Loading...
HomeMy WebLinkAboutPermit M16-0030 - HEALTHPOINT DENTAL CLINIC - MECHANICAL EQUIPMENTHEALTHPOINT DENTAL CLINIC 13030 MILITARY RDS 210 M16-0030 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 1623049171 Permit Number: M16-0030 Address: 13030 MILITARY RD S 210 Issue Date: 4/18/2016 Permit Expires On: 10/15/2016 Project Name: HEALTHPOINT DENTAL CLINIC Owner: Name: AGM INC Address: PO BOX 2039, KIRKLAND, WA, 98083 Contact Person: Name: ELLEN HAGEN Phone: (206) 634-0177 Address: 118 N 35TH ST, STE 200, SEATTLE, WA, 98103 Contractor: Name: J R ABBOTT CONSTRUCTION INC Phone: (206) 467-8500 Address: 3408 1ST AVE S SUITE 101, SEATTLE, WA, 98134-1805 License No: JRABBC1022JZ Expiration Date: 3/1/2018 Lender: Name: Address: DESCRIPTION OF WORK: TENANT IMPROVEMENT RECONFIGURE MECHANICAL EQUIPMENT FOR NEW DENTAL CLINIC INCLUDING HVAC AND PIPING FOR DENTAL EQUIPMENT AND ONE NEW WC Valuation of Work: $150,000.00 Fees Collected: $1,965.22 Type of Work: NEW Electrical Service Provided by: SEATTLE CITY LIGHT Fuel type: Water District: 20,125 Sewer District: VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-4613: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Signature: Date: ~ I Ll I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of his permit does not presuTA to give authority to violate or cancel the provisions of any other state or local la s regula ng c structio or he performance of work. I am authorized to sign and obtain this development pe t and gree e o dit' ns attached to this permit. Signature: Date: I v I Print Name: (1 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: `MECHANICAL PERMIT CONDITIONS' 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL CITY OF TUKI - _-,A • Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov SITE LOCATION Site Address: Tenant L Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: _ use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" PROPERTY OWNER Name: n Address: 2 (2,41^ Z4 E Ski IVO F&)WState: Zip: B� CONTACT PERSON — person receiving all project Communication Name: EA 1 0— Address: ` ST SU (TC 2M City: 5eaAu State: W z"18163 ip 816 3 � Phone: (D _ ax: / U Email: a�; w C Q A_ King Co Assessor's Tax No.: r Suite Number: 2 (b Floor:_ 1 1. New Tenant: ..... Yes ❑.. No MECHANICAL CONTRACTOR INFORMATION Company Name: 151D Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 1,1; Q O DO Use: Residential: New.......... ❑ Replacement........ ❑ Commercial: New.......... Replacement........ ❑ Fuel Type. Electric ...... ❑ Gas ........ ❑ Other:_ H:\Applications\Forms-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 1-4-16.docx Revised: January 2016 Page 1 of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <10,000 cfm 65 dB(A) Unit Type Qty Air handling unit >10,000 cfm Residential, Nighttime Evaporator cooler Industrial Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ h /1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is .created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM, Monday through Friday and 8AM-1OPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (7am-10pm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR A4JTHORIZED AGENT: Signature: Print Name: Date: � �Q Day Telephone: Mailing Address: �� , . IS94 SAAI L_� Im d�_� VIA q 8 1 d 3 City State Zip H:\Applications\Forms-Applications On Linc\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 Page 2 of 2 bh Indicate type of mechanical work being installed and the quantity below: N� . ON Unit Type ..�.. Qty Furnace <100k btu 0 Furnace >10Ok btu 0 Floor furnace C) Suspended/waWfloor O mounted heater Q Appliance vent 0 Repair or addition to 0 heat/refrig/cooling 65 dB(A) system 60 dB(A) Air handling unit b <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm 0 Evaporator cooler a Ventilation fan connected to single duct 0 Ventilation system D Hood and duct Q Incinerator—domestic 0 Incinerator — comm/industrial 0 Unit Type Qty Fire damper 0 Diffuser Q Thermostat Q Wood/gas stove D Emergency enerator Other mechanical equipment 0 60 dB(A) Commercial Boiler/Compressor Qty 0-3 hp/100,000 btu a 3-15 /500 000 btu Residential, Daytime* 15-30 hp/1,000,000 btu Q 30-50 hp/1,750,000 btu Q 50+ hp/1,750,000 btu a 60 dB(A) Commercial 57 dB(A) 47 dB(A) Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM, Monday through Friday and 8AM-IOPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam- IOpm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING QWNER QR AXJT41ORIZED AGENT: Date: 2' Print Name: In kra ez:: /4n Day Telephone: (0 01 i'7�- Mailing Address: 2—) Ll City state Zip H:WpplicationslFomu-Applications On LineU016 AppticationsWechanical Permit Application Revisal 1.4.16.docx Revised: January 2016 Page 2 of 2 DESCRIPTIONS 1 PermitTRAK $1,587.29 M16-0030 Address: 13030 MILITARY RD S 210 Apn: 1623049171 $1,587.29 MECHANICAL $1,511.70 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $1,479.20 TECHNOLOGY FEE $75.59 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: .. 233 R000.322.900.04.00 0.00 $75.59 $1,587.29 Date Paid: Monday, April 18, 2016 Paid By: J R ABBOTT CONSTRUCTION INC Pay Method: CHECK 525579 Printed: Monday, April 18, 2016 1:28 PM 1 of 1 r W SY57EM5 DESCRIPTIONS QUANTITY PAID PermitTRAK $3,017.97 D16-0044 Address: 13030 MILITARY RD S 210 Apn: 1623049171 $2,640.04 DEVELOPMENT $2,640.04 PLAN CHECK FEE R000.345.830.00.00 0.00 $2,640.04 M16-0030 Address: 13030 MILITARY RD S 210 Apn: 1623049171 $377.93 MECHANICAL $377.93 PLAN CHECK FEE TOTAL R000.322.102.00.00 0.00 $377.93 Date Paid: Thursday, February 18, 2016 Paid By: BRUCE HAYASHI Pay Method: CREDIT CARD 01435G Printed: Thursday, February 18, 2016 9:57 AM 1 of 1 CR SYSTEMS f INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 EzApproved per applicable codes. a Corrections required prior to approval. COMMENTS: 1"XY&C- )T- 0Aj 6C C «-V— pooU L Inspector: Date: Q �j l REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 0INSPECTION RECORD -12Retain a copy with permit 0()10 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro.ect: Type of Inspection: L Jxjr Date Called: Address: Special Instructions: ,,ZI L� Date Wante a.m. 7 //A� P Requeste : �TT Phone No: Zo&-WI-1-72-98 GAc� VZ �3c-enc MApproved per applicable codes. Ll Corrections required prior to approval. <J paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD 14!o-�' Retain a copy with permit *(�- q�3Q INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Proj ct:a O Type �f Inspection: 4 it —T -t4 Address: , 1-3030 (Cw-fol' Date Called'• Special Instructions: Date Wanted*� 7 r a.m. . r j p.m. Requester: Phone No: Inspector: 7ate6_(� e REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-01-HP-1A HRU-01-HP-1A Supply Outlet Summary Unit Data Unit Manufacturer ClimateMaster Unit Model Number TCH012 Unit Serial Number U11229706 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-01-H P-1 A/Fiker Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 Test Data Total Design Flow 350 CFM Total Actual Flow 351 CFM RA Design Flow 275 CFM RA Actual Flow 168 CFM OA Design Flow 75 CFM OA Actual Flow 183 CFM RA Damper Pos Actual 100% OA Damper Pos Actual HRU-0I-HP-1A/Fan 30% Fan Speed Medium Low Speed Motor Volts T1-T2 207 Volts Motor Amps T1 0.6 Amps HRU-01-HP-1A Supply Outlet Summary Test Pressures Actual Total SP 0.20 in. we Fan Discharge SP 0.07 in. we Fan Suction SP -0.13 in. we R ErF. F.IVLD7 CITE C)' TUKV1IL. AUG 0 4 2016 PERMIT CENTER System/UnitArea Motor Data HR -01-HP-IA/Fan Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Ams 0.8 Amps Test Pressures Actual Total SP 0.20 in. we Fan Discharge SP 0.07 in. we Fan Suction SP -0.13 in. we R ErF. F.IVLD7 CITE C)' TUKV1IL. AUG 0 4 2016 PERMIT CENTER System/UnitArea Served Type of Outlet Size AKDesign— " Design Prelim Finall Final Remarks Tota : . - - 275 168 Reading Type LxW t D Velocity Value Readina Reading % Outlet -01 QUIET Flowhood CD -1 8X8 1 - 175 215 174 99 (1) OPERATORY 212 Outlet -02 SOUTH lowhood CD -1 8X8 1 - 175 195 177 101 OPERATORY Totals: I - - I - 1 350 1 410 1 351 1 100 1- HRU-01-HP-1A Return Inlet Summary SystonVUnit Type of Outlet Size 1 A Design Design Prelim FinalFinal` emarks Readin T D lVelocity I Value Readina Readi % Inlet -01 Flowhood RG -1 24X12 1 - 275 168 168 61 Tota : . - - 275 168 16a 6 Neudorfer Engineers, Inc. Page 1 of 8 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-01-HP-1D Unit Data Unit Manufacturer ClimateMaster Unit Model Number TCH012 Unit Serial Number U11229705 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-01-HP-1 D/Filter RA Damper Pos Actual Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 Test Data Total Design Flow 335 CFM Total Actual Flow 321 CFM RA Design Flow 230 CFM RA Actual Flow 215 CFM OA Design Flow 105 CFM OA Actual Flow 106 CFM RA Damper Pos Actual 100% OA Damper Pos Actual HRU-01-HP-1 D/Fan 30% Fan Speed Medium High Speed Motor Volts T1-T2 208 Volts Motor Amps T1 0.7 Amps HRU-0I-HP-1 D Supply Outlet Summary Test Pressures Actual Total SP 0.24 in. we Fan Discharge SP 0.03 in. we Fan Suction SP -0.21 in. we System/Unit Motor Data HRU-01-HP-1 D/Fan Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 0.8 Amps Test Pressures Actual Total SP 0.24 in. we Fan Discharge SP 0.03 in. we Fan Suction SP -0.21 in. we System/Unit Area Served Type of Reading Outlet Type Size LxW 1 D AK Design Design Velocitv Value Prelim Reading Final Reading Final Remarks % Outlet -01 STERILIZATIO N 209 Flowhood CD -1 8X8 1 - 175 121 165 94 (1) Outlet -02 RECOVER 208 Flowhood CD -1 6X6 1 - 40 24 40 100 Outlet -03 X-RAY 206 Flowhood CDA 6X6 1 - 60 24 56 93 Outlet -04 OFFICE 204 Flowhood CD -1 6X6 1 - 60 175 60 100 Totals: - - - - - 335 344 321 96 - HKU-U1-HF'-1U Ketur111nlet summary System/Unit Type of Outlet Size LxW / AK Design Design Prelim Final Final Remarks Reading Type D Velocitv Value Readin Reading % Inlet -01 Flowhood RG -1 2012 1 - 230 215 215 93 1 Totals: - - - - - 230 215 215 93 - Neudorfer Engineers, Inc. Page 2 of 8 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-01-HP-2A Unit Data ------- Unit Manufacturer ClimateMaster Unit Model Number TCH012 Unit Serial Number U11229702 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-0I-HP-2A/Filter Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 HRU-0I-HP-2A Supply Outlet Summary Test Data Total Design Flow 430 CFM Total Actual Flow 388 CFM RA Design Flow 350 CFM RA Actual Flow 190 CFM OA Design Flow 80 CFM OA Actual Flow 183 CFM RA Damper Pos Actual 100% OA Damper Pos Actual HRU-01-HP-2A/Fan 20% Fan Speed Medium High Speed Motor Volts T1-T2 207 Volts Motor Amps T1 0.7 Amps HRU-0I-HP-2A Supply Outlet Summary Test Pressures Actual Total SP 0.19 in. we Fan Discharge SP 0.05 in. we Fan Suction SP -0.14 in. we System/ nit Motor Data Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 0.8 Amps Test Pressures Actual Total SP 0.19 in. we Fan Discharge SP 0.05 in. we Fan Suction SP -0.14 in. we System/ nit Area Served Type of Outlet Size AK Design Design Irn naFinal Remarks Readin ' TYoeLxW / D VellocItY Value Readina Reading °% Outlet -01 NORTH Flowhood CD -1 10X10 1 - 200 258 179 90 OPERATORY 211 Outlet -02 NORTH Flowhood CD -1 10X10 1 - 200 96 175 88 (1) OPERATORY 211 Outlet -03 STAFF TOILET Flowhood CD -2 6X6 1 - 30 36 34 113 otals: 430 390 388 9 HRU-01-HP-2A Return Inlet Summary System/nSystem/Unft Type of Outlet I Size LxW i AK Design Design I Prelim I Finalinal Remarks Readina Type I D Velocity Value I Readina I Readi °% Inlet -01 Flowhood G-1 2012 1 - 350 190 190 54 otals: - - - 390 190 190 54 - Neudorfer Engineers, Inc. Page 3 of 8 0 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-01-HP-3A Unit Data Unit Manufacturer ClimateMaster Unit Model Number TCH012 Unit Serial Number N12629440 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-01-HP-3A/Filter Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 Test Data Total Actual Flow 447 CFM RA Design Flow 210 CFM RA Actual Flow 134 CFM OA Design Flow 290 CFM OA Actual Flow 280 CFM RA Damper Pos Actual 100% OA Damper Pos Actual 90% 01-HP-3A/Fan 0.8 Amps Fan Speed Medium High Speed Motor Vofts T1-T2 207 Volts Motor Amps T1 0.6 Amps HRU-01-HP-3A Supply Outlet Summary Test Pressures Actual Total SP 0.18 in. we Fan Discharge SP 0.05 in. we Fan Suction SP -0.13 in. we System/Unit Motor Data HRU-OI-HP-3A/Fan Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 0.8 Amps Test Pressures Actual Total SP 0.18 in. we Fan Discharge SP 0.05 in. we Fan Suction SP -0.13 in. we System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final Remarks % Outlet -01 EXP BREAK ROOM 105B Flowhood CD -1 8X8 1 - 150 221 139 93 Outlet -02 WAITING 200 Flowhood CD -1 8X8 1 - 175 40 152 87 (1) Outlet -03 WITING 200 Flowhood CD -1 8X8 1 - 175 201 156 89 Totals: I- I- - - I - 1 500 1 462 1 447 1 89 - r1KU-u-1-nr-sA rcetum comet summary System/Unit Type of Outlet Size LxW l AK Design Design Prelim Final Final Remarks ReadingType D Velocity Value Re2dina Readin °Io Inlet -01 Flowhood RG -1 24X12 1 - 210 134 134 64 Totals: - - - I - - 210 134 134 64 - Neudon°er Engineers, Inc. Page 4 of 8 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-02-HP-1B Unit Data Unit Manufacturer ClimateMaster Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-02-HP-1 B/Filter Filter type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8xl8x2 Test Data Total Design Flow 350 CFM Total Actual Flow 314 CFM RA Design Flow 290 CFM RA Actual Flow 209 CFM OA Design Flow 60 CFM OA Actual Flow 105 CFM RA Damper Pos Actual 100% OA Damper Pos Actual HRU-02-HP-1 B/Fan 100% Fan Speed Medium High Speed Motor Volts T1-T2 207 Volts Motor Amps T1 0.6 Amps Test Pressures Actual Total SP 0.28 in. we Fan Discharge SP 0.07 in. we Fan Suction SP -0.21 in. we Log: 8/2/2016 Dwight Hammack Unit sit against drywall above ceiling and not able to get unit data. HRU-02-HP-1B Supply Outlet Summary System/Unit Motor Data HRU-02-HP-1 B/Fan Outlet Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 0.8 Amps Test Pressures Actual Total SP 0.28 in. we Fan Discharge SP 0.07 in. we Fan Suction SP -0.21 in. we Log: 8/2/2016 Dwight Hammack Unit sit against drywall above ceiling and not able to get unit data. HRU-02-HP-1B Supply Outlet Summary System/Unit Area Served Type of Outlet Size AK Design Design Prelim Final Final Remarks Totals: - - - - - 290 209 Reading Type LXW / D Veloci Value ReadiaL Reading % Outlet -01 SOUTH Flowhood CD -1 8X8 1 - 175 219 164 94 OPERATORIE S213 Outlet -02 SOUTH Flowhood CD -1 8X8 1 - 175 115 150 86 (1) OPERATORIE S213 Totals: - - - - - 350 334 314 90 - HKU-UZ-HP-1e Return Inlet summary System/Unit Type of Outlet Size LOVI AK Design Design Prelim Final Final Remarks Readinq Tly D Velocitv Value Readina Readin Inlet -01 Flowhood RG -1 24X12 1 - 290 209 209 72 Totals: - - - - - 290 209 209 72 - Neudorfer Engineers, Inc. Page 5 of 8 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT M 2016-477 AUTHOR: SYSTEM/UNIT: HRU-02-HPAC Unit Data Unit Manufacturer ClimateMaster Unit Model Number GRHO12 Unit Serial Number L13373475 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-02-HP-1 C/Filter Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 Test Data Total Design Flow 350 CFM Total Actual Flow 332 CFM RA Design Flow 310 CFM RA Actual Flow 253 CFM OA Design Flow 40 CFM OA Actual Flow 79 CFM RA Damper Pos Actual 100% OA Damper Pos Actual 10% HRU-02-HP-1 C/Fan 0.8 Amps Fan Speed Medium High Speed Motor Volts T1-T2 208 Volts Motor Amps T1 0.7 Amps HRU-02-HP-1C Supply Outlet Summary Test Pressures Actual Total SP 0.31 in. we Fan Discharge SP 0.09 in. we Fan Suction SP -0.22 in. we System/Unit Area Served Motor Data HRU-02-HP-1 C/Fan Size LxW / D Drive Type Direct Drive Motor Manufacturer Fasrw Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps. 0.8 Amps Test Pressures Actual Total SP 0.31 in. we Fan Discharge SP 0.09 in. we Fan Suction SP -0.22 in. we System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final Remarks % Outlet -01 WAITING 200\ Flowhood CD -1 8X8 1 - 175 155 165 94 (1) Outlet -02 RECEPTION 201 Flowhood CD -1 8X8 1 - 175 181 167 95 Totals: - - - - - 350 336 332 95 - HKU-UZ-HF-7(: Keturn Vliet Summary System/Unit Type of Outlet Size LxW / AK Design Design Prelim Final Final Remarks Readina Tyne D Velocitv Value Readina Readin Inlet -01 Flowhood RG -1 24X12 1 310 253 253 82 Totals: - - - - - 310 253 253 82 - Neudorfer Engineers, Inc. Page 6 of 8 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-02-HP-2B HRU-02-HP-28 Supply Outlet Summary - Unit Data Unit Manufacturer ClimateMaster Unit Model Number GRHO12 Unit Serial Number L13373473 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-02-HP-2B/Filter Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 HRU-02-HP-28 Supply Outlet Summary - Test Data - - - Total Design Flow 400 CFM Total Actual Flow 362 CFM RA Design Flow 300 CFM RA Actual Flow 181 CFM OA Design Flow 100 CFM OA Actual Flow 181 CFM RA Damper Pos Actual 100% OA Damper Pos Actual HRU-02-HP-2B/Fan 10% Fan Speed Medium High Speed Motor Volts T1-T2 207 Volts Motor Amps T1 0.7 Amps HRU-02-HP-28 Supply Outlet Summary - Motor Data HjiU-02-HP-26/Fan Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 0.8 Amps Test Pressures Actual Total SP 0.18 in. we Fan Discharge SP 0.03 in. we Fan Suction SP -0.15 in. we System/Unit Area Served Type of Outlet Size A Design esign rel m Final Final Remarks Totals: - 300 181 ReadingT B LxW / D VelocityValue' Reacting Readin % Outlet -01 MANAGER Flowhood CD -1 10X10 1 - 200 99 186 93 (1) 203 Outlet -02 SOUTH Flowhood CD -1 10X10 1 - 200 258 176 88 OPERATDOR Y 213 Totals: 400 357 362 i 9 HRU-02-1-113-2121 Return Inlet Summary System/Unit Tylpeof Outlet SlZeUW1 AKgn esign Prelim I Final I FinalRemarks Readin D Vel Value Re"ng,l Reading] % Inlet -01 Flowhood G-1 24X12 1 - 300 181 181 60 Totals: - 300 181 181 B Neudorfer Engineers, Inc. Page 7 of 8 Heat Pump PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016477 AUTHOR: SYSTEM/UNIT: HRU-02-HP-3B Unit Data Unit Manufacturer ClimateMaster Unit Model Number TCH012 Unit Serial Number N11919296 Unit Discharge Bottom Horizontal Fan Rotation Clockwise HRU-0241P-3B/Filter Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x24x2 Test Data Total Design Flow 500 CFM Total Actual Flow 444 CFM RA Design Flow 425 CFM RA Actual Flow 302 CFM OA Design Flow 75 CFM OA Actual Flow 142 CFM RA Damper Pos Actual 100% OA Damper Pos Actual HRU-02-HP-3B/Fan 10% Fan Speed Medium High -Speed Motor Volts T1-T2 208 Volts Motor Amps T1 0.7 Amps HRU-02-1-113-313 Supply Outlet Summary Test Pressures Actual Total SP 0.23 in. we Fan Discharge SP 0.06 in. we Fan Suction SP -0.17 in. we System/Unit Motor Data HRU-02-HP-3B/Fan Drive Type Direct Drive Motor Manufacturer Fasco Motor HP 1/10 HP Motor Rated Volts 208-230 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 0.8 Amps Test Pressures Actual Total SP 0.23 in. we Fan Discharge SP 0.06 in. we Fan Suction SP -0.17 in. we System/Unit Area Served Type of Outlet Reading Type Size LxW / D AK Design Velocity Design Value Prelim Final Final Reading Reading. % Remarks Outlet -01 PROVIDER Flowhood CD -1 OFFICE 202 10X10 1 - 215 65 186 87 (1) Outlet -02 PROVIDER Flowhood CD -1 OFFICE 202 10X10 1 - 215 297 196 91 Outlet -03 I HALL 205 Flowhood CD -1 6X6 1 - 70 1 32 6289 Totals: - - - - - 500 1 394 444 89 1 - El HRU-02-HP-313 Return inlet Summary System/Unit Type of Outlet Size LxW / AK Design Design Prelim Final Final Remarks Readin Type D Velocity Value Reading Readin Inlet -01 Flowhood RG -1 24X12 1 - 425 302 302 71 Totals: - - - - - 425 302 302 71 - Neudorfer Engineers, Inc. Page 8 of 8 Energy Recovery Unit PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-01 AREA: NORTH Unit Data Unit Manufacturer LIFEBREATH Unit Model Number 650 FD Unit Serial Number MBAL 052516076829 EF Fan Rotation Clockwise SF Fan Rotation HRU-01/ Counterclockwise „F filter Filter Type Washable Mesh Filter Quantity - Size 1 1 Fitter Dimensions - Size 1 8x38xl HRU-01/SF Filter Filter Type Washable Mesh Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x38xl HRU-01 Supply Outlet Summary Test Data SF Total Design Flow 550 CFM SF Total Actual Flow 714 CFM SF OA Design Flow 550 CFM SF OA Actual Flow 714 CFM EF Total Design Flow 570 CFM EF Total Actual Flow 624 CFM EF OA Design Flow 570 CFM EF OA Actual Flow 624 CFM HRU-01/Exhaust Fan Motor Volts T1-T2 115 Volts Motor Amps T1 HRU-01/Sunuly Fan 1.9 Amps Motor Volts T1-T2 115 Volts Motor Amps T1 2.0 Amps HRU-01 Supply Outlet Summary System/Unit Motor Data HRU-01/Exhaust Fan Drive Type Direct Drive Motor Rated Volts 115 Volts Motor Phase 1 Motor Hertz 60 Hz HRU-01/Suooly Fan HP -2A Drive Type Direct Drive Motor Rated Volts 115 Volts Motor Phase 1 Motor Hertz 60 Hz System/Unit Test Pressures SF Fan SP In -0.21 in. we SF Fan SP Out 0.05 in. we EF Fan SP In -0.26 in. we EF Fan SP Out 0.03 in. we System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Design Velocity Value Prelim Readinfl Final Readin Final Remarks % Outlet -01 HP -2A Flowhood Duct 10" 1 - 80 240 183 229 Outlet -02 HP -3A Flowhood Duct 10" 1 - 290 194 280 97 (1) Outlet -03 HP -1A Flowhood Duct 101, 1 - 75 132 145 193 Outlet -04 HP -11) Flowhood Duct 10" 1 - 105 148 106 101 Totals: I - I - i - - 1- 550 714 714 1 130 - mKu-u7 txnaust Imet bummary System/Unit Type of Reading Outlet Type Size LxW / D AK Design Design Velocity Value Prelim Reading Fina! Readin Final % Remarks Inlet -01 Flowhood EG -2 8X6 1 - 120 168 134 112 Inlet -02 Flowhood EG -1 24X12 1 - 150 276 170 113 Inlet -03 Flowhood EG -1 2012 1 - 300 251 320 107 (1) Totals: - I - - - I - 570 695 1 624 109 - Neudolfer Engineers, Inc. Page 1 of 2 a c Energy Recovery Unit PROJECT: HEALTH POINT TUKWILA DENTAL CLINIC DATE: 8/4/2016 LOCATION: TUKWILA, WA CONTACT: PROJECT #: 2016-477 AUTHOR: SYSTEM/UNIT: HRU-02 AREA: SOUTH Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 Washable Mesh 1 8x26 Filter Type Washable Mesh Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x26 Unit Data Unit Manufacturer LIFEBREATH Unit Model Number 455 FD Unit Serial Number MBAK 051716075706 EF Fan Rotation Clockwise SF Fan Rotation Counterclockwise Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 Washable Mesh 1 8x26 Filter Type Washable Mesh Filter Quantity - Size 1 1 Filter Dimensions - Size 1 8x26 HRU-02 Supply Outlet Summary Test Data SF Total Design Flow 275 CFM SF Total Actual Flow 507 CFM SF OA Design Flow 275 CFM SF OA Actual Flow 507 CFM EF Total Design Flow 275 CFM EF Total Actual Flow 337 CFM EF OA Design Flow 250 CFM EF OA Actual Flow 337 CFM HRU-02/Exhaust Fan Fan Speed Low Speed Motor Volts T1-T2 116 Volts Motor Amps T1 Fan 1.5 Amps HRU-02/Suppiv Fan Speed Low Speed Motor Volts T1-T2 115 Volts Motor Amps T1 1.7 Amps HRU-02 Supply Outlet Summary System/Unit Motor Data HRU-02/Exhaust Fan Drive Type Direct Drive Motor Manufacturer Genteq Motor HP 1/10 HP Motor Rated Volts 115 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps HRU42/Supply Fan 2 Amps Drive Type Direct Drive Motor Manufacturer Genteq Motor HP 1/10 HP Motor Rated Volts 115 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 2 Amps System/Unit Test Pressures SF Fan SP In -0.15 in. we SF Fan SP Out 0.02 in. we EF Fan SP In -0.29 in. we EF Fan SP Out 0.09 in. we System/Unit Area Served Type of Reading Outlet Type size LAN /D RK Design Velocity sign Value rem Readina Final Reading FinalRemarks % Outlet -01 HP -113 Flowhood Duct 10" 1 - 60 62 105 175 Outlet -02 HP -213 Flowhood Duct 10" 1 - 100 178 181 181 Outlet -03 HP -1C Flowhood Duct 10" 1 - 40 126 79 198 (1) Outlet -04 HP -3B Flowhood Duct 10" 1 - 75 179 -1-97 142 189 Totals: i - - 275 WS I IN HRU-02 Exhaust Inlet Summary System/ nit Type of Readi Outlet Type_ Size 4XW / D AK Design Design Velocity Vaiue Prelim Reading Final Reading Final' o Remarks Inlet -01 Flowhood EG -1 24X12 1 - 100 165 165 165 (1) Inlet -02 Flowhood EG -1 24X12 1 - 150 172 172 115 Totals: - - - - 250> 337 337 135 - Neudorfer Engineers, Inc. Page 2 of 2 Healthpoint Dental TI HVAC Calculations By HV Engineering 7100 Linden Ave N. Ste Seattle WA 98103 Brian Roetcisoender, PE 206-706-9669, Ext 112 HVAC calculations for for this project were calculated using Carrier HAP program V4.91. Envelope components were selected to match estimated existing U -values for the building. Temperature design conditions for interior (72 deg F) and exterior 24 deg F. were selected based on values listed in the 2012 Washington State Energy Code. Infiltration rates selected were based on 0.10 to .20 air changes per hour depending on room location. The existing building HVAC system is composed of a water source heat pumps coupled to a circulating water loop that is tied to a boiler and evaporative water cooler. No changes or replacements of existing water source heat pumps are being made. Only the ductwork attached to the existing heat pumps is be modified to account for floor plan changes taking place as part of this TI. In addition, 2 air to air heat recovery ventilators are being added to the project to provide code ventilation air and exhau�s,t awe. In addition, a small high efficiency ductless split system is being instaled d�do�t�h�e�ED FOR garage level to provide cooling for a dental equipment vacuum pump ant i UA&ROMPLIANCE I APPROVED CORRECTION tAl 6-1- OC) 3 0 MAR 2 5 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUI(WILA MAR 14 2016 PERMIT CENTER 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary MECH-SUM 2012 Washington State Energy Code Com liance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug2015 Project Info Project Address: Healthpolnt Temporary Dental Clinic Date 2/5/2016 13030 Military Road S For Building Dept. Use Tukwllla, WA 98168 Applicant Name: Brian Roetclsoender Applicant Address: 7100 Linden Ave N, ste 1, Seattle WA 98103 Applicant Phone: 206-706-9669, ext 112 Project Description ❑ NeW Building ❑ Building Addition ❑ Tenant Improvement ❑ System Retrofit ❑ No System Changes Briefly describe mechanical systems in The ductwork attached to the existing building water source heat pumps is being modified in layout only to the text box provided account for floor plan changes taking place. No new heat pumps are being installed. Two new air to air heat ❑ Total Bldg Performance recovery ventilation units are being added to the building to provide code required ventilation and exhaust. The t use of heat recovery for ventilation is not required by the energy code, but is rather being done as an energy T,ota(Bldg PQrformance compliance saving feature above code minimum requriements. Only new equipment is being listed in these forms as inclJdgs alllmandatory provisions per s� C401.2 Option 2. MECH-SUM existing heat pumps remain without modification. There are no new domestic water heating systems. All new HW and HWC piping is being insulated per code. MECH-CHK, and C407 Energy Analysis Summary forms required. Mechanical Systems Summary Air Compliance Heating Fan Flow Economizer Ventilation Energy Equip ID Type of System (Note 1) Space(s) Served Path and Cooling Controls (Note 2) (Note 3) Recovery Complex multi Heating and Not No cooling, 1 ASHRAE 62. Provided but HRU-1 Heat Recovery Ventilator OFFICE zone system cooling_ applicable NA per WS -IMC not required , 403.2 HRU-2 Heat Recovery Ventilator OFFICE Complex multi Heating and Not No cooling, ASHRAE 62.1 per WS -IMC Provided but zone system cooling applicable NA 403.2 not required AC-1/CU- Ductless Split System AC Dental Mechanical Simple single Cooling only Not SS Exp1 Not Not Required 2 unit Equipment Room zones stem applicable Applicable Note 1 - Provide basic description of system type, for example: unitary rooftop air handler, built-up central air handler, single -packaged, split system or packaged terminal air conditioner or heat pump; unit heater, warm -air furnace, electric resistance heater, 4 -pipe fan coil, VRF system, energy recovery air handler, make-up air system, ground or water -source heat pump, etc. Note 2 - if taking an exception to air economizer, select exception taken from drop down menu and complete MECH-ECONO thrm. Summary definitions of each exception are listed in MECH-ECONO. Note 3 - If ventilation "Not applicable" is selected, provide explanation in Project Description box above. ❑ Hydronic chilled ❑ Water -loop heat pump No hydronic systems HVAC Hydronic Systems ❑ Hydronic heating ❑ Geothermal Equipment Type (s) ❑ Hot water heating tank(s) ❑ Instantaneous ❑ No service water systems Service Water Heating ❑ Dedicated boiler ❑ Heat exchange from space heat boiler or Systems central hot water/steam Distribution Type (s) ❑� Circulation System ❑ On -demand Mechanical Plans ❑ MECH-EQ Form Mechanical Schedules Indicate location ofequipmentmpliance information. If provided on plans then MECH-EQ forms are not requked, however, include on plans all applicable compliance Information listed in MECH-EQ tables. 0 Load calculation summarf ❑ MECH-LOAD-CALC Form Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable compliance information then the MECH-LOAD-CALC form is not required. � � At Via` �^� � ` i� � �'� 4� 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary, •• 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 ti R3 over 3 stories and all R1 Revised Aug 2015 ❑ Project includes HVAC air distribution systems that provide heating and/or cooling If yes, provide a MECH-FANSYS -SUM form. Fan Power ❑ For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. Refer to Section C403.2.10 and MECH-FANSYS-DOC for requirements and exceptions. Commissioning Exception 0 Commissioning will be provided for all applicable systems Summary Commissioning Exceptions: Describe means of eligibilty for commissioning exception (capacity, ❑ Mechanical system(s) etc) for all systems noted as taking exception in Mechanical Systems Summary table. Refer to Section C408.2 and C408.4 for exceptions. El Service water heating system(s) For systems requiring commissioning, Figure C408.1.2.1 Commissioning Compliance Checklist shall be submitted to the code official upon project completion. Low Energy and Semi -Heated Spaces (Note 6 and 7) Peak Space Heating Cooling Conditioning Space Area Served, Capacity, Btu/h Capacity, Btu/h Capacity, Compliance Type Location in Plans Space(s) Served square feet (Note 4) (Note 5 Btu/h-sf Check Notes Note 4 - Provide total installed healing output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section Clot. 5.2 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h-sf. Note 7 - Refer to Section C402.1.4 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 btuh/sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 2012 Washington State Enerqv Code Compliance Forms for Commercial Buildinas including R2 & R3 over 3 stories and all R1 Revised Auo 2015 Project Address HeahhpointTemporary Dental Clinic ate 2/5/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington Slate Energy Code, Commercial Provisions. ApplicableCode Section Code Provision Information Required - Must be in permit documents Location in Building Department ,as, no na Documents Notes GENERAL PROVISIONS Equipment Sizing & Performance ATTACHE yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 D C403.2.2 Equipment and system Output capacities of heating and cooling equipment and systems do not exceed the next larger ATTACHE yes Sizing available equipment size above the calculated loads note exceptions taken D yes C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable ATTACHE of beino reduced to minimum requirement per IMC D C403.2.3 & Equipment minimum Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, M0.01 yes C403.2.3.2 & C403.2.12.1 efficiency test standard (or other efficiency source) for all mechanical equipment Y es C403.2.13 Electric motor efficient YP, Provide equipment schedule with h m, and efficient for all motors; note exceptions taken rpm, Y M0.02 na C403.2.10.1 Fan power limitation For all applicable systems > 5hp, provide system total nameplate hp in MECH-FANSYS-SUM form na C403.2.10.1 Fan power limitation For all applicable fan systems > 5hp, verify fan system motor hp or bhp complies with fan ower limits per Table C403.2.10.1 1provide MECH-FANSYS form for each system na C403.2.10.2 Motor nameplate hp Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken yes C403.2.10.3 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. M0.02 & C403.2.13 na C403.2.3 Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit capacity C403.2.3.1 Non-standard water-cooled Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard na chillers operational conditions Centrifugal fan cooling Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan na 1C403.2.12.1. towers open circuit cooling towers na C403.2.3 Forced air furnace and unit Indicate intermittent ignition or IID, flueldraft damper & jacket loss heaters C403.2.3.3Packaged electric Verify all packaged electric equipment that provides > 20,000 Bturh cooling capacity and na heating/cooling ui ment lheating is a heat pump, note in equipment schedule na C403.2.3.4 Humid cation Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems M0.02 na C403.2.4.1.1 Heat pump supplementary Indicate staged heating (compressiordsupplemental) and outdoor lock -out temperature is set to heat 40`F or less no C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling yes C403.2.4.3 Automatic setback and Indicate zone t -stat controls with required automatic setback & manual override M0.02 shutdown yes C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions M0.02 C402.4.5.2 & OSA, exhaust, and relief air Indicate location of outdoor air supply intake, and exhaust and relief outlet dampers; verify M0.02 yes C403.2.4.4 dampers Class 1 leakage rating and control type (motorized or gravity); note exceptions taken na C402.4.5.2 Return air dampers Indicate location of return air dampers that are integral to economizer operation; verify motorized control and Class 1 leakage rating; note exception taken na C402.4.5.1 Stairway and shaft vents Indicate location of stairway and shaft vents, verify Class 1 leakage rated motorized dampers and method of activation na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls na C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions na C403.2.4.6 Combustion heating Indicate modulating or staged control equipment C403.2.4.7 Group Rt hotellmolet Indicate method for guest room temperature automatic setback (heating) & set-up (cooling), na systems confirm adjustment of at least 5°F minimum. na 03.2.4.8 / S Group R2/R3 dwelling and Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback sleeping units stems periods and 10°F deadband; note exceptions taken na C403.2.5.1 Demand controlled Indicate high -occupancy spaces and systems requiring DCV ventilation na C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or alternate means provided to automatically reduce OSA when vartially occupied 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit ' Page 2 of 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address Healthpoint Temporary Dental Clinic ate 2/5/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section P Code Provision Information Required - Must be in eq permit documents Location in Building Department no na Documents Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued na C403.2.5.3 Enclosed loading dock/parking garage Indicate enclosed loadingdock and enclosed parking p ng garage ventilation system activation and ventilation control method na C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method na C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation na C403.2.6.1 Energy recovery (ER) - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; rote exceptions na C403.2.6.2 Energy recovery (ER) - Indicate on-site steam heating systems requiring energy recovery condensates stems na C403.2.6.3 Energy recovery - Indicate remote refrig. condensers requiring ER and use of captured energy cooler/freezer condensers na C403.4.6 Energy recovery (ER) - Indicate condenser systems requiring ER to pre -heat service water, indicate ER effectiveness, condensers stems note exceptions taken na C403.2.12 Variable flow control - Indicate fan and pump motors z 7.5 hp and the method of variable flow control (VSD or fans/ pumps eauivalent controls C403.2.12.1 Variable flow control - heat Indicate heat rejection equipment and coaling tower fans requiring variable flow control and na rejection equipment method Indicate single zone fan systems requiring airflow reduction capability in response to reduced na C403.2.12.2 Large volume fan systemscooling or heating demand in a zone, or adjacent zones without separating walls, with > 10,000 CFM supply air note exceptions taken na C403.2.12.2 Single zone AC systems ndicate method of cooling demand -based fan control for air conditioning systems > 110,000 sin le zones Btu/h S.= na C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand res onse set int ad ustment Ducting Systems C403.2.7.1 & Duct construction yes Indicate all ductwork constructed and sealed per IMC, C402.4 leakage requirements and IBC M0.02 C403.2.7.3 vapor retarder requirements yes 403.2.7.3. 14 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans M0.02 na C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans, provide test results to test jurisdiction when completed yes 403.2.7.1 12 Duct insulation Indicate R -value of insulation on ductwork M0.02 Piping Systems yes C403.2.8 Piping insulation Indicate R -value of insulation on piping M0.02 yes I C403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/degredation M0.02 weather SIMPLE SYSTEMS Qualifying Systems na C403.3 Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, does not have active systems humidifeation or simultaneous heating/cooling na C403.3 Qualifying 2 -pipe healing Verify 2 -pipe head ntY P Pe ng -only system does not exceed capacity limits systems na C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers na C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule yes C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) Et. E4 na C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken na C403.3.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for systems with capacity > 65,000 Btu/h operation na C403.3.1.1.3 Air economizer high limit Indicate high limit shut-off control method g per Table C403.3.1.1.3(2) controls 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 PermitMechanical 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address HeahhpolntTemporary Dental Clinic ate 2/5/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department es no na Documents Notes COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls, note in equipment schedule na C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) na C403.4.1.1 Water economizer capacity For eligible systems where water economizer may be provided in lieu of air economizer, indicates stem is capable of 100% cooling capacity at 50°F db/45°F wb OSA C403.4.1.2 Water economizer Indicate precooling coils and heat exchangers in water economizer system do not exceed na maximum pressure drop pressure drop limit na C403.4.1.3 Integrated economizer loperation Indicate capability for partial economizer operation for air or water economizer systems C403.4.1.4 Economizer heating system Verify control method of HVAC systems with economizers does not increase building heating na nt act energy usage during normal operation Specific System Requirements na C403.4.2 & VAV fan control Indicate fans requiring variable flow control and method C403.2.12 na C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major duct branch sensors na C403.4.2.2 VAV fan static pressure Indicate fan system static pressure setpoint based on zone requiring most pressure setpoint na C403.4.5 VAV systems serving Indicate supply air systems serving multiple zones, method of primary air control, and zones multiple zones served: Indicate VAV or note exceptions taken C403.4.5 VAV systems serving For each air system terminal, indicate the maximum air flow rate of primary supply air during na multiple zones zone peak cooling and the maximum air flow rates during zone peak heating. na C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads C403.4 Large capacity cooling Indicate method of multi -stage or variable control for building cooling system capacity > 300 na s stems tons na C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na C403.4.3 Large capacity boiler Indicate multi -stage or modulating burner for single boilers > 500,000 Btu/h systems na C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers C403.4.3.5 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & na solation boilers when rat in use na C403.4.3.6 & Variable flow control - Indicate pumps requiring variable flow control & method C403.2.12 pumps na C403.2.12.1 Variable flow control - Indicate cooling tower fans requiring variable flow control and method & C403.4.4 cooling towers Hydronic system part load Indicate heating & chilled water systems have the capability to automatically reset supply water na C403.4.3.4 controls temp AND reduce flow b t 50% fors stems > 300,000 Btu/h na C403.4.3.2 Two -pipe changeover Indicate deadband, heating/cooling mode scheduling and changeover temperature range systems na C403.4.3.3.1 Water loop heat pump - Indicate capability of central equipment to provide min. 20°F water supply temp deadband deadband between heat rejection and heat addition modes na C403.4.3.3.2.1 Water loop heal pump - Indicate method used to limit system creat loss when heat rejections is not needed heat re'ection Zone 4 na C403.4.3.3.2.2 Water loop heat pump - Provide heat exchanger that separates cooling tower and heat pump loop heat re echo i Zone 5 na C403.4.3.3.3 Water loop heat pump - Indicate 2 -way isolation valve on each heat pump and variable flow control for systems with isolation total pump er> 10 h na C403.5Walk-in cooler / freezer - Indicate w/sf & control method for walk-in coolertfreezer door anti -sweat heaters anti -sweat heaters na C403.5 /6 Cooler / freezer - evaporator Indicate motor type for evaporator and condenser fans < 1 hp and condenser fans 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 PermitMechanical 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address Healthpoint Temporary Dental Clinic Pate 2/5/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department es no na Documents Notes SERVICE WATER HEATING Service Water Systems C404.2 Water -heating equip min. Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency na efficiency source na C404.3 Temperature controls Indicate temperature controls have required setpoint capability na C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge na C404.5 Insulation under water Indicate R-10 insulation under electric water healer tanks heater y es C404.8 Service water piping Indicate R -value of insulation on piping-, p'p'ng; note exceptions taken insulation M0.02 na C404.7 / 8 Circulation systems and Indicate shut-off capability based on occupancy and periods of limited demand heat trace shut-off na C404.9 Group R-2 service hot water Indicate method of usage metering for dwelling units served by a central service hot water meters System Pools & In -Ground Permanently Installed Spas na C404.10.1 Pool heating equip min. Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency efficiency source na C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; note exceptions taken na C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use; note exceptions taken COMMISSIONING r Specific System Requirements Mechanical systems IMieate all mechanical systems to be commissioned, for those that will not be commissioned, yes C408.2 commission - note excetitin taken M0.02 na C408.4 Service water heating Indicate all service water heating systems to be commissioned; for those that will not be systems commissi ning commissioned, note exception taken yes C408.1.1 Commissioning plan Provide commissioning plan for all systems requiring commissioning; include in plan all required items per this section M0.02 C408.2.2.1 & Air system and h onic - •+ Include in commissioning plan that air and hydronic systems shall be balanced in a manner to yes C408.2.2.2 system bal i first minimize throttling losses then adjust to meet design flow conditions M0.02 C408.2.2.1 Air system 6ala6cing .. Indicate devices that provide the capability to balance all supply air outlets, zone terminals and yes devices equipment re uirin system balani M0.02 na C408.2.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate, balance and measure flow for all hydronic devices equipment re uirin system balancing Mechanical systems Provide description of functional performance testing procedures for all applicable systems yes C408.2.3 functional performance testing including: equipment, controls, economizers M0.02 Service water heating Provide description of functional performance testing procedures for all applicable systems na C408.4.1 functional performance including: equipment, controls, pools and spas testing yes C408.1.4 Systems operation training Indicate required systems operation training measures to be provided M0.02 C408.1.2 & Documentation Indicate required documentation including: record documents, manuals, balancing reports, yes C403.1.3 commissions preliminaryand final reports M0.02 yes C408.1.2.1 Acceptance report Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon M0.02 completion of creliminary commissioning report Common Ventilation Unit Sizing Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42PIV Air System Information Air System Name ........................................ Dental TI BHP Equipment Class .............................................. TERM kW Air System Type .............................................. WSHP in wg Sizing Calculation Information 11.04 CFM/person Calculation Months .................................. Jan to Dec Sizing Data ............................................... Calculated Ventilation Fan Sizing Data Actual max CFM .................................................. 795 CFM Standard CFM ...................................................... 782 CFM Actual max CFM/ft2............................................. 0.31 CFM/ft2 Outdoor Ventilation Air Data Design airflow CFM ............................................. 795 CFM CFM/ft2................................................................ 0.31 CFM/ftz Hourly Analysis Program v4.91 Number of zones............................................................. 8 Floor Area.............................................................. 2567.0 ft2 Location .................................. Seattle IAP, Washington Zone CFM Sizing ................ Sum of space airflow rates Space CFM Sizing ........... Individual peak space loads Fan motor BHP .......................................................... 0.22 BHP Fan motor kW............................................................ 0.17 kW Fanstatic................................................................... 1.00 in wg CFM/person............................................................. 11.04 CFM/person OETC Page 1 of 23 Zone Sizing Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201( Prepared by: HV Engineering, Inc 04:42Pb Air System Information Air System Name ........................................ Dental TI Number of zones ....... Equipment Class .............................................. TERM Floor Area .................. Air System Type .............................................. WSHP Location ..................... Sizing Calculation Information 6.2 77.1/64.1 Calculation Months .................................. Jan to Dec Zone CFM Sizing ....... Sizing Data ............................................... Calculated Space CFM Sizing .... Terminal Unit Sizing Data - Cooling ............................................ 8 .................................. 2567.0 ft2 ... Seattle IAP, Washington Sum of space airflow, rates Individual peak space loads Zone Name Total Coil Load (MBH) Sens Coil Load (MBH) Coil Entering DB / WB (°F) Coil Leaving DB/WB (°F) Water Flow @ 10.0 °F (gpm) Time of Peak Coil Load Zone CFM/ft2 HP -2A 8.1 6.2 77.1/64.1 54.3 / 53.2 0.000 Jun 1700 0.74 HP -3A 15.5 12.6 78.4/63.9 54.0/52.7 0.000 Jun 1500 1.06 HP -1A 7.3 6.0 77.2/63.6 54.4/53.2 0.000 Jun 1700 1.08 HP -213 11.3 9.6 77.0/63.1 54.3/53.1 0.000 Sep 1500 1.30 HP -36 13.5 10.6 77.0/63.6 53.7 / 52.5 0.000 Aug 1400 0.88 H-1 B 6.0 4.9 77.1/63.5 54.4/53.1 0.000 Jun 1700 1.16 HP -1C 5.3 4.2 77.4/63.8, 54.0/52.8, 0.000 Jun 1500 0. 91 HP -1 D 9.11 7.01 77.7/64.11 53.5/52.31 0.0001 Jun 15001 0.71 Terminal Unit Sizing Data - Heating, Fan, Ventilation Zone Name Heating Coil Load (MBH) Heating Coil Ent/Lvg DB (°F) Htg Coil Water Flow @20.0 °F (gpm) Fan Design Airflow (CFM) Fan Motor (BHP) Fan Motor (kW) OA Vent Design Airflow (CFM) HP -2A 6.5 62.7/86.6 11.2 257 0.000 0.000 73 HP -3A 8.9 57.4/74.5 228.0 489 0.000 0.000 264 HP -1A 5.6 61.6/83.1 Sep 1400 246 0.000 0.000 86 HP -26 8.6 64.2/84.6 HP -1C 397 0.000 0.000 89 HP -36 6.5 65.5/79.7 1.4 431 0.000 0.000 76 ,H -1B 4.5 61.9/82.7 2031 0.000 0.000 66 HP -1 C 1.91 63.8/74.2 1691 0.000 0.000 45 HP -1 D 3.81 61.6 / 74.6 2711 0.0001 0.000 97 Zone Peak Sensible Loads Zone Name Zone Cooling Sensible (MBH) Time of Peak Sensible Cooling Load Zone Heating Load (MBH) Zone Floor Area (ft') HP -2A 5.8 Jun 1700 4.9 345.0 HP -3A 11.2 Jun 1600 2.6 461.0 HP -1A 5.6 Jun 1700 3.6 228.0 HP -213 8.9 Sep 1500 6.6 305.0 HP -3B 9.7 Sep 1400 4.7 487.0 H-113 4.6 Jun 1700 3.1 175.0 HP -1C 3.9 Jun 1500 0.8 185.0 HP -1D 6.21 Jun 1500 1.4 381.0 Hourly Analysis Program v4.91 Page 2 of 23 Zone Sizing Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42P Space Loads and Airflows Zone Name / Space Name Mult. Cooling Sensible MBH Time of Peak Sensible Load Air Flow CFM Heating Load MBH) Floor Area (ftz) Space CFM/ft' HP -2A 211 North Operatories 1 5.1 Jun 1700 223 4.5 195.0 1.15 214 hallway 11 0.8 Jun 1400 341 0.5 150.0 0.22 HP -3A 105 Break Room 1 3.2 Jul 1600 141 1.6 153.0 0.92 200 Waiting 1 7.9 Jun 1600 347 1.0 308.0 1.13 HP -1A 212 Quiet Op + part 213 1 5.6 Jun 1700 246 3.6 228.0 1.08 HP -2B 213 S Portion S Op 1 5.9 Aug 1600 258 4.8 200.0 1.29 203 Manager 1 3.2 Oct 1400 139 1.8 105.0 1.32 HP -3B 202 Provider Office 1 8.5 Sep 1400 372 3.81 250.0 1.49 205-207 Hallway 1 1.4 Jul 1500 59 0.9 237.0 0.25 H -1B 213 Cent south op 1 4.6 Jun 1700 203 3.1 175.0 1.16 HP -1C 201 Reception 1 3.91 Jun 1500 169 0.8 185.0 0.91 HP -ID 208 Recovery 1 0.6 Jun 1500 25 0.3 68.0 0.37 206 X-RAY 1 1.3 Jun 1500 57 0.3 70.0 0.82 209 Sterilization 1 3.2 Jun 1500 139 0.6 175.0 0.79 204 Office 1 1 1.1 Jun 1500 501 0.3 68.01 0.73 Hourly Analysis Program v4.91 Page 3 of 23 Ventilation Sizing Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 E Prepared by: HV Engineering, Inc 04:42PN 1. Summary Ventilation Sizing Method .................. Design Condition ............................... Occupant Diversity (D) ...................... Uncorrected Outdoor Air Intake (Vou) System Ventilation Efficiency (Ev) ..., Outdoor Air Intake (Vot) ..................... 2. Space Ventilation Analysis Table . ASHRAE Std 62.1-2010 ......... Heating operation ................................ 1.000 ................................... 677 CFM ................................ 0.822 ................................... 795 CFM Hourly Analysis Program v4.91 Page 4 of 23 Supply Air (CFM) Space Floor Area (ft') Area Outdoor Air Rate (CFM/ft') Time People Averaged Outdoor Air Occupancy Air Rate Distribution (Occupants) (CFM/person) Effectiveness Space Outdoor Air (CFM) Breathing Zone Outdoor Air (CFM) Space Ventilation Efficiency Zone Name / Space Name Mult. (Vpz) (Az) (Ra) (Pz) (Rp) (Ez) (Voz) (Vbz) (Evz) HP -2A 211 North Operatories 11 223 195.0 0.301 4.0 0.00 0.80 73 59 0.935 214 hallway 1 34 150.0 0.06 0.0 0.00 0.80 11 9 0.927 HP -3A 105 Break Room 1 141 153.0 0.12 8.0 5.00 0.80 73 58 0.947 200 Waiting 1 347 308.0 0.06 30.0 5.00 0.80 211 168 0.858 HP -1A 212 Quiet Op + part 213 1 246 228.0 0.30 4.0 0.00 0.80 86 68 1.000 HP -2B 213 S Portion S Op 1 258 200.0 0.30 3.0 0.00 0.80 75 60 0.914 203 Manager 1 139 105.0 0.06 3.0 5.00 0.80 27 21 1.013 HP -3B 202 Provider Office 1 372 250.0 0.061 7.0 5.00 0.80 63 50 0.981 205-207 Hallway 1 59 237.0 0.06 0.0 0.00 0.80 18 14 0.849 H-1 B 213 Cent south op 1 203 175.0 0.30 3.0 0.00 0.80 66 53 1.000 HPAC 201 Reception 1 169 185.0 0.06 5.0 5.00 0.80 45 36 1.000 HP -1D 208 Recovery 1 25 68.0 0.06 1.0 5.00 0.80 11 9 0.839 206 X-RAY 1 57 70.0 0.06 1.0 5.00 0.80 12 9 1.095 209 Sterilization 1 139 175.0 0.30 2.0 0.001 0.801 66 53 0.822 204 Office 11 50 68.0 0.06 1.0 5.00 0.80 11 9 1.066 Totals (incl. Space Multipliers) 1 24611 1 1 1 677 0.822 Hourly Analysis Program v4.91 Page 4 of 23 Zone Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42Pfv HP -2A DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1700 COOLING OA DB / WB 80.2 "F / 64.4 °F HEATING DATA AT DES HTG HEATING OA DB I WB 23.0 °F 119.2 °F OCCUPIED T -STAT 75.0 °F OCCUPIED T -STAT 70.0'F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 60 ft2 1585 60 ft' - Wall Transmission 300 ftZ 567 300 ft2 772 - Roof Transmission 345 ft2 711 345 ft2 650 - Window Transmission 60 ft2 140 60 ft2 2278 - Skylight Transmission 0 ft2 0 0 ft2 0 - Door Loads 0 ft2 0 0 ft2 0 - Floor Transmission 0 ft2 0 0 ft2 0 - Partitions 0 ft2 0 0 ft2 0 - Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 297 W 844 0 0 Task Lighting 193 W 597 0 0 Electric Equipment 0 W 0 - 0 0 People 4 767 812 0 0 0 Infiltration - 44 -28 - 4051 0 Miscellaneous 0 0 - 0 0 Safety Factor 10%/10% 525 78 20% 821 0 » Total Zone Loads 5780 863 4925 0 HP -3A DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1600 COOLING OA DB I WB 81.5 °F / 64.8 °F HEATING DATA AT DES HTG HEATING OA DB I WB 23.0 "F 119.2 °F OCCUPIED TSTAT 75.0 °F OCCUPIED T -STAT 70.0 °F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 15 ft2 163 15 ft2 - Wall Transmission 95 ft2 71 95 ft2 245 - Roof Transmission 461 ft2 1101 461 ft2 868 - Window Transmission 15 ft2 43 15 ft2 569 - Skylight Transmission 0 ft2 0 0 ft2 0 - Door Loads 0 ft2 0 0 ft2 0 - Floor Transmission 0 ft2 0 0 ft2 0 - Partitions 0 W 0 0 ft2 0 - Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 430 W 1200 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 100W 313 - 0 0 People 38 7189 7790 0 0 0 Infiltration - 63 -6 - 460 0 Miscellaneous 0 0 0 0 Safety Factor 1 10%/10% 10141 7781 20% 428 0 » Total Zone Loads 111571 85631 2570 0 Hourly Analysis Program v4.91 Page 5 of 23 Zone Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P HP -1A DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1700 COOLING OA DB I WB 80.2 °F 164.4 °F HEATING DATA AT DES HTG HEATING OA DB I WB 23.0 °F 119.2 °F OCCUPIED T -STAT 75.0 °F OCCUPIED T -STAT 70.0 °F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 45 ft2 1850 45 ft' Wall Transmission 195 ft2 535 195 ft' 502 Roof Transmission 228W 470 228 ft2 429 Window Transmission 45 ft2 105 45 ft= 1708 Skylight Transmission 0 ftz 0 0 ft' 0 Door Loads 0 ftz 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ftz 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ftz 0 Oft' 0 Overhead Lighting 226 W 641 0 0 Task Lighting 226 W 698 0 0 Electric Equipment 0 W 0 0 0 - People 4 767 812 0 0 0 Infiltration - 38 -6 - 3421 0 Miscellaneous 0 0 - 01 -- 0 Safety Factor Safety 10%/1 % 510 81 20% 596 0 » Total Zone Loads 5613 8861 35771 0 HP -213 DESIGN COOLING DESIGN HEATING COOLING DATA AT Sep 1500 COOLING OA DB / WB 81.0 °F 164.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 75.0 °F OCCUPIED T -STAT 70.0 °F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 100 ft2 3719 100 ft2 Wall Transmission 250 ft2 608 250 ft2 644 Roof Transmission 305 ft2 502 305 ft2 574 Window Transmission 100 ft2 220 100 ft2 3796 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 305 W 837 0 0 Task Lighting 200 W 608 0 0 Electric Equipment 150W 467 0 0 People 6 1111 1230 0 0 0 Infiltration 58 -17 457 0 Miscellaneous 0 0 0 0 Safety Factor 10%/10% 813 121 20% 1094 0 » Total Zone Loads 89451 1334 6565 0 Hourly Analysis Program v4.91 Page 6 of 23 Zone Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42P HP -313 DESIGN COOLING DESIGN HEATING COOLING DATA AT Sep 1400 COOLING OA DB / WB 80.5 °F / 63.8 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 75.0 °F OCCUPIED T -STAT 70.0'F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTUIhr) Window & Skylight Solar Loads 50 ft' 1728 50 ft2 - Wall Transmission 205 ft2 531 205 ft2 528 Roof Transmission 487 ft2 858 487 ft2 917 Window Transmission 50 ft2 86 50 f12 1898 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 f12 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 428 W 1154 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 1000 W 3094 0 0 - People 7 1267 1435 0 0 0 Infiltration - 64 -43 552 0 Miscellaneous 0 0 0 0 Safety Factor 10%/10% 878 139 20% 779 0 » Total Zone Loads 9661 1531 4674 0 H-18 DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1700 COOLING OA DB / WB 80.2 °F / 64.4 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 75.0 °F OCCUPIED TSTAT 70.0 °F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 45 W 1850 45 f12 - Wall Transmission 95 ft2 261 95 ft2 245 Roof Transmission 175 ft2 360 175 ft2 329 Window Transmission 45 ft2 105 45 ft2l 1708 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 173 W 492 0 0 Task Lighting 173 W 536 0 0 Electric Equipment 0 W 0 0 0 People 3 575 609 0 0 0 Infiltration - 29 -2 - 262 0 Miscellaneous 0 0 0 0 Safety Factor 10%/10% 4211 611 20%1 509 0 >> Total Zone Loads 46281 667 3053 0 Hourly Analysis Program v4.91 Page 7 of 23 Zone Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42PIV HP -1C DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0'F / 65.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 75.0'F OCCUPIED T -STAT 70.0 °F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 0 ft' 0 0 ft' - Wall Transmission 0 ft' 0 0 f12 0 Roof Transmission 185 ft' 479 185 ft' 348 Window Transmission 0 ft2 0 0 ft2 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 185 W 508 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 500 W 1557 0 0 - People 5 926 1025 0 0 0 Infiltration - 41 -8 - 277 0 Miscellaneous 0 0 - 0 0 Safety Factor 10%/10% 351 102 20% 125 0 » Total Zone Loads 3863 1119 - 751 0 HP -1D DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0 °F 165.0'F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED TSTAT 75.0 °F OCCUPIED T -STAT 70.0 °F ZONE LOADS Sensible Details (BTU/hr) Latent (BTU/hr) Sensible Details (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 - Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 379 ft2 981 379 ft2 714 Window Transmission 0 ft2 0 0 ft2 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 364 W 999 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 850 W 2648 0 0 - People 5 926 1025 0 0 0 Infiltration 65 -23 440 0 Miscellaneous 0 0 - 0 0 Safety Factor 10%/10% 562 100 204 231 0 » Total Zone Loads 6182 1102 1384 0 Hourly Analysis Program v4.91 Page 8 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE I.I.A. COMPONENT LOADS FOR SPACE " 211 North Operatories " IN ZONE "HP -2A" DESIGN COOLING DESIGN HEATING COOLING COOLING COOLING DATA AT Jun 1700 COOLING OA DB I WB 80.2 °F 164.4 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0'F Area Sensible Latent TRANS Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 60 ft' 1585 60 ft2 - Wall Transmission 300 f12 567 WALL 300 ft' 772 - Roof Transmission 195 f12 402 335 195 f12 367 0.808 Window Transmission 60 ft2l 140 352 60 f12 2278 Skylight Transmission 0 f12 0 0 f12 0 WALL Door Loads 0 f12 0 - 0 f12 0 438 Floor Transmission 0 f12 0 0.808 0 f12 0 1233 Partitions 0 f12 0 0 ft2 0 Ceiling 0 ft2 0 ROOF 0 W 0 - Overhead Lighting 193 W 548 367 0 0 Task Lighting 193 W 597 0 0 Electric Equipment 0 W 0 - 0 0 - People 4 767 8121 0 0 0 Infiltration - 32 -20 - 2921 0 Miscellaneous 0 0 - 01 0 Safety Factor 10%/10%1 464 79 20% 742 0 » Total Zone Loads 5102 871 - 44611 0 TABLE 1.1.B. ENVELOPE LOADS FOR SPACE " 211 North Operatories " IN ZONE " HP -2A " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft') (BTUI(hr-ft' =F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) N EXPOSURE WALL 130 0.055 - 101 - 335 WINDOW 1 30 0.808 0.435 70 352 1139 W EXPOSURE WALL 170 0.055 - 466 438 WINDOW 1 30 0.808 0.435 70 1233 1139 H EXPOSURE ROOF 1 195 0.040 - 402 367 Hourly Analysis Program v4.91 Page 9 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42PIV TABLE 1.2.A. COMPONENT LOADS FOR SPACE " 214 hallway " IN ZONE " HP -2A " COOLING COOLING DESIGN COOLING Area U -Value Shade DESIGN HEATING TRANS (ft2) (BTU/(hr-ft---F)) Coeff. COOLING DATA AT Jun 1400 COOLING OA DB 1 WB 81.5 °F / 64.8 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 70.0 °F H EXPOSURE Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 150 ft2 398 150 ft2 282 Window Transmission 0 ft2 0 0 ft2 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft'l 0 0 ft2 0 Overhead Lighting 105 W 283 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 0 W 0 0 0 - People 0 0 0 0 0 0 Infiltration - 15 -18 112 0 Miscellaneous 0 0 0 0 Safety Factor 10%/107/.1 70 2 20%1 791 0 >> Total Zone Loads 766 -20 4741 0 TABLE 1.2.6. ENVELOPE LOADS FOR SPACE " 214 hallway " IN ZONE " HP -2A " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft---F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 150 0.040 398 282 Hourly Analysis Program v4.91 Page 10 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42P TABLE 2.1.A. COMPONENT LOADS FOR SPACE " 105 Break Room " IN ZONE "HP -3A" DESIGN COOLING COOLING COOLING DESIGN HEATING Area COOLING DATA AT Jul 1600 COOLING OA DB / WB 82.5'F / 64.8 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 70.0'F TRANS Sensible Latent (BTU/(hr-ft--'F)) Coeff. Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 15 ft= 153 73 15 ft2 - 15 Wall Transmission 95 ft2 73 569 95 ft2 245 Roof Transmission 153 ft2 358 ROOF 153 ft2 288 358 Window Transmission 15 ft2 55 15 ft2 569 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 Oft' 0 Floor Transmission 0 ft2 0 - 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 - 0 ft2l 0 Overhead Lighting 153 W 427 - 0 0 Task Lighting 0 W 0 - 0 0 Electric Equipment 100W 313 - 0 0 - People 8 1513 1640 0 0 0 Infiltration - 36 -8 - 2291 0 Miscellaneous 0 0 - 01 0 Safety Factor 10%/10%1 2931 163 20% 266 0 >> Total Zone Loads 32231 1795 15981 0 TABLE 2.1.13. ENVELOPE LOADS FOR SPACE " 105 Break Room" IN ZONE " HP -3A " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (1N) (BTU/(hr-ft--'F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) N EXPOSURE WALL 95 0.055 - 73 245 WINDOW 1 15 0.808 0.435 55 153 569 H EXPOSURE ROOF 1 1531 0.040 358 288 Hourly Analysis Program v4.91 Page 11 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 2.2.A. COMPONENT LOADS FOR SPACE " 200 Waiting " IN ZONE " HP -3A " DESIGN COOLING COOLING DESIGN HEATING Area U -Value Shade TRANS COOLING DATA AT Jun 1600 COOLING OA DB / WB 81.5'F / 64.8 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 70.0 °F (ft2) (BTU/(hr-ft2 °F)) Coeff. Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTUlhr) (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 - Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 308 ft2 736 308 ft2 580 Window Transmission 0 ft2l 0 0 ft' 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ftZ 0 Floor Transmission 0 ft2 0 0 ft' 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2l 0 Overhead Lighting 277 W 773 0 0 Task Lighting 0 W 0 - 0 0 Electric Equipment 0 W 0 0 0 - People 30 5675 6150 0 0 0 Infiltration - 32 -3 - 2311 0 Miscellaneous 0 01 0 0 Safety Factor 10%/10%1 722 615 20% 1 1621 0 >> Total Zone Loads 7937 6762 9731 0 TABLE 2.2.8. ENVELOPE LOADS FOR SPACE " 200 Waiting " IN ZONE " HP -3A " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2 °F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 308 0.040 736 580 Hourly Analysis Program v4.91 Page 12 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42PIV TABLE 3.1.A. COMPONENT LOADS FOR SPACE " 212 Quiet Op + part213 " IN ZONE "HP -1A" DESIGN COOLING DESIGN HEATING COOLING HEATING COOLING DATA AT Jun 1700 COOLING OA DB I WB 80.2 °F 164.4 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0 °F U -Value Shade Sensible Latent TRANS Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 45 ft' 1850 45 ft' - 195 Wall Transmission 195 ft2 535 - 195 W 502 451 Roof Transmission 228 ft2 470 1850 228 ft' 429 Window Transmission 45 ft2 105 45 ft' 1708 1 2281 Skylight Transmission 0 ft= 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 - 0 ft2 0 Overhead Lighting 226W 641 - 0 0 Task Lighting 226 W 698 - 0 0 Electric Equipment 0 W 0 - 0 0 People 4 767 812 0 0 0 Infiltration - 38 -6 - 3421 0 Miscellaneous 0 0 - 0 0 Safety Factor 10% / 10% 510 81 20% 596 0 >> Total Zone Loads 5613 886 - 3577 0 TABLE 3.1.B. ENVELOPE LOADS FOR SPACE "212 Quiet Op + part 213 " IN ZONE " HP -1A " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft-=F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) W EXPOSURE WALL 195 0.055 - 535 - 502 WINDOW 1 451 0.8081 0.4351 1051 1850 1708 H EXPOSURE ROOF 1 2281 0.040 -1 470 429 Hourly Analysis Program v4.91 Page 13 of 23 Space Design Load Summary for Dental Ti Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42PIV TABLE 4.1.A. COMPONENT LOADS FOR SPACE " 213 S Portion S Op " IN ZONE "HP -213" DESIGN COOLING DESIGN HEATING COOLING COOLING COOLING DATA AT Aug 1600 COOLING OA DB / WB 82.5 °F 164.8 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 70.0 "F Area Sensible Latent TRANS Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 75 f12 2477 75 ft2 - Wall Transmission 175 ft2 414 WALL 175 f12 451 - Roof Transmission 200 ft2 406 206 200 ft2 377 - Window Transmission 75 ft2 276 761 75 ft2 2847 - Skylight Transmission 0 ft2 0 0 ft2 0 - Door Loads 0 ft2 0 - 0 f12 0 245 Floor Transmission 0 ft2 0 0.808 0 ft2 0 1715 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 ROOF 0 ft2 0 - Overhead Lighting 200 W 558 377 0 0 Task Lighting 200 W 613 0 0 Electric Equipment 0 W 0 0 0 People 3 568 615 0 0 0 Infiltration - 48 -9 300 0 Miscellaneous 0 0 0 0 Safety Factor 10%/10% 536 61 20% 795 0 >> Total Zone Loads 5894 667 4769 0 TABLE 4.1.13. ENVELOPE LOADS FOR SPACE " 213 S Portion S Op " IN ZONE " HP -26 " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2 "F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) S EXPOSURE WALL 80 0.055 - 202 206 WINDOW 1 30 0.808 0.435 111 761 1139 W EXPOSURE WALL 95 0.055 - 212 - 245 WINDOW 1 45 0.808 0.435 166 1715 1708 H EXPOSURE ROOF 200 0.040 - 406 377 Hourly Analysis Program v4.91 Page 14 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 4.2.A. COMPONENT LOADS FOR SPACE " 203 Manager " IN ZONE "HP -213" " HP -26 " DESIGN COOLING DESIGN HEATING COOLING COOLING COOLING DATA AT Oct 1400 COOLING OA DB /WB 77.5 °F / 61.8 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB I WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0'F Area Sensible Latent SOLAR Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 25 ft2 1252 25 ft2 WALL Wall Transmission 75 ft2 227 227 75 ft2 193 WINDOW 1 Roof Transmission 105 ft2 118 18 105 ft2 198 H EXPOSURE Window Transmission 25 ft2 -18 25 ft2l 949 ROOF Skylight Transmission 0 ft2 0 1181 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2l 0 10 ft2 0 - Overhead Lighting 105 W 283 0 0 - Task Lighting 0 W 0 0 0 Electric Equipment 150 W 464 0 0 - People 3 543 615 0 0 0 Infiltration 8 -25 - 157 0 Miscellaneous 01 0 - 01 0 Safety Factor 10%/10%1 2881 591 20% 2991 0 >> Total Zone Loads 31661 649 1797 0 Hourly Analysis Program v4.91 Page 15 of 23 TABLE 4.2.13. ENVELOPE LOADS FOR SPACE " 203 Manager " IN ZONE " HP -26 " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2-°F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) S EXPOSURE WALL 75 0.055 - 227 193 WINDOW 1 25 0.808 0.435 18 1252 949 H EXPOSURE ROOF 1 1051 0.040 1181 198 Hourly Analysis Program v4.91 Page 15 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 5.1.A. COMPONENT LOADS FOR SPACE " 202 Provider Office" IN ZONE "HP -313" DESIGN COOLING DESIGN HEATING COOLING HEATING COOLING DATA AT Sep 1400 COOLING OA DB / WB 80.5 °F / 63.8 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0 °F U -Value Sensible Latent SOLAR Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 50 ft2 1728 - 50 ft2 - Wall Transmission 155 ft2 383 - 155 ft' 399 340 Roof Transmission 250 ft2 441 - 250 ft2 471 0.435 Window Transmission 50 ft2l 86 - 50 ft2l 1898 Skylight Transmission 0 ft2 0 - 0 ft2 0 40 Door Loads 0 ft2 0 - 0 ft2 0 WINDOW 1 Floor Transmission 0 ft2 0 - 0 ft2 0 759 Partitions 0 ft2 0 - 0 ft2 0 Ceiling 0 ft2 0 - 0 ft2 0 441 Overhead Lighting 250 W 675 - 0 0 Task Lighting ow--- 0 - 0 0 Electric Equipment 1000W 3094 0 0 - People 7 1267 1435 0 0 0 Infiltration - 43 -29 - 3751 0 Miscellaneous -1 0 0 -01 0 Safety Factor 10%/10%1 7721 141 20% 1 6281 0 >> Total Zone Loads 84881 1546 37711 0 TABLE S.I.B. ENVELOPE LOADS FOR SPACE " 202 Provider Office " IN ZONE " HP -36 " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2 °F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) S EXPOSURE WALL 115 0.055 - 340 - 296 WINDOW 1 30 0.808 0.435 52 1335 1139 E EXPOSURE WALL 40 0.055 - 43 103 WINDOW 1 20 0.808 0.435 34 393 759 H EXPOSURE ROOF 250 0.040 - 441 471 Hourly Analysis Program v4.91 Page 16 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42P TABLE 5.2.A. COMPONENT LOADS FOR SPACE " 205-207 Hallway " IN ZONE " HP -313 " " HP -313 " DESIGN COOLING DESIGN HEATING COOLING COOLING COOLING DATA AT Jul 1500 COOLING OA DB / WB 83.0 °F / 65.0 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0 °F Area Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 - Wall Transmission 50 ft2 111 WALL 50 ft2 129 0.055 Roof Transmission 237 ft2 602 129 237 ft2 446 Window Transmission 0 ft2l 0 0 ft2 0 ROOF Skylight Transmission 0 ft2 0 602 0 ft2 0 446 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 178 W 488 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 0 W 0 0 0 - People 0 0 0 0 0 0 Infiltration 30 -13 178 0 Miscellaneous 0 0 0 0 Safety Factor 10% / 10% 1 123 -1 20%1 150 0 >> Total Zone Loads 1355 -14 903 0 Hourly Analysis Program v4.91 Page 17 of 23 TABLE 5.2.13. ENVELOPE LOADS FOR SPACE " 205-207 Hallway " IN ZONE " HP -313 " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft'= F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) S EXPOSURE WALL 50 0.055 111 129 H EXPOSURE ROOF 2371 0.040 602 446 Hourly Analysis Program v4.91 Page 17 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 6.1.A. COMPONENT LOADS FOR SPACE " 213 Cent south op " IN ZONE "H-113" DESIGN COOLING DESIGN HEATING COOLING HEATING COOLING DATA AT Jun 1700 COOLING OA DB / WB 80.2 °F / 64.4 `F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0 "F U -Value Shade Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 45 ft2 1850 45 ft2 - Wall Transmission 95 ft2 261 95 95 ft2 245 261 Roof Transmission 175 ft2 360 WINDOW 1 175 ft2 329 0.808 0.435 Window Transmission 45 ft2 105 1708 45 ft2 1708 Skylight Transmission 0 ft2 0 0 ft2 0 ROOF Door Loads 0 ft2 0 360 0 ft2 0 329 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 173 W 492 0 0 Task Lighting 173 W 536 0 0 Electric Equipment 0 W 0 0 0 People 3 575 609 0 0 0 Infiltration - 29 -2 - 262 0 Miscellaneous 0 0 0 0 Safety Factor 10%/10% 421 61 20% 509 0 » Total Zone Loads 46281 667 - 3053 0 TABLE 6.1.13. ENVELOPE LOADS FOR SPACE " 213 Cent south op " IN ZONE "H-113" COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2-°F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) W EXPOSURE WALL 95 0.055 - 261 - 245 WINDOW 1 45 0.808 0.435 1051 1850 1708 H EXPOSURE ROOF 1751 0.040 360 329 Hourly Analysis Program v4.91 Page 18 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 7.1.A. COMPONENT LOADS FOR SPACE "201 Reception" IN ZONE " HPAC " DESIGN COOLING COOLING DESIGN HEATING Area U -Value Shade TRANS COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0 °F / 65.0 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0 °F (ft2) (BTU/(hr-ft2 =F)) Coeff. Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft' 0 0 ft2 - Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 185 ft2 479 185 ft2 348 Window Transmission 0 ft2l 0 0 ft2 0 - Skylight Transmission 0 ft2 0 0 ft2 0 - Door Loads 0 ft= 0 0 ft2 0 - Floor Transmission 0 ft2 0 0 ft2 0 - Partitions 0 ft2 0 0 ft2 0 - Ceiling 0 ft2 0 0 ft2 0 - Overhead Lighting 185 W 508 0 0 - Task Lighting 0 W 0 0 0 Electric Equipment 500 W 1557 - 0 0 People 5 926 1025 0 0 0 Infiltration - 41 -8 - 2771 0 Miscellaneous 0 0 - 01 0 Safety Factor 10%/10%1 3511 102 20% 1251 0 >> Total Zone Loads 38631 1119 7511 0 TABLE 7.1.B. ENVELOPE LOADS FOR SPACE "201 Reception" IN ZONE "HP -IC" COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2 =F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 185 0.040 479 348 Hourly Analysis Program v4.91 Page 19 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 8.1.A. COMPONENT LOADS FOR SPACE " 208 Recovery " IN ZONE " HPA D " " HP -1 D " DESIGN COOLING COOLING DESIGN HEATING HEATING Area U -Value Shade COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0 °F / 65.0 °F OCCUPIED T -STAT 75.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F 119.2 °F OCCUPIED T -STAT 70.0 °F TRANS Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTUIhr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 128 0 ft2 Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 68 ft2 176 68 ft2 128 Window Transmission 0 ft2l 0 0 ft2 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 51 W 140 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 0 W 0 - 0 0 People 1 185 205 0 0 0 Infiltration - 15 -5 - 1021 0 Miscellaneous -1 0 0 0 0 Safety Factor 10%/10%1 52 20 20% 46 0 >> Total Zone Loads 568 220 276 0 TABLE 8.1.13. ENVELOPE LOADS FOR SPACE " 208 Recovery " IN ZONE " HP -1 D " COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2 "F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 68 0.040 176 128 Hourly Analysis Program v4.91 Page 20 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42PIV TABLE 8.2.A. COMPONENT LOADS FOR SPACE "206X -RAY" IN ZONE " HPA D " COOLING COOLING DESIGN COOLING Area U -Value Shade DESIGN HEATING TRANS (ft2) (BTU/(hr-ft2-:OF)) Coeff. COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0 °F 165.0 °F OCCUPIED T -STAT 75.0'F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 70.0'F H EXPOSURE Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 - Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 68 ft2 176 68 112 128 Window Transmission 0 ft2l 0 0 ft2l 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 70W 192 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 200 W 623 - 0 0 - People 1 185 205 0 0 0 Infiltration - 16 -5 1051 0 Miscellaneous 0 0 0 0 Safety Factor 10%/10%1 119 201 20% 1 47 0 >> Total Zone Loads 1311 219 2791 0 TABLE 8.2.B. ENVELOPE LOADS FOR SPACE " 206 X-RAY " IN ZONE "HP -ID" COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft2-:OF)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 68 0.040 176 128 Hourly Analysis Program v4.91 Page 21 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering,Inc 04:42P TABLE 8.3.A. COMPONENT LOADS FOR SPACE " 209 Sterilization" IN ZONE "HP -11)" DESIGN COOLING HEATING DESIGN HEATING TRANS SOLAR TRANS COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0 °F / 65.0 °F OCCUPIED T -STAT 75.0'F HEATING DATA AT DES HTG HEATING OA DB I WB 23.0 °F / 19.2 °F OCCUPIED T -STAT 70.0 °F (BTU/hr) Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft= 0 0 ft2 - Wall Transmission 0 ft' 0 0 ft' 0 Roof Transmission 175 ft2 453 175 ft2 329 Window Transmission 0 ft2l 0 0 ft' 0 Skylight Transmission 0 ft' 0 0 ft' 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2l 0 Overhead Lighting 175 W 481 0 0 Task Lighting 0 W 0 0 0 Electric Equipment 500 W 1557 0 0 - People 2 370 410 0 0 0 Infiltration - 20 -7 - 131 0 Miscellaneous 0 0 0 0 Safety Factor 10% / 10% 288 40 20% 1 921 0 >> Total Zone Loads 3169 443 5631 0 TABLE 8.3.6. ENVELOPE LOADS FOR SPACE "209 Sterilization" IN ZONE "HP -11)" COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (W) (BTU/(hr-ft2 °F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 175 0.040 453 329 Hourly Analysis Program v4.91 Page 22 of 23 Space Design Load Summary for Dental TI Project Name: Healthpoint Tukwilla 02/05/201 Prepared by: HV Engineering, Inc 04:42PIV TABLE 8.4.A. COMPONENT LOADS FOR SPACE " 204 Office " IN ZONE " HPA D " COOLING COOLING DESIGN COOLING Area U -Value Shade DESIGN HEATING TRANS (ft2) (BTU/(hr-ft'-°F)) Coeff. COOLING DATA AT Jun 1500 COOLING OA DB / WB 82.0 °F / 65.0 °F OCCUPIED T -STAT 75.0'F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0'F / 19.2 °F OCCUPIED T -STAT 70.0 °F H EXPOSURE Sensible Latent Sensible Latent SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 68 ft2 176 68 ft2 128 Window Transmission 0 ft2 0 0 ft2l 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 0 ft2 0 0 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 - Overhead Lighting 68 W 187 - 0 0 - Task Lighting 0 W 0 0 0 - Electric Equipment 150 W 467 - 0 0 - People 1 185 205 0 0 0 Infiltration - 15 -5 - 102 0 Miscellaneous 01 0 0 0 Safety Factor 10%/10% 103 20 20;/61 46 0 » Total Zone Loads 11331 220 276 0 TABLE 8A.B. ENVELOPE LOADS FOR SPACE " 204 Office " IN ZONE "HP -ID" COOLING COOLING HEATING Area U -Value Shade TRANS SOLAR TRANS (ft2) (BTU/(hr-ft'-°F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr) H EXPOSURE ROOF 68 0.040 176 128 Hourly Analysis Program v4.91 Page 23 of 23 0 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director February 29, 2016 ELLEN HAGEN 118 N 35TH ST, STE 200 SEATTLE, WA 98103 RE: Correction Letter # 1 MECHANICAL Permit Application Number M16-0030 HEALTHPOINT DENTAL CLINIC - 13030 MILITARY RD S Dear ELLEN HAGEN, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 2406; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Provide document/calculations by the engineer with engineer's original stamp and signature on those documents. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two 2 sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)433-7165. Sincerely, VAS1,�a Rachelle Ripley I Permit Technician File No. M16-0030 6300 Southcenter Boulevard Suite #100 9 Tukwila Washineton 98188 • Phone 206-431-3670 9 Fax 206-4.31-3665 PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0030 DATE: 03/14/16 PROJECT NAME: HEALTHPOINT DENTAL CLINIC SITE ADDRESS: 13030 MILITARY RD S Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: ka MG /,�lI� Building Division 8 Fire Prevention ❑ Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 03/15/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 04/12/16 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 . PERMIT COORD COSY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0030 DATE: 02/23/16 PROJECT NAME: HEALTHPOINT DENTAL CLINIC SITE ADDRESS: 13030 MILITARY RD S X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: �� 4v- 4\ Building Division Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approvallreview required) REVIEWER'S INITIALS: Fire Prevention 10 Structural ❑ Planning Division ❑ Permit Coordinator ❑ DATE: 02/23/16 Structural Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 03/22/16 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: 2 �� Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: r r 07 12/19/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: ba://www.TukwilaWA.izov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: �i b Plan Check/Permit Number: �Q — Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner JJ J\ Project Name: e T� ► r'1 T -Q G I C ► in/ C Project Address: �sz� r't ► ni ✓y �J S Contact Person: Phone Number: Summary of Revision: n Z-7vikeel-. RECEIVED CITY OF TUKWILA MAR 14 2015 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including daIre4visio Received at the City of Tukwila Permit Center by: [__ Entered in Permits Plus on t'/ H1Applications\Forms-Applications On Line\2010 ApplicationsV-2010 -Revision Submittal.doc Revised: May 2011 J R ABBOTT CONSTRUCTION INC Hoine Pspai'iol Contact Safety & Health Claims & Insurance Washington State Department of 6j Labor & Industries J R ABBOTT CONSTRUCTION INC Owner or tradesperson 3408 IST AVE S SUITE 101 SEATTLE, WA 98134-1805 Principals 206-467-8500 FRASER, RICHARD H KING County FRASER, GWEN F NELSON, RONALD A, PRESIDENT KLEIN, DOUGLAS J, PRESIDENT STRAND, TIMOTHY R, PRESIDENT SPRAGUE, ANDREW W, PRESIDENT ABBOTT, JOHN R, PRESIDENT STEDMAN, TROY L, PRESIDENT PRICE, MICHAEL W, PRESIDENT SHALLEY, BRANNON E, PRESIDENT NEWMAN, WENDY P, VICE PRESIDENT MCGOWAN, JOHN P, VICE PRESIDENT ABBOTT, DAWN E, SECRETARY SEAMNA, MARK C, SECRETARY ROBERTSON, ROBERT M, TREASURER Doing business as J R ABBOTT CONSTRUCTION INC WA UBI No. Business type 600 479 123 Corporation Governing persons ANDY SPRAGUE BRANNON SHALLEY; DOUGLAS JOSEPH KLEIN; JOHN ABBOTT; JOHN MCGOWAN; MARK SEAMAN; MIKE PRICE; RON NELSON; TROY STEDMAN; WENDY NEWMAN; License Page 1 of 3 Search L&I n t A -I.. Index Help Roy I.,&I Workplace Rights Trades & Licensing Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ............................_..._....................................... Meets current requirements. License specialties GENERAL License no. JRABBCI022JZ Effective — expiration 04109/1998— 03/01/2018 https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=600479123&LIC=JRABBC1022JZ&SAW= 4/18/2016 GENERAL HVAC NOTES 1 THE FOLLOWING NOTES APPLY TO ALL MECHANICAL DRAWINGS. ADDITIONAL MECHANICAL NOTES MAY BE INDICATED ON EACH MECHANICAL DRAWING. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 2 INSTALLATION SHALL COMPLY WITH ALL GOVERNING CODES AND REGULATIONS (LOCAL AND STATE). NOTHING ON THE DRAWINGS OR SPECIFICATIONS SHALL BE CONSTRUED AS ALLOWING DEVIATION FROM THIS REQUIREMENT. IF A CONFLICT SHOULD OCCUR BETWEEN DRAWINGS AND REGULATIONS, THE REGULATIONS SHALL TAKE PRECEDENT AND CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING OF SUCH CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION. 3 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. 4 REFER TO ARCHITECTURAL DRAWING FOR ROOM ELEVATIONS. LOCATE MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, HUMIDISTATS, PANELS, ETC. SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION (WAINSCOT, DOOR HARDWARE, ETC.) NOR WITH ELECTRICAL SYSTEM (LIGHT SWITCHES, SPEAKERS, OUTLETS, ETC.). MOUNT THERMOSTATS 48" AFF UNO. 5 MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES AND DIFFUSERS. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF GRILLES, REGISTERS, DIFFUSERS, AND OTHER CEILING OR SURFACE MOUNTED DEVICES. INSTALL EQUIPMENT IN CONFORMANCE WITH ARCHITECTURAL FEATURES IN THE CENTER OF CEILING TILES, IN THE CENTER OF ROOMS, OR WHERE INDICATED ON ARCHITECTURAL DRAWINGS. WHERE EQUIPMENT IS NOT INDICATED ON ARCHITECTURAL DRAWINGS, OBTAIN DIRECTION FROM ARCHITECT PRIOR TO INSTALLATION. 6 SEE ARCH. DRAWINGS FOR EXACT SIZE AND LOCATION OF LOUVERS. COORDINATE EXACT SIZE OF ATTACHED DUCTWORK/PLENUM AND/OR MOTORIZED DAMPERS WITH ARCH. DRAWINGS. 7 GENERALLY DUCTWORK PLANNED TO BE TIGHT TO STRUCTURE WITH PIPING BELOW DUCTWORK AND BETWEEN LIGHT FIXTURES. ADJUST AS NECESSARY. 8 COORDINATE LOCATIONS OF MECHANICAL EQUIPMENT AND DUCTWORK TO PROVIDE CLEARANCES OVER LIGHTING FIXTURES FOR REMOVAL AND SERVICE ACCESS DUE TO EQUIPMENT MAINTENANCE. 9 ARRANGE HVAC EQUIPMENT SO THAT ACCESS CLEARANCES INDICATED BY DRAWINGS, REQUIRED BY CODES AND RECOMMENDED BY MANUFACTURER ARE PROVIDED. PROVIDE 42" CLEAR AT DISCONNECT SWITCH ON TERMINAL UNITS WITH ELECTRIC HEATING COIL. 10 PROVIDE ACCESS PANELS/DOORS IN DUCTWORK AS INDICATED IN DIVISION 23 FOR INSPECTION AND MAINTENANCE FOR ALL SMOKE/FIRE DAMPERS. 11 GENERAL CONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR COMBINATION FIRE/SMOKE DAMPERS THROUGH ACCESS DOORS IN HARD CEILINGS AND WALLS. WHERE ACCESS DOORS PENETRATE FIRE RATED SYSTEMS THEY SHALL BE RATED IN ACCORDANCE WITH IBC REQUIREMENTS. 12 REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT (VOLTAGES, ETC.). EXISTING HEAT PUMP SCHEDULE GENERAL FIRE PROTECTION OT S 13 ELECTRICAL CHARACTERISTICS OF LISTED EQUIPMENT SHALL BE VERIFIED BY CONTRACTOR DURING 8 ® SUBMITTAL PROCESS. ANY ELECTRICAL CHARACTERISTICS THAT DEVIATE FROM THOSE LISTED EXISTING EXISTING EXISTING EXISTING EXISTING EQUIPMENT NUMBER HP -UF HP -2 X HP -3(50— HP -4(X) HP -5 SUPPLY FAN 2 SCOPE OF WORK INCLUDES MODIFYING EXISTING FIRE SPRINKLER SYSTEM TO ACCOUNT FOR THE REVISIONS SHOWN 14 DRAWINGS ARE SCHEMATIC IN SOME AREAS AND MAY NOT SHOW OFFSETS WHICH MAY BE REQUIRED. ON THE ARCHITECTURAL DRAWINGS AS REQUIRED BY NFPA 13. THIS SHALL INCLUDE BUT NOT BE LIMITED TO CENTRIFUGAL SERVICE CONDITIONS MAKING ADJUSTMENTS TO SPRINKLER HEAD LOCATION AND QUANTITY TO ACCOUNT FOR THE INSTALLATION OF AIRFLOW CFM NEW WALLS/CEILINGS AND THE REMOVAL OF EXISTING WALLS AND CEILINGS. 15 CFM MAX 350 400 500 1,000 2,000 CFM MIN SYSTEM SO THAT BUILDINGS AREAS MODIFIED BY THIS PROJECT ARE COVERED AGAIN BY A NFPA 13 WET SYSTEM. CENTRIFUGAL DUCT AND PIPE SECTIONS. 3 THESE DRAWINGS ARE CONCEPTUAL AND ARE FOR INFORMATIONAL AND BIDDING PURPOSES ONLY. 17 OSA CFM L21 L212 SCHEDULE 2 2 INLET STATIC SHOP DRAWINGS SHALL BE APPROVED BY THE ARCHITECT & ENGINEER AND AUTHORITY HAVING JURISDICTION. TOTAL HP INSTRUCTIONS, AS INDICATED ON DRAWINGS, OR IN SPECIFICATIONS FOR INSTALLATION THE CONTRACTOR SHOP DRAWINGS SHALL BE AVAILABLE ON-SITE FOR INSPECTION PURPOSES. DUCTWORK STATIC PRESSURE AND SEAL CLASS, BASED UPON SMACNA: OUTLET STATIC THE CONTRACTOR SHOP DRAWINGS AND INSTALLATION OF THE SYSTEM SHALL BE AS SPECIFIED IN CFM HRU WITH AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) MANUAL. DIVISION 21 AND AS SHOWN ON THESE DRAWINGS. 19 OUTLET DUCT SIZE 4 THE FIRE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH ALL DISCIPLINES, 80 MEMBERS BETWEEN COLUMNS, JOISTS, AND STRUCTURAL FRAME TO MEET SUPPORT REACTIONS INCLUDING ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL ON PIPING PLACEMENT, REFER TO SEATTLE NREC COMPLIANCE REQUIREMENTS ON DRAWING SCHEDULE SHEETS HEA G COIL ROUTING SPRINKLER HEADS AND SPRINKLER HEAD OBSTRUCTIONS. PROVIDE ADDITIONAL PIPING AND 290 PROFESSIONAL ENGINEER. SPRINKLER HEADS AS REQUIRED. 20 NET BTUH 10,600 15,100 19,000 40,500 68,000 HEAT ABSORP. 7,900 11,179 13,800 29,580 48,892 FLOW GPM 2.4 3.3 3.9 8.0 16.6 COOLING COIL 350 60 28 COMMISSION HVAC SYSTEM PER WSEC AND PER DIVISION 23 SPECIFICATIONS. NET BTUH 8,900 12,500 14,500 30,000 62,000 HEAT REJECTED BUTH 11,915 16,650 19,300 39,900 82,819 HP -3B 500 75 275 30 THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND COOLING PER FILTER 825 WSEC. MAXIMUM VELOCITY 225 FPM 225 FPM 225 FPM 225 FPM 225 FPM TYPE 2 MERV 8 2 MERV 8 2 MERV-8-2—MERV 8 2 MERV 8 MOTOR 33 ENCLOSURE TYPE HORSEPOWER SPEED -RPM ELECTRICAL 34 VOLTS -PHASE -HERTZ 35 MANUFACTURER -DESIGN BASIS Lij Li]01 01 L11 PATCH ALL FLOOR, WALL, CEILING AND ROOF OPENINGS CREATED/CAUSED BY THE DEMOLITION 804-809 804-012 804-015 804-030 804-060 WEIGHT REMARKS L31 Pj L3j3 REMARKS [1 ] FRIEDRICH CLIMATE MASTER [2] SEE HRU AIRFLOW SCHEDULE FOR OSA CFM [3] PROVIDE NEW FILTER PLENUM/MIXING BOX ON RETURN AIR CONNECTION WITH MAXIMUM VELOCITY AS LISTED AND NEW OUTLET PLENUM AS SHOWN. L/'F/ LU 10 z.E HEAT RECOVERY UNIT GENERAL FIRE PROTECTION OT S 13 ELECTRICAL CHARACTERISTICS OF LISTED EQUIPMENT SHALL BE VERIFIED BY CONTRACTOR DURING 8 ® SUBMITTAL PROCESS. ANY ELECTRICAL CHARACTERISTICS THAT DEVIATE FROM THOSE LISTED E. ALL MIXED AIR AND EXHAUST AIR PLENUMS. DO NOT LINE OUTDOOR AIR PLENUMS. HRU-2 SHALL BE IDENTIFIED BY THE CONTRACTOR, SUBMITTED TO THE ENGINEER FOR APPROVAL AND 1 THESE NOTES SHALL APPLY TO ALL FIRE PROTECTION DRAWINGS AND ALL ASPECTS OF FLAG MECHANICAL NOTES COORDINATED WITH DIVISION 26 ELECTRICAL PRIOR TO INSTALLATION OF EQUIPMENT AS REQUIRED TO FIRE PROTECTION FOR THIS PROJECT. SOUTH PROPERLY SERVE EQUIPMENT. RETURN GRILLE, TYPE 1 2402 NECK BALANCE TO 350 CFM ® SUPPLY FAN 2 SCOPE OF WORK INCLUDES MODIFYING EXISTING FIRE SPRINKLER SYSTEM TO ACCOUNT FOR THE REVISIONS SHOWN 14 DRAWINGS ARE SCHEMATIC IN SOME AREAS AND MAY NOT SHOW OFFSETS WHICH MAY BE REQUIRED. ON THE ARCHITECTURAL DRAWINGS AS REQUIRED BY NFPA 13. THIS SHALL INCLUDE BUT NOT BE LIMITED TO CENTRIFUGAL PROVIDE OFFSETS AS REQUIRED AT NO ADDITIONAL COST. MAKING ADJUSTMENTS TO SPRINKLER HEAD LOCATION AND QUANTITY TO ACCOUNT FOR THE INSTALLATION OF AIRFLOW CFM NEW WALLS/CEILINGS AND THE REMOVAL OF EXISTING WALLS AND CEILINGS. 15 REFER TO PIPING DIAGRAMS AND DETAILS FOR REQUIRED FITTINGS, VALVES, ETC. FLOOR PLANS CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID 0.5 AND SECTIONS INDICATE EQUIPMENT LOCATIONS AND GENERAL PIPE ROUTING ONLY. IN ORDER TO UNDERSTAND EXACT SCOPE OF WORK. PROJECT SCOPE IS TO BASICALLY MODIFY THE EXISTING WET 16 DUCTS AND PIPES INDICATED WITHOUT DIMENSIONS SHALL BE SIZED PER PRECEDING UPSTREAM SYSTEM SO THAT BUILDINGS AREAS MODIFIED BY THIS PROJECT ARE COVERED AGAIN BY A NFPA 13 WET SYSTEM. CENTRIFUGAL DUCT AND PIPE SECTIONS. 3 THESE DRAWINGS ARE CONCEPTUAL AND ARE FOR INFORMATIONAL AND BIDDING PURPOSES ONLY. 17 DUCTWORK SIZES SHOWN ARE CLEAR INSIDE DIMENSION. THE SPRINKLER CONTRACTOR SHALL PROVIDE COMPLETE SHOP DRAWINGS AND SUBMIT TO HRU AIRFLOW SCHEDULE THE AUTHORITY HAVING JURISDICTION FOR FIRE SPRINKLER PERMIT. THE SPRINKLER CONTRACTOR'S 18 PROVIDE FABRICATED STEEL MEMBER SUPPORTS AS REQUIRED BY MANUFACTURER'S INSTALLATION SHOP DRAWINGS SHALL BE APPROVED BY THE ARCHITECT & ENGINEER AND AUTHORITY HAVING JURISDICTION. TOTAL HP INSTRUCTIONS, AS INDICATED ON DRAWINGS, OR IN SPECIFICATIONS FOR INSTALLATION THE CONTRACTOR SHOP DRAWINGS SHALL BE AVAILABLE ON-SITE FOR INSPECTION PURPOSES. DUCTWORK STATIC PRESSURE AND SEAL CLASS, BASED UPON SMACNA: OF EQUIPMENT. REQUIRED STRUCTURAL MEMBERS, BOLTS, AND WELDS SHALL BE IN ACCORDANCE THE CONTRACTOR SHOP DRAWINGS AND INSTALLATION OF THE SYSTEM SHALL BE AS SPECIFIED IN CFM HRU WITH AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) MANUAL. DIVISION 21 AND AS SHOWN ON THESE DRAWINGS. 19 IF REQUIRED FOR INSTALLATION OF PIPES, DUCTS, AND EQUIPMENT, PROVIDE ADDITIONAL STRUCTURAL 4 THE FIRE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH ALL DISCIPLINES, 80 MEMBERS BETWEEN COLUMNS, JOISTS, AND STRUCTURAL FRAME TO MEET SUPPORT REACTIONS INCLUDING ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL ON PIPING PLACEMENT, REFER TO SEATTLE NREC COMPLIANCE REQUIREMENTS ON DRAWING SCHEDULE SHEETS (FORCES, MOMENTS, DEFLECTIONS). STRUCTURAL MEMBERS SHALL BE DESIGNED BY A REGISTERED ROUTING SPRINKLER HEADS AND SPRINKLER HEAD OBSTRUCTIONS. PROVIDE ADDITIONAL PIPING AND 290 PROFESSIONAL ENGINEER. SPRINKLER HEADS AS REQUIRED. 20 DO NOT CORE DRILL OR DRILL THROUGH BEAMS, COLUMNS, AND SHEAR WALLS, UNLESS INDICATED ON 5 REFER TO ARCHITECTURAL DRAWINGS FOR PIPE ROUTING DETAILS IN SPACES WITH EXPOSED SPRINKLER PIPING. 75 STRUCTURAL DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER. 26 SEAL AND LEAK TEST DUCTWORK PER WSEC AND PER DIVISION 23 SPECIFICATIONS. HP -11) 6 INSTALLATION SHALL COMPLY WITH ALL GOVERNING CODES AND REGULATIONS (LOCAL AND STATE). NOTHING 21 PROVIDE DUCT LINING FOR THE FOLLOWING DUCTWORK: ON THE DRAWINGS OR SPECIFICATIONS SHALL BE CONSTRUED AS ALLOWING DEVIATION FROM THIS REQUIREMENT. LIFEBREATH B. ALL AIR TRANSFER DUCTS. IF A CONFLICT SHOULD OCCUR BETWEEN DRAWINGS AND REGULATIONS, THE REGULATIONS SHALL TAKE PRECEDENT 0 C. ALL EXHAUST DUCTWORK WITHIN 6 OF A FAN (EXCEPT KITCHEN AND SHOWER EXHAUST). AND CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING OF SUCH CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION. z.E HEAT RECOVERY UNIT D. ALL SUPPLY AND RETURN DUCTWORK WITHIN 6 OF A FAN. TERMINALS TERMINALS: 8 ® EQUIPMENT NUMBER E. ALL MIXED AIR AND EXHAUST AIR PLENUMS. DO NOT LINE OUTDOOR AIR PLENUMS. HRU-2 NUMBER IDENTIFICATION FLOW ARROWS SHOWN.ONLY FLAG MECHANICAL NOTES AREA SERVED F. PLENUMS UPSTREAM OF RETURN FANS. SOUTH RG -1 350 RETURN GRILLE, TYPE 1 2402 NECK BALANCE TO 350 CFM ® SUPPLY FAN G. OTHER LOCATIONS WHERE NOTED ON DRAWINGS OR SPECIFIED. jBEL1MO, NM24 TYPE CENTRIFUGAL CENTRIFUGAL 22 PROVIDE A VOLUME DAMPER FOR EACH SUPPLY BRANCH, RETURN BRANCH (DUCTED ONLY), & EXHAUST AIRFLOW CFM 550 275 EXT. SP. IN WG 1 BRANCH WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH THE BRANCH, AND ELSEWHERE 0.5 EXHAUST FAN CD -1 TYPE AS NOTED ON DRAWINGS OR IN SPECIFICATIONS. CENTRIFUGAL WHEEL DIA. IN. EG -1 23 PROVIDE CONICAL SPIN -IN FITTINGS FOR ALL 90 DEGREE ROUND DUCT BRANCHES FROM HRU AIRFLOW SCHEDULE 0.5 0.5 RECTANGULAR SUPPLY DUCTWORK. DO NOT USE STRAIGHT TEE FITTINGS. HEAT TOTAL HP OSA TOTAL 24 DUCTWORK STATIC PRESSURE AND SEAL CLASS, BASED UPON SMACNA: SYSTEM PUMP CFM CFM HRU CFM 115/1/60 115/1/60 HRU-1 HP -2A 400 80 MCA; 25 REFER TO SEATTLE NREC COMPLIANCE REQUIREMENTS ON DRAWING SCHEDULE SHEETS HP -3A 500 290 TYPE INLET OUTLET WASHABLE FOR ADDITIONAL MECHANICAL PROVISIONS HP -1A 350 75 WEIGHT LBS 26 SEAL AND LEAK TEST DUCTWORK PER WSEC AND PER DIVISION 23 SPECIFICATIONS. HP -11) 350 105 MAKE LIFEBREATH LIFEBREATH HP -4 1000 0 550 27 BALANCE HVAC SYSTEM PER WSEC AND PER DIVISION 23 SPECIFICATIONS. HRU-2 HP -1B 350 60 28 COMMISSION HVAC SYSTEM PER WSEC AND PER DIVISION 23 SPECIFICATIONS. HP -2B 400 100 29 PROVIDE COMPLETION/RECORD DRAWINGS PER WSEC AND PER DIVISION 23 SPECIFICATIONS HP -1 C 350 40 HP -3B 500 75 275 30 THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND COOLING PER 825 WSEC. 31 INSULATE DUCTWORK PER WSEC AND PER DIVISION 23 SPECIFICATIONS (WHICHEVER IS GREATER). 32 INSULATE PIPING PER WSEC AND PER DIVISION 23 SPECIFICATIONS (WHICHEVER IS GREATER). 33 PROVIDE MEANS OF ACCESSING/ADJUSTING BALANCING DAMPERS 0 ALL LOCATIONS WHERE MEANS OF ACCESS HAS NOT BEEN SHOWN ON ARCHITECTURAL DRAWINGS. PROVIDE UNITED ENERTECH I - SERIES REMOTE POWER/BALANCE SYSTEM OR APPROVED EQUAL. COORDINATE LOCATION OF REMOTE JACK WITH ARCHITECT & RECORD ON AS -BUILT DRAWINGS. 34 COORDINATE ALL MECHANICAL WORK WITH ARCHITECTURAL PHASING DRAWINGS. 35 COORDINATE DEMOLITION WORK WITH ARCHITECTURAL DEMOLITION AND PHASING DRAWINGS. 36 PATCH ALL FLOOR, WALL, CEILING AND ROOF OPENINGS CREATED/CAUSED BY THE DEMOLITION OF EXISTING DUCTWORK, EQUIPMENT, ETC. IN ACCORDANCE WITH DIVISION 1 OF THE SPECIFICATIONS z.E HEAT RECOVERY UNIT SCHEDULE TERMINALS TERMINALS: 8 ® EQUIPMENT NUMBER HRU-1 HRU-2 NUMBER IDENTIFICATION FLOW ARROWS SHOWN.ONLY FLAG MECHANICAL NOTES AREA SERVED NORTH SOUTH RG -1 350 RETURN GRILLE, TYPE 1 2402 NECK BALANCE TO 350 CFM ® SUPPLY FAN EXHAUST GRILL, TYPE 1 2402 NECK jBEL1MO, NM24 TYPE CENTRIFUGAL CENTRIFUGAL WHEEL DIA. IN. TYPICAL OF 2 AIRFLOW CFM 550 275 EXT. SP. IN WG 1 0.5 0.5 EXHAUST FAN CD -1 TYPE CENTRIFUGAL CENTRIFUGAL WHEEL DIA. IN. EG -1 AIRFLOW CFM 550 275 EXT., SP. IN WG 1 0.5 0.5 EFFICIENCY EXHAUST GRILLE, 3/4- SPACING TEMP EFFECTIVENESS 84% 60% ELECTRICAL ALUMINUM EGG CREATE RETURN AIR GRILLE VOLTS -PHASE -HERTZ 115/1/60 115/1/60 WATTS 912 437 MCA; 9.5 4.8 FILTER ALUMINUM EGG CREATE EXHAUST AIR GRILLE TYPE INLET OUTLET WASHABLE WASHABLE EFF % ALUMINUM EGG CREATE OSA INTAKE GRILLE, PROVIDE 1/4" BIRD SCREEN WEIGHT LBS 270 150 MANUFACTURER -DESIGN BASIS MAKE LIFEBREATH LIFEBREATH MODEL 650FD 455FD NOTES - 1. EXTERNAL TO FAN SECTION WITH DAMPER DEFROST SYSTEM, CABINET: NOT INCLUDING ECM MOTOR. INTERNAL/FILTER LOSSES. L/4/LUl b HVAC EQUIPMENT UNIT VENTILATOR UNIT HEATER NORTH NORTH ARROW A SECTION IDENTIFICATION M201 SHEET IDENTIFICATION COLUMN GRID SYMBOLS TERMINALS TERMINALS: 8 ® CD -1 350 C;IUNG DIFFUSER, TYPE 1 8 0 NECK BALANCE TO 350 CFM BASEMENT LEVEL MECHANICAL PLAN NUMBER IDENTIFICATION FLOW ARROWS SHOWN.ONLY FLAG MECHANICAL NOTES MOUNT 48" ABOVE FINISHED FLOOR IF AIR FLOW IS NOT SYMMETRICAL COPYRIGHT, HV ENGINEERING, INC. RG -1 350 RETURN GRILLE, TYPE 1 2402 NECK BALANCE TO 350 CFM ® EG -1 EXHAUST GRILL, TYPE 1 2402 NECK jBEL1MO, NM24 350 BALANCE TO 350 CFM TYP 2 TYPICAL OF 2 HVAC EQUIPMENT UNIT VENTILATOR UNIT HEATER NORTH NORTH ARROW A SECTION IDENTIFICATION M201 SHEET IDENTIFICATION SHEET f DEX COLUMN GRID SYMBOLS SHEET TITLE MO.01 8 MO.02 O GENERAL MECHANICAL NOTES BASEMENT LEVEL MECHANICAL PLAN NUMBER IDENTIFICATION LEVEL 2 HVAC & HVAC DEMO PLAN FLAG MECHANICAL NOTES MOUNT 48" ABOVE FINISHED FLOOR NUMBER IDENTIFICATION SHEET f DEX SHEET # SHEET TITLE MO.01 NOTES & LEGEND MO.02 DETAILS & SCHEDULES M2.00 BASEMENT LEVEL MECHANICAL PLAN M2.01 LEVEL 2 HVAC & HVAC DEMO PLAN MECHANICAL LEGEND SYMBOL DESCRIPTIO EXISTING WORK OR BACKGROUND INFORMATION (LIGHT UNE NEW WORK (HEAVY UNE3 R RELOCATE EXISTING EQUIPMENT ITEM OR DEVICE INDICATED EXISTING EQUIPMENT OR DUCTWORK TO BE SELECTIVELY DEMOLISHED EF -9 TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) UND3/4ER CUT DOOR POINT OF CONNECTION TO EXISTING CONTROLS ® CARBON MONOXIDE (CO) SENSOR �20 CO2 SENSOR ® OCCUPANCY (CO2) SENSOR UT ROOM THERMOSTAT (T) ISD IONIZATION TYPE SMOKE DETECTOR DUCTWORK 12x8 DUCT (1ST FIGURE = SIDE SHOWN, 2ND FIGURE = SIDE NOT SHOWN) lip FLEXIBLE CONNECTION ACOUSTIC DUCT VOLUME DAMPER 45' TAKE -OFF 90' RECTANGULAR TAKE -OFT= WITH . 45' TAPER FLEXIBLE DUCT SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY TURNING UP OR TOWARDS DUCT .� RETURN OR EXHAUST AIR DUCT TURNING DOWN OR AWAY TURNING UPTOR TOWARD TURNING DOWN OR AWAY R —' DIRECTION OF(A�ROWDROP (D) IN C AP ACCESS PANED )OR 0 ROUND DUCT OR PHASE INDICATOR BDD BACKDRAFT DAMPER M MOTORIZED DAMPER SFD COMBINATION SMOKE/FIRE DAMPER CRD CEILING DIFFUSER OR GRILLE RADIATION DAMPER FD SD -k= L4 FIRE DAMPER (FD) SMOKE DAMPER (SD) CONTROLS SCHEDULE MARK THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED MANUFACTURER DESCRIPTION NOTES T REQ IRE s- 7 -DAY PROGRAMMABLE T -STAT MOUNT 48" ABOVE FINISHED FLOOR M-1 COPYRIGHT, HV ENGINEERING, INC. BELIMO, LF24SR IMODULATING DAMPER ACTUATOR M-2 jBEL1MO, NM24 12 POSITION 24 VOLT DAMPER ACTUATOR GRILLE, REGISTER AND DIFFUSER SCHEDULE MARK MAKE MODEL DESCRIPTION NOTES CD -1 TTTUS MCD MODULAR CORE DIFFUSER EG -1 11TUS 50F ALUMINUM EGG CREATE EXHAUST GRILLE EG -2 TITUS 350RL EXHAUST GRILLE, 3/4- SPACING RG -1 11TUS 50F ALUMINUM EGG CREATE RETURN AIR GRILLE SG -1 TITUS 30ORS SUPPLY GRILLE, 3/4- SPACING, DOUBLE DEFLECTION ADJUSTABLE BLADES TG -1 TITUS 50F ALUMINUM EGG CREATE EXHAUST AIR GRILLE IG -1 TITUS 50F ALUMINUM EGG CREATE OSA INTAKE GRILLE, PROVIDE 1/4" BIRD SCREEN NOTE: REFER TO ARCHITECTURAL PLANS FOR CEILING FINISH REQUIREMENTS - I.E. T -BAR VS. GWB, PAINT COLOR, ETC. MECHANICAL LEGEND SYMBOL DESCRIPTIO EXISTING WORK OR BACKGROUND INFORMATION (LIGHT UNE NEW WORK (HEAVY UNE3 R RELOCATE EXISTING EQUIPMENT ITEM OR DEVICE INDICATED EXISTING EQUIPMENT OR DUCTWORK TO BE SELECTIVELY DEMOLISHED EF -9 TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) UND3/4ER CUT DOOR POINT OF CONNECTION TO EXISTING CONTROLS ® CARBON MONOXIDE (CO) SENSOR �20 CO2 SENSOR ® OCCUPANCY (CO2) SENSOR UT ROOM THERMOSTAT (T) ISD IONIZATION TYPE SMOKE DETECTOR DUCTWORK 12x8 DUCT (1ST FIGURE = SIDE SHOWN, 2ND FIGURE = SIDE NOT SHOWN) lip FLEXIBLE CONNECTION ACOUSTIC DUCT VOLUME DAMPER 45' TAKE -OFF 90' RECTANGULAR TAKE -OFT= WITH . 45' TAPER FLEXIBLE DUCT SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY TURNING UP OR TOWARDS DUCT .� RETURN OR EXHAUST AIR DUCT TURNING DOWN OR AWAY TURNING UPTOR TOWARD TURNING DOWN OR AWAY R —' DIRECTION OF(A�ROWDROP (D) IN C AP ACCESS PANED )OR 0 ROUND DUCT OR PHASE INDICATOR BDD BACKDRAFT DAMPER M MOTORIZED DAMPER SFD COMBINATION SMOKE/FIRE DAMPER CRD CEILING DIFFUSER OR GRILLE RADIATION DAMPER FD SD -k= L4 FIRE DAMPER (FD) SMOKE DAMPER (SD) Ra gRECTANGULAR TEE, ?`I, G OR TURNING VANES Consulting Mechanical Engineers 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 Phone(206) 706-9669 Fax:(206) 706-1830 www.hvengineering. biz HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St. Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT " SCI 30321 w CONSULTANT'S STAMP P,�!' n -4.; N 0. M � ' 00 0 i':�:l ;"_3V415W DuprovE'i is ,911binct to errors an 'n j. p'rov'�I r'; %is;il l� i� tlta �rrr7or� t s :. tE c f3 biiol�t'iiE�n c f tl,i approvod lol , n P' -- Date: _ _ i 11,P) Ito City o Tukwila BUILDING DIVISION PHASE Permit Set DATE 02/09/2016 No changes shall bo made to the scope of work %141110ui prior o pproval of Tukwila Guildin0 Division. OTc: t evisions will rogdro n nnn-i plan submittal and may instude ad6tional p;an revisvr iess REVIEVVLD FOR CODE COMPLIANCE APPROVED MAR 2 5 20 NOTE City of Tukwila BUILDING DiViCION FUSE OF DOCUMENTS 90' ELBOWjer , R/W OR R/D = 1.5 jy:]�rSQUARE CORNER ELBOW W TURNING VANES THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED 90' CONICAL SPIN -IN HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS TtROAN � 0 F OpRp) REDUCER FLAT ON �800�� THE PROPERTY OF HV ENGINEERING,' INC. AND IS NOT TO BE REQ IRE s- WYE FITTING Ra gRECTANGULAR TEE, ?`I, G OR TURNING VANES Consulting Mechanical Engineers 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 Phone(206) 706-9669 Fax:(206) 706-1830 www.hvengineering. biz HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St. Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT " SCI 30321 w CONSULTANT'S STAMP P,�!' n -4.; N 0. M � ' 00 0 i':�:l ;"_3V415W DuprovE'i is ,911binct to errors an 'n j. p'rov'�I r'; %is;il l� i� tlta �rrr7or� t s :. tE c f3 biiol�t'iiE�n c f tl,i approvod lol , n P' -- Date: _ _ i 11,P) Ito City o Tukwila BUILDING DIVISION PHASE Permit Set DATE 02/09/2016 No changes shall bo made to the scope of work %141110ui prior o pproval of Tukwila Guildin0 Division. OTc: t evisions will rogdro n nnn-i plan submittal and may instude ad6tional p;an revisvr iess REVIEVVLD FOR CODE COMPLIANCE APPROVED MAR 2 5 20 NOTE City of Tukwila BUILDING DiViCION FUSE OF DOCUMENTS VERIFY SCALE BAR MEASURES ONE INCH THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED ON ORIGINAL DRAWING HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS 0" THE PROPERTY OF HV ENGINEERING,' INC. AND IS NOT TO BE 1" USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT IF NOT ONE INCH ON THIS WITHOUT THE WRITTEN AUTHORIZATION OF HV ENGINEERING. DRAWING, '`ADJUST SCALES COPYRIGHT, HV ENGINEERING, INC. ACCORDINGLY. RECEIVED CITY OF TUKWILA FEES 18 2016 PERMIT CENTER SHEET TITLE S & LEGEND SHEET NO. J MILLER HAYASHI ARCHITECTS 1508 FSC O N co \ N O N 0 BRACE VIBRATION ISOLATORS DUCT FLEX CONN: / FLEX CONN. ANGLE IRON (TYP) STRUCTURE MAY VARY, PROVIDE CLEARANCE TO MOTOR ACCESS FOR FAN MAINTENANCE. FAN STYLE MAY VARY IN SIZE AND STYLE. WLINE HRU MOUNTING DETAIL NOT TO SCALE HVAC SYSTEM CONTROLS AND SEQUENCE OF OPERATION PLENUM SCREWED TO DIFFUSER NECK SOUND LINED PLENUM L 2" CONNECTION SIZE 4" SCREW PLENUM TO DIFFUSER NECK RADIATION DAMPER RATED CEILING /- 22 GAUGE GALVANIZED STEEL PERFORATED PLATE WITH 63 PERCENT FREE AREA ACROSS PLENUM. TOP OF PLATE AT CENTERLINE OF INLET MIN 6" DIFFUSER INLET SIZE, SAME I SIZE AS DIFFUSER NECK SIZE (IE 8x8=8"0) —FLEX DUCT, SAME SIZE AS DIFFUSER INLET 5' MINIMUM LENGTH, 6' MAX. — CLAMP (TYP) SUPPLY DUCT -7 SPIN—IN FITTING WITH VOLUME DAMPER HARD ROUND DUCT AS REQUIRED TO LIMIT FLEX DUCT LENGTH TO MAX 8'-0" FLEX DUCT ONLY ALLOWED WHERE CONCEALED BY CEILING NOTE: CEILING DIFFUSER SET DIFFUSER FOR FOUR—WAY HORIZONTAL FLOW UNLESS AIR FLOW INDICATED ON DRAWINGS TYPICALS I\l�l�l�s►19:1R� EXISTING BUILDING HVAC CONTROL SYSTEM SHALL BE UTILIZED TO THE MAXIMUM EXTENT POSSIBLE. PROVIDE ADDITIONAL CONTROL SYSTEM COMPONENTS AND WIRING AS REQUIRED TO PROVIDE THE LISTED SEQUENCE OF OPERATION BELOW. GENERAL: SEQUENCES OF OPERATION SHALL IN GENERAL BE ACCOMPLISHED USING MANUFACTURER'S STANDARD CONTROLS AND USING SCHEDULED CONTROL COMPONENTS. RELOCATE EXISTING T-STATS/SENSORS ASSOCIATED WITH HEAT PUMPS SERVING THE AREA OF WORK COVERED BY THIS PROJECT. ALL TEMPERATURE SET POINTS SHALL BE ADJUSTABLE. EXISTING HEAT PUMP SEQUENCE OF OPERATION OCCUPIED OPERATION (AS DETERMINED BY TI SPACE TIMECLOCK) TYPICAL HEAT PUMPS SHALL OPERATE USING EXISTING CONTROLS WITH CONTROLLING T-STATS/TEMPERATURE SENSORS RELOCATED TO NEW LOCATIONS SHOWN. FANS SHALL OPERATE CONTINUOUSLY DURING OCCUPIED HOURS AND HEAT PUMP COMPRESSOR SHALL BE STAGED IN HEATING AND COOLING AS REQUIRED TO SATISFY THE SPACE TEMPERATURE SETPOINT. UNOCCUPIED OPERATION FAN SHALL CYCLE UPON CALL FOR HEATING OR COOLING BASED ON SETBACK TEMPERATURES. HEAT RECOVERY UNITS (HRUs) HRU SHALL OPERATE CONTINUOUSLY DURING OCCUPIED HOURS TO PROVIDE OSA VEN11LATION TO EXISTING HEAT PUMPS AND EXHAUST TO SPACES SERVED. UNIT SHALL OPERATE USING STANDARD CONTROLS AND SHALL BE EQUIPPED WITH AUTOMATIC DEFROST CONTROLS TO INTERRUPT SUPPLY AIR WHILE AIR DEFROSTS CORE. UNIT SHALL BE OFF DURING UNOCCUPIED HOURS. MOTORIZED INTAKE AND EXHAUST DAMPERS SHALL BE CLOSED WHENEVER UNIT IS OFF. r� FIELD VERIFY (E) HP—XX DUCT CONNECTION CONFIGURATION. SOME ARE STRAIGHT THROUGH AND SOME ARE END SA DISCHARGE. SUPPLY FLEX DUCT, SIZE & QTY PER PLAN. DISCHARGE PLENUM WITH 1" SOUND LINING. SIZE PER PLANS FLEX CONN. (TYP) ,'E) HEAT PUMP OSA FROM HRU. SIZE AND LOCATION PER PLANS RETURN AIR. SIZE AND LOCATION PER PLANS NEW FILTER/ LENUM RETURN AIR MIXING BOX. 2" MERV 8 FILTER, <225 PFM), WITH 1" SOUND LINING. SIZE PER PLANS. PROVIDE SEALED AND LATCHED ACCESS DOOR FOR FITLER NOT TO SCALE OEXTERIOR 0111? PARAPET VALL SEAT. PDIETRAT0 OUTLET VIM D ASTMC LX -SET CNWSSM sum TYPE 'TITAN MW BY ED WMACTtlIZBVG INC, B NWT0 PROTECTIVE PVC COVER TYPE 'E -M Gl1ARB' BY AD X KWACTIkuNG X —, M ' � ' � I L" MI IDS wi• • , 1 •7• umm LK ClD4 Dmff 'A' v Ip, I z r N t SCALE: NTS DUCTLESS SPLIT SYSTEM SCHEDULE 2012 WASHINGTON STATE 14REC COMPLIANCE REQUIREMENTS NEW PORTIONS OF THE MECHANICAL SYSTEMS SHALL BE DESIGNED AND CONSTRUCTED TO COMPLY WITH THE 2012 WSEC SEE PARTIAL LIST OF REQUIREMENTS BELOW MARK MANUFACTURER I MODEL DESCRIP11ON COOLING CAPACITY I SEER I HEATING CAPACITY MBH 2012 NREC PARAGRAPH NO. CODE PROVISION MOCPI INFORMATION REQUIRED ADDITIONAL REQUIREMENTS EQUIPMENT SIZING AND PERFORMANCE 1 L21 L4jj.20.0 27 LBS 1 , MECH ROOM 403..1 Load calculations 9 L4J 1 Load calculations shall be performed per ASHRAE Std 183 or equivalent per Chapter 3 REFER TO ATTACHED CALCULATIONS 403.2. C403.2.3 & C403.2.3.2 & Equipment and system sizing Equipment minimum efficiency Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken Provide equipment schedules or complete MECH—SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment REFER TO ATTACHED CALCULATIONS SEE ATTACHED MECHANICAL SCHEDULES ON DRAWINGS C403..5 C403.2.12.1 Minimum ventilation Ventilation natural or mechanical provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC SEE ATTACHED CALCULATIONS, MECHANICAL SCHEDULES AND SEQUENCE OF OPERATION C403.2.10.3 Fractional hp fan motors Fan motors 1/12 to 1 hp are ECM type or shall be 65 efficient per NEMA Standard MG -1 at Full load rating conditions. SEE ATTACHED SCHEDULES HVAC SYSTEk& GUM1210 AND CRITERIA C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems SEE ATTACHED PLANS C403.2.4.2 Setpoint overlap deadband Indicate 5`F deadband minimum for systems controlling both heating & cooling EEA ACHED SEQUENCE OF OPERATION OND AWING 403.2.4.3 Automatic setback and shutdown Indicate zone t—stat controls with required automatic setback & manual override SEE ATTACHED SEQUENCE OF OPERATION ON DRAWING C403.2.4.3.3 Automatic (optimum) start Indicates tem controls that adjust equip start time to match load conditions day programmable with 2 hour override or occupancy sensor). S E ATTA H D SEQUENCE OF OPERATION ON DRAWING C402.4.5.2 & C403.2.4.4 Dampers Provide OSA, exhaust, relief and return air dampers with AMCA rated leakage and control type (motorized or gravity, note exceptions taken rovide class 1A motorized dampers, <=4cfm sf at 1.0" w.c. per AMCA 500D DUCTING SYSTEMS 403.2..1 & C403.2..3 Duct construction Indicate all ductwork constructed and sealed er IMC, C402 leakage requirements an IBC vapor retarder requirements SEE NOTES ON MOA C403.2.7.3.1-3Duct ressure classifications Identifylocation of low <=2 W.C. , medium 2-3 WC. and high >3 W.C. pressure ductwork on plans C403.2.7.1 2 Duct insulation Indicate R—value of insulation on ductwork, insulate ductwork per this section PIPING SYSTEMS C403.2.8 71ping insulation lindicate R—value of insulation on piping E NOTES ON MOA C403.2.8.1 lPiping insulation exposed to weather lIndicate method of protection from damn a de redation 1PROVIDE ALUMINUM JACKET ON EXTERIOR PIPING. SIMPLE SYSTEMS C403.3.1 Air economizer exceptions Indicate eligible ex tions taken and provisions to comply with exception(s)EXCEPTION 1 & 4 FOR AC-1/CU-1, DUCTLESS SPLIT SYSTEM SCHEDULE MARK MANUFACTURER I MODEL DESCRIP11ON COOLING CAPACITY I SEER I HEATING CAPACITY MBH HSPF SPL CFM I VOLTAGE MCA I MOCPI WEIGHT INOTES SERVES AC -1 MITSUBISHI MSY-GLI5NA-U1 MR SLIM 14.0 MBH 121.6 1 NA IMUY-GL15NA-Ul NA 49 DBA 533 1 208-230 60 1 1 L21 L4jj.20.0 27 LBS 1 , MECH ROOM CU -1 MITSUBISHI CONDENSING UNIT 14.0 MBH 21.6 1 NA NA 49 DBA - 208-230/60/1 9 L4J 1 20.0 1 80 LBS 3 , L4j, 5 MECH ROOM (1) PROVIDE WALL MOUNTED WIRED CONTROLLER (2) COORDINATE POWER CIRCUIT REQUIREMENTS WITH MFR. AC—X TYPICALLY POWERED OFF OF CU—X CIRCUIT. [3] MOUNT OUTDOOR UNIT AS HIGH AS POSSIBLE WHILE STILL PROVIDING MFR CLEARANCES. 1[41 INDOOR UNIT POWERED FROM OUTDOOR UNIT. [5] PER 2012 WSEC, SECTION 403.3.1, EXCEPTION 4 ECONOMIZERS NOT REQUIRED BECAUSE EQUIP. SEER RATING IS > 647. BETTER THAN TABLE C403.2.3 VALUES [6] PER 2012 WSEC, SECTION 403.3.1, EXCEPTION 3 ECONOMIZERS NOT REQUIRED BECAUSE EQUIP. SEER RATING IS > 15% BETTER THAN TABLE C403.2.3 VALUES L�U�LUIU Consulting Mechanical Engineers 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 Phone(206) 706-9669 Fax:(206) 706-1830 www.hvengineering. biz REl4'IE1 �R �v�roR CGDE COMPLIANCE APPROVED PEAR 2 5 2010 City Of TI.II VvilO IBUILDING DIVISION REUSE OF DOC L% E:NTS VERIFY SCALE THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED BAR MEASURES ONE INCH ON ORIGINAL DRAWING HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS 0„ 1„ THE PROPERTY OF HV ENGINEERING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT IF NOT ONE INCH ON THIS WITHOUT THE WRITTEN AUTHORIZATIO F HV NG RING. DRA ADJ21%�04 OP T, N ERING, INC. A Y. HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT CONSULTANT'S STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY OF TUKWILA FEB 16 2016 PERMIT CENTER DETAILS & SCHEDULES SHEET TITLE SHEET NO. ARCHITECTS 1508 AND REQUIREMENTS. AROUND PIPING WITH APPROVED CAULKING MATERIA .). PROTECT PIPING WITH AIREX TSS SERIES E -FLEX 0 -SYSTEM 4 BASEMENT PLUMBING PLA19 KIT. M0.02 SCALE: 1/4" = 1'0" SET UNIT ON CONCRETE PAD, SEE ARCH. ALL PIPING IS ABOVE GRADE U.N.O. O DWGS FOR DETAILS. z co 0 N Consulting Mechanical Engineers USE OF CN 0 7100 Linden Ave. N., Suite 1 �DOCUME NTS Seattle, Washington, 98103 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS v Phone(206) 706-9669 THE PROPERTY OF HV ENGINEERING, INC. AtDINOT TO BE USED, IN WHOLE OR IN PART, FOR ANY 0TOJFas:(206) 706-1830 WITHOUT THE WRITTEN AUTHORIZA OF INo www.hvengineering. biz CO T,IN NG, REVIEWED FOR CODE COMPLIANCE APPROVED MAR 2 5 2016 Citgo of Tukwila BUILDING QIVISIOi',l VEINY SCALE BAR MEASURES ONE INCH ON ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS DRAWING, ADJUST ES CORDINGLY. HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St. Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT 30321 rotes.. � C b CONSULTANT' STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY OF TUKWILA FEB 18 2016 PERMIT CENTER SHEET TITLE EMENT LEVEL ECHANICAL PLAN SHEET NO. 1508 GARAGE 01 0 -ROUTE-HIGH-- N -W L -ORA 0 COL -IN ------------ AIR --� ---- V -- AIR -F---- V ---- i- AIR----------- -- -- -, - — M' CHANT AL SUPPORT FOR DEN AL EQ IPMENT IS SH WN BA ED — I 0 PREUIAINARYILAYOUIS. CON ACTO TO C(ORDINATE EXACT F114AL INSTALLATI 3N REQ JIREMEt TS WITI I DENTAL EQUIPMENT A I V > i i MA I V i i i SUPPLIER C ORDIN DRAW1 TE FIN GS, IN L LAYO RIOR DESIGNER T OF EQUIPMEqT AND AS RCHITE REQUIRED. T. STORAGE S E ON 201 FOR "vac UP ELEC ROOM � � STORAGE LEV UATION SIR UP FoO3 a ; i OO4 SAW iCyT-SLAB���A -_ _ _� ELEV REQUIRED. �/�ODOR iNATE EQUIP[008 A i i REQUIR ME S 4" B L, S B F ELD I .E. AND C > i i ARCHITECTURAL S UCTU O S N ALL COMPLY A 99-2005 TION F LEVEL THLLO 3 ALAL MUIPMD CO ETC). E R QU INSTALLATION T AND REMEN S (I.IE., OF ALL UPC, SYSTEM DENTAL HJ, PI TECHNICIANS 6 S TNG S � 10 (SE HEMATI STEMS MEETING UPC . CO HALL 302.2). TRACT E DON E REQ INFOR R TO P BY Q IREMEN ATION OVIDE ALIFlED S OF SHOWN ADDITIONAL COMP SSE S ON DR EQ TEN f NDAR WINGS IPMEN IS , i _ _1 _ ___ _ r i FCO V IN LVES, TALLA TC AS ON. REQUIR D TO ROVIDE A COD COMP ANT - °a 1 4"W BELOW ELAB > 2" VAC, SLOPE AT — -r• — — - —1 �• ` " 1 + - - r---- - -,{------------ -- - CONNECT T VENT RISER > /4 /10 TOWARDS f il° _ _ VACUUM PUMP (TYP.) P0.02 �- rte- 0 . ________ _- I _ ___ I VESTIBULE VENT 3"W UP TO VACUUMS n ------------------------------------------- i PUMP DRA Ni a. < °°. O C I E) BELOW G A E WASTE OO9 i t 2"W UP TO FS- Ffi e a FO 0 61 j" ° ° I 1 > ii 1 i I I I D E I\•WL 1 g )VACUUM DEFIN SYSTEM D INN SHALL A99- COMPLY 005, S WI CT10N LEVE .3.3.6. 3 RE UIREME TS FIELD VERIFY ANDEQ �! ----i---------------COORDINATE-ROUTING WITH ARCHITECT. � i � -V � � != I '� i i/ , LEVEL 3 VAC _ _ I I ! 2" VAC UP i ---------.--.-- UMP_BY ER STAT R ;717 AIR AI ! ! n AIS. OMP: Y 1 --r 1 Y4"AIR 2" SCH 40 PVC PIPE REMOTE AIR INTAKE KIT (INCLUDES FLEX cu --1 —i HOSE, PIPE, CLEAR TUBING, SCREENED AIR INTAKE, ETC) FOR AIR SCOPE O F WORK 2" TYPE L COPPER EXHAUST AIR PIPE - COMPRESSOR. SEE AIR COMPRESSOR MFR. EQUIPMENT SUPPLIER �1 DWGS FOR FURTHER DETAILS (MIN. 10' FROM EXHAUS OPENINGS. 1 I ' O FROM VACUUM UNIT. SEE EQUIPMENT COORDINATE CORE DRILLING LOCATION OF CONCRETEILL WITH SIIPPI IFR nwr.q FOR FI IRTHFR nFTAII S A(:HITFrn IRAI /STRI Irn tel WATPR -ncuT Q17AI PPTPA7 Ml AND REQUIREMENTS. AROUND PIPING WITH APPROVED CAULKING MATERIA .). PROTECT PIPING WITH AIREX TSS SERIES E -FLEX 0 -SYSTEM 4 BASEMENT PLUMBING PLA19 KIT. M0.02 SCALE: 1/4" = 1'0" SET UNIT ON CONCRETE PAD, SEE ARCH. ALL PIPING IS ABOVE GRADE U.N.O. O DWGS FOR DETAILS. z co 0 N Consulting Mechanical Engineers USE OF CN 0 7100 Linden Ave. N., Suite 1 �DOCUME NTS Seattle, Washington, 98103 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS v Phone(206) 706-9669 THE PROPERTY OF HV ENGINEERING, INC. AtDINOT TO BE USED, IN WHOLE OR IN PART, FOR ANY 0TOJFas:(206) 706-1830 WITHOUT THE WRITTEN AUTHORIZA OF INo www.hvengineering. biz CO T,IN NG, REVIEWED FOR CODE COMPLIANCE APPROVED MAR 2 5 2016 Citgo of Tukwila BUILDING QIVISIOi',l VEINY SCALE BAR MEASURES ONE INCH ON ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS DRAWING, ADJUST ES CORDINGLY. HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St. Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT 30321 rotes.. � C b CONSULTANT' STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY OF TUKWILA FEB 18 2016 PERMIT CENTER SHEET TITLE EMENT LEVEL ECHANICAL PLAN SHEET NO. 1508 n C. VIII■ Ir 0 z C:) N N 0 N 0 0 n LEVEL 2 HVAC DEMO PLAN SCALE: 1/4" = 190" in FEED INTAKE GRILLE IN SOFFIT 10' MIN. FROM EG -1 EXHAUST GRILLE IN GENERALNDTES: 1. FIELD VERIFY ALL (E) ism r •• • � / 1 1 OPTION, HOME RUNS OF FLEX DUij • r wow ANONK BE COMBINED TOGETHER IF -r-•- PROVIDED 0.05"/100' • e ' ROUND r • r r ,• IIB v FLAG NOTES tl �Ql ► . 01, ■ ; - - -MIN NJ © ADJACENTSERVE r r • / EM 1111 ■1 111 ► E I■ AND r r • • . • • . ,■ ■111 ' o ��►�'�111®1111111 /1 IS ASSOCIATED WITH THIS UN T ism THAN TO BLANK OFF (E) TI - ' 1' 1' illi • 1 ' �� '� (_ WALL . • r fi► I■1 ■ I��iil m1111■11■11111111�� CORRIDOR. .. • : • rE THE SCOPE- •• •. • PROJECT• • r -r .� 0LII ■ I +m THIS SYSTEM.��► ..�, ■i1 ■ 111111► El i �INN �* > CEILING AS REQUIRED FOR HRUPROVIDE SERVICE ACCESr • • -�I1 i1 !���■ "PROVIDE CONDENSATE DRAIN AND [�>SECONDARY DRAIN PAN �.. 1 SERVICE ACCESS. SECONDARY DRAIN PAN UNDER H- m MIN m PIPED : a •. : �� : '. ••,! �'1I1I11111� 1�� 1 r • ��111N111111111111��� DEMO (E) DUCTWORK CONNECTED ©r • ��: `,� 1 '' �—. - ' �� a�i= — fes/ PROJECTDEMO AFFECTED EXHAUST DUCTM M INN SERVING THIS TI r Ci 11111 MIN VERTICAL DUCT CONNECTION T Ll C NO ---_ ME ism ��►/��®���� ■'in ISM El INN -1 EI MCI 11111 C ME E1 gill MIs El M.Pa IN m 111111 MIN III is m®f.'� '■ Y3}3� ■ mM EMS Iwo INN ]MIN is • fie■ ■� i■1�� I �� ■ ��� !��■ ., .i.s; ��� 1�� - .■ilii ..l on no EIIIII �10� X11 �II� G■1i5FMIN sm ME --- I�■ ® IIL11�' .� ��� �i�n111■111■►�11 II' ►►MIN Him �'-ali���������ir��®ease®eeee�as;ere!111����1����1 IL iLIIiI7 11 EXP Ell TING I 12X14 "P20 Inl 2O 202 TYP 2 GENERAL NOTE:EXHAUST DEMO ALL EXISTING SUPPLY, RETURN AND EXHAUST DUCTWORK GRILLE IN SOFFIT ASSOCIATED WITH EXISTING HEAT PUMPS AND EXHAUST FANS (EXCEPT �p SCALE: Y4" = IV' INTAKE GRILLE IN SOFFIT-� FOR HP -4) WITH THE SCOPE OF WORK AREA. 0 10' MIN. FROM EG -1 z Consulting Mechanical Engineers ELISEOF DOCUMENTS Ff- 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED Phone(206) 706-9669 HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF HV ENGINEERING, IN .AND IS NOT TO BE NV Engineering, Fax:(206) 706-1830 www.hvengineering. biz USED, IN WHOLE OR IN PART, FOR OTHE 0 WITHOUT THE WRITTEN AUTHORIZA COP N N REQ F1 0 ■❑III111110 HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St. Suite 200 Seattle, Washington 98103 Tel., 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT PHASE Permit Set DATE 02/09/2016 REVISIONS M0.0 RECEIVED ----�'• CITY OF TUKWILA fAMPERS TORIZED OSA/EA FEB 18 2016 0 PERMIT CENTER SHEET TITLE .: ED I`OIR .4JfPLIANCE 4 . VIED MAR 2 J 2016 LEVEL 2 HVAC & HVAC DEMO PLAN City of Ttikwrlla BUILDING DIVISION SHEET NO. VERFY SCALE BAR MEASURES ONE INCH ON ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS ARCHITECTS 1508 08 C:) CV CV 0 d 0 n Z 1 THE FOLLOWING NOTES APPLY TO ALL PLUMBING DRAWINGS. ADDITIONAL PLUMBING 36 TEST HYDRONIC PIPING PER IMC 1208. CAP OR CLEANOUT NOTES MAY BE INDICATED ON EACH PLUMBING DRAWING. SEE SPECIFICATIONS FOR 37 ALL MATERIALS IN CONTACT WITH PIPING SYSTEMS SHALL BE COMPATIBLE FOR USE WITH AND C ADDITIONAL REQUIREMENTS. FOR CONTACT WITH THE PIPING MATERIAL CONTRACTORS AND TRADES SHALL VERIFY COMPATIBILITY 2 INSTALLATION SHALL COMPLY WITH ALL GOVERNING CODES AND REGULATIONS (LOCAL AND STATE). NOTHING OF THEIR PRODUCTS WITH THE PIPING SYSTEMS. THIS INCLUDES, BUT IS NOT LIMITED TO, FIRE PIPE TEE DOWN ON THE DRAWINGS OR SPECIFICATIONS SHALL BE CONSTRUED AS ALLOWING DEVIATION FROM THIS REQUIREMENT. STOPPING SEALANTS, FIRE STOPPING COLLARS, VIBRATION ISOLATION ELEMENTS, THERMAL 45' DEGREE ELBOW IF A CONFLICT SHOULD OCCUR BETWEEN DRAWINGS AND REGULATIONS, THE REGULATIONS SHALL TAKE PRECEDENT INSULATION, EXPANSION JOINTS AND ANY MATERIAL IN CONTACT WITH PIPES. MEDIUM PRESSURE STEAM AND CONTRACTOR SHALL N011FY ENGINEER IN WRITING OF SUCH CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION. 38 ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE TRADEMARK OF TEE —S THE CAST IRON SOIL PIPE INSTITUTE (CISPI) AND BE LISTED BY NSF INTERNATIONAL 3 INSTALL ALL WASTE LINE CLEANOUTS IN ACCORDANCE WITH CHAPTER SEVEN OF THE LOW PRESSURE STEAM END BLOWDOWN VALVE UNIFORM PLUMBING CODE: 39 PIPE BURIAL METHODS FOR BELOW GRADE PIPING SHALL COMPLY WITH MFR INSTALLATION --III-- A. 3" WASTE PIPE — 3" CLEANOUT WITH 2.5" PLUG INSTRUCTIONS, ASTM D 2321 AND ASTM F1668. FAILURE TO FOLLOW THESE REQUIREMENTS ECCENTRIC REDUCER B. 4" WASTE PIPE — 4" CLEANOUT WITH 3.5" PLUG CAN LEAD TO PIPE FAILURE. C. 6" WASTE PIPE — 4" CLEANOUT WITH 3.5" PLUG HOSE BIBB/WALL HYDRANT 40 ROOF MOUNTED PIPING SHALL BE INSTALLED ON FREE FLOATING, PREFABRICATED SUPPORTS 4 WASTE, VENT AND SUPPLY PIPING SIZES TO INDIVIDUAL PLUMBING FIXTURES SHALL BE SIMILAR TO MIRO MODEL 24—R OR ROOF TOP BLOX ON WALKWAY TREAD PADS. THE USE OF WOOD AS SHOWN ON PLUMBING FIXTURE SCHEDULES. BELOW GRADE SANITARY WASTE PIPING FOR SUPPORTS IS PROHIBITED. SIZES SHALL BE AS SHOWN ON PLANS AND FIXTURE SCHEDULES AND SHALL NOT :—' FLEXIBLE CONNEC11ON IN PIPING BE LESS THAN 2" DIAMETER. 41 ALL ITEMS IN CONTACT WITH POTABLE WATER SHALL COMPLY WITH THE NATIONAL "REDUCTION Y OF LEAD IN DRINKING WATER ACT" S.3874. 5 ALL SANITARY SEWER PIPING BELOW SLAB SHALL BE INSTALLED AT A MINIMUM OF 1/4" PER FT SLOPE UNLESS APPROVAL IS PROVIDED BY THE "ADMINISTRATIVE AUTHORITY" IN WRITING FOR A SHALLOWER SLOPE. IN NO CASES SHALL SEWER PIPING BE INSTALLED AT LESS THAN 1/8" PER FT SLOPE. IN NO CASES WILL PIPING SMALLER THAN 4" BE INSTALLED AT SLOPES SHALLOWER THAN 1/4" PER FOOT. PIPING INSTALLED AT 1/8"/FT SHALL BE RESIZED PER CHAPTER 7 OF THE UNIFORM PLUMBING CODE AND SUPPORTING CALCULATION SUBMITTED TO ENGINEER FOR REVIEW. 6 PROVIDE STOPS PRIOR TO ALL PLUMBING EQUIPMENT. THIS SHALL ALSO INCLUDE PROVIDING INTEGRAL STOPS ON ALL SHOWER AND TUB/SHOWER VALVES (WHETHER SPECIFIED OR NOT). PROVIDE WASTE TRAPS AT ALL DIRECT CONNECTED EQUIPMENT IN ACCORDANCE WITH CODE AND THE SPECIFICATIONS. 7 PROVIDE TRAP PRIMERS AT ALL FLOOR DRAINS UNLESS NOTED OTHERWISE. PROVIDE UNION ON UPSTREAM AND DOWNSTREAM SIDE OF ALL TRAP PRIMERS. TRAP PRIMER BRANCH TAKEOFF SHALL BE FROM TOP OF MAIN DISTRIBUTION PIPE. 8 INSULATE P—TRAPS EXPOSED IN UNHEATED SPACES. BEFORE CLOSING OF THE WALLS, EACH SECTION OF THE PIPING SYSTEM SHALL BE SUBJECTED TO A 9 SEE ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE ROUGH—IN DIMENSIONS AND MINIMUM TEST PRESSURE OF 150 P.S.I.G. WITH OIL—FREE, DRY AIR OR NITROGEN. THIS TEST PRESSURE SHALL BE MAINTAINED UNTIL EACH JOINT HAS BEEN EXAMINED FOR LEAKAGE, AND ANY OTHER DETAILS. ALSO SEE ARCHITECTURAL DRAWINGS FOR FINISH REQUIREMENTS OF ALL LEAKS LOCATED SHALL BE REPAIRED AND RETESTED AS ABOVE. AFTER TESTING AS ABOVE, PLUMBING FIXTURES INCLUDING REQUIREMENTS FOR FLUSH LEVER LOCATION AT ADA THE SOURCE SHUTOFF VALVE SHALL THEN BE CLOSED. THE TEST SHALL REMAIN STATIC FOR A COMPLIANT TOILETS AND VALVE LOCATIONS OF ADA SHOWERS. REPORT ALL PERIOD OF 24 HOURS WITH A MAXIMUM ALLOWABLE PRESSURE LOSS OF 5 PSIG. DISCREPANCIES TO ENGINEER PRIOR TO ANY WORK. ALL BRAZED JOINTS IN THE PIPING SHALL BE MADE UP USING BRAZING FILLER ALLOYS THAT BOND WITH THE BASE METALS BEING BRAZED AND THAT COMPLY WITH 'SPECIFICATIONS FOR BRAZING 10 REFER TO ARCHITECTURAL DRAWING FOR ROOM ELEVATIONS. LOCATE PLUMBING FIXTURES AT FILLER METAL; ANSI,/AWS A5.8. HEIGHTS SHOWN ON ARCHITECTURAL ROOM ELEVATIONS. (a) COPPER—TO—COPPER JOINTS SHALL BE MADE USING A COPPER—PHOSPHOROUS BRAZING FILLER ALLOY <BCuP SERIES) WITHOUT FLUX 11 PLUMBING DRAWINGS SHOW APPROXIMATE LOCATIONS OF PLUMBING FIXTURES. REFER TO (b) DISSIMILAR METAL SUCH AS COPPER AND BRASS SHALL BE JOINED USING AN ARCHITECTURAL PLANS FOR EXACT LOCATIONS. COORDINATE FLOOR DRAINS FOR APPROPRIATE FLUX WITH EITHER A COPPER—PHOSPHOROUS <BCuP SERIES) OR A SILVER (BA9 SERIES) BRAZING FILLER ALLOY. APPLY FLUX SPARINGLY AND IN A MANNER TO MECHANICAL SPACES WITH MECHANICAL EQUIPMENT BEING SERVED. AVOID LEAKING ANY EXCESS INSIDE OF COMPLETED JOINTS. USE OF PREFLUXED ROD IS ACCEPTABLE, 12 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. OUTLET STATIONS SHALL BE DESIGNED SO THAT PARTS OR COMPONENTS THAT ARE REQUIRED TO BE GAS SPECIFIC CANNOT BE INTERCHANGED BETWEEN STATION OUTLETS FOR DIFFERENT GASES. 13 REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL ELECTRICAL CHARACTERISTICS OF PLUMBING EQUIPMENT (VOLTAGES, ETC.). LABELING SHALL APPEAR ON THE PIPING AT INTERVALS OF NOT MORE THAN 20 FT. AND AT LEAST ONCE IN EACH ROOM AND EACH STORY TRAVERSED BY THE PIPING SYSTEMS. 14 ELECTRICAL CHARACTERISTICS OF LISTED EQUIPMENT SHALL BE VERIFIED BY CONTRACTOR DURING SUBMITTAL PROCESS. ANY ELECTRICAL CHARACTERISTICS THAT DEVIATE FROM THOSE PIPING SHALL BE SEAMLESS TYPE K OR L (ASTM B88) COPPER TUBING... SHALL BE THOROUGHLY CLEANED OF OIL, GREASE ... AND BE CAPPED OR PLUGGED TO PREVENT RECONTAMINATION... LISTED SHALL BE IDENTIFIED BY THE CONTRACTOR, SUBMITTED TO THE ENGINEER FOR APPROVAL AND COORDINATED WITH DIVISION 26 ELECTRICAL PRIOR TO INSTALLATION OF INSTALLATION OF ALL DENTAL EQUIPMENT AND PIPING SYSTEM SHALL COMPLY WITH LOCAL CODE REQUIREMENTS (I.E., EQUIPMENT AS REQUIRED TO PROPERLY SERVE EQUIPMENT. UPC, AHJ, NFPA 99-2005—LEVEL 3, ETC). INSTALLATION OF ALL DENTAL PIPING SYSTEMS SHALL BE DONE BY QUALIFIED, COMPETENT TECHNICIANS MEETING THE REQUIREMENTS OF ASSE STANDARD 6010 (SEE UPC 1302.2). 15 SECURE WATER HEATERS AND STORAGE TANKS AND PLUMBING EQUIPMENT TO STRUCTURE AS INFORMATION SHOWN ON DRAWINGS IS SCHEMATIC. CONTRACTOR TO PROVIDE ADDITIONAL EQUIPMENT, VALVES, ETC AS REQUIRED BY CODE. REFER TO THE STRUCTURAL DRAWINGS FOR ADDITIONAL SPECIAL REQUIRED TO PROVIDE A CODE COMPLIANT INSTALLATION. REQUIREMENTS RELATED TO THE PLUMBING INSTALLATION. VACUUM SYSTEM SHALL COMPLY WITH LEVEL 3 REQUIREMENTS AS DEFINED IN NFPA99-2005, SECTION 5.3.3.6. 16 PROVIDE PLUMBING ANCHORAGE AND EXPANSION EVERY 100' PIPE LENGTH PER CODE. 17 ACCESS PANELS ARE REQUIRED AT ALL CONCEALED VALVES AND EQUIPMENT. COORDINATE LOCATION AND SIZE WITH ARCHITECT. U-1 Dental unit utility center location. 18 INSULATE PIPING PER SEC AND PER DIVISION 22 SPECIFICATIONS (WHICHEVER 69 Provide compressed air for instrumentation devices with shut—off valves, (3/8" angle stop IS GREATER). valves or 3—piece ball valves as required by local codes.) 66 Provide vacuum. 19 GENERALLY DUCTWORK PLANNED TO BE TIGHT TO STRUCTURE WITH PIPING BELOW DUCTWORK ❑ Provide cold water. AND BETWEEN LIGHT FIXTURES. ADJUST AS NECESSARY. See manufacturer's templates provided by equipment supplier. 20 COORDINATE LOCATIONS OF PLUMBING EQUIPMENT TO PROVIDE CLEARANCES OVER LIGHTING FIXTURES FOR REMOVAL AND SERVICE ACCESS DUE TO EQUIPMENT MAINTENANCE. GDental unit utility center location. ® Provide compressed air for instrumentation devices with shut—off valves, (3/8" angle stop 21 REFER TO PIPING DIAGRAMS AND DETAILS FOR REQUIRED FITTINGS, VALVES, ETC. FLOOR PLANS valves or 3—piece ball valves as required by local codes.) AND SECTIONS INDICATE EQUIPMENT LOCATIONS AND GENERAL PIPE ROUTING ONLY. ❑ Provide vacuum. 22 PROVIDE FABRICATED STEEL MEMBER SUPPORTS AS REQUIRED BY MANUFACTURER'S INSTALLATION ❑ Provide cold water. INSTRUCTIONS, AS INDICATED ON DRAWINGS, OR IN SPECIFICATIONS FOR INSTALLATION OF 69 See manufacturer's templates provided by equipment supplier. EQUIPMENT. REQUIRED STRUCTURAL MEMBERS, BOLTS, AND WELDS SHALL BE IN ACCORDANCE WITH AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) MANUAL. 23 IF REQUIRED FOR INSTALLA11ON OF PIPES AND EQUIPMENT, PROVIDE ADDITIONAL STRUCTURAL MEMBERS BETWEEN COLUMNS, JOISTS, AND STRUCTURAL FRAME TO MEET SUPPORT REACTIONS PLUMBING TERMINATIONS FOR EQUIPMENT (FORCES, MOMENTS, DEFLECTIONS). STRUCTURAL MEMBERS SHALL BE DESIGNED BY A REQUIRED BY SERVICE DEPARTMENT REGISTERED PROFESSIONAL ENGINEER. Vacuum Systems: 24 DO NOT CORE DRILL OR DRILL THROUGH BEAMS, COLUMNS, AND SHEAR WALLS, UNLESS Operatory — 1-1/2" stub up in each operatory terminating in 3/4" female pipe thread INDICATED ON STRUCTURAL DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER. Pump — 1-1/2" — 2" (VERIFY) female pipe thread 25 PIPES INDICATED WITHOUT DIMENSIONS SHALL BE SIZED PER PRECEDING UPSTREAM PIPE Water — 3/8" compression fitting (angle stop) SECTIONS. Compressed air for Gas—Powered Devices Systems: 26 DRAWINGS ARE SCHEMATIC IN SOME AREAS AND MAY NOT SHOW PIPING OFFSETS WHICH MAY BE At compressor — 1/2" female pipe thread REQUIRED. In operatory — 3/8" 3—piece ball valves as required by local codes 27 COORDINATE ALL PLUMBING WORK WITH ARCHITECTURAL PHASING DRAWINGS. SUGGESTED PIPING LAYOUT, SEE MFG SPECIFICATIONS, TYPICAL. 28 COORDINATE DEMOLITION WORK WITH ARCHITECTURAL DEMOLITION AND PHASING DRAWINGS. Run 1/2' I.D. copper air line. Terminate all locations with 29 PATCH ALL FLOOR, WALL, CEILING AND ROOF OPENINGS CREATED/CAUSED BY THE DEMOLITION AIR LINES 3—piece ball valves as required by local codes. OF EXISTING PIPES, FIXTURES, ETC. IN ACCORDANCE WITH DIVISION 1 OF THE SPECIFICATIONS local codes. Terminate 1" above finished floor unless otherwise specified. 30 ALL WATER PIPING IN UNHEATED SPACES EXCEPT CIRCULATED HOT WATER SHALL BE HEAT Provide 24 hour leak test at 100 PSI with oilless clean air. TRACED AND INSULATED. Where indicated rough—in, cap lines for future use. 31 WHERE PIPE SIZES ARE NOT SHOWN ON DRAWINGS, SIZE PIPING PER THE UNIFORM PLUMBING �� , Dental vacuum lines. Use only copper pipe per 2012 upc 1315. CODE. Slope l/4' for every 10 feet of run toward 32 PRIOR TO SUBMITTING ALL PLUMBING FIXTURES THE CONTRACTOR SHALL VERIFY COMPATIBILITY pump location. Avoid 90 degree angles when possible. See termination schedule. OF THE SPECIFIED FIXTURE WITH THE SIZES OF FINISH CABINETRY AS IDENTIFIED IN GENERAL Final hook up by plumber. Vacuum lines to run sub grade CONTRACTORS SHOP DRAWINGS. ANY DISCREPANCIES BETWEEN THE SIZE OF THE FIXTURES and to follow trench layout. SPECIFIED AND THE FINISH CABINETRY SIZES SHALL BE BROUGHT TO THE ATTENTION OF ° Indicates termination point. THE ENGINEER IN WRITING BEFORE SUBMITTAL. 33 PLUMBING VENTS SHALL TERMINATE MINIMUM 10' FROM FRESH AIR INTAKES PER CODE. 34 LABEL ALL PIPING SYSTEMS PER THE IMC AND UPC. 35 SUPPORT AND BRACE PIPING SYSTEMS IN ACCORDANCE WITH UPC SECTION 314 AND AS REQUIRED IN THE SPECIFICATIONS. PLUMBING LEGEND SYMBOL DESCRIPTION PIPING FLOW ARROW II-- CAP OR CLEANOUT 0-- PIPE UP OR TEE UP AND DOWN C PIPE DOWN --() PIPE TEE UP -0 PIPE TEE DOWN �— 45' DEGREE ELBOW (15-75 PSIG) 90' DEGREE ELBOW MEDIUM PRESSURE STEAM 4 WAY TEE M TEE —S PIPE BREAK PIPING SPECIALTIES ST STORM WASTE (BELOW FLOOR) T PRESSURE GAGE OF THERMOMETER --() SIGHT GLASS -0 VENTURI FLOW METER --- FLOW METER (15-75 PSIG) MANUAL AIR VENT (MAV) MEDIUM PRESSURE STEAM GAS PRESSURE REGULATOR M WATER METER t— WYE STAINER (0-15 PSIG) WYE STAINER WITH CAPPED HOSE LOW PRESSURE STEAM END BLOWDOWN VALVE ---H -- FLANGE --III-- UNION r__. ECCENTRIC REDUCER --QM — STEAM TRAP HOSE BIBBS HOSE BIBB/WALL HYDRANT PIPE ANCHOR ALLIGNMENT GUIDE tTS TEMPERATURE/PRESSURE TEST PORT :—' FLEXIBLE CONNEC11ON IN PIPING FUNNEL Y BALANCING VALVE PRESSURE REGULATING VALVE PRESSURE REDUCING VALVE (PRV) AUTOMATIC CONTROL VALVE — TWO WAY (ELECTRIC OPERATOR SHOWN) AUTOMATIC CONTROL VALVE — THREE WAY (ELECTRIC OPERATOR SHOWN) BALL VALVE GATE VALVE GAS COCK Y-1 RELIEF VALVE �— CHECK VALVE ---� r� BUTTERFLY VALVE REDUCED PRESSURE BACKFLOW ASSEMBLY �i-- BALANCING/MEASURING VALVE PLUMBING LEGEND SYMBOL DESCRIPTION FIRE PROTECTION SYSTEMS FDC FIRE DEPARTMENT CONNECTION FS FIRE SERVICE WF WET FIRE PIPING DF DRY FIRE PIPING STORM PIPING SYSTEMS ST STORM WASTE (BELOW FLOOR) RL RAIN LEADER OF OVERFLOW LEADER --() ROOF DRAIN -0 OVERFLOW DRAIN --- OVERFLOW SCUPPER HYDRO IC HVAC PIPING SYSTEMS CHS CHILLED WATER SUPPLY CHR CHILLED WATER RETURN CWS CONDENSOR WATER SUPPLY CWR CONDENSOR WATER RETURN HWSr HEATING WATER SUPPLY HWR---- HEATING WATER RETURN GAS PIPING SYSTEMS G LOW PRESSURE GAS MPG MEDIUM PRESSURE GAS LPG PROPANE COMPRESSED AIR PIPING SYSTEMS A COMPRESSED AIR STEAM ----PIPING SYSTEMS PR CONDENSATE PUMP RETURN HPS HIGH PRESSURE STEAM OX (ABOVE 75 PSIG) HPC HIGH PRESSURE STEAM N2 CONDENSATE RETURN MEDIUM PRESSURE STEAM MPS— ARGON (15-75 PSIG) MPC MEDIUM PRESSURE STEAM AIR CONDENSATE RETURN LPS LOW PRESSURE STEAM HIGH TEMP HOT WATER 160' (0-15 PSIG) LPC LOW PRESSURE STEAM TEMPERED WATER CONDENSATE RETURN BFW BOIL FEED WATER BDN BLOW DOWN ED GAS PIPING SYSTEMS MA MEDICAL AIR MV MEDICAL VACUUM OX OXYGEN N20 NITROUS OXIDE N2 NITROGEN MWG MEDICAL WASTE GAS LABORATORY PIPI G SYSTEMS D) DOONIZED WATER DW DISTILLED WATER LCW LABORATORY COLD WATER LHW LABORATORY HOT WATER LHC LABORATORY HOT WATER CIRCULATION AR ARGON HE HELIUM AIR AIR V VACUUM 160 HIGH TEMP HOT WATER 160' SHEETINDEX OR AS INDICATED SHEET # SHEET TITLE TEMPERED WATER PO.01 NOTES & LEGEND TEMPERED WATER CIRCULATING PO.02 ABBREVIATIONS & DETAILS P1.00 LEVEL 1 & 2 PLUMBING DEMO PLAN P2.01 LEVEL 1 & 2 PLUMBING PLAN HVE PLUMBING LEGEND SYMBOL DESCRIPTION NORTH NORTH ARROW A SEC11ON IDENTIFICATION M201 SHEET IDENTIFICATION OSHEET NOTES ORISER CALLOUT, RISER -1 WC PLUMBING FIXTURE TAG, WC -1 1 AREVISION CALLOUT, REV -1 CDREVISION BUBBLE 1 DETAIL CALLOUT P2.05 �—COLUMN GRID SYMBOLS �J -- + — — --- 6 .. O GENERAL MECHANICAL NOTES NUMBER IDENTIFICATION FLAG MECHANICAL NOTES NUMBER IDENTIFICATION EXISTING WORK OR BACKGROUND INFORMATION (LIGHT LINE NEW WORK (HEAVY UNE; R RELOCATE EXISTING EQUIPMENT ITEM / OR DEVICE INDICATED EXISTING EQUIPMENT OR PIPING TO BE SELECTIVELY DEMOLISHED PMP -1 TYPICAL EQUIPMENT DESIGNATION (PUMP SHOWN) POINT OF CONNECTION TO EXISTING BITER PIPING SYSTEMS WS WATER SERVICE CWF COLD WATER FILTERED — COLD WATER (ABOVE FLOOR/GRADE) P HOT WATER (ABOVE _ _ FLOOR/GRADE) (120' F TEMPERED WATER IF NOT INDICATED OTHERWISE) 140—HIGH TEMP HOT WATER 140' OR AS INDICATED 160 HIGH TEMP HOT WATER 160' OR AS INDICATED T TEMPERED WATER TWC TEMPERED WATER CIRCULATING — — — HOT WATER CIRCULATING NP NON POTABLE WATER --QM — WATER METER DR 1 STE YET PIPI G WASTE (ABOVE FLOOR) PIPING -- WASTE (BELOW FLOOR) PIPING AW ACID WASTE GW GREASE WASTE GD GARAGE DRAIN C CONDENSATE DRAIN P PUMPED PIPING FCO FLOOR CLEANOUT (FCO) —� WCO WALL CLEANOUT (WCO) O VTR VENT THRU ROOF ® FLOOR DRAIN Q FLOOR SINK Consulting Mechanical Engineers REUSE OF DOCUMENTS 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS Phone(206) 706-9669 THE PROPERTY OF HV ENGINEERING, INC. AND IS NOT TO BE Fax:(206) 706-1830 USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WWW.hvengineering. biz WITHOUT THE WRITTEN AUTHORIZATION&tV EN RI 'COPYRIGV E RI IN SCALE BAR MEASURES ONE INCH ON ORIGINAL DRAWING 0" 1" IF NOT ONE INCH ON THIS DRAWING, ADJUST SCALES, Z3 zs. HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT tIt CONSULTANT'S STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY OF TUKWILA FEB 18 2016 PERMIT CENTER SHEET TITLE NOTES & LEGEND SHEET NO. ARCHITECTS 1508 Ti 0 CV C%4 O O O n AAV AIK AUMII IANGt VALVL FH FAHRENHEIT MCC MOTOR CONTROL CENTER S.I.O. SUPPLIED AND INSTALLED AC AIR CONDITIONING FD FIRE DAMPER OR FLOOR DRAIN MCA MAXIMUM CIRCUIT AMPS COUPLER BETWEEN DISSIMILAR PLASTIC PIPE BY OWNER/ (OTHER) ABV ABOVE FF FINISHED FLOOR MAT MIXED AIR TEMPERATURE SHT SHEET AD ACCESS DOOR FLGD FLANGED MAX MAXIMUM SP STATIC PRESSURE AV ACID VENT FLR FLOOR MECH MECHANICAL SPEC SPECIFICATION AW ACID WASTE FCO FLOOR CLEAN OUT MFR MANUFACTURER SR SUPPLY REGISTER AFC ABOVE FINISHED CEILING FPM FEET PER MINUTE MED MEDIUM SS STAINLESS STEEL AFF ABOVE FINISHED FLOOR FLTR FILTER MH MANHOLE SYS SYSTEM AFG ABOVE FINISHED GRADE FOF FACE OF FLANGE MIN MINIMUM, MINUTE STAT THERMOSTAT AFUE ANNUALIZED FUEL EFFICIENCY FPI FINS PER INCH MISC MISCELLANEOUS AHU AIR HANDLING UNIT FSK FOIL SKRIM KRAFT LINED MV MED VACUM TEMP TEMPERATURE AL ALUMINUM DUCT (SPUNSTRAND) TD TEMPERATURE DIFFERENTIAL APPROX APPROXIMATELY FT FEET, FOOT N NORTH, NEUTRAL TDH TOTAL DYNAMIC HEAD ARCH ARCHITECTURAL FU FIXTURE UNITS NA NOT APPLICABLE TEMP TEMPORARY ATMOS ATMOSPHERE FV FACE VELOCITY NC NORMALLY CLOSED THRU THROUGH FW FEED WATER NIC NOT IN CONTRACT TI TENANT IMPROVEMENT BATT BATTERY FPTU FAN POWERED TERMINAL UNIT NO NUMBER OR NORMALLY OPEN TSTAT THERMOSTAT BDD BACK DRAFT DAMPER NG NATURAL GAS TYP TYPICAL BF BLIND FLANGE G GAS NTS NOT TO SCALE TRU TERMINAL REHEAT UNIT BFC BELOW FINISHED CEILING GALV GALVANIZED BHP BRAKE HORSE POWER GEN GENERATOR 02 OXYGEN UL UNDERWRITER'S LABORATORY BI BACKWARD INCLINED GA GROUND FAULT CIRCUIT INTERRUPTER OC ON CENTER UNO UNLESS NOTED OTHERWISE BLDG BUILDING GR GRILLE OSA OUTSIDE AIR UV UNIT VENTILATOR BOD BOTTOM OF DUCT GPM GALLONS PER MINUTE OAT OUTSIDE AIR TEMPERATURE UMC UNIFORM MECHANICAL CODE BTU BRITISH THERMAL UNIT GV GATE VALVE OA OUTSIDE AIR UP UNIFORM PLUMBING CODE BTUH BRITISH THERMAL UNIT PER HOUR GW GRAY WATER (NON POTABLE) OD OUTSIDE DIMENSION UBC UNIFORM BUILDING CODE GWR GLYCOL WATER RETURN OPP OPPOSITE UPC UNIFORM PLUMBING CODE CFM CUBIC FEET PER MINUTE GWS GLYCOL WATER SUPPLY OV OUTLET VELOCITY UG UNDERGROUND CHAR CHARACTERISTICS OCP OVER CURRENT PROTECTION CHEM CHEMICAL INJECTION HP HORSE POWER V VOLT CHWS CHILLED WATER SUPPLY HPFS HIGH POINT FINISHED SURFACE P PUMP VAC VOLTS AC CHWR CHILLED WATER RETURN HR HOUR PD PRESSURE DROP VDC VOLTS DC CLG CEILING HTG HEATING PERF PERFORATED VD VOLUME DAMPER CO CLEAN OUT HT HEIGHT PF PRE FILTER VAC VACUUM CONC CONCRETE HVAC HEATING, VENTILATION AND PH PHASE VAV VARIABLE AIR VOLUME CONN CONNECT OR CONNECTION AIR CONDITIONING PJ PUSH ON JOINTS VEL VELOCITY CPLG COUPLING HW HOT WATER PLCS PLACES VF VENTILATION FAN CS CARBON STEEL HWC HOT WATER CIRCULATING PNL PANEL VTR VENT THROUGH ROOF CSC CARSEALED CLOSED HWS HOT WATER HEATING SUPPLY POC POINT OF CONNECTION VOL VOLUME CSO CARSEALED OPEN HWR HOT WATER HEATING RETURN PRV PRESSURE REDUCING VALVE V/PH/HZ VOLTS/PHASE/HERTZ CV CONSTANT VOLUME PS PIPE SUPPORT CW COLD WATER IA INSTRUMENT AIR PSV PRESSURE SAFETY (RELIEF) VALVE W/ WITH CRD CEILING RADIATION DAMPER ID INSIDE DIMENSION W/O WITHOUT IE INVERT ELEVATION QTY QUANTITY W WASTE DET DETAIL IH INSULATION HOT WB WET BULB DFU DRAINAGE FIXTURE UNITS IN INCH, INCHES R RELIEF WC WATER CLOSET DIA DIAMETER INFO INFORMATION RA RETURN AIR WCO WALL CLEAN OUT DIM DIMENSION INST INSTRUMENT RED REDUCER WG WATER GAUGE DISCH DISCHARGE INSUL INSULATE, INSULATION REQD REQUIRED WHA WATER HAMMER ARRESTOR DI DUCTILE IRON INV INVERT RR REMOVE AND RELOCATE WT WATER TANK DMPR DAMPER IRR IRRIGATION (NON POTABLE) RJ RESTRAINED JOINTS WT WEIGHT DN DOWN IW INDIRECT WASTE RET RETURN WTR, W WATER DP DIFFERENTIAL PRESSURE RG RETURN GRILLE DR DRAIN JAN JANITOR RPM REVOLUTIONS PER MINUTE DWG DRAWING RWL RAINWATER LEADER KW KILOWATT EA EACH KWH KILOWATT HOUR SS SANITARY SEWER OR STAINLESS STEEL EAT ENTERING AIR TEMPERATURE SA SUPPLY AIR ECC ECCENTRIC LAT LEAVING AIR TEMPERATURE SCHED SCHEDULE ECON ECONOMIZER LB POUND SECT SECTION EER ENERGY EFFICIENCY RATIO LC LOCKED CLOSED SEER SEASONAL ENERGY EFF. RATIO EF EXHAUST FAN LF LINEAL FEET SVC SERVICE EFF EFFICIENT, EFFICIENCY LL LANDLORD SHT SHEET EG EXHAUST GRILLE LOC LOCATION SD SMOKE DETECTOR EL ELEVATION LVG LEAVING SL SOUND LINING ELEC ELECTRICAL SV SOLENOID VALVE EQUIP EQUIPMENT MA MED GAS SW SOCKET WELD ET ELECTRIC TRACED MATL MATERIAL STA STATION EXIST, (E) EXISTING MAX MAXIMUM STD STANDARD EXH EXHAUST MPG MEDIUM PRESSURE GAS SF SUPPLY FAN EXT EXTERIOR MA MIXED AIR SFD SMOKE/FIRE DAMPER MBH THOUSAND BRITISH THERMAL UNITS PER HOUR PRELIMINARY EQUIPMENT LAYOUT SHOWN. VERIFY FINAL REQUIREMENTS WITH DENTAL EQUIPMENT SUPPLIER AND THEIR DRAWINGS. SEPARATE EXHAUST & NTAKE OPENINGS, 10'-0". SEE PLANS 2" DENTAL VACUUM — TO DENTAL 10' MIN [-CHAIR SYSTEM, SEE PLANS BUG SCREEN COVER ONJ EXHAUST VENT 4"0 INTAKE HOOD WITH SYSTEM ABOVE GROUND BELOW GROUND JOINT METHOD REMARKS PIPE INSULATION SOIL/WASTE/VENT SCREENED OPENING. PVC (SOLID CORE) SOLVENT WELD LOCATE 10' CLEAR OF WATER CLOSET (ADA) ABS EXHAUST VENT OPENING COUPLER BETWEEN DISSIMILAR PLASTIC PIPE < COLD WATER & TYPE L COPPER MALGAM SEPARATOR SOLDER INSULATE PER WSEC 2"SCH 40 PVC INTAKE PIPE TO-\ " 2" TYPE L COPPER 1-1/2 TO VTR INTAKE HOOD AT WALL EXHAUST TO OUTSIDE 1-1/2" AND SMALLER VENT AT WALL.. STERILIZATION SINK 2 CONNECT TO VACUU ---ij TYPE L COPPER 1W HOSE IN AND OUT OF AMALG PUMP PER MANUFACTURER INSULATE PER WSEC UNIT INSTALLATION DENTAL SINK BY OTHERS REF ONLY BY ) INSTRUCTIONS 2" AND LARGER 1/2 ROUTE SEPARATOR TANK j REMOTE AIR INTAKE KIT CONDENSATE DRAIN VIA GATE I MANIFOLD KIT — CONNECT TO AIR AND CHECK VALVE TIGHT—LINE TO j COMPRESSOR PER WASTE SYSTEM VIA. 4" DEEP j MANUFACTURER TRAP WITH VENT BOTH AHEAD I BY OTHERS (REF ONLY) AND BEHIND TRAP — IN L REMOTE AIR INTAKE DRIP LEG ACCORDANCE WITH NFPA 99 I AND VALVE FIGURE A.5.3.3.6.3(A) I MEDICAL VACUUM PUMP AND j I TANK ASSEMBLY 4" DEEP, 2"0 "P—TRAP t DENTAL AIR COMPRESSOR WITH MEMBRANE DRYER (BY OTHERS, 3" FLOOR SINK ONLY) PIPING SYSTEM SCHEDULE AND SPECIFICATION SYSTEM ABOVE GROUND BELOW GROUND JOINT METHOD REMARKS PIPE INSULATION SOIL/WASTE/VENT PVC PVC (SOLID CORE) SOLVENT WELD WC -1H WATER CLOSET (ADA) ABS — COUPLER BETWEEN DISSIMILAR PLASTIC PIPE 1/2 COLD WATER & TYPE L COPPER TYPE L COPPER SOLDER INSULATE PER WSEC HOT WATER — 1-1/2 1/2 1/2 1-1/2" AND SMALLER SK -1 STERILIZATION SINK 2 COLD WATER & TYPE L COPPER TYPE L COPPER SOLDER INSULATE PER WSEC HOT WATER DS -1 DENTAL SINK 2 — 2" AND LARGER 1/2 1/2 BY THE DENTAL EQUIPMENT SUPPLIER 2/11/2016 PLUMBING EQUIPMENT CONNECTION SCHEDULE SYMBOL ITEM WASTE IW VENT CW HW SPECIFICATION REMARKS WC -1H WATER CLOSET (ADA) 3 — 2 1/2 — KOHLER K-3519 FLOOR MOUNT W/ LUSTRA ELONGATED OPEN FRONT TOILET SEAT L-1 H LAVATORY (ADA) 1-1/2 — 1-1/2 1/2 1/2 KOHLER K-2005. FAUCET. GROHE EUROSMART 32 643 CENTERSET LESS DRAIN WITH 1.0 GPM AERATOR SK -1 STERILIZATION SINK 2 — 1-1/2 1/2 1/2 ELKAY DCR252210 SINGLE DEEP BOWL. Faucet Cicago Faucet 2304—ABCP WITH HAND SPRAYER DS -1 DENTAL SINK 2 — 1-1/2 1/2 1/2 BY THE DENTAL EQUIPMENT SUPPLIER L/II/LUIn GUNIKAGIUK IU GUUKUINAIL ANI) VLKII-Y ALL hINAL tIXIUKL bLLL IIUNS MIN UWNLK/6G/AKL;NIItGI MISCELLANEOUS SCHEDULE SYMBOL ITEM MAKE MODEL REMARKS FS -1 FLOOR SINK IJONESPEC/FD-2375 I I %4" DENTAL AIR — SEE r- PLANS FOR CONTINUATION. D CONNECT TO AIR OMPRESSOR PER MANUFACTURE'S INSTALLATION INSTRUCTIONS MEMBRANE DRYER DRAIN VALVE CONDENSATE DRAINS TO APPROVED RECEPTOR WITH AIR GAP TRAPPED AND VENTED DRAIN, AS �, ^J REQUIRED BY NFPA 99C FOR LEVEL 3 VJ VACUUM SOURCES: C MECHANICAL 00 CO C O S P0.02 SCALE: NTS COUNTER TOP PLUMBING FIXTURE RUN LOOP AS HIGH CW & HW AS POSSIBLE UP TO FAUCEQ:� 1 45' CW & HW BELO" 1� FLOOR, OVER AND UP WAL � 2" WYE CONNECTIONS LONG TURN %4 BEND C.O. VENT (SLOPE TO 2" WASTE-//' ASTE DRAIN -MINIMUM 27.), <20' PROVIDE WCO ON VERTICAL RISER Consulting Mechanical Engineers FUSE OF DOCUMENTS 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS Phone(206) 706-9669 THE PROPERTY OF HV ENGINEERING, INC. AND IS NOT TO BE Fa%:(206) 706-1830 USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJ HVwww.hvengineering. biz WITHOUT THE WRITTEN AUTHORIZATION OF ENGIN GEnginadn% Inc.. COPYRIGHT, NGI G, h hP H al � t olnt Your Community Heolth Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT gOETcI 303� 111bbTT��'�."�•" � 6 r� CONSULTANT'S STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY -OF TUKWILA FEB 16 2016 PERMIT CENTER SHEET TITLE ABBREVIATIONS & DETAILS ry ✓�P�I�L � i1a4 SHEET NO. VERFY SCALE BAR MEASURES ONE INCH ON ORIGINAL DRAWING 0" f1" NOT ONE INCH ON THIS AWING, ADJUST opa ORDINGLY. 1508 LEVEL I SCALE: %4" = 1'0" 0 z T � z= .. (E)HW, CW, & V TO (E)SINKS. CAP END S TO PREVENT DEAD LEGS IN SYSTEM. I I I — (E)HW, CW, & V TO (E)LAV & (E)WATER I I CAP END ® MAINS TO PREVENT DEAD SYSTEM. (E)HW, CW, & V TO SINGLE (E)SINK. CAP I i MAINS TO PREVENT DEAD LEGS IN I I r OI II II � I IL (E)W TO (E)SINKS. CAP END @ MAINS TOT DEAD LEGS IN SYSTEM.I L------- LL (E)W TO (E)LAV & (E)WATER CLOSET. 1– - — — — — — — — D ® MAINS TO PREVENT DEAD LEGS IN (E)W TO SINGLE (E)SINK. CAP END @ / TO PREVENT DEAD LEGS IN SYSTEM. — — — — — — — I \\ L----- 1F-1 (E)2"V---- °IIID ---------_- --------- iE)1Y4"HW I -I CJI I I I I —J I LJ �--- F I �I I II E14"HW I ---------- —� I I I I -- F----Inl 11 (E)1 "G Q Il I n� I I (E)Y'4"G L ---1==J1 jl 2 I„I (E)3 -RL I II O II I II R R L RL I L—I R L_�� I� L R L I �I y II II H I01 I II / I / I t- _ _ q -i— F II \\ I II J L F---1 °III JI�O I I I I —JI II I II ---- I _J I L-1 — — — — — — — — — — J F===T - E II--------�,�I I I IIHI II I II ILS II I I I I I OI fr SCALE: A" = 1'0" 0 z SCOPE --- — � f nii Consulting Mechanical Engineers 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 Phone(206) 706-9669 Fax:(206) 706-1830 www.hvengineering. biz =Eel a• •' dui_ >,th? THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF HV ENGINEERING, INC. AND IS NOT USED, IN WHOLE OR IN PART, FOR ANY OTHERIfLEERAI' C WITHOUT THE WRITTEN AUTHORIZATION OF HV COPYRIGHT, HVE u,V? 0 HealthPoint Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St. Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT 616 CONSULTANT'S STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY OF TUKWILA FEB 18 2016 PERMIT CENTER SHEET TITLE 'd LEVEL LEVEL 1 & 2 PLUMBING DEMO PLAN i; SHEET NO. BAR MEASURES ONE INCH ON ORIGINAL DRAWING 0" 1" F N ONE INCH ON THIS 1508 2"W & (E2 2"W & } FLAG NOTES ROUTE Jai" AIR AND 2" VACUUM UP TO OPERATORY STATIONS. COORDINATE EXACT POINT OF CONNECTION AND PIPE SIZE WITH DENTAL EQUIPMENT SUPPLIER. Ir 0 z SCALE: %" = 1'0" GENERAL NOTES: 1. FIELD VERIFY ALL EXISTI CONDITIONS AND POINTS OF CONNECTION. T F CW 1 V DN 1 "H DN 2 2"V PO.02 DS -- 1 Y4"CW I — NORTH OPERATORT' , )T W & K CW DN, U-2 21 1 1 2"V , I CU -1) i L 1 O I (E) "V j 1 }�"V :D 1,,,1 t I � U- HALL 214- fl + 0 I CU -1 G-) I I III QUIET OPERATOR I F -21-2-1(E)1 "CW _ IE C ��G I II _ � I r (E)3"RL —� R _ —RL RL L RL VU-2r,;� '� N —ii 7t LF — 2"V c� I Ez" 'I SOUTH Q - RATORI S 1yFVAN , -DS 1 /"HW 4"F W & Y4"CW DN I l I r 1_ U — –�` — N �+ L I 'I I I I WALL [VL5 r , I U O F F I C +-� I I I 2 1WV DN — 1 PO.02 — -j– — — DS ---- -J 1 M/ CU) 0 - �-Z - 0 z LEVEL 2 PLUMBING PLA� SCALE: %4" = 1'0" Consulting Mechanical Engineers 7100 Linden Ave. N., Suite 1 Seattle, Washington, 98103 Phone(206) 706-9669 Fas:(206) 706-1830 www.hvengineering. biz SCOPE OF WORK 'I ti� • 10441 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF HV ENGINEERING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHERP JECT WITHOUT THE WRITTEN AUTHORIZATION OF HV ERI fqv; H Your Community Health Center Healthpoint Temporary Tukwila Dental Clinic 13030 Miltary Rd S Tukwila, WA 98168 Miller Hayashi Architects 118 North 35th St Suite 200 Seattle, Washington 98103 Tel: 206 634 0177 Fax: 206 634 0167 ARCHITECT'S STAMP CONSULTANT CONSULTANT'S STAMP PHASE Permit Set DATE 02/09/2016 REVISIONS RECEIVED CITY OF TUKWILA FEB 16 2016 .PERMIT CENTER SHEET TITLE c� LEVEL 1 & 2 �°� PLUMBING PLAN