HomeMy WebLinkAboutPermit M16-0016 - HABIT BURGERS - ROOFTOP GAS CARRIERs 3
�. � � � k. � g gx
ii.
1� Y{${
I�� �� �- � b ��a
City of Tukwila
• k Department of Community Development
• 6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
Parcel No: 2623049070 Permit Number: M16-0016
Address: 17025 SOUTHCENTER PKWY Issue Date: 7/13/2016
Permit Expires On: 1/9/2017
Project Name: HABIT BURGERS
Owner:
Name: KTM GROUP LLC
Address: 2810 EASTLAKE AVE E , SEATTLE, WA,
Phone: (253) 939-9495
Phone: (206) 939-9495
Expiration Date: 11/20/2016
DESCRIPTION OF WORK:
INSTALL (1) NEW CARRIER 7.5 TON ROOFTOP GAS PACKAGE UNIT AND (1) NEW CARRIER 10 TON ROOFTOP GAS
PACKAGE UNIT WITH CURBS. NO DUCTWORK
Valuation of Work: $29,000.00
Type of Work: REPLACEMENT
Fuel type: GAS
Fees Collected: $703.18
Electrical Service Provided by: PUGEST SOUND ENERGY
Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
98102
Contact Person:
2014
Name:
DAWNA PETET
Address:
899 W MAIN ST, AUBURN, WA, 98001
Contractor:
2015
Name:
IECS INC
Address:
PO BOX 19252, SEATTLE, WA, 98109-
WA State Energy Code:
1252
License No:
IECS***044QL
Lender:
Name:
Address:
Phone: (253) 939-9495
Phone: (206) 939-9495
Expiration Date: 11/20/2016
DESCRIPTION OF WORK:
INSTALL (1) NEW CARRIER 7.5 TON ROOFTOP GAS PACKAGE UNIT AND (1) NEW CARRIER 10 TON ROOFTOP GAS
PACKAGE UNIT WITH CURBS. NO DUCTWORK
Valuation of Work: $29,000.00
Type of Work: REPLACEMENT
Fuel type: GAS
Fees Collected: $703.18
Electrical Service Provided by: PUGEST SOUND ENERGY
Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2015
National Electrical Code:
2014
International Residential Code Edition:
2015
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2015
WAC 296-466:
2014
Uniform Plumbing Code Edition:
2015
WA State Energy Code:
2015
International Fuel Gas Code:
2015
Permit Center Authorized Signature: W Date: A N �
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development rmit and agree to t e conditions attached to this permit.
Signature: Date:
Print Name:
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on.satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
11: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are
acceptable with the following concerns:
12: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be
separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance
#2437)
13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings
shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the
power source of the air -moving equipment upon detection of smoke in the main return -air duct served by
such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall
be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1)
14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437)
15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City
Ordinance #2437)
16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437)
17: All new fire alarm systems or modifications to existing systems shall have the written approval of The
Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been
obtained. (City Ordinance #2437) (IFC 901.2)
18: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required
for this project.
19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances
#2436 and #2437)
20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply
approval of such condition or violation.
21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention
Bureau at (206)575-4407.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1400 FIRE FINAL
0703
MECH EQUIP EFF
1800
MECHANICAL FINAL
0609
PIPE/DUCT INSULATION
0705
REFRIGERATION EQUIP
0701
ROUGH -IN MECHANICAL
0702
SMOKE DETECTOR TEST
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
htti)://www.TukwilaWA.go
SITE LOCATION
Site
Ten:
Mechanical Permit No. —
Project No.
Date Application Accepted: _-01(0-10
Date Application Expires:
use
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
Cevifey VW -e-
Kine Co Assessor's Tax No.: -2 LzoL4 - q 07D
Number: _L70a Floor:
New Tenant: ® .....Yes []..No
PROPERTY OWNER
Name:W-rno j 1, n l.• O ( 2
Address: [ J
City*5f He State: Zip: O
CONTACT PERSON — person receiving all project
communication
Name:
'
Address:
/
City: -all b ar V) State: /1' Zip:
✓'�_
Phone: x: /
l?
Email:
z
i
MECHANICAL CONTRACTOR INFORMATION
Company Name:
Address:
City: State:Wk Zip
Phone: q ax:
Contr Reg No - Exp Date: i f- Q —Ao
Tukwila Business License No.: B
Valuation of project (contractor's bid price): $ ? ()O
Describe the scope of work in detail: li) 5+Q- -7, 5 1 b -n
Gm�, po-c)y-afio wiA anA (N) Ncw 0aAAiP-X )o Tan Roo,�hp
CSS- pa ckaty ant un* CUU1,)J/,� . iVo of u N w 6T(6 .
Use: Residential: New .......... ❑ Replacement ........ ❑
Commercial: New .......... Replacement ........ ❑
Fuel Type: Electric..... ❑ Gas ....... Other:
H:\Applications\Forms-Applications On Line\2016 ApplicalionsWochanical Permit Application Rcviscd 1-4-16.docx
Revised: January 2016
Nee I of 2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <l OOk btu
Residential Nighttime
Furnace >I OOk btu
Industrial
Floor furnace
55 dB(A)
Suspended/wall/floor
mounted heater
57 dB(A)
Appliance vent
Commercial
Repair or addition to
heat/refrig/cooling
system
47 dB(A)
Air handling unit
<I0,000 cfm
65 dB(A)
Unit Type
7Qty
Air handling unit
>I0,000 cfin
Residential Nighttime
Evaporator cooler
Industrial
Ventilation fan
connected to single duct
55 dB(A)
Ventilation system
57 dB(A)
Hood and duct
Commercial
Incinerator — domestic
47 dB(A)
Incinerator —
comm/industrial
65 dB(A)
Unit Type
Qty
Fire damper
Residential Nighttime
Diffuser
Industrial
Thermostat
55 dB(A)
Wood/gas stove
57 dB(A)
Emergency enerator
Commercial
Other mechanical
equipment
47 dB(A)
R 0600P PKg
65 dB(A)
Boiler/Compressor Qty
0-3 hp/100,000 btu
3-15 h /500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Noise:
Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is
created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed.
For more details, see TMC 8.22
District of Sound
Producing Source
District of Receiving Property
Residential, Daytime*
Residential Nighttime
Commercial
Industrial
Residential
55 dB(A)
45 dB(A)
57 dB(A)
60 dB(A)
Commercial
57 dB(A)
47 dB(A)
60 dB(A)
65 dB(A)
Industrial
60 dB(A)
50 dB(A)
65 dB(A)
70 dB(A)
*Daytime means 7AM-IOPM, Monday through Friday and 8AM-1 OPM, Saturday, Sunday and State -recognized holidays.
A few sounds are exempt from the noise code, including:
Warning devices;
Construction and property maintenance during the daytime hours (lam -I Opm);
Testing of backup generators during the day.
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
H:\Applications\Forms-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 14-16.docx
Revised: January 2016 Page 2 of 2
DESCRIPTIONS
PermitTRAK
ACCOUNTQUANTITY
PAID
$567.95
M16-0016 Address: 17025 SOUTHCENTER PKWY Apn: 2623049070
$567.95
MECHANICAL
$540.90
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00 0.00
$32.50
PERMIT FEE
R000.322.100.00.00 0.00
$508.40
TECHNOLOGY FEE
$27.05
TECHNOLOGY FEE
TOTAL1 "4
11000.322.900.04.00 0.00
$27.05
'
Date Paid: Wednesday, July 13, 2016
Paid By: SEATTLE MECHANICAL
Pay Method: ACCOUNT
Printed: Wednesday, July 13, 2016 9:30 AM 1 of 1 CR
SY57EM5
DESCRIPTIONS • QUANTITY
PermitTRAK
PAID
$418.26
M15-0118 Address: 13028 INTERURBAN AVE S 100 Apn: 0004800017
$283.03
MECHANICAL
$269.55
PERMIT ISSUANCE BASE FEE R000.322.100.00.00
0.00
$32.50
PERMIT FEE R000.322.100.00.00
0.00
$237.05
TECHNOLOGY FEE
$13.48
TECHNOLOGY FEE R000.322.900.04.00
0.00
$13.48
M16-0016 Address: 17025 SOUTHCENTER PKWY Apn: 2623049070
$135.23
MECHANICAL
$135.23
PLAN CHECK FEE R000.322.102.00.00
TOTAL4'4
0.00
$135.23
Date Paid: Tuesday, January 26, 2016
Paid By: SEATTLE MECHANICAL INC
Pay Method: CHECK 9081
Printed: Tuesday,January 26, 2016 1:18 PM 1 of 1
rY ��g wsrsrtrns
INSPECTION RECORD -�-]
Retain a co with permit "00NO°
INSPECTION N0. copy PEi2MiT' N0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206)431 _367
Permit Inspection Request Line (206) 438-9350
NApproved per applicable codes. LJ Corrections required prior to approval.
COMMENTS:
Inspector: Dater l5;�
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
SE-PARATE PERMIT
REQUIRED FOR:
❑ Mechanical
[3-fIectricd
G-Rumbing
ft7-Cas Piping
City of Tukwila
1l.DING DIVISli
4
FILE COPY
Permit No. �o
Plan review approval is subject to errors and omissions.
Approval of construction documents does not authorize
the violation of any adopted code or ordinance. Receipt
of approved Meld py a co ditions is acknowledged:
By:
Date:
City Of Tukwila
BUILDING DIVISION
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tt Il ivila Building Division.
NO—t':--: R'sv'sions will require a new plan submittal
and may include additional plan review fees.
lil6-Oollo
REVIEWED FOR
COME COMPLIANCE
APPROVED
FEB 18 2018
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TU ILA
JAN 2 6 2016
PERMIT CENTER
f
Goo,gle earth
100
IPRI=#c4cilI
Permit see
M12 6 2016
11AAlt CENT'
MI
O
W
Z U
Z
O W
Q3
Z W
oZQw
Op
¢�?�
J
N
mW Or -O
CLI
Lj
QZQ W
02
O>cn=XO
Z N
Q Q W Z
N
/ Q Q
W H
/ / I
I
I
CD
'PROJECT#C4 t1}'
ECEIVE T:s'
TY I°— UIQ}t?€�5 �P--csa
4N 262'
ERPAIT CENTS tsar _
DATE: :
PERMIT
�1
I
I
I
CD
'PROJECT#C4 t1}'
ECEIVE T:s'
TY I°— UIQ}t?€�5 �P--csa
4N 262'
ERPAIT CENTS tsar _
DATE: :
PERMIT
�1
2012 Washinaton State Enerov Cede Cmmniinnra Pft , e fnr cn..,..,e.. ; ,1 r ._.._ o, _
--
Project Info
FIL
-- - ------ - --......-.......1 ....,,.r ^ ., .— - v awry r r. a rNQ Kevise0 June 2013
Project Address�pr Date / y _
Ao
i � W For Building Dept. Use
WA
Applicant Name:
..Q
Applicant Address:
urr_
Applicant Phone: � n
Project Description
Briefly describe mechanical
system type and features.
Includes Plans
lrnskiO � � N-� 0(y -r- t� -7 r 5 TUB 9 c�uf ion &aS � �k'5_ Ik.f.i
" F !�� �� (� � Mtw e� ,, R•OC�� 6v5, P�• tl&; 4
t �� � C�1.up
wL ,
Include documentation requiring compliance with commissioning provisions per Section C408.
Compliance Option
Equipment Schedules
�imple System Domplex System Oystems Analysis
The following information is required to be incorporated with the mechanical equipment schedules on the
plans. For projects without plans, fill in the required information below.
Cooling
Eq ui ment Schedule
Equip.
ID
Equip
Type
Brand Name' Model No.'
e
7G �9
Capacity'
Btu/h
OSA CFM
or Econo?
0
SE
o ER
IPLV3
Econmizer
Option or
Exception'
Heat
Recovery
YM
Q
Get, 5
, b
Al
Heating Equipment Schedule
Equip. Equip Capacity' OSA cfm
ID Type Brand Name' Model No.' Btu/h or Econo?
, 5T ' _ teen -
u
Heat
Input Btuh Output Btuh Efficiency' Recovery
Y/N
f80- �qg e a N
1.39 Al
Fan Equipment Schedule
Equip. Equip
ID Type Brand Name' Model No.' CFM SP' HP/BHP OWE PK%4- Fi3f
Service Water Heating Equip
ment Schedule U
Equip.
IDType
Equip
Brandf4amel
Model No.'
Input
Capacity
Sub
Category
EF'
P 9 G
r-ITY OF
.111 KWILA
JAR 2 6 2016
;; avanao;e. As testea according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as
applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV) or variable speed (VS). 6 Economiz 4qt���ur
Svstems C403.3.1 or Comolex Svstems C403.4.1. 7 Efficiencv Factor per Table C404.2. tl[7 1 ermTOT
2012 Washington State Energy Code Compliance Forts for Commercial, Group R1, and > 3 story R2 & R3
Revised June 2013
Project AddressC) 1 ��, t1_C1-7095 c Date la-_ _
The following information is necessary to check a mechanical permit appii for commercial provision compliance with the 2012 WSEC.
NOTE: Define print area in Excel prior to printing MECH CHK a es.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Buildin Department
9 P
Plans
Notes
GENERAL PROVISIONS
Equipment Sizing & Performance
C403.2.1
Load calculations
Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3
C403.2.2
Equipment and system sizing
Output capacity of heating and cooling equipment and systems do not exceed
calculated loads, note exceptions taken
C403.2.5
Minimum ventilation
Ventilation (natural or mechanical) provided per IMC; indicate mechanical
ventilation is capable of being reduced to minimum requirement per IMC
C403.2.3 &
Provide equipment schedules or complete MECH-SUM tables with type,
C403.2.3.2 &
Equipment minimum efficienc5
capacity, efficiency, test standard (or other efficiency source) for all mechanical
0403.2.12.1
equipment
C403.2.13
Electric motor efficiency
Provide equipment schedule with hp, rpm, efficiency for all motors; note except.
C403.2.10
Fan power limitation
Fan system motor hp or bhp does not exceed limits per Table C403.2. 10.1 (1)
C403.2.10.3
& C403.2.13
Fractional hp fan motors
Indicate fan motors 1/12 to 1 h are ECM
P type or meet minimum efficiency req.
C403.2.3
Ma ac um air cooled chiller
Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit
C403.2.1
Non -standard water-cooled
Full-load and NPLV values for water-cooled centrifugal chiller adjusted for non-
chillers
standard operational conditions
C403.2.12.1.2
Centrifugal fan cooling towers
Large capacity cooling towers with centrifugal fan(s) meet efficiency
requirements for axial fan open circuit cooling towers
C403.2.3
Forced air furnace and unit
heaters
Indicate intermittent ignition or IID, flue/draft damper & jacket loss
4-
C403.2.3.3
Packaged electric
heating/cooling equipment
List equipment required to be heat pumps on schedule
0403.2.3.4
Humidification
Indicate method of humidification (note requirements for systems with
economizer
HVAC System Controls & Criteria
C403.2.4.1
Thermostatic controls
Indicate locations of thermostatic control zones on plans, including perimeter
systems
0403.2.4.1.1
Heat
heat pump supplementary
Indicate staged heating (compression/supplemental) & outdoor lock-out temp
C403.2.4.2
Setpoint overlap (deadband)
Indicate 5"F deadband minimum for systems controlling both heating & cooling
C403.2.4.3
Automatic shutdown setback and
Indicate zone t-stat controls with required automatic setback & manual override
C403.2.4.3.3
Automatic (optimum) start
Indicate system controls that adjust equip start time to match load conditions
C402.4.5.2 &
Dampers
Indicate location of OSA, exhaust, relief and return air dampers; include AMCA
C403.2.4.4
rated leakage and control type motorized or gravity; note exceptions taken
C403.2.11
Heating outside a building
Indicate radiant heat system and occupancy controls
C403.2.4.5
Snow melt systems
Indicate shut-off controls based on outdoor conditions
C403.2.4.6
Combustion heating
equipment Indicate
modulating or staged control
C403.2.4.7
Group R1 hotel/motel systems Indicate
method for guest room automatic setback & set-up of 5°F
minimum
C403.2.4.8 / g
Group R2/R3 dwelling unit Indicate
5-2 programmable thermostats in primary spaces with minimum of two
systems
setback
nods; note exceptions taken
C403.2.5.1 Demand
controlled ventilation Indicate
high-occupancy spaces and systems requiring DCV
C403.2.5.2 Occupancy
sensors Indicate
spaces requiring occupancy-based system control and method; or
alternate
means provided to automatically reduce OSA when Parballv occupied
Enclosed
loading
C403.2.5.3 dock/parking
garage Indicate
enclosed loading dock and enclosed parking garage ventilation system
ventilation
activation
and control method
C403.2.5.4.1 Kitchen
exhaust hoods Indicate
kitchen hoods requiring make-up air; indicate make-up air source and
conditioning
method
C403.2.5.4.2 Laboratory
exhaust systems Indicate
lab exhaust systems requiring heat recovery, method & efficiency; or
alternative
method taken (VAV, semi-conditioned makeup, or CERM calculation)
C403.2.6.1 Energy
systems
recovery - ventilation Indicate
ventilations stems requiring ER, method & efficien
y cy; note exceptions
C403.2.6.2
recovery - condensate Indicate
s
EEnergy
on-site steam heating systems requiring enc
9 Y rgy recovery
C403.2.6.3
recovery -condenserIndicate
�
remote refri condensers requiring ER and use of ea tured energy
g• P
Mechanical Permit Plans .age
2012 Washington State Energy Code Compliance Fortes for Commercial, Group R1, and > 3 story R2 8 R3 Revised June 2013
Project AddressDate
The following information is necessary to check a mechanical permit application commercial provision compliance with the 2012 WSEC.
NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Plans
Building Department
Notes
G9V93Al2PF0ASON$'OONT1NU®
HVAC System Controls & Criteria, Continued
C403.2.12
Variable flow control -
fans/pumps
Indicate fan 8 pump motors requiring VF control & method (VSD or equiv
controls
C403.2.12.1
Variable flow control - cooling
towers
Indicate cooling tower fans requiring variable flow control and method
C403.2.12.2
Large volume fan systems
Indicate fan systems requiring airflow reduction based on heating and cooling
demand; or exception taken
C403.2.12.2
Single zone AC systems
Indicate method of cooling demand -based fan control for sys. > 110,000 btuh
C403.2.4.10
DDC system capabilities
Identify all DDC system input/output control points and indicate capability for
trendinand demand response setpoint adiustment
Ducting Systems
C403.2.7.1 &
C403.2.7.3
Duct construction Indicate all ductwork constructed and sealed per IMC, C402 leakage
requirements and IBC vapor retarder requirements
C403.2.7.3.11 -21
Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans
C403.2.7.3.3
_?Htest
High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test
results to jurisdiction when completed
0403.2.7.1 / 2
Duct insulation Indicate R -value of insulation on ductwork
Piping Systems
C403.2.8 Piping insulation
Indicate R -value of insulation on piping
C403.2.8.1 Piping insulation exposed to
weather
Indicate method of protection from damage/degredation
SIM PLESYSM S
Qualifying Systems
C403.3 Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, does not
systems have active humidifcation or simultaneous heating/cooling
C403.3 Qualifying 2 -pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits
systems
C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3
Simple System Economizers
C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched.
C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception
C403.3.1.1.3 Air
i cols conomizer high limit Indicate high limit shutoff control method per Table C403.3.1.1.3(2)
C403.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for systems with capacity
o eration > 65,000 btuh
0403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s)
OONI PLDCSY5M S
Complex System Economizers
C403.4.1
Air economizer required Indicate
cooling systems requiring economizer controls; note in equip sched.
C403.4.1.4
impact
Economizer heating system
Verify control method of HVAC systems with economizers does not increase
building heating energy usage during normal operation
C403.4.1.3 Integrated
operation
economizer Indicate
systems
capability for partial economizer operation for air or water econo
Moved
Water economizer capacity Indicate
water econo capable of 100% cooling capacity at 50°F db/45°F wb
OSA
C403.4.1.2
pressure drop ter economizer maximum Indicate
precooling coils and heat exchangers do not exceed pressure drop limit
C403.3.1 Air
economizer exceptions Indicate
eligible exception(s) taken and provisions to comply with exception(s)
r 2012 Washington State Energy Code Compliance Forms for Commercial, Group Rl, and
Project Address I �J r� f 1�7 e ,. I,
201
I ne following Information is necessary to check a mechanical permit app ication k rdmerciai provision compliance with the 215121 WSEC.
NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicablity Code Section Code Provision Location on Building Department
(yes,no,na) Information Required 9 P
Plans I Notes
��iSYSMS(own NUE)
Specific System Requirements
Indicate method of multi -stage or variable control for building cooling system
AVI
0403.4.2 & 0403.2.12
Variable flow control - fans
Indicate fans requiring variable flow control and method
systems
capacity > 300 tons
C403.4.2.1
VAV fan static pressure
Indicate sensor locations on plans; include at least one sensor per major duct
C403.4.7
Hot gas bypass limitation
Indicate cooling equipment unloading or capacity modulation method
sensors
branch
C403.4.3
Large capacity boiler systems
C403.4.2.2
VAV fan static pressure
Indicate fan system static pressure setpoint based on zone requiring most
0403.4.3
Boiler sequencing
setpoint
pressure
0403.4.5
JVAV systems serving multi-
Indicate supply air systems serving multiple zones that are required to be VAV,
zones
method of primary air control, and zones served; note exceptions taken
through chillers & boilers when not in use
C403.4.5.4
VAV system supply air reset
Indicate controls that automaticaliv, resat eunnly sir I— c..e�
Variable flow control - pumps
Indicate pumps requiring variable flow control & method
C403.4
Large capacity cooling
Indicate method of multi -stage or variable control for building cooling system
systems
capacity > 300 tons
C403.4.7
Hot gas bypass limitation
Indicate cooling equipment unloading or capacity modulation method
C403.4.3
Large capacity boiler systems
Indicate multi -stage or modulating burner for single boilers > 500,000 btuh
0403.4.3
Boiler sequencing
Indicate automatic controls that sequence operation of multiple boilers
0403.4.3.5
Chiller! boiler plant pump
Indicate capability to automatically reduce overall plant flow and shutoff flow
isolation
through chillers & boilers when not in use
0403.4.2&
0403.4.3.6
Variable flow control - pumps
Indicate pumps requiring variable flow control & method
0403.2.12.1
Variable flow control - cooling
& C403.4.4
towers
Indicate cooling tower fans requiring variable flow control and method
C403.4.3.4
Hydronic system part load
Indicate heating & chilled water systems have the capability to automatically
controls _
reset supply water temp AND reduce flow by 2 50% fors stems > 300,000 btuh
C403.4.3.2
Two -pipe changeover
Indicate deadband, heating/cooling mode scheduling and changeover
systems
temperature range
0403.4.3.3.1
Water loop heat pump -
Indicate capability of central equipment to provide min. 20"F water supply temp
deadband
deadband between heat rejection and heat addition modes
C403.4.3.3
Water loop heat pump - heat
Provide heat exchanger that separates cooling tower and heat pump loop in
rejection
Climate Zone 5
C403.4.3.3.3
Water loop heat pump -
Indicate 2 -way isolation valve on each heat pump and variable flow control for
Isolation
systems with total Pump power > 10 h
0403.4.6
Condenser water heat
recovery
Indicate system provided to pre -heat service water and efficiency
0403.5
Cooler /freezer - anti -sweat
heaters
Indicate w/sf & control method for walk-in cooler/freezer door
anti -sweat heaters
0403.5 / 6
Cooler/ freezer -evaporator
ad den fan
Indicate motor p
type for evaporator and condenser fans < 1 hp
SM1AC>�WATE�HEATING
Service Water Systems
C404.2 Water -heating equip min.
Provide equipment schedule or complete MECH-SUM table with type, capacity,
efficiency_efficiency,
test standard or other efficient source
0404.3 Temperature controls
Indicate temperature controls have required setpoint capability
C404.4 Heat traps
Indicate piping connected to equipment have heat traps on supply & discharge
C404.5 Insulation under water heater
Indicate R-10 insulation under tank
0404.6 Service water piping
Insulation Indicate
R -value of Insulation on piping; note exceptions taken
Circu
0404.7 / 8 trace ationshut- systems and heat Indicate
trace shutoff
shutoff capability based on occupancy and periods of limited demand
C404.9 Group R-2 service hot water Indicate
Meters
method of usage metering for dwell. units served by central HW system
Pools & In -Ground Permanently Installed Spas
A C404.10.1 Pool heating equip min. Provide equipment schedule or complete MECHSUM table with type, capacity,
V efficiency efficiency, test standard (or other eff. source); heat pump heaters z 4 COP
C404.10.1 / 2 Pool heater on / off controls Indicate automatic onlof control based on scheduling & accessible on/off switch
on heater that operates Independent of thermostat setting; or exception taken
C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required
C404.10.3 Pool assembly Insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F
0404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy
use
T
Carrier
united Technologies
SUBMITTAL
Project
-Untitled10
Date
Monday, January 11, 2016
t4l *a.- 001
FILE
RE�%fiEWED FOR
CGDE CQMPLIANCE
APPROVED
FEB 3 8 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
JAN 2 6 2016
PERMIT CENTER
Table Of Contents
Project: -Unfitledl0
PrBnarAd Rv• 01/11/2016
7.5 ton gas pk......................... .
CertifiedDrawing .................... ....._......... ._.... .........................
......... .......... ....... --- ----...._....._._....._._......._._...
PerformanceSumma
_......._._....._...... _......_._.._.........._._...........5
Unit Feature Sheet......................................................................................
.
SpecSheet ... ......................
_......_...._...................
_.._....._.._.....__......._........._
................... 13
Packaged Rooftop Builder 1.39w Page 2 of 13
Project: -Untitled10 7.5 ton gas pk 1/2016/1
Prepared By: 01/1107:/2016
7.5 ton gas pk
Tag Cover Sheet
Unit Report
Certified Drawing
Performance Report
Unit Feature Sheet
Spec Sheet
Packaged Rooftop Builder 1.39w Page 3 of 13
Project: -Untitled10 Unit Report For 7.5 ton gas pk
/11/2016!
Prepared By: 0107 09AM
Unit Parameters Dimensions (ft. in.) & Weight (lb.) —
Unit Model: .. .......... 48TCED08A2A5-0A0A0Unit Length:. -. --.--_...........-_......---.-......_......_.._.T 4.125"
Unit Size: ....... ....................... .... ........ 08 (7.5 Tons) Unit Width: ..... .................... _......... ...... _....._.......... 4' 11.5"
Volts -Phase -Hertz ....._............_....208.3-60 Unit Height:.... _ ......3' 5.25"
_......._ _......._.__.. _....
Heating Type: ......................... Gas ... Total Operating Weight:....... 7083 Ib
..................
Duct Cfg:.................... Vertical Supply / Vertical Return
Medium Heat ••• Weights and Dimensions are approximate. Weight does
Round Tube Plate Fin Coils not include unit packaging. Approximate dimensions are
provided primarily for shipping purposes. For exact
dimensions and weights. refer to appropriate product
data catalog.
Lines and Filters
GasLine Size.. ..............__ ... _ ----------- -----
--.----- -- ............... 314
Condensate Drain Line Size: ...............
. -- ---------- .............. 314
Return Air Filter Type: - __ -
_ ...... .-Throwaway
Return Air Filter Quantity: .... ...... __ .....
..... .................. ._.__..._......4
Return Air Filter Size: ..... ......... ....... .................
....16 x 20 x 2
Unit Configuration
Medium Static Option (Belt Drive)
AI/Cu - AI/Cu
Base Electromechanical Controls
Standard Packaging
Warranty Information
1 -Year parts(std.)
5 -Year compressor parts(std.)
10 -Year heat exchanger - Aluminized(std.)
No optional warranties were selected.
NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods.
Ordering Information
Part Number
48TCEDO8A2A5-OAOAO
Description Quantity
Rooftop Unit 1
Base Unit
Medium Static Option Belt Drive
None
None
Accessories
- -
CRECOMZRO69A00
CRRFCURB003A01
LOW LEAK - Vertical EconoMi$er 1
14 -inch Tall Roof Curb 1
Packaged Rooftop Builder 1.39w Page 4 of 13
Project:—Untitledl0
nor[s
1. DIN[x51ORs ARE IR IRC... DIN[NGIOn1
Int 1 A,E Ix ❑Et IxE I[pR.
!. CE"ER 0! 4RAY1rr
3. M$� DIRECTION Of AIR IEPI
5 ton gas
01/11/2016
elm
-CONNECTION
i4 I DIA PEPPIER SUPPLY K�Iogl
1 314' 1511 DIA GAUSI ACCESS PLUG
0.
K IT
Elf. u
IaL
Q
0
`IA ,_ / I IliRETURR
,,�L m
!1M COIL
111 ,\ZY,I„ I i ..
BACK11W
,,,SUPPLYILY
11 Sill IRS A
I'
IISIP11.14�I _ il.!.
TCLff'D PI -311 CORIERI��� o ■
111►_. t 7All
111W L 0 00
114.111LEFT 11,21AIRFRONT IINT A 11 UP
P k
ac Aiw-u rc4x5nvp 6ullver Titres
Page —5of 13
Project:-Untitledl0 Certified Drawing for 7.5 ton gas pk
1/2016 01/1
Prepared By. /107:09AM
oNir[D
"II1V C.1RR1[9 r r [yYrpjjllei t wlr�Yi`f�vn�i ttip yr ortr Yrrvwr un uY rr� nr r I
sLYDARO DPII 11[10X1 IS Ill 1 fDA DAS NINp gI�XD01rnmcm rt
t0A OlN[R DNIIONS AYO ACCt5f0xi[S, Rfr[9 to": NI x0 t DATA CAIALOD [
CORNER A
CORNER B
B
CORNEA D R LOANER C
TOP
Q
r
:00 00•
FROM
i
"" dBTC 08-1? SINGLE LONE EICCiA ICAL E8TM500985
sarR 03-0810 11 �2eYf08 COOLING WIiH GAS HEAT FY
Packaged Rooftop Builder 1.39w Page 6 of 13
Project:-Untitledl0 Certified Drawing for 7.5 ton gas pk
Prepared By: 01/11/2016
07:09AM
Service Clearance
LOLAn"N-
DIMFN11ON
CONDITION -
e61n 3139 mm
. INR dhccmact is.."" m nN
361n 11 mm
. It dbneyUrsB b; Hart 306 mm
A
1tNn X167 mml
NO anw.-t calweraence OUtIN o4dm
_ .ltemmmeridetl senbcm— line NewrkscmWrherl
11an 3D6mm
.Nleimwlt detran¢ man»IratdtetscrtwdrMer
D6M 911 mm
. INet eaatamzer
B
]Ian 306 mm
. It d91anw1n" N 364n 24 mm
swces 16 "hes aHkR hood
C
364.(914-1.
9dt cwrxvnate dslln is lend
_
167n /97mm
. Nl6bnun deruQ
D
e6bt II39 mn
elan 1067mm
36Nt 911 mm
Spedal
. N9 corn meta 6 tam
.Iufece lnMrtd NctaCerb rpmded e. .,mRa4ma wM.1IpDIer ledt
Uinmd se mm is Ntetrka he e. „wtnd. fl less
I R;;*M*Wsa Mtj"0 all a'eNxs wdNt lDh cttMs lmtrs
gtmlance..1
appocetbn plenNrti caa h"d tsft" m a w"I..1 demmn.
Packaged Rooftop Builder 1.39w
Page 7 of 13
Project:-Untitledl0
ton gas
01/11/201
fmal s
.c>fsaanv
NIO
,
Lwsrtno raNeRT"u
nrraa3a®v,
��
p"
Kva"�m'
y, an.
naimEarre
mno w
Pei�v+ffmm�a
�enwamwvaRnw�
oenswmva
na[n®onon Nns►+�r ,wp,.nMr
trzryz>frvr vrTM wr
I/tiWv
r"� a
e�eT
1W
atm
noxa
pmq
wr
pq
w"
:w
¢�eir owss
1�1
ars
ar1T
+W
W4
rau
1=9
Mil
sa,omw[s�
owae 0
aaiT
averne,m
T
lslY
RTlIM
%AEVV9"
am"rrt
��
/S>sv
1W
W9
]MLP
Pm9
1513@
p@q
(113ET
NW
1
/e06taR6>♦ / T/4iG4(1�F�
ISIS
1MC
nv
fT
nnact
fELDMVFUEO
i
T
SEEVIEW'Er
RA
rELDRR3 q
CBMFEODRAV44G
n�a
—
— — ��
none fi /I uyeao'eraoc,
a
g
rme�sas>t
emvwL3Trw,�tw,3avtc,
'15�,3i9P,Y1 . w.nc
= eo�c
�'B11° - -
,LeAse vmre"`@ m
`
wo CURB SY.ROOF
- Lw.voumt �.
a�iaanlz
_
D c
alto �
R� � I�9aw1®ly
9YlF mol
M
Packaged Rooftop Builder 1.39w
Page B of 13
Performance Summary For 7.5 ton gas pk
Project: �Untitled10 0
Prepared B 1/11/2016
07:09AM
Part Number:48TCED08A2A5-OAOAO
ARIEER: ........... _...................................... .............._....
11.00
IEER:._.......................................... _......_.......__............_- ---._......._........._......__.....
--- _._.....11.7
Base Unit Dimensions
Ib
UnitLength:.- ...................._........_............... ._....... ....._._ ......
in
Unit Width:
_......-..88.1
................................. ......
UnitHeight: ------ ............
_...59.5 in
....... ........ .......... ............ ....... ........ ..............-.
Operating Weight _....... ...................
-....._......... 41.3 in
Base Unit Weight ............ .......... _..............
Ib
MediumHeat: ._.........._....._..............-- -........................_.................-_......__............................__
_...._ .....835
........_................. 15 lb
Medium Static Option (Belt Drive):----_
................. Belt
.............._......._ .......... ............... ....._......-- -
Accessories
15 Ib
LOWLEAK - Vertical EconoMi$er:................................_.._...... --------------- ..............
-........... ......................._.._..._........-- Ib
14 -inch Tall Roof Curb:
- _.......75
143
.................
................... _.................... ............... ...................... .......
Ib
TotalOperating Weight: ..............._...................... - ..............----......---....................................._............_.................
......... .........1083
Ib
Unit
_ 420
CFM
Unit Voltage -Phase -Hertz: ..................... ................_..-..-.. -
85.0
F
AirDischarge: ...._.............. ........................--- --------.----- -...
_.._..208-3-60
Vertical
F
Fan Drive Type: ...............................
_..........._............ ..... 23.0
F
ActualAirflow:_-----...._
................. Belt
F
............ ............ ._.-...-_......__......-
Site Altitude:
_......__...._............ - ..........3000
CFM
..........................................................
449
ft
Cooling Performance
CondenserEntering Air DB:........ .......................... - ..................._............._............---
----- - - ...............................
F
Evaporator Entering Air DB: ....... .................. .. ...... ......
........._.........---- ----.85.0
77.3
F
Evaporator Entering Air WB: ... .......... ............_.........................__...................._......
-------
64.1
F
Entering Air Enthalpy: ............................
F
Evaporator Leaving Air DB:
29.49
BTU/Ib
............................................ ......_..........-
EvaporatorLeaving Air WB :..
55.6
F
......................... ................. _....................... ................
Evaporator Leaving Air Enthalpy:
.......__._... _......_............ ........................... .54.0
F
......
GrossCooling Capacity:
.............22.73
BTU/Ib
--- ......... _........._...........................................
Gross Sensible Capacity: ...................__
_............... ..89.75
MBH
...........
Compressor Power Input:...
_... - ....... _...... - 69.13
MBH
--------- ..................................... ..................... -
Coil Bypass Factor:
_....... 5.60
kW
------------------------- ------------------------- -
-- ....0.104
in wg
Mixed Air
Outdoor Air Airflow:
............ __ ........... ..... . .
Outdoor Air DB:_..................
_ 420
CFM
_................................
OutdoorAir WB:
85.0
F
_...................._._..... _............__..........._..
Outdoor Air Htg. Temp.: ........................._......__._...................
65.0
F
_.. -
Return Air DB:....-
_..........._............ ..... 23.0
F
...................----.._.......
._...._.
Return Air WB.-..................
__.......... ............. ...76.0
F
.................... .......................... .........................................._.-........
ReturnAir Htg. Temp.:
64.0
F
................... ..........................._.........._....._.. ......_........._....
70.0
F
Heating Performance
HeatingAirflow:----------------------------
...................... -_..._.......... ...................._-..
...................
Entering Air Temp:........_...._._.........._.._....._......._
_...................-.................._.._..__...._.. _.....3000
CFM
...........................__..
Leaving Air Temp: ..........
. 63.4
F_.......__.....-
........ ..._................ .-...._....._.............. --.........._........................__..__._.................._..........__.109.8
Gas Heating Input Capacity:
F
...._............_..._... ......_........ .....................__._............
Gas Heating Output Capacity:....._...._
_......__...........120.0 / 180.0
................ .
MBH
..._...._..-....._.
Temperature Rise:
.
...._._........._......... ......... ........ _... ........... ........
......................
...... ............ ..... 46.4
F
Supply Fan
External Static Pressure:
....................................
Options / Accessories Static Pressure
.... ..__........._...__...........................---- 0.70
in wg
Economizer: ............................. .......... ..........................
_....0.11
in wg
Packaged Rooftop Builder 1.39w Page 9 of 13
Project: -Untitled10 Performance Summary For 7.5 ton gas pk
/11/2016
Prepared By: 0107 09AM
Total Application Static (ESP + Unit Opts/Acc.):... ....... 0.81 in wg
_............ _...... ... _...... _. _.......
Fan RPM: ........................................ - - ....- ....... - - --............................................_ Fan Power:.-..._.................. .............................................
........_........................_...... _ ....._.._..... ... -........
._._........................_...823
NOTE:......... ..- . . 1.95
BHP
........elected
IFM RPM Range: 733 - 949
Electrical Data
Discharge
Voltage Range:-------------- ._................
187-253
Compressor#1 RLA:.
........_.......--._..................._......._...-------- .....--- .......
Compressor#1 LRA:
13.6
.............. ....................... ................. ..
Compressor #2 RLA:................................ .......
..83
13.6
Compressor#2 LRA: ..................... ...__....._.-..... .........................._....................._..-....-
------- ...----- --- ..--.-..
Indoor Fan Motor Type: .......... ...- .... .__...._-----.....-................ .... ..... ....._.....
---....-- --- .----- ..................---83
.... _......._..------...----
Indoor Fan Motor FLA: ---------- ----_----- ......................._.............._...................._._....._...
..----- .................................MED
. _......._................ 8.4
Combustion Fan Motor FLA(ea):... ............................ ....-_.......----- .--
.
0.48
PowerSupply MCA:......................................................................-------- _...-...._..........._........................................_.._..........42
78.7
Power Supply MOCP (Fuse or HACR):
68.3
.......... ............... . -
DisconnectSize FLA:...
_...50
.......... ...................... .................
DisconnectSize LRA: ............................_......._............._............. _........._..
_._._......._......_.......44
.............._... ._.._..._ 246
ElectricalConvenience Outlet:. - ..................._......._._......._..........................--........................_..........
...... _.-..........._..
Outdoor Fan [Qty / FLA (ea)]:.............................................. ............ -
----.._---------- ..........None
211.5
Control Panel SCCR: 5kA RMS at Rated Symmetrical Voltage
Acoustics
Sound Power Levels, db re 10E-12 Watts
Advanced Acoustics
Advanced Accoustics Parameters
1. Unit height above ground: ................ ...........__-------- _.........30.0 ft
2. Horizontal distance from unit to receiver:... ........ 50.0 ft
3. Receiver height above ground: ............................................ ft
4. Height of obstruction: ............................................ ...0.0 ft
5. Horizontal distance from obstruction to receiver:...._ 0.0 ft
6. Horizontal distance from unit to obstruction:... ............ 0.0 It
Packaged Rooftop Builder 1.39w Page 10 of 13
Discharge
Inlet
Outdoor
63 Hz
98.6
95.7
85.8
125 Hz
91.8
86.9
84.3
250 Hz
78.9
74.6
80.5
500 Hz
71.4
67.1
78.7
1000 Hz
68.3
64.4
76.4
2000 Hz
67.0
59.5
72.7
4000 Hz
68.3
59.0
68.3
8000 Hz
71.2
58.4
65.1
A -Weighted
80.2
75.2
82.0
Advanced Acoustics
Advanced Accoustics Parameters
1. Unit height above ground: ................ ...........__-------- _.........30.0 ft
2. Horizontal distance from unit to receiver:... ........ 50.0 ft
3. Receiver height above ground: ............................................ ft
4. Height of obstruction: ............................................ ...0.0 ft
5. Horizontal distance from obstruction to receiver:...._ 0.0 ft
6. Horizontal distance from unit to obstruction:... ............ 0.0 It
Packaged Rooftop Builder 1.39w Page 10 of 13
Performance Summary For 7.5 ton gas pk
Project:-Untitled10 0
Prepared 6 1/11/2016
07:09AM
Detailed Acoustics Information
Octave Band Center Freq. Hz
63 125 1250 1500 1 1k 8k Overall
A
85.8 84.3 80.5 78.7 76.4 65.1 89.6 Lw
B
59.6 68.2 71.9 75.5176.4- 64.0 81.4 LwA
15---
C
53.4 51.9 48.1 46.3 44.0 32.7 57.2 L
D
27.2 35.8 39.5 43.1 44.0 - - - 49.0 LpA
Legend
A Sound Power Levels at Unit's Acoustic Center, Lw
B A -Weighted Sound Power Levels at Unit's Acoustic Center, LwA
C Sound Pressure Levels at Specific Distance from Unit, Lp
D A -Weighted Sound Pressure Levels at Specific Distance from Unit, LpA
Calculation methods used in this program are patterned after the ASHRAE Guide; other ASHRAE Publications and the AHRI
Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed
that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical
estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be
appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate
an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an
Acoustical Engineer or a person with sound prediction expertise should be consulted.
Fan Curve
rn 1.4
3.
4-
4
02-
0
02
Go
m
00
04 OB 12 16 20 24 28 32 36 40 44
AAOOHW(CFM-tf10usands)
RPM=823 BHP -=1.95 Maximum"M=1400MaxirnumBHP=4.70
Note: PleaseconWapphcahonengineermgforselechmsoutsidetheshadedmVon.
SC-SystemCurve RP-RatedPoint
Packaged Rooftop Builder 1.39w Page 11 of 13
1lamm
�FiPM
I
1
7MF M
\
\
✓90�F�AA
�-`,
\
A
1
1
;.2
3.00B P
L�
Go
m
00
04 OB 12 16 20 24 28 32 36 40 44
AAOOHW(CFM-tf10usands)
RPM=823 BHP -=1.95 Maximum"M=1400MaxirnumBHP=4.70
Note: PleaseconWapphcahonengineermgforselechmsoutsidetheshadedmVon.
SC-SystemCurve RP-RatedPoint
Packaged Rooftop Builder 1.39w Page 11 of 13
Unit Feature Sheet for 7.5 ton gas pk
Project: �Untitledl0
Prepared By: 01/11/2016
07 09AM
WeatherMakee — 48TC
PACKAGED ROOFTOP GAS HEATINGfELECTRIC COOLING UMTS
3r 4r 5r 6, Tor &Ee 10, 124 15 TONS
OptmzutLo nwedHalGuardSzovn
WEATHERMAKER SERIES
WeatherMaker (48TC) units are one-piece gas heating, electric
cooling units that are pre -wired and charged with Puron
(R-410) refrigerant. They are factory tested in both heating
and cooling modes, and rated in accordance with AHRI
Standards 2101240 (04-06 sizes) and 3401360 (07-16 sizes).
WeatherMaker units are designed in accordance with UL
Standard 1995, and listed by the Underwriters" Laboratories.
Approved and certified by:
Cu�US
�a
��F•
w•
C\SSI/US
Certified to ISO 9001
STANDARD FEATURES INCLUDE:
• Puron (R -410A) HI C refrigerant
•
ASMAZ 90.1 energyconpkant
• Soma compressors with internal line break and overload Protection
• Single -stage 000Fng oaPaeityconiralon 01-12 mode
• Twa stage cooling caPaeftY0Dr colon 08-16 rrpdtis
• SEER's up to 13.0. EER s uc tb 11.1 end IEER's up to 11.8
• .Actft r" nehigeront matering system
•
Exclusive non-ca"Pswecompositeoondtnsatepan inaccurdaneewith
ASHRAE Standard 62, sloping design, side arcenterdrain
• Stondard cooring operation up to 115'17(46'C)and down to 40'F (1•C)
- down to 25' F (4'C) with winter start kit.
• Pre-pawdedextevior Panels and pronercoatedvnteriorpanehtested to
500 hours salt spray protection
• Fuayinsulated cabinet
• Exclusive IGC solid-state eontmifor on -board diagnostics with LED
*nor code designation bumercontrollogic arid energy saving indoor
fen motor daisy
• Low KIN models that meatCoWamis Air Gustily Management
• Induced draft gas host combuationdesign
• Redundant gas voNeswith lip tohwoStages ofheating
• Lowpiessure and high pressure switdh protected.
111AFNTENANCE FEATURES:
• Accessoanelswith easygrp handles
• Innovative easy starting, no4ft avews on unit access panels
• Two-inch disposable mtumsiri ttrsandToo4hssfmhraccessdoor
• Mact Drive ECM on 3 to 5 ton (.5 voltage only) models and belt drtve
evaporator -fan motor and puhycombinstions avahble on as models
• New terminal board foefteting simple safetycircuii troubleshooting and
simplified control box arrangement
• Exclusive 10Cs0id-st8te control for onfioarddiagnostics with LED
error 0ode designation, burner control logia and energy saving indoor
fan motordelay.
INSTALLATION FEATURES:
• 7rn i-the-bottomPowerentayppabdity
•
Single point0asand elect* connections
• Full perimeter base rem with bumt-in rigging adapters and nark slats
•
Feld convertrblehomvertcoltohorizontslsi%wforslab mounting.
(16 sin models require field installed supply duel: cover).
STANDARD WARRANTY-
• 10-yearhestexchenger—l5-yeersta>Tkssateeloptgn
• 5-ytarconpressor
• i-yearP.rta
• 3�earparts on Navatlon Condenxrc0ms_where avamable
• fAenyoptlonalupgradas*Soavailable
OPTIONS INCLUDE BUT ARE NOT LMWtED To-
• PremerLink- and RTU Open Mufti -Protocol DDC ControE
• SuPPhand Retum Air smoka Detectors, high statio motors
• Louvered condenser comguards
• Economcer. disconnect and convenience Pullet options
• Stainless Steel hostexMangeroption
• Carrosionresistant coo Cooling.
• FlumldiMrZZef adaptive dehumldiftstionsystem evaliableanall
mpdelswith RTPF condensereoms— Moor Master eontrollerkncluded
• "ingodamuspeneR
fp a o>lnod•ssorrosaa aro a�na!res ltd! bt✓te onpaul JaN+..aagp Ar tide arK
Packaged Rooftop Builder 1.39w Page 12 of 13
Project:-Untitled10 Spec Sheet for 7.5 ton gas pk
01/11/2016
07:09AM
Packaged Rooftop Builder 1.39w
Page 13 of 13
Carrier
United technologies
SUBMITTAL
Project
Untitled 10
Date
Monday, January 11, 2016
141b-ooI�
FILE
REVIEWED FOR
CODE COMPLIANCE
APPROVED
FEB 18 2016
City of Tukwila
13UILDING DIVISION
RECEIVED
CITY OF TUKWILA
JAN 262016
PERMIT CENTER
Project: -Untitled10 Table Of Contents
01/11/2016
07:12AM
10 ton gas pk........................ ....._._........_................_..._....._.....................
-- -.........__........._........._
Unit Report .......................................................
................__............... _... 3
_......__........._......................_..........._...............
Certified Drawing......_.................._...................._........-.._._.........
__..._... _.........._......._..4
.
._... __..._.....-
Performance Summary.. ... .................. ......................
.._..........._....._.......
_..... ...............__......._....._ . _5
- ..... __.........._............._....
Unit Feature Sheet ................. ...........
_......_........ _._........9
_ ........... _._ _....._ ......_...... _.
Spec Sheet..........................---...--
...........................................................
... _......_..._ ....._...._..._....._....... 12
. __._....................
13
Packaged Rooftop Builder 1.39w
Page 2 of 13
Project:-Untitled10 10 ton gas pk 0
Prepared B 1/11/2016
07:12AM
10 ton gas pk
Tag Cover Sheet
Unit Report
Certified Drawing
Performance Report
Unit Feature Sheet
Spec Sheet
Packaged Rooftop Builder 1.39w Page 3 of 13
Unit Report For 10 ton gas pk
Project:-Untitled10 01/11/2016
Prepared By: 07.12AM
Unit Parameters
---- .. .................... 3/4
Dimensions (ft. in.) & Weight (lb.) ***
Unit Model:.... ............ _ ..................
48TCED12A2A5-0A0G0
Unit Length:.............. _............. _........__......... 4.125"
Unit Size: --------- _......... ... .._...._......................
....... 12 (10 Tons)
_.T
Unit Width:...... 4' 11.5"
Volts -Phase -Hertz:.......... ._.........._
................... .--- ..208-3-60
Unit Height: ...... _ ...._.. __..... _... _. 1.375"
Heating Type: ............ ...... ...... ....
....... .................... ........... _Gas
..._ ..... .__.4'
... Total Operating Weight:, .......... Ib
Duct Cfg:....._............. Vertical Supply / Vertical Return
_...........1211
Medium Heat
"' Weights and Dimensions are approximate. Weight does
Round Tube Plate Fin Coils
Accessories
not include unit packaging. Approximate dimensions are
CRECOMZR069AOO
provided primarily for shipping purposes. For exact
1
CRRFCURB003AO1
dimensions and weights, refer to appropriate product
1
data catalog.
Lines and Filters
Gas Line Size:... .... ............. _ - _
---- .. .................... 3/4
Condensate Drain Line Size: ..__...............
........._._...._ .3/4
Return Air Filter Type: ..... .............................Throwaway
1
Return Air Filter Quantity: _........ _ .......
4
Return Air Filter Size: ...... ..... ........ .............
20 x 20 x 2
Unit Configuration
Medium Static Option (Belt Drive)
AI/Cu - AI/Cu
Base Electromechanical Controls
Standard Packaging
2 -Speed indoor fan motor controlled by VFD
Warranty Information
1 -Year parts(std.)
5 -Year compressor parts(std.)
10 -Year heat exchanger - Aluminized(std.)
No optional warranties were selected.
NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods.
Ordering Information
Part Number
Description
Quantity
48TCED12A2A5-OAOGO
Rooftop Unit
1
Base Unit
Medium Static Option Belt Drive
None
2 Speed Fan Controller VFD
Accessories
CRECOMZR069AOO
LOW LEAK - Vertical EconoMi$er
1
CRRFCURB003AO1
14 -inch Tall Roof Curb
1
Packaged Rooftop Builder 1.39w Page 4 of 13
-Unti0edl0
for 10 ton gas
MollI_
I
01/11/201
CONNECTION SIZES
+ lln' IJJI OIA !IIID ICX[R SUPPLY HCLf
D r III' 1611 CIA PUIIfR SUPPLY XXOCX0U1
1 311' 1511 DIA GAUL[ ACCESS PL UL
D Ile' Irrl DIA PAPE CONIRUL RIRIx4 NDLI
[ LI•al X11 COm[XSAIL CRAIX
I lr'I Pr 4A5 COXXICIIOx
1: 1.11 xIi 4A5 CONN[CrION
ISII CIA POR[R SUPIII Rlml OUr
CRBrxP11R001A414A5 Ix RU CASIPAX FHRD THE -RASE CHART !FIELD INST1
[SE x01[5 R[W IR[D POR US[ Nlru A[C. RIPS.
;
I /'uP.f A0E0 AIR( Rm N01[
LMDU11 sit( US[ sl r[s 111 1
ur- AcO. rT' ar.❑
• r00i.0011 PCW[R 11)11' 111.11
I • 10011 J1+" fP 4A5 1 Jll' 111,11
100}1 P9Dr10[5 JI I' !Pl +HRU CURD
f IA XG( t !1111 X4. NDP[ 511[. }• (50.81
TNRU-iHE'BASE LHART fF IOPI
ro9 ••x9u-rxress[rAx• r.noRl on lDx,
n *r1x4s me ann Y. I, { r ARI r9Dn1m
is eum u5}[D w4u4.. mD
• e[rxiiuoesi r.:Ar ]111:11 ieoiis°ru rl
IeN[C, S�Oe
are
uoll
nu[R
COxO[NSA 1[
09AIX
Al
RflX
AIR
rA Jn iUISICE
IJP In 110{1 }e I9
IJJII SUPPLY AIR I{J!i
91
0011511
Jnl r— 00 11511
rxsl slvr ve – L s ve I
n 5511 t1 r7 111!1 n6n _
— v nnl nn1 61 ]e A.J1e
LCYAfl
EFT Ilial 9f ile 11 JJ1 Il bl
ICix 161/0 1T Jle
1 ]rJe! iUPIIP 110151 B..WFr91c
FRONT I° nqure en�u
RIGHT
d8TC 08 12 SINGLE LONEELECTRIC AL
I m r 030810 _ 11.24
x-08 __ COOLING WITH GAS HEAT 48TM 500985
ra ,[cages Koormp tswlaer 1.39w - Page 5 of 13
11111°sl Piro
J
OP"CAR I�
'Am"
iNODOR et 0x[9
CC [SS
❑srusmIAILI.
Dncoxxm
�–x.xmL
NAXDL[�
�jJ
01/11/201
CONNECTION SIZES
+ lln' IJJI OIA !IIID ICX[R SUPPLY HCLf
D r III' 1611 CIA PUIIfR SUPPLY XXOCX0U1
1 311' 1511 DIA GAUL[ ACCESS PL UL
D Ile' Irrl DIA PAPE CONIRUL RIRIx4 NDLI
[ LI•al X11 COm[XSAIL CRAIX
I lr'I Pr 4A5 COXXICIIOx
1: 1.11 xIi 4A5 CONN[CrION
ISII CIA POR[R SUPIII Rlml OUr
CRBrxP11R001A414A5 Ix RU CASIPAX FHRD THE -RASE CHART !FIELD INST1
[SE x01[5 R[W IR[D POR US[ Nlru A[C. RIPS.
;
I /'uP.f A0E0 AIR( Rm N01[
LMDU11 sit( US[ sl r[s 111 1
ur- AcO. rT' ar.❑
• r00i.0011 PCW[R 11)11' 111.11
I • 10011 J1+" fP 4A5 1 Jll' 111,11
100}1 P9Dr10[5 JI I' !Pl +HRU CURD
f IA XG( t !1111 X4. NDP[ 511[. }• (50.81
TNRU-iHE'BASE LHART fF IOPI
ro9 ••x9u-rxress[rAx• r.noRl on lDx,
n *r1x4s me ann Y. I, { r ARI r9Dn1m
is eum u5}[D w4u4.. mD
• e[rxiiuoesi r.:Ar ]111:11 ieoiis°ru rl
IeN[C, S�Oe
are
uoll
nu[R
COxO[NSA 1[
09AIX
Al
RflX
AIR
rA Jn iUISICE
IJP In 110{1 }e I9
IJJII SUPPLY AIR I{J!i
91
0011511
Jnl r— 00 11511
rxsl slvr ve – L s ve I
n 5511 t1 r7 111!1 n6n _
— v nnl nn1 61 ]e A.J1e
LCYAfl
EFT Ilial 9f ile 11 JJ1 Il bl
ICix 161/0 1T Jle
1 ]rJe! iUPIIP 110151 B..WFr91c
FRONT I° nqure en�u
RIGHT
d8TC 08 12 SINGLE LONEELECTRIC AL
I m r 030810 _ 11.24
x-08 __ COOLING WITH GAS HEAT 48TM 500985
ra ,[cages Koormp tswlaer 1.39w - Page 5 of 13
Project:-Untitledl0 Certified Drawing for 10 ton gas pk
Prepared BY: 01/11/201
IMI I� 0®�
Immum m�f�i�Q7���®
SEEMI®®mMMMM®0®®®M,300I
MUNI ���El3�t1l�1
�'mm�tT�n'm�irmmum
FRONT
.co VO I COOLING WITH GAS HEAT
CORNER C
Packaged Rooftop Builder 1.3gw
Page 6 of 13
J
FRONT
.co VO I COOLING WITH GAS HEAT
CORNER C
Packaged Rooftop Builder 1.3gw
Page 6 of 13
J
Project:-Untitledl0
ton gas pk
Service Clearance
LOCATION
DIMENSION
CONDmON Wlel
4DAI w9—
. oft dbemnm D rnpaRed m eel
3fit1 914mm
. If em . Ism" R 12in IDS mm
•
36411(457 mm)
• Ne dsctre m ztmtrtenze ouHe tDDtn
• R![gIRl mded ler9RtdetrteR azl el![hiCscrr*m k )
124n IDS nim
I6h1 914 mm
•MW*—de4rna:e use m4eutl ratchet atrew�dhor
.1114[ Ms etarla mm
B
12A IDS mm
.IfdelwDM.t DIWn !mm
tl
•Clledl saecesd s ]PR uMl ezh ah healx Mod
C
3fi7n 914 mm
• Sde mrder6tte drain If uRd
Ib In 457—
•6M1innan de4rallze
46[1 1219 mm
. ND ttYts Dint 5 6 mMrw
42dn 1067 nm1
•Sudtte 4l*Id sersAnvis e. ., InKN. wtl, tnather unit
D
I6h1 14mm
.9uftse servlcer0 e4ctrlu etnmdRth! ..hoed, Itsf
IPecfal
edurtha WMne lfezh th hle/:s wRltn lDJl dMes unR's
f/DIE:Ilnlf not
desltnMbha.•
ft. cum
.a........... �_.
__.. _.�.._,...a — a.......—..�.,
tpp9tttF4n gtmryoverhetddme tla, arvMif4l detnnns.
01/11/2016
Packaged Rooftop Builder 1.39w
Page 7 of 13
Project:—Untitledl0
A IUB
1
=f
a
ng for 10 ton gas
ORIECItig(pAdC ti0�ttt�p,tff
T/iU11ECllB
tsemawrmam namaeonva
01/11/2016
Ol4ffRC R �WiA /�,�MpAgg�
Q111EIMINipOtEC,Ry
Wnarpr „ap,.nran ,me.,w, ,a7,,.,co,
taK
WS
`11Q
A
�A
LI�
IW
W1
>
Z
r /
B61K
n�a
!2
nnnn
i
SEEVIEw"E'
CBMFgDDRAVAW
ow.ams®naMcaimm
CURBASYROOF
naa
Packaged Rooftop Builder 1.39w
Page 8 of 13
K������00K���- ���
unuUeU1O ��K�����gas p-
Pnmn.qwmm" 01/11/201
ARI EER:
�---.--'----'-
�
....... ....... ....... __
8EER:--'-_.___ -----'-�---��---
-� ' ---'- -' �i�Q
----------'-----'--'-------'-
-------- ----.......
Base Unit Dimensions
Unit
Unit Width:
in
--------------------
�Unit9
�� in28.1
Operating Weight
49.4 in
Medium Heat: ----_------'---------' ---
-�----'--------'--------�940 Uz
-------------- --'
Med�mStobnOpUon0JekDrive):-----------'---
—`-'-----
--'------ -�- —'- 18 lb
'
Controller FC): - --'-'---'------'
2Speed Fan CpnbnU�
'---------�-' -�-' �� U�
���mmAccessories--'--�-'-------' ----�--�
--� -'---------��----- -'-on U»
LOW LEAK ' Vertical EcnnoMi$oc
14�nchToURoof Cu�� --�--------------------'-------'
'--------------�75 Un
___________---_--143
Un
Total Operating Weight:, ...........
..... _....... ____---- .....
_..... _.... _____--_-----i211 lb
Unit
Unit Voltage -Phase -Hertz:
-------------'---
Discharge:Air
'3'60
8�«
Fan Drive -
Vertical
Airflow:Actual
Belt
..... ....... .......
Site Altitude: .-
4000 CFM
.........
'--'--------_--�-'
'----w9 ft_
--_--_-------'----'--------
Cooling Performance
Condenser
.......
Evaporator
Evaporator
Evaporator
4� F
......EnteringEnteringEnteringEnthalpy:LeavingEvaporator
LeavingEvaporator a~---.'- -'-'_----_---_-'---_'---------------_-'_'-�----
53.6 F
Gnzmu
'---_------�---'----�---'_�------_'''�
ro�w BTU/Ib
-�
MBH
96.23 MBH
_
Co8Bypass Foc�c----____
�v� hV�__`_`_`_
-0.066
��d A�
Ou�nnrAkA�nw�---'--'
Outdoor Air
wom CRN
VumoorA�VB�-'--.
--8�0 F
-'
--'--
Ou�norA�H�.7emp� ----'
---
6�0 F
Re�mA�DB�.---' '�-
-��0 F
'-'-----------
--------'-
Re�mA�WB: ----
76-0 F
����--'-_-�-_--�_-_-_------_----'--'_--'----_--_---_-'-'_------_------_----_-----_---_-_------_-_---_'_-'------_---'-_-----_------------__---_----�-_----'--�--_--�_--'''----''�_-'-----
Rm�mA�H�.7emp�_
-6�p F
----'-'---
______._�__��__________...____-_'_70�
-F
Heating Performance
..�-
Entering
4000 CFMLeavin-
� __
65.1 F
�
Goo Heating Input
108.4 F
_k-----'__'---
Gen __g_ '`----
1mw�/oo�u MBH
Temperature Rise:
147�/18�U MBH
--_''-_'-------_-'-__'--'---'--_----'----�
----�----'-'---'-------'---''-
-----
----�--_�
--------------4�3 F
Supply Fan
Ex�mm|S�UnP�umuno:--------.-
tsUo
-2�--O
----
---'��0 �wg/Ance000r�o
Performance Summary For 10 ton gas pk
Project: �Untitled10 01/11/2016
Prepared By: 07.12AM
Economizer: ----- .................. ..................................... ...... .........-........_____ ........................0.20 in wg
Total Application Static (ESP + Unit Opts/Acc.):__........ .......... ............................._....._................_._............................. .....1.00 in wg
FanRPM: ...-_......-........ __ ............................... ......... ...........__............ ...... ... _..... ......... ........ _....... _.............. _.997
FanPower:._ ....... ... .........._....__ _.....__._._...............__......__..... .......... ._............... .- ....._.............. __,_.2.65 BHP
NOTE: ........... _........_ _._... ._.._....._......... _...... ............... ............Selected IFM RPM Range: 838 -1084
Electrical Data
VoltageRange: ... _.._.__...._............_.......... .._ .._.._...... _....... _ ....
187-253
Compressor#1 RLA:..................... ................._........ .......-.. _. _....._ ...._......_
_...._.._. _ ... _..............__.._ ......................15.6
Compressor#1 LRA: ._......._......._ ................._.._........._ ....__..... __..........................
_...._......_........_..... _...............
Compressor#2 RLA :............_.........._....-......_......__....._......................_ ..........._.......
_.110
_..... __....... _ .__.................. _ .._.._......_15.9
Compressor#2 LRA: ......... _.__................................................_..............._.-_....
...._..................... 110
Indoor Fan Motor Type: ...._..... .__...._._............................_._._..................._ ............
_
......._.......
...._...........__ ....... MED
Indoor Fan Motor FLA:...... _. _
__...
.... _....... ED
Combustion Fan Motor FLA (ea):... . ..... ...... _
_ . ._........
Power Supply MCA:... _ . .......... ............. _ ...
........
_ . .......
Power Supply MOCP (Fuse or HACR) .... ... ._.. .....
..........50
_..........._...... __-.....
DisconnectSize FLA: .........._........._.......__........_..............._........_ ......................
_ ......_.60
_ . _....._...._.............. _ ...... 52
.
Disconnect Size LRA:........_._._.._.._..............._...._.............._....._..... ........_.._....._..._
................. .
......__....___........_....._.._......
Electrical Convenience Outlet: ................ ........._.............._._.._....._......_...........................__......_............__.._.............
...... ..............305
None
OutdoorFan [Qty /FLA (ea)]:__.................................................._..._......_............................._...
..................................211.5
Control Panel SCCR: SkA RMS at Rated Symmetrical Voltage
Acoustics
Sound Power Levels, db re 10E-12 Wafts
Advanced Acoustics
Advanced Accoustics Parameters
Discharge
Inlet
Outdoor
63 Hz
97.9
94.7
89.0
125 Hz
94.2
87.6
83.1
250 Hz
80.8
72.5
80.5
500 Hz
74.8
67.9
78.5
1000 Hz
71.1
65.7
75.5
2000 Hz
68.5
61.4
71.6
4000 Hz
71.8
61.7
69.6
8000 Hz
73.4
59.9
69.3
A -Weighted
82.3
75.4
82.0
Advanced Acoustics
Advanced Accoustics Parameters
1. Unit height above ground: ........... ....................
30.0
ft
2. Horizontal distance from unit to receiver.
ft
3. Receiver height above ground: ......__._....._............ ..........
5.7
ft
4. Height of obstruction:................................................................0.0
ft
5. Horizontal distance from obstruction to receiver:.....
0.0
ft
6. Horizontal distance from unit to obstruction:
0.0
ft
Packaged Rooftop Builder 1.39w
Page 10 of 13
Project:-Untitledl0 Performance Summary For 10 ton gas pk
01/11/2016
Prepared By:
07 12AM
Detailed Acoustics Information
Octave Band Center Fre . Hz
63 125 25015001 1k 2k 4k 8k Overall
A
89.0 83.1 80.5 78.5 75.5 71.6 69.6 69.3 91.0 Lw
B
62.867.071.975.375.572.870.668.281.1LwA
C
56.6 50.7 48.1 46.1 43.1 39.2 37.2 36.9 58.6 L
D
30.4 34.6 39.5 42.9 43.1 40.4 38.2 35.8 48.7 L A
Legend
A Sound Power Levels at Unit's Acoustic Center, Lw
B A -Weighted Sound Power Levels at Unit's Acoustic Center, LwA
C Sound Pressure Levels at Specific Distance from Unit, Lp
D A -Weighted Sound Pressure Levels at Specific Distance from Unit, LpA
Calculation methods used in this program are patterned after the ASHRAE Guide; other ASHRAE Publications and the AHRI
Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed
that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical
estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be
appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate
an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an
Acoustical Engineer or a person with sound prediction expertise should be consulted.
FanCurve
c in ,p JL4�+�,�.,� 35 42 48 54
Airft Y(CFM-µ# MAJCJI &,)
RPM=997BHP=2.65Mw mlunRPM=1400MaximumBHP--4.70
Note: Pleasecontactapphcationengineeringforseledionsoutsidetheshadedregion.
SC-Sys[emCurveRP-RatedPoint
Packaged Rooftop Builder 1.39w Page 11 of 13
X -
16
10M*M
v
�
f
14
2
0M
!- t -Y._ 1 -
_I f ri. 1 1
c in ,p JL4�+�,�.,� 35 42 48 54
Airft Y(CFM-µ# MAJCJI &,)
RPM=997BHP=2.65Mw mlunRPM=1400MaximumBHP--4.70
Note: Pleasecontactapphcationengineeringforseledionsoutsidetheshadedregion.
SC-Sys[emCurveRP-RatedPoint
Packaged Rooftop Builder 1.39w Page 11 of 13
Project:-Untitledl0
nit Feature Sheet for 10 ton gas pk
�`a rrce
0
WeatherMakee — 48TC
PACKAGED ROOFTOP GAS HEATINGIELECTRIC COOLING UMTS
3, 4, 5, 6, 7.5, ti.5, 10, 12.5, 15 TONS
000II1I LOUVered Hail Ouard Shom
C J
WEATHERMAKER SERIES
WeatharWker (487C) units are one-piece gas heating, electric
cooling units that are pro -tared and charged with Puron
(R-410) refrigerant. They are factory tested in both heating
and cooling modes, and rated in accordance with AHRI
Standards 210040 (0446 sizes) and 3401360 (07-16 sizes).
WeatherMaker units are designed in accordance with UL
Standard 1995, and listed by the Underwriters- Laboratories.
Approved and certified by:
C1 UL Use
e
rarw»+giwewe
mwve wwr.
rwrrrreaavnn.
��eprw.•e�v.
M e"rY.•�1'� b YkM1Yr1Y
•rb
C\flit/UL4
CeNti ed to ISO 9001
STANDARD FEATURES INCLUDE
• Puron (R� 10A) HFC refrigerant
• ASHRAE90 ,
90.1 enalpycompromt
•Sm" oonpressors with intemst8nebreak and overload Protection
• Singlestsge Coolie oepe
• 7wo-stage cooling apa�cmrboon 08-15 lmadets
• SEER's up to 13.0. Mrs up to 11.1 and IEEn up to 11.8
• Acutrol" refrigerant metering system
• Exclusive xron.00nosive cOmpastte condensate panin accordance with
ASHRAE Standard 62, Moping design, side oroenterdrain
• Standard cooling operation up to 115'F (46'C) and down to 40,P(4 IC)
- down to 25' F (-e' C) with winter start kit.
' P"sintedeuderiorponets and p+inercosted interiorPanels tested to
$00 hours salt spray protection
• Fully insulated cabinet
•
Exclusive I(iC SOM-state control for on -board diagnostics with LED
error code designation bUmeTcontrol logic and energy saving indoor
fan motor delay
• Low NOx models that most Caltfomis Air OuaFity Monagemont
• Induced draft gas heat combustion design
Redundant gas valves with up to two Mtagesof hosting
Low pressure and high pressure swlotn protected.
MAINTENANCE FEATURES:
• Access panels with easy grip handles
• Innovative easy starting, no-shtp act*" on unit access panels
• Two-inch disposable return akfiyers and TooNess fRtar access door
• Direct Drive ECM on 3 to 5 ton (.5 voltage only) models and belt drive
evaporator -fan muterand pulbycombinationsaveftble on aernpd
simplified els
• New terminal boar! facilitating simple safety circuit troubleshooting erM
simped control box arrangement
• Erohusive IOC solid-state control or On -board diagnostics with LED
error code designation, bumercontrol logic and energy saving indoor
IBM motor delay.
INSTALLATION FEATURES:
• Thru.thebotlompowerentrycopsbfiiy
' Single point gas and electric connections
• Full perimeter base nil with bultt-in rpping adapters end fork slats
• Field convertble fromvertioN to horimntelawl9pwor slab mounting.
(16 sin models require field installed supply dud cover).
STANDARD WARRANTY.-
• 10-yearheatexchanger—l5-yearstainlesssteel option
• 5-yearcompRssor
• 1-yearports
• 3-yearparts on fPvation Condenseroais—where available
• NlenyoptionaluPgradeselsoavafable
OPTIONS INCLUDE BUT ARE NOT Ll1YlITED TO:
• PnvnisrLink- and RTU Open f lu"Wtowl DDC Controls
• Supply and Return AirSmoke Detectors, high static motors
•
Louvered condensercorlguards
• EconomQer, disconnect and convenience ouletoptions
• Stainless Steel heat exdnangeroption
• Corrosion resistant coacooling.
• Humidi-We adaptive dehumidification system avMgable an all
models with RTPF condensercolls— f otor Mester I Controllerincluded
• KnVedaccess Panels
ftx a CQmplkral afapxrs and a.cassules rtes Dae proerq>?ae C>esop lar t'!t urri
01/11/2016
07:12AM
Packaged Rooftop Builder 1.3"
Page 12 of 13
Project: -Untitledl0 Spec Sheet for 10 ton gas pk
01/11/2016
07:12AM
Packaged Rooftop Builder 1.39w
Page 13 of 13
STRUCTURAL
CALCULATIONS
Habit Burger - RTUs
FILE 17015 Southcenter Parkway
Tukwila, Washington
JANUARY 19, 2016
REVIEVftu FOR PREPARED FOR:
djWE CpMPLIANCE Seattle Mechanical
APPROVED 899 West Main street
Auburn, Washington 98001
FEB 18 2016
City ofTUkwila
BUILDING DIMS10",
P s..E 1111
1 ►ti4' . � � Cr1 t
■
w 18959
PREPARED RV-.
Moore Engineering Group
21902 96th Avenue SE
Snohomish, Washington
Moore
Engineering
Group
K16%.001
�
� .CEIVED
CITY 01'-' TUKWILA
JAN 2 6 2016
PE'RFAIT CENTER
GENERAL STRUCTURAL NOTES:
1. ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO
THESE NOTES AND THE INTERNATIONAL BUILDING CODE (IBC), 2012 EDITION.
2. DESIGN LOADING CRITERIA:
ROOF LIVE LOAD ..................... 25 PSF
MECHANICAL UNIT ..................... RTU -1-1,211 POUNDS
RTU -2 —1,083 POUNDS
EARTHQUAKE .......................... SDs = 0.968
SITE CLASS C to D
WIND .................................. 85 MPH, EXPOSURE B
3. STRUCTURAL CALCULATIONS AND SKETCHES SHALL BE USED IN CONJUNCTION
WITH MECHANICAL DRAWINGS FOR BIDDING AND CONSTRUCTION. CONTRACTOR
SHALL VERIFY DIMENSIONS AND CONDITIONS FOR COMPATIBILITY AND SHALL
NOTIFY ENGINEER OF ALL DISCREPANCIES PRIOR TO CONSTRUCTION.
4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES AND
CONDITIONS PRIOR TO COMMENCING ANY WORK. ALL DIMENSIONS OF EXISTING
CONSTRUCTION SHOWN ARE INTENDED AS GUIDELINES ONLY AND MUST BE
VERIFIED. THE EXISTING CONDITIONS SHOWN ON THE SKETCHES ARE BASED
EITHER ON SITE OBSERVATION, ORIGINAL DRAWINGS OR WERE ASSUMED BASED ON
EXPECTED CONDITIONS. IF THE EXISTING CONDITIONS DO NOT CLOSELY MATCH
THE CONDITIONS SHOWN ON THE SKETCHES, OR IF THE EXISTING MATERIALS ARE
OF QUESTIONABLE OR SUBSTANDARD QUALITY, NOTIFY THE ENGINEER PRIOR TO
COMMENCING ANY WORK.
5. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND
STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN
COMPLETED IN ACCORDANCE WITH THE DRAWINGS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE
METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED FOR THE
COMPLETION OF THE WORK.
7. FRAMING LUMBER SHALL BE KILN DRIED OR MC -19, AND GRADED AND MARKED IN
CONFORMANCE WITH W.C.L.B. STANDARD GRADING RULES FOR WEST COAST
LUMBER NO. 17. FURNISH TO THE FOLLOWING MINIMUM STANDARDS:
JOISTS: (2x MEMBERS) HEM -FIR NO.2 Fb = 850 PSI, Fv = 150 PSI
JOISTS: (4x MEMBERS) HEM -FIR NO. 1 Fb = 975 PSI, Fv = 150 PSI
8. TDABER CONNECTORS CALLED OUT BY LETTERS AND NUMBERS SHALL BE "STRONG-
TIE- BY SIMPSON COMPANY, AS SPECIFIED IN THEIR CATALOG NO. C-2015. INSTALL
NUMBER AND SIZE OF FASTENERS AS SPECIFIED BY MANUFACTURER. CONNECTORS
SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
9. ALL PRESSURE -TREATED (P.T.) WOOD MEMBERS SPECIFIED ON THE PARTIAL
FRAMING PLAN SHALL BE PRESSURE -TREATED WITH COPPER AZOLE CA -B (HEM -FIR a al
ONLY), OR ALKALINE COPPER QUAT (ACQ-C FOR DOUGLAS -FIR, OR ACQ-D FOR HEM- t
FIR) PRESERVATIVES UNLESS OTHERWISE NOTED. AMMONIACAL COPPER ZINC o.
ARSENATE (ACZA) PRESERVATIVE, OR OTHER PRESERVATIVES WITH AMMONIA
CARRIERS, SHALL NOT BE USED.
10. SHEET METAL SCREWS SHALL CONFORM TO THE AMERICAN IRON AND STEEL
INSTITUTE (AISI) "SPECIFICATIONS FOR THE DESIGN OF COLD -FORMED STEEL
STRUCTURAL MEMBERS".
11. WOOD SCREWS SHALL CONFORM TO ANSI/ASME STANDARD 818.6.1.
12. CONNECT THE METAL CURBS TO THE ROOF STRUCTURE WITH #10 x 2" LONG WOOD
SCREWS ATA MINIMUM OF 24" ON -CENTER. PLACE ONE SCREW AT 6" TO 8" FROM
EACH CORNER OF THE UNIT AND THE REMAINING SCREWS EQUIDISTANCE BETWEEN
THE SCREWS AT EACH CORNER.
13. CONNECT THE UNITS TO THE METAL CURBS WITH #10 SHEET METAL SCREWS AT A
MINIMUM OF 24" ON -CENTER ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6"
TO 8" FROM EACH CORNER OF THE UNIT AND THE REMAINING SCREWS
EQUIDISTANCE BETWEEN THE SCREWS AT EACH CORNER
N
m
a
A
K-, P)r, --
A-Fr RcY- FbDT-PIZ4
0E -
PROJECT: ENGR:
%-- I /-\v � 4 111(s
lEnaineerina, Hp, -BI -T- DATE: I/f q1l &
Group SCALE: SHEET
PROTECT DESCRIPTION: The project consists of two new rooftop mechanical units.
LOADS: LIVE 25 pSF
DEAD Roofing and re -roof 50
1/2 Plywood sheathing
1.5
2x6 Q 24" o.c.
1.1
4x14 @ 8' o.c.
1.5
Insulation
1.0
MEP
2.0
Ceiling & Lights
2.0
Total Dead 14.1
DEAD + LIVE
85 mph, Exposure B
SEISMIC
39.1 PSF
Moore PROJECT: ENGR: K'"
ECngineering RA Us BURGER DATE: I/ 18i 16
Group SCALE• SHEET
Latitude
47.451
Longitude
-122.263
Site Gass
C to D WA DNR
SDs =
0.968
EQUIPMENT
RTU -1
RTU -2
Unit
1,068
940
Curb
143
143
Total
1,211 pounds
1,083 pounds
Dimensions
88"x59"x63" high
88"x59"x63" high
Moore PROJECT: ENGR: K'"
ECngineering RA Us BURGER DATE: I/ 18i 16
Group SCALE• SHEET
' Design Maps Summary Report
Page 1 of 2
a(= Design Maps Summary Report
User -Specified input
Report Title Habit Burger
Fri January 15, 2016 23:21:34 UTC
Building Code Reference Document 2012 International Building Code
(which utilizes USGS hazard data available in 2008)
Site Coordinates 47.4510N, 122.263°W
Site Soil Classification Site Class C - "Very Dense Soil and Soft Rock"
Risk Category I/II/III
PLO JUNG
REN 110 N
mp(>Frr,},
evri,r�r>� 'tento+n
vashort•,,� iA
SEATfLF�
'rACOVA 1YTL
ARPQRTDes mokla,
.HO!
.I cel
i *Cent
- L Ovington
USGS-Provided Output
S. = 1.452 g Sm = 1.452 g Ss = 0.968 g
S, = 0.541 g Sm, = 0.703 g So, = 0.469 g
For information on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the application and
select the "2009 NEHRP" building code reference document.
1.cs
1.so
1.zs
1.20
1.05
0.30
0.75
0.60
0.45. F
0.30
O.1S
0.00
0.00 0.20 0.40 0.60 0.90 1.00 1.20 1.40 1.60 1.90 2.00
Period T (sec)
MCER Response Spectrum
1.10Design Response Spectrum
1.00.-
0.90..
0.20
O.TO
0.60
0.50
0.40.-
0.201.
0.20 r.\
0.10
0.00
0.00 0.20 0.40 0.60 0.90 1.o0 1.20 1.40 1.60 1.90 2.00
Period T (sec)
http://ehp 1-earthquake.cr.usgs.gov/designmaps/us/summary.php?template=minimal&latitu... 1/15/2016
Unit Report For 10 ton gas pk
Project -�Untitledl0 01/1112016
Prepared
07:12AM
Unit Parameters Dimenslons (ft. In.) & Weight (lb.)'"'
Unit Model: ................ 48TCED12A2A54A0G0 Unit Length: ....................... ___ ........... _......... ..._._T 4.125"
Unit Size: ................................................... ....12 (10 Tons) Unit Width: .......................... -- ------....--..............-.4' 11.5"
Volts -Phase -Hertz:- ............................ --.............. .-....._208-340 Unit Height:_..-----..-.--._..... .......... ...-..-. --- _---------------- ' 1.375"
Heating Type: .............. ............. .................. _.Gas — Total Operating Weight .................. .................. 1211 Ib
Duct Cfg:......... _........... Vertical Supply / Vertical Retum
Medium Heat — %NeW is and Mnensions are appo ximate. wbight does
Round Tube Plate Fin Coils not hraode w* vBCMoft. dhonWons are
provided p t—ily for shipp"purposes. kwexect
dimenabru and weights. MW to appropriate product
date catalog.
Unes and Filters
GasLine Size:... .... _-............................. --------...............---...........314
DowAptlon Qua
Condensate Drain Line Size: .............
_ ................. 314
Return Air Fitter Type: .............. ...............
.3hrownway
Return Air Filter Quantity:....-.............. .............
.......... _.............. 4
Return Air Filter Size: ................ ............
__ 2Ox 20 x 2
Unit Configuration
Medium Static Option (Belt Drive)
AI/Cu - Al/Cu
Base Electromechanical Controls
Standard Packaging
2 -Speed indoor fan motor controlled by VFD
Warranty Information
1 -Year parts(std.)
5 -Year compressor parts(std.)
10 -Year heat exchanger - Aluminized(std.)
No optional warranties were selected.
NOTE: Please am Warranty Catalog 500-089 for explanation of policies and ordering methods.
Ordering Information
Part Number
DowAptlon Qua
48TCED12A2A5.0A0G0
Rooftop Unit 1
Base Unit
Medium Static O Belt Drive
None
2 Soeed Fan Controller D
Accessories
CRECOMZR069A00
LOW LEAK - Vertical Economw 1
CRRFCURS003A01
144nch Tall Roof Curb 1
Packaged Rooftop Builder 1.39w
Page 4 of 13
4/1v
Urditkdl0 Certified Drawing for 10 ton gas pk
[.P,=Bv-
. 01/11/2016
07:12AM
rata. — 77 {{
1 1iIa1KID1(fAi.,,IK[Alll3a KYtlad
r, Cart a STAY: fI
1. go. DIlttTla of All FLa
®'000
MTUEICenlaalt3
"CIO,"
1Citlu
®fi�ff»ft�
unl Ire en
Il$L 1• rut ' Is er
IKtAIICD
caunESEE I
DIFFER!]
b
r/ -be
knal
WL -Lu«
(:
IINI
A I ur f3SI IIA ITILD M. 1-1 xntt
fn1
nft
L 15-1/r r•5
115111 IIII
alt?
II Alf
ASfI
CDrar3a
11
LEFT cm
AIDE
ad
Eft®®�®fes
C 1 311' (Sll DIA 6ea! KC[fE nW
s -9—W Rooftop f3uNftr
cal
6
D in• I121 at. 'SEES fDYI1a e1tIK Mt[
MESUIL NEW
iKaiirtoA
�KIM'
Irs1ALt[D
DIKDercr
r-
SAMLf---b
O
n
31 �-
11101
MTUEICenlaalt3
"CIO,"
1Citlu
FILM ACC[tt Mal
unl Ire en
Il$L 1• rut ' Is er
IKtAIICD
caunESEE I
DIFFER!]
b
r/ -be
knal
WL -Lu«
(:
IINI
A I ur f3SI IIA ITILD M. 1-1 xntt
fn1
nft
L 15-1/r r•5
115111 IIII
alt?
II Alf
ASfI
CDrar3a
11
LEFT cm
AIDE
ad
C 1 311' (Sll DIA 6ea! KC[fE nW
s -9—W Rooftop f3uNftr
cal
6
D in• I121 at. 'SEES fDYI1a e1tIK Mt[
ICf�fA
f 311•11 Yrr CaltpAr[ KAir
r t/r••11 rll ru CWKCiIa
fan
«111
a -w
[till
ARL
'ARL
1 -Ile
BACK
j
6�—
D r - 1311 IIA Mt Stlrnl rMu-al
In31
RIOT ,[+ulr
[IIII
flfatTRIC
Ras
It9Ie
tan 11x31
I 4
THRU-THE• ASE CHART (FIELD INST)
IIAST NNl
11531 I f
48TN500985
slre[ rmu toI" ra rsf nrr aur nu:
ted°eT nwDeiiei `: eii iA°a3taB
utas uru
miDlll ITS
!troll
Ann
111
1 llesieF0'0 WI
clsnun sut 1st aua au.l
ur Au. ve• I:r.a
carjl At
—0
ISi11
3 1/r• al rlf• Itt.tl
IAIY urr/ir6
jl-)/1
treutelt
a wEpu
1i111 Jldle
0 -]le y
Il/rll
1, Irou 311• Init
A•
SEISMIC,
aatn
a
iKaiirtoA
�KIM'
Irs1ALt[D
DIKDercr
r-
SAMLf---b
O
n
31 �-
11101
MTUEICenlaalt3
"CIO,"
1Citlu
cmm
unl Ire en
Il$L 1• rut ' Is er
IKtAIICD
caunESEE I
DIFFER!]
b
r/ -be
knal
CONNECTION SIZES
(:
IINI
A I ur f3SI IIA ITILD M. 1-1 xntt
fn1
nft
L 15-1/r r•5
115111 IIII
alt?
II Alf
ASfI
B 2 Ilt' (611 DIS IaEI StlMlf IpD(YDtli
11
LEFT cm
AIDE
ad
C 1 311' (Sll DIA 6ea! KC[fE nW
s -9—W Rooftop f3uNftr
1.39w
6
D in• I121 at. 'SEES fDYI1a e1tIK Mt[
iKaiirtoA
�KIM'
Irs1ALt[D
DIKDercr
r-
SAMLf---b
O
n
31 �-
11101
MTUEICenlaalt3
rraeel. n1 IYI�, `mtte r�r tw Lr`i 1��Lwiee aolulEExl[f a
" TIr
1Citlu
cmm
unl Ire en
Il$L 1• rut ' Is er
ul
CONNECTION SIZES
11.111
13311
A I ur f3SI IIA ITILD M. 1-1 xntt
It/tel
alt?
II Alf
ASfI
B 2 Ilt' (611 DIS IaEI StlMlf IpD(YDtli
• •
C 1 311' (Sll DIA 6ea! KC[fE nW
O
D in• I121 at. 'SEES fDYI1a e1tIK Mt[
ECOMIII1fA ADW tf l/.
ID1Tauu lsJil
f 311•11 Yrr CaltpAr[ KAir
r t/r••11 rll ru CWKCiIa
fan
«111
a -w
[till
vr•u fn as calttna
1 -Ile
— foil's
IF SIT
FRONT
AIA
D r - 1311 IIA Mt Stlrnl rMu-al
In31
RIOT ,[+ulr
[IIII
flfatTRIC
Ras
It9Ie
tan 11x31
I 4
THRU-THE• ASE CHART (FIELD INST)
08-12 SINGLE
COOLING NITH
-
uan Irsn
48TN500985
slre[ rmu toI" ra rsf nrr aur nu:
ted°eT nwDeiiei `: eii iA°a3taB
utas uru
miDlll ITS
!troll
r
111
1 llesieF0'0 WI
clsnun sut 1st aua au.l
ur Au. ve• I:r.a
carjl At
—0
3 1/r• al rlf• Itt.tl
IAIY urr/ir6
jl-)/1
f 1 1/1• Itlt,a« 1gN1 1 !/1. 111.11
a wEpu
1i111 Jldle
0 -]le y
Il/rll
1, Irou 311• Init
• Y
inrrlr lea!
-11 °t
a
SAt 1 !lY II<.Il
mat rla as me• rr lxlu lore
"SIT
iii
«Are[ a rn«w. Ynt anl: r ISe.0
—
J
THRU•TNE- ASE CHART IFIOPI
rp •lptl4x6IAE[/AY• twat a«a.
ilirlref fa all f, t, 1 I All Ifanfe. ..
f1Wi
5111
nsn
ra SUN user Male, 1 'IIID
v1- Aur«I a «Wuu
_
Ilfll
xoW I u 3-iN
•z Iw
IIm
ilKo�s wu nl nttiK An 5As rALr[:
TOP
is AT
zs-vt
lel')
-111
[
[Wtl �--
iKaiirtoA
�KIM'
Irs1ALt[D
DIKDercr
r-
SAMLf---b
O
n
31 �-
11101
Page 5 13
IIM03 stat
KClfb
- -
1Citlu
ul
13311
n•SIA
tertl vlAn
alt?
II Alf
ASfI
file
O
Elm
fan
«111
a -w
[till
11111 1•Ir1
1 -Ile
— foil's
IF SIT
FRONT
AIA
IF rl
MAST
In31
RIOT ,[+ulr
[IIII
flfatTRIC
Ras
It9Ie
tan 11x31
I 4
48TC
ifw24-08
08-12 SINGLE
COOLING NITH
ZOXE €L ECTRICAL
GAS NEAT
48TN500985
m
F
Page 5 13
Certified Diawinq for 10 tnit psz pi.
Project-UnWedl0 01/11/2016
Prepared By:
0712AM
FRONT
CORNER C
�d oo p u r 1.39w
Page 8 td 13
s
a�aa�ram�®anm�mnnmm®ntm�i[®
a�a�m•m®®omo®®Euau�a®®
affiv7
alt®i,..e�rr7[CfE1®0®®s:,.®ice®®
iam�®I�i4f
�®unfln®®®�a�r=*_amE�®ate
EIISIn�®mm�®®®�a�®gym
a®tea®a��o®®inn®tuiuuou�e��
FRONT
CORNER C
�d oo p u r 1.39w
Page 8 td 13
s
Certified Dia -Hing for 10 ton gas pk
Project-Untltledl° 01111/2018
P red : 07:12AM
eakaged Rao I 9w PWe -80f 13
Prqect ~untitiedio Performance Summary For 10 ton gas pk 01/11/2016
Prepared BY: 07:12AM
Part Number:48TCEDIMAS-OACIGO
�����.............
Base Unit Dimensions
...............
Unit
Unit-Width: `................... ............ ...... .......... -.........................................................
..... -------'---------
in
Unit Height
Weight
'5�5
in
Outdoor Air WB: '-- '-----'---_-_----'---'_-_-_---'-----'----'
W
lb
MediumOperating
.~�^
Medium-_-
18
lb
Cooling Performance
76.0
lb
Accessories
�
".0mo��A�H�.Temp' -----'
F
LOW LEAK-Vertica|EconoMaer
__..........................................
.......... _.................. _ 70
'--------------
ib
1�i��dz
h?�U���u
Unit
Outdoor AirAirflow---'---'-'----_---_-_-'--_---_--------_-_-----'-------'------------���
�o0
CPM
Outdoor
mm 0
F
Outdoor Air WB: '-- '-----'---_-_----'---'_-_-_---'-----'----'
F
SiteAltitude ............ ................................... ........................... ............................ .............. ...............
-.................. .................................. 4w9
It
Cooling Performance
76.0
F
'e-''''ir ~^^~^-'----'----'----------'-------------'--------------
�
".0mo��A�H�.Temp' -----'
F
EvaporatorEntering '~ DB: -............ ........................................................... ............ .... ...... -...........
F
_--'=,ir ~E~
BTU/Ib
EvaporatorLeaving Air ~DB: .................................................................. ............. .......... .......................................
54.5
F
..
Evaporator Leaving Air ^~~a°y_................................. .................... ........... __________
��wm
STU0h
Gross-~'
MBH
--'p~-swPower ^Input ----............................... '-'...................... ....................... --....
7.74
kV*
Mixed Air
Outdoor AirAirflow---'---'-'----_---_-_-'--_---_--------_-_-----'-------'------------���
�o0
CPM
Outdoor
mm 0
F
Outdoor Air WB: '-- '-----'---_-_----'---'_-_-_---'-----'----'
F
Outdoor�'
'��0
F
Return AJr DB:
76.0
F
'e-''''ir ~^^~^-'----'----'----------'-------------'--------------
�
".0mo��A�H�.Temp' -----'
F
HeaUng Pwfbnnwnce
CFM
Leaving1 F
^~~,' 10.4 F
Gas Heating 224.0
MBH
Gas .e~~gOutput �w��y��4� �8H
l�����u���m' ����-------------
-���������.�����_��_�������������_������������_����-��� p
ExternalStatic ,.e==.=_ .......... __................................ ................ .... ...... ............ ___.......................... �.80 hmwg
Packaged Rooftop Builder 1.39w
Page -1-3
1 0/1 �0
Project —Untitledl0 Unit Report For 7.5 ton gas pk Prepared BY: 01/1 V2016
Unit Parameters
Dimensions (ft. in.) & Weight (lb.) —
Unit Model:.. ............................... 48TCED08A2A54A0A0
Unit Length:........................... 4.125"
Unit Size: ...... ......... ........................... ......_08 (7.5 Tons)
.......T
Unit Width: ..................... ............. 4' 11.5"
Volts -Phase -Herb :....................................................208-3.60
...............................
Unit Height:..... .....------- ------ ----------................3' 5.25"
Heating Type:... .......... ..................... .... .. ...............................Gas
M Total Operating Weight ................. 1083 Ib
Dud Cfg:...................... ertical Supply / Vertical Return
..................
Medium Heat
— Weights and DkWsb,s aro app oximie. IgM does
Round Tube Plate Fin Coils
^a twee unit Padcaift. ApPrW*nate dimensions are
provided p M-ty for BMPPlag PuMosw For axaa
dimanskma and weights, refer to appropriate Product
data catelog.
Lines and Filters
GasLine Size: ..... _......................................................................3/4
Condensate Drain Line Size :.............................. 3/4
Return Air Filter Type:...... .....Throwaway
Return Air Filter Quantity: ........................................ _ ................ 4
Return Air Filter Size: .................... .......... .......... 16 x 20 x 2
Unit Configuration
Medium Static Option (Belt Drive)
Al/Cu - Al/Cu
Base Electromechanical Controls
Standard Packaging
Warranty Information
1 -Year parts(std.)
5 -Year compressor parts(std.)
10 -Year heat exchanger - Aluminized(std.)
No options[ warranties were selected.
NOTE: Please see Warranty Catalog 500.089 for explanation of policies and ordering methods.
Ordering Information
Part Number
48TCED08A2A5-0A0A0
Description OUR
522292 Unit 1
Base Unit
Medium Static Option Belt Drive
None
None
Accessories
CRECOMZR069A00
CRRFCURB003A01
LOW LEAK - Vertical EconoMi$er 1
144nch Tall Roof Curb 1
Packaged Rooftop Builder 1.39w
Page 4 of 13
ProlecC-umidedlo Certified Drawing for 7.5 ton gas pk
Proamd : 01/11/2018
07i
t. Iittf a{aAitui .ti1Li 1tKiLA611M/51aI
t. qq CEDER Or OAV:n
3. M110. nR[cna Or A1/ fla
a1Tco,
/ I A F
H1C•A/e
am
HIII JJ Is 1H
IfAH) LJUI 1HJ1
HTC•01
CTR
11 7.. J Ill 71 1111
111111 11111 IIHI
OTC -All
ATn
1. JH 11 Il. is n1
371 111{( 1HJ7
HTC-ae
Am
11/1 JJ If iH
nINI IIN] IHJI
IntM119
ern
H Ja )1111 Is Na
[nSli tNll IIHI
ISTD -IR
IT.
11 ,t/1 ala 15 //t
11111111 n/n 11031
1110-M
IIC4
IOH11 11M n/3x11
01111:412
ITCH
I1 ]II It u1 11
11!31) I,H) 113.11
YCIr MOO caw(, nu[ (1111
n - MITICIII/Hl1La1
la alalMal
I
c? -43
anaL
r , xtaq
FAIR 0 Iia)
coJYLM T
IYrMEL[r G
as/e
ule,
1411
Its L
aHt HI]
nr
LEFT cots
MT
■IO
aokaged RooftoP Builder 1.39w
6
®—CAL'. t ,.In '�IaR tlt �f ~ Me 1 a1 nll�ilnm~uw�Xir, KK��iaMAfi•s rm�wcT. ■1
tuuER Y■rmllwt wt�li �.
CONNECTION SIZES
A + 11111' all OH'IM MR WrrtT nal
1 0111 e i 1/S' Iln ERA mat Saint H1R0n
[ ) ul• (ell on Govt[ AMnt nos
1 t/■' 1771 DIA FIELD COEM .111 IYA[
looK.IrER a 110 7I1 ( I ...... Yn LOHLYuu "A,.
1-IOYA,IIOISi17 i 1/!'•,/ Mri OM GO/MRIa
1//'-11 Yri 6M "AN a
O ! • 1311 nA rORt atilt I.O[1-al
THRU-THE•BASE CHART (FIELD INST)
IMI[ eOL[I ttW 11H ra
CA11 co n1A ACR Cas:
11-lle 131, ROMc111gHHtH1: Go] ,FII
.09111AltIlZll CI111Y/A11/Ael: Got TR1/1Af[ra
t1TIH
MI ,FICIOsi 11"1713 WECa0Ul1 111E RAN 1713 (YA].-0 1
■ 1/r ACR. t/e' IIt.x
t AL1. Y +/!• 11Y 11P (/2.211
tMY m.11W 1 I LI• IMt.0111 rORr tea• 111.11
IY eeJlnA to.311
Illi II SIe 10.1110 1. .111 3". "1 Ga 1 ....1..11
■ IPIL1 1933THE 1 (11111
i 1R NEC 11 :tlreLt (N 1 1ppYl 1• r rYAV G
i R,tl It nAA3[ I /71(1110. RLE SIZE: Z' 150.1)
THRU•THE-BASE CHART MOP)
1111;MV10RLa , 1. ; r�aet P.MiiEl O, n
i -III ra ella LInCY ll A nue
SU1rL1[e I/T IOIr1ER IJ /[11110
!1'n, Alt. LM x.)r1 /2531 WIN. Gott nt nniH AH 1M YAIYC
Llsu Yap I, is /1X10,3.01
TOP asst
is-vt
[1111 1 -III
i axt --I 31-211,
I
COIEta b.
AM., YAM,
FACTOR'
K O'
IFPALLID
OISCOalcl
r-
t
1111 u—
. 11e001 stat, --�•_
Att,t3 XE�1b
R
11
21-31,/. AIN at
Hat J -1/t Ills Alt
nal scant All I nal
uln
Pla
1aH "" 4421/ Ent L;Is/s� 11131
— WIFE
an Hare
1l230, to 110111 -LID
Et II f
L
FRONT Its tllvuH
RIGHT
dBTC 08-12 SIGLZONE ELCL
NE TA (CAL 487X500985
il-2A�08 COOLING WITH GAS HEAT F
Page 5 of 13
n)ill to $I 'AWE
l,aY-Lau
Galt HCR
COIL
TOM COIL
Aa[a rAMI
BACK
u
)�—
ul+s ;i,n inr
Us3s M
ucnH
mlchf.
Mt
0
crA,
tOUnscon[11a
I
c? -43
anaL
r , xtaq
FAIR 0 Iia)
coJYLM T
IYrMEL[r G
as/e
ule,
1411
Its L
aHt HI]
nr
LEFT cots
MT
■IO
aokaged RooftoP Builder 1.39w
6
®—CAL'. t ,.In '�IaR tlt �f ~ Me 1 a1 nll�ilnm~uw�Xir, KK��iaMAfi•s rm�wcT. ■1
tuuER Y■rmllwt wt�li �.
CONNECTION SIZES
A + 11111' all OH'IM MR WrrtT nal
1 0111 e i 1/S' Iln ERA mat Saint H1R0n
[ ) ul• (ell on Govt[ AMnt nos
1 t/■' 1771 DIA FIELD COEM .111 IYA[
looK.IrER a 110 7I1 ( I ...... Yn LOHLYuu "A,.
1-IOYA,IIOISi17 i 1/!'•,/ Mri OM GO/MRIa
1//'-11 Yri 6M "AN a
O ! • 1311 nA rORt atilt I.O[1-al
THRU-THE•BASE CHART (FIELD INST)
IMI[ eOL[I ttW 11H ra
CA11 co n1A ACR Cas:
11-lle 131, ROMc111gHHtH1: Go] ,FII
.09111AltIlZll CI111Y/A11/Ael: Got TR1/1Af[ra
t1TIH
MI ,FICIOsi 11"1713 WECa0Ul1 111E RAN 1713 (YA].-0 1
■ 1/r ACR. t/e' IIt.x
t AL1. Y +/!• 11Y 11P (/2.211
tMY m.11W 1 I LI• IMt.0111 rORr tea• 111.11
IY eeJlnA to.311
Illi II SIe 10.1110 1. .111 3". "1 Ga 1 ....1..11
■ IPIL1 1933THE 1 (11111
i 1R NEC 11 :tlreLt (N 1 1ppYl 1• r rYAV G
i R,tl It nAA3[ I /71(1110. RLE SIZE: Z' 150.1)
THRU•THE-BASE CHART MOP)
1111;MV10RLa , 1. ; r�aet P.MiiEl O, n
i -III ra ella LInCY ll A nue
SU1rL1[e I/T IOIr1ER IJ /[11110
!1'n, Alt. LM x.)r1 /2531 WIN. Gott nt nniH AH 1M YAIYC
Llsu Yap I, is /1X10,3.01
TOP asst
is-vt
[1111 1 -III
i axt --I 31-211,
I
COIEta b.
AM., YAM,
FACTOR'
K O'
IFPALLID
OISCOalcl
r-
t
1111 u—
. 11e001 stat, --�•_
Att,t3 XE�1b
R
11
21-31,/. AIN at
Hat J -1/t Ills Alt
nal scant All I nal
uln
Pla
1aH "" 4421/ Ent L;Is/s� 11131
— WIFE
an Hare
1l230, to 110111 -LID
Et II f
L
FRONT Its tllvuH
RIGHT
dBTC 08-12 SIGLZONE ELCL
NE TA (CAL 487X500985
il-2A�08 COOLING WITH GAS HEAT F
Page 5 of 13
Certified Drawing for 7.5 ton gas pk
lmmt;unwwio
re : 01/11/2016
07:09AM
CORNER D
CORNER C
TOP
FRONT
Psck&ged R00ftPBuf r 1.39W age 6 of 13
���smmmmmm�ammum��E��,�m
�e�mmam®m
�e®[�
C®®fIE1®®mom
®mfg C� E�IRD
e�meemem
�®m m ®m®maaa�u�n®��
CORNER D
CORNER C
TOP
FRONT
Psck&ged R00ftPBuf r 1.39W age 6 of 13
roJea:-Umiuedlo Certified Drawing for 7.5 ton gas pk
B OU1 V4o1
07.09AI
1
I
0 00000®e�c�ae
�-�-•Packaged R der 1.39w age 8 of 13
Performance Summary For 7.5 ton gas pk
Project �Untitledl0 01/11/20113'
Prepared By: 07:09AM I
Part Number UTCEDOMA"AOAO
ARIEER:..,. .............. ... ..._............._......
IEER:..............._._..._..._.........._..._._........
Total Operating Weight........- .... ..............._..-...........
Unit
UnitVoltage -Phase -Hertz:........- ....................................... ..... .................. ...................._...............................
Air Discharge:......-_ ....................
FanDrive Type:..-. ................. .............................................................................._-- ....................................
ActualAirflow.-.... .............. ................................... ...._....................._....................................._...
Site Altitude:- .......... .........................................
.........................._.....__._........_...........
Heating Performance
HeatingAirflow ........................... ................. ........... ...........
Entering Air Temp: .................... .....................
Leaving Air Temp: .......... __ .............................
Gas Healing Input Capacity: ................ ..............
Gas Heating Output Capacity:.. ----- ............
TemperatureRise:..........................................I....................
Supply Fan
External Static Pressure:..--..........................................................
Options / Accessories Static Pressure
Economizer, - - -
................. _............11.00
F
- ...._.._ ......................11.7
F
--------------------------------- --------_88.1
in
........... ....__...........................59.5
in
............ ._...____ ..................41.3
in
........................... .......... 835
Ib
---------- .---- ----------- -------------- 15
Ib
.. .................. - ............ .... .....15
Ib
............. _..... ..._....... ....75
Ib
-------- ..........................._..........143
Ib
.......... ..........-................----- 1083
Ib
............. ..........208.3-60
F
.... .................................Vertical
.......................... ................Belt
..._ ...................__............_..3000
CFM
.......................-.................... 449
it
............................ ..............85.0
F
_................. ................_77.3
F
....._._....... ...... ...._....................._......84.1
F
_.......... ......................... .........._.29.49
BTU/Ib
----------------......... ---------...._.......-----..55.6
F
--1 .......................... ................._54.0
F
............. -------------- ...._-_--- ............... MM
BTU/Ib
.........................................................89.75
MBH
....................................................69.13
MBH
....-------------- ........... ............... _...5.60
kW
.. ..... .. ..................... I— .... .........
MBH
420 CFM
................................. ............................_85.0
F
........ _ ..... .............. ..........................65.0
F
------ -- ------ _23.0
F
...............................................................76.0
F
..................... .................. . .................... ..__64.0
F
........................ ............70.0
F
............................................................
CFM
------------------------ -_......_................ ..........._.63.4
F
.............................................................109.8
F
------------------------------------20.01180.0
MBH
.............................................98.01148.0
MBH
................ -------_--- ------------- _- .................. 46.4
F
....0.70 in wg
_0.11 in wg
Packaged Rooftop Builder 1.39w Page 9 of 13
lr��
r uv
f
'=$c,
+�Ft lo'
ZRti �R�'
n4
c, 4, */, (4
t c1= P� t r 10 — 3q 1' ('
lbro 6 9
-5 AA.
`Ne4 = r q, X66 rs�
�slh� 1)(115) -::7 T&
�.�� toW C. "0: c,
1,0 cd 0, o,cr -'ear e a6X.
Mooren PROJECT: ENGR: 0144
Enaineerina r L� J rC ,E1� DATE: ( GlliCO
Group v rcroT SCALE:
SHEET
6/1/2016
City of Tukwila Allan Ekberg, Mayor
Department of Community Development Jack Pace, Director
DAWNA PETET
899 W MAIN ST
AUBURN, WA 98001
RE: Permit Application No. M16-0016
HABIT BURGERS
17025 SOUTHCENTER PKWY
Dear DAWNA PETET,
In reviewing our current application files, it appears that your permit applied for on 1/26/2016, has not been issued by the City of
Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or
National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become
null and void. Currently your application has a status of APPROVED and is due to expire on 7/26/2016.
If you still plan to pursue your project, you are hereby advised to do one of the following:
1) If the plan review is complete for the project and your application is approved, you may pick up the application before
the date of expiration. At the time of permit issuance the expiration date will automatically be extended 180 days.
-or-
2) If the plan review is not completed submit a written request for application extension (7) seven days in advance of the
expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your
application.
The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension
request is granted, you will be notified by mail.
In the event that we do not receive your written request for extension or request is denied, your permit application will expire and
your project will require a new permit application, plans and specifications, and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
pwrul'j[ �' 0) t'
Rachelle Riple)
Permit Technician
File No: M 16-0016
6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M16-0016 DATE: 01/26/16
PROJECT NAME: HABIT BURGERS
SITE ADDRESS: 17025 SOUTHCENTER PKWY
X Original Plan Submittal Revision # before Permit Issued
Response to Correction Letter #,
Revision # after Permit Issued
DEPARTMENTS:
AV(/ N� &�
Building Division is
Public Works ❑
A-V\ )(W
Fire Prevention
Structural
Planning Division
❑ Permit Coordinator
❑
PRELIMINARY REVIEW:
DATE: 01/28/16
Not Applicable ❑
Structural Review Required
❑
(no approval/review required)
REVIEWER'S INITIALS:
DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 02/25/16
Approved ❑
Approved with Conditions ❑
Corrections Required ❑
Denied
❑
(corrections entered in Reviews)
(ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/1812013
IECS INC
^ Washington State Department of
"Labor & Industries
IECS INC
Owner or tradesperson
Principals
HUMPHREY, GEORGE, PRESIDENT
Doing business as
IECS INC
WA UBI No.
601 639 846
License
Honie Espa►iol € Contact
Safety & Health Claims & Insurance
PO Box 19252
SEATTLE, WA98109-1252
206-939-9495
KING County
Business type
Corporation
Page I of 3
Cearch L&I
A-% Inde
Workplace Rights
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contra.cto,r Active.
........ .
Meets current requirements.
License specialties
Heating/Vent/Air-Conditioning and Refrig
(HVAC/R)
License no.
I ECS***044QL
Effective — expiration
11/13/1996-11/20/2016
Bond
.................
No bond accounts during the previous 6 year period.
I.ns.r....ance
.........u..............
Nationwide Mutual Ins Co $1,000,000.00
Policy no.
ACPACT07515636456
Received by L&I Effective date
07/29/2015 08/01/2013
Expiration date
08/01/2016
Insurance history