Loading...
HomeMy WebLinkAboutPermit M16-0032 - BOEING #9-101 - STEAM CONVERTER SKIDS REPLACEMENTBOEING #9-101 9725 E MARGINAL WAY S EXPIRED 06/05/17 M 1 6-0032 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov MECHANICAL PERMIT Parcel No: 0003400018 Permit Number: M16-0032 Address: 9725 E MARGINAL WAY S BLDG 9-101 Issue Date: 3/11/2016 Permit Expires On: 9/7/2016 Project Name: BOEING #9-101 Owner: 2012 National Electrical Code: Name: BOEING COMPANY THE 2012 Address: PO BOX 3707 M/C 20-00 PROPERTY International Mechanical Code Edition: 2012 TAX DEPT, SEATTLE, WA, 98124 2014 Contact Person: 2012 WA State Energy Code: Name: SHELBY RICHE Phone: (206) 812-7683 Address: 11621 E MARGINAL WAY S STE A, SEATTLE, WA, 98168 Contractor: Name: P S F MECHANICAL INC Phone: (206) 764-9663 Address: 11621 E MARGINAL WAY S SUITE A, TUKWILA, WA, 98168-1965 License No: PSFMEI*090NZ Expiration Date: 10/5/2017 Lender: Name: Address: DESCRIPTION OF WORK: REMOVE EXISTING (3) STEAM CONVERTER SKIDS AND REPLACE WITH NEW Valuation of Work: $0.00 Fees Collected: $3,778.72 Type of Work: Electrical Service Provided by: SEATTLE CITY LIGHT Fuel type: Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE,VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Signature: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development p it and agree to the conditions attached to this permit. l Signature:Date: 1� Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OF TUKWV Communitg7 Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 littp://Nvwxv.TukwilaWA.gov Mechanical Permit No. Project No. Date Application Accepted: _ Date Application Expires: use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITELOCATION 9725 East Marginal Way South, Building 9-101 2nd. King Co Assessor's Tax No.: 5 6 2 4 2 0 0 9 9 0 Site Address: 9725 E Marginal Way S Suite Number: 9-101 Floor: 2nd Tenant Name: Boeing 9-101 New Tenant: ❑ .....Yes ®..No PROPERTY OWNER Name:Desimone Trust Boeing Address: 9 7 2 5 EAST MARGINAL WAY S 98108 CitY:Tukwilla State: WA Zip: 98108 CONTACT PERSON — person receiving all project communication Name: Shelby Riche AddressPSF Mechanical INC City: S e at t l e State: WA Zip: 9 816 8 Phone: 2 0 6 - 8 12 - 7 6 8 3 Fax: Emai]:Permits@psfmech.com MECHANICAL CONTRACTOR INFORMATION Company Name: PSF Mechanical INC. Address: 11621 E Marginal Way S. Ste. A City: Seattle State: WA Zip:9-9-168 Phone: 2062-812-7683 Fax: Contr Reg No.: P S FME I * 0 90N Z Exp Datel 0 / 01 / 2 01 Tukwila Business License No.: BUS — 0 9 9 6 3 8 4 Valuation of project (contractor's bid price): $ 32 5 , 0 0 0 . 0 0 Describe the scope of work in detail: Remove existing (3) steam converter skids and replace with new. Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... ❑ Replacement ........ Pq Fuel Type: Electric..... ❑ Gas....... ❑ Other: H: Applications\Fonnc-Applications On Linc\2016 Applications Mechanical Permit Application Revised 1-4-16.docx Revised: January 2011; Page I of 2 bh indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >I OOk btu industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <10,000 cfin 65 dB(A) Unit Type Qty Air handling unit >10,000 cfm Residential, Nighttime Evaporator cooler industrial Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 lip/1,750,000 btu 50+ lip/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-1 OPM, Monday through Friday and 8AM-1 OPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam-IOpm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O NER OR AUTHORIZED AGENT: / Signature: Date: D- PrintName: Shelby qiche Day Telephone: 206-812-7683 Mailing Address: 11621 E Marginal Way S Ste . A Seattle WA 98168 City State Zip H: Applications\Forms-Applications On Line\2016 Applications Mechanical Permit Application Revised 1-4-16.docx Revised: ranuary2016 Page 2 of 2 bh DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $3,052.04 M16-0032 Address: 9725 E MARGINAL WAY S BLDG 9-101 Apn: 0003400018 $3,052.04 MECHANICAL $2,906.70 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $2,874.20 TECHNOLOGY FEE $145.34 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT:$3,052.04 R000.322.900.04.00 0.00 $145.34 Date Paid: Friday, March 11, 2016 Paid By: SHELBY RICHE Pay Method: CREDIT CARD 786280 Printed: Friday, March 11, 2016 9:00 AM 1 of 1 SYSTEMS Date Paid: Thursday, February 25, 2016 Paid By: PSF MECHANICAL INC Pay Method: CREDIT CARD 199908 Printed: Thursday, February 25, 2016 9:23 AM 1 of 1 C SYSTEMS lam INSPECTION RECORD Retain a copy with permit XN►1(�- 00T271 INSPECTION N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Address: 2,Sr E MalAfAe- W S Date Called: Special Instructions: fjC, G�G't lle a' fe-f` zlPh6ne(I,r, Date Wanted: 2 % �� Pm. Reve ter: No: ." 7f D a.. Iinspector: 4/ Iuate:` --7 _ ( f I REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 6 INSPECTION RECORD Retain a copy with permit jell16 i O�z INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pr ct: Te of Inspection: Address: 9 7ZS; - / /'- Date Called: Spe ial Instructions: 9r/0 % f W C r� V � �eA KOO �" bil-"-A dut-�fl Date Wanted .m. 3v lG �� p.m. Requester, Phone No: n -zc)C4 - IM"ts ` Lt l Approved per applicable codes. Corrections required prior to approval. Inspector: Date �+ �}, 11,6 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit A16, I CTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3�670 Permit Inspection Request Line (206) 438-9350 Pp LAVA eA -t /tel L _l Pr ect: t Type of I spection: ,&3 rid 14740 1 -- Special Instructions: ✓ Date an 1: Reque e : e Phone No: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. �gF �A PSF ```Me�cchaha'nical= CERTIFIED TEST AND BALANCE REPORT PSF Mechanical, Inc. 9322 14th Avenue South Seattle, Washington 98108 T 206.764.9663 Project Name: Boeing 9-101 Building HX -2 Replacement Project PSF Job #: 2433 Project Address: Seattle WA Customer: BNB Construction Engineer Name: Coffman Engineers TAB Supervisor: Chris Grantham Date: 10.20.16 3Anm 352 tL e*aawe 'J RECEIVED CITY OF TUKWILA DEC 0 7 2016 PERMIT CENTER Page 1 of 14 W\\v i oOM' `�p5F �A PSFMechanicali NEBB CERTIFICATION Project: Boeing 9-101 Building, HX -2 Replacement Project Project No.: 2433 Project Address: Seattle, WA THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST - ADJUST -BALANCE (TAB) REPORT PROJECT SUMMARY. BALANCING OF ENVIRONMENTAL SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEM" AND THE PROJECT SPECIFICATIONS. THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS_ NEBB TAB FIRM: PSF Mechanical CERTIFIED BY: Chris Grantham REG. #: 3352 SUBMITTED & CERTIFIED BY TAB SUPERVISOR: Chris Grantham REG. #: 23490 SIGNATURE: DATE: 10.20.1.6 CERTIFICATION EXPIRATION DATE: 2018 Page 2 of 14 W 0 Ow 1 • al Page 3 of 14 i to a 1J Page 4 of 14 ("o Instrument Calibration & Symbol Abbreviation Report \ „q "Ti 13 PSFMechanicalZ Project: Boeing 9-101 Builing, HX -2 Replacement Project Project #: 2433 Instrument Instrument Manufacturer Instrument Model No. Serial # Application Dates of use Calibration date Flow Hood Shortridge ADM 860C M13315 Air Flow Oct., 2016 11/24/16 Hydro Data Multimeter Shortridge HDM-250 W06013 Water Pressure Oct., 2016 8/28/16 Tachometer Shimpo DT205L C081313002 RPM Oct., 2016 11/30/16 VOM Fluke Fluke 902 SV0001083 Electrical Oct., 2016 11/30/16 Temperature Vaisala HM -34/34F 65120003 Air Temperature Oct., 2016 11/30/16 Humidity Vaisala HM -34/34F 65120003 Humidity Oct., 2016 11/30/16 Hot wire Anemometer TSI 9545A 812001 Air Velocity Oct., 2016 11/24/16 Rotating Vane Anemometer TSI 5725 1530006 Air Velocity Oct., 2016 11/30/16 SYMBOLS & ABBREVIATIONS ADJ Adjustable Fan Speed LD Linear Diffuser CD Ceiling Diffuser LD x Linear Diffuser where x is CFM Cubic Feet per Minute number of slots D/A VAV Inlet Dimension in Inches N/A Not Applicable D.S.P Discharge Static Pressure NI Not Installed EG Exhaust Grille NR Not Required E.S.P. External Static Pressure NPSH Net Positive Suction Head F/C VAV Calibration Factor RG Return Grille FLA Motor Full Load Amps RPM Revolutions per Minute GPM Gallons per Minute SF Motor Service Factor HP Horsepower S.P. Static Pressure Hz Hertz SWG Side Wall Grille in. Hg. Inches Mercury T.S.P. Total Static Pressure in. w.g. Inches Water Gauge VAR Variable Fan Speed - Not affected/Unrcadable Page 5 of 14 F FAN TEST REPORT PSWechanical= Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Exhaust Service: Converter #2 Rm UN]rf DATA EFRE7A Location Roof Service Converter #2 Rm. Manufacturer Greenheck Model Number GB -260-3X Serial Number 92FO5577 Type/Class BI / 1 Motor Make/Style Marathon / TEFC Motor H.P./RPM/Frame (W) 1 HP / 1725 / 56C Volts/Phase/Hertz 460/3/60 F.L. Amps/S.F. 1.6/1.0 Motor Sheave Make/Model IVP 3.75" x 5/8" Motor Sheave Diam.Bore 90% of Max Pitch Fan Sheave Make IAK 14" x 1" Fan Sheave Diam.Bore 1411/11' No. Belts/Make/Size 1 / A49 Sheave Center Distance 10" Filters Qty / Size NA TESTDATA DESIGN ACTUAL CFM (Us) 6000 5868 Minimum OSA (1/s) - - Fan RPM 580 562 S.P. In/Out -- External / Total SP - /.25" - /.3" Voltage Tl -T2 460 462 Voltage T2-T3 460 462 Voltage Tl -T3 460 462 Amperage Tl 1.6 1.4 Amperage T2 1.6 1.4 Amperage T3 1.6 1.4 REMARKS Fan tested with VFD commanded to 1001/o speed (80 HZ). Date: 10.20.16 Page 6 of 14 Readings By: CG OF PSFMechanical' AIR OUTLET TEST REPORT � Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System : Exhaust Service: Converter Station #2 OUTLET AIRFLOW CFM (Us) % OF AREA SERVED NO. TYPE SIZE DESIGN PRELIM FINAL DESIGN Station #2 1 WMS 26"x26" 6,000 4,401 5,868 98% 1 (1): Fan at full speed (80 HZ). Date: 10.20.16 Page 7 of 14 Readings By: CG �7AF PSFMechanical= PUMP TEST REPORT Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Converter Station #2 Service: Heating Water PUMPDATA P -1A P -1B DESIGN Location Converter Station #2 Converter Station #2 Pump off Pressure Service Heating Water Heating Water 24 PSI Manufacturer Grundfos Grundfos - Model Number CR64-1 A-G-A-E-HQQE CR64-1 A-G-A-E-HQQE Serial Number 0005 0003 112.6 GPM/Head t 250/95 250/95 Inipellar Dia. /RPM NA / 3308 NA / 3308 - Seal Type HQQE HQQE Final discharge pressure Motor Make Baldor Baldor 152.8' 11P/RPM/Frame 15 / 3520 / 254TCZ 15 / 3520 / 254TCZ 95 Volts/Phase/hz 460/3/60 460/3/60 Amps/SF 17.5/1.15 17.5/1.15 250 TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL Pump off Pressure - 24 PSI - 24 PSI Block Tight Head (FT) - 147.2 - 147' Valve Open Head T 95 112.6 95 111.8' Final suction pressure - 40.4' - 41' Final discharge pressure - 153.3' - 152.8' Total dynamic head (Ft) 95 112.6 95 111.8' GPM 250 250 250 250 hnpellar Diameter - - - - Impellar RPM 3308 3520 3308 3520 Voltage T1-T2 460 459.6 460 460 Voltage T2-T3 460 459.6 460 460 Volta e T1-T3 460 459.6 460 460 Amperage Tl 17.5 12.1 17.5 11.8 Amperage T2 17.5 12.1 17.5 11.8 ,Amperage T3 17.5 1 12.1 17.5 11.8 Test performed with BOTH pumps on at skid and operating at 1001/o speed (60HZ). No control of attached load down stream of pump. Date: 10.20.16 Page 8 of 14 Readings By: CG pSF PUMP TEST REPORTNE `' PSFMechaiwA- Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Converter Station #2 Service: Heating Water PUMP DATA P -2A P-211 DESIGN Location Converter Station #2 Converter Station #2 Pump off Pressure Service Heating Water Heating Water 24 PSI Manufacturer Grundfos Grundfos - Model Number CR64-1 A-(!-A-E-HQQE CR64-1 A-G-A-E-HQQE Serial Number 0004 0001 93.1' GPM/Head Ft 250/95 250/95 Impellar Dia. /RPM NA / 3308 NA / 3308 - Seal Type HQQE HQQE Final discharge pressure Motor Make Baldor Baldor 150.6' HP/RPM/Frame 15 / 3520 / 254TCZ 15 / 3520 / 254TCZ 95 Volts/Phase/hz 460/3/60 460/3/60 Amps/SF 17.5 / 1.15 17.5 / 1.15 NA (1) TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL Pump off Pressure - 24 PSI - 24 PSI Block Tight Head (FT) - 111'(1) - 147' Valve Open Head (FT) 95 93.1' 95 103.2' Final suction pressure - 48.7' - 47.3' Final discharge pressure - 141.9' - 150.6' Total dynamic head (Ft) 95 93.1' 95 103.2' GPM 250 NA (1) 250 —339 Impellar Diameter - - - - Im Alar RPM 3308 3520 3308 3520 Voltage T1-T2 460 398 460 458 Voltage T2 T3 460 398 460 458 Voltage T1-T3 460 398 460 458 Amperage T1 17.5 8.3 17.5 13.3 ,Amperage T2 17.5 8.3 17.5 13.3 Amperage T3 17.5 8.3 17.5 13.3 1 :== REMARKS (1): Pump Block Tight Head does not match pump curve. Pump impellar is either wrong size, or compromised in some Test performed with BOTH pumps on at skid and operating at 100% speed (60HZ). No control of attached load down stream of pump. Date: 10.20.16 Page 9 of 14 Readings By: CG Q!7A PSFMechanical= PUMP TEST REPORT Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Converter Station #2 Service: Heating Water PUMP DATA P -3A P -3B DESIGN Location Converter Station #2 Converter Station #2 Pump off Pressure Service Heating Water Heating Water 24 PSI Manufacturer Grundfos Grundfos - Model Number CR64-1 A-G-A-E-HQQE CR64-1 A-G-A-E-HQQE Serial Number 0002 0006 113.3' GPM/Head t 250/95 250/95 hnpeUar Dia. /RPM NA / 3308 NA / 3308 - Seal Type HQQE HQQE Final discharge pressure Motor Make Baldor Baldor 159.4' HP/RPM/Frame 15 / 3520 / 254TCZ 15 / 3520 / 254TCZ 95 Volts/Phase/hz 460/3/60 460/3/60 Amps/SF 17.5/1.15 17.5/1.15 —250 TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL Pump off Pressure - 24 PSI - 24 PSI Block Tight Head (FT) - 147.2' - 147.2' Valve Open Head T) 95 113.3' 95 113.1' Final suction pressure - 46.6 - 46.3' Final discharge pressure - 159.9' - 159.4' Total dynamic head (Ft) 95 1133' 95 113.1' GPM 250 —250 250 —250 Impellar Diameter - - - - lmpeHar RPM 3308 3520 3308 3520 Voltage T1-T2 460 459 460 459 Voltage T2-T3 460 459 460 459 Volta e Tl -T3 460 459 460 459 Amperage Tl 17.5 12 17.5 12.2 Amperage T2 17.5 12 17.5 12.2 ,Amperage T3 17.5 12 17.5 12.2 REMARKS Test performed with BOTH pumps on at skid and operating at 100% speed (60HZ). No control of attached load down stream of pump. Date: 10.20.16 Page 10 of 14 Readings By: CG �gF A PSFMechanical PUMP TEST REPORT Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Converter Station #2 Service: Heating Water N -4E, -.s PUMP DATA P -1A P -IB DESIGN Location Converter Station #2 Converter Station #2 Pump off Pressure Service Heating Water Heating Water 24 PSI Manufacturer Grundfos Grundfos - Model Number CR64-1 A-G-A-E-HQQE CR64-1 A-G-A-E-HQQE Serial Number 0005 0003 91.1' GPM/Head t 250/95 250/95 Impellar Dia. /RPM NA / 3308 NA / 3308 - Seal Type HQQE HQQE Final discharge pressure Motor Make Baldor Baldor 1367 HP/RPM/Frame 15 / 3520 / 254TCZ 15 / 3520 / 254TCZ 95 Volts/Phase/hz 460/3/60 1 460/3/60 Amps/SF 17.5/1.15 1 17.5/1.15 —375 TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL Pump off Pressure - 24 PSI - 24 PSI Block Tight Head (FT) - 147.2' - 147 Valve Open Head T) 95 91.1' 95 87.5' Final suction pressure - 47.3' - 49.2' Final discharge pressure - 138.4' - 1367 Total dynamic head (Ft) 95 91.1' 95 87.5' GPM 250 —375 250 —375 hnpellar Diameter - - - - lm ellar RPM 3308 3520 3308 3520 Voltage Tl -T2 460 459.6 460 460 Voltage T2-T3 460 459.6 460 460 Voltage Tl -T3 460 459.6 460 460 Amperage T1 17.5 14 17.5 14 Amperage T2 17.5 14 17.5 14 ,Amperage T3 17.5 14 17.5 14 Test performed with SINGLEpump on at skid and pump at 100% speed (60HZ). No control of attached load down stream of pump. Date: 10.20.16 Page 11 of 14 Readings By: CG �d gF PSFMechanical= PUMP TEST REPORT Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Converter Station #2 Service: Heating Water PUMP DATA P -2A P-211 DESIGN Location Converter Station #2 Converter Station #2 Pump off Pressure Service Heating Water Heating Water 24 PSI Manufacturer Grundfos Grundfos - Model Number CR64-1 A -G -A -E -H E CR64-1 A-G-A-E-HQQE Serial Number 0004 0001 53.6' GPM/Head t 250/95 250/95 hnpeUar Dia. /RPM NA / 3308 NA / 3308 - Seal Type HQQE HQQE Final discharge pressure Motor Make Baldor Baldor 139.2' HP/RPM/Frame 15 / 3520 / 254TCZ 15 / 3520 / 254TCZ 95 Volts/Phase/hz 460/3/60 460/3/60 Amps/SF 17.5/1.15 17.5/1.15 NA (1) TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL Pump off Pressure - 24 PSI - 24 PSI Block Tight Head (FT) - 111'(1) - 147' Valve Open Head T 95 53.6' 95 89.1' Final suction pressure - 56.7' - 50' Final discharge pressure - 110.4' - 139.2' Total dynamic head (Ft) 95 53.6' 95 89.1° GPM 250 NA (1) 250 —375 Impellar Diameter - - - - Impellar RPM 3308 3520 3308 3520 Voltage Tl -T2 460 398 460 458 Voltage T2-T3 460 398 460 458 Voltage Tl -T3 460 398 460 458 Amperage Tl 17.5 10 17.5 14.1 ,Amperage T2 17.5 10 17.5 14.1 Amperage T3 17.5 10 17.5 14.1 REMARKS (1): Pump Block Tight Head does not match pump curve. Pump impellar is either wrong size, or compromised in some Test performed with SINGLEpump on at sldd and pump at 100% speed (60HZ). No control of attached load down stream of pump. Date: 10.20.16 Page 12 of 14 Readings By: CG t P5F A PSFMechanical= PUMP TEST REPORT Project: Boeing 9-101 Bldg. - HX -2 Replacement Project System: Converter Station #2 Service: Heating Water PUMP DATA P -3A P-311 DESIGN Location Converter Station #2 Converter Station #2 Pump off Pressure Service Heating Water Heating Water 24 PSI Manufacturer Grundfos Grundfos - Model Number CR64-1 A-G-A-E-HQQE CR64-1 A-G-A-E-HQQE Serial Number 0002 0006 86' GPM/Head t 250/95 250/95 Impellar Dia. /RPM NA / 3308 NA / 3308 - Seal Type HQQE HQQE Final discharge pressure Motor Make Baldor Baldor 139.8' HP/RPM/Frame 15 / 3520 / 254TCZ 15 / 3520 / 254TCZ 95 Volts/Phase/hz 460/3/60 460/3/60 Amps/SF 17.5/1.15 17.5/1.15 —375 TESTDATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL Pump off Pressure - 24 PSI - 24 PSI Block Tight Head (FT) - 147.2' - 147.2' Valve Open Head 95 86' 95 88.9' Final suction pressure - 51.4' - 50.8' Final discharge pressure - 137.4' - 139.8' Total dynamic head (Ft) 95 86 95 88.9' GPM 250 —375 250 —375 hnpellar Diameter - - - - Impellar RPM 3308 3520 3308 3520 Voltage T1-T2 460 459 460 459 Voltage T2-T3 460 459 460 459 Voltage Tl -T3 460 459 460 459 Amperage T 1 17.5 13.7 17.5 14.2 Amperage T2 17.5 13.7 17.5 14.2 ,Amperage T3 17.5 13.7 17.5 14.2 REMARKS Test performed with SINGLEpump on at skid and pump at 100% speed (60HZ). No control of attached load down stream of pump. Date: 10.20.16 Readings By: CG Page 13 of 14 H Ift] 160 140 120 100 0 EM 20 N 1 # CR 64-1, 60Hz I i Q = 250 US gpm --- ---- - -- —_ - --- -- ----H = 113.1 ft I Pumped liquid = Water + Liquid temperature = 179.6 OF - -- -- ----- - -- --- ----,--Density= 60.56 lb/ft' I 1i - lel Pump Operation ; Paral---�---� �� - E --- f�---Y---_ _ One1Pump on ' I � I I I I I 1 Ej pump = 72.5 0 50 100 150 200 250 300 350 Q [us gpmj Measured pump performance with VFD at 1000 (60 HZ). Single pump operation: - 375 GPM Both pumps on skid on at same time: - 250 GPM per pump. Page 14 of 14 eta [%] 100 .E 20 ❑r 5/1/2017 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director SHELBY RICHE 11621 E MARGINAL WAY S STE A SEATTLE, WA 98168 RE: Permit No. M16-0032 BOEING #9-101 Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 6/5/2017. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. OTC 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 6/5/2017, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, c Bill Rambo Permit Technician File No: M16-0032 6300 Southcenter Boulevard Suite #100 0 Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 8/2/2016 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director SHELBY RICHE 11621 E MARGINAL WAY S STE A SEATTLE, WA 98168 RE: Permit No. M16-0032 BOEING #9-101 9725 E MARGINAL WAY S Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 9/7/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 9/7/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, �PW)Rachelle Ripley Permit Technician File No: M16-0032 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 9 Phone 206-431-3670 • Fax 206-431-3665 1 City of Tukwila Jim Haggerton, Mayor • Department of Community Development Jack Pace, Director August 29, 2016 Amanda Moore PSF Mechanical 11621 E Marginal Way S Seattle, WA 98168 RE: Request for Extension #1 Permit Number M16-0032 Dear Ms. Moore, This letter is in response to your written request for an extension to Permit M16-0032. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through March 7, 2017. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, W,lw�. k! Rachelle Ripley Permit Technician File: Permit No. M16-0032 WAPermit Center\Extension Letters\Permits\2016\M16-0013 Permit Extension #I.docx 6300 Southcenter Boulevard, Suite #100 9 Tukwila, Washington 98188 0 Phone 206-431-3670 • Fax 206-431-3665 �p5F August 10, 2016 City of Tukwila 6300 Southcenter Boulevard Suite #100 Tukwila, WA 98188 RE: Permit No. M16-0032 Boeing #9-101 9725 E Marginal Way S To whom it may concern, Building Relationships. Creating Environments. Please accept this as a formal request for an extension of the above mentioned permit for up to 180 days. Sincerely, wAt�-� Amanda Moore Permit Specialist CE�R -]D AU6 12 'A Coma Y Deve L, -• :nt Request for �E,x�te� nsion # I Current Expiration Date: Extension Request: Approved for /fid days ❑ Denied (provide explanation) / Signature/Initials PS F M ec h a n i ca I z Corporate Office (206) 7649663 Tacoma Office (253) 830-5978 11621 E Marginal Way S, Seattle, WA 98168 5009 Pacific Hwy E, Suite 21, Tacoma, WA 98424 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0032 DATE: 02/25/16 PROJECT NAME: BOEING #9-101 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # DEPARTMENTS: JA Building Division Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: Fire Prevention Revision # before Permit Issued Revision # after Permit Issued Planning Division ❑ Structural ❑ Permit Coordinator ❑ DATE: 03/01/16 Structural Review Required ❑ DATE: DUE DATE: 03/29/16 Approved with Conditions N", Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 P S F MECHANICAL INC to Home Espanol Contact Safety & Health Claims & Insurance Aft Washington State Department of Laker & Industries P S F MECHANICAL INC Owner or tradesperson Principals REYNOLDS, JAMES P, PRESIDENT READ, ANDREW A, PRESIDENT BEARDSLEY, WARREN SCOTT, SECRETARY CRITCHLOW, JAMES D (End: 09/27/2011) Doing business as P S F MECHANICAL INC 11621 E Marginal Way S Suite A SEATTLE, WA98168 206-764-9663 KING County WA UBI No. Business type 601 318 369 Corporation Governing persons ANDREW AARON READ JAMES P REYNOLDS; JIM BEARDSLEY; WARREN S BEARDSLEY; License Page 1 of 2 A -'L fndex Help Nl.V [.&I Workplace Rights Trades & Licensing Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ............................................................... _......... Meets current requirements. License specialties GENERAL License no. PSFMEI`090NZ Effective — expiration 08109/1991-10/0512017 Bond ................. Travelers Cas & Surety Co $12,000.00 Bond account no. 105975899q Received by L&I Effective date 03/13/2014 03/13/2014 Expiration date Until Canceled Bond history I.n.. _ ....sura.n.....c.e ............. Liberty Mutual Fire Insurance $1,000,000.00 Policy no. TB2Z91452741025 Received by L&I Effective date https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601318369&LIC=PSFMEI*090NZ&SAW= 3/11/2016 e VICINITY MAP PROJECT SITE %�' FROM DOWNTOWN SEATTLE °0 T'' �o \ off'' \OOH •; �. g -6a V✓�' 1 rn 9'gp OXBOW LOT oo3 Q�E EAST MARGINAL WAY CORPORATE PARK 99 FROM SEATTLE—TACOMA AIRPORT m WHOM st it f �,M1VioA w,r,�Pr`�w., �� A• -'w�i.«,�% n��/ �A��',N ���; a��� 3�nu w'wxua „,A 'sw.4, RV�� ,,»lx !r'u` p r REPLACE STEAM CONVERTER STATION?p m EXIT EXIT 158 158 1 /d ACCESS EXIT 157 TZOO�INC3 Dff�V LOPMII`�NTAL NT R 9_725 EAST MAFRGINAL WAY SOUTH I EXIT 157 599 TUKWILA FROM KENT \\\ 900 & AUBURN DEVELOPMENTAL CENTER SYM REVISION BY APPROVED - REPLACE STEAM CONVERTER STATION #2 16069 CEI MS DATE SYM 10.06.14 i $ a � ., e k x WASH INGTONrc—,-181 "tIk' # I8 CODE SUMMARY TYPE OF APPLICATION: NEEg ALTERA ❑ON AD ❑PION TENANT IMPR MEN PROJECT DESCRIPTION: PROJECT IS TO COMPLETELY REPLACE STEAM CONVERTER STATION #2. THIS REPLACEMENT INCLUDES INSTALLATION OF A NEW STEAM PRESSURE REDUCING STATION, (3) THREE HEAT EXCHANGE MODULES EACH WITH TWO VARIABLE SPEED HEATING WATER CIRCULATING PUMPS, UPGRADED HEATING WATER FILTRATION SYSTEM, TWO-WAY CONTROL VALVES, NEW ISOLATION VALVES AND REMOVAL OF A REMOTE STEAM -POWERED CONDENSATE PUMP. CODES: 2012 WA WITH AMENDMENTS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. CONTRACTOR & STATE NUMBER: THE BOEING CO. BIDE INC 294ML(OV2009) BOEING PROJECT ENGINEER: BRIAN HARR BOEING CONTACT:JOHN MURDOCHPHONE. FAX NUMBER -253-773-0119 253-773-0444 REV STORIES: 2 MEZZANINE ? ® (YES) ❑ (NO) SO E—MAIL: 'ohn.s.murdoch@boeinq,com FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NEPA 13 ? ® (YES) ❑ (NO) SEPARATION 09-101-CWA17R 09-101-CWE17R EXTERIOR WALL (NON-BEARING) HOUR RATING EXTTERIOR WALL (BEARING) OCCUPANCY GROUP: GROUP B AND GROUP F, DIVISION I (OFFICE AND FACTORY) RATING CONSTRUCTION TYPE: TYPE II -B, NON—COMBUSTIBLE SEPARATION 60 FEET (MINIMUM ALL SIDES) ZONING: ALLOWABLE AREA INCREASE: FULLY AUTOMATIC, F/S CLASS I SPRINKLERS THROUGHOUT OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE FLOOR/CEILINGS (TABLE 10-A) RATING ROOF CONSTRUCTION HOUR RATING OFFICES OCC, BLDG GROSS 1,116,306 SF SO FT STORAGE OCC, TUNNEL 50,910 SF SO FT LABORATORY OCC, FIRST FLOOR 713,829 SF SO FT _CANOPY OCC. IST FLR MEZZ 55,689 SF SQ FT ;,OTHER OCC. 2ND FLOOR 295,878 SF SO FT BY 2ND FLOOR MEZZ DATE SO FT TYPE: N/A PROJECT AREA 950 SF SQ FT BUILDING HEIGHT: (ACTUAL)III FT DRAWING NUMBER REV STORIES: 2 MEZZANINE ? ® (YES) ❑ (NO) SO FT 55,689 SF FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NEPA 13 ? ® (YES) ❑ (NO) SEPARATION 09-101-CWA17R 09-101-CWE17R EXTERIOR WALL (NON-BEARING) HOUR RATING EXTTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR/CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING SEISMIC DESIGN: ZONE D TO BE REVIEWED UNDER DESIGN LOADS: (CHAPTER 16) LIGHTING WASHINGTON STATE NON-RESIDENTIAL ROOF: LIVE (SNOW) (PSF) C FLOOR: OFFICE EXISTING, NO CHANGES (PSF) PRESCRIPTIVE ❑ MECH/STOR (PSF) SPECIAL INSPECTIONS REQUIRED: STAIRS (PSF) WELD CONCENTRATED: 480 VOLT POWER REF ONLY ❑ WIND: EXPOSURE C ❑ ANCHOR BOLTS B REVISION BY APPROVED DATE B MCC DETAILS - CONVERATION STATION 42 TYPE: N/A �n. DRAWING INDEX ARCHITECTURAL - CIVIL Of STRUCTURAL DRAWING NUMBER I REV I DRAWING TITLE 09-101-S2H-1 DRAWING NUMBER REV I DRAWING TITLE 09 -101 -GO - COVER SHEET 09-101-CWA17R 09-101-CWE17R ❑ A CATWALK PLAN - REMOVAL 09-101-CWA17 09-101-RFS17R - A CATWALK PLAN 09-101-A353 ❑ 09-101-CWS539 B DOOR & HARDWARE SCHEDULES,NOTES,TYPES&DETAILS 09-101-A581 - ROOF PLAN - ARCHITECTURAL DETAILS Of STRUCTURAL DRAWING NUMBER I REV I DRAWING TITLE 09-101-S2H-1 - STRUCTURAL NOTES & ABBREVIATIONS 09-101-S2H-2 - STRUCTURAL NOTES 09-101-S2H-3 - STRUCTURAL NOTES 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) 09-101-CWE17R ❑ 09-101-CWS539R - CONVERTER STATION NO.2 LAYOUT - REMOVAL 09-101-RFS17R - ROOF PLAN - REMOVAL & REVIEW: 208Y/1 20V POWER - REMOVAL ❑ 09-101-CWS539 - CONVERTER STATION NO.2 LAYOUT 09-101-RFS17 - ROOF PLAN 09-101-S467 - ENLARGED PLANS 09-101-S652 - MISCELLANEOUS SECTIONS & DETAILS Permit No. SLP' PATE PEIT' ,t r'i7 FOR:t,: i I s7 N:r� e;:'Ptof("Vd .s subleV to 3 �n oms, ission. i- I a �7 • .i-- :,.,,,,:.,.,:�„ ileSa,64El7671ldw E_A'�.sU::r tit9i a`AI:StEi�s!(."J L7 Mdchaniml _r o� a� r r �� if €moo � an Or i iO�S is acknowled:.od: 1 M114 ACCEPTABILITY CEI THIS DESIGN AND/OR CHI SPECIFICATION IS APPROVED MS N( APPROVED BY I DEPT. I DATE CODES AND PERMITS PROJECT TITLE: 9-101,2 REPLACE STEAM CONVERTER STATION #2 JOB NUMBER: 16069 QUANTITY SUBMITTED: - LEGEND, ABBREVIATIONS NOTES ❑ 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT ❑ 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) 09-101-CWE17R ❑ 3 SETS: FIRE PROTECTION/SPRINKLERS A ® 2 SETS: TENANT IMPROVEMENT (REVISION) SUBMITTED FOR PERMIT & REVIEW: 208Y/1 20V POWER - REMOVAL ❑ BUILDING ❑ GRADING ❑ ELECTRICAL ❑ PLUMBING ❑ LANDSCAPE ❑ FIRE PROTECTION B MECHANICAL DEMOLITION []CANTILEVER RACKS ❑ STRUCTURAL ❑ - ❑ - TO BE REVIEWED UNDER SEPARATE PERMIT LIGHTING WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE -APPROACHES COMPLIANCE OPTION C 208Y/1 20V POWER PLAN REF ONLY ❑ PRESCRIPTIVE ❑ LPA ❑ ANALYSIS ® N/A A SPECIAL INSPECTIONS REQUIRED: 09-101-CWE111 ❑ WELD ❑ CONCRETE 480 VOLT POWER REF ONLY ❑ REBAR ❑ ANCHOR BOLTS B ❑ ❑ STRUCTURAL BOLTING OTHER ❑ STRUCTURAL OBSERVATION CALCULATIONS B MCC DETAILS - CONVERATION STATION 42 TYPE: N/A ATTACHED (YES) (NO) DRAWING INDEX MECHANICAL DRAWING NUMBER REV DRAWING TITLE 09-101-M 1 B - PIPING LEGEND 09-101-M504 A SCHEDULES 09-101-M567 B SCHEDULES 09-101-M56OR D CONVERTER STATION 2 -PARTIAL PLAN -REMOVAL 09-101-M561 R A CONVERTER STATION 2 -SECTIONS -REMOVAL 09-101-M562R A CONVERTER STATION #2 -SECTIONS -REMOVAL 09-101-M563R A CONVERTER STATION 2 -SECTIONS -REMOVAL 09-101-M564R B CONVERTER STATION #2 -SECTIONS -REMOVAL 09-101-M566R A PARTIAL SECOND FLOOR PLAN & SECTIONS -REMOVAL 09-101-2M317ER A CONVERTER STATION 2 -DMS CONTROLS -REMOVAL 09-101-2M317FR A CONVERTER STATION 2 -DMS CONTROLLERS- REMOVAL 09-101-2M317GR A CONVERTER STATION 2 -TYPICAL WIRING DETAILS -REMOVAL 09-101-M541 B TOILET ROOM #6 PLUMBING PLAN 09-101-M560 D CONVERTER STATION 2 -PARTIAL PLAN 09-101-M561 A CONVERTER STATION 2 -SECTIONS 09-101-M562 A CONVERTER STATION 2 -SECTIONS 09-101-M564 B CONVERTER STATION 2 -SECTIONS 09-101-M565 A CONVERTER STATION 2 -FLOW DIAGRAMS 09-101-M566 A PARTIAL SECOND FLOOR & SECTIONS 09-101-M628 ORIG DETAILS 09-101-M629 ORIG DETAILS 09-101-RFM17 F ROOF PLAN - HVAC & PIPING 09-101-2M317E A CONVERTER STATION 2 -DMS CONTROLS 09-101-2M317F A CONVERTER STATION #2 -DMS CONTROLLERS ELECTRICAL 09 -101 -EO - LEGEND, ABBREVIATIONS NOTES 09-101-CWE17R A LIGHTING - REMOVAL 09-101-CWE67R A 208Y/1 20V POWER - REMOVAL 09-101-CWE117R B 480 VOLT POWER - REMOVAL 09-101-E582R B MCC DETAILS - CONVERATION STATION #2 - REMOVAL 09-101-CWE17 A LIGHTING 09-101-CWE61 C 208Y/1 20V POWER PLAN REF ONLY 09-101-CWE67 A 208Y 120V POWER 09-101-CWE111 B 480 VOLT POWER REF ONLY 09-101-CWE117 B 480 VOLT POWER 09-10.1-E582 B MCC DETAILS - CONVERATION STATION 42 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 AT City of Tukwila BUILDING DIVISION 41 t SUBTITLE 10.06.14 COVER SHEET 10.06.14 TITLE REPLACE STEAM CONVERTER STA BUILDING 0-101 ARCHITECTURAL MASTER COL. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER 100% SUBMITTAL ISSUE FOR CONSTRAX IJ JOB NO. DEV. CENTER, WA DWG NO GG COMP NO. 16069 9-101—GO iu n 2 Lo M 0 3 z U) WIM COMPUTER ROOM COOLING UNIT (AC) SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER HUMIDIFIER ELECTRIC REHEAT COIL KW AIR FILTER CHILLED WATER CONNECTION SIZE UNIT ELECTRICAL DATA REMARKS DRIVE TYPE CAPACITY (CFM) ESP IN WG HP CAPACITY MBH RM TEMP F FLOW GPM EWT �F MAX PD @ MAX FLOW FT H2O CAP #/HR F.L.A TYPE & DEPTH EFFICIENCY PER ASHRAE 52-76 MAX FINAL SP WG SENSIBLE TOTAL DB WB PREFILTER FINAL VOLTS/PHASE PHASE F.L.A. AC2E5A OF ROOM #1 CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 12.5 5.0 6.0 PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT, CYLINDER HUMIDIFIER AC2D11A OF ROOM #2 CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 12.5 5.0 6.0 PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT, CYLINDER HUMIDIFIER AC2F6A REPRO ROOM CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 --- --- --- PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT E.5,12.5 CONVERTER STATION #3 EXHAUST 30 3600 0.125 280 V -BELT 1 / 3 120/1 / GREENHECK GB -300-3, CENTRIFUGAL ROOF EXHAUSTER EFRE12B ROOF, E.9,12.8 TOILET ROOM EXHAUST 30 6400 0.85 600 V -BELT 1 1/2 480/3 GREENHECK GB -300-15, CENTRIFUGAL ROOF EXHAUSTER EFRE15A ROOF, El 6.2 2ND FLOOR CLG PLENUM 48 16100 0.25 300 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRF5A ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, AIR CONDITIONING UNIT (AC) SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER COIL CONN SIZE REMARKS DRIVE TYPE CAPACITY CFM (CFM) ESP IN WG HP VOLTAGE PHASE FLA CAPACITY MBH RM TEMP °F FLOW GPM EWT F MAX PD @ MAX FLOW FT H2O SENSIBLE TOTAL DB WB AC2A1 OA TELEPHONE ROOM SPOT COOLER 2 DIRECT 880 0.5 1/3 208/230 1 3.2 24.1 36.0 80 67 7.2 42 5.4 1 /2"MPT BSC MODEL CW2, EXIST UNIT TO BE REUSED AC2F6B COMPUTER ROOM SPOT COOLER 3 DIRECT 1250 0.3 1/2 208 1 3.3 25.4 2ND FLOOR CLG PLENUM 75 16100 5.7 45 3.3 3/4" NPTF 02 LIEBERT MOD. MME040C-PC1 INSTALLED JOB N0. 137031- 7031- 3 TOILET ROOM EXHAUST 33 90 .7 480/3 EFRE7A ROOF, E7 CONVERTER STATION #2 26 6000 0.25 580 V -BELT 1 480/3 GREENHECK GB -260-3, WITH REINFORCED WHEEL.PROVIDE NEW INVERTER DUTY MOTOR AND VFD. EFRE11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 1610 0. eA 3 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRE12A ROOF, E.5,12.5 CONVERTER STATION #3 EXHAUST 30 3600 0.125 280 V -BELT 1 / 3 EXHAUST FAN EF SCHEDULE THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED K.RAMSEY ENGINEER ILSAWYER APPROVED BY BASIS OF DESIGN NOTES TAG TYPE SERVICE CFM FREE MARK NUMBER LOCATION SIZE AREA SERVED (ROOM N0.) EXHAUST FAN AREA SF DROP IN TYPE MFR MODEL L-1 GRAVITY INTAKE HOOD REMARKS FAN WHEEL SIZE (INCHES) CFM TOTAL STATIC PRESS. INCHES WG APPROX. DRIVE MOTOR RPM SIDE HP VOLTS/PH EFRD11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 16100 0.25 310 310 A 430 V V V -BELT -BELT -BELT 2 A 2 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRD15A ROOF, E16.2 2ND FLOOR CLG PLENUM 48 16100 0.25 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER GREENHECK GB -330-20, WITH REINFORCED WHEEL J:A) EFRE6A ROOF, E6 TOILET ROOM EXHAUST 33 90 .7 480/3 EFRE7A ROOF, E7 CONVERTER STATION #2 26 6000 0.25 580 V -BELT 1 480/3 GREENHECK GB -260-3, WITH REINFORCED WHEEL.PROVIDE NEW INVERTER DUTY MOTOR AND VFD. EFRE11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 1610 0. eA 3 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRE12A ROOF, E.5,12.5 CONVERTER STATION #3 EXHAUST 30 3600 0.125 280 V -BELT 1 / 3 120/1 / GREENHECK GB -300-3, CENTRIFUGAL ROOF EXHAUSTER EFRE12B ROOF, E.9,12.8 TOILET ROOM EXHAUST 30 6400 0.85 600 V -BELT 1 1/2 480/3 GREENHECK GB -300-15, CENTRIFUGAL ROOF EXHAUSTER EFRE15A ROOF, El 6.2 2ND FLOOR CLG PLENUM 48 16100 0.25 300 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRF5A ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF513 ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5C ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5D ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF6A ROOF, F6 2ND FLOOR REPRO ROOM 16 2400 0.50 1065 V -BELT 1/2 120/1 GREENHECK GB -160-5, CENTRIFUGAL ROOF EXHAUSTER AIR INTAKE HOOD SCHEDULE L.SAWYER THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED K.RAMSEY ENGINEER ILSAWYER APPROVED BY BASIS OF DESIGN NOTES TAG TYPE SERVICE CFM FREE PRESSURE FRAME SIZE K.RAMSEY APPROVED AREA SF DROP IN TYPE MFR MODEL L-1 GRAVITY INTAKE HOOD CONVERTER 6,000 N/A 0.112 EXTRUDED ALUM. THROAT GREENHECK FGI OPTIONS: MFR PROVIDE ROOF CURB AND MOTORIZED DAMPER STATION #2 30x42 1 UI3l14 ACCEPTABILITY L.SAWYER THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED K.RAMSEY ENGINEER ILSAWYER APPROVED BY DEPT. I DATE CHECKED K.RAMSEY APPROVED K.RAMSEY APPROVED C.FERGUSON >TE SUBTITLE SCHEDULES TITLE REPLACE STEAM CONVERTER STATION #2 BUILDING 9-101 11.19.90 MECHANICAL MASTER COL. REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City Of Tulmila BUILDING DIVISION RECEIVED CITY OF TUKWILAAqFFMAN I N E E R S FEB 2 5 2016 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com PERMITCENTER LASTING creativity I results I relationships 100% ISSUE FOF SUBMITTAL CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 SHEET M504 JOB N0. COMP NO. DEV. CENTER, Wq DWG NO. 09-101-M504 Q Co to 0 N I Co0 A o6 M n M O N N M Q O 10/6/14 3"COND RETURN - 1 "STEAM VENT— FOR CONTINUATION OF 3"C SEE SHEET M566 3/4"TRAP COND TEMP CONTROL VALVE 6400#/HR RELIEF VALVE VENT THRU ROOF 1 /4"CHECK VALVE SYPHON BREAKER RELIEF VALVE 19,200#/HR SET AT 55 PSI - THERMO-DYNAMIC TRAP 200#/HR - 1 "150# STM — 3/4"TRAP COND 5"-150# STM BOP 58 -9 3/4" 3/4" TRAP COND FROM 6"STM MAIN 2 1 /2"HWS TO 2ND FLR AHU'S BOP 61'-0" — 4"CW 4"HWS TO 1ST FLR AHU'S 2"-150# STM 3"HWR 1ST FLR AHU'S 1 1/2"H & CW DOWN TO 1ST FLOOR THERMO-DYNAMIC1,.---3"HWS AHU-8, 11 & 13 TRAP 200#/HR- 3"HWR FROM 1 ST FLR 1 1 /2"HW DOWN I I AHU-8, 11 & 13 0 1 1 /4 CONDENSATE - 2"PRVRETURN TO RECEIVER 10 3"STM VTR HW awAm 3 6"HWS HEADER OVER 4 6"HWR HEADER UNDER XI Yf PRESSURE REDUCING VALVE I CONNECTTO150-125 TO 50 PSI I I HWS RISER 7 2,800#/HR STRAINER THERMO-DYNAMIC TRAPI I F 550#/HR I M560 M56 5"GLOBE VALVE I _ D TUBE BUNDLE 3°�iWR M56 M 62'REMOVAL AREA � 6°�IWR 3"THREADED � FLANGE W/PLUG TO ALLOW TEMP 40-�2607 IX HOSE CONNECTION I I 2 1/2" 4 L J 43)HW BALANCING VALVE BLIND FLANGE110 GPM 2"AUTO-AIR VENT EFD 2" 150# STM 5"WASTE 6 1 1 6"GLOBE VALVE 4" 5"VTR I • 1-- , HPC FILTER -THRU ROOF n ' I i TEMP CONTROL 6 VALVE 6400#/HR FILTER /FEED BYPASS TO 9"_1 "BACKFLOW POT & FROM HW PREVENTER HEADERS 5'-0" FROM 6"GATE VALVE FLOOR LINE I I PC TROL PU2FO7D _ VE 3 00 /H (WAS CP -4) m I / 4 6»HWR DER 2 1 /2"HWR FROM 2ND FLOOR AHU'S, 1BOP 61'-8 1/2" 40-260°F 5 A7(1 ZZ, CJ C 80 GPM 155 GPM E A BALANCING VALVES - M560 M563 M560 M561 ------ --- - - -- 3"HWR FROM 1ST FLOOR AHU'S AND RADIATORS BOP 61'-3" t I IT I 17 — — I I -- -- ID I � I PU2FO7A � AUTO 3 -WAY (WAS CP -5) CONTROL AIRTROL TANK 1 5 VALVE FITTING I .e I I M BALANCING 100 GP VALVE I I I 5 40-260°F 5 I I U BNi M560 M561 1 1 /4"HP COND D RETURN TO RECEIVER PLAN - CONVERTER STATION NOl2 SCALE; 1/2"=1'-0" LOCATED OVER TOILET6 Y3"CW DN 1/2" LEGEND SYM STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN 7 HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT DATE 10.06.14 GATE VALVE �- CHECK VALVE —ISI-- BALL VALVE BALANCE VALVE ��.►— GLOBE VALVE FFD FUNNEL FLOOR DRAIN GENERAL NOTES SEE DETAIL 2 M56, M555 FOR CONNECTIONS --A H2 E7A HOT WATER HEATER I 5 GALLON EXPANSION TANK E7B HOT WATER HEATER 3"HWS TO 2ND FLR AHU'S BOP 61'-0" 3"HWR FROM 2ND FLR AHU'S BOP 61'-3" FFD D REFERENCE DRAWINGS (0' CONSTRUCTION NOTES REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City of Tukwila j BUILDING DIVISION 1 ' REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP & ASSOCIATED PIPING. REMOVE ABANDONED IN PLACE EQUIPMENT. ® REMOVE STEAM PRV STATION PIPING, VALVES & ACCESSORIES. EXISTING VALVE TO BE REMOVED. © REMOVE FILTER AND ASSOCIATED PIPING AND VALVES. EXISTING FILTER/FEED POT TO RELOCATED. REMOVE ASSOCIATED PIPING AND VALVES. ® REMOVE EXISTING DOOR. EXISTING STEAM RELIEF VENT PIPING TO REMAIN FROM PIPE FLANGE TO PIPE THRU ROOF. 10 REMOVE 3" STEAM VENT THRU ROOF. NEW STEAM VENT WILL BE ROUTE UP THRU EXISTING OPENING. 1 REMOVE EXISTING COLD WATER PIPE. PIPE WILL BE REROUTED UP AND OVER NEW HWS/R AND PC. SEE NEW PLAN. 12 EXISTING HOT WATER HEATER & ASSOCIATED PIPING AND VALVES TO REMAIN. EXISTING 4"CW MANIFOLD TO REMAIN. 14 REMOVE EXISTING FUNNEL FLOOR DRAIN. REMOVE EXISTING COMPRESSED AIR PIPING SERVING ROOM. VALVE AND CAP AT WALL PENETRATION. SEE NEW PLAN. RECEIVEDFFMAN CITY OF TUKWILA N G I N EER S FEB 2 5 2016 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 PERMIT CENTER coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUC - smm — SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE — L S ACCEPTABILITY 1�� THIS DESIGN AND/OR SPECIFICATION IS APPROVED ® z� APPROVED BY DEPT. DATE RIb11 �o sSIONAL � K. BUN DRAWN DATE SUBTITLE CONVERTER STATION #2 - PARTIAL PLAN CURRENT REVISION 16069 SYMBOL D DATE 10.06.14 RECXORD DRAWING SR GS KR 05.28.93 CHECKED S.ROSSE SHEET M560R A CONVERTER STATION POT FEEDER 765835-00 SLB RWS EJC 02.28.97 N S. ENROSSE TITLE REPLACE STEAM CONVERTER STATION #2 BUILDING 09-101 BUILDING MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, INA B PUR/INST MOD. CLEAN ROOM 546610-01 C. HARRAH RWS 10.01.04 CHECKED 1G. SMITH C SIDESTREAM FILTER W966719 RWS 02.24.12 APPROVED K. JOB N0. COMP N0. D REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 APPROVED 04.23.92 DWG No. 09-101-M560R SYM SECTION SCALE; 1/2" = 1'-0" M560IM561 0 7 REVISION RECORD DRAWING A I REPLACE STEAM CONVERTER STATION #2 LL JJ —T J/ T BY SR 16069 CEI APPROVED DATE GS KR 05.28.93 MS 10.06.14 SECTION B SCALE; 1/2" = 1'-0" M560 M561 SYM I REVISION I BY I APPROVED I DATE 1 "C TO CONDENSATE PUMP 2"HW 4"HWS LEGEND FLOOR AHU'S STM STEAM PIPING FLOOR C STEAM CONDENSATE PIPING LOOP) HWS HEATING WATER SUPPLY AHU-8,11 & 13 HWR HEATING WATER RETURN AHU-8,11 & 13 HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT K.RAMSEY GATE VALVE CHECK VALVE 1"STEAM VENT FROM CONDENSATE PUMP BALL VALVE -' BALANCE VALVE GLOBE VALVE 3"C TO CONDENSATE PUMP SEE SHEET M566 r0_1 FFD FUNNEL FLOOR DRAIN GENERAL NOTES 1 "C TO CONDENSATE PUMP 2"HW 4"HWS TO 1 ST FLOOR AHU'S 3"HWR FROM 1 ST FLOOR AHU'S (EAST LOOP) 3"HWR FROM 1 ST FLR AHU-8,11 & 13 3"HWS TO 1 ST FLR AHU-8,11 & 13 1 /2"HWC FFD 10/3/14 ACCEPTABILITY K. BUN THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED S.ROSSE REMOVE PIPING, N IN R APPROVED BY DEPT. I DATE S.ROSSE CHECKED G.SMITH APPROVED K.RAMSEY R� wxg 4 +¢a7s0raa� � a a v�; .waw"¢x d �aa� ¢d ws REFERENCE DRAWINGS CONSTRUCTION NOTES RECEIVED CITY OF TUKWILA FEB 2 5 20% PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED -MAR 0 8 2016 CKY of Tukwila BUILDING DIVISION AORFFMAN I H E E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 M561 R BUILDING 9-101 JOB NO. COMP NO. 4.23.92 MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA DWG NO. 09-101-M561 R 0 M 0 00 0 M REMOVE PUMP, HOUSEKEEPING PAD & ASSOCIATED PIPING. REMOVE PIPING, VALVES & ACCESSORIES. RECEIVED CITY OF TUKWILA FEB 2 5 20% PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED -MAR 0 8 2016 CKY of Tukwila BUILDING DIVISION AORFFMAN I H E E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 M561 R BUILDING 9-101 JOB NO. COMP NO. 4.23.92 MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA DWG NO. 09-101-M561 R 0 M 0 00 0 M L:S:Y:m LEGEND CAP FORMER RELIEF VALVE STM STEAM PIPING VENT THRU ROOF RELIEF VALVE -CMCS SENSORS A 1 I EXTENDED THROUGH C STEAM CONDENSATE PIPING VENT THRU ROOF ROOF EL 66'-6" FORMER RELIEF VENT HWS HEATING WATER SUPPLY I I BALANCE VALVE 3/4"MANUAL AIR VENT 3 I HWR HEATING WATER RETURN 6"HWS HEADER HX2EO7B TEMPERATURE PROVIDE GAUGE GLASS 40-260°F (TYP) _ _ _ _ _ SENSOR TO CMCS 3 GA_ CO R SI HW DOMESTIC HOT WATER _ _ _ 'T K 4" 0" a 0-100 PSI (TYP) 1"CW FILL °I.a HWC DOMESTIC HOT WATER CIRCULATION TEMPERATURE 1 HX2EO7A 5 147 SENSOR TO CMCS„ "AIRTROL” d CW DOMESTIC COLD WATER RELIEF VALVE , 3 HWR 4 HWS �L TANK FITTING " 19,200#/HR RELSETTEF AT 60 VALVES 12 RUN � � 5 -� - - 2 3/4 RELIEF VALVE °a ---- --- SET AT 55 PSI - o - - 71 SET AT 60 PSI - - V - VENT DISCHARGE TO DRAIN - ^ I 2"STM 4 HWS -44 5 6"-50# STM 4"HWR 2"DRAIN FUNNEL 1 /2 V —D�— GATE VALVE - , -6"-5 S -' + � � �� I- - - -- -z HEADER v— CHECK VALVE 3 - 0 CO - , - _ �_ --I I— BALL VALVE /3/47-504f C D 4 0-100 1 1 4"HP 3/4" TRAP CO 1 HX2E07C HX2E07D PSI 40-260°F CONDENSATE ter' BALANCE VALVE TO RECEIVER 8"-50# STM BUCKET TRAP RETURN 6"-50# STM 19,200#/HR ' 1 2"HWS GLOBE VALVE ��- 4"-50# STM 6"HWR HEADER - - - - 5 BYPASS FFD FUNNEL FLOOR DRAIN 3/4"RV DRAIN REVISION ?" wnnn np-rk SECTION C crA I c . I /) "— I ' n" kALcn I wcc,) / \ RECORD DRAWING A I REPLACE STEAM CONVERTER STATION #2 SECTION SCALE; 1/2"=1'-0" BY APPROVED DATE SYM REVISION SR GS KR 05.28.93 16069 CEI MS 10.06.14 M560IM562 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED K. BUN CHECKED S. ROSSE ENGINEER S. ROSSE APPROVED BY DEPT. DATE CHECKED G. SMITH APPROVED K. RAMSEY ul . . . . . . . . . . . . . REFERENCE DRAWINGS GENERAL NOTES CONSTRUCTION NOTES REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP, HOUSEKEEPING PAD & ASSOCIATED PIPIN REMOVE EXISTING ABANDONED IN PLACE EQUIPMENT. ® REMOVE CONDENSATE RECEIVER AND ASSOCIATED PIPING, VALVES AND ACCESSORIES. REMOVE EXISTING PIPING, VALVES & ACCESSORIES. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEN/ED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 as City of Tukwila BUILDING DIVISION 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 M562R BUILDING9-101 JOB NO. COMP NO. 4.23.92 MECHANICAL MASTER COL. E-17/7-8 DEV. CENTER, WAj DWG N0. 09-101-M562R e 5 1/2 2'-6" m ro BOTTOM OF BEAM 2 1 /2"HWR FROM 2ND FLOOR AHU'S, BOP 61'-8 1/2" 5"-150# STM AUTO AIR VENTS BALANCING VALVE 40-260°F 4"HWR STRAINER (FAR SIDE) BLIND FLANGE 1 1/4" CAP - 6"HWR HEADER — 3/4"DRAIN 32'-4" 0 13 3/4"DRAIN "AIRTROC cl TANK FITTING - 3"HWR ROOF EL 66'-6" PlArav, 3/421 4"HWS ' 1" 0-100 C114 PSI tl-uA3 HWRA 11 3/4" DRAIN AUTO 3—WAY MIXING VALVE 3"THREADED FLANGE W/PLUG FOR TEMP HOSE CONNECTION BALANCING VALVE I" TO COMPRESSION TANKS 40-2607 91 AQUASTAT —4"HWS U2 _ 40-2607 2 HWS BYPASS PU2FO7A (WAS CP -5 1 1/2" HWS I I ID_ - I I I U CV I I I I 2" RAIN H DE FOR PUMP BASE DETAIL SEE AUSTIN DWG 101-227 2"WOOD DECK UNDER PUMP 5/8" PLYWOOD PLATFORM EL 53-4 3/4" SECTION E SCALE; 1/2"=1'-0" M560 M563 QF 7 SECTION LF SCALE; 1/2"=1'-0" M560 M563 5 GALLON EXPANSION TANK 3"HWR FROM 2ND FLOOR AHU, BOP 61'-3" 3"HWS TO 2ND FLOOR AHU, BOP 61'-0" H2 WH2E7A E76 BEHIND FUNNEL DRAIN 1 "STM VENT 1 1/4" HP COND 3/4" 3"C TO CONDENSATE PUMP a, LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT GATE VALVE �— CHECK VALVE --I0I-- BALL VALVE —�� BALANCE VALVE GLOBE VALVE ❑O FFD FUNNEL FLOOR DRAIN REFERENCE DRAWINGS GENERAL NOTES CONSTRUCTION NOTES REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP, HOUSEKEEPING PAD & ASSOCIATED PIPIN REMOVE EXISTING ABANDONED IN PLACE EQUIPMENT. ® REMOVE CONDENSATE RECEIVER AND ASSOCIATED PIPING, VALVES AND ACCESSORIES. REMOVE EXISTING PIPING, VALVES & ACCESSORIES. REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City of iuk% ita BUILDING DIVISION RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE L S ACCEPTABILITY KRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE RECORD DRAWING SR GS KR 05.28.93 r?�r THIS DESIGN AND/OR CHECKED CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 �C�' SPECIFICATION IS APPROVED S. ROSSE SHEET EINEER A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 lo® �� APPROVED BY DEPT. DATE SNGROSSE TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED M563R G. SMITH JOB NO. COMP NO. BUILDING 9-101 16611 APPROVED K. RAMSEY `SSjonrA� yG1 APPROVED DWG NO. 4.23.92 MECHANICAL MASTER COL. E—F/7-8 DEV. CENTER, WA 09-101—M563R l UbJ114 u LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING I HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN FLOOR DRAIN HW DOMESTIC HOT WATER WITH FUNNEL 7 HWC DOMESTIC HOT WATER CIRCULATION 2"DRAIN HEADER CW DOMESTIC COLD WATER 2 3/4"RV DRAIN 2 -- --- V ---- VENT 1 "BFP DRAIN COPPER RELIEF VALVE VTR ^� GATE VALVE 4„ CHECK VALVE B Le -I�I-- BALL VALVE —' BALANCE VALVE RELIEF VALVE BACKFLOW PREVENTER GLOBE VALVE VENT THRU ROOF 5-0" FROM FLOOR LINE z;r' DO FFD FUNNEL FLOOR DRAIN 1/2"PRV WITH BUILT—IN STRAINER 60-12 PSI 1" QUICK FILL BY—PASS (BENEATH) 3/4"DRAIN 1 "CW FILL PARTIAL PLAN - DRAINS SCALE; 1/2" = 1'-0" SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 05.28.93 A REPL PUMP DRAINS, BRACE BFP 55595900 HARR RWS 09.21.05 B REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 � Aw ACCEPTABILITY K. BUN THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED S. ROSSE ENGIN ER APPROVED BY DEPT. DATE S. ROSSE CHECKED G. SMITH APPROVED K. RAMSEY %mr �,mss"$s�u� '�3's sCs s%�✓m�a ,y�;ns id ri�'"�`.x, }? '�+ modtr.'a;�".s"aat�. REFERENCE DRAWINGS GENERAL NOTES CONSTRUCTION NOTES REMOVE PUMP, HOUSEKEEEPING PAD & ASSOCIATED DRAINS. REMOVE ABANONED EQUIPMENT AND ASSOCIATED DRAIN PIPING. REMOVE DRAIN PIPING. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City of Tukwila BUILDING DIVISION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 PARTIAL PLAN 16069 B 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 lama 5 6 /I R BUILDING 9-101 JOB NO. � COMP NO. 4.23.92 MECHANICAL MASTER COL. E—F/7-8 DEV. CENTER, WA DWG NO. 09-101—M564R M SYM REVISION RECORD DRAWING A I REPLACE STEAM CONVERTER STATION #2 PARTIAL SECOND FLOOR PLAN SCALE; 1/4"=1'-0" E3 SECTION SCALE: M566 1 "P RV 150 PSI TO 50 PSI 3/4"C FROM 1 "STM"* --1 "STM TO PUMP STM DRIP LEG 3/4"C SUPPLY CONNECTION TO PUMP INLET 3/4" THERMODYNAMIC STEAM TRAP W INTEGRAL STRAINER 200 /HR SECTION r -B-"" SCALE; NONE M566 LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT CONVERTER STATION pd--- GATE VALVE FLOOR CHECK VALVE —��I-- BALL VALVE -� BALANCE VALVE GLOBE VALVE © FFD FUNNEL FLOOR DRAIN 91 FREEWED FOR OMPUANCE PROVED 0 8 2016 L City of Tulmila UILDING DIVISION ACPFFMAN I N E E R S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION ACCEPTABILITY DRAWN K.BUN DATE SUBTITLE THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S.ROSSE � ENGINEER TITLE APPROVED BY DEPT. DATE S.ROSSE CHECKED t G.SMITH REG IVEI) APPROVED tTY OF UKWILA K.RAMSEY PARTIAL SECOND FLOOR & SECTIONS GENERAL MOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REMOVE STEAM POWERED CONDENSATE PUMP & ASSOCIATED VALVES & PIPING. REMOVE 3" CONDENSATE AS REQUIRED FOR NEW PIPE. REMOVE 150# SUPPLY STEAM TO CONDENSATE PUMP. n n !JEHMII (;I=NTER 9-101 KEY PLAN SCALE: N.T.S. N CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 REPLACE STEAM CONVERTER STATION #2 M566R BUILDING 9-101 JOB NO. COMP DWG N0. 4.23.92 IMECHANICAL MASTER COL. E -F/6-8 DEV. CENTER, WAI 09-101-M566R 131 D D 11 13 15 19 20 21 22 23 Q 0 N N 0 M566 � t REG IVEI) tTY OF UKWILA FEB 2 5 2016 !JEHMII (;I=NTER 9-101 KEY PLAN SCALE: N.T.S. N CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 REPLACE STEAM CONVERTER STATION #2 M566R BUILDING 9-101 JOB NO. COMP DWG N0. 4.23.92 IMECHANICAL MASTER COL. E -F/6-8 DEV. CENTER, WAI 09-101-M566R 131 D D 11 13 15 19 20 21 22 23 Q 0 N N 0 N HWR FRO FIRST F OR AH 3 ,I 1 E7AV1 75% CAPA( STEAM V N 2 G-2 7AV2 5% CAPAC STEAM VALX I T-1 7 G— F7D HWV U I HWS TO FIRST F OR AHUS STAR C 1 PUMP CR 22 PU2F7D R (NORTHR MOST MP) z 20 HX2E7A CONVERTS -3 3 > / 1 4 POO1 kOOUT DCO SL31 E7AV1 AO/P P002 AOOU 01 SL31 HXE7AV2 AO/P A101 IN T DCO1 SL31 E7A HX 2 Al POK, P004 AO T C01 SL32 F7D HWV AO/P DCO1 HXE7 AO/j ZRFOMOOR 6 1 1,V 0 0 AI10 P004 AO T C01 SL32 F7D HWV AO/P P001 AOOUT DC01 L32 F7 HWV 0/P 1 150 C001 1 10 DC01 XL,31 STRCO DCqAj SL31 18 GOUT C DC01 SL31 SL32 DC01 I SL3 HWP I E7 V1 RS SSM T A V2RS 71 7 E7E3 V1R E713 V S P RS C I/L AP RS 140 AP S (DA) AP RS 2/0 105 20 0 (RA) 10 200 0 95 0 2 0 200 IAP DC01 XL31 OVEil 160 DC 1 SL31 E7 HWLP 713 HWLP F P AR 0 8 201 LP ZI (RA) 5* 5° F FF 180 40 HWV o S DC SL31 UDP AP MVOARS START P F7A City 0t u1mila AP RS 55 IF P F7C BUILDI G DIVISIO 35 5 I FA I LS OFA T-2 3 HXE7BV1 75% PACITY ST VALVE m 7ACACITY A HX2E7B CONVEI,l L E. MANUAL PRY -1 VA E SV- M 0-30 PSI MAIN Al GA -1 CONTROL IR 2 PROV ED TO PN MATIC DEVI S BY OEING °l 25 TS -2 CONVERTER ROOM CONTROL AIR MAIN 2 OUTSIDE AIR TEMPERATURE mw 26 SENSOR (E7B OSA) CR -6 ADD CURRENT RELAY CR -7 TS -1 CR TO POWER LEG ADD CURRENT RELAY OUTSIDE AIR S SWITCHED THROUGH CR POWER LEG TEMPERATURE SENSOR SWITCHED THROUGH LIGHTING RELAY LIGHTING RELAY EN OSA 27 R-2 AT RELAY R-5 AT RELAY ( ) PANEL RRP-E6 28 PANEL RRP-E6 (BATHROOM LIGHTS) (BATHROOM LIGHTS) 15 G-6 F7C NV � T-4 / E7 HWV / 6 T/ I/ �G F7AiFiWV NCI C HWS NC C NO FI US FLOOR HWR FRO No SECON TARTER FLO AHUS CR- PU CR 1 P F7C 9 CR -1 THROUGH CR -7 D150 -1A CURRENT RELAY ADJ. 1 TO 200 AMPS P RV -1 N1 -11W FILTER REGULATOR PORT 3/8", SUPPLY MAX 250 PSI MANUAL DRAIN QTY 1 STARTER __X 14 714 MPrRR CR U2F7B -2 T-1 THROUGH T-6 MAMAC IMM. TEMP SENSOR 7/I /< 8 ) / ( 9 ) <100 I11 I / <12Y Y13) <14) / 115 P003 X00 KolSL32 F7C HWV AO/P A103 I NT DC01 ZSL32DC01 F7C HHWP Al 01 AI10 P004 AO T C01 SL32 F7D HWV AO/P P001 AOOUT DC01 L32 F7 HWV 0/P A101 INPNT DC 1 SL32 7B HWS Al C001 C101 Dqdl P 2 STRCO INPN ST CO INPNT GOUT C S 2 DC01 SL32 DC01 7C HWP I F7A F SAINT SSM T AO/,*' R-1 & R-2 MR -801 C CONTROL RELAY 24 VAC, SPDT T-5 STARTER CR -3 P P CR P 2F7A (SOUTHERN �� MOST PU TS -1 & TS -2 T99-1 OUTSIDE AIR TEMP SENSOR -40° TO 212°F 16)/ (17Y<18> V91 X20 A102 INPNT DCO SL32 F A HWS Al C002 I CIG2 3 1 15 1/154 2 15 P004 AO T C01 SL32 F7D HWV AO/P A105 STRCO NPNT I NT Dqdl I SL32 DCO1 161AIII r --7A F7D H SS MAINT AI / EFRE6A TOILET EXHAUST FAN 21) <22)/ (23) <r) <25 -5 C942 A109 /CO02 A110 A103 TTRCO INPNT STRCO INP INPNT DC01 SL DCO1 L31 D 1 SL32 HWP F 117 OSA SS AINT S MAINT Al / LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING - 0— CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) �— WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) DCM ADDRESS NUMBER Aloo < HARDWARE TERMINATION POINT INPNT < POINT 1/0 ELEMENT DCM I SLV SLAVE ADDRESS NO. —PNTID— POINT ID POINT TYPE Al 1/0 BLOCK INFO. KEY GENERAL NOTES: CONSTRUCTION NOTES: REMOVE CONTROLS SHOWN HATCHED. SENSOR TO BE RECONNECTED TO SIEMENS CONTROLS SYSTEM. EXHAUST FAN CONTROL TO BE DEMOLISHED AND REPLACED WITH SIEMENS SEQUENCE OF OPERATION HEATING WATER EXITING THE STEAM -TO -HOT-WATER CONVERTERS WILL BE RESET FROM 140' TO 180'F BASED ON OUTSIDE AIR TEMPERATURES OF 55' TO 357 BY MODULATING THE STEAM CONTROL VALVES. THE SMALLER CONTROL VALVE WILL MODULATE TO FULL OPEN PRIOR TO THE OPENING OF THE LARGER VALVE. HEATING WATER EXITING THE HOT WATER CIRCULATING PUMPS WILL BE RESET FROM 120' TO 160'F BASED ON OUTSIDE AIR TEMPERATURES OF 55' TO 35'F BY MODULATING THE EXISTING 3 -WAY CONTROL VALVES. HOT WATER CIRCULATION PUMP PU2F7B (ONLY) WILL BE CYCLED ON/OFF AT AN OUTSIDE AIR TEMPERATURE OF 65' FWITH A 57 DEADBAND. PUMPS PU2F7C AND PU2F7D WILL BE ON 24 HOURS A DAY. PUMP PU2F7A WILL CYCLE ON IN THE EVENT OF PUMP PU2F7C FAILURE. RESTROOM EXHAUST FANS WILL BE INTERLOCKED WITH RESTROOM LIGHTS, LIGHTING RELAY PANEL CIRCUITS: (1) RRP-2/R5 (1) RRP-1/R2 26> / <27>/ <28 A104 A109 A110 INPNT INPNT [INPNT DC01 SL31 DCO SL31 D 1 SL31 E7 OSA E61 ITE BRF6LITE AI STATUS STATUS / 3 V15 3 1 15 1/154 2 15 2/7 1 2/8 0 DC SL32 16 2/1 DC01 S 2 01 SL32 DC01 SL32 D 01 SL32 DC01 S 1 DC01 L31 C HWLP F7B LP HWP CNTL F7A HWL F7D HWLP E6LIT IL F6 EIL 120 71 7 LP L MC C LP LP I/L C I/L (DA) 2 2/0 2/0 RE�iIEUVE OR 4ZI CODE CO PLIANCE IAP OVEil 160 120 F AR 0 8 201 DC01 SIL 5* 5° F FF HWV o S UDP AP Rs START P F7A City 0t u1mila 5 55 IF P F7C BUILDI G DIVISIO I FA I LS ,. ,. ,. _ u mxxiut:.p„ 111A"xS44 sm { rr° fi u�+;mz � n 1 l � � a� NA4RFFMAN I N E E R S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results i relationships SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATEDRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE soy, ACCEPTABILITY CARECO CONVERTER STATION #2 RECORD DRAWING SR GS KR 6.15.93 ti rj� THIS DESIGN AND/OR CHECKED DMS CONTROL 1601 A 10.06.14 ROVED SPECIFICATION IS APPS SHEET A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 ® x� GINEER APPROVED BY DEPT. DATE S.ROSSE TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED 2M317ER G.SMITH BUILDING 9-101 3(1611 APPROVEDJOB N0. COMP N0. K.RAMSEY sS1ox�L ti APPROVED 10.0592 MECHANICAL MASTER COL. E -J/6-11 DEV. CENTER, INA DWG NO. 09-101-2M317ER 1 U11511 9 1 2 4 T 19 TT ww w w m Cn to Cn 0 o O 0 J J J J w w w w — N � N LIJ Z > > > Q Q _ = O Q m r` w r -- w X x CN C,4O _ Q I— Cn 3 z 0 U 6 2 26 O D CS CD J J 0 0 � CD m m N N w Lj 27 28 1 CD U Q CO w ry _ w 24 INCOMING 120VAC g w 8 4 13 17 9 23 0:f ck� V) Cn Qf w w n ry w CL O:f ry CL _ a- n LL L.L. LL- LL - N 0 7 T 19 w w w w cn Cr) Cn Cn 0 00 0 J J J J U U U U B B z z z z w w w w Q- CL m m o O o 0 w w w w J J J J 00 < 24VAC MCS -PTS LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING — 0— CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) O— WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) GENERAL NOTES: C 1 C002 (LEDs C O wDT 0 SLV v B B B O A ]/(B=CLEAR) BLACK) POWER ON 1 2 < ON AUTOLjj CONSTRUCTION NOTES: OFF I F= m I O FF LOAD 1 O M REMOVE CONTROLS SHOWN HATCHED. OVE IDE U w M/02 M M M m as 903 Q m 04 O1 5 N Q FU AMP 1"Irl ASLO—ELO / / / I I ISI o 0 MICROSMART/UNIT NCONTROLLER, �o120VAC, 60 0 Hz, 1 -PHASE :;7C CD zz / A RESS = SLAVE 32 0251141111m. =O �U F— RS -262 PORT N n -j- to O O O O O Q Q Q Q Q �DIOIOC 0 0 0 0 Z Z Z Z Z w w w w Cn Cn Cn Cn w w w w I-- I-- I— F-- Cn _ = O = _ m Q m U o Li LLl— w LL- �/ Z O Q 12 cn 8 16 0 25 z et \> co C O C Q IF 9^ � RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEWED FOR COD�EPP�QNGE MAR 0 8 2016 City of TUW1 a BUILDING DIVISION NAORFFMAN I N E E R S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION IN M. — SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �L SO ACCEPTABILITY CARECO DRAWN DATE SUBTITLE CONVERTER STATION #2 CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 RECORD DRAWING SR GS KR 6.15.93 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S.ROSSE DMS CONTROLLERS SHEET A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 ® o ENGINEER TITLE REPLACE STEAM CONVERTER STATION 2 �, APPROVED BY DEPT. DATE S.ROSSE � 2M317FR CHECKED G. SMITH ED BUILDING 9-101 J6611 JOB N0. COMP N0. K.RAMSEY �SSjolvaL �yGti APPROVED DWG N0. 10.05.92 MECHANICAL MASTER COL. E -J/6-11 DEV. CENTER, WA 09-101-2M317FR IU13114 POLARITY OF TERMINATIONS IS NOT IMPORTANT (TYPICAL OF ALL T99 TYPE TEMP SENSORS) CUT SHIELD WIRE AND FOIL BACK AND TAPE THE END OF THE WIRE TO PREVENT ACCIDENTAL GROUNDS GREY WIRE NUT OR RED BUTT SPLICE CONNECTIONS ROBERTSHAW T99-1 OUTSIDE AIR TEMP SENSOR 0 OUTSIDE AIR TEMP SENSOR WIRING DETAIL NTS 7IM TEMP SEN B QI v / ' 1 SHIELD GROUN CUTS LD WIRE A F01 ACK AND T E T END OFT WIRE 0 PREVENT ACCIDENT GROUNDS - WELL GREY W OR RED �C2>11VIIVIERSION TEMPERATURE SENSOR WIRING DETAIL NTS ICAL TERMI IONS OR ANALOG NPUT TYPE POI S T9 B B BLK 4-20 a CIS RED RED CUT/,SHIELD WIRE ND F L BE D/HE EIRE O PRACCIDp9/ RANGE MID REED HIGH NOTE: DEVI IS POLA SENSI E FO W TE 'L21< OHM-1� 1/4 WATT SUPERVISI RESISTOR/ NEI EN-KULJIAN DEL D150- -NL CURRENT -0 RATED SWITCH / 101121111163 ,JUMPER AW -TURNS NONE 1-6 MID 6-40 HIGH 40-200 O CURRENT RELAY WIRING DETAIL NTS lc--�::> / SC ECTRIC OUT T CAR JUMP OE D D C CONN1 A G IL FUSES A B 2 B a p FH, M2 Lm,, 0 0 0 2VM— IQ S R <�> EO CARD CONTACT OUTPUT WIRING kOAD-VOLTAG RATED WIR TO THE ELD DEVIC (STARTER) SE DETAIL 0 EXHAUST FAN STARTER WIRING 0 PUMP STARTER WIRING `rY t� L }Sal4?Ytr1�s`SEY4 �Y,a � SSS(FmVsitis,,.Yl '� �� LEGEND: GENERAL NOTES: CONSTRUCTION NOTES: REMOVE CONTROLS SHOWN HATCHED. SENSOR TO BE RECONNECTED TO SIEMENS CONTROLS SYSTEM. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City ofTu{mila BUILDING DIVISION 100% SUBMITTAL ISSUE FOR CONSTRUCTION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE L SO ACCEPTABILITY CARECO CONVERTER STATION #2 16069 A 10.06.14 RECORD DRAWING SR GS KR A S�I�� SPETHIS CIFICATION IISAAPPROVED SROSSE TYPICAL WIRING DETAILS SHEEP A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 APPROVED BY DEPT. DATE ENROS GINEER TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED 2M317GR G.SMITH BUILDING 9-101 JOB N0. COMP N0. 36611 APPROVED �'ECISTE�� K.RAMSEY `SS'IOfVAL � APPROVED 10.05.92 MECHANICAL MASTER COL. E -J/6-11 DEV. CENTER, WA DWG NO. 09-101-2M317GR I UI.SI "14 P-1%' WATER HAMMER I 2"V DN, CONNECT ARRESTER PDI I TO 2"V 3/4" SIZE C BELOW FLOOR 1/21) 3"SAN t� P-5 P_ 1 2" BELOW FLOOR _ I 2"V BELOW FLOOR P-5 3/4 MH 1 /2" HWC oMH TYP) 1 1 /2"SAN �- 2"V ABV AND M HW CW o _ P_4 BELOW FLOOR a P 6 2„ P-6 0 � • ° SAN 2 VTR P 4 ° I4.2 - P-3 I I 3"SAN DN 1/2" (TYP) ++ -- 1 j-/2 V--------1� 0 C:Er9 2"SAN 3/4" WATER HAMMER ARRESTER PDI 4„ SIZE C I 2"SAN DN - , _ THRU FLOOR WATER HAMMER 2" 2 1/2" 3"CW UP 9 1 /9" nN 3" 2 1/2" 2" WATER HAMMER ARRESTER PDI SIZE C 2" WATER HAMMER ARRESTER PDI SIZE C 2"SAN DN THRU FLOOR CO BELOW FLOOR (TYP 2 PLACES) 3"SAN UP TO FD 2"FD c0 L 3" r I 2" 0 co » fi 1 3„ 2 ' 3"SAN BELOW FLOOR r - E =1b 2" i 2"V & 3"SAN TO 4"VTR & 4"SAN 3" 2 V I i 2" 2" NI wco w I L-- 2"» B 3 "SAN UP P-3 (TYP) 11/2" 4"SAN DN&4" R 2"FFD IN CEILING 1 1/2"V - 2" - 3"SAN U TO FD -1�.. -1 1/2" 3"SAN UP — P -1A It IT r I BELOW 1 e • NI wco w I L-- 2"» B 3 "SAN UP P-3 (TYP) 11/2" 4"SAN DN&4" R 2"FFD IN CEILING 1 1/2"V - 2" - 3"SAN U TO FD -1�.. -1 1/2" 3"SAN UP — P -1A It IT r I 11 T I' wco 01 WIN= LEGEND SANITARY WASTE BELOW FLR SAN SANITARY WASTE ABOVE FLR CW DOMESTIC COLD WATER HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRC CID CLEAN OUT wco WALL CLEAN OUT --��F-- BALL VALVE (NO) 2" GENERAL NOTES 4" 4" 2 1/2" — 1 1 /2"SAN FOR CONTINUATION SEE SHEET 2M67 CONNECT 1 1 /2"SAN TO 4"SAN BELOW FLOOR 11/2"V REFERENCE DRAWINGS 4"SAN BELOW FLOOR 2 1/2" 4" B 3" --U7 CONSTRUCTION NOTES - 5"VTR PROVIDE NEW 3" WASTE PIPING. - 4"V PROVIDE NEW 2" VENT PIPING. FROM MEZZ. - 4"SAN � PROVIDE NEW FUNNEL FLOOR DRAIN. BELOW FLOOR - 4" SAN DN W/ 2"V & (2) 4" SAN CONNECTIONS NORFFMAN I N E E R S - 4"SAN 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com 2 1/2" LASTING creativity I results I relationships - 1 1/2"V P-4 - 2 "SAN - 2" VENT REVII 2" CODE ( AP 4" IAF 2 "SAN I City 100% SUBMITTAL ISSUE FOR CONSTRUCTION J H Ja 1 I T ---T --@ -- 2"FFD IN 19 CEILING SPACE 20 B 21 TOILET ROOM 6 - DOMESTIC WATER �I TOILET ROOM 6 -WASTE & SENT RECEIVED 22 SCALE; 14"=1 '-0" I v SCALE: 14"=1 '-0" � CITY OF TUKWILA 23 / / FEB 2 5 2016 9-101 KEY PLAN PERMIT CENTER SCALE: N.T.S. N SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �+,L Sp ACCEPTABILITY K. BUN DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE RECORD DRAWING SR GS KR 5.28.93 1�� THIS DESIGN AND/OR CHECKED TOILET ROOM #6 PLUMBING PLAN 16069 B 10.06.14 ��' �' SPECIFICATION IS APPROVED A. KILLIP SHEET A AUTO FLUSH RETROFIT 55595900 HARR RWS 9.21.05 ® �APPROVED BY DEPT. DATE M GINEER IS TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED M541 B REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 G. SMITH BUILDING 9-101 CII'iy11 R� K PRAMSEY JOB N0. COMP N0. �SSlQvnl, �s1 APPROVED DWG N0. 4.23.92 MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA 09-101-M541 1 U/;3/14 2"V DN FOR CONTINUATION OF 3"C, SEE SHEET M566 Mo 4"CW — STEAM POWERED CONDENSATE 6P----4 PUMP E7 FLASH TANK TES%\ 8" STM VENT THRU ROOF - STEAM RELIEF SRV I VALVE, 4x6 E8 17,500#/HR SET @ 55 PSIG C M560 M562 PRESSURE FD -1 REDUCING CONTROL VALVE 150 TO 50 PSI 17,500#/HR PRV 1. E8 2"BY-PASS 6"STEAM SEPARATOR- 2-1 /2"HWR FROM 2ND FLR AHU'S „ 4"HWS TO 1 ST FLR AHU'S 1-1 /2"HW&CW DN A A If1111 Itit 1111111AI 1 2"-150# STM -- 3"HWR 1 ST FLR AHU'S 3"HWR FROM 1ST FLR AHU-8, 11 & 13 3"HWS TO 1 ST FLOOR AHU-8, 11 & 13 I 1 — 1 / L FI vv uuvvly i I CW UP THRU ROOF I I 2-1 /2"CW DOWN - 2"PRV SET AT 55 AFL I THERMO-DYNAMIC AIR SEPARATOR � 73"STRAINER -� TRAP 200#/HR 1 - -I I I - HW —�——!1�!�1.!• � �� ,.;, ►,� mer LJ 4VT Mw E, MEN on .■ ,� ®SLO E HEAT C PIPE HANGER C-3 FER TRANS F7 PACKAGE ; 4 g CD 1 8 ELEC PANEL cf' I 41PS STRUCTURE ABOVE 2"BYPASS, 6"Y -STRAINER IIIIIE �r- I w n O V) STRUCTURE ABOVE �- 6„ PIPE HANGER (E)EXHAUST AIR OPENING ABOVE 28x28 (FIELD VERIFY 001 i . 0i 2 PC � � HEAT � 2 TRANSFER 7.5 PACKAGE � I I 1 I 2"PC 1 HEAT -- C-1 TRANSFER F8 PACKAGE I° _ I �EIFC PANEL 1 �Lps 5 —150# STM I "--- 6"HPS I I BOP 58'-9 3/4 xJ 7 3/4"C TO FLASH TANK 3/4" TRAP COND FROM 6"STM MAIN 1 2-1/2 HWR BUTTERFLY I _ VALVE, TYP ❑ TO MCS = 1 - t� E A VFD PS ,41 C M560 M563 T PIPE HANGER A 40-260°F M560 M561 3"HWR IF1 - - -�- - - 2-1 /2"HWS TO 2ND FLR AHU'S BOP 61'-0" 3"HWR FROM 1ST FLOOR AHU'S AND RADIATORS BOP 61'-3" 4"HWR I U I — F LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER t 7 HWC DOMESTIC HOT WATER CIRCULATION 3"CW DN 5"W DN CW DOMESTIC COLD WATER 5"VTR I V VENT �� GATE VALVE � I 1"BAC 171 0 R N '-0" FROM F OOR INE moi-- CHECK VALVE BALL VALVE I - 1/2 " PRV WITH BUILT-IN STRAINER -— BALANCE VALVE � _ > 55-12 PSI GLOBE VALVE I 1" QUICK FILL BY-PASS (BENEATH) D BUTTERFLY VALVE WFL I FILTER/FEED TANK DO FFD FUNNEL FLOOR DRAIN 1 `pMJ DAMPER, MOTORIZED - - - - - -- - - - - ET I EXPANSION TANK GENERAL NOTES FLA - - - 4 I REFERENCE DRAWINGS 1 �� 4" HOUSEKEEPING STAND I F0_1 FD— 1 CD 3 I CONSTRUCTION NOTES CONSTRUCTION NOTES g � 4"HWR 11 3/431 I - 3/4" RELIEF VALVE SET AT 60 PSI 30x42 DUCT UP THRU 2 ROOF ° °° CORROSION ,DM.,-- COUPON MJCOUPON O RACK 4 I OFD -1 1 CD 00 - - 7 I I _ Mo ® PROVIDE STEAM FLOW METER. PROVIDE NEW HEAT TRANSFER PACKAGE. SEE DWG 3/4's I ET—2 FLB amill M628 FOR DETAIL. . 0i 2 PC � � HEAT � 2 TRANSFER 7.5 PACKAGE � I I 1 I 2"PC 1 HEAT -- C-1 TRANSFER F8 PACKAGE I° _ I �EIFC PANEL 1 �Lps 5 —150# STM I "--- 6"HPS I I BOP 58'-9 3/4 xJ 7 3/4"C TO FLASH TANK 3/4" TRAP COND FROM 6"STM MAIN 1 2-1/2 HWR BUTTERFLY I _ VALVE, TYP ❑ TO MCS = 1 - t� E A VFD PS ,41 C M560 M563 T PIPE HANGER A 40-260°F M560 M561 3"HWR IF1 - - -�- - - 2-1 /2"HWS TO 2ND FLR AHU'S BOP 61'-0" 3"HWR FROM 1ST FLOOR AHU'S AND RADIATORS BOP 61'-3" 4"HWR I U I — F LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER t 7 HWC DOMESTIC HOT WATER CIRCULATION 3"CW DN 5"W DN CW DOMESTIC COLD WATER 5"VTR I V VENT �� GATE VALVE � I 1"BAC 171 0 R N '-0" FROM F OOR INE moi-- CHECK VALVE BALL VALVE I - 1/2 " PRV WITH BUILT-IN STRAINER -— BALANCE VALVE � _ > 55-12 PSI GLOBE VALVE I 1" QUICK FILL BY-PASS (BENEATH) D BUTTERFLY VALVE WFL I FILTER/FEED TANK DO FFD FUNNEL FLOOR DRAIN 1 `pMJ DAMPER, MOTORIZED - - - - - -- - - - - ET I EXPANSION TANK GENERAL NOTES FLA - - - 4 I REFERENCE DRAWINGS 1 �� 4" HOUSEKEEPING STAND I F0_1 FD— 1 CD 3 I CONSTRUCTION NOTES CONSTRUCTION NOTES g � 4"HWR 11 3/431 I - 3/4" RELIEF VALVE SET AT 60 PSI 30x42 DUCT UP THRU 2 ROOF ° °° CORROSION ,DM.,-- COUPON MJCOUPON O RACK 4 I OFD -1 1 CD 00 - - 7 I I 2' PC — I—I — I i I 3"HWS I v v •- - - 4 HWR , I - - - - - • FD -1 7 Z7\ 3„HWR_ - - - O U - I L = 2-1 /2"HWS ' ITI PROVIDE NEW HEATING WATER PIPING. 5 GALLON EXPANSION TANK ® PROVIDE NEW STEAM PIPING. INSULATE PER TABLE. EHB HOT WATER HEATER PROVIDE ALUMINUM JACKET ON PIPE BELOW 8' AFF. 9 PROVIDE 4" HOUSEKEEPING STAND. I 10 PROVIDE NEW FLOOR DRAIN. 1 RELOCATED EXISTING FILTER/FEED TANK. PROVIDE NEW ASSOCIATED PIPING AND INSTALL NEW FILTER. 12 PROVIDE NEW 4"CW PIPING. ROUTE NEW PIPING UP 1R & PC PIPING. AND OVER NEW HWS /R TO 2ND FLR / AHU'S BOP 61'-0" 13 PROVIDE NEW PLUMBING VENT. I 3"HWR FROM 2ND FLR 14 PROVIDE NEW MOTORIZED DAMPER 'S BOP 61'-3" FFD 6 D PROVIDE VFD. CONNECT TO EXISTING EXHAUST FAN ON ROOF. PROVIDE DDC CONTROL PANEL. D PROVIDE NEW DRAIN PIPE FROM EXISTING RELIEF VALVE. PLAN _ ® PROVIDE STEAM FLOW METER. PROVIDE NEW HEAT TRANSFER PACKAGE. SEE DWG 3/4's I ET—2 FLB EXPANSION TANK M628 FOR DETAIL. SCALE: I/2"=1 '-0” LOCATED OVER TOILET 4R 2 PROVIDE NEW VALVE AND CAP AT EXISTING COMPRESSED AIR. PROVIDE NEW STEAM PRV & ASSOCIATED PIPING & INSULATION. 3 I PROVIDE NEW FUNNEL FLOOR DRAIN. PROVIDE NEW EXPANSION TANK, ASSOCIATED PIPING AND VALVES. `l' \ I ® PROVIDE NEW FLASH TANK, ASSOCIATED PIPING AND 5 VALVES. �> SEE DETAIL FOR CONNECTIONS M560 M555 PROVIDE NEW STEAM POWERED CONDENSATE PUMP, H2 HOT WATER HEATER ASSOCIATED PIPING AND VALVES. T ELA - - I 6 CONNECT TO EXISTING STEAM VENT FLANGE. 2' PC — I—I — I i I 3"HWS I v v •- - - 4 HWR , I - - - - - • FD -1 7 Z7\ 3„HWR_ - - - O U - I L = 2-1 /2"HWS ' ITI PROVIDE NEW HEATING WATER PIPING. 5 GALLON EXPANSION TANK ® PROVIDE NEW STEAM PIPING. INSULATE PER TABLE. EHB HOT WATER HEATER PROVIDE ALUMINUM JACKET ON PIPE BELOW 8' AFF. 9 PROVIDE 4" HOUSEKEEPING STAND. I 10 PROVIDE NEW FLOOR DRAIN. 1 RELOCATED EXISTING FILTER/FEED TANK. PROVIDE NEW ASSOCIATED PIPING AND INSTALL NEW FILTER. 12 PROVIDE NEW 4"CW PIPING. ROUTE NEW PIPING UP 1R & PC PIPING. AND OVER NEW HWS /R TO 2ND FLR / AHU'S BOP 61'-0" 13 PROVIDE NEW PLUMBING VENT. I 3"HWR FROM 2ND FLR 14 PROVIDE NEW MOTORIZED DAMPER 'S BOP 61'-3" FFD 6 D PROVIDE VFD. CONNECT TO EXISTING EXHAUST FAN ON ROOF. PROVIDE DDC CONTROL PANEL. D PROVIDE NEW DRAIN PIPE FROM EXISTING RELIEF VALVE. PLAN - CONVERTER SIAHUN N012 SCALE: I/2"=1 '-0” LOCATED OVER TOILET 4R I ISSUE rRuvluL juxffz uuul ur InRu muur. HI1!-Auri MOTORIZED DAMPER ON BOTTOM OF DIWCEIVED CITY OF TUKWILA 2 EXISTING 4"CW MANIFOLD TO REMAIN. FEB 2 5 2016 EXISTING 2" STEAM TO REMAIN. PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE L Sp ACCEPTABILITY K. BUN � RECXORD DRAWING SR GS KR 05.28.93 s$l�� THIS DESIGN AND/OR CHECKED CONVERTER STATION #2 - PARTIAL PLAN 16069 D 10.06.14 ��' SPECIFICATION IS APPROVED S. ROSSE SHEET A CONVERTER STATION POT FEEDER 765835-00 SLB RWS EJC 02.28.97 APPROVED BY DEPT. DATE SN ROSSE WEERTITLE REPLACE STEAM CONVERTER STATION #2 B PUR/INST MOD. CLEAN ROOM 546610- CHECKED M560 01 C. HARRAH RWS 10.01.04 G. SMITH BUILDING 09-101 JOB N0. COMP N0. 36511 C SIDESTREAM FILTER W966719 RWS 02.24.12 R�Gr APPROVED K. RAMSEY D REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14ssr�vnL 4+�1 APPROVED 04.23.92 MECHANICAL MASTER COL. E-17/7-8 DEV. CENTER, WA DWGNO. 09-101-M560 I U11011 I d I (E) FIRE I o LL_ i 3/4"LPC 2-1 /2"HWR i Q i 3/4"HPC SLOPE i 3x2 RED z00 I 4 o l___C a i i STEAM I � j j SEPARATOR -00 U, z CD - z j Jw 1 - --------- w w j 3 4"HPC I LL,LLJ j CHIPS i / T o I I T o -� i 6x3 RED i n Q PLATFORM EL 53'-4 3/4" TEE 3"HWR i i i i 2-1 /2"HWS a i 111 O >Co i Q w U CD ¢� I D 00 z O O 1- I I 01 Q I 00 J N Z z � I U r) w � I w = ! � I oCf) i 3'-0" � = I I PLATFORM EL 53'-4 3/4"- 3"HWR 3"HWS 1 oei d NEW STRUCTURAL ANGLE 2 PLCS 6x4x3/8 LLV w/ 1/2" HEX BOLT w/ UNISTRUT PI010 SPRING NUTS EACH END INTO EXISTING CHANNEL INSERT -\ PIPE HANGER 2"BYPASS APCV 4x6 PSV ELBOW HANGER PIPE HANGER 1T 7==� lip 8" VENT DISCHARGE (LOCATED OUTSIDE OF CONVERTER ROOM) 3"STM VENT I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I a I I I I I I I 1 I I — I I I I _j ----- L L— -----J I I ' I 8x4 ! RED \. ! TEE \/ `8x4 ECC, RED 6x4 ECC. RED BLEED RING Y -STRAINER w/ 1/2" DRAIN VALVE SECTION A SCALE: 1/2" = 1'-0" M560 M561 ry I ZO I d- N ------------- ----- w w I z � Q � I Q— I I U w i J I w 11 I ' -----------------------� HEAT TRANSFER PACKAGE FULL METAL INSULATION JAC'KFT HWR AND HEAT TRANSFER PACKAGE I-;'-n» SECTION B SOLE: 1/2 = 1 '-0" M��60 M561 3/4"LPC d °P PROVIDE "ARMSTRON #AEH2O592-3 IN -LI E EXHAUST HEAD, d '^ I FULL METAL i ROUTE 3/4" INSULATION DRAIN FFD I JACKET ON STEAM HEADE w I � i r i 00 oI Q0 REROUTE 4"CW MAIN �t- 4"CW P4 E7/ I ZO I d- N ------------------------ � w I z I Q � I w I U w i J I w ------------------------ HEAT TRANSFER PACKAGE I-;'-n» SECTION B SOLE: 1/2 = 1 '-0" M��60 M561 3/4"LPC d °P PROVIDE "ARMSTRON #AEH2O592-3 IN -LI E EXHAUST HEAD, d '^ I FULL METAL i ROUTE 3/4" INSULATION DRAIN FFD I JACKET ON STEAM HEADE w I � i r i 00 oI Q0 REROUTE 4"CW MAIN �t- 4"CW P4 E7/ 7 4"CW [Am T�I,�, 00 I 4"CW i ------------------------ I I \L7_/i I HEAT TRANSFER _ I PACKAGE i 5 3" C'-4" I I FFD IN-LINE DRIP LEGS NOT TO BE LESS THAN HALF OF MAIN PIPE SIZE ,— PROVIDE FULL SIZE DRIP LEG AT RISER LOCATIONS ----------- STANDARD --------- , TRAP ASS'Y 3000# SEE PLAN - SOCK -O -LET ---------------------------- 800# THD UNION BLEED VAVLE TYP >> CHECK STRAINER VALVE ' � I T ( --► Lc ----------- - --- --� FORGED 800# 1" 3000# T THD VALVE TEST VALVE SOCK -O -LET NC 3/8" PLUGGED PLUG PLUG FORGED 800# FORGED 800# BLOW DOWN VALVE STEAM TRAP SWxTHD VALVE SWxTHD VALVE (HORIZ. IF REQ'D) 26" MAXIMUM _ PLUG SCALE: NTS - 4"HWS TO 1ST FLOOR AHU'S - 3"HWR FROM 1ST FLOOR AHU'S (EAST LOOP) 3"HWR FROM 1ST FLR AHU-8,11 & 13 3"HWS TO 1ST FLR AHU-8,11 & 13 M5611 M561 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 city of Tu1ck101a BUILDING DIVISION K LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING i— HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER --- V -- — VENT pa -- GATE VALVE CHECK VALVE —ICI— BALL VALVE -N BALANCE VALVE GLOBE VALVE �O FFD FUNNEL FLOOR DRAIN ENERAL NOTES DEFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE NEW HEAT TRANSFER PACKAGE. PROVIDE NEW STEAM PIPING WITH INSULATION AND METAL JACKET. SLOPE ALL CONDENSATE LINES AND FLASH VENTS TO FLASH TANK. FFMAN RECEIVED AN G I N EER S CITY OF TUKWILA 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 FEB 2 5 2016 coffman.com LASTING creativity I results I relationships EERMIT CENTER 100% SUBMITTAL I U/3/"I 4 X I ZO I j N � � � I i i Z 00 7 4"CW [Am T�I,�, 00 I 4"CW i ------------------------ I I \L7_/i I HEAT TRANSFER _ I PACKAGE i 5 3" C'-4" I I FFD IN-LINE DRIP LEGS NOT TO BE LESS THAN HALF OF MAIN PIPE SIZE ,— PROVIDE FULL SIZE DRIP LEG AT RISER LOCATIONS ----------- STANDARD --------- , TRAP ASS'Y 3000# SEE PLAN - SOCK -O -LET ---------------------------- 800# THD UNION BLEED VAVLE TYP >> CHECK STRAINER VALVE ' � I T ( --► Lc ----------- - --- --� FORGED 800# 1" 3000# T THD VALVE TEST VALVE SOCK -O -LET NC 3/8" PLUGGED PLUG PLUG FORGED 800# FORGED 800# BLOW DOWN VALVE STEAM TRAP SWxTHD VALVE SWxTHD VALVE (HORIZ. IF REQ'D) 26" MAXIMUM _ PLUG SCALE: NTS - 4"HWS TO 1ST FLOOR AHU'S - 3"HWR FROM 1ST FLOOR AHU'S (EAST LOOP) 3"HWR FROM 1ST FLR AHU-8,11 & 13 3"HWS TO 1ST FLR AHU-8,11 & 13 M5611 M561 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 city of Tu1ck101a BUILDING DIVISION K LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING i— HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER --- V -- — VENT pa -- GATE VALVE CHECK VALVE —ICI— BALL VALVE -N BALANCE VALVE GLOBE VALVE �O FFD FUNNEL FLOOR DRAIN ENERAL NOTES DEFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE NEW HEAT TRANSFER PACKAGE. PROVIDE NEW STEAM PIPING WITH INSULATION AND METAL JACKET. SLOPE ALL CONDENSATE LINES AND FLASH VENTS TO FLASH TANK. FFMAN RECEIVED AN G I N EER S CITY OF TUKWILA 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 FEB 2 5 2016 coffman.com LASTING creativity I results I relationships EERMIT CENTER 100% SUBMITTAL I U/3/"I 4 X e VICINITY MAP PROJECT SITE %�' FROM DOWNTOWN SEATTLE °0 T'' �o \ off'' \OOH •; �. g -6a V✓�' 1 rn 9'gp OXBOW LOT oo3 Q�E EAST MARGINAL WAY CORPORATE PARK 99 FROM SEATTLE—TACOMA AIRPORT m WHOM st it f �,M1VioA w,r,�Pr`�w., �� A• -'w�i.«,�% n��/ �A��',N ���; a��� 3�nu w'wxua „,A 'sw.4, RV�� ,,»lx !r'u` p r REPLACE STEAM CONVERTER STATION?p m EXIT EXIT 158 158 1 /d ACCESS EXIT 157 TZOO�INC3 Dff�V LOPMII`�NTAL NT R 9_725 EAST MAFRGINAL WAY SOUTH I EXIT 157 599 TUKWILA FROM KENT \\\ 900 & AUBURN DEVELOPMENTAL CENTER SYM REVISION BY APPROVED - REPLACE STEAM CONVERTER STATION #2 16069 CEI MS DATE SYM 10.06.14 i $ a � ., e k x WASH INGTONrc—,-181 "tIk' # I8 CODE SUMMARY TYPE OF APPLICATION: NEEg ALTERA ❑ON AD ❑PION TENANT IMPR MEN PROJECT DESCRIPTION: PROJECT IS TO COMPLETELY REPLACE STEAM CONVERTER STATION #2. THIS REPLACEMENT INCLUDES INSTALLATION OF A NEW STEAM PRESSURE REDUCING STATION, (3) THREE HEAT EXCHANGE MODULES EACH WITH TWO VARIABLE SPEED HEATING WATER CIRCULATING PUMPS, UPGRADED HEATING WATER FILTRATION SYSTEM, TWO-WAY CONTROL VALVES, NEW ISOLATION VALVES AND REMOVAL OF A REMOTE STEAM -POWERED CONDENSATE PUMP. CODES: 2012 WA WITH AMENDMENTS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. CONTRACTOR & STATE NUMBER: THE BOEING CO. BIDE INC 294ML(OV2009) BOEING PROJECT ENGINEER: BRIAN HARR BOEING CONTACT:JOHN MURDOCHPHONE. FAX NUMBER -253-773-0119 253-773-0444 REV STORIES: 2 MEZZANINE ? ® (YES) ❑ (NO) SO E—MAIL: 'ohn.s.murdoch@boeinq,com FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NEPA 13 ? ® (YES) ❑ (NO) SEPARATION 09-101-CWA17R 09-101-CWE17R EXTERIOR WALL (NON-BEARING) HOUR RATING EXTTERIOR WALL (BEARING) OCCUPANCY GROUP: GROUP B AND GROUP F, DIVISION I (OFFICE AND FACTORY) RATING CONSTRUCTION TYPE: TYPE II -B, NON—COMBUSTIBLE SEPARATION 60 FEET (MINIMUM ALL SIDES) ZONING: ALLOWABLE AREA INCREASE: FULLY AUTOMATIC, F/S CLASS I SPRINKLERS THROUGHOUT OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE FLOOR/CEILINGS (TABLE 10-A) RATING ROOF CONSTRUCTION HOUR RATING OFFICES OCC, BLDG GROSS 1,116,306 SF SO FT STORAGE OCC, TUNNEL 50,910 SF SO FT LABORATORY OCC, FIRST FLOOR 713,829 SF SO FT _CANOPY OCC. IST FLR MEZZ 55,689 SF SQ FT ;,OTHER OCC. 2ND FLOOR 295,878 SF SO FT BY 2ND FLOOR MEZZ DATE SO FT TYPE: N/A PROJECT AREA 950 SF SQ FT BUILDING HEIGHT: (ACTUAL)III FT DRAWING NUMBER REV STORIES: 2 MEZZANINE ? ® (YES) ❑ (NO) SO FT 55,689 SF FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NEPA 13 ? ® (YES) ❑ (NO) SEPARATION 09-101-CWA17R 09-101-CWE17R EXTERIOR WALL (NON-BEARING) HOUR RATING EXTTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR/CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING SEISMIC DESIGN: ZONE D TO BE REVIEWED UNDER DESIGN LOADS: (CHAPTER 16) LIGHTING WASHINGTON STATE NON-RESIDENTIAL ROOF: LIVE (SNOW) (PSF) C FLOOR: OFFICE EXISTING, NO CHANGES (PSF) PRESCRIPTIVE ❑ MECH/STOR (PSF) SPECIAL INSPECTIONS REQUIRED: STAIRS (PSF) WELD CONCENTRATED: 480 VOLT POWER REF ONLY ❑ WIND: EXPOSURE C ❑ ANCHOR BOLTS B REVISION BY APPROVED DATE B MCC DETAILS - CONVERATION STATION 42 TYPE: N/A �n. DRAWING INDEX ARCHITECTURAL - CIVIL Of STRUCTURAL DRAWING NUMBER I REV I DRAWING TITLE 09-101-S2H-1 DRAWING NUMBER REV I DRAWING TITLE 09 -101 -GO - COVER SHEET 09-101-CWA17R 09-101-CWE17R ❑ A CATWALK PLAN - REMOVAL 09-101-CWA17 09-101-RFS17R - A CATWALK PLAN 09-101-A353 ❑ 09-101-CWS539 B DOOR & HARDWARE SCHEDULES,NOTES,TYPES&DETAILS 09-101-A581 - ROOF PLAN - ARCHITECTURAL DETAILS Of STRUCTURAL DRAWING NUMBER I REV I DRAWING TITLE 09-101-S2H-1 - STRUCTURAL NOTES & ABBREVIATIONS 09-101-S2H-2 - STRUCTURAL NOTES 09-101-S2H-3 - STRUCTURAL NOTES 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) 09-101-CWE17R ❑ 09-101-CWS539R - CONVERTER STATION NO.2 LAYOUT - REMOVAL 09-101-RFS17R - ROOF PLAN - REMOVAL & REVIEW: 208Y/1 20V POWER - REMOVAL ❑ 09-101-CWS539 - CONVERTER STATION NO.2 LAYOUT 09-101-RFS17 - ROOF PLAN 09-101-S467 - ENLARGED PLANS 09-101-S652 - MISCELLANEOUS SECTIONS & DETAILS Permit No. SLP' PATE PEIT' ,t r'i7 FOR:t,: i I s7 N:r� e;:'Ptof("Vd .s subleV to 3 �n oms, ission. i- I a �7 • .i-- :,.,,,,:.,.,:�„ ileSa,64El7671ldw E_A'�.sU::r tit9i a`AI:StEi�s!(."J L7 Mdchaniml _r of a� r r �� if €moo � an Or i iO�S is acknowled:.od: 1 M114 ACCEPTABILITY CEI THIS DESIGN AND/OR CHI SPECIFICATION IS APPROVED MS N( APPROVED BY I DEPT. I DATE CODES AND PERMITS PROJECT TITLE: 9-101,2 REPLACE STEAM CONVERTER STATION #2 JOB NUMBER: 16069 QUANTITY SUBMITTED: - LEGEND, ABBREVIATIONS NOTES ❑ 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT ❑ 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) 09-101-CWE17R ❑ 3 SETS: FIRE PROTECTION/SPRINKLERS A ® 2 SETS: TENANT IMPROVEMENT (REVISION) SUBMITTED FOR PERMIT & REVIEW: 208Y/1 20V POWER - REMOVAL ❑ BUILDING ❑ GRADING ❑ ELECTRICAL ❑ PLUMBING ❑ LANDSCAPE ❑ FIRE PROTECTION B MECHANICAL DEMOLITION []CANTILEVER RACKS ❑ STRUCTURAL ❑ - ❑ - TO BE REVIEWED UNDER SEPARATE PERMIT LIGHTING WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE -APPROACHES COMPLIANCE OPTION C 208Y/1 20V POWER PLAN REF ONLY ❑ PRESCRIPTIVE ❑ LPA ❑ ANALYSIS ® N/A A SPECIAL INSPECTIONS REQUIRED: 09-101-CWE111 ❑ WELD ❑ CONCRETE 480 VOLT POWER REF ONLY ❑ REBAR ❑ ANCHOR BOLTS B ❑ ❑ STRUCTURAL BOLTING OTHER ❑ STRUCTURAL OBSERVATION CALCULATIONS B MCC DETAILS - CONVERATION STATION 42 TYPE: N/A ATTACHED (YES) (NO) DRAWING INDEX MECHANICAL DRAWING NUMBER REV DRAWING TITLE 09-101-M 1 B - PIPING LEGEND 09-101-M504 A SCHEDULES 09-101-M567 B SCHEDULES 09-101-M56OR D CONVERTER STATION 2 -PARTIAL PLAN -REMOVAL 09-101-M561 R A CONVERTER STATION 2 -SECTIONS -REMOVAL 09-101-M562R A CONVERTER STATION #2 -SECTIONS -REMOVAL 09-101-M563R A CONVERTER STATION 2 -SECTIONS -REMOVAL 09-101-M564R B CONVERTER STATION #2 -SECTIONS -REMOVAL 09-101-M566R A PARTIAL SECOND FLOOR PLAN & SECTIONS -REMOVAL 09-101-2M317ER A CONVERTER STATION 2 -DMS CONTROLS -REMOVAL 09-101-2M317FR A CONVERTER STATION 2 -DMS CONTROLLERS- REMOVAL 09-101-2M317GR A CONVERTER STATION 2 -TYPICAL WIRING DETAILS -REMOVAL 09-101-M541 B TOILET ROOM #6 PLUMBING PLAN 09-101-M560 D CONVERTER STATION 2 -PARTIAL PLAN 09-101-M561 A CONVERTER STATION 2 -SECTIONS 09-101-M562 A CONVERTER STATION 2 -SECTIONS 09-101-M564 B CONVERTER STATION 2 -SECTIONS 09-101-M565 A CONVERTER STATION 2 -FLOW DIAGRAMS 09-101-M566 A PARTIAL SECOND FLOOR & SECTIONS 09-101-M628 ORIG DETAILS 09-101-M629 ORIG DETAILS 09-101-RFM17 F ROOF PLAN - HVAC & PIPING 09-101-2M317E A CONVERTER STATION 2 -DMS CONTROLS 09-101-2M317F A CONVERTER STATION #2 -DMS CONTROLLERS ELECTRICAL 09 -101 -EO - LEGEND, ABBREVIATIONS NOTES 09-101-CWE17R A LIGHTING - REMOVAL 09-101-CWE67R A 208Y/1 20V POWER - REMOVAL 09-101-CWE117R B 480 VOLT POWER - REMOVAL 09-101-E582R B MCC DETAILS - CONVERATION STATION #2 - REMOVAL 09-101-CWE17 A LIGHTING 09-101-CWE61 C 208Y/1 20V POWER PLAN REF ONLY 09-101-CWE67 A 208Y 120V POWER 09-101-CWE111 B 480 VOLT POWER REF ONLY 09-101-CWE117 B 480 VOLT POWER 09-10.1-E582 B MCC DETAILS - CONVERATION STATION 42 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 AT City of Tukwila BUILDING DIVISION 41 t SUBTITLE 10.06.14 COVER SHEET 10.06.14 TITLE REPLACE STEAM CONVERTER STA BUILDING 0-101 ARCHITECTURAL MASTER COL. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER 100% SUBMITTAL ISSUE FOR CONSTRAX IJ JOB NO. DEV. CENTER, WA DWG NO GG COMP NO. 16069 9-101—GO iu n 2 Lo M 0 3 z U) WIM COMPUTER ROOM COOLING UNIT (AC) SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER HUMIDIFIER ELECTRIC REHEAT COIL KW AIR FILTER CHILLED WATER CONNECTION SIZE UNIT ELECTRICAL DATA REMARKS DRIVE TYPE CAPACITY (CFM) ESP IN WG HP CAPACITY MBH RM TEMP F FLOW GPM EWT �F MAX PD @ MAX FLOW FT H2O CAP #/HR F.L.A TYPE & DEPTH EFFICIENCY PER ASHRAE 52-76 MAX FINAL SP WG SENSIBLE TOTAL DB WB PREFILTER FINAL VOLTS/PHASE PHASE F.L.A. AC2E5A OF ROOM #1 CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 12.5 5.0 6.0 PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT, CYLINDER HUMIDIFIER AC2D11A OF ROOM #2 CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 12.5 5.0 6.0 PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT, CYLINDER HUMIDIFIER AC2F6A REPRO ROOM CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 --- --- --- PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT E.5,12.5 CONVERTER STATION #3 EXHAUST 30 3600 0.125 280 V -BELT 1 / 3 120/1 / GREENHECK GB -300-3, CENTRIFUGAL ROOF EXHAUSTER EFRE12B ROOF, E.9,12.8 TOILET ROOM EXHAUST 30 6400 0.85 600 V -BELT 1 1/2 480/3 GREENHECK GB -300-15, CENTRIFUGAL ROOF EXHAUSTER EFRE15A ROOF, El 6.2 2ND FLOOR CLG PLENUM 48 16100 0.25 300 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRF5A ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, AIR CONDITIONING UNIT (AC) SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER COIL CONN SIZE REMARKS DRIVE TYPE CAPACITY CFM (CFM) ESP IN WG HP VOLTAGE PHASE FLA CAPACITY MBH RM TEMP °F FLOW GPM EWT F MAX PD @ MAX FLOW FT H2O SENSIBLE TOTAL DB WB AC2A1 OA TELEPHONE ROOM SPOT COOLER 2 DIRECT 880 0.5 1/3 208/230 1 3.2 24.1 36.0 80 67 7.2 42 5.4 1 /2"MPT BSC MODEL CW2, EXIST UNIT TO BE REUSED AC2F6B COMPUTER ROOM SPOT COOLER 3 DIRECT 1250 0.3 1/2 208 1 3.3 25.4 2ND FLOOR CLG PLENUM 75 16100 5.7 45 3.3 3/4" NPTF 02 LIEBERT MOD. MME040C-PC1 INSTALLED JOB N0. 137031- 7031- 3 TOILET ROOM EXHAUST 33 90 .7 480/3 EFRE7A ROOF, E7 CONVERTER STATION #2 26 6000 0.25 580 V -BELT 1 480/3 GREENHECK GB -260-3, WITH REINFORCED WHEEL.PROVIDE NEW INVERTER DUTY MOTOR AND VFD. EFRE11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 1610 0. eA 3 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRE12A ROOF, E.5,12.5 CONVERTER STATION #3 EXHAUST 30 3600 0.125 280 V -BELT 1 / 3 EXHAUST FAN EF SCHEDULE THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED K.RAMSEY ENGINEER ILSAWYER APPROVED BY BASIS OF DESIGN NOTES TAG TYPE SERVICE CFM FREE MARK NUMBER LOCATION SIZE AREA SERVED (ROOM N0.) EXHAUST FAN AREA SF DROP IN TYPE MFR MODEL L-1 GRAVITY INTAKE HOOD REMARKS FAN WHEEL SIZE (INCHES) CFM TOTAL STATIC PRESS. INCHES WG APPROX. DRIVE MOTOR RPM SIDE HP VOLTS/PH EFRD11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 16100 0.25 310 310 A 430 V V V -BELT -BELT -BELT 2 A 2 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRD15A ROOF, E16.2 2ND FLOOR CLG PLENUM 48 16100 0.25 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER GREENHECK GB -330-20, WITH REINFORCED WHEEL J:A) EFRE6A ROOF, E6 TOILET ROOM EXHAUST 33 90 .7 480/3 EFRE7A ROOF, E7 CONVERTER STATION #2 26 6000 0.25 580 V -BELT 1 480/3 GREENHECK GB -260-3, WITH REINFORCED WHEEL.PROVIDE NEW INVERTER DUTY MOTOR AND VFD. EFRE11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 1610 0. eA 3 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRE12A ROOF, E.5,12.5 CONVERTER STATION #3 EXHAUST 30 3600 0.125 280 V -BELT 1 / 3 120/1 / GREENHECK GB -300-3, CENTRIFUGAL ROOF EXHAUSTER EFRE12B ROOF, E.9,12.8 TOILET ROOM EXHAUST 30 6400 0.85 600 V -BELT 1 1/2 480/3 GREENHECK GB -300-15, CENTRIFUGAL ROOF EXHAUSTER EFRE15A ROOF, El 6.2 2ND FLOOR CLG PLENUM 48 16100 0.25 300 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRF5A ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF513 ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5C ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5D ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF6A ROOF, F6 2ND FLOOR REPRO ROOM 16 2400 0.50 1065 V -BELT 1/2 120/1 GREENHECK GB -160-5, CENTRIFUGAL ROOF EXHAUSTER AIR INTAKE HOOD SCHEDULE L.SAWYER THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED K.RAMSEY ENGINEER ILSAWYER APPROVED BY BASIS OF DESIGN NOTES TAG TYPE SERVICE CFM FREE PRESSURE FRAME SIZE K.RAMSEY APPROVED AREA SF DROP IN TYPE MFR MODEL L-1 GRAVITY INTAKE HOOD CONVERTER 6,000 N/A 0.112 EXTRUDED ALUM. THROAT GREENHECK FGI OPTIONS: MFR PROVIDE ROOF CURB AND MOTORIZED DAMPER STATION #2 30x42 1 UI3l14 ACCEPTABILITY L.SAWYER THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED K.RAMSEY ENGINEER ILSAWYER APPROVED BY DEPT. I DATE CHECKED K.RAMSEY APPROVED K.RAMSEY APPROVED C.FERGUSON >TE SUBTITLE SCHEDULES TITLE REPLACE STEAM CONVERTER STATION #2 BUILDING 9-101 11.19.90 MECHANICAL MASTER COL. REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City Of Tulmila BUILDING DIVISION RECEIVED CITY OF TUKWILAAqFFMAN I N E E R S FEB 2 5 2016 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com PERMITCENTER LASTING creativity I results I relationships 100% ISSUE FOF SUBMITTAL CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 SHEET M504 JOB N0. COMP NO. DEV. CENTER, Wq DWG NO. 09-101-M504 Q Co to 0 N I Co0 A o6 M n M O N N M Q O 10/6/14 3"COND RETURN - 1 "STEAM VENT— FOR CONTINUATION OF 3"C SEE SHEET M566 3/4"TRAP COND TEMP CONTROL VALVE 6400#/HR RELIEF VALVE VENT THRU ROOF 1 /4"CHECK VALVE SYPHON BREAKER RELIEF VALVE 19,200#/HR SET AT 55 PSI - THERMO-DYNAMIC TRAP 200#/HR - 1 "150# STM — 3/4"TRAP COND 5"-150# STM BOP 58 -9 3/4" 3/4" TRAP COND FROM 6"STM MAIN 2 1 /2"HWS TO 2ND FLR AHU'S BOP 61'-0" — 4"CW 4"HWS TO 1ST FLR AHU'S 2"-150# STM 3"HWR 1ST FLR AHU'S 1 1/2"H & CW DOWN TO 1ST FLOOR THERMO-DYNAMIC1,.---3"HWS AHU-8, 11 & 13 TRAP 200#/HR- 3"HWR FROM 1 ST FLR 1 1 /2"HW DOWN I I AHU-8, 11 & 13 0 1 1 /4 CONDENSATE - 2"PRVRETURN TO RECEIVER 10 3"STM VTR HW awAm 3 6"HWS HEADER OVER 4 6"HWR HEADER UNDER XI Yf PRESSURE REDUCING VALVE I CONNECTTO150-125 TO 50 PSI I I HWS RISER 7 2,800#/HR STRAINER THERMO-DYNAMIC TRAPI I F 550#/HR I M560 M56 5"GLOBE VALVE I _ D TUBE BUNDLE 3°�iWR M56 M 62'REMOVAL AREA � 6°�IWR 3"THREADED � FLANGE W/PLUG TO ALLOW TEMP 40-�2607 IX HOSE CONNECTION I I 2 1/2" 4 L J 43)HW BALANCING VALVE BLIND FLANGE110 GPM 2"AUTO-AIR VENT EFD 2" 150# STM 5"WASTE 6 1 1 6"GLOBE VALVE 4" 5"VTR I • 1-- , HPC FILTER -THRU ROOF n ' I i TEMP CONTROL 6 VALVE 6400#/HR FILTER /FEED BYPASS TO 9"_1 "BACKFLOW POT & FROM HW PREVENTER HEADERS 5'-0" FROM 6"GATE VALVE FLOOR LINE I I PC TROL PU2FO7D _ VE 3 00 /H (WAS CP -4) m I / 4 6»HWR DER 2 1 /2"HWR FROM 2ND FLOOR AHU'S, 1BOP 61'-8 1/2" 40-260°F 5 A7(1 ZZ, CJ C 80 GPM 155 GPM E A BALANCING VALVES - M560 M563 M560 M561 ------ --- - - -- 3"HWR FROM 1ST FLOOR AHU'S AND RADIATORS BOP 61'-3" t I IT I 17 — — I I -- -- ID I � I PU2FO7A � AUTO 3 -WAY (WAS CP -5) CONTROL AIRTROL TANK 1 5 VALVE FITTING I .e I I M BALANCING 100 GP VALVE I I I 5 40-260°F 5 I I U BNi M560 M561 1 1 /4"HP COND D RETURN TO RECEIVER PLAN - CONVERTER STATION NOl2 SCALE; 1/2"=1'-0" LOCATED OVER TOILET6 Y3"CW DN 1/2" LEGEND SYM STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN 7 HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT DATE 10.06.14 GATE VALVE �- CHECK VALVE —ISI-- BALL VALVE BALANCE VALVE ��.►— GLOBE VALVE FFD FUNNEL FLOOR DRAIN GENERAL NOTES SEE DETAIL 2 M56, M555 FOR CONNECTIONS --A H2 E7A HOT WATER HEATER I 5 GALLON EXPANSION TANK E7B HOT WATER HEATER 3"HWS TO 2ND FLR AHU'S BOP 61'-0" 3"HWR FROM 2ND FLR AHU'S BOP 61'-3" FFD D REFERENCE DRAWINGS (0' CONSTRUCTION NOTES REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City of Tukwila j BUILDING DIVISION 1 ' REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP & ASSOCIATED PIPING. REMOVE ABANDONED IN PLACE EQUIPMENT. ® REMOVE STEAM PRV STATION PIPING, VALVES & ACCESSORIES. EXISTING VALVE TO BE REMOVED. © REMOVE FILTER AND ASSOCIATED PIPING AND VALVES. EXISTING FILTER/FEED POT TO RELOCATED. REMOVE ASSOCIATED PIPING AND VALVES. ® REMOVE EXISTING DOOR. EXISTING STEAM RELIEF VENT PIPING TO REMAIN FROM PIPE FLANGE TO PIPE THRU ROOF. 10 REMOVE 3" STEAM VENT THRU ROOF. NEW STEAM VENT WILL BE ROUTE UP THRU EXISTING OPENING. 1 REMOVE EXISTING COLD WATER PIPE. PIPE WILL BE REROUTED UP AND OVER NEW HWS/R AND PC. SEE NEW PLAN. 12 EXISTING HOT WATER HEATER & ASSOCIATED PIPING AND VALVES TO REMAIN. EXISTING 4"CW MANIFOLD TO REMAIN. 14 REMOVE EXISTING FUNNEL FLOOR DRAIN. REMOVE EXISTING COMPRESSED AIR PIPING SERVING ROOM. VALVE AND CAP AT WALL PENETRATION. SEE NEW PLAN. RECEIVEDFFMAN CITY OF TUKWILA N G I N EER S FEB 2 5 2016 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 PERMIT CENTER coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUC - smm — SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE — L S ACCEPTABILITY 1�� THIS DESIGN AND/OR SPECIFICATION IS APPROVED ® z� APPROVED BY DEPT. DATE RIb11 �o sSIONAL � K. BUN DRAWN DATE SUBTITLE CONVERTER STATION #2 - PARTIAL PLAN CURRENT REVISION 16069 SYMBOL D DATE 10.06.14 RECXORD DRAWING SR GS KR 05.28.93 CHECKED S.ROSSE SHEET M560R A CONVERTER STATION POT FEEDER 765835-00 SLB RWS EJC 02.28.97 N S. ENROSSE TITLE REPLACE STEAM CONVERTER STATION #2 BUILDING 09-101 BUILDING MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, INA B PUR/INST MOD. CLEAN ROOM 546610-01 C. HARRAH RWS 10.01.04 CHECKED 1G. SMITH C SIDESTREAM FILTER W966719 RWS 02.24.12 APPROVED K. JOB N0. COMP N0. D REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 APPROVED 04.23.92 DWG No. 09-101-M560R SYM SECTION SCALE; 1/2" = 1'-0" M560IM561 0 7 REVISION RECORD DRAWING A I REPLACE STEAM CONVERTER STATION #2 LL JJ —T J/ T BY SR 16069 CEI APPROVED DATE GS KR 05.28.93 MS 10.06.14 SECTION B SCALE; 1/2" = 1'-0" M560 M561 SYM I REVISION I BY I APPROVED I DATE 1 "C TO CONDENSATE PUMP 2"HW 4"HWS LEGEND FLOOR AHU'S STM STEAM PIPING FLOOR C STEAM CONDENSATE PIPING LOOP) HWS HEATING WATER SUPPLY AHU-8,11 & 13 HWR HEATING WATER RETURN AHU-8,11 & 13 HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT K.RAMSEY GATE VALVE CHECK VALVE 1"STEAM VENT FROM CONDENSATE PUMP BALL VALVE -' BALANCE VALVE GLOBE VALVE 3"C TO CONDENSATE PUMP SEE SHEET M566 r0_1 FFD FUNNEL FLOOR DRAIN GENERAL NOTES 1 "C TO CONDENSATE PUMP 2"HW 4"HWS TO 1 ST FLOOR AHU'S 3"HWR FROM 1 ST FLOOR AHU'S (EAST LOOP) 3"HWR FROM 1 ST FLR AHU-8,11 & 13 3"HWS TO 1 ST FLR AHU-8,11 & 13 1 /2"HWC FFD 10/3/14 ACCEPTABILITY K. BUN THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED S.ROSSE REMOVE PIPING, N IN R APPROVED BY DEPT. I DATE S.ROSSE CHECKED G.SMITH APPROVED K.RAMSEY R� wxg 4 +¢a7s0raa� � a a v�; .waw"¢x d �aa� ¢d ws REFERENCE DRAWINGS CONSTRUCTION NOTES RECEIVED CITY OF TUKWILA FEB 2 5 20% PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED -MAR 0 8 2016 CKY of Tukwila BUILDING DIVISION AORFFMAN I H E E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 M561 R BUILDING 9-101 JOB NO. COMP NO. 4.23.92 MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA DWG NO. 09-101-M561 R 0 M 0 00 0 M REMOVE PUMP, HOUSEKEEPING PAD & ASSOCIATED PIPING. REMOVE PIPING, VALVES & ACCESSORIES. RECEIVED CITY OF TUKWILA FEB 2 5 20% PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED -MAR 0 8 2016 CKY of Tukwila BUILDING DIVISION AORFFMAN I H E E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 M561 R BUILDING 9-101 JOB NO. COMP NO. 4.23.92 MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA DWG NO. 09-101-M561 R 0 M 0 00 0 M L:S:Y:m LEGEND CAP FORMER RELIEF VALVE STM STEAM PIPING VENT THRU ROOF RELIEF VALVE -CMCS SENSORS A 1 I EXTENDED THROUGH C STEAM CONDENSATE PIPING VENT THRU ROOF ROOF EL 66'-6" FORMER RELIEF VENT HWS HEATING WATER SUPPLY I I BALANCE VALVE 3/4"MANUAL AIR VENT 3 I HWR HEATING WATER RETURN 6"HWS HEADER HX2EO7B TEMPERATURE PROVIDE GAUGE GLASS 40-260°F (TYP) _ _ _ _ _ SENSOR TO CMCS 3 GA_ CO R SI HW DOMESTIC HOT WATER _ _ _ 'T K 4" 0" a 0-100 PSI (TYP) 1"CW FILL °I.a HWC DOMESTIC HOT WATER CIRCULATION TEMPERATURE 1 HX2EO7A 5 147 SENSOR TO CMCS„ "AIRTROL” d CW DOMESTIC COLD WATER RELIEF VALVE , 3 HWR 4 HWS �L TANK FITTING " 19,200#/HR RELSETTEF AT 60 VALVES 12 RUN � � 5 -� - - 2 3/4 RELIEF VALVE °a ---- --- SET AT 55 PSI - o - - 71 SET AT 60 PSI - - V - VENT DISCHARGE TO DRAIN - ^ I 2"STM 4 HWS -44 5 6"-50# STM 4"HWR 2"DRAIN FUNNEL 1 /2 V —D�— GATE VALVE - , -6"-5 S -' + � � �� I- - - -- -z HEADER v— CHECK VALVE 3 - 0 CO - , - _ �_ --I I— BALL VALVE /3/47-504f C D 4 0-100 1 1 4"HP 3/4" TRAP CO 1 HX2E07C HX2E07D PSI 40-260°F CONDENSATE ter' BALANCE VALVE TO RECEIVER 8"-50# STM BUCKET TRAP RETURN 6"-50# STM 19,200#/HR ' 1 2"HWS GLOBE VALVE ��- 4"-50# STM 6"HWR HEADER - - - - 5 BYPASS FFD FUNNEL FLOOR DRAIN 3/4"RV DRAIN REVISION ?" wnnn np-rk SECTION C crA I c . I /) "— I ' n" kALcn I wcc,) / \ RECORD DRAWING A I REPLACE STEAM CONVERTER STATION #2 SECTION SCALE; 1/2"=1'-0" BY APPROVED DATE SYM REVISION SR GS KR 05.28.93 16069 CEI MS 10.06.14 M560IM562 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED K. BUN CHECKED S. ROSSE ENGINEER S. ROSSE APPROVED BY DEPT. DATE CHECKED G. SMITH APPROVED K. RAMSEY ul . . . . . . . . . . . . . REFERENCE DRAWINGS GENERAL NOTES CONSTRUCTION NOTES REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP, HOUSEKEEPING PAD & ASSOCIATED PIPIN REMOVE EXISTING ABANDONED IN PLACE EQUIPMENT. ® REMOVE CONDENSATE RECEIVER AND ASSOCIATED PIPING, VALVES AND ACCESSORIES. REMOVE EXISTING PIPING, VALVES & ACCESSORIES. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEN/ED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 as City of Tukwila BUILDING DIVISION 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 M562R BUILDING9-101 JOB NO. COMP NO. 4.23.92 MECHANICAL MASTER COL. E-17/7-8 DEV. CENTER, WAj DWG N0. 09-101-M562R e 5 1/2 2'-6" m ro BOTTOM OF BEAM 2 1 /2"HWR FROM 2ND FLOOR AHU'S, BOP 61'-8 1/2" 5"-150# STM AUTO AIR VENTS BALANCING VALVE 40-260°F 4"HWR STRAINER (FAR SIDE) BLIND FLANGE 1 1/4" CAP - 6"HWR HEADER — 3/4"DRAIN 32'-4" 0 13 3/4"DRAIN "AIRTROC cl TANK FITTING - 3"HWR ROOF EL 66'-6" PlArav, 3/421 4"HWS ' 1" 0-100 C114 PSI tl-uA3 HWRA 11 3/4" DRAIN AUTO 3—WAY MIXING VALVE 3"THREADED FLANGE W/PLUG FOR TEMP HOSE CONNECTION BALANCING VALVE I" TO COMPRESSION TANKS 40-2607 91 AQUASTAT —4"HWS U2 _ 40-2607 2 HWS BYPASS PU2FO7A (WAS CP -5 1 1/2" HWS I I ID_ - I I I U CV I I I I 2" RAIN H DE FOR PUMP BASE DETAIL SEE AUSTIN DWG 101-227 2"WOOD DECK UNDER PUMP 5/8" PLYWOOD PLATFORM EL 53-4 3/4" SECTION E SCALE; 1/2"=1'-0" M560 M563 QF 7 SECTION LF SCALE; 1/2"=1'-0" M560 M563 5 GALLON EXPANSION TANK 3"HWR FROM 2ND FLOOR AHU, BOP 61'-3" 3"HWS TO 2ND FLOOR AHU, BOP 61'-0" H2 WH2E7A E76 BEHIND FUNNEL DRAIN 1 "STM VENT 1 1/4" HP COND 3/4" 3"C TO CONDENSATE PUMP a, LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT GATE VALVE �— CHECK VALVE --I0I-- BALL VALVE —�� BALANCE VALVE GLOBE VALVE ❑O FFD FUNNEL FLOOR DRAIN REFERENCE DRAWINGS GENERAL NOTES CONSTRUCTION NOTES REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP, HOUSEKEEPING PAD & ASSOCIATED PIPIN REMOVE EXISTING ABANDONED IN PLACE EQUIPMENT. ® REMOVE CONDENSATE RECEIVER AND ASSOCIATED PIPING, VALVES AND ACCESSORIES. REMOVE EXISTING PIPING, VALVES & ACCESSORIES. REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City of iuk% ita BUILDING DIVISION RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE L S ACCEPTABILITY KRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE RECORD DRAWING SR GS KR 05.28.93 r?�r THIS DESIGN AND/OR CHECKED CONVERTER STATION NO.2 SECTIONS 16069 A 10.06.14 �C�' SPECIFICATION IS APPROVED S. ROSSE SHEET EINEER A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 lo® �� APPROVED BY DEPT. DATE SNGROSSE TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED M563R G. SMITH JOB NO. COMP NO. BUILDING 9-101 16611 APPROVED K. RAMSEY `SSjonrA� yG1 APPROVED DWG NO. 4.23.92 MECHANICAL MASTER COL. E—F/7-8 DEV. CENTER, WA 09-101—M563R l UbJ114 u LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING I HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN FLOOR DRAIN HW DOMESTIC HOT WATER WITH FUNNEL 7 HWC DOMESTIC HOT WATER CIRCULATION 2"DRAIN HEADER CW DOMESTIC COLD WATER 2 3/4"RV DRAIN 2 -- --- V ---- VENT 1 "BFP DRAIN COPPER RELIEF VALVE VTR ^� GATE VALVE 4„ CHECK VALVE B Le -I�I-- BALL VALVE —' BALANCE VALVE RELIEF VALVE BACKFLOW PREVENTER GLOBE VALVE VENT THRU ROOF 5-0" FROM FLOOR LINE z;r' DO FFD FUNNEL FLOOR DRAIN 1/2"PRV WITH BUILT—IN STRAINER 60-12 PSI 1" QUICK FILL BY—PASS (BENEATH) 3/4"DRAIN 1 "CW FILL PARTIAL PLAN - DRAINS SCALE; 1/2" = 1'-0" SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 05.28.93 A REPL PUMP DRAINS, BRACE BFP 55595900 HARR RWS 09.21.05 B REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 � Aw ACCEPTABILITY K. BUN THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED S. ROSSE ENGIN ER APPROVED BY DEPT. DATE S. ROSSE CHECKED G. SMITH APPROVED K. RAMSEY %mr �,mss"$s�u� '�3's sCs s%�✓m�a ,y�;ns id ri�'"�`.x, }? '�+ modtr.'a;�".s"aat�. REFERENCE DRAWINGS GENERAL NOTES CONSTRUCTION NOTES REMOVE PUMP, HOUSEKEEEPING PAD & ASSOCIATED DRAINS. REMOVE ABANONED EQUIPMENT AND ASSOCIATED DRAIN PIPING. REMOVE DRAIN PIPING. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City of Tukwila BUILDING DIVISION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.2 PARTIAL PLAN 16069 B 10.06.14 SHEET TITLE REPLACE STEAM CONVERTER STATION #2 lama 5 6 /I R BUILDING 9-101 JOB NO. � COMP NO. 4.23.92 MECHANICAL MASTER COL. E—F/7-8 DEV. CENTER, WA DWG NO. 09-101—M564R M SYM REVISION RECORD DRAWING A I REPLACE STEAM CONVERTER STATION #2 PARTIAL SECOND FLOOR PLAN SCALE; 1/4"=1'-0" E3 SECTION SCALE: M566 1 "P RV 150 PSI TO 50 PSI 3/4"C FROM 1 "STM"* --1 "STM TO PUMP STM DRIP LEG 3/4"C SUPPLY CONNECTION TO PUMP INLET 3/4" THERMODYNAMIC STEAM TRAP W INTEGRAL STRAINER 200 /HR SECTION r -B-"" SCALE; NONE M566 LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER ----- V ---- VENT CONVERTER STATION pd--- GATE VALVE FLOOR CHECK VALVE —��I-- BALL VALVE -� BALANCE VALVE GLOBE VALVE © FFD FUNNEL FLOOR DRAIN 91 FREEWED FOR OMPUANCE PROVED 0 8 2016 L City of Tulmila UILDING DIVISION ACPFFMAN I N E E R S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION ACCEPTABILITY DRAWN K.BUN DATE SUBTITLE THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S.ROSSE � ENGINEER TITLE APPROVED BY DEPT. DATE S.ROSSE CHECKED t G.SMITH REG IVEI) APPROVED tTY OF UKWILA K.RAMSEY PARTIAL SECOND FLOOR & SECTIONS GENERAL MOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REMOVE STEAM POWERED CONDENSATE PUMP & ASSOCIATED VALVES & PIPING. REMOVE 3" CONDENSATE AS REQUIRED FOR NEW PIPE. REMOVE 150# SUPPLY STEAM TO CONDENSATE PUMP. n n !JEHMII (;I=NTER 9-101 KEY PLAN SCALE: N.T.S. N CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 REPLACE STEAM CONVERTER STATION #2 M566R BUILDING 9-101 JOB NO. COMP DWG N0. 4.23.92 IMECHANICAL MASTER COL. E -F/6-8 DEV. CENTER, WAI 09-101-M566R 131 D D 11 13 15 19 20 21 22 23 Q 0 N N 0 M566 � t REG IVEI) tTY OF UKWILA FEB 2 5 2016 !JEHMII (;I=NTER 9-101 KEY PLAN SCALE: N.T.S. N CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 REPLACE STEAM CONVERTER STATION #2 M566R BUILDING 9-101 JOB NO. COMP DWG N0. 4.23.92 IMECHANICAL MASTER COL. E -F/6-8 DEV. CENTER, WAI 09-101-M566R 131 D D 11 13 15 19 20 21 22 23 Q 0 N N 0 N HWR FRO FIRST F OR AH 3 ,I 1 E7AV1 75% CAPA( STEAM V N 2 G-2 7AV2 5% CAPAC STEAM VALX I T-1 7 G— F7D HWV U I HWS TO FIRST F OR AHUS STAR C 1 PUMP CR 22 PU2F7D R (NORTHR MOST MP) z 20 HX2E7A CONVERTS -3 3 > / 1 4 POO1 kOOUT DCO SL31 E7AV1 AO/P P002 AOOU 01 SL31 HXE7AV2 AO/P A101 IN T DCO1 SL31 E7A HX 2 Al POK, P004 AO T C01 SL32 F7D HWV AO/P DCO1 HXE7 AO/j ZRFOMOOR 6 1 1,V 0 0 AI10 P004 AO T C01 SL32 F7D HWV AO/P P001 AOOUT DC01 L32 F7 HWV 0/P 1 150 C001 1 10 DC01 XL,31 STRCO DCqAj SL31 18 GOUT C DC01 SL31 SL32 DC01 I SL3 HWP I E7 V1 RS SSM T A V2RS 71 7 E7E3 V1R E713 V S P RS C I/L AP RS 140 AP S (DA) AP RS 2/0 105 20 0 (RA) 10 200 0 95 0 2 0 200 IAP DC01 XL31 OVEil 160 DC 1 SL31 E7 HWLP 713 HWLP F P AR 0 8 201 LP ZI (RA) 5* 5° F FF 180 40 HWV o S DC SL31 UDP AP MVOARS START P F7A City 0t u1mila AP RS 55 IF P F7C BUILDI G DIVISIO 35 5 I FA I LS OFA T-2 3 HXE7BV1 75% PACITY ST VALVE m 7ACACITY A HX2E7B CONVEI,l L E. MANUAL PRY -1 VA E SV- M 0-30 PSI MAIN Al GA -1 CONTROL IR 2 PROV ED TO PN MATIC DEVI S BY OEING °l 25 TS -2 CONVERTER ROOM CONTROL AIR MAIN 2 OUTSIDE AIR TEMPERATURE mw 26 SENSOR (E7B OSA) CR -6 ADD CURRENT RELAY CR -7 TS -1 CR TO POWER LEG ADD CURRENT RELAY OUTSIDE AIR S SWITCHED THROUGH CR POWER LEG TEMPERATURE SENSOR SWITCHED THROUGH LIGHTING RELAY LIGHTING RELAY EN OSA 27 R-2 AT RELAY R-5 AT RELAY ( ) PANEL RRP-E6 28 PANEL RRP-E6 (BATHROOM LIGHTS) (BATHROOM LIGHTS) 15 G-6 F7C NV � T-4 / E7 HWV / 6 T/ I/ �G F7AiFiWV NCI C HWS NC C NO FI US FLOOR HWR FRO No SECON TARTER FLO AHUS CR- PU CR 1 P F7C 9 CR -1 THROUGH CR -7 D150 -1A CURRENT RELAY ADJ. 1 TO 200 AMPS P RV -1 N1 -11W FILTER REGULATOR PORT 3/8", SUPPLY MAX 250 PSI MANUAL DRAIN QTY 1 STARTER __X 14 714 MPrRR CR U2F7B -2 T-1 THROUGH T-6 MAMAC IMM. TEMP SENSOR 7/I /< 8 ) / ( 9 ) <100 I11 I / <12Y Y13) <14) / 115 P003 X00 KolSL32 F7C HWV AO/P A103 I NT DC01 ZSL32DC01 F7C HHWP Al 01 AI10 P004 AO T C01 SL32 F7D HWV AO/P P001 AOOUT DC01 L32 F7 HWV 0/P A101 INPNT DC 1 SL32 7B HWS Al C001 C101 Dqdl P 2 STRCO INPN ST CO INPNT GOUT C S 2 DC01 SL32 DC01 7C HWP I F7A F SAINT SSM T AO/,*' R-1 & R-2 MR -801 C CONTROL RELAY 24 VAC, SPDT T-5 STARTER CR -3 P P CR P 2F7A (SOUTHERN �� MOST PU TS -1 & TS -2 T99-1 OUTSIDE AIR TEMP SENSOR -40° TO 212°F 16)/ (17Y<18> V91 X20 A102 INPNT DCO SL32 F A HWS Al C002 I CIG2 3 1 15 1/154 2 15 P004 AO T C01 SL32 F7D HWV AO/P A105 STRCO NPNT I NT Dqdl I SL32 DCO1 161AIII r --7A F7D H SS MAINT AI / EFRE6A TOILET EXHAUST FAN 21) <22)/ (23) <r) <25 -5 C942 A109 /CO02 A110 A103 TTRCO INPNT STRCO INP INPNT DC01 SL DCO1 L31 D 1 SL32 HWP F 117 OSA SS AINT S MAINT Al / LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING - 0— CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) �— WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) DCM ADDRESS NUMBER Aloo < HARDWARE TERMINATION POINT INPNT < POINT 1/0 ELEMENT DCM I SLV SLAVE ADDRESS NO. —PNTID— POINT ID POINT TYPE Al 1/0 BLOCK INFO. KEY GENERAL NOTES: CONSTRUCTION NOTES: REMOVE CONTROLS SHOWN HATCHED. SENSOR TO BE RECONNECTED TO SIEMENS CONTROLS SYSTEM. EXHAUST FAN CONTROL TO BE DEMOLISHED AND REPLACED WITH SIEMENS SEQUENCE OF OPERATION HEATING WATER EXITING THE STEAM -TO -HOT-WATER CONVERTERS WILL BE RESET FROM 140' TO 180'F BASED ON OUTSIDE AIR TEMPERATURES OF 55' TO 357 BY MODULATING THE STEAM CONTROL VALVES. THE SMALLER CONTROL VALVE WILL MODULATE TO FULL OPEN PRIOR TO THE OPENING OF THE LARGER VALVE. HEATING WATER EXITING THE HOT WATER CIRCULATING PUMPS WILL BE RESET FROM 120' TO 160'F BASED ON OUTSIDE AIR TEMPERATURES OF 55' TO 35'F BY MODULATING THE EXISTING 3 -WAY CONTROL VALVES. HOT WATER CIRCULATION PUMP PU2F7B (ONLY) WILL BE CYCLED ON/OFF AT AN OUTSIDE AIR TEMPERATURE OF 65' FWITH A 57 DEADBAND. PUMPS PU2F7C AND PU2F7D WILL BE ON 24 HOURS A DAY. PUMP PU2F7A WILL CYCLE ON IN THE EVENT OF PUMP PU2F7C FAILURE. RESTROOM EXHAUST FANS WILL BE INTERLOCKED WITH RESTROOM LIGHTS, LIGHTING RELAY PANEL CIRCUITS: (1) RRP-2/R5 (1) RRP-1/R2 26> / <27>/ <28 A104 A109 A110 INPNT INPNT [INPNT DC01 SL31 DCO SL31 D 1 SL31 E7 OSA E61 ITE BRF6LITE AI STATUS STATUS / 3 V15 3 1 15 1/154 2 15 2/7 1 2/8 0 DC SL32 16 2/1 DC01 S 2 01 SL32 DC01 SL32 D 01 SL32 DC01 S 1 DC01 L31 C HWLP F7B LP HWP CNTL F7A HWL F7D HWLP E6LIT IL F6 EIL 120 71 7 LP L MC C LP LP I/L C I/L (DA) 2 2/0 2/0 RE�iIEUVE OR 4ZI CODE CO PLIANCE IAP OVEil 160 120 F AR 0 8 201 DC01 SIL 5* 5° F FF HWV o S UDP AP Rs START P F7A City 0t u1mila 5 55 IF P F7C BUILDI G DIVISIO I FA I LS ,. ,. ,. _ u mxxiut:.p„ 111A"xS44 sm { rr° fi u�+;mz � n 1 l � � a� NA4RFFMAN I N E E R S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results i relationships SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATEDRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE soy, ACCEPTABILITY CARECO CONVERTER STATION #2 RECORD DRAWING SR GS KR 6.15.93 ti rj� THIS DESIGN AND/OR CHECKED DMS CONTROL 1601 A 10.06.14 ROVED SPECIFICATION IS APPS SHEET A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 ® x� GINEER APPROVED BY DEPT. DATE S.ROSSE TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED 2M317ER G.SMITH BUILDING 9-101 3(1611 APPROVEDJOB N0. COMP N0. K.RAMSEY sS1ox�L ti APPROVED 10.0592 MECHANICAL MASTER COL. E -J/6-11 DEV. CENTER, INA DWG NO. 09-101-2M317ER 1 U11511 9 1 2 4 T 19 TT ww w w m Cn to Cn 0 o O 0 J J J J w w w w — N � N LIJ Z > > > Q Q _ = O Q m r` w r -- w X x CN C,4O _ Q I— Cn 3 z 0 U 6 2 26 O D CS CD J J 0 0 � CD m m N N w Lj 27 28 1 CD U Q CO w ry _ w 24 INCOMING 120VAC g w 8 4 13 17 9 23 0:f ck� V) Cn Qf w w n ry w CL O:f ry CL _ a- n LL L.L. LL- LL - N 0 7 T 19 w w w w cn Cr) Cn Cn 0 00 0 J J J J U U U U B B z z z z w w w w Q- CL m m o O o 0 w w w w J J J J 00 < 24VAC MCS -PTS LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING — 0— CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) O— WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) GENERAL NOTES: C 1 C002 (LEDs C O wDT 0 SLV v B B B O A ]/(B=CLEAR) BLACK) POWER ON 1 2 < ON AUTOLjj CONSTRUCTION NOTES: OFF I F= m I O FF LOAD 1 O M REMOVE CONTROLS SHOWN HATCHED. OVE IDE U w M/02 M M M m as 903 Q m 04 O1 5 N Q FU AMP 1"Irl ASLO—ELO / / / I I ISI o 0 MICROSMART/UNIT NCONTROLLER, �o120VAC, 60 0 Hz, 1 -PHASE :;7C CD zz / A RESS = SLAVE 32 0251141111m. =O �U F— RS -262 PORT N n -j- to O O O O O Q Q Q Q Q �DIOIOC 0 0 0 0 Z Z Z Z Z w w w w Cn Cn Cn Cn w w w w I-- I-- I— F-- Cn _ = O = _ m Q m U o Li LLl— w LL- �/ Z O Q 12 cn 8 16 0 25 z et \> co C O C Q IF 9^ � RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEWED FOR COD�EPP�QNGE MAR 0 8 2016 City of TUW1 a BUILDING DIVISION NAORFFMAN I N E E R S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION IN M. — SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �L SO ACCEPTABILITY CARECO DRAWN DATE SUBTITLE CONVERTER STATION #2 CURRENT REVISION SYMBOL DATE 16069 A 10.06.14 RECORD DRAWING SR GS KR 6.15.93 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S.ROSSE DMS CONTROLLERS SHEET A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 ® o ENGINEER TITLE REPLACE STEAM CONVERTER STATION 2 �, APPROVED BY DEPT. DATE S.ROSSE � 2M317FR CHECKED G. SMITH ED BUILDING 9-101 J6611 JOB N0. COMP N0. K.RAMSEY �SSjolvaL �yGti APPROVED DWG N0. 10.05.92 MECHANICAL MASTER COL. E -J/6-11 DEV. CENTER, WA 09-101-2M317FR IU13114 POLARITY OF TERMINATIONS IS NOT IMPORTANT (TYPICAL OF ALL T99 TYPE TEMP SENSORS) CUT SHIELD WIRE AND FOIL BACK AND TAPE THE END OF THE WIRE TO PREVENT ACCIDENTAL GROUNDS GREY WIRE NUT OR RED BUTT SPLICE CONNECTIONS ROBERTSHAW T99-1 OUTSIDE AIR TEMP SENSOR 0 OUTSIDE AIR TEMP SENSOR WIRING DETAIL NTS 7IM TEMP SEN B QI v / ' 1 SHIELD GROUN CUTS LD WIRE A F01 ACK AND T E T END OFT WIRE 0 PREVENT ACCIDENT GROUNDS - WELL GREY W OR RED �C2>11VIIVIERSION TEMPERATURE SENSOR WIRING DETAIL NTS ICAL TERMI IONS OR ANALOG NPUT TYPE POI S T9 B B BLK 4-20 a CIS RED RED CUT/,SHIELD WIRE ND F L BE D/HE EIRE O PRACCIDp9/ RANGE MID REED HIGH NOTE: DEVI IS POLA SENSI E FO W TE 'L21< OHM-1� 1/4 WATT SUPERVISI RESISTOR/ NEI EN-KULJIAN DEL D150- -NL CURRENT -0 RATED SWITCH / 101121111163 ,JUMPER AW -TURNS NONE 1-6 MID 6-40 HIGH 40-200 O CURRENT RELAY WIRING DETAIL NTS lc--�::> / SC ECTRIC OUT T CAR JUMP OE D D C CONN1 A G IL FUSES A B 2 B a p FH, M2 Lm,, 0 0 0 2VM— IQ S R <�> EO CARD CONTACT OUTPUT WIRING kOAD-VOLTAG RATED WIR TO THE ELD DEVIC (STARTER) SE DETAIL 0 EXHAUST FAN STARTER WIRING 0 PUMP STARTER WIRING `rY t� L }Sal4?Ytr1�s`SEY4 �Y,a � SSS(FmVsitis,,.Yl '� �� LEGEND: GENERAL NOTES: CONSTRUCTION NOTES: REMOVE CONTROLS SHOWN HATCHED. SENSOR TO BE RECONNECTED TO SIEMENS CONTROLS SYSTEM. RECEIVED CITY OF TUKWILA FEB 2 5 2016 PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 City ofTu{mila BUILDING DIVISION 100% SUBMITTAL ISSUE FOR CONSTRUCTION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE L SO ACCEPTABILITY CARECO CONVERTER STATION #2 16069 A 10.06.14 RECORD DRAWING SR GS KR A S�I�� SPETHIS CIFICATION IISAAPPROVED SROSSE TYPICAL WIRING DETAILS SHEEP A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 APPROVED BY DEPT. DATE ENROS GINEER TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED 2M317GR G.SMITH BUILDING 9-101 JOB N0. COMP N0. 36611 APPROVED �'ECISTE�� K.RAMSEY `SS'IOfVAL � APPROVED 10.05.92 MECHANICAL MASTER COL. E -J/6-11 DEV. CENTER, WA DWG NO. 09-101-2M317GR I UI.SI "14 P-1%' WATER HAMMER I 2"V DN, CONNECT ARRESTER PDI I TO 2"V 3/4" SIZE C BELOW FLOOR 1/21) 3"SAN t� P-5 P_ 1 2" BELOW FLOOR _ I 2"V BELOW FLOOR P-5 3/4 MH 1 /2" HWC oMH TYP) 1 1 /2"SAN �- 2"V ABV AND M HW CW o _ P_4 BELOW FLOOR a P 6 2„ P-6 0 � • ° SAN 2 VTR P 4 ° I4.2 - P-3 I I 3"SAN DN 1/2" (TYP) ++ -- 1 j-/2 V--------1� 0 C:Er9 2"SAN 3/4" WATER HAMMER ARRESTER PDI 4„ SIZE C I 2"SAN DN - , _ THRU FLOOR WATER HAMMER 2" 2 1/2" 3"CW UP 9 1 /9" nN 3" 2 1/2" 2" WATER HAMMER ARRESTER PDI SIZE C 2" WATER HAMMER ARRESTER PDI SIZE C 2"SAN DN THRU FLOOR CO BELOW FLOOR (TYP 2 PLACES) 3"SAN UP TO FD 2"FD c0 L 3" r I 2" 0 co » fi 1 3„ 2 ' 3"SAN BELOW FLOOR r - E =1b 2" i 2"V & 3"SAN TO 4"VTR & 4"SAN 3" 2 V I i 2" 2" NI Wco i w I L-- 2"» B 3 "SAN UP P-3 (TYP) 11/2" 4"SAN DN&4" R 2"FFD IN CEILING 1 1/2"V - 2" - 3"SAN U TO FD -1�.. -1 1/2" 3"SAN UP — P -1A It IT r I BELOW 1 e • NI Wco i w I L-- 2"» B 3 "SAN UP P-3 (TYP) 11/2" 4"SAN DN&4" R 2"FFD IN CEILING 1 1/2"V - 2" - 3"SAN U TO FD -1�.. -1 1/2" 3"SAN UP — P -1A It IT r I 11 T I' wco 01 WIN= LEGEND SANITARY WASTE BELOW FLR SAN SANITARY WASTE ABOVE FLR CW DOMESTIC COLD WATER HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRC CID CLEAN OUT wco WALL CLEAN OUT --��F-- BALL VALVE (NO) 2" GENERAL NOTES 4" 4" 2 1/2" — 1 1 /2"SAN FOR CONTINUATION SEE SHEET 2M67 CONNECT 1 1 /2"SAN TO 4"SAN BELOW FLOOR 11/2"V REFERENCE DRAWINGS 4"SAN BELOW FLOOR 2 1/2" 4" B 3" --U7 CONSTRUCTION NOTES - 5"VTR PROVIDE NEW 3" WASTE PIPING. - 4"V PROVIDE NEW 2" VENT PIPING. FROM MEZZ. - 4"SAN � PROVIDE NEW FUNNEL FLOOR DRAIN. BELOW FLOOR - 4" SAN DN W/ 2"V & (2) 4" SAN CONNECTIONS NORFFMAN I N E E R S - 4"SAN 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com 2 1/2" LASTING creativity I results I relationships - 1 1/2"V P-4 - 2 "SAN - 2" VENT REVII 2" CODE ( AP 4" IAF 2 "SAN I City 100% SUBMITTAL ISSUE FOR CONSTRUCTION J H Ja 1 I T ---T --@ -- 2"FFD IN 19 CEILING SPACE 20 B 21 TOILET ROOM 6 - DOMESTIC WATER �I TOILET ROOM 6 -WASTE & SENT RECEIVED 22 SCALE; 14"=1 '-0" I v SCALE: 14"=1 '-0" � CITY OF TUKWILA 23 / / FEB 2 5 2016 9-101 KEY PLAN PERMIT CENTER SCALE: N.T.S. N SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �+,L Sp ACCEPTABILITY K. BUN DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE RECORD DRAWING SR GS KR 5.28.93 1�� THIS DESIGN AND/OR CHECKED TOILET ROOM #6 PLUMBING PLAN 16069 B 10.06.14 ��' �' SPECIFICATION IS APPROVED A. KILLIP SHEET A AUTO FLUSH RETROFIT 55595900 HARR RWS 9.21.05 ® �APPROVED BY DEPT. DATE M GINEER IS TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED M541 B REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 G. SMITH BUILDING 9-101 CII'iy11 R� K PRAMSEY JOB N0. COMP N0. �SSlQvnl, �s1 APPROVED DWG N0. 4.23.92 MECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA 09-101-M541 1 U/;3/14 2"V DN FOR CONTINUATION OF 3"C, SEE SHEET M566 Mo 4"CW — STEAM POWERED CONDENSATE 6P----4 PUMP E7 FLASH TANK TES%\ 8" STM VENT THRU ROOF - STEAM RELIEF SRV I VALVE, 4x6 E8 17,500#/HR SET @ 55 PSIG C M560 M562 PRESSURE FD -1 REDUCING CONTROL VALVE 150 TO 50 PSI 17,500#/HR PRV 1. E8 2"BY-PASS 6"STEAM SEPARATOR- 2-1 /2"HWR FROM 2ND FLR AHU'S „ 4"HWS TO 1 ST FLR AHU'S 1-1 /2"HW&CW DN A A If1111 Itit 1111111AI 1 2"-150# STM -- 3"HWR 1 ST FLR AHU'S 3"HWR FROM 1ST FLR AHU-8, 11 & 13 3"HWS TO 1 ST FLOOR AHU-8, 11 & 13 I 1 — 1 / L FI vv uuvvly i I CW UP THRU ROOF I I 2-1 /2"CW DOWN - 2"PRV SET AT 55 AFL I THERMO-DYNAMIC AIR SEPARATOR � 73"STRAINER -� TRAP 200#/HR 1 - -I I I - HW —�——!1�!�1.!• � �� ,.;, ►,� mer LJ 4VT Mw E, MEN on .■ ,� ®SLO E HEAT C PIPE HANGER C-3 FER TRANS F7 PACKAGE ; 4 g CD 1 8 ELEC PANEL cf' I 41PS STRUCTURE ABOVE 2"BYPASS, 6"Y -STRAINER IIIIIE �r- I w n O V) STRUCTURE ABOVE �- 6„ PIPE HANGER (E)EXHAUST AIR OPENING ABOVE 28x28 (FIELD VERIFY 001 i . 0i 2 PC � � HEAT � 2 TRANSFER 7.5 PACKAGE � I I 1 I 2"PC 1 HEAT -- C-1 TRANSFER F8 PACKAGE I° _ I �EIFC PANEL 1 �Lps 5 —150# STM I "--- 6"HPS I I BOP 58'-9 3/4 xJ 7 3/4"C TO FLASH TANK 3/4" TRAP COND FROM 6"STM MAIN 1 2-1/2 HWR BUTTERFLY I _ VALVE, TYP ❑ TO MCS = 1 - t� E A VFD PS ,41 C M560 M563 T PIPE HANGER A 40-260°F M560 M561 3"HWR IF1 - - -�- - - 2-1 /2"HWS TO 2ND FLR AHU'S BOP 61'-0" 3"HWR FROM 1ST FLOOR AHU'S AND RADIATORS BOP 61'-3" 4"HWR I U I — F LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER t 7 HWC DOMESTIC HOT WATER CIRCULATION 3"CW DN 5"W DN CW DOMESTIC COLD WATER 5"VTR I V VENT �� GATE VALVE � I 1"BAC 171 0 R N '-0" FROM F OOR INE moi-- CHECK VALVE BALL VALVE I - 1/2 " PRV WITH BUILT-IN STRAINER -— BALANCE VALVE � _ > 55-12 PSI GLOBE VALVE I 1" QUICK FILL BY-PASS (BENEATH) D BUTTERFLY VALVE WFL I FILTER/FEED TANK DO FFD FUNNEL FLOOR DRAIN 1 `pMJ DAMPER, MOTORIZED - - - - - -- - - - - ET I EXPANSION TANK GENERAL NOTES FLA - - - 4 I REFERENCE DRAWINGS 1 �� 4" HOUSEKEEPING STAND I F0_1 FD— 1 CD 3 I CONSTRUCTION NOTES CONSTRUCTION NOTES g � 4"HWR 11 3/431 I - 3/4" RELIEF VALVE SET AT 60 PSI 30x42 DUCT UP THRU 2 ROOF ° °° CORROSION ,DM.,-- COUPON MJCOUPON O RACK 4 I OFD -1 1 CD 00 - - 7 I I _ Mo ® PROVIDE STEAM FLOW METER. PROVIDE NEW HEAT TRANSFER PACKAGE. SEE DWG 3/4's I ET—2 FLB amill M628 FOR DETAIL. . 0i 2 PC � � HEAT � 2 TRANSFER 7.5 PACKAGE � I I 1 I 2"PC 1 HEAT -- C-1 TRANSFER F8 PACKAGE I° _ I �EIFC PANEL 1 �Lps 5 —150# STM I "--- 6"HPS I I BOP 58'-9 3/4 xJ 7 3/4"C TO FLASH TANK 3/4" TRAP COND FROM 6"STM MAIN 1 2-1/2 HWR BUTTERFLY I _ VALVE, TYP ❑ TO MCS = 1 - t� E A VFD PS ,41 C M560 M563 T PIPE HANGER A 40-260°F M560 M561 3"HWR IF1 - - -�- - - 2-1 /2"HWS TO 2ND FLR AHU'S BOP 61'-0" 3"HWR FROM 1ST FLOOR AHU'S AND RADIATORS BOP 61'-3" 4"HWR I U I — F LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER t 7 HWC DOMESTIC HOT WATER CIRCULATION 3"CW DN 5"W DN CW DOMESTIC COLD WATER 5"VTR I V VENT �� GATE VALVE � I 1"BAC 171 0 R N '-0" FROM F OOR INE moi-- CHECK VALVE BALL VALVE I - 1/2 " PRV WITH BUILT-IN STRAINER -— BALANCE VALVE � _ > 55-12 PSI GLOBE VALVE I 1" QUICK FILL BY-PASS (BENEATH) D BUTTERFLY VALVE WFL I FILTER/FEED TANK DO FFD FUNNEL FLOOR DRAIN 1 `pMJ DAMPER, MOTORIZED - - - - - -- - - - - ET I EXPANSION TANK GENERAL NOTES FLA - - - 4 I REFERENCE DRAWINGS 1 �� 4" HOUSEKEEPING STAND I F0_1 FD— 1 CD 3 I CONSTRUCTION NOTES CONSTRUCTION NOTES g � 4"HWR 11 3/431 I - 3/4" RELIEF VALVE SET AT 60 PSI 30x42 DUCT UP THRU 2 ROOF ° °° CORROSION ,DM.,-- COUPON MJCOUPON O RACK 4 I OFD -1 1 CD 00 - - 7 I I 2' PC — I—I — I i I 3"HWS I v v •- - - 4 HWR , I - - - - - • FD -1 7 Z7\ 3„HWR_ - - - O U - I L = 2-1 /2"HWS ' ITI PROVIDE NEW HEATING WATER PIPING. 5 GALLON EXPANSION TANK ® PROVIDE NEW STEAM PIPING. INSULATE PER TABLE. EHB HOT WATER HEATER PROVIDE ALUMINUM JACKET ON PIPE BELOW 8' AFF. 9 PROVIDE 4" HOUSEKEEPING STAND. I 10 PROVIDE NEW FLOOR DRAIN. 1 RELOCATED EXISTING FILTER/FEED TANK. PROVIDE NEW ASSOCIATED PIPING AND INSTALL NEW FILTER. 12 PROVIDE NEW 4"CW PIPING. ROUTE NEW PIPING UP 1R & PC PIPING. AND OVER NEW HWS /R TO 2ND FLR / AHU'S BOP 61'-0" 13 PROVIDE NEW PLUMBING VENT. I 3"HWR FROM 2ND FLR 14 PROVIDE NEW MOTORIZED DAMPER 'S BOP 61'-3" FFD 6 D PROVIDE VFD. CONNECT TO EXISTING EXHAUST FAN ON ROOF. PROVIDE DDC CONTROL PANEL. D PROVIDE NEW DRAIN PIPE FROM EXISTING RELIEF VALVE. PLAN _ ® PROVIDE STEAM FLOW METER. PROVIDE NEW HEAT TRANSFER PACKAGE. SEE DWG 3/4's I ET—2 FLB EXPANSION TANK M628 FOR DETAIL. SCALE: I/2"=1 '-0” LOCATED OVER TOILET 4R 2 PROVIDE NEW VALVE AND CAP AT EXISTING COMPRESSED AIR. PROVIDE NEW STEAM PRV & ASSOCIATED PIPING & INSULATION. 3 I PROVIDE NEW FUNNEL FLOOR DRAIN. PROVIDE NEW EXPANSION TANK, ASSOCIATED PIPING AND VALVES. `l' \ I ® PROVIDE NEW FLASH TANK, ASSOCIATED PIPING AND 5 VALVES. �> SEE DETAIL FOR CONNECTIONS M560 M555 PROVIDE NEW STEAM POWERED CONDENSATE PUMP, H2 HOT WATER HEATER ASSOCIATED PIPING AND VALVES. T ELA - - I 6 CONNECT TO EXISTING STEAM VENT FLANGE. 2' PC — I—I — I i I 3"HWS I v v •- - - 4 HWR , I - - - - - • FD -1 7 Z7\ 3„HWR_ - - - O U - I L = 2-1 /2"HWS ' ITI PROVIDE NEW HEATING WATER PIPING. 5 GALLON EXPANSION TANK ® PROVIDE NEW STEAM PIPING. INSULATE PER TABLE. EHB HOT WATER HEATER PROVIDE ALUMINUM JACKET ON PIPE BELOW 8' AFF. 9 PROVIDE 4" HOUSEKEEPING STAND. I 10 PROVIDE NEW FLOOR DRAIN. 1 RELOCATED EXISTING FILTER/FEED TANK. PROVIDE NEW ASSOCIATED PIPING AND INSTALL NEW FILTER. 12 PROVIDE NEW 4"CW PIPING. ROUTE NEW PIPING UP 1R & PC PIPING. AND OVER NEW HWS /R TO 2ND FLR / AHU'S BOP 61'-0" 13 PROVIDE NEW PLUMBING VENT. I 3"HWR FROM 2ND FLR 14 PROVIDE NEW MOTORIZED DAMPER 'S BOP 61'-3" FFD 6 D PROVIDE VFD. CONNECT TO EXISTING EXHAUST FAN ON ROOF. PROVIDE DDC CONTROL PANEL. D PROVIDE NEW DRAIN PIPE FROM EXISTING RELIEF VALVE. PLAN - CONVERTER SIAHUN N012 SCALE: I/2"=1 '-0” LOCATED OVER TOILET 4R I ISSUE rRuvluL juxffz uuul ur InRu muur. HI1!-Auri MOTORIZED DAMPER ON BOTTOM OF DIWCEIVED CITY OF TUKWILA 2 EXISTING 4"CW MANIFOLD TO REMAIN. FEB 2 5 2016 EXISTING 2" STEAM TO REMAIN. PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE L Sp ACCEPTABILITY K. BUN � RECXORD DRAWING SR GS KR 05.28.93 s$l�� THIS DESIGN AND/OR CHECKED CONVERTER STATION #2 - PARTIAL PLAN 16069 D 10.06.14 ��' SPECIFICATION IS APPROVED S. ROSSE SHEET A CONVERTER STATION POT FEEDER 765835-00 SLB RWS EJC 02.28.97 APPROVED BY DEPT. DATE SN ROSSE WEERTITLE REPLACE STEAM CONVERTER STATION #2 B PUR/INST MOD. CLEAN ROOM 546610- CHECKED M560 01 C. HARRAH RWS 10.01.04 G. SMITH BUILDING 09-101 JOB N0. COMP N0. 36511 C SIDESTREAM FILTER W966719 RWS 02.24.12 R�Gr APPROVED K. RAMSEY D REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14ssr�vnL 4+�1 APPROVED 04.23.92 MECHANICAL MASTER COL. E-17/7-8 DEV. CENTER, WA DWGNO. 09-101-M560 I U11011 I d I (E) FIRE I o LL_ i 3/4"LPC 2-1 /2"HWR i Q i 3/4"HPC SLOPE i 3x2 RED z00 I 4 o l___C a i i STEAM I � j j SEPARATOR -00 U, z CD - z j Jw 1 - --------- w w j 3 4"HPC I LL,LLJ j CHIPS i / T o I I T o -� i 6x3 RED i n Q PLATFORM EL 53'-4 3/4" TEE 3"HWR i i i i 2-1 /2"HWS a i 111 O >Co i Q w U CD ¢� I D 00 z O O 1- I I 01 Q I 00 J N Z z � I U r) w � I w = ! � I oCf) i 3'-0" � = I I PLATFORM EL 53'-4 3/4"- 3"HWR 3"HWS 1 oei d NEW STRUCTURAL ANGLE 2 PLCS 6x4x3/8 LLV w/ 1/2" HEX BOLT w/ UNISTRUT PI010 SPRING NUTS EACH END INTO EXISTING CHANNEL INSERT -\ PIPE HANGER 2"BYPASS APCV 4x6 PSV ELBOW HANGER PIPE HANGER 1T 7==� lip 8" VENT DISCHARGE (LOCATED OUTSIDE OF CONVERTER ROOM) 3"STM VENT I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I a I I I I I I I 1 I I — I I I I _j ----- L L— -----J I I ' I 8x4 ! RED \. ! TEE \/ `8x4 ECC, RED 6x4 ECC. RED BLEED RING Y -STRAINER w/ 1/2" DRAIN VALVE SECTION A SCALE: 1/2" = 1'-0" M560 M561 ry I ZO I d- N ------------- ----- w w I z � Q � I Q— I I U w i J I w 11 I ' -----------------------� HEAT TRANSFER PACKAGE FULL METAL INSULATION JAC'KFT HWR AND HEAT TRANSFER PACKAGE I-;'-n» SECTION B SOLE: 1/2 = 1 '-0" M��60 M561 3/4"LPC d °P PROVIDE "ARMSTRON #AEH2O592-3 IN -LI E EXHAUST HEAD, d '^ I FULL METAL i ROUTE 3/4" INSULATION DRAIN FFD I JACKET ON STEAM HEADE w I � i r i 00 oI Q0 REROUTE 4"CW MAIN �t- 4"CW P4 E7/ I ZO I d- N ------------------------ � w I z I Q � I w I U w i J I w ------------------------ HEAT TRANSFER PACKAGE I-;'-n» SECTION B SOLE: 1/2 = 1 '-0" M��60 M561 3/4"LPC d °P PROVIDE "ARMSTRON #AEH2O592-3 IN -LI E EXHAUST HEAD, d '^ I FULL METAL i ROUTE 3/4" INSULATION DRAIN FFD I JACKET ON STEAM HEADE w I � i r i 00 oI Q0 REROUTE 4"CW MAIN �t- 4"CW P4 E7/ 7 4"CW [Am T�I,�, 00 I 4"CW i ------------------------ I I \L7_/i I HEAT TRANSFER _ I PACKAGE i 5 3" C'-4" I I FFD IN-LINE DRIP LEGS NOT TO BE LESS THAN HALF OF MAIN PIPE SIZE ,— PROVIDE FULL SIZE DRIP LEG AT RISER LOCATIONS ----------- STANDARD --------- , TRAP ASS'Y 3000# SEE PLAN - SOCK -O -LET ---------------------------- 800# THD UNION BLEED VAVLE TYP >> CHECK STRAINER VALVE ' � I T ( --► Lc ----------- - --- --� FORGED 800# 1" 3000# T THD VALVE TEST VALVE SOCK -O -LET NC 3/8" PLUGGED PLUG PLUG FORGED 800# FORGED 800# BLOW DOWN VALVE STEAM TRAP SWxTHD VALVE SWxTHD VALVE (HORIZ. IF REQ'D) 26" MAXIMUM _ PLUG SCALE: NTS - 4"HWS TO 1ST FLOOR AHU'S - 3"HWR FROM 1ST FLOOR AHU'S (EAST LOOP) 3"HWR FROM 1ST FLR AHU-8,11 & 13 3"HWS TO 1ST FLR AHU-8,11 & 13 M5611 M561 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 city of Tu1ck101a BUILDING DIVISION K LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING i— HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER --- V -- — VENT pa -- GATE VALVE CHECK VALVE —ICI— BALL VALVE -N BALANCE VALVE GLOBE VALVE �O FFD FUNNEL FLOOR DRAIN ENERAL NOTES DEFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE NEW HEAT TRANSFER PACKAGE. PROVIDE NEW STEAM PIPING WITH INSULATION AND METAL JACKET. SLOPE ALL CONDENSATE LINES AND FLASH VENTS TO FLASH TANK. FFMAN RECEIVED AN G I N EER S CITY OF TUKWILA 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 FEB 2 5 2016 coffman.com LASTING creativity I results I relationships EERMIT CENTER 100% SUBMITTAL I U/3/"I 4 X I ZO I j N � � � I i i Z 00 7 4"CW [Am T�I,�, 00 I 4"CW i ------------------------ I I \L7_/i I HEAT TRANSFER _ I PACKAGE i 5 3" C'-4" I I FFD IN-LINE DRIP LEGS NOT TO BE LESS THAN HALF OF MAIN PIPE SIZE ,— PROVIDE FULL SIZE DRIP LEG AT RISER LOCATIONS ----------- STANDARD --------- , TRAP ASS'Y 3000# SEE PLAN - SOCK -O -LET ---------------------------- 800# THD UNION BLEED VAVLE TYP >> CHECK STRAINER VALVE ' � I T ( --► Lc ----------- - --- --� FORGED 800# 1" 3000# T THD VALVE TEST VALVE SOCK -O -LET NC 3/8" PLUGGED PLUG PLUG FORGED 800# FORGED 800# BLOW DOWN VALVE STEAM TRAP SWxTHD VALVE SWxTHD VALVE (HORIZ. IF REQ'D) 26" MAXIMUM _ PLUG SCALE: NTS - 4"HWS TO 1ST FLOOR AHU'S - 3"HWR FROM 1ST FLOOR AHU'S (EAST LOOP) 3"HWR FROM 1ST FLR AHU-8,11 & 13 3"HWS TO 1ST FLR AHU-8,11 & 13 M5611 M561 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 0 8 2016 city of Tu1ck101a BUILDING DIVISION K LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING i— HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CW DOMESTIC COLD WATER --- V -- — VENT pa -- GATE VALVE CHECK VALVE —ICI— BALL VALVE -N BALANCE VALVE GLOBE VALVE �O FFD FUNNEL FLOOR DRAIN ENERAL NOTES DEFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE NEW HEAT TRANSFER PACKAGE. PROVIDE NEW STEAM PIPING WITH INSULATION AND METAL JACKET. SLOPE ALL CONDENSATE LINES AND FLASH VENTS TO FLASH TANK. FFMAN RECEIVED AN G I N EER S CITY OF TUKWILA 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 FEB 2 5 2016 coffman.com LASTING creativity I results I relationships EERMIT CENTER 100% SUBMITTAL I U/3/"I 4 X