. M16-0002 AEROGO 1170 ANDOVER PARK W Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 7/24/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 7/24/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Rachelle�Vnf) Permit Technician File No: M16-0002 6300 Southcenter Boulevard Suite #100 0 Tukwila, Washington 98188 • Phone 206-431-3670 0 Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0002 DATE: 01/06/16 PROJECT NAME: AEROGO SITE ADDRESS: 1170 ANDOVER PARK W X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: A� WU 1`w Building Division It AIA Awc HE -1 Fire Prevention 0 Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 01/07/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: 117:1011 APPROVALS OR CORRECTIONS: DUE DATE: 02/04/16 Approved ❑ Approved with Conditions Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: Denied ❑ (ie: Zoning Issues) 107:1 101 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 SEA AIRE INC Home Ispaiiol Contact Safety & Health 45 Washington State Department of Labor & Industries SEA AIRE INC Owner or tradesperson Principals MCCURRY, JOHN M, PRESIDENT MCCURRY, JUDY A, VICE PRESIDENT MCCURRY-WARD, JENNIFER L, SECRETARY MCCURRY, DEBRA J, TREASURER MCINTYRE, FRANCIS D (End: 01/01/1980) MCINTYRE, CHRISTINE L (End: 01/01/1980) Doing business as SEA AIRE INC Page 1 of 2 Search L&I J • ' � ` A-% Index Help RIS Secure L&I Claims & Insurance Workplace Rights Trades & Licensing 340 UPLAND DR TUKWILA, WA 98188 206-575-8051 KING County WA UBI No. Business type 600 360 471 Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ._................................................. .............. Meets current requirements. License specialties GENERAL $1,000,000.00 License no. SEAAII'206JQ Effective — expiration Effective date 04/18/1980— 04/2612016 04/18/2012 Bond ................ Expiration date AMERICAN STATES INS CO $12,000.00 Bond account no. 6162430 Received by L&I Effective date 04/18/2002 04/18/2002 Expiration date Until Canceled Insurance .... _..................... Ohio Security Ins Co $1,000,000.00 Policy no. BKS55083881 Received by L&I Effective date 03/05/2015 04/18/2012 Expiration date 04/18/2016 https://secure.Ini.wa.gov/verify/Detail.aspx?UBI=600360471&LIC=SEAAII*206JQ&SAW= 01/26/2016 HVAC Equipment Schedule Unit # Brand. Name Model # Nominal Tonnage Total CFM OSA CFM EGON Cycle urge°�o SP HP/ BHP COOLING HEATING LWA Weight' (lbsy Location Service Total (BTUH) Sensible (BTUH) SEER/ EER IPW BTU/ ft? Input (BTUH) Output (BTUH) COP/HSPF Comb.EV BTU/ ft.2 1 rano D q0 y� Zycp Zq0 ja Fr n .5 .6! e$�/+�Blf L& s Unit Length 88-5/81, lSi� coo lZt� 000 Unit Height 46-7/8" e c, I&I J�oc�r 2' Clearance - Service Side 48" . Clearance,.-. Condenser Side,_______ _ " Clearance -; Ev-ap Side 36" 116,000 85,000 116,000 85,000 10.3 > ROOF • 1 I �JOO " 3` t EXISTING PARKING 180,000 80% . 30.60 80% 30-60 I , f-i_.T PHIN Bett 12 x 15 Bett 12 x 15 3 3,800 14.0 3/16 3 3;800 1 14.0 3/16 4 r i ar x2 %/Copper (3)16x25 x2 3 20x25x2 5 A/C2o_ Qr'- 2V rrVV tr ` 8 T..AL AN lka,` I_ 03 23.8 23.8 6 SCRLE I " = 201 Y 2/21 %/Co r ti `ENT AMI;l� tt � —[ S 4 t..1 s i. 3 g 208/230 .460 17.4 6.8::��. .,� Do MM ALTERNATE CONOEIGAM DRAW �' `-• ,5,2'._ COW�n0N MA• 11 NPT OMHOLE / 470MM t ;. 12"Mm 26m, 225, IBA _ 2uMM . . to NPT OASC20ff64ON teo mcn. t2o �ronp 3ANPT0A8 CDIOSxTION (,60"Vth 2flD�4250mbM) CONTROL ANDCOMPRESSOR ACCESH PANEL .TOPPANEL - �.\ CONDENSER FAN .� Ins MM �CDNOENSER COIL wrcomRROLWIRE 7/r W" DUL "OLE SERVICE �,� UIOTPOWERVimWr W" DIJIL HOLE US6 ZLI YAvge.,'+rAP 4-o i -)t^ 04140,) Unit 'b eAc;h sed -e_ D F . ro o pe ok I n -S 1 �e e. �1 e�-S =:.► i _ Gross Cooling Capacity i Efficiency - Full Load I Efficiency = Part Load Name .value _ Gross Cooling Capacity 89,000 btu/hr Efficiency - Full Load 11.2 EER Efficiency = Part Load 12.2 IEER ARI Rated Airflow 2,400 cfm Heat Input 150,000 Btu/hr Heat Output 120,000 Btu/hr MCA 19.5 MOP 30 Indoor Fan HP 1 Indoor Fan RPM 1750 Indoor Fan FLA 1.7 Outdoor Fan HP 0.7 Outdoor Fan RPM 1100 outdoor Fan FLA 1.8 Compressor 1• RLA _ _ _....__ 12.8 Compressor_1 LRA LAUbSCAAfhlL-, Base Unit Net Weight (Approx#) 821 lbs Unit Length 88-5/81, Unit Width 53-1/4" Unit Height 46-7/8" Filter Dimensions (4) 20x25x2 Clearance - Top 72" Clearance - Service Side 48" . Clearance,.-. Condenser Side,_______ _ " Clearance -; Ev-ap Side 36" Vi1G i 3�i1 � scale: V --20'-(r PROJECT: TENANT IMPROVEMENT 1170 ANDOVER PARK WEST, SEATTLE, WA OWNER: AEROGO 1170 ANDOVER PARK WEST SEATTLE, WA 98188-3909 (206) 575-3344 REVISIONS No changes shall he made to the scope of vrl-nk pr;or approval of a EuiSaing Division. I NO . lii! require anew pian submittal an J may i; c; uda additional plan review fees. l "'0 1 ti L_ VI I1L."I. ME ca" I ftrmlt g 0002 F1ar, raview a p rour3i is suoled to errors and orniasians. Approval of construction documents does not authorize the violation of 4 ny adopter code or ordinance. Receipt I of approved HoldCopy and conditions is acknowledged: ,,, „eaft ', _._..-...._.. _.._..__ tslBelaa•scraae• � . Date: % - aS -/!,. �� F SEA-NRE, INC: 34UPLAN© RD. Cityof Tuk M TilKVitli:A, WA 98199 . . itiAVE ANDRINQA, MGR Project Information WILDING DIVISION 5751 I i t MIDLAND DR n i f -- i a_ w Q _ D � TRILAND DR z W -REVIEWED_ FOR Ul PROJECT :00M, COMPLIANCE SITE APPROVED JAN 2 1 2016 V Jo S 180TH ST ' 90ILDING DIVISION r.o � Vicinity Pian NORTH O r,.: K. LVAD TRACK �C TAX- 10#: Surveyof that onion of Govt. Lot 1, Section 35, Twp. 23 N., Range 4E. W.M.in the King County, Wash., described as follows: t �; r Beginning at the northeast corner of said -Govt. Lot 1, thence N 87' 44' 08" W along the north line thereof, a distance of 949.49 feet; thence S -1' 51' 39" W, 383.34 feet to the northeast comer of o tract, of land conveyed to Westinghouse 1 -•� .r j Electric Corporation by deed recorded Feb. 10, 1970, under t Auditor's ' File No. 6618573 and the true point of beginning the tract herein described; thence N 88' 08' 21" W along t north line of said Westinghouse tract, 333 feet to the east 01 margin of Andover Park West; thence N 1' 51' 39" E, 276 feet t1 along said east margin; thence S 88' 08' 21 E 333 feet to a point lying N 1' 51' 39" E, 276 feet from the true point of S 1' 51' 39" W, .276 feet to the true point o£..,.•: beginning; thence ---•=� --- beginning. 1 PE-RIAIT :� �� F��: Legal Descri tion �ECE�vEO ILA 1 iMcChanica! JAN 0 6 2016 dumbing Al SITE PIAN, PROJECT- DATA PERMITCENTER. ;mss Piping A2 FLOOR PIAN c ; y of Tukwila 4i.►'; DlvlsloN T Sheet Index 4 ' \ Q+ FIRE HIDRAi : SPR! N ' T iz ,fit SEL � LD Unit V►lel Q + f 08e� 16s LAUbSCAAfhlL-, �i Z12 116,000 85,000 116,000 85,000 10.3 > ROOF • 1 I �JOO " t EXISTING PARKING 180,000 80% . 30.60 80% 30-60 I , f-i_.T PHIN Bett 12 x 15 Bett 12 x 15 3 3,800 14.0 3/16 3 3;800 1 14.0 3/16 r i ar x2 %/Copper (3)16x25 x2 3 20x25x2 %/Copper (3)16x25x2t 3 20x25x2 A/C2o_ Qr'- 2V rrVV tr ` 8 T..AL AN lka,` I_ 03 23.8 23.8 SCRLE I " = 201 Y 2/21 %/Co r ti `ENT AMI;l� tt � —[ S 4 t..1 s i. 3 g 208/230 .460 17.4 6.8::��. Vi1G i 3�i1 � scale: V --20'-(r PROJECT: TENANT IMPROVEMENT 1170 ANDOVER PARK WEST, SEATTLE, WA OWNER: AEROGO 1170 ANDOVER PARK WEST SEATTLE, WA 98188-3909 (206) 575-3344 REVISIONS No changes shall he made to the scope of vrl-nk pr;or approval of a EuiSaing Division. I NO . lii! require anew pian submittal an J may i; c; uda additional plan review fees. l "'0 1 ti L_ VI I1L."I. ME ca" I ftrmlt g 0002 F1ar, raview a p rour3i is suoled to errors and orniasians. Approval of construction documents does not authorize the violation of 4 ny adopter code or ordinance. Receipt I of approved HoldCopy and conditions is acknowledged: ,,, „eaft ', _._..-...._.. _.._..__ tslBelaa•scraae• � . Date: % - aS -/!,. �� F SEA-NRE, INC: 34UPLAN© RD. Cityof Tuk M TilKVitli:A, WA 98199 . . itiAVE ANDRINQA, MGR Project Information WILDING DIVISION 5751 I i t MIDLAND DR n i f -- i a_ w Q _ D � TRILAND DR z W -REVIEWED_ FOR Ul PROJECT :00M, COMPLIANCE SITE APPROVED JAN 2 1 2016 V Jo S 180TH ST ' 90ILDING DIVISION r.o � Vicinity Pian NORTH O r,.: K. LVAD TRACK �C TAX- 10#: Surveyof that onion of Govt. Lot 1, Section 35, Twp. 23 N., Range 4E. W.M.in the King County, Wash., described as follows: t �; r Beginning at the northeast corner of said -Govt. Lot 1, thence N 87' 44' 08" W along the north line thereof, a distance of 949.49 feet; thence S -1' 51' 39" W, 383.34 feet to the northeast comer of o tract, of land conveyed to Westinghouse 1 -•� .r j Electric Corporation by deed recorded Feb. 10, 1970, under t Auditor's ' File No. 6618573 and the true point of beginning the tract herein described; thence N 88' 08' 21" W along t north line of said Westinghouse tract, 333 feet to the east 01 margin of Andover Park West; thence N 1' 51' 39" E, 276 feet t1 along said east margin; thence S 88' 08' 21 E 333 feet to a point lying N 1' 51' 39" E, 276 feet from the true point of S 1' 51' 39" W, .276 feet to the true point o£..,.•: beginning; thence ---•=� --- beginning. 1 PE-RIAIT :� �� F��: Legal Descri tion �ECE�vEO ILA 1 iMcChanica! JAN 0 6 2016 dumbing Al SITE PIAN, PROJECT- DATA PERMITCENTER. ;mss Piping A2 FLOOR PIAN c ; y of Tukwila 4i.►'; DlvlsloN T Sheet Index LD Unit V►lel Q + f 08e� 16s LAUbSCAAfhlL-, �i 116,000 85,000 116,000 85,000 10.3 10.3 10.7 225,000 153,000 10.7 225,000 153,000 180,000 EXISTING PARKING 180,000 80% . 30.60 80% 30-60 I , f-i_.T PHIN Bett 12 x 15 Bett 12 x 15 3 3,800 14.0 3/16 3 3;800 1 14.0 3/16 r i ar x2 %/Copper (3)16x25 x2 3 20x25x2 %/Copper (3)16x25x2t 3 20x25x2 A/C2o_ Qr'- 2V rrVV _24" . 1/2 6,400 241'G' 1/2 6,400 S!T-E t L hN 23.8 23.8 SCRLE I " = 201 Y 2/21 %/Co r 2/21 %/Co tt � —[ S 4 t..1 s i. 3 g 208/230 .460 17.4 6.8::��. Vi1G i 3�i1 � scale: V --20'-(r PROJECT: TENANT IMPROVEMENT 1170 ANDOVER PARK WEST, SEATTLE, WA OWNER: AEROGO 1170 ANDOVER PARK WEST SEATTLE, WA 98188-3909 (206) 575-3344 REVISIONS No changes shall he made to the scope of vrl-nk pr;or approval of a EuiSaing Division. I NO . lii! require anew pian submittal an J may i; c; uda additional plan review fees. l "'0 1 ti L_ VI I1L."I. ME ca" I ftrmlt g 0002 F1ar, raview a p rour3i is suoled to errors and orniasians. Approval of construction documents does not authorize the violation of 4 ny adopter code or ordinance. Receipt I of approved HoldCopy and conditions is acknowledged: ,,, „eaft ', _._..-...._.. _.._..__ tslBelaa•scraae• � . Date: % - aS -/!,. �� F SEA-NRE, INC: 34UPLAN© RD. Cityof Tuk M TilKVitli:A, WA 98199 . . itiAVE ANDRINQA, MGR Project Information WILDING DIVISION 5751 I i t MIDLAND DR n i f -- i a_ w Q _ D � TRILAND DR z W -REVIEWED_ FOR Ul PROJECT :00M, COMPLIANCE SITE APPROVED JAN 2 1 2016 V Jo S 180TH ST ' 90ILDING DIVISION r.o � Vicinity Pian NORTH O r,.: K. LVAD TRACK �C TAX- 10#: Surveyof that onion of Govt. Lot 1, Section 35, Twp. 23 N., Range 4E. W.M.in the King County, Wash., described as follows: t �; r Beginning at the northeast corner of said -Govt. Lot 1, thence N 87' 44' 08" W along the north line thereof, a distance of 949.49 feet; thence S -1' 51' 39" W, 383.34 feet to the northeast comer of o tract, of land conveyed to Westinghouse 1 -•� .r j Electric Corporation by deed recorded Feb. 10, 1970, under t Auditor's ' File No. 6618573 and the true point of beginning the tract herein described; thence N 88' 08' 21" W along t north line of said Westinghouse tract, 333 feet to the east 01 margin of Andover Park West; thence N 1' 51' 39" E, 276 feet t1 along said east margin; thence S 88' 08' 21 E 333 feet to a point lying N 1' 51' 39" E, 276 feet from the true point of S 1' 51' 39" W, .276 feet to the true point o£..,.•: beginning; thence ---•=� --- beginning. 1 PE-RIAIT :� �� F��: Legal Descri tion �ECE�vEO ILA 1 iMcChanica! JAN 0 6 2016 dumbing Al SITE PIAN, PROJECT- DATA PERMITCENTER. ;mss Piping A2 FLOOR PIAN c ; y of Tukwila 4i.►'; DlvlsloN T Sheet Index