Loading...
HomeMy WebLinkAboutPermit M16-0110 - SEATTLE CHOCOLATE - DUCTWORK AND GRILLESSEATTLE CHOCOLATES 1180 ANDOVER PARK W M16-0110 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 3523049085 Permit Number: M16-0110 Address: 1180 ANDOVER PARK W Issue Date: 7/22/2016 Permit Expires On: 1/18/2017 Project Name: SEATTLE CHOCOLATE Owner: Name: DANELLIE LLC Address: 1180 ANDOVER PARK WEST, National Electrical Code: TUKWILA, WA, 98188 Contact Person: 2015 Name: HENRY KURASAKI Address: 1101 SECOND AVE, SUITE 100, WAC 296-46B: SEATTLE, WA, 98101 Contractor: 2015 Name: TRISQUARE CONSTRUCTION LLC Address: PO BOX 626, LAKE STEVENS, WA, 98258 License No: TRISQCL894BO Lender: Name: Address: , , , DESCRIPTION OF WORK: Phone: (206) 962-6513 Phone: (425) 610-7424 Expiration Date: 1/31/2017 PROVIDE NEW DUCTWORK AND GRILLES TO REMODEL OF EXISTING RETAIL SPACE. PROVIDE NEW EXHAUST FANS FOR REMODELED TOILET ROOMS. Valuation of Work: $14,000.00 Fees Collected: $376.54 Type of Work: REPLACEMENT Electrical Service Provided by: PUGEST SOUND ENERGY Fuel type: GAS Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature: Date: ! ", I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign, and obtain this development permit and agree to the conditions attached to this permit. Signature: W" Date: 7-- Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: `MECHANICAL PERMIT CONDITIONS' 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department • Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov SITE LOCATION Mechanical Permit No. M I, U/-SO C 0 Project No. l Date Application Accepted: Date Application Expires: use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** King Co Assessor's Tax No.: Site Address: 1180 ANDOVER PARK WEST Suite Number: Floor: Tenant Name: SEATTLE CHOCOLATE New Tenant: ❑..... Yes ®..No PROPERTY OWNER Name: JEAN THOMPSON Address: 1180 ANDOVER PARK WEST City: SEATTLE State: WA Zip: 98065 CONTACT PERSON — person receiving all project communication Name: HENRY KURASAKI (MG2) Address: 1.1.01 2ND AVE, SUITE 100 City: SEATTLE State: WA Zip: 98101 Phone: (206) 962-651.3 Fax: Email: henry.kurasaki@mg2.com Valuation of project (contractor's bid price): $ 14,000 Describe the scope of work in detail: MECHANICAL CONTRACTOR INFORMATION Company Name: TBD Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Provide new ductwork and grilles to remodel of existing retail space. Provide new exhaust fans for remodeled toilet rooms. Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... ❑ Replacement ........0 Fuel Type: Electric..... ❑ Gas....... W Other:_ H:\Applications\Fonns-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 14-16.do" Revised: January 2016 Page) of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu 16 Floor furnace 2 Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 3 Air handling unit <10,000 cfm 65 dB(A) Unit Type Qty Air handling unit >10,000 cfm Residential, Nighttime Evaporator cooler 16 Ventilation fan connected to single duct 2 Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser 16 Thermostat 2 Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM, Monday through Friday and 8AM-IOPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam-IOpm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. i Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: (0• 24 . +So Print Name: 140zrr--l- uO-A, SAA" Day Telephone: ZC16 - I G2 40S 13 Mailing Address: 14 0 ( 7AO Al"JE S& (Zr 1,00 5i �41-r-'CLIFE -1-i A 9.1'Yhz_�- City State Zip H:\Applications\Foms-Applications On Line\2016 Applications\Mochmical Permit Application Revised 14-16.do" Revised: January 2016 Page 2 of 2 bh r • I g1 PermiltTRAK • • a .� $3,861.57 D16-0180 Address: 1180 ANDOVER PARK W Apn: 3523049085 $2,109.33 DEVELOPMENT $2,009.10 PERMIT FEE R000.322.100.00.00 0.00 $2,004.60 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $100.23 TECHNOLOGY FEE R000.322.900.04.00 0.00 $100.23 EL16=0589 Address: 1180 ANDOVER PARK W Apn: 3523049085 $1,095.83 ELECTRICAL $1,043.65 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $1,043.65 TECHNOLOGY FEE $52.18 TECHNOLOGY FEE R000.322.900.04.00 0.00 $52.18 M16-0110 Address: 1180 ANDOVER PARK W Apn: 3523049085 $304.13 MECHANICAL $289.65 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $257.15 TECHNOLOGY FEE $14.48 TECHNOLOGY FEE R000.322.900.04.00 0.00 $14.48 PG16-0086 Address: 1180 ANDOVER PARK W Apn: 3523049085 $352.28 PLUMBING $335.50 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $303.00 TECHNOLOGY FEE $16.78 TECHNOLOGY FEE R000.322.900.04.00 0.00 $16.78 Date Paid: Friday, July 22, 2016 Paid By: RONALD WOLFF Pay Method: CREDIT CARD 022956 Printed: Friday, July 22, 2016 12:11 PM 1 of 1 DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $1,720.19 D16-0180 Address: 1180 ANDOVER PARK W Apn: 3523049085 $1,302.99 DEVELOPMENT $1,302.99 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,302.99 EL16-0589 Address: 1180 ANDOVER PARK W Apn: 3523049085 $260.91 ELECTRICAL $260.91 PLAN CHECK FEE R000.345.832.00.00 0.00 $260.91 M16-0110 Address: 1180 ANDOVER PARK W Apn: 3523049085 $72.41 MECHANICAL $72.41 PLAN CHECK FEE R000.322.102.00.00 0.00 $72.41 PG16-0086 Address: 1180 ANDOVER PARK W Apn: 3523049085 $83.88 PLUMBING $83.88 PLAN CHECK FEE TOTAL FEES PAID$1,720.19 R000.322.103.00.00 0.00 $83.88 Date Paid: Monday, June 27, 2016 Paid By: HENRY KURASAKI Pay Method: CREDIT CARD 49138D Printed: Monday, June 27, 2016 7:49 AM 1 of 1[ �'�`! SYSTEMS INSPECTION RECORD Retain a copy with permit ml& -o/% ol INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Approved per applicable codes. 1-1 Corrections required prior to approval. COMMENTS: Inspector: Date: 1,._ ❑ REINSPECTION FEE REQUIRED. Prior to next inspection, tee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit��` _U"© INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: (? T e of Inspection: tJU -% - ,- ) rAdL Address: 694 L,/ Date Called: pecial Instructions: lRequestef Date Wa a a.m. 1-7 P. . Phone No: 4 Approved per applicable codes. Ll Corrections required prior to approval. COMMENTS: Inspector: Date: q 16 ,i1f M "f2 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 2012 Washington State Energy Code Compliance Forms'for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary MECH-Sum 2012 Washington State Energy Code Com fiance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Info Project Address: Seattle Chocolates Date 6/24/2016 1180 Andover Park West For Building Dept. Use Tukwila, WA 98065 Applicant Name: Henry Kurasaki - MG2 fG' Applicant Address: 1101 Second Avenue, Suite 100 Applicant Phone: 206-962-6500 Project Description ❑ New Building ❑ Building Addition ❑ System Upgrade ❑Q No System Changes Briefly describe mechanical systems in Revise ductwork from existing rooftop units to odel of existing retail space. the text box provided ❑ Total Bldg Performance Total Bldg Performance compliance includes all mandatory provisions per RENIE1�iEQ ��R �4f�, �°��ntyQ! �h�CE i✓t?Mnf� 1Yt1' 4. !'ti APPROVED C401.2 Option 2. Only MECH-SUM and MECH-CHK forms required. U JUL 0 j .t 2016 Mechanical Systems Summary city TUWAI R Air I ow Economizer Ventilation Equip ID Type of System (Note 1) Space(s) Served �.V li Is (Note 2) (Note 3) Energy Recovery RTU -1 Existing to remain. RTU -2 Existing to remain. RTU -3 Existing to remain. P El 1 CENTER Note 1 - Provide basic description of system type, for example: unitary rooftop air handler, built-up central air handler, single -packaged, split system or packaged terminal air conditioner or heat pump; unit heater, warm -air furnace, electric resistance heater, 4 -pipe fan coil, VRF system, energy recovery air handler, make-up air system, ground or water -source heat pump, etc. Note 2 - If taking an exception to air economizer, select exception taken from drop down menu and complete MECH-ECONO form. Summary definitions of each exception are listed in MECH-ECONO. Note 3 - if ventilation "Not applicable"is selected, provide explanation in Project Description box above. HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Water -loop heat pump Q No hydronic systems ❑ Hydronic heating ❑ Geothermal Equipment Type (s) ❑✓ Hot water heating tank(s) Q Instantaneous ❑ No service water systems Service Water Heating Systems ❑ Dedicated boiler ❑ Heat exchange from space heat boiler or central hot water/steam Distribution Type (s) ❑ Circulation System ❑ On -demand ❑✓ Mechanical Plans ❑ MECH-EQ Form Mechanical Schedules Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not required, however, include on plans all applicable compliance information listed in MECH-EQ tables. ❑ Load calculation summary ❑ MECH-LOAD-CALC Form ❑✓ Equipment retrofit or repair Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or Desi Load Calculations ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable compliance information then the MECH-LOAD-CALC form is not required. Equipment retrofit and repair projects where design loads in space(s) served have not changed from original design conditions are not required to perform load calculations. `�0 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary, •• 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Q Air system exceeding 5hp QQ No air system exceeds 5hp Q Fan Power Provide a MECH-FANSYS form for each HVAC system having a total fan system motor nameplate horsepower exceeding 5 horsepower. Refer to Section C403.2.10 and MECH-FANSYS-DOC for requirements and exceptions. Commissioning Exception [ ] Commissioning will be provided for all applicable systems Summary Commissioning Exceptions: Describe means of eligibilty for commissioning exception (capacity, Less than 240,000 Btu/hr cooling capacity and less than 300,000 But/hr heating ❑✓ Mechanical system(s) capacity. etc) for all systems noted as taking exception in Mechanical Systems Summary table. Refer to Section C408.2 and C408.4 for exceptions. Service water heating system(s) For systems requiring commissioning, Figure C408.1.2. I Commissioning Compliance Checklist shall be submitted to the code official upon project completion. Low Energy and Semi -Heated Spaces (Note 6 and 7) Peak Space Heating Cooling Conditioning Space Area Served, Capacity, Btu/h Capacity, Btu/h Capacity, Compliance Type Location in Plan(s) Space(s) Served square feet (Note 4) (Note 5) Btu/h-sf Check Notes Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C101.5.2 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h-sf. Note 7 - Refer to Section C402.1.4 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 btuh/sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address Seattle Chocolates 113ate 6/24/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableCode Section Code Provision information Required - Must be in permit documents Location in Building Department (yes,no,na) Documents Notes GENERAL PROVISIONS Equipment Sizing & Performance na C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 C403.2.2 Equipment and system Output capacity of heating and cooling equipment and systems do not exceed calculated M-0.2 yes sizing loads, note exceptions taken Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable M-0.2 yes C403.2.5 Minimum ventilation of being reduced to minimum requirement per IMC 0403 .2.3 & 0403.2.3.2 & Equipment minimum Provide equipment schedules or complete MECHSUM tables with type, capacity, efficiency, na C403.2.12.1 efficiency test standard (or other efficiency source) for all mechanical equipment na 0403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, and efficiency for all motors; note exceptions taken na C403.2.10.1 Fan power limitation For all applicable systems > 5hp, provide system total nameplate hp in MECH-FANSYS-SUM form na C403.2.10.1 Fan power limitation For all applicable fan systems > 5hp, verify fan system motor hp or bhp complies with fan power limits per Table C403.2.10.1(1), provide MECH-FANSYS form for each system na C403.2.10.2 Motor nameplate hp Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken na C403.2.10.3 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. & C403.2.13 na C403.2.3 Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit city 0403.2.3.1 Non-standard water-cooled Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard na chillers operational conditions na 0403.2.12.1. Centrifugal fan cooling Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan towers open circuit cooling towers na C403.2.3 Forced air furnace and unit Indicate intermittent ignition or IID, flue/draft damper & jacket loss heaters na 0403.2.3.3 Packaged electric Verify all packaged electric equipment that provides > 20,000 Bluth cooling capacity and heating/cooling equipment heating is a heat pump, note in equipment schedule na C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria yes C403.2A.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems M1.1 na C403.2.4.1.1 Heat pump supplementary Indicate staged heating (compression/supplemental) and outdoor lock -out temperature is set heat to 40°F or less na C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling na C403.2.4.3 Automatic setback and Indicate zone t -stat controls with required automatic setback & manual override shutdown na C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions 0402.4.5.2 & OSA, exhaust, and relief air Indicate location of outdoor air supply intake, and exhaust and relief outlet dampers; verify na C403.2.4.4 dampers pe Gass 1 leakage ratio and control motorized or gravity); g g type ( g ty); note exceptions taken na C402.4.5.2 Return air dampers Indicate location of return air dampers; verify motorized control; verify Class 1 leakage rating for all return air dampers not integral to packaged equipment na C402.4.5.1 Stairway and shaft vents Indicate location of stairway and shaft vents, verify Class 1 leakage rated motorized dampers and method of activation na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls na C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions na C403.2.4.6 Combustion heating Indicate modulating or staged control equipment C403.2.4.7 Group R1 hotel/motel Indicate method for guest room temperature automatic setback (heating) & set-up (cooling), na systems confirm adjustment of at least 5°F minimum. na C403.2.4.8 / 9 Group R2/R3 dwelling and Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback sleeping unit systems periods; note exceptions taken na C403.2.5.1 Demand controlled ventilation Indicate high -occupancy spaces and 9 systems requiring DCV na C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or altemate means rovtded to automatically reduce OSA when partially occupied , A 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 201 Project Address Seattle Chocolates Date 6/24/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section I Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Documents Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued na C403.2.5.3 Enclosed loading dock/parking garage Indicate enclosed loadingdock and enclosed parking p g garage ventilation system activation and ventilation control method na C403.2.5.4.1 IGtchen exhaust hoods Indicate kitchen hoods requiring make-up air, indicate make-up air source and conditioning method na C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken AV, semi -conditioned makeup, or CERM calculation) na C403.2.6.1 Energy recovery (ER) - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; q 9 cy; note exceptions na C403.2.6.2 Energy recovery (ER) - Indicate on-site steam heating systems requiring energy recovery condensate systems na C403.2.6.3 Energy recovery (ER) - Indicate remote refrig. condensers requiring ER and use of captured energy kxwler/freezer condensers C403.4.6 Energy recovery (ER) - Indicate condenser systems requiring ER to pre -heat service water, indicate ER effectiveness; na condenser systems note exceptions taken C403.2.12 Variable flow control - Indicate fan and pump motors requiring variable flow control and method (VSD or equivalent na fans/pumps controls) na C403.2.12.1 Variable flow control - heat Indicate heat rejection equipment and cooling tower fans requiring variable flow control and rejection equipment method na C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; note exceptions taken na C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 Btu/h na C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand response setpoint adjustment Ducting Systems C403.2.7.1 & Dud Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC yes C403.2.7.3 construction vapor retarder requirements M-1.1 yes :403.2.7.3.14 Dud pressure classifications Identify location of low, medium and high pressure ductwork on plans M-1.1 C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test results to na test jurisdiction when completed yes C403.2.7.1 / Duct insulation Indicate R -value of insulation on ductwork M1.1 Piping Systems na C403.2.8 Piping insulation Indicate R -value of insulation on piping . PAA na C403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/degredation weather SIMPLE SYSTEMS Qualifying Systems C403.3 Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, does not have active na systems humidifcation or simultaneous heating/cooling na C403.3 Qualifying 2 -pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits systems na C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers na C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule na C403.3.1 Air economizer exceptions Indicate eligible exceptions) taken and provisions to comply with exception(s) na C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken na C403.3.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for systems with capacity > 65,000 BbA operation na C403.3.1.1.3 Air economizer high limit Indicate high limit shutoff control method per Table C403.3.1.1.3(2) controls 2012 Washington State Energy Code Compliance Fortes for Commercial, Group R1, and > 3 story R2 and R3 PermitMechanical -•- 3 of 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address Seattle Chocolates Date 6/24/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Documents Notes COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule na 0403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) na 0403.4.1.1 Water economizer capacity For eligible systems where water economizer may be provided in lieu of air economizer, indicate system is capable of 100% cooling capacity at 50°F db/45°F wb OSA C403.4.1.2 Water economizer Indicate precooling coils and heat exchangers in water economizer system do not exceed na maximum pressure drop pressure drop limit na 0403.4.1.3 Integrated economizer Indicate capability for partial economizer operation for air or water economizer systems operation C403.4.1.4 Economizer heating system Verify control method of HVAC systems with economizers does not increase building heating I na impact energy usage during normal operation Specific System Requirements na C403.4.2 & VAV fan control Indicate fans requiring variable flow control and method C403.2.12 na C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major duct branch sensors na C403.4.2.2 VAV fan static pressure Indicate fan system static pressure setpoint based on zone requiring most pressure setpoint C403.4.5 VAV systems serving Indicate supply air systems serving multiple zones, method of primary air control, and zones na multiple zones served; Indicate VAV or note exceptions taken 0403.4.5 VAV systems serving For each air system terminal, indicate the maximum air flow rate of primary supply air during na multiple zones zone peak cooling and the maximum air flow rates during zone peak heating. na C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads C403.4 Large capacity cooling indicate method of multi -stage or variable control for building cooling system capacity > 300 na systems tons na C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na C403.4.3 Large capacity boiler Indicate multi -stage or modulating burner for single boilers > 500,000 BbA systems na C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers C403.4.3.5 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & na isolation boilers when not in use na C403.4.3.6 & Variable flow control - Indicate pumps requiring variable flow control & method C403.2.12: pumps na 0403.2.12.1 Variable flow control - Indicate cooling tower fans requiring variable flow control and method & C403.4.4 cooling towers C403.4.3.4 Hydronic system part load Indicate heating & chilled water systems have the capability to automatically reset supply water na controls temp AND reduce flow by k 50% for systems > 300,000 Btu/h na C403.4.3.2 Two -pipe changeover Indicate deadband, heating/000ling mode scheduling and changeover temperature range systems 0403.4.3.3.1 Water loop heat pump - Indicate capability of central equipment to provide min. 20"F water supply temp deadband na deadband between heat rejection and heat addition modes na 0403.4.3.3.2.1 Water loop heat pump - heat rejection, Zone 4 Indicate method used to limit system heat loss when heat rejections is not needed na C403.4.3.3.2.2 Water loop heat pump - Provide heat exchanger that separates cooling tower and heat pump loop heat rejection, Zone 5 na C403.4.3.3.3 Water loop heat pump - Indicate 2 -way isolation valve on each heat pump and variable flow control for systems with isolation total pump power > 10 hp na C403.5 Walk-in cooler / freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters na C403.516 Cooler / freezer - evaporator Indicate motor type for evaporator and condenser fans < 1 hp and condenser fans 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Page 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address Seattle Chocolates Date 6/24/2016 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableCode Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Documents Notes SERVICE WATER HEATING Service Water Systems C404.2 Water -heating equip min. Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency na efficiency source na C404.3 Temperature controls Indicate temperature controls have required setpoint capability na C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge na C404.5 Insulation underwater heater Indicate R-10 insulation under electric water heater tanks na C404.8 Service water piping Indicate R -value of insulation on piping; note exceptions taken insulation na C404.7 / 8 Circulation systems and heat trace shut-off indicate shut-off capability based on occupancy and periods of limited demand C404.9 Group R-2 service hot water Indicate method of usage metering for dwelling units served by a central service hot water na meters system Pools & In -Ground Permanently Installed Spas C404.10.1 Pool heating equip min. Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency na efficiency source na C404.10.1 / 2 Pool heater on / off controls indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; note exceptions taken na C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90'F na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use; note exceptions taken COMMISSIONING Specific System Requirements C408.2 Mechanical systems Indicate all mechanical systems to be commissioned; for those that will not be commissioned, na commissioning note exception taken C408.4 Service water heating Indicate all service water heating systems to be commissioned; for those that will not be na systems commissioning commissioned, note exception taken na C408.1.1 Commissioning plan Provide commissioning plan for all systems requiring commissioning; include in plan all required items per this section 0408.2.2.1 & Air system and hydronic Include in commissioning plan that air and hydronic systems shall be balanced in a manner to na C408.2.2.2 system balancing first minimize throttling losses, then adjust to meet design flow conditions C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets, zone terminals and na devices equipment requiring system balancing C4082.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate, balance and measure flow for all hydronic na devices equipment requiring system balancing na C408.2.3 Mechanical systems functional performance Provide l ti ti f f descri on of performance testing p P g procedures for all applicable systems testing including: equipment, controls, economizers na C408.4.1 Service water heating functional performance Provide ti f f description of erformance testing p P g procedures for all applicable systems testing including: equipment controls, pools and spas na C408.1.4 Systems operation training Indicate required systems operation training measures to be provided na 0408.1.2 & Documentation Indicate required documentation including: record documents, manuals, balancing reports, C403.1.3 commissioning preliminary and final reports na C408.1.2.1 Acceptance report Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon completion of preliminary commissioning report PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0110 PROJECT NAME: SEATTLE CHOCOLATE SITE ADDRESS: 1180 ANDOVER PARK W DATE: 06/27/16 X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: A �) �-30.10 AM NO- c� *-I- BuildCin Division Fire Prevention Planning Division g � � g ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 06/28/16 Not Applicable ❑ Structural Review Required (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07/26/16 Approved ❑ Approved with Conditions IRI Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/1812013 TRISQUAU CONSTRUCTION LIQ Washington State Department of Labor & Industries Page 1 of 2 Home Espahol Contact Search L&I � 5- 4 3S Safety & Health TRISQUARE CONSTRUCTION LLC A -L Index help My U,I Claims & Insurance Workplace Rights Trades & Licensing Owner or tradesperson PO BOX 626 LAKE STEVENS, WA 98258 Principals 425-610-7424 WOLFF, DANIEL JOHN, PARTNER/MEMBER SNOHOMISH County Doing business as TRISQUARE CONSTRUCTION LLC WA UBI No. Business type 603 074 598 Limited Liability Company License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties $1,000,000.00 GENERAL License no. TRISOCL894BO Effective date Effective — expiration 01/18/2016 01/20/2011— 01/31/2017 Expiration date Bond ................. 01/18/2017 Developers Surety & Indem Co $12,000.00 Bond account no. 256039C Received by L&I Effective date 03/30/2012 04/01/2012 Expiration date Until Canceled Bond history Insurance Ohio Security Ins Co $1,000,000.00 Policy no. BKS57065230 Received by L&I Effective date 01/18/2016 01/18/2016 Expiration date 01/18/2017 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period L&I Tax debts No LW tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. Q https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=603074598&LIC=TRISQCL894BO&SAW= 07/22/2016 O 0 a U ti N O co r - c0 0 CN L u.i J LL 2 [L N P') c0 0 N N cD C W F - Q 0 z z 0 2i W Y m J- m W O J a G9 10 U C 0 rI REFERENCE SYMBOLS NEW MECHANICAL WORK EXISTING MECHANICAL WORK EXISTING MECHANICAL WORK TO BE DEMOLISHED ENLARGED PLAN BORDER MATCHLINE SECTION IDENTIFIER DETAIL OR DRAWING IDENTIFIER REVISION CLOUD INDICATES WHERE SECTION APPEARS FLAG NOTE EQUIPMENT IDENTIFIER POINT OF CONNECTION NORTH ARROW MECHANICAL ACCESS DIFFUSER, REGISTER, AND GRILLE SYMBOLS AIR DEVICE TAG SUPPLY DIFFUSER RETURN OR RELIEF GRILLE EXHAUST GRILLE SIDEWALL GRILLE (SUPPLY), LOUVER (EXHAUST OR RETURN) SIDEWALL GRILLE (RETURN OR EXHAUST), LOUVER (OUTSIDE) LINEAR GRILLE ROUND DIFFUSER DUCTWORK SYMBOLS ROOM THERMOSTAT SENSOR NEW DUCTWORK "THERMOSTAT" (,S RISE OR DROP DIRECTION ® ROOM PRESSURE SENSOR OF AIR FLOW VARIABLE FREQUENCY DRIVE TAG INTERNALLY LINED DUCT LOCATION DIRECT DIGITAL CONTROL PANEL MANUAL VOLUME DAMPER DIFFERENTIAL PRESSURE TRANSMITTER BDD - CONTROL WIRING $ BACKDRAFT DAMPER DIMENSIONS (LxWxHT) INANAN WEIGHT LBS MOTOR OPERATED DAMPER FLOW CFM ESP IN WC MOTOR HP DUCT SMOKE DETECTOR OUTPUT CAPACITY MBH TOTAL CAPACITY BTU EER FIRE DAMPER MOP AMPS VOLTAGE/ PHASE V/PJ RTU -1 SMOKE DAMPER ROOF TRANE/YCDO48C4LOBE 1600 COMBINATION FIREISMOKE DAMPER 1 500 00 HORIZONTAL FIRE DAMPER .-K21 HORIZONTAL SMOKE DAMPER 12 HORIZONTAL COMBINATION VEY FIRE/SMOKE DAMPER EXISTING FLEXIBLE CONNECTION RTU -2 UC UNDERCUT DOOR ® SUPPLY AIR DUCT SECTION 0.5 RETURN OR OUTSIDE AIR DUCT SECTION ® (Q} EXHAUST AIR DUCT SECTION 64 RECTANGULAR DUCT UP DQ 25 35 RECTANGULAR DUCT DOWN 75x47x42 EXISTING ROUND DUCT UP -( ROOF TRANE/YCD120C4LOAA ROUND DUCT DOWN 0.5 11111111111111111111 FLEXIBLE DUCTWORK CONTROLS ® ROOM THERMOSTAT SENSOR MECHANICAL LEGEND, SCHEDULES AND NOTES "THERMOSTAT" (,S ROOM SENSOR ® ROOM PRESSURE SENSOR ®F VARIABLE FREQUENCY DRIVE TAG STARTER OR STARTER/DISCONNECT LOCATION DIRECT DIGITAL CONTROL PANEL DP DIFFERENTIAL PRESSURE TRANSMITTER - - - - - - - - - - CONTROL WIRING $ SWITCH GENERAL NOTES: GENERAL: 1. COORDINATE MECHANICAL WORK WITH ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL AND LANDSCAPE WORK SHOWN ON OTHER CONTRACT DOCUMENTS. PROVIDE ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION WHERE REQUIRED. 2. COORDINATE HVAC, PLUMBING AND FIRE PROTECTION WORK PRIOR TO INSTALLATION. DUCTWORK AND EQUIPMENT ACCESS TAKES PRECEDENCE OVER PIPING FOR AVAILABLE SPACE. 3. WHERE USED, THE TERM -PROVIDE" SHALL MEAN -FURNISH AND INSTALL". 4. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF DUCTS, PIPES, CONDUITS, SUSPENDED EQUIPMENT, ETC., IN MECHANICAL ROOM ACCESS SPACES. 5. COORDINATE EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE DUCT AND PIPING DIMENSIONS BEFORE FABRICATION. 6. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION OF MECHANICAL SYSTEMS. 7. PROVIDE ACCESS DOORS FOR MECHANICAL EQUIPMENT INSTALLED BEHIND WALLS, ABOVE INACCESSIBLE CEILINGS AND BELOW FLOORS. ACCESS DOOR SHALL BE SIZED SO THAT ADJACENT EQUIPMENT IS ACCESSIBLE. PROVIDE ACUDOR, ELMDOR, MILCOR, OR APPROVED. 8. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY THAT ATTACHMENT POINTS ON EQUIPMENT AND STRUCTURE CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS IMPOSED. 9. MAINTAIN INDICATED FIRE AND SMOKE RATING OF WALLS, PARTITIONS, CEILINGS, AND FLOORS AT MECHANICAL PENETRATIONS. SEAL PENETRATIONS WITH FIRESTOP MATERIAL. PROVIDE MATERIAL IN ACCORDANCE WITH ASTM E 814 AND UL 1479 3M OR APPROVED. COMPLY WITH REQUIREMENTS SPECIFIED IN DIVISION 07. 10. LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH OTHER TRADES INVOLVED. INCLUDE IN THE COST OF MECHANICAL WORK, CUTTING, CORING, PATCHING AND PAINTING OF EXISTING WALLS, CEILINGS, FLOORS AND ROOFS AS REQUIRED TO ACCOMMODATE WORK AS INDICATED IN THE MECHANICAL CONTRACT DOCUMENTS, UNLESS SPECIFICALLY SHOWN ON ARCHITECTURAL DRAWINGS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS. 12. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP DRAWING SO ROUTING IS COORDINATED WITH OTHER DISCIPLINES. 13. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723. 14. MECHANICAL EQUIPMENT, PACKAGED UNITS, CONTROL PANELS, MOTOR STARTER, MOTOR CONTROLLERS, VARIABLE FREQUENCY DRIVES AND SIMILAR EQUIPMENT SHALL CARRY A SHORT CIRCUIT CURRENT RATING (SCCR) EQUAL TO OR GREATER THAN AVAILABLE FAULT CURRENT DELIVERED FROM ELECTRICAL SYSTEM. INCLUDE VISIBLE FACTORY NAMEPLATE FOR SUCH EQUIPMENT INDICATING SCCR OF EQUIPMENT IN ACCORDANCE WITH UL 1995 AND UL 508A. HVAC/SHEET METAL: 1. DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS. 2. PROVIDE MANUAL VOLUME DAMPER FOR EACH DIFFUSER, REGISTER, AND GRILLE. 3. PROVIDE DUCT ACCESS DOORS AT DUCT SMOKE DETECTORS, BACKDRAFT DAMPERS, MOTORIZED CONTROL DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS, DUCT MOUNTED COILS, DUCT AIRFLOW STATIONS AND LOUVER PLENUMS. ENERGY CODE: (WASHINGTON STATE ENERGY CODE) 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD EFFICIENCIES LISTED IN THE WASHINGTON STATE ENERGY CODE. 2. PIPING AND DUCT INSULATION: COMPLY WITH THICKNESS AND TYPES LISTED IN THE WASHINGTON STATE ENERGY CODE. 3. DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND LONGITUDINAL SEAMS PER THE WASHINGTON STATE ENERGY CODE. 4. RECORD DRAWINGS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE, 5. OPERATION AND MAINTENANCE MANUALS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 6. SYSTEM BALANCING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 7. MECHANICAL SYSTEMS COMMISSIONING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN DESIGNED TO COMPLY WITH THE WASHINGTON STATE ENERGY CODE. CONTRACTOR IS RESPONSIBLE FOR CORRECT INSTALLATION OF ENERGY CONSERVATION MEASURES. 9. BUILDING PRESSURE TESTING: COORDINATE PHASING OF BUILDING ENVELOPE LEAKAGE TESTING WITH MECHANICAL SYSTEM SCOPES OF WORK. TEMPORARILY CAP SYSTEMS AS REQUIRED TO FACILITATE LEAKAGE TESTING SCOPE OF WORK. NON-STRUCTURAL MECHANIC'AL COMPONENTS: 1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2012 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CML ENGINEERS (ASCE) STANDARD 7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN BID. 2. 2012 IBC 1613.1 SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-10, EXCLUDING CHAPTER 14 AND APPENDIX 11A. 3. 2012 IBC 1705.11 CONTRACTOR RESPONSIBILITY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF A SEISMIC -FORCE -RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS. 4. HANGERS AND SEISMIC BRACING FOR THE MECHANICAL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY THE MECHANICAL CONTRACTOR. REFER TO CONTRACTOR SHOP DRAWINGS FOR LOCATIONS OF EQUIPMENT AND HUNG MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN LOADS FOR HUNG MECHANICAL SYSTEMS WITH THE GENERAL CONTRACTOR AND OTHER TRADES THAT MAY BE IMPACTED. EXISTING MECHANICAL: 1. WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE CONSTRUCTION AREA. 2. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 3. WHERE INDICATED, DUCTWORK AND PIPING OR PORTIONS OF DUCTWORK AND PIPING SHALL BE REUSED. REFER TO DRAWING PLANS FOR POINTS OF CONNECTIONS. 4. PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR AND PROVIDE ALL NECESSARY PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE WORK. DEMOLITION: 1. TAKE CAUTION IN DEMOLITION OF MECHANICAL EQUIPMENT. 2. CONTRACTOR SHALL REMOVE ALL PIPING, DUCTWORK, AND EQUIPMENT INDICATED ON DRAWINGS INCLUDING ALL ASSOCIATED INSULATION, HANGERS, VALVES, PLENUM WALLS, DAMPERS, WIREMOLD, WIRING, CONTROLS, AND APPURTENANCES ASSOCIATED WITH EACH PIECE OF EQUIPMENT. 3. EXISTING CONTROL PATHWAYS MAY BE RE -USED. COORDINATE CONTROLS DEMO WORK PRIOR TO DEMOLITION. REMOVE ALL EXISTING THERMOSTATS SHOWN ON THE DRAWINGS ALONG WITH ASSOCIATED WIRING AND RACEWAYS. 4. WHERE EXISTING ITEMS PENETRATE A WALL OR ROOF, CONTRACTOR SHALL PROVIDE INFILL AT (E) PENETRATIONS THROUGH WALL/ROOF WITH LIKE MATERIALS. PATCH & REPAIR TO MATCH SURROUNDING SURFACES INCLUDING PAINT. 5. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL EQUIPMENT WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GC AND PROVIDE NECESSARY SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS. MECHANICAL SHEET LIST M0.1 MECHANICAL LEGEND, SCHEDULES AND NOTES MD1.1 MECHANICAL DEMOLITION PLAN M1.1 HVAC FLOOR PLAN PROJECT DESCRIPTION: TENANT IMPROVEMENT OF AN APPROXIMATE 2,005 SQUARE FOOT EXISTING RETAIL SPACE FOR A NEW RESTAURANT. MECHANICAL SCOPE INCLUDES REVISED DUCTWORK OF EXISTING ROOFTOP MECHANICAL UNIT; EXHAUST FANS FOR TOILET ROOMS; AND FULL PLUMBING INSTALLATION FOR KITCHEN AND TOILET ROOMS. BUILDING CODE INFORMATION: 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL MECHANICAL MECHANICAL CODE 2012 UNIFORM PLUMBING CODE 2012 WASHINGTON STATE ENERGY CODE rmft, _I.11 ° 111/U Plan roe/iew epproval is subject to errors and omisGW3. Approval of consir radon documents does lira auithalizo the violation of urly adoptod code or ordinance. Reccipt of approved Field d con*Ic/oledged: By: Date: City of Tukwila BUILDING DIVISION ...........-- REVISIONS shall be made to the scope No Changes prior ar�proval 01 0, work �,,tithOL1t p ' pivlslon. -I Ol Jila Building Ian submittal NOTE: �,evisio s v'iil require a plan tees. and may inc;uds add,tlonal p rFR PARRA iPERMFORIT EQUIRE- S E3 mechanical Electrical Of Plumbing Gas Piping City of Tukwlta ru III_r)IMS DIVISIOt PACKAGED GAS/ELECTRIC ROOFTOP UNIT SCHEDULE FAN SCHEDULE TAG MANUFACTURER / MODEL TYPE MATERIAL FINISH FACE DUCT TAG NEW OR EXISTING LOCATION MANUFACTURERIMODEL EVAPORATOR FAN OUTSIDE AIR FLOW CFM HEATING COOLING SIZE ELECTRICAL DIMENSIONS (LxWxHT) INANAN WEIGHT LBS NOTES FLOW CFM ESP IN WC MOTOR HP INPUT CAPACITY MBH OUTPUT CAPACITY MBH TOTAL CAPACITY BTU EER MCA AMPS MOP AMPS VOLTAGE/ PHASE V/PJ RTU -1 EXISTING ROOF TRANE/YCDO48C4LOBE 1600 0.5 1 500 90 73 48000 12 12 20 46013 75x47x42 EXISTING NOTE 3 RTU -2 EXISTING ROOF TRANE/YSC048A3EMA180 1600 0.5 1 500 80 64 48000 12 25 35 208/3 75x47x42 EXISTING RTU -3 EXISTING ROOF TRANE/YCD120C4LOAA 4000 0.5 1 1000 120 98 120 12 24 30 460/3 75x47x42 EXISTING NOTES: 1) RELOCATE EXISTING PROGRAMMABLE THERMOSTATS TO LOCATIONS INDICATED ON SHEET M-1.1. ABBREVIATIONS: ST = STEEL, AL = ALUMINUM, BE = BAKED ENAMEL, AA = ANODIZED ALUMINUM, FA = FULLY ADJUSTABLE, TP =TWO POSITION, OPD = OPPOSED BLADE DAMPERS, ADJ = ADJUSTABLE, BA=BAKED ACRYLIC, BO = BLANK OFF, DB = DIRECTIONAL BLADES, AND P = PLENUM. DIFFUSER, GRILLE AND LOUVER SCHEDULE FAN SCHEDULE TAG MANUFACTURER / MODEL TYPE MATERIAL FINISH FACE DUCT MOUNTING PATTERN DAMPERS FAN ELEC DIMENSIONS (LxWxHT) INANAN NOTES SIZE INLET SPEED RPM VOLTAGE/PHASE 10 EF -1 A TITUS MCD -AA SQUARE CEILING DIFFUSER AL WH 24x24 NOTE 1 NOTE 3 4 -WAY NOTE 2 E TITUS 50F EGGCRATE GRILLE AL WH 24x24 NOTE 1 NOTE 3 - NONE S TITUS TMRA-AA SUPPLY GRILLE AL WH NOTE 2 NOTE 1 NOTE 3 FA NOTE 5 R TITUS 350RL EXHAUST/TRANSFER GRILLE AL WH NOTE 2 NOTE 1 NOTE 3 - NONE NOTES: 1) SEE AIR DEVICE TAG FOR DUCT INLET SIZE. 2) FACE SIZE DETERMINED FRO DUCT INLET SIZE. 3) COORDINATE BORDER TYPE (SURFACE MOUNT, SNAP IN, LAY -IN, SPLINE, DROPPED FACE, AND BEVELED DROP FACE) WITH ARCHITECTURAL CEILING PLANS. 4) REFER TO ARCHITECT FOR PAINT COLOR TO MATCH BUILDING EXTERIOR. 5) PROVIDE WITH OPPOSED BLADE DAMPERS. ABBREVIATIONS: ST = STEEL, AL = ALUMINUM, BE = BAKED ENAMEL, AA = ANODIZED ALUMINUM, FA = FULLY ADJUSTABLE, TP =TWO POSITION, OPD = OPPOSED BLADE DAMPERS, ADJ = ADJUSTABLE, BA=BAKED ACRYLIC, BO = BLANK OFF, DB = DIRECTIONAL BLADES, AND P = PLENUM. EXHAUST FAN SCHEDULE TAG AREA SERVED LOCATION MANUFACTURER / MODEL FAN ELEC DIMENSIONS (LxWxHT) INANAN NOTES FLOW CFM ESP IN WC SPEED RPM VOLTAGE/PHASE 10 EF -1 WOMEN'S TOILET KITCHEN COOK / GN -166 150 0.125 1100 120/1 14x16x9 1 EF -2 MEN'S TOILET ROOM UTILITY ROOM COOK/ GN -166 150 0.125 1100 120/1 14x16x9 1 NOTES: 1) FAN SHALL BE CONTROLLED BY PROGRAMMABLE TIMER SWITCH TO OPERATE DURING OCCUPIED HOURS DETERMINED BY BUILDING OWNER. SEATTLE CHOCOLATES 1180 ANDOVER PARK WEST TUKWILA, WA 98065 SEATTLE CHOCOLATES CHOCOLATE FACTORY TOUR 1180 ANDOVER PARK WEST TUKWILA, WA 98065 0 DATE DESCRIPTION 06/24/16 Permit Bid Set R CEINJ'ED CITE' OF TU h0LA JUN 27 2016 PERMIT CENTER MECHANICAL LEGEND, SCHEDULES AND NOTES 0 T C� G U ti N O O r O W ILL 2 a M cfi co 0 N N GD w M C w Z Z 0 0 0 w J M M W f— ❑ —1 1 19 E A C 1.1 w I I I � I I .- ---------------------------- - - -L�_ L ��12"0 � ' w I T �r —14— I 1 i I " I �— 14"0 ' I I I Xy i 1 ——r-----------------------------------------------------------------------I—T— I -L-------- ----------------- — i_IJ --------------- — I I r 10"0 I I I 1 � I I I I I I } I I I ! I I � I I I i I I I 1 I I I I I � I I I I I I 1 I I I I MI I I I GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. FLAG NOTES: EXISTING ROOFTOP UNITS TO REMAIN. DEMOLISH ALL DUCTWORK ASSOCIATED WITH ROOFTOP UNIT. SELECTIVE DEMOLITION OF ROOFTOP UNIT REQUIRED FOR NEW CONSTRUCTION. REFER TO SHEET M-1.1 FOR ADDITIONAL INFORMATION. [4�> DEMOLISH ALL EXISTING TOILET SERVICE ROOM FIXTURES, SINK, WATER HEATER, AND KITCHEN SINK. REMOVE ALL CW, HW, WASTE, AND VENT PIPING TO ACCOMMODATE NEW CONSTRUCTION. RE�jpNCE CODApp�pVMID ltll. � 1 2016 Ctty ° G p ujS10N Bk�l�o�N CITY OF TUK°�° ILA JUN 2'7 2016 PERMIT CENTER SEATTLE CHOCOLATES 1180 ANDOVER PARK WEST TUKWILA, WA 98065 SEATTLE CHOCOLATES CHOCOLATE FACTORY TOUR 1180 ANDOVER PARK WEST TUKWILA, WA 98065 DATE DESCRIPTION 06/24/16 Permit Bid Set 19 E C 0 v Q B N O to r O a u.i u - a cn 0 N N w t W Q n z z O s A Lu Y m m n W O J FLAG NOTES: PROVIDE ROOF CAP ON EXHAUST DISCHARGE. 2� RELOCATE EXISTING PROGRAMMABLE THERMOSTAT SERVING THIS UNIT TO THIS LOCATION. R'Ev1E��L1�tyCE `` 1u� 01 201G CITY OF WKW21L JUN 27 2016 PERMIT CENTER SEATTLE CHOCOLATES 1180 ANDOVER PARK WEST TUKWILA, WA 98065 SEATTLE CHOCOLATES CHOCOLATE FACTORY TOUR 1180 ANDOVER PARK WEST TUKWILA, WA 98065 DATE DESCRIPTION 06/24/16 Permit Bid Set HVAC PLAN O 0 a U ti N O co r - c0 0 CN L u.i J LL 2 [L N P') c0 0 N N cD C W F - Q 0 z z 0 2i W Y m J- m W O J a G9 10 U C 0 rI REFERENCE SYMBOLS NEW MECHANICAL WORK EXISTING MECHANICAL WORK EXISTING MECHANICAL WORK TO BE DEMOLISHED ENLARGED PLAN BORDER MATCHLINE SECTION IDENTIFIER DETAIL OR DRAWING IDENTIFIER REVISION CLOUD INDICATES WHERE SECTION APPEARS FLAG NOTE EQUIPMENT IDENTIFIER POINT OF CONNECTION NORTH ARROW MECHANICAL ACCESS DIFFUSER, REGISTER, AND GRILLE SYMBOLS AIR DEVICE TAG SUPPLY DIFFUSER RETURN OR RELIEF GRILLE EXHAUST GRILLE SIDEWALL GRILLE (SUPPLY), LOUVER (EXHAUST OR RETURN) SIDEWALL GRILLE (RETURN OR EXHAUST), LOUVER (OUTSIDE) LINEAR GRILLE ROUND DIFFUSER DUCTWORK SYMBOLS ROOM THERMOSTAT SENSOR NEW DUCTWORK "THERMOSTAT" (,S RISE OR DROP DIRECTION ® ROOM PRESSURE SENSOR OF AIR FLOW VARIABLE FREQUENCY DRIVE TAG INTERNALLY LINED DUCT LOCATION DIRECT DIGITAL CONTROL PANEL MANUAL VOLUME DAMPER DIFFERENTIAL PRESSURE TRANSMITTER BDD - CONTROL WIRING $ BACKDRAFT DAMPER DIMENSIONS (LxWxHT) INANAN WEIGHT LBS MOTOR OPERATED DAMPER FLOW CFM ESP IN WC MOTOR HP DUCT SMOKE DETECTOR OUTPUT CAPACITY MBH TOTAL CAPACITY BTU EER FIRE DAMPER MOP AMPS VOLTAGE/ PHASE V/PJ RTU -1 SMOKE DAMPER ROOF TRANE/YCDO48C4LOBE 1600 COMBINATION FIREISMOKE DAMPER 1 500 00 HORIZONTAL FIRE DAMPER .-K21 HORIZONTAL SMOKE DAMPER 12 HORIZONTAL COMBINATION VEY FIRE/SMOKE DAMPER EXISTING FLEXIBLE CONNECTION RTU -2 UC UNDERCUT DOOR ® SUPPLY AIR DUCT SECTION 0.5 RETURN OR OUTSIDE AIR DUCT SECTION ® (Q} EXHAUST AIR DUCT SECTION 64 RECTANGULAR DUCT UP DQ 25 35 RECTANGULAR DUCT DOWN 75x47x42 EXISTING ROUND DUCT UP -( ROOF TRANE/YCD120C4LOAA ROUND DUCT DOWN 0.5 11111111111111111111 FLEXIBLE DUCTWORK CONTROLS ® ROOM THERMOSTAT SENSOR MECHANICAL LEGEND, SCHEDULES AND NOTES "THERMOSTAT" (,S ROOM SENSOR ® ROOM PRESSURE SENSOR ®F VARIABLE FREQUENCY DRIVE TAG STARTER OR STARTER/DISCONNECT LOCATION DIRECT DIGITAL CONTROL PANEL DP DIFFERENTIAL PRESSURE TRANSMITTER - - - - - - - - - - CONTROL WIRING $ SWITCH GENERAL NOTES: GENERAL: 1. COORDINATE MECHANICAL WORK WITH ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL AND LANDSCAPE WORK SHOWN ON OTHER CONTRACT DOCUMENTS. PROVIDE ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION WHERE REQUIRED. 2. COORDINATE HVAC, PLUMBING AND FIRE PROTECTION WORK PRIOR TO INSTALLATION. DUCTWORK AND EQUIPMENT ACCESS TAKES PRECEDENCE OVER PIPING FOR AVAILABLE SPACE. 3. WHERE USED, THE TERM -PROVIDE" SHALL MEAN -FURNISH AND INSTALL". 4. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF DUCTS, PIPES, CONDUITS, SUSPENDED EQUIPMENT, ETC., IN MECHANICAL ROOM ACCESS SPACES. 5. COORDINATE EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE DUCT AND PIPING DIMENSIONS BEFORE FABRICATION. 6. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION OF MECHANICAL SYSTEMS. 7. PROVIDE ACCESS DOORS FOR MECHANICAL EQUIPMENT INSTALLED BEHIND WALLS, ABOVE INACCESSIBLE CEILINGS AND BELOW FLOORS. ACCESS DOOR SHALL BE SIZED SO THAT ADJACENT EQUIPMENT IS ACCESSIBLE. PROVIDE ACUDOR, ELMDOR, MILCOR, OR APPROVED. 8. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY THAT ATTACHMENT POINTS ON EQUIPMENT AND STRUCTURE CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS IMPOSED. 9. MAINTAIN INDICATED FIRE AND SMOKE RATING OF WALLS, PARTITIONS, CEILINGS, AND FLOORS AT MECHANICAL PENETRATIONS. SEAL PENETRATIONS WITH FIRESTOP MATERIAL. PROVIDE MATERIAL IN ACCORDANCE WITH ASTM E 814 AND UL 1479 3M OR APPROVED. COMPLY WITH REQUIREMENTS SPECIFIED IN DIVISION 07. 10. LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH OTHER TRADES INVOLVED. INCLUDE IN THE COST OF MECHANICAL WORK, CUTTING, CORING, PATCHING AND PAINTING OF EXISTING WALLS, CEILINGS, FLOORS AND ROOFS AS REQUIRED TO ACCOMMODATE WORK AS INDICATED IN THE MECHANICAL CONTRACT DOCUMENTS, UNLESS SPECIFICALLY SHOWN ON ARCHITECTURAL DRAWINGS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS. 12. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP DRAWING SO ROUTING IS COORDINATED WITH OTHER DISCIPLINES. 13. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723. 14. MECHANICAL EQUIPMENT, PACKAGED UNITS, CONTROL PANELS, MOTOR STARTER, MOTOR CONTROLLERS, VARIABLE FREQUENCY DRIVES AND SIMILAR EQUIPMENT SHALL CARRY A SHORT CIRCUIT CURRENT RATING (SCCR) EQUAL TO OR GREATER THAN AVAILABLE FAULT CURRENT DELIVERED FROM ELECTRICAL SYSTEM. INCLUDE VISIBLE FACTORY NAMEPLATE FOR SUCH EQUIPMENT INDICATING SCCR OF EQUIPMENT IN ACCORDANCE WITH UL 1995 AND UL 508A. HVAC/SHEET METAL: 1. DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS. 2. PROVIDE MANUAL VOLUME DAMPER FOR EACH DIFFUSER, REGISTER, AND GRILLE. 3. PROVIDE DUCT ACCESS DOORS AT DUCT SMOKE DETECTORS, BACKDRAFT DAMPERS, MOTORIZED CONTROL DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS, DUCT MOUNTED COILS, DUCT AIRFLOW STATIONS AND LOUVER PLENUMS. ENERGY CODE: (WASHINGTON STATE ENERGY CODE) 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD EFFICIENCIES LISTED IN THE WASHINGTON STATE ENERGY CODE. 2. PIPING AND DUCT INSULATION: COMPLY WITH THICKNESS AND TYPES LISTED IN THE WASHINGTON STATE ENERGY CODE. 3. DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND LONGITUDINAL SEAMS PER THE WASHINGTON STATE ENERGY CODE. 4. RECORD DRAWINGS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE, 5. OPERATION AND MAINTENANCE MANUALS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 6. SYSTEM BALANCING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 7. MECHANICAL SYSTEMS COMMISSIONING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN DESIGNED TO COMPLY WITH THE WASHINGTON STATE ENERGY CODE. CONTRACTOR IS RESPONSIBLE FOR CORRECT INSTALLATION OF ENERGY CONSERVATION MEASURES. 9. BUILDING PRESSURE TESTING: COORDINATE PHASING OF BUILDING ENVELOPE LEAKAGE TESTING WITH MECHANICAL SYSTEM SCOPES OF WORK. TEMPORARILY CAP SYSTEMS AS REQUIRED TO FACILITATE LEAKAGE TESTING SCOPE OF WORK. NON-STRUCTURAL MECHANIC'AL COMPONENTS: 1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2012 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CML ENGINEERS (ASCE) STANDARD 7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN BID. 2. 2012 IBC 1613.1 SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-10, EXCLUDING CHAPTER 14 AND APPENDIX 11A. 3. 2012 IBC 1705.11 CONTRACTOR RESPONSIBILITY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF A SEISMIC -FORCE -RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS. 4. HANGERS AND SEISMIC BRACING FOR THE MECHANICAL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY THE MECHANICAL CONTRACTOR. REFER TO CONTRACTOR SHOP DRAWINGS FOR LOCATIONS OF EQUIPMENT AND HUNG MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN LOADS FOR HUNG MECHANICAL SYSTEMS WITH THE GENERAL CONTRACTOR AND OTHER TRADES THAT MAY BE IMPACTED. EXISTING MECHANICAL: 1. WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE CONSTRUCTION AREA. 2. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 3. WHERE INDICATED, DUCTWORK AND PIPING OR PORTIONS OF DUCTWORK AND PIPING SHALL BE REUSED. REFER TO DRAWING PLANS FOR POINTS OF CONNECTIONS. 4. PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR AND PROVIDE ALL NECESSARY PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE WORK. DEMOLITION: 1. TAKE CAUTION IN DEMOLITION OF MECHANICAL EQUIPMENT. 2. CONTRACTOR SHALL REMOVE ALL PIPING, DUCTWORK, AND EQUIPMENT INDICATED ON DRAWINGS INCLUDING ALL ASSOCIATED INSULATION, HANGERS, VALVES, PLENUM WALLS, DAMPERS, WIREMOLD, WIRING, CONTROLS, AND APPURTENANCES ASSOCIATED WITH EACH PIECE OF EQUIPMENT. 3. EXISTING CONTROL PATHWAYS MAY BE RE -USED. COORDINATE CONTROLS DEMO WORK PRIOR TO DEMOLITION. REMOVE ALL EXISTING THERMOSTATS SHOWN ON THE DRAWINGS ALONG WITH ASSOCIATED WIRING AND RACEWAYS. 4. WHERE EXISTING ITEMS PENETRATE A WALL OR ROOF, CONTRACTOR SHALL PROVIDE INFILL AT (E) PENETRATIONS THROUGH WALL/ROOF WITH LIKE MATERIALS. PATCH & REPAIR TO MATCH SURROUNDING SURFACES INCLUDING PAINT. 5. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL EQUIPMENT WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GC AND PROVIDE NECESSARY SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS. MECHANICAL SHEET LIST M0.1 MECHANICAL LEGEND, SCHEDULES AND NOTES MD1.1 MECHANICAL DEMOLITION PLAN M1.1 HVAC FLOOR PLAN PROJECT DESCRIPTION: TENANT IMPROVEMENT OF AN APPROXIMATE 2,005 SQUARE FOOT EXISTING RETAIL SPACE FOR A NEW RESTAURANT. MECHANICAL SCOPE INCLUDES REVISED DUCTWORK OF EXISTING ROOFTOP MECHANICAL UNIT; EXHAUST FANS FOR TOILET ROOMS; AND FULL PLUMBING INSTALLATION FOR KITCHEN AND TOILET ROOMS. BUILDING CODE INFORMATION: 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL MECHANICAL MECHANICAL CODE 2012 UNIFORM PLUMBING CODE 2012 WASHINGTON STATE ENERGY CODE rmft, _I.11 ° 111/U Plan roe/iew epproval is subject to errors and omisGW3. Approval of consir radon documents does lira auithalizo the violation of urly adoptod code or ordinance. Reccipt of approved Field d con*Ic/oledged: By: Date: City of Tukwila BUILDING DIVISION ...........-- REVISIONS shall be made to the scope No Changes prior ar�proval 01 0, work �,,tithOL1t p ' pivlslon. -I Ol Jila Building Ian submittal NOTE: �,evisio s v'iil require a plan tees. and may inc;uds add,tlonal p rFR PARRA iPERMFORIT EQUIRE- S E3 mechanical Electrical Of Plumbing Gas Piping City of Tukwlta ru III_r)IMS DIVISIOt PACKAGED GAS/ELECTRIC ROOFTOP UNIT SCHEDULE FAN SCHEDULE TAG MANUFACTURER / MODEL TYPE MATERIAL FINISH FACE DUCT TAG NEW OR EXISTING LOCATION MANUFACTURERIMODEL EVAPORATOR FAN OUTSIDE AIR FLOW CFM HEATING COOLING SIZE ELECTRICAL DIMENSIONS (LxWxHT) INANAN WEIGHT LBS NOTES FLOW CFM ESP IN WC MOTOR HP INPUT CAPACITY MBH OUTPUT CAPACITY MBH TOTAL CAPACITY BTU EER MCA AMPS MOP AMPS VOLTAGE/ PHASE V/PJ RTU -1 EXISTING ROOF TRANE/YCDO48C4LOBE 1600 0.5 1 500 90 73 48000 12 12 20 46013 75x47x42 EXISTING NOTE 3 RTU -2 EXISTING ROOF TRANE/YSC048A3EMA180 1600 0.5 1 500 80 64 48000 12 25 35 208/3 75x47x42 EXISTING RTU -3 EXISTING ROOF TRANE/YCD120C4LOAA 4000 0.5 1 1000 120 98 120 12 24 30 460/3 75x47x42 EXISTING NOTES: 1) RELOCATE EXISTING PROGRAMMABLE THERMOSTATS TO LOCATIONS INDICATED ON SHEET M-1.1. ABBREVIATIONS: ST = STEEL, AL = ALUMINUM, BE = BAKED ENAMEL, AA = ANODIZED ALUMINUM, FA = FULLY ADJUSTABLE, TP =TWO POSITION, OPD = OPPOSED BLADE DAMPERS, ADJ = ADJUSTABLE, BA=BAKED ACRYLIC, BO = BLANK OFF, DB = DIRECTIONAL BLADES, AND P = PLENUM. DIFFUSER, GRILLE AND LOUVER SCHEDULE FAN SCHEDULE TAG MANUFACTURER / MODEL TYPE MATERIAL FINISH FACE DUCT MOUNTING PATTERN DAMPERS FAN ELEC DIMENSIONS (LxWxHT) INANAN NOTES SIZE INLET SPEED RPM VOLTAGE/PHASE 10 EF -1 A TITUS MCD -AA SQUARE CEILING DIFFUSER AL WH 24x24 NOTE 1 NOTE 3 4 -WAY NOTE 2 E TITUS 50F EGGCRATE GRILLE AL WH 24x24 NOTE 1 NOTE 3 - NONE S TITUS TMRA-AA SUPPLY GRILLE AL WH NOTE 2 NOTE 1 NOTE 3 FA NOTE 5 R TITUS 350RL EXHAUST/TRANSFER GRILLE AL WH NOTE 2 NOTE 1 NOTE 3 - NONE NOTES: 1) SEE AIR DEVICE TAG FOR DUCT INLET SIZE. 2) FACE SIZE DETERMINED FRO DUCT INLET SIZE. 3) COORDINATE BORDER TYPE (SURFACE MOUNT, SNAP IN, LAY -IN, SPLINE, DROPPED FACE, AND BEVELED DROP FACE) WITH ARCHITECTURAL CEILING PLANS. 4) REFER TO ARCHITECT FOR PAINT COLOR TO MATCH BUILDING EXTERIOR. 5) PROVIDE WITH OPPOSED BLADE DAMPERS. ABBREVIATIONS: ST = STEEL, AL = ALUMINUM, BE = BAKED ENAMEL, AA = ANODIZED ALUMINUM, FA = FULLY ADJUSTABLE, TP =TWO POSITION, OPD = OPPOSED BLADE DAMPERS, ADJ = ADJUSTABLE, BA=BAKED ACRYLIC, BO = BLANK OFF, DB = DIRECTIONAL BLADES, AND P = PLENUM. EXHAUST FAN SCHEDULE TAG AREA SERVED LOCATION MANUFACTURER / MODEL FAN ELEC DIMENSIONS (LxWxHT) INANAN NOTES FLOW CFM ESP IN WC SPEED RPM VOLTAGE/PHASE 10 EF -1 WOMEN'S TOILET KITCHEN COOK / GN -166 150 0.125 1100 120/1 14x16x9 1 EF -2 MEN'S TOILET ROOM UTILITY ROOM COOK/ GN -166 150 0.125 1100 120/1 14x16x9 1 NOTES: 1) FAN SHALL BE CONTROLLED BY PROGRAMMABLE TIMER SWITCH TO OPERATE DURING OCCUPIED HOURS DETERMINED BY BUILDING OWNER. SEATTLE CHOCOLATES 1180 ANDOVER PARK WEST TUKWILA, WA 98065 SEATTLE CHOCOLATES CHOCOLATE FACTORY TOUR 1180 ANDOVER PARK WEST TUKWILA, WA 98065 0 DATE DESCRIPTION 06/24/16 Permit Bid Set R CEINJ'ED CITE' OF TU h0LA JUN 27 2016 PERMIT CENTER MECHANICAL LEGEND, SCHEDULES AND NOTES 0 T C� G U ti N O O r O W ILL 2 a M cfi co 0 N N GD w M C w Z Z 0 0 0 w J M M W f— ❑ —1 1 19 E A C 1.1 w I I I � I I .- ---------------------------- - - -L�_ L ��12"0 � ' w I T �r —14— I 1 i I " I �— 14"0 ' I I I Xy i 1 ——r-----------------------------------------------------------------------I—T— I -L-------- ----------------- — i_IJ --------------- — I I r 10"0 I I I 1 � I I I I I I } I I I ! I I � I I I i I I I 1 I I I I I � I I I I I I 1 I I I I MI I I I GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. FLAG NOTES: EXISTING ROOFTOP UNITS TO REMAIN. DEMOLISH ALL DUCTWORK ASSOCIATED WITH ROOFTOP UNIT. SELECTIVE DEMOLITION OF ROOFTOP UNIT REQUIRED FOR NEW CONSTRUCTION. REFER TO SHEET M-1.1 FOR ADDITIONAL INFORMATION. [4�> DEMOLISH ALL EXISTING TOILET SERVICE ROOM FIXTURES, SINK, WATER HEATER, AND KITCHEN SINK. REMOVE ALL CW, HW, WASTE, AND VENT PIPING TO ACCOMMODATE NEW CONSTRUCTION. RE�jpNCE CODApp�pVMID ltll. � 1 2016 Ctty ° G p ujS10N Bk�l�o�N CITY OF TUK°�° ILA JUN 2'7 2016 PERMIT CENTER SEATTLE CHOCOLATES 1180 ANDOVER PARK WEST TUKWILA, WA 98065 SEATTLE CHOCOLATES CHOCOLATE FACTORY TOUR 1180 ANDOVER PARK WEST TUKWILA, WA 98065 DATE DESCRIPTION 06/24/16 Permit Bid Set 19 E C 0 v Q B N O to r O a u.i u - a cn 0 N N w t W Q n z z O s A Lu Y m m n W O J FLAG NOTES: PROVIDE ROOF CAP ON EXHAUST DISCHARGE. 2� RELOCATE EXISTING PROGRAMMABLE THERMOSTAT SERVING THIS UNIT TO THIS LOCATION. R'Ev1E��L1�tyCE `` 1u� 01 201G CITY OF WKW21L JUN 27 2016 PERMIT CENTER SEATTLE CHOCOLATES 1180 ANDOVER PARK WEST TUKWILA, WA 98065 SEATTLE CHOCOLATES CHOCOLATE FACTORY TOUR 1180 ANDOVER PARK WEST TUKWILA, WA 98065 DATE DESCRIPTION 06/24/16 Permit Bid Set HVAC PLAN