HomeMy WebLinkAboutPermit M16-0140 - NW HYDRAULICS - DUCTWORK AND DIFFUSERS12787 GATEWAY DR
M16-0140
City of Tukwila
• Department of Community Development
• 6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.Rov
MECHANICAL PERMIT
Parcel No:
2716000060
Permit Number: M16-0140
Address:
12787 GATEWAY DR
Issue Date: 9/23/2016
WA Cities Electrical Code:
2014
Permit Expires On: 3/22/2017
Project Name:
NW HYDRAULICS
2014
Owner:
2015
WA State Energy Code:
Name:
EPROPERTY TAX INC DEPT #207
2015
Address:
PO BOX 4900, SCOTTSDALE, WA,
85261
Contact Person:
Name:
JENNIFER SPARRS
Phone: (253) 872-5665
Address:
5108 D ST NW, AUBURN, WA, 98001
Contractor:
Name:
EMERALD AIRE INC
Phone: (253) 872-5665
Address:
5108 D ST NW, AUBURN, WA, 98001-
2418
License No:
EMERAA1055BL
Expiration Date: 4/1/2017
Lender:
Name:
Address:
DESCRIPTION OF WORK:
DEMO AND RELOCATION OF DUCTWORK AND DIFFUSERS.
Valuation of Work: $45,946.00
Fees Collected: $255.19
Type of Work:
REPLACEMENT
Electrical Service Provided by: SEATTLE CITY LIGHT
Fuel type: GAS
Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2015
National Electrical Code:
2014
International Residential Code Edition:
2015
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2015
WAC 296-466:
2014
Uniform Plumbing Code Edition:
2015
WA State Energy Code:
2015
International Fuel Gas Code:
2015
Permit Center Authorized Signature:
Date: q—c)-1 (0
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature: Date: l!�
Print Name: z2s
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: Readily accessible access to roof mounted equipment is required.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
CITY OF TUKWI,
Community Development Department
Permit Center
6300 Southcen ter Blvd., Suite 100
Tukwila, WA 98188
hqp://www.TukwilaWA.gov
W
Mechanical Permit No.
Project No.
Date Application Accepted: q A — I b
Date Application Expires: 2 —q -
use
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
"please print"
SITE LOCATION
King Co Assessor's Tax No.: 271600-0060
Site Address: 12787 GATEWAY DR Suite Number: Floor:
Tenant Name: NW HYDRAULICS New Tenant: ❑ .....Yes ®..No
PROPERTY OWNER
Name: EPROPERTY TAX INC
Address: PO BOX 4900
City: SCOTTSDALE State: AZ Zip: 85261
CONTACT PERSON — person receiving all project
communication
Name: JENNIFER SPARRS
Address: 5108 DST NW
City: AUBURN State: WA Zip: 98001
Phone: Fax:
Email:
Valuation of project (contractor's bid price): $ 45,946
MECHANICAL CONTRACTOR INFORMATION
Company Name: EMERALD AIRE
Address: 5108 DST NW
City: AUBURN State: WA Zip: 98001
Phone: (253) 872-5665 Fax: (253) 872-5797
Contr Reg No.: EMERAAI055BL Exp Date: 04/01/2017
Tukwila Business License No.: BUS -0994424
Describe the scope of work in detail:
DEMO AND RELOCATION OF DUCTWORK AND DIFFUSERS.
Use: Residential: New .......... ❑ Replacement ........ ❑
Commercial: New .......... Replacement ........ 0
Fuel Type- Electric..... ❑ Gas....... ® Other:_
H:':Applications,Forms-Applications On Line 2016 Applications,Mechanical Permit Application Revised 1-4-16.docx
Revised: January 2016
bh
Page 1 of 2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <l OOk btu
Residential, Nighttime
Furnace >1 OOk btu
7 NEw
Floor furnace
55 dB(A)
Suspended/wall/floor
mounted heater
57 dB(A)
Appliance vent
Commercial
Repair or addition to
heat/refrig/cooling
system
47 dB(A)
Air handling unit
<10,000 cfm
65 dB(A)
Unit Type
Qty
Air handling unit
>I0,000 cfm
Residential, Nighttime
Evaporator cooler
7 NEw
Ventilation fan
connected to single duct
55 dB(A)
Ventilation system
57 dB(A)
Hood and duct
Commercial
Incinerator — domestic
47 dB(A)
Incinerator —
comm/industrial
65 dB(A)
Unit Type
Qty
Fire damper
Residential, Nighttime
Diffuser MOVING 40
7 NEw
Thermostat
55 dB(A)
Wood/gas stove
57 dB(A)
Emergency enerator
Commercial
Other mechanical
equipment
47 dB(A)
60 dB(A)
65 dB(A)
Boiler/Compressor Qty
0-3 hp/100,000 btu
3-15 h /500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Noise:
Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is
created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed.
For more details, see TMC 8.22
District of Sound
Producing Source
District of Receiving Property
Residential, Daytime*
Residential, Nighttime
Commercial
Industrial
Residential
55 dB(A)
45 dB(A)
57 dB(A)
60 dB(A)
Commercial
57 dB(A)
47 dB(A)
60 dB(A)
65 dB(A)
Industrial
60 dB(A)
50 dB(A)
65 dB(A)
70 dB(A)
*Daytime means 7AM-1 OPM, Monday through Friday and 8AM-1 OPM, Saturday, Sunday and State -recognized holidays.
A few sounds are exempt from the noise code, including:
Warning devices;
Construction and property maintenance during the daytime hours (lam -1 Opm);
Testing of backup generators during the day.
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER ORA
Si
AGENT:
Date: 09/09/2016
Print Name:`JJENNIFER SPARRS Day Telephone: (253) 872-5665
Mailing Address: 5108 D ST NW AUBURN WA 98001
City State Zip
H: Applications�Forms-Applications On Line 2016 ApplicationsWechanical Permit Application Revised 1-416.docx
Revised: January 2016 Page 2 of 2
bh
DESCRIPTIONS
PermitTRAK
ACCOUNT
QUANTITY
PAID
$110.50
M16-0140 Address: 12787 GATEWAY DR
Apn: 2716000060
$110.50
MECHANICAL
$105.62
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
PERMIT FEE
R000.322.100.00.00
0.00
$65.00
PLAN CHECK FEE
R000.322.102.00.00
0.00
$8.12
TECHNOLOGY FEE
$4.88
TECHNOLOGY FEE
TOTAL+ .. : 1
R000.322.900.04.00
0.00
$4.88
$110.50
Date Paid: Friday, September 23, 2016
Paid By: EMERALD AIRE INC
Pay Method: CHECK 2292
Printed: Friday, September 23, 2016 10:31 AM 1 of 1
CRSY57EM5
Date Paid: Friday, September 09, 2016
Paid By: EMERALD AIRE INC
Pay Method: CHECK 2290
Printed: Friday, September 09, 2016 7:58 AM 1 of 1 r—#?
SYSTEMS
INSPECTION RECORD
Retain a copy with permit s 16 `- (?��O
INS TION N0. PERMIT N0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD
69) Retain a copy with permit [M)& --
6/z/0
INSP ON NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350, '4V
Project: �n
A"i
Type of Inspection:
0f,4L
aW,,b
Address:
Y i2
Date Called:
Special Instructions:
Date Wante )/ p.m.
lRequestdr:
hone No:
1-1 Approved per applicable codes. 11 Corrections required prior to approval.
IInspector: IDate: lel'? 911co I
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
171 1 INSPECTION RECORD 06 -ON 0
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
RApproved per applicable codes. t__.J Corrections required prior to approval.
M
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I
AXRTEST Co, Xnco
Preliminary TAB Report
PROJECT:
NW Hydraulics
DATE: 11/8/2016
LOCATION:
Tukwila, WA
CONTACT: Jason Douglas
PROJECT #:
AUTHOR: Dustin Polly
FIRM:
Airtest Co Inc
PHONE: 425-313-0172
PO Box 86
FAX: 425-313-5735
Issaquah, WA 98027
PROJECT: NW Hydraulics
12787 Gateway Dr
Building 6
Tukwila, WA 98168
NOTES:
DATE: 11/8/2016
PROJECT #:
CONTACT: Douglas, Jason
AIRTEST issues preliminary TAB reports as a courtesy to contractors and building officials as verification that
TAB is in progress. Any other use of this report should be carefully considered, as the document is
PRELIMINARY and is not complete. It has NOT been reviewed for accuracy or compliance with project
requirements.
Engineering review of this document should not occur until the FINAL TAB report is issued. If it is necessary to
conduct a thorough review of the report at this time please call AIRTEST to discuss what information is ready for
review before proceeding.
1141tv 01q0
Airtest Co Inc
Preliminary TAB Report
RECEIVED
CITY OF TUKWILA
NOV 14 2016
PERMIT CENTER
3 1
AIRTEST Co., Inc.
Table Of Contents
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT M AUTHOR: Dustin Polly
Table Of Contents -
1 Deficiency Report ......................................................................................................................................................... 1
2 Field Note Report ......................................................................................................................................................... 3
3 Roof Top Unit............................................................................................................................................................... 4
3.1 RTU-01.................................................................................................................................................................. 4
3.2 RTU -01 /Duct-01..................................................................................................................................................... 5
3.3 RTU-02.................................................................................................................................................................. 7
3.4 RTU-03................................................................................................................................................................... 9
3.5 RTU-04.................................................................................................................................................................. 11
3.6 RTU-05................................................................................................................................................................... 13
3.7 RTU-06................................................................................................................................................................... 15
3.8 RTU-06/Duct-01...................................................................................................................................................... 16
3.9 RTU-07................................................................................................................................................................... 18
4 Fan Unit........................................................................................................................................................................ 20
4.1 EF-01...................................................................................................................................................................... 20
Airtest Co Inc
Preliminary TAB Report
AIRIEST Co.. Inc. ufie�a'�
Deficiency Report
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT #: AUTHOR: Dustin Poll
Equipment: U-04 Created Date: 07 -Nov -16
Area: Open Office 117 Due Date: 07 -Nov -16
Completed Date:
Issue Description:
Fan does not run.
Issue Type: Not Assigned Job Tag: Repair Estimate:
Role Assignment: My Company Users Cross Ref#: Replacement Cost:
User Assignment:
EF -01
Due Date: 07 -Nov -16
eted Date:
Issue Description:
Fan does not run.
Issue Type: Not Assigned Job Tag: Repair Estimate:
Role Assignment: My Company Users Cross Ref#: Replacement Cost:
User Assignment:
M i u -u I Created Date: 07 -Nov -16
Open Area Due Date: 07 -Nov -16
Issue Description:
Outside air screened opening is plugged with dirt.
Issue Type: Not Assigned Job Tag: Repair Estimate:
Role Assignment: My Company Users Cross Ref#: Replacement Cost:
User Assignment:
Due Date: 07 -Nov -16
sted Date:
Issue Description:
Unit trips breaker at main panel.
Issue Type: Not Assigned Job Tag: Repair Estimate:
Role Assignment: My Company Users Cross Ref#: Replacement Cost:
User Assignment:
Airtest Co Inc Page 1 of 20
Preliminary TAB Report
AIRTEST Co., Inc.
Deficiency Report
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT M AUTHOR: Dustin Polly
Area: Mulipurpose Room 119 Due Date:
Com leted Date:
Issue Description:
Missing volume damper on return inlet serving Conf. RM.
Issue Type: Observation Job Tag: Repair Estimate:
Role Assignment: Mechanical Contractor Cross ROM Replacement Cost:
EF -01
Due Date: 07 -Nov -16
Issue Description:
Motor does not turn freely. Possible motor/bearing failure.
Issue Type: Not Assigned Job Tag: Repair Estimate:
Role Assignment: My Company Users Cross Ref#: Replacement Cost:
Offices
Issue Description:
T -stat not installed. Wires are in wall
Issue Type: Not Assigned
Role Assignment: My Company Users
ated Date: 07 -Nov -16
Due Date: 07 -Nov -16
Job Tag: Repair Estimate:
Cross Ref#: Replacement Cost:
Issue ID: 0017 Status: SWAIWW Issue Priority:
Equipment: RTU -03 Created Date: 07 -Nov -16
Due Date: 07 -Nov -16
Completed Date:
Issue Description:
No power to 3 zone control T -stat.
Issue Type: Not Assigned Job Tag: Repair Estimate:
Role Assignment: My Company Users Cross Ref#: Replacement Cost:
User Assignment:
Airtest Co Inc Page 2 of 20
Preliminary TAB Report
AIRTEST Co., Inc.
Field Note Report
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
DATE: 11/8/2016
CONTACT: Jason Douglas
011T114n1Q• fli .coin D-11.1
Airtest Co Inc Page 3 of 20
Preliminary TAB Report
Test
Roof Top Unit
System Unit Name
RTU -01
D.Commentv..
7 -Nov -16
Jason Douglas
Set total flow by traverse.
7 -Nov -16
Jason Douglas
Issue 0007: Outside air screened opening is
plugged with dirt.
Roof Top Unit
RTU -02
7 -Nov -16
Jason Douglas
OSA inlet to unit does not have a damper that
can be set.
7 -Nov -16
Jason Douglas
Issue 0014: T -stat not installed. Wires are in
wall plate.
7 -Nov -16
Jason Douglas
Issue 0010: The T-Stat is not installed.
Roof Top Unit
RTU -03
7 -Nov -16
Jason Douglas
Issue 0017: No power to 3 zone control T -stat.
7 -Nov -16
Jason Douglas
Issue 0001: Fan does not run.
7 -Nov -16
Jason Douglas
Issue 0008: Unit tris breaker at main panel.
Roof Top Unit
RTU -04
7 -Nov -16
Jason Douglas
Unit was forced ON to perform TAB.
7 -Nov -16
Jason Douglas
Issue 0003: Fan does not run.
Roof Top Unit
RTU -07
7 -Nov -16
Jason Douglas
Unit was forced ON to perform TAB.
Fan Unit
EF -01
7 -Nov -16
Jason Douglas
Issue 0004: Fan does not run.
7 -Nov -16
Jason Douglas
Issue 0012: Motor does not turn freely. Possible
motor/bearing failure.
Return Inlet
RTU-07/Inlet-04
7 -Nov -16
Jason Douglas
Issue 0011: Missing volume damper on return
inlet serving Conf. RM.
Air Apparatus Fan
RTU -02 /Supply Fan
7 -Nov -16
Jason Douglas
The unit was forced ON to perform TAB.
Air Apparatus Fan
RTU -04 /Supply Fan
7 -Nov -16
Jason Douglas IThe
unit was forced ON to perform TAB.
Air Apparatus Fan
RTU-07/Su 1 Fan
7 -Nov -16
Jason Douglas I
The ,not was forced ON to perform TAB.
Airtest Co Inc Page 3 of 20
Preliminary TAB Report
AIRTEST Co., Inq
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
SYSTEM/UNIT: RTU -01
AREA: Open Area
Unit Manufacturer
York International
Unit Model Number
D8CG036N04046A
Unit Serial Number
RTU /Supply
NOA7383935
-01 Fan
Fan Type / Class
FC/1
Motor Phase
1
Motor Hertz
60 Hz
Motor FL Amps
RTU -01 /SuR Iv Fan
Motor RPM Actual
High RPM
A. Tot. Inlet SP
-0.04 in. wc.
A. Tot. Discharge SP
0.10 in, wc.
TSP Actual
0.14 in, wc.
Electrical
Test Data
RTU -01 /Supply
Final Operating Hz
60 Hz
Motor Volts 1
473 Volts
Motor Amps 1
1.6 Amps
Log:
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Tested By: Jason Douglas
Date: 11/7/2016
otor Dat.
Motor Manufacturer
Genteq
Motor HP
1/2 HP
Motor RPM
HIGH RPM
Motor Rated Volts
480 Volts
Motor Phase
1
Motor Hertz
60 Hz
Motor FL Amps
2.2 Amps
Motor Service Factor
1.00
Sheave
Flanders
Data
BTU -01 /Supply Fan
Drive Type
Direct Drive
8
Filter Quantity
Air
Filter Size
Test Data
Design GRD Total CFM
1200 CFM
Actual GRD Total CFM
1315 CFM
Return Air CFM Design
1200 CFM
Return Air CFM Actual
1100 CFM
Filter Manufacturer
Flanders
Filter Type
Pleated
MERV Rating
8
Filter Quantity
3
Filter Size
14x25x2 (1) / 15x20x2 (2)
Inches
RTU -01 11/7/2016 Jason Douglas Outside air screened opening is plugged with dirt.
RTU -01 11/7/2016 Jason Douglas Set total flow by traverse.
Airtest Co Inc Page 4 of 20
Preliminary TAB Report
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
SYSTEM/UNIT: RTU -01 /Duct -01
AREA: Open Area
Hole 7
Airtest Co Inc
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Tested By: Jason Douglas
Date: 11/7/2016
/Plot/]
Sum of Readings 17846 FPM
Average Velocity 939 FPM
Actual Total Flow (CFM) 1315 CFM
Traverse Data Points
N
O
O
744
851
960
933
1001
939 927 972 971 972 939 896 992 $33 $75 �
995
1109
1002
935
r 0
16
Preliminary TAB Report
Page 5 of 20
Traverse Location
Discharge Duct
Type of Traverse
Round
Test Instrument Used
Pitot -Tube
Duct Diameter
16 in.
Duct Area
1.400 sq. ft.
# of Rows (T -B)
2
Readings Per Row (L -R)
10
Total Readings
20
Hole 7
Airtest Co Inc
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Tested By: Jason Douglas
Date: 11/7/2016
/Plot/]
Sum of Readings 17846 FPM
Average Velocity 939 FPM
Actual Total Flow (CFM) 1315 CFM
Traverse Data Points
N
O
O
744
851
960
933
1001
939 927 972 971 972 939 896 992 $33 $75 �
995
1109
1002
935
r 0
16
Preliminary TAB Report
Page 5 of 20
AIRTEST Co., Inc.
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT M
RTU -01 Supply Outlet Summary
X
X
X
R 1 N-Ul mexurn iniet summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Airtest Co Inc Page 6 of 20
Preliminary TAB Report
AIRTEST Co., Inc.
Roof Top Unit
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT M AUTHOR: Dustin Polly
SYSTEM/UNIT: RTU -02
AREA: Offices
Dar.
Unit Manufacturer
York International
Unit Model Number
D7CG048N06046A
Unit Serial Number
RTU /Sugoly
NOE6390109
-02 Fan
Fan Type / Class
FC/1
Motor Phase
1
Test
60 Hz
Data
RTU -02 /Supuly Fan
Fan RPM Actual
High RPM
A. Tot. Inlet SP
-0.32 in. wc.
A. Tot. Discharge SP
0.32 in. wc.
TSP Actual
0.64 in. wc.
205
175
Electrical
Outlet -04
Test Data
RTU -02 /SuDRIy Fan
Final Operating Hz
60 Hz
Motor Volts 1
473 Volts
Motor Amps 1
1.6 Amps
Log
Tested By: Jason Douglas
Date: 11/7/2016
E)tor Dat;.
Motor Manufacturer
A.O. Smith
Motor HP
3/4 HP
Motor RPM
1050 3 spd RPM
Motor Rated Volts
480 Volts
Motor Phase
1
Motor Hertz
60 Hz
Motor FL Amps
2.2 Amps
Motor Service Factor
1.00
Sheave
Filter Data
Data
RTU -02 ISupoly Fan
Drive Tye
Direct Drive
Pleated
MERV Rating
Air
Filter Quantity
Test Data
Design GRD Total CFM
1800 CFM
Actual GRD Total CFM
1615 CFM
Return Air CFM Design
1600 CFM
Return Air CFM Actual
1320 CFM
RTU -02
Filter Data
��-02 /Filter Bank
Filter Manufacturer
Flanders
Filter Type
Pleated
MERV Rating
8
Filter Quantity
3
Filter Size
14x25x2 (1) / 15x20x2 (2)
RTU -02
Inches
RTU -02
11/7/2016
Jason Douglas
OSA inlet to unit does not have a damper that can be set.
RTU -02
1117/2016
Jason Douglas
The unit was forced ON to perform TAB.
RTU -02
11/7/2016
Jason Douglas
The T-Stat is not installed.
RTU -02
11/7/2016
Jason Douglas
T -stat not installed. Wires are in wall plate.
RTU -02 Supply Outlet Summary
System/Unit
Outlet -01
Area Served
Office 113
Outlet
Type
CD
Size LxW
D
8 RD
Design
CFM
200
Reading
235
Reading 180
90
Outlet -02
Office 112
CD
8 RD
200
210
185
93
Outlet -03
Office 110
CD
8 RD
200
205
175
88
Outlet -04
Office 108
CD
8 RD
200
215
180
90
Outlet -05
Office 106
CD
8 RD
200
185
185
93
Outlet -06
Office 105
CD
8 RD
200
120
185
93
Outlet -07
Reception 100
CD
8 RD
200
150
170
85
Outlet -08
Reception 100
CD
8 RD
200
145
175
88
Outlet -09
Office 101
CD
8 RD
200
145
180
90
Airtest Co Inc Page 7 of 20
Preliminary TAB Report
AIRTEST Co., Inc.
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT M
RTU -02 Return Inlet Summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Airtest Co Inc Page 8 of 20
Preliminary TAB Report
AIRTEST Co., Ine,
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
SYSTEM/UNIT: RTU -03
7)at;
Unit Manufacturer York International
Unit Model Number D8CGO6ON07946EBA
Unit Serial Number NOH6790984
RTU-031Suoaly Fan
Fan Type / Class FC/1
Log:
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Tested By: Jason Douglas
Date: 11/7/2016
Motor Manufacturer
A.O. Smith
Motor HP
1.5 HP
Motor RPM
1725 RPM
Motor Frame
56H
Motor Rated Volts
480 Volts
Motor Phase
3
Motor Hertz
60 Hz
Motor FL Amps
2.6 Amps
Motor Service Factor
1.15
Sheave D..
RTU-031Sunaly Fan
Filter Type
Drive Type
Belt
Belt Size
AX35
Number of Belts
1
Motor Sheave
1 VL40
Motor Sheave Bore
7/8 in.
Motor Sheave Position
Mid
Motor Adjustment (+/- Inches)
1/2 in.
Fan Sheave
5.5" OD
Fan Sheave Bore
15/16 in.
Sheave Center Line
12 in.
Air Test Data
Design GRD Total CFM 1800 CFM
Return Air CFM Design 1600 CFM
Filter Manufacturer
Flanders
Filter Type
Pleated
MERV Rating
8
Filter Quantity
3
Filter Size
14x25x2 (1) / 15x20x2 (2)
Jason Douglas
Inches
RTU -03
11/7/2016
Jason Douglas
Fan does not run.
RTU -03
11/7/2016
Jason Douglas
Unit trips breaker at main panel.
RTU -03
11/7/2016
Jason Douglas
No power to 3 zone control T -stat.
Airtest Co Inc
Preliminary TAB Report
Page 9 of 20
AIRTEST Co., Inc.
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT M
RTU -03 Supply Outlet Summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
System/Unit
Area Served
Outlet Size
LxW
Design
Outlet -01
Office 134
Type
CD
•
8 RD
CFM Reading Reading
200
Outlet -02
Open Office 138
CD
8 RD
200
Outlet -03
Open Office 138
CD
8 RD
200
Outlet -04
Office 135
CD
8 RD
200
Outlet -05
Office 136
CD
8 RD
200
Outlet -06
Breakroom 124
CD
8 RD
200
Outlet -07
Breakroom 124
CD
8 RD
200
Outlet -08
Breakroom 124
CD
8 RD
200
Outlet -09
Breakroom 124 1
Totals::00
CD 1
8 RD
1 200
i i
RTU -03 Return Inlet Summary
Airtest Co Inc Page 10 of 20
Preliminary TAB Report
AIRTEST
Inc.
-N
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
SYSTEM/UNIT: RTU -04
AREA: Open Office 117
Unit Manufacturer York International
Unit Model Number DF072N10P4AAA2A
Unit Serial Number NOL6081614
RTU-041Suppiv Fan
Fan Type / Class FC/1
Fan RPM Actual
1785 RPM
Motor RPM Actual
818 RPM
A. Tot. Inlet SP
-0.07 in. wc.
A. Tot. Discharge SP
0.06 in. wc.
TSP Actual
0.13 in. wc.
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Tested By: Jason Douglas
Date: 11/7/2016
Motor Manufacturer
Motor HP
Motor RPM
Motor Frame
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Motor Service Factor
Electrical Test Data
Flanders
Drive Type
Belt Size
Number of Belts
04 /Supply Fan
Final Operating Hz 60 Hz
Actual GRD Total CFM
Motor Sheave
Motor Volts 1 475 Volts
2400 CFM
Motor Sheave Bore
Motor Volts 2 475 Volts
Inches
Motor Sheave Position
Motor Volts 3 475 Volts
Motor Adjustment (+/- Inches)
Motor Amps 1 1.9 Amps
Fan Sheave
Motor Amps 2 1.9 Amps
Fan Sheave Bore
Motor Amps 3 1.9 Amps
Sheave Center Line
Log:
A.O. Smith
1.5 HP
1725 RPM
56H
480 Volts
3
60 Hz
2.5 Amps
1.15
Belt
41-370
1
1VL40
7/8 in.
Mid.
1/2 in.
AK56
1 in.
12 3/4 in.
Air Test
Flanders
Data
Design GRD Total CFM
1900 CFM
Actual GRD Total CFM
1370 CFM
Return Air CFM Design
2400 CFM
Return Air CFM Actual
900 CFM
Filter Manufacturer
Flanders
Filter Type
Pleated
MERV Rating
8
Filter Quantity
3
Filter Size
14x25x2 (1) / 15x20x2 (2)
Jason Douglas
Inches
RTU -04
11/7/2016
Jason Douglas
Fan does not run.
RTU -04
11/7/2016
Jason Douglas
The unit was forced ON to perform TAB.
RTU -04
11/7/2016
Jason Douglas
Unit was forced ON to perform TAB.
Airtest Co Inc
Preliminary TAB Report
Page 11 of 20
AIRTEST Co., Inc.
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT M
RTU -04 Supply Outlet Summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Outlet -01
Area Served
Open Office 117
Outlet
Type
CD
Size LxW
D
10 RD
DesignSystem/Unit
CFM
300
Reading
200
Reading
220
73
Outlet -02
Open Office 117
CD
10 RD
400
230
275
69
Outlet -03
Open Office 117
CD
10 RD
200
165
140
70
Outlet -04
Open Office 117
CD
10 RD
200
215
140
70
Outlet -05
Open Office 117
CD
10 RD
200
170
145
73
Outlet -06
Open Office 117
CD
10 RD
300
170
225
75
Outlet -07
Open Office 117
Totals:1900
CD
10 RD
1 300
1 170 1225
1320
1370
75
72
RTU -04 Return Inlet Summary
Airtest Co Inc Page 12 of 20
Preliminary TAB Report
AIRTEST Co., Inc.
7-1
Roof Top Unit
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT M AUTHOR: Dustin Polly
SYSTEM/UNIT: RTU -05
Unit Manufacturer
York International
Unit Model Number
DF072N10P4AAA2A
Unit Serial Number
NOL608502
RTU-05/Supply Fan
Fan Type / Class
FC/1
Fan RPM Actual
Motor RPM Actual
A. Tot. Inlet SP
A. Tot. Discharge SP
TSP Actual
Final Operating Hz
Motor Volts 1
Motor Volts 2
Motor Volts 3
Motor Amps 1
Motor Amps 2
Motor Amos 3
1100 RPM
1728 RPM
-0.10 in. wc.
0.12 in. wc.
0.22 in. wc.
60 Hz
475 Volts
475 Volts
475 Volts
1.9 Amps
1.8 Amps
1.9 Amos
Tested By: Jason Douglas
Date: 11/7/2016
Motor Manufacturer
Motor HP
Motor RPM
Motor Frame
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Motor Service Factor
Drive Type
Belt Size
Number of Belts
Motor Sheave
Motor Sheave Bore
Motor Sheave Position
Motor Adjustment (+/- Inches)
Fan Sheave
Fan Sheave Bore
Sheave Center Line
A.O. Smith
1.5 HP
1725 RPM
56H
480 Volts
3
60 Hz
2.2 Amps
1.15
Belt
A35
1
1VL40
7/8 in.
Min
1/2 in.
5.5" OD
15/16 in.
12 in.
Air Test
Data
Design GRD Total CFM
2000 CFM
Actual GRD Total CFM
1315 CFM
Outside Air CFM Design
N/S CFM
Return Air CFM Design
2400 CFM
Return Air CFM Actual
1100 CFM
Filter Manufacturer
Filter Type
MERV Rating
Filter Quantity
Filter Size
Flanders
Pleated
8
3
14x25x2 (1) / 15x20x2 (2)
Airtest Co Inc Page 13 of 20
Preliminary TAB Report
AIRTEST Co., InAc
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT M
RTU -05 Supply Outlet Summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Outlet -01
Area Served
Hall 109
Outlet
.-
CD
Size LxW
D
12 RD
DesignSystem/Unit
CFM
400
Reading Reading
180 230
58
Outlet -02
Server Room 129
CD
12 RD
200
170
135
68
Outlet -03
Library 123
CD
10 RD
200
145
145
73
Outlet -04
Office 131
CD
8 RD
200
110
135
68
Outlet -05
Office 132
CD
10 RD
200
100
135
68
Outlet -06
Office 133
CD
10 RD
200
50
135
68
Outlet -07
Open Office 138
CD
10 RD
200
130
135
68
Outlet -08
Open Office 138
CD
10 RD -00
180
130
65
Outlet -09
Open Office 138
Totals:000
CD
8 RDE:!20:0=110
1175
135 1
1315
68
66
RTU -05 Return Inlet Summary
Airtest Co Inc
Preliminary TAB Report
;tet
r r
• M
t
Page 14 of 20
AIRTEST Co., Inc.
Roof Top Unit
C----
57ral
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT M AUTHOR: Dustin Polly
SYSTEM/UNIT: RTU -06
Unit Manufacturer
York International
Unit Model Number
DF072N10P4AAAIA
Unit Serial Number
RTU-06/SuEply Fan
NOB6986587
Fan Type / Class
FC/1
Motor Volts 3
475 Volts
Test
1.7 Amps
Data
RTU•OB/Sunpjy Fan
A. Tot. Inlet SP
0.002 in. wc.
A. Tot. Discharge SP
-0.004 in. wc.
TSP Actual
0.006 in. wc.
Electrical
Test Data
Final Operating Hz
60 Hz
Motor Volts 1
475 Volts
Motor Volts 2
475 Volts
Motor Volts 3
475 Volts
Motor Amps 1
1.7 Amps
Motor Amps 2
1.8 Amps
Motor Amps 3
1.7 Amps
Tested By: Jason Douglas
Date: 11/7/2016
ator Data
Motor Manufacturer
A.O. Smith
Motor HP
1.5 HP
Motor Frame
56H
Motor Rated Volts
480 Volts
Motor Phase
3
Motor Hertz
60 Hz
Motor FL Amps
2.5 Amps
Motor Service Factor
1.15
Drive Type
Belt
Belt Size
41-370
Number of Belts
1
Motor Sheave
1 VL40
Motor Sheave Bore
7/8 in.
Motor Sheave Position
Mid
Motor Adjustment (+/- Inches)
1/2 in.
Fan Sheave
AK56
Fan Sheave Bore
1 in.
Sheave Center Line
12 3/4 in.
Air Test
Data
Design GRD Total CFM
1200 CFM
Actual GRD Total CFM
625 CFM
Return Air CFM Design
1200 CFM
Return Air CFM Actual
475 CFM
Filter Manufacturer Flanders
Filter Type Pleated
MERV Rating 8
Filter Quantity 3
Filter Size 14x25x2 (1) / 15x20x2 (2)
Inches
Airtest Co Inc Page 15 of 20
Preliminary TAB Report
AIRTEST
Inco
Roof Top Unit
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT M AUTHOR: Dustin Polly
SYSTEM/UNIT: RTU-06/Duct-01
Traverse Location
Discharge Duct
Type of Traverse
Rectangular
Test Instrument Used
Pitot -Tube
Inner Height
17 in.
Inner Width
17 in.
Insulation Thickness
1 in.
Duct Area
1.890 sq. ft.
# of Rows (T -B)
4
Readings Per Row (L -R)
6
Total Readings
24
Row 1
Row 2
Row 3
Row 4
..yJ P.
� s
Tested By:
Jason Douglas
Date:
11/7/2016
Final
Data
Sum of Readings
7937 FPM
Average Velocity
331 FPM
Design Total Flow (CFM)
1200 CFM
Actual Total Flow (CFM)
626 CFM
Traverse Data Points
r N M � 1fi iG
V U V V U V
Airtest Co Inc Page 16 of 20
Preliminary TAB Report
AIRTEST Co., Incl
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT M
RTU -06 Supply Outlet Summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
System/Unit
Area Served
Outlet Size
LxW /
Design
Outlet -01 1
Tool Shop 122
Type D
SWD 17X10
CFM Reading Reading
200
Outlet -02
Tool Shop 122
SWD 1 1200
200
Outlet -03
Tool Shop 122
SWD 12x10
200
Outlet -04
Tool Shop 122
SWD 12x10
200
Outlet -05
Tool Shop 122
SWD 12x10
200
Outlet -06
Tool Shop 122
Totals:1200
SWD 12x10
200
i
KU-06 Return Inlet Summary
Airtest Co Inc
Preliminary TAB Report
Page 17 of 20
ACo., Inc.
-- - - ------ -4
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
SYSTEM/UNIT: RTU -07
AREA: Mulipurpose Room 119
Data
Unit Manufacturer York International
Unit Model Number DF90N10PAAA4A
Unit Serial Number NOA737830
RTU-07/Supply Fan
Fan Type / Class FC/1
Fan RPM Actual
Motor RPM Actual
A. Tot. Inlet SP
A. Tot. Discharge SP
TSP Actual
Final Operating Hz
Motor Volts 1
Motor Volts 2
Motor Volts 3
Motor Amps 1
Motor Amps 2
Motor Amps 3
Log:
1047 RPM
1773 RPM
-0.40 in. wc.
0.32 in. wc.
0.72 in. wc.
60 Hz
475 Volts
474 Volts
475 Volts
3.2 Amps
3.6 Amps
3.2 Amos
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Tested By: Jason Douglas
Date: 11/7/2016
Motor Manufacturer
Motor HP
Motor RPM
Motor Frame
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Motor Service Factor
Drive Type
Belt Size
Number of Belts
Motor Sheave
Motor Sheave Bore
Motor Sheave Position
Fan Sheave
Fan Sheave Bore
Sheave Center Line
A.O. Smith
3 HP
1725 RPM
56HZ
460 Volts
3
60 Hz
4.7 Amps
1.15
Belt
AX49
1
1VM50
7/8 in.
Min.
AK61
15/16 in.
17 3/4 in.
Air Test
Data
Design GRD Total CFM
2400 CFM
Actual GRD Total CFM
2615 CFM
Return Air CFM Design
2400 CFM
Return Air CFM Actual
2160 CFM
Filter Manufacturer
Filter Type
MERV Rating
Filter Quantity
Filter Size
RTU -07 11/7/2016 Jason Douglas The unit was forced ON to perform TAB.
RTU -07 11/7/2016 Jason Douglas Unit was forced ON to perform TAB.
Airtest Co Inc
Preliminary TAB Report
Airguard
Pleated
8
4
16x25x2 Inches
Page 18 of 20
AIRTEST Co., Inc.
Roof Top Unit
PROJECT: NW Hydraulics
LOCATION: Tukwila, WA
PROJECT #:
RTU -07 Supply Outlet Summary
DATE: 11/8/2016
CONTACT: Jason Douglas
AUTHOR: Dustin Polly
Ij
Outlet -01
Area Served
Office 137
Outlet
, -
CD
SizeLxW/'
D
8 RD
DesignSystem/Unit
CFM
200
Reading
280
Reading
215
108
Outlet -02
Office 102
CD
8 RD
200
240
215
108
Outlet -03
Office 103
CD
8 RD
200
260
220
110
Outlet -04
Large Conf. 107
CD
10 RD
300
325
330
110
Outlet -05
Large Conf. 107
CD
10 RD
300
370
325
108
Outlet -06
Mulipurpose Room 119
CD
10 RD
300
330
325
108
Outlet -07
Mulipurpose Room 119
CD
10 RD
1 300
290
330
110
Outlet -08
Mulipurpose Room 119
CD
10 RD
300
300
325
108
Outlet -09
Mulipurpose Room 119
CD
10 RD
300
rr
330
2725
330
2615
110
109
RTU -07 Return Inlet Summary
Log: RTU-07/Inlet-04 11/7/2016 Jason Douglas Missing volume damper on return inlet serving Conf. RM.
Airtest Co Inc
Preliminary TAB Report
Page 19 of 20
AIRTEST Co., Inc.
Fan Unit
PROJECT: NW Hydraulics DATE: 11/8/2016
LOCATION: Tukwila, WA CONTACT: Jason Douglas
PROJECT #: AUTHOR: Dustin Polly
SYSTEM/UNIT: EF -01 Tested By: Jason Douglas
Date: 11/7/2016
Unit Serves
Restrooms
Motor HP
1/8 HP
Unit Manufacturer
American Coolair
Motor RPM
1050 RPM
Model Number
5505 CRDA12E10
Motor Rated Volts
115 Volts
Serial Number
121506MO92440
Motor Phase
1
Fan Type / Class
Mushroom
Motor Hertz
60 Hz
Inlet -05
Mens Room 125
Motor FL Amps
3.1 Amps
N/S
Inlet -06
Motor Service Factor
1.0
Log:
Sheave Data
Drive Type Direct Drive
EF -01 11/7/2016 Jason Douglas Fan does not run.
EF -01 11/7/2016 Jason Douglas Motor does not tum freely. Possible motor/bearing failure.
EF -01 Exhaust Inlet Summary
System/Unit
Inlet -01
Area Served
Shower 128
Outlet
Type
EG
Size LxW
•
8 RD
Design
CFM Reading Reading
75
Inlet -02
Shower 126
EG
8 RD
75
Inlet -03
Janitor 123
EG
8 RD
75
Inlet -04
Mens Room 125
EG
8 RD
N/S
Inlet -05
Mens Room 125
EG
8 RD
N/S
Inlet -06
Women s Room 127
EG
8 RD
N/9—
Inlet-07
Womens Room 127
EG
8 RD
N/S
Airtest Co Inc Page 20 of 20
Preliminary TAB Report
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: MI6 -0140 DATE: 09/08/16
PROJECT NAME: NW HYDRAULICS
SITE ADDRESS: 12787 GATEWAY DR
X Original Plan Submittal Revision # before Permit Issued
Response to Correction Letter # Revision # after Permit Issued
DEPARTMENTS:
hT )�U) C
Building Division'
Public Works ❑
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/reviex, required)
REVIEWER'S INITIALS:
APPROVALS OR CORRECTIONS:
Approved ❑
Corrections Required ❑
(corrections entered in Reviews)
Notation:
REVIEWER'S INITIALS:
MA PA,
Fire Prevention
Structural ❑
Planning Division ❑
Permit Coordinator ❑
DATE: 09/13/16
Structural Review Required ❑
DATE:
DUE DATE:
Approved with Conditions
Denied ❑
(ie: Zoning Issues)
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
10/11/16
EMERALD AIRE INC Page 1 of 2
Home F,spafiol Contact �Searc – iC I'
A-'LIndex Help MyL&I
Safety & Health Claims & Insurance Workplace Rights Trades & Licensing
Washington State Department of
Labor & Industries
EMERALD AIRE INC
Owner or tradesperson
5108 D STREET NW
GENERAL
AUBURN, WA 98001
Principals
253-872-5665
HAPPE, DOUGLAS A, PRESIDENT
KING County
RIDGE, JOHN PATRICK, VICE PRESIDENT
RICHARDS, RON, SECRETARY
(End: 06/01/2000)
DUPUIS-FRICKE, LINDA, PRESIDENT
$12,000.00
(End: 12/31/1999)
HAPPE, DOUGLAS A, PRESIDENT
(End: 12/31/1999)
Effective date
TREMAINE, DAVIS WRIGHT, AGENT
01/01/2011
(End: 12/31/1999)
Expiration date
Doing business as
EMERALD AIRE INC
WA UBI No. Business type
600 591 552 Corporation
Governing persons
DOUGLAS
HAPPE
JOHN RIDGE;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor. Active.
......................_..._................................_.........
Meets current requirements.
License specialties
GENERAL
License no.
EMERAA1055BL
Effective — expiration
01/13/1995— 04/01/2017
Bond
..............
THE HANOVER INSURANCE COMPANY
$12,000.00
Bond account no.
1977929
Received by L&I
Effective date
01106/2011
01/01/2011
Expiration date
Until Canceled
Bond history
Insurance
Help us improve
https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=600591552&LIC=EMERAAIO55BL&SAW= 9/23/2016
NW HYDRAULICS
GENERAL INFORMATION GENERAL MECHANICAL: VICINITY AP; WSEC & COMMISSIONING NOTES: HVAC LEGEND & ABBREVIATIONS:
PROPERTY TAX NO.:
271600-0060
LEGAL DESCRIPTION:
GATEWAY CORPORATE CENTER
PLAT BLOCK;
PLAT LOT; 6
PROJECT LOCATION:
BLDG 6 - FLOOR 1
12787 GATEWAY DR,
TUKWILA, WA 98168
PROJECT DESCRIPTION:
DEMO, RELOCATION, AND INSTALLATION OF DIFFUSERS AND
DUCTWORK, AIR BALANCING AND COMMISSIONING OF HVAC
SYSTEM IN TENANT IMPROVEMENT SPACE,
HVAC CONTRACTOR:
EMERALD AIRE INC
5108 D STREET
AUBURN, WA 98001
PROJECT MANAGER:
CONTACT. -EMERALD AIRE, INC.
VOICE. -(253) 872-5665
FAX: ( 253) 872-5797
I GENERAL CONTRACTOR: I
FOUSHEE & ASSOCIATES, INC.
3260 118TH AVE. SE
BELLEVUE, WA 98004
CONTACT
VOICE: 425, 746. 1000
INDEX:
Sheet List Table
Sheet Number Sheet Title
M0.00 COVER SHEET
M1.00 EXISTING & DEMO HVAC PLAN
M2.00 LEVEL 1 HVAC PLAN
STANDARDS.-
EQUIPMENT
TANDARDS:EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE
PROVISIONS OF ARL, ASME, ASTM, UL, NEMA, ANSI, SMACNA,
ASHRAE, MFPA, OTHER APPLICABLE AGENCIES AND AHJ AS
APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY
CODES:
ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH
ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES AND
ORDINANCES. IN CASE OF CONFLICT BETWEEN THE
DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES,
THE MOST STRICT STANDARD (IN THE OPINION OF THE
ENGINEER) SHALL APPLY, THE MECHANICAL CONTRACTOR SHAL
SATISFY CODE REQUIREMENTS & REQUIREMENTS OF THE
CONTRACT DOCUMENTS AS A MINIMUM STANDARD,
APPLICABLE CODES:
2015 IMC W/WASHINGTON STATE AMENDMENTS.
2015 IBC W/WASHINGTON STATE AMENDMENTS.
2015 WASHINGTON STATE ENERGY CODE.
GENERAL CONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR
COMBINATION FIRE/SMOKE DAMPERS.
ELECTRIC HEAT IS PROVIDED BY OTHERS, UNLESS SPECIFICALLY
SCHEDULED ON THESE HVAC DRAWINGS. ELECTRIC HEAT FOR
FREEZE PROTECTION AND/OR HUMAN COMFORT NOT A PART OF
THE HVAC SYSTEM ON THESE DRAWINGS SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR AND
COMMUNICATED BY THE TRADE RESPONSIBLE FOR THAT SCOPE.
EAI IS NOT RESPONSIBLE FOR THIS SCOPE, BUT CAN ASSIST IN
SIZING APPLICATIONS. WHERE INDIVIDUAL UNIT APARTMENT HEAT
LOSS CALCULATIONS ARE PROVIDED BY EAI, THE MINIMUM HEAT
REQUIRED IS CALCULATED FOR CODE -COMPLIANCE PURPOSES
ASSUMING CODE -MINIMUM ENVELOPE ASSEMBLIES AND AN
INDOOR WINTER HEATING TEMPERATURE OF 69 DEG F.
NOT TO SCALE
THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND
COOLING PER WSEC 403. 2. 4, 1. 1
ECONOMIZERS SHALL MODULATE OUTSIDE AIR FROM MINIMUM TO 100%
SITE LOCATION
12787 Gateway br_ ECONOMIZER CONTROLS SHALL BE CAPABLE OF EVALUATING OUTDOOR AIR COOLING
Tukwila, VIA 98168 CAPACITY PER WSEC C403. 3. 1. 1
I INSULATE REFRIGERANT PIPING PER WSEC TABLE C403.2.8
SEAL DUCTWORK PER WSEC C403, 2. 7. 3
INSULATE DUCTWORK PER WSEC C403. 2. 7. 1 AND C403. 2. 7. 2
COMMISSIONING PER WSEC C408 INCLUDING COMMISSIONING PLAN, SYSTEMS
BALANCING, FUNCTIONAL TESTING, CONTROLS TESTING, OPERATION AND
MAINTENANCE MANUALS, AND RECORD DRAWINGS, SHALL BE SUBMITTED TO OWNER
ON PROJECT COMPLETION.
INSTALL ALL THERMOSTATS AT 48' AFF
GRILLES, REGISTERS &
DIFFUSERS
FANS
#
MFR
MODEL
SERVICE
#
MFR
MODEL
LOCATION
SERVES
DRIVE
DAMPER
CFM
SP
HP (W)
ELECTRICAL
SONE/
WT
ISO
NOTES
CEILING/WALL
1,2
Cj
SHOEMAKER I
SD52
I SUPPLY
SIDE WALL
1,2
( 11 WC)
LWA
01)Y
V / PH
FLA
EF -1
BROAN
AE80
SEE PLANS
SEE PLANS
Ld
80/60
0.1-0.25
(27)
120/1
0.3
(0.8)
10
0
1,2
EF -2
BROAN
AE50
SEE PLANS
SEE PLANS
z
j 50/37
1 0.1-0.25
(20)
120/1
0.2
(0.5)
10
0
1
NOTES:
1.
RUN CONTINUOUS 24/7.
2.
PROVIDE WITH SPEED CONTROL.
3.
ON/OFF CONTROL BY SWITCH PROVIDED BY EC.
4.
PROVIDE WITH VARIABLE FREQUENCY DRIVE & TWO SMOKE DETECTORS WIRED TO SHUT DOWN. DETECTORS SUPPLIED BY OTHERS, INSTALLED BY MC. INTERLOCK WITH FIREALARM BY OTHERS. VFD SUPPLIED
BY MC, INSTALLED BY OTHERS.
z
5.
FAN CONTROLLED VIA 120 VOLT OCCUPANCY SENSOR
GRILLES, REGISTERS &
DIFFUSERS
#
MFR
MODEL
SERVICE
MOUNTING
NOTES
A
SHOEMAKER
MA
SUPPLY
9-8-2016
TBAR/HARDLID
1,2
B
SHOEMAKER
600
XFR/RETURN
DATE
CEILING/WALL
1,2
Cj
SHOEMAKER I
SD52
I SUPPLY
SIDE WALL
1,2
NOTES:
1. SEE PLANS FOR DIMENSIONS.
2. SEE ARCH PLANS FOR CEILING TYPE.
3. W/OBD.
HIF
�,..... �._... - -- REVISIONS
Pfn 011t nCSS sli7tl ho made to the scope
of I°,,ork 11,ithc i prior approval of
"J"i , 'ila Building Division.
TW: v.lil require a neer plan submittal
and may include additional plan review fees.
I
",STA mr+_-
f tL.. E�13 FOR:
❑ h13chanical
C�lect�ical
L''l�- rnbing
s Piping
t-,;-1 ofi Tuklvila
'VISION
Plan rayieve approvF-1 is subject to errors and omissions.
Ap, , o anal of ,or!si:ru Mian documents does not au iii e
t 'a Violation of any adopted code or ordinance. Re it
Of approved ; ield Copy and conditions is acknowledged:
Sy. WS
Date: 2 -7 I
City If TuIwAla
BUILDING DIVISION
IV GRD IDENTIFIER
U SIDE WALL GRILL
® SUPPLY GRILLE
THERMAFUSER
® RETURN AIR GRILLE
EXHAUST GRILLE
® EXHAUST FAN
® EQUIPMENT TAG
O T -STAT
®CO/NO2 SENSOR
OCCUPANCY SENSOR
--� L/V WIRE
ED DUCT RUN
(- 4? ELBOW
-�- ED REDUCER
1_ SIDE TAPS
90 ELBOW
W/ TURNING VANES
nnO, nn* FLEXIBLE DUCT
-E E::D MANUAL DAMPER
FIRE DAMPER
SMOKE DAMPER
SMOKE/FIRE DAMPER
MOTORIZED DAMPER
BACKDRAFT DAMPER
-:F E:p VARIABLE VOLUME/TEMPERATURE
HP
HP
HTG
HTR
ID
IN
KW
LAT
LBS.
LWT
MA
MAX
MBH
MIN
MS
NC
NTS
OA
OBD
OC
OD
PH
PSI
QTY
R/A
REF
RET
RH
RLD
RPM
S/A
SEER
SH
SOV
SP
TEMP
LIC
VAV
VD
VEL
W
WB
W/0
HEAT PUMP
HORSEPOWER
HEATING
HEATER
INSIDE DIAMETER
INCHES
KILOWATT
LEAVING AIR TEMPERATURE
POUNDS
LEAVING WATER TEMPERATURE
MIXED AIR
MAXIMUM
THOUSAND BTU'S PER HOUR
MINIMUM
MOTOR STARTER
NOISE CRITERIA
NOT TO SCALE
OUTSIDE AIR
OPPOSED BLADE DAMPER
ON CENTER
OUTSIDE DIAMETER
PHASE
POUNDS PER SQUARE INCH
QUANTITY
RETURN AIR
REFRIGERANT
RETURN
RELATIVE HUMIDITY
RELIEF DAMPER
..............
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
� ifs tit' Tuifx+tuita
BUILDING DIVISION
REVOLUTIONS PER MINUTE
SUPPLY AIR
SEASONAL ENERGY EFFICIENCY RATING
SENSIBLE HEAT
SHUT OFF VALVE
STATIC PRESSURE
TEMPERATURE
UNDERCUT DOOR
VOLT
VARIABLE AIR VOLUME
VOLUME DAMPER (HAND OPERATOR)
VELOCITY
WATT
WITH
WET BULB
WITHOUT
RECEIVED
PNORTHT
SEP 0 8 2016
PERMIT CENTER
SEATTLE DPD
2' 8' O ,pva;89s
GIST V,
EM I
E�G1
0' 4' 16' �ssIONAL
SCALE: 1/8' = 1'-0'
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\MO.00 COVER SHEET.dwg
PLOT DATE 9/8/2016
I
z
DRAWING
DATE
--
COORDINATION
DATE
ZD
O
J
DATE
9-8-2016
13
CONSTRUCTION
DATE
Odrn
®
AS BUILT
DATE
0 <
Q
Q
�
o
V)
d
01)Y
}-
Nn
�
zQ
Ld
C�
U
m
N
z
J
W
Q
W
z
0
z
W
a
v
PLOT DATE 9/8/2016
I
DESIGN DEVELOPMENT
DRAWING
DATE
--
COORDINATION
DATE
ZD
ImPERMIT
J
DATE
9-8-2016
13
CONSTRUCTION
DATE
Odrn
®
AS BUILT
DATE
0 <
COVER SHEET
SCALE: AS -NOTED
M0.00
216-0706
co
�
U
m
ZD
J
Odrn
0 <
Q
Q
�
o
V)
01)Y
}-
Nn
�
zQ
Ld
C�
m
z
J
W
Q
COVER SHEET
SCALE: AS -NOTED
M0.00
216-0706
EXISTING TO REMAIN
a�
PROJECT
NORTH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 0 8 2016
PERMIT CENTER
2' 81 0 _�76
`�'� ACISTVR 1�
0' 4' ' L
16
s`SIONA
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M1.00 EXISTING & DEMO HVAC PLAN.dwg
z
A
DATE
-
i
f
COORDINATION
EXISTING TO REMAIN
a�
PROJECT
NORTH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 0 8 2016
PERMIT CENTER
2' 81 0 _�76
`�'� ACISTVR 1�
0' 4' ' L
16
s`SIONA
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M1.00 EXISTING & DEMO HVAC PLAN.dwg
z
A
DATE
--
iI
p " " M O
COORDINATION
DATE
zOCC))ON
L0 C,4 Q
O
_U
DATE
9-8-2016
CONSTRUCTION
DATE
00
< CY)
to LLJ
aeq
AS BUILT
DATE
J
O _
�Q�
'-
i
o
(; r-
o_
{..
o0
Z
Q
�
N
i
i
U
1
1
EXISTING TO REMAIN
a�
PROJECT
NORTH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 0 8 2016
PERMIT CENTER
2' 81 0 _�76
`�'� ACISTVR 1�
0' 4' ' L
16
s`SIONA
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M1.00 EXISTING & DEMO HVAC PLAN.dwg
PLOT DATE 9�/8/2016
❑
z
DRAWING
DATE
--
iI
p " " M O
COORDINATION
DATE
zOCC))ON
L0 C,4 Q
O
_U
DATE
9-8-2016
CONSTRUCTION
DATE
00
< CY)
to LLJ
aeq
AS BUILT
DATE
OOwQ
O _
�Q�
'-
i
o
(; r-
o_
=
o0
Z
Q
Q
N
'
U
z
W
Q
LWl
w
CD
o
U
CL
t
W
W
U)
7�
Z
Z
LTJ
_I
QL�/
L
1—
U
w
m
W
0
U)
z
O
w
w
a
p
PLOT DATE 9�/8/2016
❑
DESIGN DEVELOPMENT
DRAWING
DATE
--
iI
p " " M O
COORDINATION
DATE
zOCC))ON
L0 C,4 Q
ImPERMIT
_U
DATE
9-8-2016
CONSTRUCTION
DATE
00
< CY)
to LLJ
aeq
AS BUILT
DATE
OOwQ
EXISTING & DEMO HVAC
PLAN
SCALE: AS -NOTED
M1.00
216-0706
�
r n
V J
iI
p " " M O
o
zOCC))ON
L0 C,4 Q
_U
1
M
00
Qo
r-
oOp �
p z 'o
00
< CY)
to LLJ
aeq
U
OOwQ
O _
�Q�
'-
i
o
(; r-
JO
=
o0
Z
Q
Q
N
'
U
z
W
Q
LWl
w
CD
o
CL
t
W
W
7�
Z
Z
LTJ
_I
QL�/
L
1—
U
0
EXISTING & DEMO HVAC
PLAN
SCALE: AS -NOTED
M1.00
216-0706
rn
J
_
O rM
iI
p " " M O
zOCC))ON
L0 C,4 Q
I O Q
V) � w
oOp �
p z 'o
to LLJ
aeq
pp Lr) W v�
Co
JO
Q
F
Z
Q
'
U
LWl
w
o
CL
t
z
IM
m
W
EXISTING & DEMO HVAC
PLAN
SCALE: AS -NOTED
M1.00
216-0706
®9
a
Z
u
I I
DRAWING
DATE
--
F 71 F 71
COORDINATION
DATE
Z O N Q
�
O
_
DATE
9-8-2016
CONSTRUCTION
DATE
p Qo
Lr) W
00
AS BUILT
DATE
< 00
�
U
O0wQ
a
�'-Q�
v V
aD
PROJECT
NORTH
RELOCATE
NEW
EXISTING TO REMAIN
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
CitY of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 08 2016
PERMIT CENTER
2 8 vales s AD
�CrSTB 1t'
ssiONAEAG
0' 4 ' 16' L
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M2.00 LEVEL 1 HVAC PLAN.dwg
PLOT DATE 9/8/2016
`I
Z
u
DRAWING
DATE
--
�S 0 (DN 0 O
00
COORDINATION
DATE
Z O N Q
�
O
_
DATE
9-8-2016
CONSTRUCTION
DATE
p Qo
Lr) W
00
AS BUILT
DATE
< 00
�
U
O0wQ
a
�'-Q�
d
}-
o
nig
=
00 3:
Q
N �
F -
w
o
zQ
W
U
m
w
I�
F:zz
z
�
w
W
F--
U
V
W
p
V)
Z
O
W
W
Q
0
PLOT DATE 9/8/2016
`I
DESIGN DEVELOPMENT
u
DRAWING
DATE
--
�S 0 (DN 0 O
00
COORDINATION
DATE
Z O N Q
�
ImPERMIT
_
DATE
9-8-2016
CONSTRUCTION
DATE
p Qo
Lr) W
00
AS BUILT
DATE
< 00
�
LEVEL 1 HVAC PLAN
SCALE: AS -NOTED
M2.00
216-0706
Q0
/ //'��
cj
�S 0 (DN 0 O
00
U
�
Z O N Q
�
_
i
ry 00
J
m
p Qo
Lr) W
00
< 00
�
U
O0wQ
a
�'-Q�
o
}-
o
nig
=
00 3:
Q
N �
F -
w
o
zQ
W
s
m
w
I�
F:zz
z
�
w
Q
F--
U
V
W
LEVEL 1 HVAC PLAN
SCALE: AS -NOTED
M2.00
216-0706
rn
J
_
O 0-, r.A
�S 0 (DN 0 O
00
Z O N Q
�
^
N N OCIOpe
00 'w
p z 00 --' M :2
Lr) W
00
O�
�W04
mL�lXiL,Z0
a
o
Z
a
F -
w
o
s
m
I�
V
W
LEVEL 1 HVAC PLAN
SCALE: AS -NOTED
M2.00
216-0706
NW HYDRAULICS
GENERAL INFORMATION GENERAL MECHANICAL: VICINITY AP; WSEC & COMMISSIONING NOTES: HVAC LEGEND & ABBREVIATIONS:
PROPERTY TAX NO.:
271600-0060
LEGAL DESCRIPTION:
GATEWAY CORPORATE CENTER
PLAT BLOCK;
PLAT LOT; 6
PROJECT LOCATION:
BLDG 6 - FLOOR 1
12787 GATEWAY DR,
TUKWILA, WA 98168
PROJECT DESCRIPTION:
DEMO, RELOCATION, AND INSTALLATION OF DIFFUSERS AND
DUCTWORK, AIR BALANCING AND COMMISSIONING OF HVAC
SYSTEM IN TENANT IMPROVEMENT SPACE,
HVAC CONTRACTOR:
EMERALD AIRE INC
5108 D STREET
AUBURN, WA 98001
PROJECT MANAGER:
CONTACT. -EMERALD AIRE, INC.
VOICE. -(253) 872-5665
FAX: ( 253) 872-5797
I GENERAL CONTRACTOR: I
FOUSHEE & ASSOCIATES, INC.
3260 118TH AVE. SE
BELLEVUE, WA 98004
CONTACT
VOICE: 425, 746. 1000
INDEX:
Sheet List Table
Sheet Number Sheet Title
M0.00 COVER SHEET
M1.00 EXISTING & DEMO HVAC PLAN
M2.00 LEVEL 1 HVAC PLAN
STANDARDS.-
EQUIPMENT
TANDARDS:EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE
PROVISIONS OF ARL, ASME, ASTM, UL, NEMA, ANSI, SMACNA,
ASHRAE, MFPA, OTHER APPLICABLE AGENCIES AND AHJ AS
APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY
CODES:
ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH
ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES AND
ORDINANCES. IN CASE OF CONFLICT BETWEEN THE
DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES,
THE MOST STRICT STANDARD (IN THE OPINION OF THE
ENGINEER) SHALL APPLY, THE MECHANICAL CONTRACTOR SHAL
SATISFY CODE REQUIREMENTS & REQUIREMENTS OF THE
CONTRACT DOCUMENTS AS A MINIMUM STANDARD,
APPLICABLE CODES:
2015 IMC W/WASHINGTON STATE AMENDMENTS.
2015 IBC W/WASHINGTON STATE AMENDMENTS.
2015 WASHINGTON STATE ENERGY CODE.
GENERAL CONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR
COMBINATION FIRE/SMOKE DAMPERS.
ELECTRIC HEAT IS PROVIDED BY OTHERS, UNLESS SPECIFICALLY
SCHEDULED ON THESE HVAC DRAWINGS. ELECTRIC HEAT FOR
FREEZE PROTECTION AND/OR HUMAN COMFORT NOT A PART OF
THE HVAC SYSTEM ON THESE DRAWINGS SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR AND
COMMUNICATED BY THE TRADE RESPONSIBLE FOR THAT SCOPE.
EAI IS NOT RESPONSIBLE FOR THIS SCOPE, BUT CAN ASSIST IN
SIZING APPLICATIONS. WHERE INDIVIDUAL UNIT APARTMENT HEAT
LOSS CALCULATIONS ARE PROVIDED BY EAI, THE MINIMUM HEAT
REQUIRED IS CALCULATED FOR CODE -COMPLIANCE PURPOSES
ASSUMING CODE -MINIMUM ENVELOPE ASSEMBLIES AND AN
INDOOR WINTER HEATING TEMPERATURE OF 69 DEG F.
NOT TO SCALE
THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND
COOLING PER WSEC 403. 2. 4, 1. 1
ECONOMIZERS SHALL MODULATE OUTSIDE AIR FROM MINIMUM TO 100%
SITE LOCATION
12787 Gateway br_ ECONOMIZER CONTROLS SHALL BE CAPABLE OF EVALUATING OUTDOOR AIR COOLING
Tukwila, VIA 98168 CAPACITY PER WSEC C403. 3. 1. 1
I INSULATE REFRIGERANT PIPING PER WSEC TABLE C403.2.8
SEAL DUCTWORK PER WSEC C403, 2. 7. 3
INSULATE DUCTWORK PER WSEC C403. 2. 7. 1 AND C403. 2. 7. 2
COMMISSIONING PER WSEC C408 INCLUDING COMMISSIONING PLAN, SYSTEMS
BALANCING, FUNCTIONAL TESTING, CONTROLS TESTING, OPERATION AND
MAINTENANCE MANUALS, AND RECORD DRAWINGS, SHALL BE SUBMITTED TO OWNER
ON PROJECT COMPLETION.
INSTALL ALL THERMOSTATS AT 48' AFF
GRILLES, REGISTERS &
DIFFUSERS
FANS
#
MFR
MODEL
SERVICE
#
MFR
MODEL
LOCATION
SERVES
DRIVE
DAMPER
CFM
SP
HP (W)
ELECTRICAL
SONE/
WT
ISO
NOTES
CEILING/WALL
1,2
Cj
SHOEMAKER I
SD52
I SUPPLY
SIDE WALL
1,2
( 11 WC)
LWA
01)Y
V / PH
FLA
EF -1
BROAN
AE80
SEE PLANS
SEE PLANS
Ld
80/60
0.1-0.25
(27)
120/1
0.3
(0.8)
10
0
1,2
EF -2
BROAN
AE50
SEE PLANS
SEE PLANS
z
j 50/37
1 0.1-0.25
(20)
120/1
0.2
(0.5)
10
0
1
NOTES:
1.
RUN CONTINUOUS 24/7.
2.
PROVIDE WITH SPEED CONTROL.
3.
ON/OFF CONTROL BY SWITCH PROVIDED BY EC.
4.
PROVIDE WITH VARIABLE FREQUENCY DRIVE & TWO SMOKE DETECTORS WIRED TO SHUT DOWN. DETECTORS SUPPLIED BY OTHERS, INSTALLED BY MC. INTERLOCK WITH FIREALARM BY OTHERS. VFD SUPPLIED
BY MC, INSTALLED BY OTHERS.
z
5.
FAN CONTROLLED VIA 120 VOLT OCCUPANCY SENSOR
GRILLES, REGISTERS &
DIFFUSERS
#
MFR
MODEL
SERVICE
MOUNTING
NOTES
A
SHOEMAKER
MA
SUPPLY
9-8-2016
TBAR/HARDLID
1,2
B
SHOEMAKER
600
XFR/RETURN
DATE
CEILING/WALL
1,2
Cj
SHOEMAKER I
SD52
I SUPPLY
SIDE WALL
1,2
NOTES:
1. SEE PLANS FOR DIMENSIONS.
2. SEE ARCH PLANS FOR CEILING TYPE.
3. W/OBD.
HIF
�,..... �._... - -- REVISIONS
Pfn 011t nCSS sli7tl ho made to the scope
of I°,,ork 11,ithc i prior approval of
"J"i , 'ila Building Division.
TW: v.lil require a neer plan submittal
and may include additional plan review fees.
I
",STA mr+_-
f tL.. E�13 FOR:
❑ h13chanical
C�lect�ical
L''l�- rnbing
s Piping
t-,;-1 o; Tuklvila
'VISION
Plan rayieve approvF-1 is subject to errors and omissions.
Ap, , o anal of ,or!si:ru Mian documents does not au iii e
t 'a Violation of any adopted code or ordinance. Re it
Of approved ; ield Copy and conditions is acknowledged:
Sy. WS
Date: 2 -7 I
City If TuIwAla
BUILDING DIVISION
IV GRD IDENTIFIER
U SIDE WALL GRILL
® SUPPLY GRILLE
THERMAFUSER
® RETURN AIR GRILLE
EXHAUST GRILLE
® EXHAUST FAN
® EQUIPMENT TAG
O T -STAT
®CO/NO2 SENSOR
OCCUPANCY SENSOR
--� L/V WIRE
ED DUCT RUN
(- 4? ELBOW
-�- ED REDUCER
1_ SIDE TAPS
90 ELBOW
W/ TURNING VANES
nnO, nn* FLEXIBLE DUCT
-E E::D MANUAL DAMPER
FIRE DAMPER
SMOKE DAMPER
SMOKE/FIRE DAMPER
MOTORIZED DAMPER
BACKDRAFT DAMPER
-:F E:p VARIABLE VOLUME/TEMPERATURE
HP
HP
HTG
HTR
ID
IN
KW
LAT
LBS.
LWT
MA
MAX
MBH
MIN
MS
NC
NTS
OA
OBD
OC
OD
PH
PSI
QTY
R/A
REF
RET
RH
RLD
RPM
S/A
SEER
SH
SOV
SP
TEMP
LIC
VAV
VD
VEL
W
WB
W/0
HEAT PUMP
HORSEPOWER
HEATING
HEATER
INSIDE DIAMETER
INCHES
KILOWATT
LEAVING AIR TEMPERATURE
POUNDS
LEAVING WATER TEMPERATURE
MIXED AIR
MAXIMUM
THOUSAND BTU'S PER HOUR
MINIMUM
MOTOR STARTER
NOISE CRITERIA
NOT TO SCALE
OUTSIDE AIR
OPPOSED BLADE DAMPER
ON CENTER
OUTSIDE DIAMETER
PHASE
POUNDS PER SQUARE INCH
QUANTITY
RETURN AIR
REFRIGERANT
RETURN
RELATIVE HUMIDITY
RELIEF DAMPER
..............
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
� ifs tit' Tuifx+tuita
BUILDING DIVISION
REVOLUTIONS PER MINUTE
SUPPLY AIR
SEASONAL ENERGY EFFICIENCY RATING
SENSIBLE HEAT
SHUT OFF VALVE
STATIC PRESSURE
TEMPERATURE
UNDERCUT DOOR
VOLT
VARIABLE AIR VOLUME
VOLUME DAMPER (HAND OPERATOR)
VELOCITY
WATT
WITH
WET BULB
WITHOUT
RECEIVED
PNORTHT
SEP 0 8 2016
PERMIT CENTER
SEATTLE DPD
2' 8' O ,pva;89s
GIST V,
EM I
E�G1
0' 4' 16' �ssIONAL
SCALE: 1/8' = 1'-0'
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\MO.00 COVER SHEET.dwg
PLOT DATE 9/8/2016
I
z
DRAWING
DATE
--
COORDINATION
DATE
ZD
O
J
DATE
9-8-2016
13
CONSTRUCTION
DATE
Odrn
®
AS BUILT
DATE
0 <
Q
Q
�
o
V)
d
01)Y
}-
Nn
�
zQ
Ld
C�
U
m
N
z
J
W
Q
W
z
0
z
W
a
v
PLOT DATE 9/8/2016
I
DESIGN DEVELOPMENT
DRAWING
DATE
--
COORDINATION
DATE
ZD
ImPERMIT
J
DATE
9-8-2016
13
CONSTRUCTION
DATE
Odrn
®
AS BUILT
DATE
0 <
COVER SHEET
SCALE: AS -NOTED
M0.00
216-0706
co
�
U
m
ZD
J
Odrn
0 <
Q
Q
�
o
V)
01)Y
}-
Nn
�
zQ
Ld
C�
m
z
J
W
Q
COVER SHEET
SCALE: AS -NOTED
M0.00
216-0706
EXISTING TO REMAIN
a�
PROJECT
NORTH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 0 8 2016
PERMIT CENTER
2' 81 0 _�76
`�'� ACISTVR 1�
0' 4' ' L
16
s`SIONA
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M1.00 EXISTING & DEMO HVAC PLAN.dwg
z
A
DATE
-
i
f
COORDINATION
EXISTING TO REMAIN
a�
PROJECT
NORTH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 0 8 2016
PERMIT CENTER
2' 81 0 _�76
`�'� ACISTVR 1�
0' 4' ' L
16
s`SIONA
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M1.00 EXISTING & DEMO HVAC PLAN.dwg
z
A
DATE
--
iI
p " " M O
COORDINATION
DATE
zOCC))ON
L0 C,4 Q
O
_U
DATE
9-8-2016
CONSTRUCTION
DATE
00
< CY)
to LLJ
aeq
AS BUILT
DATE
J
O _
�Q�
'-
i
o
(; r-
o_
{..
o0
Z
Q
�
N
i
i
U
1
1
EXISTING TO REMAIN
a�
PROJECT
NORTH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 0 8 2016
PERMIT CENTER
2' 81 0 _�76
`�'� ACISTVR 1�
0' 4' ' L
16
s`SIONA
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M1.00 EXISTING & DEMO HVAC PLAN.dwg
PLOT DATE 9�/8/2016
❑
z
DRAWING
DATE
--
iI
p " " M O
COORDINATION
DATE
zOCC))ON
L0 C,4 Q
O
_U
DATE
9-8-2016
CONSTRUCTION
DATE
00
< CY)
to LLJ
aeq
AS BUILT
DATE
OOwQ
O _
�Q�
'-
i
o
(; r-
o_
=
o0
Z
Q
Q
N
'
U
z
W
Q
LWl
w
CD
o
U
CL
t
W
W
U)
7�
Z
Z
LTJ
_I
QL�/
L
1—
U
w
m
W
0
U)
z
O
w
w
a
p
PLOT DATE 9�/8/2016
❑
DESIGN DEVELOPMENT
DRAWING
DATE
--
iI
p " " M O
COORDINATION
DATE
zOCC))ON
L0 C,4 Q
ImPERMIT
_U
DATE
9-8-2016
CONSTRUCTION
DATE
00
< CY)
to LLJ
aeq
AS BUILT
DATE
OOwQ
EXISTING & DEMO HVAC
PLAN
SCALE: AS -NOTED
M1.00
216-0706
�
r n
V J
iI
p " " M O
o
zOCC))ON
L0 C,4 Q
_U
1
M
00
Qo
r-
oOp �
p z 'o
00
< CY)
to LLJ
aeq
U
OOwQ
O _
�Q�
'-
i
o
(; r-
JO
=
o0
Z
Q
Q
N
'
U
z
W
Q
LWl
w
CD
o
CL
t
W
W
7�
Z
Z
LTJ
_I
QL�/
L
1—
U
0
EXISTING & DEMO HVAC
PLAN
SCALE: AS -NOTED
M1.00
216-0706
rn
J
_
O rM
iI
p " " M O
zOCC))ON
L0 C,4 Q
I O Q
V) � w
oOp �
p z 'o
to LLJ
aeq
pp Lr) W v�
Co
JO
Q
F
Z
Q
'
U
LWl
w
o
CL
t
z
IM
m
W
EXISTING & DEMO HVAC
PLAN
SCALE: AS -NOTED
M1.00
216-0706
®9
a
Z
u
I I
DRAWING
DATE
--
F 71 F 71
COORDINATION
DATE
Z O N Q
�
O
_
DATE
9-8-2016
CONSTRUCTION
DATE
p Qo
Lr) W
00
AS BUILT
DATE
< 00
�
U
O0wQ
a
�'-Q�
v V
aD
PROJECT
NORTH
RELOCATE
NEW
EXISTING TO REMAIN
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 2 2016
CitY of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 08 2016
PERMIT CENTER
2 8 vales s AD
�CrSTB 1t'
ssiONAEAG
0' 4 ' 16' L
SCALE: 1/8" = 1'-0"
P:\working projects\nw hydraulics (216-0706)\engineering\cad drawings\nw hydraulics\Sheets\M2.00 LEVEL 1 HVAC PLAN.dwg
PLOT DATE 9/8/2016
`I
Z
u
DRAWING
DATE
--
�S 0 (DN 0 O
00
COORDINATION
DATE
Z O N Q
�
O
_
DATE
9-8-2016
CONSTRUCTION
DATE
p Qo
Lr) W
00
AS BUILT
DATE
< 00
�
U
O0wQ
a
�'-Q�
d
}-
o
nig
=
00 3:
Q
N �
F -
w
o
zQ
W
U
m
w
I�
F:zz
z
�
w
W
F--
U
V
W
p
V)
Z
O
W
W
Q
0
PLOT DATE 9/8/2016
`I
DESIGN DEVELOPMENT
u
DRAWING
DATE
--
�S 0 (DN 0 O
00
COORDINATION
DATE
Z O N Q
�
ImPERMIT
_
DATE
9-8-2016
CONSTRUCTION
DATE
p Qo
Lr) W
00
AS BUILT
DATE
< 00
�
LEVEL 1 HVAC PLAN
SCALE: AS -NOTED
M2.00
216-0706
Q0
/ //'��
cj
�S 0 (DN 0 O
00
U
�
Z O N Q
�
_
i
ry 00
J
m
p Qo
Lr) W
00
< 00
�
U
O0wQ
a
�'-Q�
o
}-
o
nig
=
00 3:
Q
N �
F -
w
o
zQ
W
s
m
w
I�
F:zz
z
�
w
Q
F--
U
V
W
LEVEL 1 HVAC PLAN
SCALE: AS -NOTED
M2.00
216-0706
rn
J
_
O 0-, r.A
�S 0 (DN 0 O
00
Z O N Q
�
^
N N OCIOpe
00 'w
p z 00 --' M :2
Lr) W
00
O�
�W04
mL�lXiL,Z0
a
o
Z
a
F -
w
o
s
m
I�
V
W
LEVEL 1 HVAC PLAN
SCALE: AS -NOTED
M2.00