Loading...
HomeMy WebLinkAboutPermit M16-0107 - BOEING #9-101 - AHU REPLACEMENT, DUCT WORK AND PIPINGBOEING #9-101 9725 E MARGINAL WAY S M16-0107 City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.Tukwi[aWA.gov MECHANICAL PERMIT Parcel No: 0003400018 Permit Number: M16-0107 Address: 9725 E MARGINAL WAY S BLDG 9-101 Issue Date: 7/11/2016 WA Cities Electrical Code: 2014 Permit Expires On: 1/7/2017 Project Name: BOEING #9-101 2014 Owner: 2015 WA State Energy Code: Name: BOEING COMPANY THE 2015 Address: PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 Contact Person: Name: CONNIE HARDIN Phone: (206) 250-4530 Address: 4600 S 134 PL, SEATTLE, WA, 98168 Contractor: Name: HOLADAY PARKS INC Phone: (206) 248-9700 Address: 4600 S 134 PL, SEATTLE, WA, 98168 License No: HOLADPI379NO Expiration Date: 9/3/2017 Lender: Name: Address: DESCRIPTION OF WORK: REPLACING (1) AHU; ASSOCIATED DUCTWORK AND PIPING. Valuation of Work: $300,000.00 Fees Collected: $3,538.22 Type of Work: NEW Electrical Service Provided by: SEATTLE CITY LIGHT Fuel type: GAS Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature: Date: -7-11-10 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this developmenf`p`L6,r t -"%agree to the condjt(ons attached to this permit. Signature: Print Name: Date: _74 < _ � 1p This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Installation of high-strength bolts shall be periodically inspected in accordance with AISC specifications. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 6: Readily accessible access to roof mounted equipment is required. 7: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 8: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 11: `MECHANICAL PERMIT CONDITIONS' 12: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 13: Manufacturers installation instructions shall be available on the job site at the time of inspection. 14: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 15: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 16: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 17: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 18: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 19: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 20: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 21: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 23: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST 4 •r'O' R-PL"Jour, �HY OF TUKOW 7ommunity Development Depal-tment 'ermit Center i300 Southcenter Blvd., Suite 100 ruk>vila, WA 98188 ittp://wA,)A,.Tukwila W A. eov Mechanical Permit No. M I 0101 Project No. q Date Application Accepted: tl9 Date Application Expires: (For office use only MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" SITE LOCATION • King Co Asse sor's Tax No.:00 3q6 O �W — Site Address: 1 1 ui Ntair: Floor: Tenant Name: "" New Tenant: ❑ .....Yes[. 10 PROPERTY OWNER Name: Addres . City: State: III Z' CONTACT PERSON — person receiving all project communication Name: Address: LIRODD 4& I-SOLW City: 64mtL State: Zi6Q 1 Phone: L( ax: Z(41t Email: L r MECHANICAL CONTRACTOR INFORMATION Company Name: �kok" Address• I City: Statet Zip Phon Jq"r Ir Fax: �•!J V4f. Contr Reg NoDate: Tukwila Business License No.: Y, J1 Valuation of project (contractor's bid price): $ Describe the scope of work in detail:' 06550 AuJ461k AAA ALOwo% P, run•colraQ o►� Q4"vs-ocl-'RPA Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... E - i Replacement ........ ' FuelFuel Type: Electric..... Gas ....... 0 Other: H:.Applications\Forms-Applications On Linc'2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 Page I of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <I OOk btu Residential, Nighttime Furnace >I OOk btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <I0,000 cfm 65 dB(A) Unit Type Qty Air handling unit >I0,000 cfm Residential, Nighttime Evaporator cooler Industrial Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ h /1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM, Monday through Friday and 8AM-1 OPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam- l Opm); Testing of bafkup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIP Signature Print Name: Mailing Address: gLew S H:\Applications\Forma-Applications On Line12016 Applications\Mechanical Permit Application Revised 1-4-16.docz Revised: January 2016 bh Date:�''� �p Day Telephone: 2 • Z0 - mp City Zip Page 2 of 2 DESCRIPTIONS PermitTRAK • • •� $2,857.79 M16-0107 Address: 9725 E MARGINAL WAY S BLDG 9-101 ` Apn: 0003400018 $2,857.79 MECHANICAL $2,721.70 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $2,689.20 TECHNOLOGY FEE $136.09 TECHNOLOGY FEE TOTAL PAID BY RECEIPT: R8922 R000.322.900.04.00 0.00 $136.09 Date Paid: Monday, July 11, 2016 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 05735G Printed: Monday, July 11, 2016 2:13 PM 1 of 1 ��r �'l srsl[!As Date Paid: Monday, June 20, 2016 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 04552G Printed: Monday, June 20, 2016 3:33 PM 1 of 1 V? SYSTEMS Z INSPECTION RECORD MJ(s_QJG7 Retain a copy with permit ECTIUN N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 206) W-3670 Permit Inspection Request Line (206) 438-9350 S'at� e4 Project: 6 9- /a f Type of Inspection: 1 f .-Jic41- �oz, Address: Date Called: '7 !!i5- G/ M041AAL S Special Instructions � / p Date Wanted: .m. Requeser: ell -IM a Pho a No: G �f REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD (� Retain a copy with permit,' -�10 IN ON NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro'ect: Type of Inspection: , 4AAjI Z - Address: 725— 6e6iWA& b)S Date Called: Special Instructions: ,c: -b& q—loo Date Wanted Z� a.m .' m. Re sten. Phone No: Approved per applicable codes. t__.J Corrections required prior to approval. REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. X INSPECTION RECORD Retain a copy with permit I ECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Ty a of Inspection: & F IC4L Address: % ZS' )&,1A/AL LJ Y S Date Called: Special Instructions: f a IQ 6 '�U&,--tjOV �Y �� ��05 �4 Date WaEdy /� y� f ��17% .m. Requester. 11— / CLbCi N �! Phone No: 2b 09 6,per Inspector: y/ G / IuateB I I REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection. INSPECTION RECORD /%6 - 0/0-7 Retain a copy with permit da K INSPECTION NUMBER PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 . Project: OCZ, k L0 Type of Inspection: 4—A 15P 1 'Ae c, Address: Contact Person' Suite #: Pre -Fire: Special Instructions: Phone No.: 1-1 Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: PI fV o K Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: � 't_ --Date: �"�/� Hrs.: ❑ $100.00 REINSPECTION FEE REQUIRED. You will -receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Esming Aaaress Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 NEUDORFER ENGINEERS INC. TEST, ADJUST & BALANCE BALANCE REPORT Boeing Building 9-101 Replace AHU-AH1M18 Seattle, Washington 2016-658 Project Completion Date: 09/15/16 Revision Date: Revision Number: BILL NEUDORFER CEwwicAnoN 2465 Exp. 3AI1/17 , M (&1- 0107 RECEIVED CITY OF TUKWILA OCT 0 5 2016 PERMIT CENTER 5516 1" Ave S 2501 SE Columbia Way, Ste, #230 Seattle, WA 98108 Vancouver, WA 98661 Phone (206) 621-1810 Phone (503) 235-8924 Fax (206) 343-9820 Fax (503) 235-8925 PROJECT Boeing Building 9-101, Replace AHU-AH1M18 LOCATION Seattle, WA TABLE OF CONTENTS Cover Report Title 3 Certification 4 Warranty 5 Terms & Abbreviations 6-7 Executive Summary 8 Air Handling Units 9-12 Coil Test 13 TAB Drawings 14-20 instrument Calibration 21 2 Report Title CERTIFIED TEST: BALANCE REPORT Project: Boeing Building 9-101 Replace AHU-AHIM18 Seattle, Washington NEI Job#: 2016-658 Engineer: FSI Engineers Contractor: Holaday Parks TAB Firm: Neudorfer Engineers Inc 5516 1 st Avenue South Seattle, WA 98108 Test Engineer: Andy Eaden Architect: -- 55161" Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 3 6 rfai� BILL NEUDORFER CEFMFgCAr(ON 246 EXP. =1M7 2501 SE Columbia Way, Ste. #230 Vancouver, WA 98661 Phone (503) 235-8924 Fax(503)236-8925 CERTIFICATION The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities which exceed NEBB tolerances are noted in the Test-Adiust-Balance Report Proiect Summarv. Significant / Noteworthy Remarks are noted on the General Remarks and General Field Notes pages. Other remarks are noted on individual test sheets. Noted deficiencies are not Neudorfer Engineers responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from date of this report. Within that time, any discrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by: NEBB TAB Firm: Neudorfer Engineers Inc Certification No: 2465 Expiration Date: March 31, 2017 CrCEZRTIFICATION Certification Date: September 15, 2016 NKrimm (Date completed)Signed and Seated by: NEBB Supervisor: William C. Neudorfer 4 Warranty Project: Boeing Building 9-101 Warranty of Services: Neudorfer Engineers, Inc. warrants that the air balancing, evaluated during this performance evaluation are operating at the specified levels as documented within this report. At and only this time, and makes no other warranties, stated or implied, concerning the continued performance, operation or safety in the use of this equipment past this time. Neudorfer Engineers warrants the air and hydronic balancing for 1 year from the date of substantial completion. Neudorfer Engineers reserves the right to correct errors or omissions in the collections of data. Warranty Procedures: For all warranty items, Neudorfer Engineers requires written request. The written request should be specific on the areas of concern, such rooms, or equipment, and the type of issue the occupants are experiencing. Once written notification is received, Neudorfer Engineers will schedule a Technician. It is recommended that an Owner or A/E Representative be on site at that time. Voided Warranty and Additional Charges: If a complaint issue is due to a mechanical equipment failure, control or maintenance related, the return trip maybe subject to a service charge, not covered under warranty. Neudorfer Engineers reserves the right to resolve any TAB issue. If a third party or competing Test & Balance Commissioning firm test or adjust any equipment, all project warranty is voided. (This is typical standard for the Mechanical industry, as Manufacture, Mechanical and Control Contractor voids all warranty when a competing firm tests or manipulates their systems.) Any return trips to the job site are subject to a service charge and a purchase order will be required before returning to the job site. Document Archiving An electronic file of all test documents will be kept on file until the end of the Warranty period. During that time and electronic copy of the test data will be provided a no charge. Any additional hard / bound copies requested will be subject to a fee. 5 Terms and Abbreviations Project: Boeing Building 9-101 AC Or ACU Air Conditioner or Air Conditioning Unit Act. Actual ACCU Air Cooled Condensing Unit Address Equipment designation number given on the Control Program AH or AMU Air Handler or Air Handling Unit Amps Amperage AP Access Point APP. Application Air Arrangement AVG Average BHP Brake Horsepower BTU British Thermal Units BTUH British Thermal Units per Hour CAV Constant Air Volume CBV Calbirated Balancing Valve (Circuit Setter) CC Cooling Coil CD Ceiling Diffuser CFLA Correct Full Load Amperage CFM Cubic Feet per Minute CH Chiller CHWS Chilled Water Supply CHWR Chilled Water Return Coeff. Coefficient CP Circulating Pump CR Ceiling Register CRAC Computer Room Air Conditioner CRU Computer Room Unit CT Cooling Tower CU Condenser Unit CUH Cabinet Unit Heater CWS Condenser Water Supply CWR Condenser Water Return DAT Discharge Air Temperature DB Dry Bulb DD Direct Drive DDC Direct Digital Controls: EMS Control System for the HVAC Delta Difference, net decrease or increase 0 Des. Design Dia. Diameter Disch. Discharge DNL Data Not Listed EA Exhaust Air EAT Entering Air Temperature Economizer Controls and components that allow an air handler to logically utilize outdoor air for cooling as opposed to the use of mechanical cooling. EDC Electric Duct Coil EDH Electric Duct Heater EF Exhaust Fan EG Exhaust Grille EMCS Energy Management Control System ERU Energy Recovery Unit E.S.P. External Static pressure Evap. Evaporator EWT Entering Water Temperature FCU Fan Coil Unit FD Fire Damper FH Fume Hood FLA Full Load Amperage: Maximum amperage a motor can draw. Flow Hood Instrument that captures air and converts the reading to CFM. FPB Fan Powered Box FPM Feet per Minute FR Field Report FT Foot, Feet FTU Fan Terminal Unit GPM Gallons per Minute HC Heating Coil HD Pressure Difference across the entering and leaving side of a pump. Heater O.L. Thermal overload protection for motors located at the motor starter (starter heaters) NEPA High Efficiency Particulate Arrestance HOA Hand / Off / Auto Switch HP Horsepower Terms and Abbreviations Project: Boeing Building 9-101 HRC Heat Recovery Coil HUH Hydronic Unit Heater HVAC Heating Ventilation and Air Conditioning HWS Heating Water Supply HWR Heating Water Return HX Heat Exchanger HZ Hertz, cycle per second I.D. Inside Diameter in. inches in.w.g. inches of water gauge Kfactor Correction factor to the free area need to calculate CFM. KW Kilowatts LAT Leaving Air Temperature LWG Low Wall Grille LWR Low Wall Register LWT Leaving Water Temperature MAU Make-up Air Hangling Unit MBH 1,000 BTUH MAX. Maximum Flow Requirements for DDC MBH Mega BTUs per hour (1MBH=I,000BTUH) MIN Minimum Flow Requirements for DDC N/A Not Available N/S Not Shown or Specked OA Outside Air OBD Opposed Blade Damper O.D. Outside Diameter PD Pressure Drop. PH Phase PHC Preheat Coil Prim. Primary PSI Pounds per Square Inch RA Return Air RAT Return Air Temperature RF Return Fan RH Relative Humidity RHC Reheat Coil RPM Revolutions per Minute RTU Roof Top Unit 7 RVA Rotating Vane Anemometer -reads air velocity in feet per minute SA Supply Air SAT Supply Air Temperature S.F. Service Factor Schedule Design data obtained from the (ached) mechanical prints' schedule of equipment. SCR Silcon Controlled Rectifier Speed Controller SF Supply Fan SFO Smoke/Fire Damper SP Static Pressure Spec($) Specifications sq.ft. square feet Submittals Submitted data on equipment (subs) capabilities. Suct. Suction SWG Sidewall Grille SWR Sidewall Register TAB Test; Adjust; and Balance Tach Tachometer Tech Technician TSP Total Static Pressure: Difference between the entering and leaving static pressure of a fan. TP Traverse or Test Point UH Unit Heater VAV Variable Air Volume; box that contains a motorized damper that modulates airflow. VD Volume Damper VFD Variable Frequency Drive Velgrid Instrument that reads used to read velocity in feet per minute. VP Velocity Pressure VVT Variable Volume Terminal WC Water Column W.G. Water Gauge WB Wet Bulb PROJECT Boeing LOCATION Seattle, Building 9-101 Replace AHU-AH1M18 EXECUTIVE SUMMARY This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures. Neudorfer Engineers performed the air balancing and water balancing on the following: (1) New Air Handler with a Chilled Water Coil. This fan has been checked for unit data, operating amperage, voltage, rotation, RPM, and operating static pressure. All outlets have been proportioned to ± 10% of design airflow unless otherwise noted. New Air Handler (AHU-AH1M18) This new unit was connected to the existing ductwork and serves the existing cleanroom in the Boeing Building 9-101. Design is 17,000 CFM and actual is 17,740 CFM (104% of design total). A total air duct traverse was obtained; refer to Duct Traverse Sheet T-01 for further details. After the supply diffusers were proportioned, the minimum outside air was obtained. The return air velocity was obtained across the return air intake grille; refer to Duct Traverse Sheet T-02, for further details. The room pressure differential between the cleanroom and the main plant was 0.008" of water column. Then the chilled water control valve was commanded full open. The TA manual circuit setter was set the design GPM; refer to the Coil Test Data Sheet for further details. Balancing diagrams are attached to this report with outlets numbered for locations. NATIONAL ENVIRONMENTAL BALANCING BUREAU u Air Handling Unit PROJECT: Boeing Bldg. 9-101 Replace AHU-AH1M18 DATE: 9/15/2016 LOCATION: Seattle, WA CONTACT: Andy Eaden PROJECT #: 2016-658 SYSTEMIUNIT: AHIM18 AREA: Clean Room Unit Data Unit Manufacturer Trane Unit Model Number CSAA035UAL00 Unit Serial Number K15MO1136A Unit Discharge Inline Fan Rotation Counterclockwise AH1M18/SF Fitter Bank Filter Type Pleated Filter Quantity - Size 1 6 Filter Dimensions - Size 1 24x24x2 Filter Quantity - Size 2 5 Filter Dimensions - Size 2 12x24x2 Filter Quantity - Size 3 6 Filter Dimensions - Size 3 24x24xl2 Filter Quantity - Size 4 5 Filter Dimensions - Size 4 12x24xl2 Starter Data AH1 M18/SuI2RIy.Fan Starter Manufacturer Danfoss / VFD Log: 19/14/2016 Andy Eaden (3) Data was Tested By: Andy Eaden Date: 9/15/2016 Drive Type Motor Manufacturer Motor Frame Motor HP Motor RPM Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Motor Service Factor Motor Efficiency Motor Data Direct Drive Baldor 284T 25 HP 1770 RPM 230/460 Volts 3 60 Hz 60 / 30 Amps 1.15 93.6% 82 PF I Test Pressures Pre -Filter Inlet SP Test Data Total Design Flow 17000 CFM Total Actual Flow 17740 (1) CFM OA Design Flow 1700 CFM OA Actual Flow 1815 CFM RA Design Flow 15300 CFM RA Actual Flow 15925 (2) CFM AH1M18/Suzy Fan Fan RPM Actual 1787 RPM Motor RPM Actual 1787 RPM VFD Setting 58 (3) Hz Motor Volts T1-T2 436.8 (3) Volts Motor Amps T1 29.5 (3) Amps Log: 19/14/2016 Andy Eaden (3) Data was Tested By: Andy Eaden Date: 9/15/2016 Drive Type Motor Manufacturer Motor Frame Motor HP Motor RPM Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Motor Service Factor Motor Efficiency Motor Data Direct Drive Baldor 284T 25 HP 1770 RPM 230/460 Volts 3 60 Hz 60 / 30 Amps 1.15 93.6% 82 PF I Test Pressures Pre -Filter Inlet SP -1.71 in. we Pre -Filter Outlet SP -2.00 in. we Final Filter Inlet SP -2.00 in. we Final Filter Outlet SP -2.57 in. we Clg Coil Inlet SP -2.57 in. we Clg Coil Outlet SP -3.39 in. we Htg Coil Inlet SP -3.39 in. we Htg Coil Outlet SP -3.67 in. we SF Suction SP -3.67 in. we SF Discharge SP 1.01 in. we SF Design Total SP 5.50 in. we SF Actual Total SP 4.68 in. we SF Design External SP 2.70 in. we SF Actual External SP 2.72 in. we OA Damper Pos 33% RA Damper Pos 67% on 9/15/2016 Andy Eaden (1) Actual supply CFM was obtained from a total air duct traverse. Refer to duct traverse sheet T-01 for further details. 9/15/2016 Andy Eaden (2) Actual return air was obtained from a total air duct traverse. Refer to duct traverse sheet T-02 for further details. 9/15/2016 Andy Eaden The room differential pressure between the clean room and the main plant is 0.008" of water column Neudorfer Engineers, Inc. E Air Handling Unit PROJECT: Boeing Bldg. 9-101 Replace AHU-AH1M18 DATE: 9/15/2016 LOCATION: Seattle, WA CONTACT: Andy Eaden PROJECT M 2016-658 AH1M18 Supply Outlet Summary System/Unit erved Type of ReadingT Outlet Size LxW / D AK Design VelocityValue Design Prelim ReadingReadingY. Final Final Remarks Outlet -01 ;Cleanoom lowhood RD 0" round 1 - 1840 1755 1930 105 Outlet -02 RoomFlowhood RD 20"round 1 - 1840 1935 195 106 Outlet -03 Room Flowhoo RD 20" round 1 - 1840 1815 1895 103 utlet-04 Room Flowhood RD 20" round 1 - 1840 2035 1965 107 outlet -0s Clean Room Flowhood RD 20" round 1 - 1840 1775 1920 104 Outlet -06 Clean Room Flowhood RD 18" round 1 - 450 740 465 103 Outlet -07 Clean Room Flowhood R6— 20" round 1 - 1840 1745 1900 103 Outlet -08 Clean Room Flowhood RD 20" round 1 - 1840 1605 1850 101 Outlet -09 Clean Room I Flowhood RD 20" round 1 1 - 1840 1885 1 0 1 105 Outlet -10 Clean Room Flowhood RD 120"roundl 1 - 184 1825 1925 105 Totals: - I- - - 17010 17115 17740 104 - Neudorfer Engineers, Inc. 10 Duct Traverse PROJECT: Boeing Bldg. 9-101 Replace AHU-AH1M18 DATE: 9/15/2016 LOCATION: Seattle, WA CONTACT: Andy Eaden PROJECT #: 2016-658 SYSTEM/UNIT: T-01/Total supply air for AHI M18 Tested By: Andy Eaden AREA: Clean Room Date: 9/15/2016 Final Data Sum of Readings Unit Data Type of Traverse Rectangular Outer Height 18 in. Outer Width 90 in. Insulation Width 0 in. Air Flow Area 11.25 sq. ft. Number Of Rows 3 Readings Per Row 9 Total Readings 27 Final Data Sum of Readings 43419 Average Reading 1608 FPM Design Total Flow 17000 CFM Actual Total Flow 18090 CFM Static Pressure 0.34 in. Log: 9/15/2016 Andy Eaden Shortridge Multimeter with Pftot Tube was used to obtain velocity readings. Traverse Data Points r H ro +? %a m r+- ee ed Rawl 2167 ti ® 1984 1793 1659 1818 142-3 13x'2 1551 Row 2 1476 1352 7353 14fi9 119$ —m 1345 1318 1389 w R+ow 3 1698 1557 159 174-7 1326 1693 Y07f3 t -w — 90 Neudorfer Engineers, Inc. 11 Duct Traverse PROJECT: Boeing Bldg. 9-101 Replace AHU-AHIM18 DATE: 9/15/2016 LOCATION: Seattle, WA CONTACT: Andy Eaden PROJECT M 2016-658 SYSTEM/UNIT: T-02/Total return air for AH1M18 Tested By: Andy Eaden AREA: Clean Room Date: 9/15/2016 Final Date Average Reading Unit Data Type of Traverse Rectangular Outer Height 24 in. Outer Width 70.25 in. Insulation Width 0 in. Air Flow Area 11.71 sq. ft. Number Of Rows 2 Readings Per Row 6 Total Readings 12 Final Date Average Reading 1360 FPM Design Total Flow 15300 CFM Actual Total Flow 15926 CFM Static Pressure -0.27 in. Log: 9115/2016 Andy Eaden Shortridge Multimeter with Velgrid was used to obtain velocity readings across the face of the openir of this booth. Traverse Data Points Row 1 Row 2 Neudorfer Engineers, Inc. ea re N m V 0 0 8 0 0 c i-nz 1144 t17fi am-, - 1327 1-386 N 1182 017 1275 11527 1IM17 1-358 T0.25 12 Coil Test PROJECT: Boeing Bldg. 9-101 Replace AHU-AHIM18 DATE: 9/15/2016 LOCATION: Seattle, WA CONTACT: Andy Eaden PROJECT #: 2016-658 SYSTEM/UNIT: AH1M18 AREA: Clean Room Tested By: Andy Eaden Date: 9/15/2016 Air Test Data Unit Data System Number AH1M18 Valve Manufacture TA Valve Size 2 1/2 N Gail Location Clean Room Coil Type Chilled Water Tested By: Andy Eaden Date: 9/15/2016 Air Test Data Airflow Design 17000 CFM Airflow Actual 17740 CFM Ent. Air DB Temp Design 74.0 Deg F Ent. Air DB Temp Actual 73.0 Deg F Ent. Air WB Temp Design 63.0 Deg F Ent. Air WB Temp Actual 62.4 Deg F Leay. Air DB Temp Design 50.0 Deg F Leay. Air DB Temp Actual 49.5 Deg F Leay. Air WB Temp Design 50.0 Deg F Leay. Air WB Temp Actual 49.7 Deg F Air Temp Delta T Design 24.0 Deg F Air Temp Delta T Actual 23.5 Deg F Water Test Data CBV Entering PSI 72 P5I CBV Leaving PSI 54 PSI CBV DP Actual 18 PSI CBV Position 3.4 Tums Water Flow Design 125.6 GPM Water Flow Actual 126.0 GPM Ent. Water Temp Design 45.0 Deg F Ent. Water Temp Actual 45.7 Deg F Leay. Water Temp Design 55.0 Deg F Leay. Water Temp Actual 55.2 Deg F Water Delta T Design 10.0 Deg F Water Delta T Actual 9.5 Deg F Log: 19/14/2016 Andy Eaden On the chilled water manual circuit setter. 8 turns is full open. Neudorfer Engineers, Inc. 13 W Z OD W = Zi Q Who Z JNrn L-QZ Z Who 2Zz Z 600) = J<� tr W2 Q �Q� W L U z W� wm w ti go J war � � go Z &psi W�.� i H Ma IKEa ora Z - W G 3 0 0 � ■ooa pours �o ❑oro � �� W Z OD W = Zi Q Who Z JNrn L-QZ Z Who 2Zz Z 600) = J<� tr W2 Q �Q� W L U z W� wm - C""CCCC Q ❑ _ 2� I l I - Y Igo gal G! g w w z w 0 J f" Z w 2 CL 0 J w w W q w ti go J war � � go Z &psi W�.� H Ma - C""CCCC Q ❑ _ 2� I l I - Y Igo gal G! g w w z w 0 J f" Z w 2 CL 0 J w w W q 4 o 1ie. AA Ll eVae CLlas � I y JOIN o Z�� 3 co 140 1,111 Mull € A A A ' z 0 U � z �' OV N z f ui'`, m Q a M z D 3 - __-- 11 I � I f Ih ------------------ 4 f qvs $ s s P all -::,I i ' 0 a' a E $ 5 4 d d W uj A A AAA o a g s = � CO ;� a O CD IM 3 LL m S O o m t � i Icn0o� n � I � � IMP � I L� I �� s ❑ ®I nt/oe � � y9 e � 1 IBM=o m I i ipis. WNW i I -- -- 315fi�RYYu�7P1II 1 — — c El y ri n �i nt iw/a i a leg - a inaaaa�aaa,anCO,IE't,9�J�Olil\/IEIlii�G:���=��n . V Imo`■ q_ `- i �3��aa�+aaa�At01�!{F3i[Pi�O�( � Im4`�l•;,�-(: - w V!EIM gz�V.,!! Iq3�-m I i i i i i i �� £„ Z Z w q LLJ m U $ D o 0 W m - a inaaaa�aaa,anCO,IE't,9�J�Olil\/IEIlii�G:���=��n . V Imo`■ q_ `- i �3��aa�+aaa�At01�!{F3i[Pi�O�( � Im4`�l•;,�-(: - w V!EIM gz�V.,!! Iq3�-m I i i i i i i �� slat S6� F �z Z � m A 3 a - ON o 7€ '91 P- 1 91 i m k LL j aabZ I 7€ '91 P- 1 91 �Inl�f��nlnlal�l� seevo©e©vee®eee ELL a, Instrument Calibrations Instrument Type Air Data Meter with Flowhood Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M08421 Calibration Due Date 2l3/2017 Instrument Type Tachometer Instrument Manufacturer Shimpo DT -205L Instrument Model Number Type B Instrument Serial # D069B0080 Calibration Due Date 8/17/2016 Instrument Type Amp Probe Instrument Manufacturer Fluke Instrument Model Number TRUE RMS 902 Instrument Serial # 10820578 Calibration Due Date 10/14/2016 Instrument Type Temperature Probe Instrument Manufacturer Shortrid e Instrument Model Number ADM 870 Instrument Serial # M08421 Calibration Due Date 213/2017 Instrument Type Air foil Instrument Manufacturer Shortrid e Instrument Model Number ADM 870 Instrument Serial # M08421 Calibration Due Date 2/3/2017 21 Air Handling / Make up Air Units Log ❑ Inspection ® Start up Customer HOLADAY PARKS Model # CSAA035UAL00 Date 9-7-16 Location Boeing Bldg 9-101 Serial # K15M01136A Service Call # 16 7268106 Technician MATT THOMPSON Unit ID# AH1M18 Room # Motor Data - Record Annually or at Start Up -Voltage T1-T2 479 T2-T3 477 T3 -T1 479 Rated 460 VFDs mT1 29 T2 29 T3 28 FLA 30 Hz 60 MaKe uo Air unit — tmeatina section Gas Pressures Heat Operations Unit psi Flame Pattern Pilot osi Limit Operation Main Flame psi Flame Signal Comments STARTUP COMPLETE NO ISSUES FOUND Temperatures Size Qty Condition deg. Actual Discharge Temp deg. Outside Air Temp 58 deg. Belts deg. NA NA NA deg. Return Air Temp 71 deg. Filters Discharge Air Temp 100 deg. Hot Deck Temp deg Cold Deck Temp deg Actuators Legend Component Conditions OK NW OK =Alright OK NW ❑ ❑ Outside Air Damper NW = Needs Work ® ❑, Fan Wheels ® ❑ Return Air Damper ❑ ❑ Fan Bearings ❑ ❑ Exhaust Air Damper ® ❑ Motor Bearings ® ❑ Face/Bypass Damper ❑ ❑ Sheaves ® ❑ Hot Water/Steam Valve ❑ ❑ Shaft ® ❑ Chilled Water Valve ® ❑ Drain Pan ❑ ❑ Evaporator Coil Transducers ® ❑ Heating Coil OK NW ® ❑ Starter ® ❑ Duct Static Pressure ® ❑ Freeze Stat ® ❑ Building Static Pressure ® ❑ Supply Fan VFD/Inlet Vanes ❑ ❑ Return Fan VFD/Inlet Vanes Motor Data - Record Annually or at Start Up -Voltage T1-T2 479 T2-T3 477 T3 -T1 479 Rated 460 VFDs mT1 29 T2 29 T3 28 FLA 30 Hz 60 MaKe uo Air unit — tmeatina section Gas Pressures Heat Operations Unit psi Flame Pattern Pilot osi Limit Operation Main Flame psi Flame Signal Comments STARTUP COMPLETE NO ISSUES FOUND Temperatures Discharge Temp Setting deg. Actual Discharge Temp deg. Max. Discharge Temp deg. Actual Temp Rise deg. Max. Temp Rise deg. 1-10_54(0307) Page 1 of 3 N Seattle - Service Tel: 425-6434310 TA"A "" 2333 158th Court NE Fax: 425-643-4314 Bellevue, WA 98008 License: TRANE**934RE Building Services FIELD REPORT Location Name Service Call Date Boeing 9 101 Building 16-7268106 09-07-2016 9725 East Marginal Way South Technician Name Account Manager Seattle, WA 98108 Thompson, Matthew Contact/Phone: - Call Type: EQUIPMENT PROJECT Scope Description Scope Complete? Yes Sales Follow-up Required? No NEW EQUIP. PROJECT START UP- Reason: CSAR- W/ VFD WORK PERFORMED Mod#/Ser#/Mfg/Tag# CSAA035UAL00, K15M01136A, Trane, AH1M18 Quality Task Code: Date: 09-07-2016 Sample Taken: No Work Activity: Work Performed Details: Checked in with Holaday Parks and gained access to the unit. I LOTO the units disconnect, opened all access panels, inspected all sections of the unit, verified all debris is removed from the unit. Inspected coils, piping and verified no leaks. Checked set screws on dampers, and fan assembly. Verified the supply fan rotates freely. Went through all electrical connections. Powered up the unit and went through drive parameters and performed AMA to link the drive and the motor electrically. Bumped the supply fan and verified proper rotation. Had Siemer enable the supply fan to 60HZ and took voltage and amperage readings. (See startup log for additional info) No issues found, the unit startup i complete. Tasks Performed: PARTS MATERIALS Source I QtyPart# Description BAS ONLY: Was a copy made? No REFRIGERANT ACTIVITY: Did Activity occur? No SURCHARGES Date: EXPENSES Date: LABOR Date Technician Travel Time Mobilization Diagnostics Work h in h in h m h in 09-07-2016 1 Thompson, 1 0 0 10 0 10 0 14 0 Customer Name: Tim Lane Date: 09-07-2016 0 0 10 0 10 0 14 Customer PO: Y304943 Signature Available Yes Services described were performed as a part of the terms of this document. N� Customer Signature Reg Time Overtime Prem Time h in h in h in 4 0 0 0 10 0 4 0 10 0 10 Technician Name: Thompson, Matthew Reason: Page 2 of 3 TERMS AND CONDLTIONS ?QUOTED SERVICE "Company" shall mean Trane US. Inc. for Sevlea performed in the Unfted States and Trane Canada ULC for Servim performed in Cauda. 1. Acceptance; Agreement. These terma and conditions are an Integral pan of Cwnpmy s offer and form the basis of my agreement (the "Agreemem") resulting from Compaq's proposal (the "proposal") for the services (the "Services") on equipment Listed m the Proposal (the "Covered Equipment"). COMPANY'S TERMS AND CONDITIONS ARE SUBJECT TO PERIODIC CHANGE OR AMENDMENT. The Proposal is subject to acceptance in writing by the party on whom this offer is made a an authorized agent ("Customer') delivered to Company within 30 days from the date of the Proposal. If Customer accepts the Proposal by placing an order, withoal the addition of airy other terms and coadftios of sale or any other modi5cation, Cuaomea's order shall be deemed acceptance of the Proposal subject to Company's teams and conditions. If CoatammS order is expressly caudidoned upon the Company a acceptance or axac m to terms and/or condivans other than those expressed herein, mum of such order by Company with Company's terms and conditions attached or referenced serves as Company's notice of objection to Cumme's terms amt as Company i emmter-cffer on Itmide Services in award.. with the Proposal. If Customer does mut reject or object to writing to Company within 10 days, the Company, counter-offer will be deemed accepted Customers acceptance of the Services by Company will in any event constitute a acceptance by Customer of Company's terms and condition This Agreement is subject to credit approval by Company. Upon disapproval of credit, Company may delay or suspend performance or, at its option, renegotiate prices and/or teems and conditions with Customer. If Compaq and Customer ore unable m agree on such revisions, this Agreement shall be cancelled without my liability, other than Custnmefs obligation to pay for Smites rendered by Company to the due of cancellation. 2. Services Feet and Taxes. Fees for the Services (done "Service Peels)') shag be as set forth in the Proposal and me based on performance during regular business boars. Fees for outside Cu mpanys ramal business hours and any after-hours smites shall be billed separately according to then prevailing mertime or emergency laborflubour rotes. In addition to the steed Service Fee, Customer shall pay all uses oat legally required to be paid by CmVmy or, alternatively, shall provide Company with acceptable out exemption certifies=. Customer aball pay all costs (including atter eys' fees) Incurred by Company in allempting to collect amounts due, 5. Payment Payment is dna upon receipt of Company's invoke. Company reserves rhe right to aid m my accost outatmiding for more than 30 days a service charge equal to the leaser of the maximum allowable legal mteeat rate or 1.3% of the principal amonm due at the aid of each mash Custamer shall pay all costa (including attorneys fees) incurred by Company in snemping to collect amounts due m otherwise enforcing these terra and conditions. 4. Customer Breach Each of the following events or conditions shag mutation. a breach by Customer and shall give Company (he might, without an election of remedies, to terminate this Agramem or sasp®d perf rmaice by delivery of written notice declaring nomination, open which event Customer shall be liable to the Company for all Service famished to date and all damages .gained by Company (including trot profit and overhead} (t) Any failure by Customer to pay amounts when; or (2) any general assignment by Customer for the benefit of its creditors, or if Customer becomes bankrupt or insolvent or takes the benefit of any statue for bankrupt or insolvent debtors, or mates or proposes to male my proposal or arrangement with aedinors, or if any steps me taken for the winding up or oast termination of Customer or the liquidation of its assets, or if a wore, receiver, or similar person is appointed over my of the assets or interests of Customer, (3) Any representation or warranty furnished by Customer in connection with this Agreement is false or misleading in any material respect when mode: or (4) Any failure by Customer to perform or comply with my material provision of this Agreement 9. Performance. Company sha0 perfoam the Services m accord.. with h dNwy sWidend ger mBy applicablem dm area under aimtm cucamWumws m of the tame Company pnfmvw the Scrvim. Company is om liable far my claims, damages, leases, or expenses, arising from or related to work dam by or services provided by individuals or entities that are not employed by or hired by Company. Company may refuse m perform my Services a work where working conditions could endanger property or pm at risk the safety of people. Unless otherwise agreed m by Customer and Company, at Customers expense and before the Smites begin, Customer will provide my necessary access platforms, catwalks to safely perform the Services in compliance with OSHA or use industrial safety, regulations. 6. Exclusions. Unless expressly included in the Proposal, the Services do not include, and Company shall not be liable for, my of the following (a) Any guaramee of room conditions or system perhmnmres: (b) Inspection, operation, maintenance, repair, reptacrnmm or performance of work or "mites outside the Services; (c) Damage, repairs or replacement of parts made necessary as a .suit of me scot or omission of Customer or my Event of Face Majeure; (d) Any claims, damages, losses, or expeasea, arising from or related to conditions that existed in, at or upon the premises before We effective dam of this Agreement VPr Fxisti ag Conditions') including, without limitation, damages, losses, or expo res involving 4 PmExiaing Condition of building envelope issues, mechanical issues, plumbing issues, and/or indoor air quality issues involving mold/mould and/or fungi; mid (e) Replacement of refrigerator is excluded, unless replaoenem of refrigerast is exproutly geed as, mdaled with the Proposal ?. Warranty. Company warrants that: (a) the material manufactured by Company and famished henvnder is @ere from defects in material and manductute for a period of 12 months from the earlier of the dam of equipment sten-up or replacement and (b) the tabur/labom portion of the Services is warranted to have been properly petfommd for a period of 90 days from dam of completion (the "W arrmny"). Canparty obligations of equipment stag -up, if any are anted in the Proposal, are coterminous with the Warranty period. Defects most be reported to Ctmtpauy within the Warranty period. CmrMay s obligation under the Waiamy is limited m repairing or replacing the defective pan at its option and on correcting my improperly performed labor/labour. No liability whatsoever shal much to Company will the Services have been paid for in fug. Exclusions from this Warranty include damage or failure arising from: wear and teat; corrosion, erosion, deterimtum; Customers failure to follow the Company -provided maintenance plarc refrigerant not supplied by Canpany; and modifications made by asters to Company's equipment Company shall not be obhgated w pay fm die cora of log refrigerant m lou pmduct. Some rnmpoamts of Company equipment nay be warranted directly froaa tan connponemt supplier, in which event this Compaq Warranty shall not apply to diose components but shall be pursuant to the warranty given by etch component supplier. Nawithannding the foregoing, all warranties provided herein terminue upon termination or camel cion of this Agreement. Equipment, material audior pans that are not manufactured by Company are not warrented by Company and have Bach warranties as may be extended by the respective mamfaatmer. THE WARRANTY AND LIABILITY SET FORTH IN THIS SECTION ARE IN LIEU OF ALL OTHER WARRANTIES AND LIABILITIES, WHETHER IN CONTRACT OR IN NEGLIGENCE, EXPRESS OR IMPLIED, IN LAW OR IN FACT, INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE OR FITNESS FOR A PARTICULAR PURPOSE AND/OR OTHERS ARISING FROM COURSE OF DEALING OR TRADE. UNLESS EXPRESSLY WARRANTED IN WRITING FOR CERTAIN HUSSMANN. BRANDED EQUIPMENT, COMPANY MARES NO REPRESENTATION OR WARRANTY EXPRESS OR IMPLIED REGARDING PREVENTION BY THE SCOPE OF SERVICES, OR ANY COMPONENT THEREOF, OF MOLD/MOULD, FUNGUS, BACTERIA, MICROBIAL GROWTH, OR ANY OTHER CONTAMINATES. COMPANY SPECIFICALLY DISCLAIMS ANY LIABILITY IF THE SCOPE OF SERVICES OR ANY COMPONENT THEREOF IS USED TO PREVENT OR INHIBIT THE GROWTH OF SUCH MATERIALS. THE WARRANTY AND LIABILITY SET FORTH IN THIS AGREEMENT ARE IN LIEU OF ALL OTHER WARRANTIES AND LIABILITIES, WHETHER IN CONTRACT OR IN NEGLIGENCE, EXPRESS OR IMPLIED, IN LAW OR IN FACT, INCLUDING IMPLIED IED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. S. Indemnity. Company and Customer shall indemnify, defend and hold bumleas each other from any and all claims, actions, costs, expenses, damages and liabiliva, including reasonable attorneys fees, resulting from death or bodily injury m damage m real or Itenomal property, to the extent caused by me negligence or misconduct of the iodemtdfyimg party, and/m its respective employees a authorized agents in connection with their activities within the scope of this Agreement. Neither pony shall indemnify the other against claims, damages, expenses, or liabilities to the extent atmbuahle m the ata or omissions of the other party. If the parties are both a fault. the obugauon to iodeeonify shag be proportional oro their relative fmh. The dory to indemnify will continue in full force and effect, notwithstanding the expinums or early termination herd, with respect to my claims based on facts or conditions that occurred prim m expiration or termination. 9. Limitation rf Liability. NOTWITHSTANDING ANYTHING TO THE CONTRARY, NEITHER PARTY SHALL HE LIABLE FOR SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES OF ANY NATURE (INCLUDING WITHOUT LIMITATION REFRIGERANT LOSS, PRODUCT LOSS, LOST REVENUE OR PROFITS), OR PUNITIVE DAMAGES WHETHER CLAIMED UNDER CONTRACT, WARRANTY, NEGLIGENCE, STRICT L.IABI[JTY OR ANY OTHER LEGAL THEORY OR FACTS, Should Company nevertheless be found liable for any damages they shall be limited to the put"-, prim of the Services for me location over a 12 month term. IN NO EVENT SHALL SELLER BE LIABLE FOR ANY DAMAGES RESULTING FROM MOLD, FUNGUS, BACTERIA, MICROBIAL GROWTH. OR OTHER CONTAMINATES OR AIRBORNE BIOLOGICAL AGENTS. 10. A,Detaa and Hazardous Matedids. Company's services expressly exclude my identification, abatement. cleanup, comol. disposal, removal m other wok connected with eabeancs or other hazardous materials (collectively, "Hazardous Materials'). Should Company become aware of or suspect the presence of Hvmdou Materials, Company may immediately soup wok in the affected arae and shall notify Customer. Customer will be responsible for toting my and all scum necessary m correct the condition in accordance with all applicable Is- and fegulatas. Customer shall be exclusively responsible for my claims, liability, fees and penehies, and the payment thereof, wising rot of or relating to my Hazardous Materials on or abort the premises, no brought onto the premises by Company. Company shall be required to resume performance of the smites only when the affected area has been tendered harmless. 11. Isotones. Company, agrees to maintain the following insurance during the term of the contract with limits not less than shown below and will, uponrequest from Customer, provide a Cmificme of evidencing the following coverage: Commercial General Liability $2,000,000 per -serene Automobile Liability $2,000,000 CSL Workers Compensation Salutary Limits Page 3 of 3 �iaWMv �m dp�ig u rogiom}butAbbmp�aa�is�dibbsr�te�dorsarihi�o�nnt�aiatal 12. Form Majeure Company's duty to perform under this Agreement is contingent upon the trop -occurrence of an Event of Force Majeure. If Company shall be unable m carry out any material obligation under this Agreement due to an Event of Force Majeure, this Agreement shall at Company's election (i) remain in effect but Company's obligations ahahl be suspended until the uncontrollable event teamir ates or (ii) be terminated upon ten (10) days notice to Customer, in which event Customer shall pay Company for all pans of the Services furnished to the date of termination, An "Event of Face Majeure" shall mean any cause or event beyond the central of Company. Without limiting the foregoing, "Event of Face Majeure" includes: acts of God; acts of tertmism, wen a the public enemy; flood; earthquake; lightning; tomado; storm; fate; civil dimbedience; pandemic insunectons; riots; labor disputes; labor or material shortages; sabotage; restraint by court order in public authority (whetter valid or invalid), and action or non -action by or inability to obtain m keep in force the necessary, governmental authorizations, permits, ficonses, certificates or approvals if not caused by Company and the requirements of any applicable government in any answer that diverts either die material or the finished product to the direct ce indirect benefit of the government. 13. General. Except as provided below, to the maximum exrem provided by law, this Agreement is made and shall be interpreted and enforced in accordance with the laws of the state orprovince in which the Services are performed. Any dispute arising under or :elating to this Agreement that is not disposed of by agreement shall be derided by litigation in a court of competent jurisdiction located in the store or province in which the Services ate performed. To the extent the premises are owned araUm operated by any agency of the Federal Government, determination of any substantive issue of law shall be according to the Federal common law, of Govert rmam, contacts as eamciated and applied by Federal judicial bodies and boards of contact appeals of the Federal Go ernoram. Ibis Agreement contains all of the agreements, repxeseatatio as and understandings of the parties and supersedes all previous understandings, commitments or agreements, ora( or wrinm, related to the subject matter hereof. This Agreement contains all of the agreemems, tepteaentatiahs and anderstmdings of the parties and supersedes 90 previous understandings, commitments re agreements, oral car written, related to the subject matter hereof. Except as provided for Service Fee adjustments, this Agtmment may or be amended, modified or terminated except by • writing signed by the paries hereto. No documents shall be incorporated herein by reference except to the extent Company is a signatory thereon. If any turn or condition of this Agreement is invalid, illegal or incapable of being enforced by any role of law, all other wet+ and conditions of this Agreement will t rvenbeless remain in full force and effect sa long as the economic or legal substance of the transaction contemplated hereby is net affected in a mamer adverse to retry party hereto. Customermay nor assign, tamsfer, or convey this Agreemem, or any pan hereof, without the written consent of Company. Subject to the foregoing, this Agteemrnt shall bind and inure to tine benefit tithe parties hereto and their permitted suecessan and assigns. This Agreement may be executed in several counterparts, each of which when executed shall be deemed to be an original, but all together shall conssimte but one and the same Agreement. A fully executed facsimile copy hereof or the several counterpme, shall suffice as an original. No modifications, additives or changes may be merle to this Agreement except in a writing signed by Company. 14. Equal Employment OppottunitylARlrmative Action Clarissa. Company is a federal contactor which complies fully with Executive Osier 11246, m amended, and the applicable regulations comained in 41 CX.R, Pots 60-1 through 60-60,29 U.S.C. Section 793 and the applicable regulations contained in 41 C.F3t Pan 64741; mrd 38 U.S.C. Section 4212 and the applicable regulations contained in 41 C.E.R. Pan 60.250 and Executive Order 13496 and Section 29 CPR 471, appatdix A to subpart A. regarding the notice of employee rights In the United States sad with Canadian Charter of Rights and Freedoms Schedule B in the hada Act 1982 (UJQ 1981 c. 11 and applicable Provincial Humor Rights Codes and employment law in Canada 15. U.S. Government Contracts The following provision applies may to direct galea by Company to the US Governmemt. The Parties acknowledge that all items or services ordered and delivered under this Agreement 1 Purchase Order are Commercial Items ss defined order Pan 12 of the Federal Acquisitiod Regulation (FAR). In particular, Company agrees to be bound only by those Federal contacting classes that apply in "commercial" suppliers and that ane conceited in PAR 52.212- 5(e)(1). Company complies with 52.219.5 or 52.219.9 in its service and installation contracting business. Ilia following provides applies only to indirect sales by Company to the US Government. An a Commercial Item Subconmactor, Company accepts only the following mandatory flaw, down pmvisiom: 52219-8; 52.222-26; 52.222.35; 52.222-36; 52222.39; 52.747.64. if the Services are in connection with a U.S. government contract, Customer agrees and hereby certifies that it has provided and will provide current, accurate, and complete information, representations and cenifrcatioas to all government officials, including but not limited to the contracting officer and officials of the Small Busueas Adminiatreim, on all mattes related to the prime contract, including but not limited to all aspects of is ownership, eligibility, and performance. Anything herein notwithstanding. Company will have no obligations to Customer unless and until Customer provides Company with a one, correct and compete executed copy of the prime connate. Upon aqucst, Customer will provide copies in Company of all requested written communications with my government official related to the prime contract prim to or concurrent with the execution thereof, including but not limited to any communications related to contractor's Custaners ownership, eligibility m performanes of the prime contact. Customer will obtain written authorization and approval Sem Company prim to providing any government official my information about Company's performance of the Services that are the subject of this offer or agreement, other than the Proposal or this Agreement. 16. Umiled Waiver of S were(gn hnmwn ty. If Customrcr is an Indian tribe (in the U.S.) or a Fust Nation or Band Council (in Canada), Cummer, wherher acting in is Capacity as a government, governmental entity, a duly mgmized rnryonte entity or otherwise, fm itself and fa Its agents, successors, and assigns: (1) hemby provides this limited waiver of its sovereign immunity as to my dhunagas, claims, lawsuit, or cane of action therein "Action") brought against Customer by Company and arising or alleged to vise out of the famishing by Company of my product or service under this Agreement, whether such Action is based in comma, tom, strict liability, civil liability or my what legal theory; (2) agrees that jurisdiction and venue for any such Action spall be proper and valid (a) if Customer is in the US., in my sora or United States court located in the sun in which Company is performing this Agreement or (b) if Customer ix in Canada, in the superior conn of the province or territory in which the work was pc[otmed; (3) expressly cousenti to such Action, and waives my objection to jurisdiction or ve®e; (4) waives my requirement of exhaustion of tribal taut or administrative remedies for any Action arising out of or related to dos Agreement; and (5) expressly acknowledges and agrees that Company u not subject in the jurisdiction of Customers tribal amt or my timila tribal futon, dust Customer will am bring say action against Company in tribal tarn, and tort Customer will ort avail itself of airy ruling or director of the tribal coon pemdding in directing it to suspend its payment or other obligations under this Agrom mt. The individual signing on behalf of Customer warrants and teptesara that such individual is duly authorised to provide this waiver and enter into this Agreement and that this Agreement amst Utes the valid and legally binding obligation of Customer, enforceable in accotdmtt with in terms, 1-10.48(1013) Supersedes 1-10.48 (1012) Connie Hardin From: Sent: To: Subject: Derek Hart, Sr. Project Manager HOLADAY-PARKS, INC. 206.248.9700 main 425.269.2447 cell derekh holadayparks.com HOLADAYPARKS.COM Derek Hart Monday, June 20, 2016 9:56 AM Connie Hardin FW: Permit for 9-101 Replace AH1M18 From: Dan [mailto:danj@dahlgrenindustrial.com] Sent: Monday, lune 20, 2016 9:46 AM To: Derek Hart; Josh Cc: Julie; rock.a.moug@boeing.com Subject: RE: Permit for 9-101 Replace AH1M18 Derek — it appears to be under the Tukwila Dan permit application, 15 -001 -BPA. From: Derek Hart [mailto:derekhLciholaLla parks.com] Sent: Monday, June 20, 2016 9:38 AM To: Dan <danj'a:dalilgrenindustrial.com>; Josh <ioshp,'rr da hlgrenindustrial.com> Subject: Permit for 9-101 Replace AH1M18 Have you pulled a permit for this project? If so we need your permit #. We want to reference you permit # so our reviewer knows that that the AHU platform has been reviewed. Derek Hart, Sr. Project Manager HOLADAY-PARKS, INC. 206.248.9700 main 425.269.2447 cell PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0107 DATE: 06/20/16 PROJECT NAME: BOEING #9-101 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Bui ing Division a Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: �m AWG Fire Prevention Structural ❑ Planning Division ❑ Permit Coordinator ❑ DATE: 06/21/16 Structural Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07/19/16 Approved ❑ Approved with Conditions 9 Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: I0l 12/18/2013 HOLADAY PARKS INC Home F.spaiiol Contact Safety & Health Claims & Insurance 40Washington State Department of 1 Labor & Industries HOLADAY PARKS INC Owner or tradesperson 4600 S 134TH PL BECK, DAVID CARL SEATTLE, WA 98168 206-248-9700 Principals KING County BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRT, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUTT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. Business type 578 004 089 Corporation Page 1 of 3 T v' (Search L&I A -L Index Help My L&I Workplace Rights Trades & Licensing https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379NO&SAW= 7/11/2016 HOLADAY PARKS INC ILicense J Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. .......................................................... . Meets current requirements. License specialties GENERAL $1,000,000.00 License no. HOLADPI379NO Effective — expiration Effective date 01/21/1983— 09/03/2017 11/01/2015 Bond ................ Expiration date LIBERTY MUTUAL INS CO $12,000.00 Bond account no. 23000452 Received by L&I Effective date 08/23/2002 09/01/2002 Expiration date Until Canceled Insurance ........................ ... - Charter Oak Fire Ins Co $1,000,000.00 Policy no. DTC01 F465357PHX15 Received by L&I Effective date 10/30/2015 11/01/2015 Expiration date 11/01/2016 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings ............ No jawsui4s against the .. bond . or savings accounts during the previous 6 year period. L&I Tax debts ............... No�L&I tax..de.bts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license v'iolafjons during the previous 6 year period. I Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 177,231.00 ................................. Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 1 of Year 2016 "Greater than 100 Workers" L&I account representative T4 / CARIE PICKETT (360)902-5592 - Email: PICC235@lni.wa.gov Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 05/05/2016 No violations Inspection no. 317940156 Location 4600 S 134th PI Tukwila, WA 98168 Page 2 of 3 https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379NO&SAW= 7/11/2016 HOLADAY PARKS INC Inspection results date No violations 06/11/2014 Inspection no. 317319382 Location 1011 Dexter Ave Seattle, WA 98102 Inspection results date 05/08/2014 No violations Inspection no. 317278497 Location 2nd and 110th Ave Bellevue, WA 98004 .. .......... --- . .... .... ...... ...... 1.1-1--l.- ......... .... Inspection results date Violations iolations Inspection no. 316256841 Location 3003 W Casino Rd Everett, WA 98204 © Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Page 3 of 3 https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379NO&SAW= 7/11/2016 PROJECT WORK LOCATION VICINITY MAP sy, u :kt# } s «,fs 7 S' }< 1 3 4 ,. , < ; .."; ,, ,Js.. ev,• s.: -�,Y tial `^ '` ..v :v ,. 4 ul. n t s � } z � c at 4 t e t a. pr, fr' ss` S pYt x v »v m ,; v,. _{ »: 4t"f a W' •�!`,: �, �r. +, 5;,, ; �.,�r ^mt:rv,,, N� ,,,x°'=' M:}; � :� •ra ti' }?.•: � ^�,,,, a 4�°. dal' °ra o� .,'w :f?' � a"' }_� �'s� ..•rh,. „ -' .p. -. ,a� ae. :t... ....., `iy',. 4,..; „ , a... :{. �: .} t?;. '�?^. z' .:},w. ,t <::. ssy. :ay �:,': '.«' i{},' ` :'t�" re. ,;z `�. %s,. t:� s^p,, z;.,x;: -�' •�. „a�, :�. 5i,,... "t��., Yr,. ,.,n,,,r»,-fin" ».,,.<»<,n w. �k et,C? •^wa.a ,.,�t.- �i.§ ,naso st,? as.wwsa,.,,pavw. �,».., ...�., »:.;wa„� '4W;Wn «`eut7 � � m° ,f �� s.7e '�`t`.am»;w, w.6w: saw3seiFs' Ym to nX#� MFC �6 F-1 ,w .. PmLACO� w»spa .aw»,»:,.,,�,,, HANDnLING z'$ � :�,w i4 ` r:4i''«f.4i.. {, :»r.x.^ ?+)e t/;p <�< ,{^x UNIT :.: ,,:,»<.. .x.,, ,v,.t i. }y .),. ,. .,.s. w'.� t,tY». ,v } », '.:r. . .». Y !:. ^,x. l i.+ 'itti'tL <, ';� 'i;, :°:q,: Y.^ :p ::1: t`v� � "', � 6�qu�”' �. fl«.,.�s.. �,wa k �-„a.�,>a "'sn' �` m.�xs�� �'r�a.,�»�..�-.�., a: a s <„fi:r,�w�w� l BC) yz..nDr�VIFELOPM"�NTAL ern<<,•,, { t �{'s,, �, NTff�” n. $ „ � t'` ;j^ �,' '��`, e � � ;� ,.�z't t, x�''�D } r t',, ?q}S ii; r ``�a Yp 5 }S .. ” '`r1r ' a 'Ya��. ;» Sf4a Y. t 49725 EAST MAEFIZ.GINAL WAY SOUTH U 111111"Or n'0AA/1LA rx 9'101, w. W I WA`NH--'1NGT0N •" •,-N CODE SUMMARY TYPE OF APPLICATION: [:]NEW ❑ ALTERATION ❑ ADDITION ® TENANT IMPROVEMENT PROJECT DESCRIPTION: REMOVE EXISTING AC UNIT & REPLACE, MODIFY SUPPORT STRUCTURE TO ADD WALKWAY AND ACCESS PLATFORM, CODES: 2012 INTERNATIONAL BUILDING CODE & WAC 51-50 2012 INTERNATIONAL MECHANICAL CODE & WAC 51-52 2012 INTERNATIONAL FIRE CODE & WAC 51-54 2012 UNIFORM PLUMBING CODE & WAC 51-56 2012 UNIFORM PLUMBING CODE AMENDMENTS A, B & I & WAC 51-57 2014 NATIONAL ELECTRIC CODE, AMENDMENTS A, B & C & WAC 296-4613-010 2012 WASHINGTON STATE ENERGY CODE WAC 51 -II CURRENT CITY OF TUKWILA ZONING ORDINANCES CONTRACTOR &STATE NUMBER: THE BOEING COMPANY (BOEINC *294ML 1/18/2017) BOEING PROJECT ENGINEER: PROJECT DESI GNER/ARCHITEC: DOUGLAS CONDIT/EISI PHONE: 206-284-1181 BOEING CONTACT: JOHN MURDOCH PHONE: 253-740-0214 FAX NUMBER: 253-657-0858 E-MAIL: john,s.murdoch@boeinq.com OCCUPANCY GROUP: GROUP B & GROUP F - BUSINESS & MANUFACTURING CONSTRUCTION TYPE: TYPE II -B ZON I NG: ALLOWABLE AREA INCREASE: SPRINKLERED & 60' SET -BACK (NO CHANGES) OCCUPANT LOAD: (ALLOWABLE) NO CHANGE (TABLE 10-A) FLOOR AREA: (ACTUAL) NO CHANGE OFFICES OCC. BLDG GROSS 1,089,878 SF SQ FT STORAGE OCC. TUNNEL 50,910 SF SQ FT LABORATORY OCC, FIRST FLOOR 713,829 SF SQ FT CANOPY OCC. IST FLR MEZZ 28,401 SF SQ FT OTHER OCC: 2ND FLOOR 296,460 SF SQ FT 09-101-1 2ND FLOOR MEZZ 278 SF SQ FT L LIGHTING PROJECT AREA 1000 SF SQ FT BUILDING HEIGHT: (ACTUAL) III FT STORIES: 2 MEZZANINE ?® (YES) ❑ (NO) SQ FT 54,794 SF FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NFPA 13 ? ® (YES) ❑ (NO) SEPARATION EXTERIOR WALL (NON-BEARING) HOUR RATING EXTTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR/CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING ��II SEISMIC DESIGN: ZONE D DEVELOPMENTAL CENTER IV DESIGN LOADS: (CHAPTER 16) NO SCALE ROOF: LIVE (SNOW) FLOOR: OFFICE MECH/STOR STAIRS CONCENTRATED: WIND: EXPOSURE 110 MPH, EXPOSURE C SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE - ORIGINAL ISSUE 28760 EISI GMM 01.06.16 (PSF) (PSF) (PSF) (PSF) 100% DESIGN REVIEW GENERAL NOTES A CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY THE CITY OF TUKWILA BUILDING DEPARTMENT MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. 1. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS WITHIN THE AREA OF WORK BEFORE COMMENCING ANY WORK AND ENSURE THAT THE JOINING OF THE WORK OF VARIOUS TRADES MEETS APPROPRIATELY. THE CONTRACTOR SHALL BRING DISCREPANCIES ON THE DRAWINGS OR SPECIFICATIONS TO THE ATTENTION OF THE BOEING PROJECT CONSTRUCTION MANAGER IMMEDIATELY UPON DISCOVERY ONLY IF THEY REQUIRE DESIGN REVISIONS. 2. COORDINATE THE WORK OF ALL TRADES. REFER TO ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS IN DETAIL FOR COORDINATION OF SPECIFIC TRADE REQUIREMENTS. COORDINATE ALL ROUGH -IN REQUIREMENTS FOR MATERIALS OR EQUIPMENT FURNISHED BY CONTRACTOR OR BY OTHERS FOR THIS PROJECT. 3. ASBESTOS NOTIFICATION: A GOOD FAITH SURVEY OF THE WORK AREA HAS BEEN CONDUCTED AND ASBESTOS CONTAINING MATERIAL WAS NOT DISCOVERED OR WILL BE REMOVED PRIOR TO THE BEGINNING OF THE WORK FOR THIS PROJECT. A COPY OF THE REPORT OF THE SURVEY WILL BE FURNISHED TO THE CONTRACTOR AT THE TIME OF BIDDING OR NEGOTIATIONS. DO NOT REMOVE, DAMAGE OR DISTURB ANY ASBESTOS MATERIAL ADJACENT TO THE WORK AREA. CONTACT BOEING FACILITIES DEPARTMENT IF ASBESTOS CONTAINING MATERIAL IS DISCOVERED OR DAMAGED THAT IS REQUIRED TO BE REMOVED TO SUPPORT THE WORK OF THIS PROJECT. 4. THE GENERAL CONTRACTOR SHALL OBTAIN AND MAINTAIN A FULL SET OF CONSTRUCTION DOCUMENTS ON SITE. THIS SET SHALL BE MARKED UP (RED -LINED) DAILY WITH ANY ACTUAL WORK OR INSTALLATIONS DIFFERING FROM THE CONSTRUCTION DOCUMENTS. SAID SET SHALL BE TURNED OVER TO THE BOEING CONSTRUCTION PROJECT MANAGER AT THE COMPLETION OF THE WORK FOR INCORPORATION INTO BOEING RECORD DOCUMENTS. DRAWING INDEX ARCHITECTURAL - CIVIL DRAWING NUMBER REV DRAWING TITLE 09-101—AO NEW COVER SHEET MECHANICAL ❑ DEMOLITION ❑ CANTILEVER RACKS 09-101-1A30 A7 M FLOOR PLAN 09-101-1A31 A8 N FIRST FLOOR PLAN 09-101—A364 NEW DOOR DETAILS AND SCHEDULE 09-101—A458 NEW AH 1 M 18 PLATFORM PLAN PLUMBING FIRST FLOOR PLAN 09-101—M1 M130 C IPLUMBING — MEZZANINE PLAN 09-101-1 M280 D FIRE PROTECTION — PLAN VIEW 09-101—M513 L LIGHTING C HVAC DETAILS AND SECTIONS 09-101-1E80 Q 208Y/120 STRUCTURAL DRAWING NUMBER REV DRAWING TITLE 09-101-1S80 B SLAB PLAN (J—N/15-19) VOLT PARTIAL POWER PLAN 09-101—S475 NEW AH 1 M 18 PLATFORM PLAN 09-101—S685 NEW SECTIONS AND DETAILS 09-101—S686 NEW SECTIONS AND DETAILS 09-101—S687 NEW SECTIONS AND DETAILS ------ ETAILS09-101—S2aa 09-101 —S2aa NEW GENERAL NOTES �s L • c CSy OF WASkt 0� BUILDING ❑ GRADING REQ ^R 0. 15620 ORAL S10NAL -Ai PROJECT REPLACE TITLE: E E LACE AIR HANDLING UNIT AHIM18 JOB NO: 28760 QUANTITY SUBMITTED: ® 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT ❑ 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) 3 SETS: FIRE PROTE CTION SPRINKLERS ❑ 2 SETS: TENANT IMPROVEMENT (REVISION) SUBMITTED FOR PERMIT & REVIEW: ❑ BUILDING ❑ GRADING ❑ ELECTRICAL * ❑ PLUMBING ❑ LANDSCAPE ❑ FIRE PROTECTION ❑ MECHANICAL ❑ DEMOLITION ❑ CANTILEVER RACKS IM STRUCTURAL ❑ - ❑ - * TO BE REVIEWED UNDER SEPARATE PERMIT WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE -APPROACHES COMPLIANCE OPTION PRESCRIPTIVE❑ ❑ LPA ANALYSIS IM N/A SPECIAL INSPECTIONS REQUIRED: ❑ WELD ❑ CONCRETE ❑ REBAR ANCHOR BOLTS ® STRUCTURAL BOLTING ❑ STRUCTURAL OBSERVATION ❑ OTHER CALCULATIONS TYPE: N/A ATTACHED (YES) (NO) DRAWING INDEX MECHANICAL DRAWING NUMBER REV I DRAWING TITLE 09-101.1-1M30R H PLAN —HVAC—REMOVAL 09-101-1M31R B HVAC FLOOR PLAN—REMOVAL _09-101-1M80R D PIPING FIRST FLOOR PLAN—REMOVAL 09-101.1-1 DRAWING NUMBER M30 H PLAN — HVAC 09-101-101 09-101-1 CHECKED B HVAC FLOOR PLAN 09-101-1M80 — REMOVAL DEPT. D PIPING FIRST FLOOR PLAN 09-101-1 X M130 W PLUMBING FIRST FLOOR PLAN 09-101-1 M131 V PLUMBING FIRST FLOOR PLAN 09-101—M1 M130 C IPLUMBING — MEZZANINE PLAN 09-101-1 M280 D FIRE PROTECTION — PLAN VIEW 09-101—M513 L LIGHTING C HVAC DETAILS AND SECTIONS 09-101-1E80 Q 208Y/120 VOLT POWER PLAN 09-101 —1 E130 W 480Y/277 VOLT PARTIAL POWER PLAN 09-101—M323 NEW CONTROLS FOR AH 1 M 18 ELECTRICAL SEPARATE PERMIT REQUIRED MR ❑ Machanied Lff Electrical I-IUMbing An- Pin to City of Tukwila euiLDING Divisio-j- shall be made to the vithout prior am)rova ': Revisions will require a new olan submi may include additional plan review fees. CITY OF TUKWILA _ LANKET PERMIT AGREEMENT NUMBER: 15 -001 -BPA Permit No, u) Plan review approval is subject to errors and omissions. Approval of construction documents does not aulhorize RECEIVED the violation of any adopted code or ordinance. Recolpt CITY OF TUKWILA ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWING NUMBER REV I DRAWING TITLE 09-101-1 CHECKED E30R X LIGHTING — REMOVAL DEPT. 09-101-1 ENGINEER E80R X 208Y/120 VOLT POWER PLAN — REMOVAL 09-101-1 El 30R X 480/277V PARTIAL POWER PLAN — REMOVAL JOB NO. 28760 COMP NO. APPROVED 09-101-1E30 DWG NO. 09-101—AO L LIGHTING 09-101-1E80 Q 208Y/120 VOLT POWER PLAN 09-101 —1 E130 W 480Y/277 VOLT PARTIAL POWER PLAN SEPARATE PERMIT REQUIRED MR ❑ Machanied Lff Electrical I-IUMbing An- Pin to City of Tukwila euiLDING Divisio-j- shall be made to the vithout prior am)rova ': Revisions will require a new olan submi may include additional plan review fees. CITY OF TUKWILA _ LANKET PERMIT AGREEMENT NUMBER: 15 -001 -BPA Permit No, u) Plan review approval is subject to errors and omissions. Approval of construction documents does not aulhorize RECEIVED the violation of any adopted code or ordinance. Recolpt CITY OF TUKWILA ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE SUBTITLE COVER SHEET CURRENT REVISIONSYMBOL 28760 0 R I G DATE 01.06.16 CHECKED SHEET AO APPROVED BY DEPT. DATE ENGINEER TITLE REPLACE AIR HANDLING UNIT AH1M18 BUILDING 09-101 ARCHITECTURAL MASTER DEV. CENTER, WAI CHECKED APPROVED JOB NO. 28760 COMP NO. APPROVED DWG NO. 09-101—AO YL M N I I I I I I I I I I /- I I - - ------------ - l I - - - - - - - - �----------------- - - - - - - - i�-� CCT— - -�? I I I I I I I I I I I I I I I 38/24 I I I I I I I I I I I L -- -- -- -----------G -�51 CC�II__ �4J l__r� ;I���-LLNi\III\i i_ AU0 �� j I f L I M30 M579 I � (D I I O I I I QI I 120 F- I � CC8 C 12 24x- TRANSFER - - C 0 - - - - - - - - - —;- - - - C - - - - - - - - GRILLES NON—SIGHT BACK CFM TRIM SHOP80 TO HOOD (TYP 3) W/F.D. N I DRAFT 36x30 I OCCP. LOAD FACTOR = 200 SF, OCCP. r HOOD -- EXHAUST OCCP. LOAD: = 14 OCCPANTS MAX. ' 450 GRILLE CFM rto I I � I I I I I I I CRANE RAIL N I i I I I I i i I I SECURITY BARS 120 TRANSPORTATION _AISI_F I i 00 I � CONNECT TO BRIDGE CRANE I � EXHAUST DUCT N m I I - - - - �- - - - - �- - - - - EEI - - - - - - - -Eb= 1 48X24 RETURN GRILLE, TITUS 350RL WITH BACK DRAFT DAMPER, GREENHECK EM -30 COUNTER BALANCE WEIGHT (TYPICAL OF 2) 120x24 UP TO ROOF SYM I REVISION A RELOCATE RESIN ROOM FAN B RELOCATE EQUIPMENT C SECURE AWACS AREA D PURCHASE VACUUM PUMP E INSTALL 400K CLEAN ROOM 8"0 UP, SEE DWG. 1 M35 DATE 01/30/08 03.14.08 01.05.16 PLAN SCALE: 118"=1'—Y OPENING 120x24 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DAN, ACCEPTABILITY �\ I w�syl ��� THIS DESIGN AND/OR c�, y SPECIFICATION IS APPROVED ® 1 APPROVED BY I DEPT. I DATE a,..,s SXM �- 8" FIRE LINE I 1 M3014571—M2 TITLE LEGEND Ja K GENERAL NOTES B REFERENCE DRAWINGS 1M30 M513 0 0 r-Zm 0 H 1100% DESIGN REVIEW PLAN - HVAC BUILDING 9-101.1 MECHANICAL) MASTER COL. J—N/15-20 REMOVAL NOTES REMOVE EXISTING AC/2 AND DUCTWORK AS SHOWN. PROVIDE TEMPORARY CAP FOR PROTECTION. REMOVE EXISTING 20" NK ROUND DIFFUSER. PROTECTION FOR RECONNECTION NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 - "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. l �V 1M10 1M11 1M12 BY APPROVED DATE SYM REVISION BY APPROVED 766063-00 SLB RWS EJC 04.22.03 F STUDY: INVESTIGATE NOISE J#556839-00 M.WONG 1M25 771751-00 KGP RWS EJC 09.08.97 G REROUTE DUST COLL. FOR CFAC CONSOLIDATION 57822000 HARR 1M32 534135-00 RWS RWS 04.22.03 — RELOCATED DUST COLL. TO DWG. 1M380 S.RUDELL 1M43 546843-01 M.WONG RWS 11.16.04 H 9-101 REPLACE AIR HANDLING UNITS 28076 FSi 140627-14 M.WONG RWS 12.01.04 DATE 01/30/08 03.14.08 01.05.16 PLAN SCALE: 118"=1'—Y OPENING 120x24 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DAN, ACCEPTABILITY �\ I w�syl ��� THIS DESIGN AND/OR c�, y SPECIFICATION IS APPROVED ® 1 APPROVED BY I DEPT. I DATE a,..,s SXM �- 8" FIRE LINE I 1 M3014571—M2 TITLE LEGEND Ja K GENERAL NOTES B REFERENCE DRAWINGS 1M30 M513 0 0 r-Zm 0 H 1100% DESIGN REVIEW PLAN - HVAC BUILDING 9-101.1 MECHANICAL) MASTER COL. J—N/15-20 REMOVAL NOTES REMOVE EXISTING AC/2 AND DUCTWORK AS SHOWN. PROVIDE TEMPORARY CAP FOR PROTECTION. REMOVE EXISTING 20" NK ROUND DIFFUSER. PROTECTION FOR RECONNECTION NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 - "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. l �V 1M10 1M11 1M12 T 1M13 T 1M14 T 1M15 T 1M16 1M17 1M18 1M19 1M20 1M21 1M22 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1M31 1M32 1M33 1M34 1M35 1M36 1M39 1M40 1M41 1 44 1M37 1M38 1M42 1M43 1M45 1M46 15 19 20 21 22 23 9-1OL-KW PLAN N REv1�11G opGE RECEIVED 'O, e01CITY OE TUKWVIL.11 �► JUN 2 0 2016 PERMIT CENTER 1S��NgV�FSi consulting engineers 28706 SHEET Seattle, Washington Solutions & Service OL DATE H 01.05.16 JOB N0. 130R COMP DEV. CENTER, WA DWG NO. 09-101.1-1 M30R ruAi rvrmm, vrruv iv rmu I vr\ i ). 1 M31 4572 M1 ""'"" "' —.1— -1— "" —11. ' ""'° "' RETURN AIR BLOWS INTO THE HIGH BAY. SYM REVISION BY APPROVED DATE SYM - REDRAWN KB CH 12.3.97 A RELOCATE DAMPER, REBALANCE 280112 HARR RWS 06/28/05 B 9-101 REPLACE AIR HANDLING UNITS 280761 FSi 1 01.05.16 REVISION PLAN SCALE: 1/8"=1'-0 BY I APPROVED I DATE PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DA ACCEPTABILITY ACCEPTABILITY THIS DESIGN AND/OR yiQ y SPECIFICATION IS APPROVED ® �` APPROVED BY DEPT. I DATE t>� 100% DESIGN REVIEW '01 2s y,£ �y 7,,,<7,77 K.BUN 12'7'97 HVAC FLOOR PLAN C.HARRAH 12.7.97 ENGINEER I TITLE 09 RWS 12.17.97 BUILDING 9-101.1 > F6IERF 1�a� APPROVED ���SINNAL ENG APPROVED 0IA516 siom EJC 12.18.97 MECHANICAL MASTER COL. N—S/15-20 0 LEGEND GENERAL NOTES 1. DIFFUSERS: TITUS MODEL #XC -310 WITH AG -75 OPPOSED BLADE DAMPER. 140 CEILING DIFFUSER, 1250 CFM, BOTTOM OF DIFFUSER APPROX 16'-6" AFF (8 TYP) 140 CEILING DIFFUSER, 1150 CFM, BOTTOM OF DIFFUSER APPROX 12'-0" AFF (2 TYP) 140 CEILING DIFFUSER, 1150 CFM, BOTTOM OF DIFFUSER APPROX 9'-6" AFF (2 TYP) 140 CEILING DIFFUSER, 1250 CFM, BOTTOM OF DIFFUSER APPROX 12'-0" AFF CONTROL DAMPER: RUSKIN CD 60 OBD, 24" H X 48" W, WITH EXTENDED SHAFT, FRONT AND BACK T -FLANGE FRAME, BULIMO MOTOR OPERATOR. REMOVAL NOTES REMOVE EXISTING 20" NK ROUND DIFFUSER. PROVIDE TEMPORARY CAP FOR PROTECTION, REMOVE EXISTING 14" NK ROUND DIFFUSER. PROVIDE TEMPORARY CAP FOR PROTECTION. NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 - "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. REFERENCE DRAWINGS OA OD OE OH J Ja nN nS REVI COM - n n l��-`� V iM10 1M11 1M12 PPROVED T 1M13 T 1M14 T 1M15 1M16 1M17 1M18 1M19 1M20 1M21 1M22 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1101 1M32 1M33 1M34 1M35 1M36 EWED. 0039 1M40 1M41 1 M 44 1M37 1M38 1M42 1 M 45 1M43 1 M 46 i AUL o 1 2016 9101.1 KEY PLAN City of Ttjkwlla gUIWING DIVISION 7 a 10] 15 19 20 21 z2 N ,ECEIVED OF TUKWILA JUN 2 0 2016 PERMIT CENTER FSi consulting engineers Seattle, Washington Solutions & Service CURRENT REVISION ISYMBOL DATE 28706 B 01.05.16 JOB NO. DEV. CENTER, WA DWG N0. 1M31R COMP N0. 280112 09-101-1M31 1 "CLWS/R DN COLUMN TO _ PLUG THE VALVES ON THE WALL - I I - - - -- CC8 CC7 I I I I 2" I I U) I I U 'SJ I I U I I I I CONNECTION TO MOBILE TRACK, `—MOBILE POWER TRACK EL 22.66' RELOCATED FROM PLANT -1 7GPM 2, WITH POWER, COOLING -HD, - H�----- -- ---WATER- -&-GOMPR-ESSED AIR RELOCATION BY OTHERS I I I I L M N I I I I I I I I I I FOR CONT OF COIL I PIPING, SEE DWG 109-101-4546-M2 1 1/211 CHWSCHWR CHWSCHWR I I I w ------------------------ - �------------------- --------- - -- � (MEZZANINE ABOVE) I N I V Cc rr I F-- I -�C-7-- - -�- - - - om C- - - - - - - - - C(727-@ — TRIM SHOP — I AREA: = 2,800 SF. OCCP. LOAD FACTOR = 200 SF/ OCCP. I — OCCP. LOAD: = 14 OCCPANTS MAX. I i I I 2"CHWR&S ABOVE MEZZ LUNCHROOM i I SUSP. CEILING I I I I I I I �l 1/4 CHWR ,., ,..,,, (CHWR "CHWR FROM CENTRAL "CHWR � CHILLED WATER LOOP ON ROOF 11 LEGEND HPC CONDENSATE STEAM (HIGH PRESSURE) HPS STEAM SUPPLY 1 1M66 (HIGH PRESSURE 125, 250 PSIG) STM STEAM SUPPLY 1M70 HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY COND CONDENSATE 1M83 — P COND PUMPED CONDENSATE CLWS COOLING WATER SUPPLY CLWR COOLING WATER RETURN GENERAL NOTES REMOVAL NOTES REMOVE EXISTING DUCT MOUNTED HUMIDIFIER, ASSOCIATED STEAM, CONDENSATE PIPE AND PIPE ACCESSORIES REMOVE EXISTING ASSOCIATED STEAM CONDENSATE PIPE AND PIPE ACCESSORIES TO REMOVED AC/2 REMOVE EXISTING CHWS&R PIPES, CONTROL VALVES, AND PIPE ACCESSORIES TO REMOVED AC/2 NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 — "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. REFERENCE DRAWINGS OA O O OH J Ja N nS R nz 1 ( - Y 1M60 1M61 1M62 IV�Iw I I 1M63 1M64 I 1M65 1 1M66 11VI67 1M68 1M69 1M70 1M71 1M72 1M73 1M74 1M75 11V176 1M77 1M78 1M79 1M80 1M81 1M82 1M83 1M84 1M85 1M86 11V187 1M88 1M89 1M90 1M91 0 494 1M92 1M93 1M95 1M96 15 19 20 z� 22 _ I y 23 - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - �J :.+ 9-101 KEY PLAN I n n n SEE DETAIL 1, DWG I N 109-101-4546-M1 100% DESIGN RECEIVED REVIEW Cid of Tukwila CITY OF TUKWILA UILDING DIVISION JUN 2 Q 2016 FIRST FLOOR PLAN PERMIT CENTER SCALE: 1/8"=V-0" N FSi consulting engineers PROFESSIONAL STAMP & SIGNATURE Seattle, Washington APPLIES TO WORK WITHIN THE CLOUDED REMOVAL] Mi REVISION AREAS ONLY AS INDICATED Solutions & Service SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE D �F� THIS DESIGN AND/OR CHECKED PIPING FIRST FLOOR PLAN 28706 D 01.05.16 REDRAWN KB/CH 9.9.99 ����P �� y THIS IS APPROVED NGINE R TITLE SHEET A 21-01 MR&D COMPOSITE LAB RELOC. 190142-00 CH 1.20.00 ® APPROVED BY DEPT. DATE CHECKED 1 M80R B REMOVE FREEZER J#140627-04 M.WONG RWS 09.14.04 FAPPROVED BUILDING 9-101.1 JOB NO. COMP NO. C ENG-ZIMMERMAN NO.2 2967/8245178 M.WONG RWS 09.17.09 SSZONAL D 9-101 REPLACE AIR HANDLING UNITS 28706 FSi 01.05.16 01 SSW APPROVED MECHANICAL MASTER COL. J—N/15-19 DEV. CENTER, WA DWG NO. 09-101-1M80 AIR HANDLING UNIT SCHEDULE MIN SUPPLY FAN COOLING COIL STEAM REHEAT COIL PRE FILTERS FINAL FILTERS BASIS OF DESIGN REMARKS MARK SUPPLY AIR OUTSIDE- AIR ESP TSP TYPE RPM BRAKE MOTOR POWER- ENT AIR LVG AIR APD (IN) SENSIBLE LOAD TOTAL CHILLED WATER ROWS PRESS. ENT LVG APD (I N) STEAM ROWS PRESS. COIL SIZE EFF SIZE EFF SIZE DIMENSION WEIGHT NUMBER CFM CFM (IN) (IN) VFD HP HP V/ph DB WB DB Wg MB� GPM ENT LVG DROP SIZE AIR AIR LBS/HR PRIES MBH DROP AH1M18 17,000 1,700 2.7 5.5 30" -DD 1736 YES 23.6 25 460/3 74°F 63-F 50-F 50-F 0.9 448.6 630.4 125.6 45°F 55°F 8 11.2 FT NA 50 70 0.3 360 15 340 1 8.6 FT NA MERV 8 2" PLEAT MERV 16 12" CART 71 (H) X100 (W) x355 (L) 8,257 LBS TRANE CLIMATE 1, 2, 3, 4, 5 PLENUM CHANGER 1. PROVIDE WITH FACE AND BYPASS DAMPERS FOR THE HEATING COIL 2. PROVIDE WITH HUMIDIFIER: ARMSTRONG HUMIDIPACK. STEAM PRESSURE: 15 PSI, STEAM LOAD: 58.6 LBS/HR. 3. PROVIDE WITH CONVENIENCE LIGHTS IN THE UNIT AT THE FILTERS, COILS AND MOTOR 4• ALL ACCESS (DOORS, PORTS, ETC) TO BE ON NORTH SIDE OF UNIT. 5• OUTSIDE AIR AND RETURN AIR FROM BACK OF UNIT. JC 5- FR-UT,T--15 0 LEGEND H GENERAL NOTES TITUS TMRA DIFFUSER l i I �vvvVVV 38/24 I LTJ in B (�9E7zarJINE ABOVE)- -..-- - � J - -- 1 M30 M513 1 co Dp0 m z=i 60 M579 1 :11 REFERENCE DRAWINGS o Q 120 CC8 cc 24x12 TRANSFERr 2 4 16 H ,�.��_ �1 � GRILLES NON -SIGHT BACK CFM 80 TO HOOD = TRIM SHOP (TYP 3) W/F.D. N DRAFT AREA: = 2,800 SF. HOOD 36x30 OCCP. LOAD FACTOR = 200 SF/ OCCP. ' EXHAUST - - OCCP. LOAD: = 14 OCCPANTS MAX. 450 GRILLE CONSTRUCTION NOTES CFM U CONNECT NEW 64/24 OUTSIDE AIR DUCT TO EXISTING CRANE RAIL - 90/18. PROVIDE TRANSITION AS SHOWN. ROUTE TO N I REPLACED AH 1 M 18. CONNECT NEW 42/26 SUPPLY AIR DUCT TO EXISTING SECURITY BARS I 90/18. PROVIDE TRANSITION AS SHOWN. ROUTE TO 120 TRANSPORTATION AISLE REPLACED AH 1 M 18. 0oBRIDGE CRANE I � REPLACE EXISTING AH1 M18. SEE SHEET 09-101-S475 CONNECT TO FOR UNIT PLACEMENT. EXHAUST DUCT N ® 1- ® INSTALL ROUND DIFFUSER. 8"0 SPENCER T H CONTRACTOR TO FIELD VERIFY IF BACKDRAFT DAMPERS CAP OPENING —I-- TUBING, - - - - 3 - ��� - - MH - - ----- -- - --� OR MOTORIZED DAMPERS ARE INSTALLED. IF BACKDRAFT \ UNDERGROUND �\ DAMPERS ARE INSTALLED, THE CONTRACTOR SHALL 1 REPLACE THEM WITH MOTORIZED DAMPERS. IF j H MOTORIZED DAMPERS ARE INSTALLED, THEY SHALL 4 40/30 4 REMAIN. 00 -- --_-_ I 0 1 1 NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS C:)I �, /"ix PROJECT #25239-10 - "INSTALL AGFM 50FT 9 64/24 PLYCUTTER . REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. SECURITY BARS �' 1 O 18 12 00 00 � \ i JJJ // TOP DUC O O D E H of Joa oN S W Zo 24 2 2/ 0 /20 ' 30/20 IL�-.-__-- -- ` ai m --� - -- _ TIGHT TO BEAM CRANE RAIL L_ 1M10 1M11 1M12 1M13 1M14 1M15 I I � 26/10 28/10 1 36/18 J�J�J ���L 52/18 42/16 �X � 30/1 1M16 1M17 1M18 1M19 1M20 1M21 H PULTRUSION CLEAN LOCATE DUCT TO 8"0 22 GA. H 1, ARYFD �TYR i 1M22 1M23 1M24 1M25 1M26 OCCP. FACTOR: MISS DIAGONAL 26/10 EXHAUST H OCCP. Lo = 4 n BRACING SUPPO'TIN (8 TYP) FROM j 15 1 O BRIDGE CRANE RAI 1 O VACUUM 1 0 1 7 0 1 0 j 8" FIRE 1M28 1M29 1 M30 1M31 1M32 1M33 ,9 48X24 RETURN GRILLE, PUMP 4 � 4 4 � 4 4 LINE 1 M34 1 M35 1 M36 1 M37 1 M38 20 TITUS 350RL WITH H MOTORIZED DAMPER. 2070 CFM EL rn 21 (TYPICAL OF 2) (TYP OF 8) B.O.D. 1M39 1M40 1M41 1M42 1M43 N 18'-4" CRANE RAIL ---""' 1 44 1 M45 1 M46 22 �EVIBV�p F0� — M �; ,-, --- --- — -- - - 0 DE Dp�ptlAC�GE Y OF T U K W I L 3 — - -- --- - -� ---------- - - - 19 ��oven 9-101 KEY PLAN N L-IL01 SECURITY , -- � 0`�UN 2 0 2016 GRILLE SEE F1 f l F� I 1 100 /o DESIGN �� o DETAIL OPENING PERMIT CENTER 1UT0M529 8"0 UP, SEE 120x24 REVIEW ity cfTu �la FSi consulting engineers 120x24 UP TO ROOF DWG. 1 M35 PLAN PROFESSIONAL STAMP & SIGNATURE A D NC,, DNISIDN Seattle, Washington SCALE: 1/8"= 1 -0 N APPLIES TO WORK WITHIN THE CLOUDED 1 M30 4571-M2 BUILD REVISION AREAS ONLY AS INDICATED mi Solutions & Service SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATEACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE ,, E14 PLAN - HVAC A RELOCATE RESIN ROOM FAN 766063-00 SLB RWS EJC 04.22.03 F STUDY: INVESTIGATE NOISE J#556839-00 M.WONG �'� ��I W ,f'P, THIS DESIGN AND/OR CHECKED 28706 01.05.16 ��P y SPECIFICATION IS APPROVEDSHEET B RELOCATE EQUIPMENT 771751-00 KGP RWS EJC 09.08.97 G REROUTE DUST COLL. FOR CFAC CONSOLIDATION 57822000 HARR 01/30/08 ® APPROVED BY DEPT. DATE N C PIN R TITLE M30 C SECURE AWACS AREA 534135-00 RWS RWS 04.22.03 - RELOCATED DUST COLL. TO DWG. 1M380 S.RUDELL 03.14.08 CHECKED I �E� ���APPROVED BUILDING 9-101.1 JOB N0. COMP N0. D PURCHASE VACUUM PUMP 546843-01 M.WONG RWS 11.16.04 H 9-101 REPLACE AIR HANDLING UNITS 28076 FSi 01.05.16 .10 AL �a6 E INSTALL 400K CLEAN ROOM 140627-14 M.WONG RWS 12.01.04 aS.0� DWc No. APPROVED (MECHANICAL) MASTER COL. J -N/15-20 DEV. CENTER, WA 09-101.1-1 M30 NLAI VUKM, UFLN IU VAU I UKT). — 1 M3114572 M 1 Ur'IVII L \ LVUFNL-U Vr uv .aV i i 1r\1 i VVio V1 RETURN AIR BLOWS INTO THE HIGH BAY. SYM REVISION BY APPROVED DATE SYM — REDRAWN KB CH 12.3.97 A RELOCATE DAMPER, REBALANCE 280112 HARR RWS 06/28/05 B 1 9-101 REPLACE AIR HANDLING UNITS 28076 FSi j 01.05.16 REVISION P LAN SCALE: 1/8"=V-0 BY I APPROVED I DATE PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DAN, ACCEPTABILITY CIFwast, �'P'ATHIS DESIGN AND/OR y SPECIFICATION IS APPROVED ® APPROVED BY DEPT. I DATE t -*2 K.BUN CHECKED C.HARRAH I t SUBTITLE 12.7.97 12.7.97 TITLE 100% DESIGN REVIEW HVAC FLOOR PLAN '-�' ��� RWS 12.17.97 BUILDING 9-101.1 VtiAPPROVED jONAL 6N QLM16 APPROVED sxmn EJC 12.18.97 MECHANICAL MASTER COL. N—S/15-20 LEGEND GENERAL NOTES T 1M13 T 1M14 1. DIFFUSERS: TITUS MODEL #XC -310 WITH AG -75 OPPOSED 1M16 BLADE DAMPER. 1M18 1M19 140 CEILING DIFFUSER, 1250 CFM, BOTTOM OF DIFFUSER APPROX 16'-6" AFF (8 TYP) 1M23 140 CEILING DIFFUSER, 1150 CFM, BOTTOM OF DIFFUSER APPROX 12'-0" AFF (2 TYP) 140 CEILING DIFFUSER, 1150 CFM, BOTTOM OF DIFFUSER APPROX 9'-6" AFF (2 TYP) 1M33 140 CEILING DIFFUSER, 1250 CFM, BOTTOM OF DIFFUSER APPROX 12'-0" AFF B [E> CONTROL DAMPER: RUSKIN CD 60 OBD, 24" H X 48" W, WITH EXTENDED SHAFT, FRONT AND BACK T—FLANGE FRAME, BULIMO 3 > TITUS TMRA DIFFUSER CONSTRUCTION NOTES PROVIDE AND INSTALL ROUND 20" DIFFUSER. PROVIDE AND INSTALL ROUND 14" DIFFUSER. 2 NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 — "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. REFERENCE DRAWINGS (GJ n n n n OA O O J Ja � � � V 1M10 1M11 1M12 © T 1M13 T 1M14 T 1M15 1M16 1M17 1M18 1M19 1M20 1M21 1M22 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1 M 3 1 1M32 1M33 1M34 1M35 1M36 1 39 1M40 1M41 WPLIP'NG'E 1 M44 1M37 1M38 1M42 1M43 1M45 1 M46 �I 03 703 15 19 20 21 22 C011J r-pVSp _ E D 23 LIBU. -101.1 KEY PLAN YOFTUKWILA JUN 2 0 2016 o kWPERMIT CENTER GIVIS�ON FSi consulting engineers N Seattle, Washington Solutions & Service CURRENT REVISION SYMBOL I DATE 28706 B 01.05.16 131 JOB NO. COMP NO. 280112 DEV. CENTER, WA DWG NO. 09-101-101 Ja K L M N I I I I CONNECTION TO 1 "CLWS/R DN MOBILE TRACK, --- - - - - - COLUMN T0- - - - - - - - - - C=1-- - - - - - - -C(�- - - - - - - - � EL 22. 1 1» I I I I CC I FOR CONT OF COIL MOBILE POWER TRACK I I PIPING, SEE DWG EL 22.66' RELOCATED FROM PLANT 109-101-4546-M2 PLUG THE PUMP 11 7 GPM 2, WITH POWER, COOLING VALVES ON ®-----------------WATfR-&-C-OMPRESS D AIR I I 1" 1 1/2 THE WALL RELOCATION BY OTHERS CHWS04 CHWR CH WSCHWR I I I c I I I --------- ---------------------- — ------------------- ' } Q (MEZZANINE ABOVE) i= I � � U n cr_ f1i IAIQAlt) I LY I Mm F- I - TT7------ - - - - Com- ------------ _ STC' - --------­ - ------------- C 16 CC8 CC ' TRIM SHOP I _ AREA: = 2,800 SF. OCCP. LOAD FACTOR = 200 SF/ OCCP. all OCCP. LOAD: 1A OCCPANTS MAX. I I 2» I I I I 2"CHWR&S ABOVE MEZZ LUNCHROOM C I SUSP. CEILING U I I I i I I � I 7 STEAM PRESSURE D REDUCING STATION I DETAI COIL Lq- ' qTRANSPORTATION AISLE SEE DETAIL 1M80 M636 I I � ' 1 M80LM636 COOLING COIL ' 2"CHWR FROM CENTRAL ®STF�M HUMIDIFIER 2" STM VENT SEE DETAIL t[o��2"CHWS CHILLED WATER SEE DETAIL �� THRU ROOF r__ LOOP ON ROOF SYM I REVISION - REDRAWN A 21-01 MR&D COMPOSITE LAB RELOC. B REMOVE FREEZER C ENG-ZIMMERMAN NO.2 D 9-101 REPLACE AIR HANDLING UNITS BY KB/CH 190142-00 CH J#140627-04 M.WONG 2967/8245178 M.WONG 28706 FSi APPROVED DATE SYM 9.9.99 1.20.00 RWS 09.14.04 RWS 09.17.09 01.05.16 REVISION /;�_1 1/4 [-� CHWR vp I CHWR FIRST FLOOR PLAN SCALE: 1/8"=V-0" BY I APPROVED I DATE =L UtIAIL I, UVVU 109-101-4546-M1 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DAN, - ACCEPTABILITY tF wa".z 'P], THIS DESIGN AND/OR 5' y SPECIFICATION IS APPROVED ® APPROVED BY I DEPT.1 DATE 4-*-± �SIONAL 01.05.6 ssm SUBTITLE 0 100% DESIGN REVIEW 0 LEGEND HPC CONDENSATE STEAM (HIGH PRESSURE) HPS STEAM SUPPLY I 1M65 I (HIGH PRESSURE 125, 250 PSIG) STM STEAM SUPPLY 1M69 HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY COND - CONDENSATE 1M82 - P COND - PUMPED CONDENSATE CLWS COOLING WATER SUPPLY CLWR COOLING WATER RETURN GENERAL NOTES SPIRAX/SARCO MODEL #GC3D151 DUPLEX CONDENSATE PUMP CONSTRUCTION NOTES CONNECT TO EXISTING CHWS&R AND ROUTE TO AH1 M18 COOLING COILS CONNECT COND TO PUMP DISCHARGE AND ROUTE TO COND MAIN. CONNECT VENT PIPE TO VENT ON CONDENSATE PUMP AND ROUTE TO AND CONNECT TO STEAM VENT. ® ROUTE COND FROM AH1M18 TO COND PUMP CONNECT TO STEAM MAIN AND ROUTE TO STEAM PRESSURE REDUCING STATION. © CONNECT COND FROM TRAPS TO COND FROM PUMP. MOUNT STEAM PRESSURE REDUCING STATION WHERE ACCESSIBLE FROM PLATFORM. NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 — "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. REFERENCE DRAWINGS An O nE OHQ Ja nN n l��J n 1M60 1 Y 1M61 1M62 I 1M63 I 1M64 I 1M65 I 1M66 1M67 1M68 1M69 1M70 1M71 1M72 1M73 1M74 1M75 1M76 1M77 1M78 1M79 rlM80 1M81 1M82 1M83 1M84 1M89 1M85 1M86 1M87 1M88 1M90 1M91 1M92 1M93 ED FOR E 1 94 LIAN �— 1M95 1 M 66 ®DAppIROVI:C) �1,�l. 01 �fli6 • City of `rumilaON BUILDING V 15 19 20 21 22 01 KEY PLANjr, ITY QP' TUKWI! JUN 2 0 2016 FSi consuli91 ��1Tg�i erE Seattle, Washington 0i Solutions & Service IISION SYMBOL DATE PIPING FIRST FLOOR PLAN 28706 D 01.05.16 SHEET TITLE 1M80 BUILDING 9-101A JOB NO. COMP NO. MECHANICAL MASTER COL. J—N/15-19 DEV. CENTER, WA DWG NO. 09-101-1M80 1M 1M130 1 "CW DN TO BFP ® 5'-6" AFF - E IN :NCH 1" Q 5.v EL 33.00'- ----------- 1 3.00'- 1 /2" A CRANE RAIL M Q I K L , 1 I 1 M 130 4546—M1 I EL 33.16' V 2 V - --I-- - - - - - - - Operator V141 — -I Con2rVTR \] I__� M N I , I , 6'-4" A.F.F. I An 3 (TYPICAL) ' ® Y ff ff CCT_ C(T1 ) _/2" Vt 21P VAC I DUPLEX FLEX. HOSE 1 VACUUM OUTLETS a \-1 "CW&HW UP SEE DWG. 109 -101 -4547 -Ml 11 "A ISOLATION VALVE - CW -� ;P. FACTOR: = 1/200 SF ' ' ' 31f ;P. LOAD: = 4 MAX. I P41# I I N I (% > I I2 2 1-1/23) c > ' "PINK" LINE STS STS TOP EL 3647 , .' ' n r 1„ v � A 1„ TOP EL 36.471„ � ] j I PLUGGED TEE PLUGGED TEE TOP EL 36.47' A VAC 1» 1ff 2" VA — I VAC I 2 • v v v v v v 1 2 A n , n r�✓2 I (TYP) I n Off SEE DETAIL (TYp) 4 TYP 1M130 525—M2 1 M 602 1 M 130 SEE DETAIL I TYP 1 M 130 4525—M2 FIRST FLOOR PLAN SCALE: 1/8"=V-0" SYM I REVISION BY APPROVED DATE SYM I REVISION BY APPROVED DATE W 9-101 REPLACE AIR HANDLING UNITS 28706 FSi 1M123 01.05.16 S ENG-ZIMMERMAN NO.2 2967 M.WONG RWS 09.17.09 L 2 SPINDLE HEAD SHAPER MACHINE 547230-01 M.WONG RWS 12.01.05 T ADC WH GV 04.01.13 M ADD VACUUM DROPS IN CIM AREA 4712366 M.WONG 1M145 1M146 - RECORD SET 0 ADD (4) VACUUM PORTS ON WALL 7075100 DSH RWS 05.02.08 U 787-8 DOOR SURROUND W1719932 FSi 11.21.13 R RELOCATE INGERSOLL-RAND VACUUM PUMP 58694700 DSH RWS 7/21/08 V INSTALL AGFM 50FT PLYCUTTER 25239-10 FSi 11.06.15 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED pAE�ACCEPTABILITY DRAWN irF�'p THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED ®E NGIN EF APPROVED BY DEPT. DATE S.ROSSE CHECKED APPROVEI ZONAL VOW 01.05.16 SICNBD r�(T T -1v 1M110 1M111 1M112 T 1M113 T 1M114 T 1M115 T 1M116 1M117 1M118 1M119 1M120 1M121 PROCESS WATER 1M122 1M123 1M124 1M125 1M126 1M127 SAN 1M128 1M129 1M130 1M131 1M132 1M133 1M1341 1M135 1M136 1M139 1M140 1M141 1M144 1M137 1M138 1M142 1M143 1M145 1M146 —rtD 15 1s 20 z1 22 23 KEY PLAN N SCALE: NONE REVIEWED FOR CODE c()MPU�W3 APPROVED o JUL O l 2016 100% DESIGN REVIEW cD N� Tukwila BUIL - _ SUBTITLE PLUMBING FIRST FLOOR PLAN TITLE INSTALL AGFM 50FT PLYCUTTER BUILDING 9-101.1 MECHANICAL MASTER COL. J—N/15-19 LEGEND A COMPRESSED AIR CW DOMESTIC COLD WATER D DRAIN G GAS HW DOMESTIC HOT WATER SUPPLY PW PROCESS WATER IWP INDUSTRIAL WASTE PUMPED V VENT RWL RAIN WATER LEADER SAN SANITARY WASTE VAC PROCESS VACUUM GENERAL NOTES INGERSOLL—RAND CO. MODEL #20VX15 VACUUM PUMP 2. COMPRESSED AIR PIPING SYSTEMS: INSTALLATION OF COMPRESSED AIR PIPING SYSTEMS SHALL BE IN ACCORDANCE WITH FACILITIES MECHANICAL STANDARD D38106-20 USING THE FOLLOWING DEVELOPMENTAL CENTER SITE—SPECIFIC PREFERENCES: PIPE: ASTM B-88 SEAMLESS COPPER, TYPE L, HARD DRAWN. UNDERGROUND: SCHEDULE 80 STEEL, ASTM A53, GRADE B FITTINGS: 2" AND SMALLER: WROUGHT OR CAST COPPER SOLDERED OR PROPRESS SOCKET FITTINGS. UNDERGROUND: SOCKET WELDED, FITTINGS, PER ASTM A105 AND ASME/ANSI 816.11 2-1/2" OR LARGER: TYPE L COPPER ROLL—GROOVED FITTINGS AND DUCTILE IRON ROLL—GROOVED COUPLINGS WITH EPDM GASKETS, RIGID SYSTEM. VALVES: 2" AND SMALLER: BRONZE TWO—PIECE BALL VALVE, THREADED END. APOLLO 70-100. PROVIDE WITH THREADED ADAPTER FITTINGS. 2-1/2" AND LARGER: ELASTOMER—LINED LUGGED BUTTERFLY VALVE. FURNISH WITH 125# COPPER FLANGE ADAPTERS. DEMCO 21 1x 3. TESTING OF NEW COMPRESSED AIR PIPING SHALL USE COMPRESSED AIR OR NITROGEN AT 150 PSIG FOR 1 HOUR. THERE SHALL BE NO LOSS IN PRESSURE. CHECK EACH JOINT WITH SOAPY WATER. 4. VACUUM PIPING SYSTEMS: INSTALLATION OF VACUUM PIPING SYSTEMS SHALL BE IN ACCORDANCE WITH FACILITIES MECHANICAL STANDARD USING THE FOLLOWING DEVELOPMENTAL CENTER SITE—SPECIFIC PREFERENCES: PIPE: SCHEDULE 40 STEEL PIPE. ASTM A53, GRADE B, ELECTRIC RESISTANCE WELDED. FITTINGS: 2-1/2 INCHES OR LARGER; STANDARD WEIGHT SEAMLESS STEEL BUTT WELDING ASTM A 234, GRADE WPB; DIMENSIONS TO ANSI B16.9 AND B16.10. FLANGES: 2-1/2 INCHES OR LARGER; ASTM A 105, 150—LB FORGED STEEL, RAISED FACE, WELD NECK OR SLIP—ON, ANSI B16.5. USE FLAT—FACE FLANGES WHEN MATING WITH FLAT—FACE EQUIPMENT FLANGES. GASKETS: 150—LB RED RUBBER, WIRE INSERTED, RING—TYPE FOR RAISED FACE, FULL FACE FOR FLAT FAC E. BOLTING: CARBON STEEL HEX—HEAD MACHINE BOLTS AND NUTS OR CONTINUOUS THREAD STUD BOLTS, ASTM A 307, GRADE B. HEX NUTS ASTM A 354, GRADE BC. 5. TESTING OF VACUUM PIPING SHALL BE DONE BY AGFM. THERE SHALL BE NO LOSS IN PRESSURE, CONSTRUCTION NOTES CONTRACTOR TO FIELD VERIFY CW PIPE RUN AND RAISE THE LENGTH OF PIPE TO AVOID NEW AH INSTALLATION. CONTRACTOR TO FIELD VERIFY VAC PIPE RUN AND MODIFY PIPE TO AVOID NEW AH INSTALLATION. REMOVE EXISTING DRAIN LINE TO WALL. INSTALL NEW 1—j" DRAIN LINE FROM DRAIN PAN AND TIE INTO EXISTING CONNECTION. NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 — "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. RECEIV . V, I JUN 2 0 2011) FSi consultiPf_FWhTn` gAT • Seattle, Washington Solutions & Service CURRENT REVISION SYMBOLDATE 28706 W 01.05.16 SHEEP 1M130 DEV. CENTER, WA I DWG ICOMP NO. 09-101-1 M130 LA m LEGEND A COMPRESSED AIR CW DOMESTIC COLD WATER D DRAIN G GAS HW DOMESTIC HOT WATER SUPPLY PW PROCESS WATER IWP INDUSTRIAL WASTE PUMPED V VENT S RWL RAIN WATER LEADER N P �• R R a J SAN SANITARY WASTE 2"CA _ 6 CA VAC VACUUM 4"CW PSAN PUMPED SANITARY WASTE Q �OIL_ � 6 SINGLE AIR CONN (HARD) - ! SAN! DN FROM 2ND ! j o i VERIFYE) DUPLEX AIR CONN (HARD) _ _ �.I_� _ _ _ _ J_ _ _ _ _ _ - _ _ _ +� - DUPLEX AIR CONN (HOSE) n Q � n 1 ! l l RD � 15 2 CA 2 CA 2 CA i ! 31"S1 t� _ — -_- v0 SINGLE VAC OUTLET (VE II 1 ) �1� 00 DOUBLE VAC OUTLET U C14? ; ! ! c, ®� I Ov OO vO TRIPLE VAC OUTLET „ 1 �C N 11 1 I I! I I� 3 SAN _{}— 1 I I in z o - ��� !! !! �' zz II 1 j U E) I I I I r7 1 N I � N } "CA 1 1 1 1 o �, o ISOLATION VALVE — CW -- - ------------------------ 1 1 1 I I O I I i iI SAN DNI FROM ! ! ! ! ~ 1 'VAC *V C 1 ! 2ND FL� (TYP) ! ! ! ! 2 CA r----------- I! I I `VI (TORIT BOOTH) 1 "E)I ! ! ! Y T - - T I - - - - -------------------------- C14 I rj - T Ij- - -rr LLJi i i li rr I I I I I � J I ••, i t i �; 1 j I I I I I ®()-- -!"CA WALL MNTED "OUI i i I I HW AIR DROPS L_ +� I o I i i i j II II I i' I I I I z III II � H 11 VAC c`, (;I � •f L 2"CA _may "CW� VC -4— +, / /' I 1 CA I 1 I 1 L____4" DN_TO I I L------� #� ----- C,-) i r 1 I I II SAN DN FROM =-__ -_� 1 ! ! 4"SAN I 2ND FLR (TYP 3) I I cv N I I 21, ! II 0 1 1 -- 2"SANi ! 1 SAN N FSM 1 M131 M548 U _ I .,�2ND LR tfiYP) D 1 I VENDING MAC IPdE L- - '----- ` II ! ! ! ! VALVE 3'-0"AF 1 12"cA J 2CA 1 1 1 1 M 131 M548 -mac y I I PARTIAL CW PLAN —_ vv v v c-4- v v V v v v I �, 2"CA ! I EL 33.09' - V 2"SANS 1 1 UPI I✓ 1 1 c 2"CA & I I 4"CW I I TO �W --i,i 4"CW y ._G- 2 CA _ TUNNEL 1 I SAN 1'VACt1t [---���I� 4"CW I I ! ! 2"SAN DN FROM 2ND a 1 VAC z¢ a Z `a ! ! 1 1 FLR (TYP 2) �„ ' 0 04 'N N N Z L+- O Q cn Z U' li LL. v I I I I II i N N N r----- 7----- / „ CA Z I I � I - Q 2 "CA I -� I ,A, 2 I cn i N N ---- V 1" VAC 3"Cq �- 3"CA "I A �L 37.42' i i ' I I I I I I PARTIAL 3"SAN YSAN A PI N ABOVE I II CAP) 1 M 1131 1M559 FUNNEL 11 DRAIN - 1 - - �!- -,— - --i-- - - — V- 2"FD = I l z 1 1 PAR IAL U F-� I I Q I r, --j -10'-0" > L� AFF----- I I = P Li4 113 IM I II 1 . 5 ••L ---i-------�---- 1 » i - ------------------------ - - - - - - - - - Ij ^ •�-----F-,===-, ! ! I I 2"SAN �' 4'VAC ! ! 2" 4N dN FROM ^ 2gD1 FL '(TYP-12) I 'PUMPEDI DRAIN 'DRAIN N 2"SAN, „SAN DN2 "VAC T_ 1-- - - -- -- - -- 1 - - �- EL 6.47' I 4'VAC� SEE ROM 2ND FL N DWG P 2) t11 ! ► COND. DRAIN > UGM 1311 ! 1 CO -- ----- X211 FT AF I 2 VAC 1 r- - -- , EL 36.47' I FOR CONT 2"SAN UP FU*,E�DRAIN - - - ---I - - - AFS- -- - �_ ! 4" VAC DOWN i1 TO TUNNEL #3 FIRST FLOOR PLAN SCALE: 1/8"=V-0 SYM REVISION BY APPROVED DATE SYM I REVISION V 9-101 REPLACE AIR HANDLING UNITS 28076 FSi 1M121 01.05.16 R I SWAP SINK M ADD FILTER ON CA DROP 4969921 HARR RWS 06/06/07 - DLR UPDATE & FIELD VERIFIED N ADD AIR DROPS FOR TRIM SHOP MOVE 57655800 HARR RWS 09/19/07 S RELOCATE CA & CW PIPES AT SUBSTN #14 P HAND TRIM REARRANGE PHASE 2 57655802 HARR RWS 10/31/07 T RE-ROUTE AHU-12 CONDENSATE DRAIN Q RELOC AIR OUTLET ON TORIT BOOTH 6759650 HARR 04/09/08 U INSTALL UTILITIES TO LATHE I " I 1 "CA „ IT,' I 1 CA SAN DOWN _ I I FROM 2ND FLR >, 2 SAN " Co, !� i V r---- -- j:D „SA-----------rt?--------- -- - r--------------------- --- ------------------------- „CABELOW I ! Y” AIR.OWN SUBSTATION _____ Ii W/PUMP !.• I I FILTER 5 DETAIL ! ! ° I I VENT UP TO ATMOS. f) 1 M1 1 M54� II HB 12r CA I -� CA TO EQUIP. 2 I I„CW FILTER 7 ! I DETAIL M 131 M548 U i '•I ! ! 11 L1 - RLTE STA j r7 i ISOLATION --- VALVES -----CA------___ Ll< ------- C4 - N n III SAN 1 6— �N 18 1 2„ I ' ' I I ; Io' I I ;_- !�� I I I _- ---�--I I---- ZD or_-A�I 1 M131 M5;48 MIeF F-----------�;- I I ---- ---- T----- } --1 I I'` ECHANICAL RM 1 1 N !'! ! I PBOVE� Z h ) I "'CA L Imo_—�----------- ---� , V/"O CONDENSATE DRAIN FROM AHU-12 CATWALK ELEVATION SEE DWG. CWM36 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DA ACCEPTABILITY ACCEPTABILITY tF w4syl ��� THIS DESIGN AND/OR y SPECIFICATION IS APPROVED ® APPROVED BY DEPT. I DATE 0I.M16 Sxm. 100% DESIGN I REVIEW vxt it -OR t �s C'OmpLjk CS CoAPPROVED Imp ��16 ' 'la GENERAL MOTES 11> BY APPROVED DATE 6628246 M.WONG RWS 04.10.08 1M119 S.RUDELL 1M121 07.07.08 57622900 HARR 1M124 07/24/08 W1152549 M.WONG RWS 07.19.12 C120281 M.WONG 1 M 1315 03.26.14 1M133 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DA ACCEPTABILITY ACCEPTABILITY tF w4syl ��� THIS DESIGN AND/OR y SPECIFICATION IS APPROVED ® APPROVED BY DEPT. I DATE 0I.M16 Sxm. 100% DESIGN I REVIEW vxt it -OR t �s C'OmpLjk CS CoAPPROVED Imp ��16 ' 'la GENERAL MOTES 11> 1" COMPRESSED AIR FILTER: F17-800-A1DA 2� 21 "x24"x14" EAGLE UTILITIES SINK CONSTRUCTION NOTES OFFSET VACUUM LINE TO AVOID BLOCKING DOOR AT MEZZANINE LEVEL. CONTRACTOR TO FIELD VERIFY ROUTING OF OFFSET VACCUUM LINE. REFERENCE DRAWINGS TIFF 109-101-4547-M1 FIRST FLOOR PLUMBING, PARTIAL PLAN 9-101-M548 SECTIONS & DETAILS 9-101-M559 PARTIAL PLANS, SECTIONS & DETAILS 9-101-UGM131 UNDERGROUND PLUMBING PLAN A D E H J Ja N S W Z I cityNG SION j3UtLC D1 FSi consulting en 1 1 Y I 1M110 1M111 1M112 I 1M113 1M114 I 1M115 1M116 1M117 1M118 1M119 1M120 1M121 1M122 1M123 1M124 1M125 1M126 1M127 1M128 1M129 1M130 1 M 1315 1M132 1M133 M134 1M135 1M136 1M139 1M140 1M141 gineers 1M 44 I 1M137 1M138 ,ITY 1M142 1M143 J 1M1451M146 IER 19 21 22 0 MIT Seattle, Washington 23 9-101 KEY PLAN N Solutions & Service SUBTITLE CURRENT REVISION SYMBOLDATE PLUMBING FIRST FLOOR PLAN 28076 U 01.05.16 SHEET TITLE 1M131 BUILDING 9-101.1 JOB NO. COMP NO. MECHANICAL MASTER COL. N—S/15-19 DEV. CENTER, ITA DWG NO. 09-101-1 M131 VIED UKUVIL A 2016 ENTER LEGEND J Ja K M N I I I I I I GENERAL NOTES SINK WITH FAUCET: EAGLE SRW10-14-5-1. N 3/4" T- UNDER FLOOR SLAB - - 01 L -j— - _ _ 16 CONSTRUCTION NOTES __ N RELOCATE EXISTING TOWEL DISPENSER. i i i ABOVE FLOOR SLAB C U -71 f I I i� 0 -- - - 1 3» VTR LOAD I NG s -- - -- — — ---- -- DOCK / i i 1 ' - - - I r=--=---- - — ---1- --- - -- - — - 17 I I I-- - I ABOVE SUSPENDED CEILING BELOW SUSPENDED CEILING C REFERENCE DRAWINGS 109-101-4546 M2 I I I I I I 1 1 J Ja I I I ZQ F ,f 1,. I I I I I I 19 I�c 11 ppp OV� 15 M ,U` 1 M 130 19 20 • City of �Cukw�la 21 MEZZANINE PLAN gU1LDING SCALE: 1/8" = 1'-0» N 100% DESIGN CITX U TUK3 IL. PROFESSIONAL STAMP &SIGNATURE REVIEW FSi consulting engineers �+�� � U �Q9� Seattle, Washington APPLIES TO WORK WITHIN THE CLOUDED KEY PLAN N PERMIT CENTS REVISION AREAS ONLY AS INDICATED Solutions & Service SCALE: NONE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE DAA/ ACCEPTABILITY HARK 05/01/07 PLUMBING -MEZZANINE PLAN A OFFICE RENOVATION 16062000 HARR RWS 05/01/07 �� ��� r�'PA THIS DESIGN AND/OR CHECKED 28076 C 01.05.16 SPECIFICATION IS APPROVED SHEET B REWORK COIL CONDENSATE DRAINS 16062000 HARR 09/14/07 ®NGIN TITLE APPROVED BY DEPT. DATE 1 13 0 C 9-101 REPLACE AIR HANDLING UNITS 28076 FSi 01.05.16 CHECKED �O IT 1��� APPROVED BUILDING 9-101.M JOB N0. COMP N0. -117 AL ENG ICDWG No APPROVED MECHANICAL MASTER COL. J -N/15-20 DEV. CENTER, SIA . SAD 09-101-M1M130 �� SYM REVISION BY APPROVED DATE A REPLACE BURRIED FIRE MAIN SV 912 4714294 RWS RWS 04.24.07 B DISCONNECT TO MOVE TORIT BOOTH 57655802 HARR RWS 11/24/07 C DESIGN CIMS CONVERSION TO OPF 11249874 RWS RWS 11.01.10 D 1 9-101 REPLACE AIR HANDLING UNITS 287061 FSi 1 01.05.16 SYM LEGEND UNXLESS STANDAROTHERWDESNOT D) R, PENDANT (165' -0- (NEW) STANDARD SPRINKLER, PENDANT (165' UNLESS OTHERWISE NOTED) (EXIST) STANDARD SPRINKLER, UPRIGHT (165' UNLESS OTHERWISE NOTED) 0(NEW) STANDARD SPRINKLER, UPRIGHT (165' N UNLESS OTHERWISE NOTED) s SPRINKLER PIPING, SIZE AND SLOPE TO LOW POINT DRAIN ® SPRINKLER RISER (ALARM VALVE OR UPPER) FLOORS WATER MOTOR GONG WATER MOTOR GONG PIPE HANGER FTJ-�- 2 -WAY EARTHQUAKE BRACING -� 5 4 -WAY EARTHQUAKE BRACING REVISION MAIN RUNNING UNDER GROUND TO TUNNEL #3 P LAN SCALE: 1 BY I APPROVED I DATE PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DAA/, ACCEPTABILITY DRAWNM.WONG ), THIS DESIGN AND/OR CHECKEE y%QT y SPECIFICATION IS APPROVED NGINEEI ® APPROVED BY DEPT. DATE M.WONG Aff""w" 0 CHECKEE �OX,tl_ �7 p(l`a��v APPROVE 01.05.16 SSW 4 ✓k 5i pp+ TO SV -912 IN TUNNEL ---TO SV -913 IN TUNNEL NIL SUBTITLE 10.24.03 TITLE 10.24.03 GENERAL NOTES CONSTRUCTION NOTES PROVIDE SPRINKLER COVERAGE UNDER PLATFORM. SEE SHEET 09-101-S475 FOR PLATFORM EXTENTS. CONNECT TO SPRINKLER MAIN AND ROUTE TO AH 1 M 18. PROVIDE SPRINKLER HEAD IN AH 1 M 18 MIXING SECTION. NOTE: THIS PROJECT WILL OCCUR AT THE SAME TIME AS PROJECT #25239-10 - "INSTALL AGFM 50FT PLYCUTTER". REFER TO THAT PROJECT AND COORDINATE ALL WORK, SCHEDULES, ETC. ACCORDINGLY. REFERENCE DRAWINGS 109-101-4596-M1 SPRINKLER SYSTEM (ORIGINAL MYLAR) 9-101-11VI280A FIRE PROTECTION - UNDER MEZZANINE PLAN 9-101-M1M280 FIRE PROTECTION - MEZZANINE PLAN 1 M260 I 1 M261 11 1V1262 11M2631 11V1264 11 M265 1 M266 11 M267 I 11V1268 11 M269 I 1 M270 11 1V1271 11 1M272 1M273 1M274 11V1275 11V1276 1M277 t•'1 v FOR 15 REIEp�iP�N�E pp v�p 1M278 1M279 1M280 1M281 1M282 1M283 19 JUL 0 2®i� 1M284 1M285 11V1286 11V1287 1M288 20 21 ►1 1M289 1M290 1M291 1M292 1M29 CEIV CISof Yukw IviS1ON 1 gUiLpING p 1 294 11V1295 1M296 D u 9-101.1 KEY PLAN N PERMIT CENT CURRENT REVISION SYMBOL DATE FIRE PROTECTION - PLAN VIEW 287061 01.05.16 MECHANICAL MASTER 9-101.1 COL. J -N/15-19 'HEE'r 1 M280 JOB NO. 11.23.15 DWG NO. 09-101-1M280 Ell m 7 180 120 - ---•-� -- ' ------ EL @ 17,_6„ CV I CV 1'9 1 /2" I W2 I CLEAR LO, „ -- -®-'b- I at -M-•-16/16 CLEAR I EL @ 10'-6" I 00 I I SECTION 1/41)= 1 f-O)p SEE DETAIL _ 2M62 3/4"CW 2" SAN DOWN THROUGH FLOOR SEE DRAWING 109-101-4527-M 1 1/2"V 3/4"CW U VI IVY,) & R MAINS FROM ROOF @ 48" ABOVE CATWALK - 2"V CONNECT TO 2"V CONNECT 3/4"CW TO 2"CW 1 /2"CW 2M17 I M513 TOP CATWALK DECT @ 55-2" 10 1/2" CATWALK UNISTRUT TOP UNISTRUT @ 12'-0"SUPPORT 3" 6" CEILING LIGHT SPACE CEILING @ 8'-10" FIN 2ND FLOOR EL 40'-6" 16 14x16 eo;e;oe; eooao F �� ee;aaoeaee;oo P.O.C. 14" O PERFORATED SPIRAL DUCT, 4 FEET LONG, 2 EACH co X cV TORIT DOWNDRAFT BENCH, DDHV-45 SN#239419, 10HP TORIT DOWNDRAFT EXHAUST PLENUM FOR SCALE: 3/8"=1'-0" 1 M301 M513 2" TYP. CAPPED TEE, TYP PRESSURE & TEMP TEST PORT, TYP C MAX PRACTICAL ---,,<7 6" OR MAX PRACTICAL u EQUIPMENT OR STEAM MAIN TRAP SIZE AND BYPASS TYPE AS SCHEDULED � I ISLOPE DOWN TO CONDENSATE TO FD RECEIVER PIPE SIZE AS INDICATED ON TRAP SCHEDULE STEAM TRAP CONNECTION DETA SCALE: NONE 1 M801 M513 2 -WAY MODULATING CONTROL VALVE VERIFY COIL INLET AND OUTLET CONN. LOCATIONS PRIOR TO PIPING FABRICATION AND INSTALLATION. cn = CONNECT INLET AND OUTLET PER MANUFACTURERE'S INSTRUCTIONS. U ` \ r, COOLING COIL I /3/4" MANUAL DRAIN WITH HOSE -END CONNECTION AND CAP, TYP. MANUAL VENT TYPICAL COOLING COIL WITH 2 -WAY VALVE DETA SCALE: NONE CONTROL VALVE TYP 13 LPC LIIVL JILL AS INDICATED ON TRAP SCHEDULE ST -3 LINE SIZE AS INDICATED ON PLANS SLOPE DOWN TO CONDENSATE RECEIVER I L r3--� 1 M801 M513 150 LBS STEAM PRESSURE RELIEF VALVE. SET TO 30 PSI TO CONDENSATE TO VTR �15 LBS STEAM RECEIVER 7 �—BYPASS 1/4" PRESSURE �C� ►' . ('� SENSING LINE Y �pY I& p- �_T 1 1 ST -2 D SEE _ M56 u u STEAM PRESSURE ST -1 REDUCING VALVE. 150 TO 15 PSIG PRESSURE STEAM PRESSURE REDUCING STATION DETA SCALE: NONE VACUUM BREAKER 3/4'.' TO FD AAV 3/4" STEAM U HEATING COIL ST -4 (HEATING COIL) ALTERNATE LOCATION FOR AAV IF COIL CONN NOT FURNISHED Q Q SEE TYP J -_M513 LPC —LINE SIZE AS INDICATED ON TRAP SCHEDULE —� LPS IL 1M80 M513 LINE SIZE AS INDICATED ON COIL SCHEDULE SLOPE DOWN TO CONDENSATE RECEIVER TYPICAL STEAM HEATING COIL CONNECTION DETA SCALE: NONE I L r4--� 1 M80 M513 STEAM TRAP SCHEDULE MARK MAX INLET MAX DIFFERENTIAL CAPACITY (ACTUAL) TRAP INLET & OUTLET BASIS OF DESIGN REMARKS PRESSURE (PSIG) PRESSURE (PSIG) (LBS/HR) TYPE PIPING SIZE (IN) ST -1 150 20 420 IB 3/4" ARMSTRONG 811 ST -2 15 5 420 F&T 1" ARMSTRONG B ST -3 15 5 60 F&T 3/4" ARMSTRONG B ST -4 15 5 360 F&T 3/4" ARMSTRONG B NOTES: TRAP TYPES: IB = INVERTED BUCKET F&T = FLOAT AND THERMOSTATIC RE VEIVE ITY TUKW I PARTIAL PLAN 0 CO �p1 lP�t� JUN 2 0 201a 1/4 -1 -0 TYPICAL STEAM HUMIDIFIER DETAIL ��'AIR oven SCALE: NONE 1M80 LM5i3 100% DESIGN PERMIT CENTE REVIEW FSi consulting engineers ��-�U�i1a Seattle, Washington PROFESSIONAL STAMP &SIGNATURE LDIN� O�v�S�ON �U Solutions 8c Service APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED DRAWN SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE O ACCEPTABILITY K BUN DATE SUBTITLE CURRENT W199812 SYMBOL DATE 01.05.16 DA ACCEPTABILITY HVAC DETAILS AND SECTIONS �ff l �P>, THIS DESIGN AND/OR CHECKED SHEEP RECORD DRAWING SR GS KR 06.15.93 cv�y�g y SPECIFICATION IS APPROVED AXILLIP A REPLACE COILS ON AHU57 W199860 M.WONG RWS 08.26.10 ® APPROVED BY DEPT. DATE A.KILLIP TITLEM51 /� B REPLACE COILS ON AHU58 W199812 M.WONG RWS 08.26.10 CHECKED �vj) �o �FGISr�R�9 ��`` G.SMITH BUILDING 9-101 JOB NO. COMP N0. C 9-101 REPLACE AIR HANDLING UNITS 28706 FSi 01.05.16 �FIsrONAL E��l APPROVED K.RAMSEY /90133 01,,16 APPROVED MECHANICAL MASTER DEV. CENTER, WA��O- 09-101-M513 s�� LA R PXPLX01 S DPTE-1 0/1 in H20 DC.101.AH1 MI B.AHU.BSP N06: 0.0.14 *D-1 GCA161.1 U NO AE —1 0/10 VDC FM DC.101.AH1 M18.AHU.RAD N27: 0.0.16 GCA161.1 U AE —2 0/10 VDC DC.101. AH 1 M1 8.AH U.OAD N27: 0. 0.1 0 F *D-2 A M NC S GTX116P AFS -1 DC.101.AH1 M18.AHU.OAF N27: 0. 0.1 11 KO s CEILING L GCA161.1 U AE —3 0/10 VDC DC.101.AH1 M18.AHU.EAD N06: 0.0.16 LOCATED AT COLUMN JA -19 E:�i E A *D-3 NC LOUVER BY OTHERS 535-490-18 TTE —6 20/120 DEG F DC.101.AH1 MI 8.AHU.RAT * SD -2 IN27: 0. 0. DC.101.AH1 M18.AHU.RSD N27: 0.0.2-87 T 000 533-380-24 TTE -1 20/120 DEG F DC.101.AH1 M18.AHU.MAT N27: 0.0.2 o06 ©I�I� 141-0574 DPS -1 1 in H2O DC.101.AH1 M18.AHU.PFLTR N27: 0.0.26 141-0574 DPS -2 1 in H2O DC.101.AH1 M18.AHU.FFLTR N27: 0. 0. SYM I REVIS ON I BY I APPROVED I DATE I SYM WIN 910 SEE SCHEDULE V-2 0/10 VOLTS DC.101. AH 1 MI 8.AH U. CCV N27: 0. 0.20 CHWR -411111111111111 CHWS N. C. 535-490-18 TTE -4 20/120 DEG F DC.101.AH1 M18.AHU.CCT N27: 0.0.4 1•••I C-2350VFD CS -1 IR DC.101.AH1M18.AHU.SS (PROOF) N27: 0.0.25 RIBU1C SEE SCHEDULE RE -5 HV -1 FDC.101.AHlMl8.AHU.SS (ON/OFF) 0/10 VOLTS N27:0.0.29 DC.101.AH1M18.AHU.HUMV N27: 0.0.22 GTX116F AFS -2 DC. 101.AH1 MI 8.AHU.SAF N27: 0.0.7 lJ H SF -1 - C1 0 o SEE SCHEDULE V-3 _ 134-1504 0/10 VOLTS5203 DC.101.AH1 M18.AHU.HCV LTDE -1 N27: 0.0.19 DC.101.AH1M18.AHU.SVD 38 DEG F -- N27: 0.0.21 VFD-1 RIBUIC ,,pp�� ' SAFETY SHUT DOWN RE -4 I C ON D L--- -------------------------- ._ B A C N E T F L N LPS N. 0. REV SION I BY I APPROVED I DATE Control Device Qty Product Number Manufacturer Document Number Description Field Mounted Devices AE 1-3 3 GCA161.1 U SIEMENS 154001 MOD(V) SR,24V, MED. AFS 1 1 GTX116P EBTRON GTx116 THERMAL DISPERSION AIR FLOW MON AFS 2 1 GTX116F EBTRON GTX116 FAN INLET THERMAL DISPERSION AIR FLOW M CS 1 1 C-2350VFD SENVA INC C-2350VFD Current Sw,Split,AutoSet VFD,3.5-135A DPS 1-2 2 141-0574 SIEMENS 155 052 AIR FLOW SWITCH .05-1.0 WC DPTE 1 1 PXPLX01 S VERIS INDU 1006cut021 PXPLX01 S Pressure,Dry,PaneI,LCD,0-1 "WC HTE 1 1 QFM2101 SIEMENS 149991 SENSOR (DUCT) RH: 4-20MA HTE 2 1 QFA3212.EWSN SIEMENS 129104 RH, 2%, BAU HSNG, V RH, PT1K 385A, NC LTDE 1 1 134-1504 SIEMENS 155 016 T'STAT, LOW TEMP,15/55,MANUAL RE 2 1 RH3B—ULAC24V—KIT LECTRO COM N/A (1) RH3B—ULAC24V and (1) SH313-05 socket RE 4-5 2 RIBU1 C FUNCTIONAL DEVICES 1208cutO13 RIB 120VAC 24VAC/DC SPDT TTE 1 1 533-380-24 SIEMENS 149263 FLEX AVER SNSR, 20-120#F, 24FT PROBE TTE 4-6 3 535-490-18 SIEMENS 149263 RIGID AVER SNSR, 20-120#F, 18" PROBE RH3B-ULAC24V-KIT RE -2 DC.101.AH1 M18.AHU.LTD N27: 0.0.27 QFM2101 HTE -1 0/95 %RH DC.101.AH1 M18.AHU.SAH N27: 0. 0. LPS DETAIL M 6'MIN 535-490-18 TTE -5 20/120 DEG F DC.101.AH1 M18.AHU.SAT N 27: 0.0.6 QFA3212.EWSN H TE -2 0/100 %RH DC.101.AH1 M18.AHU.I R M H N27: 0.0.12 AC C EPTAB ILITY THS DESIGN AND/OR SPEC F CATION IS APPROVED APPROVFD RY IDFPT. I DATF TYPICAL AIR HANDLING UNIT UNIT START/STOP THE DDC SYSTEM SHALL START/STOP THE AIR HANDLING UNIT (AHU) ON ITS OWN SCHEDULE. PROOF OF RUN STATUS SHALL BE MONITORED BY A CURRENT SENSOR, UNLESS NOTED OTHERWISE. ANY ASSOCIATED INTERLOCKED EQUIPMENT SHALL ALSO START. WHEN THE UNIT IS STOPPED (NORMAL OR OTHERWISE), THE ASSOCIATED INTERLOCKED EQUIPMENT SHALL ALSO STOP. WHEN AN AIR HANDLING PIECE OF EQUIPMENT IS STOPPED, ITS OUTSIDE AIR DAMPER SHALL CLOSE AND THE RETURN AIR DAMPER SHALL OPEN AFTER THE FAN HAS COME TO A STOP. WHEN THE UNIT IS STOPPED, COOLING—COIL AND STEAM HEATING VALVES SHALL CLOSE TO THE COIL. VARIABLE SPEED DRIVE FAN MOTOR CONTROL THE DDC SHALL MONITOR THE SUPPLY AIR SYSTEM FAN INLET AIR FLOW STATION AND MODULATE THE SUPPLY FAN SPEED TO COMPENSATE FOR FILTER LOADING. ECONOMIZER CONTROL THE DDC SYSTEM SHALL COMPARE THE SIGNAL OF AN OUTSIDE AIR TEMPERATURE SENSOR AND THE RETURN AIR TEMPERATURE. AS LONG AS THE OUTSIDE AIR TEMPERATURE IS BELOW THE RETURN AIR TEMPERATURE AND THE UNIT IS CALLING FOR COOLING, THE DDC SYSTEM SHALL MODULATE THE OUTSIDE AIR AND RETURN AIR DAMPERS TO ADMIT MORE OUTSIDE AIR TO MAINTAIN DISCHARGE SETPOINT. DEHUMIDIFCATION THE DDC SHALL MONITOR SPACE HUMIDITY. THE DDC SYSTEM SHALL MODULATE THE THE HEATING COIL VALVE AND THE COOLING COIL VALVE TO MAINTAIN 45% RELATIVE HUMIDIY IN THE SPACE AND 70 DEG IN THE SPACE. HUMIDIFIER THE DDC SHALL MONITOR SPACE HUMIDITY. THE DDC SHALL MODULATE THE HUMIDIFIER CONTROL VALVE SUPPLY AIR HUMIDITY TO MAINTAIN 45% RELATIVE HUMIDIY IN THE SPACE. TEMPERATURE CONTROL THE DDC SYSTEM SHALL MONITOR THE SPACE TEMPERATURE. THE DDC SHALL RESET THE AHU DISCHARGE TEMPERATURE TO MEET THE SPACE COOLING DEMAND. WHEN THE ECONOMIZER REACHES MINIMUM OSA DAMPER POSITION AND UPON A FURTHER CALL FOR HEATING, THE DDC SHALL MODULATE THE STEAM CONTROL VALVE TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT. AFTER THE ECONOMIZER REACHES FULL "FREE COOLING" POSITION AND UPON A FURTHER CALL FOR COOLING, THE DDC SHALL RESET THE OSA DAMPER TO THE REVIEWED FOR MINIMUM POSITION AND MODULATE THE COOLING CONTROL VALVE TO MAINTAIN tO4BCOMPLIANCE DISCHARGE AIR TEMPERATURE SETPOINT.APPROVED FREEZE PROTECTION JUL 0 � A FREEZESTAT 2016 SHALL STOP THE SUPPLY FAN, CAUSE THE OUTSIDE AIR AND RETURN AIR DAMPERS TO RETURN TO THEIR SPECIFIED "OFF" POSITION, AND SHALL INITIATE A LOW—TEMPERATURE ALARM (VIA MONITORED AUXILIARY CONTACTS) IF THE Tukwila TEMPERATURE DROPS BELOW THE FREEZESTAT'S SETPOINT. RETURN TO THE NORMAL BUILD NG ISION MODE OF OPERATION SHALL REQUIRE MANUAL RESET. SMOKE DETECTION SMOKE DETECTOR(S) IN THE AIR STREAM SHALL PROVIDE A "HARD -WIRED" SHUTDOWN OF THE SUPPLY FAN AND INITIATE A SMOKE ALARM AT THE DDC IF SMOKE IS DETECTED. RESTARTING THE SUPPLY FAN SHALL REQUIRE MANUAL RESET AT THE SMOKE DETECTORS. AIR FILTERS THE DDC PANEL SHALL MONITOR THE DIFFERENTIAL PRESSURE SWITCH ACROSS THE FILTER AND SHALL PROVIDE AN ALARM WHEN THE PRESSURE DROP EXCEEDS THE SETPOINT. TOM IBROZNOWSKI IUA1.04.16 SUBTILE CONTROLS FOR AH1M18 TITLE BUILDING 9-101 MECHANICAL MASTER COL. A—E/1-6 *** DO NOT TYPE HERE *** 100% DESIGN REVIEW CURRENT REVISION I SYMBOL SHEET JOB NM323 COMP N0. DEV. C ENTER, `%(Ara DWG N0. 09-101—M323 RECEIVED CITY OF TUKWVILA JU 4 2 0 2010 PERIV IT CENTER