Loading...
HomeMy WebLinkAboutPermit M16-0100 - TAHOMA CLINIC - INDOOR FAN COILS AND OUTDOOR CONDENSOR UNITSTAHOMA CLINIC 6835 FORT DENT WAY M16-0100 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov Parcel No: 2954900445 Address: 6835 FORT DENT WAY Project Name: TAHOMA CLINIC MECHANICAL PERMIT Permit Number: M16-0100 Issue Date: 6/29/2016 Permit Expires On: 12/26/2016 Owner: 2012 National Electrical Code: Name: FORT DENT WAY LLC 2012 Address: 6839 FORT DENT WAY #134, International Mechanical Code Edition: 2012 TUKWILA, WA, 98188 2014 Contact Person: 2012 WA State Energy Code: Name: ZACH COLE Phone: (206) 402-9639 Address: 1221 SECOND AVE N, KENT, WA, 98032 Contractor: �/i/%/l�-C L/C/� Name: HERMANSON COMPANY LLP Phone: (206) 575-9700 Address: 1221 2ND AVE N, KENT, WA, 98032- 2945 License No: HERMACLO05BJ Expiration Date: 8/25/2016 Lender: Name: Address: DESCRIPTION OF WORK: INSTALLATION OF 6 NEW VRF INDOOR FAN COILS AND 2 OUTDOOR CONDENSOR UNITS. RELOCATION OF 1 EXISTING VRF FAN COIL AND THE INSTALLATION OF A NEW HEAT RECOVERY UNIT. Valuation of Work: $245,240.00 Fees Collected: $3,013.54 Type of Work: REPLACEMENT Electrical Service Provided by: PUGEST SOUND ENERGY Fuel type: ELECT Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Signature: �/i/%/l�-C L/C/� Date: 06 621// I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature:. ( Date: Print Name: '`T�� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL CITY OF TUKWIL- _ Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. �` a(0o Project No. Date Application Accepted: Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" SITE LOCATION King Co Assessor's Tax No.: 2954900445 Site Address: 6835 Fort Deny Way Tukwila, WA 98168 Suite Number: Floor: Tenant Name: Tahoma Clinic New Tenant: ❑ .....Yes O..No PROPERTY OWNER Name: Tahoma Clinic Address: 6839 Fort Dent Way Suite 206 City: Tukwila State: wa zip: 98188 CONTACT PERSON — person receiving all project communication Name: Zach Cole Address: 1221 2nd Ave N. City: Kent State: wa Zip: 98032 Phone: (206) 402-9639 Fax: Email: Zcole@hermanson.com Valuation of project (contractor's bid price): $ Describe the scope of work in detail: 245,240 MECHANICAL CONTRACTOR INFORMATION Company Name: Hennanson Address: 1221 2nd Ave N City: Kent State: wa zip: 98032 Phone: (206) 575-9700 Fax: Contr Reg No.: HERMACLO05BJ Exp Date: 08/26/2016 Tukwila Business License No.: BUS -0994464 Installation of 6 new VRF indoor fan coils and 2 outdoor condenser units. Relocation of 1 existing VRF Fan coil and the installation of a new heat recovery unit. Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... ® Replacement ........ Fuel Type. Electric..... ® Gas ....... ❑ Other:_ H: ApplicationslForms-Applications On Line�2011 Applications•.Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 Page 1 of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace 6 Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling System 6 Air handling unit <I0,000 cfm Unit Type Qty Air handling unit >I0,000 cfm Evaporator cooler Ventilation fan connected to single duct 6 Ventilation system Hood and duct Incinerator — domestic 6 Incinerator — comm/industrial PERMIT APPLICATION NOTES - Unit Type Qty Fire damper Diffuser Thermostat 6 Wood/gas stove Emergency enerator Other mechanical equipment 6 Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ h /1,750,000 btu Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT BUILDING OWNER OR 06/14/2016 Print Name: Terese Anderson Day Telephone: (206) 200-7804 Mailing Address: 1221 2nd Ave N Kent WA 98032 City State Zip H:Applications'Forms-Applications On Line201 I Applications Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 Page 2 of 2 bh DESCRIPTIONS PermitTRAK • QUANTITY PAID $3,013.54 M16-0100 Address: 6835 FORT DENT WAY Apn: 2954900445 $3,013.54 MECHANICAL $2,897.63 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $2,285.60 PLAN CHECK FEE R000.322.102.00.00 0.00 $579.53 TECHNOLOGY FEE $115.91 TECHNOLOGY FEE TOTALR8735 R000.322.900.04.00 0.00 $115.91 $3,013.54 Date Paid: Tuesday, June 14, 2016 Paid By: TERESE ANDERSON Pay Method: CREDIT CARD 572635 Printed: Tuesday, June 14, 2016 2:24 PM 1 of 1 L-�' I�SYS7EM5 INSPECTION RECORD Retain a copy with permit i�1 & ` 0/G INS ION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: n'fl el -,A)')& Type of Inspection: 2 AAL- AL.A-' Address: dress: fl Date Called: Special Instructions: Date Wante a. lRequest0r: Phone No: Approved per applicable codes. L�J Corrections required prior to approval. COMMENTS: Inspector: Ab Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection INSPECTION RECORD GINS�PE­CTION Retain a copy with permit � C6���'oO N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Projec Type of Inspe tion: 4 A dress: ° 3 Fo Lf- P ek Wq k4 DateCalled: Special Instructions: If Date W/ante I - -z- 2, , 0 ale, P.m. Requester: { ��JJ�� gga— �( c Phone No: f y 01 Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit MI /U0 INS ION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 5outhcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: T��qqe of Inspection: ;i - �+�t-A G�UA,'1 C` CJ Address Date Called: e 39✓ atr LA Special Instructions: Date Wanted: p p. Requester: Phone No: Approved per applicable codes. LJ Corrections required prior to approval. REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD [Ml(t vQ/UQ Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 5outhcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: rA i iC� COAPC Type of Inspection: IC.C`R1 &C-9/A17CAf Address: Date Called: 0 3S' %CWT— L/A'l Special Instructions: Date Wanted, a.m. (� 3 16 p.m. Requester. Phone No: 006 - t -1194y- S011 EjApproved per applicable codes. El Corrections required prior to approval. ©/I REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. )) Hermanson Project: Hermanson Company LLP 1221 2nd Avenue North Kent, WA 98032 tel 206-575-9700 fax 206-575-9800 TAHOMA CLINIC 6835 FORT DENT WAY TU KW I LA WA 98168 Date: June 10, 2016 REVIEWED FOR CODECQMPUANCE APPROVED JUN 2 4 2016 Ci of Tukwila BUIL ING DIVISION Load Calculations M�6-o�00 RECEIV'-=D CITY OF TUKWILA JUN 14 2016 PERMIT CENTER Mechanical Construction, Engineering and Service www.hermanson.com * Hermanson SPACE INPUT DATA System Loads Carrier HAP Version 4.9 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/2016 HERMANSON COMPANY LLP 09:37AM 1-01 NE -SE CR OFFICE 1. General Details: Wall Gross Area (ftZ) Window 1 Qty. Floor Area _ _._ . __ .................. .._._ ._..172.0 ftZ Avg. Ceiling Height ....._..._ .... ..... ... - - ... _...... -- 12.0 ft Building Weight _ ._ _ ._ ... 70.0 lb/ft' 1.1. OA Ventilation Requirements: 0 0 Space Usage __. ._ .. — OFFICE: Office space OA Requirement 1 ...... _ _..__....._ __ ____ ____ -.-.__ 5.0 CFM/person OA Requirement 2 ___ ._...._._. _.. _... 0.06 CFM/ftZ Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type . .... .......... _..._..... Recessed (Unvented) Wattage .... ................. - 0.90 W/ftZ Ballast Multiplier _ _ __ _ _.__ _ __ 1.08 Schedule _ . _ ................ 2417 People/Light Schedule 2.2. Task Lighting: Wattage . --...... - - - _ 0.00 W/ftZ Schedule __ _ ......_ ....._.... None ............................... 2.3. Electrical Equipment: Wattage - ---.._ _ ..._..__.._.. _ _ _ 290.0 Watts Schedule .......................... 24/7 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy - .. ....... 2.0 People Activity Level _ _ _ _ _ Office Work Sensible ........_.................... .... ......_ 245.0 BTU/hr/person Latent - ..... .... _. ........................ 205.0 BTU/hr/person Schedule ._............... ____. 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible _ _ _. - _ -- -- 0 BTU/hr Schedule _. ...... _....... ... None Latent .... _ _ __ 0 BTU/hr Schedule.._ ................. _........... None Exp. Wall Gross Area (ftZ) Window 1 Qty. Window 2 Qty. Door 1 Qty. NE 228.0 19 0 0 SE 108.0 9 0 0 3.1. Construction Types for Exposure NE Wall Type _ __.........._.................._--- EXISTING WALL R-13 1 st Window Type _ _ -...._ - 5.5ft 2p Dark-Shd Metal Frame 3.2. Construction Types for Exposure SE Wall Type ..................... _ _ --l- _ _ EXISTING WALL R-13 1st Window Type _ _ -_ - _ .5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ftZ) Roof Slope (deg.) Skylight Qty. H 172.0 0 0 4.1. Construction Types for Exposure H Roof Type _.. ._ .__. _ __ __ Existing Roof R-19 5. Infiltration: Design Cooling _ __ . ............................ 0.00 ACH Design Heating. . _ _ __ _ _ _ 0.50 ACH Energy Analysis .... ........... ... ........ .... _ - _ _... - - - 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type _ __ Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 1 of 14 Space Input Data TUKTahoma Clinic VRF v4_91 06/10/201E HERM_ANSON COMPANY LLP 09:37AN 1-02 SE Perim Horm Off 1. General Details: Wall Gross Area (ft-) Window 1 Qty. Floor Area - ........ _ - ... 137.0 ft2 Avg. Ceiling Height _ - - - 12.0 ft Building Weight ... 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage. - - . _ _ _.-__.. OFFICE: Office space OA Requirement 1 . 5.0 CFM/person OA Requirement 2 ............ ..... ._ ... _ ... 0.06 CFM/ft2 Space Usage Defaults- ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type - - -- Recessed (Unvented) Wattage .. 0.90 W/ft2 Ballast Multiplier .......... ....... ........ _ .. 1.08 Schedule. _ __ __.._ ..... 24/7 People/Light Schedule 2.2. Task Lighting: Wattage..... . ...... ... -.. ... _._ 0.00 W/ft2 Schedule.......................................................................... None 2.3. Electrical Equipment: Wattage .... ........... ........ ..145.0 Watts Schedule _ _ __.. 24/7 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy ............... ........... .._ _ 1.0 Person Activity Level _ - ............. Office Work Sensible . . 245.0 BTU/hr/person Latent ............................ ......... _ _. 205.0 BTU/hr/person Schedule ........... ... .... . 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible -- - --- - - ........ _ ... ............... _ .. 0 BTU/hr Schedule .... _ - _ _ - None Latent _. - 0 BTU/hr Schedule _ _... None Exp. Wall Gross Area (ft-) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 120.0 10 0 0 3.1. Construction Types for Exposure SE Wall Type _ _ ___..._ . _ _______ _ . _ EXISTING WALL R-13 1st Window Type... ............ ...5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 137.0 0 1 0 4.1. Construction Types for Exposure H Roof Type _.. _ . _ __.__.. ___ _ _ _ . _ Existing Roof R-19 5. Infiltration: Design Cooling 0.00 ACH --------------------------- - Design Heating ...... ......... ....._ ................. - .............. 0.50 ACH Energy Analysis __ __ __ 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type ............ _._... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 2 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/2016 HERMANSON COMPANY LLP 09:37AM 1-03 SE Per ACCOUNT OFF 1. General Details: ........ _ 1.0 Person Floor Area .. - - _ _.. _ - _ 137.0 ftZ Avg. Ceiling Height .. _ _..._................................... 12.0 ft Building Weight ._ _ _ - 70.0 Ib/ftZ 1.1. OA Ventilation Requirements: 2417 People/Light Schedule Space Usage . . ... OFFICE: Office space OA Requirement 1 ............_ ............._____ - .. . .... ... 5.0 CFM/person OA Requirement 2 _____ __ __ __ __ 0.06 CFM/ftz Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type ....... _ ..... Recessed (Unvented) Wattage ............ .. . - _ 0.90 W/ftZ Ballast Multiplier . ... __._ __ 1.08 Schedule . ... ...... ..... ._. 24/7 People/Light Schedule 2.2. Task Lighting: Wattage _.............. - - _..... 0.00 W/ftz Schedule- _ __ _ _ _ None 2.3. Electrical Equipment: Wattage - - - 145.0 Watts Schedule ................. 24/7 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy ........... ........ _ 1.0 Person Activity Level _ ...... Office Work SE Sensible _ _ 245.0 BTU/hr/person Latent ...................... ._ ._ ........ 205.0 BTU/hr/person Schedule .._ . . 2417 People/Light Schedule 2.5. Miscellaneous Loads: Sensible-- ._ ........ _ .......... ............. 0 BTU/hr Schedule _ _ _ - _ None Latent .............. ...... .... .... ...... ... ......... - 0 BTU/hr Schedule . _..... _ .__- None Exp. Wall Gross Area (ft) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 120.0 10 0 0 3.1. Construction Types for Exposure SE Wall Type ........_................................ EXISTING WALL R-13 1st Window Type ___ 5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ftZ) Roof Slope (deg.) Skylight Qty. H 137.0 0 0 4.1. Construction Types for Exposure H Roof Type . _..............._. ....... ............. ........ Existing Roof R-19 5. Infiltration: Design Cooling....... .._ ......................... 0.00 ACH ................. Design Heating _._ _ 0.50 ACH Energy Analysis __ .......... __ _ ___ 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 3 of 14 Space Input Data TUKTahoma Clinic VRF v4_91 06/10/2016 HERMANSON_COMPANY LLP 09:37AIV 1-04 SE Priim ACCOUNTG 1. General Details: Wall Gross Area (ft2) Window 1 Qty. Floor Area - - -- 137.0 ft2 Avg. Ceiling Height. __ 12.0 ft Building Weight.- .. . . .. .. . ............................. __ -- -- _70.0 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage... ___ ... OFFICE: Office space OA Requirement 1 .... ... ... .__. __ ___ __ ___ _ . 5.0 CFM/person OA Requirement 2 _ _ _ . _ _ __ _ 0.06 CFM/ft2 Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type.. ___._. _ __ Recessed (Unvented) Wattage ........ ..... 0.90 W/ft2 Ballast Multiplier .................... __ ........ . _. 1.08 Schedule . _ ._ _ 2417 People/Light Schedule 2.2. Task Lighting: Wattage ...... ......... __ 0.00 W/ft2 Schedule None 2.3. Electrical Equipment: Wattage ............-._.........-- . . .... - 145.0 Watts Schedule _ _ _.._ 2417 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy - _ 1.0 Person Activity Level ................ Office Work Sensible _.. . ...... _ ...........245.0 BTU/hr/person Latent ___ ._ _ __ _ _ _ _ 205.0 BTU/hr/person Schedule _. _ . _ _ _ 2417 People/Light Schedule 2.5. Miscellaneous Loads: Sensible ... _........ . .__. ... .. 0 BTU/hr Schedule - _ _ None Latent... __. _ .... ......... 0 BTU/hr Schedule - - -_ . None Exp. Wall Gross Area (ft2) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 120.0 10 0 0 3.1. Construction Types for Exposure SE Wall Type _ _ ____ _ _ __ _ ___. _._ __ EXISTING WALL R-13 1st Window Type ... ... .... ....... 5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 137.0 0 0 4.1. Construction Types for Exposure H Roof Type ..._. _ . _..._ . ......... Existing Roof R-19 5. Infiltration: Design Cooling _ _.__ _ _ 0.00 ACH Design Heating _._. __... _ _ 0.50 ACH Energy Analysis......................__. 0.00 CFM .................... Infiltration occurs at all hours. 6. Floors: Type ........................ Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 4 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AIV 1-05 SE Perim LC/MS 1. General Details: Wall Gross Area (ft2) Window 1 Qty. Floor Area _ _ _ _ __ . 767.0 ft2 Avg. Ceiling Height ..................................................... 12.0 ft Building Weight - - -.. _ ._._ - -- _ .. _ _ - - - 70.0 lb/ft' 1.1. OA Ventilation Requirements: Space Usage _ .._.. .. .1 OFFICE: Office space OA Requirement 1........................... ............................. ...5.0 CFM/person OA Requirement 2 __ _ 0.06 CFM/ft2 Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type ................................. Recessed (Unvented) Wattage _.. - 0.90 W/ft2 Ballast Multiplier .._ _ _._ . 1.08 Schedule .... ..._.__ ...... 24/7 People/Light Schedule 2.2. Task Lighting: Wattage - - 0.00 W/ft2 Schedule ............. . _............... _. None .............................. 2.3. Electrical Equipment: Wattage _ _. _..- - __.-... - - -_._ 12925.0 Watts Schedule .............. _. 2417 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy _ .-- 4.0 People Activity Level ........... __ Office Work Sensible - _ .__. ___ ............ _ ... 245.0 BTU/hr/person Latent _ _ ...... 205.0 BTU/hr/person Schedule _ _ _ 2417 People/Light Schedule 2.5. Miscellaneous Loads: Sensible ............. ......... ............ _ ...... _ . _ 0 BTU/hr Schedule ..... - --........... None Latent....... _ 0 BTU/hr Schedule -- - - _ _.... ................... ... .......... None Exp. Wall Gross Area (ft2) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 240.0 20 0 0 3.1. Construction Types for Exposure SE Wall Type .. .................... ................ ............. EXISTING WALL R-13 1st Window Type . . 5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 767.0 0 0 4.1. Construction Types for Exposure H Roof Type. _ _.__ _ . __ Existing Roof R-19 ------------------ 5. Infiltration: Design Cooling ................... _ ____ ..._ 0.00 ACH Design Heating 0.50 ACH Energy Analysis ._- _- _ _- _ __ ._ _ 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type ......................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 5 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AIV 1-06 SE Peri HORMN 2302 1. General Details: Wall Gross Area (111:2) Window 1 Qty. Floor Area — - _ 819.0 ft2 Avg. Ceiling Height .. ............................................. 12.0 ft Building Weight..-, .... .. .... 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage ... ............... _. OFFICE: Office space OA Requirement 1 _ _ _ 5.0 CFM/person OA Requirement 2 0.06 CFM/ft2 Space Usage Defaults. ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type Recessed (Unvented) Wattage ___ _ _ . __ _ __ _ 0.90 W/ft2 Ballast Multiplier ......................... ......__ . ........... 1.08 Schedule ................. ... ..... 24/7 People/Light Schedule 2.2. Task Lighting: Wattage _._ _ 0.00 W/ft2 Schedule.......... .... ..............._........ .. .................. None 2.3. Electrical Equipment: Wattage ............................................................900.0 Watts ..... ... Schedule .. _ ._ 2417 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy ... _....__.. 3.0 People Activity Level ... ...__._._..Office Work Sensible ___-. _ ___.....245.0 BTU/hr/person Latent __. _ ... _ .... 205.0 BTU/hr/person Schedule _._ __ _ .... _ _ 2417 People/Light Schedule 2.5. Miscellaneous Loads: Sensible .......... ............ .. ........... - 0 BTU/hr Schedule _. _ None Latent .............. 0 BTU/hr Schedule _ _....._ - _ ...... None Exp. Wall Gross Area (111:2) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 360.0 30 0 0 3.1. Construction Types for Exposure SE Wall Type _ .... _ _ EXISTING WALL R-13 1st Window Type .... 5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 819.0 0 0 4.1. Construction Types for Exposure H Roof Type ...... _ . . Existing Roof R-19 5. Infiltration: Design Cooling -- --- _ _..._ ._ _...---._ ----- --- _. - __ 0.00 ACH Design Heating ................... ............................ 0.50 ACH Energy Analysis 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type .......... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 6 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/2016 HERMANSON COMPANY LLP 09:37AM 1-07 SE ALLERGY OFFICE 1. General Details: Wall Gross Area (ft') Window 1 Qty. Floor Area _ .............. ............... 135.0 ft2 Avg. Ceiling Height . ____ _ __._.. 12.0 ft Building Weight _ .............. 70.0 Ib/ft2 1.1. OA Ventilation Requirements: 0 Space Usage __ _ _ __ .____. __. OFFICE: Office space OA Requirement 1 .._ - _ 5.0 CFM/person OA Requirement 2 ... ..__. ............... - _ - _ 0.06 CFM/ft2 Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type __ _ Recessed (Unvented) Wattage ....... ........ - ........... _ _.._ 0.90 W/ft2 Ballast Multiplier _ _ ._ ._ ___. _ __... 1.08 Schedule _ . ............. 24/7 People/Light Schedule 2.2. Task Lighting: Wattage _ - 0.00 W/ft2 Schedule _..... ................... ............. None 2.3. Electrical Equipment: Wattage _ _-. -- .- ___ __.. 145.0 Watts Schedule _ ............. 24/7 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy................. ... ................. ....................... ........ _ 1.0 Person Activity Level .. Office Work Sensible _. _ .245.0 BTU/hr/person Latent - - - - -- _...- - ._..---- ....................... 205.0 BTU/hr/person Schedule ........................... 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible _ __ __ _ -- . 0 BTU/hr Schedule .................... .............. _...................... None Latent _ _. _._ ____ _ _ _- 0 BTU/hr Schedule..................................................... .. ... None Exp. Wall Gross Area (ft') Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 120.0 10 0 0 SW 48.0 3 0 0 3.1. Construction Types for Exposure SE Wall Type __.._ _ . _ _ __ _ EXISTING WALL R-13 1st Window Type ....... __.5.5ft 2p Dark-Shd Metal Frame 3.2. Construction Types for Exposure SW Wall Type . _ ....... ....._...... ........ .... EXISTING WALL R-13 1st Window Type ___ _ ._.__ 5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ft') Roof Slope (deg.) Skylight Qty. H 135.0 0 0 4.1. Construction Types for Exposure H Roof Type _......._ _ ._ _____ _ _ __ Existing Roof R-19 5. Infiltration: Design Cooling _ _ _ _ _ __ 0.00 ACH Design Heating ........._.... ............ _ 0.50 ACH Energy Analysis _ _.... _ ............ 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type ...._ _____ __ Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 7 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AIV 1-08 SE IT/SERVER 1. General Details: .......................... ........................ 0.0 Person Floor Area _ . _ _ _ .. ___ 300.0 ft2 Avg. Ceiling Height .. _ . ..... 12.0 ft Building Weight ............ ............... _ .......................... 70.0 Ib/ft2 1.1. OA Ventilation Requirements: ...._ . 24/7 People/Light Schedule Space Usage _ . _ __ _ ..... - __ OFFICE: Office space OA Requirement 1 ...._ _ - ......... _ __. 5.0 CFM/person OA Requirement 2 ....._.._ ................._ .................... 0.06 CFM/ft2 Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type .. . .. Recessed (Unvented) Wattage.............................................................................. 0.90 W/ft2 Ballast Multiplier __... _ 1.08 Schedule __ _. ... 24/7 People/Light Schedule 2.2. Task Lighting: Wattage ....... ........... 0.00 W/ft2 Schedule -- None 2.3. Electrical Equipment: Wattage ........._._.............. __ ...._ 5500.0 Watts Schedule _ _ _-- 24/7 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy __........_. .......................... ........................ 0.0 Person Activity Level - .- - - - ... ....... Office Work SE Sensible _. _ -_ 245.0 BTU/hr/person Latent .-.--_..............._...................... _ .205.0 BTU/hr/person Schedule .................... ...._ . 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible - .. .......... ....... ..... ... 0 BTU/hr Schedule _ _ .. None Latent - __... - _........................... . . _ 0 BTU/hr Schedule _ ._ _..-.__. .. None Exp. Wall Gross Area (ft- ) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 168.0 0 0 0 3.1. Construction Types for Exposure SE Wall Type _ ._...___ _ _ _ .. EXISTING WALL R-13 4. Roofs, Skylights: Exp. Roof Gross Area (ft) Roof Slope (deg.) Skylight Qty. H 300.0 0 0 4.1. Construction Types for Exposure H Roof Type _................_.._.....- — ................... Existing Roof R-19 5. Infiltration: Design Cooling _ 0.00 ACH Design Heating _ ___. - -_-- _ _ ._ _.__ _ _ _ _ 0.00 ACH Energy Analysis ._.... - ......... ___. .......... . 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 8 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AIV 1-09 SW ALLERGY 2305 1. General Details: Wall Gross Area (ft2) Window 1 Qty. Floor Area - .... 1150.0 ft2 Avg. Ceiling Height... .... _.............................. 12.0 ft Building Weight..... ..... _ ............. 70.0 Ib/ft2 1.1. OA Ventilation Requirements: 0 0 Space Usage_ _..._ _ _ __ OFFICE: Office space OA Requirement 1 ...................... ...... ___ 5.0 CFM/person OA Requirement 2 .... __ _. ___ - __ 0.06 -- --------------- --- - CFM/ft2 Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type Recessed (Unvented) Wattage_.................. ............................ ............-_...... 0.90 W/ft2 Ballast Multiplier ._ _ _ _ _ 1.08 Schedule _ ___ .._ _ _. 24/7 People/Light Schedule 2.2. Task Lighting: Wattage ..... ..... ... - 0.00 W/ft2 Schedule _ None 2.3. Electrical Equipment: Wattage. — .-.__--- -- ._..- - 1450.0 Watts Schedule ............................. 24/7 People/Light Schedule 3. Walls, Windows, Doors: 2.4. People: Occupancy _ _ __ 8.0 People Activity Level _.. _ . _ Office Work Sensible ... _ - - - .... - ..._ ........... 245.0 BTU/hr/person Latent __ _... - -- - 205.0 BTU/hr/person Schedule __.._ _._ ._.._ 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible.... ........ .- ...... ........... _ .......................... - 0 BTU/hr Schedule __ .._ _ .___. _ _ None Latent.......... ._.......... .._.:......... .................... ........ . 0 BTU/hr Schedule _.. - _..- - - — - None Exp. Wall Gross Area (ft2) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 36.0 3 0 0 SW 588.0 49 0 0 3.1. Construction Types for Exposure SE Wall Type _ ._ __ _..__.-_._. EXISTING WALL R-13 1st Window Type ...... ...... ....5.5ft 2p Dark-Shd Metal Frame 3.2. Construction Types for Exposure SW Wall Type ................................................ EXISTING WALL R-13 1st Window Type ____.__. 5.5ft 2p Dark-Shd Metal Frame 4. Roofs, Skylights: Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 1150.0 0 0 4.1. Construction Types for Exposure H Roof Type ...................... Existing Roof R-19 5. Infiltration: Design Cooling.-.. ...._.___.. __ . __ _. - 0.00 ACH Design Heating .._ ....... . 0.50 ACH Energy Analysis __-_._._ _ 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type . _ _ . _ Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 9 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AIV 1-10 Int ALLERGY 1. General Details: Roof Gross Area (ft') Roof Slope (deg.) Floor Area . _.__ _ _ ___ _ _ _ ._ _ ... 1208.0 ft Avg. Ceiling Height _ ..... 12.0 ft Building Weight .. .... ............ ................ ......... -.. ..... _.. 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage ____ _ _. _. _ _ ___ OFFICE: Office space OA Requirement 1 _ _ .. ___ ....._ ......... .. 5.0 CFM/person OA Requirement 2 _..........._._ ...... ......__ ___ 0.06 CFM/ftz Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type __ . _ Recessed (Unvented) Wattage ............................ 0.90 W/ftz Ballast Multiplier _ _ _ _ __ _._ __.__ .._ 1.08 Schedule _.. _.._ . _ _. 24/7 People/Light Schedule 2.2. Task Lighting: Wattage ......_ ....................... _...... 0.00 W/ftz Schedule - None 2.3. Electrical Equipment: Wattage ...... ..... - - - 3975.0 Watts Schedule 24/7 People/Light Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: 2.4. People: Occupancy _ __..._.._ 4.0 People Activity Level _ _ Office Work Sensible ........ ........... __ - . .245.0 BTU/hr/person Latent - - ._...... .. 205.0 BTU/hr/person Schedule ............................ 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible __ . _ _.._.. __. - ... _._.. 0 BTU/hr Schedule ...._ ..... .... _ ..... None Latent _ _ _ . 0 BTU/hr Schedule ............. ...... __. None Exp. Roof Gross Area (ft') Roof Slope (deg.) Skylight Qty. H 1208.0 0 0 4.1. Construction Types for Exposure H Roof Type .. -- - .._ . ._ .- __ .._ __ Existing Roof R-19 5. Infiltration: Design Cooling ....._____ ..- - _ _. 0.00 ACH Design Heating _ -._ _ .... _....._ 0.00 ACH Energy Analysis . _- ___ ._ __.- __ 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 10 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AN 1-11 Int LAB 1. General Details: Roof Gross Area (ft2) Roof Slope (deg.) Floor Area _ _ _ _.._ ..... __. _ _ .. 595.0 ft2 Avg. Ceiling Height ..... .. ................... - ............. ........._. _. 12.0 It Building Weight _.. _ 70.0 lb/ft' 1.1. OA Ventilation Requirements: Space Usage _ ......... _ ............. OFFICE: Office space OA Requirement 1 .................._.._ ....... .._..__ 5.0 CFM/person OA Requirement 2- -- .. - .- - _. --- - --......._... 0.06 CFM/ft' Space Usage Defaults. ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type . _ .._._.. _ _.._. _.. Recessed (Unvented) Wattage _ .......... ...................... 0.90 W/ft2 Ballast Multiplier ............ .......... _...... _... _...... .- -- __ 1.08 Schedule ... ___..__ 24/7 People/Light Schedule 2.2. Task Lighting: Wattage ......................... ----------- - ......... ........ 0.00 W/ft2 Schedule _. _ ._..._ _ _ _ ____ .. _ .. None 2.3. Electrical Equipment: Wattage .......... .... - _ 725.0 Watts Schedule _ _ _ ..__ _ ... 2417 People/Light Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: 2.4. People: Occupancy . __ __ . 7.0 People Activity Level ................................................. Office Work Sensible .... . ........ _...... .... _.- _........ _.........245.0 BTU/hr/person Latent .. _ _ ....- _. _ .- ._ ..... 205.0 BTU/hr/person Schedule _ _ _ _ 2417 People/Light Schedule 2.5. Miscellaneous Loads: Sensible ...... ........ ......... ...._............_..._ ....... 0 BTU/hr Schedule _ __._ . _.. None Latent ................. .......... ...... _ _ . _ _ 0 BTU/hr Schedule _ ..... None Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 595.0 10 0 4.1. Construction Types for Exposure H Roof Type _ _ _ -- Existing Roof R-19 5. Infiltration: Design Cooling ........-.....- - - - 0.00 ACH Design Heating _ _ ..... ........ 0.00 ACH Energy Analysis __- _ ._..... 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type _ .. .. Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 11 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AN 1-12 Int FREEZER 1. General Details: Roof Gross Area (ft2) Roof Slope (deg.) Floor Area - - 332.0 ft2 Avg. Ceiling Height ... 12.0 ft Building Weight ................. .... ........... ........... ._............ 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage _ _ .___ ._.._ OFFICE: Office space OA Requirement 1 ._. ._ __ - __. 5.0 CFM/person OA Requirement 2 _ ...... ..... ... 0.06 ............................... CFM/ft2 Space Usage Defaults . ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type _. _ Recessed (Unvented) Wattage .................................0.90 W/ft2 Ballast Multiplier- _.1.08 Schedule .__._ ._ ._ .. 24/7 People/Light Schedule 2.2. Task Lighting: Wattage .... __........ ... ... ..... .. 0.00 W/ft2 Schedule - - None 2.3. Electrical Equipment: Wattage ....... ............... ............. ................................ _... 7500.0 Watts Schedule _.._ 24/7 People/Light Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: 2.4. People: Occupancy . ..... ._ ..... _ ..... ....... ..... ... 0.0 Person Activity Level _ Office Work Sensible ........... _... ... _ _ 245.0 BTU/hr/person Latent _.......... ....................... .................... 205.0 BTU/hr/person Schedule .... ........ .... ..... 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible .._. _.._ _ ._ _ _...._ 0 BTU/hr Schedule ................. _ _. _ _. None Latent _ 0 BTU/hr Schedule _ _ _ _ . _ .. - _._ _ None Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 332.0 0 0 4.1. Construction Types for Exposure H Roof Type- _ .._. _. - _ _ .._ Existing Roof R-19 S. Infiltration: Design Cooling ........................ _ ......... ....... 0.00 ACH ..................... . Design Heating __ _ _ 0.00 ACH Energy Analysis ___.......__.. - - ....... _ _......... 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type _ .. __ Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 12 of 14 Space Input Data TUK_Tahoma Clinic VRF v4_91 06/10/201E HERMANSON COMPANY LLP 09:37AN 1-13 Int PROCESSING 2301 1. General Details: Roof Gross Area (ft2) Roof Slope (deg.) Floor Area .................. - _ _ - .278.0 ft' Avg. Ceiling Height -._-_.._. _.. ._ ._. _ __ . 12.0 ft Building Weight- _ ...__.............._....... 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage _____ ..__._.__ __.. OFFICE: Office space OA Requirement 1 _ _ ........ ................. ....5.0 CFM/person OA Requirement 2 .. .............. ....... ........ ... . ___ - _ 0.06 CFM/ft2 Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type _ .......... _ _ ._ Recessed (Unvented) Wattage _ -- - _.___ _ _ _ ___ -. _. 0.90 W/ft2 Ballast Multiplier . . _ _ .... ..............1.08 Schedule ..... ............... 24/7 People/Light Schedule 2.2. Task Lighting: Wattage -.... _.._ _ 0.00 W/ft2 Schedule ...... .......... ......... - None 2.3. Electrical Equipment: Wattage . _ _.._............. .. 580.0 Watts Schedule _ ___ .- 2417 People/Light Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: 2.4. People: Occupancy. - ._ _ __ ____ 4.0 People Activity Level ......... ........ Office Work Sensible ___... ..._ __ .......... __ .......... .... __..245.0 BTU/hr/person Latent __. _ _ _ 205.0 BTU/hr/person Schedule ... - - - - 2417 People/Light Schedule 2.5. Miscellaneous Loads: Sensible .......... ....... ._ ..................................................... . 0 BTU/hr Schedule _. .. -- _ ._ _ ._.._.. -- . -- - None Latent.......... _............................. _....... _.__ ... _ .... 0 BTU/hr Schedule - - None Exp. Roof Gross Area (ft2) Roof Slope (deg.) Skylight Qty. H 278.0 10 0 4.1. Construction Types for Exposure H Roof Type., ._ _ _- -- _.__.._ Existing Roof R-19 5. Infiltration: Design Cooling .........._._............ . _... _ 0.00 ACH Design Heating . _. ___ _ _ ....._ __..........0.00 ACH Energy Analysis _ . _ _ - .- -- - _. 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type _ _ _ _ Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 13 of 14 Space Input Data TUKTahoma Clinic VRF v4_91 06/10/2016 HERM_ANSON COMPANY LLP 09:37AIV 1-14 Int LC -MS Lab 1. General Details: Roof Gross Area (ftZ) Roof Slope (deg.) Floor Area __.__ __ ___ _ 300.0 ftZ Avg. Ceiling Height _ . _ _ _ ____ . _ __ 12.0 ft Building Weight ......... 70.0 Ib/ft2 1.1. OA Ventilation Requirements: Space Usage _... __ .... ..... __ _ OFFICE: Office space OA Requirement 1 _ 5.0 CFM/person OA Requirement 2 .. ................. .._ ... _................ 0.06 CFM/ftZ Space Usage Defaults ASHRAE Standard 62.1-2007 2. Internals: 2.1. Overhead Lighting: Fixture Type . Recessed (Unvented) Wattage _ _..... .. - .. _.. ............ _............ . 0.90 W/ftZ Ballast Multiplier __. _ _ _ .1.08 Schedule ............................ 24/7 People/Light Schedule 2.2. Task Lighting: Wattage - _. 0.00 W/ftZ Schedule None 2.3. Electrical Equipment: Wattage _ ... _ 6000.0 Watts Schedule .._ 2417 People/Light Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: 2.4. People: Occupancy.......... ...... ................... ............ _ 3.0 People Activity Level _ _ _ Office Work Sensible ........ ......... . _ ...._. _ .... ._ .245.0 BTU/hr/person Latent . - - ...... ....... ._........... ...... 205.0 BTU/hr/person Schedule _............. _.......... 24/7 People/Light Schedule 2.5. Miscellaneous Loads: Sensible _ _ -- - - _....... 0 BTU/hr Schedule .....--............_......... _ .._ .. None Latent - _............. ..0 BTU/hr Schedule.._ ............. _ - . - None Exp. Roof Gross Area (ftZ) Roof Slope (deg.) Skylight Qty. H 300.0 0 0 4.1. Construction Types for Exposure H Roof Type _ _ _ _._ _ _ . __ __ _ _ Existing Roof R-19 5. Infiltration: Design Cooling _ 0.00 ACH Design Heating .... _ .. 0.00 ACH Energy Analysis _ - - - . -- 0.00 CFM Infiltration occurs at all hours. 6. Floors: Type .. __ . . ... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data). Hourly Analysis Program v4.91 Page 14 of 14 D Hermanson SYSTEM INPUT DATA System Loads Carrier HAP Version 4.9 NEW Mitsubishi City Multi Input Data Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Prepared by: HERMANSON COMPANY LLP 09:49AM 1. General Details: Air System Name ..... ........ ... ............. ... .... ._... NEW Mitsubishi City Multi Equipment Type __ __ .. . __ __ ____ _ Terminal Units Air System Type .___ _ _ ____ __ _ Packaged DX Fan Coil Numberof zones...... .......... ............................ ... ............... -........ .... _ 10 Ventilation . __ __ .. _ _. _ __ ______ _ _ __ _Common Ventilation System 2. Ventilation System Components: Ventilation Air Data: Airflow Control _ . _ ._ _ ._ .. Constant Ventilation Airflow ------------- Ventilation Sizing Method _ . _ _ _ _ _ Sum of Space OA Airflows Unocc. Damper Position ......... __......................... .._............... ....... ... ................ Open Outdoor Air CO2 Level .... ...... _....... - ...... _. ......... 400 ppm Ventilation Reclaim Data: Reclaim Type.. . ........................................ __ ..... ... ...... Sensible and Latent Heat Thermal Efficiency - - - 50 % Input kW .. _ 0.000 kW Schedule _ _ .. JFMAMJJASOND Ventilation Fan Data: Fan Type ._ _ _ __. Forward Curved Configuration _ _ .. _ ..... ... Draw-thru Fan Performance ... ...... .. ---- - ..... _...._ 0.75 in wg Overall Efficiency __._ __ _ -.... _. 54 % Airflow 100 1 90 1 80 1 70 11 60 50 kWJ 100 1 91 1 81 1 72 1 61 54 % Airflow 1 40 1 30 1 20 1 10 0 % kWJ 46 1 40 1 33 1 27 21 Duct System Data: Return Duct or Plenum Data: Return Air Via ...... ..... Ducted Return 3. Zone Components: Space Assignments: Zone 1: Zone 1 red 1-01 NE -SE CR OFFICE x1 1-02 SE Perim Horm Off x1 1-03 SE Per ACCOUNT OFF x1 1-04 SE Priim ACCOUNTG x1 Zone 2: Zone 2 yellow 1-05 SE Perim LC/MS x1 Zone 3: Zone 3 pink 1-06 SE Peri HORMN 2302 x1 1-07 SE ALLERGY OFFICE x1 Zone 4: Zone 4 blue 1-08 SE IT/SERVER x1 Zone 5: Zone 5 green 1-09 SW ALLERGY 2305 x1 Zone 6: Zone 6 red/orange 1-10 Int ALLERGY x1 Zone 7: Zone 7 light blue 1-11 Int LAB x1 Zone 8: Zone 8 purple 1-12 Int FREEZER x1 Zone 9: Zone 9 small green 1-13 Int PROCESSING 2301 x1 Zone 10: Zone 10 orange 1-14 Int LC -MS Lab x1 Hourly Analysis Program v4.91 Page 1 of 3 NEW Mitsubishi City Multi Input Data Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Prepared by: HERMANSON COMPANY LLP 09:49AIV Thermostats and Zone Data: Supply Airflow Zone Htg Unit Reheat Coil (CFM) (MBH) (MBH) Zone........ ............. ..... ................ All Cooling T -stat: Occ.... .......__ .... .._._ - 75.0 °F Cooling T -stat: Unocc. _ ._ _.. _ 85.0 °F Heating T -stat: Occ. _ - - _ _ 70.0 °F Heating T -stat: Unocc. _ ....... _ ..... .. 60.0 °F T -stat Throttling Range ........... __..........- - - 1.00 °F Thermostat Schedule __ ......- ................................Seattle Office HVAC Sch. Unoccupied Cooling is __.._ .___ Available Common Terminal Unit Data: Supply Airflow Zone Htg Unit Reheat Coil (CFM) (MBH) (MBH) Cooling Coil: - ---...._.... _ .... All Design Supply Temperature __ _ _ 55.0 °F Coil Bypass Factor _ 0.100 Cooling Source ................................. ...................................................... ... Air -Cooled DX Schedule -- - -- -- _- - -_ JFMAMJJASOND Heating Coil: Design Supply Temperature _ __ 95.0 °F Heating Source _ ........ _ _ _ _ _ Air Source Heat Pump Schedule _ _. _ JFMAMJJASOND Fan Control __ .._ _ _ _ _ _ _ .__ . _ Fan On Terminal Units Data: Supply Airflow Zone Htg Unit Reheat Coil (CFM) (MBH) (MBH) Zone... - ........ _ ............ ........... ............... - ---...._.... _ .... All Terminal Type _. Fan Coil Minimum Airflow ... ....... _ 0.30 CFM/ft' Fan Performance _ - -- - 0.50 in wg Fan Overall Efficiency _ ........._._ .........._ .... ... ..... .... .......... .......__ ..... __ 50 % 4. Sizing Data (Computer -Generated): System Sizing Data: Sizing Data: Cooling Supply Temperature... . _ __ ... _ ._ _. _ _. _55.0 °F Heating Supply Temperature .._............_.__._....... ° Hydronic Sizing Specifications: Chilled Water Delta -T ........... ° Hot Water Delta -T _ ... _____ .___ - .._ . _ .-. __ . _ _ _... 20.0 °F Safety Factors: Cooling Sensible . - - - - - - - - . 0 % CoolingLatent........... _ .............. .............. .......... .... .............. .............. ................. 0 % Heating _. __ . ___ _ . - _.. 0 % Zone Sizing Data: Zone Airflow Sizing Method Sum of space airflow rates Space Airflow Sizing Method ._ ............... ................. Individual peak space loads Zone Supply Airflow Zone Htg Unit Reheat Coil (CFM) (MBH) (MBH) Ventilation (CFM) 1 1093.0 - - 60.0 2 2601.4 - - 66.0 3 1102.5 - - 77.2 4 970.2 - - 18.0 5 1530.5 - - 109.0 6 962.4 - - 92.5 7 334.1 - - 70.7 8 1280.6 - - 19.9 9 203.2 - - 36.7 10 1067.0 - - 33.0 Hourly Analysis Program v4.91 Page 2 of 3 NEW Mitsubishi City Multi Input Data Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Prepared by: HERMANSON COMPANY LLP 09:49AM 5. Equipment Data Terminal Cooling Units - Air -Cooled DX Zone Estimated Maximum Load MBH Design OAT °F Equipment Sizing Gross Cooling Capacity MBH Capacity Oversizing Factor % Compressor + OD Fan Power kW ARI Performance Rating Units Conventional Cutoff OAT °F 1 26.2 95.0 Auto -Sized - 0 0 11.000 EER 0.0 2 61.1 95.0 Auto -Sized - 0 0 11.000 EER 0.0 3 27.9 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 4 23.6 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 5 37.1 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 6 26.9 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 7 9.7 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 8 31.0 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 9 5.7 95.0 Auto -Sized - 0 0 - 11.000 EER 0.0 10 26.0 95.0 Auto -Sized -1 0 0 - 11.000 EER 0.0 Terminal Heating Units - ASHP Zone Estimated Maximum Load MBH Design OAT "F Equipment Sizing Gross Heating Capacity MBH Capacity Oversizing Factor % Compressor + OD Fan Power kW ARI Performance Rating Units Cutoff OAT °F 1 14.4 47.0 Auto -Sized 0 - 3.200 COP -15.0 2 8.8 47.0 Auto -Sized 0 - 3.200 COP -15.0 3 14.8 47.0 Auto -Sized 0 - 3.200 COP -15.0 4 1.1 47.0 Auto -Sized - 0 - 3.200 COP -15.0 5 18.1 47.0 Auto -Sized 0 - 3.200 COP -15.0 6 4.6 47.0 Auto -Sized 0 - 3.200 COP -15.0 7 2.7 47.0 Auto -Sized 0 - 3.200 COP -15.0 8 0.5 47.0 Auto -Sized - 0 - 3.200 COP -15.0 9 1.3 47.0 Auto -Sized 0 - 3.200 COP -15.0 10 1 0.9 47.01 Auto -Sized 0 - 3.200 COP -15.0 Auxiliary Heating Type __..._ ._ _ _ .___.._ . Electric Resistance Auxiliary Heating Upper Cutoff . ....... .................._..._._............._.._...._ .............. 40.0 °F Hourly Analysis Program v4.91 Page 3 of 3 0 Hermanson SYSTEM OUTPUT DATA System Loads Carrier HAP Version 4.9 Common Ventilation Unit Sizing Summary for NEW Mitsubishi City Multi Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Prepared by: HERMANSON COMPANY LLP 09:49AM Air System Information Air System Name _ _ __ NEW Mitsubishi City Multi Equipment Class..... TERM . ................ . Air System Type _ _ ........ -_ ... - - - - PKG-FC Sizing Calculation Information Calculation Months _ . _ ___ __._._ __ _____ Jan to Dec Sizing Data. __.._. _ .__. _ _ . Calculated Ventilation Fan Sizing Data Actual max CFM ..._ __ ...__ _.... __ 583 CFM Standard CFM ... _ ...... _ .......... _............ ........ .... _. 574 CFM Actual max CFM/ft2......_.__.... 0.09 CFM/ft2 Outdoor Ventilation Air Data Design airflow CFM _ _. _.._._ 583 CFM CFM/ft2. 0.09 CFM/ft2 Number of zones .. _..... . _ 10 Floor Area _ ... _ _ .... ........ ..... .... 6467.0 ft2 Location _ _ - _ Tukwila, Washington Zone CFM Sizing Sum of space airflow rates Space CFM Sizing _ _ Individual peak space loads Fan motor BHP .. __..... _ _ _ _ _ _ 0.12 BHP Fan motor kW ... ..... _ _.. 0.09 kW Fan static . . . ..... . ....... ....... 0.75 in wg CFM/person . _ 14.95 CFM/person Hourly Analysis Program v4.91 Page 1 of 5 Zone Sizing Summary for NEW Mitsubishi City Multi Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Prepared by: HERMANSON COMPANY LLP 09:49AM Air System Information Air System Name NEW Mitsubishi City Multi Number of zones _ 10 Equipment Class TERM Floor Area 6467.0 ft' Air System Type PKG-FC Location _ Tukwila, Washington Sizing Calculation Information 55.0/53.6 - Aug 1200 Calculation Months Jan to Dec Zone CFM Sizing Sum of space airflow rates Sizing Data Calculated Space CFM Sizing Individual peak space loads Terminal Unit Sizing Data - Cooling Zone Name Total Coil Load (MBH) Sens Coil Load (MBH) Coil Entering DB/WB (°F) Coil Leaving DB/WB (°F) Water Flow @ 10.0 °F (gpm) Time of Peak Coil Load Zone CFM/ftz Zone 1 red 26.2 25.3 76.8/62.1 55.0/53.6 - Aug 1200 1.87 Zone 2 yellow 61.1 59.9 76.7/62.0 55.0/53.61 - Aug 1200 3.39 Zone 3 pink 27.9 26.5 77.6/62.5 55.0/53.6 - Aug 1200 1.16 Zone 4 blue 23.6 23.1 77.4/62.2 55.0/53.6 - Aug 0600 3.23 Zone 5 green 37.1 35.5 76.9/62.3 55.1/53.7 - Sep 1600 1.33 Zone 6 red/orange 26.9 25.0 79.5/63.3 55.0/53.5 - Aug 0600 0.80 Zone 7 light blue 9.7 8.8 79.8/63.6 55.0/53.5 - Jun 1500 0.56 Zone 8 purple 31.0 30.5 77.4/62.2 55.0/53.6 - Aug 0600 3.86 Zone 9 small green 5.7 5.2 79.3/63.3 55.0/53.51 - Jun 1500 0.73 Zone 10 orange 26.0 25.41 77.4/62.2 55.0/53.61 - Aug 0600 3.56 Terminal Unit Sizing Data - Heating, Fan, Ventilation Zone Name Heating Coil Load (MBH) Heating Coil Ent/Lvg DB (°F) Htg Coil Water Flow @20.0 °F (gpm) Fan Design Airflow (CFM) Fan Motor (BHP) Fan Motor (kW) OA Vent Design Airflow (CFM) Zone 1 red 14.4 68.8/81.2 - 1093 0.162 0.128 60 Zone 2 yellow 8.8 69.5/72.7 - 2601 0.385 0.305 66 Zone 3 pink 14.8 68.4/81.0 - 1103 0.163 0.129 77 Zone 4 blue 1.1 69.8/70.9 - 970 0.143 0.114 18 Zone 5 green 18.1 68.4/79.5 0.7 1530 0.226 0.180 109 Zone 6 red/orange 4.6 68.2/72.7 22.7 962 0.142 0.113 92 Zone 7 light blue 2.7 65.4/72.9 334 0.049 0.039 71 Zone 8 purple 0.5 69.7/70.0 1281 0.189 0.150 20 Zone 9 small green 1.3 66.1 /71.9 203 0.030 0.024 37 Zone 10 orange 0.9 69.3/70.1 1067 0.158 0.125 33 Zone Peak Sensible Loads Zone Name Zone Cooling Sensible (MBH) Time of Peak Sensible Cooling Load Zone Heating Load (MBH) Zone Floor Area (ftz) Zone 1 red 22.3 Aug 1200 13.3 583.0 Zone 2 yellow 55.3 Sep 1200 8.5 767.0 Zone 3 pink 23.3 Sep 1200 13.5 954.0 Zone 4 blue 20.6 Jul 1500 1.1 300.0 Zone 5 green 32.5 Sep 1600 16.3 1150.0 Zone 6 red/orange 20.5 Jun 1600 2.5 1208.0 Zone 7 light blue 7.1 Jun 1600 1.2 595.0 Zone 8 purple 27.2 Jun 1600 0.7 332.0 Zone 9 small green 4.3 Jun 1600 0.6 278.0 Zone 10 orange 22.7 Jun 1600 0.6 300.0 Hourly Analysis Program v4.91 Page 2 of 5 Zone Sizing Summary for NEW Mitsubishi City Multi Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Pre ared by: HERMANSON COMPANY LLP 09:49AM Space Loads and Airflows Zone Name I Space Name Mult. Cooling Sensible MBH Time of Peak Sensible Load Air Flow CFM Heating Load MBH) Floor Area (ft2) Space CFM/ft' Zone 1 red 1-01 NE -SE CR OFFICE 1 8.5 Jun 1200 402 5.7 172.0 2.34 1-02 SE Perim Horm Off 1 4.9 Sep 1200 230 2.5 137.0 1.68 1-03 SE Per ACCOUNT OFF 1 4.9 Sep 1200 230 2.5 137.0 1.68 1-04 SE Priim ACCOUNTG 1 4.9 Sep 1200 230 2.5 137.0 1.68 Zone 2 yellow 1-05 SE Perim LC/MS 1 55.3 Sep 1200 2601 8.5 767.0 3.39 Zone 3 pink 1-06 SE Peri HORMN 2302 1 17.8 Sep 1200 839 10.5 819.0 1.02 1-07 SE ALLERGY OFFICE 1 5.6 Sep 1300 263 3.0 135.0 1.95 Zone 4 blue 1-08 SE IT/SERVER 1 20.6 Jul 1500 970 1.1 300.0 3.23 Zone 5 green 1-09 SW ALLERGY 2305 1 32.5 Sep 1600 1530 16.3 1150.0 1.33 Zone 6 red/orange 1-10Int ALLERGY 1 20.5 Jun 1600 962 2.5 1208.0 0.80 Zone 7 light blue 1-11 Int LAB 1 7.1 Jun 1600 334 1.2 595.0 0.56 Zone 8 purple 1-12 Int FREEZER 1 27.2 Jun 1600 1281 0.7 332.0 3.86 Zone 9 small green 1-13 Int PROCESSING 2301 1 4.3 Jun 1600 203 0.6 278.0 0.73 Zone 10 orange 1-14 Int LC -MS Lab 1 22.7 Jun 1600 1067 0.6 300.0 3.56 Hourly Analysis Program v4.91 Page 3 of 5 Ventilation Sizing Summary for NEW Mitsubishi City Multi Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Prepared by: HERMANSON COMPANY LLP 09:49AM 1. Summary Ventilation Sizing Method Sum of Space OA Airflows Design Ventilation Airflow Rate _ _ __ 583 CFM 2. Space Ventilation Analysis Table Zone Name / Space Name Mult. Floor Area (ft') Maximum Occupants Maximum Required Supply Air Outdoor Air (CFM) (CFM/person) Required Outdoor Air (CFM/ft') Required Outdoor Air (CFM) Required Outdoor Air (% of supply) Uncorrected Outdoor Air (CFM) Zone 1 red 1-01 NE -SE CR OFFICE 1 172.0 2.0 402.0 5.00 0.06 0.0 0.0 20.3 1-02 SE Perim Horm Off 1 137.0 1.0 230.3 5.00 0.06 0.0 0.0 13.2 1-03 SE Per ACCOUNT OFF 1 137.0 1.0 230.3 5.00 0.06 0.0 0.0 13.2 1-04 SE Priim ACCOUNTG 1 137.0 1.0 230.3 5.00 0.06 0.0 0.0 13.2 Zone 2 yellow 1-05 SE Perim LC/MS 1 767.0 4.0 2601.4 5.00 0.06 0.0 0.0 66.0 Zone 3 pink 1-06 SE Peri HORMN 2302 1 819.0 3.0 839.4 5.00 0.06 0.0 0.0 64.1 1-07 SE ALLERGY OFFICE 1 135.0 1.0 263.2 5.00 0.06 0.0 0.0 13.1 Zone 4 blue 1-08 SE IT/SERVER 1 300.0 0.0 970.2 5.00 0.06 0.0 0.0 18.0 Zone 5 green 1-09 SW ALLERGY 2305 1 1150.0 8.0 1530.5 5.00 0.06 0.0 0.0 109.0 Zone 6 red/orange 1-10 Int ALLERGY 1 1208.0 4.0 962.4 5.00 0.06 0.0 0.0 92.5 Zone 7 light blue 1-11 Int LAB 1 595.0 7.0 334.1 5.00 0.06 0.0 0.0 70.7 Zone 8 purple 1-12 Int FREEZER 1 332.0 0.0 1280.6 5.00 0.06 0.0 0.0 19.9 Zone 9 small green 1-13 Int PROCESSING 2301 1 278.0 4.0 203.2 5.00 0.06 0.0 0.0 36.7 Zone 10 orange 1-14 Int LC -MS Lab 1 300.0 3.0 1067.0 5.00 0.06 0.0 0.0 33.0 Totals (incl. Space Multipliers) 11144.7 583.0 Hourly Analysis Program v4.91 _ Page 4 of 5 Air System Design Load Summary for NEW Mitsubishi City Multi Project Name: TUK_Tahoma Clinic VRF v4_91 06/10/2016 Pre ared by: HERMANSON COMPANY LLP 09:49AM Hourly Analysis Program v4.91 Page 5 of 5 DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1500 COOLING OA DB / WB 84.5 °F 165.8 °F HEATING DATA AT DES HTG HEATING OA DB / WB 24.0 °F / 19.2 °F ZONE LOADS Details Sensible Latent (BTU/hr) (BTU/hr) Details Sensible Latent (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 952 ftZ 44422 - 952 ftZ - - Wall Transmission 1305 ftz 2750 - 1305 ftZ 4046 - Roof Transmission 6467 ftZ 8925 - 6467 ftz 13340 - Window Transmission 952 ftZ 3208 - 952 ftZ 24073 - Skylight Transmission 0 ftZ 0 - 0 ftZ 0 - Door Loads 0 ft, 0 - 0 ftZ 0 Floor Transmission 0 ftZ 0 - 0 ft2 0 Partitions 0 ftZ 0 - 0 ftZ 0 Ceiling 0 ftZ 0 - 0 ftZ 0 Overhead Lighting 6286 W 21447 - 0 0 - Task Lighting 0 W 0 - 0 0 Electric Equipment 40425 W 137930 - 0 0 - People 39 9555 7995 0 0 0 Infiltration - 0 0 - 16883 0 Miscellaneous - 0 0 - 0 0 Safety Factor 0%/0% 0 0 0% 0 0 >> Total Zone Loads 228236 7995 58342 0 Zone Conditioning - 248743 7995 - 57764 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 0% 0 - 0 0 - Plenum Lighting Load 0% 0 - 0 0 - Exhaust Fan Load 583 CFM 0 - 583 CFM 0 - Ventilation Load 583 CFM 2331 855 583 CFM 14161 0 Ventilation Fan Load 583 CFM 324 - 583 CFM -324 - Space Fan Coil Fans - 4461 - - -4461 Duct Heat Gain / Loss 0% 0 - 0% 0 - >> Total System Loads 255860 8850 67140 0 Terminal Unit Cooling - 255860 9007 - 0 0 Terminal Unit Heating 0 - - 67140 - >> Total Conditioning 255860 9007 67140 0 Key: Positive values are clg loads Negative values are htg loads Positive values are htg loads Negative values are clg loads Hourly Analysis Program v4.91 Page 5 of 5 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0100 PROJECT NAME: TAHOMA CLINIC SITE ADDRESS: 6835 FORT DENT WAY DATE: 06/14/16 X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter #, DEPARTMENTS: �1►UCi & • 11.1 Budding Division Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) Revision # after Permit Issued ft qo_ �.�z' I(P Fire Prevention M Planning Division ❑ Structural ❑ Permit Coordinator 0 DATE: 06/16/16 Structural Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07/14/16 Approved ❑ Approved with Conditions d Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/1812013 HERMANSON COMPANY LLP Borne Espanol Contact Safety & Health Claims & Insurance Washington State Department of Labor & Industries HERMANSON COMPANY LLP Owner or tradesperson Principals NICOLAISEN, KNUT H, PARTNER/MEMBER BROCK, DANIEL L, PARTNER/MEMBER FOX, DEAN M, PARTNER/MEMBER HENGEL, STEPHEN A, PARTNER/MEMBER DYCKMAN,KENNETH A, PARTNER/MEMBER ROBINETT, PAUL J, PARTNER/MEMBER HERMANSON, RICHARD L, PARTNER/MEMBER ALMON, KEVIN, PARTNER/MEMBER (End: 08/05/2010) MACDONALD, JAMES, PARTNER/MEMBER (End: 08/05/2010) Doing business as HERMANSON COMPANY LLP 1221 2ND AVE N KENT, WA 98032-2945 206-575-9700 KING County WA UBI No. Business type 602 004 844 Limited Liability Partnership Governing persons CORP HERMANSON LLC HERMANSON GROUP; License Page I of 3 Search L&I����xi A-% Index Help My IA -I Workplace Rights Trades & Licensing Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor. Active. .......................................... Meets current requirements. License specialties GENERAL License no. HERMACL005BJ Effective — expiration 01/1112000— 08/25/2016 Bond ............ WESTERN SURETY CO $12,000.00 Bond account no. 929381801 Received by L.&I Effective date 12/01/2005 01/01/2006 Expiration date Until Canceled https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=602004844&LIC=HERMACLO05BJ&SAW= 6/27/2016 A AMPS IE INVERT ELEVATION AC AIR CONDITIONING IEER INTEGRATED ENERGY EFFICIENCY RATIO ACH AIR CHANGES PER HOUR IMC INTERNATIONAL MECHANICAL CODE ACT ACOUSTICAL CEILING TILE IN INCHES AD ACCESS DOOR IN WG INCHES WATER GAUGE ADD'L ADDITIONAL IPLV INTEGRATED PART LOAD VALUE AFF ABOVE FINISHED FLOOR KW KILOWATTS AFG ABOVE FINISHED GRADE LAT LEAVING AIR TEMPERATURE AHU AIR HANDLING UNIT LB/LBS POUND/POUNDS ALUM ALUMINUM LF/LIN FT LINEAL FOOT/FEET AMP/AMPS AMPERAGE LPG LIQUID PROPANE GAS AP ACCESS PANEL LPS LOW PRESSURE STEAM ARCH ARCHITECT LVG LEAVING BC BEADED COLLAR LWA SOUND POWER RATING LEVEL (IN DB) BDD BACKDRAFT DAMPER LWG LOW WALL GRILLE BF BELOW FLOOR LWT LEAVING WATER TEMPERATURE BHP BRAKE HORSEPOWER MAX MAXIMUM BLDG BUILDING MAU MAKE UP AIR UNIT BOD BOTTOM OF DUCT MBH 1000 BRITISH THERMAL UNITS/HOUR BOP BOTTOM OF PIPE MCA MINIMUM CIRCUIT AMPACITY BOT BOTTOM MD MOTORIZED DAMPER BS BIRD SCREEN / BLACK STEEL MFR MANUFACTURER BTU BRITISH THERMAL UNIT MISC MISCELLANEOUS BTUH BRITISH THERMAL UNITS PER HOUR MIN MINIMUM/MINUTE CAP CAPACITY MPS MEDIUM PRESSURE STEAM CC CONTROLS CONTRACTOR MT MOUNT CD CEILING DIFFUSER/CONDENSATE DRAIN MTD MOUNTED CDWR CONDENSER WATER RETURN MUW MAKE-UP WATER CDWS CONDENSER WATER SUPPLY NA NOT APPLICABLE CFM CUBIC FEET PER MINUTE NC NORMALLY CLOSED/NOISE CRITERIA CHWR CHILLED WATER RETURN NG/NGAS NATURAL GAS CHWS CHILLED WATER SUPPLY NIC NOT IN CONTRACT CLG CEILING NO NORMALLY OPEN/NUMBER COL COLUMN NPW NON -POTABLE WATER CONC CONCRETE N -R NON-RESIDENTIAL COND CONDENSATE OA/OSA OUTSIDE AIR CONN CONNECT/CONNECTED/CONNECTION OBD OPPOSED BLADE DAMPER CONT CONTINUOUS/CONTINUATION OD OUTSIDE DIAMETER/DIMENSION CONTR CONTRACTOR PCF POUNDS PER CUBIC FOOT COORD COORDINATE PD PRESSURE DROP COP COEFFICIENT OF PERFORMANCE PH PHASE CT COOLING TOWER POC POINT OF CONNECTION CU CUBIC/CONDENSER UNIT P/PRESS PRESSURE CW DOMESTIC COLD WATER/CONDENSER WATER PSI POUNDS PER SQUARE INCH DB DUCTBOARD/DRY BULB/DECIBEL PSIG POUNDS PER SQUARE INCH GAUGE DDC DIRECT DIGITAL CONTROL QTY QUANITY DEFL DEFLECTION R RETURN GRILLE/RELOCATED/RETURN DEG DEGREE/DEGREES RA RETURN AIR DIA DIAMETER RD/RND ROUND DMPR DAMPER REF REFERENCE DN DOWN REQ REQUIRED DWG DRAWING RESID RESIDENTIAL EXH EXHAUST RF RELIEF EA EACH RG REFRIGERANT DISCHARGE GAS EAT ENTERING AIR TEMPERATURE RL REFRIGERANT LIQUID EC EGGCRATE GRILLE/END CAP/ELEC CONTRACTOR RPM REVOLUTIONS PER MINUTE EER ENERGY EFFICIENT RATING RS REFRIGERANT SUCTION EF EXHAUST FAN S SUPPLY EFF EFFICIENCY SA SUPPLY AIR EL ELEVATION SAT SATURATION/SUPPLY AIR TEMPERATURE ELEC/ELECT ELECTRICAL/ELECTRIC SD SMOKE DETECTOR EMCS ENERGY MANAGEMENT CONTROL SYSTEM S/D SLIP & DRIVE CONNECTION ENT ENTERING S -C SEATTLE CODE EQUIP EQUIPMENT SEER SEASONAL ENERGY EFFICIENCY RATING ESP EXTERNAL STATIC PRESSURE SENS SENSIBLE EWT ENTERING WATER TEMPERATURE - SL SOUND LINED EXIST EXISTING SM SHEETMETAL EXH EXHAUST SPEC SPECIFICATION F FAHRENHEIT SO SCREENED OPENING FAC FIRE ALARM CONTRACTOR SOG SLAB ON GRADE FD FIRE DAMPER SP STATIC PRESSURE FDC FIRE DEPARTMENT CONNECTION SF SQUARE FEET FF FINISHED FLOOR SS STAINLESS STEEL FIC FURNISHED AND INSTALLED BY CONTRACTOR STRUC STRUCTURAL FIO FURNISHED AND INSTALLED BY OWNER TA TRANSFER AIR FLA FULL LOAD AMPS TEMP TEMPERATURE/TEMPORARY FLEX FLEXIBLE TBD TO BE DETERMINED FLR FLOOR TOD TOP OF DUCT FOB FLAT ON BOTTOM TOS TOP OF STEEL/TOP OF SLAB FOIC FURNISHED BY OTHERS, TOT TOTAL INSTALLED BY CONTRACTOR TSP TOTAL STATIC PRESSURE FOS FLAT ON SIDE TSTAT THERMOSTAT FOT FLAT ON TOP TYP TYPICAL FP FIRE PROTECTION UH UNIT HEATER FPM FEET PER MINUTE UNO UNLESS NOTED OTHERWISE FSD FIRE/SMOKE DAMPER V VOLT FT FOOT/FEET VD VOLUME DAMPER FUT FUTURE VEL VELOCITY FV FACE VELOCITY VERT VERTICAL G GRILLE VFD VARIABLE FREQUENCY DRIVE GA GAUGE/GALLON VOL VOLUME GALV GALVANIZED W WRAPPED DUCT GC GENERAL CONTRACTOR WB WET BULB GPM GALLONS PER MINUTE WG WATER GAUGE GRD GRILLE/REGISTER/DIFFUSER W/ WITH GWB GYPSUM WALL BOARD W/0 WITHOUT HD HEAD W/SF WATTS PER SQUARE FOOT HORIZ HORIZONTAL WSEC WASHINGTON STATE ENERGY CODE HP HORSEPOWER HR HOUR HSPF HEATING SEASONAL PERFORMANCE FACTOR HT HEIGHT HWTG HIGH WALL TRANSFER GRILLE HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER HZ HERTZ IBC INTERNATIONAL BUILDING CODE ICW INDUSTRIAL COLD WATER ID INSIDE DIAMETER/DIMENSION MECHANICAL LEGEND 10X10 RECT SUPPLY AIR DUCT 10X0-® UP/TOWARD 1OX10'; RECT SUPPLY AIR DUCT 10X1� DN/AWAY 10X10 RECT EXHAUST OR RETURN DUCT 1OXIO UP/TOWARD 10X10;, RECT EXHAUST OR RETURN DUCT 1OX10 DN/AWAY 109 100 ,, ROUND DUCT - UP/TOWARD 100 100 ROUND DUCT - DN/ AWAY S12X1O0ffl FLATOVAL DUCT - UP/ TOWARD 12X100j FLATOVAL DUCT - DN/ AWAY E0 ,:13 ' DUCT OVERLAP 100 BOOT TAP 100 100 45' TAP 100'VOLUME DAMPER 10�-� a B� RISE(R) & DROP(D) TRANSITION ' TURNING VANES/SPLITTERS s DUCT MOUNTED SMOKE DETECTOR n BACK DRAFT DAMPER FLEXIBLE DUCT AIR FLOW (FORCED AIR) COMBINATION FSD FIRE DAMPER SMOKE DAMPER MOTOR OPERATED DAMPER ACCESS DOORS SOUND TRAP FLEX CONNECTION 16X165L ACOUSTICALLY LINED DUCT (SL) FABRIC DUCT CLEARANCE ® SUPPLY AIR DIFFUSER (WITH CORE BLANKOFF) CEILING RETURN, TRANSFER OR EXHAUST AIR GRILLE SLOTTED DIFFUSER (PLAN VIEW) Q REVISION CLOUD & TRIANGLE 1#0 ROUND DUCT SYMBOL ##X## 0 FLATOVAL DUCT SYMBOL ##' DEGREES SYMBOL ® POINT OF CONNECTION CD1-100 GRD TAG IDENTIFIER = TYPE -CFM 80 SIZE (D T'STAT/TEMP SENSOR ®o CARBON DIOXIDE H HUMIDITY SENSOR SENSOR sD SMOKE DETECTOR @ CARBON MONOXIDE sP STATIC PRESSURE SENSOR SENSOR MECHANICAL GENERAL NOTES 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE 2012 IBC, 2012 WSEC, & 2012 IMC. 2. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNLESS NOTED OTHERWISE. 3. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE ENGINEER PRIOR TO PROCEEDING. 6. ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNLESS NOTED OTHERWISE. 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4" CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DANPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS AFTER LINING HAS BEEN ACCOUNTED FOR. 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY FUEL BURNING EQUIPMENT OR 3 FEET BELOW ANY PLUMBING VENT OR EXHAUST OUTLET WITHIN 10 FEET 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING: -0% TO 100% OF THE DESIGN SUPPLY AIR -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE EQUIPPED WITH MOTORIZED (OR GRAVITY DAMPERS PER EXCEPTIONS IN C403.2.4.4) WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE. 13. THE CONTROL SYSTEM SHALL BE 7 -DAY PROGRAMMABLE, CAPABLE OF BEING SET FOR SEVEN (7) DIFFERENT DAY TYPES PER WEEK, AND CAPABLE OF A DEADBAND SETTING OF AT LEAST 56F (19F FOR RESIDENTOPLY BETWEEN THE HEATING AND COOLING SETPOINTS. AHU CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF RESETTING AIR TEMPERATURES BY REPRESENTATIVE BUILDING LOADS. 14. RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE WASHINGTON STATE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. COMMISSIONING, SYSTEM BALANCING, RECORD DRAWINGS AS REQUIRED PER THE WASHINGTON STATE ENERGY CODE C408. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT MEfiHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING IN EXCESS OF 2000 CFM [INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH AN AGGREGATE SUPPLY GREATER THAN 2000 CFM] OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM, 22. FOR ALL "SEALED AIR TIGHT" SHAFTS OR ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS INSIDE THE SHAFT SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT, (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE SHAFT SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE -ANY PENETRATIONS OF THE SHAFT CONSTRUCTION DUCTWORK CONDUIT, PIPING, ...) SHALL BE SEALED ON BOTH SIDES -USE SECTION 909.5 OF THE 2012 IBC FOR MAX A LOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS, AND OPEN AGAINST THE DIRECTION OF ROOM/SHAFT PRESSURE. 23. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENTS. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 ASID SMOKE DEVELOPED RATING SHALL BE < 50. USE FLEXIDUCT MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATONS OR APPROVED EQUAL. 24. LOCATION AND DETAILS OF EQUIPMENT DUCT ROUTING AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH OTHER TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. 25. FOR RESIDENTIAL INSULATION ON DUCTWORK AND PIPING SEE ENERGY CODE CHAPTER R403. 26. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION. A PERMANENT AND VISIBLE DISPLAY IS TO BE PROVIDED FOR EACH BUILDING, READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL EXISTING DUCTWORK LAST UPDATED DEMO DUCTWORK DUCT TYPE WALL -MOUNTED GRILLE �- PIPE ELBOW UP SUPPLY & RETURN PIPE ELBOW DN R-8 DIRECTION OF FLOW -" DIRECTION OF SLOPE DOWN SEE NOTES 4 & 5 7 PLUG OR CAP NOT WITHIN CONDITIONED SPACE: INSIDE BUILDING PRESS REDUCING ASSEMBLY -��--� SOLENOID VALVE WITHIN CONDITIONED SPACE PUMP z---CHWS /CHWR-5 CHILLED WATER SUPPLY/RETURN 2- RL/RS -s REFRIGERANT LIQUID/SUCTION 2-- NG --S NATURAL GAS 2- LPG -s LIQUID PROPANE GAS 2-CDWS /CDWR-s CONDENSER WATER SUPPLY/RETURN '-HWS/HWR-s HEATING WATER SUPPLY/RETURN 2- COND -s CONDENSATE 2-- FOV -3 FUEL OIL VENT 2- FOS / FOR --3 FUEL OIL SUPPLY/RETURN 2-- RDG -s REFRIGERANT DISCHARGE GAS MECHANICAL GENERAL NOTES 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE 2012 IBC, 2012 WSEC, & 2012 IMC. 2. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNLESS NOTED OTHERWISE. 3. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE ENGINEER PRIOR TO PROCEEDING. 6. ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNLESS NOTED OTHERWISE. 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4" CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DANPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS AFTER LINING HAS BEEN ACCOUNTED FOR. 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY FUEL BURNING EQUIPMENT OR 3 FEET BELOW ANY PLUMBING VENT OR EXHAUST OUTLET WITHIN 10 FEET 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING: -0% TO 100% OF THE DESIGN SUPPLY AIR -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE EQUIPPED WITH MOTORIZED (OR GRAVITY DAMPERS PER EXCEPTIONS IN C403.2.4.4) WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE. 13. THE CONTROL SYSTEM SHALL BE 7 -DAY PROGRAMMABLE, CAPABLE OF BEING SET FOR SEVEN (7) DIFFERENT DAY TYPES PER WEEK, AND CAPABLE OF A DEADBAND SETTING OF AT LEAST 56F (19F FOR RESIDENTOPLY BETWEEN THE HEATING AND COOLING SETPOINTS. AHU CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF RESETTING AIR TEMPERATURES BY REPRESENTATIVE BUILDING LOADS. 14. RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE WASHINGTON STATE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. COMMISSIONING, SYSTEM BALANCING, RECORD DRAWINGS AS REQUIRED PER THE WASHINGTON STATE ENERGY CODE C408. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT MEfiHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING IN EXCESS OF 2000 CFM [INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH AN AGGREGATE SUPPLY GREATER THAN 2000 CFM] OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM, 22. FOR ALL "SEALED AIR TIGHT" SHAFTS OR ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS INSIDE THE SHAFT SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT, (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE SHAFT SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE -ANY PENETRATIONS OF THE SHAFT CONSTRUCTION DUCTWORK CONDUIT, PIPING, ...) SHALL BE SEALED ON BOTH SIDES -USE SECTION 909.5 OF THE 2012 IBC FOR MAX A LOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS, AND OPEN AGAINST THE DIRECTION OF ROOM/SHAFT PRESSURE. 23. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENTS. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 ASID SMOKE DEVELOPED RATING SHALL BE < 50. USE FLEXIDUCT MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATONS OR APPROVED EQUAL. 24. LOCATION AND DETAILS OF EQUIPMENT DUCT ROUTING AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH OTHER TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. 25. FOR RESIDENTIAL INSULATION ON DUCTWORK AND PIPING SEE ENERGY CODE CHAPTER R403. 26. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION. A PERMANENT AND VISIBLE DISPLAY IS TO BE PROVIDED FOR EACH BUILDING, READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL 1 RCrCIC 1 u CINUMUT LuUC JCI.I lu1V Lmua.za ruK rUKI rttK KtyUIKtMtN I5 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.7.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (THEN R-6 FOR REST OF INSTALLATION) OR HEATING & COOLING EQUIPMENT 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEVEL IF: DEDICATED OUTSIDE AIR SYSTEM AND LESS THAN 2,800 CFM SUPPLY AIR MINIMUMLAST UPDATED: 01/10/14 MINIMUMT INSULATION LAST UPDATED 01/10/14 DUCT TYPE DUCT LOCATION IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM INSULATION R -VALUE REMARKS SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE, OUTSIDE BUILDING R-8 1,2,3 OUTSIDE AIR WITHIN CONDITIONED SPACE, INSIDE BUILDING SEE NOTES 4 & 5 1,2,3,4,5 SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE: INSIDE BUILDING R-6 1,2 SUPPLY AIR <550 OR >1050 WITHIN CONDITIONED SPACE R-3.3 1,2 1 RCrCIC 1 u CINUMUT LuUC JCI.I lu1V Lmua.za ruK rUKI rttK KtyUIKtMtN I5 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.7.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (THEN R-6 FOR REST OF INSTALLATION) OR HEATING & COOLING EQUIPMENT 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEVEL IF: DEDICATED OUTSIDE AIR SYSTEM AND LESS THAN 2,800 CFM SUPPLY AIR MINIMUMLAST UPDATED: 01/10/14 FLUID DESIGN INSULATION CONDUCTIVITY NOMINAL PIPE DIAMETER (INCH) OPERATING TEMP OF CONDUCTIVITY RANGE MEAN TEMP RATING °F <1 _F 1 TO <1-1/2 1-1/2 TO <4 4 TO <8 >8 HEATING SYSTEMS (STEAM, CONDENSATE, HYDRONIC HOT WATER, DOMESTIC HOT WATER) >350 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0 251-350 0.29-0.32 200 3.0 4.0 4.5 4.5 4.5 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 141-200 0.25-0.29 125 1.5 1.5 1 2.0 1 2.0 2.0 105-140 0.21-0.28 100 1.0' 1.0 1 1.5 1 1.5 1.5 DOMESTIC COLD WATER AND HORIZONTAL RAIN LEADERS TO FIRST VERTICAL RAIN LEADER 40-60 1 0.21-0.27 1 0.5 1 0.5 1 1.0 1 1.0 1.0 COOLING SYSTEMS (CHILLED WATER, BRINE AND REFRIGERANT, WATERSIDE ECONOMIZER SYSTEMS)** 40-60 0.21-0.27 1 75 1 0.5 0.5 1 1.0 1.0 1.0 <40 0.20-0.26 1 75 0.5 1 1.0 1.0 1 1.0 1.5 M11YLI�JI <.VIY 1 RVL VMLV Ca U DMU 110-1lvl7 VIALVCJ HJJUL YA I tU VVI I rl FIVIJIU 1" UK Lt55 1N UTA. ** TYPICAL CONDENSER WATER PIPE IN NON -ECONOMIZER SYSTEMS DOES NOT REQUIRE INSULATION i 2954900445 GUNDAKERS INTERURBAN ADD LOT 1 OF CITY OF TUKWILA SHORT PLAT NO L93-0050 RECORDING NO 9403313383 SAID SHORT PLAT DAF - LOT 1 OF CITY OF TUKWILA SHORT PLAT NO 88-1SS RECORDING NO 8807210416 BEING A PORTION OF SW 1/4 OF NW 1/4 AND OF NW 1/4 OF SW 1/4 OF SECTION 24-23-04 SITE MAP ML, COW kALE pamitmo._ lid -010D Plan reVIOW aoprOVal is subject to errors and +ornissions. Approval of constru6ion dow-ments does not &0hoft,3 the Violation cf any adoptod code or Ordinance. Pealpt of approved Field Copy and conditions is acknowledged: Date: City of Tukwila ila BUILDING DIVISION JUN 14 2016 PERPAIT CENTER Building Today, Defining Tomorrow Henmanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 �J. Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC IEVVED FOR COMPLIANCE DRAWING INDEX SHEET NO. SHEET TITLE CURRENT REVISION MO.00 LEGEND ABBREVIATIONS GENERAL NOTES & SHEET INDEX - HVAC MO.01 SCHEDULE SHEET - HVAC M2.01 D 1ST FLOOR DEMO PLAN - HVAC M2.021) 2ND FLOOR DEMO PLAN - HVAC M2.01 1 ST FLOOR PLAN - HVAC M2.02 2ND FLOOR PLAN - HVAC M2.R1 ROOF PLAN - HVAC M6.01 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC M6.02 LIQUID REFRIGERANT PIPING DIAGRAM - HVAC MP2.01 1ST FLOOR PIPING PLAN - HVAC MP2.02 2ND FLOOR PIPING PLAN - HVAC i 2954900445 GUNDAKERS INTERURBAN ADD LOT 1 OF CITY OF TUKWILA SHORT PLAT NO L93-0050 RECORDING NO 9403313383 SAID SHORT PLAT DAF - LOT 1 OF CITY OF TUKWILA SHORT PLAT NO 88-1SS RECORDING NO 8807210416 BEING A PORTION OF SW 1/4 OF NW 1/4 AND OF NW 1/4 OF SW 1/4 OF SECTION 24-23-04 SITE MAP ML, COW kALE pamitmo._ lid -010D Plan reVIOW aoprOVal is subject to errors and +ornissions. Approval of constru6ion dow-ments does not &0hoft,3 the Violation cf any adoptod code or Ordinance. Pealpt of approved Field Copy and conditions is acknowledged: Date: City of Tukwila ila BUILDING DIVISION JUN 14 2016 PERPAIT CENTER Building Today, Defining Tomorrow Henmanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 �J. Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC IEVVED FOR COMPLIANCE KtMAKK5: 1 PROVIDE BC CONTROLLER AS SCHEDULED, AND SIMPLE MA CONTROLLERS PAC-YT5ICRB (ONE FOR EACH FC), TWINNING KIT FOR CU -02, AND CONNECT TO EXISTING CENTRAL CONTROLLER GB -50A. 2 PRESSURE TEST REFRGERANT PIPING AT 600 PSI 3 INDIVIDUAL MODULE OF CU -02 REQUIRE SEPARATE ELECTRICAL CONNECTION 4 SWITCH DISCONNECT MAY BE REQUIRED FOR EACH UNIT. (ELECTRICAL CONTRACTOR TO VERIFY WITH JURISDICTION HAVING AUTHORITY) 5 R -410A REFRIGERANT, PROVIDE SHUT-OFF VALVES WITH SCHRADER VALVES ON BC CONTROLLER ON ALL PIPING INCLUDING UNUSED PORTS. PROVIDE 1" CONDENSATE DRAIN LINE OFF BC CONTROLLER. 6 ROOM TEMPERATURE SENSOR INSTALLED BY CONTROLS CONTRACTOR 7 NO ECONOMIZER PROVIDED, ECONOMIZER EXCEPTION PER 2012 WA STATE ENERGY CODE SECTION C403.4.1 ECONOMIZERS, EXCEPTION #6 - FOR VRF SYSTEMS. 8 UNIT > 2000 CFM - REQUIRES SMOKE DETECTOR FOR LOCAL SHUTDOWN 9 INSTALL PER MANUFACTURERS RECOMMENDATION 10 FOR TRADE COORDINATION REFER TO LATEST APPROVED SUBMITTALS 11 EXISTING UNIT 12 RELOCATE AS SHOWN ON DRAWINGS AIR TO AIR ENERG"T' RECOVERY UmmN37 SCHEDULE LAST UPDATED: 06/09/16 UNIT TAG BASIS OF DESIGN CONDITIONS OF OPERATION OUTSIDE AIR COUTY-MULTI % EFFECTIVENESS VARIABLE REFRIGERANT SYSTEM SCHEDULE HEATING COOLING NOTES: CFM EAT'F LAT°F MAX COIL DB WB DB RH APD (IN WG) CFM EAT°F DB WB VOLTAGE/PH MCA MOP ERV2-01 LOSSNAY LGH-F600RX5-E SUMMER DESIGN 600 85 66 81 63.6 - - 600 78 62 67% 208 3.6 15 525 1-7 OUTDOOR HR UNITS 1 600 1 24 15 1 56.3 49 - - 600 70 62 CFM CFM IN WG EWT OF LWT OF GPM PD FT HD TOTAL BTUH SENS. BTUH EER EWT OF LWT OF GPM PD FT HD OUTPUT BTUH. QTY I BHP HP FLA VJPH LBS INDOOR AIR HANDLING UNIT AC -1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-25 7,100 1,065 2.82 75 89.0 50 243,000 10.4 - - - - - 14 15 50 480/3 3,225 1f2 AC -1 1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-29 CVTCTTRiC f I IAITT Tr1 f1CPA ATAI 1'fC�At API/"C ANI f1T r11 LAST UPDATED: 06J09/16 UNIT UNIT 1 l5 BASIS COOLING CAPACITY HEATING CAPACITY FAN 0.5 0.34 ELECTRICAL SOUND WEIGHT 16.1 125 UNIT BASIS OF NOM. SUPPLY MIN OSA MAX ESP ON-OFF CLG POWER CONS. HTG CAP 120/1 ELECTRICAL SOUND WEIGHT EF -2 TAG LOCATION TAG EXISTING - PENN OF DESIGN TOTAL BTUH SENS. BTUH IEER BTUH COP QTY kW EACH MCA MOCP V/PH dB LBS REMARKS TAG DESIGN TONNAGE CFM CFM IN WG MIXING BOX CAP BTUH CLNG W HTG W BTUH MCA MOCP VPH MAX Db LBS REMARKS CU -01 OUTDOORS MECH ENCL SYSTEM DATA MITSUBISHI PURY-P168 YSKMU A 168,000 157 927 19.4 188,000 3.63 - - - - - 61.0 2ND FLOOR CONF - . 1 AT1.1 11 Z6 -TD FC1-01 MITSUBISHI PLFY-P12NCMU-E 1.00 350 30 0.00 NA 12,000 60 60 13,500 0.35 15 208-230/1 34 44 MODUL-1 DATA MITSUBISHI PURY-P96YKMU-A 96,000 - 108,000 - 1 0.92 15 20 460/3 - 574 11 FC1-02 MITSUBISHI PLFY-P08NCMU-E 0.67 320 30 0.00 NA 8,000 50 50 9,000 0.29 15 208-230/1 32 41 11 11 MODUL-2 DATA MITSUBISHI PURY-P72YKMU A 72,000 - 80,000 - 1 0.92 11 15 460/3 - 534 11 FC1-03 MITSUBISHI PLFY-P12NCMU-E 1.00 350 40 0.00 NA 12,000 60 60 13,500 0.35 15 208-230/1 34 44 11 FC1-04 MITSUBISHI PEFY-P15NMHU-E 1.25 660 40 0.60 CUSTOM 15,000 90 70 17,000 1.45 15 208-230/1 34 58 11 FC1-05 MITSUBISHI PEFY-P18NMHU-E 1.50 500 60 0.60 CUSTOM 18,000 110 90 20 000 1.56 15 208-230/1 35 58 11 BC -01 STORAGE RM CU -01 MITSUBISHI CMB-P1010NU-GA - - - - - - - 1.04 15 208/230/1 - 132 11 FC1-06 MITSUBISHI PEFY-P36NMHU-E 3.00 1,165 100 0.60 CUSTOM 36,000 240 220 40,000 3.50 15 208-230-/l 41 86 11 FC1-07 MITSUBISHI PEFY-P18NMHU-E 1.50 600 150 0.60 CUSTOM 18,000 110 90 20,000 1.56 15 208-230/1 35 58 11 FCI-08 MITSUBISHI PEFY-P30NMHU-E 2.50 890 230 0.60 CUSTOM 30,000 170 150 34,000 2.73 15 208-230/1 39 67 11 FC2-01 MITSUBISHI PEFY-P15NMHU-E 1.25 660 40 0.60 CUSTOM 15,000 90 70 17 000 1.45 15 208-230/1 34 58 11 FC2-02 MITSUBISHI DEFY-P36NMHU-E 3.00 1 165 60 0.60 CUSTOM 36 000 240 220 40 000 3.50 15 208-230/1 41 86 2 6 7 9 11 12 FC2-03 MITSUBISHI PEFY-P72NMHSU-E 8.00 1766-2154-2542 70 1.00 CUSTOM 72,000 630 630 80,000 7.70 15 208-230/1 43 214 2 6 7 8 9 10 CU -02 OUTDOORS MECH ENCL SYSTEM DATA MITSUBISHI PURY-P288YSLMU-A 288,000 248,080 18.50 323,000 3.28 64 1-146-0- 1,2 FC2-04 MITSUBISHI PEFY-P36NMAU-E3 3.00 812-989-1165 80 0.60 CUSTOM 36,000 240 220 40,000 3.32 15 208-230/1 41 86 2 6 7 9 10 MODUL-1 DATA MITSUBISHI PURY-P144YLMU-A 144,000 - - - - 2 0.92 24.00 35 460/3 - - -3,4 FC2-05 MITSUBISHI PEFY-P36NMAU-E3 3.00 812-989-1165 20 0.60 CUSTOM 36,000 240 220 40,000 3.32 15 208-230/1 41 86 2 6 7 9 10 MODUL-2 DATA MITSUBISHI PURY-P144YLMU-A 144,000 - - - - 2 0.92 24.00 35 460/3 - - 3,4 FC2-06 MITSUBISHI PEFY-P48NMAU-E3 4.00 989-1201-1412 110 1 0.60 CUSTOM 48,000 340 320 5-410-0-0 3.41 15 208-230/1 44 86 2 6 7 9 10 FC2-07 MITSUBISHI PEFY-P36NMAU-E3 3.00 812-989-1165 95 0.60 CUSTOM 36,000 240 220 40,000 3.32 15 208-230/1 41 86 2161719110 FC2-08 MITSUBISHI PEFY-P18NMAU-E3 1.50 424-512-600 70 0.60 CUSTOM 18,000 110 90 20,000 1.56 15 208-230/1 35 58 2 6 7 9 10 FFC2-09 MITSUBISHI PEFY-P48NMAU-E3 4.00 989-1201-1412 20 0.60 CUSTOM 48,000 340 1 320 54,000 3.41 15 208-230/1 44 86 2 6 7 9 10 BC -02 CU -02 MITSUBISHI CMB-P1010NU-HA1 - - - - - - - 1.04 1 15 1208/230/11 132 5 FC2-10 MITSUBISHI PEFY-P36NMAU-E3 3.00 1 812-989-1165 35 0.60 CUSTOM 36.000 240 1 220 1 40.000 332 15 7mg'inm 41 1 1 Qr. I ') A -7 o in KtMAKK5: 1 PROVIDE BC CONTROLLER AS SCHEDULED, AND SIMPLE MA CONTROLLERS PAC-YT5ICRB (ONE FOR EACH FC), TWINNING KIT FOR CU -02, AND CONNECT TO EXISTING CENTRAL CONTROLLER GB -50A. 2 PRESSURE TEST REFRGERANT PIPING AT 600 PSI 3 INDIVIDUAL MODULE OF CU -02 REQUIRE SEPARATE ELECTRICAL CONNECTION 4 SWITCH DISCONNECT MAY BE REQUIRED FOR EACH UNIT. (ELECTRICAL CONTRACTOR TO VERIFY WITH JURISDICTION HAVING AUTHORITY) 5 R -410A REFRIGERANT, PROVIDE SHUT-OFF VALVES WITH SCHRADER VALVES ON BC CONTROLLER ON ALL PIPING INCLUDING UNUSED PORTS. PROVIDE 1" CONDENSATE DRAIN LINE OFF BC CONTROLLER. 6 ROOM TEMPERATURE SENSOR INSTALLED BY CONTROLS CONTRACTOR 7 NO ECONOMIZER PROVIDED, ECONOMIZER EXCEPTION PER 2012 WA STATE ENERGY CODE SECTION C403.4.1 ECONOMIZERS, EXCEPTION #6 - FOR VRF SYSTEMS. 8 UNIT > 2000 CFM - REQUIRES SMOKE DETECTOR FOR LOCAL SHUTDOWN 9 INSTALL PER MANUFACTURERS RECOMMENDATION 10 FOR TRADE COORDINATION REFER TO LATEST APPROVED SUBMITTALS 11 EXISTING UNIT 12 RELOCATE AS SHOWN ON DRAWINGS AIR TO AIR ENERG"T' RECOVERY UmmN37 SCHEDULE LAST UPDATED: 06/09/16 UNIT TAG BASIS OF DESIGN CONDITIONS OF OPERATION OUTSIDE AIR EXHAUST AIR % EFFECTIVENESS ELECTRICAL UNIT WEIGHT HEATING COOLING NOTES: CFM EAT'F LAT°F MAX COIL DB WB DB RH APD (IN WG) CFM EAT°F DB WB VOLTAGE/PH MCA MOP ERV2-01 LOSSNAY LGH-F600RX5-E SUMMER DESIGN 600 85 66 81 63.6 - - 600 78 62 67% 208 3.6 15 525 1-7 WINTER DESIGN 1 600 1 24 15 1 56.3 49 - - 600 70 62 1 ELECTRICAL CONTRACTOR TO PROVIDE SCCR PROTECTION FOR EQUIPMENT AS REQUIRED BY NATIONAL ELECTRICAL CODE. MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM) INSIDE CONTROL PANEL AS REQUIRED BY NATI04AL ELECTRICAL CODE. 2 INTERLOCK UNIT OPERATION WITH BUILDING OPERATING HOURS 3 MANUFACTURER TO PROVIDE MERV-8 FILTERS FOR OUTSIDE AIRFLOW SYSTEM AND MERV-8 FILTERS FOR EXHAUST AIRFLOW SYSTEM. 4 UNIT PROVIDED WITH LOW LEAKAGE MOTORIZED DAMPERS ON OSA AND EXHAUST AIR, FILTER SENSOR, ROTATION SENSOR, AND SERVICE OUTLET. 5 PROVIDE SEPARATE POWER CONNECTION AND DISCONNECT TO ELECTRIC DUCT HEATER, BY ELECTRICAL CONTRACTOR 6 INSTALL PER MANUFACTURER RECOMMENDATIONS 7 FOR TRADE COORDINATION REFER TO EQUIPMENT SUBMITTALS - �..-v . a.. v v..a • • v • �.-. •! u • . • �•-v. ..�! a• .V•- ! \V 1 V t 1-✓ 2 FIELD VERIFY EXISTING UNIT INFORMATION (EXISTING) MAKE-UP AIMUNIT SCHEDULE . LAST UPDATED 06/03/16 UNIT TAG (EXISTING) AIR HAN[r)"LING UNI"I"a"CHErDfULE BASIS OF DESIGN OSA CFM FAN MOTOR ESP IN WG HEATING COOLING UNIT ELECTRICAL I UNIT dBA IWEIGHT I LBS REMARKS FLA HP MBTUINIMBTUOUTIEATOFI LAST UPDATED: 06 09/16 UNIT BASIS OF SUPPLY OSA ESP CONDENSER WATER COOLING COIL HOT WATER HEATING COIL INDOOR FAN ELEC WEIGHT 2,100 TAG LOCATION SERVES DESIGN CFM CFM IN WG EWT OF LWT OF GPM PD FT HD TOTAL BTUH SENS. BTUH EER EWT OF LWT OF GPM PD FT HD OUTPUT BTUH. QTY I BHP HP FLA VJPH LBS REMARKS AC -1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-25 7,100 1,065 2.82 75 89.0 50 243,000 10.4 - - - - - 14 15 50 480/3 3,225 1f2 AC -1 1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-29 CVTCTTRiC f I IAITT Tr1 f1CPA ATAI 1'fC�At API/"C ANI f1T r11 11 860 1,779 3.56 75 88.5 60 313 000 11.1 - - - - - 1 l5 56 480/3 3,300 1,2 _.. - �..-v . a.. v v..a • • v • �.-. •! u • . • �•-v. ..�! a• .V•- ! \V 1 V t 1-✓ 2 FIELD VERIFY EXISTING UNIT INFORMATION (EXISTING) MAKE-UP AIMUNIT SCHEDULE . LAST UPDATED 06/03/16 UNIT TAG LOCATION SERVES BASIS OF DESIGN OSA CFM FAN MOTOR ESP IN WG HEATING COOLING UNIT ELECTRICAL I UNIT dBA IWEIGHT I LBS REMARKS FLA HP MBTUINIMBTUOUTIEATOFI TYPE LAT°F ITURNDNINGCONN MBH TOTAL MBH SENS EER MCA I MOP VPH MAU-1 .1 ROOF r \1Tf-TTat1 2ND FLOOR FUME HOODS TRANE YSC072F4RZA 2,100 2.5 1 0.90 150 121.5 24.0 80.3 4:1 3/41t 72 49 11.2 18.2 25 460/3 81 875 1 1 a_f\iJ 1 117V a v♦i✓1 i.�V I..�V11 1-1 L1. 1 I V 1\LI'1/"li i'1 LAISTING) SURD nr- L11'r j CA HAUST AN[)` RELIEF FAN SCOPMEDULE TOTAL SENS MBH MBH LAST UPDATED 06/09/16 TAG LAST UPDATED: 06/19J16 UNIT TAG LOCATION SERVES BASIS OF DESIGN TYPE CONTROLS FAN CFM ESP IN WG BHP MOTOR HP ELECTRICAL V/PH Sone Rating WEIGHT LBS REMARKS SF1-01 1ST FLOOR CLNG VRF OSA VENTILATION COOK 80S N -B IN-LINE TIME CLOCK 600 0.9 0.30 1/3 120/1 12.0 151 1 EFl-02 IST FLOOR CLNG MAGNET AREA RESTROOM BROAN L-200 IN-LINE ON-OFF 120 0.6 127 W 120/1 2.3 23 1 EF2-01 2ND FLOOR CLNG SERVER ROOM COOK 100S N -B IN-LINE T -STAT 1,000 0.5 0.34 1/2 120/1 16.1 125 1 EF -1 1ST FLOOR CLNG MAIN RESTROOM EXISTING - PENN Z10RA ON-OFF 380 0.3 0.30 130 W 120/1 1 EF -2 ROOF 2ND FLR RESTROOM EXISTING - PENN XR94L BAS 486 0.13 1/10 120/1 1 EF -3 ROOF ROOM 216 EXISTING - PENN XR94L BAS 375 0.13 1/10 120/1 1 EF -4 ROOF ELEV EQ RM 104 EXISTING - PENN I XR94L BAS 504 0.13 1/10 120/1 1 EF -5 i 2 -ND FLOOR CLNG r\/Te-,r, ^ 1- 11T1\.. r.1T -f 2ND FLOOR CONF - . 1 AT1.1 EXISTING - PENN Z6 -TD BAS 60 0.25 50 W 120/1 l a v♦i✓1 i.�V I..�V11 1-1 L1. 1 I V 1\LI'1/"li i'1 1 L/\1J111YV VIY11 J (E ISTING) P C.Ema E UIPMENT COm"OUNG mumNXT SLAOO"HEDULE 06/03/16 ESP UNIT BASIS OF SUPPLY IN TAG LOCATION SERVES DESIGN CFM WG (E."KISTING) LAB H00110"D SCHEDULE SOUND OPERATING PER ARI 270/370 WEIGHT (dBA) (LBS REMARKS TOTAL SENS MBH MBH LAST UPDATED 06/09/16 TAG LOCATION BASIS OF DESIGN SERVES ORE UAL EXHAUST FACE CFM VELOCITY FPM SP IN WG OPNG SIZE IN INCHES WIDTH HEIGHT EXHAUST MOTOR COLLAR BHP HP ELECTRICAL HOOD WEIGHT FLA V/PH MATERIAL LBS REMARKS LH2-1 2ND FLOOR WET CHEM 2ND FLOOR WET CHEM EXISTING 686 100 0.4 38 26 1211 1 LH2-2 2ND FLOOR WET CHEM 2ND FLOOR WET CHEM EXISTING 1292 100 0.4 62 30 1211 1 LH2-3 2ND FLOOR WET CHEM 2ND FLOOR WET CHEM EXISTING 686 100 0.4 38 26 12" 1 LH2-4 2ND FLOOR WET CHEM turf-'TTIIIP'• 1 u1TT" 2ND FLOOR WET CHEM EXISTING 519 100 0.4 44 17 1 12" 1 1 L/\1J111YV VIY11 J (E ISTING) P C.Ema E UIPMENT COm"OUNG mumNXT SLAOO"HEDULE 06/03/16 ESP UNIT BASIS OF SUPPLY IN TAG LOCATION SERVES DESIGN CFM WG COOLING CAPACITY SUPPLY FAN ELEC SOUND OPERATING PER ARI 270/370 WEIGHT (dBA) (LBS REMARKS TOTAL SENS MBH MBH TYPE HP MCA MAX FUSE V/PH ACR -1 ROOF 1st F!r MAGNET RM YORK DlEB042 114 0 0.50 42 30 DRAW THROUGH 3/4 22.0 30 208/3 81 342 1 ACR -2 ROOF 1st Fir MAGNET RM YORK D1EB042 1,400 1 0.50 4 r Tr_TTkl/ 42 1 30 1 DRAW THROUGH 3/4 22.0 30 208/3 81 342 1 i L/\1J 1 11 V V rs� . REVIEWED FOR ODE COMPLIANCE APPROVED JUN 2 4 2016 City of Tukwila gU1L.D{(�� DIVISION RECEIVED CITY OF TUKWILA JUN 14 2016 PERMIT CENTER VAV UNIT TAG 101-1 101-2 LOCATION 2ND FLOOR 2ND FLOOR (EXISTING) VAV BASIS OF SERVES DESIGN TYPE ALLERGY TRANE VCCD-17 ALLERGY TRANE VCCD-11 BOX SCHEDULE - HOT ESP COOLING VALVE IN FAN MOTOR CFM MINIMUM WG HR SPEED MCA 900 135 0.50 450 70 0.50 WATER V/PH BTUH CFM HOT WATER HEATING COIL EAT LAT EWT LWT OF OF OF OF GPM LAST UPDATED: PD WEIGHT IN WG LBS x%27 j12 REMARKS 1 1 101-3 101-4 2ND FLOOR 2ND FLOOR FREEZER RM CHEMISTRY TRANE TRANE VCCD-06 VCCD-17 450 600 70 90 0.50 0.50 1-5 BAC VFL 488 CLOSE CT 110 89 75 67 11.8 1, 2, 3, 4 DT2 480/3 1 1 101-5 101-6 2ND FLOOR 2ND FLOOR CHEM/PROCESSING SHIPPING TRANE TRANE VCCD-17 VCCD-03 600 200 90 30 0.50 0.50 TITUS NICD MODULAR 10 ALUMINUM 350 10 X 10 24 X24 T–BAR STEEL 1, 2, 3, 4 DT4 1 MODULAR 1 101-7 101-8 102-1 103-1 2ND FLOOR 1ST FLOOR 1ST FLOOR 2ND FLOOR OFFICE OFFICE RETAIL SERVER RM TRANE TRANE TRANE TRANE VCCD-11 VPWF-08 VFWD 2415 VCCD-11 500 900 1,100 700 75 135 165 105 0.50 0.50 0.50 0.50 1/3 M 5 M 120/1 13500 22000 600 1100 66 66 87 85 165 165 0.81 0.81 0.17 STEEL 1, 2, 3, 4 DT6 1 105 4,5,6 1 1 103-2 103-3 103-4 204-1 205-1 206-1 1ST FLOOR 1ST FLOOR 1ST FLOOR 2ND FLOOR 2ND FLOOR 2ND FLOOR MECH RM WAITING WAITING CS/ACC CHEMISTRY ALLERGY TRANE TRANE TRANE TRANE TRANE TRANE VFWD 0604 VFWD 1104 VCCD-11 VFWD 1707 VFWD 3220 VFWD 3220 200 700 500 1,200 3,100 2,880 30 105 75 180 470 450 0.50 0.50 0.50 0.50 0.50 0.50 1 L 1 L 1 1 M M M 4000 7000 14000 1 33500 35000 200 350 675 1600 1700 66 66 1 66 66 66 85 85 85 85 85 1 165 165 165 165 165 0.27 0.45 0.80 0.90 0.90 DT8 TITUS 5OF-8 DUMP STYLE 12 1 1 20 X 24 1 1 1 STEEL 1 207-1 208-1 209-1 209-2 210-1 2ND FLOOR 2ND FLOOR 2ND FLOOR 2ND FLOOR 1ST FLOOR FUTURE STAFF LOUNGE CORRIDOR CORRIDOR SHIPPING TRANE TRANE TRANE TRANE TRANE VFWD1104 VFWD 1707 VCCD-06 VCCD-06 VFWD 1107 750 1,300 250 550 650 115 195 40 83 100 0.50 0.50 0.50 0.50 0.50 M M L 9000 14000 8400 450 700 400 66 66 66 85 85 85 j165 0.54 0.81 0.45 230 8 X 8 -- -- 1 1 1, 2, 3, 5 1 1 1 10 350 10 X 10 -- -- SURFACE STEEL 1, 2, 3, 5 DG4 TITUS MCD MODULAR 12 500 12 X 12 -- -- SURFACE STEEL I [:VTCTTAt� t lit#TT Tfl D[:KAATAi DCQAI nKlt•C Ac AEnTi•f1 MODULAR 18,480 600 14 X 14 160400 SURFACE STEEL 1, 2, 3, 5 DG6 TITUS MCD MODULAR 14 880 16 X 16 2 EXISTING UNIT TO BE RELOCATED AS SHOWN ON DRAWINGS REBALANCE AS NOTED 3 DEMO EXISTING UNIT AND RETURN TO OWNER STOCKPILE 4 NEW FAN POWERED VAV 5 DISCONNECT (AS REQUIRED) TO BE PROVIDED AND INSTALLED BY ELECTRICAL 6 PARALLEL TERMINAL UNIT – SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INLCUDE: – FACTORY INSTALLED 1" THROW–AWAY FILTERS – EXTENDED DAMPER 1%2" DIAM. SHAFT – UNIT CONTROLS AND AUTO RESET 130 DEG. F. THERMOSTAT BY CONTROLS CONTRACTOR – MATT FACED INTERNAL INSULATION TO AIRSTREAM – FIELD VERIFY RIGHT/LEFT HAND OF COLD & HOT DECK INLETS PRIOR TO ORDER (HAND DETERMINED BY LOCATION OF COLD DECK LOOKING IN DIRECTION OF AIRFLOW) 7 SMOKE DETECTOR REQUIRED. SMOKE DETECTOR PROVIDED BY ELECTRICAL, INSTALLED BY MECHANICAL. 8 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1PH POWER TO THE FAN MOTOR (E)Aff ISTINCO-3%) E LECTRXC DUCT H EATE lffm% SCH E DU Lr. LAST UPDATED: 06/03/16 UNIT TAG EDH1-01 LOCATION FIRST RST�F FLOOR CEILING�DVFR D SERVES SYSTEM VENTILATION BASIS OF DESIGN NEPTRONIC DF CIOOH^^T^7.0^_ KW HEATING STAGES 2.0 TOTAL CFM 600 TEMP RISE OF 36.9 DUCT T'STAT LOCATION DUCT ELECTRICAL WEIGHT LBS 20 REMARKS WIDTH IN 12.0 HEIGHT IN 12.0 FLA 8.42 V/PH 460/3 1-5 ..�........ JYY1 / �, I I Iuv InL_ \.v I vv I rRv 1 Cl.l lU1V, CLCI.I ICVIV1l, l.U1V 1 KVLJ, vuLi 1 -�i Hi tN� i HLLtu 1N MixiNV bUX AND SET TU 55 DEG F. 2 DISCONNECT PROVIDED WITH UNIT TO BE INSTALLED BY ELECTRICAL CONTRACTOR 3 INSTALL PER MANUFACTURERS INSTALLATION INSTRUCTION 4 FOR TRADE COORDINATION REFER TO APPROVED SUBMITTALS 5 EXISTING. FOR REFERENCE ONLY awlamisT I LAST UPDATED: 06/09/16 UNIT TAG LOCATION SERVES BASIS OF DESIGN TYPE TOTAL GPM EWT OF LWT OF AMB. WB OF MAX PD FT FAN MOTOR WEIGHT LBS SOUND DBA REMARKS NO. FANS HP EACH V/PH CT -1 PARKING AC -1 &AC -2 �IAIT BAC VFL 488 CLOSE CT 110 89 75 67 11.8 1, 2, 3, 4 DT2 480/3 9,700 8 1 i LJ\ilii li 7V VI1A I I Iwly vv I vlri �7J•Vvlc Qits r%o vlrr-UoCr- IVC�,r\ Olt -m, U.N.U. UN uvvuo 2 ALL DIFFUSERS TO HAVE SHEET METAL CAN PLENUM 3 STANDARD #26 WHITE FINISH 4 PROVIDE BORDER TYPE 3, LAY—IN TYPE 5 PROVIDE BORDER TYPE 1, SURFACE MOUNT TYPE 6 DIFFUSER CANTO HAVE 1" SOUNDLINING WITH PERFORATED PLATE 7 DIFFUSER CAN PLENUM TO BE EQUIPPED WITH PERFORATED PLATE T lk4'SFER / RETURN / EXHAUST AIR GRILLE SCHEDULE O®ULAR DIFFUSER SCHEDULE LAST UPDATED: 09/27/12 UNIT TAG BASIS OF DESIGN TYPE NECK SIZE IN DIA MAX CFM CORE SIZE FACE SIZE NC MOUNTING MATERIAL REMARKS DT1 TITUS NICD MODULAR 6 EC2 110 6 X 6 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT2 TITUS MCD MODULAR 8 2,9 230 8 X 8 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT3 TITUS NICD MODULAR 10 ALUMINUM 350 10 X 10 24 X24 T–BAR STEEL 1, 2, 3, 4 DT4 TITUS MCD MODULAR 12 14 x 14 500 12 X 12 24 X 24 T–BAR STEEL 1, 2, 3, 4 D 1 TITUS MCD MODULAR 12 GWB 600 14 X 14 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT6 TITUS MCD MODULAR 14 880 16 X 16 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT7 TITUS MCD MODULAR 16 1,120 18 X 18 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT8 TITUS 5OF-8 DUMP STYLE 12 600 20 X 24 20 X 24 T–BAR STEEL 1, 2, 3, 4, 7 DG1 TITUS MCD MODULAR 6 110 6 X 6 -- -- SURFACE STEEL 1, 2, 3, 5 DG2 TITUS MCD MODULAR 8 230 8 X 8 -- -- SURFACE STEEL 1, 2, 3, 5 DG3 TITUS MCD MODULAR 10 350 10 X 10 -- -- SURFACE STEEL 1, 2, 3, 5 DG4 TITUS MCD MODULAR 12 500 12 X 12 -- -- SURFACE STEEL 1, 2, 3, 5 DG5 TITUS MCD MODULAR 12 600 14 X 14 ---- SURFACE STEEL 1, 2, 3, 5 DG6 TITUS MCD MODULAR 14 880 16 X 16 ---- SURFACE STEEL 1, 2, 3, 5 DG7 TITUS MCD MODULAR 16 1,120 18 X 18 -- — SURFACE STEEL 1, 2, 3, 5 I Iwly vv I vlri �7J•Vvlc Qits r%o vlrr-UoCr- IVC�,r\ Olt -m, U.N.U. UN uvvuo 2 ALL DIFFUSERS TO HAVE SHEET METAL CAN PLENUM 3 STANDARD #26 WHITE FINISH 4 PROVIDE BORDER TYPE 3, LAY—IN TYPE 5 PROVIDE BORDER TYPE 1, SURFACE MOUNT TYPE 6 DIFFUSER CANTO HAVE 1" SOUNDLINING WITH PERFORATED PLATE 7 DIFFUSER CAN PLENUM TO BE EQUIPPED WITH PERFORATED PLATE T lk4'SFER / RETURN / EXHAUST AIR GRILLE SCHEDULE LAST UPDATED 9/27/2012 UNIT BASIS OF MAX NECK SIZE FACE TAG DESIGN CFM IN DIA MOUNTING SIZE MATERIAL REMARKS EC1 TITUS 5OF-8 500 — -- T—BAR 24 x 12 ALUMINUM 2,9 EC2 TITUS 50F-8 1,000 T—BAR 24 x 24 ALUMINUM 2,9 EC3 TITUS 50E-8 2,000 -- T—BAR 24 x 48 ALUMINUM 2,9 G1 TITUS 35ORL AGA5 150 8 GWB 8 x 8 ALUMINUM 1,3,7/8,9 G2 TITUS 350RL AGA5 250 10 GWB 10 x 10 ALUMINUM 1,3,7/8,9 G3 TITUS 350RL AGA5 375 12 GWB 12 x.12 ALUMINUM 1,3,7/8,9 G4 TITUS 350RL AGA5 525 14 GWB 14 x 14 ALUMINUM 1,3,7/8,9 G5 TITUS 350RL AGA5 600 14 GWB 16 x 16 ALUMINUM 1,377/8,9 G6 A TITUS 350RL AGA5 1 900 16 rlI IA lr%l PP ^ A A A/- AA r,.w r/1 GWB 18 x 18 ALUMINUM 1,3,7/8,9 r -v. wr yr Yl" -vV L.,vv IYLVI\ ViL..t- V.1 V. V. %JiV UVVt7 2 CORE ONLY — LAY—IN 3 SURFACE MOUNT FRAME 4 CHANNEL FRAME — LAY—IN 5 T—BAR LAY—IN 6 PROVIDE OPPOSED BLADE DAMPER (OBD) 7 PROVIDE DUCTBOARD PLENUM 8 PROVIDE SHEETMETAL PLENUM 9 STANDARD #26 WHITE FINISH 10 PROVIDE ALUMINUM GRILLES IN SHOWERS/HUMID AREAS 11 ALL NON—FERROUS MATERIALS IN MRI ROOMS y -r - 'D F 21 fll OWN RECEIVED CITY OF TUKWILA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT e.. �B EXIST 16X16 SUPPLY AND RETURN UP TO ACR -1 PROCESS COOLING EQUIPMENT ON THE ROOF EXIST 180 SUPPLY AND RETURN DN TO FIRST FLOOR MAGNET ROOM EQUIPMENT EXIST 16X16 SUPPLY AND RETURN UP TO ACR -2 PROCESS COOLING EQUIPMENT ON THE ROOF G — — i �5 Q CSA 2ND ti SCALE: 1/8" = 1'-0" O NbW�73 FLOOR DEMO PLAN - HVAC RECO��Ep� ANCE p,PPP� 2 4 216 G1hIOGpVIS10N gV1�DIN RECEIVED CITE' OF TUKWILA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg J: HERMACLO05N TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 2ND FLOOR DEMO PLAN - HVAC y R o- �A - llll�' 12X10 DUCT TO EF -4 ON R0 �) - ti \,�\� O NyWa� 1 ST FLOOR PLAN - HVAC SCALE: 1/8" = 1'-0° METER SHEET NOTES: 1. (R) - RELOCATED 2. (E) - EXISTING ;0 PROCESS )OLING DN 0 PROCESS )OLING DN 0 PROCESS )OLING I 'A INTAKE ILLE IN THE )FFIT. O SUPPLY AND RETURN SHAFT TO SECOND OOR. :STROOM HAUST GRILLE IN IE SOFFIT. 0 PROCESS !OLING 0 PROCESS OLING DN 0 PROCESS OLING DN %EMEAMEM- R; 9)5 c0mpj.%ptAG- s - REE IBJ ':;. CITY 4F TUK"WIL A JUN 14 2016 PERMIT CENTER �B �c EXIST 16X16 SUPPLY AND RETURN UP TO ACR -1 PROCESS COOLING EQUIPMENT ON THE ROOF EXIST 180 SUPPLY AND RETURN DN TO FIRST FLOOR MAGNET ROOM EQUIPMENT EXIST 16X16 SUPPLY AND RETURN UP TO ACR -2 PROCESS COOLING EQUIPMENT ON THE ROOF Jho �;1 E „ z wQ° f �o �ppjoo •-�u�tvtla 0W`NG jpjOQ BU1L� RECEIVED CITY OF TU I(VflLA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hennanson.com Contractor Reg J: HERMACLO05BJ TAHOIRVIIA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 Revisions _ 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 2ND FLOOR PLAN - HVAC g 71 y g REVIC� p1.1AN�� .. .SON 24 2016 C1t0 °�4� V�S�ON gi)16��N� RECEIINf CITY OF ` U'i C JIL A. JUN 14 2016 PERMIT CENTER Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 ME t 1 A Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn M BY Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 ROOF PLAN - HVAC Tahoma Clinic VRF Hermanson DIAGRAM SYMBOL LEGEND — DISPLAY DESCRIPTION CMY—R10C �— POWER—W! CONTROL WIRE F. 11i CONT.No PAGE1 1 CITY MULTI SYSTEM SCHEMATIC DWG. System -z HP -1 Additional refrigerant charge is needed depending on the size and length of extended piping. Please refer the amount of pre—charge and the formula of calculation which is mentioned on the data book. 1.25mmII6 AWG) : 1.25mmJ16 AWG) or more. 0.15mm(20 AWG) : between 0.5mm� 24 AWG) and 0.15mm(20 AWG). REMARKS E "MU—E MITSUBISHI ELECTRIC CORPORATION PREPARED ON 2012/09/20 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC SCALE: NONE REV\CQ pE9 N E SAA ApP�0v�O •SUN 2A 216 GttY ���' VlS�6N gua.O�N RrCEIV ED CITY OF `I`U V40LA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg 1. HERMACL0056J TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 ME Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC ter., PIPIN( SYMBOL BRANCH PI J 1 CMY—R10C J2 Reducer SYMBOL t1 UID PIPI P1 P2 314 P3 5/8 P4 P6 / Y184 P7 11i CONT.No PAGE1 1 CITY MULTI SYSTEM SCHEMATIC DWG. System -z HP -1 Additional refrigerant charge is needed depending on the size and length of extended piping. Please refer the amount of pre—charge and the formula of calculation which is mentioned on the data book. 1.25mmII6 AWG) : 1.25mmJ16 AWG) or more. 0.15mm(20 AWG) : between 0.5mm� 24 AWG) and 0.15mm(20 AWG). REMARKS E "MU—E MITSUBISHI ELECTRIC CORPORATION PREPARED ON 2012/09/20 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC SCALE: NONE REV\CQ pE9 N E SAA ApP�0v�O •SUN 2A 216 GttY ���' VlS�6N gua.O�N RrCEIV ED CITY OF `I`U V40LA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg 1. HERMACL0056J TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 ME Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC ter., DIAGRAM SYMBOL LEGEND DISPLAY DESCRIPTION —aF— POWER WIRE CONTROL WIRE PE PIPING LIST SYMBOL BRANCH PIPE MODEL NAME J1 CMY-R160C-J J2 Reducer SYMBOL U UID PIPE GAS PIPE SVE P1 38 34 P3 1/4 / 1/2 P4 1-1/8 / 1-3/8 P6 7/8 � P7 3/4 / P8 1-1/8 1ao-20 16-2 AWG CITY MULTI SYSTEM SCHEMATIC DWG. 3^' �> System 1 460V/60Hz FSU CU -02 PURY— P288YSLMU—A Additional refrigerant charge is needed depending on the size and length of extended piping. Please refer the amount of pre -charge and the formula of calculation which is mentioned on the data book. 1.25mm�16 AWG) : 1.25mm�16 AWG) or more. 0.75mm(20 AWG) : between 0.5mm�24 AWG) and 0.75mmJ20 AWG). 3" 460V/60HzFUSE LiL20 TB7 L1L2L3 TB7 PURY-P1445IU-A PURY-P144YNU-A DIP SKU 3-7 OFF 051a 052 TB3i G TB3 G (5) .- P8 TT P7 16-2 AWG(S)Ps P5' P4 BC -02 16-2 AWG S TB2 053 CMB—P1010NU—HA1 2core TB1 G 1 2 3 4 5 6 7 8 9 T J1 YJ2L LL L 208-"2307FUSE P1 P2 P2 �P2 r� �P2� P3� � P2 P2 208-23 07 0 2�8 2FUSE FUSE 28-230 FUSE FUSE FUS2L 230 2 8-2301 USE 208-230 2�8-230 2 8-230 08, 230 FUSE FUSE FUSE FUSE FUSE L11_2 G L1 L2 G L1 L2 G L1 L2 G U L2 G L1 L2 G L1 L2 G U L2 G 001 = 002 - 003 - 004 - 005 = 006 = 007 = 008 TB5 TB15 Gp 1 TB5 T815 Gp2 TB5 T815 Gp3 TB5 T815 Gp4 TB5 T815 Gp5 TB5 TB15 Gp6 TB5 TB15 Gp7 TB5 TB15 Gp8 PEFY- PEFY- PEFY- PEFY- PEFY- PEFY- PEfY- PEfY- P72NitfflSU-E P36NMAU-E3 P36NMAU-E3 P48NMAU-E3 P36Nl043 P18 43 P48NNAU-E3 P36NMAU-E3 1 R-7 AUINC) CR CRI ICR CRI ICR CRI ICR CR FC 4 , Fu -9 , FQ4 FC2-i , FQ-01 FC 4 FQ4 FC2-10 , — REMARKS omments: LIQUID REFRIGERANT PIPING DIAGRAM - HVAC SCALE: NONE 009 Gp9 B5 LGH— F600RX5—E1 lossnay 0 , ffi ek�j L:&�G RECEIVED CITY OF `I'U IQVII-A JUN 14 2016 PERMIT CENTER 1110 1� I I *110ii tllllgm Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg 1. HERMACLO05BJ A4K*",,l`? c4 Ji,a kalltn"'mI TAHOMA CLINIC VRFINSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 `�t,,,V,atiLbY::.Snf7h"�Ytc#r",."«r at yftt t<l,rht 2iF:�Bi:! �;' 5t`.�asc:r �>r5i3�>:sv, i „v�`fnrLfi' .. Srrii `�,a9HSF{?B.' Revisions 06/14/16 JMH ISSUE FOR PERMrr No. Date By Description Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 h3lw�,�i dv b3.is',h� 4 \ rfiE53i�,�Ct fin=, €3:ur'.."S£3P av"t�t� �' LIQUID REFRIGERANT PIPING DIAGRAM - HVAC "0"W"r<; u•SS 'A� 1ST FLOOR PIPING PLAN - HVAC SCALE: 1/8" = V-0" 19 '2�'/1� 1 GAS METER �n h RE VVEEV� D FOR BODE COMPLIANCE pppROVED JUN 2 4 2016 BUILDf TUWMIS ING RECEIVED CITY OF TUKWILA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 war "= *a►��! nr �d Revisions _ 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 1ST FLOOR PIPING PLAN - HVAC IN W/ VENT VENT SHEET NOTE: 1. REFER TO SHEET MP6.01 FOR REFRIGERANT PIPING SIZES. 0 ROUTE J"GOND TO THE NEAREST INDIRECT DRAIN. RE�c� p� pCE 1UN 2 4 2p16 *%i s Cjw NGUp1VISjoN 136 RECEi ED, CITY O: ` U KWILA .JUN 14 2016 PERMIT CENTER A AMPS IE INVERT ELEVATION AC AIR CONDITIONING IEER INTEGRATED ENERGY EFFICIENCY RATIO ACH AIR CHANGES PER HOUR IMC INTERNATIONAL MECHANICAL CODE ACT ACOUSTICAL CEILING TILE IN INCHES AD ACCESS DOOR IN WG INCHES WATER GAUGE ADD'L ADDITIONAL IPLV INTEGRATED PART LOAD VALUE AFF ABOVE FINISHED FLOOR KW KILOWATTS AFG ABOVE FINISHED GRADE LAT LEAVING AIR TEMPERATURE AHU AIR HANDLING UNIT LB/LBS POUND/POUNDS ALUM ALUMINUM LF/LIN FT LINEAL FOOT/FEET AMP/AMPS AMPERAGE LPG LIQUID PROPANE GAS AP ACCESS PANEL LPS LOW PRESSURE STEAM ARCH ARCHITECT LVG LEAVING BC BEADED COLLAR LWA SOUND POWER RATING LEVEL (IN DB) BDD BACKDRAFT DAMPER LWG LOW WALL GRILLE BF BELOW FLOOR LWT LEAVING WATER TEMPERATURE BHP BRAKE HORSEPOWER MAX MAXIMUM BLDG BUILDING MAU MAKE UP AIR UNIT BOD BOTTOM OF DUCT MBH 1000 BRITISH THERMAL UNITS/HOUR BOP BOTTOM OF PIPE MCA MINIMUM CIRCUIT AMPACITY BOT BOTTOM MD MOTORIZED DAMPER BS BIRD SCREEN / BLACK STEEL MFR MANUFACTURER BTU BRITISH THERMAL UNIT MISC MISCELLANEOUS BTUH BRITISH THERMAL UNITS PER HOUR MIN MINIMUM/MINUTE CAP CAPACITY MPS MEDIUM PRESSURE STEAM CC CONTROLS CONTRACTOR MT MOUNT CD CEILING DIFFUSER/CONDENSATE DRAIN MTD MOUNTED CDWR CONDENSER WATER RETURN MUW MAKE-UP WATER CDWS CONDENSER WATER SUPPLY NA NOT APPLICABLE CFM CUBIC FEET PER MINUTE NC NORMALLY CLOSED/NOISE CRITERIA CHWR CHILLED WATER RETURN NG/NGAS NATURAL GAS CHWS CHILLED WATER SUPPLY NIC NOT IN CONTRACT CLG CEILING NO NORMALLY OPEN/NUMBER COL COLUMN NPW NON -POTABLE WATER CONC CONCRETE N -R NON-RESIDENTIAL COND CONDENSATE OA/OSA OUTSIDE AIR CONN CONNECT/CONNECTED/CONNECTION OBD OPPOSED BLADE DAMPER CONT CONTINUOUS/CONTINUATION OD OUTSIDE DIAMETER/DIMENSION CONTR CONTRACTOR PCF POUNDS PER CUBIC FOOT COORD COORDINATE PD PRESSURE DROP COP COEFFICIENT OF PERFORMANCE PH PHASE CT COOLING TOWER POC POINT OF CONNECTION CU CUBIC/CONDENSER UNIT P/PRESS PRESSURE CW DOMESTIC COLD WATER/CONDENSER WATER PSI POUNDS PER SQUARE INCH DB DUCTBOARD/DRY BULB/DECIBEL PSIG POUNDS PER SQUARE INCH GAUGE DDC DIRECT DIGITAL CONTROL QTY QUANITY DEFL DEFLECTION R RETURN GRILLE/RELOCATED/RETURN DEG DEGREE/DEGREES RA RETURN AIR DIA DIAMETER RD/RND ROUND DMPR DAMPER REF REFERENCE DN DOWN REQ REQUIRED DWG DRAWING RESID RESIDENTIAL EXH EXHAUST RF RELIEF EA EACH RG REFRIGERANT DISCHARGE GAS EAT ENTERING AIR TEMPERATURE RL REFRIGERANT LIQUID EC EGGCRATE GRILLE/END CAP/ELEC CONTRACTOR RPM REVOLUTIONS PER MINUTE EER ENERGY EFFICIENT RATING RS REFRIGERANT SUCTION EF EXHAUST FAN S SUPPLY EFF EFFICIENCY SA SUPPLY AIR EL ELEVATION SAT SATURATION/SUPPLY AIR TEMPERATURE ELEC/ELECT ELECTRICAL/ELECTRIC SD SMOKE DETECTOR EMCS ENERGY MANAGEMENT CONTROL SYSTEM S/D SLIP & DRIVE CONNECTION ENT ENTERING S -C SEATTLE CODE EQUIP EQUIPMENT SEER SEASONAL ENERGY EFFICIENCY RATING ESP EXTERNAL STATIC PRESSURE SENS SENSIBLE EWT ENTERING WATER TEMPERATURE - SL SOUND LINED EXIST EXISTING SM SHEETMETAL EXH EXHAUST SPEC SPECIFICATION F FAHRENHEIT SO SCREENED OPENING FAC FIRE ALARM CONTRACTOR SOG SLAB ON GRADE FD FIRE DAMPER SP STATIC PRESSURE FDC FIRE DEPARTMENT CONNECTION SF SQUARE FEET FF FINISHED FLOOR SS STAINLESS STEEL FIC FURNISHED AND INSTALLED BY CONTRACTOR STRUC STRUCTURAL FIO FURNISHED AND INSTALLED BY OWNER TA TRANSFER AIR FLA FULL LOAD AMPS TEMP TEMPERATURE/TEMPORARY FLEX FLEXIBLE TBD TO BE DETERMINED FLR FLOOR TOD TOP OF DUCT FOB FLAT ON BOTTOM TOS TOP OF STEEL/TOP OF SLAB FOIC FURNISHED BY OTHERS, TOT TOTAL INSTALLED BY CONTRACTOR TSP TOTAL STATIC PRESSURE FOS FLAT ON SIDE TSTAT THERMOSTAT FOT FLAT ON TOP TYP TYPICAL FP FIRE PROTECTION UH UNIT HEATER FPM FEET PER MINUTE UNO UNLESS NOTED OTHERWISE FSD FIRE/SMOKE DAMPER V VOLT FT FOOT/FEET VD VOLUME DAMPER FUT FUTURE VEL VELOCITY FV FACE VELOCITY VERT VERTICAL G GRILLE VFD VARIABLE FREQUENCY DRIVE GA GAUGE/GALLON VOL VOLUME GALV GALVANIZED W WRAPPED DUCT GC GENERAL CONTRACTOR WB WET BULB GPM GALLONS PER MINUTE WG WATER GAUGE GRD GRILLE/REGISTER/DIFFUSER W/ WITH GWB GYPSUM WALL BOARD W/0 WITHOUT HD HEAD W/SF WATTS PER SQUARE FOOT HORIZ HORIZONTAL WSEC WASHINGTON STATE ENERGY CODE HP HORSEPOWER HR HOUR HSPF HEATING SEASONAL PERFORMANCE FACTOR HT HEIGHT HWTG HIGH WALL TRANSFER GRILLE HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER HZ HERTZ IBC INTERNATIONAL BUILDING CODE ICW INDUSTRIAL COLD WATER ID INSIDE DIAMETER/DIMENSION MECHANICAL LEGEND 10X10 RECT SUPPLY AIR DUCT 10X0-® UP/TOWARD 1OX10'; RECT SUPPLY AIR DUCT 10X1� DN/AWAY 10X10 RECT EXHAUST OR RETURN DUCT 1OXIO UP/TOWARD 10X10;, RECT EXHAUST OR RETURN DUCT 1OX10 DN/AWAY 109 100 ,, ROUND DUCT - UP/TOWARD 100 100 ROUND DUCT - DN/ AWAY S12X1O0ffl FLATOVAL DUCT - UP/ TOWARD 12X100j FLATOVAL DUCT - DN/ AWAY E0 ,:13 ' DUCT OVERLAP 100 BOOT TAP 100 100 45' TAP 100'VOLUME DAMPER 10�-� a B� RISE(R) & DROP(D) TRANSITION ' TURNING VANES/SPLITTERS s DUCT MOUNTED SMOKE DETECTOR n BACK DRAFT DAMPER FLEXIBLE DUCT AIR FLOW (FORCED AIR) COMBINATION FSD FIRE DAMPER SMOKE DAMPER MOTOR OPERATED DAMPER ACCESS DOORS SOUND TRAP FLEX CONNECTION 16X165L ACOUSTICALLY LINED DUCT (SL) FABRIC DUCT CLEARANCE ® SUPPLY AIR DIFFUSER (WITH CORE BLANKOFF) CEILING RETURN, TRANSFER OR EXHAUST AIR GRILLE SLOTTED DIFFUSER (PLAN VIEW) Q REVISION CLOUD & TRIANGLE 1#0 ROUND DUCT SYMBOL ##X## 0 FLATOVAL DUCT SYMBOL ##' DEGREES SYMBOL ® POINT OF CONNECTION CD1-100 GRD TAG IDENTIFIER = TYPE -CFM 80 SIZE (D T'STAT/TEMP SENSOR ®o CARBON DIOXIDE H HUMIDITY SENSOR SENSOR sD SMOKE DETECTOR @ CARBON MONOXIDE sP STATIC PRESSURE SENSOR SENSOR MECHANICAL GENERAL NOTES 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE 2012 IBC, 2012 WSEC, & 2012 IMC. 2. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNLESS NOTED OTHERWISE. 3. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE ENGINEER PRIOR TO PROCEEDING. 6. ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNLESS NOTED OTHERWISE. 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4" CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DANPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS AFTER LINING HAS BEEN ACCOUNTED FOR. 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY FUEL BURNING EQUIPMENT OR 3 FEET BELOW ANY PLUMBING VENT OR EXHAUST OUTLET WITHIN 10 FEET 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING: -0% TO 100% OF THE DESIGN SUPPLY AIR -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE EQUIPPED WITH MOTORIZED (OR GRAVITY DAMPERS PER EXCEPTIONS IN C403.2.4.4) WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE. 13. THE CONTROL SYSTEM SHALL BE 7 -DAY PROGRAMMABLE, CAPABLE OF BEING SET FOR SEVEN (7) DIFFERENT DAY TYPES PER WEEK, AND CAPABLE OF A DEADBAND SETTING OF AT LEAST 56F (19F FOR RESIDENTOPLY BETWEEN THE HEATING AND COOLING SETPOINTS. AHU CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF RESETTING AIR TEMPERATURES BY REPRESENTATIVE BUILDING LOADS. 14. RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE WASHINGTON STATE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. COMMISSIONING, SYSTEM BALANCING, RECORD DRAWINGS AS REQUIRED PER THE WASHINGTON STATE ENERGY CODE C408. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT MEfiHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING IN EXCESS OF 2000 CFM [INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH AN AGGREGATE SUPPLY GREATER THAN 2000 CFM] OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM, 22. FOR ALL "SEALED AIR TIGHT" SHAFTS OR ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS INSIDE THE SHAFT SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT, (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE SHAFT SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE -ANY PENETRATIONS OF THE SHAFT CONSTRUCTION DUCTWORK CONDUIT, PIPING, ...) SHALL BE SEALED ON BOTH SIDES -USE SECTION 909.5 OF THE 2012 IBC FOR MAX A LOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS, AND OPEN AGAINST THE DIRECTION OF ROOM/SHAFT PRESSURE. 23. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENTS. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 ASID SMOKE DEVELOPED RATING SHALL BE < 50. USE FLEXIDUCT MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATONS OR APPROVED EQUAL. 24. LOCATION AND DETAILS OF EQUIPMENT DUCT ROUTING AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH OTHER TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. 25. FOR RESIDENTIAL INSULATION ON DUCTWORK AND PIPING SEE ENERGY CODE CHAPTER R403. 26. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION. A PERMANENT AND VISIBLE DISPLAY IS TO BE PROVIDED FOR EACH BUILDING, READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL EXISTING DUCTWORK LAST UPDATED DEMO DUCTWORK DUCT TYPE WALL -MOUNTED GRILLE �- PIPE ELBOW UP SUPPLY & RETURN PIPE ELBOW DN R-8 DIRECTION OF FLOW -" DIRECTION OF SLOPE DOWN SEE NOTES 4 & 5 7 PLUG OR CAP NOT WITHIN CONDITIONED SPACE: INSIDE BUILDING PRESS REDUCING ASSEMBLY -��--� SOLENOID VALVE WITHIN CONDITIONED SPACE PUMP z---CHWS /CHWR-5 CHILLED WATER SUPPLY/RETURN 2- RL/RS -s REFRIGERANT LIQUID/SUCTION 2-- NG --S NATURAL GAS 2- LPG -s LIQUID PROPANE GAS 2-CDWS /CDWR-s CONDENSER WATER SUPPLY/RETURN '-HWS/HWR-s HEATING WATER SUPPLY/RETURN 2- COND -s CONDENSATE 2-- FOV -3 FUEL OIL VENT 2- FOS / FOR --3 FUEL OIL SUPPLY/RETURN 2-- RDG -s REFRIGERANT DISCHARGE GAS MECHANICAL GENERAL NOTES 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE 2012 IBC, 2012 WSEC, & 2012 IMC. 2. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNLESS NOTED OTHERWISE. 3. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE ENGINEER PRIOR TO PROCEEDING. 6. ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNLESS NOTED OTHERWISE. 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4" CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DANPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS AFTER LINING HAS BEEN ACCOUNTED FOR. 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY FUEL BURNING EQUIPMENT OR 3 FEET BELOW ANY PLUMBING VENT OR EXHAUST OUTLET WITHIN 10 FEET 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING: -0% TO 100% OF THE DESIGN SUPPLY AIR -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE EQUIPPED WITH MOTORIZED (OR GRAVITY DAMPERS PER EXCEPTIONS IN C403.2.4.4) WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE. 13. THE CONTROL SYSTEM SHALL BE 7 -DAY PROGRAMMABLE, CAPABLE OF BEING SET FOR SEVEN (7) DIFFERENT DAY TYPES PER WEEK, AND CAPABLE OF A DEADBAND SETTING OF AT LEAST 56F (19F FOR RESIDENTOPLY BETWEEN THE HEATING AND COOLING SETPOINTS. AHU CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF RESETTING AIR TEMPERATURES BY REPRESENTATIVE BUILDING LOADS. 14. RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE WASHINGTON STATE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. COMMISSIONING, SYSTEM BALANCING, RECORD DRAWINGS AS REQUIRED PER THE WASHINGTON STATE ENERGY CODE C408. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT MEfiHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING IN EXCESS OF 2000 CFM [INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH AN AGGREGATE SUPPLY GREATER THAN 2000 CFM] OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM, 22. FOR ALL "SEALED AIR TIGHT" SHAFTS OR ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS INSIDE THE SHAFT SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT, (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE SHAFT SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE -ANY PENETRATIONS OF THE SHAFT CONSTRUCTION DUCTWORK CONDUIT, PIPING, ...) SHALL BE SEALED ON BOTH SIDES -USE SECTION 909.5 OF THE 2012 IBC FOR MAX A LOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS, AND OPEN AGAINST THE DIRECTION OF ROOM/SHAFT PRESSURE. 23. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENTS. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 ASID SMOKE DEVELOPED RATING SHALL BE < 50. USE FLEXIDUCT MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATONS OR APPROVED EQUAL. 24. LOCATION AND DETAILS OF EQUIPMENT DUCT ROUTING AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH OTHER TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. 25. FOR RESIDENTIAL INSULATION ON DUCTWORK AND PIPING SEE ENERGY CODE CHAPTER R403. 26. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION. A PERMANENT AND VISIBLE DISPLAY IS TO BE PROVIDED FOR EACH BUILDING, READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL 1 RCrCIC 1 u CINUMUT LuUC JCI.I lu1V Lmua.za ruK rUKI rttK KtyUIKtMtN I5 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.7.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (THEN R-6 FOR REST OF INSTALLATION) OR HEATING & COOLING EQUIPMENT 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEVEL IF: DEDICATED OUTSIDE AIR SYSTEM AND LESS THAN 2,800 CFM SUPPLY AIR MINIMUMLAST UPDATED: 01/10/14 MINIMUMT INSULATION LAST UPDATED 01/10/14 DUCT TYPE DUCT LOCATION IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM INSULATION R -VALUE REMARKS SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE, OUTSIDE BUILDING R-8 1,2,3 OUTSIDE AIR WITHIN CONDITIONED SPACE, INSIDE BUILDING SEE NOTES 4 & 5 1,2,3,4,5 SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE: INSIDE BUILDING R-6 1,2 SUPPLY AIR <550 OR >1050 WITHIN CONDITIONED SPACE R-3.3 1,2 1 RCrCIC 1 u CINUMUT LuUC JCI.I lu1V Lmua.za ruK rUKI rttK KtyUIKtMtN I5 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.7.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (THEN R-6 FOR REST OF INSTALLATION) OR HEATING & COOLING EQUIPMENT 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEVEL IF: DEDICATED OUTSIDE AIR SYSTEM AND LESS THAN 2,800 CFM SUPPLY AIR MINIMUMLAST UPDATED: 01/10/14 FLUID DESIGN INSULATION CONDUCTIVITY NOMINAL PIPE DIAMETER (INCH) OPERATING TEMP OF CONDUCTIVITY RANGE MEAN TEMP RATING °F <1 _F 1 TO <1-1/2 1-1/2 TO <4 4 TO <8 >8 HEATING SYSTEMS (STEAM, CONDENSATE, HYDRONIC HOT WATER, DOMESTIC HOT WATER) >350 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0 251-350 0.29-0.32 200 3.0 4.0 4.5 4.5 4.5 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 141-200 0.25-0.29 125 1.5 1.5 1 2.0 1 2.0 2.0 105-140 0.21-0.28 100 1.0' 1.0 1 1.5 1 1.5 1.5 DOMESTIC COLD WATER AND HORIZONTAL RAIN LEADERS TO FIRST VERTICAL RAIN LEADER 40-60 1 0.21-0.27 1 0.5 1 0.5 1 1.0 1 1.0 1.0 COOLING SYSTEMS (CHILLED WATER, BRINE AND REFRIGERANT, WATERSIDE ECONOMIZER SYSTEMS)** 40-60 0.21-0.27 1 75 1 0.5 0.5 1 1.0 1.0 1.0 <40 0.20-0.26 1 75 0.5 1 1.0 1.0 1 1.0 1.5 M11YLI�JI <.VIY 1 RVL VMLV Ca U DMU 110-1lvl7 VIALVCJ HJJUL YA I tU VVI I rl FIVIJIU 1" UK Lt55 1N UTA. ** TYPICAL CONDENSER WATER PIPE IN NON -ECONOMIZER SYSTEMS DOES NOT REQUIRE INSULATION i 2954900445 GUNDAKERS INTERURBAN ADD LOT 1 OF CITY OF TUKWILA SHORT PLAT NO L93-0050 RECORDING NO 9403313383 SAID SHORT PLAT DAF - LOT 1 OF CITY OF TUKWILA SHORT PLAT NO 88-1SS RECORDING NO 8807210416 BEING A PORTION OF SW 1/4 OF NW 1/4 AND OF NW 1/4 OF SW 1/4 OF SECTION 24-23-04 SITE MAP ML, COW kALE pamitmo._ lid -010D Plan reVIOW aoprOVal is subject to errors and +ornissions. Approval of constru6ion dow-ments does not &0hoft,3 the Violation cf any adoptod code or Ordinance. Pealpt of approved Field Copy and conditions is acknowledged: Date: City of Tukwila ila BUILDING DIVISION JUN 14 2016 PERPAIT CENTER Building Today, Defining Tomorrow Henmanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 �J. Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC IEVVED FOR COMPLIANCE DRAWING INDEX SHEET NO. SHEET TITLE CURRENT REVISION MO.00 LEGEND ABBREVIATIONS GENERAL NOTES & SHEET INDEX - HVAC MO.01 SCHEDULE SHEET - HVAC M2.01 D 1ST FLOOR DEMO PLAN - HVAC M2.021) 2ND FLOOR DEMO PLAN - HVAC M2.01 1 ST FLOOR PLAN - HVAC M2.02 2ND FLOOR PLAN - HVAC M2.R1 ROOF PLAN - HVAC M6.01 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC M6.02 LIQUID REFRIGERANT PIPING DIAGRAM - HVAC MP2.01 1ST FLOOR PIPING PLAN - HVAC MP2.02 2ND FLOOR PIPING PLAN - HVAC i 2954900445 GUNDAKERS INTERURBAN ADD LOT 1 OF CITY OF TUKWILA SHORT PLAT NO L93-0050 RECORDING NO 9403313383 SAID SHORT PLAT DAF - LOT 1 OF CITY OF TUKWILA SHORT PLAT NO 88-1SS RECORDING NO 8807210416 BEING A PORTION OF SW 1/4 OF NW 1/4 AND OF NW 1/4 OF SW 1/4 OF SECTION 24-23-04 SITE MAP ML, COW kALE pamitmo._ lid -010D Plan reVIOW aoprOVal is subject to errors and +ornissions. Approval of constru6ion dow-ments does not &0hoft,3 the Violation cf any adoptod code or Ordinance. Pealpt of approved Field Copy and conditions is acknowledged: Date: City of Tukwila ila BUILDING DIVISION JUN 14 2016 PERPAIT CENTER Building Today, Defining Tomorrow Henmanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 �J. Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC IEVVED FOR COMPLIANCE KtMAKK5: 1 PROVIDE BC CONTROLLER AS SCHEDULED, AND SIMPLE MA CONTROLLERS PAC-YT5ICRB (ONE FOR EACH FC), TWINNING KIT FOR CU -02, AND CONNECT TO EXISTING CENTRAL CONTROLLER GB -50A. 2 PRESSURE TEST REFRGERANT PIPING AT 600 PSI 3 INDIVIDUAL MODULE OF CU -02 REQUIRE SEPARATE ELECTRICAL CONNECTION 4 SWITCH DISCONNECT MAY BE REQUIRED FOR EACH UNIT. (ELECTRICAL CONTRACTOR TO VERIFY WITH JURISDICTION HAVING AUTHORITY) 5 R -410A REFRIGERANT, PROVIDE SHUT-OFF VALVES WITH SCHRADER VALVES ON BC CONTROLLER ON ALL PIPING INCLUDING UNUSED PORTS. PROVIDE 1" CONDENSATE DRAIN LINE OFF BC CONTROLLER. 6 ROOM TEMPERATURE SENSOR INSTALLED BY CONTROLS CONTRACTOR 7 NO ECONOMIZER PROVIDED, ECONOMIZER EXCEPTION PER 2012 WA STATE ENERGY CODE SECTION C403.4.1 ECONOMIZERS, EXCEPTION #6 - FOR VRF SYSTEMS. 8 UNIT > 2000 CFM - REQUIRES SMOKE DETECTOR FOR LOCAL SHUTDOWN 9 INSTALL PER MANUFACTURERS RECOMMENDATION 10 FOR TRADE COORDINATION REFER TO LATEST APPROVED SUBMITTALS 11 EXISTING UNIT 12 RELOCATE AS SHOWN ON DRAWINGS AIR TO AIR ENERG"T' RECOVERY UmmN37 SCHEDULE LAST UPDATED: 06/09/16 UNIT TAG BASIS OF DESIGN CONDITIONS OF OPERATION OUTSIDE AIR COUTY-MULTI % EFFECTIVENESS VARIABLE REFRIGERANT SYSTEM SCHEDULE HEATING COOLING NOTES: CFM EAT'F LAT°F MAX COIL DB WB DB RH APD (IN WG) CFM EAT°F DB WB VOLTAGE/PH MCA MOP ERV2-01 LOSSNAY LGH-F600RX5-E SUMMER DESIGN 600 85 66 81 63.6 - - 600 78 62 67% 208 3.6 15 525 1-7 OUTDOOR HR UNITS 1 600 1 24 15 1 56.3 49 - - 600 70 62 CFM CFM IN WG EWT OF LWT OF GPM PD FT HD TOTAL BTUH SENS. BTUH EER EWT OF LWT OF GPM PD FT HD OUTPUT BTUH. QTY I BHP HP FLA VJPH LBS INDOOR AIR HANDLING UNIT AC -1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-25 7,100 1,065 2.82 75 89.0 50 243,000 10.4 - - - - - 14 15 50 480/3 3,225 1f2 AC -1 1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-29 CVTCTTRiC f I IAITT Tr1 f1CPA ATAI 1'fC�At API/"C ANI f1T r11 LAST UPDATED: 06J09/16 UNIT UNIT 1 l5 BASIS COOLING CAPACITY HEATING CAPACITY FAN 0.5 0.34 ELECTRICAL SOUND WEIGHT 16.1 125 UNIT BASIS OF NOM. SUPPLY MIN OSA MAX ESP ON-OFF CLG POWER CONS. HTG CAP 120/1 ELECTRICAL SOUND WEIGHT EF -2 TAG LOCATION TAG EXISTING - PENN OF DESIGN TOTAL BTUH SENS. BTUH IEER BTUH COP QTY kW EACH MCA MOCP V/PH dB LBS REMARKS TAG DESIGN TONNAGE CFM CFM IN WG MIXING BOX CAP BTUH CLNG W HTG W BTUH MCA MOCP VPH MAX Db LBS REMARKS CU -01 OUTDOORS MECH ENCL SYSTEM DATA MITSUBISHI PURY-P168 YSKMU A 168,000 157 927 19.4 188,000 3.63 - - - - - 61.0 2ND FLOOR CONF - . 1 AT1.1 11 Z6 -TD FC1-01 MITSUBISHI PLFY-P12NCMU-E 1.00 350 30 0.00 NA 12,000 60 60 13,500 0.35 15 208-230/1 34 44 MODUL-1 DATA MITSUBISHI PURY-P96YKMU-A 96,000 - 108,000 - 1 0.92 15 20 460/3 - 574 11 FC1-02 MITSUBISHI PLFY-P08NCMU-E 0.67 320 30 0.00 NA 8,000 50 50 9,000 0.29 15 208-230/1 32 41 11 11 MODUL-2 DATA MITSUBISHI PURY-P72YKMU A 72,000 - 80,000 - 1 0.92 11 15 460/3 - 534 11 FC1-03 MITSUBISHI PLFY-P12NCMU-E 1.00 350 40 0.00 NA 12,000 60 60 13,500 0.35 15 208-230/1 34 44 11 FC1-04 MITSUBISHI PEFY-P15NMHU-E 1.25 660 40 0.60 CUSTOM 15,000 90 70 17,000 1.45 15 208-230/1 34 58 11 FC1-05 MITSUBISHI PEFY-P18NMHU-E 1.50 500 60 0.60 CUSTOM 18,000 110 90 20 000 1.56 15 208-230/1 35 58 11 BC -01 STORAGE RM CU -01 MITSUBISHI CMB-P1010NU-GA - - - - - - - 1.04 15 208/230/1 - 132 11 FC1-06 MITSUBISHI PEFY-P36NMHU-E 3.00 1,165 100 0.60 CUSTOM 36,000 240 220 40,000 3.50 15 208-230-/l 41 86 11 FC1-07 MITSUBISHI PEFY-P18NMHU-E 1.50 600 150 0.60 CUSTOM 18,000 110 90 20,000 1.56 15 208-230/1 35 58 11 FCI-08 MITSUBISHI PEFY-P30NMHU-E 2.50 890 230 0.60 CUSTOM 30,000 170 150 34,000 2.73 15 208-230/1 39 67 11 FC2-01 MITSUBISHI PEFY-P15NMHU-E 1.25 660 40 0.60 CUSTOM 15,000 90 70 17 000 1.45 15 208-230/1 34 58 11 FC2-02 MITSUBISHI DEFY-P36NMHU-E 3.00 1 165 60 0.60 CUSTOM 36 000 240 220 40 000 3.50 15 208-230/1 41 86 2 6 7 9 11 12 FC2-03 MITSUBISHI PEFY-P72NMHSU-E 8.00 1766-2154-2542 70 1.00 CUSTOM 72,000 630 630 80,000 7.70 15 208-230/1 43 214 2 6 7 8 9 10 CU -02 OUTDOORS MECH ENCL SYSTEM DATA MITSUBISHI PURY-P288YSLMU-A 288,000 248,080 18.50 323,000 3.28 64 1-146-0- 1,2 FC2-04 MITSUBISHI PEFY-P36NMAU-E3 3.00 812-989-1165 80 0.60 CUSTOM 36,000 240 220 40,000 3.32 15 208-230/1 41 86 2 6 7 9 10 MODUL-1 DATA MITSUBISHI PURY-P144YLMU-A 144,000 - - - - 2 0.92 24.00 35 460/3 - - -3,4 FC2-05 MITSUBISHI PEFY-P36NMAU-E3 3.00 812-989-1165 20 0.60 CUSTOM 36,000 240 220 40,000 3.32 15 208-230/1 41 86 2 6 7 9 10 MODUL-2 DATA MITSUBISHI PURY-P144YLMU-A 144,000 - - - - 2 0.92 24.00 35 460/3 - - 3,4 FC2-06 MITSUBISHI PEFY-P48NMAU-E3 4.00 989-1201-1412 110 1 0.60 CUSTOM 48,000 340 320 5-410-0-0 3.41 15 208-230/1 44 86 2 6 7 9 10 FC2-07 MITSUBISHI PEFY-P36NMAU-E3 3.00 812-989-1165 95 0.60 CUSTOM 36,000 240 220 40,000 3.32 15 208-230/1 41 86 2161719110 FC2-08 MITSUBISHI PEFY-P18NMAU-E3 1.50 424-512-600 70 0.60 CUSTOM 18,000 110 90 20,000 1.56 15 208-230/1 35 58 2 6 7 9 10 FFC2-09 MITSUBISHI PEFY-P48NMAU-E3 4.00 989-1201-1412 20 0.60 CUSTOM 48,000 340 1 320 54,000 3.41 15 208-230/1 44 86 2 6 7 9 10 BC -02 CU -02 MITSUBISHI CMB-P1010NU-HA1 - - - - - - - 1.04 1 15 1208/230/11 132 5 FC2-10 MITSUBISHI PEFY-P36NMAU-E3 3.00 1 812-989-1165 35 0.60 CUSTOM 36.000 240 1 220 1 40.000 332 15 7mg'inm 41 1 1 Qr. I ') A -7 o in KtMAKK5: 1 PROVIDE BC CONTROLLER AS SCHEDULED, AND SIMPLE MA CONTROLLERS PAC-YT5ICRB (ONE FOR EACH FC), TWINNING KIT FOR CU -02, AND CONNECT TO EXISTING CENTRAL CONTROLLER GB -50A. 2 PRESSURE TEST REFRGERANT PIPING AT 600 PSI 3 INDIVIDUAL MODULE OF CU -02 REQUIRE SEPARATE ELECTRICAL CONNECTION 4 SWITCH DISCONNECT MAY BE REQUIRED FOR EACH UNIT. (ELECTRICAL CONTRACTOR TO VERIFY WITH JURISDICTION HAVING AUTHORITY) 5 R -410A REFRIGERANT, PROVIDE SHUT-OFF VALVES WITH SCHRADER VALVES ON BC CONTROLLER ON ALL PIPING INCLUDING UNUSED PORTS. PROVIDE 1" CONDENSATE DRAIN LINE OFF BC CONTROLLER. 6 ROOM TEMPERATURE SENSOR INSTALLED BY CONTROLS CONTRACTOR 7 NO ECONOMIZER PROVIDED, ECONOMIZER EXCEPTION PER 2012 WA STATE ENERGY CODE SECTION C403.4.1 ECONOMIZERS, EXCEPTION #6 - FOR VRF SYSTEMS. 8 UNIT > 2000 CFM - REQUIRES SMOKE DETECTOR FOR LOCAL SHUTDOWN 9 INSTALL PER MANUFACTURERS RECOMMENDATION 10 FOR TRADE COORDINATION REFER TO LATEST APPROVED SUBMITTALS 11 EXISTING UNIT 12 RELOCATE AS SHOWN ON DRAWINGS AIR TO AIR ENERG"T' RECOVERY UmmN37 SCHEDULE LAST UPDATED: 06/09/16 UNIT TAG BASIS OF DESIGN CONDITIONS OF OPERATION OUTSIDE AIR EXHAUST AIR % EFFECTIVENESS ELECTRICAL UNIT WEIGHT HEATING COOLING NOTES: CFM EAT'F LAT°F MAX COIL DB WB DB RH APD (IN WG) CFM EAT°F DB WB VOLTAGE/PH MCA MOP ERV2-01 LOSSNAY LGH-F600RX5-E SUMMER DESIGN 600 85 66 81 63.6 - - 600 78 62 67% 208 3.6 15 525 1-7 WINTER DESIGN 1 600 1 24 15 1 56.3 49 - - 600 70 62 1 ELECTRICAL CONTRACTOR TO PROVIDE SCCR PROTECTION FOR EQUIPMENT AS REQUIRED BY NATIONAL ELECTRICAL CODE. MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM) INSIDE CONTROL PANEL AS REQUIRED BY NATI04AL ELECTRICAL CODE. 2 INTERLOCK UNIT OPERATION WITH BUILDING OPERATING HOURS 3 MANUFACTURER TO PROVIDE MERV-8 FILTERS FOR OUTSIDE AIRFLOW SYSTEM AND MERV-8 FILTERS FOR EXHAUST AIRFLOW SYSTEM. 4 UNIT PROVIDED WITH LOW LEAKAGE MOTORIZED DAMPERS ON OSA AND EXHAUST AIR, FILTER SENSOR, ROTATION SENSOR, AND SERVICE OUTLET. 5 PROVIDE SEPARATE POWER CONNECTION AND DISCONNECT TO ELECTRIC DUCT HEATER, BY ELECTRICAL CONTRACTOR 6 INSTALL PER MANUFACTURER RECOMMENDATIONS 7 FOR TRADE COORDINATION REFER TO EQUIPMENT SUBMITTALS - �..-v . a.. v v..a • • v • �.-. •! u • . • �•-v. ..�! a• .V•- ! \V 1 V t 1-✓ 2 FIELD VERIFY EXISTING UNIT INFORMATION (EXISTING) MAKE-UP AIMUNIT SCHEDULE . LAST UPDATED 06/03/16 UNIT TAG (EXISTING) AIR HAN[r)"LING UNI"I"a"CHErDfULE BASIS OF DESIGN OSA CFM FAN MOTOR ESP IN WG HEATING COOLING UNIT ELECTRICAL I UNIT dBA IWEIGHT I LBS REMARKS FLA HP MBTUINIMBTUOUTIEATOFI LAST UPDATED: 06 09/16 UNIT BASIS OF SUPPLY OSA ESP CONDENSER WATER COOLING COIL HOT WATER HEATING COIL INDOOR FAN ELEC WEIGHT 2,100 TAG LOCATION SERVES DESIGN CFM CFM IN WG EWT OF LWT OF GPM PD FT HD TOTAL BTUH SENS. BTUH EER EWT OF LWT OF GPM PD FT HD OUTPUT BTUH. QTY I BHP HP FLA VJPH LBS REMARKS AC -1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-25 7,100 1,065 2.82 75 89.0 50 243,000 10.4 - - - - - 14 15 50 480/3 3,225 1f2 AC -1 1 MECHANICAL ROOM 1st & 2nd FV VAV TRANE SWUD-29 CVTCTTRiC f I IAITT Tr1 f1CPA ATAI 1'fC�At API/"C ANI f1T r11 11 860 1,779 3.56 75 88.5 60 313 000 11.1 - - - - - 1 l5 56 480/3 3,300 1,2 _.. - �..-v . a.. v v..a • • v • �.-. •! u • . • �•-v. ..�! a• .V•- ! \V 1 V t 1-✓ 2 FIELD VERIFY EXISTING UNIT INFORMATION (EXISTING) MAKE-UP AIMUNIT SCHEDULE . LAST UPDATED 06/03/16 UNIT TAG LOCATION SERVES BASIS OF DESIGN OSA CFM FAN MOTOR ESP IN WG HEATING COOLING UNIT ELECTRICAL I UNIT dBA IWEIGHT I LBS REMARKS FLA HP MBTUINIMBTUOUTIEATOFI TYPE LAT°F ITURNDNINGCONN MBH TOTAL MBH SENS EER MCA I MOP VPH MAU-1 .1 ROOF r \1Tf-TTat1 2ND FLOOR FUME HOODS TRANE YSC072F4RZA 2,100 2.5 1 0.90 150 121.5 24.0 80.3 4:1 3/41t 72 49 11.2 18.2 25 460/3 81 875 1 1 a_f\iJ 1 117V a v♦i✓1 i.�V I..�V11 1-1 L1. 1 I V 1\LI'1/"li i'1 LAISTING) SURD nr- L11'r j CA HAUST AN[)` RELIEF FAN SCOPMEDULE TOTAL SENS MBH MBH LAST UPDATED 06/09/16 TAG LAST UPDATED: 06/19J16 UNIT TAG LOCATION SERVES BASIS OF DESIGN TYPE CONTROLS FAN CFM ESP IN WG BHP MOTOR HP ELECTRICAL V/PH Sone Rating WEIGHT LBS REMARKS SF1-01 1ST FLOOR CLNG VRF OSA VENTILATION COOK 80S N -B IN-LINE TIME CLOCK 600 0.9 0.30 1/3 120/1 12.0 151 1 EFl-02 IST FLOOR CLNG MAGNET AREA RESTROOM BROAN L-200 IN-LINE ON-OFF 120 0.6 127 W 120/1 2.3 23 1 EF2-01 2ND FLOOR CLNG SERVER ROOM COOK 100S N -B IN-LINE T -STAT 1,000 0.5 0.34 1/2 120/1 16.1 125 1 EF -1 1ST FLOOR CLNG MAIN RESTROOM EXISTING - PENN Z10RA ON-OFF 380 0.3 0.30 130 W 120/1 1 EF -2 ROOF 2ND FLR RESTROOM EXISTING - PENN XR94L BAS 486 0.13 1/10 120/1 1 EF -3 ROOF ROOM 216 EXISTING - PENN XR94L BAS 375 0.13 1/10 120/1 1 EF -4 ROOF ELEV EQ RM 104 EXISTING - PENN I XR94L BAS 504 0.13 1/10 120/1 1 EF -5 i 2 -ND FLOOR CLNG r\/Te-,r, ^ 1- 11T1\.. r.1T -f 2ND FLOOR CONF - . 1 AT1.1 EXISTING - PENN Z6 -TD BAS 60 0.25 50 W 120/1 l a v♦i✓1 i.�V I..�V11 1-1 L1. 1 I V 1\LI'1/"li i'1 1 L/\1J111YV VIY11 J (E ISTING) P C.Ema E UIPMENT COm"OUNG mumNXT SLAOO"HEDULE 06/03/16 ESP UNIT BASIS OF SUPPLY IN TAG LOCATION SERVES DESIGN CFM WG (E."KISTING) LAB H00110"D SCHEDULE SOUND OPERATING PER ARI 270/370 WEIGHT (dBA) (LBS REMARKS TOTAL SENS MBH MBH LAST UPDATED 06/09/16 TAG LOCATION BASIS OF DESIGN SERVES ORE UAL EXHAUST FACE CFM VELOCITY FPM SP IN WG OPNG SIZE IN INCHES WIDTH HEIGHT EXHAUST MOTOR COLLAR BHP HP ELECTRICAL HOOD WEIGHT FLA V/PH MATERIAL LBS REMARKS LH2-1 2ND FLOOR WET CHEM 2ND FLOOR WET CHEM EXISTING 686 100 0.4 38 26 1211 1 LH2-2 2ND FLOOR WET CHEM 2ND FLOOR WET CHEM EXISTING 1292 100 0.4 62 30 1211 1 LH2-3 2ND FLOOR WET CHEM 2ND FLOOR WET CHEM EXISTING 686 100 0.4 38 26 12" 1 LH2-4 2ND FLOOR WET CHEM turf-'TTIIIP'• 1 u1TT" 2ND FLOOR WET CHEM EXISTING 519 100 0.4 44 17 1 12" 1 1 L/\1J111YV VIY11 J (E ISTING) P C.Ema E UIPMENT COm"OUNG mumNXT SLAOO"HEDULE 06/03/16 ESP UNIT BASIS OF SUPPLY IN TAG LOCATION SERVES DESIGN CFM WG COOLING CAPACITY SUPPLY FAN ELEC SOUND OPERATING PER ARI 270/370 WEIGHT (dBA) (LBS REMARKS TOTAL SENS MBH MBH TYPE HP MCA MAX FUSE V/PH ACR -1 ROOF 1st F!r MAGNET RM YORK DlEB042 114 0 0.50 42 30 DRAW THROUGH 3/4 22.0 30 208/3 81 342 1 ACR -2 ROOF 1st Fir MAGNET RM YORK D1EB042 1,400 1 0.50 4 r Tr_TTkl/ 42 1 30 1 DRAW THROUGH 3/4 22.0 30 208/3 81 342 1 i L/\1J 1 11 V V rs� . REVIEWED FOR ODE COMPLIANCE APPROVED JUN 2 4 2016 City of Tukwila gU1L.D{(�� DIVISION RECEIVED CITY OF TUKWILA JUN 14 2016 PERMIT CENTER VAV UNIT TAG 101-1 101-2 LOCATION 2ND FLOOR 2ND FLOOR (EXISTING) VAV BASIS OF SERVES DESIGN TYPE ALLERGY TRANE VCCD-17 ALLERGY TRANE VCCD-11 BOX SCHEDULE - HOT ESP COOLING VALVE IN FAN MOTOR CFM MINIMUM WG HR SPEED MCA 900 135 0.50 450 70 0.50 WATER V/PH BTUH CFM HOT WATER HEATING COIL EAT LAT EWT LWT OF OF OF OF GPM LAST UPDATED: PD WEIGHT IN WG LBS x%27 j12 REMARKS 1 1 101-3 101-4 2ND FLOOR 2ND FLOOR FREEZER RM CHEMISTRY TRANE TRANE VCCD-06 VCCD-17 450 600 70 90 0.50 0.50 1-5 BAC VFL 488 CLOSE CT 110 89 75 67 11.8 1, 2, 3, 4 DT2 480/3 1 1 101-5 101-6 2ND FLOOR 2ND FLOOR CHEM/PROCESSING SHIPPING TRANE TRANE VCCD-17 VCCD-03 600 200 90 30 0.50 0.50 TITUS NICD MODULAR 10 ALUMINUM 350 10 X 10 24 X24 T–BAR STEEL 1, 2, 3, 4 DT4 1 MODULAR 1 101-7 101-8 102-1 103-1 2ND FLOOR 1ST FLOOR 1ST FLOOR 2ND FLOOR OFFICE OFFICE RETAIL SERVER RM TRANE TRANE TRANE TRANE VCCD-11 VPWF-08 VFWD 2415 VCCD-11 500 900 1,100 700 75 135 165 105 0.50 0.50 0.50 0.50 1/3 M 5 M 120/1 13500 22000 600 1100 66 66 87 85 165 165 0.81 0.81 0.17 STEEL 1, 2, 3, 4 DT6 1 105 4,5,6 1 1 103-2 103-3 103-4 204-1 205-1 206-1 1ST FLOOR 1ST FLOOR 1ST FLOOR 2ND FLOOR 2ND FLOOR 2ND FLOOR MECH RM WAITING WAITING CS/ACC CHEMISTRY ALLERGY TRANE TRANE TRANE TRANE TRANE TRANE VFWD 0604 VFWD 1104 VCCD-11 VFWD 1707 VFWD 3220 VFWD 3220 200 700 500 1,200 3,100 2,880 30 105 75 180 470 450 0.50 0.50 0.50 0.50 0.50 0.50 1 L 1 L 1 1 M M M 4000 7000 14000 1 33500 35000 200 350 675 1600 1700 66 66 1 66 66 66 85 85 85 85 85 1 165 165 165 165 165 0.27 0.45 0.80 0.90 0.90 DT8 TITUS 5OF-8 DUMP STYLE 12 1 1 20 X 24 1 1 1 STEEL 1 207-1 208-1 209-1 209-2 210-1 2ND FLOOR 2ND FLOOR 2ND FLOOR 2ND FLOOR 1ST FLOOR FUTURE STAFF LOUNGE CORRIDOR CORRIDOR SHIPPING TRANE TRANE TRANE TRANE TRANE VFWD1104 VFWD 1707 VCCD-06 VCCD-06 VFWD 1107 750 1,300 250 550 650 115 195 40 83 100 0.50 0.50 0.50 0.50 0.50 M M L 9000 14000 8400 450 700 400 66 66 66 85 85 85 j165 0.54 0.81 0.45 230 8 X 8 -- -- 1 1 1, 2, 3, 5 1 1 1 10 350 10 X 10 -- -- SURFACE STEEL 1, 2, 3, 5 DG4 TITUS MCD MODULAR 12 500 12 X 12 -- -- SURFACE STEEL I [:VTCTTAt� t lit#TT Tfl D[:KAATAi DCQAI nKlt•C Ac AEnTi•f1 MODULAR 18,480 600 14 X 14 160400 SURFACE STEEL 1, 2, 3, 5 DG6 TITUS MCD MODULAR 14 880 16 X 16 2 EXISTING UNIT TO BE RELOCATED AS SHOWN ON DRAWINGS REBALANCE AS NOTED 3 DEMO EXISTING UNIT AND RETURN TO OWNER STOCKPILE 4 NEW FAN POWERED VAV 5 DISCONNECT (AS REQUIRED) TO BE PROVIDED AND INSTALLED BY ELECTRICAL 6 PARALLEL TERMINAL UNIT – SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INLCUDE: – FACTORY INSTALLED 1" THROW–AWAY FILTERS – EXTENDED DAMPER 1%2" DIAM. SHAFT – UNIT CONTROLS AND AUTO RESET 130 DEG. F. THERMOSTAT BY CONTROLS CONTRACTOR – MATT FACED INTERNAL INSULATION TO AIRSTREAM – FIELD VERIFY RIGHT/LEFT HAND OF COLD & HOT DECK INLETS PRIOR TO ORDER (HAND DETERMINED BY LOCATION OF COLD DECK LOOKING IN DIRECTION OF AIRFLOW) 7 SMOKE DETECTOR REQUIRED. SMOKE DETECTOR PROVIDED BY ELECTRICAL, INSTALLED BY MECHANICAL. 8 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1PH POWER TO THE FAN MOTOR (E)Aff ISTINCO-3%) E LECTRXC DUCT H EATE lffm% SCH E DU Lr. LAST UPDATED: 06/03/16 UNIT TAG EDH1-01 LOCATION FIRST RST�F FLOOR CEILING�DVFR D SERVES SYSTEM VENTILATION BASIS OF DESIGN NEPTRONIC DF CIOOH^^T^7.0^_ KW HEATING STAGES 2.0 TOTAL CFM 600 TEMP RISE OF 36.9 DUCT T'STAT LOCATION DUCT ELECTRICAL WEIGHT LBS 20 REMARKS WIDTH IN 12.0 HEIGHT IN 12.0 FLA 8.42 V/PH 460/3 1-5 ..�........ JYY1 / �, I I Iuv InL_ \.v I vv I rRv 1 Cl.l lU1V, CLCI.I ICVIV1l, l.U1V 1 KVLJ, vuLi 1 -�i Hi tN� i HLLtu 1N MixiNV bUX AND SET TU 55 DEG F. 2 DISCONNECT PROVIDED WITH UNIT TO BE INSTALLED BY ELECTRICAL CONTRACTOR 3 INSTALL PER MANUFACTURERS INSTALLATION INSTRUCTION 4 FOR TRADE COORDINATION REFER TO APPROVED SUBMITTALS 5 EXISTING. FOR REFERENCE ONLY awlamisT I LAST UPDATED: 06/09/16 UNIT TAG LOCATION SERVES BASIS OF DESIGN TYPE TOTAL GPM EWT OF LWT OF AMB. WB OF MAX PD FT FAN MOTOR WEIGHT LBS SOUND DBA REMARKS NO. FANS HP EACH V/PH CT -1 PARKING AC -1 &AC -2 �IAIT BAC VFL 488 CLOSE CT 110 89 75 67 11.8 1, 2, 3, 4 DT2 480/3 9,700 8 1 i LJ\ilii li 7V VI1A I I Iwly vv I vlri �7J•Vvlc Qits r%o vlrr-UoCr- IVC�,r\ Olt -m, U.N.U. UN uvvuo 2 ALL DIFFUSERS TO HAVE SHEET METAL CAN PLENUM 3 STANDARD #26 WHITE FINISH 4 PROVIDE BORDER TYPE 3, LAY—IN TYPE 5 PROVIDE BORDER TYPE 1, SURFACE MOUNT TYPE 6 DIFFUSER CANTO HAVE 1" SOUNDLINING WITH PERFORATED PLATE 7 DIFFUSER CAN PLENUM TO BE EQUIPPED WITH PERFORATED PLATE T lk4'SFER / RETURN / EXHAUST AIR GRILLE SCHEDULE O®ULAR DIFFUSER SCHEDULE LAST UPDATED: 09/27/12 UNIT TAG BASIS OF DESIGN TYPE NECK SIZE IN DIA MAX CFM CORE SIZE FACE SIZE NC MOUNTING MATERIAL REMARKS DT1 TITUS NICD MODULAR 6 EC2 110 6 X 6 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT2 TITUS MCD MODULAR 8 2,9 230 8 X 8 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT3 TITUS NICD MODULAR 10 ALUMINUM 350 10 X 10 24 X24 T–BAR STEEL 1, 2, 3, 4 DT4 TITUS MCD MODULAR 12 14 x 14 500 12 X 12 24 X 24 T–BAR STEEL 1, 2, 3, 4 D 1 TITUS MCD MODULAR 12 GWB 600 14 X 14 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT6 TITUS MCD MODULAR 14 880 16 X 16 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT7 TITUS MCD MODULAR 16 1,120 18 X 18 24 X 24 T–BAR STEEL 1, 2, 3, 4 DT8 TITUS 5OF-8 DUMP STYLE 12 600 20 X 24 20 X 24 T–BAR STEEL 1, 2, 3, 4, 7 DG1 TITUS MCD MODULAR 6 110 6 X 6 -- -- SURFACE STEEL 1, 2, 3, 5 DG2 TITUS MCD MODULAR 8 230 8 X 8 -- -- SURFACE STEEL 1, 2, 3, 5 DG3 TITUS MCD MODULAR 10 350 10 X 10 -- -- SURFACE STEEL 1, 2, 3, 5 DG4 TITUS MCD MODULAR 12 500 12 X 12 -- -- SURFACE STEEL 1, 2, 3, 5 DG5 TITUS MCD MODULAR 12 600 14 X 14 ---- SURFACE STEEL 1, 2, 3, 5 DG6 TITUS MCD MODULAR 14 880 16 X 16 ---- SURFACE STEEL 1, 2, 3, 5 DG7 TITUS MCD MODULAR 16 1,120 18 X 18 -- — SURFACE STEEL 1, 2, 3, 5 I Iwly vv I vlri �7J•Vvlc Qits r%o vlrr-UoCr- IVC�,r\ Olt -m, U.N.U. UN uvvuo 2 ALL DIFFUSERS TO HAVE SHEET METAL CAN PLENUM 3 STANDARD #26 WHITE FINISH 4 PROVIDE BORDER TYPE 3, LAY—IN TYPE 5 PROVIDE BORDER TYPE 1, SURFACE MOUNT TYPE 6 DIFFUSER CANTO HAVE 1" SOUNDLINING WITH PERFORATED PLATE 7 DIFFUSER CAN PLENUM TO BE EQUIPPED WITH PERFORATED PLATE T lk4'SFER / RETURN / EXHAUST AIR GRILLE SCHEDULE LAST UPDATED 9/27/2012 UNIT BASIS OF MAX NECK SIZE FACE TAG DESIGN CFM IN DIA MOUNTING SIZE MATERIAL REMARKS EC1 TITUS 5OF-8 500 — -- T—BAR 24 x 12 ALUMINUM 2,9 EC2 TITUS 50F-8 1,000 T—BAR 24 x 24 ALUMINUM 2,9 EC3 TITUS 50E-8 2,000 -- T—BAR 24 x 48 ALUMINUM 2,9 G1 TITUS 35ORL AGA5 150 8 GWB 8 x 8 ALUMINUM 1,3,7/8,9 G2 TITUS 350RL AGA5 250 10 GWB 10 x 10 ALUMINUM 1,3,7/8,9 G3 TITUS 350RL AGA5 375 12 GWB 12 x.12 ALUMINUM 1,3,7/8,9 G4 TITUS 350RL AGA5 525 14 GWB 14 x 14 ALUMINUM 1,3,7/8,9 G5 TITUS 350RL AGA5 600 14 GWB 16 x 16 ALUMINUM 1,377/8,9 G6 A TITUS 350RL AGA5 1 900 16 rlI IA lr%l PP ^ A A A/- AA r,.w r/1 GWB 18 x 18 ALUMINUM 1,3,7/8,9 r -v. wr yr Yl" -vV L.,vv IYLVI\ ViL..t- V.1 V. V. %JiV UVVt7 2 CORE ONLY — LAY—IN 3 SURFACE MOUNT FRAME 4 CHANNEL FRAME — LAY—IN 5 T—BAR LAY—IN 6 PROVIDE OPPOSED BLADE DAMPER (OBD) 7 PROVIDE DUCTBOARD PLENUM 8 PROVIDE SHEETMETAL PLENUM 9 STANDARD #26 WHITE FINISH 10 PROVIDE ALUMINUM GRILLES IN SHOWERS/HUMID AREAS 11 ALL NON—FERROUS MATERIALS IN MRI ROOMS y -r - 'D F 21 fll OWN RECEIVED CITY OF TUKWILA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT e.. �B EXIST 16X16 SUPPLY AND RETURN UP TO ACR -1 PROCESS COOLING EQUIPMENT ON THE ROOF EXIST 180 SUPPLY AND RETURN DN TO FIRST FLOOR MAGNET ROOM EQUIPMENT EXIST 16X16 SUPPLY AND RETURN UP TO ACR -2 PROCESS COOLING EQUIPMENT ON THE ROOF G — — i �5 Q CSA 2ND ti SCALE: 1/8" = 1'-0" O NbW�73 FLOOR DEMO PLAN - HVAC RECO��Ep� ANCE p,PPP� 2 4 216 G1hIOGpVIS10N gV1�DIN RECEIVED CITE' OF TUKWILA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg J: HERMACLO05N TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 2ND FLOOR DEMO PLAN - HVAC y R o- �A - llll�' 12X10 DUCT TO EF -4 ON R0 �) - ti \,�\� O NyWa� 1 ST FLOOR PLAN - HVAC SCALE: 1/8" = 1'-0° METER SHEET NOTES: 1. (R) - RELOCATED 2. (E) - EXISTING ;0 PROCESS )OLING DN 0 PROCESS )OLING DN 0 PROCESS )OLING I 'A INTAKE ILLE IN THE )FFIT. O SUPPLY AND RETURN SHAFT TO SECOND OOR. :STROOM HAUST GRILLE IN IE SOFFIT. 0 PROCESS !OLING 0 PROCESS OLING DN 0 PROCESS OLING DN %EMEAMEM- R; 9)5 c0mpj.%ptAG- s - REE IBJ ':;. CITY 4F TUK"WIL A JUN 14 2016 PERMIT CENTER �B �c EXIST 16X16 SUPPLY AND RETURN UP TO ACR -1 PROCESS COOLING EQUIPMENT ON THE ROOF EXIST 180 SUPPLY AND RETURN DN TO FIRST FLOOR MAGNET ROOM EQUIPMENT EXIST 16X16 SUPPLY AND RETURN UP TO ACR -2 PROCESS COOLING EQUIPMENT ON THE ROOF Jho �;1 E „ z wQ° f �o �ppjoo •-�u�tvtla 0W`NG jpjOQ BU1L� RECEIVED CITY OF TU I(VflLA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hennanson.com Contractor Reg J: HERMACLO05BJ TAHOIRVIIA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 Revisions _ 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 2ND FLOOR PLAN - HVAC g 71 y g REVIC� p1.1AN�� .. .SON 24 2016 C1t0 °�4� V�S�ON gi)16��N� RECEIINf CITY OF ` U'i C JIL A. JUN 14 2016 PERMIT CENTER Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 ME t 1 A Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn M BY Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 ROOF PLAN - HVAC Tahoma Clinic VRF Hermanson DIAGRAM SYMBOL LEGEND — DISPLAY DESCRIPTION CMY—R10C �— POWER—W! CONTROL WIRE F. 11i CONT.No PAGE1 1 CITY MULTI SYSTEM SCHEMATIC DWG. System -z HP -1 Additional refrigerant charge is needed depending on the size and length of extended piping. Please refer the amount of pre—charge and the formula of calculation which is mentioned on the data book. 1.25mmII6 AWG) : 1.25mmJ16 AWG) or more. 0.15mm(20 AWG) : between 0.5mm� 24 AWG) and 0.15mm(20 AWG). REMARKS E "MU—E MITSUBISHI ELECTRIC CORPORATION PREPARED ON 2012/09/20 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC SCALE: NONE REV\CQ pE9 N E SAA ApP�0v�O •SUN 2A 216 GttY ���' VlS�6N gua.O�N RrCEIV ED CITY OF `I`U V40LA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg 1. HERMACL0056J TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 ME Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC ter., PIPIN( SYMBOL BRANCH PI J 1 CMY—R10C J2 Reducer SYMBOL t1 UID PIPI P1 P2 314 P3 5/8 P4 P6 / Y184 P7 11i CONT.No PAGE1 1 CITY MULTI SYSTEM SCHEMATIC DWG. System -z HP -1 Additional refrigerant charge is needed depending on the size and length of extended piping. Please refer the amount of pre—charge and the formula of calculation which is mentioned on the data book. 1.25mmII6 AWG) : 1.25mmJ16 AWG) or more. 0.15mm(20 AWG) : between 0.5mm� 24 AWG) and 0.15mm(20 AWG). REMARKS E "MU—E MITSUBISHI ELECTRIC CORPORATION PREPARED ON 2012/09/20 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC SCALE: NONE REV\CQ pE9 N E SAA ApP�0v�O •SUN 2A 216 GttY ���' VlS�6N gua.O�N RrCEIV ED CITY OF `I`U V40LA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg 1. HERMACL0056J TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 ME Revisions 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 EXISTING LIQUID REFRIGERANT PIPING DIAGRAM - HVAC ter., DIAGRAM SYMBOL LEGEND DISPLAY DESCRIPTION —aF— POWER WIRE CONTROL WIRE PE PIPING LIST SYMBOL BRANCH PIPE MODEL NAME J1 CMY-R160C-J J2 Reducer SYMBOL U UID PIPE GAS PIPE SVE P1 38 34 P3 1/4 / 1/2 P4 1-1/8 / 1-3/8 P6 7/8 � P7 3/4 / P8 1-1/8 1ao-20 16-2 AWG CITY MULTI SYSTEM SCHEMATIC DWG. 3^' �> System 1 460V/60Hz FSU CU -02 PURY— P288YSLMU—A Additional refrigerant charge is needed depending on the size and length of extended piping. Please refer the amount of pre -charge and the formula of calculation which is mentioned on the data book. 1.25mm�16 AWG) : 1.25mm�16 AWG) or more. 0.75mm(20 AWG) : between 0.5mm�24 AWG) and 0.75mmJ20 AWG). 3" 460V/60HzFUSE LiL20 TB7 L1L2L3 TB7 PURY-P1445IU-A PURY-P144YNU-A DIP SKU 3-7 OFF 051a 052 TB3i G TB3 G (5) .- P8 TT P7 16-2 AWG(S)Ps P5' P4 BC -02 16-2 AWG S TB2 053 CMB—P1010NU—HA1 2core TB1 G 1 2 3 4 5 6 7 8 9 T J1 YJ2L LL L 208-"2307FUSE P1 P2 P2 �P2 r� �P2� P3� � P2 P2 208-23 07 0 2�8 2FUSE FUSE 28-230 FUSE FUSE FUS2L 230 2 8-2301 USE 208-230 2�8-230 2 8-230 08, 230 FUSE FUSE FUSE FUSE FUSE L11_2 G L1 L2 G L1 L2 G L1 L2 G U L2 G L1 L2 G L1 L2 G U L2 G 001 = 002 - 003 - 004 - 005 = 006 = 007 = 008 TB5 TB15 Gp 1 TB5 T815 Gp2 TB5 T815 Gp3 TB5 T815 Gp4 TB5 T815 Gp5 TB5 TB15 Gp6 TB5 TB15 Gp7 TB5 TB15 Gp8 PEFY- PEFY- PEFY- PEFY- PEFY- PEFY- PEfY- PEfY- P72NitfflSU-E P36NMAU-E3 P36NMAU-E3 P48NMAU-E3 P36Nl043 P18 43 P48NNAU-E3 P36NMAU-E3 1 R-7 AUINC) CR CRI ICR CRI ICR CRI ICR CR FC 4 , Fu -9 , FQ4 FC2-i , FQ-01 FC 4 FQ4 FC2-10 , — REMARKS omments: LIQUID REFRIGERANT PIPING DIAGRAM - HVAC SCALE: NONE 009 Gp9 B5 LGH— F600RX5—E1 lossnay 0 , ffi ek�j L:&�G RECEIVED CITY OF `I'U IQVII-A JUN 14 2016 PERMIT CENTER 1110 1� I I *110ii tllllgm Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg 1. HERMACLO05BJ A4K*",,l`? c4 Ji,a kalltn"'mI TAHOMA CLINIC VRFINSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 `�t,,,V,atiLbY::.Snf7h"�Ytc#r",."«r at yftt t<l,rht 2iF:�Bi:! �;' 5t`.�asc:r �>r5i3�>:sv, i „v�`fnrLfi' .. Srrii `�,a9HSF{?B.' Revisions 06/14/16 JMH ISSUE FOR PERMrr No. Date By Description Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 h3lw�,�i dv b3.is',h� 4 \ rfiE53i�,�Ct fin=, €3:ur'.."S£3P av"t�t� �' LIQUID REFRIGERANT PIPING DIAGRAM - HVAC "0"W"r<; u•SS 'A� 1ST FLOOR PIPING PLAN - HVAC SCALE: 1/8" = V-0" 19 '2�'/1� 1 GAS METER �n h RE VVEEV� D FOR BODE COMPLIANCE pppROVED JUN 2 4 2016 BUILDf TUWMIS ING RECEIVED CITY OF TUKWILA JUN 14 2016 PERMIT CENTER ISSUE FOR PERMIT Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (206) 575-9800 www.hermanson.com Contractor Reg #: HERMACLO05BJ TAHOMA CLINIC VRF INSTALL 6835 FORT DENT WAY TUKWILA, WA 98168 war "= *a►��! nr �d Revisions _ 06/14/16 JMH ISSUE FOR PERMIT No. Date By Description Design Team Design JMH Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0629-08662 Project Number 14-16-08662 Issue Date 06/14/16 1ST FLOOR PIPING PLAN - HVAC IN W/ VENT VENT SHEET NOTE: 1. REFER TO SHEET MP6.01 FOR REFRIGERANT PIPING SIZES. 0 ROUTE J"GOND TO THE NEAREST INDIRECT DRAIN. RE�c� p� pCE 1UN 2 4 2p16 *%i s Cjw NGUp1VISjoN 136 RECEi ED, CITY O: ` U KWILA .JUN 14 2016 PERMIT CENTER