Loading...
HomeMy WebLinkAboutPermit M16-0039 - SLEEP NUMBER - HVAC SYSTEM RETROFITSLEEP NUMBER 17250 SOUTHCENTER PKWY SUITE 100 M16-0039 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov MECHANICAL PERMIT Parcel No: 7888920020 Permit Number: M16-0039 Address: 17250 SOUTHCENTER PKWY 100 Issue Date: 6/1/2016 Permit Expires On: 11/28/2016 Project Name: SLEEP NUMBER Owner: Name: WIG PROPERTIES LLC -SS Address: 4811 134TH PL SE, BELLEVUE, WI, 98006 Contact Person: 2012 Name: VAUN PODLOGAR Address: 319 ELAINES COURT, DODGEVILLE, WA Cities Electrical Code: WI, 53533 Contractor: 2012 Name: NARROWS HEATING/AIR CNDTNG, IN Address: 5121 S BURLINGTON WAY, TACOMA, WA State Energy Code: WA, 98409 License No: NARROI*216.13 Lender: Name: Address: , , , DESCRIPTION OF WORK: Phone: (608) 407-9900 Phone: (253) 627-7543 Expiration Date: 4/5/2018 RETROFIT EXISTING HVAC SYSTEM, SUPPLY AND RETURN DUCTWORK Valuation of Work: $9,000.00 Fees Collected: $311.22 Type of Work: REPLACEMENT Fuel type: ELECT Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Signature: Date: b— f -A I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signa Print ture: Date: 6 Name:,/ This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: `MECHANICAL PERMIT CONDITIONS' 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 " http://xvww.TukwilaWA..gov Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" SITE LOCATION Q:1 / - J �[ King Co Assessor's Tax No.: %� Site Address: / /Zed S7U7y! t�r`'�? /�� 0<�w� Suite Number: ZM Floor: Tenant Name: ��%� AA11,✓J +6'C& New Tenant: S ..... Yes ❑TT..No PROPERTY OWNER Name: 06— P" PL L'/ C'S Address: e /% 04 (, city :I uvL- State: W4 Zip: CONTACT PERSON — person receiving all project communication Name: 1#0k/ U� Address: 17- City: V0 960N XPi State: ( Zip: Phone: P'? 0-gWax. 7 Email: 7Tvl,) V-AvA Valuation of project (contractor's bid price): $ //� MECHANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Describe the scope of work in detail: p � � l y� � UA.— c'1'-/ �1-1— Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... 71, Replacement ....... Fuel Type: Electric..... ❑ Gas ....... ❑ Other: H:Wpplications\Fomts-Applications On Line\2016 ApplicationsUNechanical Permit Application Revised 14-16.docx Revised: January 2016 bb Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <I OOk btu Residential, Nighttime Furnace>100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <10,000 cfin 65 dB(A) Unit Type Qty Air handling unit >I 0. 000 cfm Residential, Nighttime Evaporator cooler Industrial Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ h /1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details. see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM, Monday through Friday and 8AM-1 OPM, Saturday, Sunday and State -recognized holidays. few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam -I Opm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING AGENT: Signature: f� k � (� Date: -2z-4 - 2a1 Print Name: l �V-Ad� ploeoe4a, Day Telephone: 62 Mailing Address: �J ��% �( 1JtZ5 C'(- �i�l �j I'G �{ 54!� City State Zip H:Wpplicationsffo=-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 14-16.doca Revised: January 2016 Page 2 of 2 bh DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $251.37 M16-0039 Address: 17250 SOUTHCENTER PKWY 100 Apn: 7888920020 $251.37 MECHANICAL $239.40 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $206.90 TECHNOLOGY FEE $11.97 TECHNOLOGY FEE R000.322.900.04.00 0.00 TOTAL FEES PAID BY RECEIPT: .. 611 $11.97 $251.37 Date Paid: Wednesday, June 01, 2016 Paid By: GAYLE L CALHOUN Pay Method: CREDIT CARD 02033G Printed: Wednesday, June 01, 2016 10:11 AM 1 of 1 Lr r Jv SYSTEMS DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $1,903.30 D16-0066 Address: 17250 SOUTHCENTER PKWY 100 Apn: 7888920020 $1,700.79 DEVELOPMENT $1,700.79 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,700.79 EL16-0221 Address: 17250 SOUTHCENTER PKWY 100 Apn: 7888920020 $107.78 ELECTRICAL $107.78 PLAN CHECK FEE R000.345.832.00.00 0.00 $107.78 M16-0039 Address: 17250 SOUTHCENTER PKWY 100 Apn: 7888920020 $59.85 MECHANICAL $59.85 PLAN CHECK FEE R000.322.102.00.00 0.00 $59.85 PG16-0032 Address: 17250 SOUTHCENTER PKWY 100 Apn: 7888920020 $34.88 PLUMBING $34.88 PLAN CHECK FEE R000.322.103.00.00 0.00 TOTAL+$1,903.30 $34.88 Date Paid: Monday, March 14, 2016 Paid By: STATE PERMITS INC Pay Method: CHECK 23571 Printed: Monday, March 14, 2016 10:58 AM 1 of 1 ,. I?WSYSTEMS INSPECTION RECORD 10/) Retain a copy with permit SPEC ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 981 8 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 -bucf T-IAl. I ,.(.. Project: ��pp {� � L i T'�,� Type of Ins ecti n: Address: IDate ( ? 7,,5"0 S0 ik. C � Called: K—teeVante Special Instructions: AA / a.m. ip ® p.m. C� Request r� P'XX5 v� e 3� REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ISI INSPECTION RECORD Retain a copy with permit SPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pr 'gCt-. � Type olnsp Ad rj s' ,�' �7!e�® SG V4 /�e v� Y Dat all Special Instructions: Date Wanted: a.m. Za- p.m. Requester: Phone No: Inspector: Y/ C Iuate:I y -*D REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 nni n gni.,.. ti;.,..+..., ct.,te r: r,,., rnrla r`-linnra Fnrmc fnr r.nmmerrial Grnun R11 and > 3 story R2 and R3 Revised June 2013 Project Info FIL "-10 Project Address Select Comfort Date 6/3/2013 Southcenter Square, suite 100 Tukwila, WA 98188 Applicant Name:- ._..._ - .�A I I���iF nS Applicant Address: CODE COMPLIANCE 4 Applicant Phone: APPROVED For Building Dept. Use TE A$y�21� Project Description Briefly describe mechanical system type and features. Q Includes Plans Drawings must cont ti MAR 2 5 2016 R City of TukwilaNI& in otere�r yew'h ceJ�p�iern Wii<h�commissioning tion C Compliance Option Simple System 0 Complex Systeme ..O Systems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. Equip ID Type Brand Name' Model No.1 Capacity' OSA CFM SEER Btu/h or Econo? or EER IPLV3 Econmizer Option or Exception! Heat Recovery Y/N RTU -1 RTU York D8CG060 5200 EXISTING EXISTING EXISTING EXISTING N RTU -2 RTU York DBCGO60 5200 EXISTING EXISTING EXISTING EXISTING N Heating Equipment Schedule Equip. Equip ID Type Brand Name' Model No.' Capacity' OSA cfm Btu/h or Econo? Input Btuh Output Btuh Heat Efficiency4 Recovery Y/N RTU -1 RTU York D8CG060 100000 EXISTING 100000 80000 EXISTING N RTU -2 RTU York DBCGO60 100000 EXISTING 100000 80000 EXISTING N Fan E ui ment Schedule Equip. Equip ID Type Brand Name' Model No.' CFM SP1 HP/BHP Flow Controls Location of Service Lk - Service Water Heating Equipment Schedule Equip. Equip ID Type Brand Name' Model No.' - Input Sub MAR 14 2016 Capacity Category EF' Location of Service PERMIT CENTER - I If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume (VAV),-constant volume (CV), or variable speed (VS). 6 Economizer exception number per 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address Select Comfort Date 6/3/2013 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability Code Section Code Provision Information Required Location on Plans Building Department Notes (yes,no,na) GENERAL PROVISIONS Equipment Sizing & Performance Load calculations performed per ASHRAE Std 183 or equivalent per YES .. C40321 Load calculations Chapter 3 Equipment and system Output capacity of heating and cooling equipment and systems do not YES C403.2.2 sizing exceed calculated loads note exceptions taken Ventilation (natural or mechanical) provided per IMC; indicate mechanical YES C403.2.5 Minimum ventilation ventilation is capable of being reduced to minimum requirement per IMC C403.2.3 & Provide equipment schedules or complete MECH-SUM tables with type, C403.2.3.2 &Equipment minimum capacity, efficiency, test standard (or other efficiency source) for all YES C403.2.12.1 efficiency mechanical equipment equipment schedule with hp, rpm, efficiency for all motors; note N 0 C403.2.13 Electric motor efficiency except exce t. Fan system motor hp or bhp does not exceed limits per Table N� C403.2.10 Fan power limitation C403.2.10.1(1) C403.2.10.3 fan Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency YES & C403.2.13 Fractional hp motors req. NA C403.2.3 Maximum air cooled chiller capacity. Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit Non-standard water-cooled Full -load and NPLV values for water-cooled centrifugal chiller adjusted for NA C403.2.1 chillers non-standard operational conditions Centrifugal fan cooling Large capacity cooling towers with centrifugal fan(s) meet efficiency NA C403.2.12.1. towers requirements for axial fan open circuit cooling towers C403.2.3 Forced air furnace and unit Indicate intermittent ignition or IID, flue/draft damper & jacket loss NA heaters C403.2.3.3 Packaged electric List equipment required to be heat pumps on schedule NA heating/coolingheating/cooling equipment Indicate method of humidification (note requirements for systems with NA C403.2.3.4 Humidification economizer HVAC System Controls & Criteria Indicate locations of thermostatic control zones on plans, including YES C403.2.4.1 Thermostatic controls perimeter systems Heat pump supplementary Indicate staged heating (compression/supplemental) & outdoor lock -out NA C403.2.4.1.1 heat tem Indicate 5°F deadband minimum for systems controlling both heating & YES C403.2.4.2 Setpoint overlap (deadband) ling Automatic setback and Indicate zone t -stat controls with required automatic setback & manual YES C403.2.4.3 shutdown override Indicate system controls that adjust equip start time to match load YES C403.2.4.3.3 Automatic (optimum) start conditions C402.4.5.2 & Dampers Indicate location of OSA, exhaust, relief and return air dampers; include YES C403.2.4.4 AMCA rated leakage and control type motorized or gravity; note exceptions NA C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls NA C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions C403.2.4.6 Combustion heating Indicate modulating or staged control YES equipment NA C403.2.4.7 Group R1 hotel/motel Indicate method for guest room automatic setback & set-up of 5°F minimum systems Group R2/R3 dwelling unit Indicate 5-2 programmable thermostats in primary spaces with minimum of NA C403.2.4.8 / s stems two setbackperiods; note exceptions taken C403.2.5.1 Demand controlled Indicate high -occupancy spaces and systems requiring DCV NA ventilation Indicate spaces requiring occupancy -based system control and method; or NA C403.2.5.2 Occupancy sensors alternate means provided to automatically reduce OSA when partially Enclosed loading Indicate enclosed loading dock and enclosed parking garage ventilation NA C403.2.5.3 dock/parking garage system activation and control method ventilation Indicate kitchen hoods requiring make-up air, indicate make-up air source NA C403.2.5.4.1 Kitchen exhaust hoods and conditioning method Indicate lab exhaust systems requiring heat recovery, method & efficiency; C403.2.5.4.2 Laboratory exhaust systems or alternative method taken (VAV, semi -conditioned makeup, or CERM NA calculation Energy recovery - Indicate ventilation systems requiring ER, method & efficiency; note NA C403.2.6.1 I ventilation systems exceptions NA C403.2.6.2 Energy recovery - Indicate on-site steam heating systems requiring energy recovery condensates stems C403.2.6.3 Energy recovery - Indicate remote refrig. condensers requiring ER and use of captured energy condensers stems 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address Select Comfort Date 6/3/2013 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel priorto printing MECH-CHK pages. Applicability Code Section I Code Provision Information Required Location I Building Department. (yes,no,na) I on Plans. Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued Variable flow control - Indicate fan & pump motors requiring VF control & method (VSD or equiv NA C403.2.12 fans/pumps controls NA C403.2.12.1 Variable flow control - Indicate cooling tower fans requiring variable flow control and method cooling towers Indicate fan systems requiring airflow reduction based on heating and NA C403.2.12.2 Large volume fan systems cooling demand; or exception taken Indicate method of cooling demand -based fan control for sys. > 110,000 C403.2.12.2 Single zone AC systems btuh N O 1 Identify all DDC system input/output control points and indicate capability NO C403.2.4.10 1 DDC system capabilities for trendino and demand resoonse setpoint Ducting Systems C403.2.7.1 & Indicate all ductwork constructed and sealed per IMC, C402 leakage YES C403.2.7.3 Duct construction re uirements and IBC vapor retarder requirements YES 403.2.7.3.1- Duct pressure identify location of low, medium and high pressure ductwork on plans classifications C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide NA test test results to jurisdiction when completed YES C403.2.7.1 / Duct insulation Indicate R -value of insulation on ductwork Piping Systems YES C403.2.8 Piping insulation Indicate R -value of insulation on piping YES C403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/degredation weather SIMPLE SYSTEMS Qualifying Systems Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, does YES C403.3 systems not have active humidifcation or simultaneous heating/cooling NA C403.3 Qualifying 2 -pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits systems NA C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers Indicate cooling systems requiring economizer controls; note in equip YES C403.3.1 Air economizer required sched. YES C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception YES C403.3.1.1.3 Air economizer high limit Indicate high limit shut-off control method per Table C403.3.1.1.3(2) controls Integrated air economizer Indicate capability for partial air economizer operation for systems with NA C403.1.1.2 operation capacity > 65,000 btuh Indicate eligible exception(s) taken and provisions to comply with NA C403.3.1 Air economizer exceptions exception(s) COMPLEX SYSTEMS Complex System Economizers Indicate cooling systems requiring economizer controls; note in equip NA C403.4.1 Air economizer required sched. Economizer heating system Verify control method of HVAC systems with economizers does not NA C403.4.1.4 impact increase building heating energy usage during normal operation Integrated economizer Indicate capability for partial economizer operation for air or water econo NA C403.4.1.3 operation systems Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb Moved Water economizer capacity OSA NA Water economizer Indicate precooling coils and heat exchangers do not exceed pressure drop NA C403.4.1.2 maximum pressure drop limit Indicate eligible exception(s) taken and provisions to comply with NA C403.3.1 Air economizer exceptions x Mechanical Permit Plans Checklist - Page of 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised .lune 2013 Project Address Select Comfort Date 6/3/2013 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printingMECH-CHK pages. Applicability Code Section Code Provision Information Required Location Building Department (yes,no,na) on Plans Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements NA C403.4.2 & Variable flow control - fans Indicate fans requiring variable flow control and method C403.2.12 C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major NA sensors duct branch C403.4.2.2 VAV an static pressure Indicate fan system static pressure setpoint based on zone requiring most NA set oint pressure VAV systems serving multi- Indicate supply air systems serving multiple zones that are required to be C403.4.5 VAV, method of primary air control, and zones served; note exceptions NA zones taken NA C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads C403.4 Large capacity cooling Indicate method of mufti-stage or variable control for building cooling NA systems system capacity > 300 tons NA C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method NA C403.4.3 Large capacity boiler Indicate mufti-stage or. modulating burner for single boilers > 500,000 btuh s stems NA C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers C403.4.3.5 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off NA isolation flow through chillers & boilers when not in use C403.4.2 & Variable flow control - NA C403.4.3.6 pumps Indicate pumps requiring variable flow control & method C403.2.12.1 Variable flow control - NA & C403.4.4 cooling towers Indicate cooling tower fans requiring variable flow control and method NA C403.4.3.4 Hydropic system part load reset supply water temp AND reduce flow by >_ 50% for systems > 300,000 controls NA C403.4.3.2 Two-pipe changeover Indicate deadband, heating/cooling mode scheduling and changeover systems temperature range C403.4.3.3.1 Water loop heat pump - Indicate capability of central equipment to provide min. 20'F water supply NA deadband temp deadband between heat rejection and heat addition modes NA C403.4.3.3 Water loop heat pump - Provide heat exchanger that separates cooling tower and heat pump loop heat rejection in Climate Zone 5 C403.4.3.3.3 Water loop heat pump - Indicate 2-way isolation valve on each heat pump and variable flow control NA isolation fors stems with total pump power > 10 h NA C403.4.6 Condenser water heat Indicate system provided to pre-heat service water and efficiency recovery C403.5 Cooler / freezer - anti-sweat Indicate w/sf & control method for walk-in cooler/freezer door anti-sweat NA heaters heaters NA C403.5 / 6 Cooler / freezeer - evaporator and fans I Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems C404:2 Water-heating equip min. Provide equipment schedule or complete MECH-SUM table with type, NA efficiency capacity, efficiency,test standard or other efficiency source NA C404.3 Temperature controls Indicate temperature controls have required setpoint capability NA C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge NAC404.5 Insulation under water Indicate R-10 insulation under tank heater NA C404.6 Service water piping Indicate R-value of insulation on piping; note exceptions taken insulation C404.7 / 8 Circulation systems and Indicate shut-off capability based on occupancy and periods of limited NA heat trace shut-off demand R-2 service hot water Indicate method of usage metering for dwell. units served by central HW NA C404.9Group meters system Pools & In-Ground Permanently Installed Spas Pool heating equip min. Provide equipment schedule or complete MECH-SUM table with type, C404.10.1 capacity, efficiency, test standard (or other eff. source); heat pump heaters NA efficiency >_ 4 COP NA C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat settin • or NA C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required NA C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90'F NA C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0039 DATE: 03/14/16 PROJECT NAME: SLEEP NUMBER SITE ADDRESS: 17250 SOUTHCENTER PKWY SUITE 100 X Original Plan Submittal Response to Correction Letter # DEPARTMENTS: KJ ASN G �q Building Division IN AM 91h ��i Fire Prevention Revision # before Permit Issued Revision # after Permit Issued Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 03/15/16 Not Applicable ❑ Structural .Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 04/12/16 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: Denied ❑ (ie: Zoning Issues) REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 NARROWS HEATING/AIR CNDT\TG, IN ^ Washington State Department of k,h Labor & Industries Page 1 of 2 Home Espanol Contact Search L&I --�—� A -Z Index Help My L&I Safety & Health Claims & Insurance Workplace Rights Trades & Licensing NARROWS HEATING/AIR CNDTNG, IN Owner or tradesperson 5121 S BURLINGTON WAY TACOMA, WA 98409-2805 Principals 253-627-7543 CALHOUN, STEVEN W, PRESIDENT PIERCE County CALHOUN, R MICHAEL, VICE PRESIDENT CALHOUN, GAYLE L, SECRETARY STAAB, DANIEL E, VICE PRESIDENT (End: 12/04/2008) STAAB, MARSHA J, SECRETARY (End: 12/04/2008) Doing business as NARROWS HEATING/AIR CNDTNG, IN WA UBI No. Business type 600 304 971 Corporation Governing persons GAYLE CALHOUN MIKE CALHOUN; STEVE CALHOUN; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Con.....tr.aor Active. ........ _..... _... . .....................................ct....... Meets current requirements. License specialties Heating/VenUAir-Conditioning and Refrig (HVAC/R) License no. NARROI*216J3 Effective — expiration 04/23/1979— 04/05/2018 Bond ................. Contractors Bonding & Insurance Co $6,000.00 Bond account no. SJ4732 Received by L&I Effective date 01/26/2012 04/05/2012 Expiration date Until Canceled Bond history Insurance .............................. Truck Ins Exchange $2,000,000.00 Policy no. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600304971 &LIC=NARROI*216J3&SAW= 6/1/2016 KEY NOTES: O1 EXISTING LANDLORD PROVIDED GAS HEAT ROOFTOP UNIT TO BE REUSED — SEE SCHEDULE FOR AIR BALANCE AND REFURBISHING REQUIREMENTS. VERIFY EXISTING R.A. SMOKE DETECTOR, PROVIDE NEW IF REQUIRED. VERIFY EXACT LOCATION ON SITE. O CONNECT NEW DUCT TO EXISTING DUCT DROP WITH TRANSITION — DO NOT "HARD TAP" DROPS FROM UNIT. VERIFY EXISTING DROP SIZE IN FIELD. O3 INSTALL NEW SPIN—IN TAKE OFF IN SUPPLY AIR DUCTWORK. PROVIDE MANUAL VOLUME DAMPER. (TYPICAL FOR ALL) O4 FLEX DUCT 5'-0" MAX LENGTH. TYPICAL FOR ALL. < VOLUME DAMPER TO BE ACCESSIBLE THROUGH TMS PLASTER FRAME. COORDINATE LOCATION IN FIELD. O EXISTING TOILET ROOMS TO REMAIN. CONTRACTOR SHALL BRING ALL EQUIPMENT AND COMPONENTS TO "LIKE NEW' CONDITION. PROVIDE NEW OF LIKE MODEL AND SIZE AS REQUIRED. VERIFY ALL CONDITIONS ON SITE PRIOR TO BID. < RELOCATE EXISTING THERMOSTAT TO LOCATION SHOWN - MOUNTED AT 4'-0" A.F.F. CONFIRM OPERATION OF EXISTING THERMOSTAT PRIOR TO REUSE. SPACE LOAD CALCULATIONS DESIGN TEMPS SUMMER O.A.D.B. 85 DEG F O.A.W.B 65 DEG F I.A. D. B. 75 DEG F GAINS WINTER O.A.D.B. 23 DEG F I.A.D.B. 70 DEG F LOSS SOLAR LOAD 54163 BTUH ROOF LOAD 5415 BTUH GLASS LOAD 1627 BTUH WALL LOAD 1057 BTUH LIGHTS 12356 BTUH PEOPLE 31 A PEOPLE (SENS) 6821 BTUH PEOPLE (LAT) 8370 BTUH INFILTRATION (SENS) 760 BTUH INFILTRATION (LAT) (50) BTUH MISCELLANEOUS 3824 BTUH VENTILATION (SENS) 4488 BTUH VENTILATION (LAT) (366) BTUH SUPPLY FAN LOAD 4448 BTUH SENS. LOAD 99,429 BTUH TOTAL TOTAL LOAD 107,374 BTUH TOTAL CFM 4000 VENT. 5581 BTUH 18516 BTUH 3794 BTUH 4794 BTUH 34733 BTUH (4448) BTUH 62.906 BTUH 700 CFM OUTSIDE AIR CALCULATION OUTSIDE AIR CALCULATION BASED ON THE 2012 WASHINGTON MECHANICAL CODE AREA #1 — SALES NET SQ. FOOTAGE: 2128 0.12 CFM/SQFT. X 2128 SQ. FT. = 256 7.5 CFM / PERSON X 32 PEOPLE = 240 AREA #2 — STORAGE 0.12 CFM/SQFT. X 506 SQ. FT. VENTILATION SUBTOTAL: VENTILATION EFFECTIVENESS: MINIMUM VENTILATION REQUIRED: VENTILATION SUPPLIED: VENTILATION (CFM): 496 NET SQ. FOOTAGE: 506 VENTILATION (CFM): 61 MECHANICAL NOTES 696 CFM 700 CFM 1. ALL EQUIPMENT, INSTALLATION AND MATERIALS SHALL COMPLY WITH ALL APPLICABLE LANDLORD CRITERIA. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL EXISTING STUB—INS, TAPS, ETC. FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN TENANT SPACE. 3. NO FIBERGLASS DUCT BOARD ALLOWED. 4. BRANCH DUCT RUN OUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK UNLESS OTHERWISE SPECIFIED. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL CONNECTIONS TO THE LANDLORD'S BASE SYSTEMS. COORDINATE ALL SYSTEMS IN THE FIELD. 6. VERIFY LOCATION OF ANY PENETRATION OF ROOF WITH LANDLORD. ALL ROOF PENETRATIONS, PATCHING AND FLASHING SHALL BE BY LANDLORD APPROVED ROOFING CONTRACTOR AT TENANT CONTRACTOR'S EXPENSE. 7. PVC PIPING IS PROHIBITED. 8. ALL FIRE PROTECTION AND SPRINKLER WORK SHALL BE PERFORMED BY LANDLORD—APPROVED FIRE PROTECTION CONTRACTOR AT THE TENANT'S EXPENSE. 9. CONTRACTOR SHALL SUBMIT CERTIFIED AIR BALANCE REPORT INCLUDING ALL ASSOCIATED AIR TEMPERATURES AND PRESSURES AS APPLICABLE. SEND TWO COPIES TO OWNER FOR APPROVAL. 10. CEILING CONTRACTOR TO PROVIDE ADEQUATE ACCESS IN OPEN CEILING GRID AT DIFFUSER/DAMPER LOCATIONS FOR PURPOSE OF AIR BALANCING. 11. REMOVE ALL UNUSED PIPING, HVAC EQUIPMENT, DUCTWORK AND ACCESSORIES. DO NOT ABANDON. DIFFUSER, GRILLE & REGISTER SCHEDULE EQUIP. SERVICE MOUNTING TYPE DESCRIPTION ACCESSORIES FINISH MANUF. MODEL TAG o Q LU CO OUTSIDE ENTERING AIR GROSS COOLING CAPACITY MBH NO. A SUPPLY LAY—IN 24"X24" OBD SEE NOTE TITUS TMS B SUPPLY SURFACE 24"X24" OBD, RAPID SEE TITUS TMS ACCESSORIES (LBS) TOTAL SENSIBLE MOUNT FRAME NOTE VOLT/PH/HZ RTU -1 C SUPPLY SURFACE 8"X12" OBD SEE NOTE TITUS 30ORL D RETURN LAY—IN 24"X24" --- SEE NOTE TITUS PAR E TRANSFER LAY—IN 24"X12" --- SEE NOTE TITUS PAR F TRANSFER SURFACE 24"X12" --- SEE I NOTE TITUS PAR NOTE: ALL GRILLES, REGISTERS & DIFFUSERS MUST BE PAINTED TO MATCH CEILING TILE COLOR. VERIFY EXACT COLOR WITH ARCHITECT. 1 HVAC FLOOR PLAN M1.0 1/4'=1'-0" IF YOU HAVE ANY QUESTIONS REGARDING THE MECHANICAL PLANS, PLEASE CALL THE MECHANICAL DESIGNER. DESIGNER: CRAIG ENGLE PHONE/FAX:. 612-465-7680/612-465-7780 E—MAIL: craig.engle®dunhameng.com MECHANICAL SYMBOLS 17 SUPPLY DIFFUSER SUPPLY DIFFUSER W/ BLANK -OFF RETURN GRILLE VOLUME DAMPER sn SMOKE DETECTOR A-10"0 DIFFUSER TYPE/NECK SIZE 450 CFM REQUIRED QQ THERMOSTAT ® POINT OF CONNECTION FILE COPY -It N o. M 11 n oIM plaun -r.,pi _ ,7! is subjoci to errors and `..:.'• vidar, lc'l E,i an �f ui�t �.ie6J t1 C;rc'< c,' r Of pprrove i i"ir d Copy and Date: City 01 8 ukwila3 BUILDING DIVISION -JAI i•'.l is c� 'is.IT ❑ N"ochanical O EItsLtrical Plumbing ,ac -as Piping City of Tukwila ft'JILD11"'Mi DIVISION REVIEWED FOR. CODE COIMPLIANCE APPROVED MAR 2 5 2016 J 1_ City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAR 14 2016 PERMIT CENTER No changes shn'l h'i m^de to the scope of wont pricr v,,,pMw,.l of s uk% ila 61.10din" Division. NOTE: R.,,v� o Mil rcquilo a it ,1 `.2n Submittal nr-i rna%t in^•iir!n art -,N innal nlnn nnu;ct�, 5nnn >: M CL LU z 0 U 4 ° n Q LO0: 0 co sEr Q9'P 3~L-,� LU tu z z= } z W J J LLj � Q ^ o > a �E �°'� 0zo 0 o a N _WLL v v _ m N d� EXISTING ROOFTOP UNIT SCHEDULE (GAS HEAT/ELEC. COOL) LO ,LO C7 MFG/ �n LU UQU o Q LU CO OUTSIDE ENTERING AIR GROSS COOLING CAPACITY MBH EER ® HEATING CAPACITY O N ELECTRICAL LU 3 UNIT WEIGHT MARK MODEL DISCHARGE TONS ESP CFM AIR CFM CONDITIONS ARI AFUE % ACCESSORIES (LBS) TOTAL SENSIBLE INPUT OUTPUT VOLT/PH/HZ RTU -1 YORK O VERTICAL 5 O N 2000 350 76.5F DB 63.8 WB EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING D8CGO60 0 J x o U) .75 d CSD 92F AMBIENT o w d CL 0 sn -- a 5 E LU RTU -2 YORK VERTICAL 5 LLLL 2000 350 76.5F DB 63.8 WB EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING D8CGO60T .75 Foz F<T<1<1<1<1<[! @ 92F AMBIENT a W a: 0 L NOTE: E CL U 1. THE MECHANICAL CONTRACTOR SHALL PERFORM SERVICE AND REPAIR OF THE EXISTING ROOF TOP UNIT AND ITS ACCESSORIES AS FOLLOWS, BUT ARE NOT LIMITED TO: CLEAN ALL COILS, REPLACE THE FILTERS AND BELTS, INSPECT, REPAIR OR REPLACE DRIVES, FAN BEARINGS, MOTORS, CONTROL COMPONENTS, VALVES AND ANY OTHER ITEM NECESSARY FOR A COMPLETE AND PROPER OPERATING SYSTEM. THIS CONTRACTOR SHALL ALSO VISIT THE SITE PRIOR TO BIDDING AND VERIFY ALL EXISTING SITE CONDITIONS. 2. ALL WORK, EQUIPMENT, AND ACCESSORIES TO BRING EXISTING SYSTEM TO GOOD WORKING CONDITION SHALL BE COVERED UNDER CONTRACTOR'S ORIGINAL BID AND AT NO ADDITIONAL EXPENSE. CONTRACTOR SHALL VERIFY ALL ON SITE CONDITIONS PRIOR TO BID. MECHANICAL SYMBOLS 17 SUPPLY DIFFUSER SUPPLY DIFFUSER W/ BLANK -OFF RETURN GRILLE VOLUME DAMPER sn SMOKE DETECTOR A-10"0 DIFFUSER TYPE/NECK SIZE 450 CFM REQUIRED QQ THERMOSTAT ® POINT OF CONNECTION FILE COPY -It N o. M 11 n oIM plaun -r.,pi _ ,7! is subjoci to errors and `..:.'• vidar, lc'l E,i an �f ui�t �.ie6J t1 C;rc'< c,' r Of pprrove i i"ir d Copy and Date: City 01 8 ukwila3 BUILDING DIVISION -JAI i•'.l is c� 'is.IT ❑ N"ochanical O EItsLtrical Plumbing ,ac -as Piping City of Tukwila ft'JILD11"'Mi DIVISION REVIEWED FOR. CODE COIMPLIANCE APPROVED MAR 2 5 2016 J 1_ City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAR 14 2016 PERMIT CENTER No changes shn'l h'i m^de to the scope of wont pricr v,,,pMw,.l of s uk% ila 61.10din" Division. NOTE: R.,,v� o Mil rcquilo a it ,1 `.2n Submittal nr-i rna%t in^•iir!n art -,N innal nlnn nnu;ct�, 5nnn >: M CL LU z 0 U 4 ° n Q LO0: 0 co sEr Q9'P 3~L-,� LU tu z z= } z W J J LLj � Q ^ o > a �E �°'� 0zo 0 o a N _WLL v v _ m � N d� on p m 0 LO ,LO C7 IVLLI O_ �n LU UQU o Q LU CO p=o o o r a y 0o O N a co O LU 3 J O z woo— d U) a) cc = Q 0 O ;n u 0z y m E O U O L o z T O O h c i-- O N !n c F � E U z d cn a r v LU E .y n c } 0 J x o U) d c o w d CL 0 sn -- a 5 E � N d� on p m E LO ,LO C7 IVLLI O_ LU UQU 4D Q LU p=o o Q U L.0w LU 3 J O z woo— d U) a) O w U } p m LO 00 C7 IVLLI O_ -no Q LU O (0 co a r- U) w00 cc = Q 4� zZ) LU 0z no U(nOQ U I —Ow O O 0— O �» U 2 n. 0 to (n I— cn J } m o � } w Q } z m 0 z LU z 0 LLLL w x z Foz F<T<1<1<1<1<[! o N a W a: 0 L n� E CL U O w U - W a 0 C7 wQ a � o � } m } z m 0 z LU LLLL z w o N a W a: 0 L n� E CL U n o LL Z_ LL Uv W W W J Z U) f— GENERAL WORK INCLUDED: EACH CONTRACTOR SHALL VERIFY LANDLORD REQUIREMENTS. BID AND INSTALLATION SHALL BE BASED ON SUCH REQUIREMENTS. DRAWINGS AND SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL WORK WITH THAT OF OTHER TRADES ON THE PROJECT PREVENTING UNNECESSARY CONFLICTS OR DELAYS DURING CONSTRUCTION. IF FOR ANY REASON EXISTING EQUIPMENT TO BE RE -USED NEEDS REPLACEMENT PARTS, THIS COST IS TO BE COVERED UNDER ORIGINAL CONTRACT AMOUNT AND WILL NOT BE ACCEPTED AS AN EXTRA COST OR EXPENSE. CONTRACTOR MUST INSPECT ALL EQUIPMENT TO BE RE -USED AT TIME OF BIDDING OR NEGOTIATING PERIOD. CONTRACTOR SHALL EXAMINE THE SITE, COMPARE IT WITH DRAWINGS AND SPECIFICATIONS AND BECOME FAMILIAR WITH EXISTING CONDITIONS BEFORE SUBMITTING A BID. NO ALLOWANCE WILL SUBSEQUENTLY BE MADE IN BEHALF OF THIS CONTRACTOR BY REASON OF ANY ERROR ON HIS PART. CODES AND STANDARDS: ALL CODES, ORDINANCES, RULES, REGULATIONS, ORDERS, AND OTHER LEGAL REQUIREMENTS WITH WHICH COMPLIANCE IS REQUIRED BY GOVERNING AUTHORITIES SHALL BE ADHERED TO. CONTRACTOR SHALL VERIFY WITH HVAC PLAN TO COORDINATE THE REQUIREMENT OF PLENUM RATED FIXTURES, PIPING, WIRING, ETC. FAILURE TO DO SO COULD RESULT IN THE REMOVAL AND REPLACEMENT OF THESE ITEMS AT NO ADDITIONAL COST TO THE TENANT. DRAWINGS AND SPECIFICATIONS ARE TO BE CONSIDERED AS SUPPLEMENTING EACH OTHER. WORK SPECIFIED BUT NOT SHOWN ON DRAWINGS, OR SHOWN ON DRAWINGS BUT NOT SPECIFIED, SHALL BE PERFORMED OR FURNISHED AS THOUGH MENTIONED IN BOTH SPECIFICATIONS AND DRAWINGS. IF NOT OTHERWISE DIRECTED, INSTALLATION OF ALL SYSTEMS AND EQUIPMENT SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. WHERE WORK DESCRIBED IN THE SPECIFICATIONS IS IN CONFLICT WITH THE WORK SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL SUPPLY THE GREATER QUANTITY, QUALITY AND COST VIA THE BID AND CONTACT THE ENGINEER FOR CLARIFICATION ON DIRECTION PRIOR TO INSTALLATION. MECHANICAL SCOPE A. THE WORK COVERED BY THIS SPECIFICATION INCLUDES THE COMPLETE HEATING AND AIR CONDITIONING SYSTEM. B. THE WORK TO BE PERFORMED UNDER THE HEATING AND AIR CONDITIONING SPECIFICATIONS AND DRAWINGS CONSISTS OF FURNISHING ALL LABOR AND MATERIAL FOR THE COMPLETE INSTALLATION OF ALL HEATING AND AIR CONDITIONING SYSTEM FOR TENANT SPACE. THE WORK SHALL INCLUDE, BUT SHALL NOT BE LIMITED TO, THE FOLLOWING: 1. HEATING/COOLING UNITS 2. TOILET ROOM EXHAUST SYSTEMS 3. AUTOMATIC TEMPERATURE CONTROL 4. DUCTWORK AND AIR CONTROL 5. USE OF CRANE TO PLACE ROOF TOP EQUIPMENT (WHEN REQUIRED) GENERAL: A. THIS SPECIFICATION IS INCLUSIVE FOR EACH ITEM REQUIRING ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO PROPERLY INSTALL, ALTER, ADJUST, AND PUT IN OPERATION, THE COMPLETE HEATING AND AIR CONDITIONING SYSTEM. B. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER LAYOUT AND CONSTRUCTION OF THE WORK INCLUDED IN THIS CONTRACT. LAWS, ORDINANCES AND REGULATIONS: A. ALL SYSTEMS IN ALL AND/OR PART SHALL CONFORM TO ALL PERTINENT LAWS, ORDINANCES AND REGULATIONS OF ALL BODIES HAVING JURISDICTION, AT ALL GOVERNING LEVELS, NOTWITHSTANDING ANYTHING IN THESE DRAWINGS OR SPECIFICATIONS TO THE CONTRARY. IN CASE OF CONFLICT BETWEEN GOVERNING LEVELS, THE MORE STRINGENT LAWS SHALL APPLY. B. THE CONTRACTOR SHALL PAY ALL FEES AND OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED BY ANY AUTHORITY HAVING JURISDICTION IN CONNECTION WITH HIS WORK. MATERIALS AND EQUIPMENT: A. ALL MATERIALS SHALL BE NEW AND SHALL BE OF THE TYPE AND SHALL MEET THE CAPACITIES OF EQUIPMENT SPECIFIED ON THE DRAWINGS. ALL MATERIALS AND EQUIPMENT UTILIZED SHALL BE MANUFACTURED IN THE UNITED STATES OF AMERICA. B. ALL EQUIPMENT OFFERED UNDER THESE SPECIFICATIONS SHALL BE LIMITED TO PRODUCTS REGULARLY PRODUCED AND RECOMMENDED FOR SERVICE, IN ACCORDANCE WITH ENGINEERING DATA, RATINGS, OR OTHER COMPREHENSIVE LITERATURE MADE AVAILABLE TO THE PUBLIC AND IN EFFECT AT THE TIME OF OPENING OF BIDS. C. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS FOR TYPE AND CAPACITY OF EACH PIECE OF EQUIPMENT USED. WORKMANSHIP: A. ALL HEATING EQUIPMENT SHALL BE INSTALLED IN A WORKMANLIKE MANNER MEETING THE ACCEPTED STANDARDS OF THE HEATING INDUSTRY. THE WORK SHALL BE DONE BY SKILLED HEATING CRAFTSMAN, AND SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF ASHRAE AND/OR THE SMACNA MANUAL. CUTTING, PATCHING AND PAINTING: UNLESS OTHERWISE DIRECTED BY THE LANDLORD CRITERIA, THE CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING REQUIRED IN CONNECTION WITH HIS WORK. ALL FINISHED SURFACES THAT ARE CUT SHALL BE REPLACED IN KIND SO THAT THERE ARE NO VISIBLE EVIDENCE OF "PATCH". PAINTING OF MECHANICAL WORK SHALL BE BY PRIME CONTRACTOR. ALL EQUIPMENT WHICH HAS HAD THE FINISH DAMAGED BY INSTALLATION OR TRANSPORTATION SHALL BE REFINISHED. ROOF AND OTHER PENETRATIONS: EACH CONTRACTOR REQUIRING OPENINGS IN THE ROOF OF THE BUILDING STRUCTURE (WHERE REQUIRED) SHALL MAKE ARRANGEMENTS WITH THE LANDLORD FOR SUCH OPENINGS. PROCEDURE AND COST ARRANGEMENTS SHALL BE OUTLINED IN THE LANDLORD CRITERIA. COMPLY WITH ALL LANDLORD REQUIREMENTS. ALL ROOF PENETRATIONS SHALL BE ARRANGED TO PROVIDE A WEATHER -TIGHT INSTALLATION. THE INSTALLATION SHALL INCLUDE, WHERE REQUIRED, VENTILATING COLLARS TO GIVE PROPER CLEARANCE FROM COMBUSTIBLE ROOFS, FLOORS, CEILINGS OR OTHER SUCH STRUCTURES. FIRE -PROOFING SHALL BE PROVIDED USING MATERIALS CONFORMING WITH MUNICIPAL CODES AND ORDINANCES. DUCTWORK: A. ALL DUCTWORK SHALL BE INSTALLED AS SHOWN ON MECHANICAL DRAWINGS. B. THE DUCTWORK SHALL BE CLEAR INSIDE OF THE SIZES SHOWN ON THE DRAWINGS. ALL DUCTS TO BE SHEET METAL DUCTS AS PER ASHRAE AND SMACNA GUIDLINES. C. FLEXIBLE DUCTS SHALL BE LIMITED TO 5'-0" MAX. FOR CONNECTION TO AIR DEVICES. D. DUCTWORK SHALL BE "FACTORY MADE" CLASS 1 GALVANIZED SHEET METAL WITH IRON SUPPORTS SECURED TO OVERHEAD MEMBERS AT 5'-0" ON CENTER. DUCTWORK MATERIALS SHALL BE PER CURRENT MECHANICAL CODE. DUCTWORK INSULATION: A. SUPPLY, RETURN, OUTDOOR AIR, AND EXHAUST DUCTWORK BE WRAPPED WITH MINIMUM R-6 FIBERGLASS, FOIL BACKED INSULATION TO PREVENT CONDENSATION. B. EXPOSED DUCTWORK DOES NOT NEED TO BE INSULATED. GRILLES AND DIFFUSERS: GRILLES AND DIFFUSERS SHALL BE AS MANUFACTURED BY KREUGER, HART AND COOLEY, BARBERCOLMAN, OR TITUS. EACH IS TO BE FITTED WITH A VOLUME DAMPER. (OPPOSED BLADE DAMPER) TESTING AND BALANCING CERTIFIED (AABC OR NABS) INDEPENDENT TESTING COMPANY TO TEST AND BALANCE SYSTEM TO CFM AS SPECIFIED. REPORT RESULTS TO TENANT AND ARCHITECT. GUARANTEE: A. EACH CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE OF OWNER. THE CONTRACTOR SHALL PROVIDE FREE SERVICE FOR ALL EQUIPMENT INVOLVED IN HIS CONTRACT DURING THIS GUARANTEE PERIOD. B. THE GUARANTEE SHALL INCLUDE RESTORATION OF ITS ORIGINAL CONDITION OF ALL ADJACENT WORK THAT MUST BE DISTURBED IN FULFILLING THIS GUARANTEE. C. ALL SUCH REPAIRS AND/OR REPLACEMENTS SHALL BE MADE WITHOUT DELAY, AND AT THE CONVENIENCE OF THE OWNER. SUBSTITUTIONS: A. APPROVALS OF SUBSTITUTIONS FOR "APPROVED EQUAL", MUST BE IN WRITING AND SUBSTITUTION MUST BE APPROVED BEFORE INSTALLATION. INSTALLATION WITHOUT PRIOR APPROVAL MAY RESULT IN CONTRACTOR REMOVING SUBSTITUTION AND REPLACING IT WITH SPECIFIED ITEM AT HIS EXPENSE. B. APPROVAL MAY BE GIVEN BY ARCHITECT, ENGINEER OR OWNER. TEMPERATURE CONTROL: RELOCATE EXISTING (2) THERMOSTATS AS SHOWN ON M1.0. A. TEMPERATURE CONTROL SHALL BE BY A WALL MOUNTED HEATING/COOLING THERMOSTAT, WITH SUBBASE HAVING SELECTOR SWITCHES FOR "ON/AUTO" AND "HEAT/OFF/COOL" TEMPERATURE RANGE FROM 50 DEGREES F. TO 90 DEGREES F. B. THIS STANDARD SYSTEM TO BE USED UNLESS SPECIAL CONTROL SYSTEM IS CALLED FOR OR SHOWN ON DRAWINGS. MECHANICAL UNIT: A. REUSE (2) YORK GAS/ELEC ROOFTOP UNITS. SEE SCHEDULE FOR BALANCE AND SPECIFICATIONS. B. ALL UNITS SHALL BE WITH WATERPROOFED AND INSULATED DRAIN PANS AND SHALL BE INTERNALLY ENGINEERED WITH RIGID FIBERGLASS BOARD AND NEOPRENE COATING. PROVIDE FACTORY ENGINEERED VIBRATION ISOLATORS FOR MOUNTING EACH UNIT. FURNISH EACH UNIT WITH A DISCONNECT SWITCH. NIT C. ALL U CASINGS SHALL BE DIEFORMED STEEL WITH SMOOTH PANEL CONSTRUCTION WITHOUT PROJECTING ANGLES OR EDGES. ALL COMPONENTS HAVE REMOVABLE PANELS FOR ACCESS TO INTERIOR AND SHALL BE INTERNALLY BOLTED TO ADJACENT COMPONENTS. PREPUNCHED STRUCTURAL STEEL HANGERS SHALL BE WELDED TO THE CASING. D. FANS SHALL BE STATICALLY AND DYNAMICALLY BALANCED FORWARD -CURVED, MULTI -BLADE TYPE V -BELT DRIVES SHALL INCLUDE VARIABLE PITCH SHEAVE ON THE MOTOR PULLEY OF ALL MOTORS. MOTOR BASES SHALL BE OF THE SLIDE RAIL ADJUSTABLE TYPE. SHAFTS SHALL BE OF SINGLE PIECE CONSTRUCTION, BALANCED, AND SIZED TO OPERATE AT LEAST 25% BELOW CRITICAL SPEED BEARING SHALL BE SELF -ALIGNING TYPE, STUD MOUNTED IN RECESSED BEARING HOUSINGS FOR EXTERIOR ACCESS. BEARINGS SHALL TYPE WITH GREASE LUBRICATION LINES EXTENDED TO THE OUTSIDE OF THE CASING. E. ELECTRICAL WIRING OF MOTORS AND EQUIPMENT AS SPECIFIED ON DRAWINGS. F. SEQUENCE OF CONTROL (ROOF TOP UNIT) 1. OCCUPIED HOURS. A. UNIT OUTDOOR AIR DAMPER SHALL OPEN TO ITS MINIMUM POSITION AND UNIT SUPPLY FAN SHALL OPERATE CONTINUOUSLY. B. UNIT COMPRESSOR(S) SHALL CYCLE OR HEAT EXCHANGER SHALL STAGE TO MAINTAIN SPACE SETPOINT. C UNIT ECONOMIZER CYCLE SHALL BE INITIATED UPON A SIGNAL FROM OUT DOOR AIR SENSORS. OUTDOOR AIR DAMPER, RETURN AIR DAMPER, AND UNIT COMPRESSOR(S) SHALL CYCLE TO MAINTAIN SPACE SETPOINT. 2. UNOCCUPIED HOURS. A. UNIT OUTDOOR AIR DAMPER SHALL REMAIN CLOSED AND UNIT SUPPLY FAN SHALL CYCLE ON A SIGNAL FROM SPACE SENSOR. B. UNIT COMPRESSOR(S) SHALL CYCLE OR HEAT EXCHANGER SHALL STAGE WITH UNIT SUPPLY FAN TO MAINTAIN SPACE SETPOINT. FIRE PROTECTION EXECUTION -INSTALLATION: A. GENERAL CONTRACTOR TO VERIFY MALL SPRINKLER CONTRACTOR REQUIREMENTS AND USE SPECIFIED CONTRACTOR IF REQUIRED. B. INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 13. INSTALL SPRINKLER PIPING PRODUCTS WHERE REQUIRED IN ACCORDANCE WITH RECOGNIZED PRACTICES TO ENSURE THAT FIRE PROTECTION SPRINKLER PIPING COMPLIES WITH GOVERNING REQUIREMENTS AND SERVES THE INTENDED PURPOSES. C. EXAMINE OTHER WORK SHOWN ON THE DRAWINGS AND CONDITIONS AT THE JOB SITE. COORDINATE THE ROUTING OF WORK WITH OTHER TRADES TO AVOID INTERFERENCE WITH OTHER INSTALLATIONS. D. PIPE ROUTING AND SPRINKLER HEAD LOCATIONS SHALL BE LOCATED AS REQUIRED TO AVOID EQUIPMENT, PLUMBING, HEATING AND AIR CONDITIONING PIPING, DUCTWORK, LIGHTING FIXTURES, ELECTRICAL CONDUITS AND BUS DUCTS AND SIMILAR WORK. E. PROVIDE PIPE OFFSETS AS REQUIRED TO COMPLETE THE INSTALLATION. MODIFY PIPE, PREFABRICATED PIPING, PIPE HANGERS AND OTHER COMPONENTS AS REQUIRED TO FIT THE JOB SITE CONDITIONS. CLEANING ANO FLUSHING: PRIOR TO CONNECTING SPRINKLER PIPING FOR FLUSHING, FLUSH WATER FEED MAINS, LEAD-IN CONNECTIONS AND CONTROL PORTIONS OF SPRINKLER PIPING. AFTER FIRE SPRINKLER PIPING INSTALLATION HAS BEEN COMPLETED AND BEFORE PIPING IS PLACED IN SERVICE FLUSH ENTIRE SPRINKLER SYSTEM UNDER PRESSURE, AS REQUIRED TO REMOVE FOREIGN SUBSTANCES AS REQUIRED BY NFPA 13. CONTINUE FLUSHING UNTIL WATER IS CLEAR AND CHECK TO ENSURE THAT DEBRIS HAS NOT CLOGGED SPRINKLERS. TESTING: A. AFTER FLUSHING SYSTEM, TEST FIRE SPRINKLER PIPING HYDROSTATIC ALLY IN ACCORDANCE WITH NFPA 13, AT NOT LESS THAN 200 PSI OR AT 50 PSIG. CHECK SYSTEM FOR LEAKAGE AT JOINTS. MEASURE HYDROSTATIC PRESSURE AT LOW POINT OF EACH SYSTEM OR ZDNE BEING TESTED. B. REPAIR OR RE'L.ACE PIPING SYSTEM AS REQUIRED TO ELIMINATE LEAKAGE IN ACCORDANCE WITH NFPA STANDARDS FOR "LITTLE OR NO LEAKAGE" AND RETEST AS SPECIFIED TO DEMONSTRATE COMPLIANCE. SPRINKLER MAINS AND BRANCHES A. PIPING MATERIAL: BLACK STEEL, SCHEDULE 40 OR LIGHTWEIGHT SPRINKLER PIPE, SCHEDULE 10 ASTM A 135 (IF ALLOWED BY LANDLORD AND LOCAL AUTHORITIES). B. FITTINGS: THREADED, CLASS 175. MECHANICAL COUPLINGS AND TEES OF A ROLLED GROOVED TYPE WILL BE ACCEPTED (IN LIEU OF THREADED) IF BOTH U.L. LISTED AND FIRE MARSHAL APPROVED. INSTALLATION: C. ALL SPRINKLER PIPING SHALL BE CONCEALED UNLESS OTHERWISE INDICATED. ALL PIPING SHALL BE LOCATED TO AVOID INTERFERENCE WITH ALL OTHER ELEMENTS ABOVE CEILINGS, ETC. D. SUPPORT ALL HORIZONTAL PIPING AT NOT GREATER THAN 10 FEET INTERVALS, EXCEPT PIPES OF SIZE 1-1/2" AND LARGER WHICH SHALL BE SUPPORTED AT NOT GREATER THAN FIFTEEN FEET INTERVALS, WITH APPROVED SWIVEL SPLIT RING HANGERS WITH ROD SUPPORTS AND SWAY BRACES AT EVERY THIRD HANGER. E. ALL SPRINKLER PIPING SHALL BE INSTALLED SO THAT IS CAN BE THOROUGHLY DRAINED AND WHERE PRACTICAL, ARRANGE TO DRAIN THE MAIN VALVE. SPRINKLER HEADS A. SPRINKLER HEADS SHALL BE: • SALES AREA, HALLWAY/COORIDORS, TOILET ROOMS WITH LAY -IN ACOUSTIC TILE AND GYPSUM BOARD: CONCEALED WITH COVER PLATE, COLOR TO MATCH CEILING COLOR - COORDINATE WITH ARCHITECT. • STOCK ROOM WITH LAY -IN ACOUSTIC TILE: CONCEALED TYPE, CHROME PLATED HEAD WITH ESCUTCHEON COLOR TO MATCH CEILING COLOR - COORDINATE WITH ARCHITECT. • AREA WITH NO CEILING - CHROME PLATED UPRIGHT. B. ALL SPRINKLER HEADS SHALL BE 1/2" ORIFICE, RATED AT 165 DEGREES WITH A K -FACTOR OF 5.65. C. ALL SPRINKLER HEADS THAT ARE TO REMAIN AND BE REUSED SHALL BE PROTECTED DURING CONSTRUCTION AND CLEANED THOROUGHLY TO INSURE THAT THEY ARE CLEAR OF PAINT AND DEBRIS AND ARE IN GOOD WORKING CONDITION, PRIOR TO PROJECT CLOSEOUT. D. ALL SPRINKLER HEADS SHALL BE INSTALLED IN ACCORDANCE TO NFPA 13 AND ALL LOCAL CODES AND AUTHORITIES HAVING JURISDICTION. PLUMBING SCOPE: A. THE WORK TO BE PERFORMED UNDER THE PLUMBING SPECIFICATIONS AND DRAWINGS CONSISTS OF FURNISHING ALL LABOR AND MATERIAL FOR THE COMPLETE INSTALLATION OF ALL PLUMBING SYSTEMS FOR TENANT SPACE. THE WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING: 1. COLD AND HOT WATER SYSTEMS 2. DRAINAGE AND VENT SYSTEMS 3. INSULATION GENERAL: A. THIS SPECIFICATIONS IS INCLUSIVE FOR EACH ITEM REQUIRING ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO PROPERLY INSTALL, ALTER, ADJUST, AND PUT INTO OPERATION, THE COMPLETE PLUMBING SYSTEM . B. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER LAYOUT AND CONSTRUCTION OF THE WORK INCLUDED IN THIS CONTRACT. WORKMANSHIP: ALL WORK MUST BE DONE IN A WORKMANLIKE MANNER TO THE COMPLETE SATISFACTION OF THE ENGINEERS AND SHALL BE PERFORMED BY QUALIFIED MECHANICS. A. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, AND SHALL CONFORM TO THE GRADE, QUALITY AND STANDARDS SPECIFIED HEREIN. ALL MATERIALS AND EQUIPMENT UTILIZED SHALL BE MANUFACTURED IN THE UNITED STATES OF AMERICA. B. ALL EQUIPMENT OFFERED UNDER THESE SPECIFICATIONS SHALL BE LIMITED TO PRODUCTS REGULARLY PRODUCED AND RECOMMENDED FOR SERVICE, IN ACCORDANCE WITH ENGINEERING DATA, RATINGS, OR OTHER COMPREHENSIVE LITERATURE MADE AVAILABLE TO THE PUBLIC AND IN EFFECT AT THE TIME OF OPENING OF BIDS. C. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS FOR TYPE AND CAPACITY OF EACH PIECE OF EQUIPMENT USED. LAW, ORDINANCES AND REGULATIONS: A. ALL MECHANICAL SYSTEMS IN ALL AND/OR PART SHALL CONFORM TO ALL PERTINENT LAWS, ORDINANCES AND REGULATIONS AND ALL BODIES HAVING JURISDICTION, AT ALL GOVERNING LEVELS, NOTWITHSTANDING IN THESE PLANS AND SPECIFICATION TO THE CONTRARY. IN CASE OF CONFLICT BETWEEN GOVERNING LEVELS, THE MORE STRINGENT LAWS SHALL APPLY. B. CONTRACTOR SHALL PAY ALL FEES AND OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED BY ANY AUTHORITY HAVING JURISDICTION IN CONNECTION WITH HIS WORK. C. WHERE APPLICABLE, ALL MATERIAL SHALL BEAR THE THE NATIONAL BOARD OF FIRE UNDERWRITER'S SEAL OF APPROVAL. CERTIFICATES TO THIS EFFECT TO BE FURNISHED TO ARCHITECT TO BE TO ARCHITECT UPON REQUEST. ESCUTCHEONS: A. ALL EXPOSED PIPES, EXCEPT AS OTHERWISE DESCRIBED, PASSING THRU WALLS, FLOORS, CEILINGS, ETC. IN FINISHED SPACES, SHALL BE PROVIDED WITH SOLID PATTERN HEAVY CEILING, FLOOR OR WALL ESCUTCHEONS WITH SET SCREW. ESCUTCHEONS AND PLATES SHALL BE OF STEEL OR MALLEABLE IRON WITH PRIME COAT READY FOR PAINTING. ESCUTCHEONS WILL NOT BE PROVIDED WHERE SLEEVES INTENTIONALLY EXTEND ABOVE FINISHED FLOOR. B. ALL EXPOSED PLUMBING SHORT BRANCH CONNECTIONS TO FIXTURES AND/OR EQUIPMENT PASSING THROUGH WALL OR FLOORS SHALL BE EQUIPPED WITH PRESS BRASS, CHROMIUM PLATED, SOLID TYPE ESCUTCHEONS. GUARANTEE: A. EACH CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE BY OWNER. THE CONTRACTOR SHALL PROVIDE FREE SERVICE FOR ALL EQUIPMENT INVOLVED IN HIS CONTRACT DURING THIS GUARANTEE PERIOD. B. THE GUARANTEE SHALL INCLUDE RESTORATION TO ITS ORIGINAL CONDITION OF ALL ADJACENT WORK THAT MUST BE DISTURBED IN FULFILLING THIS GUARANTEE. C. ALL SUCH REPAIRS AND/OR REPLACEMENTS SHALL BE MADE WITHOUT DELAY, AND AT THE CONVENIENCE OF THE OWNER. TEMPORARY SERVICES: A. THE CONTRACTOR, AT HIS OWN EXPENSE AND COST, SHALL INSTALL, OPERATE, PROTECT AND MAINTAIN THE RESPECTIVE TEMPORARY SERVICES AS REQUIRED BY HIS WORK. TEST OF PIPING AND SYSTEM: A. THE SYSTEMS OF PIPING AS INSTALLED BY THIS CONTRACTOR MUST BE TESTED WITH WATER OR AIR AND PROVEN TIGHT TO THE SATISFACTION OF REPRESENTATIVES OF THE OWNER. TESTING INSTRUMENTS MUST BE FURNISHED BY THE PLUMBING CONTRACTOR. B. TEST MUST BE MADE WITH WATER, EXCEPT WHEN THERE IS DANGER FROM FREEZING, THEN TESTS MAY BE MADE WITH AIR. WOODEN PLUGS ARE NOT TO BE USED IN MAKING TESTS. STERILIZATION OF DOMESTIC WATER SYSTEM: A. BEFORE BEING PLACED IN SERVICE ALL WATER LINES SHALL BE CHLORINATED TO THE SATISFACTION OF THE A.W.W.A SPECIFICATIONS C601 -53T. SOIL WASTE AND VENT PIPING: A. SOIL WASTE PIPING SHALL BE SERVICE WEIGHT CAST IRON PIPE, BELL & SPIGOT TYPE AS REQUIRED. B. VENT PIPE SHALL BE SERVICE WEIGHT CAST IRON BELL & SPIGOT TYPE AS REQUIRED PER LOCAL CODE. INSULATE -ALL LINES (ABOVE CEILING/IN WALLS INCLUDED): A. INSULATION ON COLD WATER, HOT WATER, CONDENSATE LINES, ETC., SHALL BE ARMAFLEX II, OR APPROVED EQUAL, WITH THICKNESS AS REQUIRED. MINIMUM THICKNESS IS 1/27 INCH. B. INSULATION ON ROOF DRAINS AND ROOF DRAIN LEADERS SHALL BE FIBERGLASS WITH MULTI-PURPOSE WRAPPING. SUBSTITUTIONS: A. SUBSTITUTIONS WILL BE CONSIDERED FOR "OR EQUAL" BUT MUST BE APPROVED IN WRITING, BY OWNER, ARCHITECT OR ENGINEER, PRIOR TO INSTALLATION. B. IF, AFTER PLANS ARE COMPLETED, AUTHORITIES RULE THAT HANDICAPPED RESTROOM IS REQUIRED, BUT NOT SHOWN, USE AMERICAN STANDARD 'CADET -HI" WATER CLOSETS AND SET LAVATORY AT PROPER HEIGHT WITH LEVER HANDLES. (VERIFY ALL FINAL EQUIPMENT SPECS WITH PLUMBING DRAWING). WATER PIPING: A. WATER PIPING UNDER FLOOR SHALL BE TYPE "K" SOFT COPPER WITH SILVER SOLDER JOINTS. B. WATER PIPING ABOVE FLOOR SHALL BE TYPE "L" HARD DRAWN COPPER WITH LEAD FREE SOLDER JOINTS. GAS PIPING: A. GAS PIPING INCLUDING TAP AND SERVICE SHALL BE INCLUDED. COORDINATE METER LOCATION WITH LOCAL AUTHORITY. B. UNDERGROUND GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH LONG RADIUS STEEL WELDING FITTINGS. PROTECT PIPE AND FITTINGS WITH TRANTEX WRAPPING TAPE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION. OTHER TYPE OF PIPE PROTECTION OF EQUIVALENT QUALITY WILL BE OPTIONAL WITH THIS CONTRACTOR. INSTALLATION OF GAS SERVICE PIPING AND MATERIAL SHALL MEET WITH LOCAL GAS COMPANY'S APPROVAL. 0 F_ J N Lu H Q U O U) U) Q pIt,D0 uj 0 Lo Lu e(9'� 3N W O a co W� > W z zo z_= J J L o0 J ^ a Q U 0 > Q a N n 117 J 0z0, 0 o aN _wU.© v • 1 z = L) U z W Ir o O � N d� L0 EL0 co co Lu w O4D u- Q on 0 3: 0 O rolU (7)Q ~LOW @D U z @� 0 _joz O en U) 05 2E m W U C. GAS PIPING ABOVE GROUND SHALL BE SCHEDULE 40 BLACK STEEL WITH 125 LB. REVIEWED FORM BLACK MALLEABLE IRON SCREWED FITTINGS AND SUPPORTED AT INTERVALS NOT TO CODE COli PLI. EXCEED 8'-0" AND AT EACH CHANGE IN HORIZONTAL OR VERTICAL DIRECTION. GAS APPR yVEDo Ot: PIPING COMPOUND AT JOINTS SHALL BE IN COMPLIANCE WITH NFPA BULLETIN NO. 51 m m AND LOCAL APPLICABLE CODES AND SUITABLE FOR NATURAL GAS SERVICE. MAR 2 5 20 A LU u. z D. GAS PIPING SHALL SUPPLY HVAC UNITS, WATER HEATER AND KITCHEN EQUIPMENT IF u M< INDICATED ON DRAWINGS BY THIS CONTRACTOR. o N ► o E. MOISTURE TRAPS SHALL BE INSTALLED ON EACH PIPING DROP FOR HVAC UNITS, WATR City ofTukvv "v HEATER AND KITCHEN EQUIPMENT. BI.JIL1 @NO MVI 10N IF YOU HAVE ANY QUESTIONS REGARDING THE RECEIVEDMECHANICAL PLANS, PLEASE CALL THE MECHANICAL CITY OF TUI(WILA DESIGNER. MAR 14 2016 DESIGNER: CRAIG ENGLE PHONE/FAX: 612-465-7680/612-465-7780 PERMIT CENTER E—MAIL: craig.engle®dunhameng.com w W U) z CD W a 0 p m co co Lu o a on rr Q00 00 O Cfl z E p m o n U) w rn � 4D OwC 2 Q zZ)0Z Lu I u U) 1 U LLJ w LO> cc O O 0Onp� c, g IL 0 to r- U) I- cA J } m w a 0 z O W w m o aQ a z m W U C. GAS PIPING ABOVE GROUND SHALL BE SCHEDULE 40 BLACK STEEL WITH 125 LB. REVIEWED FORM BLACK MALLEABLE IRON SCREWED FITTINGS AND SUPPORTED AT INTERVALS NOT TO CODE COli PLI. EXCEED 8'-0" AND AT EACH CHANGE IN HORIZONTAL OR VERTICAL DIRECTION. GAS APPR yVEDo Ot: PIPING COMPOUND AT JOINTS SHALL BE IN COMPLIANCE WITH NFPA BULLETIN NO. 51 m m AND LOCAL APPLICABLE CODES AND SUITABLE FOR NATURAL GAS SERVICE. MAR 2 5 20 A LU u. z D. GAS PIPING SHALL SUPPLY HVAC UNITS, WATER HEATER AND KITCHEN EQUIPMENT IF u M< INDICATED ON DRAWINGS BY THIS CONTRACTOR. o N ► o E. MOISTURE TRAPS SHALL BE INSTALLED ON EACH PIPING DROP FOR HVAC UNITS, WATR City ofTukvv "v HEATER AND KITCHEN EQUIPMENT. BI.JIL1 @NO MVI 10N IF YOU HAVE ANY QUESTIONS REGARDING THE RECEIVEDMECHANICAL PLANS, PLEASE CALL THE MECHANICAL CITY OF TUI(WILA DESIGNER. MAR 14 2016 DESIGNER: CRAIG ENGLE PHONE/FAX: 612-465-7680/612-465-7780 PERMIT CENTER E—MAIL: craig.engle®dunhameng.com w W U) z CD W a 0 0 N Z 0 U 5 w a cn w J F- F- o a 00 U- z o 0 N Z 0 U 5 w a cn w J F- F-