Loading...
HomeMy WebLinkAboutPermit M16-0142 - BANK OF AMERICA - DIFFUSERS AND GRILLESis p lipt : ►707�i1�1:i(N1 320 STRANDER BLVD M16-0142 City of Tukwila • �" Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.itov MECHANICAL PERMIT Parcel No: 9202470050 Permit Number: M16-0142 Address: 320 STRANDER BLVD Issue Date: 9/23/2016 Permit Expires On: 3/22/2017 Project Name: BANK OF AMERICA Owner: Name: BANK OF AMERICA NA Address: 101 N TRYON ST NC10010381, CHARLOTTE, WA, 28255 Contact Person: Name: TED HUNT Phone: (253) 926-9777 Address: 6426 18 ST E, FIFE, WA, 98424 Contractor: Name: MECHANICAL & CONTROL SERVICES Phone: (253) 926-9777 INC Address: 6426 18TH ST E, FIFE, WA, 98424 License No: MECHACS962BT Expiration Date: 2/26/2018 Lender: Name: Address: DESCRIPTION OF WORK: RELOCATE AND ADD SUPPLY DIFFUSERS AND GRILLES FOR NEW CEILING Valuation of Work: $9,600.00 Fees Collected: $324.28 Type of Work: REPLACEMENT Electrical Service Provided by: PUGEST SOUND ENERGY Fuel type: Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to thkc"b"nditions attached to this permit. Sign i Print Name: j Z -S' ykJf(,A— Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: `MECHANICAL PERMIT CONDITIONS' 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htti)://www.TukwilaWA.gov Mechanical Permit No. Q — C- (14 Project No. Date Application Accepted: Date Application Expires: 1 use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "please print" SITE LOCATION t King Co Assessor's Tax No.:—q 02 a� c�0 Ci Site Address: �c� 5��ct nd e f I �C� Suite Number: Floor: Tenant Name: _Z—n A �-- o i Awy-r 1c,*— _ __ _ New Tenant: ❑ .....Yes No PROPERTY OWNER Nam Address- L9UO E -1-4k Ave– 10' 'Elea, City:t441 e,-- /A A Zip- -<::;f f OL -1 CONTACT PERSON — person receiving all project communication Name: to i ce— cp 4--A r J9 c s Address: ySk S'}- 5 City: 140— State:w� Zip• sya Phone .�c/dlc-x/77`7 Fa �53 -9da a Email:.A-,a kcocqt ,—c.5, 6z, M MECHANICAL CONTRACTOR INFORMATION Company Name: yvi 1 Address: y a-6 1 b -,L,% S v. F� City:�r l C _ State�A Zip: Ct O Ja Phone:o75 i3�c%�:r� `1777 Fax:/•,,.�> 9p - Ia Contr Reg No.: Exp Date: Tukwila Business License No.40sa Lfo q q -5j Valuation of project (contractor's bid price): $ %`Ot7. UJ Describe the scope of work in detail:"A C AAc< FCt"c M Z3 Use: Residential: New .......... ❑ Replacement ........ Q Commercial: New .......... ❑ Replacement ..... Fuel Twe: Electric..... Q Gas....... ❑ Other: H:\Applications\Foms-Applicatio s On Line\2016 Applicatiofs\hlechanical Pemtit Application Revised 14-16.do" Revised: January2016 Page I oft bb 5 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <I OOk btu Residential, Nighttime Furnace >I OOk btu Industrial Floor furnace L` Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <I0,000 cfm 65 dB(A) Unit Type Qty Air handling unit >I 0,000 cfm Residential, Nighttime Evaporator cooler Industrial Ventilation fan connected to single duct L` Ventilation system 57 dB(A) Hood and duct Commercial Incinerator— domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat Wood/gas stove L` Emergency enerator 57 dB(A) Other mechanical equipment Commercial 57 dB(A) 47 dB(A) Boiler/Compressor Qty 0-3 hp/I 00,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ h /1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (lam- I Opm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING AGENT: Date: '9� Print Name:. Day Telephone:( :�), /d-6 —9 7 -7 Mailing Address: `!a (� s-� cn 5 L.u/-r %, yay City State Zip H:UpplicationsTmnts-Applications On Line\2016 Applications\Mcchanical Pemtil Application Revised 14-16.docx Revised: January 2016 Page 2 of 2 bh DESCRIPTIONS ACCOUNT PermitTRAK $324.28 M16-0142 Address: 320 STRANDER BLVD Apn: 9202470050 $324.28 MECHANICAL $311.81 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $216.95 PLAN CHECK FEE R000.322.102.00.00 0.00 $62.36 TECHNOLOGY FEE $12.47 TECHNOLOGY FEE R000.322.900.04.00 0.00 $12.47 TOTAL FEES PAID BY RECEIPT: .. 387 $324.28 Date Paid: Monday, September 12, 2016 Paid By: TED HUNT Pay Method: CREDIT CARD 112102 Printed: Monday, September 12, 2016 9:20 AM 1 of 1 forNwpAo SYSTEMS INSPECTION RECORD Retain a copy with permit m&-0142- IN57ECTION N0, PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro'' t: Type of Inspection: tW AAJ 1�"14� ji eAL L. Address: Date Called: s � f Special Instructions: Date Wante rz lG p.m. Requester. :�Ioa Phone No: L 2S�'- ��- IInspector: /j A IDate; ll fl e U REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORDI W 1� Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro' `t::� t Yet clot T e of Ins t' n* Address: JZ Date Cal ed: Special Instructions: Date Wanted :W ltle a.m. lm. Requester: Phone No: MApproved per applicable codes. 1:1 Corrections required prior to approval. r Ilnspector: /4 7 m.A Iuace:/61.7 /IP F] REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD - f INSPECTION N0. Retain a Copy With permit Ml —O q 2 PERMI CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Approved per applicable codes. Ll Corrections required prior to approval. ❑ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit I A4 /6 vVti Z INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro'ect: . w K oY" G �G4 Type of Ins ection: Pr bt/F AKU L.i7 Address: O S ozgi-e Date Call d: Special Instructions: j Date Wanted:. a.m. fJ uC .m. Requester: Phone No: Approved per applicable codes. L- Corrections required prior to approval. I I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. AIRIEST Co., Inc. Certified Test, Adjust and Balance Report Project: Address: Engineer: Mechanical Contractor: Address: TAB Supervisor: Bank of America - Tukwila 320 Strander Blvd Tukwila, WA 98188 Henderson Engineers Inc. Mechanical & Control Services, Inc. 6426 18th Street East Fife, WA 98424 Dustin Polly NEBB Certification: 3000 Date: December 15, 2016 RECEIVED CITY CSE TUKWILA DEC 212016 PERMIT CENTER M I bqw- C) I Li 24 P.O. Box 86 • Issaquah, Washington 98027 - (425) 313-0172 • Fax (425) 313-5735 Page 1 of 12 C.Q Table of Contents C Certification............................................................................................................... NEBBCertificates..................................................................................................... AIRTEST Company, Inc. Warranty......................................................................... CalibrationReport ...................................................................................................... Test and Balance Summary ....................................................................................... FieldNote Report ....................................................................................................... RTU -01 Report .......................................................................................................... RTU -02 Report .......................................................................................................... RTU -03 Report .......................................................................................................... RTU -04 Report .......................................................................................................... 3 4 6 7 8 9 10 11 12 12 Page 2 of 12 C 3 4 6 7 8 9 10 11 12 12 Page 2 of 12 .A AIRTEST Co., Inc. N CERTIFICATION PROJECT: Bank of America - Tukwila ADDRESS: Tukwila, WA THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST -ADJUST -BALANCE REPORT PROJECT SUMMARY. NEBB TAB FIRM: AIRTEST CO., INC. REG. NO. 3000 CERTIFIED BY: DUSTIN POLLY DATE: December 15, 2016 SUBMITTED & CERTIFIED BY: NEBB TAB FIRM: TAB SUPERVISOR: REG. NO. 3000 AIRTEST CO., INC. DUSTIN POLLY SIGNATURE: CERTIFICATION EXPIRATION DATE: March 31, 2017 ENP. P.O. Box 86 • Issaquah, Washington 98027 • (425) 313-0172 • Fax (425) 313-5735 Page 3 of 12 a b z w U r i Page 4 of 12 (;;:Lf E Page 5 of 12 AIRTEST Co., Inc, 6 Warranty of TAB Services PROJECT: Bank of America - Tukwila DATE: 12/15/2016 LOCATION: Tukwila, WA TECHNICIAN: Jason Douglas PROJECT M 16-3085-1 Warranty of TAB Services: AIRTEST Co., Inc. warranties the TAB work performed on this project for one year from the date of the first published report. AIRTEST Co., Inc. reserves the right to correct errors or omissions in the collection of data, and issue amended TAB reports. This Warranty covers all Test and Balance services provided by AIRTEST unless otherwise stated in writing. When any balancing issues or concerns arise, AIRTEST Co., Inc. will dedicate resources to understand the issue or question. This may include a return trip(s) to the project site, or other appropriate methods of resolving the issue. A return trip(s) to the site, if necessary, will involve verification of system adjustments and adherence to reported values. No charges will be issued for any work found to be in compliance with the reported data, however if AIRTEST Co., Inc. is directed to make adjustments that result in differences from the reported data (i.e. Comfort Balancing), charges may be incurred. Repeated requests for Warranty services may incur charges if the TAB work is found to be in compliance with the reported data. Voided Warranty and Additional Charges: When issues arise due to mechanical equipment failure, control or maintenance related causes, the return trip may be subject to a service charge not covered under warranty. AIRTEST Co., Inc. reserves the right to resolve any TAB issues. Actions by others to resolve a warranty issue before AIRTEST Co., Inc. is notified, or allowed sufficient time to respond, will result in a voided project warranty. Any return trip(s) to the jobsite as a result of such actions are subject to charges. A purchase order will be required before returning to the jobsite if such conditions exist. Document Archiving: An electronic copy of the test data will be provided at no charge for the warranty period. Electronic copies of the project test data may be available after the warranty period, at no charge. Printed / bound copies will be subject to a fee. Page 6 of 12 JIRTEST Co., Inc. Calibration Report PROJECT: Bank of America - Tukwila LOCATION: Tukwila, WA PROJECT #: 16-3085-1 DATE: 12/15/2016 TECHNICIAN: Jason Douglas INSTRUMENT / SERIAL NUMBER APPLICATION DATES OF USE THRU CALIBRATION TEST DATE Pacer DA410/ 1014638 Velocity Dec -16 9/16 Alnor 6461/ 70530238 CFM Dec -16 9/16 Alnor EBT720/ 90504013 Pressure Dec -16 9/16 Monarch NOVA STROBE BBX / 2521500 RPM Dec -16 8/16 Fluke 3000FC/ 2960011 Electrical Dec -16 9/16 Alnor CF8612 / 56117041 Temperature Dec -16 9/16 Alnor HM670 / 70826081 Hydronics Dec -16 3/16 Page 7 of 12 SYMBOLS & ABBREVIATIONS ADJ = Adjustable Fan Speed LD x = Linear Diffuser where "x" is number of slots CD = Ceiling Diffuser N/A = Not Available CFM = Cubic Feet per Minute NI = Not Installed D/A = VAV Inlet Dimension in Inches NR = Not Required DD = Design Data NPSH = Net Positive Suction Head EG = Exhaust Grille RG = Return Grille E.S.P. = External Static Pressure RPM = Revolutions per Minute F/C = VAV Calibration Factor SF = Motor Service Factor FCD = Field Collected Data S.P. = Static Pressure FG = Floor Grille SWG = Side Wall Grille FLA = Motor Full Load Amps T.S.P. = Total Static Pressure GPM = Gallons per Minute VAR = Variable Fan Speed !HP = Horsepower Hz = Hertz in. Hg. = Inches Mercury in. w.g. = Inches Water Gauge LD = Linear Diffuser Page 7 of 12 AIRTEST Co., Inc. Test and Balance Summary PROJECT: Bank of America - Tukwila LOCATION: Tukwila, WA PROJECT #: 16-3085-1 DATE: December 15, 2016 TECHNICIAN: Jason Douglas Test and balance was done based upon NEBB procedural standards and specification 230593. Items of note are listed in the "Field Note Report" and in the "Note" section under each piece of equipment throughout the report. Unable to test all equipment under design day conditions due to ambient conditions at time of balance. There were 4 existing roof top units to balance. All readings were taken with a flow hood unless otherwise noted. The following deficiencies existed at time of balance. RTU -01: RTU serves other outlets with no CFM values to balance to. Unable to balance zone to design airflow. Outlet serving ATM Room is low on airflow. Outlet serving lobby is low on airflow. No access to damper above hard lid ceiling. Unit tags are faded and illegible on all units. Page 8 of 12 AIRTEST Co., Inc. Field Note Report PROJECT: Bank of America - Tukwila LOCATION: Tukwila, WA PROJECT M 16-3085-1 DATE: 12/15/2016 CONTACT: Jason Douglas AUTFIAR. mmfin 13,41. Airtest Co Inc Page 9 of 12 Test System Unit Name .. .. Project 15 -Dec -16 Jason Douglas Roof icy. No safe access to units. 8 -Dec -16 Jason Douglas Deficiency 0002: No access to roof. Hatch is locked by bank. No key available. 8 -Dec -16 Jason Douglas Deficiency 0003: Stat temp override will not keep unit running. Stat resets itself to normal and fan shuts off. Per General the control of units is handled by back east monitoring. Roof Top Unit RTU -01 15 -Dec -16 Jason Douglas Deficiency 0008: RTU serves other outlets with no CFM values. Roof Top Unit RTU -03 10 -Dec -16 Jason Douglas Other outlets served by RTU and print shows to rebalance 2 outlets only. Roof Top Unit RTU -04 10 -Dec -16 Jason Douglas Other outlets served by RTU and print shows to rebalance 2 outlets only. Supply Outlet RTU-01/Outlet-01 15 -Dec -16 Jason Douglas ATM room with no tenant. Supply Outlet RTU-01/Outlet-02 15 -Dec -16 Jason Douglas Deficiency 0006: No access to damper above hard lid ceiling. Supply Outlet RTU-01/Outlet-03 15 -Dec -16 Jason Douglas Deficiency 0007: No access to damper above hard lid ceiling. Airtest Co Inc Page 9 of 12 AIRTEST Co., Inc. Roof Top Unit PROJECT: Bank of America - Tukwila LOCATION: Tukwila, WA PROJECT M 16-3085-1 SYSTEM/UNIT: RTU -01 AREA: ATM Room 7UnUnit Manufacturer Trane Unit Model Number YHC048E3RMA008F Unit Serial Number 914100098L DATE: 12/15/2016 CONTACT: Jason Douglas AUTHOR: Dustin Polly Tested By: Jason Douglas Date: 12/15/2016 Air Test Data Design GRD Total CFM 640 CFM Actual GRD Total CFM 285 CFM Log: I RTU -01 12/15/2016 Jason Douglas RTU serves other outlets with no CFM values. RTU -01 Supply Outlet Summary Log: RTU -01 /Outlet -01 12/15/2016 Jason Douglas ATM room with no tenant. RTU-01/Outlet-02 12/15/2016 Jason Douglas No access to damper above hard lid ceiling. RTU-01/Outlet-03 12/15/2016 Jason Douglas No access to damper above hard lid ceiling. Airtest Co Inc Page 10 of 12 AIRTEST Co., Inc. Roof Top Unit PROJECT: Bank of America - Tukwila LOCATION: Tukwila , WA PROJECT #: 16-3085-1 SYSTEMIUNIT: RTU -02 AREA: Bank Lobby Unit Manufacturer Trane Unit Model Number YSH120E3RMA0168 Unit Serial Number 904101806E DATE: 12/15/2016 CONTACT: Jason Douglas AUTHOR: Dustin Polly Tested By: Jason Douglas Date: 12/15/2016 Actual GRD Total CFM 3170 CFM Outside Air CFM Design 445 CFM Outside Air CFM Actual 455 CFM Return Air CFM Design WS CFM Return Air CFM Actual 480 CFM RTU -02 Supply Outlet Summary Unit Area Served Outlet Size LxW DesignSystem Design CFM Prelim Reading Final % Final Reading Outlet -01 Calling Cube .• CD D 10 RD CFM 250 Reading 300 Reading 255 102 Outlet -02 Bank Lobby CD 10 RD 250 200 200 80 Outlet -03 Bank Lobby CD 10 RD 250 100 140 56 Outlet -04 Office 113 CD 6 RD 100 105 105 105 Outlet -05 Office 112 CD 6 RD 100 105 105 105 Outlet -06 Bank Lobby CD 10 RD 250 180 195 78 Outlet -07 Bank Lobby CD 10 RD 250 250 245 98 Outlet -08 Bank Lobby CD 10 RD 250 180 190 76 Outlet -09 Office 128 CD 6 RD 100 110 100 100 Outlet -10 Bank Lobby CD 6 RD 250 150 170 68 Outlet -11 Office 127 CD 6 RD 100 155 105 105 Outlet -12 Bank Lobby CD 10 RD 250 190 195 78 Outlet -13 Bank Lobby CD 10 RD 250 180 185 74 Outlet -14 Bank Lobby CD 10 RD 250 160 175 70 Outlet -15 Office 126 CD 6 RD 100 155 105 105 Outlet -16 Bank Lobby CD 10 RD 250 110 150 60 Outlet -17 Bank Lobby SWD 8 x 12 300 100 175 58 Outlet -18 Bank Lobby SWD 8 x 12 300 100 175 1 58 Outlet -19 Bank Lobby Totals:00 CD 10 RD 250 185 3015 200 80 RTU -02 Return Inlet Summary System/Unit Area Served Outlet Type Size —Lx W- / D Design CFM Prelim Reading Final % Final Reading Totals: 0 480 480 0 Airtest Co Inc Page 11 of 12 AIRTEST Co., Inc. Roof Top Unit PROJECT: Bank of America - Tukwila LOCATION: Tukwila, WA PROJECT #: 16-3085-1 SYSTEM/UNIT: RTU -03 AREA: Bank Lobby 7Unitanufacturer Trane odel Number YHC036E3RMA0168 erial Number 914100179L DATE: 12/15/2016 CONTACT: Jason Douglas AUTHOR: Dustin Polly Tested By: Jason Douglas Date: 12/15/2016 Air Test Data Design GRD Total CFM 300 CFM Actual GRD Total CFM 295 CFM Return Air CFM Design N/S CFM Return Air CFM Actual 160 CFM Log: RTU -03 12/10/2016 Jason Douglas Other outlets served by RTU and print shows to rebalance 2 outlets only. RTU -03 Supply Outlet Summary RTU -03 Return Inlet Summary SYSTEM/UNIT: RTU -04 AREA: Bank Lobby Unit Manufacturer Trane Unit Model Number YHC048E3RhAO08F Unit Serial Number 914100094L Tested By: Jason Douglas Date: 12/9/2016 Design GRD Total CFM 205 CFM Actual GRD Total CFM 220 CFM Outside Air CFM Design 330 CFM Outside Air CFM Actual 335 CFM Return Air CFM Design N/S CFM Return Air CFM Actual 1310 CFM Log: RTU -04 12/10/2016 Jason Douglas Other outlets served by RTU and print shows to rebalance 2 outlets only. RTU -04 Supply Outlet Summary RTU -04 Return Inlet Summary Airtest Co Inc Page 12 of 12 PERMIT COORD COPY. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0142 DATE: 09/12/16 PROJECT NAME: BANK OF AMERICA SITE ADDRESS: 320 STRANDER BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Building Division Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: AM A)IA Fire Prevention Structural ❑ Planning Division ❑ Permit Coordinator DATE: 09/13/16 Structural Review Required ❑ DATE: DUE DATE: Approved with Conditions Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 10/11/16 12/18/2013 MECHANICAL & CONTROL SP"CS INC 4nWashington State Department of Labor & Industries Page 1 of 3 Home Fs Contact. Search L&I —111 A-7., Index Help MY L&I Safety & Health Claims & Insurance Workplace Rights Trades & Licensing MECHANICAL & CONTROL SRVCS INC Owner or tradesperson 6426 18th St E Principals FIFE, WA 98424 p 253-926-9777 Hull, Travis Edward, PRESIDENT PIERCE County Hunt, Ted Lamond, VICE PRESIDENT HULL, ANGELA DAWN, SECRETARY GROVER, HAROLD, VICE PRESIDENT (End: 02/26/2010) DICKSON, PAUL, TREASURER (End: 02/26/2010) Doing business as MECHANICAL & CONTROL SRVCS INC WA UBI No. Business type 602 338 440 Corporation Governing persons ANGELA DAWN HULL TRAVIS EDWARD HULL; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. .......................................... Meets current requirements. License specialties GENERAL License no. MECHACS962BT Effective — expiration 01/30/2004— 02/26/2018 Bond American Contractors Indem CO $12,000.00 Bond account no. 100239439 Received by L&I Effective date 02/10/2014 02/06/2014 Expiration date Until Canceled Bond history Insurance ....................... Continental Western Ins Co $1,000,000.00 Policy no. 6023856626 Received by L&I Effective date 01/22/2016 01/23/2016 https:Hsecure.Ini.wa. gov/verify/Detail.aspx?UBI=6023 3 8440&LIC=MECHACS962BT&SAW= Help us improve 9/22/2016 0 L N System Checksums By HENDERSON ENGINEERS, INC. Block Load Packaged Terminal Air Conditioner COOLING COIL PEAK THIS IS A NOTE: SYMBOLS, ETC- ARE ED CLG SPACE PEAK HEATING COIL PEAK CDCONDENSATE ORAIN (CD) TEMPERATURES RL REFRIGERANT LIQUID (RL) Peaked at Time: Mo/Hr. T 116 HWS HEATING HOT WATER SUPPLY (HWS) Mo/Hr. Sum of Mo./Hr Heating Design ---HPWR--- HEAT PUMP WATER RETURN (HPWR) Cooling Heating Outside Air: OADBMI6/HR: 85/64159 OADB: Peaks OADB: 30 THREE-WAY CONTROL VALVE SHUTOFF VALVE SAD13 55.0 95.0 --i') WATER METER STRAINER SOLENOID VALVE PRESSURE GAUGE THERMOMETER T PRESSURE AND TEMPERATURE TEST PLUG UNION FLANGE CONNECTION -40 ELBOW UP -� ELBOW DOWN Ra Plenum 79.6 65.4 HVAC EQUIPMENT EC DUCTWORK Space Plenum Net Percent Space Percent Space Peak Coll Peak Percent Retum, 79.3 65.4 Sens. +LaL Sens. +Lat Total Of Total: Sensible Of Total Space Sens Tot Sens of Total ReUOA 80.1 60.0 YD VOLUME DAMPERSlffi STATIC PRESSURE SENSOR Btufh Btulh Btulh (%): Btulh (%) Btulh Bluth (%) FnMtrTD 0.0 0.0 Envelope Loads DDC DIRECT DIGITAL CONTROL RA RETURN AIR DX DIRECT EXPANSION SA SUPPLY AIR EA EXHAUST AIR Envelope Loads ETR EXISTING TO REMAIN TFA TO FLOOR ABOVE FFA FROM FLOOR ABOVE Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 - 0 0 - Skytite Solar 0 STANDARD MOUNTING HEIGHTS 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0. Skylite Cond 0 0 0.00 Roof Cond 0 14,874 14,874 6 0 0 Roof Cond 0 -11,170 4.08 Glass Solar 31,904 0 31,904 14. 33,272 21 Glass Solar 0 0 0.00 AIRFLOWS Glasa/DoorCond 2,033 0 2,033 1 1,410 1. Glass/DoorCond -24,100 -24,100 8.81 Wall Cond 40,804 43.466 84,270 36: 40.790 26 Wall Cond -31,T31 -66,775 24.40 Cooling Heating Partition/Door 0 0 0. 0 0 Partition0cior 0 0 0.00 Diffuser 7,109 7,109 Floor 0 0 0* 0 0- Floor 0 0 O.DO Terminal 7,109 7,109 Adjacent Floor 0 0 0 0 0 0- Adjacent Floor 0 0 0 Main Fan 7,109 7,109 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 See Fan 0 0 Sub Total => 74,740 58,340 133,080 57, 75,472 48. Sub Total =_> -55,831 -102,045 37.28 Nom Vent 1,073 1,073 AHU Vent 1,073 1,073 Internal Loads Internal Loads Infill 0 0 Lights 22,224 5,556 27,780 12 22,224 14 Lights 0 0 0.00 MlnStoplRh 0 0 People 40.000 0 40,000 17 20,0W 13 People 0 0 0.00 Return 7,109 7,109 Misc 28,065 0 28,065 12: 28,065 18 flisc 0 0 0.00 Exhaust 1,073 1,073 Sub Total ==> 90.289 5556 95,846 41 70,259 45 Sub Total -> 0 0 D.DO Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 9,803 -9,803 0 0 10,465 7 Ceiling Load -9,972 0 0.00 Leakage own 0 0 Ventilation Load 0 0 8.078 3 0 0 Ventilation Load 0 -47,633 17.40 Leakaga Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing D 0: OvlUndr Suing -129,484 -129,484 47.31 ENGINEERING CKS OvlUndr Sizing 3 3 0 3 0 Exhaust Heat 5,470 -2.00 Exhaust Heat -5,413 -5,413 -2' OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 _ RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.D0 % OA 15.1 15.1 Duct Heat Pkup 0 0 0 cfnJfe 1.05 1.05 Underfir Sup Ht Pkup 0 0. Undedlr Sup Ht Pkup 0 0.00 cfmfton 368.35 SuppfyAtr Leakage 0 0 0 : Supply Air Leakage 0 0.00 frAon 351.46 BtulhrrfP 34.14 -40.35 Grand Total=a 174,835 48,680 231,593 100.00 156,229 100.00 Grand Total==> -195,286 -273,691 100.00 No. People 80 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coif Airflow Enter DBIWBIHR Leave DBlWBIHR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh dm 'F 'F gr/lb 'F `F grilb ft' (%) MBh cfm `F 'F Main Cig 19.3 231.6 212.8 7,109 79.8 62.3 57,4 55.0 50.9 49.6 Floor 6,763 Main Htg -273.7 7,109 60.0 95.0 Aux Gig 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 19.3 231.6 Roof 6,247 0 0 Humidif 0.0 0 0.0 0.0 Wall 3,330 1,035 31 t Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -273.7 Project Name: Dataset Name: TRACE000.TRC TRACE& 700 v6.3.1 calculated at 0728 AM on 04r22r2016 Alternative - 1 System Checksums Report Page 1 of 1 GENERAL MECHANICAL NOTES: 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND MAY NOT REFLECT EXACT "AS -BUILT" CONDITIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. 3. COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AS TIGHT TO STRUCTURE AS POSSIBLE COORDINATE WITH OTHER TRADES TO AVOID CONFUCTS. COORDINATE INSTALLATION OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. ANY MODIFICATIONS REQUIRED DUE TO LACK OF COORDINATION WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO EXTRA COST TO THE OWNER. 4. WHERE SHUTDOWN OF EXISTING SYSTEMS IS REQUIRED DURING NEW WORK, COORDINATE SHUTDOWN TIME AND DURATION WITH THE OWNER TO MINIMIZE DOWNTIME. NOTIFY OWNER SEVEN (7) DAYS PRIOR TO INTERRUPTION OF SERVICE - 5. DURING INSTALLATION OF NEW WORK, AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN. REPAIR DAMAGE CAUSED DURING CONSTRUCTION AT NO EXTRA COST TO THE OWNER. 6. PROVIDE TEMPORARY BARRIERS TO CONTAIN DUST AND DEBRIS RESULTING FROM THE PERFORMANCE OF THE WORK TO THE AREA WHERE WORK IS BEING PERFORMED. 7. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 8. NEW DUCTWORK IS SHOWN AT APPROXIMATE LOCATIONS. FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. 9- REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON ARCHITECTURAL DRAWINGS THAT ARE INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS - 10. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. REPLACE INSULATION THAT HAS GOTTEN WET AT ANY TIME DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. SEAL ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM CEILING/RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO TURNING SYSTEM OVER TO THE OWNER. THE INTERNAL SURFACES AND ASSOCIATED COILS OF ANY HVAC UNITS THAT WERE OPERATED SHALL ALSO BE CLEANED. 11. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN OR NOTED. 12. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT AND DUCTWORK SHALL BE FASTENED TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF EXCEPT WHERE CONCRETE INSERTS IN CONCRETE SLABS ARE ALLOWED BY THE SPECIFICATIONS. 13. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER REPLACEMENT. 14- CONTRACTOR SHALL DRAIN, FLUSH, AND REFILL ALL PIPING SYSTEMS NECESSARY TO PERFORM THE WORK. PROVIDE CHEMICAL TREATMENT FOR ALL PIPING SYSTEMS AFTER REFIL UNG SYSTEM. 15. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT INSTALLATION REQUIREMENTS. 16. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS REQUIRED TO ACCOMMODATE FINAL CEILING GRID AND UGHTING LOCATIONS. 17. LOCATE AND SET THERMOSTATS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES WITH BOTTOM OF DEVICE AT MAXIMUM 44" AFF TO MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. ENSURE DEVICE IS EVEN WITH OTHER SWITCHES ON WALL. PROVIDE INSULATED BACKING FOR THERMOSTATS MOUNTED ON EXTERIOR BUILDING WALLS. INSTALL WIRING IN CONDUIT PROVIDED BY DIVISION 26. AT A MINIMUM, PROVIDE CONDUIT IN THE WALL FROM THE JUNCTION BOX TO 6' ABOVE THE CEILING. 18. COORDINATE THE LOCATION AND ELEVATION OF WALL -MOUNTED DEVICES WITH PRESENTATION BOARDS, DISPLAY CABINETS, SHELVES OR OTHER COMPONENTS SHOWN ON THE ARCHITECTURAL DRAWINGS THAT ARE TO BE INSTALLED UNDER OTHER DIVISIONS. CONTRACTOR WILL NOT BE REIMBURSED FOR RELOCATION OF WALL -MOUNTED DEVICES CAUSED BY A LACK OF COORDINATION. 19. PROVIDE A MANUAL BALANCING DAMPER IN EACH BRANCH DUCT TAKEOFF FROM MAIN SUPPLY AIR DUCTS. 20. PROVIDE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, RECTANGULAR/ROUND BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING QUADRANT FOR BRANCH DUCT CONNECTIONS AND TAKE -OFFS TO INDIVIDUAL DIFFUSERS, REGISTERS AND GRILLES, 21. BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK SIZE UNLESS OTHERWISE NOTED. 22. REFER TO SPECIFICATIONS FOR DUCTWORK AND PIPING INSULATION REQUIREMENTS. DUCT SIZES ON MECHANICAL PLANS INDICATE CLEAR INSIDE AIRFLOW DIMENSIONS, INCREASE SHEET METAL SIZES ACCORDINGLY TO ACCOUNT FOR THICKNESS OF DUCT LINER. 23. FLEXIBLE DUCTWORK SHALL NOT EXCEED 5'-0" IN LENGTH AND SHALL BE INSTALLED / AND SUPPORTED TO AVOID SHARP BENDS AND SAGGING. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 24. PROVIDE EQUIPMENT VENTS PER EQUIPMENT MANUFACTURERS RECOMMENDATIONS AND EQUIPMENT SPECIFICATIONS. KEEP PENETRATIONS THROUGH ROOF A MINIMUM OF 10'-0' FROM HVAC EQUIPMENT FRESH AIR INLETS AND 2'-0" FROM ROOF PARAPETS. 25. CONTRACTOR SHALL FIELD VERIFY THAT THE EXISTING EQUIPMENT INCLUDING ACCESSORIES BEING REUSED FOR THIS PROJECT IS NOT DAMAGED AND IS IN GOOD WORKING ORDER. REPORT ANY DEFICIENCIES TO THE OWNER OR ARCHITECT. CONTRACTOR SHALL SUBMIT TO THE OWNER AND ARCHITECT A WRITTEN REPORT DESCRIBING TESTS PERFORMED TO VERIFY OPERATION AND RESULTS OF THE TESTS. 26. CLEAN EXISTING EQUIPMENT AND EQUIPMENT COMPONENTS BEING REUSED FOR THIS PROJECT. PROVIDE NEW FILTERS FOR EXISTING AIR HANDLING EQUIPMENT PRIOR TO STARTUP OF EQUIPMENT. NEW FILTERS SHALL BE COMPATIBLE WITH THE EXISTING EQUIPMENT AND EQUAL IN PERFORMANCE TO THE EXISTING FILTERS AT NEW CONDITION UNLESS OTHERWISE NOTED. CLEAN STRAINERS IN PIPING SYSTEMS PRIOR TO STARTING PUMPS. 27. LUBRICATE EXISTING EQUIPMENT BEING REUSED FOR THIS PROJECT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. OBTAIN INSTRUCTIONS FROM MANUFACTURER IF THEY ARE NOT AVAILABLE AT THE SITE. 28. FULLY CHARGE EXISTING REFRIGERANT SYSTEMS BEING REUSED FOR THIS PROJECT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CHARGE SYSTEMS WITH NEW REFRIGERANT MATCHING EXISTING. 29- ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED PER RIC, C402.4 LEAKAGE REQUIREMENTS AND IMB VAPOR RETATRDER REQUIREMENTS. 30. ALL DUCTING IS LOW PRESSURE DUCTWORK UNLESS OTHERINISE SPECIFIED. REVISIONS c�hjanass shah 15� r nde toth♦.e sc`n� "=�1 jG�:i..rIVNCI 07 t 'ti;Lt'rHa E:Ji� rillrTg Civision 1:111 rEr m?m, a:1,.�_ 1�4n .y - .,., � Sis;L�iT}�t.$I uy inn''ude a1✓d,-ti0rzaj pian ; r :,. tem rev; s I SEI-ARAT E LHMIT REQUIRED FOR: C7 Mechanical �icctrical �� C tubing Gas Piping 'jEY of Tukwila L415 r,t"�t; DIVICtnhl MECHANICAL SYMBOLS THIS IS A NOTE: SYMBOLS, ETC- ARE ED NECESSARILYMASTER ON THE DRAWINGS. PIPING CDCONDENSATE ORAIN (CD) AC�=ACD- AUXILIARY CONDENSATE DRAIN (ACD) RL REFRIGERANT LIQUID (RL) -RD---- REFRIGERANT DISCHARGE (HOT GAS) (RD) -RS- REFRIGERANT SUCTION (RS) HWS HEATING HOT WATER SUPPLY (HWS) - -HWR- - HEATING HOT WATER RETURN (HWR) CHWS CHILLED WATER SUPPLY (CHWS) - -CHWR- - CHILLED WATER RETURN (CHWR) HPWS HEAT PUMP WATER SUPPLY (HPWS) ---HPWR--- HEAT PUMP WATER RETURN (HPWR) LPS LOW PRESSURE STEAM SUPPLY (LPS) -LPC- - LOW PRESSURE STEAM CONDENSATE (LPC) - - - - EXISTING PIPING TO BE REMOVED ---- EXISTING PIPING TO REMAIN DIRECTION OF FLOW iQ BALL VALVE DTO CONTROL VALVE THREE-WAY CONTROL VALVE SHUTOFF VALVE CHECK VALVE da BALANCING VALVE WITH PRESSURE PORTS TRIPLE DUTY VALVE WITH PRESSURE PORTS --i') WATER METER STRAINER SOLENOID VALVE PRESSURE GAUGE THERMOMETER T PRESSURE AND TEMPERATURE TEST PLUG UNION FLANGE CONNECTION -40 ELBOW UP -� ELBOW DOWN TEE UP lel TEE DOWN REDUCER HVAC EQUIPMENT EC DUCTWORK NOTE: ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. SEE SECTION 15250 OF THE SPECIFICATION FOR DUCTWORK TO RECEIVE INSULATION OR LINER. EXISTING DUCTWORK OR EQUIPMENT TO REMAIN EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED BRANCH DUCT WITH 45' RECTANGLE -ROUND BRANCH FITTING AND MANUAL VOLUME DAMPER ELBOW WITH TURNING VANES RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN SUPPLY AIR DUCT UP xl SUPPLY AIR DUCT DOWN t=41 EQUIPMENT WITH FLEXIBLE DUCT CONNECTION 10" CSD -1 300 CFM NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER OR REGISTER MANUAL VOLUME DAMPER SQUARE TO ROUND TRANSITION �-- DUCT MOUNTED SMOKE DETECTOR RD (SD=SUPPLY/RD=RETURN) FD FIRE DAMPER ® CARBON DIOXIDE SENSOR FSD FIRE SMOKE DAMPER H® HUMIDITY SENSOR SD SMOKE DAMPER © PULL STATION YD VOLUME DAMPERSlffi STATIC PRESSURE SENSOR MD MOTORIZED DAMPER ® TEMPERATURE SENSOR gD BACKDRAFT DAMPERO HUMIDISTAT OT THERMOSTAT ABBREVIATIONS AFF ABOVE FINISHED FLOOR MC MECHANICAL CONTRACTOR BAS BUILDING AUTOMATION SYSTEM MIN MINIMUM BD BACKDRAFT DAMPER NC NOISE CRITERIA CFM CUBIC FEET PER MINUTE OA OUTSIDE AIR DDC DIRECT DIGITAL CONTROL RA RETURN AIR DX DIRECT EXPANSION SA SUPPLY AIR EA EXHAUST AIR SO SMOKE DUCT DETECTOR ETR EXISTING TO REMAIN TFA TO FLOOR ABOVE FFA FROM FLOOR ABOVE 'm TO FLOOR BELOW FFB FROM FLOOR BELOW TYP TYPICAL GPM GALLONS PER MINUTE UNO UNLESS NOTED OTHERWISE IN WC INCHES OF WATER COLUMN W/ WITH MAX MAXIMUM W/0 WITHOUT MBH 1000 BTU PER HOUR STANDARD MOUNTING HEIGHTS MECHANICAL (AFF AFG, UNLESS NOTED OTHERWISE) THERMOSTATS (BOTTOM OF DEVICE) 44" CONTROLS (BOTTOM OF DEVICE) 44' ANNOTATION G1 MECHANICAL PLAN CALLOUT CU MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED T AND INSTALLED UNLESS NOTED OTHERWISE) ® CONNECTION POINT OF NEW WORK TO EXISTING 1 DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER M) LOWER NUMBER INDICATES SHEET NUMBER 1 SECTION CUT DESIGNATION M1 e Plan review approval is subject to errors and or Fissions. Approval of constr+, lion documents does not authoilze the violation or any adopted Cade or ordinance. Recfiipt of approved Reld Copy and can "Eicns i3 acknowied od: Date:.._.. City of T ulila BUILDING DIVISION REVIEWED FOR :CODE COMPLIANCE APPROVED SEP City of Tukwila BlLOIN. f X21 -- 4 )s Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 I Telephone 510.625.7400 Facsimile 510.625.7499 rHEHDE D 17JENGINEERS1 5555 REDWOOD STREET, SUITE 201 IAS VEGAS, NV 89118 TEL 702 697 2187 IFAX 702 697 2188 *rww.hei-eng.mm x' 1650000542 WA. CORPORATE NUTABER:1754 EXPIRES 06/30/16 F' 10 1 i ' ! i Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNFTH L_ BIESIVA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Scale NONE RECEIVED CITY OF TUKWILA M SEP 122016 PERMIT CENTER @2016 Gensler =UTA 3/16"=1'-0 0 ALL EXISTING DUCTS, DIFFUSERS, RETURNS AND EXHAUSTS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE. REVIEWED FO CODE COMPLIANCE APPROVED, SEP 2 2 2016 11 It'y of Yukrwl I BUILDING DIVISION 1. DEMOLISH CEILING DIFFUSER AND ASSOCIATED DUCTWORK BACK TO DUCT MAIN. CAP AND SEAL DEMOLISHED DUCT OPENING AIRTIGHT. 2. DEMOLISH EXISTING RETURN GRILLE. CAP DUCT END FOR EXTENSION DURING CONSTRUCTION PHASE. 3. REMOVE EXISTING THERMOSTAT FOR RELOCATION AS SHOWN ON M02.01. 4. REMOVE EXISTING DIFFUSER AND PREPARE TO RELOCATION UNDER NEW CONSTRUCTION. 5. REMOVE EXISTING DIFFUSER AND PREPARE TO RELOCATION UNDER NEW CONSTRUCTION. Tukwila SeuthCenter WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description DEMOLITION FLOOR PLAN - HVAC @2016 Gensler i M 4EH i r A Ps ,r 1. RELOCATE EXISTING RETURN TO NEW LOCATION SHOWN. 2. REBALANCE EXISTING DIFFUSER TO CFM INDICATED. 3. EXISTING THERMOSTAT TO REMAIN. 4. RELOCATE EXISTING THERMOSTAT AS SHOWN. PROVIDE NEW CONTROL WIRING. 5. REBALANCE RTU OUTSIDE AIR TO CFM SCHEDULED ON M04.01. EXISTING SUPPLY CFM TO REMAIN. 6. FIELD VERIFY DUCT SIZE AND LOCATION PRIOR TO CONSTRUCTION. 7. RELOCATE EXISTING DIFFUSER TO LOCATION SHOWN AND REBALANCE TO CFM INDICATED. EXTEND FLEX DUCT TO NEW DIFFUSER LOCATION. .VIEWED FO * COMPLIANCY APPROV14f) . SEP ' 21 ?. L t Of Tyk it . .. t tON Tukwila SouthContor WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description MECHANICAL HVAC PLAN Scale NONE RECEIVED 1M 0.02c� SEP 12 2016 TY OF 'LA @2016 Gensler PERMIT CENTER I ML GoRILLE, REGISTER AND DIFFUSER SCHEDULE OUTSIDE AIR REQUIREMENTS, UIVIC 2 MODEL FACE MOUNTING FACE SIZE MAX NOTES SINGLE -ZONE SYSTEMS ONLY MULTI -ZONE SYSTEMS ONLY LOCATION (IN) NC CD -1 TITUS OMNI PLAQUE CEILING 24)Q4 SYSTEMTYPE: FLOOR AREASERVED SYSTEM AVER ED AREA SYSTEM POPULATION SYSTEM AVERAGED PEOPLE REQUIRED OA DESIGN NOTES SINGLE -ZONE SYSTEM SINGLE ZONE WORST CASE SYSTEM VENTILATION CEILING DESIGNATION SYSTEM TAB NAME ASSOCIATED ZONE AIR DISTRIBUTION EFFICIENCY[Ey] BY SYSTEM [As] BASED OUTDOOR AIR RATE [Ps] BASED OUTDOOR AIR RATE INTAKE FLOW[Vot] OA INTAKE FLOW D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR. E. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. F. ALUMINUM CONSTRUCTION. OR LIST'SINGLE' VENTILATION ZONE EFFECTIVENESS [Ez] (SF) (CFM/SF) (PEOPLE) (CFM/P ) (CFM) (CFM) RTU2 MULTIZONE (RTU2) - - 0.91 2,640 0.059 37 6.62 441 445 RTU3 MULTIZONE (RTU3) - - 0.91 1,143 0.049 1 3 5.00 72 75 RTU4 MULTIZONE (RTU4) - - 0.91 1,975 0.067 129 5.64 328 330 TOTALS 841 850 GENERAL NOTES: 1. VENTILATION CALCULATIONS BASED ON ASHRAE STANDARD 62.1-2010. 2. SYSTEM POPULATIONS BASED ON MAX SEATING AND/OR CODE MAXIMUMVALUES. 3. SINGLE ZONE SYSTEMS (Vot= Voz): SYSTEM VENTILATION EFFICIENCY CALCULATION IS NOT REQUIRED FOR SINGLE ZONE SYSTEMS. WORST CASE AIR DISTRIBUTION EFFECTIVENESS BETWEEN HEATING AND COOLING MODES OF OPERATION IS SHOWN IN TABLE. 4. 100% OASYSTEMS (Wt= Lellzmes Voz): WHEN ONE AIR HANDLER SUPPLIES ONLY OUTDOOR AIR TO ONE OR MORE ZONES. EACH ZONE IS INDIVIDUALLY CALCULATED WITH ITS WORST CASE ZONE AIR DISTRIBUTION EFFECTIVENESS (HEATING/COOLING). 5. MULTI -ZONE RECIRCULATING SYSTEMS: ASH RAE 62.1-2010 CALCULATOR USED TO DETERMINE VENTILATION AIRFLOW IN COMPLIANCE WITH VRP AND APPENDIXA. VENTILATION RATE SHOWN IS ACTUAL CALCULATED WITH CORRECTION FACTORS INCLUDED. EACH ZONE IS CALCULATED WITH ITS WORST CASE ZONE AIR DISTRIBUTION EFFECTIVENI (HEATING/COOLING) AS PART OF CALCUALTIONS TO FIND Ev. GoRILLE, REGISTER AND DIFFUSER SCHEDULE MARK MANUFACTURER MODEL FACE MOUNTING FACE SIZE MAX NOTES TYPE LOCATION (IN) NC CD -1 TITUS OMNI PLAQUE CEILING 24)Q4 30 A -F CR -1 TITUS 50F EGGCRATE CEILING 24)Q4 30 A, C, D -F CR -2 TITUS 50F EGGCRATE CEILING 24X12 30 A, C, D -F MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND MODEL NUMBERS ONLY. REVIEW THE COMPLETE DESCRIPTION, NOTES AND SPECIFICATIONS TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE MANUFACTURERS LISTED ARE THE BASIS FOR THE DESIGN. NOTES: A. NECK SIZE SHOWN ON DRAWINGS. B. 4-WAYTHROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS. C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR. E. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. F. ALUMINUM CONSTRUCTION. METALLIC OR NON—METALLIC BAND OVER INSULATION (TYPICAL) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED, WITH VOLUME DAMPER AND DAMPER LOCK WITH EXTENSION FOIL TAPE AT INSULATION JOINT--,/C'Cll1 SEE NOTE 1. PRE—INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS METALLIC OR NON—METALLIC BAND (TYPICAL) CEILING DIFFUSER WITH VOLUME DAMPER, FIRE DAMPER OR COMBINATION VOLUME/FIRE DAMPER AS SCHEDULED CEILING INSULATED DUCT FOR FIRE RATED CEILINGS, PROVIDE FIRE RATED JACKET TO COMPLETELY COVER DIFFUSER CONE. SEAL FOIL TO CONE WITH FIBER REINFORCED TAPE. PROVIDE 1" THICK, R-6 FIBERGLASS INSULATION TO COMPLETELY COVER DIFFUSER CONE WHERE SCHEDULED OF SPECIFIED. NOTES: 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5'-0". PROVIDE RIGID 90' ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN 5'-0" LENGTH LIMITATION. 2. PROVIDE RIGID ROUND—TO—OVAL TRANSITION WHEN PLENUM HAS OVAL CONNECTION. LAY—IN AND SLOT TYPE D2 :NOSCALE EILING DIFFUSER DETAIL PARALLEL TO STRUCTURE OPTIONAL ROUTING IN CONCEALED AREAS ANGLE OR UNISTRUT ROUND SUPPLY AIR DUCT PERPENDICULAR TO STRUCTURI BOTTOM OF STRUCTURE TWIST STRAP 16 GA. GALV. STEEL BAND (2" WIDE) ROUND DUCT ROOF JOIST) 1 6" FASTENER BOLT AND NUT (MAX. 36"0) SHEET METAL SCREW (MAX. 24"0) FASTENER TYPES LOADS MUST BE HUNG WITHIN 6" OF PANEL POINTS NOTES: 1. FOR DUCTS LARGER THAN 36"0, USE TWO HANGER RODS, WIRES OR STRAP TO SUPPORT DUCT FROM EACH SIDE. KUUNU NO SCALE REVIEWED FOR CODE COMPLIANCE APPROVED SEP 2 2 2016 Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone 510.625.7400 Facsimile 510.625.7499 rH E N ffU"E OR S 0 N 1JENGINEERSM 5555 REDWOOD STREET, SUITE 201 LAS VEGAS, NV 89118 TEL 702 697 2187 FAx 702 697 2188 www.hei-eng.com 1650000542 WA. CORPORATE NUMBER: 1754 EXPIRES 06/30/16 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Proiect Number 33.1361.007 Description MECHANICAL DETAILS AND SCHEDULES Scale NONE @2016 Gensler RECEIVE. CITY OF TU KII" IMUA SEP 12 2016 PERMIT CENTER 1 2012 Washington State Enerav Code Compliance Form for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 2012 Washington State Energy Code Compliance Form for Commercial Buildings including R2 & R3 over 3 stories and all R1 Project Address Fill this line out on MECH-SUM Date 1/1/2e] 5 The following information is necessary to check a permit application for compliance w ith the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Mustbe in permit documents Location in Building Department (yes,no,na) Location in Building Department (yes,no,na) Documents Notes GENERAL PROVISIONS Equipment Sizing & Performance Notes COMPLEX SYSTEMS Water -heating equip min. Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency M00.01 Air economizer required yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 1 C403.4.1 Air economizer exceptions na C403.2.2 Equipment and system Output capacities of heating and cooling equipment and system do not exceed the next 0403.4.1.1 ALL UNITS ARE no C404.4 sizing larger available equipment size above the calculated loads; note exceptions taken EXISTING na C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable 1VO4.01 Water economizer maximum yes 0403.2.5.4.2 heater of being reduced to minimum requirement per IMC pressure drop na C404.6 Service water piping Indicate R -value of insulation on piping; note exceptions taken 0403.4.1.3 ALL UNITS ARE na C403.2.3 & C403.2.3.2 & Equipment minimum Provide equipment schedules or complete MECH-SUM tables w ith type„capacity, efficiency, EXISTING no 0404.7 / 8 efficiency test standard (or other efficiency source) for all mechanical equipment C403.4.1.4 Economizer heating system na C403.2.12.1 heat trace shut-off Indicate on-site steam heating system requiring energy recovery impact no C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, and efficiency for all motors; note exceptions taken na ALL UNITS ARE na C404.9 water meters Isystern EXISTING na C403.2.10.1 Fan power limitation For all applicable system > 5hp, provide systemtotal nameplate hp in MECH-FANSYS-SUM Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency C403.4.2.1 VAV fan static pressure na C404.10.1 form source na C403.2.10.1 Fan pow e limitation For all applicable fan system > 5hp, verify fan system motor hp or bhp complies w ith fan Indicate automatic on/off control based on scheduling & accessible on/off switch on heater na na 0404.10.1 / 2 power limits per Table C403.2.10.1(1), provide MECH-FANSYS formfor each system that operates independent of thermostat setting; note exceptions taken 0403.4.2.2 no C403.2.10.2 Motor nameplate hp Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, Indicate vapor retardant cover and insulation rating as required ALL UNITS ARE VAV system serving na C404.10.3 note exceptions taken Indicate rating of insulation on sides and bottom of pools heated to > 90°F EXISTING no C403.2.10.3 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECMtype or meet minimumefficiency req. Indicate method, exhaust air temperature reduction and recovered energy use; note ALL UNITS ARE VAV system serving & C403.2.13 Indicate single zone fan systems requiring airflow reduction capability in response to reduced exceptions taken EXISTING na COMMISSIONING Maximum air cooled chiller cooling or heating demand in a zone, or adjacent zones w ithout separating walls, w ith > na Mechanical systems na 0403.2.3 capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit 0408.2 commissioning note exception taken MECH. Non-standard water-cooled Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard na C403,2.3.1 chillers operational conditions na Service water heating Indicate all service water heating system to be commissioned; for those that w ill not be tons Centrifugal fan cooling Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial 0408.4 system commissioning na 0403.2.12.1.2 towers fan open circuit cooling towers na C403.4.3 na C403.2.3 Forced air furnace and unit Indicate intermittent ignition or IID, flue/draft damper & jacket loss C408. 1.1 Commissioning plan required item per this section SPECS heaters Duct construction C408.2.2.1 & Air system and hydronic Include in commissioning plan that air and hydronic systems shall be balanced in a manner to Indicate automatic controls that sequence operation of multiple boilers Packaged electric Verify all packaged electric equipment that provides > 20,000 Btu/h cooling capacity and 0408.2.2.2 system balancing na 0403.2.3.3 heating/cooling equipment heating is a heat pump, note in equipment schedule na Air system balancing na C403.2.3.4 Humidification Indicate method of humidification (note requirements for system w ith economizer) 0408.2.2.1 devices HVAC System Controls & Criteria M02.01 C403.2.7.3.3 High pressure duct leakage C408.2•2•2 M02.01 Indicate devices that provide the capability to isolate, balance and measure flow for all yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems devices hydronic equipment requiring system balancing Heat pump supplementary Indicate staged heating (compression/supplemental) and outdoor lock -out temperature is set Mechanical systems Provide description of functional performance testing procedures for all applicable system na 0403.2.4.1.1 heat to 40 -For less functional performance including: equipment, controls, economizers MECH. setpoint overlap Piping insulation testing controls na 0403.2.4.2 (deadband) Indicate 5'F deadband minimum for system controlling both heating &cooling Service water heating Provide description of functional performance testing procedures for all applicable system na 0403.2.8.1 Piping insulation exposed to Automatic setback and C408.4.1 functional performance ALL CONTROLS ARE na 0403.2.4.3 shutdown Indicate zone t stat controls with required automatic setback &manual override testing EXISTING na C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions System operation training Indicate required system operation training measures to be provided na C402.4.5.2 & OSA, exhaust, and relief air Indicate location of outdoor air supply intake, and exhaust and relief outlet dampers; verify M04.01 OUTSIDE AIR INTAKE yes C403.2.4.4 dampers Class 1 leakage rating and control type (motorized or gravity); note exceptions taken Documentation AT RTU SPECS C403.3 Qualifying2-pipe heating Indicate location of return air dampers that are integral to economizer operation; verify Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon na 0402.4.5.2 Return air dampers motorized control and Class 1 leakage rating; note exception taken Acceptance report completion of preliminary commissioning report na C402.4.5.1 Stairway and shaft vents Indicate location of stairway and shaft vents, verify Class 1 leakage rated motorized dampers NA heat rejection, Zone 5 Simple System Economizers and method of activation Water loop heat pump - na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls Indicate cooling system requiring economizer controls; note in equipment schedule isolation na C403.2.4.5 Snow melt system Indicate shut-off controls based on outdoor conditions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) Walk in cooler/ freezer- Indicate w /sf &control method for walk-in cooler/freezer door anti -sweat heaters na Combustion heating Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken ALL UNITS ARE yes C403.2.4.6 equipment Indicate modulating or staged control Indicate capability for partial air economizer operation for system w ith capacity > 65,000 EXISTING ALL UNITS ARE na Group R1 hotel/motel Indicate method for guest room temperature automatic setback (heating) & set-up (cooling), Btu/h evaporator and condenser na C403.2.4.7 system confirm adjustment of at least 5°F minimum. fans ALL UNITS ARE na Group R2/R3 dwelling and Indicate 5-2 programmable thermostats in primary spaces w ith minimum of tw o setback Indicate high limit shut-off control method per Table 0403.3.1.1.3(2) na 0403.2.4.8 / sleeping unit system periods and 10-F deadband; note exceptions taken na C403.2.5.1 Demand controlled Indicate high -occupancy spaces and system requiring DCV ventilation Indicate spaces requiring occupancy -based system control and method; or alternate means na 0403.2.5.2 Occupancy sensors provided to automatically reduce OSA when partially occupied 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address FII this line out on MECH-SUM Date '1/! /20' 5 The follow Ing information is necessary to check a permit application for compliance w ith the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Location in Building Department (yes,no,na) Documents Notes SERVICE WATER HEATING Service Water Systems Notes COMPLEX SYSTEMS Water -heating equip min. Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency C403.4.1 Air economizer required na C404.2 efficiency source C403.4.1 Air economizer exceptions na C404.3 Temperature controls Indicate temperature controls have required setpoint capability 0403.4.1.1 Water economizer capacity na C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge na C404.5 Insulation under water Indicate R-10 insulation under electric water heater tanks 0403.4.1.2 Water economizer maximum Indicate precooling coils and heat exchangers in water economizer system do not exceed 0403.2.5.4.2 heater Indicate lab exhausts stem requiring heat recovery, method & efficienc • or alternative pressure drop na C404.6 Service water piping Indicate R -value of insulation on piping; note exceptions taken 0403.4.1.3 Integrated economizer na C403.2.6.1 insulation Indicate ventilation system requiring ER, method & efficiency; note exceptions operation na 0404.7 / 8 Circulation system and Indicate shut-off capability based on occupancy and periods of limited demand C403.4.1.4 Economizer heating system na C403.2.6.2 heat trace shut-off Indicate on-site steam heating system requiring energy recovery impact energy usage during normal operation Group R-2 service hot Indicate method of usage metering for dwelling units served by a central service hot water na C403.4.2 & na C404.9 water meters Isystern C403.2.12 Pools & In -Ground Permanently Installed Spas cooler/freezer condensers Pool heating equip min. Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency C403.4.2.1 VAV fan static pressure na C404.10.1 efficiency source na condenser system effectiveness; note exceptions taken Indicate automatic on/off control based on scheduling & accessible on/off switch on heater na na 0404.10.1 / 2 Pool heater on /off controls that operates independent of thermostat setting; note exceptions taken 0403.4.2.2 setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required C403.4.5 VAV system serving na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F na na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use; note VAV system serving For each air systemterminal, indicate the maximum air flow rate of primary supply air during Indicate single zone fan systems requiring airflow reduction capability in response to reduced exceptions taken 0403.4.5 na COMMISSIONING Specific System Requirements cooling or heating demand in a zone, or adjacent zones w ithout separating walls, w ith > na Mechanical systems Indicate all mechanical system to be commissioned; for those that w ill not be commissioned indicate controls that automatically reset supply air temp in response to loads yes 0408.2 commissioning note exception taken MECH. EXISTING UNITS ARE Indicate method of cooling demand -based fan control for air conditioning system > 110,000 Large capacity cooling SPECS EXISTING TO REMAIN. Btu/h serving single zones na Service water heating Indicate all service water heating system to be commissioned; for those that w ill not be tons na 0408.4 system commissioning commissioned, note exception taken 0403.2.4.10 DDC system capabilities demand response setpoint adjustment na C403.4.3 Provide commissioning plan for all systems requiring commissioning; include in plan all MECH. 0403.2.7.1 & yes C408. 1.1 Commissioning plan required item per this section SPECS C403.2.7.3 Duct construction C408.2.2.1 & Air system and hydronic Include in commissioning plan that air and hydronic systems shall be balanced in a manner to Indicate automatic controls that sequence operation of multiple boilers no 0408.2.2.2 system balancing first minimize throttling losses, then adjust to meet design flow conditions Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers Duct pressure na Air system balancing Indicate devices that provide the capability to balance all supply air outlets, zone terminals and yes 03.2.7.3.1- yes 0408.2.2.1 devices equipment requiring system balancing M02.01 C403.2.7.3.3 High pressure duct leakage C408.2•2•2 Hydronic system balancing Indicate devices that provide the capability to isolate, balance and measure flow for all na na jurisdiction w hen completed devices hydronic equipment requiring system balancing na Mechanical systems Provide description of functional performance testing procedures for all applicable system yes 0403.2.7.1 12 yes C408.2.3 functional performance including: equipment, controls, economizers MECH. na C403.2.8 Piping insulation testing controls SPECS Service water heating Provide description of functional performance testing procedures for all applicable system na 0403.2.8.1 Piping insulation exposed to na C408.4.1 functional performance including: equipment, controls, pools and spas weather testing Qualifying Systems na C408.1.4 System operation training Indicate required system operation training measures to be provided na 0403.3 system 0408.1.2 & 0403.4.3.3.1 Indicate required documentation including: record documents, manuals, balancing reports, MECH. yes C403 1 3 Documentation commissioning preliminary and final reports SPECS C403.3 Qualifying2-pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon MECH. yes 0408.1.2.1 Acceptance report completion of preliminary commissioning report SPECS C403.3.2 Revised Aug 2015 Project Address Fill this line out on MECH-SUM Date 1/1;2015 The follow ing information is necessary to check a permit application for compliance w ith the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Location in Building Department (yes,no,na) Documents Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued Notes COMPLEX SYSTEMS Enclosed loading Indicate enclosed loading dock and enclosed parking garage ventilation system activation and C403.4.1 Air economizer required na C403.2.5.3 dock/parking garage control method C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) ventilation na 0403.4.1.1 Water economizer capacity na C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning indicate system is capable of 100% cooling capacity at 50°F db/45°F w b OSA method 0403.4.1.2 Water economizer maximum Indicate precooling coils and heat exchangers in water economizer system do not exceed 0403.2.5.4.2 Laboratoryexhaust Indicate lab exhausts stem requiring heat recovery, method & efficienc • or alternative pressure drop na system method taken (VAV, sem-conditioned makeup, or CERM calculation) 0403.4.1.3 Integrated economizer na C403.2.6.1 Energy recovery (ER) - Indicate ventilation system requiring ER, method & efficiency; note exceptions operation ventilation systems C403.4.1.4 Economizer heating system na C403.2.6.2 Energy recovery (ER) - Indicate on-site steam heating system requiring energy recovery impact energy usage during normal operation condensate system Specific System Requirements na C403.4.2 & na 0403.2.6.3 Energy recovery (ER) - Indicate remote refrig. condensers requiring ER and use of captured energy C403.2.12 cooler/freezer condensers na C403.4.2.1 VAV fan static pressure C403.4.6 Energy recovery (ER) - Indicate condenser systems requiring ER to pre -heat service water; indicate ER na condenser system effectiveness; note exceptions taken na C403.2.12 Variable flow control - Indicate fan and pump motors a 7.5 hp and the method of variable flow control (VSD or na 0403.4.2.2 setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure fans/pumps equivalent controls) C403.4.5 VAV system serving Indicate supply air systems serving multiple zones, method of primary air control, and zones Variable flow control -heat Indicate heat rejection equipment and cooling tower fans requiring variable flow control and na na C403.2.12.1 rejection equipment method VAV system serving For each air systemterminal, indicate the maximum air flow rate of primary supply air during Indicate single zone fan systems requiring airflow reduction capability in response to reduced na 0403.4.5 na C403.2.12.2 Large volume fan system cooling or heating demand in a zone, or adjacent zones w ithout separating walls, w ith > na C403.4.5.4 VAV system supply air indicate controls that automatically reset supply air temp in response to loads 10,000 CFM supply air; note exceptions taken na C403.2.12.2 Single zone AC system Indicate method of cooling demand -based fan control for air conditioning system > 110,000 Large capacity cooling Indicate method of multi -stage or variable control for building cooling system capacity > 300 Btu/h serving single zones na 0403.4 systems tons Identify all DDC system input/output control points and indicate capability for trending and na C403.4.7 na 0403.2.4.10 DDC system capabilities demand response setpoint adjustment na C403.4.3 Ducting Systems Indicate multi -stage or modulating burner for single boilers > 500,000 Btu/h 0403.2.7.1 & Indicate all ductw ork constructed and sealed per IMC, C402.4 leakage requirements and IBC system yes C403.2.7.3 Duct construction vapor retarder requirements C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers M00.01 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers Duct pressure na 0403.4.3.5 isolation yes 03.2.7.3.1- classifications Identify location of low, medium and high pressure ductwork on plans M00.01 Variable flow control - Indicate pumps requiring variable flow control &method C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test results to C403.2.12 pumps na test jurisdiction w hen completed 0403.2.12.1 Variable flow control - na MECH. cooling towers yes 0403.2.7.1 12 Duct insulation Indicate R -value of insulation on ductwork SPECS Hydronic system part load Piping Systems na C403.2.8 Piping insulation Indicate R -value of insulation on piping controls w ater temp AND reduce flow by a 50% for system > 300,000 Btu/h NA Tw o -pipe changeover na 0403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/depredation NA 0403.4.3.2 weather SIMPLE SYSTEMS Qualifying Systems Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, does not have active Water loop heat pump - na 0403.3 system hurnidifcation or simultaneous heating/cooling 0403.4.3.3.1 deadband between heat rejection and heat addition modes na NA Water loop heat pump - na C403.3 Qualifying2-pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits heat rejection, Zone 4 systems na NA Water loop heat pump - na C403.3.2 Hydronic system controls Refer to Complex System Section C403.4.3 NA heat rejection, Zone 5 Simple System Economizers Water loop heat pump - ALL UNITS ARE na C403.3.1 Air economizer required Indicate cooling system requiring economizer controls; note in equipment schedule isolation EXISTING TO REMAIN na C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) Walk in cooler/ freezer- Indicate w /sf &control method for walk-in cooler/freezer door anti -sweat heaters na C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken anti-sw eat heaters ALL UNITS ARE EXISTING TO REMAIN 0403.3.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for system w ith capacity > 65,000 Cooler / freezer - ALL UNITS ARE na operation Btu/h evaporator and condenser EXISTING TO REMAIN Air economizer high limit fans ALL UNITS ARE na 0403.3.1.1.3 controls Indicate high limit shut-off control method per Table 0403.3.1.1.3(2) EXISTING TO REMAIN Bankof America -o7 Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila WA 98188 FLAGSHIP x 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone p 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description MECHANICAL COMPLIANCE FORMS Scale NONE © 2016 Gensler RECEIVED CITY of TUKWILA SEP 12 2016 PERMIT CENTER 2012 Washington State Energy Code Corrpliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address FII this line out on MECH-SUM Date 1/1/2015 The following information is necessary to check a permit application for compliance with the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Documents Notes COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling system requiring economizer controls; note in equipment schedule na C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) na 0403.4.1.1 Water economizer capacity For eligible systems w here water economizer may be provided in lieu of air economizer, indicate system is capable of 100% cooling capacity at 50°F db/45°F w b OSA 0403.4.1.2 Water economizer maximum Indicate precooling coils and heat exchangers in water economizer system do not exceed na pressure drop pressure drop limit na 0403.4.1.3 Integrated economizer Indicate capability for partial economizer operation for air or water economizer systems operation C403.4.1.4 Economizer heating system Verify control method of HVAC system w ith economizers does not increase building heating na impact energy usage during normal operation Specific System Requirements na C403.4.2 & VAV fan control Indicate fans requiring variable flow control and method C403.2.12 na C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major duct branch sensors VAV fan static pressure na 0403.4.2.2 setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure C403.4.5 VAV system serving Indicate supply air systems serving multiple zones, method of primary air control, and zones na multiple zones served; Indicate VAV or note exceptions taken VAV system serving For each air systemterminal, indicate the maximum air flow rate of primary supply air during na 0403.4.5 multiple zones zone peak cooling and the maximum air flow rates during zone peak heating. na C403.4.5.4 VAV system supply air indicate controls that automatically reset supply air temp in response to loads reset Large capacity cooling Indicate method of multi -stage or variable control for building cooling system capacity > 300 na 0403.4 systems tons na C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na C403.4.3 Large capacity boiler Indicate multi -stage or modulating burner for single boilers > 500,000 Btu/h system na C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers na 0403.4.3.5 isolation & boilers when not in use na 0403.4.3.6 & Variable flow control - Indicate pumps requiring variable flow control &method C403.2.12 pumps 0403.2.12.1 Variable flow control - na & C403,4.4 cooling towers Indicate cooling tower fans requiring variable flow control and method Hydronic system part load Indicate heating & chilled water system have the capability to automatically reset supply na 0403.4.3.4 controls w ater temp AND reduce flow by a 50% for system > 300,000 Btu/h Tw o -pipe changeover na 0403.4.3.2 Indicate deadband, heating/cooling mode scheduling and changeover temperature range system Water loop heat pump - Indicate capability of central equipment to provide rain. 20°F w ater supply temp deadband na 0403.4.3.3.1 deadband between heat rejection and heat addition modes na 0403.4.3.3.2.1 Water loop heat pump - Indicate method used to limit system heat loss w hen heat rejections is not needed heat rejection, Zone 4 na 0403.4.3.3.2.2 Water loop heat pump - Provide heat exchanger that separates cooling tower and heat pump loop heat rejection, Zone 5 Water loop heat pump - Indicate 2 -way isolation valve on each heat pump and variable flow control for systems with na 0403.4.3.3.3 isolation total pump power > 10 hp na 0403.5 Walk in cooler/ freezer- Indicate w /sf &control method for walk-in cooler/freezer door anti -sweat heaters anti-sw eat heaters Cooler / freezer - na C403.5 / 6 evaporator and condenser Indicate motor type for evaporator and condenser fans < 1 hp fans Bankof America -o7 Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila WA 98188 FLAGSHIP x 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone p 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description MECHANICAL COMPLIANCE FORMS Scale NONE © 2016 Gensler RECEIVED CITY of TUKWILA SEP 12 2016 PERMIT CENTER 0 L N System Checksums By HENDERSON ENGINEERS, INC. Block Load Packaged Terminal Air Conditioner COOLING COIL PEAK THIS IS A NOTE: SYMBOLS, ETC- ARE ED CLG SPACE PEAK HEATING COIL PEAK CDCONDENSATE ORAIN (CD) TEMPERATURES RL REFRIGERANT LIQUID (RL) Peaked at Time: Mo/Hr. T 116 HWS HEATING HOT WATER SUPPLY (HWS) Mo/Hr. Sum of Mo./Hr Heating Design ---HPWR--- HEAT PUMP WATER RETURN (HPWR) Cooling Heating Outside Air: OADBMI6/HR: 85/64159 OADB: Peaks OADB: 30 THREE-WAY CONTROL VALVE SHUTOFF VALVE SAD13 55.0 95.0 --i') WATER METER STRAINER SOLENOID VALVE PRESSURE GAUGE THERMOMETER T PRESSURE AND TEMPERATURE TEST PLUG UNION FLANGE CONNECTION -40 ELBOW UP -� ELBOW DOWN Ra Plenum 79.6 65.4 HVAC EQUIPMENT EC DUCTWORK Space Plenum Net Percent Space Percent Space Peak Coll Peak Percent Retum, 79.3 65.4 Sens. +LaL Sens. +Lat Total Of Total: Sensible Of Total Space Sens Tot Sens of Total ReUOA 80.1 60.0 YD VOLUME DAMPERSlffi STATIC PRESSURE SENSOR Btufh Btulh Btulh (%): Btulh (%) Btulh Bluth (%) FnMtrTD 0.0 0.0 Envelope Loads DDC DIRECT DIGITAL CONTROL RA RETURN AIR DX DIRECT EXPANSION SA SUPPLY AIR EA EXHAUST AIR Envelope Loads ETR EXISTING TO REMAIN TFA TO FLOOR ABOVE FFA FROM FLOOR ABOVE Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 - 0 0 - Skytite Solar 0 STANDARD MOUNTING HEIGHTS 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0. Skylite Cond 0 0 0.00 Roof Cond 0 14,874 14,874 6 0 0 Roof Cond 0 -11,170 4.08 Glass Solar 31,904 0 31,904 14. 33,272 21 Glass Solar 0 0 0.00 AIRFLOWS Glasa/DoorCond 2,033 0 2,033 1 1,410 1. Glass/DoorCond -24,100 -24,100 8.81 Wall Cond 40,804 43.466 84,270 36: 40.790 26 Wall Cond -31,T31 -66,775 24.40 Cooling Heating Partition/Door 0 0 0. 0 0 Partition0cior 0 0 0.00 Diffuser 7,109 7,109 Floor 0 0 0* 0 0- Floor 0 0 O.DO Terminal 7,109 7,109 Adjacent Floor 0 0 0 0 0 0- Adjacent Floor 0 0 0 Main Fan 7,109 7,109 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 See Fan 0 0 Sub Total => 74,740 58,340 133,080 57, 75,472 48. Sub Total =_> -55,831 -102,045 37.28 Nom Vent 1,073 1,073 AHU Vent 1,073 1,073 Internal Loads Internal Loads Infill 0 0 Lights 22,224 5,556 27,780 12 22,224 14 Lights 0 0 0.00 MlnStoplRh 0 0 People 40.000 0 40,000 17 20,0W 13 People 0 0 0.00 Return 7,109 7,109 Misc 28,065 0 28,065 12: 28,065 18 flisc 0 0 0.00 Exhaust 1,073 1,073 Sub Total ==> 90.289 5556 95,846 41 70,259 45 Sub Total -> 0 0 D.DO Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 9,803 -9,803 0 0 10,465 7 Ceiling Load -9,972 0 0.00 Leakage own 0 0 Ventilation Load 0 0 8.078 3 0 0 Ventilation Load 0 -47,633 17.40 Leakaga Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing D 0: OvlUndr Suing -129,484 -129,484 47.31 ENGINEERING CKS OvlUndr Sizing 3 3 0 3 0 Exhaust Heat 5,470 -2.00 Exhaust Heat -5,413 -5,413 -2' OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 _ RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.D0 % OA 15.1 15.1 Duct Heat Pkup 0 0 0 cfnJfe 1.05 1.05 Underfir Sup Ht Pkup 0 0. Undedlr Sup Ht Pkup 0 0.00 cfmfton 368.35 SuppfyAtr Leakage 0 0 0 : Supply Air Leakage 0 0.00 frAon 351.46 BtulhrrfP 34.14 -40.35 Grand Total=a 174,835 48,680 231,593 100.00 156,229 100.00 Grand Total==> -195,286 -273,691 100.00 No. People 80 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coif Airflow Enter DBIWBIHR Leave DBlWBIHR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh dm 'F 'F gr/lb 'F `F grilb ft' (%) MBh cfm `F 'F Main Cig 19.3 231.6 212.8 7,109 79.8 62.3 57,4 55.0 50.9 49.6 Floor 6,763 Main Htg -273.7 7,109 60.0 95.0 Aux Gig 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 19.3 231.6 Roof 6,247 0 0 Humidif 0.0 0 0.0 0.0 Wall 3,330 1,035 31 t Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -273.7 Project Name: Dataset Name: TRACE000.TRC TRACE& 700 v6.3.1 calculated at 0728 AM on 04r22r2016 Alternative - 1 System Checksums Report Page 1 of 1 GENERAL MECHANICAL NOTES: 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND MAY NOT REFLECT EXACT "AS -BUILT" CONDITIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. 3. COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AS TIGHT TO STRUCTURE AS POSSIBLE COORDINATE WITH OTHER TRADES TO AVOID CONFUCTS. COORDINATE INSTALLATION OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. ANY MODIFICATIONS REQUIRED DUE TO LACK OF COORDINATION WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO EXTRA COST TO THE OWNER. 4. WHERE SHUTDOWN OF EXISTING SYSTEMS IS REQUIRED DURING NEW WORK, COORDINATE SHUTDOWN TIME AND DURATION WITH THE OWNER TO MINIMIZE DOWNTIME. NOTIFY OWNER SEVEN (7) DAYS PRIOR TO INTERRUPTION OF SERVICE - 5. DURING INSTALLATION OF NEW WORK, AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN. REPAIR DAMAGE CAUSED DURING CONSTRUCTION AT NO EXTRA COST TO THE OWNER. 6. PROVIDE TEMPORARY BARRIERS TO CONTAIN DUST AND DEBRIS RESULTING FROM THE PERFORMANCE OF THE WORK TO THE AREA WHERE WORK IS BEING PERFORMED. 7. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 8. NEW DUCTWORK IS SHOWN AT APPROXIMATE LOCATIONS. FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. 9- REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON ARCHITECTURAL DRAWINGS THAT ARE INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS - 10. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. REPLACE INSULATION THAT HAS GOTTEN WET AT ANY TIME DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. SEAL ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM CEILING/RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO TURNING SYSTEM OVER TO THE OWNER. THE INTERNAL SURFACES AND ASSOCIATED COILS OF ANY HVAC UNITS THAT WERE OPERATED SHALL ALSO BE CLEANED. 11. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN OR NOTED. 12. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT AND DUCTWORK SHALL BE FASTENED TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF EXCEPT WHERE CONCRETE INSERTS IN CONCRETE SLABS ARE ALLOWED BY THE SPECIFICATIONS. 13. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER REPLACEMENT. 14- CONTRACTOR SHALL DRAIN, FLUSH, AND REFILL ALL PIPING SYSTEMS NECESSARY TO PERFORM THE WORK. PROVIDE CHEMICAL TREATMENT FOR ALL PIPING SYSTEMS AFTER REFIL UNG SYSTEM. 15. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT INSTALLATION REQUIREMENTS. 16. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS REQUIRED TO ACCOMMODATE FINAL CEILING GRID AND UGHTING LOCATIONS. 17. LOCATE AND SET THERMOSTATS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES WITH BOTTOM OF DEVICE AT MAXIMUM 44" AFF TO MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. ENSURE DEVICE IS EVEN WITH OTHER SWITCHES ON WALL. PROVIDE INSULATED BACKING FOR THERMOSTATS MOUNTED ON EXTERIOR BUILDING WALLS. INSTALL WIRING IN CONDUIT PROVIDED BY DIVISION 26. AT A MINIMUM, PROVIDE CONDUIT IN THE WALL FROM THE JUNCTION BOX TO 6' ABOVE THE CEILING. 18. COORDINATE THE LOCATION AND ELEVATION OF WALL -MOUNTED DEVICES WITH PRESENTATION BOARDS, DISPLAY CABINETS, SHELVES OR OTHER COMPONENTS SHOWN ON THE ARCHITECTURAL DRAWINGS THAT ARE TO BE INSTALLED UNDER OTHER DIVISIONS. CONTRACTOR WILL NOT BE REIMBURSED FOR RELOCATION OF WALL -MOUNTED DEVICES CAUSED BY A LACK OF COORDINATION. 19. PROVIDE A MANUAL BALANCING DAMPER IN EACH BRANCH DUCT TAKEOFF FROM MAIN SUPPLY AIR DUCTS. 20. PROVIDE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, RECTANGULAR/ROUND BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING QUADRANT FOR BRANCH DUCT CONNECTIONS AND TAKE -OFFS TO INDIVIDUAL DIFFUSERS, REGISTERS AND GRILLES, 21. BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK SIZE UNLESS OTHERWISE NOTED. 22. REFER TO SPECIFICATIONS FOR DUCTWORK AND PIPING INSULATION REQUIREMENTS. DUCT SIZES ON MECHANICAL PLANS INDICATE CLEAR INSIDE AIRFLOW DIMENSIONS, INCREASE SHEET METAL SIZES ACCORDINGLY TO ACCOUNT FOR THICKNESS OF DUCT LINER. 23. FLEXIBLE DUCTWORK SHALL NOT EXCEED 5'-0" IN LENGTH AND SHALL BE INSTALLED / AND SUPPORTED TO AVOID SHARP BENDS AND SAGGING. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 24. PROVIDE EQUIPMENT VENTS PER EQUIPMENT MANUFACTURERS RECOMMENDATIONS AND EQUIPMENT SPECIFICATIONS. KEEP PENETRATIONS THROUGH ROOF A MINIMUM OF 10'-0' FROM HVAC EQUIPMENT FRESH AIR INLETS AND 2'-0" FROM ROOF PARAPETS. 25. CONTRACTOR SHALL FIELD VERIFY THAT THE EXISTING EQUIPMENT INCLUDING ACCESSORIES BEING REUSED FOR THIS PROJECT IS NOT DAMAGED AND IS IN GOOD WORKING ORDER. REPORT ANY DEFICIENCIES TO THE OWNER OR ARCHITECT. CONTRACTOR SHALL SUBMIT TO THE OWNER AND ARCHITECT A WRITTEN REPORT DESCRIBING TESTS PERFORMED TO VERIFY OPERATION AND RESULTS OF THE TESTS. 26. CLEAN EXISTING EQUIPMENT AND EQUIPMENT COMPONENTS BEING REUSED FOR THIS PROJECT. PROVIDE NEW FILTERS FOR EXISTING AIR HANDLING EQUIPMENT PRIOR TO STARTUP OF EQUIPMENT. NEW FILTERS SHALL BE COMPATIBLE WITH THE EXISTING EQUIPMENT AND EQUAL IN PERFORMANCE TO THE EXISTING FILTERS AT NEW CONDITION UNLESS OTHERWISE NOTED. CLEAN STRAINERS IN PIPING SYSTEMS PRIOR TO STARTING PUMPS. 27. LUBRICATE EXISTING EQUIPMENT BEING REUSED FOR THIS PROJECT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. OBTAIN INSTRUCTIONS FROM MANUFACTURER IF THEY ARE NOT AVAILABLE AT THE SITE. 28. FULLY CHARGE EXISTING REFRIGERANT SYSTEMS BEING REUSED FOR THIS PROJECT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CHARGE SYSTEMS WITH NEW REFRIGERANT MATCHING EXISTING. 29- ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED PER RIC, C402.4 LEAKAGE REQUIREMENTS AND IMB VAPOR RETATRDER REQUIREMENTS. 30. ALL DUCTING IS LOW PRESSURE DUCTWORK UNLESS OTHERINISE SPECIFIED. REVISIONS c�hjanass shah 15� r nde toth♦.e sc`n� "=�1 jG�:i..rIVNCI 07 t 'ti;Lt'rHa E:Ji� rillrTg Civision 1:111 rEr m?m, a:1,.�_ 1�4n .y - .,., � Sis;L�iT}�t.$I uy inn''ude a1✓d,-ti0rzaj pian ; r :,. tem rev; s I SEI-ARAT E LHMIT REQUIRED FOR: C7 Mechanical �icctrical �� C tubing Gas Piping 'jEY of Tukwila L415 r,t"�t; DIVICtnhl MECHANICAL SYMBOLS THIS IS A NOTE: SYMBOLS, ETC- ARE ED NECESSARILYMASTER ON THE DRAWINGS. PIPING CDCONDENSATE ORAIN (CD) AC�=ACD- AUXILIARY CONDENSATE DRAIN (ACD) RL REFRIGERANT LIQUID (RL) -RD---- REFRIGERANT DISCHARGE (HOT GAS) (RD) -RS- REFRIGERANT SUCTION (RS) HWS HEATING HOT WATER SUPPLY (HWS) - -HWR- - HEATING HOT WATER RETURN (HWR) CHWS CHILLED WATER SUPPLY (CHWS) - -CHWR- - CHILLED WATER RETURN (CHWR) HPWS HEAT PUMP WATER SUPPLY (HPWS) ---HPWR--- HEAT PUMP WATER RETURN (HPWR) LPS LOW PRESSURE STEAM SUPPLY (LPS) -LPC- - LOW PRESSURE STEAM CONDENSATE (LPC) - - - - EXISTING PIPING TO BE REMOVED ---- EXISTING PIPING TO REMAIN DIRECTION OF FLOW iQ BALL VALVE DTO CONTROL VALVE THREE-WAY CONTROL VALVE SHUTOFF VALVE CHECK VALVE da BALANCING VALVE WITH PRESSURE PORTS TRIPLE DUTY VALVE WITH PRESSURE PORTS --i') WATER METER STRAINER SOLENOID VALVE PRESSURE GAUGE THERMOMETER T PRESSURE AND TEMPERATURE TEST PLUG UNION FLANGE CONNECTION -40 ELBOW UP -� ELBOW DOWN TEE UP lel TEE DOWN REDUCER HVAC EQUIPMENT EC DUCTWORK NOTE: ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. SEE SECTION 15250 OF THE SPECIFICATION FOR DUCTWORK TO RECEIVE INSULATION OR LINER. EXISTING DUCTWORK OR EQUIPMENT TO REMAIN EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED BRANCH DUCT WITH 45' RECTANGLE -ROUND BRANCH FITTING AND MANUAL VOLUME DAMPER ELBOW WITH TURNING VANES RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN SUPPLY AIR DUCT UP xl SUPPLY AIR DUCT DOWN t=41 EQUIPMENT WITH FLEXIBLE DUCT CONNECTION 10" CSD -1 300 CFM NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER OR REGISTER MANUAL VOLUME DAMPER SQUARE TO ROUND TRANSITION �-- DUCT MOUNTED SMOKE DETECTOR RD (SD=SUPPLY/RD=RETURN) FD FIRE DAMPER ® CARBON DIOXIDE SENSOR FSD FIRE SMOKE DAMPER H® HUMIDITY SENSOR SD SMOKE DAMPER © PULL STATION YD VOLUME DAMPERSlffi STATIC PRESSURE SENSOR MD MOTORIZED DAMPER ® TEMPERATURE SENSOR gD BACKDRAFT DAMPERO HUMIDISTAT OT THERMOSTAT ABBREVIATIONS AFF ABOVE FINISHED FLOOR MC MECHANICAL CONTRACTOR BAS BUILDING AUTOMATION SYSTEM MIN MINIMUM BD BACKDRAFT DAMPER NC NOISE CRITERIA CFM CUBIC FEET PER MINUTE OA OUTSIDE AIR DDC DIRECT DIGITAL CONTROL RA RETURN AIR DX DIRECT EXPANSION SA SUPPLY AIR EA EXHAUST AIR SO SMOKE DUCT DETECTOR ETR EXISTING TO REMAIN TFA TO FLOOR ABOVE FFA FROM FLOOR ABOVE 'm TO FLOOR BELOW FFB FROM FLOOR BELOW TYP TYPICAL GPM GALLONS PER MINUTE UNO UNLESS NOTED OTHERWISE IN WC INCHES OF WATER COLUMN W/ WITH MAX MAXIMUM W/0 WITHOUT MBH 1000 BTU PER HOUR STANDARD MOUNTING HEIGHTS MECHANICAL (AFF AFG, UNLESS NOTED OTHERWISE) THERMOSTATS (BOTTOM OF DEVICE) 44" CONTROLS (BOTTOM OF DEVICE) 44' ANNOTATION G1 MECHANICAL PLAN CALLOUT CU MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED T AND INSTALLED UNLESS NOTED OTHERWISE) ® CONNECTION POINT OF NEW WORK TO EXISTING 1 DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER M) LOWER NUMBER INDICATES SHEET NUMBER 1 SECTION CUT DESIGNATION M1 e Plan review approval is subject to errors and or Fissions. Approval of constr+, lion documents does not authoilze the violation or any adopted Cade or ordinance. Recfiipt of approved Reld Copy and can "Eicns i3 acknowied od: Date:.._.. City of T ulila BUILDING DIVISION REVIEWED FOR :CODE COMPLIANCE APPROVED SEP City of Tukwila BlLOIN. f X21 -- 4 )s Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 I Telephone 510.625.7400 Facsimile 510.625.7499 rHEHDE D 17JENGINEERS1 5555 REDWOOD STREET, SUITE 201 IAS VEGAS, NV 89118 TEL 702 697 2187 IFAX 702 697 2188 *rww.hei-eng.mm x' 1650000542 WA. CORPORATE NUTABER:1754 EXPIRES 06/30/16 F' 10 1 i ' ! i Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNFTH L_ BIESIVA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Scale NONE RECEIVED CITY OF TUKWILA M SEP 122016 PERMIT CENTER @2016 Gensler =UTA 3/16"=1'-0 0 ALL EXISTING DUCTS, DIFFUSERS, RETURNS AND EXHAUSTS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE. REVIEWED FO CODE COMPLIANCE APPROVED, SEP 2 2 2016 11 It'y of Yukrwl I BUILDING DIVISION 1. DEMOLISH CEILING DIFFUSER AND ASSOCIATED DUCTWORK BACK TO DUCT MAIN. CAP AND SEAL DEMOLISHED DUCT OPENING AIRTIGHT. 2. DEMOLISH EXISTING RETURN GRILLE. CAP DUCT END FOR EXTENSION DURING CONSTRUCTION PHASE. 3. REMOVE EXISTING THERMOSTAT FOR RELOCATION AS SHOWN ON M02.01. 4. REMOVE EXISTING DIFFUSER AND PREPARE TO RELOCATION UNDER NEW CONSTRUCTION. 5. REMOVE EXISTING DIFFUSER AND PREPARE TO RELOCATION UNDER NEW CONSTRUCTION. Tukwila SeuthCenter WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description DEMOLITION FLOOR PLAN - HVAC @2016 Gensler i M 4EH i r A Ps ,r 1. RELOCATE EXISTING RETURN TO NEW LOCATION SHOWN. 2. REBALANCE EXISTING DIFFUSER TO CFM INDICATED. 3. EXISTING THERMOSTAT TO REMAIN. 4. RELOCATE EXISTING THERMOSTAT AS SHOWN. PROVIDE NEW CONTROL WIRING. 5. REBALANCE RTU OUTSIDE AIR TO CFM SCHEDULED ON M04.01. EXISTING SUPPLY CFM TO REMAIN. 6. FIELD VERIFY DUCT SIZE AND LOCATION PRIOR TO CONSTRUCTION. 7. RELOCATE EXISTING DIFFUSER TO LOCATION SHOWN AND REBALANCE TO CFM INDICATED. EXTEND FLEX DUCT TO NEW DIFFUSER LOCATION. .VIEWED FO * COMPLIANCY APPROV14f) . SEP ' 21 ?. L t Of Tyk it . .. t tON Tukwila SouthContor WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description MECHANICAL HVAC PLAN Scale NONE RECEIVED 1M 0.02c� SEP 12 2016 TY OF 'LA @2016 Gensler PERMIT CENTER I ML GoRILLE, REGISTER AND DIFFUSER SCHEDULE OUTSIDE AIR REQUIREMENTS, UIVIC 2 MODEL FACE MOUNTING FACE SIZE MAX NOTES SINGLE -ZONE SYSTEMS ONLY MULTI -ZONE SYSTEMS ONLY LOCATION (IN) NC CD -1 TITUS OMNI PLAQUE CEILING 24)Q4 SYSTEMTYPE: FLOOR AREASERVED SYSTEM AVER ED AREA SYSTEM POPULATION SYSTEM AVERAGED PEOPLE REQUIRED OA DESIGN NOTES SINGLE -ZONE SYSTEM SINGLE ZONE WORST CASE SYSTEM VENTILATION CEILING DESIGNATION SYSTEM TAB NAME ASSOCIATED ZONE AIR DISTRIBUTION EFFICIENCY[Ey] BY SYSTEM [As] BASED OUTDOOR AIR RATE [Ps] BASED OUTDOOR AIR RATE INTAKE FLOW[Vot] OA INTAKE FLOW D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR. E. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. F. ALUMINUM CONSTRUCTION. OR LIST'SINGLE' VENTILATION ZONE EFFECTIVENESS [Ez] (SF) (CFM/SF) (PEOPLE) (CFM/P ) (CFM) (CFM) RTU2 MULTIZONE (RTU2) - - 0.91 2,640 0.059 37 6.62 441 445 RTU3 MULTIZONE (RTU3) - - 0.91 1,143 0.049 1 3 5.00 72 75 RTU4 MULTIZONE (RTU4) - - 0.91 1,975 0.067 129 5.64 328 330 TOTALS 841 850 GENERAL NOTES: 1. VENTILATION CALCULATIONS BASED ON ASHRAE STANDARD 62.1-2010. 2. SYSTEM POPULATIONS BASED ON MAX SEATING AND/OR CODE MAXIMUMVALUES. 3. SINGLE ZONE SYSTEMS (Vot= Voz): SYSTEM VENTILATION EFFICIENCY CALCULATION IS NOT REQUIRED FOR SINGLE ZONE SYSTEMS. WORST CASE AIR DISTRIBUTION EFFECTIVENESS BETWEEN HEATING AND COOLING MODES OF OPERATION IS SHOWN IN TABLE. 4. 100% OASYSTEMS (Wt= Lellzmes Voz): WHEN ONE AIR HANDLER SUPPLIES ONLY OUTDOOR AIR TO ONE OR MORE ZONES. EACH ZONE IS INDIVIDUALLY CALCULATED WITH ITS WORST CASE ZONE AIR DISTRIBUTION EFFECTIVENESS (HEATING/COOLING). 5. MULTI -ZONE RECIRCULATING SYSTEMS: ASH RAE 62.1-2010 CALCULATOR USED TO DETERMINE VENTILATION AIRFLOW IN COMPLIANCE WITH VRP AND APPENDIXA. VENTILATION RATE SHOWN IS ACTUAL CALCULATED WITH CORRECTION FACTORS INCLUDED. EACH ZONE IS CALCULATED WITH ITS WORST CASE ZONE AIR DISTRIBUTION EFFECTIVENI (HEATING/COOLING) AS PART OF CALCUALTIONS TO FIND Ev. GoRILLE, REGISTER AND DIFFUSER SCHEDULE MARK MANUFACTURER MODEL FACE MOUNTING FACE SIZE MAX NOTES TYPE LOCATION (IN) NC CD -1 TITUS OMNI PLAQUE CEILING 24)Q4 30 A -F CR -1 TITUS 50F EGGCRATE CEILING 24)Q4 30 A, C, D -F CR -2 TITUS 50F EGGCRATE CEILING 24X12 30 A, C, D -F MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND MODEL NUMBERS ONLY. REVIEW THE COMPLETE DESCRIPTION, NOTES AND SPECIFICATIONS TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE MANUFACTURERS LISTED ARE THE BASIS FOR THE DESIGN. NOTES: A. NECK SIZE SHOWN ON DRAWINGS. B. 4-WAYTHROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS. C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR. E. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. F. ALUMINUM CONSTRUCTION. METALLIC OR NON—METALLIC BAND OVER INSULATION (TYPICAL) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED, WITH VOLUME DAMPER AND DAMPER LOCK WITH EXTENSION FOIL TAPE AT INSULATION JOINT--,/C'Cll1 SEE NOTE 1. PRE—INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS METALLIC OR NON—METALLIC BAND (TYPICAL) CEILING DIFFUSER WITH VOLUME DAMPER, FIRE DAMPER OR COMBINATION VOLUME/FIRE DAMPER AS SCHEDULED CEILING INSULATED DUCT FOR FIRE RATED CEILINGS, PROVIDE FIRE RATED JACKET TO COMPLETELY COVER DIFFUSER CONE. SEAL FOIL TO CONE WITH FIBER REINFORCED TAPE. PROVIDE 1" THICK, R-6 FIBERGLASS INSULATION TO COMPLETELY COVER DIFFUSER CONE WHERE SCHEDULED OF SPECIFIED. NOTES: 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5'-0". PROVIDE RIGID 90' ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN 5'-0" LENGTH LIMITATION. 2. PROVIDE RIGID ROUND—TO—OVAL TRANSITION WHEN PLENUM HAS OVAL CONNECTION. LAY—IN AND SLOT TYPE D2 :NOSCALE EILING DIFFUSER DETAIL PARALLEL TO STRUCTURE OPTIONAL ROUTING IN CONCEALED AREAS ANGLE OR UNISTRUT ROUND SUPPLY AIR DUCT PERPENDICULAR TO STRUCTURI BOTTOM OF STRUCTURE TWIST STRAP 16 GA. GALV. STEEL BAND (2" WIDE) ROUND DUCT ROOF JOIST) 1 6" FASTENER BOLT AND NUT (MAX. 36"0) SHEET METAL SCREW (MAX. 24"0) FASTENER TYPES LOADS MUST BE HUNG WITHIN 6" OF PANEL POINTS NOTES: 1. FOR DUCTS LARGER THAN 36"0, USE TWO HANGER RODS, WIRES OR STRAP TO SUPPORT DUCT FROM EACH SIDE. KUUNU NO SCALE REVIEWED FOR CODE COMPLIANCE APPROVED SEP 2 2 2016 Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila, WA 98188 FLAGSHIP 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone 510.625.7400 Facsimile 510.625.7499 rH E N ffU"E OR S 0 N 1JENGINEERSM 5555 REDWOOD STREET, SUITE 201 LAS VEGAS, NV 89118 TEL 702 697 2187 FAx 702 697 2188 www.hei-eng.com 1650000542 WA. CORPORATE NUMBER: 1754 EXPIRES 06/30/16 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Proiect Number 33.1361.007 Description MECHANICAL DETAILS AND SCHEDULES Scale NONE @2016 Gensler RECEIVE. CITY OF TU KII" IMUA SEP 12 2016 PERMIT CENTER 1 2012 Washington State Enerav Code Compliance Form for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 2012 Washington State Energy Code Compliance Form for Commercial Buildings including R2 & R3 over 3 stories and all R1 Project Address Fill this line out on MECH-SUM Date 1/1/2e] 5 The following information is necessary to check a permit application for compliance w ith the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Mustbe in permit documents Location in Building Department (yes,no,na) Location in Building Department (yes,no,na) Documents Notes GENERAL PROVISIONS Equipment Sizing & Performance Notes COMPLEX SYSTEMS Water -heating equip min. Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency M00.01 Air economizer required yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 1 C403.4.1 Air economizer exceptions na C403.2.2 Equipment and system Output capacities of heating and cooling equipment and system do not exceed the next 0403.4.1.1 ALL UNITS ARE no C404.4 sizing larger available equipment size above the calculated loads; note exceptions taken EXISTING na C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable 1VO4.01 Water economizer maximum yes 0403.2.5.4.2 heater of being reduced to minimum requirement per IMC pressure drop na C404.6 Service water piping Indicate R -value of insulation on piping; note exceptions taken 0403.4.1.3 ALL UNITS ARE na C403.2.3 & C403.2.3.2 & Equipment minimum Provide equipment schedules or complete MECH-SUM tables w ith type„capacity, efficiency, EXISTING no 0404.7 / 8 efficiency test standard (or other efficiency source) for all mechanical equipment C403.4.1.4 Economizer heating system na C403.2.12.1 heat trace shut-off Indicate on-site steam heating system requiring energy recovery impact no C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, and efficiency for all motors; note exceptions taken na ALL UNITS ARE na C404.9 water meters Isystern EXISTING na C403.2.10.1 Fan power limitation For all applicable system > 5hp, provide systemtotal nameplate hp in MECH-FANSYS-SUM Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency C403.4.2.1 VAV fan static pressure na C404.10.1 form source na C403.2.10.1 Fan pow e limitation For all applicable fan system > 5hp, verify fan system motor hp or bhp complies w ith fan Indicate automatic on/off control based on scheduling & accessible on/off switch on heater na na 0404.10.1 / 2 power limits per Table C403.2.10.1(1), provide MECH-FANSYS formfor each system that operates independent of thermostat setting; note exceptions taken 0403.4.2.2 no C403.2.10.2 Motor nameplate hp Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, Indicate vapor retardant cover and insulation rating as required ALL UNITS ARE VAV system serving na C404.10.3 note exceptions taken Indicate rating of insulation on sides and bottom of pools heated to > 90°F EXISTING no C403.2.10.3 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECMtype or meet minimumefficiency req. Indicate method, exhaust air temperature reduction and recovered energy use; note ALL UNITS ARE VAV system serving & C403.2.13 Indicate single zone fan systems requiring airflow reduction capability in response to reduced exceptions taken EXISTING na COMMISSIONING Maximum air cooled chiller cooling or heating demand in a zone, or adjacent zones w ithout separating walls, w ith > na Mechanical systems na 0403.2.3 capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit 0408.2 commissioning note exception taken MECH. Non-standard water-cooled Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard na C403,2.3.1 chillers operational conditions na Service water heating Indicate all service water heating system to be commissioned; for those that w ill not be tons Centrifugal fan cooling Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial 0408.4 system commissioning na 0403.2.12.1.2 towers fan open circuit cooling towers na C403.4.3 na C403.2.3 Forced air furnace and unit Indicate intermittent ignition or IID, flue/draft damper & jacket loss C408. 1.1 Commissioning plan required item per this section SPECS heaters Duct construction C408.2.2.1 & Air system and hydronic Include in commissioning plan that air and hydronic systems shall be balanced in a manner to Indicate automatic controls that sequence operation of multiple boilers Packaged electric Verify all packaged electric equipment that provides > 20,000 Btu/h cooling capacity and 0408.2.2.2 system balancing na 0403.2.3.3 heating/cooling equipment heating is a heat pump, note in equipment schedule na Air system balancing na C403.2.3.4 Humidification Indicate method of humidification (note requirements for system w ith economizer) 0408.2.2.1 devices HVAC System Controls & Criteria M02.01 C403.2.7.3.3 High pressure duct leakage C408.2•2•2 M02.01 Indicate devices that provide the capability to isolate, balance and measure flow for all yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems devices hydronic equipment requiring system balancing Heat pump supplementary Indicate staged heating (compression/supplemental) and outdoor lock -out temperature is set Mechanical systems Provide description of functional performance testing procedures for all applicable system na 0403.2.4.1.1 heat to 40 -For less functional performance including: equipment, controls, economizers MECH. setpoint overlap Piping insulation testing controls na 0403.2.4.2 (deadband) Indicate 5'F deadband minimum for system controlling both heating &cooling Service water heating Provide description of functional performance testing procedures for all applicable system na 0403.2.8.1 Piping insulation exposed to Automatic setback and C408.4.1 functional performance ALL CONTROLS ARE na 0403.2.4.3 shutdown Indicate zone t stat controls with required automatic setback &manual override testing EXISTING na C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions System operation training Indicate required system operation training measures to be provided na C402.4.5.2 & OSA, exhaust, and relief air Indicate location of outdoor air supply intake, and exhaust and relief outlet dampers; verify M04.01 OUTSIDE AIR INTAKE yes C403.2.4.4 dampers Class 1 leakage rating and control type (motorized or gravity); note exceptions taken Documentation AT RTU SPECS C403.3 Qualifying2-pipe heating Indicate location of return air dampers that are integral to economizer operation; verify Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon na 0402.4.5.2 Return air dampers motorized control and Class 1 leakage rating; note exception taken Acceptance report completion of preliminary commissioning report na C402.4.5.1 Stairway and shaft vents Indicate location of stairway and shaft vents, verify Class 1 leakage rated motorized dampers NA heat rejection, Zone 5 Simple System Economizers and method of activation Water loop heat pump - na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls Indicate cooling system requiring economizer controls; note in equipment schedule isolation na C403.2.4.5 Snow melt system Indicate shut-off controls based on outdoor conditions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) Walk in cooler/ freezer- Indicate w /sf &control method for walk-in cooler/freezer door anti -sweat heaters na Combustion heating Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken ALL UNITS ARE yes C403.2.4.6 equipment Indicate modulating or staged control Indicate capability for partial air economizer operation for system w ith capacity > 65,000 EXISTING ALL UNITS ARE na Group R1 hotel/motel Indicate method for guest room temperature automatic setback (heating) & set-up (cooling), Btu/h evaporator and condenser na C403.2.4.7 system confirm adjustment of at least 5°F minimum. fans ALL UNITS ARE na Group R2/R3 dwelling and Indicate 5-2 programmable thermostats in primary spaces w ith minimum of tw o setback Indicate high limit shut-off control method per Table 0403.3.1.1.3(2) na 0403.2.4.8 / sleeping unit system periods and 10-F deadband; note exceptions taken na C403.2.5.1 Demand controlled Indicate high -occupancy spaces and system requiring DCV ventilation Indicate spaces requiring occupancy -based system control and method; or alternate means na 0403.2.5.2 Occupancy sensors provided to automatically reduce OSA when partially occupied 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address FII this line out on MECH-SUM Date '1/! /20' 5 The follow Ing information is necessary to check a permit application for compliance w ith the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Location in Building Department (yes,no,na) Documents Notes SERVICE WATER HEATING Service Water Systems Notes COMPLEX SYSTEMS Water -heating equip min. Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency C403.4.1 Air economizer required na C404.2 efficiency source C403.4.1 Air economizer exceptions na C404.3 Temperature controls Indicate temperature controls have required setpoint capability 0403.4.1.1 Water economizer capacity na C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge na C404.5 Insulation under water Indicate R-10 insulation under electric water heater tanks 0403.4.1.2 Water economizer maximum Indicate precooling coils and heat exchangers in water economizer system do not exceed 0403.2.5.4.2 heater Indicate lab exhausts stem requiring heat recovery, method & efficienc • or alternative pressure drop na C404.6 Service water piping Indicate R -value of insulation on piping; note exceptions taken 0403.4.1.3 Integrated economizer na C403.2.6.1 insulation Indicate ventilation system requiring ER, method & efficiency; note exceptions operation na 0404.7 / 8 Circulation system and Indicate shut-off capability based on occupancy and periods of limited demand C403.4.1.4 Economizer heating system na C403.2.6.2 heat trace shut-off Indicate on-site steam heating system requiring energy recovery impact energy usage during normal operation Group R-2 service hot Indicate method of usage metering for dwelling units served by a central service hot water na C403.4.2 & na C404.9 water meters Isystern C403.2.12 Pools & In -Ground Permanently Installed Spas cooler/freezer condensers Pool heating equip min. Provide equipment schedule w ith type, capacity, efficiency, test standard or other efficiency C403.4.2.1 VAV fan static pressure na C404.10.1 efficiency source na condenser system effectiveness; note exceptions taken Indicate automatic on/off control based on scheduling & accessible on/off switch on heater na na 0404.10.1 / 2 Pool heater on /off controls that operates independent of thermostat setting; note exceptions taken 0403.4.2.2 setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required C403.4.5 VAV system serving na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F na na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use; note VAV system serving For each air systemterminal, indicate the maximum air flow rate of primary supply air during Indicate single zone fan systems requiring airflow reduction capability in response to reduced exceptions taken 0403.4.5 na COMMISSIONING Specific System Requirements cooling or heating demand in a zone, or adjacent zones w ithout separating walls, w ith > na Mechanical systems Indicate all mechanical system to be commissioned; for those that w ill not be commissioned indicate controls that automatically reset supply air temp in response to loads yes 0408.2 commissioning note exception taken MECH. EXISTING UNITS ARE Indicate method of cooling demand -based fan control for air conditioning system > 110,000 Large capacity cooling SPECS EXISTING TO REMAIN. Btu/h serving single zones na Service water heating Indicate all service water heating system to be commissioned; for those that w ill not be tons na 0408.4 system commissioning commissioned, note exception taken 0403.2.4.10 DDC system capabilities demand response setpoint adjustment na C403.4.3 Provide commissioning plan for all systems requiring commissioning; include in plan all MECH. 0403.2.7.1 & yes C408. 1.1 Commissioning plan required item per this section SPECS C403.2.7.3 Duct construction C408.2.2.1 & Air system and hydronic Include in commissioning plan that air and hydronic systems shall be balanced in a manner to Indicate automatic controls that sequence operation of multiple boilers no 0408.2.2.2 system balancing first minimize throttling losses, then adjust to meet design flow conditions Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers Duct pressure na Air system balancing Indicate devices that provide the capability to balance all supply air outlets, zone terminals and yes 03.2.7.3.1- yes 0408.2.2.1 devices equipment requiring system balancing M02.01 C403.2.7.3.3 High pressure duct leakage C408.2•2•2 Hydronic system balancing Indicate devices that provide the capability to isolate, balance and measure flow for all na na jurisdiction w hen completed devices hydronic equipment requiring system balancing na Mechanical systems Provide description of functional performance testing procedures for all applicable system yes 0403.2.7.1 12 yes C408.2.3 functional performance including: equipment, controls, economizers MECH. na C403.2.8 Piping insulation testing controls SPECS Service water heating Provide description of functional performance testing procedures for all applicable system na 0403.2.8.1 Piping insulation exposed to na C408.4.1 functional performance including: equipment, controls, pools and spas weather testing Qualifying Systems na C408.1.4 System operation training Indicate required system operation training measures to be provided na 0403.3 system 0408.1.2 & 0403.4.3.3.1 Indicate required documentation including: record documents, manuals, balancing reports, MECH. yes C403 1 3 Documentation commissioning preliminary and final reports SPECS C403.3 Qualifying2-pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon MECH. yes 0408.1.2.1 Acceptance report completion of preliminary commissioning report SPECS C403.3.2 Revised Aug 2015 Project Address Fill this line out on MECH-SUM Date 1/1;2015 The follow ing information is necessary to check a permit application for compliance w ith the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Location in Building Department (yes,no,na) Documents Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued Notes COMPLEX SYSTEMS Enclosed loading Indicate enclosed loading dock and enclosed parking garage ventilation system activation and C403.4.1 Air economizer required na C403.2.5.3 dock/parking garage control method C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) ventilation na 0403.4.1.1 Water economizer capacity na C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning indicate system is capable of 100% cooling capacity at 50°F db/45°F w b OSA method 0403.4.1.2 Water economizer maximum Indicate precooling coils and heat exchangers in water economizer system do not exceed 0403.2.5.4.2 Laboratoryexhaust Indicate lab exhausts stem requiring heat recovery, method & efficienc • or alternative pressure drop na system method taken (VAV, sem-conditioned makeup, or CERM calculation) 0403.4.1.3 Integrated economizer na C403.2.6.1 Energy recovery (ER) - Indicate ventilation system requiring ER, method & efficiency; note exceptions operation ventilation systems C403.4.1.4 Economizer heating system na C403.2.6.2 Energy recovery (ER) - Indicate on-site steam heating system requiring energy recovery impact energy usage during normal operation condensate system Specific System Requirements na C403.4.2 & na 0403.2.6.3 Energy recovery (ER) - Indicate remote refrig. condensers requiring ER and use of captured energy C403.2.12 cooler/freezer condensers na C403.4.2.1 VAV fan static pressure C403.4.6 Energy recovery (ER) - Indicate condenser systems requiring ER to pre -heat service water; indicate ER na condenser system effectiveness; note exceptions taken na C403.2.12 Variable flow control - Indicate fan and pump motors a 7.5 hp and the method of variable flow control (VSD or na 0403.4.2.2 setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure fans/pumps equivalent controls) C403.4.5 VAV system serving Indicate supply air systems serving multiple zones, method of primary air control, and zones Variable flow control -heat Indicate heat rejection equipment and cooling tower fans requiring variable flow control and na na C403.2.12.1 rejection equipment method VAV system serving For each air systemterminal, indicate the maximum air flow rate of primary supply air during Indicate single zone fan systems requiring airflow reduction capability in response to reduced na 0403.4.5 na C403.2.12.2 Large volume fan system cooling or heating demand in a zone, or adjacent zones w ithout separating walls, w ith > na C403.4.5.4 VAV system supply air indicate controls that automatically reset supply air temp in response to loads 10,000 CFM supply air; note exceptions taken na C403.2.12.2 Single zone AC system Indicate method of cooling demand -based fan control for air conditioning system > 110,000 Large capacity cooling Indicate method of multi -stage or variable control for building cooling system capacity > 300 Btu/h serving single zones na 0403.4 systems tons Identify all DDC system input/output control points and indicate capability for trending and na C403.4.7 na 0403.2.4.10 DDC system capabilities demand response setpoint adjustment na C403.4.3 Ducting Systems Indicate multi -stage or modulating burner for single boilers > 500,000 Btu/h 0403.2.7.1 & Indicate all ductw ork constructed and sealed per IMC, C402.4 leakage requirements and IBC system yes C403.2.7.3 Duct construction vapor retarder requirements C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers M00.01 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers Duct pressure na 0403.4.3.5 isolation yes 03.2.7.3.1- classifications Identify location of low, medium and high pressure ductwork on plans M00.01 Variable flow control - Indicate pumps requiring variable flow control &method C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test results to C403.2.12 pumps na test jurisdiction w hen completed 0403.2.12.1 Variable flow control - na MECH. cooling towers yes 0403.2.7.1 12 Duct insulation Indicate R -value of insulation on ductwork SPECS Hydronic system part load Piping Systems na C403.2.8 Piping insulation Indicate R -value of insulation on piping controls w ater temp AND reduce flow by a 50% for system > 300,000 Btu/h NA Tw o -pipe changeover na 0403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/depredation NA 0403.4.3.2 weather SIMPLE SYSTEMS Qualifying Systems Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, does not have active Water loop heat pump - na 0403.3 system hurnidifcation or simultaneous heating/cooling 0403.4.3.3.1 deadband between heat rejection and heat addition modes na NA Water loop heat pump - na C403.3 Qualifying2-pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits heat rejection, Zone 4 systems na NA Water loop heat pump - na C403.3.2 Hydronic system controls Refer to Complex System Section C403.4.3 NA heat rejection, Zone 5 Simple System Economizers Water loop heat pump - ALL UNITS ARE na C403.3.1 Air economizer required Indicate cooling system requiring economizer controls; note in equipment schedule isolation EXISTING TO REMAIN na C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) Walk in cooler/ freezer- Indicate w /sf &control method for walk-in cooler/freezer door anti -sweat heaters na C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken anti-sw eat heaters ALL UNITS ARE EXISTING TO REMAIN 0403.3.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for system w ith capacity > 65,000 Cooler / freezer - ALL UNITS ARE na operation Btu/h evaporator and condenser EXISTING TO REMAIN Air economizer high limit fans ALL UNITS ARE na 0403.3.1.1.3 controls Indicate high limit shut-off control method per Table 0403.3.1.1.3(2) EXISTING TO REMAIN Bankof America -o7 Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila WA 98188 FLAGSHIP x 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone p 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description MECHANICAL COMPLIANCE FORMS Scale NONE © 2016 Gensler RECEIVED CITY of TUKWILA SEP 12 2016 PERMIT CENTER 2012 Washington State Energy Code Corrpliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Aug 2015 Project Address FII this line out on MECH-SUM Date 1/1/2015 The following information is necessary to check a permit application for compliance with the mechanicial system and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Building Department (yes,no,na) Documents Notes COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling system requiring economizer controls; note in equipment schedule na C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply w ith exception(s) na 0403.4.1.1 Water economizer capacity For eligible systems w here water economizer may be provided in lieu of air economizer, indicate system is capable of 100% cooling capacity at 50°F db/45°F w b OSA 0403.4.1.2 Water economizer maximum Indicate precooling coils and heat exchangers in water economizer system do not exceed na pressure drop pressure drop limit na 0403.4.1.3 Integrated economizer Indicate capability for partial economizer operation for air or water economizer systems operation C403.4.1.4 Economizer heating system Verify control method of HVAC system w ith economizers does not increase building heating na impact energy usage during normal operation Specific System Requirements na C403.4.2 & VAV fan control Indicate fans requiring variable flow control and method C403.2.12 na C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major duct branch sensors VAV fan static pressure na 0403.4.2.2 setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure C403.4.5 VAV system serving Indicate supply air systems serving multiple zones, method of primary air control, and zones na multiple zones served; Indicate VAV or note exceptions taken VAV system serving For each air systemterminal, indicate the maximum air flow rate of primary supply air during na 0403.4.5 multiple zones zone peak cooling and the maximum air flow rates during zone peak heating. na C403.4.5.4 VAV system supply air indicate controls that automatically reset supply air temp in response to loads reset Large capacity cooling Indicate method of multi -stage or variable control for building cooling system capacity > 300 na 0403.4 systems tons na C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na C403.4.3 Large capacity boiler Indicate multi -stage or modulating burner for single boilers > 500,000 Btu/h system na C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers na 0403.4.3.5 isolation & boilers when not in use na 0403.4.3.6 & Variable flow control - Indicate pumps requiring variable flow control &method C403.2.12 pumps 0403.2.12.1 Variable flow control - na & C403,4.4 cooling towers Indicate cooling tower fans requiring variable flow control and method Hydronic system part load Indicate heating & chilled water system have the capability to automatically reset supply na 0403.4.3.4 controls w ater temp AND reduce flow by a 50% for system > 300,000 Btu/h Tw o -pipe changeover na 0403.4.3.2 Indicate deadband, heating/cooling mode scheduling and changeover temperature range system Water loop heat pump - Indicate capability of central equipment to provide rain. 20°F w ater supply temp deadband na 0403.4.3.3.1 deadband between heat rejection and heat addition modes na 0403.4.3.3.2.1 Water loop heat pump - Indicate method used to limit system heat loss w hen heat rejections is not needed heat rejection, Zone 4 na 0403.4.3.3.2.2 Water loop heat pump - Provide heat exchanger that separates cooling tower and heat pump loop heat rejection, Zone 5 Water loop heat pump - Indicate 2 -way isolation valve on each heat pump and variable flow control for systems with na 0403.4.3.3.3 isolation total pump power > 10 hp na 0403.5 Walk in cooler/ freezer- Indicate w /sf &control method for walk-in cooler/freezer door anti -sweat heaters anti-sw eat heaters Cooler / freezer - na C403.5 / 6 evaporator and condenser Indicate motor type for evaporator and condenser fans < 1 hp fans Bankof America -o7 Tukwila SouthCenter WA3-186 320 Strander Blvd Tukwila WA 98188 FLAGSHIP x 2101 Webster Street, Suite 2000 Oakland, CA 94612 Telephone p 510.625.7400 Facsimile 510.625.7499 Seal/Signature THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY SUBMITTAL KENNETH L. BIESMA LICENSE # 38619 IT IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. Project Name Tukwila SouthCenter Project Number 33.1361.007 Description MECHANICAL COMPLIANCE FORMS Scale NONE © 2016 Gensler RECEIVED CITY of TUKWILA SEP 12 2016 PERMIT CENTER