MECHANICAL PERMIT
Parcel No:
9202470010
Permit Number: M16-0069
Address:
344 SOUTHCENTER MALL
Issue Date: 5/17/2016
WA Cities Electrical Code:
2014
Permit Expires On: 11/13/2016
Project Name:
AT&T STORE
2014
Owner:
2012
WA State Energy Code:
Name:
WESTFIELD PROPERTY TAX DEPT
2012
Address:
PO BOX 130940, CARLSBAD, WA,
92013
Contact Person:
Name:
APRIL HOUSE
Phone: (206) 905-3748
Address:
7717 DETROIT AVE SW, SEATTLE, WA,
98106
Contractor:
Name:
MACDONALD/MILLER FAC SOL INC
Phone: (206) 768-4180
Address:
PO BOX 47983, SEATTLE, WA, 98146-
7983
License No:
MACDOFS980RU
Expiration Date: 1/3/2017
Lender:
Name:
Address:
DESCRIPTION OF WORK:
INSTALL (3) FAN
TERMINALS AND (9) GRD'S AND DIFFUSERS. MODIFY EXISTING MEDIUM AND LOW PRESSURE
DUCTWORK PER PLAN.
Valuation of Work: $23,117.00
Fees Collected: $507.20
Type of Work:
NEW
Electrical Service Provided by: PUGET SOUND ENERGY
Fuel type: ELECT
Water District: TUKWILA
Sewer District: TUKWILA SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2012
National Electrical Code:
2014
International Residential Code Edition:
2012
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2012
WAC 296-466:
2014
Uniform Plumbing Code Edition:
2012
WA State Energy Code:
2012
International Fuel Gas Code:
2012
Permit Center Authorized Signature: Date:
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
developmen er=dtons attached to this permit.
Signatur Date:
Print Name:
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
2: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
3: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
4: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
S: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
6: ***MECHANICAL PERMIT CONDITIONS***
7: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
8: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
9: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
0703 MECH EQUIP EFF
1800 MECHANICAL FINAL
0609 PIPE/DUCT INSULATION
0701 ROUGH -IN MECHANICAL
CITY OF TUKWIL.
Community Development Department
Permit Center
• 6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
lin://www.TukwilaWA.gov
SITE LOCATION
Mechanical Permit No. T -1 W6?
Project No.
Date Application Accepted:
Date Application Expires:
or office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
"please print"
3144 King Co Assessor's Tax No.: 9202470010
Site Address: .28e llouthcenter Mall Blvd Tukwila, WA 981 Suite Number: Floor: 1
Tenant Name: AT & T Store New Tenant: ❑ .....Yes ®..No
PROPERTY OWNER
Name: WESTFIELD PROPERTY TAX DEPT
Address: 2800 Southcenter Mall Blvd
City: TUKWILA State: WA Zip: 98168
CONTACT PERSON — person receiving all project
communication
Name: APRIL HOUSE
Address: 7717 Detroit Ave SW
City: Seattle State: WA Zip: 98106
Phone: (206) 905-3748 Fax:
Email: April.House@macmiller.com
MECHANICAL CONTRACTOR INFORMATION
Company Name: MacDonald Miller
Address: 7717 Detroit Ave SW
City: Seattle State: WA zip: 98106
Phone: (206) 768-4278 Fax: (206) 768-4279
Contr Reg No.: MACDOFS980RU Exp Date: 01/03/2017
Tukwila Business License No.: BUS -0994318
Valuation of project (contractor's bid price): $ 23,117
Describe the scope of work in detail:
Install (3) fan terminals and (9) GRDS and Diffusers. Modify existing medium and low pressure ductwork per plan.
Use: Residential:
New ..........
❑
Replacement ........
❑
Commercial:
New ..........
W
Replacement ........
❑
Fuel Type: Electric.....
W
Gas .......
❑ Other:_
N:\Applications\Forms-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 1-4-16.doex
Revised: January 2016 Pagel of 2
bh
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Residential, Nighttime
Furnace > 100k btu
9
Floor furnace
55 dB(A)
Suspended/wall/floor
mounted heater
57 dB(A)
Appliance vent
Commercial
Repair or addition to
heat/refrig/cooling
system
3
Air handling unit
<10,000 cfin
65 dB(A)
Unit Type
Qty
Air handling unit
>10,000 cfin
Residential, Nighttime
Evaporator cooler
9
Ventilation fan
connected to single duct
55 dB(A)
Ventilation system
57 dB(A)
Hood and duct
Commercial
Incinerator — domestic
3
Incinerator —
comm/industrial
65 dB(A)
Unit Type
Qty
Fire damper
Residential, Nighttime
Diffuser
9
Thermostat
55 dB(A)
Wood/gas stove
57 dB(A)
Emergency enerator
Commercial
Other mechanical
equipment
3
60 dB(A)
65 dB(A)
Boiler/Compressor Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Noise:
Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is
created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed.
For more details, see TMC 8.22
District of Sound
Producing Source
District of Receiving Property
Residential, Daytime*
Residential, Nighttime
Commercial
Industrial
Residential
55 dB(A)
45 dB(A)
57 dB(A)
60 dB(A)
Commercial
57 dB(A)
47 dB(A)
60 dB(A)
65 dB(A)
Industrial
60 dB(A)
50 dB(A)
65 dB(A)
70 dB(A)
*Daytime means 7AM-1 OPM, Monday through Friday and 8AM-1OPM, Saturday, Sunday and State -recognized holidays.
A few sounds are exempt from the noise code, including:
Warning devices;
Construction and property maintenance during the daytime hours (lam -1 Opm);
Testing of backup generators during the day.
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWWER OR AUTHORIZED AGENT:
Print Name: APRIL HOUSE
Mailing Address: 7717 DETROIT AVE SW
Date: 05/05/2016
Day Telephone: (206) 905-3748
SEATTLE WA 98106
City State Zip
H:\Applications\Formt-Applications On Linc12016 ApplicationsWechanical Permit Application Revised 14-16.docz
Revised: January 2016 Page 2 of 2
bh
Date Paid: Thursday, May 05, 2016
Paid By: MACDONALD-MILLER FACILITY SOLU
Pay Method: CHECK 4476
Printed: Thursday, May 05, 2016 4:00 PM 1 of 1U[_? L/J srsrerns
INSPECTION RECORD r
Retain a copy with permit r 0-( ff
IZPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd- #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
a of Inspection:
Va�t
Address:
e Called:
3qq.-W
14iA U,
Special Instructions:
Date Wanted: a.m.
I z �_Gr� P.M.
Requesie�:
Phone No:
2W -S77)- 29RO
EnApproved per applicable codes. LJ Corrections required prior to approval.
(Inspector: -M Iuate: a A 1&
El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection.
INSPECTION RECORD
9J 104
Retain a copy with permit I U�
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
A
Type of Inspection:
Address:
13 yt)
Date Called:
Special Instructions:
Date WWnd: a.m.
�Z % p.m.
Request r:
Phone No:
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit 'ex,
� 16- D
INS ION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:,�
Type of Inspection:
Lid AQC
Date Called
Special Instructions:
Date Wgnte _ 16 e r a.
p.m.
Request r:
Phone e 5-71 3T-3
3
UQApproved per applicable codes. El Corrections required prior to approval.
COMMENTS:
Inspector: Date:
e4►.ul
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
m o o npi c c c cm nrT p D D
m
v 0 3 a 3 3 3 s y a
o v �'. m
to co m m Q m m �� a,
e°T n�i 3 op c° cc (D y cD cD m m a o `�
CL a C X= C 7 CD 7 LA Ln- �, v CD S
3 3 °: m (Q cO � m
� S = r � @ CL (n CD Cn `G a S
a s CSD (D n (D C 7 C '; (a a CD `a CD
d
O O M. — fy 0 Q C a' C C O
CC (C a n j Q II' (S O
`< `G CD n CD CL
C
CD
C n C_ A 0 0 -► <O V 00 A is 0 0
= 0 0 0 0 0 0 0 O 0000 000 r
0 coo i, CCA AAAA
r,
" v
D�
=3
.Z1 �
W m_irrr
-{ n
p p�
!' F 3 3 9 8
ili
(n
o <CD �2_ E m
c
y
m o o 0. m
:3
m y
®
;°
CD CD
o
v :3
w
O
CD =
3
3 M o
CD
CD
N
CD CD
O O
3
C
y
CD Qo —
CD
O
0
n o
C �1
(ND COT( O W O)
Gf V
-CO)-�
D
N N O G o
N
Q Oo 0
r
'n
0
N
D
m O Q
N
m
3
Cn Z
3 M o
= (
N
O
A
O O
3
n
C
N
CD Qo —
m'T1
Q W W W Q 7 CD(DN f0/I
N =
r
'n
3
__
= m (a
co
ClU-2o
°T
m
3 M o
= (
7 7
n o
C �1
N
O L1
CL
ray
y�
` ,
c
N 3
=i
C)-0
�M
K) *
M
90<n
I
c
�`
�
<
&y
cn
0 0 T co a
3 3 co a v
CD m3 co
= O
CD
CD
i
i
A
M
m
v
Room Checksums
By MACDONALD-MILLER
001 SALES NORTH
COOLING COIL PEAK
COOLING COIL SELECTION
CLG SPACE PEAK
HEATING COIL PEAK
Coil Airflow
TEMPERATURES
Peaked
at Time:
Mo/Hr:
7 / 16
gr/Ib
Mo/Hr:
8 / 17
Mo/Hr: Heating Design
77.9 65.7
77.6
Cooling
Heating
Outside Air:
OADB/WB/HR: 87 / 74 / 110
0.0
OADB:
79
OADB: -9
0.0 0.0
0.0
SADB
55.0
88.0
0
0
Wall
428
326
76
Ext Door
42
0
0
Ra Plenum
75.5
69.9
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Return
75.5
69.9
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
77.9
16.6
Btu/h
Btu/h
Btu/h
(%) :
Btu/h
(%)
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
: Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0:
0
0 Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0•
0
0: Skylite Cond
0
0
0.00
Roof Cond
0
0
0
0
0
0 Roof Cond
0
0
0.00
Glass Solar
13,108
0
13,108
17 ;
15,907
36 Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
Wail Cond
1,429
0
0
82
1,429
82
2 :
0 :
451
0
1 Glass/Door Cond
0 Wall Cond
-11,027
0
-11,027
-442
14.12
0.57
Cooling
Heating
Partition/Door
0
0
0:
0
0: Partition/Door
0
0
0.00
Diffuser
2,019
2,019
Floor
0
0
0
0
0 Floor
0
0
0.00
Terminal
2,019
2,019
Adjacent Floor
0
0
0
01
0
0 Adjacent Floor
0
0
0.00
Main Fan
2,019
606
Infiltration
7,477
7,477
10 ;
868
2 Infiltration
-15,592
-15,592
19.97
Sec Fan
2,019
2,019
Sub Total =_>
22,014
82
22,096
28:
17,227
39: Sub Total =_>
-26,619
-27,062
34.65
Nom Vent
409
409
Internal Loads
Internal Loads
AHU Vent
Infil
1 182
82
409
182
Lights
4,956
1,239
6,195
81
4,956
11 Lights
0
0
0.00
MinStop/Rh
606
606
People
27,000
0
27,000
34 '
15,000
34 People
0
0
0.00
Return
2,201
787
Misc
6,485
0
6,485
8 ;
6,485
15 Misc
0
0
0.00
Exhaust
590
590
Sub Total =_>
38,440
1,239
39,679
51
26,440
60 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
257
-257
0
0
250
1 Ceiling Load
-86
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
16,845
22
0
0 Ventilation Load
0
-35,128
44.98
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0 :
0
0 : Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
-12,821
-12,821
16.42
Ov/Undr Sizing
Exhaust Heat
0
-287
0
-287
0
0
0
0 Exhaust Heat
OA Preheat Diff.
96
0
-0.12
0.00
ENGINEERING CKS
Sup. Fan Heat
0
0
RA Preheat Diff.
-3,180
4.07
Cooling
Heating
Ret. Fan Heat
0
0
0:
: Additional Reheat
0
0.00
% OA
20.2
67.5
Duct Heat Pkup
0
0
O:
System Plenum Heat
0
0.00
cfm/ft'
1.11
1.11
Underflr Sup Ht Pkup
0
0
Underfir Sup Ht Pkup
0
0.00
cfm/ton
309.34
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft'/ton
278.04
Btu /heft'
43.16
-43.03
Grand Total ==>
60,711
777
78,333
100.00
43,918
100.00 Grand Total =_>
-39,526
-78,095
100.00
No. People
60.0 33.1/1000 ft'
Total 6.5 78.3
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
'F °F gr/Ib
55.0 52.7 57.2
0.0 0.0 0.0
0.0 0.0 0.0
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F °F
gr/Ib
Main Clg 6.5 78.3
50.0
2,008
77.9 65.7
77.6
Aux Clg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 6.5 78.3
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
'F °F gr/Ib
55.0 52.7 57.2
0.0 0.0 0.0
0.0 0.0 0.0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 1 of 8
AREAS
Capacity Coil Airflow
Gross Total
Glass
MBh cfm
'F
ft'
(%)
Floor
1,815
88.0
Htg
Part
0
0.0
seat
Int Door
0
55.0
eat
ExFlr
0
70.0
iidif
Roof
0
0
0
Wall
428
326
76
Ext Door
42
0
0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 1 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
'F
°F
i Htg
49.6 2,019
65.4
88.0
Htg
0.0 0
0.0
0.0
seat
-28.5 409
-9.0
55.0
eat
-9.9 606
55.0
70.0
iidif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
i/
-78.1
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 1 of 8
Room Checksums
By MACDONALD-MILLER
001 SALES SOUTH
COOLING COIL PEAK
HEATING COIL SELECTION
COOLING COIL SELECTION
CLG SPACE PEAK
Total Capacity
HEATING COIL PEAK
Coli Airflow
TEMPERATURES
Peaked
at Time:
Mo/Hr. 7 / 15
dm
Mo/Hr:
7 / 15
Main Clg 3.6
Mo/Hr: Heating Design
26.6
1,041
Cooling
Heating
Outside Air:
OADB/WB/HR: 88/75/113
0.0
OADB:
88
0.0
OADB: -9
0.0
0.0
SADB
55.0
88.0
0.0 0
0.0
0.0
/
-49.1
Re Plenum
75.5
69.6
Space
Plenum
Net
Percent
Space
Percent:
Space Peak
Coil Peak
Percent
Return
75.5
69.6
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
78.5
18.8
Btu/h
Btu/h
Btu/h
(%);
Btu/h
(%)
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
:
Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0:
0
0
Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0:
Skylite Cond
0
0
0.00
Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00
Glass Solar
5,058
0
5,058
12 ;
5,058
18 ;
Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
2,137
0
2,137
5 :
2,137
8
Glass/Door Cond
-16,557
-16,557
33.71
Wall Cond
0
126
126
0
0
0 :
Wall Cond
0
-670
1.36
Cooling
Heating
Partition/Door
0
0
0:
0
0:
Partition/Door
0
0
0.00
Diffuser
1,284
1,284
Floor
0
0
0
0
0:
Floor
0
0
0.00
Terminal
1,284
1,284
Adjacent Floor
0
0
0
0
0
0
Adjacent Floor
0
0
0.00
Main Fan
1,284
385
Infiltration
3,882
3,882
9:
1,392
5
Infiltration
-8,462
-8,462
17.23
Sec Fan
1,284
1,284
Sub Total =_>
11,077
126
11,203
26:
8,587
31
Sub Total =_>
-25,019
-25,689
52.30
Nom Vent
249
249
AHU Vent
249
249
Internal Loads
Internal Loads
Infil
99
99
Lights
2,689
672
3,362
8:
2,689
10:
Lights
0
0
0.00
MinStop/Rh
385
385
People
17,100
0
17,100
40
9,500
34
People
0
0
0.00
Return
1,383
484
Misc
1,707
0
1,707
4
1,707
6
Misc
0
0
0.00
Exhaust
348
348
Sub Total =_>
21,496
672
22,168
52
13,896
50 :
Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
161
-161
0
0
161
1
Ceiling Load
-115
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
9,817
23 ;
0
0
Ventilation Load
0
-21,400
43.57
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 :
Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
0
0
0.00
Ov/Undr Sizing
0
0
0
5,283
19
Exhaust Heat
140
-0.28
ENGINEERING CKS
Exhaust Heat
-194
-194
0
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0:
RA Preheat Diff.
-2,166
4.41
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
19.4
64.7
Duct Heat Pkup
0
0
0:
System Plenum Heat
0
0.00
cfm/ft'
1.30
1.30
Underflr Sup Ht Pkup
0
0:
Underfir Sup Ht Pkup
0
0.00
cfm/ton
358.39
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft'/ton
274.93
Btu/heft'
43.65
-49.86
Grand Total =_>
32,733
443
42,993
100.00
27,927
100.00 '
Grand Total ==>
-25,134
49,115
100.00
No, People
38.0 38.6/1000 ft'
Total 3.6 43.0
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 54.1 62.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
COOLING COIL SELECTION
Gross Total
Total Capacity
Sens Cap.
Coli Airflow
Enter DB/WB/HR
ton
MBh
MBh
dm
°F °F
gr/Ib
Main Clg 3.6
43.0
26.6
1,041
78.5 67.3
85.3
Aux Clg 0.0
0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0
0.0
0.0
0
0.0 0.0
0.0
Total 3.6 43.0
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 54.1 62.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
Gross Total
Glass
Ent
Lvg
ft'
(%)
Floor 985
°F
i Htg
Part 0
65.2
88.0
Int Door 0
0.0 0
0.0
ExFlr 0
wat
-17.3 249
Roof 0
0
0
Wall 665
510
77
Ext Door 42
0
0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 2 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
i Htg
-31.8 1,284
65.2
88.0
Htg
0.0 0
0.0
0.0
wat
-17.3 249
-9.0
55.0
eat
-6.3 385
55.0
70.0
iidif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
/
-49.1
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 2 of 8
Room Checksums
By MACDONALD-MILLER
002 MGR OFFICE
Total 0.2 2.6
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.7 57.0
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL PEAK
Total Capacity
CLG SPACE PEAK
HEATING COIL PEAK
ton MBh
TEMPERATURES
Peaked at Time:
Mo/Hr:
7115
Mo/Hr:
7 / 15
Mo/Hr:
Heating Design
0.0 0.0
0.0
Cooling
Heating
Outside
Air:
OADB/WB/HR:
88/75/113
Wall 0
OADB:
88
OADB:
-9
0
SADB
55.0
88.0
0.0
0.0
Total
-2.8
Ra Plenum
75.6
70.0
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Return
75.6
70.0
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
76.8
45.4
Btu/h
Btu/h
Btu/h
(%);
Btu/h
(%) :
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
: Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0:
0
0 : Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0 Skylite Cond
0
0
0.00
Roof Cond
0
0
0
0
0
0 Roof Cond
0
0
0.00
Glass Solar
0
0
0
0
0
0 Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0
0
0 Glass/Door Cond
0
0
0.00
Cooling
Heating
Wall Cond
0
0
0
0:
0
0: Wall Cond
0
0
0.00
Partition/Door
0
0
0:
0
0: Partition/Door
0
0
0.00
Diffuser
91
91
Floor
0
0
0:
0
0 Floor
0
0
0.00
Terminal
91
91
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
91
27
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
91
91
Sub Total =_>
0
0
0
0:
0
0: Sub Total =_>
0
0
0.00
Nom Vent
8
8
AHU Vent
8
8
Internal Loads
Internal Loads
Infil
0
0
Lights
174
44
218
8
174
9 Lights
0
0
0.00
MinStop/Rh
27
27
People
450
0
450
17
250
13 People
0
0
0.00
Return
91
27
Misc
1,536
0
1,536
58;
1,536
78; Misc
0
0
0.00
Exhaust
8
8
Sub Total =_>
2,160
44
2,204
84
1,960
99 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
12
-12
0
0
12
1 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
431
16:
0
0 Ventilation Load
0
-729
25.94
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0: Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0 •
Ov/UndrSizing
-1,774
-1,774
63.19
Ov/Undr Sizing
0
0
0
0
0 : Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-6
-6
0;
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0
: RA Preheat Diff.
-305
10.87
Cooling
Heating
Ret. Fan Heat
0
0
0
Additional Reheat
0
0.00
% OA
9.4
31.2
Duct Heat Pkup
0
0
O:
System Plenum Heat
0
0.00
cfm/ft'
1.56
1.56
Underflr Sup Ht Pkup
0
0
Underflr Sup Ht Pkup
0
0.00
cfm/ton
413.81
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft2/ton
264.76
Btu /heft=
45.32
-48.42
Grand Total ==>
2,172
26
2,629
100.00'
1,972
100.00 Grand Total ==>
-1,774
-2,808
100.00
No. People
1.0 17.2/1000 ftz
Total 0.2 2.6
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.7 57.0
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DB/WB/HR
ton MBh
MBh cfm
°F °F
gr/Ib
Main Clg 0.2 2.6
2.1 91
76.8 62.7
64.8
Aux CIg 0.0 0.0
0.0 0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0 0
0.0 0.0
0.0
Total 0.2 2.6
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.7 57.0
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
Gross Total
Glass
Ent
Lvg
ft2
(%)
Floor 58
°F
Main Htg
Part 0
65.5
88.0
Int Door 0
0.0 0
0.0
ExFlr 0
Preheat
-0.6 8
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 3 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
Main Htg
-2.2 91
65.5
88.0
Aux Htg
0.0 0
0.0
0.0
Preheat
-0.6 8
-9.0
55.0
Reheat
-0.4 27
55.0
70.0
Humidif
0.0 0
0.0
0.0
Opt Vent
0.0 0
0.0
0.0
Total
-2.8
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 3 of 8
Room Checksums
By MACDONALD-MILLER
003 LOUNGE
Total 0.1 1.1
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL PEAK
Total Capacity
CLG SPACE PEAK
HEATING COIL PEAK
ton MBh
TEMPERATURES
°F °F
Peaked at Time:
Mo/Hr:
7 / 15
80.7 67.3
Mo/Hr:
7 / 15
Mo/Hr: Heating Design
0.0 0.0
0.0
Cooling Heating
Outside
Air:
OADB/WB/HR:
88/75/113
0
OADS:
88
OADB: -9
Ext Door 0
0
SADB
55.0
88.0
0.0 0
0.0
0.0
d
-1.2
Re Plenum
75.6
70.0
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Return
75.6
70.0
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
80.7
-9.0
Btu/h
Btu/h
Btu/h
(%)
Btu/h
(%):
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0
0
0: Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0:
0
0' Skylite Cond
0
0
0.00
Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00
Glass Solar
0
0
0
0;
0
0: Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
Cooling
Heating
Wall Cond
0
0
0
0
0
0 Wall Cond
0
0
0.00
Partition/Door
0
0
0
0
0 Partition/Door
0
0
0.00
Diffuser
23
23
Floor
0
0
0
0
0Floor
0
0
0.00
Terminal
23
23
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
23
7
Infiltration
0
0
0
0
0 Infiltration
0
0
0.00
Sec Fan
23
23
Sub Total =_>
0
0
0
0
0
0 Sub Total =_>
0
0
0.00
Nom Vent
9
7
AHU Vent
9
7
Internal Loads
Internal Loads
Infil
0
0
Lights
466
116
582
56
466
94 Lights
0
0
0.00
MinStop/Rh
7
7
People
0
0
0
0
0
0 People
0
0
0.00
Return
23
7
Misc
0
0
0
0
0
0 Misc
0
0
0.00
Exhaust
9
7
Sub Total =_>
466
116
582
56
466
94 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
31
-31
0
0
31
6 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
473
45:
0
0 Ventilation Load
0
-588
48.79
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0 Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
447
-447
37.05
Ov/Undr Sizing
0
0
0
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-6
-6
-1
OA Preheat Diff.
-171
14.16
Sup. Fan Heat
0
0:
: RA Preheat Diff.
0
0.00
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
40.7
100.0
Duct Heat Pkup
0
0
0
System Plenum Heat
0
0.00
cfm/ft'
0.15
0.15
Underflr Sup Ht Pkup
0
0
Underflr Sup Ht Pkup
0
0.00
cfm/ton
261.27
Supply Air Leakage
0
0
0 •
Supply Air Leakage
0
0.00
ft'/ton
1,774.35
Btu/hr-ft'
6.76
-7.78
Grand Total ==>
496
79
1,048
100.00
496
100.00 Grand Total ==>
447
-1,206
100.00
No. People
0.0 0.0/1000 ft2
Total 0.1 1.1
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DB/WB/HR
ton MBh
MBh cfm
°F °F
gr/Ib
Main Cig 0.1 1.1
0.7 23
80.7 67.3
81.6
Aux Clg 0.0 0.0
0.0 0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0 0
0.0 0.0
0.0
Total 0.1 1.1
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
Gross Total
Glass
Ent
Lvg
ft'
(%)
Floor 155
°F
i Htg
Part 0
65.5
88.0
Int Door 0
0.0 0
0.0
ExFlr 0
seat
-0.7 9
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 4 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
'F
°F
i Htg
-0.6 23
65.5
88.0
Htg
0.0 0
0.0
0.0
seat
-0.7 9
-9.0
55.0
eat
-0.1 7
55.0
70.0
iidif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
d
-1.2
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 4 of 8
Room Checksums
By MACDONALD-MILLER
004 INVENTORY/MDP RM
Total 0.3 3.2
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DBIWB/HR
°F °F gr/Ib
55.0 52.6 56.9
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL PEAK
Total Capacity
CLG SPACE PEAK
HEATING COIL PEAK
ton MBh
TEMPERATURES
Peaked at Time:
Mo/Hr:
7/15
Mo/Hr:
7 / 15
Mo/Hr: Heating Design
0.0 0
0.0 0.0
Cooling
Heating
Outside Air:
OADB/WB/HR:
88/75/113
0
OADB:
88
OADB: -9
0
Ext Door 0
SADB
55.0
88.0
Opt Vent
0.0 0
0.0
0.0
Total
-3.4
Ra Plenum
75.6
70.0
Space
Plenum
Net
Percent :
Space
Percent:
Space Peak
Coil Peak
Percent
Return
75.6
70.0
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
77.2
35.8
Btu/h
Btu/h
Btu/h
(%)
Btu/h
(%)
Bluth
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
: Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0:
0
0 : Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0:
0
0 Skylite Cond
0
0
0.00
Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00
Glass Solar
0
0
0
0
0
0: Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
Wall Cond
0
0
0
0:
0
0; Wall Cond
0
0
0.00
Cooling
Heating
Partition/Door
0
0
0:
0
0. Partition/Door
0
0
0.00
Diffuser
103
103
Floor
0
0
0:
0
0: Floor
0
0
0.00
Terminal
103
103
Adjacent Floor
0
0
0
0:
0
0 Adjacent Floor
0
0
0.00
Main Fan
103
31
Infiltration
0
0
0
0
0 Infiltration
0
0
0.00
Sec Fan
103
103
Sub Total =_>
0
0
0
0:
0
o: Sub Total =_>
0
0
0.00
Nom Vent
13
13
AHU Vent
13
13
Internal Loads
Internal Loads
Infil
0
0
Lights
417
104
522
16
417
19: Lights
0
0
0.00
MinStop/Rh
31
31
People
450
0
450
14
250
11 People
0
0
0.00
Return
103
31
Misc
1,536
0
1,536
48;
1,536
69; Misc
0
0
0.00
Exhaust
13
13
Sub Total =_>
2,403
104
2,508
79
2,203
99 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
28
-28
0
0
28
1 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
678
21
0
0 Ventilation Load
0
-1,146
33.33
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 : Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
-2,008
-2,008
58.40
Ov/Undr Sizing
0
0
0
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-9
-9
0.
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0
RA Preheat Diff.
-284
8.27
Cooling
Heating
Ret. Fan Heat
0
0
0 :
Additional Reheat
0
0.00
% OA
13.0
43.3
Duct Heat Pkup
0
0
0 :
System Plenum Heat
0
0.00
cfm/ft'
0.74
0.74
Underflr Sup Ht Pkup
0
0
: Underflr Sup Ht Pkup
0
0.00
cfm/ton
387.50
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
Whon
525.08
Btu /heft'
22.85
-24.74
Grand Total ==>
2,431
68
3,177
100.00
2,231
100.00 Grand Total =_>
-2,008
-3,438
100.00
No. People
1.0
7.2/1000 ftz
Total 0.3 3.2
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DBIWB/HR
°F °F gr/Ib
55.0 52.6 56.9
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DB/WB/HR
ton MBh
MBh cfm
°F °F
gr/Ib
Main Clg 0.3 3.2
2.5 103
77.2 63.2
66.7
Aux Clg 0.0 0.0
0.0 0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0 0
0.0 0.0
0.0
Total 0.3 3.2
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DBIWB/HR
°F °F gr/Ib
55.0 52.6 56.9
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
Gross Total
Glass
Ent
Lvg
ft2
(%)
Floor 139
°F
Main Htg
Part 0
65.5
88.0
Int Door 0
0.0 0
0.0
ExFlr 0
Preheat
-0.9 13
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 5 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
Main Htg
-2.5 103
65.5
88.0
Aux Htg
0.0 0
0.0
0.0
Preheat
-0.9 13
-9.0
55.0
Reheat
-0.5 31
55.0
70.0
Humidif
0.0 0
0.0
0.0
Opt Vent
0.0 0
0.0
0.0
Total
-3.4
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 5 of 8
Room Checksums
By MACDONALD-MILLER
005A WOMENS TOILET
COOLING COIL PEAK
COOLING COIL SELECTION
CLG SPACE PEAK
HEATING COIL PEAK
Enter DB/WB/HR
TEMPERATURES
Peaked
at Time:
Mo/Hr: 7 / 15
Main Clg 0.0 0.3
Mo/Hr:
7 / 15
Mo/Hr:
Heating Design
0.0 0
0.0 0.0
Cooling
Heating
Outside
Air:
OADB/WB/HR:
88 / 75 / 113
Reheat
OADB:
88
OADB:
-9
Roof
SADB
55.0
88.0
Wall
0
0
0
Ext Door
0
0
0
Re Plenum
75.6
70.0
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Return
75.6
70.0
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
80.7
-9.0
Btu/h
Btu/h
Btu/h
(%)
Btu/h
(%) :
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
: Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0:
0
0 : Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0 Skylite Cond
0
0
0.00
Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00
Glass Solar
0
0
0
0
0
0 Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
Wall Cond
0
0
0
0:
0
0: Wall Cond
0
0
0.00
Cooling
Heating
Partition/Door
0
0
0
0
0: Partition/Door
0
0
0.00
Diffuser
6
6
Floor
0
0
0:
0
0: Floor
0
0
0.00
Terminal
6
6
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
6
2
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
6
6
Sub Total =_>
0
0
0
0:
0
0: Sub Total =_>
0
0
0.00
Nom Vent
2
2
AHU Vent
2
2
Internal Loads
Internal Loads
Infil
0
0
Lights
123
31
154
56
123
94 Lights
0
0
0.00
MinStop/Rh
2
2
People
0
0
0
0
0
0 People
0
0
0.00
Return
6
2
Misc
0
0
0
0;
0
0 Misc
0
0
0.00
Exhaust
2
2
Sub Total =_>
123
31
154
56
123
94 Sub Total ==>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
8
-8
0
0
8
6 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
125
45
0
0 Ventilation Load
0
-156
48.81
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0: Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
01
Ov/Undr Sizing
-118
-118
37.04
Ov/Undr Sizing
0
0
0:
0
0 Exhaust Heat
0
0.00
ENGINEERING
CKS
Exhaust Heat
-2
-2
-1
OA Preheat Diff.
-45
14.15
Sup. Fan Heat
0
0:
RA Preheat Diff.
0
0.00
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
40.7
100.0
Duct Heat Pkup
0
0
O:
: System Plenum Heat
0
0.00
cfm/ft'
0.15
0.15
Underflr Sup Ht Pkup
0
0
Underflr Sup Ht Pkup
0
0.00
cfm/ton
261.29
Supply Air Leakage
0
0
0:
;Supply Air Leakage
0
0.00
ft'/ton
1,774.29
Btu /heft'
6.76
-7.78
Grand Total ==>
131
21
277
100.00
131
100.00 Grand Total ==>
-118
-319
100.00
No. People
0.0 0.0/1000 ft'
Total 0.0 0.3
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
COOLING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DB/WB/HR
ton MBh
MBh cfm
°F °F
gr/Ib
Main Clg 0.0 0.3
0.2 6
80.7 67.3
81.6
Aux Clg 0.0 0.0
0.0 0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0 0
0.0 0.0
0.0
Total 0.0 0.3
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 6 of 8
AREAS
Capacity Coil Airflow
Gross Total
Glass
MBh cfm
°F
ft'
(%)
Floor
41
88.0
Aux Htg
Part
0
0.0
Preheat
Int Door
0
55.0
Reheat
ExFlr
0
70.0
Humidif
Roof
0
0
0
Wall
0
0
0
Ext Door
0
0
0
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 6 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
Main Htg
-0.2 6
65.5
88.0
Aux Htg
0.0 0
0.0
0.0
Preheat
-0.2 2
-9.0
55.0
Reheat
0.0 2
55.0
70.0
Humidif
0.0 0
0.0
0.0
Opt Vent
0.0 0
0.0
0.0
Total
-0.3
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 6 of 8
Room Checksums
By MACDONALD-MILLER
0058 MENS TOILET
COOLING COIL PEAK
COOLING COIL SELECTION
Cooling
CLG SPACE PEAK
HEATING COIL PEAK
Coil Airflow
Peaked
at Time:
Mo/Hr:
7 / 15
°F °F
Mo/Hr:
7 / 15
Mo/Hr:
Heating Design
80.7 67.3
Outside
Air:
OADB/WB/HR: 88 / 75 / 113
0
OADB:
88
OADB:
-9
0
0.0 0.0
Space
Plenum
Net
Percent.
Space
Percent :
Space Peak
Coil Peak
Percent
Rm Exh
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
0
Btu/h
Btu/h
Btu/h
(%):
Btu/h
(%),:
Btu/h
Btu/h
(%)
Envelope Loads
: Envelope Loads
Skylite Solar
0
0
0
0:
0
0: Skylite Solar
0
0
0.00
Skylite Cond
0
0
0
0:
0
0 Skylite Cond
0
0
0.00
Roof Cond
0
0
0
0
0
0 Roof Cond
0
0
0.00
Glass Solar
0
0
0
0�
0
0; Glass Solar
0
0
0.00
Glass/Door Cond
0
0
0
0:
0
0; Glass/Door Cond
0
0
0.00
Wall Cond
0
0,
0
0
0
0; Wall Cond
0
0
0.00
Partition/Door
0
0
0:
0
0 Partition/Door
0
0
0.00
Floor
0
0
0:
0
0: Floor
0
0
0.00
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Infiltration
0
0
0
0
0 Infiltration
0
0
0.00
Sub Total =_>
0
0
0
0:
0
0: Sub Total =_>
0
0
0.00
Internal Loads
Internal Loads
Lights
162
41
203
56
162
94 Lights
0
0
0.00
People
0
0
0
0
0
0 People
0
0
0.00
Misc
0
0
0
0
0
0; Misc
0
0
0.00
Sub Total =_>
162
41
203
56:
162
94 Sub Total =_>
0
0
0.00
Ceiling Load
11
-11
0
0:
11
6 Ceiling Load
0
0
0.00
Ventilation Load
0
0
165
45 ;
0
0 Ventilation Load
0
-205
48.80
Adj Air Trans Heat
0
0
O:
0
0 : Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0:
Ov/Undr Sizing
-156
-156
37.04
Ov/Undr Sizing
0
0
0
0
0 Exhaust Heat
0
0.00
Exhaust Heat
-2
-2
-1
OA Preheat Diff.
-59
14.16
Sup. Fan Heat
0
0
: RA Preheat Diff.
0
0.00
Ret. Fan Heat
0
0
0 :
Additional Reheat
0
0.00
Duct Heat Pkup
0
0
0 :
System Plenum Heat
0
0.00
Underflr Sup Ht Pkup
0
0,
Underflr Sup Ht Pkup
0
0.00
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
Grand Total ==>
173
28
365
100.00'
173
100.00 Grand Total ==>
-156
-420
100.00
Total 0.0 0.4
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Cooling
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F °F
gr/Ib
Main Clg 0.0 0.4
0.3
8
80.7 67.3
81.6
Aux Clg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 0.0 0.4
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
Cooling
Gross Total
Glass
55.0
88.0
ft.
(%)
Floor 54
Return
75.6
Part 0
Ret/OA
80.7
Int Door 0
Fn MtrTD
0.0
ExFlr 0
Fn BIdTD
0.0
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
TEMPERATURES
HEATING COIL SELECTION
Cooling
Heating
SADB
55.0
88.0
Ra Plenum
75.6
70.0
Return
75.6
70.0
Ret/OA
80.7
-9.0
Fn MtrTD
0.0
0.0
Fn BIdTD
0.0
0.0
Fn Frict
0.0
0.0
AIRFLOWS
HEATING COIL SELECTION
Cooling
Cooling
Heating
Diffuser
8
8
Terminal
8
8
Main Fan
8
2
Sec Fan
8
8
Nom Vent
3
2
AHU Vent
3
2
Infil
0
0
MinStop/Rh
2
2
Return
8
2
Exhaust
3
2
Rm Exh
0
0
Auxiliary
0
0
Leakage Dwn
0
0
Leakage Ups
0
0
ENGINEERING CKS
HEATING COIL SELECTION
Cooling
Heating
% OA
40.7
100.0
cfm/ft'
0.15
0.15
cfm/ton
261.28
-0.2 8
ft'/ton
1,774.31
x Htg
Btu/heft'
6.76
-7.78
No. People
0.0
0.0/1000 ftz
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 7 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
in Htg
-0.2 8
65.5
88.0
x Htg
0.0 0
0.0
0.0
sheat
-0.2 3
-9.0
55.0
heat
0.0 2
55.0
70.0
midif
0.0 0
0.0
0.0
t Vent
0.0 0
0.0
0.0
W
-0.4
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 7 of 8
Room Checksums
By MACDONALD-MILLER
006 STORAGE
COOLING COIL PEAK
COOLING COIL SELECTION
CLG SPACE PEAK
HEATING COIL PEAK
Coil Airflow Enter DB/WB/HR
TEMPERATURES
Peaked
at Time:
Mo/Hr: 7 / 15
Main Cig 0.6 7.5
Mo/H r:
7 / 15
Mo/Hr:
Heating Design
0.0
0 0.0 0.0
Cooling
Heating
Outside Air:
OADB/WB/HR: 88/75/113
0.0
OADB:
88
OADB:
-9
0
SADB
55.0
88.0
0.0
Vent
0.0 0
0.0
0.0
/
-8.3
Ra Plenum
75.6
70.0
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Return
75.6
70.0
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
76.4
54.7
Btu/h
Btu/h
Btu/h
(%);
Btu/h
(%);
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0:
0
0 Skylite Solar
0
0
0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0 Skylite Cond
0
0
0.00
Roof Cond
0
0
0
0
0
0 Roof Cond
0
0
0.00
Glass Solar
0
0
0
0:
0
0: Glass Solar
0
0
0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
Cooling
Heating
Wall Cond
0
0
0
0:
0
0 Wall Cond
0
0
0.00
Partition/Door
0
0
0:
0
0 Partition/Door
0
0
0.00
Diffuser
292
292
Floor
0
0
0
0
0: Floor
0
0
0.00
Terminal
292
292
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
292
88
Infiltration
0
0
0
0
0 Infiltration
0
0
0.00
Sec Fan
292
292
Sub Total =_>
0
0
0
0 :
0
0: Sub Total =_>
0
0
0.00
Nom Vent
17
17
AHU Vent
17
17
Internal Loads
Internal Loads
Infil
0
0
Lights
598
149
747
10
598
9 Lights
0
0
0.00
MinStop/Rh
88
88
People
450
0
450
6
250
4 People
0
0
0.00
Return
292
88
Misc
5,459
0
5,459
73 ;
5,459
86 Misc
0
0
0.00
Exhaust
17
17
Sub Total =_>
6,507
149
6,656
89
6,307
99 Sub Total ==>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
40
-40
0
0
40
1 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
861
11
0
0 Ventilation Load
0
-1,455
17.49
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0 Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
01
Ov/Undr Sizing
-5,712
-5,712
68.66
Ov/Undr Sizing
0
0
0
0
0 Exhaust Heat
0
0.00
ENGINEERING
CKS
Exhaust Heat
-12
-12
0 ;
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0 :
: RA Preheat Diff.
-1,152
13.84
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
5.8
19.4
Duct Heat Pkup
0
0
0:
: System Plenum Heat
0
0.00
cfm/ft,
1.47
1.47
Underfir Sup Ht Pkup
0
0
Underfir Sup Ht Pkup
0
0.00
cfm/ton
466.53
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft'/ton
318.16
Btu /heft'
37.72
-41.80
Grand Total ==>
6,546
98
7,506
100.00
6,346
100.00 Grand Total ==>
-5,712
-8,319
100.00
No. People
1.0 5.0/1000 f:2
Total 0.6 7.5
Leave DB/WB/HR
°F °F gr/Ib
55.0 53.2 59.2
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow Enter DB/WB/HR
ton MBh
MBh
cfm °F °F
gr/Ib
Main Cig 0.6 7.5
6.7
292 76.4 62.1
62.9
Aux Cig 0.0 0.0
0.0
0 0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0 0.0 0.0
0.0
Total 0.6 7.5
Leave DB/WB/HR
°F °F gr/Ib
55.0 53.2 59.2
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
HEATING COIL SELECTION
Gross Total
Glass
Ent
Lvg
ftz
(%)
Floor 199
°F
i Htg
Part 0
65.5
88.0
Int Door 0
0.0 0
0.0
ExFlr 0
teat
-1.2 17
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
Project Name: 73166272 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 8 of 8
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
i Htg
-7.1 292
65.5
88.0
Htg
0.0 0
0.0
0.0
teat
-1.2 17
-9.0
55.0
eat
-1.4 88
55.0
70.0
ddif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
/
-8.3
Project Name: 73166272 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 8 of 8
System Checksums
By MACDONALD-MILLER
BACK OF HOUSE VAV
Series Fan -Powered VAV
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88 / 75 / 113
Space Plenum Net Percent :
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%)
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0:
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr: 7 / 15
OADB: 88
Space Percent
Sensible Of Total
Btu/h (%)
Envelope Loads
0 0: Skylite Solar
0 0 Skylite Cond
0 0 Roof Cond
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(/°)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.6
Return 75.6
Ret/OA 76.9
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
70.0
70.0
44.9
0.0
0.0
0.0
Lvg
Glass Solar
0
0
0
0;
0
0; Glass Solar
0
0
0.00
AIRFLOWS
gr/Ib
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
58.1
Cooling
Heating
Wall Cond
0
0
0
0.
0
0: Wall Cond
0
0
0.00
0.0
0
0.0 0.0
Partition/Door
0
0.0
0
0;
0
0; Partition/Door
0
0
0.00
Diffuser
522
522
Floor
0
0
0•
0
0: Floor
0
0
0.00
Terminal
522
522
Adjacent Floor
0
0
0
0:
0
0 Adjacent Floor
0
0
0
Main Fan
522
157
Infiltration
0
0
0
0
0 Infiltration
0
0
0.00
Sec Fan
522
522
Sub Total =_>
0
0
0
0
0
0: Sub Total =_>
0
0
0.00
Nom Vent
54
50
AHU Vent
54
50
Internal Loads
Internal Loads
Infil
0
0
Lights
1,940
485
2,425
16
1,940
17: Lights
0
0
0.00
MinStop/Rh
157
157
People
1,350
0
1,350
9:
750
7 People
0
0
0.00
Return
522
157
Misc
8,531
0
8,531
57:
8,531
75 ; Misc
0
0
0.00
Exhaust
54
50
Sub Total =_>
11,821
485
12,306
82:
11,221
99 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
129
-129
0
0
129
1 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
2,732
18 ;
0
0 Ventilation Load
0
-4,279
25.92
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
-10,214
-10,214
61.87
Ov/Undr Sizing
0
0
0:
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-37
-37
0 ;
OA Preheat Diff.
-275
1.67
Sup. Fan Heat
0
0 :
RA Preheat Diff.
-1,741
10.55
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
10.3
31.8
Duct Heat Pkup
0
0
0:
cfm/ft'
0.81
0.81
Underflr Sup Ht Pkup
0
0:
: Underflr Sup Ht Pkup
0
0.00
cfm/ton
417.42
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft'/ton
516.74
Btu/hr-ft'
23.22
-25.56
Grand Total ==>
11,950
320
15,002
100.00
11,350
100.00 Grand Total ==>
-10,214
-16,510
100.00
No. People
3
AREAS
COOLING COIL SELECTION
Glass
Ent
Lvg
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
Leave DB/WB/HR
-12.8
ton
MBh
MBh
cfm
°F °F
gr/Ib
°F °F
gr/Ib
Main Clg
1.3
15.0
12.4
522
76.9 62.8
65.3
55.0 52.9
58.1
Aux CIg
0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0
0.0
Opt Vent
0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0
0.0
Total
1.3
15.0
AREAS
Gross Total
Glass
Ent
Lvg
MBh
Floor 646
°F
°F
Part 0
-12.8
522
Int Door 0
88.0
Aux Htg
ExFlr 0
0
0.0
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
HEATING COIL SELECTION
Capacity Coil
Airflow
Ent
Lvg
MBh
cfm
°F
°F
Main Htg
-12.8
522
65.5
88.0
Aux Htg
0.0
0
0.0
0.0
Preheat
-3.7
54
-9.0
55.0
Reheat
-2.6
157
55.0
70.0
Humidif
0.0
0
0.0
0.0
Opt Vent
0.0
0
0.0
0.0
Total
-16.5
Project Name: 73166272 TRACE@ 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 1 of 3
System Checksums
By MACDONALD-MILLER
NORTH VAV
Series Fan -Powered VAV
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7/16
Outside Air: OADB/WB/HR: 87174 / 110
Space Plenum Net Percent:
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%) ;
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr: 8 / 17
OADB: 79
Space Percent:
Sensible Of Total
Btu/h (%)
Envelope Loads
0 0 Skylite Solar
0 0: Skylite Cond
0 0: Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.5
Return 75.5
RetlOA 77.9
Fn MtrTD 0.0
Fn 13IdTD 0.0
Fn Frict 0.0
Heating
88.0
69.9
69.9
16.6
0.0
0.0
0.0
MBh
Glass Solar
13,108
0
13,108
17
15,907
36 Glass Solar
0
0
0.00
AIRFLOWS
gr/Ib
Glass/DoorCond
1,429
0
1,429
2;
451
1: Glass/DoorCond
-11,027
-11,027
14.12
57.2
Cooling
Heating
Wall Cond
0
82
82
0
0
0: Wall Cond
0
-442
0.57
0.0
0
0.0 0.0
Partition/Door
0
0.0
0
0.
0
0 Partition/Door
0
0
0.00
Diffuser
2,019
2,019
Floor
0
0
0:
0
0: Floor
0
0
0.00
Terminal
2,019
2,019
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0
Main Fan
2,019
606
Infiltration
7,477
7,477
10:
868
2 Infiltration
-15,592
-15,592
19.97
Sec Fan
2,019
2,019
Sub Total =_>
22,014
82
22,096
28
17,227
39: Sub Total ==>
-26,619
-27,062
34.65
Nom Vent
409
409
AHU Vent
409
409
Internal Loads
Internal Loads
Infil
182
182
Lights
4,956
1,239
6,195
8:
4,956
11 : Lights
0
0
0.00
MinStop/Rh
606
606
People
27,000
0
27,000
34
15,000
34 People
0
0
0.00
Return
2,201
787
Misc
6,485
0
6,485
8 ;
6,485
15: Misc
0
0
0.00
Exhaust
590
590
Sub Total ==>
38,440
1,239
39,679
51:
26,440
60: Sub Total ==>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
257
-257
0
0
250
1 Ceiling Load
-86
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
16,845
22:
0
0 Ventilation Load
0
-35,128
44.98
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0 Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0;
Ov/Undr Sizing
-12,821
-12,821
16.42
Ov/Undr Sizing
0
0
0
0
0 Exhaust Heat
96
-0.12
ENGINEERING CKS
Exhaust Heat
-287
-287
0 ;
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0',
RA Preheat Diff.
-3,180
4.07
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
20.2
67.5
Duct Heat Pkup
0
0
0:
cfm/ft,
1.11
1.11
Underflr Sup Ht Pkup
0
0:
: Underfir Sup Ht Pkup
0
0.00
cfm/ton
309.34
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft=/ton
278.04
Btu/heft=
43.16
-43.03
Grand Total ==>
60,711
777
78,333
100.00'
43,918
100.00 Grand Tota/ ==>
-39,526
-78,095
100.00
No. People
60
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
AREAS
COOLING COIL SELECTION
Gross Total
Glass
MBh
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
Leave DB/WB/HR
2,019
ton
MBh
MBh
cfm
°F °F
gr/Ib
°F °F
gr/Ib
Main Clg
6.5
78.3
50.0
2,008
77.9 65.7
77.6
55.0 52.7
57.2
Aux Clg
0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0
0.0
Opt Vent
0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0
0.0
Total
6.5
78.3
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
HEATING COIL SELECTION
AREAS
Capacity Coil Airflow
Gross Total
Glass
MBh
cfm
ftz
(%)
Floor
1,815
2,019
65.4
Part
0
0.0
0
Int Door
0
Preheat
-28.5
ExFlr
0
55.0
Reheat
Roof
0
0
0
Wall
428
326
76
Ext Door
42
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh
cfm
°F
°F
Main Htg
-49.6
2,019
65.4
88.0
Aux Htg
0.0
0
0.0
0.0
Preheat
-28.5
409
-9.0
55.0
Reheat
-9.9
606
55.0
70.0
Humidif
0.0
0
0.0
0.0
Opt Vent
0.0
0
0.0
0.0,
Total
-78.1
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 2 of 3
System Checksums
By MACDONALD-MILLER
SOUTH VAV
Series Fan -Powered VAV
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88 / 75 / 113
Space Plenum Net Percent
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%)
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0:
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/H r: 7 / 15
OADB: 88
Space Percent
Sensible Of Total
Btu/h (%)
: Envelope Loads
0 0 : Skylite Solar
0 0: Skylite Cond
0 0� Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.5
Return 75.5
Ret/OA 78.5
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
69.6
69.6
18.8
0.0
0.0
0.0
MBh
Glass Solar
5,058
0
5,058
12 ;
5,058
18 : Glass Solar
0
0
0.00
AIRFLOWS
gr/Ib
Glass/DoorCond
2,137
0
2,137
5;
2,137
8; Glass/DoorCond
-16,557
-16,557
33.71
62.6
Aux Clg
0.0
Wall Cond
0
126
126
0 :
0
0 : Wall Cond
0
-670
1.36
0.0
Cooling
Heating
Partition/Door
0
0.0
0
0:
0
0: Partition/Door
0
0
0.00
Diffuser
1,284
1,284
Floor
0
0
0:
0
0: Floor
0
0
0.00
Terminal
1,284
1,284
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0
Main Fan
1,284
385
Infiltration
3,882
3,882
9 ;
1,392
5 Infiltration
-8,462
-8,462
17.23
Sec Fan
1,284
1,284
Sub Total =_>
11,077
126
11,203
26
8,587
31 : Sub Total =_>
-25,019
-25,689
52.30
Nom Vent
249
249
AHU Vent
249
249
Internal Loads
: Internal Loads
Infil
99
99
Lights
2,689
672
3,362
8
2,689
10 Lights
0
0
0.00
MinStop/Rh
385
385
People
17,100
0
17,100
40
9,500
34 People
0
0
0.00
Return
1,383
484
Misc
1,707
0
1,707
4
1,707
6 Misc
0
0
0.00
Exhaust
348
348
Sub Total =_>
21,496
672
22,168
52
13,896
50: Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
161
-161
0
0
161
1 Ceiling Load
-115
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
9,817
23:
0
0 Ventilation Load
0
-21,400
43.57
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 : Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
0
0
0.00
Ov/Undr Sizing
0
0
0
5,283
19 Exhaust Heat
140
-0.28
ENGINEERING CKS
Exhaust Heat
-194
-194
01
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0 :
RA Preheat Diff.
-2,166
4.41
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
19.4
64.7
Duct Heat Pkup
0
0
0:
cfm/ft'
1.30
1.30
Underflr Sup Ht Pkup
0
0:
Underflr Sup Ht Pkup
0
0.00
cfm/ton
358.39
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft'/ton
274.93
Btu/heft=
43.65
-49.86
Grand Total =_>
32,733
443
42,993
100.00
27,927
100.00 Grand Total =_>
-25,134
-49,115
100.00
No. People
38
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
AREAS
COOLING COIL SELECTION
Gross Total
Glass
MBh
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
Leave DBIWB/HR
1,284
ton
MBh
MBh
cfm
°F °F
gr/Ib
°F °F
gr/Ib
Main Clg
3.6
43.0
26.6
1,041
78.5 67.3
85.3
55.0 54.1
62.6
Aux Clg
0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0
0.0
Opt Vent
0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0
0.0
Total
3.6
43.0
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
HEATING COIL SELECTION
AREAS
Capacity Coil Airflow
Gross Total
Glass
MBh
cfm
°F
°F
Floor
985
1,284
65.2
Part
0
0.0
0
Int Door
0
Preheat
-17.3
ExFlr
0
55.0
Reheat
Roof
0
0
0
Wall
665
510
77
Ext Door
42
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh
cfm
°F
°F
Main Htg
-31.8
1,284
65.2
88.0
Aux Htg
0.0
0
0.0
0.0
Preheat
-17.3
249
-9.0
55.0
Reheat
-6.3
385
55.0
70.0
Humidif
0.0
0
0.0
0.0
Opt Vent
0.0
0
0.0
0.0
Total
-49.1
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 3 of 3
001 SALES NORTH
Internal Loads
COOLING COIL PEAK
Sensible
Of Total
Peaked at Time:
Mo/Hr: 7 / 16
4,956
1,239
Outside Air:
OADB/WB/HR: 87 / 74 / 110
People
27,000
Space
Plenum
Net
Percent :
6,485
Sens. + Lat.
Sens. + Lat
Total
Of Total
38,440
Btu/h
Btu/h
Btu/h
(%)::
Envelope Loads
-257
0
0
Ventilation Load
Skylite Solar
0
0
0
0:
Skylite Cond
0
0
0
0
Roof Cond
0
0
0
0
Glass Solar
13,108
0
13,108
17:
Glass/DoorCond
1,429
0
1,429
2:
Wall Cond
0
82
82
0:
Partition/Door
0
0
0
0:
Floor
0
0
0
0:
Adjacent Floor
0
0
0
0:
Infiltration
7,477
0
7,477
10 ;
Sub Total =_>
22,014
82
22,096
28:
Internal Loads
Percent:
Sensible
Of Total
Btu/h
Lights
4,956
1,239
6,195
8.
People
27,000
0
27,000
34
Misc
6,485
0
6,485
8
Sub Total =_>
38,440
1,239
39,679
51
Ceiling Load
257
-257
0
0
Ventilation Load
0
0
16,845
22
Adj Air Trans Heat
0
15 ; Misc
0
0
Dehumid. Ov Sizing
1 Ceiling Load
0
0
0
Ov/Undr Sizing
0
Ov/Undr Sizing
0
0
Exhaust Heat
OA Preheat Diff.
-287
-287
0
Sup. Fan Heat
System Plenum Heat
0
0'
Ret. Fan Heat
Supply Air Leakage
0
0
0
Duct Heat Pkup
0
0
0
Underfir Sup Ht Pkup
0
0.
Supply Air Leakage
0
0
0
Grand Total ==>
60,711
777
78,333
100.00
Zone Checksums
By MACDONALD-MILLER
CLG SPACE PEAK
Mo/Hr: 8 / 17
OADB: 79
Space
Percent:
Sensible
Of Total
Btu/h
(%) :
Enter DB/WB/HR
: Envelope Loads
0
0 : Skylite Solar
0
0 Skylite Cond
0
0 Roof Cond
15,907
36 Glass Solar
451
1 Glass/Door Cond
0
0 Wall Cond
0
0: Partition/Door
0
0: Floor
0
0 : Adjacent Floor
868
2 Infiltration
17,227
39: Sub Total =_>
0
Internal Loads
4,956
11 : Lights
15,000
34 People
6,485
15 ; Misc
26,440
60, Sub Total =_>
250
1 Ceiling Load
0
0 Ventilation Load
0
0 : Adj Air Trans Heat
0
Ov/Undr Sizing
0
0 Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underflr Sup Ht Pkup
Supply Air Leakage
43,918
100.00 Grand Total ==>
Total 6.5 78.3
Leave DI
'F 'F
55.0 52.7
0.0 0.0
0.0 0.0
gr/Ib
57.2
0.0
0.0
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak
Space Sens
Btu/h
0
0
0
0
-11,027
0
0
0
0
-15,592
-26,619
0
0
0
0
-86
0
0
-12,821
-39,526
Coil Peak Percent
Tot Sens Of Total
Btu/h (%)
0 0.00
0 0.00
0 0.00
0 0.00
-11,027 14.12
-442 0.57
0 0.00
0 0.00
0 0.00
-15,592 19.97
-27,062 34.65
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-35,128 44.98
0 0
-12,821 16.42
96 -0.12
0 0.00
-3,180 4.07
0 0.00
0 0.00
0 0.00
0 0.00
-78,095 100.00
COOLING COIL SELECTION
Cooling Heating
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
'F 'F
gr/Ib
Main Clg 6.5 78.3
50.0
2,008
77.9 65.7
77.6
Aux Clg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 6.5 78.3
Leave DI
'F 'F
55.0 52.7
0.0 0.0
0.0 0.0
gr/Ib
57.2
0.0
0.0
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak
Space Sens
Btu/h
0
0
0
0
-11,027
0
0
0
0
-15,592
-26,619
0
0
0
0
-86
0
0
-12,821
-39,526
Coil Peak Percent
Tot Sens Of Total
Btu/h (%)
0 0.00
0 0.00
0 0.00
0 0.00
-11,027 14.12
-442 0.57
0 0.00
0 0.00
0 0.00
-15,592 19.97
-27,062 34.65
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-35,128 44.98
0 0
-12,821 16.42
96 -0.12
0 0.00
-3,180 4.07
0 0.00
0 0.00
0 0.00
0 0.00
-78,095 100.00
TEMPERATURES
AREAS
Cooling Heating
Cooling
Gross Total
Glass
55.0
88.0
Ra Plenum
ft'
(%)
Floor
1,815
69.9
Ret/OA
Part
0
Fn MtrTD
0.0
Int Door
0
0.0
0.0
ExFlr
0
0.0
MinStop/Rh
Roof
0
0
0
Wall
428
326
76
Ext Door
42
0
0
TEMPERATURES
Cooling Heating
Cooling
Heating
SADB
55.0
88.0
Ra Plenum
75.5
69.9
Return
75.5
69.9
Ret/OA
77.9
16.6
Fn MtrTD
0.0
0.0
Fn BIdTD
0.0
0.0
Fn Frict
0.0
0.0
AIRFLOWS
Cooling Heating
Cooling
Heating
Diffuser
2,019
2,019
Terminal
2,019
2,019
Main Fan
2,019
606
Sec Fan
2,019
2,019
Nom Vent
409
409
AHU Vent
409
409
Infil
182
182
MinStop/Rh
606
606
Return
2,201
787
Exhaust
590
590
Rm Exh
0
0
Auxiliary
0
0
Leakage Dwn
0
0
Leakage Ups
0
0
ENGINEERING CKS
Cooling Heating
% OA
20.2 67.5
cfm/ft'
1.11 1.11
cfm/ton
309.34
ft'/ton
278.04
Btu/heft'
43.16 -43.03
No. People
60
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
'F
'F
Htg
49.6 2,019
65.4
88.0
Htg
0.0 0
0.0
0.0
seat
-28.5 409
-9.0
55.0
eat
-9.9 606
55.0
70.0
iidif
0.0 0
0.0
0.0,
Vent
0.0 0
0.0
0.0
It
-78.1
Project Name: 73166272 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 1 of 8
Zone Checksums
By MACDONALD-MILLER
001 SALES SOUTH
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88/75/113
Space Plenum Net Percent
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%);
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr. 7 / 15
OADB: 88
Space Percent
Sensible Of Total
Btu/h (%)',
; Envelope Loads
0 0 Skylite Solar
0 0 Skylite Cond
0 0: Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.5
Return 75.5
Ret/OA 78.5
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
69.6
69.6
18.8
0.0
0.0
0.0
Enter DB/WB/HR
ton MBh
Glass Solar
5,058
0
5,058
12
5,058
18 Glass Solar
0
0
0.00
AIRFLOWS
0
Glass/Door Cond
2,137
0
2,137
5
2,137
8 Glass/Door Cond
-16,557
-16,557
33.71
Vent
0.0 0
0.0
Wall Cond
0
126
126
0
0
0: Wall Cond
0
-670
1.36
Cooling
Heating
Partition/Door
0
0
0
0
0: Partition/Door
0
0
0.00
Diffuser
1,284
1,284
Floor
0
0
0:
0
0 Floor
0
0
0.00
Terminal
1,284
1,284
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
1,284
385
Infiltration
3,882
3,882
9:
1,392
5 Infiltration
-8,462
-8,462
17.23
Sec Fan
1,284
1,284
Sub Total =_>
11,077
126
11,203
26:
8,587
31 : Sub Total =_>
-25,019
-25,689
52.30
Nom Vent
249
249
AHU Vent
249
249
Internal Loads
Internal Loads
Infil
99
99
Lights
2,689
672
3,362
8
2,689
10 Lights
0
0
0.00
MinStop/Rh
385
385
People
17,100
0
17,100
40
9,500
34 People
0
0
0.00
Return
1,383
484
Misc
1,707
0
1,707
4;
1,707
6; Misc
0
0
0.00
Exhaust
348
348
Sub Total =_>
21,496
672
22,168
52
13,896
50 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
161
-161
0
0
161
1 Ceiling Load
-115
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
9,817
23:
0
0 Ventilation Load
0
-21,400
43.57
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0: AdJ Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0 ;
Ov/Undr Sizing
0
0
0.00
Ov/Undr Sizing
0
0
0 ;
5,283
19 Exhaust Heat
140
-0.28
ENGINEERING CKS
Exhaust Heat
-194
-194
0 ;
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0 :
: RA Preheat. Diff.
-2,166
4.41
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
19.4
64.7
Duct Heat Pkup
0
0
0:
System Plenum Heat
0
0.00
cfm/ft'
1.30
1.30
Underflr Sup Ht Pkup
0
0:
UnderfIr Sup Ht Pkup
0
0.00
cfm/ton
358.39
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ft'/ton
274.93
Btu/hr-ft'
43.65
-49.86
Grand Total ==>
32,733
443
42,993
100.00'
27,927
100.00 'Grand Total =_>
-25,134
-49,115
100.00
No. People
38
Total 3.6 43.0
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DI
'F 'F
55.0 54.1
0.0 0.0
0.0 0.0
gr/Ib
62.6
0.0
0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F 'F
gr/Ib
Main CIg 3.6 43.0
26.6
1,041
78.5 67.3
85.3
Aux Clg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 3.6 43.0
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DI
'F 'F
55.0 54.1
0.0 0.0
0.0 0.0
gr/Ib
62.6
0.0
0.0
AREAS
Gross Total
Glass
Lvg
ft2
(%)
Floor 985
i Htg
-31.8 1,284
Part 0
88.0
Htg
Int Door 0
0.0
0.0
ExFtr 0
-17.3 249
-9.0
Roof 0
0
0
wall 665
510
77
Ext Door 42
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
'F
'F
i Htg
-31.8 1,284
65.2
88.0
Htg
0.0 0
0.0
0.0
seat
-17.3 249
-9.0
55.0
eat
-6.3 385
55.0
70.0
iidif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
it
-49.1
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 2 of 8
Zone Checksums
By MACDONALD-MILLER
002 MGR OFFICE
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88/75/113
Space Plenum Net Percent.
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%):
Envelope Loads
Skylite Solar 0 0 0 0
Skylite Cond 0 0 0 0:
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr: 7 / 15
OADB: 88
Space Percent:
Sensible Of Total
Btu/h (%)
Envelope Loads
0 0 Skylite Solar
0 0: Skylite Cond
0 0 Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.6
Return 75.6
Ret/OA 76.8
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
70.0
70.0
45.4
0.0
0.0
0.0
Enter DB/WB/HR
ton MBh
Glass Solar
0
0
0
0
0
0 Glass Solar
0
0
0.00
AIRFLOWS
0
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
Opt Vent
Cooling
Heating
Wall Cond
0
0
0
0.
0
0; Wall Cond
0
0
0.00
Partition/Door
0
0
0:
0
0: Partition/Door
0
0
0.00
Diffuser
91
91
Floor
0
0
0:
0
0 Floor
0
0
0.00
Terminal
91
91
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
91
27
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
91
91
Sub Total =_>
0
0
0
0.
0
0: Sub Total =_>
0
0
0.00
Nom Vent
8
8
AHU Vent
8
8
Internal Loads
Internal Loads
Infil
0
0
Lights
174
44
218
8
174
9 Lights
0
0
0.00
MinStop/Rh
27
27
People
450
0
450
17
250
13 People
0
0
0.00
Return
91
27
Misc
1,536
0
1,536
58 ;
1,536
78 Misc
0
0
0.00
Exhaust
8
8
Sub Total =_>
2,160
44
2,204
84
1,960
99: Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
12
-12
0
0
12
1 Ceiling Load
0
0
0.00
Leakage Own
0
0
Ventilation Load
0
0
431
16
0
0 Ventilation Load
0
-729
25.94
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0 •
Ov/Undr Sizing
-1,774
-1,774
63.19
Ov/Undr Sizing
0
0
0
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-6
-6
.0:
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0
RA Preheat Diff.
-305
10.87
Cooling
Heating
Ret. Fan Heat
0
0
0
Additional Reheat
0
0.00
% OA
9.4
31.2
Duct Heat Pkup
0
0
0:
System Plenum Heat
0
0.00
cfm/ft'
1.56
1.56
Underfir Sup Ht Pkup
0
0:
Underfir Sup Ht Pkup
0
0.00
cfm/ton
413.81
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
ftz/ton
264.76
Btu/heft=
45.32
-48.42
Grand Total =_>
2,172
26
2,629
100.00'
1,972
100.00 Grand Total ==>
-1,774
-2,808
100.00
No. People
1
Total 0.2 2.6
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.7 57.0
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
dm
°F °F
gr/Ib
Main Cig 0.2 2.6
2.1
91
76.8 62.7
64.8
Aux Cig 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 0.2 2.6
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.7 57.0
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
Gross Total
Glass
Lvg
ft2
(%)
Floor 58
Main Htg
-2.2 91
Part 0
88.0
Aux Htg
Int Door 0
0.0
0.0
ExFlr 0
-0.6 8
-9.0
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
Main Htg
-2.2 91
65.5
88.0
Aux Htg
0.0 0
0.0
0.0
Preheat
-0.6 8
-9.0
55.0
Reheat
-0.4 27
55.0
70.0
Humidif
0.0 0
0.0
0.0
Opt Vent
0.0 0
0.0
0.0
Total
-2.8
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 3 of 8
Zone Checksums
By MACDONALD-MILLER
003 LOUNGE
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88 / 75 / 113
Space Plenum Net Percent:
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%);
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0:
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr: 7 / 15
OADB: 88
Space Percent:
Sensible Of Total
Btu/h (%)',
: Envelope Loads
0 0 : Skylite Solar
0 0: Skylite Cond
0 0 Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.6
Return 75.6
Ret/OA 80.7
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
70.0
70.0
-9.0
0.0
0.0
0.0
Enter DB/WB/HR
ton MBh
Glass Solar
0
0
0
0:
0
0• Glass Solar
0
0
0.00
AIRFLOWS
0
Glass/Door Cond
0
0
0
0;
0
0: Glass/Door Cond
0
0
0.00
Vent
0.0 0
0.0
Wall Cond
0
0
0
0:
0
0 Wall Cond
0
0
0.00
Cooling
Heating
Partition/Door
0
0
0:
0
0: Partition/Door
0
0
0.00
Diffuser
23
23
Floor
0
0
0:
0
0: Floor
0
0
0.00
Terminal
23
23
Adjacent Floor
0
0
0
0:
0
0 Adjacent Floor
0
0
0.00
Main Fan
23
7
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
23
23
Sub Total =_>
0
0
0
0
0
0 Sub Total =_>
0
0
0.00
Nom Vent
9
7
AHU Vent
9
7
Internal Loads
Internal Loads
Infil
0
0
Lights
466
116
582
56:
466
94: Lights
0
0
0.00
MinStop/Rh
7
7
People
0
0
0
0
0
0 People
0
0
0.00
Return
23
7
Misc
0
0
0
0;
0
0; Misc
0
0
0.00
Exhaust
9
7
Sub Total =_>
466
116
582
56:
466
94 : Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
31
-31
0
0
31
6 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
473
45 ;
0
0 Ventilation Load
0
-588
48.79
Leakage Ups
0
0
Adj Air Trans Heat
0
0
O:
0
0 : Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
447
-447
37.05
Ov/Undr Sizing
0
0
0:
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-6
-6
-1
OA Preheat Diff.
-171
14.16
Sup. Fan Heat
0
0
RA Preheat Diff.
0
0.00
Cooling
Heating
Ret. Fan Heat
0
0
0
Additional Reheat
0
0.00
% OA
40.7
100.0
Duct Heat Pkup
0
0
0.
System Plenum Heat
0
0.00
cfm/ft'
0.15
0.15
Underflr Sup Ht Pkup
0
0:
Underflr Sup Ht Pkup
0
0.00
cfm/ton
261.27
Supply Air Leakage
0
0
0:
Supply Air Leakage
0
0.00
ftz/ton
1,774.35
Btu/hr-ft'
6.76
-7.78
Grand Total ==>
496
79
1,048
100.00'
496
100.00 Grand Total ==>
447
-1,206
100.00
No. People
0
Total 0.1 1.1
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F °F
gr/Ib
Main Clg 0.1 1.1
0.7
23
80.7 67.3
81.6
Aux CIg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 0.1 1.1
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
Gross Total
Glass
Lvg
ftz
(%)
Floor 155
i Htg
-0.6 23
Part 0
88.0
Htg
Int Door 0
0.0
0.0
ExFlr 0
-0.7 9
-9.0
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
i Htg
-0.6 23
65.5
88.0
Htg
0.0 0
0.0
0.0
seat
-0.7 9
-9.0
55.0
eat
-0.1 7
55.0
70.0
ddif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
d
-1.2
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative -1 System Checksums Report Page 4 o1`8
Zone Checksums
By MACDONALD-MILLER
004 INVENTORY/MDP RM
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88175/113
Space Plenum Net Percent
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%)
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0:
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr: 7 / 15
OADB: 88
Space Percent:
Sensible Of Total
Btu/h (%)
Envelope Loads
0 0 Skylite Solar
0 0 Skylite Cond
0 0 Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.6
Return 75.6
Ret/OA 77.2
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
70.0
70.0
35.8
0.0
0.0
0.0
Enter DB/WB/HR
ton MBh
Glass Solar
0
0
0
0:
0
0; Glass Solar
0
0
0.00
AIRFLOWS
0
Glass/Door Cond
0
0
0
0
0
0; Glass/Door Cond
0
0
0.00
Vent
Cooling
Heating
Wall Cond
0
0
0
0;
0
0; Wall Cond
0
0
0.00
Partition/Door
0
0
0;
0
0: Partition/Door
0
0
0.00
Diffuser
103
103
Floor
0
0
0
0
0 Floor
0
0
0.00
Terminal
103
103
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
103
31
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
103
103
Sub Total =_>
0
0
0
0 :
0
0: Sub Total =_>
0
0
0.00
Nom Vent
13
13
AHU Vent
13
13
Internal Loads
Internal Loads
Infil
0
0
Lights
417
104
522
16
417
19 Lights
0
0
0.00
MinStop/Rh
31
31
People
450
0
450
14
250
11 People
0
0
0.00
Return
103
31
Misc
1,536
0
1,536
48;
1,536
69; Misc
0
0
0.00
Exhaust
13
13
Sub Total =_>
2,403
104
2,508
79
2,203
99 Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
28
-28
0
0
28
1 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
678
21 ;
0
0 Ventilation Load
0
-1,146
33.33
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0: AdJ Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0 ;
Ov/Undr Sizing
-2,008
-2,008
58.40
Ov/Undr Sizing
0
0
0 :
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-9
-9
0 ;
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0
: RA Preheat Diff.
-284
8.27
Cooling
Heating
Ret. Fan Heat
0
0
0
Additional Reheat
0
0.00
% OA
13.0
43.3
Duct Heat Pkup
0
0
0
System Plenum Heat
0
0.00
cfm/ft'
0.74
0.74
Underflr Sup Ht Pkup
0
0
Underfir Sup Ht Pkup
0
0.00
cfm/ton
387.50
Supply Air Leakage
0
0
0 ;
Supply Air Leakage
0
0.00
ft'lton
525.08
Btu/heft=
22.85
-24.74
Grand Total ==>
2,431
68
3,177
100.00'
2,231
100.00 Grand Total =_>
-2,008
-3,438
100.00
No. People
1
Total 0.3 3.2
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.6 56.9
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F °F
gr/Ib
Main Clg 0.3 3.2
2.5
103
77.2 63.2
66.7
Aux Cig 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 0.3 3.2
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.6 56.9
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
Gross Total
Glass
Lvg
MBh cfm
°F
Floor 139
i Htg
-2.5 103
Part 0
88.0.
Htg
Int Door 0
0.0
0.0
ExFlr 0
-0.9 13
-9.0
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F'
i Htg
-2.5 103
65.5
88.0.
Htg
0.0 0
0.0
0.0
seat
-0.9 13
-9.0
55.0
eat
-0.5 31
55.0
70.0
iidif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
1
-3.4
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 5 of 8
O �
d 0
m �
N .Oi
zd
d
3 3m
CD
N W
O
Di
m r
3
d -
�� C
(D c
� r
CDc
C`
= C
CD
05
Nr
C
CD
W -
0 =
O C
T
C° r
CD
CT
O c
co c
o y c Dai
< n
oro
0 0 00 S�
O 0 0 0 7 O
d
n
d
d
O O O O co I)
W O o W :r �7
n
y O
KOO
0 0 0 W d _
Z
O
o n
n0
3
O cn
0 0 0 3 f r
m
0 0 0
�m O
Q)
Z
O O V p
O O W T W
D7
o 0 o cr
`n
O CD
r
0 00
�01
R
Z
O O N
ID
O O W
T W
m
m
t°W
0oc`n
CD0
O�
C0 2 M
a c m c d
3 m m x 5
t<D a^;� 22
.3i r CO 0»
m
Z
d O
0 0000 00 ti
co 000N oNO
0`,O-�•
r
n cn
°m
a r"
o n
OONN OO) 3 f O
CT a) Z
. . . - p m
0000 o<T
V CT OD r
OOO CT OCD
00 o co 00 -n to
O N coxromOp D <O 5 m
w c° c 0 c x `A a a CD fn ��� (o 5 DT'p 0ax(nw3
° v tnp°.T�dcc Dom. Q 00 o »mo °�-)ddoxx®
c D ��aN.a3. 9;m o mN m o?:m�on�NC) ID a
_. y»S22Na d 7 0 N `) .O-. �7 p O j
r-0 tD N O 7 r n II d II T 0 a N n O r
to CO) 2 N v N v 0 t1 CLa
V �� ~• .dd. n N d
CD
W to O m
p C t1
CD a m O
N CD O
+ o D CD r
N N C d 0
O O 0 c W 00 W 00000000000 d
0
to O
F
y D '9
w+(D m m
W c r- c ? D
0 0o N o6D o0-2 O O 000000 ,d.3 K X
� o
2 =
0 n
OD V
OD
(_7T W 1
V O 0000N00 O CNTO A OOA 0 0 000000000 S d N
01 W
0
o c
O A C) 00
01
O 0e w
0 0 0 0 0 0 O C T O m0) 0 0 0 0 0 0 0 0 0 0 0
n
r
N O
CD CO)
m y y O
N N Ccs p° D
O o 000 W OO G) 00000000000 =r CD N 07? C%
OD V m
O OD
o D
o CD CD CD T`
O O 0 00 A O o A 0 0 0 0 0 0 0 0 0 0 0 o d w
______________m___________________________________
rii c a D k - a 5
V m mn-»°�vDS+ c D :3 0* a Amro 0 e'nno DTi o �Nc xm
Q '� 3 fD ID .cN. a .d. m tS n O» d
o D c �:03 d d 2to = o 0 5N o ° a 1° o o° C)tnr
N 7 d 7 7
on a d a o �°-� 0
v » 3 0 m 2 d n m n o O n n
to �S» �a v v a 0 n N
CD c 0 a
v
zWx-Onn. o
o c 3 3 p
g x D
CO)
m
R
Z
CD
G)
v
m
m
V
CD0
O�
V N N + 7
O a) CD CD CT :-4(0
n
-0o°
2
_ tD
»
V O O d
O
�c
Z
m
a 000
0 000
Oo0oo0000a0w
x
�??
�%
fOd
W
O
r
0
to
O1 °_
0
CD
m
D
W
S N 9
O
_
cy
CD
O O OO O CAT O CA 0 00))0
O 000
000 00000000
=r N 7C
O m
O
W A
O
O O OOOA O V POP
O 000
000 000000 00
O
0 0 000-+00 000
0 000
00 0 000000 00
eCD
d»
O
00OAO
0000 —0
0
000
00000000000
...
zWx-Onn. o
o c 3 3 p
g x D
o =
m
R
Z
CD
G)
z
m
V
?
O 0 A 0
Z
V N N + 7
O a) CD CD CT :-4(0
n
�
2
_ tD
»
V O O d
O
00 N O CO
m m> � K; 3 5 D z to 301 0
d d x 3 S 0 2 0 n d
.' m= mN- c 3 T 53 c
COD COD =r7' 7 d mo
> >d
c 0 z » »
1 7
N ' D
A
r
oO
O t
O C
5 Cl)
O O O O N 0) N O N N 0) 0) m O t0
2
N
7
O O O O N N N O N N (T N fT O to
>>=mmda
m 3
n 0 3 F
�. -I> ,
a0 3
m
0
O
OD V V N C
O 00
OCT CT N
O O O V 0) 41 O CO m
2 �
m
.di
O O O W O O OOD
000000 C) cc
O
O
D
O
3
m
Z
O
r
m
W 0
>3
n CD
O
O =♦I
Z
v�
N
F r -
r -3
m y
Zone Checksums
By MACDONALD-MILLER
005B MENS TOILET
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88/75/113
Space Plenum Net Percent,
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%);
Envelope Loads
Skylite Solar 0 0 0 0:
Skylite Cond 0 0 0 0
Roof Cond 0 0 0 0:
CLG SPACE PEAK
Mo/Hr. 7 / 15
OADB: 88
Space Percent
Sensible Of Total
Btu/h (%);
: Envelope Loads
0 0 : Skylite Solar
0 0: Skylite Cond
0 0 Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.6
Return 75.6
Ret/OA 80.7
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
70.0
70.0
-9.0
0.0
0.0
0.0
Enter DB/WB/HR
ton MBh
Glass Solar
0
0
0
0
0
0 Glass Solar
0
0
0.00
AIRFLOWS
0
Glass/Door Cond
0
0
0
0:
0
0 Glass/Door Cond
0
0
0.00
Opt Vent
Cooling
Heating
Wall Cond
0
0
0
0;
0
01 Wall Cond
0
0
0.00
Partition/Door
0
0
0:
0
0 Partition/Door
0
0
0.00
Diffuser
8
8
Floor
0
0
0'
0
0' Floor
0
0
0.00
Terminal
8
8
Adjacent Floor
0
0
0
01
0
0: Adjacent Floor
0
0
0.00
Main Fan
8
2
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
8
8
Sub Total =_>
0
0
0
0
0
0 Sub Total =_>
0
0
0.00
Nom Vent
3
2
AHU Vent
3
2
Internal Loads
Internal Loads
Infil
0
0
Lights
162
41
203
56:
162
94: Lights
0
0
0.00
MinStop/Rh
2
2
People
0
0
0
0
0
0 People
0
0
0.00
Return
8
2
Misc
0
0
0
0
0
0 Misc
0
0
0.00
Exhaust
3
2
Sub Total =_>
162
41
203
56:
162
94 : Sub Total ==>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
11
-11
0
0
11
6 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
165
45
0
0 Ventilation Load
0
-205
48.80
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 : Adj Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0 ;
Ov/Undr Sizing
-156
-156
37.04
Ov/Undr Sizing
0
0
0 ;
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-2
-2
-1
OA Preheat Diff.
-59
14.16
Sup. Fan Heat
0
0
RA Preheat Diff.
0
0.00
Cooling
Heating
Ret. Fan Heat
0
0
0;
Additional Reheat
0
0.00
% OA
40.7
100.0
Duct Heat Pkup
0
0
0
: System Plenum Heat
0
0.00
cfm/ft'
0.15
0.15
Underfir Sup Ht Pkup
0
0:
Underfir Sup Ht Pkup
0
0.00
cfm/ton
261.28
Supply Air Leakage
0
0
0
Supply Air Leakage
0
0.00
Whon
1,774.31
Btu/hr-ft=
6.76
-7.78
Grand Total ==>
173
28
365
100.00 '
173
100.00 Grand Total =_>
-156
-420
100.00
No. People
0
Total 0.0 0.4
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F °F
gr/ib
Main Clg 0.0 0.4
0.3
8
80.7 67.3
81.6
Aux Clg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 0.0 0.4
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 52.3 55.6
0.0 0.0 0.0
0.0 0.0 0.0
AREAS
Gross Total
Glass
Lvgl
ft2
(%)
Floor 54
Main Htg
-0.2 8
Part 0
88.01
Aux Htg
Int Door 0
0.0
0.0'
ExFlr 0
-0.2 3
-9.0
Roof 0
0
0
Wall 0
0
0
Ext Door 0
0
0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvgl
MBh cfm
°F
°FI
Main Htg
-0.2 8
65.5
88.01
Aux Htg
0.0 0
0.0
0.0'
Preheat
-0.2 3
-9.0
55.0
Reheat
0.0 2
55.0
70.0
Humidif
0.0 0
0.0
0.0
Opt Vent
0.0 0
0.0
0.0
Total
-0.4
TRACE@ 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 7 of 8
Zone Checksums
By MACDONALD-MILLER
006 STORAGE
COOLING COIL PEAK
Peaked at Time: Mo/Hr: 7 / 15
Outside Air: OADB/WB/HR: 88 / 75 / 113
Space Plenum Net Percent :
Sens. + Lat. Sens. + Lat Total Of Total
Btu/h Btu/h Btu/h (%)
Envelope Loads
Skylite Solar 0 0 0 O:
Skylite Cond 0 0 0 0
Roof Cond 0 0 0 0
CLG SPACE PEAK
Mo/Hr: 7 / 15
OADB: 88
Space Percent
Sensible Of Total
Btu/h (%)
: Envelope Loads
0 0 : Skylite Solar
0 0 Skylite Cond
0 0 Roof Cond
HEATING COIL PEAK
Mo/Hr: Heating Design
OADB: -9
Space Peak Coil Peak
Space Sens Tot Sens
Btu/h Btu/h
0 0
0 0
0 0
Percent
Of Total
(%)
0.00
0.00
0.00
TEMPERATURES
Cooling
SADB 55.0
Ra Plenum 75.6
Return 75.6
Ret/OA 76.4
Fn MtrTD 0.0
Fn BIdTD 0.0
Fn Frict 0.0
Heating
88.0
70.0
70.0
54.7
0.0
0.0
0.0
Enter DB/WB/HR
ton MBh
Glass Solar
0
0
0
0;
0
0 Glass Solar
0
0
0.00
AIRFLOWS
0
Glass/Door Cond
0
0
0
0;
0
0; Glass/Door Cond
0
0
0.00
Vent
0.0 0
0.0
Wall Cond
0
0
0
0
0
0 Wall Cond
0
0
0.00
Cooling
Heating
Partition/Door
0
0
0.
0
0 Partition/Door
0
0
0.00
Diffuser
292
292
Floor
0
0
0
0
0: Floor
0
0
0.00
Terminal
292
292
Adjacent Floor
0
0
0
0
0
0 Adjacent Floor
0
0
0.00
Main Fan
292
88
Infiltration
0
0
0;
0
0 Infiltration
0
0
0.00
Sec Fan
292
292
Sub Total =_>
0
0
0
0.
0
0: Sub Total =_>
0
0
0.00
Nom Vent
17
17
AHU Vent
17
17
Internal Loads
Internal Loads
Infil
0
0
Lights
598
149
747
10
598
9 Lights
0
0
0.00
MinStop/Rh
88
88
People
450
0
450
6
250
4 People
0
0
0.00
Return
292
88
Misc
5,459
0
5,459
73 ;
5,459
86 ; Misc
0
0
0.00
Exhaust
17
17
Sub Total =_>
6,507
149
6,656
89
6,307
99: Sub Total =_>
0
0
0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
40
-40
0
0
40
1 Ceiling Load
0
0
0.00
Leakage Dwn
0
0
Ventilation Load
0
0
861
11
0
0 Ventilation Load
0
-1,455
17.49
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0:
0
0 AdJ Air Trans Heat
0
0
0
Dehumid. Ov Sizing
0
0
Ov/Undr Sizing
-5,712
-5,712
68.66
Ov/Undr Sizing
0
0
0 ;
0
0 Exhaust Heat
0
0.00
ENGINEERING CKS
Exhaust Heat
-12
-12
0 ;
OA Preheat Diff.
0
0.00
Sup. Fan Heat
0
0
RA Preheat Diff.
-1,152
13.84
Cooling
Heating
Ret. Fan Heat
0
0
0:
Additional Reheat
0
0.00
% OA
5.8
19.4
Duct Heat Pkup
0
0
0:
: System Plenum Heat
0
0.00
cfm/ft'
1.47
1.47
Underflr Sup Ht Pkup
0
0
: Underflr Sup Ht Pkup
0
0.00
cfm/ton
466.53
Supply Air Leakage
0
0
0:
Supply Air Leakage
0
0.00
ft'/ton
318.16
Btu/heft=
37.72
-41.80
Grand Total ==>
6,546
98
7,506
100.00'
6,346
100.00 Grand Total ==>
-5,712
-8,319
100.00
No. People
1
Total 0.6 7.5
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 53.2 59.2
0.0 0.0 0.0
0.0 0.0 0.0
COOLING COIL SELECTION
Total Capacity
Sens Cap.
Coil Airflow
Enter DB/WB/HR
ton MBh
MBh
cfm
°F °F
gr/Ib
Main Clg 0.6 7.5
6.7
292
76.4 62.1
62.9
Aux Clg 0.0 0.0
0.0
0
0.0 0.0
0.0
Opt Vent 0.0 0.0
0.0
0
0.0 0.0
0.0
Total 0.6 7.5
Project Name: 73166272
Dataset Name: 72166272 AT&T STORE.trc
Leave DB/WB/HR
°F °F gr/Ib
55.0 53.2 59.2
0.0 0.0 0.0
0.0 0.0 0.0
HEATING COIL SELECTION
AREAS
Gross Total
Glass
Lvg
ft. (%)
Floor
199
i Htg
Part
0
88.0
Int Door
0
0.0
ExFlr
0
-1.2 17
Roof
0
0 0
Wall
0
0 0
Ext Door
0
0 0
HEATING COIL SELECTION
Capacity Coil Airflow
Ent
Lvg
MBh cfm
°F
°F
i Htg
-7.1 292
65.5
88.0
Htg
0.0 0
0.0
0.0
seat
-1.2 17
-9.0
55.0
eat
-1.4 88
55.0
70.0
iidif
0.0 0
0.0
0.0
Vent
0.0 0
0.0
0.0
d
-8.3
TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016
Alternative - 1 System Checksums Report Page 8 of 8
01 0
O.
N n�.
z z
N 0)
3 3
CD
n
O c
CD
C
N
cn (1)
m
CD m
7. 7. M.
(Dmm.
N N (n
T , T
ID N d
7 7 7
0 T -u'.
O O:
CD
COL
OO N N
ao.
H
m
3
0
0
v
0
U1 N W 0 cD
N O O 3 O c
N — W' F
01000
O o o o
v
m
CO) Cl)
m Z N
�a -q
0�
z
o C
D
m D
m<
m
V)
nO
(� O A
n N
A' (D CD :
3
f a
m
D n
0
N O N
M O
a
3 0
nN
im
f m'
N
2
yCD
CTT O N
y.
N OD.
N c0
3 0
10
U1 N W 0 cD
N O O 3 O c
N — W' F
01000
O o o o
v
m
CO) Cl)
m Z N
�a -q
0�
z
o C
D
m D
m<
m
V)
N W
0) a)
N N
N N
a�
U)
0
m
0
cu c v_
c � m
a m
N
j N
O 1p
7
N D o O a -
N
A
N �-10 m
0maf 3
T < <
�
O < < 0
c m
w 0.
m N
D
-'rnw� o c m
A W N O A O = 7
O O O O O p 0 C
O O O O o 7 �• x
O
0 n
0 0 0 0 0 0
0 0 0 0 6 0
r 3
°
00oo$ m m 0
W GI O O W x O m
x
v_
OOOOO p O m N .�.
0 0 0 0 0 O n o 0
m
M
o O (A N
0 0 0 0 0 p O m
0 0 0 0 0 >> N m
a w
C
o O o O O
O W O O Omt
mmmo�CD 0pr
rn w o
n
O m
N (n W � 7
0 0 0 O op 0=
00000 °• x
i
0 0 0 0 0 $ o
v
o 0 0 0 0 = m
of
0 0 0 0 0 0 0 3 �I
wwoow o a 0 vi
7
0 0 0 0 0 $ o m y
0
0 0 0 0 0 a o y
0 0 o 0 0 p 0 CCD N
O O C O O 7 O N O
CL N
C D7
0 0 0 0 0 0=w
0 0 0 0 0 m
rn w O O
�incncn�, o m n
x
W
C
EL
7
D
y
CL
N
N
CD
3
m
m
a
a
n,
n
m
a
m
n
r:
Io
H
u
u
CO) Ch
W ZZ Cl)
• I
o O
z—
o C) CO)
D
N
m
cn
11/1/2016
City of Tukwila Allan Ekberg, Mayor
Department of Community Development Jack Pace, Director
APRIL HOUSE
7717 DETROIT AVE SW
SEATTLE, WA 98106
RE: Permit No. M16-0069
AT&T STORE
344 SOUTHCENTER MALL
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 12/26/2016.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 12/26/2016, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File No: M I6-0069
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M16-0069 DATE: 05/05/16
PROJECT NAME: AT&T STORE
SITE ADDRESS: 344 SOUTHCENTER MALL
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
Building Division 14 Fire Prevention Planning Division ❑
Public Works ❑ Structural ❑ Permit Coordinator
PRELIMINARY REVIEW: DATE: 05/1.0/16
Not Applicable ❑ Structural Review Required ❑
(no approval/review required)
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 06/07/16
Approved ❑ Approved with Conditions ❑
Corrections Required ❑ Denied ❑
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
MACDONALD/MILLER FAC SOL TNC
Home E-Spahol Contact
Safety & Health Claims & Insurance
inWashington State Department of
Labor & Industries
MACDONALD/MILLER FAC SOL INC
Owner or tradesperson PO BOX 47983
SEATTLE, WA 98106
Principals 206-768-4180
SIMONDS, DERRICK R, PRESIDENT KING County
INEBSTER, MARK E, VICE PRESIDENT
GEBHARDT, STEPHANIE
WETTACH, TREASURER
HOEL, STEPHANIE W, MEMBER
SIGMUND, FREDRIC, PRESIDENT
(End: 01 /04/2011)
LOVELY, STEVE C, VICE PRESIDENT
(End: 01 /04/2011)
HACK, RICHARD, SECRETARY
(End: 01 /04/2011)
KOPET, TYLER, TREASURER
(End: 01 /04/2011)
TURLEY, DOUGLAS, CHIEF EXECUTIVE
OFFICER
(End: 01/04/2011)
TURLEY, DOUGLAS, CHIEF OPERATING
OFFICER
(End: 01 /04/2011)
GOUGH, DAVID ANTHONY, DIRECTOR
(End: 08/29/2014)
Doing business as
MACDONALD/MILLER FAC SOL INC
WA UBI No. Business type
602 254 260 Corporation
Governing persons
FREDRIC
J
SIGMUND
STEVE C LOVELY;
TYLER C KOPET;
License
Page 1 of 3
Search L&I '
A-7.Index Help My 1"10
Workplace Rights Trades & Licensing
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
..........................................................................
Meets current requirements.
License specialties
GENERAL
License no.
MACDOFS980RU
Effective — expiration
12/31/2002— 01/03/2017
https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS98ORU&SAW= 5/17/2016
3
0
I
0
al
04
N
i
r
3
i
a
c
0 m
c
rn
a
0
0
a
m
a
v
B
0°
a
c
N
0
c
m
0
Cn
a
N
n
N
0
M
n
2
a
0
12
M
M
t0
O
N
M
O
I
SERIES'VAV BOX SCHEDULE
NAME
COMPANY
PHONE NUMBER
EMAIL
UNIT I TRAND 1 INLET j FAN VALVE CFM I HEATER
JESSE MONTEZ
FAN
206-768-4178
JESSE.MONTEZ@MACMILLER.COM
NO. MODEL NO. j SIZE CFM i MAX MIN i KW DT CFM ! VOLTIPH
STGS HP
VOLT/PH
;SPD
NOTES
VAV-101 VSEF 1404SQ 14 ! 1400 I 1260 300 12 27 1400 480/3
2 1/2
27711
i ECM
NEW,1,2
VAV-102 VSEV 1405SQ i 14 `: 1600 1440 ! 360 17 1 33.4 1 1600 480/3
2 1
277/1
ECM
NEW,1,2
VAV-103 VSEF 1003SQ j 10 925 830 j 215 5 i 19.1 825 I 480/3
2 1/3
277/1ECM
206-768-4234
NEW,1,2
f
o
NOTES:
O
1. DISCONNECT BY ELECTRICAL.
>6
Q
eel
10 z
ti
2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE:
' U_
(DN J
CU
F
- WITH ECM MOTOR.
- EXTENDED DAMPER 1/2" DIAM. SHAFT
- FACTORY INSTALLED 1' THROW -AWAY FILTERS
- CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED
FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET.
-1" MATT -FACED UNIT INSULATION
- VARIABLE SPEED FAN CONTROL
- 24V TRANSFORMER, 50 VA MIN RATING
- HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS
-AUTO RESET 120"F HIGH LIMIT TSTAT
- NON MAGNETIC QUIET ACTING HEATER CONTACTOR
NOTE TO ELECTRICAL:
- 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO
THE FAN MOTOR.
N VICINITY MAP
NO SCALE
1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO
VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2012 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE
CODE AND STATE AND LOCAL CODES AND ORDINANCES.
3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2012 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE
SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM.
4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT.
5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2012 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS
- DUCT WRAP, WHERE INDICATED, SHALL BE 11/2' 0.75 LB/CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-6 MIN.).
- SOUND LINING, WHERE INDICATED, SHALL BE V 1.5 LB/CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-6 MIN.).
DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED EI 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R6 MIN.). AIR DUCT (R6 MIN)
SUPPLY DUCT WHICH CONVEY SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER THAN 105 DEG F SHALL BE INSULATED WITH A MINIMUM OF R-3.3, WHEN LOCATED IN CONDITIONED
SPACE.
6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER,1 1/2" FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS
1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE.
7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2012 IBC.
8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
9. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION
606 OF THE 2012 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. BAS TO MONITOR FIRE ALARM CONTROL PANEL AND SHUT
DOWN ALL FAN TERMINAL UNITS DURING ANY BUILDING FIRE ALARM EVENT, IN ACCORDANCE WITH IMC 606.2.2.
10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED
AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18"X 18".
11. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS
A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL
AIR AND WATER DESIGN FLOW RATES.
12. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC
CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM.
13. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC), COMMERCIAL PROVISIONS, SECTION C408 AND WITH LEED NC -2.1 FUNDAMENTAL
BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING.
14. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER
APN# 9202470010
PROPERTY NAME: WESTFIELD SHOPPING CENTER
LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765)
JURISDICTION: TUKWILA
PROJECT ADDRESS: 344 SOUTHCENTER MALL
TUKWILA, WA 98188
TITLE
NAME
COMPANY
PHONE NUMBER
EMAIL
PROJECT ENGINEER
JESSE MONTEZ
MACDONALD MILLER
206-768-4178
JESSE.MONTEZ@MACMILLER.COM
ACCOUNT MANAGER
MITCH POWELL
MACDONALD MILLER
253-680-3166
MITCH.POWELL@MACMILLER.COM
SHEET METAL FOREMAN
TIM FELTON
MACDONALD MILLER
206-407-2692
TIM.FELTON@MACMILLER.COM
AIR BALANCE FOREMAN
STEVE BAKER
MACDONALD MILLER
206-768-3824
STEVE.BAKER@MACMILLER.COM
ELECTRICAL FOREMAN
CLAYTON PARKER
MACDONALD MILLER
206-768-4234
CLAYTON.PARKER@MACMILLER.COM
DEMO 2 EXISTING COOLING ONLY VAV BOXES.
PROVIDE AND INSTALL 3 FAN TERMINALS
MODIFY EXISTING MEDIUM AND LOW PRESSURE DUCTWORK AS SHOWN.
PROVIDE AND INSTALL ELECTRICAL BREAKERS, RACEWAYS, AND WIRE FOR NEW FAN TERMINALS.
PROVIDE AND INSTALL CONTROLS, WIRING AND SENSORS FOR NEW FAN TERMINALS.
PROVIDE TEMPORARY COOLING DURING CONSTRUCTION.
SERIES FAN TERMINALS WITH ECM FAN MOTORE MEET THE 2012 WSEC, C403.2.10.3 FRACTIONAL HP FAN MOTORS.
RECEIVED
CITY OF `I"W(WILA
MAY 05 2015
PERMIT CENTER I
SYMBOL I MANUFACTURER & MODEL NUMBER SIZE TYPE j NOTES
AA CFM 1 TITUS PCS AS NOTED T -BAR PERORATED CEILING DIFFUSER j 4 -WAY ADJUSTABLE, SUPPLY
I I TITUS PXP AS NOTED j T -BAR PERFOATED RETURN GRILLE I PERFORATED FACE, RETURN I
A i i
NAME TITLE NAME TITLE
TM0.01 SCHEDULES -HVAC
TM0.01S SITE MAP
TM2.01 FLOOR PLAN - HVAC
DM2.01 FLOOR DEMO PLAN - HVAC
No changes shall be made to the scope
of work without prior approval of
Tu%vjila Building Division.
U0 ► F :;v; „trill rewire a new plan submittal
c-nd r„ay il::;,do add ianai plan review f3 7'S.
I MElcy,pyl
Poenrift No. M14411
Oor�
7 r vjv I0(}rev>,1 ilw subject to errnrs and _
cf '!'rl5(('.l
Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei
rOvwo ' 1 -fold 0-1py
� :- and
c -,y .
Date: 1
Z
city o ui'mild o
BUILDING DIV>Slt
1 1 1 1 1 1 111 Ld
I Q
04 O
O
1
is
0
L
V)
H
Z
O
Ld (n
O_
Sal"t^,' i L P1-RT.AIT
F 01UIFD FOFI:
❑ Me'Chanical
.r Elcctricat
—� ,O Plumbing
—� .ErGas Piping
Q City of Tukvilla
F_ tJII rli�!r DIVISION
W
Z (.5
d.
> U)
Q0 VJ
z
> m 0
J
J
Wr/ Wr/ /U/
�r 1
W 00
i'••"'.'� � t ��', Vim
0 0 I— 00 o
�'— F— Urn =n LL
C�
= Q.. t
L. {LLI
00 DO°g
E 1
C:) Y_.:-
o r' 7 Cn
N F—
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
B GEZON 05-02-16
CAD: ISSUE DATE:
R VILLANUEVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
T
_... RE IE D FOR
CODE COMPLIANCE
'
APPROVED
V E®
=. MAY 1 3 2016
City Qf Tultti�eila
BUILDIi' G DIVISION
•
o
05
�o 0)
w N U)
U) LL L 0
�
0
Cts�
E
o
N C
E G
O
>6
Q
eel
10 z
ti
U
' U_
(DN J
CU
F
j
I MElcy,pyl
Poenrift No. M14411
Oor�
7 r vjv I0(}rev>,1 ilw subject to errnrs and _
cf '!'rl5(('.l
Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei
rOvwo ' 1 -fold 0-1py
� :- and
c -,y .
Date: 1
Z
city o ui'mild o
BUILDING DIV>Slt
1 1 1 1 1 1 111 Ld
I Q
04 O
O
1
is
0
L
V)
H
Z
O
Ld (n
O_
Sal"t^,' i L P1-RT.AIT
F 01UIFD FOFI:
❑ Me'Chanical
.r Elcctricat
—� ,O Plumbing
—� .ErGas Piping
Q City of Tukvilla
F_ tJII rli�!r DIVISION
W
Z (.5
d.
> U)
Q0 VJ
z
> m 0
J
J
Wr/ Wr/ /U/
�r 1
W 00
i'••"'.'� � t ��', Vim
0 0 I— 00 o
�'— F— Urn =n LL
C�
= Q.. t
L. {LLI
00 DO°g
E 1
C:) Y_.:-
o r' 7 Cn
N F—
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
B GEZON 05-02-16
CAD: ISSUE DATE:
R VILLANUEVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
T
_... RE IE D FOR
CODE COMPLIANCE
'
APPROVED
V E®
=. MAY 1 3 2016
City Qf Tultti�eila
BUILDIi' G DIVISION
BAKER BLVD
RECEIV rE D
CIT` of 'rUKVjILA
MAY 0 5 2016
PERMIT CENTER
APN# 9202470010
PROPERTY NAME: WESTFIELD SHOPPING CENTER
LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765)
JURISDICTION: TUKWILA
PROJECT ADDRESS: 344 SOUTHCENTER MALL
TUKWILA, WA 98188
Lv
Q
6i
J MONTEZ
Z
3
OI--
rnCD
B GEZON
V)
CAD:
■
R VI LLAN U EVA
co
co
DRAWING NUMBER:
C
SHEET NUMBER:
CD
N
O
LL
O
U O
C
�
Oo
s
o A
QM Z
UL
' U
o (m
C
cu
�
N
Lv
Q
V)
�Z
�o
wN
I KOf
J Z
J O
N
(0
v) O V
Q D
d LL
> U) F—
J U)
m z
0
WW< U
LL' w ry
W 00 LL
u) co " p
Q
F-
D W
06°�_
��� ����
N H A`
ENGINEER:
6i
J MONTEZ
Z
CHECKED BY:
O
B GEZON
V)
CAD:
ISSUE DAM
R VI LLAN U EVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
N
O
1
Ln
O
V)
�Z
�o
wN
I KOf
J Z
J O
N
(0
v) O V
Q D
d LL
> U) F—
J U)
m z
0
WW< U
LL' w ry
W 00 LL
u) co " p
Q
F-
D W
06°�_
��� ����
N H A`
ENGINEER:
LAST REVISED:
J MONTEZ
04-21-16
CHECKED BY:
DATE PLOTTED:
B GEZON
CAD:
ISSUE DAM
R VI LLAN U EVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
TMO 01
REVIEWED FOR
CC'iDE COMPLIANCE I
APPROVED
MAY 13 2016.
City of T ukwila
R1111 -DING DIVISION
cv 14•/
Fi�mmjmhm
18•/
0
Fit 00-tP)
W
Q
O
I- 200 CFN
_-( i ! 12 z
t 4's
10Y
Fo I \ O
6-0
'` 22•f 16 � I I I I I I I I �
OP.4P 0
FI
' _ I 04
_ L 1 p
40
i ---_-_- + -- i-- itjr 0O
�- 24.16.
i1
' 14•/ \ - / 2-f,I tog i
- i.•"fid C z
O
cr
1 _ a
i � r
I .-
8•
1010ivo1
r;
`!
�� -
J Z
I ( i
CD�
r
s� V
II
U M3
��(E) Uj
WU CMUM.11 ^ _
LL �.
MECHANICAL FLOOR PLAN > 0 °y U)
> �/ J
> m
O
W W Q U
�C d 11
00
00W-00 p
Z�
f- I- W 00 LL
U) � U Y, t,
= Q g 0
~..� W
06 06 co
p Y �s
<C Q N
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
E C W B GEZON 05-02-16
CITY C)F 1 UK ILA CAD: ISSUE DATE:
Y 6e� R VILLANUEVA
MAY 0 5 2016 DRAWING NUMBER:
T CENTER
C-2321-73166272-00
PERMIT CEN t ER SHEET NUMBER:
a
N _ _ . _..._ REVIEWED FOR
M CODE COMPLIANCE
t0 � APPROVED
N
N
M
e
MAY 13 2016
City of Tukwila
t
' BUILDING DIVISION
I
•
19 t7
op co
�..
C)W
(3)
t)j O
N (n
E
m LL
U) LL U O
�0
co
U
�@<C
o
4a
cE�
O
�
�
O
chec)
U
y
0 0
a)N J
Q
r O
ti 0-
W
Q
O
I- 200 CFN
_-( i ! 12 z
t 4's
10Y
Fo I \ O
6-0
'` 22•f 16 � I I I I I I I I �
OP.4P 0
FI
' _ I 04
_ L 1 p
40
i ---_-_- + -- i-- itjr 0O
�- 24.16.
i1
' 14•/ \ - / 2-f,I tog i
- i.•"fid C z
O
cr
1 _ a
i � r
I .-
8•
1010ivo1
r;
`!
�� -
J Z
I ( i
CD�
r
s� V
II
U M3
��(E) Uj
WU CMUM.11 ^ _
LL �.
MECHANICAL FLOOR PLAN > 0 °y U)
> �/ J
> m
O
W W Q U
�C d 11
00
00W-00 p
Z�
f- I- W 00 LL
U) � U Y, t,
= Q g 0
~..� W
06 06 co
p Y �s
<C Q N
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
E C W B GEZON 05-02-16
CITY C)F 1 UK ILA CAD: ISSUE DATE:
Y 6e� R VILLANUEVA
MAY 0 5 2016 DRAWING NUMBER:
T CENTER
C-2321-73166272-00
PERMIT CEN t ER SHEET NUMBER:
a
N _ _ . _..._ REVIEWED FOR
M CODE COMPLIANCE
t0 � APPROVED
N
N
M
e
MAY 13 2016
City of Tukwila
t
' BUILDING DIVISION
I
•
0
(E) u•°
MOM?) O
W
Q
D
12x12 75 ObFD
\� z
ce
0
EXHAUSTI! — � VAV-1 3
i ;
(� �� ,6•e - � I I I I I I I I �
,o° I
FD
6•° CRQ'
LLJ
6x6 a
75-
' ( t
— t O
(
E✓`- ; 2Fs,6 10x10 ..._ T.
10x10 --
i3m,
I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010
0 VAV-101 D ' Poc CAP , 0 + i,
{ t ;
II..I24x2 �, 4SL
I 6 Rq 18x
--POC
FZ
I
z
I�I VAV-1 2 24x24 24x24
B R�A..._. _ BRA — _ _ _ - '% t ain
il:j
! 6x6 :..: U)
10x10 1;
'4 100 8x8 _ A B -x8
I X :\. q 2 00 Q 200 `� 1
- ,
A 8x8 ... - _ ' !1 (n MALL
AI,Vi'l To
N PAWNG
I �8�g—; j I CAP . 2� oO POG �,' ;
i _ . _ A 200 _ _ i POC _ o
9 Fs
'� ,O F f0•f j
A 3000
� 00—
624 . I / / q 10x10 q 10x10 �� r SHEET NOTES:
I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J
/ O1 FOR USE AS MEDIUM PRESSURE DUCT
�.._ ® O
i N
O
U) W U
�(i) uu,_ MUMN1y
d
MECHANICAL FLOOR PLAN >
Q > `" U)
�:� z
> -J O
W WQ ;.a C)
ry �' trA
� O
O O zW
00
��
I— I— w 00 L
U) Cf) U
QY
�—' E-- o
06 C45 co
N H a c/)
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
RECEIVED B GEZON 05-02-16
CITY 0Ff UKV,,1LA
CAD: ISSUE DATE:
MAY 0 5 2016 R VI LLAN U EVA
DRAWING NUMBER:
PERMIT CENTER C-2321-73166272-00
SHEET NUMBER:
E ) OR
T Ll INCE
- .lam
N APPROVED
MAY 1 3. 2016
City of Tukwila
BUILDING DIVISION
1 = "
CD r-
■
^-
C)
r00
0)
co,
v^
J
LL
'fn
LL
`-
� Q
=e
U
o Q
�40E�
a co 3
U
U_
°C)
NCU jJ
W
Q
D
12x12 75 ObFD
\� z
ce
0
EXHAUSTI! — � VAV-1 3
i ;
(� �� ,6•e - � I I I I I I I I �
,o° I
FD
6•° CRQ'
LLJ
6x6 a
75-
' ( t
— t O
(
E✓`- ; 2Fs,6 10x10 ..._ T.
10x10 --
i3m,
I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010
0 VAV-101 D ' Poc CAP , 0 + i,
{ t ;
II..I24x2 �, 4SL
I 6 Rq 18x
--POC
FZ
I
z
I�I VAV-1 2 24x24 24x24
B R�A..._. _ BRA — _ _ _ - '% t ain
il:j
! 6x6 :..: U)
10x10 1;
'4 100 8x8 _ A B -x8
I X :\. q 2 00 Q 200 `� 1
- ,
A 8x8 ... - _ ' !1 (n MALL
AI,Vi'l To
N PAWNG
I �8�g—; j I CAP . 2� oO POG �,' ;
i _ . _ A 200 _ _ i POC _ o
9 Fs
'� ,O F f0•f j
A 3000
� 00—
624 . I / / q 10x10 q 10x10 �� r SHEET NOTES:
I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J
/ O1 FOR USE AS MEDIUM PRESSURE DUCT
�.._ ® O
i N
O
U) W U
�(i) uu,_ MUMN1y
d
MECHANICAL FLOOR PLAN >
Q > `" U)
�:� z
> -J O
W WQ ;.a C)
ry �' trA
� O
O O zW
00
��
I— I— w 00 L
U) Cf) U
QY
�—' E-- o
06 C45 co
N H a c/)
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
RECEIVED B GEZON 05-02-16
CITY 0Ff UKV,,1LA
CAD: ISSUE DATE:
MAY 0 5 2016 R VI LLAN U EVA
DRAWING NUMBER:
PERMIT CENTER C-2321-73166272-00
SHEET NUMBER:
E ) OR
T Ll INCE
- .lam
N APPROVED
MAY 1 3. 2016
City of Tukwila
BUILDING DIVISION
1 = "
3
0
I
0
al
04
N
i
r
3
i
a
c
0 m
c
rn
a
0
0
a
m
a
v
B
0°
a
c
N
0
c
m
0
Cn
a
N
n
N
0
M
n
2
a
0
12
M
M
t0
O
N
M
O
I
SERIES'VAV BOX SCHEDULE
NAME
COMPANY
PHONE NUMBER
EMAIL
UNIT I TRAND 1 INLET j FAN VALVE CFM I HEATER
JESSE MONTEZ
FAN
206-768-4178
JESSE.MONTEZ@MACMILLER.COM
NO. MODEL NO. j SIZE CFM i MAX MIN i KW DT CFM ! VOLTIPH
STGS HP
VOLT/PH
;SPD
NOTES
VAV-101 VSEF 1404SQ 14 ! 1400 I 1260 300 12 27 1400 480/3
2 1/2
27711
i ECM
NEW,1,2
VAV-102 VSEV 1405SQ i 14 `: 1600 1440 ! 360 17 1 33.4 1 1600 480/3
2 1
277/1
ECM
NEW,1,2
VAV-103 VSEF 1003SQ j 10 925 830 j 215 5 i 19.1 825 I 480/3
2 1/3
277/1ECM
206-768-4234
NEW,1,2
f
o
NOTES:
O
1. DISCONNECT BY ELECTRICAL.
>6
Q
eel
10 z
ti
2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE:
' U_
(DN J
CU
F
- WITH ECM MOTOR.
- EXTENDED DAMPER 1/2" DIAM. SHAFT
- FACTORY INSTALLED 1' THROW -AWAY FILTERS
- CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED
FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET.
-1" MATT -FACED UNIT INSULATION
- VARIABLE SPEED FAN CONTROL
- 24V TRANSFORMER, 50 VA MIN RATING
- HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS
-AUTO RESET 120"F HIGH LIMIT TSTAT
- NON MAGNETIC QUIET ACTING HEATER CONTACTOR
NOTE TO ELECTRICAL:
- 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO
THE FAN MOTOR.
N VICINITY MAP
NO SCALE
1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO
VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2012 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE
CODE AND STATE AND LOCAL CODES AND ORDINANCES.
3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2012 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE
SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM.
4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT.
5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2012 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS
- DUCT WRAP, WHERE INDICATED, SHALL BE 11/2' 0.75 LB/CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-6 MIN.).
- SOUND LINING, WHERE INDICATED, SHALL BE V 1.5 LB/CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-6 MIN.).
DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED EI 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R6 MIN.). AIR DUCT (R6 MIN)
SUPPLY DUCT WHICH CONVEY SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER THAN 105 DEG F SHALL BE INSULATED WITH A MINIMUM OF R-3.3, WHEN LOCATED IN CONDITIONED
SPACE.
6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER,1 1/2" FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS
1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE.
7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2012 IBC.
8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
9. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION
606 OF THE 2012 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. BAS TO MONITOR FIRE ALARM CONTROL PANEL AND SHUT
DOWN ALL FAN TERMINAL UNITS DURING ANY BUILDING FIRE ALARM EVENT, IN ACCORDANCE WITH IMC 606.2.2.
10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED
AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18"X 18".
11. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS
A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL
AIR AND WATER DESIGN FLOW RATES.
12. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC
CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM.
13. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC), COMMERCIAL PROVISIONS, SECTION C408 AND WITH LEED NC -2.1 FUNDAMENTAL
BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING.
14. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER
APN# 9202470010
PROPERTY NAME: WESTFIELD SHOPPING CENTER
LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765)
JURISDICTION: TUKWILA
PROJECT ADDRESS: 344 SOUTHCENTER MALL
TUKWILA, WA 98188
TITLE
NAME
COMPANY
PHONE NUMBER
EMAIL
PROJECT ENGINEER
JESSE MONTEZ
MACDONALD MILLER
206-768-4178
JESSE.MONTEZ@MACMILLER.COM
ACCOUNT MANAGER
MITCH POWELL
MACDONALD MILLER
253-680-3166
MITCH.POWELL@MACMILLER.COM
SHEET METAL FOREMAN
TIM FELTON
MACDONALD MILLER
206-407-2692
TIM.FELTON@MACMILLER.COM
AIR BALANCE FOREMAN
STEVE BAKER
MACDONALD MILLER
206-768-3824
STEVE.BAKER@MACMILLER.COM
ELECTRICAL FOREMAN
CLAYTON PARKER
MACDONALD MILLER
206-768-4234
CLAYTON.PARKER@MACMILLER.COM
DEMO 2 EXISTING COOLING ONLY VAV BOXES.
PROVIDE AND INSTALL 3 FAN TERMINALS
MODIFY EXISTING MEDIUM AND LOW PRESSURE DUCTWORK AS SHOWN.
PROVIDE AND INSTALL ELECTRICAL BREAKERS, RACEWAYS, AND WIRE FOR NEW FAN TERMINALS.
PROVIDE AND INSTALL CONTROLS, WIRING AND SENSORS FOR NEW FAN TERMINALS.
PROVIDE TEMPORARY COOLING DURING CONSTRUCTION.
SERIES FAN TERMINALS WITH ECM FAN MOTORE MEET THE 2012 WSEC, C403.2.10.3 FRACTIONAL HP FAN MOTORS.
RECEIVED
CITY OF `I"W(WILA
MAY 05 2015
PERMIT CENTER I
SYMBOL I MANUFACTURER & MODEL NUMBER SIZE TYPE j NOTES
AA CFM 1 TITUS PCS AS NOTED T -BAR PERORATED CEILING DIFFUSER j 4 -WAY ADJUSTABLE, SUPPLY
I I TITUS PXP AS NOTED j T -BAR PERFOATED RETURN GRILLE I PERFORATED FACE, RETURN I
A i i
NAME TITLE NAME TITLE
TM0.01 SCHEDULES -HVAC
TM0.01S SITE MAP
TM2.01 FLOOR PLAN - HVAC
DM2.01 FLOOR DEMO PLAN - HVAC
No changes shall be made to the scope
of work without prior approval of
Tu%vjila Building Division.
U0 ► F :;v; „trill rewire a new plan submittal
c-nd r„ay il::;,do add ianai plan review f3 7'S.
I MElcy,pyl
Poenrift No. M14411
Oor�
7 r vjv I0(}rev>,1 ilw subject to errnrs and _
cf '!'rl5(('.l
Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei
rOvwo ' 1 -fold 0-1py
� :- and
c -,y .
Date: 1
Z
city o ui'mild o
BUILDING DIV>Slt
1 1 1 1 1 1 111 Ld
I Q
04 O
O
1
is
0
L
V)
H
Z
O
Ld (n
O_
Sal"t^,' i L P1-RT.AIT
F 01UIFD FOFI:
❑ Me'Chanical
.r Elcctricat
—� ,O Plumbing
—� .ErGas Piping
Q City of Tukvilla
F_ tJII rli�!r DIVISION
W
Z (.5
d.
> U)
Q0 VJ
z
> m 0
J
J
Wr/ Wr/ /U/
�r 1
W 00
i'••"'.'� � t ��', Vim
0 0 I— 00 o
�'— F— Urn =n LL
C�
= Q.. t
L. {LLI
00 DO°g
E 1
C:) Y_.:-
o r' 7 Cn
N F—
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
B GEZON 05-02-16
CAD: ISSUE DATE:
R VILLANUEVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
T
_... RE IE D FOR
CODE COMPLIANCE
'
APPROVED
V E®
=. MAY 1 3 2016
City Qf Tultti�eila
BUILDIi' G DIVISION
•
o
05
�o 0)
w N U)
U) LL L 0
�
0
Cts�
E
o
N C
E G
O
>6
Q
eel
10 z
ti
U
' U_
(DN J
CU
F
j
I MElcy,pyl
Poenrift No. M14411
Oor�
7 r vjv I0(}rev>,1 ilw subject to errnrs and _
cf '!'rl5(('.l
Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei
rOvwo ' 1 -fold 0-1py
� :- and
c -,y .
Date: 1
Z
city o ui'mild o
BUILDING DIV>Slt
1 1 1 1 1 1 111 Ld
I Q
04 O
O
1
is
0
L
V)
H
Z
O
Ld (n
O_
Sal"t^,' i L P1-RT.AIT
F 01UIFD FOFI:
❑ Me'Chanical
.r Elcctricat
—� ,O Plumbing
—� .ErGas Piping
Q City of Tukvilla
F_ tJII rli�!r DIVISION
W
Z (.5
d.
> U)
Q0 VJ
z
> m 0
J
J
Wr/ Wr/ /U/
�r 1
W 00
i'••"'.'� � t ��', Vim
0 0 I— 00 o
�'— F— Urn =n LL
C�
= Q.. t
L. {LLI
00 DO°g
E 1
C:) Y_.:-
o r' 7 Cn
N F—
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
B GEZON 05-02-16
CAD: ISSUE DATE:
R VILLANUEVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
T
_... RE IE D FOR
CODE COMPLIANCE
'
APPROVED
V E®
=. MAY 1 3 2016
City Qf Tultti�eila
BUILDIi' G DIVISION
BAKER BLVD
RECEIV rE D
CIT` of 'rUKVjILA
MAY 0 5 2016
PERMIT CENTER
APN# 9202470010
PROPERTY NAME: WESTFIELD SHOPPING CENTER
LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765)
JURISDICTION: TUKWILA
PROJECT ADDRESS: 344 SOUTHCENTER MALL
TUKWILA, WA 98188
Lv
Q
6i
J MONTEZ
Z
3
OI--
rnCD
B GEZON
V)
CAD:
■
R VI LLAN U EVA
co
co
DRAWING NUMBER:
C
SHEET NUMBER:
CD
N
O
LL
O
U O
C
�
Oo
s
o A
QM Z
UL
' U
o (m
C
cu
�
N
Lv
Q
V)
�Z
�o
wN
I KOf
J Z
J O
N
(0
v) O V
Q D
d LL
> U) F—
J U)
m z
0
WW< U
LL' w ry
W 00 LL
u) co " p
Q
F-
D W
06°�_
��� ����
N H A`
ENGINEER:
6i
J MONTEZ
Z
CHECKED BY:
O
B GEZON
V)
CAD:
ISSUE DAM
R VI LLAN U EVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
N
O
1
Ln
O
V)
�Z
�o
wN
I KOf
J Z
J O
N
(0
v) O V
Q D
d LL
> U) F—
J U)
m z
0
WW< U
LL' w ry
W 00 LL
u) co " p
Q
F-
D W
06°�_
��� ����
N H A`
ENGINEER:
LAST REVISED:
J MONTEZ
04-21-16
CHECKED BY:
DATE PLOTTED:
B GEZON
CAD:
ISSUE DAM
R VI LLAN U EVA
DRAWING NUMBER:
C-2321-73166272-00
SHEET NUMBER:
TMO 01
REVIEWED FOR
CC'iDE COMPLIANCE I
APPROVED
MAY 13 2016.
City of T ukwila
R1111 -DING DIVISION
cv 14•/
Fi�mmjmhm
18•/
0
Fit 00-tP)
W
Q
O
I- 200 CFN
_-( i ! 12 z
t 4's
10Y
Fo I \ O
6-0
'` 22•f 16 � I I I I I I I I �
OP.4P 0
FI
' _ I 04
_ L 1 p
40
i ---_-_- + -- i-- itjr 0O
�- 24.16.
i1
' 14•/ \ - / 2-f,I tog i
- i.•"fid C z
O
cr
1 _ a
i � r
I .-
8•
1010ivo1
r;
`!
�� -
J Z
I ( i
CD�
r
s� V
II
U M3
��(E) Uj
WU CMUM.11 ^ _
LL �.
MECHANICAL FLOOR PLAN > 0 °y U)
> �/ J
> m
O
W W Q U
�C d 11
00
00W-00 p
Z�
f- I- W 00 LL
U) � U Y, t,
= Q g 0
~..� W
06 06 co
p Y �s
<C Q N
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
E C W B GEZON 05-02-16
CITY C)F 1 UK ILA CAD: ISSUE DATE:
Y 6e� R VILLANUEVA
MAY 0 5 2016 DRAWING NUMBER:
T CENTER
C-2321-73166272-00
PERMIT CEN t ER SHEET NUMBER:
a
N _ _ . _..._ REVIEWED FOR
M CODE COMPLIANCE
t0 � APPROVED
N
N
M
e
MAY 13 2016
City of Tukwila
t
' BUILDING DIVISION
I
•
19 t7
op co
�..
C)W
(3)
t)j O
N (n
E
m LL
U) LL U O
�0
co
U
�@<C
o
4a
cE�
O
�
�
O
chec)
U
y
0 0
a)N J
Q
r O
ti 0-
W
Q
O
I- 200 CFN
_-( i ! 12 z
t 4's
10Y
Fo I \ O
6-0
'` 22•f 16 � I I I I I I I I �
OP.4P 0
FI
' _ I 04
_ L 1 p
40
i ---_-_- + -- i-- itjr 0O
�- 24.16.
i1
' 14•/ \ - / 2-f,I tog i
- i.•"fid C z
O
cr
1 _ a
i � r
I .-
8•
1010ivo1
r;
`!
�� -
J Z
I ( i
CD�
r
s� V
II
U M3
��(E) Uj
WU CMUM.11 ^ _
LL �.
MECHANICAL FLOOR PLAN > 0 °y U)
> �/ J
> m
O
W W Q U
�C d 11
00
00W-00 p
Z�
f- I- W 00 LL
U) � U Y, t,
= Q g 0
~..� W
06 06 co
p Y �s
<C Q N
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
E C W B GEZON 05-02-16
CITY C)F 1 UK ILA CAD: ISSUE DATE:
Y 6e� R VILLANUEVA
MAY 0 5 2016 DRAWING NUMBER:
T CENTER
C-2321-73166272-00
PERMIT CEN t ER SHEET NUMBER:
a
N _ _ . _..._ REVIEWED FOR
M CODE COMPLIANCE
t0 � APPROVED
N
N
M
e
MAY 13 2016
City of Tukwila
t
' BUILDING DIVISION
I
•
0
(E) u•°
MOM?) O
W
Q
D
12x12 75 ObFD
\� z
ce
0
EXHAUSTI! — � VAV-1 3
i ;
(� �� ,6•e - � I I I I I I I I �
,o° I
FD
6•° CRQ'
LLJ
6x6 a
75-
' ( t
— t O
(
E✓`- ; 2Fs,6 10x10 ..._ T.
10x10 --
i3m,
I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010
0 VAV-101 D ' Poc CAP , 0 + i,
{ t ;
II..I24x2 �, 4SL
I 6 Rq 18x
--POC
FZ
I
z
I�I VAV-1 2 24x24 24x24
B R�A..._. _ BRA — _ _ _ - '% t ain
il:j
! 6x6 :..: U)
10x10 1;
'4 100 8x8 _ A B -x8
I X :\. q 2 00 Q 200 `� 1
- ,
A 8x8 ... - _ ' !1 (n MALL
AI,Vi'l To
N PAWNG
I �8�g—; j I CAP . 2� oO POG �,' ;
i _ . _ A 200 _ _ i POC _ o
9 Fs
'� ,O F f0•f j
A 3000
� 00—
624 . I / / q 10x10 q 10x10 �� r SHEET NOTES:
I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J
/ O1 FOR USE AS MEDIUM PRESSURE DUCT
�.._ ® O
i N
O
U) W U
�(i) uu,_ MUMN1y
d
MECHANICAL FLOOR PLAN >
Q > `" U)
�:� z
> -J O
W WQ ;.a C)
ry �' trA
� O
O O zW
00
��
I— I— w 00 L
U) Cf) U
QY
�—' E-- o
06 C45 co
N H a c/)
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
RECEIVED B GEZON 05-02-16
CITY 0Ff UKV,,1LA
CAD: ISSUE DATE:
MAY 0 5 2016 R VI LLAN U EVA
DRAWING NUMBER:
PERMIT CENTER C-2321-73166272-00
SHEET NUMBER:
E ) OR
T Ll INCE
- .lam
N APPROVED
MAY 1 3. 2016
City of Tukwila
BUILDING DIVISION
1 = "
CD r-
■
^-
C)
r00
0)
co,
v^
J
LL
'fn
LL
`-
� Q
=e
U
o Q
�40E�
a co 3
U
U_
°C)
NCU jJ
W
Q
D
12x12 75 ObFD
\� z
ce
0
EXHAUSTI! — � VAV-1 3
i ;
(� �� ,6•e - � I I I I I I I I �
,o° I
FD
6•° CRQ'
LLJ
6x6 a
75-
' ( t
— t O
(
E✓`- ; 2Fs,6 10x10 ..._ T.
10x10 --
i3m,
I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010
0 VAV-101 D ' Poc CAP , 0 + i,
{ t ;
II..I24x2 �, 4SL
I 6 Rq 18x
--POC
FZ
I
z
I�I VAV-1 2 24x24 24x24
B R�A..._. _ BRA — _ _ _ - '% t ain
il:j
! 6x6 :..: U)
10x10 1;
'4 100 8x8 _ A B -x8
I X :\. q 2 00 Q 200 `� 1
- ,
A 8x8 ... - _ ' !1 (n MALL
AI,Vi'l To
N PAWNG
I �8�g—; j I CAP . 2� oO POG �,' ;
i _ . _ A 200 _ _ i POC _ o
9 Fs
'� ,O F f0•f j
A 3000
� 00—
624 . I / / q 10x10 q 10x10 �� r SHEET NOTES:
I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J
/ O1 FOR USE AS MEDIUM PRESSURE DUCT
�.._ ® O
i N
O
U) W U
�(i) uu,_ MUMN1y
d
MECHANICAL FLOOR PLAN >
Q > `" U)
�:� z
> -J O
W WQ ;.a C)
ry �' trA
� O
O O zW
00
��
I— I— w 00 L
U) Cf) U
QY
�—' E-- o
06 C45 co
N H a c/)
ENGINEER: LAST REVISED:
J MONTEZ 05-02-16
CHECKED BY: DATE PLOTTED:
RECEIVED B GEZON 05-02-16
CITY 0Ff UKV,,1LA
CAD: ISSUE DATE:
MAY 0 5 2016 R VI LLAN U EVA
DRAWING NUMBER:
PERMIT CENTER C-2321-73166272-00
SHEET NUMBER:
E ) OR
T Ll INCE
- .lam
N APPROVED
MAY 1 3. 2016
City of Tukwila
BUILDING DIVISION
1 = "