Loading...
HomeMy WebLinkAboutPermit M16-0129 - BOEING #9-101 - STEAM CONVERTER REPLACEMENTBOEING #9-101 9725 E MARGINAL WAY S EXPIRED 08/21/17 M16=0129 City of Tukwila • Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov Parcel No: 0003400018 MECHANICAL PERMIT Permit Number: M16-0129 Address: 9725 E MARGINAL WAYS BLDG 9-101 Issue Date: 8/24/2016 Permit Expires On: 2/20/2017 Project Name: BOEING #9-101 Owner: Name: BOEING COMPANY THE Address: PO BOX 3707 M/C 20-00 PROPERTY Address: , , , DESCRIPTION OF WORK: Phone: (206) 812-7683 Phone: (206) 764-9663 Expiration Date: 10/5/2017 REMOVE (3) EXISTING STEAM CONVERTER SKIDS AND REPLACE WITH NEW Valuation of Work: $0.00 Fees Collected: $3,778.72 Type of Work: Electrical Service Provided by: SEATTLE CITY LIGHT Fuel type: Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature:W '� Date:J !/_1 TAX DEPT, SEATTLE, WA, 98124 Contact Person: Name: AMANDA MOORE Address: 11621 E MARGINAL WAY S, TUKWILA, WA, 98168 Contractor: Name: P S F MECHANICAL INC Address: 11621 E MARGINAL WAY S SUITE A, TUKWILA, WA, 98168-1965 License No: PSFMEI*090NZ Lender: Name: Address: , , , DESCRIPTION OF WORK: Phone: (206) 812-7683 Phone: (206) 764-9663 Expiration Date: 10/5/2017 REMOVE (3) EXISTING STEAM CONVERTER SKIDS AND REPLACE WITH NEW Valuation of Work: $0.00 Fees Collected: $3,778.72 Type of Work: Electrical Service Provided by: SEATTLE CITY LIGHT Fuel type: Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature:W '� Date:J !/_1 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Sign at Print N ure• Date: a This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 3: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is placed unless a tremie is to be used or unless otherwise permitted by the building official. All debris and ice shall be removed from spaces to be occupied by concrete. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: `MECHANICAL PERMIT CONDITIONS' 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 12: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OF TUKW Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hqp://www.TukwilaWA.gov IMechanical Permit No. KA Project No. Date Application Accepted: Date Application Expires: _ use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No... 0003400018 Site Address: 9725 E Marginal Way S, Bldg 9-101 Suite Number: Floor: 2nd Tenant Name: Boeing New Tenant: ❑ .....Yes O..No PROPERTY OWNER Name: The Boeing Company Address: PO Box 3707 City: Seattle State: WA zip: 98124 CONTACT PERSON — person receiving all project communication Name: Amanda Moore Address: 11621 E Marginal Way S City: Seattle State: WA Zip: 98168 Phone: (206) 812-7683 Fax: Email: permits@psfinech.com Valuation of project (contractor's bid price): $ 325,000 Describe the scope of work in detail: MECHANICAL CONTRACTOR INFORMATION Company Name: PSF Mechanical, Inc. Address: 11621 E Marginal Way S City: Seattle State: WA Zip: 98168 Phone: (206) 812-7683 Fax: (206) 762-8381 Contr Reg No.: PSFMEI*090NZ Exp Date: 10/05/2017 Tukwila Business License No.: BUS -0996384 Remove (3) existing steam converter skids and replace with new Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... ` Replacement ........ 0 Fuel Type: Electric..... ❑ Gas ....... ❑ Other: H: Applications Forms -Applications On Line 2016 Applications Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page] of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <10,000 cfrn 65 dB(A) Unit Type Qty Air handling unit >10,000 cfin Residential, Nighttime Evaporator cooler Industrial Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency enerator Other mechanical s� equipment J Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-1 OPM, Monday through Friday and 8AM-IOPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (7am-1 Opm); Testing of backup generators during the day. PE1RMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O "A AUTHORIZED AGENT: Print Name: 'Amanda Moore Mailing Address: 11621 E Marginal Way S H: Applications'Forms-Applications On Line 2016 Applications -Mechanical permit Application Revised 1-4-16.docx Revised: January 2016 bh Day Telephone: (206) 812-7683 Seattle City WA 98168 State Zip Page 2 of 2 DESCRIPTIONS PAID PermitTRAK $3,052.04 M16-0129 Address: 9725 E MARGINAL WAY S BLDG 9-101 Apn: 0003400018 $3,052.04 MECHANICAL $2,906.70 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $2,874.20 TECHNOLOGY FEE $145.34 TECHNOLOGY FEE TOTAL FEES 1 BY RECEIPT:$3,052.04 R000.322.900.04.00 0.00 $145.34 Date Paid: Wednesday, August 24, 2016 Paid By: AMANDA MOORE Pay Method: CREDIT CARD 201187 Printed: Wednesday, August 24, 2016 11:05 AM 1 of 1 N?WSYS7EM5 DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $962.64 M16-0129 Address: 9725 E MARGINAL WAY S BLDG 9-101 Apn: 0003400018 $726.68 MECHANICAL $726.68 PLAN CHECK FEE' R000.322.102.00.00 0.00 $726.68 PG16-0119 Address: 9725 E MARGINAL WAY S BLDG 9-101 Apn: 0003400018 $235.96 PLUMBING $226.88 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $149.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $45.38 TECHNOLOGY FEE $9.08 TECHNOLOGY FEE TOTAL PAID R9192 R000.322.900.04.00 0.00 $9.08 $962.64 Date Paid: Monday, August 15, 2016 Paid By: AMANDA MOORE Pay Method: CREDIT CARD 378241 Printed: Monday, August 15, 2016 3:03 PM 1 of 1 m SYSTEMS INSPECTION RECORD Retain a copy with permitFM11e_0V2-q IN ON N0, PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: F/N C' i' bi Type of Inspection: f\A9CHAW1 Cft Fi tt AL Address:^�,f� ��� %'I�ftS`�/�'1` l Date Called: Now Special Instructions:��D� '� i 1 Date Wanted: a.m 2-22--1-7 p.m. Requester: Phone No: FlApproved per applicable codes. VQ Corrections required prior to approval. I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD _ Retain a copy with permit I M61 PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: /e1 T e of Inspection: - " ,40CAL Address: 72 #)A&-1n%1y— Ali 5 Date Called: Special Instructions 9—/0/ "k . Iec `mak Date Waned %2�G a.m. d m. Requester: Phone o: "jC[? ' L� Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: / Date:/Z— i REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 0 i INSPECTION RECORD ` Retain a copy with permit !vl 20 PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd— #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Projec v'rc r- o l Ty of Inspection: v f 4 ?,\/a A)IeAL Address: 70S- E MZhIA6 iia S Date Called: Special Instructions: /ttcVe %� v �fC'a 1/VfdQlrit4 `C Date Wanted: I 2 .m % % p.m. Re siert MI P No: -Qs:-k ❑ Approved per applicable codes. L, Corrections required prior to approval. 9 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 7/3/2017 City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director AMANDA MOORE 11621 E MARGINAL WAY S TUKWILA, WA 98168 RE: Permit No. M 16-0129 BOEING #9-101 9725 E MARGINAL WAY S 9-101 Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 8/21/2017. Based on the above, you are hereby advised to: l) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. Q1rt 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 8/21/2017, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M16-0129 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0129 DATE: 08/16/16 PROJECT NAME: BOEING #9-101 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: A -J WO V1� W W `A Building Division Fire Prevention Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator ❑ PRELIMINARY REVIEW: DATE: 08/16/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 09/13/16 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) N REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Plug ❑ PW ❑ Staff Initials: 12/18/2013 P S F MECHANICAL INC Home Elspanol Contact Safety & Health A^ Washington State Department of "Labor & Industries P S F MECHANICAL INC Owner or tradesperson Principals REYNOLDS, JAMES P, PRESIDENT READ, ANDREW A, PRESIDENT BEARDSLEY, WARREN SCOTT, SECRETARY CRITCHLOW, JAMES D (End: 09/27/2011) Doing business as P S F MECHANICAL INC Claims & Insurance 11621 E Marginal Way S Suite A SEATTLE, WA 98168 206-764-9663 KING County Page I of 2 Search L&I A -Z Index Help Mc L&I Workplace Rights Trades & Licensing WA UBI No. Business type 601 318 369 Corporation Governing persons ANDREW AARON READ JAMES P REYNOLDS; JIM BEARDSLEY; WARREN S BEARDSLEY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. .Construction.. .. . . . . .. ....Contracto ................................... . . . . .r Active. Meets current requirements. License specialties GENERAL License no. PSFMEI*090NZ Effective — expiration 0810911991-10105/2017 Bond Travelers Cas & Surety Co $12,000.00 Bond account no. 105975899q Received by L&I Effective date 03/13/2014 03/1312014 Expiration date Until Canceled Bond history Insurance ........... ....._._. Liberty Mutual Fire Insurance $1,000,000.00 Policy no. TB2Z91452741025 Received by L&I Effective date https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=601318369&LIC=PSFMEI*090NZ&SAW= 8/23/2016 GENERAL SYMBOL DESCRIPTION ® THERMOSTAT, REMOTE, CEILING 24/12 RECTANGULAR DUCT, FIRST NUMBER 24/12 INDICATES SIZE FOR SIDE SHOWN 24/12-4.DUCT SHOWN IN SECTION, ARROW 4 D POINTS TO SIDE CALLED OUT FIRST 241 ROUND DUCT, NUMBER INDICATES 240 DIAMETER 24/12 OVAL DUCT, FIRST NUMBER INDICATES 100 CFM MAJOR DIAMETER, SECOND NUMBER 24 12� INDICATES MINOR DIAMETER El SUPPLY AIR DUCT, SQUARE OR BACK DRAFT 'DAMPER RECTANGULAR ELBOW FACING TOWARDS • SUPPLY AIR DUCT, SQUARE OR I �"� RECTANGULAR ELBOW FACING AWAY OR REGISTER AND AIR FLOW EXHAUST, RETURN OR SUPPLY AIR DUCT BUILDING ROUND, ELBOW FACING TOWARDS SCREENED OPENING AND CFM AIR FLOW EXHAUST, RETURN OR SUPPLY AIR DUCT BOTTOM OF PIPE ROUND, ELBOW FACING AWAY SUPPLY OUTLET, CEILING TYPE, BTU EXHAUST AIR OR RETURN AIR DUCT, BTUH RECTANGULAR AND CFM AIR FLOW (4 TYP) SQUARE OR RECTANGULAR, ELBOW SUPPLY OUTLET, CEILING TYPE, ROUND C FACING TOWARDS Cv LINEAR DIFFUSER AND CFM AIR FLOW EXHAUST AIR OR RETURN AIR DUCT, (SEE NOTE 4) CAP SQUARE OR RECTANGULAR, ELBOW Ic_J CEILING DUCT TYPE AND CFM AIR FLOW FACING AWAY RETURN/RELIEF GRILLE, CEILING TYPE, TRANSITION RECTANGULAR TO NON—DUCTED RECTANGULAR UNIT HEATER, HORIZONTAL TRANSITION AT TAKE OFF UNIT HEATER, VERTICAL PROJECTION TRANSITION SQUARE OR RECTANGULAR LINED DUCT TO ROUND OR OVAL UP -�- DOWN DUCT OFFSET UP OR DOWN CONTINUED/CONTINUATION OPPOSED BLADE DAMPER LINED DUCT WITH ACCESS DOOR PARALLEL BLADE DAMPER AND SMOKE DAMPER VOLUME DAMPER CLOCKWISE ROTATION DUCT DAMPER, MOTOR OPERATED DM (ELECTRIC OR PNEUMATIC) — BACK DRAFT DAMPER (ALLOWS BDD FLOW IN DIRECTION OF ARROW) AD -OR -AP ACCESS DOOR (AD) OR SUPPLY AIR FLOW DIRECTION ACCESS PANEL (AP) SFD DN I SMOKE FIRE DAMPER (1 HOUR) SFD DWG SFD2 dB 1 SMOKE FIRE DAMPER (2 HOUR) SFD2 � EAT ENTER AIR TEMPERATURE (°F) EFF EFFICIENCY ELL ELBOW ELEC ELECTRICAL ELEV, EL ELEVATION ESP SYM REVISION — REPLACE STEAM CONVERTER STATION #3 GENERAL SYMBOL DESCRIPTION ® THERMOSTAT, REMOTE, CEILING NGULAR DVANES SQUARE ELBOW RECTATURN HUMIDISTAT, WALL Q WITH NG 4D RECTANGULAR DUCT, RADIUS VANED ELBOW 4 D EXTRACTION GRID 1'W---- i FLEXIBLE DUCT T H FLEXIBLE DUCT CONNECTION 0 SIDEWALL SUPPLY AIR DIFFUSER, 100 CFM GRILLE OR REGISTER AND CFM 0 AIR FLOW El TEMPERATURE TRANSMITTER BACK DRAFT 'DAMPER BFP BACKFLOW PREVENTER SIDEWALL RETURN/EXHAUST AIR GRILLE BOTTOM HORIZONTAL DISCHARGE 100 CFM OR REGISTER AND AIR FLOW BLDG BUILDING BOD SCREENED OPENING AND CFM AIR FLOW 100 CFM BOTTOM OF PIPE -- SUPPLY OUTLET, CEILING TYPE, BTU DIFFUSER OR GRILLE, SQUARE OR BTUH RECTANGULAR AND CFM AIR FLOW (4 TYP) I t l SUPPLY OUTLET, CEILING TYPE, ROUND C AND CFM AIR FLOW (SEE NOTE 4) Cv LINEAR DIFFUSER AND CFM AIR FLOW ® (SEE NOTE 4) CAP RETURN/EXHAUST REGISTER OR GRILLE, Ic_J CEILING DUCT TYPE AND CFM AIR FLOW CCW RETURN/RELIEF GRILLE, CEILING TYPE, ®� NON—DUCTED -- UNIT HEATER, HORIZONTAL UNIT HEATER, VERTICAL PROJECTION COND LINED DUCT Ef SOUND ATTENUATOR CONT CONTINUED/CONTINUATION El LINED DUCT WITH ACCESS DOOR CPVC AND SMOKE DAMPER AD SD CLOCKWISE ROTATION _ LINED DUCT WITH AXIAL FLOW FAN DB CENTRIFUGAL FAN DBD CENTRIFUGAL FAN, INLET GUIDE VANES FA LID EXHAUST FAN DIS SUPPLY AIR FLOW DIRECTION DIR RETURN, OUTSIDE OR EXHAUST AIR DN FLOW DIRECTION DS DOWNSPOUT DWG DRAWING BY APPROVED DATE SYM 16069-201 CEI I MS 1 04.22.16 REVISION GENERAL SYMBOL DESCRIPTION ® THERMOSTAT, REMOTE, CEILING QQ HUMIDISTAT, WALL Q HUMIDISTAT CEILING 4D DUCT TYPE SMOKE DETECTOR 4 D DUCT TYPE HEAT DETECTOR ACCESS PANEL STATIC PRESSURE REGULATOR T H TEMPERATURE SENSOR, HUMIDITY SENSOR, DUCT MOUNTED 0 THERMOSTAT, WALL ON NIGHT THERMOSTAT 0 THERMOSTAT, CEILING El TEMPERATURE TRANSMITTER BACK DRAFT 'DAMPER BFP VAV BOX LEGEND W=VARIABLE AIR VOLUME TERMINAL UNIT XX MARK NUMBER AAV AUTOMATIC AIR VENT AD ACCESS DOOR ADD ANGULAR DOWN DISCHARGE AF AIR FOIL WHEEL AFF ABOVE FINISHED FLOOR AP ACCESS PANEL APPROX APPROXIMATELY ARCH ARCHITECTURAL BY I APPROVED I DATE SUGGESTED ABBREVIATIONS ABBREVIATION DESCRIPTION A ANCHOR AAV AUTOMATIC AIR VENT AD ACCESS DOOR ADD ANGULAR DOWN DISCHARGE AF AIR FOIL WHEEL AFF ABOVE FINISHED FLOOR AP ACCESS PANEL APPROX APPROXIMATELY ARCH ARCHITECTURAL AUD ANGULAR UP DISCHARGE AVG AVERAGE BI BACKWARD INCLINED WHEEL BDD BACK DRAFT 'DAMPER BFP BACKFLOW PREVENTER BHD BOTTOM HORIZONTAL DISCHARGE BHP BRAKE HORSE POWER BLDG BUILDING BOD BOTTOM OF DUCT BOP BOTTOM OF PIPE BOS BOTTOM OF STEEL BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR BW BUTTWELD C COMMON Cv FLOW COEFFICIENT °C TEMPERATURE — DEGREES CELSIUS CAP CAPACITY CC COOLING COIL CCW COUNTER CLOCKWISE ROTATION CFM CUBIC FEET PER MINUTE CI CAST IRON _CENTER .LINE COND CONDENSATE CONN CONNECTION CONT CONTINUED/CONTINUATION CPLG COUPLING CPVC CHLORINATED POLYVINYL CHLORIDE CW CLOCKWISE ROTATION DA DIRECT ACTING DB DRY BULB TEMPERATURE DBD DOWN BLAST DISCHARGE DIA 0 DIAMETER DIS DEIONIZED WATER SUPPLY DIR DEIONIZED WATER RETURN DN DOWN DS DOWNSPOUT DWG DRAWING dB DECIBELS EA EXHAUST AIR / EACH EAT ENTER AIR TEMPERATURE (°F) EFF EFFICIENCY ELL ELBOW ELEC ELECTRICAL ELEV, EL ELEVATION ESP EXTERNAL STATIC PRESSURE EVAP EVAPORATOR EWT ENTERING WATER TEMPERATURE EXH EXHAUST EXIST EXISTING EXT EXTERIOR / EXTERNAL °F TEMPERATURE — DEGREES FAHRENHEIT FC FORWARD CURVE WHEEL FD FIRE DAMPER FLR FLOOR FCO FLOOR CLEAN OUT FOB FLAT ON BOTTOM FOF FACE OF FLANGE FOIC FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FOT FLAT ON TOP FPM FEET PER MINUTE FRP GLASS FIBER REINFORCED PLASTIC FS FLOW SWITCH FT FEET FV FACE VELOCITY FPM GAL GALLONS GPM GALLONS PER MINUTE GALV GALVANIZED GA GAGE, GAUGE HC HEATING COIL HD HEAD — FEET OF WATER HORIZ HORIZONTAL HP HORSEPOWER HPC HIGH PRESSURE CONDENSATE HR HOUR HVAC HEATING, VENTILATING AND AIR CONDITIONING HPU HEAT PUMP UNIT HTC HEATING ID INSIDE DIAMETER IE INVERT ELEVATION IGV INLET GUIDE VANE INSUL INSULATION IN INCHES Z ��L Spy ACCEPTABILITY S$j THIS DESIGN AND/OR SPECIFICATION IS APPROVED _ APPROVED BY I DEPT.1 DATE 36611 SlOnrel. F��,� SUGGESTED ABBREVIATIONS ABBREVIATION DESCRIPTION KW KVA LAT LBS, # LWT MA MAX MBH MCC MECH MIN MOV MTD, MTG NC NIC NO NTS NPSH OA OBD OF OS&Y OD OVHD PBD PD/AP PDI POC POS PRESS PRV PS PSIG PSV PVC RA RECT REF REV RH RM ROT RPM RQD RTN RV SA SCFH SCFM SFD SHC SHF SHT SL SO SOV SP SQ SS STL STRUC SW SUCT TDH TEMP TH THC THD THRD TO D TOS TOP TP TS TSP TV TYP UBD VAV VD VP VERT VTA VTR WB WCO WG WHA W/ CEI CHECKED M. SOTURA KILOWATT KILOVOLT—AMPERE LEAVING AIR TEMPERATURE (°F) POUNDS LEAVING WATER TEMPERATURE (°F) MIXED AIR MAXIMUM HEAT CAPACITY BTU PER HOUR X 1000 MOTOR CONTROL CENTER MECHANICAL MINIMUM MOTOR OPERATED VALVE MOUNTED, MOUNTING NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN / NUMBER NOT TO SCALE NET POSITIVE SUCTION HEAD OUTSIDE AIR OPPOSED BLADE DAMPER OVERFLOW OUTSIDE SCREW AND YOKE OUTSIDE DIAMETER OVERHEAD PARALLEL BLADE DAMPER PRESSURE DROP OR DIFFERENTIAL PRESSURE PLBG. & DRAINAGE INSTITUTE POINT OF CONNECTION POSITION PRESSURE PRSSURE REGULATING VALVE PRESSURE SWITCH PRESSURE — POUNDS PER SQUARE INCH, GAUGE PRESSURE RELIEF (SAFETY) VALVE POLYVINYL CHLORIDE REVERSE ACTING (CONTROLLER) / RETURN AIR RECTANGULAR REFERENCE REVISED RELATIVE HUMIDITY ROOM ROTATION REVOLUTIONS PER MINUTE REQUIRED RETURN ROOF VENT SUPPLY AIR STANDARD CUBIC FEET/HR STANDARD CUBIC FEET/MIN COMBINATION SMOKE &FIRE DAMPER SENSIBLE HEAT CAPACITY SENSIBLE HEAT FACTOR SHEET SOUND LINE SCREENED OPENING SOLENOID OPERATED VALVE STATIC PRESSURE SQUARE STAINLESS STEEL STEEL STRUCTURAL SOCKET WELD SUCTION TOTAL DYNAMIC HEAD (FEET OF WATER) TEMPERATURE TOTAL HEAD (FEET OF WATER) TOTAL HEAT CAPICIiY TOP HORIZONTAL DISCHARGE THREADED TOP OF DUCT TOP OF STEEL TOP OF PIPE 7 TOTAL PRESSURE EXPI. TEMPERATURE SWITCH TOTAL STATIC PRESSURE TURNING VANE I 2ff TYPICAL UP BLAST DISCHARGE VARIABLE AIR VOLUME VOLUME DAMPER VELOCITY PRESSURE VERTICAL VENT TO ATMOSPHERE VENT THROUGH ROOF WET BULB TEMPERATURE WALL CLEAN OUT WATER GAUGE (INCHES OF WATER) WATER HAMMER ARRESTOR WITH a.l cwtL IT"T Q^ccttanical Electrical Piumbing .5GMs Piping C- ► of i ! �E:4�aila REVISIONS No chandos shall be made -to -the scope of work without prior approval of OLJIP };nU Division. NOTE: a n -3w p!, -.n submittal and mai i:T_..U�^ p'sn rcv!svi 1^css _ I FILE Coupy reef ®. Pian raview E'Pp rov" la Sidd'1�� Approval of canstl°�r�:fion 1�ocurnenct to Qrrors and omissions, the violation of Orly adopted code or ordinance. Rcccs does not authorize of approvocf Field C�CIr�t Y and conditions is aclenotvledod: By: Datec.� City Of Tukwila BUILDING DIVISION a,It SUBTITLE 04.22.16 MECHANICAL LEGENDS it 04.22.16 TITLE REPLACE STEAM CONVERTER STATION #3 MECHANICAL MASTER BUILDING•9-101 REVIEWED FOR CODE COMPLIANCE A'PPROV'ED AUG 1.9 2016 City of-'ukwila BUILDING DIVISION ri EC,EIVED I"r i OF _FUK:%NILA AUG 15 2016 PE11 CENTER A4FFMAN N G I N E E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION DEV. CENTER, WA I DWG NO. DATE 04.22.16 M1A 16069-20 COMP N0. 09-101—M1A r C ZZc Lf C Q C DIFFUSER, REGISTER & GRILLE SCHEDULE MARK MAX STATIC PD IN WG MAX NC DECIBELS MATERIAL DAMPER (VN) FRAME TYPE FINISH BASIS OF DESIGN NOTES D-1 0.2 28 STEEL Y DUCT P—E13A TITUS TriTec 24"x48" 2—WAY END SUCTION, FRAME MTND D-2 0.2 28 STEEL Y DUCT 1750 TITUS TriTec 24"x24" 2—WAY 4" D-3 0.25 35 STEEL Y DUCT 71 TITUS PAS 24"X24" 10 R-1 0.2 25 STEEL Y DUCT 1,3 TITUS 272 3/4" IL 0 RG -1 0.25 28 STEEL N SURFACE 3 TITUS PAR 24X24 1 P — P -N0513 CHILLED WATER LOOP -'(RESERVE) END SUCTION, FRAME MTND 439 48 50 NOTES: 1 12/8/00 ISSUE: ADDED RG -1 TO SCHEDULE GENERAL: SEE PLANS FOR LOCATION, NECK, SIZE, AND CFM. CONTRACTOR SHALL COORDINATE MOUNTING AND SURFACE CONSTRUCTION PRIOR TO FURNISHING MATERIAL. PUMP SCHEDULE MARK SERVES PUMP TYPE GPM PUMP HEAD MIN EFF 0 MOTOR DATA SUCTION DIFF TRIPLE DUTY VAVLE SIZE BASIS OF DESIGN NOTES HP V PH RPM P—E13A HOT WATER LOOP END SUCTION, FRAME MTND 202 71 70 10 460 3 1750 Y 4" PACO 2595-7 1,3 P—El3B HOT WATER LOOP (RESERVE) END SUCTION, FRAME MTND 202 71 70 10 460 1 3 1750 Y 4" PACO 2595-7 1,3 P— IL 0 C A M 9 4 4 3 Y P — P -N0513 CHILLED WATER LOOP -'(RESERVE) END SUCTION, FRAME MTND 439 48 50 7 1/2 460 3 1750 Y 6" PACO 3095-7 2, 3 P—N 17A CHILLED WATER — OVEN RECIRC INLINE CIRCULATOR 20 8 — 1/6 115 1 1750 N N PACO C4S 4 P—P17A CHILLED WATER — SETA RECIRC INLINE CIRCULATOR 20 8 — 1/6 115 1 1750 N N PACO C4S 4 MECHANICAL NOTES: 1 4"X3" SUCTION DIFFUSER 2 6"x4" SUCTION DIFFUSER 3 01/05/01 REVISION: PUMP MARKS REVISED FOR REVISED LOCATION 4 01/05/01 REVISION: ADDED CIRCULATION PUMP FOR CHILLED WATER USAGE WHEN P—N05* NOT OPERATING. EQUIPMENT HOOD SCHEDULE MARK SERVICE TYPE LENGTH IN. WIDTH IN. CONN. SIZE DIAMETER IN. HEIGHT -A.F.F. IN. REMARKS EH N17A CURING OVEN (#4) CUSTOM 120 54 14 7'-3" FPTU N17A EH N 17B PLATEN PRESS (#5) CUSTOM 48 48 12 6'-10" 680 EH N17C HIGH—TEMP OVEN (#14) CUSTOM 72 60 12 5-11" 180 EH N17D ANNEALING OVEN (#6) CUSTOM 96 72 12 9'-1" EH P18A ELECTROPLATING PROCESS CUSTOM 60 84 20 10'-0" 1 NOTES: 1 12/08/00 ISSUE REVISION: ADDED HEIGHT GENERAL: CONSTANT VOLUME SERIES FAN POWERED TERMINAL UNIT SCHEDULE MARK FPTU L17A SERVES SEM LAB (21 L17) PRIMARY AIR CFM P.D. AT MAX CFM IN. W. G. 0.40 MAX. 2270 MIN. 775 FPTU L18A BRTS LAB 680 240 0.35 FPTU L18B FTIR LAB 2600 975 0.45 FPTU N17A CORRIDOR 1290 475 0.40 NOTES: 1 12/8/00 ISSUE: REVISED CFM TO MATCH PLANS 2 12/8/00 ISSUE: REVISED POWER SUPPLY HOT WATER COIL DATA INLET DIA. 1 1 WATER 36 (IN.) GPM E.W.T. P.D. CFM 31 TITUS DTQS 2 de F IN W. G.) 1 16 2.0 180 2.6 2270 8 2.0 180 0.9 680 16 4.0 180 9.0 2600 12 4.0 180 4.3 1290 GENERAL: AIR PRESSURE DROP IS FOR BASIC UNIT ONLY. SOUND POWER LEVEL IN DECIBELS IS FOR BASIC UNIT ONLY. AIR P.D. N W. G. 0.25 0.08 0.34 0.11 E.A.T. deg 64 65 64 65 ELEC. INFO NC—LEVEL AT W.O. S.P. +0.35" V PH HP OUTLET I RAD. BASIS OF DESIGN 208/240 1 1 — 36 TITUS DTQS 7 120 1 1/6 26 31 TITUS DTQS 2 208/240 1 1 20 41 TITUS DTQS 7 120 1 1/3 — 28 TITUS DTQS 5 t�j�y .;� daYYdE 4i4k`pfi { F Vet EtU � .� �1 77771 NOTES ,2 LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES EXISTING ROOF MOUNTED HEATING WATER PUMP TO BE REMOVED. SEE DWG RFM23R FOR ADDITIONAL INFORMATION. 'AUG21'2017, REVIEWED FOR ODE COMPLIANCE APPROVED AUG 19 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG" 15 2-016 PERMIT CENTER AgFFMAN I N E E R- S 1601 Fifth Avenue, Suite 900 I Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity [results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION E DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �L so ACCEPTABILITY K HAWKINS 12.08.00 MECHANICAL SCHEDULES SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE C A MDL RELOCATION —PERMIT SET J#100082-00/01 DLR RP 11.10.00 ��tl�� THIS DESIGN AND/OR CHECKED 16069-20 E 04.22.16 S SPECIFICATION IS APPROVED K. PAULSON 12.08.00 SHEET B MDL RELOCATION — REVISIONS J#100082-00/01 DLR RP 11.30.00 (ID APPROVED BY DEPT. DATE EFCMEER TITLE REPLACE STEAM CONVERTER STATION #3. M1 HR C MDL RELOCATION —CONSTRUCTION ISSUE J#100082-00/01 DLR RP 12.08.00 CHECKED Q— JOB No. i 36611 APPROVED BUILDING V 1 O 1 1 COMP No. D MDL RELOCATION — POST—CONSTRUCTION J#100082-00/01 DLR 01.05.01 �I� 100082-00/01 E REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 Ssr�raL APPROVED MECHANICAL MASTER DEV. CENTER, WA DWG N0. 09-101—M1 HR Al)nl�� COMPUTER ROOM COOLING UNIT (AC) . SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER HUMIDIFIER ELECTRIC REHEAT COIL KW AIR FILTER CHILLED WATER CONNECTION SIZE UNIT ELECTRICAL DATA REMARKS DRIVE TYPE CAPACITY (CFM) ESP IN WG HP CAPACITY MBH RM TEMP F FLOW GPM EWT `F MAX PD @ MAX FLOW FT H2O CAP #/ HR F.L.A. TYPE & DEPTH EFFICIENCY PER ASHRAE 52-76 MAX FINAL SP WG SENSIBLE TOTAL DB WB PREFILTER FINAL VOLTS/PHASE F.L.A. AC2E5A OF ROOM #1 CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 12.5 5.0 6.0 PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT, CYLINDER HUMIDIFIER AC2D11A OF ROOM #2 CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 12.5 5.0 6.0 PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT, CYLINDER HUMIDIFIER AC2F6A REPRO ROOM CHILLED WATER 5 BELT 2900 0.50 1 1/2 76.2 99.1 85.0 65.0 12.0 41.0 6.4 --- --- --- PANEL -1" PLEAT -2" 40% 0.50 (2) @ 2" F.P.T. 480/3 22 CONTEMPO MODEL CEMC-05 SPLIT CABINET, "UP" ARRANGEMENT ROOF, E12.2 2ND FLOOR CLG PLENUM 48 16100 0.25 310 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRE12A ROOF, E.5,12.5 CONVERTER STAUSTATION #3 EXH 30 3600 0.125 280 V -BELT 1/3 120/1 GREENHECK GB -300-3, CENTRIFUGAL ROOF EXHAUSTER EFRE12B ROOF, E.9,12.8 TOILET ROOM EXHAUST 30 6400 0.85 600 V -BELT 1 1/2 480/3 GREENHECK GB -300-15, CENTRIFUGAL ROOF EXHAUSTER EFRE15A ROOF, E16.2 2ND FLOOR CLG PLENUM 48 16100 0.25 300 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRF5A ROOF, F5.5 AIR CONDITIONING UNIT (AC) SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER COIL CONN SIZE REMARKS DRIVE TYPE CAPACITY (CFM) ESP IN WG HP VOLTAGE PHASE FLA CAPACITY MBH RM TEMP 'F FLOW GPM EWT 'F MAX PD @ MAX FLOW FT H2O SENSIBLE TOTAL DB WB AC2A10A TELEPHONE ROOM SPOT COOLER 2 DIRECT 880 0.5 1/3 208/230 1 3.2 24.1 36.0 80 67 7.2 42 5.4 1/2"MPT BSC MODEL CW2, EXIST UNIT TO BE REUSED AC2F6B COMPUTER ROOM SPOT COOLER 3 DIRECT 1250 0.3 1/2 208 1 3.3 25.4 EFRD15A 75 E16.2 5.7 45 3.3 3/4" NPTF LIEBERT MOD. MME040C-PC1 SOB N0. 137031-02 INSTALLED 7-21-93 310 V -BELT 2 480/3 GREENHECK GB -480-20, NICH. NICH. NICH. CENTRIFUGAL ROOF EXHAUSTER EFRE6A ROOF, E6 7 23 2.4 TOILET ROOM EXHAUST 33 6690 0.70 430 V -BELT 2 480/3 GREENHECK GB -330-20, WITH REINFORCED WHEEL EFRE7A ROOF, E7 CONVERTER„ STATION #2 26 .6000 0.25 .580 V -BELT 1 480/3 GREENHECK GB -260-3, WITH REINFORCED WHEEL. PROVIDE NEW INVERTER DUTY MOTOR AND VFD. EFRE11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 16100 0.25 310 V -BELT 2 480/3 EXHAUST FAN (EF) LOCATION/ NUMBER SCHEDULE STEAM (PSIG) MFR MODEL CONNECTION # SIZE IN./ CONNECTION TYPE COMMENT NOTES Steam Separator 150 SARCO S3 ANSI 125 6 MARK NUMBER LOCATION BASIS OF DESIGN AREA SERVED (ROOM NO.) TAG TYPE SERVICE EXHAUST FAN FREE PRESSURE FRAME SIZE 2 220 MFR MODEL REMARKS FAN WHEEL SIZE (INCHES) CFM TOTAL STATIC PRESS. INCHES WG APPROX. RPM DRIVE SIDE MOTOR HP VOLTS/PH EFRD11A ROOF, E12.2 CONVERTER 2ND FLOOR CLG PLENUM 48 16100 0.25 310 V -BELT 2 480/3 GREENHECK GB -480-20, - CENTRIFUGAL ROOF EXHAUSTER EFRD15A ROOF, E16.2 CONTRACTOR TO VERIFY EXISTING ROOF CURB PRIOR TO ORDERING 2ND FLOOR CLG PLENUM 48 16100 0.25 310 V -BELT 2 480/3 GREENHECK GB -480-20, NICH. NICH. NICH. CENTRIFUGAL ROOF EXHAUSTER EFRE6A ROOF, E6 7 23 2.4 TOILET ROOM EXHAUST 33 6690 0.70 430 V -BELT 2 480/3 GREENHECK GB -330-20, WITH REINFORCED WHEEL EFRE7A ROOF, E7 CONVERTER„ STATION #2 26 .6000 0.25 .580 V -BELT 1 480/3 GREENHECK GB -260-3, WITH REINFORCED WHEEL. PROVIDE NEW INVERTER DUTY MOTOR AND VFD. EFRE11A ROOF, E12.2 2ND FLOOR CLG PLENUM 48 16100 0.25 310 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRE12A ROOF, E.5,12.5 CONVERTER STAUSTATION #3 EXH 30 3600 0.125 280 V -BELT 1/3 120/1 GREENHECK GB -300-3, CENTRIFUGAL ROOF EXHAUSTER EFRE12B ROOF, E.9,12.8 TOILET ROOM EXHAUST 30 6400 0.85 600 V -BELT 1 1/2 480/3 GREENHECK GB -300-15, CENTRIFUGAL ROOF EXHAUSTER EFRE15A ROOF, E16.2 2ND FLOOR CLG PLENUM 48 16100 0.25 300 V -BELT 2 480/3 GREENHECK GB -480-20, CENTRIFUGAL ROOF EXHAUSTER EFRF5A ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5B ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5C ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF5D ROOF, F5.5 2ND FLOOR CLG PLENUM 42 11,375 0.25 325 V -BELT 1 1/2 480/3 GREENHECK GB -420-15, CENTRIFUGAL ROOF EXHAUSTER EFRF6A ROOF, F6 2ND FLOOR REPRO ROOM 16 2400 0.50 1065 V -BELT 1/2 120/1 GREENHECK GB -160-5, CENTRIFUGAL ROOF EXHAUSTER AIR INTAKE HOOD SCHEDULE LOCATION/ NUMBER SERVES STEAM (PSIG) MFR MODEL CONNECTION # SIZE IN./ CONNECTION TYPE COMMENT NOTES Steam Separator 150 SARCO S3 ANSI 125 6 FLANGED CAST IRON BASIS OF DESIGN 150 TAG TYPE SERVICE CFM FREE PRESSURE FRAME SIZE 2 220 MFR MODEL 415 CAST IRON BODY, SS INTERNAL PARTS AREA SF DROP IN TYPE 0__L-1 G TTY 10AKE EQOD CONVERTER 6 000 A ­112 EXTRUDED THROAT vaftS000R GR HEC F OP NS: R P VIDE OF CiIRB MOTDBIZQAMP L-2 LOUVERED PENTHOUSE ER CONVERTE 3,600 - - EXTRUDED ALUM. THROAT 42x84 GREENHECK WIH CONTRACTOR TO VERIFY EXISTING ROOF CURB PRIOR TO ORDERING 3 2 STATION 3/4 NPT 250/450 415 CAST IRON BODY, SS INTERNAL PARTS MEZZ-03/ ST -03 MEZZ-03/ ST -04 MEZZ-03/ ST -05 LPS END of Main Steam Separator Condensate Pump 50 50 150 STEAM SEPARATOR LOCATION/ NUMBER SERVES STEAM (PSIG) MFR MODEL CONNECTION # SIZE IN./ CONNECTION TYPE COMMENT MEZZ-03 SS -01 Steam Separator 150 SARCO S3 ANSI 125 6 FLANGED CAST IRON HIPS PRV Sta. Drip 150 FREE FLOATING NICH. NOVA NFT 250 0.067 5/6 140 110 23 2 220 3/4 NPT 250/450 415 CAST IRON BODY, SS INTERNAL PARTS STEAM TRAP SCHEDULE (ASSUMES 1 HR START-UP) LOCATION NUMBER SERVES STEAM (PSIG) TYPE MFG. MODEL ORIFICE NUMBER DIAMETER PIPE SIZE LENGTH IN./ FT. START-UP LOAD LB./HR. RUNNING LOAD LB./HR. SAFETY FACTOR ADJUSTED LOAD LB./HR. CONNECTION SIZE IN. MAX PRSS & TEMP MAX LB HR AT 150 DIFF PRSS' INSTALL DATE COMMENT MEZZ-03/ ST -01 HIPS PRV Sta. Drip 150 FREE FLOATING NICH. NOVA NFT 250 0.067 5/6 140 110 23 2 220 3/4 NPT 250/450 415 CAST IRON BODY, SS INTERNAL PARTS MEZZ-03/ ST -02 LPS PRV Sta. Drip 50 FREE FLOATING NICH. NOVA NFT 250 0.067 8 25 22 3 2 44 3/4 NPT 250/450 415 CAST IRON BODY, SS INTERNAL PARTS MEZZ-03/ ST -03 MEZZ-03/ ST -04 MEZZ-03/ ST -05 LPS END of Main Steam Separator Condensate Pump 50 50 150 FREE FLOATING F & T THERMODYNAMIC NICH. NICH. NICH. NOVA NFT 250 FTN- 125 NTD600S 0.067 - - 8 8 0.5 50 2 50 44 110 2.4 7 23 2.4 2 2 2 88 220 4.8 3/4 NPT 3/4 NPT 1 /2"NTP 250/450 125/450 600/800 415 300 1450 CAST IRON BODY, SS INTERNAL PARTS CAST IRON BODY, SS INTERNAL PARTS SS WITH SS DISC, INTEGRAL STRAINER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 06.15.93 A REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.15 B REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 ACCEPTABILITY L.SAWYER THIS DESIGN AND/OR EC E SPECIFICATION IS APPROVED K.RAMSEY APPROVED BY DEPT. DATE L.SAWYER 36611 APPROVED crsxE K.RAMSEY �TALs APPROVED C.FERGUSON A //1l11A !_• DATE I SUBTITLE SCHEDULES REPLACE STEAM CONVERTER STATION #3 BUILDING 9-101 11.19.90 IMECHANICAL MASTER REVIEWED FOR CODE COMPLIANCE APPROVE) AUG 19 2016 City of Tukwila BUILUILIQ DIVISION 100% ECS ;D CI'Ty OF TUKWILA, AUS" 15 2016 PI RIAIT CENTER ACFFMAN �HGIH EERS 1601 Fifth Avenue, Suite 900 I Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships ISSUE FOR CONSTRUCTION CURRENT REVISION I SYMBOLp DATE 16069-20 B 04.22.16 SHEET M504 JOB NO. COMP NO. DEV. CENTER, Wq DWG No. 09-101-M504 r K K c C, N c U STEAM CONVERTERS HOT WATER CIRCULATING PUMPS (PU) SCHEDULE INLET/OUTLET FACE TO FACE APPROX. OPERATING REMARKS NUMBER FULL WEIGHT (LBS) GPM (INCHES) EQUIPMENT NUMBER LOCATION (SHT NO.) EQUIPMENT NUMBER LOCATION (SHT NO.) CONDENSATE WATER WATER EQUIPMENT NUMBER LOCATION (SHT NO.) CAPACITY ENT. WATER TEMP. DEG. F. LVG. WATER TEMP. DEG. F. STEAM PPSSS REMARKS REMARKS 8.5" X 23.7" GPM LBS/HR EQUIPMENT LOCATION GPM FLUID TEMP CAPACITY SIZE (IN) CONSTRUCTION PROVIDE AS MOTOR GPM C-1 M560 PUMP TYPE MANUFACTURER 140 180 50 CONVERTER REMARKS #2 — SKID MOUNTED PACKAGE WITH CP -1, CC -1, P-1 A AND P-113 STATION C-2 M560 5,000,000 250 140 180 50 NUMBER (SHT NO.) #2 — SKID °F GPM TDH SUCT DISCH BODY FITTINGS DRIVE TYPE HP VOLTS PH HZ RPM 0 AND MODEL 40 4 el 0 0 M570 PACKAGE CP -5 M570 INSULATION REQUIREMENTS. 250 143 140 CONVERTER P -1A #3 M560 AS WATER 180 250 95 4" 4" 250 FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-1 5,000,000 SKID MOUNTED PACKAGE P-113 CONVERTER M560 #3 WATER 180 250 95 4" 4" CC FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 — PROVIDED WITH VFD AS PART OF C-1 -6, SKID MOUNTED PACKAGE P -2A NAD M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-2 SKID MOUNTED PACKAGE P-213 M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-2 SKID MOUNTED PACKAGE P -3A M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-3 SKID MOUNTED PACKAGE P -313M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-3 SKID MOUNTED PACKAGE 'PU2E7E M563 WATERT 120 4.8 7 1 /2 1/2 C.I. FLANGED AG M DRN EIC 1/20 115 -1 '60 1750 CENTRIFUGAL 1 PEEL CONVERTER STATION' -#2 DOMESTIC HOT WATER , RECIRCULATION DOMEST F MAGNETIC 1 TEEL rP-4A M570 WATER 180 250 120 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #3 — PROVIDED WITH VFD AS PART OF C-4 SKID MOUNTED PACKAGE P-413 M570 WATER 180 250 120 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #3 — PROVIDED WITH VFD AS PART OF C-4 SKID MOUNTED PACKAGE P -5A M570 WATER 180 250 120 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #3 — PROVIDED WITH VFD AS PART OF C-5 SKID MOUNTED PACKAGE P-513 M570 WATER 180 250 120 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #3 — PROVIDED WITH VFD AS PART OF C-5 SKID MOUNTED PACKAGE P -6A M570 WATER 180 250 120 4" 4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #3 — PROVIDED WITH VFD AS PART OF C-6 SKID MOUNTED PACKAGE P-613 M570 WATER 180 250 120 4"4" FLANGED DIRECT COUPLED 15 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #3 - PROVIDED WITH VFD AS PART OF C-6 SKID MOUNTED PACKAGE STEAM CONVERTERS HX SCHEDULE HX SCHEDULES SCHEDULE OVERALL DIMINSIONS OUTLET/INLET INLET/OUTLET FACE TO FACE APPROX. OPERATING REMARKS NUMBER FULL WEIGHT (LBS) GPM (INCHES) EQUIPMENT NUMBER LOCATION (SHT NO.) EQUIPMENT NUMBER LOCATION (SHT NO.) CONDENSATE WATER WATER EQUIPMENT NUMBER LOCATION (SHT NO.) CAPACITY ENT. WATER TEMP. DEG. F. LVG. WATER TEMP. DEG. F. STEAM PPSSS REMARKS REMARKS 8.5" X 23.7" GPM LBS/HR REMARKS LVG. TEMP. DEG. F. GPM ENT TEMP. DEG. F. LVG. TEMP. DEG. F. CC -1 M560 _ SPIRAX SARCO APT14HC PROVIDE AS BTU/HR GPM C-1 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 — SKID MOUNTED PACKAGE WITH CP -1, CC -1, P-1 A AND P-113 STATION C-2 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 — SKID MOUNTED PACKAGE WITH CP -2, CC -2, P -2A AND P-213 - — 0 5 0 0 40 4 el 0 0 M570 PACKAGE CP -5 M570 INSULATION REQUIREMENTS. 250 143 140 CONVERTER STATION #3 - PROVIDE AS PART OF C-4 M570 5,000,000 250 140 180 50 CONVERTER STATION #3 — SKID MOUNTED PACKAGE WITH CP -4, CC -4, P -4A AND P-413 PACKAGE C-5 M570 5,000,000 250 140 180 50 CONVERTER STATION #3 — SKID MOUNTED PACKAGE WITH CP -5, CC -5, P -5A AND P-513 C-6 M570 5,000,000 250 140 180 50 CONVERTER STATION #3 — SKID MOUNTED PACKAGE WITH CP -6, CC -6, P -6A NAD P-613 CONDENSATE COOLERS HX SCHEDULES SCHEDULE OVERALL DIMINSIONS OUTLET/INLET INLET/OUTLET FACE TO FACE APPROX. OPERATING REMARKS NUMBER FULL WEIGHT (LBS) GPM (INCHES) EQUIPMENT NUMBER LOCATION (SHT NO.) EQUIPMENT NUMBER LOCATION (SHT NO.) CONDENSATE WATER WATER MANUFACTURER AND MODEL 4" 20-5/8" 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR AS -2 REMARKS REMARKS 8.5" X 23.7" GPM LBS/HR ENT TEMP. DEG. F. LVG. TEMP. DEG. F. GPM ENT TEMP. DEG. F. LVG. TEMP. DEG. F. CC -1 M560 _ SPIRAX SARCO APT14HC PROVIDE AS 250 143 140 CONVERTER STATION #2 - PROVIDE AS PART OF C-1 SKID MOUNTED PACKAGE CC -2 M560 AS PART OF C-2 250 143 140 CONVERTER STATION #2 - PROVIDE AS PART OF C-2 SKID MOUNTED PACKAGE C OF C-3 SKID MOUNTED PACKAGE CP -4 4 14 0 T TA 50 - P ID - P 0 - ID OF P G CC -4 M570 PACKAGE CP -5 M570 INSULATION REQUIREMENTS. 250 143 140 CONVERTER STATION #3 - PROVIDE AS PART OF C-4 SKID MOUNTED PACKAGE CC -5 M570 10 50 250 143 140 CONVERTER STATION #3 - PROVIDE AS PART OF C-5 SKID MOUNTED PACKAGE CC -6 M570 50 - 250 143 140 CONVERTER STATION #3 - PROVIDE AS PART OF C-6 SKID MOUNTED PACKAGE CONDENSATE RECEIVER & PUMP SETS CP SCHEDULE OVERALL DIMINSIONS OUTLET/INLET INLET/OUTLET FACE TO FACE APPROX. OPERATING REMARKS NUMBER FULL WEIGHT (LBS) GPM (INCHES) EQUIPMENT NUMBER LOCATION (SHT NO.) CAPACITY BACK PREPSSSG RE STEAM INLET PRESS. PSIG WATER REC'R CAPS MANUFACTURER AND MODEL 4" 20-5/8" 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR AS -2 WATER REMARKS 8.5" X 23.7" GPM LBS/HR CP -1 .M560 - 10.06.14 10 50 WF—F13 _ SPIRAX SARCO APT14HC PROVIDE AS PART OF C-1 SKID MOUNTED PACKAGE CP -2 M560 - BLADDER 10 50 10 - SPIRAX/SARCO APT14HC PROVIDE AS PART OF C-2 SKID MOUNTED PACKAGE CP -3 M560 - 1 140-190 10 50 1-1/2 - SPIRAX/SARCO PROVIDE AS PART OF C-3 SKID MOUNTED PACKAGE CP -4 M570 2. PROVIDE METAL JACKET FOR ALL STEAM PIPES LOCATED BETWEEN FLOOR 10 50 - SPIRAX/SARCO APT14HC PROVIDE AS PART OF C-4 SKID MOUNTED PACKAGE CP -5 M570 INSULATION REQUIREMENTS. 10 50 - SPIRAX/SARCO APT14HC PROVIDE AS PART OF C-5 SKID MOUNTED PACKAGE CP -6 M570 10 50 - SPIRAX/SARCO APT14HC PROVIDE AS PART OF C-6 SKID MOUNTED PACKAGE CP -7 M560 10 50 - WITH STAINLESS STEEL CHECK VALVE, CONVERTER STA. 2 AREA CP -8 M570 2000 10 50 _ SPIRAX SARCO DUPLEX PTC -CS DUPLEX W/ STAINLESS STEEL CHECK VALVE, CONVERTER STA. 3 AREA AIR SEPARATORAS SCHEDULE MARK SYSTEM MIN. CAPACITY OVERALL DIMINSIONS OUTLET/INLET INLET/OUTLET FACE TO FACE APPROX. OPERATING REMARKS NUMBER FULL WEIGHT (LBS) GPM (INCHES) SIZE/ CLASS DIM. (INCHES) WEIGHT (LBS) (LBS) AS -1 WATER 170 8.5" X 23.7" 4" 20-5/8" 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR AS -2 WATER 170 8.5" X 23.7" 4" 20-5/8 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR SYM I REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE FULL WEIGHT (LBS) RECORD DRAWING SR GS KR 05.28.93 (IN) (LBS) S — 0 10 PRV-2 A PUR/INST MOD. CLEAN ROOM #546610-01 C. HARRAH RWS 10.01.04 N/A SPIRA—TROL DD NOTE: WATER B REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 NALCO A E WF—F13 WATERCARTRIDGE SIDE—STREAM C REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 FLANGED CONNECTION 543 AMTROL EXTROL 800—L ASME ET -4 STEAM PRESSURE REDUCING VALVE SCHEDULE MARK LOCATION CAPACITY (LBS/HR) VALVE SIZE (IN) INLET PRESS (PSI) DISCH PRESS (PSI) STRAINER SIZE (IN) BASIS OF DESIGN SPIRAX SARCO DATE OF SERVICE FULL WEIGHT (LBS) MANUFACTURER 1 0 (GPM) 0 (IN) (LBS) S — 0 10 PRV-2 CONVERTER STATION #3 1 17,500 3" 150 50 N/A SPIRA—TROL DD NOTE: WATER FILTER SCHEDULE MARK NUMBER SYSTEM SERVED TYPE RATED VOLUME DIMENSIONS CONNECTIONS FULL WEIGHT MANUFACTURER REMARKS FULL WEIGHT (LBS) MANUFACTURER REMARKS (GPM) HxL (IN) (IN) (LBS) 211 10 50 30 X 82 CARTRIDGE 543 AMTROL EXTROL 800—L ASME ET—B 1"TO<1-1/2" DD WF—F7 WATER 10 0 36 X 54 2 X 2 100 NALCO A E WF—F13 WATERCARTRIDGE SIDE—STREAM 300 36 x 61 3 x 3 139 NALCO FLANGED CONNECTION i em EXPANSION TANK SCHEDULE MARK NUMBER SYSTEM SERVED TYPE TANK CAPACITY (GAL) TANK ACCEPTANCE (GAL) CHARGE PRESSURE PSI RELIEF PRESSURE PSI DIMENSIONS HxL ( IN ) CONNECTION (IN) FULL WEIGHT (LBS) MANUFACTURER REMARKS ET -1 WATER BLADDER 211 211 10 50 30 X 82 1-1/2 543 AMTROL EXTROL 800—L ASME ET—B 1"TO<1-1/2" DD 121 10 0 30 —1/ 54 MTROL EXTRIUL 80L A E ET -3 WATER BLADDER 211 211 10 50 30 X 82 1-1/2 543 AMTROL EXTROL 800—L ASME ET -4 WATER BLADDER 211 211 10 50 30 X 82 1-1/2 543 AMTROL EXTROL 800—L ASME FLOOR ' PIPE INSULATION SCHEDULE MARK NUMBER SYSTEM CW OUTLET REMARKS FD -1 WASTE 1/211 OPERATING THERMAL MEAN NOMINAL PIPE OR TUBE SIZE (IN) INSULATION FLUID TYPE TEMP. (°F) CONDUCTIVITY (BTU*IN/HR*SF*°F) TEMPERATURE RATING (F) THICKNESS PER WASHINGTON NREC (2013) NOTES: <1" 1"TO<1-1/2" 1-1/2"TO<4" 4"TO<8" 150 PSIG STM FIBERGLASS 354-410 0.32 —0.34 250 4.5 5 5 5 1, 3, 4 50 PSIG STM FIBERGLASS 248-353 0.31 250 3 4 4.5 4.5 1, 3, 4 CONDENSATE—ALL FIBERGLASS 141-200 0.25 170 1 —1 /2 1-1/2 1 —1 /2 1-1/2 HEATING WATER I FIBERGLASS 1 140-190 0.25 — 0.29 170 1-1/2 1-1/2 2 2 2, 4 1. PROVIDE CALCIUM SILICATE INSULATION & METAL JACKET ON PIPING ON ROOF. 2. PROVIDE METAL JACKET FOR ALL STEAM PIPES LOCATED BETWEEN FLOOR AND 8 FOOT ABOVE FLOOR 3. PROVIDE PVC JACKET FOR ALL HOT WATER PIPES LOCATED BETWEEN FLOOR AND 8 FOOT ABOVE FLOOR H,-. D, 4. DO NOT INSULATE STEAM TRAP ASSEMBLIES. EXPI. 5. SEE SPECIFICATION 230700 FOR OTHER INSULATION REQUIREMENTS. FLOOR ' DRAIN SCHEDULE MARK NUMBER SYSTEM CW OUTLET REMARKS FD -1 WASTE 1/211 4" J.R. SMITH 2010 W/ TRAP PRIMER FFD -1 WASTE 1/2" 4" J.R. SMITH 2010 W/ TRAP PRIMER & FIG 3591 FUNNEL DRAIN L SO ACCEPTABILITY K.BUN G�►j�� THIS DESIGN AND/OR C EC ED SPECIFICATION IS APPROVED S.ROSSE APPROVED BY DEPT. I DATE S.ROSSE 36611p ��CISfiEri"" slolvvei. >� K.RAMSEY SUBTITLE m SCHEDULES TITLE REPLACE STEAM CONVERTER STATION #3 4.23.92 I MECHANICAL MASTER BUILDING 9=101 RECEIVED i lTY OF TUKWILA AUl l 2016 ERIUIIT CENTER REVIEWED FOR eeMPLI A 01 I^r- FFMAN APPROVED P.1 A E E R S AUG 19 2016 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships City of Tukwila 100°/a SUBMITTAL ISSUE FOR CONSTRUCTION REVISION I SYMBOL DATE 16069-20 C 04.22.16 M567. JOB NO. DEV. CENTER, WAIDwc No. 09-101—M567 1\ Q FOR CONTINUATION, SEE SHEET 2M73 FLOOR PLAN CONVERTER STATION N0 , 3 12 =1 —0 (OVER TOILET ROOM N0.5 MEZZANINE FLOOR LEVEL PIPING, SEE DWG. M571 FOR PIPING ABOVE THIS LEVEL) SYM I REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 01.12.93 A CONVERTER STATION FILTER/FEEDERS SLB RWS/EJC 02.28.97 8 REPLACE STEAM CONVERTER STATION #3 16069-201 CEI MS 104.22.16. 91, 80 11 ACCEPTABILITY k.BUN Sb►l�'� THIS DESIGN AND/OR C ECKED SPECIFICATION IS APPROVED SAOSSE APPROVED BY DEPT. DATE S.ROSSE CHECKED 36611 rsr HUB DRAIN. G.SMITH APPROVED K.RAMSEY SIdNeT APPROVED AS ` 0 �.. 21171 7 r� I ..,;u;.vlr f~1 ;{;; tt3uhd,.✓,„�ail4 lZ d � "� �� t J, a1`ir.�,�, ,n:ti9ta„c .'•''t'` s it.<i��„wa,?'�t t~as� �` _ IN REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2016 rm City of Tukwila BUILDING D{VISION LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION D DRAIN lyli► DOMESTIC COLD WATER GATE VALVE CHECK VALVE BALL VALVE BALANCE VALVE D.li GLOBE VALVE +POC POINT OF CONNECTION GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REMOVE HEAT EXCHANGER & ASSOCIATED PIPING. REMOVE PUMP & ASSOCIATED PIPING. REMOVE STEAM POWER CONDENSATE PUMP & ASSOCIATED PIPING. ® REMOVE STEAM PRV STATION PIPING, VALVES & ACCESSORIES. EXISTING VALVE TO BE REMOVED. REMOVE FILTER AND ASSOCIATED PIPING AND VALVES. REMOVE FILTER/FEED POT ASSOCIATED PIPING AND VALVES. 14 REMOVE EXISTING DRAIN PIPING. RECEIVED CITY OF TUKWILA AUS' 15 2016 PERMIT CENTER -AgFFMAN NP6 I N E'E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100°/a SUBMITTAL ISSUE FOR CONSTRUCTION SUBTITLE CONVERTER STATION NO.3 PLAN TITLE REPLACE STEAM CONVERTER STATION #3 BUILDING 9-101 CURRENT REVISION SYMBOL DATE 16069-20 B 04.22.16 SHEET M570R 3.09.92 IMECHANICAL MASTER COL. E -F/12-13 DEV. CENTER, WA DWG N0. 09-101-M570R M LC C Ix c C, M c ® REMOVE EXISTING FUNNEL FLOOR DRAIN. REMOVE EXISTING HUB DRAIN. ► 10 REMOVE EXISTING HEATING WATER PIPING. 11 REMOVE EXISTING CONDENSATE PIPING. ► ► 12 REMOVE EXISTING STEAM PIPING. ► EXISTING HOUSEKEEPING PAD TO BE REMOVED. SEE STRUCTURAL DWG FOR ADDTTIONAL INFORMATION. 14 REMOVE EXISTING DRAIN PIPING. RECEIVED CITY OF TUKWILA AUS' 15 2016 PERMIT CENTER -AgFFMAN NP6 I N E'E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100°/a SUBMITTAL ISSUE FOR CONSTRUCTION SUBTITLE CONVERTER STATION NO.3 PLAN TITLE REPLACE STEAM CONVERTER STATION #3 BUILDING 9-101 CURRENT REVISION SYMBOL DATE 16069-20 B 04.22.16 SHEET M570R 3.09.92 IMECHANICAL MASTER COL. E -F/12-13 DEV. CENTER, WA DWG N0. 09-101-M570R M LC C Ix c C, M c 2 1 /2" A M571M572 B M571M572 10 2 1 /2 2"HWS TO HIGH BAY FOR CONTINUATION, SEE SHEET 2M73 BOP EL 20'-8" AF 2"HWR FROM HIGH BAY 3"HWR FROM 2ND FLOR AHU 1 1 /2"CW RISER TO TOILET ROOM #5 BELOW FOR CONTINUATION SEE SHEET 2M73 1/4" CHECK VALVE �• VACCUUM BREAKER RELIEF VALVE AIR VENT ///j 1► �'�j I�%��/�►/%/ �►�'�l� VIII/j';I� I�j%��%i 1 AUTOMATIC N CONTROL1� VALVE �' i'• —TO HEADER BUCKET TRAP BELOW 3 4" 200#/HRS 1 2 1/2" !11 INCOMING (4" NON REDUCE)CW 1 1 /2"HW RISER TO TOILET ROOM #5 BELOW 211 SEE DETAIL 2 M571M555 ' = TO FUNNEL FOR CONNECTIONS DRAIN C-IFn 1 1/2" 1 1/2"_ L& r CW 1 2„ � HW LINE OF BEAM 3/4 AIR VENT ' 4"HWS/R %" HWSFROM POT 611HWR UP THRU FEEDER HEADER ROOF 9a 6 lo lo 6 ` 2" L,J C STEAM CONDENSATE PIPING 2" aw HWR 2" HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION ID INDIRECT DRAIN a 4 PLUG COCK OPERATION 3, ,`,`i4 3 FROM PLATFORM � o `'— J � z � T N N 0 0 o � � BOP EL 20'-8" AFF N N BOP EL 21'-3" AFF J T FOR CONTINUATION OF ALL LINES, SEE SHEET 2M79 QUICK FEED VALVE I 1/21) 1 /2"PRV 60 TO 12 PSI WITH BUILT IN STRAINER F HOT WATER HEATERS 5 GALLON EXPANSION TANK 1 /2"HWC LINE DOWN TO TOILET ROOM #5 SEE DWG M551 /TOILET ROOM EXHAUST T 3 TO 7 3�4"� S -�—SEE SHEETR FRE126 23 PLAN OVERHEAD PIPING & EQUIPMENT (SEE DWG. M570 FOR MEZZ. FLOOR LEVEL PIPING) LEGEND 5 I M L,J C STEAM CONDENSATE PIPING ell, LU aw HWR M571M573 HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION ID INDIRECT DRAIN a E I— ZD GATE VALVE z rK O:f M571 M574 0 0 0 GLOBE VALVE � o `'— J � z � T N N 0 0 o � � BOP EL 20'-8" AFF N N BOP EL 21'-3" AFF J T FOR CONTINUATION OF ALL LINES, SEE SHEET 2M79 QUICK FEED VALVE I 1/21) 1 /2"PRV 60 TO 12 PSI WITH BUILT IN STRAINER F HOT WATER HEATERS 5 GALLON EXPANSION TANK 1 /2"HWC LINE DOWN TO TOILET ROOM #5 SEE DWG M551 /TOILET ROOM EXHAUST T 3 TO 7 3�4"� S -�—SEE SHEETR FRE126 23 PLAN OVERHEAD PIPING & EQUIPMENT (SEE DWG. M570 FOR MEZZ. FLOOR LEVEL PIPING) LEGEND 5 I M STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION ID INDIRECT DRAIN CW DOMESTIC COLD WATER ------ V ------ VENT GATE VALVE FLANGE TO PIPE THRU ROOF. CHECK VALVE EXISTING BALL VALVE BALANCE VALVE PIPE THROUGH ROOF TO REMAIN. GLOBE VALVE -0-poc POINT OF CONNECTION GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES 1� REMOVE HEAT EXCHANGER &ASSOCIATED PIPING. 2� REMOVE COMPRESSION TANK &ASSOCIATED REVISION PIPING. APPROVED DATE REMOVE STEAM RELIEF VALVE. K BUN REMOVE EXISTING VALVE. 5� EXISTING STEAM RELIEF VENT PIPING TO REMAIN FROM PIPE FLANGE TO PIPE THRU ROOF. 6� EXISTING 4" HEATING WATER SUPPLY AND RETURN PIPE THROUGH ROOF TO REMAIN. REMOVE EXISTING DRAIN PIPING. EXISTING PIPE TO REMAIN. PIPE TO BE GS KR REINSULATED. REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2016 Citi of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWIL_A AUG 15 2016 PERMIT CENTER FFMAN N-G1NEERS 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE +1, SOS ACCEPTABILITY THIS DESIGN AND/OR K BUN DATE SUBTITLE CONVERTER STATION NO. 3 PLAN CURRENT I REVISION 20 SYMBOL I-� IB DATE 04.22.1 6 CH CKE RECORD DRAWING SR GS KR 01.12.93 AI to SPECIFICATION IS APPROVED S.ROSSE SHEET romEER TITLE A CONVT STA POT FEEDERS J#765835 SLB RWS/EJC 02.28.97 ® �� APPROVED BY DEPT. DATE S.ROSSE REPLACE STEAM CONVERTER STATION #3 B U ILD I N G .9- 1 1 0 1 MECHANICAL MASTER COL. E—F/12-13 DEV. CENTER, WA M571 RG.SMITH B REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 r 61 MAL CHECKED APP RROVEY AMS JOB NO. COMP NO. APPROVED 3.09.92 DWG No . 09-101—M571 R if c Q c c c r c A& 5 1/2" RELIEF VALVE 15000/HR 00 SET 55 PSI - CV 8"STM 50 PSI —� 2 1/2" PUMPED CONDENSATE — 3"HWR 3/4" 50 PSI ,00]0 Q 0&*aI 0 I DRIP PAN ELBOW 3/4" RUN TO DRAIN 5" GLOBE VALVE EFRE12A SEE SHEET RM23 AUTOMATIC CONTROL VALVE 5" GATE VALVE m i '��/011111 3" HOT WATER RUN 6" TO CONVERTER '\-1/4" CHECK PRESS REDUCE VALVE VALVE 5000#/HR 150-125 PSI TO 10 PSIol PRESS GAGE PILOT VALVE 0- 0 4" qp 3" PRESS REDUCE VALVE v 10000#/HR 1100-1210 PSI PILOT VALVE TO 10 PSI —� nn _ nn_ nn CAP ON FORMER STEAM VENT ROOF EL 66'-6" ; A--- RUN TO DRAIN �--2 1/2" PUMPED CONDENSATE DRIP & TRAP n 200#/HR 3"CW 4"CW PRESS GAGE 0-200 PSI 2 " 1 1/2" HW-� „ Ar 3 4" ROLLER /�f+ 3/4" TOILET ROOM SUPPORT I 5" 150 PSI STM EXHAUST DUCT (HEATING) 200#/HR 2" WOOD SLEEPER 2" DRAIN FLOOR EL 53'-4 3/4" HEADER 550#/HR 01 PL OOD TOILET ROOM #5 BELOW DECK A SECTION A /2"-I'-0" M570,M571M572 F 5 GAL EXPANSION TANK VH2� U J2 (REFER TO STRUCTURAL DRAWINGS FOR SUPPORT OF WATER HEATERS) If U2 —AQUASTAT ir-0115—HOT WATER FROM 1 ROOM BELOW AID 9-13117, SYM I REVISION RECORD DRAWING A REPLACE STEAM CONVERTER STATION #3 APPROVED DATE SYM GS KR 01.12.93 MS 04.22.16 tai iUIN 1/2"-1'-0" M571M572 REVISION BY I APPROVED I DATE DRAWN ACCEPTABILITY K.BUN THIS DESIGN AND/OR C ECKED SPECIFICATION IS APPROVED S.ROSSE APPROVED BY DEPT. DATE S.ROSSE CHECKED G.SMITH LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION D . INDIRECT' DRAIN CW DOMESTIC COLD WATER ------ V ------ VENT GATE VALVE —ham— CHECK VALVE -ICI-- BALL VALVE BALANCE VALVE GLOBE VALVE *POC POINT OF CONNECTION GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REMOVE EQUIPMENT AND PIPING SHOWN HATCHED. REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2016 CitY of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 15 2016 PERMIT CE:i TER 100% SUBMITTAL ISSUE FOR CONSTRUCTION TE SUBTITLE CURRENT REVISION SYMBOL DATE CONVERTER STATION NO.3 SECTIONS 16069-20 A 04.22.16 SHEET TITLE REPLACE STEAM CONVERTER STATION #3 M572R BUILDING9-101 JOB N0. COMP NO. 3.09.92 MECHANICAL MASTER COL. 12-13/E—F DEV. CENTER, WA DWG NO. 09-101—M572R AIR HANDLING UNIT PLATFORM EL 57'-8" AUTO- CONTRO VALVE 3/4"DRAIN VALVE 4"HWR BYPASS ,- /, 1/2" STEAM L ,—TEMPERATURE SENSOR TO CIVICS — 4"HWS THERMOMETER 40° TO 260°F PRESSURE GAGE 0-100 PSI 3 1 /2"VENT VALVE , SECTION 1/2"=1'-0" ROOF EL 66'-6" HOT WATER CIRCULATING PUMP- PU2F13D PUMP BASE, SEE ORIGINAL AUSTIN CO DWG 613OD-101-227 2" WOOD DECK i U, 1/2"=1'-0" COMPRESSION TANKS 3/4" RELIEF VALVE SET 60 PSI Ie, �41 1 /2"PRV 60 TO 12 PSI WITH BUILT IN STRAINER 1 " CITY WATER - 5/8" PLYWOOD DECK FLOOR EL 53'-4 3/4" TOILET ROOM #5 BELOW M570 , M571IM573 CONVERTERS HX2F13A & B D 2 1/2" `L CONDENSATE COOLERS HX21713C & D H2 LEGEND REVISION BY STM 1/21) 1" PRV RELIEF REVISION BY APPROVED C 3"VENT STEAM DRAWN K BUN DATE SUBTITLE CONVERTER STATION NO. 3 SECTIONS HWS lo 2 1 /2"HWR Y2 5 GALLON EXPANSION TANK 1/2" RECORD DRAWING R S'ti��' HWR HEATING WATER RETURN 3"HWR 2"HWR 10 PSI ' CHECKED S.ROSSE RELIEF HWC DOMESTIC HOT WATER CIRCULATION A CONDENSATE ' 1 1 2"HW / 04.22.16 2"HWS ' DOMESTIC COLD WATER BOP - - -- .. GATE VALVE H2 CHECK VALVE EL 21'-3" AFF -- BALL VALVE :;44 --- -- CHECKED G.SMITH DRIP AND BO 20'-8” BALANCE VALVE 2 HWR GLOBE VALVE 2 1 /2„HW TRAP POINT OF CONNECTION AFF �� TO FUNNEL DRAIN JOB NO. r = 1/2"HW RECICULATOR GENERAL NOTES � LINE TO TOILET ROOM ' AP 2 1 /2 " PUMPED PU 2", 1 1/2 2 '� 3 09 92 1 150 PSI 15000#/HR6UCKET CONDENSATE r 2" CONDENSATE or -1 /3-HWR "V 1 /2" 2 1 /2" PT PLUG X 6"CONDENSATE / 1/231 RETURN HEADER BUCKET CONDENSATE PUMPS —� TRAP 2"DRAIN HEADER - CP2E13B CP2E13A r 2"WOOD DE '%'K 3/4" DRAIN 3/4" ECT I ON 1/2"=1'-0" COMPRESSION TANKS 3/4" RELIEF VALVE SET 60 PSI Ie, �41 1 /2"PRV 60 TO 12 PSI WITH BUILT IN STRAINER 1 " CITY WATER - 5/8" PLYWOOD DECK FLOOR EL 53'-4 3/4" TOILET ROOM #5 BELOW M570 , M571IM573 CONVERTERS HX2F13A & B D 2 1/2" `L CONDENSATE COOLERS HX21713C & D H2 REFERENCE DRAWINGS J-11 � DRIP PAN ELBOW RELIEF VALVE 8"HEADER 2 1/2" PUMPED CONDENSATE " I �3"HWR DRIP 2 1/2" 10 PSI TRAPCONDENSATE X3/4" 50 PSI A CONDENSATE 1" 150 PSI BUCKET TRAP CONDENSATE 15000#/HR 3/4" So PS, CONSTRUCTION NOTES CONDENSATE ,� __ _ PRESSURE 3/4" DRAIN STATION REDUCING 5/8" PLYWOOD DECK \ FLOOR EL 53'-4 3/4" TOILET ROOM #5 BELOW M570 , M571IM573 AUG .21.201?, t�" •-;.-est , �'� �!b fly` x�"� � � ts�' i � REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2016 City of Tukwila BUILDING DIVISION 100% ISSUE FOF RECEIVED CITY OF TUKWILA AUG' 1 .5 2016 PERMIT CENTER SUBMITTAL LEGEND REVISION BY STM STEAM PIPING 1" PRV RELIEF REVISION BY APPROVED C STEAM CONDENSATE PIPING 1 1/2" HW DRAWN K BUN DATE SUBTITLE CONVERTER STATION NO. 3 SECTIONS HWS HEATING WATER SUPPLY 5 GALLON EXPANSION TANK RECORD DRAWING R S'ti��' HWR HEATING WATER RETURN HW DOMESTIC HOT WATER 1 "PRV CHECKED S.ROSSE RELIEF HWC DOMESTIC HOT WATER CIRCULATION A D ' INDIRECT DRAIN 1 1 2"HW / 04.22.16 CW DOMESTIC COLD WATER ------ V ------ VENT TITLE REPLACE STEAM CONVERTER STATION #3 B U I L D -I N G 9-101 MECHANICAL MASTER COL. 12-13/E—F DEV. CENTER, WA GATE VALVE H2 CHECK VALVE �A --ICI-- BALL VALVE U CHECKED G.SMITH J uz 4i BALANCE VALVE —D91— GLOBE VALVE -0-poc POINT OF CONNECTION 1 1 /2"ID APPROVED K.RAMSEY TO FUNNEL DRAIN JOB NO. COMP N0. = 1/2"HW RECICULATOR GENERAL NOTES � LINE TO TOILET ROOM = BELOW 2", 1 1/2 APPROVED 3 09 92 DWG NO. 09-101—M573R REFERENCE DRAWINGS J-11 � DRIP PAN ELBOW RELIEF VALVE 8"HEADER 2 1/2" PUMPED CONDENSATE " I �3"HWR DRIP 2 1/2" 10 PSI TRAPCONDENSATE X3/4" 50 PSI A CONDENSATE 1" 150 PSI BUCKET TRAP CONDENSATE 15000#/HR 3/4" So PS, CONSTRUCTION NOTES CONDENSATE ,� __ _ PRESSURE 3/4" DRAIN STATION REDUCING 5/8" PLYWOOD DECK \ FLOOR EL 53'-4 3/4" TOILET ROOM #5 BELOW M570 , M571IM573 AUG .21.201?, t�" •-;.-est , �'� �!b fly` x�"� � � ts�' i � REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2016 City of Tukwila BUILDING DIVISION 100% ISSUE FOF RECEIVED CITY OF TUKWILA AUG' 1 .5 2016 PERMIT CENTER SUBMITTAL c C C M c c AL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE tt•���+L So ACCEPTABILITY GjrOF WA�l?'ll THIS DESIGN AND/OR '�� SPECIFICATION IS APPROVED x� APPROVED BY DEPT. DATE . 36611 o I° jL A IOAlA C DRAWN K BUN DATE SUBTITLE CONVERTER STATION NO. 3 SECTIONS - CURRENT REVISION 16069-20 SYMBOL DATE RECORD DRAWING R S'ti��' cs KR 01.12.93 CHECKED S.ROSSE SHEET M573R A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 ENGINEER S.ROSSE TITLE REPLACE STEAM CONVERTER STATION #3 B U I L D -I N G 9-101 MECHANICAL MASTER COL. 12-13/E—F DEV. CENTER, WA CHECKED G.SMITH APPROVED K.RAMSEY JOB NO. COMP N0. APPROVED 3 09 92 DWG NO. 09-101—M573R c C C M c c AL SECTION 1/2"=1'-0" M571IM574 ACRFFMAN IN-EERS 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships h LEGEND — STM — STEAM PIPING C STEAM CONDENSATE PIPING — HWS — HEATING WATER SUPPLY — HWR — HEATING WATER RETURN — HW — DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION D ' INDIRECT DRAIN CW DOMESTIC COLD WATER ------ V ------ VENT GATE VALVE CHECK VALVE —��I— BALL VALVE >1 BALANCE VALVE GLOBE VALVE -0-POC POINT OF CONNECTION GENERAL NOTES REFERENCE DRAWINGS NO CONSTRUCTION NOTES 1 ' REMOVE EQUIPMENT AND PIPING SHOWN HATCHED. AUG. _912017, REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2015 BUILDINGTukwila OM510N 100% SUBMITTAL ISSUE FOR CONSTRUCTION RECEIVED CITY OF TUKWILA AUG 15 2016 PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE c1�L Soy, ACCEPTABILITY G j THIS DESIGN AND/OR DRAWN K BUN DATE SUBTITLE CONVERTER STATION NO. 3 SECTION CURRENT REVISION 20 SYMBOL ^ H DATE 04.22.1 6 HE K RECORD DRAWING SR GS KR 01.12.93 SPECIFICATION IS APPROVED S.ROSSE SHEET IGINEER TITLE A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 �� APPROVED BY DEPT. DATE S.ROSSE REPLACE STEAM CONVERTER STATION #3 M574R CHECKED 36611 tcrs� �IL} G.SMITHAPPROVED BUILDING 9-101 MECHANICAL MASTER COL. 12-13/E–F DEV. CENTER, WA APPR OVED K.RAMSEY JOB N0. COMP N0. APPROVED 3.09.92 DWG NO. 09-101–M574R a rr LC c K c C, C, a c (: D ( E ) (: F 9 20 TON LAC GLYCOL UNITS FOR COMPUTER RM COOLING MODULES PARTIAL ROOF PLAN SCALE: 1/8"=V-0" 4 LEGEND VTR VENT THROUGH ROOF — CHWS — CHILLED WATER SUPPLY — CHWR — CHILLED WATER RETURN — HWS — HEATING WATER SUPPLY — HWR — HEATING WATER RETURN -D4- -�- VALVE, OPEN/CLOSED --ice- LIFT CHECK VALVE CURB. SHEET METAL DUCT DOWN THROUGH ROOF TO PIPE REDUCER —���— BUTTERFLY VALVE GENERAL NOTES 1. ALL CHILLED AND HOT WATER PIPING IS COVERED WITH FIBERGLASS INSULATION AND ALUMINUM VAPOR BARRIER. REFERENCE DRAWINGS CONSTRUCTION NOTES QD J�E J Ja (� HQ QN 1 1 REMOVE EXISTING HEATING WATER PUMP & ASSOCIATED PIPING. 22 LEAVE IN PLACE EXISTING TUBE FRAME. EXISTING 4" HEATING WATER DOWN THROUGH ROOF TO REMAIN. ® REMOVE SHEET METAL CAP FROM EXISTING ROOF CURB. SHEET METAL DUCT DOWN THROUGH ROOF TO REMAIN. EXISTING ROOF CURB TO REMAIN. 5 REMOVE EXISTING BYPASS VALVE. EXISTING 4"HWR TEE FITTING AND FLANGE TO REMAIN. Tc Q I RFM10 RFM11 I RFM12 IRFM13 RFM14 RFM15 11 RFM16 I RFM17 I RFM18 IRFM191 RFM20 I RFM21 /RFM22V////., FM23 RFM24 RFM25 RFM26 RFM27 H-61HEElS 1601 Fifth Avenue, Suite 900 I Seattle, WA 98101 RFM28 RFM29 RFM30 RFM31 3 ph 206.623.0717 I fax 206.624.3775 REV IEZa coffman.com 4 RFM 34 I� RFM 35 RFM 36E Ca LASTING creativity results I relationships t7 Af 100% SUBMITTAL ISSUE FOR CONSTRUCTION 0m 1 CITY WfuTV" 'IN40 RFM41 FM42 U Rft 4�D 6 16 RFM44 RFM45RFM46 PERMIT CENTER 9-101.RF KEY PLA 4N -G D-'VS10N SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATEDRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �,L Sp ACCEPTABILITY K.BUN p - RECORD DRAWING SR GS KR 05.28.93 A,_y r THIS DESIGN AND/OR CHECKED ROOF PLAN - HVAC AND PIPING 16069-20 B 04.22.16 SPECIFICATION IS APPROVED SHEET A MDL RELOCATION - POST CONSTRUCTION J#100082-01 DLR 01.05.01 �� APPROVED BY DEPT. DATE S.ROSSE IGINEER TITLE REPLACE STEAM CONVERTER STATION #3 RFM23R ,Ili Alm B REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 D.KLOTZ CHECKED BUILDING 09 101 36611 APPROVED JOB NO. COMP NO. crsT° K.RAMSEY - l°N APPROVED D 8.23.91 MECHANICAL MASTER COL. D -J/11-15 DEV. CENTER, WA DWG No. W i� e 09-101-RFM23R � inn EFRE11 A BUILDING EXHAUST FAN 24 9 �.wu= -v -2 MR -801 CONTROL RELAY 120VAC PROBE TO OUTSIDE V T BUILDING ATMOSPHERE SPS -1 PR -5 LOW DIFF PRESS SENSOR -0.5 TO 0.5" WC 4-20 MA OUTPUT 25 EFRE12B TOILET EXHAUST FAN BUILDING PRESSURE PROBE I120VAC m 1:1 LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING - 0- CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) DCM ADDRESS NUMBER AIOO E- HARDWARE. TERMINATION P01 INPNT POINT 1/0 ELEMENT DCM I SL.V SLAVE ADDRESS NO. -PNTID- POINT ID POINT TYPE Al 1/0 BLOCK INFO. KEY GENERAL NOTES: CONSTRUCTION NOTES: 1� REMOVE CONTROLS SHOWN HATCHED. 2� SENSOR TO BE RECONNECTED TO SIEMENS CONTROLS SYSTEM. EXHAUST FAN CONTROL TO BE DEMOLISHED AND REPLACED WITH SIEMENS. SEQUENCE OF OPERATION SYM REVISION RECORD DRAWING A REPLACE STEAM CONVERTER STATION #3 ICCVI '4 JTMOVL UHIL 16069-20 A 04.22.16 2M323AR JOB NO. COMP N0. DEV. CENTER, WA DWG No. 09-101-2M323AR rs. ., cl c a M c C% a c- BY APPROVED DATE3 SYM REVISION BY APPROVED DATE ��L Spy ACCEPTABILITY ��l THIS DESIGN AND/OR CARECO HAWN "It SUBTITLE CONVERTER STATION #3 DMS CONTROLS SR GS KR 6 5ti CHECKED S.ROSSE SPECIFICATION IS APPROVED TITLE 16069-20 CEI MS 04.22.16 ® o'Y APPROVED BY DEPT. DATE S.ROSSE REPLACE STEAM CONVERTER STATION 3 CHECKED 36611 cr SsjL �1Cs APPRoED BUILDING 9-101 MECHANICAL MASTER COL. E -J/11-15 K.RAMSEY APPROVED 4.09.93 ICCVI '4 JTMOVL UHIL 16069-20 A 04.22.16 2M323AR JOB NO. COMP N0. DEV. CENTER, WA DWG No. 09-101-2M323AR rs. ., cl c a M c C% a c- LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING - CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) 0— WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) WIRING DETAIL TAG NUMBER. GENERAL NOTES: CONSTRUCTION NOTES: REMOVE CONTROLS SHOWN HATCHED. mr_v11=vvCu rvr% 'ODE COMPLIANCE .APPROVED AUG 19 2016 City of Tukwila mi III himm ntVIRIO \ RECEIVED CITE' OF T UKWILA AUG 15 2016 PERMIT CENTER AqFFMAN I. N E` E IR S 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE +L Spy ACCEPTABILITY �� Sir OR IS rISAAPPR UMWN CARECO uAlt SUBTITLE CONVERTER STATION #3 DMS CONTROLLERS CURRENTREVISION 20 SYMBOL A DATE 04.22.16 RECORD DRAWING SR GS KR 6.15.93 CHECKED S.ROSSE SHEET WA SPECIFICATION APPROVED NGINEER TITLE A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 Qz� APPROVEDBY DEPT. DATE S.ROSSE REPLACE STEAM CONVERTER STATION #3 R R 2M323V CHECKED 36611 G.SMITFi BUILDING 9=101 1 APPROVED APPROVED JOB NO. COMP NO. Ctsr° S�' Sla3vAL K.RAMSEY MECHANICAL MASTER COL. D -J/11-15 DEV. CENTER, Wq APPROVED 04.09.93 DWG NO. 09-101-2M323BR cl K C C, Li 13 a POLARITY OF TERMINATIONS IS NOT IMPORTANT (TYPICAL OF ALL T99 TYPE TEMP SENSORS) 2 CUT SHIELD WIRE AND FOIL BACK AND TAPE THE END OF THE WIRE TO PREVENT ACCIDENTAL GROUNDS—/ GREY WIRE NUT OR RED BUTT SPLICE CONNECTIONS ROBERTSHAW T99-1 OUTSIDE AIR TEMP SENSOR � OUTSIDE AIR TEMP SENSOR WIRING DETAIL NTS SEN _ SHIE / GR ND CUTS LD WI AND FOIL ACK A TAPE T END THE W 0 PREY APPROVED BY DEPT. I DATE ACCID TAL G NDS -7 WELL Y WIRE UT RED TT SP E 7 IMMERSION TEMPERATURE SENSOR WIRING DETAIL NTS /CUTS LD WI AND F01 ACK A TAPE T END THE E 0 PR N ACCT NTA G UNDS SYM REVISION RECORD DRAWING A REPLACE STEAM CONVERTER STATION #3 BLK RANGE MID IVU I t' UtVll;t IS OLARITY NSITIV FOLLO TERM. AGRAM 22k0 —10 4WA SUP VISION ESISTO NEILS —KULJI MO D150 1A—”" C RENT— ERATE WITCH UT RA ES: - --- ACCEPTABILITY CARECO Sd THIS DESIGN AND/OR WON . SPECIFICATION IS APPROVED O CURRENT RELAY WIRING DETAIL NTS BY APPROVED DATE SYM SR GS KR 6.15.93 16069-20 CEI MS 04.22.16 J <�> EO CARD CONTACT OUTPUT WIRING BBLK i;aal� �i 0 /TATR GH P –54S ET OO STATIC PRESSURE SENSOR WIRING DETAIL NTS WIN GPICAL L D ERMI TION ETAIL / DET T CON o O� D–VOL GE RAT LS R-801 IRES THE F D L DRE DEVI (STAR <�> BUILDING EXHAUST FAN CONTROL RELAY NTS CURRENT REALY. 480V / 3 PHASE f f �I -IT rl I INPUT I 1 Z TO DMS 'XHAUS FAN MOTOR FUSE 480V TYPICAL TRANSFORMER 50VA 120V — H 0 A I"„ CONTACT OUTPUT 0/Ls Q EXHAUST FAN STARTER WIRING 480V /I 3 P PU 1,11,1,1.1 ■ � , ■ CONT OUORUT CON TS CLOSE IA CON CT 0 T T QQ PUMP STARTER WIRING s ALLEN BRADLEY COMBINATION STARTER N BRAND BINATIgi� ST �L Sp ACCEPTABILITY CARECO Sd THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S.ROSSE rwNEER S.ROSSE APPROVED BY DEPT. I DATE CHECKED 36611 cr° G.SMITH APPROVED K.RAMSEY S+IUNAt. APPROVED 100% SUBMITTAL ISSUE FOR CONSTRUCTION NTE SUBTITLE CONVERTER STATION #3 TYPICAL WIRING DETAILS TITLE REPLACE STEAM CONVERTER STATION #3 BUILDING 9=101 04.09.93 MECHANICAL MASTER COL. D–J/11-15 DEV. CENTER, WA CURRENT REVISION SYMBOL 16069-20 A SHEET 2M323CR M 04.22.16 a I, c 4 COMP NO. a < c 09-101-2M323CR CD 1 nD n C 200 CFM nG /1nK ITr)/-% MA AIr'I IAI nH LEGEND sP STATIC PRESSURE SENSOR T -STAT LOCATED IN RETURN GRILLE DIFFUSER (1) 90' BLANK -OFF SECTION DIFFUSER (2) 90' BLANK -OFF SECTION FLEXIBLE DUCT WITH VOLUME DAMPER g� MEDIUM PRESSURE EXTERIOR INSULATED 280 CFM CD SPIRAL DUCTWORK LOW PRESSURE, SOUNDLINED VVIY 11\VL I /-IIYLL IIY BREAK MECHANICAL ROOM ABOVE BREAK ROOM DUCTWORK SEE SHEET M550 CD FOR TOILET ROOM 1\j_j VAV TERMINAL UNIT I MEDIUM PRESSURE EAST/WEST DUCT HANGER. SEE DETAIL 4 CD 2M231 M510 CD 3 0 HANGER. SEE DETAIL 7 2M23 M510 LOWER LEVEL UNISTRUT DUCT * HANGER. SEE DETAIL 6 , VENTILATION 2M23 M510 BEAM CLAMP AND STRAP DUCT 135 CFM HANGER. SEE DETAIL 9 2M23 M510 2 TYP 10 00 110 CFM 400 CFM --- ------- ----------- ---------- -------- --- --- ------ -------------------------------- --- - - ----- ---------------- - _==___=__ _____=-=__ _----------_---------- - - - z T RG I T CP2 RG 1 T ' I 12/12 1 5 1 L N RG T/ 7/ EFR -G RG 2 120 180 CD 230 CFM ' 315 CFM CD 1 W2 1 2 TYP 12 ON ROOF G11 /-W2-\i RG 12/12 _ 60x30 (TYP) 1 H12 2 RG 2 1 N - './W-2-\' R LIEF AI N I REL AIR IE - - 14 - - - T - G12 315 CFM CD \140 - EFR O ® -LI C \ 2 TYP 12 E LV2 ' W2 Q L2-9 QL1 A' ON ROOF _j CD 275 CF 2 6 Np o CD 2 ' 1 A 112 \ 80 - CD 275 CFM 2 7 TYP 1 230 CFM 8 i 120 CD 230 CFM 12 g 140 4 FE SEE 2 7 TYP RG RG C2D ' 8 TYP M N ' T _ _ _ --' / W2 DETAIL 1 2 23 M512 2 2 CD 2 12 W2 RG i I N 2 200 CD G13 140 18� 12� 2 180 230 CFM 160 N 2 CFM 10 D 160 18� 140 W2 140 W2 ! CD 2 H13 J13 l 30 CFM -I-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (E)OSA 240 CFM CD INTAKE ABOVE © AH2 N Co I 2 TYP 10 00 - - o0 CD 125 8 SEE M550 FOR CONT.' F,1 3A °O CFM S D 30� 24� 220 SEISMIC EXPANSION / T % N I DM I I 1 34/28 i CONNECTION -}- ` T 5 RG T -1 -- ' 60/32 �� I 64/24 1 I l „ l - 60 RETURN rr AIR rr T N 00 � N CD CDT BLANK �� o CD oO W2 11*12Z f 2 0 400 CFM F14 T o 350 CFM "-(,7D-\250 CFM 13A 1204 300 CFM CD 5 RG 10 10 2 6 TYP - W 2 TYP 12 - - - - 1 - - - z - - z z - - - - - - - - - - 12/8 _ _ 12/ _ _ 15/12 - - - - l I l - - 12 EL 17'-6" AFF 375 CFM 4M 100 S 1 540 CFM T N N 9 TYP 12 (2 TYP) 24/24 TYP ALL � CD VV2 RA GRILLES d- 12 120 l -'— 2 �0 1 12/12 1 E 315 CFMN (2 TYP) - W2 - _ _ T r BLANK 1 14A Q - 140 x 140 - CAP EXPI 2 4 _ _14� I \I I \I L_ N L_ i P14 12 2 - ._% BOD EL 10'-0" AFF z i i 120 EL 10'-6" AFF ' -I- Lu I LEGEND sP STATIC PRESSURE SENSOR T -STAT LOCATED IN RETURN GRILLE DIFFUSER (1) 90' BLANK -OFF SECTION DIFFUSER (2) 90' BLANK -OFF SECTION FLEXIBLE DUCT WITH VOLUME DAMPER g� MEDIUM PRESSURE EXTERIOR INSULATED INSULATION SPIRAL DUCTWORK LOW PRESSURE, SOUNDLINED METAL DUCTWORK VAV TERMINAL UNIT I MEDIUM PRESSURE EAST/WEST DUCT HANGER. SEE DETAIL 4 I 2M231 M510 MEDIUM PRESSURE NORTH/SOUTH DUCT HANGER. SEE DETAIL 7 2M23 M510 LOWER LEVEL UNISTRUT DUCT * HANGER. SEE DETAIL 6 , 2M23 M510 BEAM CLAMP AND STRAP DUCT HANGER. SEE DETAIL 9 2M23 M510 18� MEDIUM PRESSURE 1208 ACCESS PANEL. SEE DETAIL 2M23 M511 LOW PRESSURE 12x18 ACCESS PANEL. SEE DETAIL 2 2M23 M511 GENERAL NOTES 1. SIZE OF FLEX RUNOUT IS SAME AS DIFFUSER NECK UNLESS INDICATED OTHERWISE. 2. FOR VAV UNIT DUCTWORK, 3 SEE DETAIL 2 23 M510 2 �M601 3. INSTALL EARTHQUAKE TABS (2 PER DIFFUSER) ON ALL DIFFUSERS AND ATTACH WITH 12 GA WIRE TO UNISTRUT GRID. � ACCESS PANEL ABOVE WYE OR ELBOW TYPICAL. PROVIDE ACOUSTIC ELBOW, SEE DETAIL � — 2 23 M601 _ A.H.U. X57 AH2-F13A REFURBISHED 2013; FAN SHAFT CHECKED &BEARINGS REPLACED, VFD & CONTROLS RECOMMISSIONED. CC 0 "INS TRUCTION NOTES PROVIDE AND INSTALL NEW 24"0 DUCTWORK WITH R8 INSULATION. PROVIDE AND INSTALL NEW MOTORIZED DAMPER. CONNECT TO EXISTING OUTSIDE AIR SHEET METAL DUCT BELOW ROOF. PROVIDE NEW OPENING IN EXISTING SHEEP METAL SAME SIZE AS DAMPER. PROVIDE AND INSTALL NEW R18 INSULATION ON EXISTING SHEET METAL BELOW ROOF. lJ Ja I I � I 2M10 I 2M11 I 2M12 12M13 2M16 I 2M17 I 2M18 12M19 2M23,/A 2M24 12M25 I%GvtGVVCLJ um 19 \-1 40 20 SECOND FLOOR HVAC PLAN RECEIVED PPRCivE 2, 8 =1 -0 N COFFMA CITY OF TUKWILfAUG 19 2016 N61NEERs 100% SUBMITTAL 22 UG 15 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 �� City Of Tukwila II 23 phnan. 3.0717 I fax 206.624.3775 ffman. cocom ISSUE FOR CONSTRUCTION PERMIT CENTER M1Ut LASTING creativity I results I relationships SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �L SO ACCEPTABILITY EDDIE P. DUARTE 03.09.92 SECOND FLOOR HVAC PLAN REPLACE STEAM CONVERTER STATION 3 16069-20 CEI MS 04.22.16 1�� THIS DESIGN AND/OR CHECKED 16069-20 D 04.22.16 RECORD DRAWING SR SG/KR 10.16.06 D #3 16069-20 �`�' SPECIFICATION IS APPROVED SHEET A IPT MANAGEMENT COMPLEX J#147023-00 SLB KP/GM 10.16.06 APPROVED BY DEPT. DATE IGINEER TITLE REPLACE STEAM CONVERTER STATION #3 lid i CHECKED B OFFICE RENOVATION J#160530-00 COFFMAN M. SOTURA 12.20.06 2M23 — — 36611 � APPROVED BUILDING 9-101.2 V � � 0 � . � JOB N0. COMP N0. — RECORD DRAWING CLEAN—UP J#160530 00 COFFMAN M. SOTURA .04 05.07 I C REBUILD AIR HANDLER 20413 HARR 04/11/13 sslcc+raL APPROVED MECHANICAL MASTER COL. D-JA/10.9-15 DEV. CENTER, WA DWG No. 09-101-2M23 A101"1140 CC C, c C .71 Ic o� Lf 2 1/2 3"HWR FRO 1 ST FLOOR I SYM .LEGEND CHWS CHILLED WATER SUPPLY 6 —CHWR— CHILLED WATER RETURN HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN C STEAM CONDENSATE PIPING STM STEAM PIPING X ANCHOR 2 WAY BRACE, FOR DETAILS- SEE 2M67 M507 x4 WAY BRACE, FOR DETAILS SEE rf� 2M67 M507 �7l GENERAL NOTES REFERENCE DRAWINGS C CONSTRUCTION NOTES ;OND FLOOR HVAC PIPING PLAN =1'-0" PROVIDE AND INSTALL NEW 6" CLASS 150 UPGRADE ROOM NON—SAR RF GATE SHUT-OFF VALVE. CONTRACTOR TO OFFICE RENOVATION FIELD VERIFY LOCATION. PROVIDE AND INSTALL 6x5 ECCENTRIC REDUCER FLAT ON BOTTOM. (2 TYP). PROVIDE AND INSTALL ADDITIONAL PIPE SUPPORT AT VALVE LOCATION. ;OND FLOOR HVAC PIPING PLAN =1'-0" REVISION BY APPROVED DATE SYM I REVISION SR GS/KR 06.15.93 — RECORD DRAWING CLEAN—UP J#137031-02 DMV E REPLACE STEAM CONVERTER STATION #3 J#737235-00 SR J#147022-08 DMV J#160530-00 COFFMAN I M. SOTURA 1 12.20.06 BY APPROVED DATE J#160530-00 COFFMAN M. SOTURA 05.04.07 16069-20 CEI MS 04.22.16 ACCEPTABILITY K. "BUN THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S. ROSSE APPROVED BY DEPT. I DATE S. ROSSI &RFFMAN I -A .E E R, S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativityl results relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION SUBTITLE SECOND FLOOR HVAC PIPING PLAN TITLE REPLACE STEAM CONVERTER STATION #3 %3GG11® APPROVED BUILDING 9-101.2 JOB NO. 'crsr° K. RAMSEY SIAL APPROVED MECHANICAL MASTER COL. E-JA/6-11.1 DEV. CENTER, WA DWG NO. inn c 2M60 2M61 2M62 2M63 2M64 2M65 2M66 2M6 2M68 2M69 2M70 2M71 2M72 2M73 2M74 2M75 2M76 2M77 21VI78 I 2M79 I 21VI80 2M81 2M821mr 2M83 2M84 1 �-_2MPED 2M86 2 D 2UV. NA" N)1 2 92 A „2M,93 I n ----(D Eo 2M94 2 495 1 2M96 PERMIT CENTEFz3 Iyo 7u ila 9-101.2 KEY PLAN B ifVG DIVISION ENT REVISION SYMBOL DATE 16069-20 E 04.22.16 T 2M67 09-101-2M67 a occ C, a a Lf LC RECORD DRAWING A INSTALL SPOT COOLER B UPGRADE ROOM NON—SAR C INSTALL SPOT COOLERS D OFFICE RENOVATION REVISION BY APPROVED DATE SYM I REVISION SR GS/KR 06.15.93 — RECORD DRAWING CLEAN—UP J#137031-02 DMV E REPLACE STEAM CONVERTER STATION #3 J#737235-00 SR J#147022-08 DMV J#160530-00 COFFMAN I M. SOTURA 1 12.20.06 BY APPROVED DATE J#160530-00 COFFMAN M. SOTURA 05.04.07 16069-20 CEI MS 04.22.16 ACCEPTABILITY K. "BUN THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S. ROSSE APPROVED BY DEPT. I DATE S. ROSSI &RFFMAN I -A .E E R, S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativityl results relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION SUBTITLE SECOND FLOOR HVAC PIPING PLAN TITLE REPLACE STEAM CONVERTER STATION #3 %3GG11® APPROVED BUILDING 9-101.2 JOB NO. 'crsr° K. RAMSEY SIAL APPROVED MECHANICAL MASTER COL. E-JA/6-11.1 DEV. CENTER, WA DWG NO. inn c 2M60 2M61 2M62 2M63 2M64 2M65 2M66 2M6 2M68 2M69 2M70 2M71 2M72 2M73 2M74 2M75 2M76 2M77 21VI78 I 2M79 I 21VI80 2M81 2M821mr 2M83 2M84 1 �-_2MPED 2M86 2 D 2UV. NA" N)1 2 92 A „2M,93 I n ----(D Eo 2M94 2 495 1 2M96 PERMIT CENTEFz3 Iyo 7u ila 9-101.2 KEY PLAN B ifVG DIVISION ENT REVISION SYMBOL DATE 16069-20 E 04.22.16 T 2M67 09-101-2M67 a occ C, a a Lf LC TRANSIZE TO 22/18 IN VERTICAL - DUCT ABOVE 2ND FLOOR EL 8"-8" AFF • � ' �''ll IIII • I�Iii� lz J JANITOR CLOSET 12/12 EXH REGISTER - - - 60 - --- - ' (24/24 FACE) j 130 CFM i EL 1 C -6 AFF I��J STORAGE ROOM I I � -------12/12 EXH------- _ 6 - - IBJ (24/24 FACE) REGISTER 150 CFM I WOMEN'S TOILET ROOM i SECOND FLOOR TOILET ROOM N0,5 1/4"=1'-0" SYM I REVISION RECORD DRAWING A ADD RELIEF GRILLES 55595900 B REPLACE STEAM CONVERTER STATION #3 BY APPROVED DATE SYM SR GS KR 01.12.93 HARR RWS 9.21.05 16069-20 CEI MS 04.22.1.6 -d--4,-. 12/12 EXH REGISTER (WITH 24/24 FACE) (5) AT 300 CFM 18/12 BOD EL 8'-2" AFF nE nF LEGEND clo91. SEE SHEET 2M17 FOR HVAC LEGEND. cl, I ----- 12 -- ------- --------------E -------------4- - - -- 12 A M550 M554 `18/12 12/12 EXH REGISTER (WITH 24/24 FACE) (6) AT 300 CFM BOD EL 8'-2" AFF ------- @3 n u In GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES v PROVIDE AND INSTALL NEW SUPPLY GRILLE APPROVED BY PROVIDE AND INSTALL NEW DUCTWORK WITH R8 INSULATION. CHECKED G. SMITH PROVIDE AND INSTALL NEW MOTORIZED DAMPER & SHEET METAL DUCTWORK BELOW ROOF. CONNECT SHEEP METAL DUCTWORK AROUND EXISTING EXHAUST ROOF OPENING. PROVIDE AND INSTALL NEW DDC CONTROL PANEL. PROVIDE NEW TEMPERATURE SENSOR AND WIRING. cr �fi', �;tiA��w r� s}1r�d�a�:Nfi wit'1'��.,�.,� ,d'��` „e��J �,�sr��S ��i�s�„s<!;✓�w °2.�. `,C,, I kd �� ��� °r "�"•�w'.se,+��wz�•.�, gip:. .� r� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED K. BUN CHECKED A. KILLIP GINEER A. KILLIP APPROVED BY DEPT. I DATE CHECKED G. SMITH APPROVED K.RAMSEY SUBTITLE TITLE JBMITTAL INSTRUCTION I I O 1 g AUG 19 20 PERMIT City of Tulkwwlla �UILIfNO DIVISION - -101 KEY PLAN N SCALE: N.T.S. CURRENT REVISION SYMBOL DATE TOILET ROOM #5 HVAC PLANS 16069-20 B 04.22.16 SHEET REPLACE STEAM CONVERTER STATION #3 M550 BUILDING9- 1 O 1 JOB NO. COMP NO. 3.09.92 MECHANICAL MASTER COL. E -F/11-13 DEV. CENTER, WAD No. 09-101-M550 SYM T E Q REVISION RECORD DRAWING A AUTO FLUCH RETROFIT B OFFICE RENOVATION - RECORD DRAWING CLEAN-UP C REPLACE STEAM CONVERTER STATION #3 TOILET ROOM 5 - DOMESTIC WATER I APPROVED DATE THIS DESIGN AND/OR SR GS/KR 01.12.93 J#555959-00 HARR RWS 09.21.05 J#160530-00 COFFMAN M. SOTURA 12.20.06 J#160530-00 COFFMAN M. SOUTRA 05.04.07 16069-20 CEI MS 04.22.16 r�VALs FUNNEL DRAIN GENERAL NOTES APPROVED i wco 4„ P -1A P -1A — 2» 2„ Li -1 F WATER HA (nP) ARRESTER wco wco P- (TYP) Li2 SIZE C �- „ 1 1/2” 1/" a- 1/2 0 CO - 0 L -i 3/4„ ni a- i' VV 2 1/2" 17\ 3/4„ Fla) N z WATER HA Li ARRESTER 2"SAN DN SIZE C THRU FLOOR CO 3/4„ n- 3/4 1 BELOW FLOOR SAN BELOWLi > S (TYP 2 PLACES) 3/4" 3/4" _ C 1 2"CW HW 2" SAN DN - P-2 (TYP) t+-HWC 2 "CW UP TOL_j THRU FL 4" SAN WATER HAMMER I I iCONVERTER ROAM 1 1/2 Li DOWN POC ARRESTER PDI 1 1/2 V _ 2 1/2" 4„ 4 2» SIZE B 2"FD `\' 3» = 4»SAN (NP) i A. 4„ BELOW FLC 1 1/4" 1 1/2" 1 1/2" t 5” VTR 5" SAN DC zV---�"- I D COI '511m rh FUD V 1 1/2" ---- 2 1/2"0A MEZZA - --- -SAN - HW UP & D TO 2" 3" DN 4"SAN 1 1/2' z N 0 2 1 /2"CVS DOWN HW & CW UP = " 2" 4"VTR AND DOWN 1 --- 1 1 "HW & CW wco `e „ 3 CW UR TD CONVERTER wco `e 1/211 - C R 0 , CONNECT 4"SAN TC 2'HW & 3"CW I �. 3" SAN 1 1/211 i Q ,$ V) „ CONTINUAL Hi 11 11111111111111,1111,11iffflTmi 111111111-11HEATER 3/4" 1 PIPING TO TO FD A/ IN 2"V UP Li a 3/4" MEZZANINE 3"VTR O i HWC 3 POC TO P-5 HW & CW BELOW = j 1-1 /2"SAN wc,�°, ❑SLAB SEE 3/4 �� 3/4 �� 2 SA 3"SAN T02MEZZ� EE DWG 2 1 1/2"V-\ o- ABOVE CEILING Q 1/211 1 '-- _-� 1/2 = -----WATER HA ARRESTER "i & CW 3/4 SAN SIZE C 2"SAN HW W FLOOR SLAB > i _ 1 1/2"V— 2"V CW3/4" 1 2" /? / i C'4CONNECT 2" BELOW n > 3„SAN — TO 2'V P-4 12» HWC 3/4„ OOR 2 VTR „ V 2"FD ABOVE CEILING 4" SAN I 2 V3„ � DOWN POC O 2„ SAN ° 1(2) 2" 4 A 2 SAN P- I A - WATER HP P-4 1 1/2 V N ARRESTER �� 3 SAN U P 1 /» 1 2 SAN 3SAN UP SIZE C REVISION RECORD DRAWING A AUTO FLUCH RETROFIT B OFFICE RENOVATION - RECORD DRAWING CLEAN-UP C REPLACE STEAM CONVERTER STATION #3 TOILET ROOM 5 - DOMESTIC WATER SYM REVISION BY I APPROVED MMER PDI MMER PDI �2„ =E 2M123 FOR 9NTINUATION FOR CONTINUATION SEE SHEET 2M73 DN NINE ION OF WATER UP ,NINE M571 MMER PDI 3"SAN 1 BELOW FL � DI MMER PDI DATE BY APPROVED DATE THIS DESIGN AND/OR SR GS/KR 01.12.93 J#555959-00 HARR RWS 09.21.05 J#160530-00 COFFMAN M. SOTURA 12.20.06 J#160530-00 COFFMAN M. SOUTRA 05.04.07 16069-20 CEI MS 04.22.16 SYM REVISION BY I APPROVED MMER PDI MMER PDI �2„ =E 2M123 FOR 9NTINUATION FOR CONTINUATION SEE SHEET 2M73 DN NINE ION OF WATER UP ,NINE M571 MMER PDI 3"SAN 1 BELOW FL � DI MMER PDI DATE yv11: `0, f %fir yrs i .i�tu^ter ` 1: L Sp ACCEPTABILITY I VENT THIS DESIGN AND/OR CHECKED — SAN — SPECIFICATION IS APPROVED KILLIP I ' APPROVED BY DEPT. DATE DOMESTIC COLD WATER _HW— DOMESTIC HOT WATER — HWC — CHECKED 36611 "crs1 CLEAN OUT WALL CLEAN OUT G. ,SMITH AFD APPROVED K. RAMSEY r�VALs FUNNEL DRAIN GENERAL NOTES APPROVED i wco 4„ P -1A — 2» FUNNEL DF z Q wco wco P- (TYP) - 2„FD 1 1/2” 1 1/2' a- fi CO - 21L- ni a- i' VV 2 1/2" 17\ z � 2„ N z 2"SAN DN THRU FLOOR CO 3„ BELOW FLOOR SAN BELOWLi > (TYP 2 PLACES) FLOOR 2" SAN DN - SAN AN THRU FL 4" SAN 1 1/2 Li DOWN POC 1 1/2 V _ 2 1/2" 4„ 4 2„V & (2) 4 SAN P-2 2"FD `\' 3» 4»SAN (NP) i I I 12 1/211 4„ BELOW FLC 1 1/4" _r= t 5” VTR 5" SAN DC zV---�"- I D COI '511m rh FUD V 1 1/2" ---- -_ - --- -SAN - 2" 3" DN 4"SAN Li z N DOWN -- 4"VTR wco o wco C 4"SAN _ BELOW FLC 3" SAN i Q V) 3"SAN UP TO FD A/ 2"V UP Li a 3"VTR i 3 j 1-1 /2"SAN wc,�°, 3"FFD �� 2 SA 3"SAN 2 1 1/2"V-\ o- ABOVE CEILING Q 1 N P-6 "i 2"SAN DOWN SAN P-5 2"SAN THRU FLOOR > i 1 1/2"V— 2"V 1 2" /? / i C'4CONNECT 2" BELOW „ > 3„SAN DN > TO 2'V FLOOR 4 OOR 2 VTR „ V 2"FD ABOVE CEILING 4" SAN 2 V3„ � DOWN POC 2„ SAN ° 1(2) 4 A 2 SAN 21/2” P-4 1 1/2 V N 4„ �� 3 SAN U P 1 /» 1 2 SAN 3SAN UP TO FD 0al 2 V -- - TO TO FD1 - - - ----� 2"V 2 i UP 2 2 3 2" FUNNEL 3» WCO 3» 3„ 2"V UP 3"SAN UP OF 4" TO FD 1 1 P -1A 2 wco 2"V UP TOILET ROOM #5 - WASTE & VENT 1'60% Sl 4 =1 -0 I V ISSUE FOR G yv11: `0, f %fir yrs i .i�tu^ter ` 1: L Sp ACCEPTABILITY UVVII K. BUN VENT THIS DESIGN AND/OR CHECKED — SAN — SPECIFICATION IS APPROVED KILLIP M. CAUNITIS ' APPROVED BY DEPT. DATE DOMESTIC COLD WATER _HW— DOMESTIC HOT WATER — HWC — CHECKED 36611 "crs1 CLEAN OUT WALL CLEAN OUT G. ,SMITH AFD APPROVED K. RAMSEY r�VALs FUNNEL DRAIN GENERAL NOTES APPROVED CIO.9 I ,AIN FOR OR WN -SEE 2M123 FOR CONTINUATION DIZ C epi 14 of 5 PIP y64, fc, /6 — 6 / 1,7 FOR FFMAN N G I N E E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativityI results i relatiomhips JBMITTAL ONSTRUCTION LEGEND NEW 2" VENT VENT PROVIDE SANITARY WASTE BELOW FLR — SAN — SANITARY WASTE ABOVE FLR — ID — INDIRECT DRAIN —CW— DOMESTIC COLD WATER _HW— DOMESTIC HOT WATER — HWC — DOMESTIC HOT WATER CIRC CO CLEAN OUT WALL CLEAN OUT wco�— AFD FLOOR DRAIN ❑O FUD FUNNEL DRAIN GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES ROVIDE NEW 3” WASTE PIPING. PROVIDE NEW 2" VENT PIPING. PROVIDE NEW FUNNEL FLOOR DRAIN. 'AUB.2.120171 J 9-101 KEY PLAN SCALE: N.T.S. d t SUBTITLE CURRENT REVISION SYMBOLDATE TOILET ROOM #5 PLUMBING PARTIAL PLANS 16069-20 C SHEET TITLE REPLACE STEAM CONVERTER STATION #3 IRVI C 5 1 BUILDING 9-101.2 JOB N0. COME 910804-07 3.09.92 IMECHANICAL MASTER COL. E -F/11-13 DEV. CENTER, WA DWG NO. 09-101-M551 04.22.16 13 I a a C, oC LC LC c Al B FOE SHOEET 2MT70N LEGEND 11-5" 150 PSI STM STM STEAM PIPING STEAM RELIEF PRESSURE REDUCING Q l (HEATING) BOP C STEAM CONDENSATE PIPING VALVE 4x6 CONTROL VALVE o of EL 21'-2" AFF , 17,500#/HR 150 TO 50 PSI o (E) ANCHOR SET 55 PSIG 17,500#/HR CI TO REMAIN HWS HEATING WATER SUPPLY SRV -2 P RVz M N i HWR HEATING WATER RETURN F13 FI I CSI PIPE SUPPORT/HANGER TYPICAL , PIPE ANCHOR 6 1 6» HPS 0 l POINT OF CONNECTION 8 itc ST -XX STEAM TRAP 5S-01. \\-ST-01 MTD ON BUTTERFLY VALVE 2 F 13 STEAM DRIP LEG ' 6"STEAM SEPARATOR W/ST-04 0 FFD -1 A GENERAL NOTES I ST -02 MTD ON STEAM 6'-8" MINIMUM ' M570 M572 DRIP LEG l SLOPE 3'-4" MINIMUM 1 SLOPE IBOP=7-3" 81P - -- „�_EXISTING - - --- - - --.-- - - - g- - DUCTWORK I C-4 HEATC-5 HEAT C_6 HEAT 1 F13 TRANSFER � F13 TRANSFER 15 F13 TRANSFER 15 4"LPs DN To REFERENCE DRAWINGS PACKAGE PACKAGE PACKAGE. DRIP LEG °-— WITH ST -03, ; ° 1 ; ° ° 14 rn ° STEAM TRAP. n n --fit - D D I B �� z z z l l � � 1 1 - l - CONSTRUCTION NOTES i IN 13 PROVIDE NEW HEAT TRANSFER PACKAGE. SEE 3'-0" 3'-0" 3'-0" DWG M628 FOR DETAIL. BUTTERFLY VALVE, TYP. WF F 13 FILTER/FEED TANK PROVIDE NEW STEAM PRESSURE CONTROL VALVE VYHWS & ASSOCIATED PIPING & INSULATION AS SHOWN. CORROSION PROVIDE NEW EXPANSION TANK, INSULATION, & 7 1 COUPON RACK ASSOCIATED PIPING AND VALVES. _7Z--_ IVVIJ_�_ _ _ °� _ _ _ _ _ _ _ I ® PROVIDE NEW FLASH TANK W/INSULATION, 0 BOP -7'-9" 0 7 ASSOCIATED PIPING AND VALVES. HWR FD -1 Q ° FD -1 ° ° 3 7 FD -1 RO - - - 1 PROVIDE NEW STEAM POWERED CONDENSATE - - -- ° PUMP, ASSOCIATED PIPING AND VALVES. 4„HWS (E)2„HWS/R ry cn 1WRr 0 7 l © CONNECT TO EXISTING 8” STEAM VENT THRU TO/FROM HIGH BAY, = T = AIR qS 2 4"HWS/R UP 1 FFD -1 ❑O ROOF. BOP EL 20'-8" AFF. 7 �'' "� 7 7 `r 7 7 SEPARATOR THRU ROOF PROVIDE NEW HEATING WATER PIPING AS FOR CONTINUATION, F 13 7 SEE SHEET 2M73 �-- - - - - - ---6"HWR - 4"HWS TO 2ND FLOOR AHU. SHOWN. 2"HWS BOP=7'-9" FOR CONTINUATION, S SEE SHEET 2M73 ® PROVIDE NEW STEAM PIPING AS SHOWN & B - T C 4"HWR 9 '�' BOP=9'-6" BOP EL 20'-4" AFF INSULATE PER TABLE ON DWG M567. PROVIDE M570 M572 (E) ALUMINUM JACKET ON PIPE BELOW 8' AFF. 2 HWR FLASH z 3"STM VTR (E) 5 TANK > _ 3/4 2-1 /2" PUMPED PROVIDE 4” HOUSEKEEPING STAND. SEE STRUCTURAL. CONDENSATE V T N- II F13 4 7 T t CHEMICAL POT FEEDER 10 PROVIDE 6x5 ECCENTRIC REDUCER (FOB) G� = T = t `00%,,III i F13 N �1 I PROVIDE NEW FILTER/FEED TANK. PROVIDE NEW 3 3 ASSOCIATED PIPING AND INSTALL NEW FILTER. STEAM POWERED CONDENSATE PUMP ,� 12 8x4 ECCENTRIC REDUCER (FLAT ON BOTT) WITH ST -05 l ET -4 ET -5 HOUSEKEEPING 4"EXHAUST HEAD D F1 3,A F13A STAND C r%E EXISTING PIPING. PROVIDE NEW INSULATION. (E)1-1 /2"STM (50 PSI) � EXPANSION EXPANSION C/), w , M570 M573 TANK TANK M570 M573 M570 M574 DO NOT ROUTE }PIPING OVER ELECTRICAL TO AHU-60 & 61 a Q PANELS. TYPICAL. HUMIDIFIERS _ FjXP ZD 7 1 PROVIDE AND INSTALL 4" CLASS 150, RF GATE _ z = , 1= a VALVE W/CHAIN OPERATOR AND VALVE BLANKET. (E)3/4» o CONDENSATE FOR CONTINUATION, o o ' FLOOR PLAN CONVERTER SN 0 . 16 PROVIDE NEW DRAIN PIPE FROM EXISTING FROM AHU-60 & �- ' RELIEF VALVE. 61 HUMIDIFIERS SEE SHEET 2M73 0 c z SCALE: 1/2°'=1-'-0" &RFFMAN I H E:. E R S w.:�:�:-_.�.,. I CV 1601 Fifth Avenue, Suite 900 1 Seattle, WA 98101 cn (OVER TOILET ROOM NO.5 MEZZANINE FLOOR LEVEL PIPING) 1 PROVIDE CORROSION COUPON RACK IN l :2� � ph 206.623.07171 fax 206.624.3775 CATION. SEE DIAGRAM 5/M629. coffman.com o I ODE COMPLIANCE GE I-- LL. li LASTING creativity I results I relationships cn Of Of 18 PPRVM NEW 4" EXHAUST HEAD AND CV CV 100% SUBMITTAL AUG O ED PING AND C ?N�I CIS d0 EXISTING BOP EL 20'-8" AFF BOP EL 21'-3" AFF 3 VET BEL1WN T ' . F'TUKWiLA ISSUE FOR CONSTRUCTIONCity Of Tukwila AUG 15 2016 FOR CONTINUATION OF ALL BUILDING DIVISION LINES, SEE SHEET 2M79 PE.FIMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �L Sp ACCEPTABILITY K.BUN CONVERTER STATION NO. 3 HVAC PIPING PLAN D KR 01.12.93 �tl�� THIS DESIGN AND/OR CHECKED 16069-20 B 04.22.16 RECORD DRAWING SR GS ti ��' SPECIFICATION IS APPROVED S.ROSSE SHEET ' G TITLE REPLACE STEAM CONVERTER STATION 3 A CONVERTER STATION FILTER/FEEDERS SLB RWS/EJC 02.28.97 APPROVED BY DEPT. DATE S.ROSSE M570 B REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 CHECKED G.SMITH BUILDING 9-101 3JOB NO. COMP NO. 6611 APPROVED K.RAMSEY �loNaL APPROVED 3.09.92 MECHANICAL MASTER COL. E -F/12-13 DEV. CENTER, WA r NO. 09-101-M570 A10414C Q INCOMING (4" NON REDUCE)CW —\ LEGEND p GENERAL NOTES FLOOR DRAIN. J.R. SMITH 2010 W/ TRAP PRIMER. 5 � FUNNEL FLOOR DRAIN. J.R. SMITH 2010 W/ TRAP PRIMER 8c FIG 3591 FUNNEL DRAIN D3 FLOOR PLAN CONVERTER STATION NO. 3 N SCALE: 1/2"=V-0" CRFFMAN I H E. E R S (OVER TOILET ROOM NO.5 MEZZANINE FLOOR LEVEL) 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships REFERENCE DRAWINGS CONSTRUCTION NOTES 1� PROVIDE NEW FLOOR DRAIN. 2 PROVIDE NEW FUNNEL FLOOR DRAIN. 3� PROVIDE NEW VENT PIPING. 4� PROVIDE DRAIN PIPING. , 5� EXISTING DRAIN PIPING TO REMAIN. 6� EXISTING VENT PIPING TO REMAIN. PROVIDE NEW COLD WATER MAKE—UP PIPING. 100% SUBMITTAL ISSUE FOR CONSTRUCTION REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 2016 City of Tulmils ILDING DIVISION RECEIVED C ITS' OE TUKWILA, AUG" 15 2016 PERMIT CENTER Ull UAI E SUBTITLE " "'"" " CURRENT REVISION SYMBOL DATE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE�L Soy, ACCEPTABILITY K.BUN 16069-20 B 04.22.16 RECORD DRAWING SR GS KR 01.,2.93 G j THIS DESIGN AND/OR CED CONVERTER STATION NO. 3 PLUMBING PLAN ti R�' SPECIFICATION IS APPROVED S.ROSSE SHEET GINEER A CONVERTER STATION FILTER/FEEDERS SLB RWS/EJC 02.28.97 19 APPROVED BY DEPT. DATE S.ROSSE TITLE REPLACE STEAM CONVERTER STATION #3 CHECKED M5711 B REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 G.SMITH 9_6 61IIKBMs BUILDING 9-101JOB N0. COMP N0. Sl>" I�vAL 4 APPROVED 3 09 92 MECHANICAL MASTER COL. E—F/12-13 DEV. CENTER, INA DWG NO. 09-101—M571 AInn /A /• AL SECTION M570IM572 r1111 rr i9 P%1 -%l LEGEND STM STEAM PIPING K.BUN STEAM CONDENSATE PIPING C S.ROSSE HEATING WATER SUPPLY HWS HEATING WATER RETURN HWR CHECKED DOMESTIC HOT WATER HW DOMESTIC HOT WATER CIRCULATION HWC D INDIRECT DRAIN CW DOMESTIC COLD WATER V VENT SION GATE VALVE CHECK VALVE moi BALL VALVE -N4-- BALANCE VALVE GLOBE VALVE R TO STRUCTURAL POINT OF CONNECTION NGS FOR SUPPORT BUTTERFLY VALVE ITER HEATERS) STAT GENERAL NOTES EATER ;ULATION TOILET BELOW SYM I REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 01.12.93 A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 r°) f i,r rix�3a I`7 a � z r s� L so ACCEPTABILITY K.BUN THIS DESIGN AND/OR SPECIFICATION IS APPROVED C CK D S.ROSSE S.ROSSE APPROVED BY DEPT. DATE CHECKED 36�61�,�1 p ISPri�"4 G.SMITH APPROVED K.RAMSEY 1(WAY. JAPPROVED REFERENCE DRAWINGS CONSTRUCTION NOTES D::� PROVIDE NEW HEAT TRANSFER PACKAGE. 2� PROVIDE NEW STEAM PIPING WITH INSULATION AND METAL JACKET. L� • 100% SUBMITTAL • ! i : • iV d t SUBTITLE CURRENTREVISIO606g20 04.22. � 6N SYMBOL A DATE CONVERTER STATION NO.3 SECTIONS I SHEET TITLE REPLACE STEAM CONVERTER STATION #3 M572 BUILDING9- 101 JOB NO. COMP NO. 3.09.92 IMECHANICAL MASTER COL. 12 -13/E -F DEV. CENTER, WAi DWG NO. 09-101-M572 A& /r\-7»r-ru ►n—Ktr /t—\n»nr►J ►ir—Kir 1/2"=1'-0" M570 M573 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 01.12.93 A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 L Sp ACCEPTABILITY UN*l �� THIS DESIGN AND/OR SPECIFICATION IS APPROVED S.ROKED SSE S.ROSSE ' Z� APPROVED BY DEPT. DATE HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION CHECKED 36611 I° CW DOMESTIC COLD WATER V G.SMITH GATE VALVE APPROVED K.RAMSEY 'ONST --ISI— BALL VALVE ' APPROVED a 9 � ate tj LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION D INDIRECT DRAIN CW DOMESTIC COLD WATER V VENT GATE VALVE CHECK VALVE --ISI— BALL VALVE ' BALANCE VALVE GLOBE VALVE -0- POINT OF CONNECTION GENERAL NOTES CONSTRUCTION NOTES r•..,, .;.. _, ...... :>,{'_ °;.,:tea '�?<i"'*;.: REVIEWED FOR CODE COMPLIANCE APPROVED AUG 19 zoos s City Of Tukwila LIN BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG' 15 20161 PERMIT CENTER N4RFFMAN I N I- E R S 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION SUBTITLE CONVERTER STATION NO.3 SECTIONS TITLE REPLACE STEAM CONVERTER STATION #3 BUILDING 9-101 CURRENT REVISION SYMBOL DATE 16069-20 A 04.22.16 SHEET M573 3.09.92 IMECHANICAL MASTER COL. 12-13/E—F DEV. CENTER, WAI DWG N0. COMP NO. 09-101—M573 SECTION 1/2"=1'-0" M5711 M574 SOD DECK 3'-4 3/4" LEGEND STM STEAM PIPING C STEAM CONDENSATE PIPING HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER CIRCULATION ID INDIRECT DRAIN CW DOMESTIC COLD WATER V VENT GATE VALVE CHECK VALVE —�C�I-- BALL VALVE ' BALANCE VALVE GLOBE VALVE *POC POINT OF CONNECTION GENERAL NOTES REFERENCE DRAWINGS REVIEWED FOR `C17DE COMPLIANCE APPROVE AUG 19 Zoos City of Tukwila BUILDING DIVISION RECEIVED CITE' CE TUKWILA AUG' 15 2016 PERMIT CENTER FFMAN NG..IHEERS 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING creativity I results I reldwships 100% SUBMITTAL ISSUE FOR CONSTRUCTION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE L Spy s�►j ACCEPTABILITY THIS DESIGN AND/OR UKAWN K BUN uAlt SUBTITLE CONVERTER STATION NO. 3 SECTION CURRENT1 6069- 20 SYMBOL ^ /n\ DATE 04.22.1 6 CHECKS RECORD DRAWING SR GS KR 01.12.93 ® A%, S a y x SPECIFICATIONIS APPROVED S.ROSSE SHEET M574 A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 APPROVED BY DEPT. DATE SAOSSE TITLE REPLACE STEAM CONVERTER STATION 3 CHECKED 36611 G.. BUILDING 9-101 APPROVED JOB N0. COMP N0. I� SS,IONAL �yCs K.RAMSEY MECHANICAL MASTER COL. 12 -13/E -F DEV. CENTER, WA APPROVED 3.09.92 . DWG N0 09-101-M574 n ronin a a c C, C, K (E) 2-1 /2"PC TO BOILER ROOM INCOMING 5" 150 PSI STEAM (17,500 #/hr) 6" 5x6 REDUCER ` PRESSURE GAGE WITH PIGTAIL AND SHUT-OFF VALVE (TYPICAL) 0-250 PSI 3/4"HPC ST�T 3/4"HPC 3/4"LPC FROM CR HUMIDIFIER v v 00�� PROVIDE AL ) 3" VENT DISCHARGE 1-1 /2"LPS -1/2" 50 PSI STEAM TO AHU-60 ROOF FLASHING 8" VENT DISCHARGE r THRU ROOF AND AHU-6 I HUMIDIFIERS CONE (TYP) I I THRU ROOF I �— ,� 1/2" 50 PSI STEAM TO COMPUTER ROOM HUMIDIFIERS 2-1/2" PC _ _ _ � _ _ 2-1 /2"PC _ _ _ 2-1 /2"PC SEE TYPICAL DRIP LEG ROUTE TO DRIP PAN 4x6 PSV 4"EXHAUST I FLOW METER I I ALLTRAPS ASSEMBLY FOR DRAIN ELBOW (17,500 #/hr) ( HEAD I I 3/4"LPS I SET � 60 PSIG M561 2"GLOBE VALVE I 10 DIA �� � STEAM SEPARATOR I 8"LPS 8"LPS I 4"LPS SKID MOUNTED CONVERTER w/TRAP ASS'Y III — FM �� PACKAGE (3 TYPICAL) '� " '- " CONTROLLER PRESSURE CONTROL — — — — — VALVE 17,500 #/HR. I I 150 PSIG INLET, 50 PSIG OUTLETPCV I rpT I —04 PRESSURE FLOOR TRANSMITTER DRAIN g" PRESSURE GAGE WITH PIGTAIL AND SHUT-OFF VALVE (TYPICAL) 0-150 PSI ST -02 ECCENTRIC REDUCER "-- ROTATE STRAINER 90° (FLAT ON BOTTOM) TO MINIMIZE CONDENSATE POCKETS TYP 3/4"HPC ■ � SLOPE i sr -os i T 3" FLASH 'TANK _ 2 CP -8 SEE TYPICAL CONDENSATE � FLOW SCHEMATIC �^�29 STEAM 8c CONDENSATE FLOW DIAGRAM TIE-INS TO EXISTING BUILDING SYSTEM 2"HWS TO STRUCTURAL TEST AREA 4"HWS TO 2nd FLOOR AHU 2"HWS TO 1 st FLOOR UNIT HEATERS 4"HWS POC 1 4 " HWR _ POC PIPING AND TIE-IN ON ROOF LOCKING BALL P SEE MAKE-UP VALVES � WATER/CHEMICAL FEEDER DIAGRAM I I FOR DETAILED REQUIREMENTS. M629 InT n P UI n N 4" N a Lr M c C, K C A I- RELAY IN LIGHTING PANEL RELAY SWITCHED WHEN EITHER R-2 IN RELAY PANEL RRP-1 OR RELAY R-5 IN PANEL RRP-2 IS ENERGIZED 27 1 X TS -1 T99-1 OUTSIDE AIR TEMP SENSOR -40° TO 212°F 1 rTS-2 R TEMP SENSOR —40° TO 2127 1 PROBE TO OUTSIDE BUILDING ATMOSPHERE 7SENSOR ILDING SPS-1ESSURE PR-5OBE LOW DIFF PRE -0.5 TO 0.5"4-20 MA OUT EFRDIIA BUILDING EXHAUST FAN EFREIIA BUILDING EXHAUST FAN EFRE126 TOILET EXHAUST FAN EFRE12) CONVERTEI EXHAUS FAN x kRTER CR -4 rl X LAY 2 X kRTER CR -5 CR X R-2 MR -801 CONTROL RELAY 120VAC l�J 120VAC VAI �b 120VAC EXISTING SYSTEMS TO BE SAVED BUT PROVIDED WITH NEW SIEMENS CONTROL INTERFACE `g 0 rK cn u � � � d- t� to HWS HWR I T I U) a m CD ry J 0 z ClI O 2/3 DOWN IN THE LOOP (TYP) w L BY 3: 3: 3: 3;: Q APPROVED DATE z Q CARECO C14 C14 CURRENT REVISION 16069-20 ry DATE 04.22.16 Lt_ry L� U_ GS KR 6.15.93'+ J LL M cn SHEET 2M323A N M CV CEI 71 O O C14 O O O IK � u � � � d- t� to HWS HWR I T I U) a m CD ry J 0 z ClI O 2/3 DOWN IN THE LOOP (TYP) c w L BY 3: 3: 3: 3;: IBJ APPROVED DATE z � CARECO C14 C14 c w L BY LU DATE Cl -1 _ IBJ APPROVED DATE z � CARECO z SUBTITLE CONVERTER STATION #3 DMS CONTROLS CURRENT REVISION 16069-20 ry DATE 04.22.16 RECORD DRAWING U_ GS KR 6.15.93'+ cn SHEET 2M323A U) A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS O O ry _I = HWS HWS HWR HWS I T I EXCHANGER \� CV -4 1-7 r STEAM TO CMCS �, VFD PUMP TRAP P4—A —I r_*__j —� L PC CONDENSATE HEAT RECOVERY P4—B VFD C-4 i TO CMCS �\ T EXCHANGER � CV -5 —� I— "� ' STEAM I I TO CMCS I VFD PUMP T TRAP P5—A —� rAF—i J L PC CONDENSATE HEAT RECOVERY P5—B VFD C-5 TO CMCS IT EXCHANGER HWS TO CMCS A ACV-6 STEAM I T VFD PUMP TRAP T HWR P6—AA L r- -j L fPC LEGEND: ANALOG (ELECTRONIC OR PNEUMATIC) OUTPUT CONNECTION WITH WIRING TAG CONTACT OUTPUT WIRING — CAN BE "BUILDING" GRADE WIRE INPUT (ANALOG OR CONTACT) C WIRING CONNECTION (SHIELDED WIRING ONLY IS ALLOWED) v v v v CONSTRUCTION NOTES: SIEMENS TO RECONNECT TO EXISTING OSA SENSOR OR REPLACE OUTSIDE AIR TEMPERATURE SENSOR. SIEMENS TO PROVIDE NEW CONTROL TO EXISTING BATHROOM FAN, BLDG RELIEF FANS & CONVERTER #3 EXHAUST FAN. SIEMENS TO REPORT EXISTING CURRENT RELAY INPUT TO CMCS. DESCRIPTION OF OPERATION A. THE HOT WATER FROM THE CONVERTER STATION#3 IS CIRCULATED IN MULTIPLE HOT WATER DISTRIBUTION LOOPS SERVING AIR HANDLER UNITS HEATING COILS IN THE 9-101 BUILDING. B. CONVERTER STATION #3 HAS THREE HEAT TRANSFER CONVERTERS SERVING A COMMON PIPE MANIFOLD CONNECTED TO FOUR EXISTING HOT WATER DISTRIBUTION LOOPS. C. CMCS WILL SET THE HOT WATER TEMPERATURE TO THE COMMON HOT WATER HEADER AND WILL SET THE SPEED OF THE PUMPS OF EACH CONVERTER. ALL PUMPS WILL RUN AT THE SAME SPEED. D. CMCS CONTROL THE STEAM CONTROL VALVE OF EACH CONVERTER PLATE & FRAME HEAT EXCHANGER CONVERTER. CMCS ADJUST STEAM VALVE OUTPUT BASED ON A RESET SCHEDULE SO LEAVING HOT WATER TEMPERATURE OF EACH EXCHANGER IS 150 DEG WHEN OUTSIDE TEMPERATURE IS 60 AND 180 DEG WHEN OUTSIDE TEMPERATURE IS 30 DEG. CMCS MONITOR HOT WATER TEMPERATURE IN AND OUT OF THE THREE (3) EXCHANGERS. E. CMCS WILL CONTROL THE SPEED OF THE CONVERTER'S PUMP BASED ON THE DIFFERENTIAL PRESSURES IN EACH OF THE HOT WATER LOOPS. THE LOWEST DIFFERENTIAL PRESSURE OF THE FOUR LOOPS WILL DICTATE THE SPEED OF THE PUMPS. NEW DIFFERENTIAL PRESSURE SENSORS WILL BE ADDED TO EACH LOOP. F. WHEN THE PUMP SPEED OF THE FIRST CONVERTER REACH 90%, A SECOND CONVERTER WILL BE STARTED. THE PUMPS OF BOTH CONVERTERS WILL THEN RUN AT THE SAME SPEED. WHEN THE SPEED OF THE CONVERTER PUMPS GOES BELOW 40% ONE OF THE CONVERTER WILL BE STOPPED. F. WHEN THE PUMP SPEED OF TWO CONVERTERS REACH 90%, A THIRD CONVERTER WILL BE STARTED. THE PUMPS OF ALL CONVERTERS WILL THEN RUN AT THE SAME SPEED. WHEN THE SPEED OF THE CONVERTER PUMPS GOES BELOW 40% ONE OF THE CONVERTER WILL BE STOPPED. G. EACH CONVERTER STATION HAS TWO PUMPS. IF THE LEAD PUMP FAIL THE LAG PUMP SHALL START. CONDENSATE ALTERNATE LEAD LAG PUMP EVERY WEEK. HWS T P6—B HEAT RECOVERYEXPIRE DH. CMCS HARDWARE POINTS WILL INCLUDE: MODULATING STEAM VALVES % POSITION OPEN, LEAVING AND v -n C —6 AAllp. CONVERTER STATION#3 CONTROL DIAGRAM � SCALE: NONE 67012623A RETURNING WATER TEMPERATURES AT EACH SKID—MOUNTED CONVERTER, MAIN HEADER HOT WATER AND RETURN TEMPERATURES, PUMPS STATUS AND SPEED, HOT WATER SUPPLY AND RETURN TEMPERATURES AT EACH LOOP. I. THE STEAM METER SHALL REPORT STEAM USAGE AND BE RECORDED FOR MONTHLY REPORTING. FFMAN J. CMCS CONTROL THE ELECTRONIC PRV VALVE TO N G I N E E R S DELIVER 50 PSI STEAM PRESSURE TO THE THREE 1601.Fifth Avenue, Suite 9001 Seattle, WA 98101 CONVERTERS. ph 206.623.07171 fax 206.624.3775 coffman.com K. PRV STATION PRESSURE AND THE LEI OR LASTING asaNty I results I relationships ODE AN05 VALVE POSITION WILL BE MONITOR � APpROVEC? L. PRESSURE IN THE HOTIU 66T[l RV gO WIL OEI AL2016 MONITORED. ; EXHAUST FAN DAMPER, D1 MD DAMPER, [ i TO. CMCS _CONVERTER ROOM #3 VENTILATION DIAGRAM SCALE: NONE 2M323B I --j TO .0 NTRAL -(( EMCS SYSTEM l Air SYM I REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 6.15.93 A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 i i NC, D2 �} OUTSIDE AIR I MC 0 I 0 NC, D1 EFR 12 6 J CONVERTER ROOM $3 CONTROL DIAGRAM SCALE: NONE 2M323B AIR INTAKE HOOD LEGEND GENERAL NOTES REFERENCE DRAWINGS SEQUENCE OF OPERATION FOR CONVERTER STATION #3 TEMPERATURE CONTROL CARECO 1 BLAL JIUM.1j" OPEN/CLOSE OPEN/CLOSE EXHAUST OA EA FAN DAMPER DAMPER EFR—El2A ROOM D1 D2 START/STOP TEMPERATURE DO DO DO AI n.: ,z:= AUG 1 5 2016 3. WHEN TEMPERATURE IN THE ROOM IS HIGHER THAN 78-F (ADJ) START EXHAUST FAN EFR—El2A. Air SYM I REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING SR GS KR 6.15.93 A REPLACE STEAM CONVERTER STATION #3 16069-20 CEI MS 04.22.16 i i NC, D2 �} OUTSIDE AIR I MC 0 I 0 NC, D1 EFR 12 6 J CONVERTER ROOM $3 CONTROL DIAGRAM SCALE: NONE 2M323B AIR INTAKE HOOD LEGEND GENERAL NOTES REFERENCE DRAWINGS SEQUENCE OF OPERATION FOR CONVERTER STATION #3 TEMPERATURE CONTROL CARECO 1 BLAL JIUM.1j" 1. EFR—E12A EXHAUST FAN CONTROLS THE TEMPERATURE OF THE ROOM. DATE AUS 2 1 21M 2. WHEN TEMPERATURE IN THE ROOM IS HIGHER THAN 74-F (ADJ) OPEN THE TWO MOTORIZED DAMPERS D1 ,E'CEIVED CITY OF TUKWILA & D2. PROOF THAT DAMPERS ARE OPEN ARE BY SWITCH ON DAMPER SHAFT. m1b o1zPERMIT APPROVED K.RAMSEY n.: ,z:= AUG 1 5 2016 3. WHEN TEMPERATURE IN THE ROOM IS HIGHER THAN 78-F (ADJ) START EXHAUST FAN EFR—El2A. CENTER 4. IF TEMPERATURE IN THE ROOM IS MORE THAN 95°F (ADJ) ENERGIZE HIGH TEMPERATURE ALARM. FOR MPLIANC5 FFMAN 5.. REPORT TO. EMCS: ROOM .TEMPERATURE, STATUS OF FAN, AND STATUS OF ALL DAMPERS. OVED N G I N E� E R S 6. REPORT ALARM IF TEMPERATURE IN ROOM IS HIGHER THAN 95°F OR LOWER THAN 457 AND IF EXHAUST FREF-D 9 201E Fifth Avenue, Suite I Seattle, WA 98101 FAN DOES NOT START WHEN COMMANDED. ph 2 24. coffma .corn 71tax206.624.3T75 coffman.com Tukwila LASTING creativity I results I relationships 100% SUBMITTAL ISSUE FOR CONSTRUCTION ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED CARECO CHECKED S.ROSSE APPROVED BY DEPT. DATE S.ROSSE CHECKED G.SMITH APPROVED K.RAMSEY Alt SUBTITLE CONVERTER STATION #3 DMS CONTROLLERS TITLE REPLACE STEAM CONVERTER STATION BUILDING 9-101 04.09.93 MECHANICAL MASTER COL. D—J/11-15 CURRENT REVISION ISYMBOL DATE 16069-20 A 04.22.16 SHEET 2M323B JOB NO. COMP NO. DEV. CENTER, WA DWG NO. 09-101-2M323B I., c CONNECTION SCHEDULE TAG No. SIZE FUNCTION DESCRIPTION 2 Grundfos CR 64-1-1,15hp 3ph.,460v,TEFC COLD WATER 2 A 4„ ANSI 150 2 Sondex SGIA Plate Exchanger,52plate INLET 4 B 3„ STEAM ANSI 150 1 SPIRAX SARCO DCV4 CHECK VALVE INLET 6 C 3„ HOT WATER ANSI 150 1 SPIRAX SARCO CI -125 CAST IRON STRAINER OUTLET 9 D 1/2" MOTIVE 1 /2"NPT 1 SPIRAX SARCO TD52L THERMOSTATIC TRAP INLET 11 E 1/2" DRIP 1 /2"NPT 1 SPIRAX SARCO DCV41 CHECK VALVE TRAP 13 F 3" CONDENSATE ANSI 150 1 SPIRAX SARCO EL2270 TEMPERATURE PROBE OUTLET 15 G POWELL GATE VALVE MODEL 1787 3" ANSI 125 16 H SPIRAX SARCO CI -125 CAST IRON STRAINER 3" ANSI 125 17 TOP VIEW (steam inlet—B,hot water - outlet—C ,not shown for Clarity) UNIT BREAK 2; LEFT SIDE VIEW (control enclosure not shown) 0 37� 0 53 501 97 47 1 8 f6A 60 FAI FRONT VIEW 0 7 .8 AN 454 3' BILL OF MATERIALS TAG QTY. DESCRIPTION SIZE/MODEL 1 2 Grundfos CR 64-1-1,15hp 3ph.,460v,TEFC 4 "150 Flg Suction4" 150# Fig Disch. 2 3 2 Sondex SGIA Plate Exchanger,52plate 3" 150# ANSI 4 1 SPIRAX SARCO APT14HC AUTOMATIC PUMP TRAP 2" x 1 1/2" ANSI 150 5 1 SPIRAX SARCO DCV4 CHECK VALVE 4" ANSI 150 6 4 LUG—MOUNT PUMP SUCTION BUTTERFLY 4" ANSI 150 7 1 SPIRAX SARCO CI -125 CAST IRON STRAINER 4" ANSI 125 9 1 SPIRAX: SARCO. CAST .IRON IT STRAINER -1/2" NPT 10 1 SPIRAX SARCO TD52L THERMOSTATIC TRAP 1/2" NPT 11 3 SPIRAX SARCO M1 OS BAL VALVE 1/2" NPT 12 1 SPIRAX SARCO DCV41 CHECK VALVE 1/2" NPT 13 1 SPIRAX SARCO TSS300 THERMOSTATIC AIR VENT 1/2" NPT 14 1 SPIRAX SARCO EL2270 TEMPERATURE PROBE 1/2" NPT 15 2 POWELL GATE VALVE MODEL 1787 3" ANSI 125 16 1 SPIRAX SARCO CI -125 CAST IRON STRAINER 3" ANSI 125 17 1 SPIRAX SARCO LEA33 CONTROL VALVE WITH AEL5 ELECTRIC ACTUATOR & 0-10 VDC MODULATING SIGNAL WITH POSITIONER CARD 3" ANSI 125 18 3 PRESSURE GAUGE ASSEMBLY 1/4" NPT 19 1 SPIRAX SARCO M 10S BAL VALVE 1-1/2" NPT 20 1 ASHCROFT BIMETAL THERMOMETER 0-200°F 1/2 ft NPT 21 1 CONTROL BOX ENCLOSURE 30x24x8 22 1 SPIRAX SARCO M 10S BAL VALVE 1-1/2" NPT 23 2 DANFOSS VFD 10 HP 'RIGHT SIDE VIEW HEAT TRANSFER PACKAGE DETAIL "N% G I N E E R S SCALE: NTS M628 1601 Fifth Avenue, Suite 900 I Seattle, WA 98101�` ph 206.623.0717 I fax 206.624.3775 I coffman.com ` LASTING creativity I results I relationships AUG1.1. 201T, AU -13 15 PERMIT CE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATEDRAWN DATE SUBTITLE CURRENT REVISION ISYMBOL DA L SD ACCEPTABILITY CEI 04.22.16 ORIG REPLACE STEAM CONVERTER STATION #2 16069-20 CEI MS 04.22.16r?� THIS DESIGN AND/OR CHECKED HEAT TRANSFER PACKAGE DETAIL 16069-20 O R I tia SPECIFICATION IS APPROVED M. SOTURA 04.22.16 SHEET ® $� APPROVED BY DEPT. DATE rITONEER TITLE REPLACE STEAM CONVERTER STATION #3 CHECKED M628 36611 APPROVED BUILDING V=101 roe NO. 16069-20 co _T Ssj �gCs APPROVED DWG NO. °L MECHANICAL MASTER COL. DEV. CENTER, WA 09-101—M628 04.22.16 r C M I. cc FOR TYPI, DRIP SEE NICHOLSON STAINLESS STEEL FREE FLOAT TRAP 3/4" PIPE UNION .TRAINER NP CHECK VALVE T 1" DRAIN `c A ^, , 3" VENT 7 STEAM TR � 1-1/2" PC F 1/2" THERMODYNAMIC TRAP w/INTEGRAL STRAINER " NICHOLSON NTD600S DRIP LEG, TRAP ASSEMBLY AND CONDENSATE FLOW SCHEMATIC (TYPICAL SCALE: NTS 1' -loll 20"x 16 "x 1 /2" STEEL TYP;TE /16 --- - 25"x21 "x 1 /2" BASE PLATE SIDE VIEW 1'-7" TYP 3/16 2 - 10 O —2"x2"x 1 /4" _ - - ANGLE FRAME (TYP) I (4) 11/16" HOLE THRU FOR 5/8" BOLT END VIEW CONDENSATE PUMP SUPPORT SCALE: NONE CONNECTED TO HWS PIPING ON SUCTION SIDE OF PUMPS (DOWNSTREAM —�— OF HEAT EXCHANGERS) CONNECTED TO HWR PIPING UPSTREAM OF HEAT EXCHANGER 3/ �--HWS HWR CORROSION COUPON RACK MODIFY COUPON RACK TO INCLUDE DRAIN VALVE AND FLOW CONTROL DEVICE. EXISTING INSTALLATION AVAILABLE FOR STUDY MAKE-UP WATER SCALE: NONE SYM REVISION REPLACE STEAM CONVERTER STATION #3 3/4" (2) 1 " PIPE BOLLARDS w/ 3/8" CAP. (NOT REQUIRED WHEN SIGHT GLASS FACES WALL). SITE GLASS M629 GRISWOLD MODEL CR -072 -STATION COUPON RACK 2� NALCO PART NO. 500-531059.88 SAMPLE COOLER PW HWS HWR 3/4" SAMPLE VALVE FLOW CONTROL DEVICE -3/4" INDIRECT DRAINS TO FLOOR SINK 3/4" BALANCING/ SHUT-OFF VALVE PRESSURE GAUGE - TURN FACE AS REG FOR BEST VISIBILITY THRED-O-LET 1 " CONDENSATE PUMP EXHAUST LINE 4" EXHAUST HEAD T RF INSTAI I FR IN TOP OR . ImF OF THRU ROOF PUMP EXHAUST LINE PRESSURE REGULATOR MFR SUPPLIED SITE GLASS CONDENSATE PUMP I I I 3/4„ u I IIMP 1-1/2" PC PUMP SUPPORT M629 FRAME GAUGE DETAIL SCALE: NONE 215 PSI RELIEF VALVE P LOCKING BALL VALVE (TYP) - VECTOR "FA-600AL" BYPASS FEEDER 5 -GAL, 300 PSI, 300 DEG. F -3/4" M629 COUPLING ON x1/4" BUSHING "TELL TALE" GATE VALVE SW/THR'D GATE VALVE PIPE NIPPLE OW (WHEN REQ"D) TYF E NIPPLE -LENGTH TO SUIT CLEARANCE FOR GAUGE M629 (E) WATER MAKE-UP P FFD M629 Y 3" COUPLING, 3000# 3" TOL 3000# 1 (HPC INLET) (FLASH VENT OUT' rT` 2" SCH 40 PIPE, 10" XH (0.500" TYP TYP WT) PIPE 8" 3/16 cV l 1-1/2" TOL, 1" FORGED 800# 3000# (GRAVITY THD VALVE, CAPPED COND. TO PUMP) LEFT END ELEVATION RIGHT END ELEVATION MOUNT TO WALL ELEVATION OR PROVIDE I 1'-4" 10" ANGLE SUPPORT FRAME I 8" PIPE CAP. TYP. (2) NOTES: XH SW 1. WELDS FOR BRANCH CONNECTION FITTINGS (0 -LETS, COUPLINGS, ETC) SHALL BE MADE PER ASME 831.1, CHAPTER V, —J - -;-- -� - -- SECTION 127.4.8. ADDITIONALLY, SUB -PARAGRAPH (F) APPLIES FOR 3'-O" CONNECTIONS 2" AND SMALLER. FLASH TANK TYPICAL D ETAI L PLAN MOUNT TO WALL DR PROVIDE 4NGLE SUPPORT RAM E SCALE: NTS TYF SIDE VIEW FLASH TANK ALTERNATE SUPPORT SCALE: NTS w °- IN-LINE DRIP I LEGS NOT TO 00 o� LLI > o J Ld li M629 GRISWOLD MODEL CR -072 -STATION COUPON RACK 2� NALCO PART NO. 500-531059.88 SAMPLE COOLER PW HWS HWR 3/4" SAMPLE VALVE FLOW CONTROL DEVICE -3/4" INDIRECT DRAINS TO FLOOR SINK 3/4" BALANCING/ SHUT-OFF VALVE PRESSURE GAUGE - TURN FACE AS REG FOR BEST VISIBILITY THRED-O-LET 1 " CONDENSATE PUMP EXHAUST LINE 4" EXHAUST HEAD T RF INSTAI I FR IN TOP OR . ImF OF THRU ROOF PUMP EXHAUST LINE PRESSURE REGULATOR MFR SUPPLIED SITE GLASS CONDENSATE PUMP I I I 3/4„ u I IIMP 1-1/2" PC PUMP SUPPORT M629 FRAME GAUGE DETAIL SCALE: NONE 215 PSI RELIEF VALVE P LOCKING BALL VALVE (TYP) - VECTOR "FA-600AL" BYPASS FEEDER 5 -GAL, 300 PSI, 300 DEG. F -3/4" M629 COUPLING ON x1/4" BUSHING "TELL TALE" GATE VALVE SW/THR'D GATE VALVE PIPE NIPPLE OW (WHEN REQ"D) TYF E NIPPLE -LENGTH TO SUIT CLEARANCE FOR GAUGE M629 (E) WATER MAKE-UP P FFD M629 Y 3" COUPLING, 3000# 3" TOL 3000# 1 (HPC INLET) (FLASH VENT OUT' rT` 2" SCH 40 PIPE, 10" XH (0.500" TYP TYP WT) PIPE 8" 3/16 cV l 1-1/2" TOL, 1" FORGED 800# 3000# (GRAVITY THD VALVE, CAPPED COND. TO PUMP) LEFT END ELEVATION RIGHT END ELEVATION MOUNT TO WALL ELEVATION OR PROVIDE I 1'-4" 10" ANGLE SUPPORT FRAME I 8" PIPE CAP. TYP. (2) NOTES: XH SW 1. WELDS FOR BRANCH CONNECTION FITTINGS (0 -LETS, COUPLINGS, ETC) SHALL BE MADE PER ASME 831.1, CHAPTER V, —J - -;-- -� - -- SECTION 127.4.8. ADDITIONALLY, SUB -PARAGRAPH (F) APPLIES FOR 3'-O" CONNECTIONS 2" AND SMALLER. FLASH TANK TYPICAL D ETAI L PLAN MOUNT TO WALL DR PROVIDE 4NGLE SUPPORT RAM E SCALE: NTS TYF SIDE VIEW FLASH TANK ALTERNATE SUPPORT SCALE: NTS w °- IN-LINE DRIP LEGS NOT TO 00 o� BE LESS THAN Lo HALF OF MAIN [if 0 PIPE SIZE 00 5/8" U -BOLT FOR 8"PIPE W/ DOUBLE NUTS (TYPICAL) M629 STRUCTURAL TUBE STEEL WELDED BEAM ATTACHMENT (ANVIL FIG. 66) MAX LOAD 2,160# ROD EYE END ANVIL FIG. 290 5/8" THREADED ROD ADJUSTABLE CLEVIS HANGER (ANVIL FIG. 260) PIPE INSULATION k. 1/4 PIPE SADDLE (ANVIL FIG. 166A 5-1/2") PIPE HANGER DETAIL ff 1 LJ 1 V/"NLV L 1 3000# l SOCK -O -LET NC PLUG BUILDING DIVIS1011" PLUG 3/8 PLUGGED FORGED 800# FORGED 800 BLOW DOWN VALVEFFMAN ECF SWxTHD VALVE T SWxTHD VALVE EAM TRAP # FY OF TUKWILA, N G FN 'E E R S (HORIZ. IF REQ'D) AUS' � � ���� 1601 Fifth Avenue, Suite 900 I Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 26" MAXIMUM coffman.com PERMIT CENTER LASTING aeawty 1 remits I relaUonships PLUG DRIP LEG, TRAP ASSEMBLY (TYPICAL SCALE: NTS ACCEPTABILITY CEI THIS DESIGN AND/OR CHE SPECIFICATION IS APPROVED MS APPROVED BY DEPT. T DATE M629 a. It SUBTITLE 06.30.14 DETAILS 06.30.14 TITLE REPLACE STEAM CONVERTER STATION #3 BUILDING 9-101 MECHANICAL MASTER COL. 100% SUBMITTAL ISSUE FOR CONSTRUCTION CURRENT REVISION SYMBOL DA 16069-20;— SHEET M629 JOB NO. CO DEV. CENTER, Wq °wc No. 09-101-M629 cc r 04.22.16 c cl c K