Loading...
HomeMy WebLinkAboutPermit M16-0069 - AT&T STORE - FAN TERMINALS, GRIDS AND DIFFUSERSAT&T STORE 344 SOUTHCENTER MALI. M16-0069 City of Tukwila • Department of Community Development �y' • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 9202470010 Permit Number: M16-0069 Address: 344 SOUTHCENTER MALL Issue Date: 5/17/2016 WA Cities Electrical Code: 2014 Permit Expires On: 11/13/2016 Project Name: AT&T STORE 2014 Owner: 2012 WA State Energy Code: Name: WESTFIELD PROPERTY TAX DEPT 2012 Address: PO BOX 130940, CARLSBAD, WA, 92013 Contact Person: Name: APRIL HOUSE Phone: (206) 905-3748 Address: 7717 DETROIT AVE SW, SEATTLE, WA, 98106 Contractor: Name: MACDONALD/MILLER FAC SOL INC Phone: (206) 768-4180 Address: PO BOX 47983, SEATTLE, WA, 98146- 7983 License No: MACDOFS980RU Expiration Date: 1/3/2017 Lender: Name: Address: DESCRIPTION OF WORK: INSTALL (3) FAN TERMINALS AND (9) GRD'S AND DIFFUSERS. MODIFY EXISTING MEDIUM AND LOW PRESSURE DUCTWORK PER PLAN. Valuation of Work: $23,117.00 Fees Collected: $507.20 Type of Work: NEW Electrical Service Provided by: PUGET SOUND ENERGY Fuel type: ELECT Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this developmen er=dtons attached to this permit. Signatur Date: Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 2: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 3: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 4: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. S: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 6: ***MECHANICAL PERMIT CONDITIONS*** 7: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 8: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OF TUKWIL. Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 lin://www.TukwilaWA.gov SITE LOCATION Mechanical Permit No. T -1 W6? Project No. Date Application Accepted: Date Application Expires: or office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" 3144 King Co Assessor's Tax No.: 9202470010 Site Address: .28e llouthcenter Mall Blvd Tukwila, WA 981 Suite Number: Floor: 1 Tenant Name: AT & T Store New Tenant: ❑ .....Yes ®..No PROPERTY OWNER Name: WESTFIELD PROPERTY TAX DEPT Address: 2800 Southcenter Mall Blvd City: TUKWILA State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: APRIL HOUSE Address: 7717 Detroit Ave SW City: Seattle State: WA Zip: 98106 Phone: (206) 905-3748 Fax: Email: April.House@macmiller.com MECHANICAL CONTRACTOR INFORMATION Company Name: MacDonald Miller Address: 7717 Detroit Ave SW City: Seattle State: WA zip: 98106 Phone: (206) 768-4278 Fax: (206) 768-4279 Contr Reg No.: MACDOFS980RU Exp Date: 01/03/2017 Tukwila Business License No.: BUS -0994318 Valuation of project (contractor's bid price): $ 23,117 Describe the scope of work in detail: Install (3) fan terminals and (9) GRDS and Diffusers. Modify existing medium and low pressure ductwork per plan. Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... W Replacement ........ ❑ Fuel Type: Electric..... W Gas ....... ❑ Other:_ N:\Applications\Forms-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 1-4-16.doex Revised: January 2016 Pagel of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace > 100k btu 9 Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 3 Air handling unit <10,000 cfin 65 dB(A) Unit Type Qty Air handling unit >10,000 cfin Residential, Nighttime Evaporator cooler 9 Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 3 Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser 9 Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 3 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-1 OPM, Monday through Friday and 8AM-1OPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam -1 Opm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWWER OR AUTHORIZED AGENT: Print Name: APRIL HOUSE Mailing Address: 7717 DETROIT AVE SW Date: 05/05/2016 Day Telephone: (206) 905-3748 SEATTLE WA 98106 City State Zip H:\Applications\Formt-Applications On Linc12016 ApplicationsWechanical Permit Application Revised 14-16.docz Revised: January 2016 Page 2 of 2 bh Date Paid: Thursday, May 05, 2016 Paid By: MACDONALD-MILLER FACILITY SOLU Pay Method: CHECK 4476 Printed: Thursday, May 05, 2016 4:00 PM 1 of 1U[_? L/J srsrerns INSPECTION RECORD r Retain a copy with permit r 0-( ff IZPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd- #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: a of Inspection: Va�t Address: e Called: 3qq.-W 14iA U, Special Instructions: Date Wanted: a.m. I z �_Gr� P.M. Requesie�: Phone No: 2W -S77)- 29RO EnApproved per applicable codes. LJ Corrections required prior to approval. (Inspector: -M Iuate: a A 1& El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. INSPECTION RECORD 9J 104 Retain a copy with permit I U� INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: A Type of Inspection: Address: 13 yt) Date Called: Special Instructions: Date WWnd: a.m. �Z % p.m. Request r: Phone No: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit 'ex, � 16- D INS ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:,� Type of Inspection: Lid AQC Date Called Special Instructions: Date Wgnte _ 16 e r a. p.m. Request r: Phone e 5-71 3T-3 3 UQApproved per applicable codes. El Corrections required prior to approval. COMMENTS: Inspector: Date: e4►.ul REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. m o o npi c c c cm nrT p D D m v 0 3 a 3 3 3 s y a o v �'. m to co m m Q m m �� a, e°T n�i 3 op c° cc (D y cD cD m m a o `� CL a C X= C 7 CD 7 LA Ln- �, v CD S 3 3 °: m (Q cO � m � S = r � @ CL (n CD Cn `G a S a s CSD (D n (D C 7 C '; (a a CD `a CD d O O M. — fy 0 Q C a' C C O CC (C a n j Q II' (S O `< `G CD n CD CL C CD C n C_ A 0 0 -► <O V 00 A is 0 0 = 0 0 0 0 0 0 0 O 0000 000 r 0 coo i, CCA AAAA r, " v D� =3 .Z1 � W m_irrr -{ n p p� !' F 3 3 9 8 ili (n o <CD �2_ E m c y m o o 0. m :3 m y ® ;° CD CD o v :3 w O CD = 3 3 M o CD CD N CD CD O O 3 C y CD Qo — CD O 0 n o C �1 (ND COT( O W O) Gf V -CO)-� D N N O G o N Q Oo 0 r 'n 0 N D m O Q N m 3 Cn Z 3 M o = ( N O A O O 3 n C N CD Qo — m'T1 Q W W W Q 7 CD(DN f0/I N = r 'n 3 __ = m (a co ClU-2o °T m 3 M o = ( 7 7 n o C �1 N O L1 CL ray y� ` , c N 3 =i C)-0 �M K) * M 90<n I c �` � < &y cn 0 0 T co a 3 3 co a v CD m3 co = O CD CD i i A M m v Room Checksums By MACDONALD-MILLER 001 SALES NORTH COOLING COIL PEAK COOLING COIL SELECTION CLG SPACE PEAK HEATING COIL PEAK Coil Airflow TEMPERATURES Peaked at Time: Mo/Hr: 7 / 16 gr/Ib Mo/Hr: 8 / 17 Mo/Hr: Heating Design 77.9 65.7 77.6 Cooling Heating Outside Air: OADB/WB/HR: 87 / 74 / 110 0.0 OADB: 79 OADB: -9 0.0 0.0 0.0 SADB 55.0 88.0 0 0 Wall 428 326 76 Ext Door 42 0 0 Ra Plenum 75.5 69.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.5 69.9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 77.9 16.6 Btu/h Btu/h Btu/h (%) : Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads : Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0: 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0• 0 0: Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 13,108 0 13,108 17 ; 15,907 36 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wail Cond 1,429 0 0 82 1,429 82 2 : 0 : 451 0 1 Glass/Door Cond 0 Wall Cond -11,027 0 -11,027 -442 14.12 0.57 Cooling Heating Partition/Door 0 0 0: 0 0: Partition/Door 0 0 0.00 Diffuser 2,019 2,019 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 2,019 2,019 Adjacent Floor 0 0 0 01 0 0 Adjacent Floor 0 0 0.00 Main Fan 2,019 606 Infiltration 7,477 7,477 10 ; 868 2 Infiltration -15,592 -15,592 19.97 Sec Fan 2,019 2,019 Sub Total =_> 22,014 82 22,096 28: 17,227 39: Sub Total =_> -26,619 -27,062 34.65 Nom Vent 409 409 Internal Loads Internal Loads AHU Vent Infil 1 182 82 409 182 Lights 4,956 1,239 6,195 81 4,956 11 Lights 0 0 0.00 MinStop/Rh 606 606 People 27,000 0 27,000 34 ' 15,000 34 People 0 0 0.00 Return 2,201 787 Misc 6,485 0 6,485 8 ; 6,485 15 Misc 0 0 0.00 Exhaust 590 590 Sub Total =_> 38,440 1,239 39,679 51 26,440 60 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 257 -257 0 0 250 1 Ceiling Load -86 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 16,845 22 0 0 Ventilation Load 0 -35,128 44.98 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 : 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing -12,821 -12,821 16.42 Ov/Undr Sizing Exhaust Heat 0 -287 0 -287 0 0 0 0 Exhaust Heat OA Preheat Diff. 96 0 -0.12 0.00 ENGINEERING CKS Sup. Fan Heat 0 0 RA Preheat Diff. -3,180 4.07 Cooling Heating Ret. Fan Heat 0 0 0: : Additional Reheat 0 0.00 % OA 20.2 67.5 Duct Heat Pkup 0 0 O: System Plenum Heat 0 0.00 cfm/ft' 1.11 1.11 Underflr Sup Ht Pkup 0 0 Underfir Sup Ht Pkup 0 0.00 cfm/ton 309.34 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 278.04 Btu /heft' 43.16 -43.03 Grand Total ==> 60,711 777 78,333 100.00 43,918 100.00 Grand Total =_> -39,526 -78,095 100.00 No. People 60.0 33.1/1000 ft' Total 6.5 78.3 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR 'F °F gr/Ib 55.0 52.7 57.2 0.0 0.0 0.0 0.0 0.0 0.0 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 6.5 78.3 50.0 2,008 77.9 65.7 77.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 6.5 78.3 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR 'F °F gr/Ib 55.0 52.7 57.2 0.0 0.0 0.0 0.0 0.0 0.0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 1 of 8 AREAS Capacity Coil Airflow Gross Total Glass MBh cfm 'F ft' (%) Floor 1,815 88.0 Htg Part 0 0.0 seat Int Door 0 55.0 eat ExFlr 0 70.0 iidif Roof 0 0 0 Wall 428 326 76 Ext Door 42 0 0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 1 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm 'F °F i Htg 49.6 2,019 65.4 88.0 Htg 0.0 0 0.0 0.0 seat -28.5 409 -9.0 55.0 eat -9.9 606 55.0 70.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 i/ -78.1 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 1 of 8 Room Checksums By MACDONALD-MILLER 001 SALES SOUTH COOLING COIL PEAK HEATING COIL SELECTION COOLING COIL SELECTION CLG SPACE PEAK Total Capacity HEATING COIL PEAK Coli Airflow TEMPERATURES Peaked at Time: Mo/Hr. 7 / 15 dm Mo/Hr: 7 / 15 Main Clg 3.6 Mo/Hr: Heating Design 26.6 1,041 Cooling Heating Outside Air: OADB/WB/HR: 88/75/113 0.0 OADB: 88 0.0 OADB: -9 0.0 0.0 SADB 55.0 88.0 0.0 0 0.0 0.0 / -49.1 Re Plenum 75.5 69.6 Space Plenum Net Percent Space Percent: Space Peak Coil Peak Percent Return 75.5 69.6 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 78.5 18.8 Btu/h Btu/h Btu/h (%); Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads : Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0: 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0: Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 5,058 0 5,058 12 ; 5,058 18 ; Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 2,137 0 2,137 5 : 2,137 8 Glass/Door Cond -16,557 -16,557 33.71 Wall Cond 0 126 126 0 0 0 : Wall Cond 0 -670 1.36 Cooling Heating Partition/Door 0 0 0: 0 0: Partition/Door 0 0 0.00 Diffuser 1,284 1,284 Floor 0 0 0 0 0: Floor 0 0 0.00 Terminal 1,284 1,284 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 1,284 385 Infiltration 3,882 3,882 9: 1,392 5 Infiltration -8,462 -8,462 17.23 Sec Fan 1,284 1,284 Sub Total =_> 11,077 126 11,203 26: 8,587 31 Sub Total =_> -25,019 -25,689 52.30 Nom Vent 249 249 AHU Vent 249 249 Internal Loads Internal Loads Infil 99 99 Lights 2,689 672 3,362 8: 2,689 10: Lights 0 0 0.00 MinStop/Rh 385 385 People 17,100 0 17,100 40 9,500 34 People 0 0 0.00 Return 1,383 484 Misc 1,707 0 1,707 4 1,707 6 Misc 0 0 0.00 Exhaust 348 348 Sub Total =_> 21,496 672 22,168 52 13,896 50 : Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 161 -161 0 0 161 1 Ceiling Load -115 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 9,817 23 ; 0 0 Ventilation Load 0 -21,400 43.57 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 5,283 19 Exhaust Heat 140 -0.28 ENGINEERING CKS Exhaust Heat -194 -194 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0: RA Preheat Diff. -2,166 4.41 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 19.4 64.7 Duct Heat Pkup 0 0 0: System Plenum Heat 0 0.00 cfm/ft' 1.30 1.30 Underflr Sup Ht Pkup 0 0: Underfir Sup Ht Pkup 0 0.00 cfm/ton 358.39 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 274.93 Btu/heft' 43.65 -49.86 Grand Total =_> 32,733 443 42,993 100.00 27,927 100.00 ' Grand Total ==> -25,134 49,115 100.00 No, People 38.0 38.6/1000 ft' Total 3.6 43.0 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 54.1 62.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION COOLING COIL SELECTION Gross Total Total Capacity Sens Cap. Coli Airflow Enter DB/WB/HR ton MBh MBh dm °F °F gr/Ib Main Clg 3.6 43.0 26.6 1,041 78.5 67.3 85.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 3.6 43.0 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 54.1 62.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION Gross Total Glass Ent Lvg ft' (%) Floor 985 °F i Htg Part 0 65.2 88.0 Int Door 0 0.0 0 0.0 ExFlr 0 wat -17.3 249 Roof 0 0 0 Wall 665 510 77 Ext Door 42 0 0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 2 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F i Htg -31.8 1,284 65.2 88.0 Htg 0.0 0 0.0 0.0 wat -17.3 249 -9.0 55.0 eat -6.3 385 55.0 70.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 / -49.1 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 2 of 8 Room Checksums By MACDONALD-MILLER 002 MGR OFFICE Total 0.2 2.6 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.7 57.0 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL PEAK Total Capacity CLG SPACE PEAK HEATING COIL PEAK ton MBh TEMPERATURES Peaked at Time: Mo/Hr: 7115 Mo/Hr: 7 / 15 Mo/Hr: Heating Design 0.0 0.0 0.0 Cooling Heating Outside Air: OADB/WB/HR: 88/75/113 Wall 0 OADB: 88 OADB: -9 0 SADB 55.0 88.0 0.0 0.0 Total -2.8 Ra Plenum 75.6 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.8 45.4 Btu/h Btu/h Btu/h (%); Btu/h (%) : Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads : Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0: 0 0 : Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0: 0 0: Wall Cond 0 0 0.00 Partition/Door 0 0 0: 0 0: Partition/Door 0 0 0.00 Diffuser 91 91 Floor 0 0 0: 0 0 Floor 0 0 0.00 Terminal 91 91 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 91 27 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 91 91 Sub Total =_> 0 0 0 0: 0 0: Sub Total =_> 0 0 0.00 Nom Vent 8 8 AHU Vent 8 8 Internal Loads Internal Loads Infil 0 0 Lights 174 44 218 8 174 9 Lights 0 0 0.00 MinStop/Rh 27 27 People 450 0 450 17 250 13 People 0 0 0.00 Return 91 27 Misc 1,536 0 1,536 58; 1,536 78; Misc 0 0 0.00 Exhaust 8 8 Sub Total =_> 2,160 44 2,204 84 1,960 99 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 12 -12 0 0 12 1 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 431 16: 0 0 Ventilation Load 0 -729 25.94 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0: Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 • Ov/UndrSizing -1,774 -1,774 63.19 Ov/Undr Sizing 0 0 0 0 0 : Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -6 -6 0; OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 : RA Preheat Diff. -305 10.87 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 9.4 31.2 Duct Heat Pkup 0 0 O: System Plenum Heat 0 0.00 cfm/ft' 1.56 1.56 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 413.81 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft2/ton 264.76 Btu /heft= 45.32 -48.42 Grand Total ==> 2,172 26 2,629 100.00' 1,972 100.00 Grand Total ==> -1,774 -2,808 100.00 No. People 1.0 17.2/1000 ftz Total 0.2 2.6 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.7 57.0 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.2 2.6 2.1 91 76.8 62.7 64.8 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.2 2.6 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.7 57.0 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION Gross Total Glass Ent Lvg ft2 (%) Floor 58 °F Main Htg Part 0 65.5 88.0 Int Door 0 0.0 0 0.0 ExFlr 0 Preheat -0.6 8 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 3 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -2.2 91 65.5 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.6 8 -9.0 55.0 Reheat -0.4 27 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.8 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 3 of 8 Room Checksums By MACDONALD-MILLER 003 LOUNGE Total 0.1 1.1 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL PEAK Total Capacity CLG SPACE PEAK HEATING COIL PEAK ton MBh TEMPERATURES °F °F Peaked at Time: Mo/Hr: 7 / 15 80.7 67.3 Mo/Hr: 7 / 15 Mo/Hr: Heating Design 0.0 0.0 0.0 Cooling Heating Outside Air: OADB/WB/HR: 88/75/113 0 OADS: 88 OADB: -9 Ext Door 0 0 SADB 55.0 88.0 0.0 0 0.0 0.0 d -1.2 Re Plenum 75.6 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 80.7 -9.0 Btu/h Btu/h Btu/h (%) Btu/h (%): Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0: Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0: 0 0' Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0; 0 0: Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 23 23 Floor 0 0 0 0 0Floor 0 0 0.00 Terminal 23 23 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 23 7 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 23 23 Sub Total =_> 0 0 0 0 0 0 Sub Total =_> 0 0 0.00 Nom Vent 9 7 AHU Vent 9 7 Internal Loads Internal Loads Infil 0 0 Lights 466 116 582 56 466 94 Lights 0 0 0.00 MinStop/Rh 7 7 People 0 0 0 0 0 0 People 0 0 0.00 Return 23 7 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 9 7 Sub Total =_> 466 116 582 56 466 94 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 31 -31 0 0 31 6 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 473 45: 0 0 Ventilation Load 0 -588 48.79 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 447 -447 37.05 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -6 -6 -1 OA Preheat Diff. -171 14.16 Sup. Fan Heat 0 0: : RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 40.7 100.0 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 0.15 0.15 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 261.27 Supply Air Leakage 0 0 0 • Supply Air Leakage 0 0.00 ft'/ton 1,774.35 Btu/hr-ft' 6.76 -7.78 Grand Total ==> 496 79 1,048 100.00 496 100.00 Grand Total ==> 447 -1,206 100.00 No. People 0.0 0.0/1000 ft2 Total 0.1 1.1 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Cig 0.1 1.1 0.7 23 80.7 67.3 81.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.1 1.1 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION Gross Total Glass Ent Lvg ft' (%) Floor 155 °F i Htg Part 0 65.5 88.0 Int Door 0 0.0 0 0.0 ExFlr 0 seat -0.7 9 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 4 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm 'F °F i Htg -0.6 23 65.5 88.0 Htg 0.0 0 0.0 0.0 seat -0.7 9 -9.0 55.0 eat -0.1 7 55.0 70.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 d -1.2 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 4 of 8 Room Checksums By MACDONALD-MILLER 004 INVENTORY/MDP RM Total 0.3 3.2 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DBIWB/HR °F °F gr/Ib 55.0 52.6 56.9 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL PEAK Total Capacity CLG SPACE PEAK HEATING COIL PEAK ton MBh TEMPERATURES Peaked at Time: Mo/Hr: 7/15 Mo/Hr: 7 / 15 Mo/Hr: Heating Design 0.0 0 0.0 0.0 Cooling Heating Outside Air: OADB/WB/HR: 88/75/113 0 OADB: 88 OADB: -9 0 Ext Door 0 SADB 55.0 88.0 Opt Vent 0.0 0 0.0 0.0 Total -3.4 Ra Plenum 75.6 70.0 Space Plenum Net Percent : Space Percent: Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 77.2 35.8 Btu/h Btu/h Btu/h (%) Btu/h (%) Bluth Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads : Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0: 0 0 : Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0: 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0: Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0: 0 0; Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0: 0 0. Partition/Door 0 0 0.00 Diffuser 103 103 Floor 0 0 0: 0 0: Floor 0 0 0.00 Terminal 103 103 Adjacent Floor 0 0 0 0: 0 0 Adjacent Floor 0 0 0.00 Main Fan 103 31 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 103 103 Sub Total =_> 0 0 0 0: 0 o: Sub Total =_> 0 0 0.00 Nom Vent 13 13 AHU Vent 13 13 Internal Loads Internal Loads Infil 0 0 Lights 417 104 522 16 417 19: Lights 0 0 0.00 MinStop/Rh 31 31 People 450 0 450 14 250 11 People 0 0 0.00 Return 103 31 Misc 1,536 0 1,536 48; 1,536 69; Misc 0 0 0.00 Exhaust 13 13 Sub Total =_> 2,403 104 2,508 79 2,203 99 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 28 -28 0 0 28 1 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 678 21 0 0 Ventilation Load 0 -1,146 33.33 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing -2,008 -2,008 58.40 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0. OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -284 8.27 Cooling Heating Ret. Fan Heat 0 0 0 : Additional Reheat 0 0.00 % OA 13.0 43.3 Duct Heat Pkup 0 0 0 : System Plenum Heat 0 0.00 cfm/ft' 0.74 0.74 Underflr Sup Ht Pkup 0 0 : Underflr Sup Ht Pkup 0 0.00 cfm/ton 387.50 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 Whon 525.08 Btu /heft' 22.85 -24.74 Grand Total ==> 2,431 68 3,177 100.00 2,231 100.00 Grand Total =_> -2,008 -3,438 100.00 No. People 1.0 7.2/1000 ftz Total 0.3 3.2 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DBIWB/HR °F °F gr/Ib 55.0 52.6 56.9 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.3 3.2 2.5 103 77.2 63.2 66.7 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.3 3.2 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DBIWB/HR °F °F gr/Ib 55.0 52.6 56.9 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION Gross Total Glass Ent Lvg ft2 (%) Floor 139 °F Main Htg Part 0 65.5 88.0 Int Door 0 0.0 0 0.0 ExFlr 0 Preheat -0.9 13 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 5 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -2.5 103 65.5 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.9 13 -9.0 55.0 Reheat -0.5 31 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -3.4 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 5 of 8 Room Checksums By MACDONALD-MILLER 005A WOMENS TOILET COOLING COIL PEAK COOLING COIL SELECTION CLG SPACE PEAK HEATING COIL PEAK Enter DB/WB/HR TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Main Clg 0.0 0.3 Mo/Hr: 7 / 15 Mo/Hr: Heating Design 0.0 0 0.0 0.0 Cooling Heating Outside Air: OADB/WB/HR: 88 / 75 / 113 Reheat OADB: 88 OADB: -9 Roof SADB 55.0 88.0 Wall 0 0 0 Ext Door 0 0 0 Re Plenum 75.6 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 80.7 -9.0 Btu/h Btu/h Btu/h (%) Btu/h (%) : Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads : Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0: 0 0 : Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0: 0 0: Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0 0 0: Partition/Door 0 0 0.00 Diffuser 6 6 Floor 0 0 0: 0 0: Floor 0 0 0.00 Terminal 6 6 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 6 2 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 6 6 Sub Total =_> 0 0 0 0: 0 0: Sub Total =_> 0 0 0.00 Nom Vent 2 2 AHU Vent 2 2 Internal Loads Internal Loads Infil 0 0 Lights 123 31 154 56 123 94 Lights 0 0 0.00 MinStop/Rh 2 2 People 0 0 0 0 0 0 People 0 0 0.00 Return 6 2 Misc 0 0 0 0; 0 0 Misc 0 0 0.00 Exhaust 2 2 Sub Total =_> 123 31 154 56 123 94 Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 8 -8 0 0 8 6 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 125 45 0 0 Ventilation Load 0 -156 48.81 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0: Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 01 Ov/Undr Sizing -118 -118 37.04 Ov/Undr Sizing 0 0 0: 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -2 -2 -1 OA Preheat Diff. -45 14.15 Sup. Fan Heat 0 0: RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 40.7 100.0 Duct Heat Pkup 0 0 O: : System Plenum Heat 0 0.00 cfm/ft' 0.15 0.15 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 261.29 Supply Air Leakage 0 0 0: ;Supply Air Leakage 0 0.00 ft'/ton 1,774.29 Btu /heft' 6.76 -7.78 Grand Total ==> 131 21 277 100.00 131 100.00 Grand Total ==> -118 -319 100.00 No. People 0.0 0.0/1000 ft' Total 0.0 0.3 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.0 0.3 0.2 6 80.7 67.3 81.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.0 0.3 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 6 of 8 AREAS Capacity Coil Airflow Gross Total Glass MBh cfm °F ft' (%) Floor 41 88.0 Aux Htg Part 0 0.0 Preheat Int Door 0 55.0 Reheat ExFlr 0 70.0 Humidif Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 6 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -0.2 6 65.5 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.2 2 -9.0 55.0 Reheat 0.0 2 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -0.3 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 6 of 8 Room Checksums By MACDONALD-MILLER 0058 MENS TOILET COOLING COIL PEAK COOLING COIL SELECTION Cooling CLG SPACE PEAK HEATING COIL PEAK Coil Airflow Peaked at Time: Mo/Hr: 7 / 15 °F °F Mo/Hr: 7 / 15 Mo/Hr: Heating Design 80.7 67.3 Outside Air: OADB/WB/HR: 88 / 75 / 113 0 OADB: 88 OADB: -9 0 0.0 0.0 Space Plenum Net Percent. Space Percent : Space Peak Coil Peak Percent Rm Exh Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total 0 Btu/h Btu/h Btu/h (%): Btu/h (%),: Btu/h Btu/h (%) Envelope Loads : Envelope Loads Skylite Solar 0 0 0 0: 0 0: Skylite Solar 0 0 0.00 Skylite Cond 0 0 0 0: 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0� 0 0; Glass Solar 0 0 0.00 Glass/Door Cond 0 0 0 0: 0 0; Glass/Door Cond 0 0 0.00 Wall Cond 0 0, 0 0 0 0; Wall Cond 0 0 0.00 Partition/Door 0 0 0: 0 0 Partition/Door 0 0 0.00 Floor 0 0 0: 0 0: Floor 0 0 0.00 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sub Total =_> 0 0 0 0: 0 0: Sub Total =_> 0 0 0.00 Internal Loads Internal Loads Lights 162 41 203 56 162 94 Lights 0 0 0.00 People 0 0 0 0 0 0 People 0 0 0.00 Misc 0 0 0 0 0 0; Misc 0 0 0.00 Sub Total =_> 162 41 203 56: 162 94 Sub Total =_> 0 0 0.00 Ceiling Load 11 -11 0 0: 11 6 Ceiling Load 0 0 0.00 Ventilation Load 0 0 165 45 ; 0 0 Ventilation Load 0 -205 48.80 Adj Air Trans Heat 0 0 O: 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0: Ov/Undr Sizing -156 -156 37.04 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 Exhaust Heat -2 -2 -1 OA Preheat Diff. -59 14.16 Sup. Fan Heat 0 0 : RA Preheat Diff. 0 0.00 Ret. Fan Heat 0 0 0 : Additional Reheat 0 0.00 Duct Heat Pkup 0 0 0 : System Plenum Heat 0 0.00 Underflr Sup Ht Pkup 0 0, Underflr Sup Ht Pkup 0 0.00 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 Grand Total ==> 173 28 365 100.00' 173 100.00 Grand Total ==> -156 -420 100.00 Total 0.0 0.4 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Cooling Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.0 0.4 0.3 8 80.7 67.3 81.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.0 0.4 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION Cooling Gross Total Glass 55.0 88.0 ft. (%) Floor 54 Return 75.6 Part 0 Ret/OA 80.7 Int Door 0 Fn MtrTD 0.0 ExFlr 0 Fn BIdTD 0.0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES HEATING COIL SELECTION Cooling Heating SADB 55.0 88.0 Ra Plenum 75.6 70.0 Return 75.6 70.0 Ret/OA 80.7 -9.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS HEATING COIL SELECTION Cooling Cooling Heating Diffuser 8 8 Terminal 8 8 Main Fan 8 2 Sec Fan 8 8 Nom Vent 3 2 AHU Vent 3 2 Infil 0 0 MinStop/Rh 2 2 Return 8 2 Exhaust 3 2 Rm Exh 0 0 Auxiliary 0 0 Leakage Dwn 0 0 Leakage Ups 0 0 ENGINEERING CKS HEATING COIL SELECTION Cooling Heating % OA 40.7 100.0 cfm/ft' 0.15 0.15 cfm/ton 261.28 -0.2 8 ft'/ton 1,774.31 x Htg Btu/heft' 6.76 -7.78 No. People 0.0 0.0/1000 ftz TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 7 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F in Htg -0.2 8 65.5 88.0 x Htg 0.0 0 0.0 0.0 sheat -0.2 3 -9.0 55.0 heat 0.0 2 55.0 70.0 midif 0.0 0 0.0 0.0 t Vent 0.0 0 0.0 0.0 W -0.4 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 7 of 8 Room Checksums By MACDONALD-MILLER 006 STORAGE COOLING COIL PEAK COOLING COIL SELECTION CLG SPACE PEAK HEATING COIL PEAK Coil Airflow Enter DB/WB/HR TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Main Cig 0.6 7.5 Mo/H r: 7 / 15 Mo/Hr: Heating Design 0.0 0 0.0 0.0 Cooling Heating Outside Air: OADB/WB/HR: 88/75/113 0.0 OADB: 88 OADB: -9 0 SADB 55.0 88.0 0.0 Vent 0.0 0 0.0 0.0 / -8.3 Ra Plenum 75.6 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.4 54.7 Btu/h Btu/h Btu/h (%); Btu/h (%); Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0: 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0: 0 0: Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0: 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0: 0 0 Partition/Door 0 0 0.00 Diffuser 292 292 Floor 0 0 0 0 0: Floor 0 0 0.00 Terminal 292 292 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 292 88 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 292 292 Sub Total =_> 0 0 0 0 : 0 0: Sub Total =_> 0 0 0.00 Nom Vent 17 17 AHU Vent 17 17 Internal Loads Internal Loads Infil 0 0 Lights 598 149 747 10 598 9 Lights 0 0 0.00 MinStop/Rh 88 88 People 450 0 450 6 250 4 People 0 0 0.00 Return 292 88 Misc 5,459 0 5,459 73 ; 5,459 86 Misc 0 0 0.00 Exhaust 17 17 Sub Total =_> 6,507 149 6,656 89 6,307 99 Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 40 -40 0 0 40 1 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 861 11 0 0 Ventilation Load 0 -1,455 17.49 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 01 Ov/Undr Sizing -5,712 -5,712 68.66 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -12 -12 0 ; OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 : : RA Preheat Diff. -1,152 13.84 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 5.8 19.4 Duct Heat Pkup 0 0 0: : System Plenum Heat 0 0.00 cfm/ft, 1.47 1.47 Underfir Sup Ht Pkup 0 0 Underfir Sup Ht Pkup 0 0.00 cfm/ton 466.53 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 318.16 Btu /heft' 37.72 -41.80 Grand Total ==> 6,546 98 7,506 100.00 6,346 100.00 Grand Total ==> -5,712 -8,319 100.00 No. People 1.0 5.0/1000 f:2 Total 0.6 7.5 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 59.2 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Cig 0.6 7.5 6.7 292 76.4 62.1 62.9 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.6 7.5 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 59.2 0.0 0.0 0.0 0.0 0.0 0.0 AREAS HEATING COIL SELECTION Gross Total Glass Ent Lvg ftz (%) Floor 199 °F i Htg Part 0 65.5 88.0 Int Door 0 0.0 0 0.0 ExFlr 0 teat -1.2 17 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 Project Name: 73166272 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 8 of 8 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F i Htg -7.1 292 65.5 88.0 Htg 0.0 0 0.0 0.0 teat -1.2 17 -9.0 55.0 eat -1.4 88 55.0 70.0 ddif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 / -8.3 Project Name: 73166272 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 8 of 8 System Checksums By MACDONALD-MILLER BACK OF HOUSE VAV Series Fan -Powered VAV COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88 / 75 / 113 Space Plenum Net Percent : Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0: Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 88 Space Percent Sensible Of Total Btu/h (%) Envelope Loads 0 0: Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond HEATING COIL PEAK Mo/Hr. Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (/°) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.6 Return 75.6 Ret/OA 76.9 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 70.0 70.0 44.9 0.0 0.0 0.0 Lvg Glass Solar 0 0 0 0; 0 0; Glass Solar 0 0 0.00 AIRFLOWS gr/Ib Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 58.1 Cooling Heating Wall Cond 0 0 0 0. 0 0: Wall Cond 0 0 0.00 0.0 0 0.0 0.0 Partition/Door 0 0.0 0 0; 0 0; Partition/Door 0 0 0.00 Diffuser 522 522 Floor 0 0 0• 0 0: Floor 0 0 0.00 Terminal 522 522 Adjacent Floor 0 0 0 0: 0 0 Adjacent Floor 0 0 0 Main Fan 522 157 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 522 522 Sub Total =_> 0 0 0 0 0 0: Sub Total =_> 0 0 0.00 Nom Vent 54 50 AHU Vent 54 50 Internal Loads Internal Loads Infil 0 0 Lights 1,940 485 2,425 16 1,940 17: Lights 0 0 0.00 MinStop/Rh 157 157 People 1,350 0 1,350 9: 750 7 People 0 0 0.00 Return 522 157 Misc 8,531 0 8,531 57: 8,531 75 ; Misc 0 0 0.00 Exhaust 54 50 Sub Total =_> 11,821 485 12,306 82: 11,221 99 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 129 -129 0 0 129 1 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 2,732 18 ; 0 0 Ventilation Load 0 -4,279 25.92 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing -10,214 -10,214 61.87 Ov/Undr Sizing 0 0 0: 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -37 -37 0 ; OA Preheat Diff. -275 1.67 Sup. Fan Heat 0 0 : RA Preheat Diff. -1,741 10.55 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 10.3 31.8 Duct Heat Pkup 0 0 0: cfm/ft' 0.81 0.81 Underflr Sup Ht Pkup 0 0: : Underflr Sup Ht Pkup 0 0.00 cfm/ton 417.42 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 516.74 Btu/hr-ft' 23.22 -25.56 Grand Total ==> 11,950 320 15,002 100.00 11,350 100.00 Grand Total ==> -10,214 -16,510 100.00 No. People 3 AREAS COOLING COIL SELECTION Glass Ent Lvg Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR -12.8 ton MBh MBh cfm °F °F gr/Ib °F °F gr/Ib Main Clg 1.3 15.0 12.4 522 76.9 62.8 65.3 55.0 52.9 58.1 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 1.3 15.0 AREAS Gross Total Glass Ent Lvg MBh Floor 646 °F °F Part 0 -12.8 522 Int Door 0 88.0 Aux Htg ExFlr 0 0 0.0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -12.8 522 65.5 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -3.7 54 -9.0 55.0 Reheat -2.6 157 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -16.5 Project Name: 73166272 TRACE@ 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 1 of 3 System Checksums By MACDONALD-MILLER NORTH VAV Series Fan -Powered VAV COOLING COIL PEAK Peaked at Time: Mo/Hr: 7/16 Outside Air: OADB/WB/HR: 87174 / 110 Space Plenum Net Percent: Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) ; Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr: 8 / 17 OADB: 79 Space Percent: Sensible Of Total Btu/h (%) Envelope Loads 0 0 Skylite Solar 0 0: Skylite Cond 0 0: Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.5 Return 75.5 RetlOA 77.9 Fn MtrTD 0.0 Fn 13IdTD 0.0 Fn Frict 0.0 Heating 88.0 69.9 69.9 16.6 0.0 0.0 0.0 MBh Glass Solar 13,108 0 13,108 17 15,907 36 Glass Solar 0 0 0.00 AIRFLOWS gr/Ib Glass/DoorCond 1,429 0 1,429 2; 451 1: Glass/DoorCond -11,027 -11,027 14.12 57.2 Cooling Heating Wall Cond 0 82 82 0 0 0: Wall Cond 0 -442 0.57 0.0 0 0.0 0.0 Partition/Door 0 0.0 0 0. 0 0 Partition/Door 0 0 0.00 Diffuser 2,019 2,019 Floor 0 0 0: 0 0: Floor 0 0 0.00 Terminal 2,019 2,019 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 Main Fan 2,019 606 Infiltration 7,477 7,477 10: 868 2 Infiltration -15,592 -15,592 19.97 Sec Fan 2,019 2,019 Sub Total =_> 22,014 82 22,096 28 17,227 39: Sub Total ==> -26,619 -27,062 34.65 Nom Vent 409 409 AHU Vent 409 409 Internal Loads Internal Loads Infil 182 182 Lights 4,956 1,239 6,195 8: 4,956 11 : Lights 0 0 0.00 MinStop/Rh 606 606 People 27,000 0 27,000 34 15,000 34 People 0 0 0.00 Return 2,201 787 Misc 6,485 0 6,485 8 ; 6,485 15: Misc 0 0 0.00 Exhaust 590 590 Sub Total ==> 38,440 1,239 39,679 51: 26,440 60: Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 257 -257 0 0 250 1 Ceiling Load -86 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 16,845 22: 0 0 Ventilation Load 0 -35,128 44.98 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0; Ov/Undr Sizing -12,821 -12,821 16.42 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 96 -0.12 ENGINEERING CKS Exhaust Heat -287 -287 0 ; OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0', RA Preheat Diff. -3,180 4.07 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 20.2 67.5 Duct Heat Pkup 0 0 0: cfm/ft, 1.11 1.11 Underflr Sup Ht Pkup 0 0: : Underfir Sup Ht Pkup 0 0.00 cfm/ton 309.34 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft=/ton 278.04 Btu/heft= 43.16 -43.03 Grand Total ==> 60,711 777 78,333 100.00' 43,918 100.00 Grand Tota/ ==> -39,526 -78,095 100.00 No. People 60 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc AREAS COOLING COIL SELECTION Gross Total Glass MBh Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR 2,019 ton MBh MBh cfm °F °F gr/Ib °F °F gr/Ib Main Clg 6.5 78.3 50.0 2,008 77.9 65.7 77.6 55.0 52.7 57.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 6.5 78.3 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc HEATING COIL SELECTION AREAS Capacity Coil Airflow Gross Total Glass MBh cfm ftz (%) Floor 1,815 2,019 65.4 Part 0 0.0 0 Int Door 0 Preheat -28.5 ExFlr 0 55.0 Reheat Roof 0 0 0 Wall 428 326 76 Ext Door 42 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -49.6 2,019 65.4 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -28.5 409 -9.0 55.0 Reheat -9.9 606 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0, Total -78.1 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 2 of 3 System Checksums By MACDONALD-MILLER SOUTH VAV Series Fan -Powered VAV COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88 / 75 / 113 Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0: Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/H r: 7 / 15 OADB: 88 Space Percent Sensible Of Total Btu/h (%) : Envelope Loads 0 0 : Skylite Solar 0 0: Skylite Cond 0 0� Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.5 Return 75.5 Ret/OA 78.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 69.6 69.6 18.8 0.0 0.0 0.0 MBh Glass Solar 5,058 0 5,058 12 ; 5,058 18 : Glass Solar 0 0 0.00 AIRFLOWS gr/Ib Glass/DoorCond 2,137 0 2,137 5; 2,137 8; Glass/DoorCond -16,557 -16,557 33.71 62.6 Aux Clg 0.0 Wall Cond 0 126 126 0 : 0 0 : Wall Cond 0 -670 1.36 0.0 Cooling Heating Partition/Door 0 0.0 0 0: 0 0: Partition/Door 0 0 0.00 Diffuser 1,284 1,284 Floor 0 0 0: 0 0: Floor 0 0 0.00 Terminal 1,284 1,284 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 Main Fan 1,284 385 Infiltration 3,882 3,882 9 ; 1,392 5 Infiltration -8,462 -8,462 17.23 Sec Fan 1,284 1,284 Sub Total =_> 11,077 126 11,203 26 8,587 31 : Sub Total =_> -25,019 -25,689 52.30 Nom Vent 249 249 AHU Vent 249 249 Internal Loads : Internal Loads Infil 99 99 Lights 2,689 672 3,362 8 2,689 10 Lights 0 0 0.00 MinStop/Rh 385 385 People 17,100 0 17,100 40 9,500 34 People 0 0 0.00 Return 1,383 484 Misc 1,707 0 1,707 4 1,707 6 Misc 0 0 0.00 Exhaust 348 348 Sub Total =_> 21,496 672 22,168 52 13,896 50: Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 161 -161 0 0 161 1 Ceiling Load -115 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 9,817 23: 0 0 Ventilation Load 0 -21,400 43.57 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 5,283 19 Exhaust Heat 140 -0.28 ENGINEERING CKS Exhaust Heat -194 -194 01 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 : RA Preheat Diff. -2,166 4.41 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 19.4 64.7 Duct Heat Pkup 0 0 0: cfm/ft' 1.30 1.30 Underflr Sup Ht Pkup 0 0: Underflr Sup Ht Pkup 0 0.00 cfm/ton 358.39 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 274.93 Btu/heft= 43.65 -49.86 Grand Total =_> 32,733 443 42,993 100.00 27,927 100.00 Grand Total =_> -25,134 -49,115 100.00 No. People 38 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc AREAS COOLING COIL SELECTION Gross Total Glass MBh Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DBIWB/HR 1,284 ton MBh MBh cfm °F °F gr/Ib °F °F gr/Ib Main Clg 3.6 43.0 26.6 1,041 78.5 67.3 85.3 55.0 54.1 62.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 3.6 43.0 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc HEATING COIL SELECTION AREAS Capacity Coil Airflow Gross Total Glass MBh cfm °F °F Floor 985 1,284 65.2 Part 0 0.0 0 Int Door 0 Preheat -17.3 ExFlr 0 55.0 Reheat Roof 0 0 0 Wall 665 510 77 Ext Door 42 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -31.8 1,284 65.2 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -17.3 249 -9.0 55.0 Reheat -6.3 385 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -49.1 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 3 of 3 001 SALES NORTH Internal Loads COOLING COIL PEAK Sensible Of Total Peaked at Time: Mo/Hr: 7 / 16 4,956 1,239 Outside Air: OADB/WB/HR: 87 / 74 / 110 People 27,000 Space Plenum Net Percent : 6,485 Sens. + Lat. Sens. + Lat Total Of Total 38,440 Btu/h Btu/h Btu/h (%):: Envelope Loads -257 0 0 Ventilation Load Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0 Glass Solar 13,108 0 13,108 17: Glass/DoorCond 1,429 0 1,429 2: Wall Cond 0 82 82 0: Partition/Door 0 0 0 0: Floor 0 0 0 0: Adjacent Floor 0 0 0 0: Infiltration 7,477 0 7,477 10 ; Sub Total =_> 22,014 82 22,096 28: Internal Loads Percent: Sensible Of Total Btu/h Lights 4,956 1,239 6,195 8. People 27,000 0 27,000 34 Misc 6,485 0 6,485 8 Sub Total =_> 38,440 1,239 39,679 51 Ceiling Load 257 -257 0 0 Ventilation Load 0 0 16,845 22 Adj Air Trans Heat 0 15 ; Misc 0 0 Dehumid. Ov Sizing 1 Ceiling Load 0 0 0 Ov/Undr Sizing 0 Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. -287 -287 0 Sup. Fan Heat System Plenum Heat 0 0' Ret. Fan Heat Supply Air Leakage 0 0 0 Duct Heat Pkup 0 0 0 Underfir Sup Ht Pkup 0 0. Supply Air Leakage 0 0 0 Grand Total ==> 60,711 777 78,333 100.00 Zone Checksums By MACDONALD-MILLER CLG SPACE PEAK Mo/Hr: 8 / 17 OADB: 79 Space Percent: Sensible Of Total Btu/h (%) : Enter DB/WB/HR : Envelope Loads 0 0 : Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 15,907 36 Glass Solar 451 1 Glass/Door Cond 0 0 Wall Cond 0 0: Partition/Door 0 0: Floor 0 0 : Adjacent Floor 868 2 Infiltration 17,227 39: Sub Total =_> 0 Internal Loads 4,956 11 : Lights 15,000 34 People 6,485 15 ; Misc 26,440 60, Sub Total =_> 250 1 Ceiling Load 0 0 Ventilation Load 0 0 : Adj Air Trans Heat 0 Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 43,918 100.00 Grand Total ==> Total 6.5 78.3 Leave DI 'F 'F 55.0 52.7 0.0 0.0 0.0 0.0 gr/Ib 57.2 0.0 0.0 HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Space Sens Btu/h 0 0 0 0 -11,027 0 0 0 0 -15,592 -26,619 0 0 0 0 -86 0 0 -12,821 -39,526 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 0 0.00 0 0.00 -11,027 14.12 -442 0.57 0 0.00 0 0.00 0 0.00 -15,592 19.97 -27,062 34.65 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -35,128 44.98 0 0 -12,821 16.42 96 -0.12 0 0.00 -3,180 4.07 0 0.00 0 0.00 0 0.00 0 0.00 -78,095 100.00 COOLING COIL SELECTION Cooling Heating Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm 'F 'F gr/Ib Main Clg 6.5 78.3 50.0 2,008 77.9 65.7 77.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 6.5 78.3 Leave DI 'F 'F 55.0 52.7 0.0 0.0 0.0 0.0 gr/Ib 57.2 0.0 0.0 HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Space Sens Btu/h 0 0 0 0 -11,027 0 0 0 0 -15,592 -26,619 0 0 0 0 -86 0 0 -12,821 -39,526 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 0 0.00 0 0.00 -11,027 14.12 -442 0.57 0 0.00 0 0.00 0 0.00 -15,592 19.97 -27,062 34.65 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -35,128 44.98 0 0 -12,821 16.42 96 -0.12 0 0.00 -3,180 4.07 0 0.00 0 0.00 0 0.00 0 0.00 -78,095 100.00 TEMPERATURES AREAS Cooling Heating Cooling Gross Total Glass 55.0 88.0 Ra Plenum ft' (%) Floor 1,815 69.9 Ret/OA Part 0 Fn MtrTD 0.0 Int Door 0 0.0 0.0 ExFlr 0 0.0 MinStop/Rh Roof 0 0 0 Wall 428 326 76 Ext Door 42 0 0 TEMPERATURES Cooling Heating Cooling Heating SADB 55.0 88.0 Ra Plenum 75.5 69.9 Return 75.5 69.9 Ret/OA 77.9 16.6 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Cooling Heating Cooling Heating Diffuser 2,019 2,019 Terminal 2,019 2,019 Main Fan 2,019 606 Sec Fan 2,019 2,019 Nom Vent 409 409 AHU Vent 409 409 Infil 182 182 MinStop/Rh 606 606 Return 2,201 787 Exhaust 590 590 Rm Exh 0 0 Auxiliary 0 0 Leakage Dwn 0 0 Leakage Ups 0 0 ENGINEERING CKS Cooling Heating % OA 20.2 67.5 cfm/ft' 1.11 1.11 cfm/ton 309.34 ft'/ton 278.04 Btu/heft' 43.16 -43.03 No. People 60 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm 'F 'F Htg 49.6 2,019 65.4 88.0 Htg 0.0 0 0.0 0.0 seat -28.5 409 -9.0 55.0 eat -9.9 606 55.0 70.0 iidif 0.0 0 0.0 0.0, Vent 0.0 0 0.0 0.0 It -78.1 Project Name: 73166272 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Dataset Name: 72166272 AT&T STORE.trc Alternative - 1 System Checksums Report Page 1 of 8 Zone Checksums By MACDONALD-MILLER 001 SALES SOUTH COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88/75/113 Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%); Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr. 7 / 15 OADB: 88 Space Percent Sensible Of Total Btu/h (%)', ; Envelope Loads 0 0 Skylite Solar 0 0 Skylite Cond 0 0: Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.5 Return 75.5 Ret/OA 78.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 69.6 69.6 18.8 0.0 0.0 0.0 Enter DB/WB/HR ton MBh Glass Solar 5,058 0 5,058 12 5,058 18 Glass Solar 0 0 0.00 AIRFLOWS 0 Glass/Door Cond 2,137 0 2,137 5 2,137 8 Glass/Door Cond -16,557 -16,557 33.71 Vent 0.0 0 0.0 Wall Cond 0 126 126 0 0 0: Wall Cond 0 -670 1.36 Cooling Heating Partition/Door 0 0 0 0 0: Partition/Door 0 0 0.00 Diffuser 1,284 1,284 Floor 0 0 0: 0 0 Floor 0 0 0.00 Terminal 1,284 1,284 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 1,284 385 Infiltration 3,882 3,882 9: 1,392 5 Infiltration -8,462 -8,462 17.23 Sec Fan 1,284 1,284 Sub Total =_> 11,077 126 11,203 26: 8,587 31 : Sub Total =_> -25,019 -25,689 52.30 Nom Vent 249 249 AHU Vent 249 249 Internal Loads Internal Loads Infil 99 99 Lights 2,689 672 3,362 8 2,689 10 Lights 0 0 0.00 MinStop/Rh 385 385 People 17,100 0 17,100 40 9,500 34 People 0 0 0.00 Return 1,383 484 Misc 1,707 0 1,707 4; 1,707 6; Misc 0 0 0.00 Exhaust 348 348 Sub Total =_> 21,496 672 22,168 52 13,896 50 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 161 -161 0 0 161 1 Ceiling Load -115 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 9,817 23: 0 0 Ventilation Load 0 -21,400 43.57 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0: AdJ Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 ; Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 ; 5,283 19 Exhaust Heat 140 -0.28 ENGINEERING CKS Exhaust Heat -194 -194 0 ; OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 : : RA Preheat. Diff. -2,166 4.41 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 19.4 64.7 Duct Heat Pkup 0 0 0: System Plenum Heat 0 0.00 cfm/ft' 1.30 1.30 Underflr Sup Ht Pkup 0 0: UnderfIr Sup Ht Pkup 0 0.00 cfm/ton 358.39 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 274.93 Btu/hr-ft' 43.65 -49.86 Grand Total ==> 32,733 443 42,993 100.00' 27,927 100.00 'Grand Total =_> -25,134 -49,115 100.00 No. People 38 Total 3.6 43.0 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DI 'F 'F 55.0 54.1 0.0 0.0 0.0 0.0 gr/Ib 62.6 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F 'F gr/Ib Main CIg 3.6 43.0 26.6 1,041 78.5 67.3 85.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 3.6 43.0 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DI 'F 'F 55.0 54.1 0.0 0.0 0.0 0.0 gr/Ib 62.6 0.0 0.0 AREAS Gross Total Glass Lvg ft2 (%) Floor 985 i Htg -31.8 1,284 Part 0 88.0 Htg Int Door 0 0.0 0.0 ExFtr 0 -17.3 249 -9.0 Roof 0 0 0 wall 665 510 77 Ext Door 42 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm 'F 'F i Htg -31.8 1,284 65.2 88.0 Htg 0.0 0 0.0 0.0 seat -17.3 249 -9.0 55.0 eat -6.3 385 55.0 70.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 it -49.1 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 2 of 8 Zone Checksums By MACDONALD-MILLER 002 MGR OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88/75/113 Space Plenum Net Percent. Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%): Envelope Loads Skylite Solar 0 0 0 0 Skylite Cond 0 0 0 0: Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 88 Space Percent: Sensible Of Total Btu/h (%) Envelope Loads 0 0 Skylite Solar 0 0: Skylite Cond 0 0 Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.6 Return 75.6 Ret/OA 76.8 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 70.0 70.0 45.4 0.0 0.0 0.0 Enter DB/WB/HR ton MBh Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS 0 Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 Opt Vent Cooling Heating Wall Cond 0 0 0 0. 0 0; Wall Cond 0 0 0.00 Partition/Door 0 0 0: 0 0: Partition/Door 0 0 0.00 Diffuser 91 91 Floor 0 0 0: 0 0 Floor 0 0 0.00 Terminal 91 91 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 91 27 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 91 91 Sub Total =_> 0 0 0 0. 0 0: Sub Total =_> 0 0 0.00 Nom Vent 8 8 AHU Vent 8 8 Internal Loads Internal Loads Infil 0 0 Lights 174 44 218 8 174 9 Lights 0 0 0.00 MinStop/Rh 27 27 People 450 0 450 17 250 13 People 0 0 0.00 Return 91 27 Misc 1,536 0 1,536 58 ; 1,536 78 Misc 0 0 0.00 Exhaust 8 8 Sub Total =_> 2,160 44 2,204 84 1,960 99: Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 12 -12 0 0 12 1 Ceiling Load 0 0 0.00 Leakage Own 0 0 Ventilation Load 0 0 431 16 0 0 Ventilation Load 0 -729 25.94 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 • Ov/Undr Sizing -1,774 -1,774 63.19 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -6 -6 .0: OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -305 10.87 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 9.4 31.2 Duct Heat Pkup 0 0 0: System Plenum Heat 0 0.00 cfm/ft' 1.56 1.56 Underfir Sup Ht Pkup 0 0: Underfir Sup Ht Pkup 0 0.00 cfm/ton 413.81 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftz/ton 264.76 Btu/heft= 45.32 -48.42 Grand Total =_> 2,172 26 2,629 100.00' 1,972 100.00 Grand Total ==> -1,774 -2,808 100.00 No. People 1 Total 0.2 2.6 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.7 57.0 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh dm °F °F gr/Ib Main Cig 0.2 2.6 2.1 91 76.8 62.7 64.8 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.2 2.6 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.7 57.0 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass Lvg ft2 (%) Floor 58 Main Htg -2.2 91 Part 0 88.0 Aux Htg Int Door 0 0.0 0.0 ExFlr 0 -0.6 8 -9.0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -2.2 91 65.5 88.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.6 8 -9.0 55.0 Reheat -0.4 27 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.8 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 3 of 8 Zone Checksums By MACDONALD-MILLER 003 LOUNGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88 / 75 / 113 Space Plenum Net Percent: Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%); Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0: Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 88 Space Percent: Sensible Of Total Btu/h (%)', : Envelope Loads 0 0 : Skylite Solar 0 0: Skylite Cond 0 0 Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.6 Return 75.6 Ret/OA 80.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 70.0 70.0 -9.0 0.0 0.0 0.0 Enter DB/WB/HR ton MBh Glass Solar 0 0 0 0: 0 0• Glass Solar 0 0 0.00 AIRFLOWS 0 Glass/Door Cond 0 0 0 0; 0 0: Glass/Door Cond 0 0 0.00 Vent 0.0 0 0.0 Wall Cond 0 0 0 0: 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0: 0 0: Partition/Door 0 0 0.00 Diffuser 23 23 Floor 0 0 0: 0 0: Floor 0 0 0.00 Terminal 23 23 Adjacent Floor 0 0 0 0: 0 0 Adjacent Floor 0 0 0.00 Main Fan 23 7 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 23 23 Sub Total =_> 0 0 0 0 0 0 Sub Total =_> 0 0 0.00 Nom Vent 9 7 AHU Vent 9 7 Internal Loads Internal Loads Infil 0 0 Lights 466 116 582 56: 466 94: Lights 0 0 0.00 MinStop/Rh 7 7 People 0 0 0 0 0 0 People 0 0 0.00 Return 23 7 Misc 0 0 0 0; 0 0; Misc 0 0 0.00 Exhaust 9 7 Sub Total =_> 466 116 582 56: 466 94 : Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 31 -31 0 0 31 6 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 473 45 ; 0 0 Ventilation Load 0 -588 48.79 Leakage Ups 0 0 Adj Air Trans Heat 0 0 O: 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 447 -447 37.05 Ov/Undr Sizing 0 0 0: 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -6 -6 -1 OA Preheat Diff. -171 14.16 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 40.7 100.0 Duct Heat Pkup 0 0 0. System Plenum Heat 0 0.00 cfm/ft' 0.15 0.15 Underflr Sup Ht Pkup 0 0: Underflr Sup Ht Pkup 0 0.00 cfm/ton 261.27 Supply Air Leakage 0 0 0: Supply Air Leakage 0 0.00 ftz/ton 1,774.35 Btu/hr-ft' 6.76 -7.78 Grand Total ==> 496 79 1,048 100.00' 496 100.00 Grand Total ==> 447 -1,206 100.00 No. People 0 Total 0.1 1.1 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.1 1.1 0.7 23 80.7 67.3 81.6 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.1 1.1 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass Lvg ftz (%) Floor 155 i Htg -0.6 23 Part 0 88.0 Htg Int Door 0 0.0 0.0 ExFlr 0 -0.7 9 -9.0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F i Htg -0.6 23 65.5 88.0 Htg 0.0 0 0.0 0.0 seat -0.7 9 -9.0 55.0 eat -0.1 7 55.0 70.0 ddif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 d -1.2 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative -1 System Checksums Report Page 4 o1`8 Zone Checksums By MACDONALD-MILLER 004 INVENTORY/MDP RM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88175/113 Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0: Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 88 Space Percent: Sensible Of Total Btu/h (%) Envelope Loads 0 0 Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.6 Return 75.6 Ret/OA 77.2 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 70.0 70.0 35.8 0.0 0.0 0.0 Enter DB/WB/HR ton MBh Glass Solar 0 0 0 0: 0 0; Glass Solar 0 0 0.00 AIRFLOWS 0 Glass/Door Cond 0 0 0 0 0 0; Glass/Door Cond 0 0 0.00 Vent Cooling Heating Wall Cond 0 0 0 0; 0 0; Wall Cond 0 0 0.00 Partition/Door 0 0 0; 0 0: Partition/Door 0 0 0.00 Diffuser 103 103 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 103 103 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 103 31 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 103 103 Sub Total =_> 0 0 0 0 : 0 0: Sub Total =_> 0 0 0.00 Nom Vent 13 13 AHU Vent 13 13 Internal Loads Internal Loads Infil 0 0 Lights 417 104 522 16 417 19 Lights 0 0 0.00 MinStop/Rh 31 31 People 450 0 450 14 250 11 People 0 0 0.00 Return 103 31 Misc 1,536 0 1,536 48; 1,536 69; Misc 0 0 0.00 Exhaust 13 13 Sub Total =_> 2,403 104 2,508 79 2,203 99 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 28 -28 0 0 28 1 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 678 21 ; 0 0 Ventilation Load 0 -1,146 33.33 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0: AdJ Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 ; Ov/Undr Sizing -2,008 -2,008 58.40 Ov/Undr Sizing 0 0 0 : 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0 ; OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 : RA Preheat Diff. -284 8.27 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 13.0 43.3 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 0.74 0.74 Underflr Sup Ht Pkup 0 0 Underfir Sup Ht Pkup 0 0.00 cfm/ton 387.50 Supply Air Leakage 0 0 0 ; Supply Air Leakage 0 0.00 ft'lton 525.08 Btu/heft= 22.85 -24.74 Grand Total ==> 2,431 68 3,177 100.00' 2,231 100.00 Grand Total =_> -2,008 -3,438 100.00 No. People 1 Total 0.3 3.2 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.6 56.9 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.3 3.2 2.5 103 77.2 63.2 66.7 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.3 3.2 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.6 56.9 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass Lvg MBh cfm °F Floor 139 i Htg -2.5 103 Part 0 88.0. Htg Int Door 0 0.0 0.0 ExFlr 0 -0.9 13 -9.0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F' i Htg -2.5 103 65.5 88.0. Htg 0.0 0 0.0 0.0 seat -0.9 13 -9.0 55.0 eat -0.5 31 55.0 70.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 1 -3.4 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 5 of 8 O � d 0 m � N .Oi zd d 3 3m CD N W O Di m r 3 d - �� C (D c � r CDc C` = C CD 05 Nr C CD W - 0 = O C T C° r CD CT O c co c o y c Dai < n oro 0 0 00 S� O 0 0 0 7 O d n d d O O O O co I) W O o W :r �7 n y O KOO 0 0 0 W d _ Z O o n n0 3 O cn 0 0 0 3 f r m 0 0 0 �m O Q) Z O O V p O O W T W D7 o 0 o cr `n O CD r 0 00 �01 R Z O O N ID O O W T W m m t°W 0oc`n CD0 O� C0 2 M a c m c d 3 m m x 5 t<D a^;� 22 .3i r CO 0» m Z d O 0 0000 00 ti co 000N oNO 0`,O-�• r n cn °m a r" o n OONN OO) 3 f O CT a) Z . . . - p m 0000 o<T V CT OD r OOO CT OCD 00 o co 00 -n to O N coxromOp D <O 5 m w c° c 0 c x `A a a CD fn ��� (o 5 DT'p 0ax(nw3 ° v tnp°.T�dcc Dom. Q 00 o »mo °�-)ddoxx® c D ��aN.a3. 9;m o mN m o?:m�on�NC) ID a _. y»S22Na d 7 0 N `) .O-. �7 p O j r-0 tD N O 7 r n II d II T 0 a N n O r to CO) 2 N v N v 0 t1 CLa V �� ~• .dd. n N d CD W to O m p C t1 CD a m O N CD O + o D CD r N N C d 0 O O 0 c W 00 W 00000000000 d 0 to O F y D '9 w+(D m m W c r- c ? D 0 0o N o6D o0-2 O O 000000 ,d.3 K X � o 2 = 0 n OD V OD (_7T W 1 V O 0000N00 O CNTO A OOA 0 0 000000000 S d N 01 W 0 o c O A C) 00 01 O 0e w 0 0 0 0 0 0 O C T O m0) 0 0 0 0 0 0 0 0 0 0 0 n r N O CD CO) m y y O N N Ccs p° D O o 000 W OO G) 00000000000 =r CD N 07? C% OD V m O OD o D o CD CD CD T` O O 0 00 A O o A 0 0 0 0 0 0 0 0 0 0 0 o d w ______________m___________________________________ rii c a D k - a 5 V m mn-»°�vDS+ c D :3 0* a Amro 0 e'nno DTi o �Nc xm Q '� 3 fD ID .cN. a .d. m tS n O» d o D c �:03 d d 2to = o 0 5N o ° a 1° o o° C)tnr N 7 d 7 7 on a d a o �°-� 0 v » 3 0 m 2 d n m n o O n n to �S» �a v v a 0 n N CD c 0 a v zWx-Onn. o o c 3 3 p g x D CO) m R Z CD G) v m m V CD0 O� V N N + 7 O a) CD CD CT :-4(0 n -0o° 2 _ tD » V O O d O �c Z m a 000 0 000 Oo0oo0000a0w x �?? �% fOd W O r 0 to O1 °_ 0 CD m D W S N 9 O _ cy CD O O OO O CAT O CA 0 00))0 O 000 000 00000000 =r N 7C O m O W A O O O OOOA O V POP O 000 000 000000 00 O 0 0 000-+00 000 0 000 00 0 000000 00 eCD d» O 00OAO 0000 —0 0 000 00000000000 ... zWx-Onn. o o c 3 3 p g x D o = m R Z CD G) z m V ? O 0 A 0 Z V N N + 7 O a) CD CD CT :-4(0 n � 2 _ tD » V O O d O 00 N O CO m m> � K; 3 5 D z to 301 0 d d x 3 S 0 2 0 n d .' m= mN- c 3 T 53 c COD COD =r7' 7 d mo > >d c 0 z » » 1 7 N ' D A r oO O t O C 5 Cl) O O O O N 0) N O N N 0) 0) m O t0 2 N 7 O O O O N N N O N N (T N fT O to >>=mmda m 3 n 0 3 F �. -I> , a0 3 m 0 O OD V V N C O 00 OCT CT N O O O V 0) 41 O CO m 2 � m .di O O O W O O OOD 000000 C) cc O O D O 3 m Z O r m W 0 >3 n CD O O =♦I Z v� N F r - r -3 m y Zone Checksums By MACDONALD-MILLER 005B MENS TOILET COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88/75/113 Space Plenum Net Percent, Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%); Envelope Loads Skylite Solar 0 0 0 0: Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0: CLG SPACE PEAK Mo/Hr. 7 / 15 OADB: 88 Space Percent Sensible Of Total Btu/h (%); : Envelope Loads 0 0 : Skylite Solar 0 0: Skylite Cond 0 0 Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.6 Return 75.6 Ret/OA 80.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 70.0 70.0 -9.0 0.0 0.0 0.0 Enter DB/WB/HR ton MBh Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS 0 Glass/Door Cond 0 0 0 0: 0 0 Glass/Door Cond 0 0 0.00 Opt Vent Cooling Heating Wall Cond 0 0 0 0; 0 01 Wall Cond 0 0 0.00 Partition/Door 0 0 0: 0 0 Partition/Door 0 0 0.00 Diffuser 8 8 Floor 0 0 0' 0 0' Floor 0 0 0.00 Terminal 8 8 Adjacent Floor 0 0 0 01 0 0: Adjacent Floor 0 0 0.00 Main Fan 8 2 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 8 8 Sub Total =_> 0 0 0 0 0 0 Sub Total =_> 0 0 0.00 Nom Vent 3 2 AHU Vent 3 2 Internal Loads Internal Loads Infil 0 0 Lights 162 41 203 56: 162 94: Lights 0 0 0.00 MinStop/Rh 2 2 People 0 0 0 0 0 0 People 0 0 0.00 Return 8 2 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 3 2 Sub Total =_> 162 41 203 56: 162 94 : Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 11 -11 0 0 11 6 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 165 45 0 0 Ventilation Load 0 -205 48.80 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 : Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 ; Ov/Undr Sizing -156 -156 37.04 Ov/Undr Sizing 0 0 0 ; 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -2 -2 -1 OA Preheat Diff. -59 14.16 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0; Additional Reheat 0 0.00 % OA 40.7 100.0 Duct Heat Pkup 0 0 0 : System Plenum Heat 0 0.00 cfm/ft' 0.15 0.15 Underfir Sup Ht Pkup 0 0: Underfir Sup Ht Pkup 0 0.00 cfm/ton 261.28 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 Whon 1,774.31 Btu/hr-ft= 6.76 -7.78 Grand Total ==> 173 28 365 100.00 ' 173 100.00 Grand Total =_> -156 -420 100.00 No. People 0 Total 0.0 0.4 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/ib Main Clg 0.0 0.4 0.3 8 80.7 67.3 81.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.0 0.4 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 52.3 55.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass Lvgl ft2 (%) Floor 54 Main Htg -0.2 8 Part 0 88.01 Aux Htg Int Door 0 0.0 0.0' ExFlr 0 -0.2 3 -9.0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvgl MBh cfm °F °FI Main Htg -0.2 8 65.5 88.01 Aux Htg 0.0 0 0.0 0.0' Preheat -0.2 3 -9.0 55.0 Reheat 0.0 2 55.0 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -0.4 TRACE@ 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 7 of 8 Zone Checksums By MACDONALD-MILLER 006 STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 88 / 75 / 113 Space Plenum Net Percent : Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) Envelope Loads Skylite Solar 0 0 0 O: Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 88 Space Percent Sensible Of Total Btu/h (%) : Envelope Loads 0 0 : Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: -9 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h 0 0 0 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.6 Return 75.6 Ret/OA 76.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 88.0 70.0 70.0 54.7 0.0 0.0 0.0 Enter DB/WB/HR ton MBh Glass Solar 0 0 0 0; 0 0 Glass Solar 0 0 0.00 AIRFLOWS 0 Glass/Door Cond 0 0 0 0; 0 0; Glass/Door Cond 0 0 0.00 Vent 0.0 0 0.0 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0. 0 0 Partition/Door 0 0 0.00 Diffuser 292 292 Floor 0 0 0 0 0: Floor 0 0 0.00 Terminal 292 292 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 292 88 Infiltration 0 0 0; 0 0 Infiltration 0 0 0.00 Sec Fan 292 292 Sub Total =_> 0 0 0 0. 0 0: Sub Total =_> 0 0 0.00 Nom Vent 17 17 AHU Vent 17 17 Internal Loads Internal Loads Infil 0 0 Lights 598 149 747 10 598 9 Lights 0 0 0.00 MinStop/Rh 88 88 People 450 0 450 6 250 4 People 0 0 0.00 Return 292 88 Misc 5,459 0 5,459 73 ; 5,459 86 ; Misc 0 0 0.00 Exhaust 17 17 Sub Total =_> 6,507 149 6,656 89 6,307 99: Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 40 -40 0 0 40 1 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 861 11 0 0 Ventilation Load 0 -1,455 17.49 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0: 0 0 AdJ Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing -5,712 -5,712 68.66 Ov/Undr Sizing 0 0 0 ; 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -12 -12 0 ; OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -1,152 13.84 Cooling Heating Ret. Fan Heat 0 0 0: Additional Reheat 0 0.00 % OA 5.8 19.4 Duct Heat Pkup 0 0 0: : System Plenum Heat 0 0.00 cfm/ft' 1.47 1.47 Underflr Sup Ht Pkup 0 0 : Underflr Sup Ht Pkup 0 0.00 cfm/ton 466.53 Supply Air Leakage 0 0 0: Supply Air Leakage 0 0.00 ft'/ton 318.16 Btu/heft= 37.72 -41.80 Grand Total ==> 6,546 98 7,506 100.00' 6,346 100.00 Grand Total ==> -5,712 -8,319 100.00 No. People 1 Total 0.6 7.5 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 59.2 0.0 0.0 0.0 0.0 0.0 0.0 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Main Clg 0.6 7.5 6.7 292 76.4 62.1 62.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.6 7.5 Project Name: 73166272 Dataset Name: 72166272 AT&T STORE.trc Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 59.2 0.0 0.0 0.0 0.0 0.0 0.0 HEATING COIL SELECTION AREAS Gross Total Glass Lvg ft. (%) Floor 199 i Htg Part 0 88.0 Int Door 0 0.0 ExFlr 0 -1.2 17 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F i Htg -7.1 292 65.5 88.0 Htg 0.0 0 0.0 0.0 seat -1.2 17 -9.0 55.0 eat -1.4 88 55.0 70.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 d -8.3 TRACE® 700 v6.3.2 calculated at 01:29 PM on 04/25/2016 Alternative - 1 System Checksums Report Page 8 of 8 01 0 O. N n�. z z N 0) 3 3 CD n O c CD C N cn (1) m CD m 7. 7. M. (Dmm. N N (n T , T ID N d 7 7 7 0 T -u'. O O: CD COL OO N N ao. H m 3 0 0 v 0 U1 N W 0 cD N O O 3 O c N — W' F 01000 O o o o v m CO) Cl) m Z N �a -q 0� z o C D m D m< m V) nO (� O A n N A' (D CD : 3 f a m D n 0 N O N M O a 3 0 nN im f m' N 2 yCD CTT O N y. N OD. N c0 3 0 10 U1 N W 0 cD N O O 3 O c N — W' F 01000 O o o o v m CO) Cl) m Z N �a -q 0� z o C D m D m< m V) N W 0) a) N N N N a� U) 0 m 0 cu c v_ c � m a m N j N O 1p 7 N D o O a - N A N �-10 m 0maf 3 T < < � O < < 0 c m w 0. m N D -'rnw� o c m A W N O A O = 7 O O O O O p 0 C O O O O o 7 �• x O 0 n 0 0 0 0 0 0 0 0 0 0 6 0 r 3 ° 00oo$ m m 0 W GI O O W x O m x v_ OOOOO p O m N .�. 0 0 0 0 0 O n o 0 m M o O (A N 0 0 0 0 0 p O m 0 0 0 0 0 >> N m a w C o O o O O O W O O Omt mmmo�CD 0pr rn w o n O m N (n W � 7 0 0 0 O op 0= 00000 °• x i 0 0 0 0 0 $ o v o 0 0 0 0 = m of 0 0 0 0 0 0 0 3 �I wwoow o a 0 vi 7 0 0 0 0 0 $ o m y 0 0 0 0 0 0 a o y 0 0 o 0 0 p 0 CCD N O O C O O 7 O N O CL N C D7 0 0 0 0 0 0=w 0 0 0 0 0 m rn w O O �incncn�, o m n x W C EL 7 D y CL N N CD 3 m m a a n, n m a m n r: Io H u u CO) Ch W ZZ Cl) • I o O z— o C) CO) D N m cn 11/1/2016 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director APRIL HOUSE 7717 DETROIT AVE SW SEATTLE, WA 98106 RE: Permit No. M16-0069 AT&T STORE 344 SOUTHCENTER MALL Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 12/26/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 12/26/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M I6-0069 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0069 DATE: 05/05/16 PROJECT NAME: AT&T STORE SITE ADDRESS: 344 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division 14 Fire Prevention Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 05/1.0/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 06/07/16 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 MACDONALD/MILLER FAC SOL TNC Home E-Spahol Contact Safety & Health Claims & Insurance inWashington State Department of Labor & Industries MACDONALD/MILLER FAC SOL INC Owner or tradesperson PO BOX 47983 SEATTLE, WA 98106 Principals 206-768-4180 SIMONDS, DERRICK R, PRESIDENT KING County INEBSTER, MARK E, VICE PRESIDENT GEBHARDT, STEPHANIE WETTACH, TREASURER HOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01 /04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01 /04/2011) HACK, RICHARD, SECRETARY (End: 01 /04/2011) KOPET, TYLER, TREASURER (End: 01 /04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01 /04/2011) GOUGH, DAVID ANTHONY, DIRECTOR (End: 08/29/2014) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. Business type 602 254 260 Corporation Governing persons FREDRIC J SIGMUND STEVE C LOVELY; TYLER C KOPET; License Page 1 of 3 Search L&I ' A-7.Index Help My 1"10 Workplace Rights Trades & Licensing Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. .......................................................................... Meets current requirements. License specialties GENERAL License no. MACDOFS980RU Effective — expiration 12/31/2002— 01/03/2017 https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS98ORU&SAW= 5/17/2016 3 0 I 0 al 04 N i r 3 i a c 0 m c rn a 0 0 a m a v B 0° a c N 0 c m 0 Cn a N n N 0 M n 2 a 0 12 M M t0 O N M O I SERIES'VAV BOX SCHEDULE NAME COMPANY PHONE NUMBER EMAIL UNIT I TRAND 1 INLET j FAN VALVE CFM I HEATER JESSE MONTEZ FAN 206-768-4178 JESSE.MONTEZ@MACMILLER.COM NO. MODEL NO. j SIZE CFM i MAX MIN i KW DT CFM ! VOLTIPH STGS HP VOLT/PH ;SPD NOTES VAV-101 VSEF 1404SQ 14 ! 1400 I 1260 300 12 27 1400 480/3 2 1/2 27711 i ECM NEW,1,2 VAV-102 VSEV 1405SQ i 14 `: 1600 1440 ! 360 17 1 33.4 1 1600 480/3 2 1 277/1 ECM NEW,1,2 VAV-103 VSEF 1003SQ j 10 925 830 j 215 5 i 19.1 825 I 480/3 2 1/3 277/1ECM 206-768-4234 NEW,1,2 f o NOTES: O 1. DISCONNECT BY ELECTRICAL. >6 Q eel 10 z ti 2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: ' U_ (DN J CU F - WITH ECM MOTOR. - EXTENDED DAMPER 1/2" DIAM. SHAFT - FACTORY INSTALLED 1' THROW -AWAY FILTERS - CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET. -1" MATT -FACED UNIT INSULATION - VARIABLE SPEED FAN CONTROL - 24V TRANSFORMER, 50 VA MIN RATING - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS -AUTO RESET 120"F HIGH LIMIT TSTAT - NON MAGNETIC QUIET ACTING HEATER CONTACTOR NOTE TO ELECTRICAL: - 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO THE FAN MOTOR. N VICINITY MAP NO SCALE 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2012 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2012 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2012 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS - DUCT WRAP, WHERE INDICATED, SHALL BE 11/2' 0.75 LB/CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-6 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE V 1.5 LB/CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-6 MIN.). DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED EI 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R6 MIN.). AIR DUCT (R6 MIN) SUPPLY DUCT WHICH CONVEY SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER THAN 105 DEG F SHALL BE INSULATED WITH A MINIMUM OF R-3.3, WHEN LOCATED IN CONDITIONED SPACE. 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER,1 1/2" FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2012 IBC. 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 9. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION 606 OF THE 2012 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. BAS TO MONITOR FIRE ALARM CONTROL PANEL AND SHUT DOWN ALL FAN TERMINAL UNITS DURING ANY BUILDING FIRE ALARM EVENT, IN ACCORDANCE WITH IMC 606.2.2. 10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18"X 18". 11. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 12. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 13. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC), COMMERCIAL PROVISIONS, SECTION C408 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 14. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER APN# 9202470010 PROPERTY NAME: WESTFIELD SHOPPING CENTER LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765) JURISDICTION: TUKWILA PROJECT ADDRESS: 344 SOUTHCENTER MALL TUKWILA, WA 98188 TITLE NAME COMPANY PHONE NUMBER EMAIL PROJECT ENGINEER JESSE MONTEZ MACDONALD MILLER 206-768-4178 JESSE.MONTEZ@MACMILLER.COM ACCOUNT MANAGER MITCH POWELL MACDONALD MILLER 253-680-3166 MITCH.POWELL@MACMILLER.COM SHEET METAL FOREMAN TIM FELTON MACDONALD MILLER 206-407-2692 TIM.FELTON@MACMILLER.COM AIR BALANCE FOREMAN STEVE BAKER MACDONALD MILLER 206-768-3824 STEVE.BAKER@MACMILLER.COM ELECTRICAL FOREMAN CLAYTON PARKER MACDONALD MILLER 206-768-4234 CLAYTON.PARKER@MACMILLER.COM DEMO 2 EXISTING COOLING ONLY VAV BOXES. PROVIDE AND INSTALL 3 FAN TERMINALS MODIFY EXISTING MEDIUM AND LOW PRESSURE DUCTWORK AS SHOWN. PROVIDE AND INSTALL ELECTRICAL BREAKERS, RACEWAYS, AND WIRE FOR NEW FAN TERMINALS. PROVIDE AND INSTALL CONTROLS, WIRING AND SENSORS FOR NEW FAN TERMINALS. PROVIDE TEMPORARY COOLING DURING CONSTRUCTION. SERIES FAN TERMINALS WITH ECM FAN MOTORE MEET THE 2012 WSEC, C403.2.10.3 FRACTIONAL HP FAN MOTORS. RECEIVED CITY OF `I"W(WILA MAY 05 2015 PERMIT CENTER I SYMBOL I MANUFACTURER & MODEL NUMBER SIZE TYPE j NOTES AA CFM 1 TITUS PCS AS NOTED T -BAR PERORATED CEILING DIFFUSER j 4 -WAY ADJUSTABLE, SUPPLY I I TITUS PXP AS NOTED j T -BAR PERFOATED RETURN GRILLE I PERFORATED FACE, RETURN I A i i NAME TITLE NAME TITLE TM0.01 SCHEDULES -HVAC TM0.01S SITE MAP TM2.01 FLOOR PLAN - HVAC DM2.01 FLOOR DEMO PLAN - HVAC No changes shall be made to the scope of work without prior approval of Tu%vjila Building Division. U0 ► F :;v; „trill rewire a new plan submittal c-nd r„ay il::;,do add ianai plan review f3 7'S. I MElcy,pyl Poenrift No. M14411 Oor� 7 r vjv I0(}rev>,1 ilw subject to errnrs and _ cf '!'rl5(('.l Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei rOvwo ' 1 -fold 0-1py � :- and c -,y . Date: 1 Z city o ui'mild o BUILDING DIV>Slt 1 1 1 1 1 1 111 Ld I Q 04 O O 1 is 0 L V) H Z O Ld (n O_ Sal"t^,' i L P1-RT.AIT F 01UIFD FOFI: ❑ Me'Chanical .r Elcctricat —� ,O Plumbing —� .ErGas Piping Q City of Tukvilla F_ tJII rli�!r DIVISION W Z (.5 d. > U) Q0 VJ z > m 0 J J Wr/ Wr/ /U/ �r 1 W 00 i'••"'.'� � t ��', Vim 0 0 I— 00 o �'— F— Urn =n LL C� = Q.. t L. {LLI 00 DO°g E 1 C:) Y_.:- o r' 7 Cn N F— ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: B GEZON 05-02-16 CAD: ISSUE DATE: R VILLANUEVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: T _... RE IE D FOR CODE COMPLIANCE ' APPROVED V E® =. MAY 1 3 2016 City Qf Tultti�eila BUILDIi' G DIVISION • o 05 �o 0) w N U) U) LL L 0 � 0 Cts� E o N C E G O >6 Q eel 10 z ti U ' U_ (DN J CU F j I MElcy,pyl Poenrift No. M14411 Oor� 7 r vjv I0(}rev>,1 ilw subject to errnrs and _ cf '!'rl5(('.l Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei rOvwo ' 1 -fold 0-1py � :- and c -,y . Date: 1 Z city o ui'mild o BUILDING DIV>Slt 1 1 1 1 1 1 111 Ld I Q 04 O O 1 is 0 L V) H Z O Ld (n O_ Sal"t^,' i L P1-RT.AIT F 01UIFD FOFI: ❑ Me'Chanical .r Elcctricat —� ,O Plumbing —� .ErGas Piping Q City of Tukvilla F_ tJII rli�!r DIVISION W Z (.5 d. > U) Q0 VJ z > m 0 J J Wr/ Wr/ /U/ �r 1 W 00 i'••"'.'� � t ��', Vim 0 0 I— 00 o �'— F— Urn =n LL C� = Q.. t L. {LLI 00 DO°g E 1 C:) Y_.:- o r' 7 Cn N F— ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: B GEZON 05-02-16 CAD: ISSUE DATE: R VILLANUEVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: T _... RE IE D FOR CODE COMPLIANCE ' APPROVED V E® =. MAY 1 3 2016 City Qf Tultti�eila BUILDIi' G DIVISION BAKER BLVD RECEIV rE D CIT` of 'rUKVjILA MAY 0 5 2016 PERMIT CENTER APN# 9202470010 PROPERTY NAME: WESTFIELD SHOPPING CENTER LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765) JURISDICTION: TUKWILA PROJECT ADDRESS: 344 SOUTHCENTER MALL TUKWILA, WA 98188 Lv Q 6i J MONTEZ Z 3 OI-- rnCD B GEZON V) CAD: ■ R VI LLAN U EVA co co DRAWING NUMBER: C SHEET NUMBER: CD N O LL O U O C � Oo s o A QM Z UL ' U o (m C cu � N Lv Q V) �Z �o wN I KOf J Z J O N (0 v) O V Q D d LL > U) F— J U) m z 0 WW< U LL' w ry W 00 LL u) co " p Q F- D W 06°�_ ��� ���� N H A` ENGINEER: 6i J MONTEZ Z CHECKED BY: O B GEZON V) CAD: ISSUE DAM R VI LLAN U EVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: N O 1 Ln O V) �Z �o wN I KOf J Z J O N (0 v) O V Q D d LL > U) F— J U) m z 0 WW< U LL' w ry W 00 LL u) co " p Q F- D W 06°�_ ��� ���� N H A` ENGINEER: LAST REVISED: J MONTEZ 04-21-16 CHECKED BY: DATE PLOTTED: B GEZON CAD: ISSUE DAM R VI LLAN U EVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: TMO 01 REVIEWED FOR CC'iDE COMPLIANCE I APPROVED MAY 13 2016. City of T ukwila R1111 -DING DIVISION cv 14•/ Fi�mmjmhm 18•/ 0 Fit 00-tP) W Q O I- 200 CFN _-( i ! 12 z t 4's 10Y Fo I \ O 6-0 '` 22•f 16 � I I I I I I I I � OP.4P 0 FI ' _ I 04 _ L 1 p 40 i ---_-_- + -- i-- itjr 0O �- 24.16. i1 ' 14•/ \ - / 2-f,I tog i - i.•"fid C z O cr 1 _ a i � r I .- 8• 1010ivo1 r; `! �� - J Z I ( i CD� r s� V II U M3 ��(E) Uj WU CMUM.11 ^ _ LL �. MECHANICAL FLOOR PLAN > 0 °y U) > �/ J > m O W W Q U �C d 11 00 00W-00 p Z� f- I- W 00 LL U) � U Y, t, = Q g 0 ~..� W 06 06 co p Y �s <C Q N ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: E C W B GEZON 05-02-16 CITY C)F 1 UK ILA CAD: ISSUE DATE: Y 6e� R VILLANUEVA MAY 0 5 2016 DRAWING NUMBER: T CENTER C-2321-73166272-00 PERMIT CEN t ER SHEET NUMBER: a N _ _ . _..._ REVIEWED FOR M CODE COMPLIANCE t0 � APPROVED N N M e MAY 13 2016 City of Tukwila t ' BUILDING DIVISION I • 19 t7 op co �.. C)W (3) t)j O N (n E m LL U) LL U O �0 co U �@<C o 4a cE� O � � O chec) U y 0 0 a)N J Q r O ti 0- W Q O I- 200 CFN _-( i ! 12 z t 4's 10Y Fo I \ O 6-0 '` 22•f 16 � I I I I I I I I � OP.4P 0 FI ' _ I 04 _ L 1 p 40 i ---_-_- + -- i-- itjr 0O �- 24.16. i1 ' 14•/ \ - / 2-f,I tog i - i.•"fid C z O cr 1 _ a i � r I .- 8• 1010ivo1 r; `! �� - J Z I ( i CD� r s� V II U M3 ��(E) Uj WU CMUM.11 ^ _ LL �. MECHANICAL FLOOR PLAN > 0 °y U) > �/ J > m O W W Q U �C d 11 00 00W-00 p Z� f- I- W 00 LL U) � U Y, t, = Q g 0 ~..� W 06 06 co p Y �s <C Q N ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: E C W B GEZON 05-02-16 CITY C)F 1 UK ILA CAD: ISSUE DATE: Y 6e� R VILLANUEVA MAY 0 5 2016 DRAWING NUMBER: T CENTER C-2321-73166272-00 PERMIT CEN t ER SHEET NUMBER: a N _ _ . _..._ REVIEWED FOR M CODE COMPLIANCE t0 � APPROVED N N M e MAY 13 2016 City of Tukwila t ' BUILDING DIVISION I • 0 (E) u•° MOM?) O W Q D 12x12 75 ObFD \� z ce 0 EXHAUSTI! — � VAV-1 3 i ; (� �� ,6•e - � I I I I I I I I � ,o° I FD 6•° CRQ' LLJ 6x6 a 75- ' ( t — t O ( E✓`- ; 2Fs,6 10x10 ..._ T. 10x10 -- i3m, I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010 0 VAV-101 D ' Poc CAP , 0 + i, { t ; II..I24x2 �, 4SL I 6 Rq 18x --POC FZ I z I�I VAV-1 2 24x24 24x24 B R�A..._. _ BRA — _ _ _ - '% t ain il:j ! 6x6 :..: U) 10x10 1; '4 100 8x8 _ A B -x8 I X :\. q 2 00 Q 200 `� 1 - , A 8x8 ... - _ ' !1 (n MALL AI,Vi'l To N PAWNG I �8�g—; j I CAP . 2� oO POG �,' ; i _ . _ A 200 _ _ i POC _ o 9 Fs '� ,O F f0•f j A 3000 � 00— 624 . I / / q 10x10 q 10x10 �� r SHEET NOTES: I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J / O1 FOR USE AS MEDIUM PRESSURE DUCT �.._ ® O i N O U) W U �(i) uu,_ MUMN1y d MECHANICAL FLOOR PLAN > Q > `" U) �:� z > -J O W WQ ;.a C) ry �' trA � O O O zW 00 �� I— I— w 00 L U) Cf) U QY �—' E-- o 06 C45 co N H a c/) ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: RECEIVED B GEZON 05-02-16 CITY 0Ff UKV,,1LA CAD: ISSUE DATE: MAY 0 5 2016 R VI LLAN U EVA DRAWING NUMBER: PERMIT CENTER C-2321-73166272-00 SHEET NUMBER: E ) OR T Ll INCE - .lam N APPROVED MAY 1 3. 2016 City of Tukwila BUILDING DIVISION 1 = " CD r- ■ ^- C) r00 0) co, v^ J LL 'fn LL `- � Q =e U o Q �40E� a co 3 U U_ °C) NCU jJ W Q D 12x12 75 ObFD \� z ce 0 EXHAUSTI! — � VAV-1 3 i ; (� �� ,6•e - � I I I I I I I I � ,o° I FD 6•° CRQ' LLJ 6x6 a 75- ' ( t — t O ( E✓`- ; 2Fs,6 10x10 ..._ T. 10x10 -- i3m, I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010 0 VAV-101 D ' Poc CAP , 0 + i, { t ; II..I24x2 �, 4SL I 6 Rq 18x --POC FZ I z I�I VAV-1 2 24x24 24x24 B R�A..._. _ BRA — _ _ _ - '% t ain il:j ! 6x6 :..: U) 10x10 1; '4 100 8x8 _ A B -x8 I X :\. q 2 00 Q 200 `� 1 - , A 8x8 ... - _ ' !1 (n MALL AI,Vi'l To N PAWNG I �8�g—; j I CAP . 2� oO POG �,' ; i _ . _ A 200 _ _ i POC _ o 9 Fs '� ,O F f0•f j A 3000 � 00— 624 . I / / q 10x10 q 10x10 �� r SHEET NOTES: I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J / O1 FOR USE AS MEDIUM PRESSURE DUCT �.._ ® O i N O U) W U �(i) uu,_ MUMN1y d MECHANICAL FLOOR PLAN > Q > `" U) �:� z > -J O W WQ ;.a C) ry �' trA � O O O zW 00 �� I— I— w 00 L U) Cf) U QY �—' E-- o 06 C45 co N H a c/) ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: RECEIVED B GEZON 05-02-16 CITY 0Ff UKV,,1LA CAD: ISSUE DATE: MAY 0 5 2016 R VI LLAN U EVA DRAWING NUMBER: PERMIT CENTER C-2321-73166272-00 SHEET NUMBER: E ) OR T Ll INCE - .lam N APPROVED MAY 1 3. 2016 City of Tukwila BUILDING DIVISION 1 = " 3 0 I 0 al 04 N i r 3 i a c 0 m c rn a 0 0 a m a v B 0° a c N 0 c m 0 Cn a N n N 0 M n 2 a 0 12 M M t0 O N M O I SERIES'VAV BOX SCHEDULE NAME COMPANY PHONE NUMBER EMAIL UNIT I TRAND 1 INLET j FAN VALVE CFM I HEATER JESSE MONTEZ FAN 206-768-4178 JESSE.MONTEZ@MACMILLER.COM NO. MODEL NO. j SIZE CFM i MAX MIN i KW DT CFM ! VOLTIPH STGS HP VOLT/PH ;SPD NOTES VAV-101 VSEF 1404SQ 14 ! 1400 I 1260 300 12 27 1400 480/3 2 1/2 27711 i ECM NEW,1,2 VAV-102 VSEV 1405SQ i 14 `: 1600 1440 ! 360 17 1 33.4 1 1600 480/3 2 1 277/1 ECM NEW,1,2 VAV-103 VSEF 1003SQ j 10 925 830 j 215 5 i 19.1 825 I 480/3 2 1/3 277/1ECM 206-768-4234 NEW,1,2 f o NOTES: O 1. DISCONNECT BY ELECTRICAL. >6 Q eel 10 z ti 2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: ' U_ (DN J CU F - WITH ECM MOTOR. - EXTENDED DAMPER 1/2" DIAM. SHAFT - FACTORY INSTALLED 1' THROW -AWAY FILTERS - CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET. -1" MATT -FACED UNIT INSULATION - VARIABLE SPEED FAN CONTROL - 24V TRANSFORMER, 50 VA MIN RATING - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS -AUTO RESET 120"F HIGH LIMIT TSTAT - NON MAGNETIC QUIET ACTING HEATER CONTACTOR NOTE TO ELECTRICAL: - 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO THE FAN MOTOR. N VICINITY MAP NO SCALE 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2012 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2012 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2012 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS - DUCT WRAP, WHERE INDICATED, SHALL BE 11/2' 0.75 LB/CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-6 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE V 1.5 LB/CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-6 MIN.). DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED EI 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R6 MIN.). AIR DUCT (R6 MIN) SUPPLY DUCT WHICH CONVEY SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER THAN 105 DEG F SHALL BE INSULATED WITH A MINIMUM OF R-3.3, WHEN LOCATED IN CONDITIONED SPACE. 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER,1 1/2" FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2012 IBC. 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 9. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION 606 OF THE 2012 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. BAS TO MONITOR FIRE ALARM CONTROL PANEL AND SHUT DOWN ALL FAN TERMINAL UNITS DURING ANY BUILDING FIRE ALARM EVENT, IN ACCORDANCE WITH IMC 606.2.2. 10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18"X 18". 11. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 12. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 13. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC), COMMERCIAL PROVISIONS, SECTION C408 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 14. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER APN# 9202470010 PROPERTY NAME: WESTFIELD SHOPPING CENTER LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765) JURISDICTION: TUKWILA PROJECT ADDRESS: 344 SOUTHCENTER MALL TUKWILA, WA 98188 TITLE NAME COMPANY PHONE NUMBER EMAIL PROJECT ENGINEER JESSE MONTEZ MACDONALD MILLER 206-768-4178 JESSE.MONTEZ@MACMILLER.COM ACCOUNT MANAGER MITCH POWELL MACDONALD MILLER 253-680-3166 MITCH.POWELL@MACMILLER.COM SHEET METAL FOREMAN TIM FELTON MACDONALD MILLER 206-407-2692 TIM.FELTON@MACMILLER.COM AIR BALANCE FOREMAN STEVE BAKER MACDONALD MILLER 206-768-3824 STEVE.BAKER@MACMILLER.COM ELECTRICAL FOREMAN CLAYTON PARKER MACDONALD MILLER 206-768-4234 CLAYTON.PARKER@MACMILLER.COM DEMO 2 EXISTING COOLING ONLY VAV BOXES. PROVIDE AND INSTALL 3 FAN TERMINALS MODIFY EXISTING MEDIUM AND LOW PRESSURE DUCTWORK AS SHOWN. PROVIDE AND INSTALL ELECTRICAL BREAKERS, RACEWAYS, AND WIRE FOR NEW FAN TERMINALS. PROVIDE AND INSTALL CONTROLS, WIRING AND SENSORS FOR NEW FAN TERMINALS. PROVIDE TEMPORARY COOLING DURING CONSTRUCTION. SERIES FAN TERMINALS WITH ECM FAN MOTORE MEET THE 2012 WSEC, C403.2.10.3 FRACTIONAL HP FAN MOTORS. RECEIVED CITY OF `I"W(WILA MAY 05 2015 PERMIT CENTER I SYMBOL I MANUFACTURER & MODEL NUMBER SIZE TYPE j NOTES AA CFM 1 TITUS PCS AS NOTED T -BAR PERORATED CEILING DIFFUSER j 4 -WAY ADJUSTABLE, SUPPLY I I TITUS PXP AS NOTED j T -BAR PERFOATED RETURN GRILLE I PERFORATED FACE, RETURN I A i i NAME TITLE NAME TITLE TM0.01 SCHEDULES -HVAC TM0.01S SITE MAP TM2.01 FLOOR PLAN - HVAC DM2.01 FLOOR DEMO PLAN - HVAC No changes shall be made to the scope of work without prior approval of Tu%vjila Building Division. U0 ► F :;v; „trill rewire a new plan submittal c-nd r„ay il::;,do add ianai plan review f3 7'S. I MElcy,pyl Poenrift No. M14411 Oor� 7 r vjv I0(}rev>,1 ilw subject to errnrs and _ cf '!'rl5(('.l Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei rOvwo ' 1 -fold 0-1py � :- and c -,y . Date: 1 Z city o ui'mild o BUILDING DIV>Slt 1 1 1 1 1 1 111 Ld I Q 04 O O 1 is 0 L V) H Z O Ld (n O_ Sal"t^,' i L P1-RT.AIT F 01UIFD FOFI: ❑ Me'Chanical .r Elcctricat —� ,O Plumbing —� .ErGas Piping Q City of Tukvilla F_ tJII rli�!r DIVISION W Z (.5 d. > U) Q0 VJ z > m 0 J J Wr/ Wr/ /U/ �r 1 W 00 i'••"'.'� � t ��', Vim 0 0 I— 00 o �'— F— Urn =n LL C� = Q.. t L. {LLI 00 DO°g E 1 C:) Y_.:- o r' 7 Cn N F— ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: B GEZON 05-02-16 CAD: ISSUE DATE: R VILLANUEVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: T _... RE IE D FOR CODE COMPLIANCE ' APPROVED V E® =. MAY 1 3 2016 City Qf Tultti�eila BUILDIi' G DIVISION • o 05 �o 0) w N U) U) LL L 0 � 0 Cts� E o N C E G O >6 Q eel 10 z ti U ' U_ (DN J CU F j I MElcy,pyl Poenrift No. M14411 Oor� 7 r vjv I0(}rev>,1 ilw subject to errnrs and _ cf '!'rl5(('.l Y!(3! ! '`1i1 ]�' I tt(il,e€ I • dei rOvwo ' 1 -fold 0-1py � :- and c -,y . Date: 1 Z city o ui'mild o BUILDING DIV>Slt 1 1 1 1 1 1 111 Ld I Q 04 O O 1 is 0 L V) H Z O Ld (n O_ Sal"t^,' i L P1-RT.AIT F 01UIFD FOFI: ❑ Me'Chanical .r Elcctricat —� ,O Plumbing —� .ErGas Piping Q City of Tukvilla F_ tJII rli�!r DIVISION W Z (.5 d. > U) Q0 VJ z > m 0 J J Wr/ Wr/ /U/ �r 1 W 00 i'••"'.'� � t ��', Vim 0 0 I— 00 o �'— F— Urn =n LL C� = Q.. t L. {LLI 00 DO°g E 1 C:) Y_.:- o r' 7 Cn N F— ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: B GEZON 05-02-16 CAD: ISSUE DATE: R VILLANUEVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: T _... RE IE D FOR CODE COMPLIANCE ' APPROVED V E® =. MAY 1 3 2016 City Qf Tultti�eila BUILDIi' G DIVISION BAKER BLVD RECEIV rE D CIT` of 'rUKVjILA MAY 0 5 2016 PERMIT CENTER APN# 9202470010 PROPERTY NAME: WESTFIELD SHOPPING CENTER LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765) JURISDICTION: TUKWILA PROJECT ADDRESS: 344 SOUTHCENTER MALL TUKWILA, WA 98188 Lv Q 6i J MONTEZ Z 3 OI-- rnCD B GEZON V) CAD: ■ R VI LLAN U EVA co co DRAWING NUMBER: C SHEET NUMBER: CD N O LL O U O C � Oo s o A QM Z UL ' U o (m C cu � N Lv Q V) �Z �o wN I KOf J Z J O N (0 v) O V Q D d LL > U) F— J U) m z 0 WW< U LL' w ry W 00 LL u) co " p Q F- D W 06°�_ ��� ���� N H A` ENGINEER: 6i J MONTEZ Z CHECKED BY: O B GEZON V) CAD: ISSUE DAM R VI LLAN U EVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: N O 1 Ln O V) �Z �o wN I KOf J Z J O N (0 v) O V Q D d LL > U) F— J U) m z 0 WW< U LL' w ry W 00 LL u) co " p Q F- D W 06°�_ ��� ���� N H A` ENGINEER: LAST REVISED: J MONTEZ 04-21-16 CHECKED BY: DATE PLOTTED: B GEZON CAD: ISSUE DAM R VI LLAN U EVA DRAWING NUMBER: C-2321-73166272-00 SHEET NUMBER: TMO 01 REVIEWED FOR CC'iDE COMPLIANCE I APPROVED MAY 13 2016. City of T ukwila R1111 -DING DIVISION cv 14•/ Fi�mmjmhm 18•/ 0 Fit 00-tP) W Q O I- 200 CFN _-( i ! 12 z t 4's 10Y Fo I \ O 6-0 '` 22•f 16 � I I I I I I I I � OP.4P 0 FI ' _ I 04 _ L 1 p 40 i ---_-_- + -- i-- itjr 0O �- 24.16. i1 ' 14•/ \ - / 2-f,I tog i - i.•"fid C z O cr 1 _ a i � r I .- 8• 1010ivo1 r; `! �� - J Z I ( i CD� r s� V II U M3 ��(E) Uj WU CMUM.11 ^ _ LL �. MECHANICAL FLOOR PLAN > 0 °y U) > �/ J > m O W W Q U �C d 11 00 00W-00 p Z� f- I- W 00 LL U) � U Y, t, = Q g 0 ~..� W 06 06 co p Y �s <C Q N ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: E C W B GEZON 05-02-16 CITY C)F 1 UK ILA CAD: ISSUE DATE: Y 6e� R VILLANUEVA MAY 0 5 2016 DRAWING NUMBER: T CENTER C-2321-73166272-00 PERMIT CEN t ER SHEET NUMBER: a N _ _ . _..._ REVIEWED FOR M CODE COMPLIANCE t0 � APPROVED N N M e MAY 13 2016 City of Tukwila t ' BUILDING DIVISION I • 19 t7 op co �.. C)W (3) t)j O N (n E m LL U) LL U O �0 co U �@<C o 4a cE� O � � O chec) U y 0 0 a)N J Q r O ti 0- W Q O I- 200 CFN _-( i ! 12 z t 4's 10Y Fo I \ O 6-0 '` 22•f 16 � I I I I I I I I � OP.4P 0 FI ' _ I 04 _ L 1 p 40 i ---_-_- + -- i-- itjr 0O �- 24.16. i1 ' 14•/ \ - / 2-f,I tog i - i.•"fid C z O cr 1 _ a i � r I .- 8• 1010ivo1 r; `! �� - J Z I ( i CD� r s� V II U M3 ��(E) Uj WU CMUM.11 ^ _ LL �. MECHANICAL FLOOR PLAN > 0 °y U) > �/ J > m O W W Q U �C d 11 00 00W-00 p Z� f- I- W 00 LL U) � U Y, t, = Q g 0 ~..� W 06 06 co p Y �s <C Q N ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: E C W B GEZON 05-02-16 CITY C)F 1 UK ILA CAD: ISSUE DATE: Y 6e� R VILLANUEVA MAY 0 5 2016 DRAWING NUMBER: T CENTER C-2321-73166272-00 PERMIT CEN t ER SHEET NUMBER: a N _ _ . _..._ REVIEWED FOR M CODE COMPLIANCE t0 � APPROVED N N M e MAY 13 2016 City of Tukwila t ' BUILDING DIVISION I • 0 (E) u•° MOM?) O W Q D 12x12 75 ObFD \� z ce 0 EXHAUSTI! — � VAV-1 3 i ; (� �� ,6•e - � I I I I I I I I � ,o° I FD 6•° CRQ' LLJ 6x6 a 75- ' ( t — t O ( E✓`- ; 2Fs,6 10x10 ..._ T. 10x10 -- i3m, I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010 0 VAV-101 D ' Poc CAP , 0 + i, { t ; II..I24x2 �, 4SL I 6 Rq 18x --POC FZ I z I�I VAV-1 2 24x24 24x24 B R�A..._. _ BRA — _ _ _ - '% t ain il:j ! 6x6 :..: U) 10x10 1; '4 100 8x8 _ A B -x8 I X :\. q 2 00 Q 200 `� 1 - , A 8x8 ... - _ ' !1 (n MALL AI,Vi'l To N PAWNG I �8�g—; j I CAP . 2� oO POG �,' ; i _ . _ A 200 _ _ i POC _ o 9 Fs '� ,O F f0•f j A 3000 � 00— 624 . I / / q 10x10 q 10x10 �� r SHEET NOTES: I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J / O1 FOR USE AS MEDIUM PRESSURE DUCT �.._ ® O i N O U) W U �(i) uu,_ MUMN1y d MECHANICAL FLOOR PLAN > Q > `" U) �:� z > -J O W WQ ;.a C) ry �' trA � O O O zW 00 �� I— I— w 00 L U) Cf) U QY �—' E-- o 06 C45 co N H a c/) ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: RECEIVED B GEZON 05-02-16 CITY 0Ff UKV,,1LA CAD: ISSUE DATE: MAY 0 5 2016 R VI LLAN U EVA DRAWING NUMBER: PERMIT CENTER C-2321-73166272-00 SHEET NUMBER: E ) OR T Ll INCE - .lam N APPROVED MAY 1 3. 2016 City of Tukwila BUILDING DIVISION 1 = " CD r- ■ ^- C) r00 0) co, v^ J LL 'fn LL `- � Q =e U o Q �40E� a co 3 U U_ °C) NCU jJ W Q D 12x12 75 ObFD \� z ce 0 EXHAUSTI! — � VAV-1 3 i ; (� �� ,6•e - � I I I I I I I I � ,o° I FD 6•° CRQ' LLJ 6x6 a 75- ' ( t — t O ( E✓`- ; 2Fs,6 10x10 ..._ T. 10x10 -- i3m, I CAP q 3�— \ _ _ q 3001 ID 7 A 3 010 0 VAV-101 D ' Poc CAP , 0 + i, { t ; II..I24x2 �, 4SL I 6 Rq 18x --POC FZ I z I�I VAV-1 2 24x24 24x24 B R�A..._. _ BRA — _ _ _ - '% t ain il:j ! 6x6 :..: U) 10x10 1; '4 100 8x8 _ A B -x8 I X :\. q 2 00 Q 200 `� 1 - , A 8x8 ... - _ ' !1 (n MALL AI,Vi'l To N PAWNG I �8�g—; j I CAP . 2� oO POG �,' ; i _ . _ A 200 _ _ i POC _ o 9 Fs '� ,O F f0•f j A 3000 � 00— 624 . I / / q 10x10 q 10x10 �� r SHEET NOTES: I ---� II T� /; 3a 00 3P -D SEAL AND INSULATE EXISTING LOW PRESSURE DUCT J / O1 FOR USE AS MEDIUM PRESSURE DUCT �.._ ® O i N O U) W U �(i) uu,_ MUMN1y d MECHANICAL FLOOR PLAN > Q > `" U) �:� z > -J O W WQ ;.a C) ry �' trA � O O O zW 00 �� I— I— w 00 L U) Cf) U QY �—' E-- o 06 C45 co N H a c/) ENGINEER: LAST REVISED: J MONTEZ 05-02-16 CHECKED BY: DATE PLOTTED: RECEIVED B GEZON 05-02-16 CITY 0Ff UKV,,1LA CAD: ISSUE DATE: MAY 0 5 2016 R VI LLAN U EVA DRAWING NUMBER: PERMIT CENTER C-2321-73166272-00 SHEET NUMBER: E ) OR T Ll INCE - .lam N APPROVED MAY 1 3. 2016 City of Tukwila BUILDING DIVISION 1 = "