Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M16-0145 - HOMEWOOD SUITES - SPLIT SYSTEM HEAT PUMP, EXHAUST FAN, DUCTWORK AND GRILLES/DIFFUSERS
HOMEWOOD SUI'T'ES 6955 FORT DENT WAY M16-0145 City of Tukwila • Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 2954900460 Permit Number: M16-0145 Address: 6955 FORT DENT WAY BLDG 4 Issue Date: 10/28/2016 WA Cities Electrical Code: 2014 Permit Expires On: 4/26/2017 Project Name: HOMEWOOD SUITES 2014 Owner: 2015 WA State Energy Code: Name: APPLE EIGHT SPE TUKWILA INC 2015 Address: 814 E MAIN ST, RICHMOND, WA, 23219 Contact Person: Name: ALEX BURKHART Phone: (206) 763-1744 Address: 727 S KENYON ST, SEATTLE, WA, 98108 Contractor: Name: EVERGREEN REFRIGERATION LLC Phone: (206) 763-1744 Address: 727 S KENYON ST, SEATTLE, WA, 98108 License No: EVERGRL954R2 Expiration Date: 1/6/2018 Lender: Name: Address: DESCRIPTION OF WORK: INSTALLATION OF ONE SPLIT SYSTEM HEAT PUMP, ONE EXHAUST FAN, DUCTWORK AND GRILLES/DIFFUSERS Valuation of Work: $22,999.00 Fees Collected: $494.14 Type of Work: Electrical Service Provided by: PUGEST SOUND ENERGY Fuel type: Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature: lP fi"Rc Date: Jolnlh I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature:L,4-P-Date: lo Print Name: nr, i �0 S -e This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 2: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 3: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 4: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 5: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 6: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 7: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 8: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 9: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 10: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 11: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 12: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 13: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 14: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 15: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 16: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 17: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 18: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 19: ***MECHANICAL PERMIT CONDITIONS*** 20: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 21: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 littp://www.TukNvilaWA.gov II Mechanical Permit No. IV l IV -0 Project No. Date Application Accepted: Date Application Expires: _ MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: 5 �� b) L46`t� Site Address: ��'�� Suite Number: Floor: Tenant Name: Dr4tVV0J �V res New Tenant: ❑ .....Yes 2"..No PROPERTY OWNER Name: n (e V-1 Lk- SQ&_ Address: p�� Cyt S;r City:��yDtD State: uk Zip: 2722, (,q CONTACT PERSON — person receiving all project communication Name: 1 11- r Address: - '1,1 Wn -i City: 'Se.4/bj-[e, d State: w/)C- Zip: p[ 91 61 Phone: =16 3 - l'i Fax: fieri -7,6) Email: �,e�v¢nYtGth%1VetC�fv+►. Valuation of project (contractor's bid price): $ VL tQa q MECHANICAL CONTRACTOR INFORMATION Company Name: F ��cc,n i L r nh Address: 72`7 o,*Ii City:;".t-1 State: VvA- Zip: I Vol Phone: �H `163 .- 12, Fax: �� _-16238 1 Contr Reg No.: fve tz.C- _q 5qp Fxp Date: 116 j f Tukwila Business License No.: IBVS _ 041,9-7-7 Describe the scope of work in detail: Skz✓i�,wk owe. 51" l c k- kdrl \g ' p �v"' p t ©Ae.. (k � &4 � vs -}-- Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... ❑ Replacement ........ ❑ Fuel Type: Electric..... ❑ Gas ....... ❑ Other: H:\Applications\Forms-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 14-16.docx Revised: January 2016 Pagel of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu ) Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Ap liance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit <I0.000 cfin 65 dB(A) Unit Type Qty Air handling unit >10.000 cfm Residential, Nighttime Evaporator cooler ) Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator— domestic 47 dB(A) Incinerator — comm/industrial 65 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser ) Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency enerator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500.000 btu 15-30 hp/1;000,000 btu 30-50 hp/1,750,000 btu 50+hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM, Monday through Friday and 8AM-IOPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: Warning devices; Construction and property maintenance during the daytime hours (7am-1 Opm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PER.IURY BY THE LAWS OF THE STATE OF WASHINGTON. AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature:f',, Date: / L Print Name: (u �U' rO' D�ay�Telephone: " U 3 l'l� A Mailing Address: City State Zip H:\Applications\Forms-Applications On Line\2016 ApplicationsWechanical Permit Application Revised 1 4-16.docx Revised: January 2016 Page 2 of 2 bh DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $562.39 EL16-0850 Address: 6955 FORT DENT WAY BLDG 4 Apn: 2954900460 $68.25 ELECTRICAL $65.00 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $65.00 TECHNOLOGY FEE $3.25 TECHNOLOGY FEE R000.322.900.04.00 0.00 $3.25 M16-0145 Address: 6955 FORT DENT WAY BLDG 4 Apn: 2954900460 $494.14 MECHANICAL $475.13 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $347.60 PLAN CHECK FEE R000.322.102.00.00 0.00 $95.03 TECHNOLOGY FEE $19.01 TECHNOLOGY FEE R000.322.900.04.00 TOTAL . R9432 0.00 $19.01 $562.39 Date Paid: Friday, September 16, 2016 Paid By: EVERGREEN REFRIGERATION Pay Method: CHECK 008200 Printed: Friday, September 16, 2016 9:44 AM 1 of 1y SYSTEMS y� ' INSP Y Retain INWECTION NO. :CTION RECORD a copy with permit PERMIT NO. CITY OF' TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Proj ct: Type of Inspection: Address: Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: 2C,4_ 671-- 3137 KA Approved per applicable codes. —] Corrections required prior to approval. LAJ nspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, foe must be paid at 6300 5outhcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit Mfg INSPrICTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Proj, ct: 6 b SU/ "StC1 Type of Inspection: AiJiCAZ L Address: A Q I 6 /T Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: 206 Zq 3197 Approved per applicable codes. rM Corrections required prior to approval. inspector: Date: J1-7 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Cail to schedule reinspection. INSPECTION RECORD _ Retain a copy with permit � P42_ ©l INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: ' Address: ,67— T U)Ay Date Called: Special Instructions: ,3LiI� Date Wanted: a.m. -Z 1-17 Requester: Phone No: © Approved per applicable codes. E] Corrections required prior to approval. Inspector: -kyr � Date: �— F] REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit Gz m�-Ql�15° I ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., 4100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 nspection: 41 .- J i 0 ss: N Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS' 1? yo —1 p loco 6-64L, e4? L REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. iLABC CsR TIMED 00 Is E. 301ain, 13047 S. E.4.rth Pte. Cushin.a.Oil74023 Be.Uevue.IVA93006 Phone: (918) 225-16600 Phone: (425; 747-9356 FH 4: (918) 335-16087 -Fan: (425) 641-5662 TEST r` ND Bi3.L,"3.a ,1':E REPORT Prorezi: �L)MCWOOD S( lTeS TUuwzL.A TNTS�10R9 X01" AOR Locatio€z: 6q SS r—()�T -D £Nr w A' , Tu l;wiL A �ti✓A �1 `d I �� — aSSH Architect F&L4 D E5Svy WOkl.Dw%DF Enai.Teer. 8061OA/ F-N6r N'£RTNG� zNL, contractor: �V[:RG�f_tN /�EfRC��,RRT1vN Protect Number-: ACA✓NvV/k7T 3tv/ This is to certify that Eat) e Test —Z Balance has balanced the s sterns described her-ein to UheL- opdin unn nerfosna+-�ce capa'oildes. The testing and balancing has been penorrned in accordance mitis the Standard requ rernents and procedures of the 3ssociaCed 3L7 Balance Cour_cfl and u e r esti'is of Lhese test a:b herein recorded. Associated Air Balance Councfl Certification Number. 93-03-01 D aie: Test & Balance Egireer: Stephen D. Beres Foran ;8so3 o RECEIVED CITY OF TUKWILA MAR 0 3 2017 PERMIT CENTER Late Page of System Y131 i DlS 3 i siE.]L,J i' ECOM E EV F IS, tELEE 4 TerrWinal Room Terminal Number #dumber_ TYPe - Size - Design F=actor r-pM C -FM Test --PPM or CFM Final Test 1 Test 2 - Test 3 FPM CFM 3io 350 ' 2 I cz-j- 1 D i o Elio 10)-V I�x I . U I �U rj y �5 �InS t SCD- '-= i I22 l O 1400 L 30 390 � ICD- 2x ► I�-� t_ Via. 3$S ; 3�5 Remarks Form #89040 1 li rj ! I L I - 1 IM t - { e t e E rl it Remarks Form #89040 Date Page of Project Name AIR MMOVING EQUIPMENT TEST SHEET. SYSTErA U " Specified Actual ;=quipmentLocation L: E__VF.L: 3 ATr G Total CFM — Fan Area. Served UG V E L . A rjA) ZVV� 01 � 5 Equipment Manufacturer Total CFM — Outlet Model L �1X a5U � — QG0-a3O-10 p� J q 5 Serial Number 1-116:5'10 T4 i Spectfled Specified Actual Specified Actual Total CFM — Fan iZ d (9Q 01 � 5 Total CFM — Outlet o2 O 0 p� J q 5 j R/A CFM S V '-�- � q o D E O/A. CFM Totai Static -Pressure (iotalfExtetTial) Total 3- Inlet Pressure Amperage _ � l Discharge Pressure Motor RPM — _ can RP?ifi Motor Service Factor Spectfled Attuaf Speared Actual motor Manufacturer�— ' a Motor HPIBHP Phase '-�- Voltage Amperage Motor RPM — _ -DD Motor Service Factor Starter Heater EIements ----'---- Motor Sheave & No. Grooves �� g Fan Sheave & No. Grooves Befits Remarks Form m89030 2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016 General Info Project Title: 1 - This title will copy onto other forms Date 9/16/2016 This PROJ-SUM Project Street Address: 6955 Fort Dent Way For Building Department Use form shall be Project City, County, Zip: Tukwila, WA 98188 provided as a cover sheet for all Project Owner or Rep: Apple Eight SPE Tukwila Inc. compliance form" submittals. ProjectJurisdiction: City of Tukwila I L Title matches project plans title block. Project Description New Construction and Additions Select all that apply to the ❑ New Building ❑ Building Addition ❑ Addition + Existing scope of project. Select Addition + Existing Existing Building Retrofit or Alteration + Existing if the existing building will be Alteration ❑ Alteration + Existing ❑ Change in Space Conditioning combined with the addition oralteration to demonstrate ❑ Change of Occupancy ❑ Historic Building compliance per Section C502.1 or C503.1. Building Elements Scope - Select all that apply ❑ All ❑ Building Envelope ❑✓ Mechanical Systems ❑ Service Hot Water Systems ❑ Lighting Systems ❑ Electrical Systems Q All Commercial O Group R - R2, R3, & R4 O over 3 stories and all R1 Occupancy T P Y Ype Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group R occupancies. Mixed Occupancy - Building is three stories or less above grade and it has both Commerical and Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. Select all that apply to the scope of project ❑� Fully Conditioned ❑ Semi-heated2 ❑ Refrigerated Warehouse, Walk-in Cooler/Freezer, E]Low Energy Space Category3 Refrigerated Display Case' Space Conditioning Eligible Low Energy Spaces Categories ❑ Unconditioned ❑ Low energy heating/cooling capacity ❑ Wireless service ❑ Greenhouse4 ❑ Equipment building equipment shelter Floor Area and Floors Above Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area Stories Q Prescriptive Total Building Performance Prescriptive - Projects complying prescriptively shall demonstrate compliance with all applicable mandatory General Compliance and prescriptve requirements of this code. Refer to C401.2, Item 1 for more information. Compliance forms to include with a Prescriptive submittal: All applicable ENV, LTG, MECH and C406. Path FOR I Total Building Performance - Projects complying via total building performance,(TBP�shall in, clude.9 ^ r summary of results from a whole building energy model per Section C407 and shall demonst6i6 oCOKi> laneas_ i with all applicable mandatory provisions in this Code. Refer to Section C491.21 Item,24ormore.ipformation. Compliance forms to include with a TPB submital: PROJ-SUM, C406 -SUM & C406fDTAiL+ EiVV%Ckk, E LTG -EXT, LTG-C/KEM1VEZ forms (except MECH-ECONO). R SEP 16 2016 City of Tutwifa i PERMIT CENTER , BUILQIh!0 DIVISION' 0 1 ', iv111Q-f� 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 2012 Washinqton State Enerqv Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Info Project Address 6955 Fort Dent way Date 9/16/2016 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Alex Burkhart Applicant Address: 727 South Kenyon St. Seattle, WA 98108 Applicant Phone: 206-763-1744 ext. 247 Project Description Briefly describe mechanical system type and features. Q Includes Plans Installation of one (1) split system heat pump and one (1) exhaust fan. Drawings must contain notes requiring compliance with commissioning provisions per Section C408 Compliance Option 0 Simple System O Complex System O Systems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exception Heat Recovery Y/N AHu-1 / HP -1 Lennox CBx32Mv-60 / SPB060H4 60000 294 15.5 SEER N/A Econmizer N Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu/h OSA cfm or Econo? Input Btuh Output Btuh Efficiency4 Heat Recovery Y/N AHu-1 / HP -1 Lennox CBK32MV-60 / SPB060H4 52500 294 52500 52500 3.28 COP N Fan E ui ment Schedule Equip. Equip ID Type Brand Name' Model No.' CFM SP1 HP/BHP Flow Controls Location of Service EF -1 Fantech FR250 417 0.20 0.05 cv in-line Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Input Capacity Sub - Category EF7 Location of Service 1 If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economizer exception number per 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Project Address 6955 Fort Dent Way Date 9/16/2016 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability Code Section Code Provision Information Required Location on Building Department (yes,no,na) Plans Notes GENERAL PROVISIONS Equipment Sizing & Performance N/A C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 N/A C403.2.2 Equipment and system Output capacity of heating and cooling equipment and systems do not sizing exceed calculated loads note exceptions taken Yes C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical MO -2 ventilation is capable of being reduced to minimum requirement per IMC C403.2.3 & Equipment minimum Provide equipment schedules or complete MECH-SUM tables with type, C403.2.3.2 & efficiency capacity, efficiency, test standard (or other efficiency source) for all Yes C403.2.12.1 mechanical equipment MO -2 N/A C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. N/A C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1 1 N/AC403.2.10.3 / Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency & C403.2.13 reg. N/A C403.2.3 Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit capacity N/A C403.2.1 Non-standard water-cooled Full -load and NPLV values for water-cooled centrifugal chiller adjusted for chillers non-standard operational conditions N/Atowers C403.2.12.1.2Centrifugal fan cooling Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers N/A C403.2.3 Force air furnace and unit Indicate intermittent ignition or IID, flue/draft damper & jacket loss sed N / A C403.2.3.3 Packaged electric List equipment required to be heat pumps on schedule heating/cooling equipment N/A C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer HVAC System Controls & Criteria Yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including MO -0 perimeter s stems C403.2.4.1.1 Heat pump supplementary Indicate staged heating (compression/supplemental) & outdoor lock -out Yes heat tem MO -0 Yes C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & M0-0 cooling Yes C403.2.4.3 Automatic setback and Indicate zone t -stat controls with required automatic setback & manual M0-0 shutdown override Yes C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load MO -0 conditions Yes C402.4.5.2 & Dampers p Indicate location of OSA, exhaust, relief and return air dampers; include MO -0 C403.2.4.4 AMCA rated leakage and control type motorized or ravit ; note exceptions N/A C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls N/A C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions N/A C403.2.4.6 Combustion heating Indicate modulating or staged control equipment N/A C403.2.4.7 Group R1 hotel/motel Indicate method for guest room automatic setback & set-up of 5°F systems minimum N/A C403.2.4.8 / 9 Group R2/R3 dwelling unit Indicate 5-2 programmable thermostats in primary spaces with minimum of systems two setbackperiods: note exceptions taken N/A C403.2.5.1 Demand controlled Indicate high -occupancy spaces and systems requiring DCV ventilation N/A C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or alternate means provided to automatically reduce OSA when partially Enclosed loading Indicate enclosed loading dock and enclosed parking garage ventilation N/A C403.2.5.3 dock/parking garage system activation and control method ventilation N/A C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method Indicate lab exhaust systems requiring heat recovery, method & efficiency; N/A C403.2.5.4.2 Laboratory exhaust systems or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation C403.2.6.1 Energy recovery - Indicate ventilation systems requiring ER, method & efficiency; note N/A ventilation systems exceptions N/A C403.2.6.2 Energy recovery Indicate on-site steam heating systems requiring energy recovery condensates stems JEnergy N/A C403.2.6.3 recovery - Indicate remote refrig. condensers requiring ER and use of captured energy condensers stems > 3 story une Project Address 6955 Fort Dent Way Date 9/16/2016 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability Code Section Code Provision Information Required Location Building Department (yes,no,na) on Plans Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued N/A C403.2.12 Variable flow control - Indicate fan & pump motors requiring VF control & method (VSD or equiv fans/pumps controls N/A C403.2.12.1 Variable flow control - Indicate cooling tower fans requiring variable flow control and method coolinq towers N/A C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; or exception taken C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 N/A btuh N/A C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trend'na and demand response setpoint adLaJmaaL_ Ducting Systems Yes C403.2.7.1 & Duct construction Indicate all ductwork constructed and sealed per IMC, C402 leakage MO -0 C403.2.7.3 requirements and IBC vapor retarder requirements N/A 403.2.7.3.1- Duct pressure Identify location of low, medium and high pressure ductwork on plans classifications N/A C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test test results to jurisdiction when completed Yes C403.2.7.1 / Duct insulation Indicate R -value of insulation on ductwork MO -0 Piping Systems N/A C403.2.8 Piping insulation Indicate R -value of insulation on piping N/A C403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/degredation weather SIMPLE SYSTEMS Qualifying Systems Yes C403.3 Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits, MO - 0s stems does not have active humidification or simultaneous heating/cooling N/A C403.3 Qualifying 2 -pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits systems N/A C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers Yes C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip M0-0 sched. Yes C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception MO -O Yes C403.3.1.1.3 Air economizer high limit Indicate high limit shut-off control method per Table C403.3.1.1.3(2) MO -0 controls Yes C403.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for systems with MO -O operation capacity > 65,000 btuh N/Alexceot C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with COMPLEX SYSTEMS Complex System Economizers N/A C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. C403.4.1.4 Economizer heating system Verify control method of HVAC systems with economizers does not N/A impact increase building heating energy usage during normal operation N/A C403.4.1.3 Integrated economizer Indicate capability for partial economizer operation for air or water econo operation s stems Moved Water economizer capacity Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb N/A OSA C403.4.1.2 Water economizer Indicate precooling coils and heat exchangers do not exceed pressure N/A maximum pressure drop drop limit N/A C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with Mechanical PePlansrmit ..•- 2012 Washington State Energy Code Compliance Forms for Commercial, Group Rt, and > 3 story R2 and R3 Revised June 2013 Project Address 6955 Fort Dent Way Date 9/16/2016 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability Code Section Code Provision Information Required Location on Building Department (yes,no,na) Plans Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements N/A C403.4.2 & Variable flow control - fans Indicate fans requiring variable flow control and method C403.2.12 N/A C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major sensors duct branch N/A C403.4.2.2 VAV fan static pressure Indicate fan system static pressure setpoint based on zone requiring most setpoint pressure VAV systems serving multi- Indicate supply air systems serving multiple zones that are required to be N/A C403.4.5 zones VAV, method of primary air control, and zones served; note exceptions taken N/A C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads N/A C403.4 Large capacity cooling Indicate method of multi-stage or variable control for building cooling systems system capacity > 300 tons N/A C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method N/A C403.4.3 Large capacity boiler Indicate multi-stage or modulating burner for single boilers > 500,000 btuh systems N/A C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers N/A C403.4.3.5 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off isolation flow through chillers & boilers when not in use N/A C403.4.2 & Variable flow control - Indicate pumps requiring variable flow control & method I C403.4.3.6 pumps N/AC403.2.12.1 / Variable flow control - Indicate cooling tower fans requiring variable flow control and method & C403.4.4 cooling towers N/A C403.4.3.4 Hydronic system part load Indicate heating & chilled water systems have the capability to automatically controls reset supply water temp AND reduce flow by >_ 50% fors stems > 300,000 N/A C403.4.3.2 Two-pipe changeover Indicate deadband, heating/cooling mode scheduling and changeover systems temperature range N/A C403.4.3.3.1 Water loop heat pump - Indicate capability of central equipment to provide min. 20°F water supply deadband temp deadband between heat re'ection and heat addition modes N/A C403.4.3.3 Water loop heat pump - Provide heat exchanger that separates cooling tower and heat pump loop heat re'ection in Climate Zone 5 N/A C403.4.3.3.3 Water loop heat pump - Indicate 2-way isolation valve on each heat pump and variable flow control isolation fors stems with total pump power > 10 hip N/A C403.4.6 Condenser water heat Indicate system provided to pre-heat service water and efficiency recovery N/A C403.5 Cooler / freezer - anti-sweat Indicate w/sf & control method for walk-in cooler/freezer door anti-sweat heaters heaters N/A C403.5 / 6 Cooler / freezer - evaporator and .nc1enser1aa&._ Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems N/A C404.2 Water-heating equip min. Provide equipment schedule or complete MECH-SUM table with type, Pffir.ip.nr.v capacity, efficiency, test standard or other efficient source N/A C404.3 Temperature controls Indicate temperature controls have required setpoint capability N/A C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge N/A C404.5 Insulation under water Indicate R-10 insulation under tank heater N/A C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken C404.7 / 6 Circulation systems and Indicate shut-off capability based on occupancy and periods of limited N/A heat trace shut-off demand N/A C404.9 Group ImetersR-2 service hot water Indicate method of usage metering for dwell. units served by central HW Isystem Pools & In-Ground Permanently Installed Spas Pool heating equip min. Provide equipment schedule or complete MECH-SUM table with type, N/A C404.10.1 efficiency capacity, efficiency, test standard (or other eff. source); heat pump heaters > 4 COP N/A C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat settin • or N/A C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required N/A C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F N//� C404.10.4 !Heat recovery Indicate method, exhaust air temperature reduction and recovered energy Plan Check Comment Responses Robison Engineering, Inc. 1940140th Ave. W. Suite 302 Lynnwood, Washington 98036 206-364-3342 RECEIPT DATE: 10/17/2016 PROJECT: Homewood Suites Tukwila Contact: Alex Burkhart REVIEW DATE: 10/18/2016 REI PROJECT NUMBER: 683-001 REVIEWED BY: John Harrington SUBJECT: City of Tukwila Building Department Correction Letter#1 Mechanical Permit Application Number: M16-0145 The purpose of this document is to describe revisions made to plans in response to redlined plan corrections. Corrections are noted in bold. 1. Plan code notes refer to past outdated codes. As of July 1, 2016 City of Tukwila adopted the 2015 International Building codes. Revise plan sheets, notes and related documents for compliance with the current 2015 International Building codes including 2015 UPC, IMC, 2015 WSEC, 2009 ANSI as well as all other relative 2015 codes and local building codes. Washington State energy codes have also been updated or are different from 2012 codes. Revise code notes and references to reflect current codes. New mechanical appliances/units and their ratings shall comply with current 2015 codes. Plan set updated to reflect 2015 codes. See sheet M0.1, M0.2 for changes. 2. The reference for the new AHU and Economizer refer to calculations under the 2012 codes. Also the CFM on AHU shows 2005; economizer indicates 2000. Where the design capacity is greater than 2,000 cfm, smoke detector shall be required on the return air side. Revise the calculations to reference compliance with the 2015 codes and verify the new calculations are consistent with new codes. Specify required smoke detection or otherwise clarification. (2015 IMC 6062.1) Calculations updated per 2015 codes. Design capacity is less than 2,000 cfm. Plan set updated to reflect updated design capacity. See sheets M0.2, M2.0 for changes. CORRETION LTR# RECEIVED CITY OF TUKWILA OCT 19 2016 Page 1 of 1 PERMIT CENTER City of Tukwila Department of Community Development September 28, 2016 ALEX BURKHART 727 S KENYON ST SEATTLE, WA 98108 RE: Correction Letter # 1 MECHANICAL Permit Application Number M16-0145 HOMEWOOD SUITES - 6955 FORT DENT WAY Dear ALEX BURKHART, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the. same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Plan code notes refer to past outdated codes. As of July 1,2016 City of Tukwila adopted the 2015 International Building codes. Revise plan sheets, notes and related documents for compliance with the current 2015 International Building codes including 2015 UPC, IMC, 2015 WSEC, 2009 ANSI as well as all other relative 2015 codes and local building codes. Washington State energy codes have also been updated or are different from 2012 codes. Revise code notes and references to reflect current codes. New mechanical appliances/units and their ratings shall comply with current 2015 codes. 2. The reference for the new AHU and Economizer refer to calculations under the 2012 codes. Also the CFM on AHU shows 2005; economizer indicates 2000. Where the design capacity is greater than 2,000 cfm, smoke detector shall be required on the return air side. Revise the calculations to reference compliance with the 2015 codes and verify the new calculations are consistent with new codes. Specify required smoke detection or otherwise clarification. (2015 IMC 606.2. 1) Note: This permit plan review may not be complete as revised plans may require further corrections. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two 2 sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. 6300 Southeenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 9 Fax 206-431-3665 In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)433-7165. Sincerely, wlif/F Rachelle Ripley P Y Permit Technician File No. M16-0145 6300 Southcenter Boulevard Suite #100 9 Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-366.5 PERMIT CQQRD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0145 DATE: 10/19/16 PROJECT NAME: HOMEWOOD SUITES SITE ADDRESS: 6955 FORT DENT WAY Original Plan Submittal Revision # X Response to Correction Letter # 1 Revision # DEPARTMENTS: N1 MW Iql, Building Division Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) before Permit Issued after Permit Issued Fire Prevention ❑ Planning Division ❑ Structural ❑ Permit Coordinator ffW DATE: 10/20/16 Structural Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11/17/16 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0145 PROJECT NAME: HOMEWOOD SUITES SITE ADDRESS: 6955 FORT DENT WAY X Original Plan Submittal Response to Correction Letter #, DEPARTMENTS: A7- CL)A�V, q4��f Building Division 11 Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approvallreview required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Corrections Required (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: DATE: 09/19/16 Revision #, Revision #, km AW v1 q Fire Prevention Structural ❑ before Permit Issued after Permit Issued Planning Division ❑ Permit Coordinator ❑ DATE: 09/20/16 Structural Review Required ❑ DATE: DUE DATE: 10/18/16 Approved with Conditions ❑ Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: " ► Departments issued corrections: Bldg , Fire ❑ Ping ❑ PW E] Staff Initials: 9JR. 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.Tukwi]aWA.gov .REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: VO — \ — Va Plan Check/Permit Number:��— ❑ Response to Incomplete Letter # Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name:// YV� ��� 4bc Project Address: Contact Person:— Phone Number: Summary of Revision: OCT Sheet Number(s): "Cloud" or highlight all areas of revision including date o revision Received at the City of Tukwila Permit Center by: Entered in TRAKiT on lo—(q—(( Le W:Termit CenterUempiates\Forms\Revision Submittal Form.doc Revised. August 2015 EVERGREEN REFRIGERATION T LC Home llspaiiol Contact Safety & Health Claims & Insurance CWashington State Department of Labor & Industries EVERGREEN REFRIGERATION LLC Owner or tradesperson Principals PATTON, RODGER, PARTNER/MEMBER PATTON, MATTHEW, PARTNER/MEMBER Patton, Adam, PARTNER/MEMBER Patton, Douglas, PARTNER/MEMBER EVERGREEN REFRIGERATION LLC, PARTNER/MEMBER PATTON, DAVID, PARTNER/MEMBER (End: 01/21/2014) Doing business as EVERGREEN REFRIGERATION LLC 727 S KENYON ST SEATTLE, WA 98108 206-763-1744 KING County WA UBI No. Business type 602 512 953 Limited Liability Company Governing persons DAVID A PATTON MATTHEW PATTON; RODGER PATTON; License Page 1 of 2 Search L&I A-7, Index Help My 1,&I Workplace Rights Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ....................-.......... .......................... Meets current requirements. License specialties GENERAL License no. EVERGRL954112 Effective — expiration 01106/2006— 01/06/2018 Bond ............ Merchants Bonding Co (Mutual) $12,000.00 Bond account no. WA15097 Received by L&I Effective date 12/15/2011 01/01/2012 Expiration date Until Canceled Bond history Insurance ....................... Nationwide Mutual Ins Co $1,000,000.00 Policy no. ACP 3007246151 Trades & Licensing Help us improve https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=602512953&LIC=EVERGRL954R2&SAW= 10/27/2016 K' I:■ GI F E A 1 2 3 4 5 6 7 E 1 2 3 4 PRE -CON MEETING NOTES CONTRACTORS SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH THE ENGINEER FOR THE PURPOSE OF REVIEWING THE WORK PRIOR TO ORDERING ANY EQUIPMENT OR PERFORMING ANY WORK. THE MEETING SHALL BE LOCATED AT THE PROJECT SITE ON A DATE AND TIME TO BE MUTUALLY AGREED. THE MEETING WILL BE A WORKING SESSION. THE MEETING WILL BE FACILITATED BY THE ENGINEER AND THE AGENDA WILL INCLUDE A DETAILED REVIEW OF THE PLAYS AND SPECIFICATIONS, CROSS CHECK WITH OTHER TRADES FOR COORDINATION ISSUES, REVIEW OF PROPOSED PRODUCTS, REVIEW OF PLANNED MEANS AND METHODS,AND ON-SITE INVESTIGATION OF FIELD CONDITIONS RELATIV= TO EXISTING CONDITIONS THAT COULD AFFECT THE WORK. PERSONS ATTENDING THE MEETING SHALL BE KNOWLEDGEABLE OF THE PROJECT AND SHALL BE THE SPECIFIC PERSONS INTENDED TO CON 11NUE WITH THE PROJECT THROUGH TO COMPLETION. IF REQUIRED, REVISED PLANS WILL BE ISSUED THROUGH OFFICIAL CHANNELS. CHANGES IN THE BID PRICE WILL BE DISCUSSED, BUT NO CHANGE ORDERS WILL BE ISSUED UNLESS PROCESSED THOUGH OFFICIAL CHANNELS. IT SHALL BE UNDERSTOOD THAT THE ENGINEER HAS NO AUTHORITY TO ISSUE CHANGE ORDERS. THE FOLLOWING TRADES SHALL BE REPRESENTED FOR THE MINIMUM TIME INDICATED: - MECHANICAL SHEET METAL 4 HOURS PLUMBING/PIPING 4 HOURS ELECTRICAL 4 HOURS SPRINKLER 2 HOURS GENERAL CONTRACTOR ALL SESSIONS 5 0 7 0 ABBREVIATIONS ACU AIR CONDITIONING UNIT AFF ABOVE FINISHED FLOOR AHJ AUTHORITY HAVING JURISDICTION AHU AIR HANDLING UNIT BDD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTUH BRITISH THERMAL UNIT PER HOUR C COMMON CAP CAPACITY CC COOLING COIL CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE CLG CEILING, COOLING CO CLEANOUT COMB COMBUSTION CONT CONTINUE, CONTROL COP COEFFICIENT OF PERFORMANCE CWS CHILLED/CONDENSER WATER SUPPLY CWR CHILLED/CONDENSER WATER RETURN D DIAMETER DB DRY BULB, DECIBEL DIM DIMENSION DISCH DISCHARGE DN DOWN EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EFF EFFICIENCY EG EXHAUST GRILLE ELEC ELECTRIC ESP EXTERNAL STATIC PRESSURE EXH EXHAUST EXT EXTERIOR, EXTERNAL F FAHRENHEIT FCU FAN COIL UNIT FLR FLOOR FPM FEET PER MINUTE FPS FEET PER SECOND FSD FIRE/SMOKE DAMPER G GAS GAL GALLONS GPM GALLONS PER MINUTE GRD GRILLES, REGISTERS, DIFFUSERS GWB GYPSUM WALLBOARD HD HEAD HORIZ HORIZONTAL HP HORSEPOWER HPU HEAT PUMP UNIT HRU HEAT RECOVERY UNIT HVAC HEATING, VENTILATING, AND AIR CONDITIONING HVU HEATING & VENTILATION UNIT HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER ID INDIRECT DRAIN, INSIDE DIAMETER IN INCH KW KILOWATT L LONG, LENGTH LB POUND MBH THOUSAND BTU PER HOUR MECH MECHANICAL MCA MIN. CIRCUIT AMPACITY MOCP MAX. OVER CURRENT PROTECTION MTD MOUNTED OSA OUTDOOR AIR OBD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION OR DIAMETER OPNG OPENING P PUMP PD PRESSURE DROP, PUMPED DRAIN POC POINT OF CONNECTION PRV PRESSURE REDUCING VALVE PSIG POUNDS PER SQUARE IN GAUGE RA RETURN AIR RD ROOF DRAIN REF REFERENCE RF RELIEF FAN RG RETURN GRILLE RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SCH SCHEDULE SF SUPPLY FAN, SQUARE FOOT SENS SENSIBLE SG SUPPLY GRILLE SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SO SCREENED OPENING SP STATIC PRESSURE SS STAINLESS STEEL, SANITARY SEWER SQ SQUARE TG TRANSFER GRILLE TYP TYPICAL UH UNIT HEATER UON UNLESS OTHERWISE NOTED V VENT VENT VENTILATION, VENTILATOR VTR VENT THRU ROOF W WASTE, WATT, WIDE WB WET BULB (TEMPERATURE) Ir] 10 w 11 12 SYMBOLS EQUIPMENT EF -1 TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) DSD DUCT SMOKE DETECTOR O ROOM THERMOSTAT OR INCLUDED IN SET : GENERAL NOTES O ROOM HUMIDISTAT OR HUMIDITY GENERAL NOTES - MECHANICAL 3. ADJUSTMENTS: ALL EQUIPMENT, MOTORS, FANS GAS BURNERS, sD SMOKE DETECTOR PROJECT NOTES, TABLES, & CALCULATIONS TERMINALS CID -12x12 CD-1,o-DIFFUSER/GRILLE IGNITION DEVICES, DRIVES, ETC. SHALL BE ADJUSTED AND 6. RECTANGULAR DIVIDED FLOW FITTINGS: USE GENERALLY, EXCEPT 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE WORK F-71 BALANCED TO OPERATE AT SPECIFIED RATINGS AS REQUIRED ) BRANCHES TO TERMINALS; SMACNA HVAC FIG 2-5, TYPES I, 2, !�I COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, CIVIL, M1.0 FOR THIS PROJECT SITE AND ACCOUNTING FOR ELEVATION ABOVE X 4A, AND 4B. DO NOT USE TYPE 3. X ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED ON A SEA LEVEL. WALL SUPPLY GRILLE (SG) F� SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). X X 7. TURNING VANES: H.E.P. MANUFACTURER OR APPROVED HIGH �3 CONNECTED, WALL MOUNTED W/ 4. APPROVALS: MECHANICAL AND PLUMBING EQUIPMENT SHALL BE M4.0I EFFICIENCY PROFILE AIRFOIL TYPE FOR RECTANGULAR SQUARE 2. ELECTRICAL CHARACTERISTICS: REFER TO ELECTRICAL DRAWINGS X APPROVED FOR INSTALLATION IN THE PROJECT LOCATION AND THROAT ELBOWS. ACOUSTICAL TYPE FOR RETURN AIR MITERED CD FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC. OF G SHALL HAVE ALL CERTIFICATIONS AND RATINGS TO MEET ALL ENERGY, POLLUTION, ENVIRONMENTAL, SEISMIC, ETC. CODES AND MPG ELBOWS. --:,] MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. el REGULATIONS. THE CONTRACTOR SHALL COORDINATE WITH HIS 8. TAKEOFFS TO OPENINGS: CONICAL TYPE WITH VOLUME DAMPER H FLANGE MANUFACTURE SUPPLIERS AND SHALL INCLUDE ALL COSTS FOR ROUND DUCT BRANCHES PER SMACNA HVAC FIG 2-6, 3. A CODES: COMPLETE INSTALLATION THE MECHANICAL SYSTEM REQUIRED TO MEET THESE REQUIREMENTS IN HIS BID. --RL MINIMUM INLET DIAMETER 2 INCHES LARGER THAN DUCT SIZE. 45 OL SHALL BE PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, CHECK VALVE DEGREE ENTRY FITTING FOR RECTANGULAR DUCT BRANCHES PER PLUMBING, FIRE, AND HEALTH CODES AND REGULATIONS AS 5. FIRE PROTECTION: CONTRACTOR SHALL PROVIDE A FULLY SMACNA HVAC FIG 2-6. ADOPTED BY THE LOCAL AHJ. DESIGNED FIRE PROTECTION SPRINKLER SYSTEM IN COMPLIANCE WITH NFPA AND LOCAL CODES. PROVIDE DESIGN, PERMITS, 9. FLEXIBLE CONNECTIONS: PROVIDE AT EACH DUCT CONNECTION 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON MATERIALS, INSTALLATION, TESTING AND ALL OTHER FOR A TO FANS, PACKAGED HVAC EQUIPMENT, EXTERNALLY ISOLATED FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING FULLY OPERATIONAL SYSTEM. LOCATION OF ALL PIPING TO BE AIR HANDLING UNITS, FAN COIL UNITS, AND SIMILAR EQUIPMENT. ALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. COORDINATED WITH OTHER TRADES. EXCEPTION: EQUIPMENT IN CORRIDOR CEILING SPACES WHERE A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH RATING IS REQUIRED. STRUCTURAL.FIRE 6. FIREPLACES: COORDINATE WITH THE GENERAL CONTRACTOR TO B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, DETERMINE GAS FIREPLACE FLUE AND COMBUSTION AIR HVAC NOTES LIGHTS, WALLS, FARE SPRINKLER PIPING, AND OTHER TRADES DUCTWORK REQUIREMENTS PRIOR TO BIDDING. WORK. 1. ATTACHMENTS: AIR DISTRIBUTION OUTLETS AND LOUVERS SHALL C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, PIPING NOTES HAVE ALL REQUIRED ACCESSORIES AND ATTACHMENTS FOR A EQUIVALENT DUCT SIZING EXCHANGE, RELOCATING, ETC. AS ' COMPLETE CONNECTION TO THE SPECIFIC TYPE OF STRUCTURE REQUIRED FOR A COMPLETE OPERATING MECHANICAL SYSTEM. 1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FLANGES AT THAT THEY ARE BEING ATTACHED TO. THIS INCLUDES, BUT IS D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL NOT LIMITED TO, EXTERIOR BRICKS, GWB WALLS, GWB CEILING, OWNER. VALVES, AND OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR ETC. MAINTENANCE. 5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE 2. DUCTWORK: DUCTWORK SHALL 8E SMOOTH SHEET METAL EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE 2. REDUCERS: PROVIDE AS REQUIRED FROM LINE PIPE SIZE TO (CLASS -1). DUCTWORK THROUGH FIRE RATED STRUCTURE AVD STRUCTURE. EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CONNECTION FLOOR SHALL BE MIN. 26 GA. STEEL. MAXIMUM LENGTH OF 6. ACCESS DOORS: COORDINATE WITH ARCHITECT AND LOCATE ALL SIZES. FLEXIBLE DUCTS SHALL BE 5'-0", UNLESS OTHERWISE NOTED ON ACCESS DOORS ON SHOP DRAWINGS PRIOR TO BEGINNING OF 3. OFFSETS: PROVIDE FOR BRANCH LINES TO EQUIPMENT. DRAWINGS. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. CONSTRUCTION. ACCESS DOORS IN FIRE RATED STRUCTURE SHALL BE FIRE RATED. VERIFY ACCESS DOOR LOCATIONS WITH 4. DIELECTRIC UNIONS: PROVIDE AT CONNECTIONS OF DISSIMILAR 3. VOLUME DAMPERS: PROVIDE AN ACCESSIBLE MANUAL VOLUME GENERAL CONTRACTOR PRIOR TO BIDDING. PIPE. DAMPER FOR EACH SUPPLY, RETURN, OSA, AND EXHAUST 7. RATED PENETRATION: DUCT PENETRATIONS THROUGH RATED 5. REFRIGERANT PIPING: PROVIDE SIZING & INSTALLATION IN OPENING, LOCATED AS FAR UPSTREAM AS POSSIBLE FROM THE OPENING. PROVIDE A MANUAL VOLUME DAMPER FOR BRANCH ED ENCLOSURES SHALL BE FIRE/SMOKE APER THE LATEST STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. MAINS SERVING MORE THAN ONE OPENING. VOLUME DAMPERS IN EDITION OF THE UNDERWRITERS LABORRATTORIORI ES(UL) FIRE NON -ACCESSIBLE CEILINGS SHALL HAVE A CONTROL ARM RESISTANCE WITH HOURLY RATINGS FOR THROUGH -PENETRATION 6. CONDENSATE DRAIN: PROVIDE A P -TRAP FOR EACH HVAC UNIT EXTENDED TO AN ACCESSIBLE LOCATION. FIRE STOPS SYSTEM VOLUME #2, OR SHALL BE INSTALLED IN CONDENSATE PAN WITH PLUG TEES FOR CLEANING. CONDENSATE STRICT ACCORDANCE WITH THE MANUFACTURER'S UL LISTINGS DRAINS SHALL BE DISCHARGED TO AN INDIRECT WASTE OR 4. SEISMIC: PROVIDE SEISMIC RESTRAINTS FOR MECHANICAL (3M OR EQUIVALENT). DETERMINE REQUIREMENTS WITH GENERAL OUTSIDE. EQUIPMENT, PIPING, AND DUCTWORK PER SMACNA AND LOCAL CONTRACTOR PRIOR TO BID. REGULATIONS. INSULATION /LINING NOTES 8. EXHAUST OUTLETS: SOURCE -SPECIFIC FANS SHALL BE VENTED 5. FILTER CLEARANCE: PROVIDE ADEQUATE CLEARANCE FOR TO OUTDOORS WITH A MINIMUM 3' CLEARANCE BETWEEN VENT 1. ENERGY CODE: AS A MINIMUM, COMPLY WITH THICKNESSES AND CHANGING AIR FILTERS. OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEEN TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. VENT OUTLETS AND MECHANICAL AIR INTAKES. 6. DUCTWORK AND PIPING OUTSIDE OF MECHANICAL ROOMS SHALL PLAN NOTES BE CONCEALED, COORDINATE WITH THE GENERAL CONTRACTOR 9. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF TO FUR -OUT AS REQUIRED. CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. 1. DUCTWORK SHALL BE METALLIC DUCTWORK 7. FIRE RATINGS: RATED FLOOR/CEILING JOINT SPACES HAVING 10. EXPOSED PIPING: PROVIDE CHROME PLATING FOR EXPOSED 2. TEST AND BALANCE WORK SHALL BE PERFORMED BY AN DUCTWORK INSIDE THEM SHALL BE FIRE/SMOKE PROTECTED TO PIPING IN FINISHED ROOMS. INDEPENDENT TEST AND BALANCE AGENCY. PROVIDE (3) COPIES MAINTAIN THE 1 -HOUR FLOOR/CEILING RATING PER LOCAL OF TEST AND BALANCE REPORT TO OWNER. JURISDICTIONS. EXHAUST DUCTWORK PENETRATING THE 1 -HOUR 11. PENETRATIONS: PROVIDE ESCUTCHEON PLATES FOR EXPOSED ROOF/CEILING OR FLOOR/CEILING ASSEMBLY SHALL HAVE PIPING PENETRATIONS AND SHEET METAL FLASHING FOR 3. COORDINATE DUCTWORK WITH MISCELLANEOUS OBSTRUCTIONS IN ACCESSIBLE CEILING FIRE DAMPERS. ALTERNATIVELY, THE EXPOSED DUCTWORK PENETRATIONS. CEILING SPACE. EXHAUST DUCTWORK SHALL BE ROUTED INSIDE A RATED SHAFT 12. SHAFT AND PLENUM CONNECTIONS: SEAL CONNECTIONS TO AIR 4. RESTROOM EXHAUST SHALL BE A MINIMUM OF 10' FROM ANY TO PROTECT THE CEILING/ROOF RATING PER THE LOCAL JURISDICTIONS. SHAFTS AIRTIGHT. PROVIDE AIRTIGHT SEAL AROUND MECHANICAL OUTSIDE AIR INTAKES. PENETRATIONS IN AIR PLENUMS. 8. FIRESTOP: PIPE, DUCT AND CONDUIT PENETRATIONS THROUGH 5. ROUTE DUCTWORK UNDERNEATH JOISTS UON. RATED ASSEMBLIES SHALL BE FIRE AND SMOKE STOPPED PER 13. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF CODE. MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING 6. TRANSITION DUCT UNDER BEAMS AND DUCTS. FIELD VERIFY FIXTURES FOR REMOVAL AND REPLACEMENT. AVAILABLE CEILING CAVITY DIMENSIONS. 9. CORRIDOR THERMOSTAT: PROVIDE TAMPERPROOF THERMOSTATS 14. CABLE TRAYS: DUCTWORK AND PIPING INSTALLED ADJACENT TO 7. COORDINATE MOUNTING HEIGHT OF DIFFUSERS WITH IN CORRIDORS. DO NOT PROVIDE PLASTIC GUARDS TO MAKE THE THERMOSTATS TAMPERPROOF. PROVIDE BLANK SECURABLE ELECTRICAL CABLE TRAYS SHALL ALLOW MINIMUM ACCESS OF 6" ARCHITECTURAL PLANS. THERMOSTAT COVERS. ABOVE AND TO THE SIDE OF CABLE TRAYS. SHEET METAL NOTES 15. MOTORS: COMPLY WITH ENERGY CODE ENFORCED BY AHJ FOR MINIMUM EFFICIENCIES UNDER FULL LOAD. 1. REFERENCE: SMACNA HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE, CURRENT EDITION. 16. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT 2. CLEARANCE: COORDINATE DUCTWORK WITH MISCELLANEOUS ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF OBSTRUCTIONS IN CEILING SPACE. MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. 3. ROUND ELBOWS AND OFFSETS: FULL RADIUS (R/D = 1.5), 5 -PIECE SEGMENTED OR STAMPED. REFER TO SMACNA HVAC COORDINATION REQUIREMENTS FIG 2-7, 3-3. DO NOT USE ANGLED OFFSET (TYPE 1). MITERED OFFSET (TYPE 2) MAY BE USED UP TO 30 DEGREE OFFSET 1. PIPING: COORDINATE WITH STRUCTURAL FOR EXACT LOCATION OF ANGLE. ALL STRUCTURAL FRAMING AND FOOTINGS AND FINALIZE THE EXACT ROUTING OF ALL PIPES WITH STRUCTURAL AND AT THE 4. ROUND TEES AND LATERALS: CONICAL TEE PER SMACNA HVAC SITE PRIOR AND DURING THE CONSTRUCTION. FIG 3-5; DO NOT USE STRAIGHT TEE; DO NOT USE CONICAL SADDLE TAP FOR EXPOSED DUCTWORK IN FINISHED SPACES. 2. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF 90 -DEGREE TEE WITH OVAL TO ROUND TAP, LATERAL, AND DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL 45 -DEGREE RECTANGULAR LEAD-IN PER SMACNA HVAC FIG 3-4. CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE 5. RECTANGULAR ELBOWS AND OFFSETS: FULL RADIUS WHERE JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SPACE PERMITS, R/W = 1.5; OTHERWISE USE SQUARE CORNER DIFFERENT JOIST SPACES. ELBOW WITH TURNING VANES. 1 2 3 4 PRE -CON MEETING NOTES CONTRACTORS SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH THE ENGINEER FOR THE PURPOSE OF REVIEWING THE WORK PRIOR TO ORDERING ANY EQUIPMENT OR PERFORMING ANY WORK. THE MEETING SHALL BE LOCATED AT THE PROJECT SITE ON A DATE AND TIME TO BE MUTUALLY AGREED. THE MEETING WILL BE A WORKING SESSION. THE MEETING WILL BE FACILITATED BY THE ENGINEER AND THE AGENDA WILL INCLUDE A DETAILED REVIEW OF THE PLAYS AND SPECIFICATIONS, CROSS CHECK WITH OTHER TRADES FOR COORDINATION ISSUES, REVIEW OF PROPOSED PRODUCTS, REVIEW OF PLANNED MEANS AND METHODS,AND ON-SITE INVESTIGATION OF FIELD CONDITIONS RELATIV= TO EXISTING CONDITIONS THAT COULD AFFECT THE WORK. PERSONS ATTENDING THE MEETING SHALL BE KNOWLEDGEABLE OF THE PROJECT AND SHALL BE THE SPECIFIC PERSONS INTENDED TO CON 11NUE WITH THE PROJECT THROUGH TO COMPLETION. IF REQUIRED, REVISED PLANS WILL BE ISSUED THROUGH OFFICIAL CHANNELS. CHANGES IN THE BID PRICE WILL BE DISCUSSED, BUT NO CHANGE ORDERS WILL BE ISSUED UNLESS PROCESSED THOUGH OFFICIAL CHANNELS. IT SHALL BE UNDERSTOOD THAT THE ENGINEER HAS NO AUTHORITY TO ISSUE CHANGE ORDERS. THE FOLLOWING TRADES SHALL BE REPRESENTED FOR THE MINIMUM TIME INDICATED: - MECHANICAL SHEET METAL 4 HOURS PLUMBING/PIPING 4 HOURS ELECTRICAL 4 HOURS SPRINKLER 2 HOURS GENERAL CONTRACTOR ALL SESSIONS 5 0 7 0 ABBREVIATIONS ACU AIR CONDITIONING UNIT AFF ABOVE FINISHED FLOOR AHJ AUTHORITY HAVING JURISDICTION AHU AIR HANDLING UNIT BDD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTUH BRITISH THERMAL UNIT PER HOUR C COMMON CAP CAPACITY CC COOLING COIL CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE CLG CEILING, COOLING CO CLEANOUT COMB COMBUSTION CONT CONTINUE, CONTROL COP COEFFICIENT OF PERFORMANCE CWS CHILLED/CONDENSER WATER SUPPLY CWR CHILLED/CONDENSER WATER RETURN D DIAMETER DB DRY BULB, DECIBEL DIM DIMENSION DISCH DISCHARGE DN DOWN EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EFF EFFICIENCY EG EXHAUST GRILLE ELEC ELECTRIC ESP EXTERNAL STATIC PRESSURE EXH EXHAUST EXT EXTERIOR, EXTERNAL F FAHRENHEIT FCU FAN COIL UNIT FLR FLOOR FPM FEET PER MINUTE FPS FEET PER SECOND FSD FIRE/SMOKE DAMPER G GAS GAL GALLONS GPM GALLONS PER MINUTE GRD GRILLES, REGISTERS, DIFFUSERS GWB GYPSUM WALLBOARD HD HEAD HORIZ HORIZONTAL HP HORSEPOWER HPU HEAT PUMP UNIT HRU HEAT RECOVERY UNIT HVAC HEATING, VENTILATING, AND AIR CONDITIONING HVU HEATING & VENTILATION UNIT HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER ID INDIRECT DRAIN, INSIDE DIAMETER IN INCH KW KILOWATT L LONG, LENGTH LB POUND MBH THOUSAND BTU PER HOUR MECH MECHANICAL MCA MIN. CIRCUIT AMPACITY MOCP MAX. OVER CURRENT PROTECTION MTD MOUNTED OSA OUTDOOR AIR OBD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION OR DIAMETER OPNG OPENING P PUMP PD PRESSURE DROP, PUMPED DRAIN POC POINT OF CONNECTION PRV PRESSURE REDUCING VALVE PSIG POUNDS PER SQUARE IN GAUGE RA RETURN AIR RD ROOF DRAIN REF REFERENCE RF RELIEF FAN RG RETURN GRILLE RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SCH SCHEDULE SF SUPPLY FAN, SQUARE FOOT SENS SENSIBLE SG SUPPLY GRILLE SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SO SCREENED OPENING SP STATIC PRESSURE SS STAINLESS STEEL, SANITARY SEWER SQ SQUARE TG TRANSFER GRILLE TYP TYPICAL UH UNIT HEATER UON UNLESS OTHERWISE NOTED V VENT VENT VENTILATION, VENTILATOR VTR VENT THRU ROOF W WASTE, WATT, WIDE WB WET BULB (TEMPERATURE) Ir] 10 w 11 12 SYMBOLS EQUIPMENT EF -1 TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) DSD DUCT SMOKE DETECTOR O ROOM THERMOSTAT OR INCLUDED IN SET TEMPERATURE TRANSMITTER O ROOM HUMIDISTAT OR HUMIDITY MO.0 TRANSMITTER co CARBON MONOXIDE SENSOR sD SMOKE DETECTOR PROJECT NOTES, TABLES, & CALCULATIONS TERMINALS CID -12x12 CD-1,o-DIFFUSER/GRILLE TYPE, AND OR NUMBER OR SIZE 400 400 "'DESIGN CFM (WHERE APPLICABLE) F-71 CEILING DIFFUSER (FLOW ARROWS ) SHOWN FOR NON SYMMETRICAL !�I AIRFLOW) M1.0 CEILING RETURN/EXHAUST GRILLE X LINEAR DIFFUSER, CEILING OR WALL X MOUNTED (FLOW ARROWS SHOWN FOR NON SYMMETRICAL AIRFLOW) WALL SUPPLY GRILLE (SG) F� WALL RETURN/EXHAUST GRILLE X X X TRANSFER GRILLE (TG), DUCT �3 CONNECTED, WALL MOUNTED W/ 50 OPTIONAL CFM SHOWN M4.0I TRANSFER GRILLE, CEILING _Aa1 -> MOUNTED WITH FULL-SIZED LINED X DUCT CONNECTION PIPING CD CONDENSATE DRAINAGE G NATURAL GAS - STD. PRESSURE MPG NATURAL GAS - MEDIUM PRESSURE --:,] PIPE CAP el PIPE PLUG UNION H FLANGE GATE VALVE OR BALL VALVE BALL VALVE - PRESSURE REDUCING VALVE (PRV) BREAK IN PIPING OR DUCTWORK --RL RAIN LEADER (RL) OL OVERFLOW RAIN LEADER (OL) CHECK VALVE 13 14 DUCTWORK 18x12 DUCT (1ST FIGURE = SIDE SHOWN, 2ND FIGURE = SIDE NOT SHOWN) UP DOWN DUCT SECTION, POSITIVE PRESSURE UP DOWN DUCT SECTION, NEGA 1'A C7, ^17 E'" 7"I'l PRESSURE F ,�.;JIj '7D F NC", R: UP DOWN ROUND DUCT SECTION ❑ t"zcl anical UP UP UPAn Electrical A xDUCT PENETRATION RUeCFOR.nbing OR ROOF Gus Piping VOLUME DAMPER Ci y of Tvk`" la -� FSD FIRE/SMOKE DAMPER - FSD HORIZ DUCT, -- = VERT DUCT), 2 -HR RATED, UON Fp FIRE DAMPER HORIZ - FD DUCT, --® = VERT DUCT), 2 -HR RATED, UON 90' ELBOW, R/D OR R/W=1.5 SQUARE CORNER ELBOW WITH TURNING VANES 90' TAKE -OFF OR TEE 90' CONICAL TAKE -OFF 45' LATERAL TAKE -OFF TRANSITION OR REDUCER (POT = FLAT ON TOP, FOB = FLAT ON BOTTOM) I--� -� WYE FITTING 90' RECTANGULAR TAKE -OFF WITH 45' TAPER 90' DIVERGING RECTANGULAR TEE, `` EITHER RADIUS OR TURNING VANES PARALLEL FLOW BRANCH CONNECTION, EITHER RADIUS OR -{_ TURNING VANES FLEXIBLE DUCT 0 ROUND DUCT INDICATOR DRAWINGS ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, CONNECTIONS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. DRAWING INDEX DWG DESCRIPTION INCLUDED IN SET 2 w� W_ M of co U)\ 04 �--�, 0WZ\ 00 c��a-1 m0cn 0 MO.0 LEGEND, GENERAL NOTES, DRAWING INDEX X X X MOA PROJECT NOTES, TABLES, & CALCULATIONS X X X MO.2 MECHANICAL SCHEDULES X X X M1.0 EVEL 1 MECHANICAL PLAN X X X M2.0 VITG ROOM- BLDG 1 LEVEL 2 MECHANICAL PLAN X X X M4.0I DETAILS X X X 11 12 RECEIVED ITY OF TUKWILA OCT 19 2016 ERMIT CENTER Permit o. 0 c 40 Plan review approval is subject to errors and oi l osions. Approval of construction documents door r �i the violation of any adopted code or ordinance. Rcc.-;�2 of approved Field Copy and condition: iS ac"noviledged: 13y: Date: t 0 ' ' City of Tuiwia BUILDING CLIVI RECTION LTR# 13 14 HOMEW001",') ,,,&SUITES BY HILTON' Seattle/Tukwila, WA Inn Code: SEATK FRCH DESIGN WORLDWIDE 311 Elm Street Suite 600 Cincinnati, OH 45202 www.FRGH.com 513 241 3000 Owner 804.727.1757 Apple Hospitality REIT, Inc. 814 East Main Street Richmond, VA 23219 Chris Zeigler Architect 513.241.3000 FRCH Design Worldwide t: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Mike Keifling Interior Design 513.241.3000 FRCH Design Worldwide 1:513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Raeiean Downs ISSUED INFORMATION OWNER REVIEW SET. BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: 01 10/18/16 BLDG DEPT CMENTS fifSPONSES 0 000aoovvo .......... 00 `Z':: • of wast'/ •�sOpo4 �� 179 r�• 40 �,� 6 Na� °ovnn©oo a7 RomBSISON ENGINEERING, INC 19401 40TH AVE W, SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL/ 425-835-0098 FAX PROJECT INFORMATION INTERIOR & EXTERIOR RENOVATION Homewood Suites Tukwila 6955 Fort Dent Way Tukwila, WA 98188-2554 PROJECT NUMBER: 032609.000 SHEET INFORMATION LEGEND, GENERAL NOTES9 & -D FOR i DRAWN 9': BK, AAPPROVED REVIEWE BY: RPCT 2 5 2016 SCALE: + IES iiit y of Tal 1 f AUTHORI I� A,Dtt I 10i,t momo No Changes shall be made to the scope of work without prior epprovai of Tukkvila Building Qwfcin~� NOTE: Revisions will require a nF":r r,!Gn submittat and may include additional plan mlaVi fG:= U a K HI GI FI EI FDA AI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 OUTSIDE AIR CALCULATl0N,'.z,-.--_,i.L,, OUTSIDE AIR SCHEDULE ROOM AREA PEOPLE CFM/SQFT CFM/PERSON OSA CFM (AREA) OSA CFM (PEOPLE) TOTAL OSA CFM CONFERENCE ROOM 734 50 0.06 5 44 250 294 NOTES: (11. CALCULATION PER 2015 IMC TABLE 403.3.1.1.),& DUCT INSULATION w ' 1 DUCT INSULATION SCHEDULE SERVICE MATERIAL R—VALUE FIELD APPLIED SERVICE MATERIAL (MIN -REQUIRED VAPOR RETARDER INSTALLED) REQUIRED SUPPLY & RETURN AIR DUCTS IN MINERAL—FIBER 6.0 NO UNCONDITIONED SPACE BLANKET NO NONE SUPPLY & RETURN AIR DUCTS MINERAL—FIBER N/A N/A CONCEALED WITHIN CONDITIONED SPACE BLANKET TEMPERATURE 35 TO 50 DEG F. OUTSIDE AIR DUCTS MINERAL—FIBER 7.0 YES YES BLANKET COPPER PIPING. OPERATING THE BUILDING OUTSIDE AIR DUCTS IN UNCONDITIONED MINERAL—FIBER 4.5 N/A SPACE BLANKET �o� NOTES: INSULATION SHALL BE PER 2015 WASHINGTON STATE ENERGY CODE SECTION C403.2.8 0 OUTSIDE AIR FROM EXTERIOR OF MINERAL—FIBER BUILDING TO AUTOMATIC SHUT—OFF BLANKET 7.0 YES DAMPER AND LESS THAN 2,800 CFM OUTSIDE AIR FROM EXTERIOR OF MINERAL—FIBER BUILDING TO AUTOMATIC SHUT—OFF BLANKET NOTE 2 YES DAMPER AND GREATER THAN 2,800 CFM ROUND & RECTANGULAR EXHAUST AIR MINERAL—FIBER N/A N/A DUCTS IN UNCONDITIONED SPACE BLANKET ROUND & RECTANGULAR SUPPLY AIR MINERAL—FIBER DUCTS, EXPOSED WITHIN CONDITIONED BLANKET N/A N/A SPACE ROUND & RECTANGULAR RETURN AIR MINERAL—FIBER DUCTS, EXPOSED WITHIN CONDITIONED BLANKET N/A N/A NOTES (1) INSULATION SHALL BE PER WASHINGTON STATE ENGERY CODE SECTION C403.2.7.2 (2) DUCT SHALL MEET THE REQUIREMENTS OF METAL FRAMED WALLS PER TABLE C402.1.2 2 o,. n I V V V V V V V V V V V V V V N 2015 INTERNATIONAL BUILDING CODE (IBC) 2015 INTERNATIONAL MECHANICAL CODE (IMC) 2015 UNIFORM PLUMBING CODE (UPC) 2015 WASHINGTON STATE ENERGY CODE (WSEC) 3 4 FAN Al REFRIGERANT PIP INSULATION PIPE INSULATION SCHEDULE SERVICE MATERIAL THICKNESS FIELD APPLIED VAPOR RETARDER FINISH NOTES JACKET REQUIRED REFRIGERANT SECTION, LIQUID AND FLEYIBLE 1" NONE NO NONE COPPER PIPING. OPERATING HOT—GAS PIPING (WHERE REQUIRED). ELASTOMERIC TEMPERATURE 35 TO 50 DEG F. ABOVE GROUND INSULATION OUTSIDE FLEXIBLE 1/2" NONE YES TWO COATS OF MANUFACTURER'S COPPER PIPING. OPERATING THE BUILDING ELASTOMERIC RECOMMENDED UV INHIBITOR TEMPERATURE 35 TO 50 DEG F. �o� NOTES: INSULATION SHALL BE PER 2015 WASHINGTON STATE ENERGY CODE SECTION C403.2.8 0 7 ...N.,, i Y � v 44' G � ,~s i r : s t x 3 w Y 1. !HVAC THERMOSTATS SHALL BE SET TO MAINTAIN A MINIMUM DEADBAND OF 5°F IN AREAS SERVED ,AS REQUIRED PER 2015 WSEC C403.2.4.2. 2. PER 2015 WSEC 403.2.7, ALL DUCTS SHALL BE INSULATED AS FOLLOWS: A. OUTSIDE AIR DUCTS SERVING INDIVIDUAL SUPPLY AIR UNITS WITH LESS THAN 2800 CFM SUPPLY AIR CAPACITY: R-7. B. UNHEATED EQUIPMENT ROOMS WITH COMBUSTION AIR LOUVERS, ISOLATED FROM CONDITIONED SPACE AT SIDES, TOP AND BOTTOM: R-11. C. SUPPLY & RETURN DUCTS WITHIN UNCONDITIONED SPACE: R-6. D. SUPPLY & RETURN DUCTS LOCATED OUTSIDE THE BUILDING: R-8. E. SUPPLY WITH SA TEMP <557 OR >1057 WITHIN CONDITIONED SPACE: R-3.3. 3. MOTORIZED DAMPERS: PER 2015 WSEC C402.4.5.2 PROVIDE MOTORIZED DAMPERS ON ALL OUTSIDE AIR INTAKES, EXHAUST OUTLETS AND RELIEF OUTLETS SERVING CONDITIONED SPACES WHICH CLOSE AUTOMATICALLY WHEN THE SYSTEM IS OFF. RETURN AIR DAMPERS SHALL BE EQUIPPED WITH MOTORIZED DAMPERS. SEE 2015 WSEC C402.4.5.2 FOR EXCEPTIONS AND ADDITIONAL REQUIREMENTS. 4. PER 2015 WSEC C402./—.5.1 MOTORIZED DAMPERS FOR ELEVATOR AND STAIR SHAFTS, PROVIDE DAMFERS THAT ARE POWERED CLOSED AND FAIL OPEN IN THE RELAXED POSITION. (ELEVATOR AND STAIR SHAFT DAMPERS SHALL BE TIED TO THE FIRE ALARM SYSTEM). 0 10 Al 11 iK 13 RECEIVE© CITY OF TUKWILA UG 1 19 2016 PERMIT CENTER 14 KI HI GI FI EI DI CI BI AI 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 HEAT PUMP SCHEDULE - OUTDOOR UNIT EQUIP NECK SIZE MOUNTING / 2 STAGE COOLING HEATING ELECTRICAL REFRIDGERANT DIMENSIONS, INCHES ELECTRICAL BASIS OF DESIGN DIMENSIONS, INCHES EQUIP SERVICE CAPACITY, N0. SERVICE DISCHARGE CAPACITY, MBH HEATING CAPACITY, BTUH WEIGHT, HEATING CAPACITY, BTUH CONNECTED STAGE 1 OUTDOOR UNIT AIRFLOW, CFM HIGH TEMP. LOW TEMP. L W H TITUS 350 DIAMETER 1ECON-1 CONFERENCE ROOM DUCTED 1800 0 NO. CFM (4) TONS COOLING STAGE 2 COOLING SEER/EER HEATING HEATING COP VOLTAGE MCA MOCP CHARGE, LIQUID GAS L W H LBS (1)(2)(3)(4) FAN COIL UNIT 294 57.0 52.5 CAPACITY, MBH CAPACITY, MBH 208V/3P CAPACITY, BTUH CAPACITY, BTUH 3/8 3/4 58Y2" 245/8" LBS 212 LENNOX CBX32MV-60 HP —1 HP -1 CONFERENCE ROOM 5 42.5 60.0 15.50/11.50 52.5 33.2 3.28 208V/3P 23.9 40 11.4 3/8" 3/4" 30)211 39)'232 39" 331 LENNOX AHU-1 SPB060H4 NOTES: (1) ARI LISTED WITH ALL STANDARD FEATURES, INSTALLATION ACCESSORIES AND COMPRESSOR SHORT CYCLING PROTECTION. FILTER DRIVER, REFRIGERANT LINE FILTER, LIQUID SOLENOID VALVE, AND SAFETY PRESSURE SWITCHES. INSTALL REFRIGERANT TUBING AND LENGTH IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION. (2) PROVIDE ALL REQUIRED ACCESSORIES FOR LOW—AMBIENT AND LONG—LINE APPLICATIONS. (3) ROUTING OF REFRIGERANT LINES FROM INDOOR TO OUTDOOR UNITS NOT SHOWN ON PLANS. CONTRACTOR TO FIELD COORDINATE ROUTING. (4) REFRIGERANT SHALL BE R -410A. AIR HANDLING UNIT SCHEDULE - INDOOR UNIT EQUIP NECK SIZE MOUNTING / FAN TOTAL COOLING HIGH TEMP. LOW TEMP. ELECTRICAL ELECTRICAL PIPING CONNECTIONS, IN DIMENSIONS, INCHES WEIGHT BASIS OF DESIGN CONNECTED N0. SERVICE DISCHARGE CAPACITY, MBH HEATING CAPACITY, BTUH HEATING CAPACITY, BTUH (2) HEATING CAPACITY, BTUH (LBS) (1)(2)(3) OUTDOOR UNIT AIRFLOW, CFM MIN. OSA, VOLTAGE L W H TITUS 350 DIAMETER 1ECON-1 CONFERENCE ROOM DUCTED 1800 0 AIRFLOW, CFM CFM (4) 233/8" 24/2" 24Y8" 83.8 VOLTAGE MCA MOCP LIQUID GAS L W H AHU-1 CONFERENCE ROOM HORIZONTAL 1800 ,& 294 57.0 52.5 33.2 20.5 208V/3P 32 40 3/8 3/4 58Y2" 245/8" 21)'4" 212 LENNOX CBX32MV-60 HP —1 NOTES: (1) REFRIGERANT SHALL BE R -410A. (2) PROVIDE 8KW ELECTRIC HEAT ECB29-8 (28K33). (3) PROVIDE HORIZONTAL SUPPORT FRAME. (4) PROVIDE SINGLE POINT ELECTRICAL CONNECTION (5) PROVIDE PROGRAMMABLE THERMOSTAT AND 100% MODULATING ECONOMIZER CONTROLLER. (6) SEE VENTILATION CALCULATIONS ON SHEET MO -1 FOR MINIMUM OSA CFM. ECONOMIZER SCHEDULE EQUIP NECK SIZE MOUNTING/ DAMPER ELECTRICAL DIMENSIONS, INCHES WEIGHT BASIS OF DESIGN (1) CONNECTED N0. SERVICE DISCHARGE (LBS) 30 INDOOR UNIT MCD—AA RG -1 20X20 RETURN SURFACE 1799 30 TITUS 350 AIRFLOW, CFM IN. W. G. VOLTAGE L W H TITUS 350 DIAMETER 1ECON-1 CONFERENCE ROOM DUCTED 1800 0 -15 24V 233/8" 24/2" 24Y8" 83.8 LENNOX EMD14-65 AHU-1 NOTES: (1) SEE VENTILATION CALCULATIONS ON SHEET MO -1 FOR MINIMUM OSA CFM. (2) PROVIDE POWER WIRING HARNESS. DIFFUSER SCHEDULE MARK NECK SIZE TYPE MOUNTING TYPE MAX CFM MAXIMUM N.C. MANUFACTURER MODEL CD -1 14X14 SUPPLY SURFACE 817 30 TITUS MCD—AA RG -1 20X20 RETURN SURFACE 1799 30 TITUS 350 EG -1 10X10 EXHAUST SURFACE 413 30 TITUS 350 INLINE EXHAUST FAN FAN ELECTRICAL DIMENSION EQUIP SERVICE MOUNTING/ DUCT SIZE, WEIGHT BASIS OF DESIGN MAX AIRFLOW, NO. DISCHARGE DIA CFM RPM VOLTAGE MCA MOCP DIAMETER HEIGHT EF -1 STORAGE ROOM INLINE DUCT 10" 417 2509 120V/1P 1.11 15 13Y4" 9Y4" 12 FANTECH FR250 NOTES: (1) PROVIDE BACKDRAFT DAMPER. (2) 3 4 y� �It 7 M HOMEWOOD W W v 1rq vmesu1� ts BY HILTON"' Seattle/Tukwila, WA Inn Code: SEATK FRCH DESIGN WORLDWIDE 311 Elm Street Suite 600 Cincinnati, OH 45202 www.FRCH.com 513 241 3000 Owner 804.727.1757 Apple Hospitality REIT, Inc. 814 East Main Street Richmond, VA 23219 Chris Zeigler Architect 513.241.3000 FRCH Design Worldwide f: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Mike Keifling Interior Design 513.241.3000 FRCH Design Worldwide 1:513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Raejean Downs ISSUED INFORMATION OWNER REVIEW SET: BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: A 10/18/16 BLDG DEPT OMENIS ISS ONO V RO p........... (Yy Y [3 m L L 13 1 179 AIB oNA� 0 00-29 RotwmsoN 0 ENGINEERING, INC N 19401 40TH AVE W, SUITE 302 E LYNNWOOD, WA 98036 a 206-364-3343 TEL/ 425-835-0098 FAX m L PROJECT INFORMATION a mCx ID U INTERIOR & EXTERIOR 00 0 RENOVATION N J Homewood Suites Tukwila 6955 Fort Dent Way a Tukwila, WA 98188-2554 E m 6 n: 6 m PROJECT NUMBER: 032609.000 m L U SHEET INFORMATION _ LL MECHANICAL 2 SCHEDULEa 0 0 _ LL O a r� :t vv c D FOR m 1 COX—DEC241rLIANC DRAWN BY: J.K, AS P APPROVED CL OCT 2 5 2W L REVIEWED B RR N m SCALE: vARI Cityof Tukwila AUTHORIZED Fa�� >11T-RNVISI© C M0 2 .Q m C 3 H 0 N O KI HI GI FI EI D G B AI 1 2 3 4 5 6 7 8 9 10 11 12 13 A 14 MFC;HANIC;AI MAIN BUILDING LEVEL 1 SCALE: 1' = 1'-0" ® s a a s 1 2 3 4 5 6 7 8 E 10 11 12 HOMEWOOD Ili. SWIMS B Y HILTON" Seattle/Tukwila, WA Inn Code: SEATK FRCH DESIGN WORLDWIDE 311 Elm Street Suite 600 Cincinnati, OH 45202 www.FRCH.com 513 241 3000 Owner 804.727.1757 Apple Hospitality RErr, Inc. 814 East Main Street Richmond, VA 23219 Chris Zeigler Architect 513.241.3000 FRCH Design Worldwide f: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Mike Keifling Interior Design 513.241.3000 FRCH Design Worldwide f: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Raejean Downs ISSUED INFORMATION OWNER REVIEW SET: BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: 010/18/16 BLDG DEPT (TENTS RESPONSES 000a00 o° . Rpe000 E3 o �:Z❑ 0 ❑ CZE x'179 Alm! 04 °°°o ��oNA� •��o ° -2916 °ooni3t3w a7 ROBISC)N ENGINEERING, INC 19401 40TH AVE W, SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL / 425-835-0098 FAx PROJECT INFORMATION INTERIOR & EXTERIOR RENOVATION Homewood Suites Tukwila 6955 Fort Dent Way Tukwila, WA 98188-2554 PROJECT NUMBER: 032609.000 SHEET INFORMATION MAIN BUILDING LEVEL I DRAWN 12 tq ,QAC COMPLIANCE APPROVED REVIEWE I BY: RUT 2 5 2016 SCALE: V' RIES AUTHORI' E CI cM1T ul{viVlla P�.I�q�> 101� J H G F E 7 G A 1 2vr 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ILA 'ER ' Raejean Downs II ISSUED INFORMATION OWNER REVIEW SET. BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: 010/18/16 BLDG DEPT OMEN1S UONSES aop000po0 .•••oFWAShi ••./s °O ❑°off o g:Za �© 179 1009 OD 1 6 °Orinnnoa° a7 Rowt-snsoN ENGINEERING, INC 19401 40TH AVE W, SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL / 425835-0098 FAx PROJECT INFORMATION INTERIOR & EXTERIOR RENOVATION Homewood Suites Tukwila 6955 Fort Dent Way Tukwila, WA 98188-2554 U a c a c m PROJECT NUMBER: 032609.000 R s U SHEET INFORMATION MEETINGm ROOM -BLDG I LEVEL 2 3 O MECHANICAL 2 LL O a WD FOR Q DRAWN BY: K, AS APPROVED CL 0 U REVIEWED B RR OCT 2 5 2016 N SCALE: VARAA S m 0 AUTHORIZE ��1ii, It", RVIp#ISIC)�1 m M2mOm C S N O K J 2 G F E 11 C A 1 1 #10 St TWO P 3/8" t WI TH r (MIN) 3"X3" TWO P CONCR THAN SIDES, 2 3 4 5 g 7 8 2 K CONDENSING UNIT, CONCRETE PAD MOUNTED DETAIL SCALE: NONE 4 5 0 7 '2' MO -4 E:3 10 11 ROOFING AN INSTALLED F MANUFACTUI REQUIREMEN 12 13 T SIZED PER PLANS 14 DUCT PENETRATION THROUGH ROOF DETAIL SCALE: NONEM4.0 K' I:■ GI F E A 1 2 3 4 5 6 7 E 1 2 3 4 PRE -CON MEETING NOTES CONTRACTORS SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH THE ENGINEER FOR THE PURPOSE OF REVIEWING THE WORK PRIOR TO ORDERING ANY EQUIPMENT OR PERFORMING ANY WORK. THE MEETING SHALL BE LOCATED AT THE PROJECT SITE ON A DATE AND TIME TO BE MUTUALLY AGREED. THE MEETING WILL BE A WORKING SESSION. THE MEETING WILL BE FACILITATED BY THE ENGINEER AND THE AGENDA WILL INCLUDE A DETAILED REVIEW OF THE PLAYS AND SPECIFICATIONS, CROSS CHECK WITH OTHER TRADES FOR COORDINATION ISSUES, REVIEW OF PROPOSED PRODUCTS, REVIEW OF PLANNED MEANS AND METHODS,AND ON-SITE INVESTIGATION OF FIELD CONDITIONS RELATIV= TO EXISTING CONDITIONS THAT COULD AFFECT THE WORK. PERSONS ATTENDING THE MEETING SHALL BE KNOWLEDGEABLE OF THE PROJECT AND SHALL BE THE SPECIFIC PERSONS INTENDED TO CON 11NUE WITH THE PROJECT THROUGH TO COMPLETION. IF REQUIRED, REVISED PLANS WILL BE ISSUED THROUGH OFFICIAL CHANNELS. CHANGES IN THE BID PRICE WILL BE DISCUSSED, BUT NO CHANGE ORDERS WILL BE ISSUED UNLESS PROCESSED THOUGH OFFICIAL CHANNELS. IT SHALL BE UNDERSTOOD THAT THE ENGINEER HAS NO AUTHORITY TO ISSUE CHANGE ORDERS. THE FOLLOWING TRADES SHALL BE REPRESENTED FOR THE MINIMUM TIME INDICATED: - MECHANICAL SHEET METAL 4 HOURS PLUMBING/PIPING 4 HOURS ELECTRICAL 4 HOURS SPRINKLER 2 HOURS GENERAL CONTRACTOR ALL SESSIONS 5 0 7 0 ABBREVIATIONS ACU AIR CONDITIONING UNIT AFF ABOVE FINISHED FLOOR AHJ AUTHORITY HAVING JURISDICTION AHU AIR HANDLING UNIT BDD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTUH BRITISH THERMAL UNIT PER HOUR C COMMON CAP CAPACITY CC COOLING COIL CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE CLG CEILING, COOLING CO CLEANOUT COMB COMBUSTION CONT CONTINUE, CONTROL COP COEFFICIENT OF PERFORMANCE CWS CHILLED/CONDENSER WATER SUPPLY CWR CHILLED/CONDENSER WATER RETURN D DIAMETER DB DRY BULB, DECIBEL DIM DIMENSION DISCH DISCHARGE DN DOWN EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EFF EFFICIENCY EG EXHAUST GRILLE ELEC ELECTRIC ESP EXTERNAL STATIC PRESSURE EXH EXHAUST EXT EXTERIOR, EXTERNAL F FAHRENHEIT FCU FAN COIL UNIT FLR FLOOR FPM FEET PER MINUTE FPS FEET PER SECOND FSD FIRE/SMOKE DAMPER G GAS GAL GALLONS GPM GALLONS PER MINUTE GRD GRILLES, REGISTERS, DIFFUSERS GWB GYPSUM WALLBOARD HD HEAD HORIZ HORIZONTAL HP HORSEPOWER HPU HEAT PUMP UNIT HRU HEAT RECOVERY UNIT HVAC HEATING, VENTILATING, AND AIR CONDITIONING HVU HEATING & VENTILATION UNIT HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER ID INDIRECT DRAIN, INSIDE DIAMETER IN INCH KW KILOWATT L LONG, LENGTH LB POUND MBH THOUSAND BTU PER HOUR MECH MECHANICAL MCA MIN. CIRCUIT AMPACITY MOCP MAX. OVER CURRENT PROTECTION MTD MOUNTED OSA OUTDOOR AIR OBD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION OR DIAMETER OPNG OPENING P PUMP PD PRESSURE DROP, PUMPED DRAIN POC POINT OF CONNECTION PRV PRESSURE REDUCING VALVE PSIG POUNDS PER SQUARE IN GAUGE RA RETURN AIR RD ROOF DRAIN REF REFERENCE RF RELIEF FAN RG RETURN GRILLE RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SCH SCHEDULE SF SUPPLY FAN, SQUARE FOOT SENS SENSIBLE SG SUPPLY GRILLE SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SO SCREENED OPENING SP STATIC PRESSURE SS STAINLESS STEEL, SANITARY SEWER SQ SQUARE TG TRANSFER GRILLE TYP TYPICAL UH UNIT HEATER UON UNLESS OTHERWISE NOTED V VENT VENT VENTILATION, VENTILATOR VTR VENT THRU ROOF W WASTE, WATT, WIDE WB WET BULB (TEMPERATURE) Ir] 10 w 11 12 SYMBOLS EQUIPMENT EF -1 TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) DSD DUCT SMOKE DETECTOR O ROOM THERMOSTAT OR INCLUDED IN SET : GENERAL NOTES O ROOM HUMIDISTAT OR HUMIDITY GENERAL NOTES - MECHANICAL 3. ADJUSTMENTS: ALL EQUIPMENT, MOTORS, FANS GAS BURNERS, sD SMOKE DETECTOR PROJECT NOTES, TABLES, & CALCULATIONS TERMINALS CID -12x12 CD-1,o-DIFFUSER/GRILLE IGNITION DEVICES, DRIVES, ETC. SHALL BE ADJUSTED AND 6. RECTANGULAR DIVIDED FLOW FITTINGS: USE GENERALLY, EXCEPT 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE WORK F-71 BALANCED TO OPERATE AT SPECIFIED RATINGS AS REQUIRED ) BRANCHES TO TERMINALS; SMACNA HVAC FIG 2-5, TYPES I, 2, !�I COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, CIVIL, M1.0 FOR THIS PROJECT SITE AND ACCOUNTING FOR ELEVATION ABOVE X 4A, AND 4B. DO NOT USE TYPE 3. X ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED ON A SEA LEVEL. WALL SUPPLY GRILLE (SG) F� SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). X X 7. TURNING VANES: H.E.P. MANUFACTURER OR APPROVED HIGH �3 CONNECTED, WALL MOUNTED W/ 4. APPROVALS: MECHANICAL AND PLUMBING EQUIPMENT SHALL BE M4.0I EFFICIENCY PROFILE AIRFOIL TYPE FOR RECTANGULAR SQUARE 2. ELECTRICAL CHARACTERISTICS: REFER TO ELECTRICAL DRAWINGS X APPROVED FOR INSTALLATION IN THE PROJECT LOCATION AND THROAT ELBOWS. ACOUSTICAL TYPE FOR RETURN AIR MITERED CD FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC. OF G SHALL HAVE ALL CERTIFICATIONS AND RATINGS TO MEET ALL ENERGY, POLLUTION, ENVIRONMENTAL, SEISMIC, ETC. CODES AND MPG ELBOWS. --:,] MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. el REGULATIONS. THE CONTRACTOR SHALL COORDINATE WITH HIS 8. TAKEOFFS TO OPENINGS: CONICAL TYPE WITH VOLUME DAMPER H FLANGE MANUFACTURE SUPPLIERS AND SHALL INCLUDE ALL COSTS FOR ROUND DUCT BRANCHES PER SMACNA HVAC FIG 2-6, 3. A CODES: COMPLETE INSTALLATION THE MECHANICAL SYSTEM REQUIRED TO MEET THESE REQUIREMENTS IN HIS BID. --RL MINIMUM INLET DIAMETER 2 INCHES LARGER THAN DUCT SIZE. 45 OL SHALL BE PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, CHECK VALVE DEGREE ENTRY FITTING FOR RECTANGULAR DUCT BRANCHES PER PLUMBING, FIRE, AND HEALTH CODES AND REGULATIONS AS 5. FIRE PROTECTION: CONTRACTOR SHALL PROVIDE A FULLY SMACNA HVAC FIG 2-6. ADOPTED BY THE LOCAL AHJ. DESIGNED FIRE PROTECTION SPRINKLER SYSTEM IN COMPLIANCE WITH NFPA AND LOCAL CODES. PROVIDE DESIGN, PERMITS, 9. FLEXIBLE CONNECTIONS: PROVIDE AT EACH DUCT CONNECTION 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON MATERIALS, INSTALLATION, TESTING AND ALL OTHER FOR A TO FANS, PACKAGED HVAC EQUIPMENT, EXTERNALLY ISOLATED FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING FULLY OPERATIONAL SYSTEM. LOCATION OF ALL PIPING TO BE AIR HANDLING UNITS, FAN COIL UNITS, AND SIMILAR EQUIPMENT. ALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. COORDINATED WITH OTHER TRADES. EXCEPTION: EQUIPMENT IN CORRIDOR CEILING SPACES WHERE A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH RATING IS REQUIRED. STRUCTURAL.FIRE 6. FIREPLACES: COORDINATE WITH THE GENERAL CONTRACTOR TO B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, DETERMINE GAS FIREPLACE FLUE AND COMBUSTION AIR HVAC NOTES LIGHTS, WALLS, FARE SPRINKLER PIPING, AND OTHER TRADES DUCTWORK REQUIREMENTS PRIOR TO BIDDING. WORK. 1. ATTACHMENTS: AIR DISTRIBUTION OUTLETS AND LOUVERS SHALL C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, PIPING NOTES HAVE ALL REQUIRED ACCESSORIES AND ATTACHMENTS FOR A EQUIVALENT DUCT SIZING EXCHANGE, RELOCATING, ETC. AS ' COMPLETE CONNECTION TO THE SPECIFIC TYPE OF STRUCTURE REQUIRED FOR A COMPLETE OPERATING MECHANICAL SYSTEM. 1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FLANGES AT THAT THEY ARE BEING ATTACHED TO. THIS INCLUDES, BUT IS D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL NOT LIMITED TO, EXTERIOR BRICKS, GWB WALLS, GWB CEILING, OWNER. VALVES, AND OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR ETC. MAINTENANCE. 5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE 2. DUCTWORK: DUCTWORK SHALL 8E SMOOTH SHEET METAL EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE 2. REDUCERS: PROVIDE AS REQUIRED FROM LINE PIPE SIZE TO (CLASS -1). DUCTWORK THROUGH FIRE RATED STRUCTURE AVD STRUCTURE. EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CONNECTION FLOOR SHALL BE MIN. 26 GA. STEEL. MAXIMUM LENGTH OF 6. ACCESS DOORS: COORDINATE WITH ARCHITECT AND LOCATE ALL SIZES. FLEXIBLE DUCTS SHALL BE 5'-0", UNLESS OTHERWISE NOTED ON ACCESS DOORS ON SHOP DRAWINGS PRIOR TO BEGINNING OF 3. OFFSETS: PROVIDE FOR BRANCH LINES TO EQUIPMENT. DRAWINGS. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. CONSTRUCTION. ACCESS DOORS IN FIRE RATED STRUCTURE SHALL BE FIRE RATED. VERIFY ACCESS DOOR LOCATIONS WITH 4. DIELECTRIC UNIONS: PROVIDE AT CONNECTIONS OF DISSIMILAR 3. VOLUME DAMPERS: PROVIDE AN ACCESSIBLE MANUAL VOLUME GENERAL CONTRACTOR PRIOR TO BIDDING. PIPE. DAMPER FOR EACH SUPPLY, RETURN, OSA, AND EXHAUST 7. RATED PENETRATION: DUCT PENETRATIONS THROUGH RATED 5. REFRIGERANT PIPING: PROVIDE SIZING & INSTALLATION IN OPENING, LOCATED AS FAR UPSTREAM AS POSSIBLE FROM THE OPENING. PROVIDE A MANUAL VOLUME DAMPER FOR BRANCH ED ENCLOSURES SHALL BE FIRE/SMOKE APER THE LATEST STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. MAINS SERVING MORE THAN ONE OPENING. VOLUME DAMPERS IN EDITION OF THE UNDERWRITERS LABORRATTORIORI ES(UL) FIRE NON -ACCESSIBLE CEILINGS SHALL HAVE A CONTROL ARM RESISTANCE WITH HOURLY RATINGS FOR THROUGH -PENETRATION 6. CONDENSATE DRAIN: PROVIDE A P -TRAP FOR EACH HVAC UNIT EXTENDED TO AN ACCESSIBLE LOCATION. FIRE STOPS SYSTEM VOLUME #2, OR SHALL BE INSTALLED IN CONDENSATE PAN WITH PLUG TEES FOR CLEANING. CONDENSATE STRICT ACCORDANCE WITH THE MANUFACTURER'S UL LISTINGS DRAINS SHALL BE DISCHARGED TO AN INDIRECT WASTE OR 4. SEISMIC: PROVIDE SEISMIC RESTRAINTS FOR MECHANICAL (3M OR EQUIVALENT). DETERMINE REQUIREMENTS WITH GENERAL OUTSIDE. EQUIPMENT, PIPING, AND DUCTWORK PER SMACNA AND LOCAL CONTRACTOR PRIOR TO BID. REGULATIONS. INSULATION /LINING NOTES 8. EXHAUST OUTLETS: SOURCE -SPECIFIC FANS SHALL BE VENTED 5. FILTER CLEARANCE: PROVIDE ADEQUATE CLEARANCE FOR TO OUTDOORS WITH A MINIMUM 3' CLEARANCE BETWEEN VENT 1. ENERGY CODE: AS A MINIMUM, COMPLY WITH THICKNESSES AND CHANGING AIR FILTERS. OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEEN TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. VENT OUTLETS AND MECHANICAL AIR INTAKES. 6. DUCTWORK AND PIPING OUTSIDE OF MECHANICAL ROOMS SHALL PLAN NOTES BE CONCEALED, COORDINATE WITH THE GENERAL CONTRACTOR 9. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF TO FUR -OUT AS REQUIRED. CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. 1. DUCTWORK SHALL BE METALLIC DUCTWORK 7. FIRE RATINGS: RATED FLOOR/CEILING JOINT SPACES HAVING 10. EXPOSED PIPING: PROVIDE CHROME PLATING FOR EXPOSED 2. TEST AND BALANCE WORK SHALL BE PERFORMED BY AN DUCTWORK INSIDE THEM SHALL BE FIRE/SMOKE PROTECTED TO PIPING IN FINISHED ROOMS. INDEPENDENT TEST AND BALANCE AGENCY. PROVIDE (3) COPIES MAINTAIN THE 1 -HOUR FLOOR/CEILING RATING PER LOCAL OF TEST AND BALANCE REPORT TO OWNER. JURISDICTIONS. EXHAUST DUCTWORK PENETRATING THE 1 -HOUR 11. PENETRATIONS: PROVIDE ESCUTCHEON PLATES FOR EXPOSED ROOF/CEILING OR FLOOR/CEILING ASSEMBLY SHALL HAVE PIPING PENETRATIONS AND SHEET METAL FLASHING FOR 3. COORDINATE DUCTWORK WITH MISCELLANEOUS OBSTRUCTIONS IN ACCESSIBLE CEILING FIRE DAMPERS. ALTERNATIVELY, THE EXPOSED DUCTWORK PENETRATIONS. CEILING SPACE. EXHAUST DUCTWORK SHALL BE ROUTED INSIDE A RATED SHAFT 12. SHAFT AND PLENUM CONNECTIONS: SEAL CONNECTIONS TO AIR 4. RESTROOM EXHAUST SHALL BE A MINIMUM OF 10' FROM ANY TO PROTECT THE CEILING/ROOF RATING PER THE LOCAL JURISDICTIONS. SHAFTS AIRTIGHT. PROVIDE AIRTIGHT SEAL AROUND MECHANICAL OUTSIDE AIR INTAKES. PENETRATIONS IN AIR PLENUMS. 8. FIRESTOP: PIPE, DUCT AND CONDUIT PENETRATIONS THROUGH 5. ROUTE DUCTWORK UNDERNEATH JOISTS UON. RATED ASSEMBLIES SHALL BE FIRE AND SMOKE STOPPED PER 13. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF CODE. MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING 6. TRANSITION DUCT UNDER BEAMS AND DUCTS. FIELD VERIFY FIXTURES FOR REMOVAL AND REPLACEMENT. AVAILABLE CEILING CAVITY DIMENSIONS. 9. CORRIDOR THERMOSTAT: PROVIDE TAMPERPROOF THERMOSTATS 14. CABLE TRAYS: DUCTWORK AND PIPING INSTALLED ADJACENT TO 7. COORDINATE MOUNTING HEIGHT OF DIFFUSERS WITH IN CORRIDORS. DO NOT PROVIDE PLASTIC GUARDS TO MAKE THE THERMOSTATS TAMPERPROOF. PROVIDE BLANK SECURABLE ELECTRICAL CABLE TRAYS SHALL ALLOW MINIMUM ACCESS OF 6" ARCHITECTURAL PLANS. THERMOSTAT COVERS. ABOVE AND TO THE SIDE OF CABLE TRAYS. SHEET METAL NOTES 15. MOTORS: COMPLY WITH ENERGY CODE ENFORCED BY AHJ FOR MINIMUM EFFICIENCIES UNDER FULL LOAD. 1. REFERENCE: SMACNA HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE, CURRENT EDITION. 16. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT 2. CLEARANCE: COORDINATE DUCTWORK WITH MISCELLANEOUS ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF OBSTRUCTIONS IN CEILING SPACE. MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. 3. ROUND ELBOWS AND OFFSETS: FULL RADIUS (R/D = 1.5), 5 -PIECE SEGMENTED OR STAMPED. REFER TO SMACNA HVAC COORDINATION REQUIREMENTS FIG 2-7, 3-3. DO NOT USE ANGLED OFFSET (TYPE 1). MITERED OFFSET (TYPE 2) MAY BE USED UP TO 30 DEGREE OFFSET 1. PIPING: COORDINATE WITH STRUCTURAL FOR EXACT LOCATION OF ANGLE. ALL STRUCTURAL FRAMING AND FOOTINGS AND FINALIZE THE EXACT ROUTING OF ALL PIPES WITH STRUCTURAL AND AT THE 4. ROUND TEES AND LATERALS: CONICAL TEE PER SMACNA HVAC SITE PRIOR AND DURING THE CONSTRUCTION. FIG 3-5; DO NOT USE STRAIGHT TEE; DO NOT USE CONICAL SADDLE TAP FOR EXPOSED DUCTWORK IN FINISHED SPACES. 2. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF 90 -DEGREE TEE WITH OVAL TO ROUND TAP, LATERAL, AND DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL 45 -DEGREE RECTANGULAR LEAD-IN PER SMACNA HVAC FIG 3-4. CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE 5. RECTANGULAR ELBOWS AND OFFSETS: FULL RADIUS WHERE JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SPACE PERMITS, R/W = 1.5; OTHERWISE USE SQUARE CORNER DIFFERENT JOIST SPACES. ELBOW WITH TURNING VANES. 1 2 3 4 PRE -CON MEETING NOTES CONTRACTORS SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH THE ENGINEER FOR THE PURPOSE OF REVIEWING THE WORK PRIOR TO ORDERING ANY EQUIPMENT OR PERFORMING ANY WORK. THE MEETING SHALL BE LOCATED AT THE PROJECT SITE ON A DATE AND TIME TO BE MUTUALLY AGREED. THE MEETING WILL BE A WORKING SESSION. THE MEETING WILL BE FACILITATED BY THE ENGINEER AND THE AGENDA WILL INCLUDE A DETAILED REVIEW OF THE PLAYS AND SPECIFICATIONS, CROSS CHECK WITH OTHER TRADES FOR COORDINATION ISSUES, REVIEW OF PROPOSED PRODUCTS, REVIEW OF PLANNED MEANS AND METHODS,AND ON-SITE INVESTIGATION OF FIELD CONDITIONS RELATIV= TO EXISTING CONDITIONS THAT COULD AFFECT THE WORK. PERSONS ATTENDING THE MEETING SHALL BE KNOWLEDGEABLE OF THE PROJECT AND SHALL BE THE SPECIFIC PERSONS INTENDED TO CON 11NUE WITH THE PROJECT THROUGH TO COMPLETION. IF REQUIRED, REVISED PLANS WILL BE ISSUED THROUGH OFFICIAL CHANNELS. CHANGES IN THE BID PRICE WILL BE DISCUSSED, BUT NO CHANGE ORDERS WILL BE ISSUED UNLESS PROCESSED THOUGH OFFICIAL CHANNELS. IT SHALL BE UNDERSTOOD THAT THE ENGINEER HAS NO AUTHORITY TO ISSUE CHANGE ORDERS. THE FOLLOWING TRADES SHALL BE REPRESENTED FOR THE MINIMUM TIME INDICATED: - MECHANICAL SHEET METAL 4 HOURS PLUMBING/PIPING 4 HOURS ELECTRICAL 4 HOURS SPRINKLER 2 HOURS GENERAL CONTRACTOR ALL SESSIONS 5 0 7 0 ABBREVIATIONS ACU AIR CONDITIONING UNIT AFF ABOVE FINISHED FLOOR AHJ AUTHORITY HAVING JURISDICTION AHU AIR HANDLING UNIT BDD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTUH BRITISH THERMAL UNIT PER HOUR C COMMON CAP CAPACITY CC COOLING COIL CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE CLG CEILING, COOLING CO CLEANOUT COMB COMBUSTION CONT CONTINUE, CONTROL COP COEFFICIENT OF PERFORMANCE CWS CHILLED/CONDENSER WATER SUPPLY CWR CHILLED/CONDENSER WATER RETURN D DIAMETER DB DRY BULB, DECIBEL DIM DIMENSION DISCH DISCHARGE DN DOWN EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EFF EFFICIENCY EG EXHAUST GRILLE ELEC ELECTRIC ESP EXTERNAL STATIC PRESSURE EXH EXHAUST EXT EXTERIOR, EXTERNAL F FAHRENHEIT FCU FAN COIL UNIT FLR FLOOR FPM FEET PER MINUTE FPS FEET PER SECOND FSD FIRE/SMOKE DAMPER G GAS GAL GALLONS GPM GALLONS PER MINUTE GRD GRILLES, REGISTERS, DIFFUSERS GWB GYPSUM WALLBOARD HD HEAD HORIZ HORIZONTAL HP HORSEPOWER HPU HEAT PUMP UNIT HRU HEAT RECOVERY UNIT HVAC HEATING, VENTILATING, AND AIR CONDITIONING HVU HEATING & VENTILATION UNIT HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER ID INDIRECT DRAIN, INSIDE DIAMETER IN INCH KW KILOWATT L LONG, LENGTH LB POUND MBH THOUSAND BTU PER HOUR MECH MECHANICAL MCA MIN. CIRCUIT AMPACITY MOCP MAX. OVER CURRENT PROTECTION MTD MOUNTED OSA OUTDOOR AIR OBD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION OR DIAMETER OPNG OPENING P PUMP PD PRESSURE DROP, PUMPED DRAIN POC POINT OF CONNECTION PRV PRESSURE REDUCING VALVE PSIG POUNDS PER SQUARE IN GAUGE RA RETURN AIR RD ROOF DRAIN REF REFERENCE RF RELIEF FAN RG RETURN GRILLE RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SCH SCHEDULE SF SUPPLY FAN, SQUARE FOOT SENS SENSIBLE SG SUPPLY GRILLE SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SO SCREENED OPENING SP STATIC PRESSURE SS STAINLESS STEEL, SANITARY SEWER SQ SQUARE TG TRANSFER GRILLE TYP TYPICAL UH UNIT HEATER UON UNLESS OTHERWISE NOTED V VENT VENT VENTILATION, VENTILATOR VTR VENT THRU ROOF W WASTE, WATT, WIDE WB WET BULB (TEMPERATURE) Ir] 10 w 11 12 SYMBOLS EQUIPMENT EF -1 TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) DSD DUCT SMOKE DETECTOR O ROOM THERMOSTAT OR INCLUDED IN SET TEMPERATURE TRANSMITTER O ROOM HUMIDISTAT OR HUMIDITY MO.0 TRANSMITTER co CARBON MONOXIDE SENSOR sD SMOKE DETECTOR PROJECT NOTES, TABLES, & CALCULATIONS TERMINALS CID -12x12 CD-1,o-DIFFUSER/GRILLE TYPE, AND OR NUMBER OR SIZE 400 400 "'DESIGN CFM (WHERE APPLICABLE) F-71 CEILING DIFFUSER (FLOW ARROWS ) SHOWN FOR NON SYMMETRICAL !�I AIRFLOW) M1.0 CEILING RETURN/EXHAUST GRILLE X LINEAR DIFFUSER, CEILING OR WALL X MOUNTED (FLOW ARROWS SHOWN FOR NON SYMMETRICAL AIRFLOW) WALL SUPPLY GRILLE (SG) F� WALL RETURN/EXHAUST GRILLE X X X TRANSFER GRILLE (TG), DUCT �3 CONNECTED, WALL MOUNTED W/ 50 OPTIONAL CFM SHOWN M4.0I TRANSFER GRILLE, CEILING _Aa1 -> MOUNTED WITH FULL-SIZED LINED X DUCT CONNECTION PIPING CD CONDENSATE DRAINAGE G NATURAL GAS - STD. PRESSURE MPG NATURAL GAS - MEDIUM PRESSURE --:,] PIPE CAP el PIPE PLUG UNION H FLANGE GATE VALVE OR BALL VALVE BALL VALVE - PRESSURE REDUCING VALVE (PRV) BREAK IN PIPING OR DUCTWORK --RL RAIN LEADER (RL) OL OVERFLOW RAIN LEADER (OL) CHECK VALVE 13 14 DUCTWORK 18x12 DUCT (1ST FIGURE = SIDE SHOWN, 2ND FIGURE = SIDE NOT SHOWN) UP DOWN DUCT SECTION, POSITIVE PRESSURE UP DOWN DUCT SECTION, NEGA 1'A C7, ^17 E'" 7"I'l PRESSURE F ,�.;JIj '7D F NC", R: UP DOWN ROUND DUCT SECTION ❑ t"zcl anical UP UP UPAn Electrical A xDUCT PENETRATION RUeCFOR.nbing OR ROOF Gus Piping VOLUME DAMPER Ci y of Tvk`" la -� FSD FIRE/SMOKE DAMPER - FSD HORIZ DUCT, -- = VERT DUCT), 2 -HR RATED, UON Fp FIRE DAMPER HORIZ - FD DUCT, --® = VERT DUCT), 2 -HR RATED, UON 90' ELBOW, R/D OR R/W=1.5 SQUARE CORNER ELBOW WITH TURNING VANES 90' TAKE -OFF OR TEE 90' CONICAL TAKE -OFF 45' LATERAL TAKE -OFF TRANSITION OR REDUCER (POT = FLAT ON TOP, FOB = FLAT ON BOTTOM) I--� -� WYE FITTING 90' RECTANGULAR TAKE -OFF WITH 45' TAPER 90' DIVERGING RECTANGULAR TEE, `` EITHER RADIUS OR TURNING VANES PARALLEL FLOW BRANCH CONNECTION, EITHER RADIUS OR -{_ TURNING VANES FLEXIBLE DUCT 0 ROUND DUCT INDICATOR DRAWINGS ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, CONNECTIONS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. DRAWING INDEX DWG DESCRIPTION INCLUDED IN SET 2 w� W_ M of co U)\ 04 �--�, 0WZ\ 00 c��a-1 m0cn 0 MO.0 LEGEND, GENERAL NOTES, DRAWING INDEX X X X MOA PROJECT NOTES, TABLES, & CALCULATIONS X X X MO.2 MECHANICAL SCHEDULES X X X M1.0 EVEL 1 MECHANICAL PLAN X X X M2.0 VITG ROOM- BLDG 1 LEVEL 2 MECHANICAL PLAN X X X M4.0I DETAILS X X X 11 12 RECEIVED ITY OF TUKWILA OCT 19 2016 ERMIT CENTER Permit o. 0 c 40 Plan review approval is subject to errors and oi l osions. Approval of construction documents door r �i the violation of any adopted code or ordinance. Rcc.-;�2 of approved Field Copy and condition: iS ac"noviledged: 13y: Date: t 0 ' ' City of Tuiwia BUILDING CLIVI RECTION LTR# 13 14 HOMEW001",') ,,,&SUITES BY HILTON' Seattle/Tukwila, WA Inn Code: SEATK FRCH DESIGN WORLDWIDE 311 Elm Street Suite 600 Cincinnati, OH 45202 www.FRGH.com 513 241 3000 Owner 804.727.1757 Apple Hospitality REIT, Inc. 814 East Main Street Richmond, VA 23219 Chris Zeigler Architect 513.241.3000 FRCH Design Worldwide t: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Mike Keifling Interior Design 513.241.3000 FRCH Design Worldwide 1:513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Raeiean Downs ISSUED INFORMATION OWNER REVIEW SET. BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: 01 10/18/16 BLDG DEPT CMENTS fifSPONSES 0 000aoovvo .......... 00 `Z':: • of wast'/ •�sOpo4 �� 179 r�• 40 �,� 6 Na� °ovnn©oo a7 RomBSISON ENGINEERING, INC 19401 40TH AVE W, SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL/ 425-835-0098 FAX PROJECT INFORMATION INTERIOR & EXTERIOR RENOVATION Homewood Suites Tukwila 6955 Fort Dent Way Tukwila, WA 98188-2554 PROJECT NUMBER: 032609.000 SHEET INFORMATION LEGEND, GENERAL NOTES9 & -D FOR i DRAWN 9': BK, AAPPROVED REVIEWE BY: RPCT 2 5 2016 SCALE: + IES iiit y of Tal 1 f AUTHORI I� A,Dtt I 10i,t momo No Changes shall be made to the scope of work without prior epprovai of Tukkvila Building Qwfcin~� NOTE: Revisions will require a nF":r r,!Gn submittat and may include additional plan mlaVi fG:= U a K HI GI FI EI FDA AI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 OUTSIDE AIR CALCULATl0N,'.z,-.--_,i.L,, OUTSIDE AIR SCHEDULE ROOM AREA PEOPLE CFM/SQFT CFM/PERSON OSA CFM (AREA) OSA CFM (PEOPLE) TOTAL OSA CFM CONFERENCE ROOM 734 50 0.06 5 44 250 294 NOTES: (11. CALCULATION PER 2015 IMC TABLE 403.3.1.1.),& DUCT INSULATION w ' 1 DUCT INSULATION SCHEDULE SERVICE MATERIAL R—VALUE FIELD APPLIED SERVICE MATERIAL (MIN -REQUIRED VAPOR RETARDER INSTALLED) REQUIRED SUPPLY & RETURN AIR DUCTS IN MINERAL—FIBER 6.0 NO UNCONDITIONED SPACE BLANKET NO NONE SUPPLY & RETURN AIR DUCTS MINERAL—FIBER N/A N/A CONCEALED WITHIN CONDITIONED SPACE BLANKET TEMPERATURE 35 TO 50 DEG F. OUTSIDE AIR DUCTS MINERAL—FIBER 7.0 YES YES BLANKET COPPER PIPING. OPERATING THE BUILDING OUTSIDE AIR DUCTS IN UNCONDITIONED MINERAL—FIBER 4.5 N/A SPACE BLANKET �o� NOTES: INSULATION SHALL BE PER 2015 WASHINGTON STATE ENERGY CODE SECTION C403.2.8 0 OUTSIDE AIR FROM EXTERIOR OF MINERAL—FIBER BUILDING TO AUTOMATIC SHUT—OFF BLANKET 7.0 YES DAMPER AND LESS THAN 2,800 CFM OUTSIDE AIR FROM EXTERIOR OF MINERAL—FIBER BUILDING TO AUTOMATIC SHUT—OFF BLANKET NOTE 2 YES DAMPER AND GREATER THAN 2,800 CFM ROUND & RECTANGULAR EXHAUST AIR MINERAL—FIBER N/A N/A DUCTS IN UNCONDITIONED SPACE BLANKET ROUND & RECTANGULAR SUPPLY AIR MINERAL—FIBER DUCTS, EXPOSED WITHIN CONDITIONED BLANKET N/A N/A SPACE ROUND & RECTANGULAR RETURN AIR MINERAL—FIBER DUCTS, EXPOSED WITHIN CONDITIONED BLANKET N/A N/A NOTES (1) INSULATION SHALL BE PER WASHINGTON STATE ENGERY CODE SECTION C403.2.7.2 (2) DUCT SHALL MEET THE REQUIREMENTS OF METAL FRAMED WALLS PER TABLE C402.1.2 2 o,. n I V V V V V V V V V V V V V V N 2015 INTERNATIONAL BUILDING CODE (IBC) 2015 INTERNATIONAL MECHANICAL CODE (IMC) 2015 UNIFORM PLUMBING CODE (UPC) 2015 WASHINGTON STATE ENERGY CODE (WSEC) 3 4 FAN Al REFRIGERANT PIP INSULATION PIPE INSULATION SCHEDULE SERVICE MATERIAL THICKNESS FIELD APPLIED VAPOR RETARDER FINISH NOTES JACKET REQUIRED REFRIGERANT SECTION, LIQUID AND FLEYIBLE 1" NONE NO NONE COPPER PIPING. OPERATING HOT—GAS PIPING (WHERE REQUIRED). ELASTOMERIC TEMPERATURE 35 TO 50 DEG F. ABOVE GROUND INSULATION OUTSIDE FLEXIBLE 1/2" NONE YES TWO COATS OF MANUFACTURER'S COPPER PIPING. OPERATING THE BUILDING ELASTOMERIC RECOMMENDED UV INHIBITOR TEMPERATURE 35 TO 50 DEG F. �o� NOTES: INSULATION SHALL BE PER 2015 WASHINGTON STATE ENERGY CODE SECTION C403.2.8 0 7 ...N.,, i Y � v 44' G � ,~s i r : s t x 3 w Y 1. !HVAC THERMOSTATS SHALL BE SET TO MAINTAIN A MINIMUM DEADBAND OF 5°F IN AREAS SERVED ,AS REQUIRED PER 2015 WSEC C403.2.4.2. 2. PER 2015 WSEC 403.2.7, ALL DUCTS SHALL BE INSULATED AS FOLLOWS: A. OUTSIDE AIR DUCTS SERVING INDIVIDUAL SUPPLY AIR UNITS WITH LESS THAN 2800 CFM SUPPLY AIR CAPACITY: R-7. B. UNHEATED EQUIPMENT ROOMS WITH COMBUSTION AIR LOUVERS, ISOLATED FROM CONDITIONED SPACE AT SIDES, TOP AND BOTTOM: R-11. C. SUPPLY & RETURN DUCTS WITHIN UNCONDITIONED SPACE: R-6. D. SUPPLY & RETURN DUCTS LOCATED OUTSIDE THE BUILDING: R-8. E. SUPPLY WITH SA TEMP <557 OR >1057 WITHIN CONDITIONED SPACE: R-3.3. 3. MOTORIZED DAMPERS: PER 2015 WSEC C402.4.5.2 PROVIDE MOTORIZED DAMPERS ON ALL OUTSIDE AIR INTAKES, EXHAUST OUTLETS AND RELIEF OUTLETS SERVING CONDITIONED SPACES WHICH CLOSE AUTOMATICALLY WHEN THE SYSTEM IS OFF. RETURN AIR DAMPERS SHALL BE EQUIPPED WITH MOTORIZED DAMPERS. SEE 2015 WSEC C402.4.5.2 FOR EXCEPTIONS AND ADDITIONAL REQUIREMENTS. 4. PER 2015 WSEC C402./—.5.1 MOTORIZED DAMPERS FOR ELEVATOR AND STAIR SHAFTS, PROVIDE DAMFERS THAT ARE POWERED CLOSED AND FAIL OPEN IN THE RELAXED POSITION. (ELEVATOR AND STAIR SHAFT DAMPERS SHALL BE TIED TO THE FIRE ALARM SYSTEM). 0 10 Al 11 iK 13 RECEIVE© CITY OF TUKWILA UG 1 19 2016 PERMIT CENTER 14 KI HI GI FI EI DI CI BI AI 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 HEAT PUMP SCHEDULE - OUTDOOR UNIT EQUIP NECK SIZE MOUNTING / 2 STAGE COOLING HEATING ELECTRICAL REFRIDGERANT DIMENSIONS, INCHES ELECTRICAL BASIS OF DESIGN DIMENSIONS, INCHES EQUIP SERVICE CAPACITY, N0. SERVICE DISCHARGE CAPACITY, MBH HEATING CAPACITY, BTUH WEIGHT, HEATING CAPACITY, BTUH CONNECTED STAGE 1 OUTDOOR UNIT AIRFLOW, CFM HIGH TEMP. LOW TEMP. L W H TITUS 350 DIAMETER 1ECON-1 CONFERENCE ROOM DUCTED 1800 0 NO. CFM (4) TONS COOLING STAGE 2 COOLING SEER/EER HEATING HEATING COP VOLTAGE MCA MOCP CHARGE, LIQUID GAS L W H LBS (1)(2)(3)(4) FAN COIL UNIT 294 57.0 52.5 CAPACITY, MBH CAPACITY, MBH 208V/3P CAPACITY, BTUH CAPACITY, BTUH 3/8 3/4 58Y2" 245/8" LBS 212 LENNOX CBX32MV-60 HP —1 HP -1 CONFERENCE ROOM 5 42.5 60.0 15.50/11.50 52.5 33.2 3.28 208V/3P 23.9 40 11.4 3/8" 3/4" 30)211 39)'232 39" 331 LENNOX AHU-1 SPB060H4 NOTES: (1) ARI LISTED WITH ALL STANDARD FEATURES, INSTALLATION ACCESSORIES AND COMPRESSOR SHORT CYCLING PROTECTION. FILTER DRIVER, REFRIGERANT LINE FILTER, LIQUID SOLENOID VALVE, AND SAFETY PRESSURE SWITCHES. INSTALL REFRIGERANT TUBING AND LENGTH IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION. (2) PROVIDE ALL REQUIRED ACCESSORIES FOR LOW—AMBIENT AND LONG—LINE APPLICATIONS. (3) ROUTING OF REFRIGERANT LINES FROM INDOOR TO OUTDOOR UNITS NOT SHOWN ON PLANS. CONTRACTOR TO FIELD COORDINATE ROUTING. (4) REFRIGERANT SHALL BE R -410A. AIR HANDLING UNIT SCHEDULE - INDOOR UNIT EQUIP NECK SIZE MOUNTING / FAN TOTAL COOLING HIGH TEMP. LOW TEMP. ELECTRICAL ELECTRICAL PIPING CONNECTIONS, IN DIMENSIONS, INCHES WEIGHT BASIS OF DESIGN CONNECTED N0. SERVICE DISCHARGE CAPACITY, MBH HEATING CAPACITY, BTUH HEATING CAPACITY, BTUH (2) HEATING CAPACITY, BTUH (LBS) (1)(2)(3) OUTDOOR UNIT AIRFLOW, CFM MIN. OSA, VOLTAGE L W H TITUS 350 DIAMETER 1ECON-1 CONFERENCE ROOM DUCTED 1800 0 AIRFLOW, CFM CFM (4) 233/8" 24/2" 24Y8" 83.8 VOLTAGE MCA MOCP LIQUID GAS L W H AHU-1 CONFERENCE ROOM HORIZONTAL 1800 ,& 294 57.0 52.5 33.2 20.5 208V/3P 32 40 3/8 3/4 58Y2" 245/8" 21)'4" 212 LENNOX CBX32MV-60 HP —1 NOTES: (1) REFRIGERANT SHALL BE R -410A. (2) PROVIDE 8KW ELECTRIC HEAT ECB29-8 (28K33). (3) PROVIDE HORIZONTAL SUPPORT FRAME. (4) PROVIDE SINGLE POINT ELECTRICAL CONNECTION (5) PROVIDE PROGRAMMABLE THERMOSTAT AND 100% MODULATING ECONOMIZER CONTROLLER. (6) SEE VENTILATION CALCULATIONS ON SHEET MO -1 FOR MINIMUM OSA CFM. ECONOMIZER SCHEDULE EQUIP NECK SIZE MOUNTING/ DAMPER ELECTRICAL DIMENSIONS, INCHES WEIGHT BASIS OF DESIGN (1) CONNECTED N0. SERVICE DISCHARGE (LBS) 30 INDOOR UNIT MCD—AA RG -1 20X20 RETURN SURFACE 1799 30 TITUS 350 AIRFLOW, CFM IN. W. G. VOLTAGE L W H TITUS 350 DIAMETER 1ECON-1 CONFERENCE ROOM DUCTED 1800 0 -15 24V 233/8" 24/2" 24Y8" 83.8 LENNOX EMD14-65 AHU-1 NOTES: (1) SEE VENTILATION CALCULATIONS ON SHEET MO -1 FOR MINIMUM OSA CFM. (2) PROVIDE POWER WIRING HARNESS. DIFFUSER SCHEDULE MARK NECK SIZE TYPE MOUNTING TYPE MAX CFM MAXIMUM N.C. MANUFACTURER MODEL CD -1 14X14 SUPPLY SURFACE 817 30 TITUS MCD—AA RG -1 20X20 RETURN SURFACE 1799 30 TITUS 350 EG -1 10X10 EXHAUST SURFACE 413 30 TITUS 350 INLINE EXHAUST FAN FAN ELECTRICAL DIMENSION EQUIP SERVICE MOUNTING/ DUCT SIZE, WEIGHT BASIS OF DESIGN MAX AIRFLOW, NO. DISCHARGE DIA CFM RPM VOLTAGE MCA MOCP DIAMETER HEIGHT EF -1 STORAGE ROOM INLINE DUCT 10" 417 2509 120V/1P 1.11 15 13Y4" 9Y4" 12 FANTECH FR250 NOTES: (1) PROVIDE BACKDRAFT DAMPER. (2) 3 4 y� �It 7 M HOMEWOOD W W v 1rq vmesu1� ts BY HILTON"' Seattle/Tukwila, WA Inn Code: SEATK FRCH DESIGN WORLDWIDE 311 Elm Street Suite 600 Cincinnati, OH 45202 www.FRCH.com 513 241 3000 Owner 804.727.1757 Apple Hospitality REIT, Inc. 814 East Main Street Richmond, VA 23219 Chris Zeigler Architect 513.241.3000 FRCH Design Worldwide f: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Mike Keifling Interior Design 513.241.3000 FRCH Design Worldwide 1:513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Raejean Downs ISSUED INFORMATION OWNER REVIEW SET: BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: A 10/18/16 BLDG DEPT OMENIS ISS ONO V RO p........... (Yy Y [3 m L L 13 1 179 AIB oNA� 0 00-29 RotwmsoN 0 ENGINEERING, INC N 19401 40TH AVE W, SUITE 302 E LYNNWOOD, WA 98036 a 206-364-3343 TEL/ 425-835-0098 FAX m L PROJECT INFORMATION a mCx ID U INTERIOR & EXTERIOR 00 0 RENOVATION N J Homewood Suites Tukwila 6955 Fort Dent Way a Tukwila, WA 98188-2554 E m 6 n: 6 m PROJECT NUMBER: 032609.000 m L U SHEET INFORMATION _ LL MECHANICAL 2 SCHEDULEa 0 0 _ LL O a r� :t vv c D FOR m 1 COX—DEC241rLIANC DRAWN BY: J.K, AS P APPROVED CL OCT 2 5 2W L REVIEWED B RR N m SCALE: vARI Cityof Tukwila AUTHORIZED Fa�� >11T-RNVISI© C M0 2 .Q m C 3 H 0 N O KI HI GI FI EI D G B AI 1 2 3 4 5 6 7 8 9 10 11 12 13 A 14 MFC;HANIC;AI MAIN BUILDING LEVEL 1 SCALE: 1' = 1'-0" ® s a a s 1 2 3 4 5 6 7 8 E 10 11 12 HOMEWOOD Ili. SWIMS B Y HILTON" Seattle/Tukwila, WA Inn Code: SEATK FRCH DESIGN WORLDWIDE 311 Elm Street Suite 600 Cincinnati, OH 45202 www.FRCH.com 513 241 3000 Owner 804.727.1757 Apple Hospitality RErr, Inc. 814 East Main Street Richmond, VA 23219 Chris Zeigler Architect 513.241.3000 FRCH Design Worldwide f: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Mike Keifling Interior Design 513.241.3000 FRCH Design Worldwide f: 513.241.5015 311 Elm Street, Suite 600 Cincinnati, OH 45202-2706 Raejean Downs ISSUED INFORMATION OWNER REVIEW SET: BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: 010/18/16 BLDG DEPT (TENTS RESPONSES 000a00 o° . Rpe000 E3 o �:Z❑ 0 ❑ CZE x'179 Alm! 04 °°°o ��oNA� •��o ° -2916 °ooni3t3w a7 ROBISC)N ENGINEERING, INC 19401 40TH AVE W, SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL / 425-835-0098 FAx PROJECT INFORMATION INTERIOR & EXTERIOR RENOVATION Homewood Suites Tukwila 6955 Fort Dent Way Tukwila, WA 98188-2554 PROJECT NUMBER: 032609.000 SHEET INFORMATION MAIN BUILDING LEVEL I DRAWN 12 tq ,QAC COMPLIANCE APPROVED REVIEWE I BY: RUT 2 5 2016 SCALE: V' RIES AUTHORI' E CI cM1T ul{viVlla P�.I�q�> 101� J H G F E 7 G A 1 2vr 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ILA 'ER ' Raejean Downs II ISSUED INFORMATION OWNER REVIEW SET. BRAND REVIEW SET: ISSUED: 07.29.2016 REVISIONS: 010/18/16 BLDG DEPT OMEN1S UONSES aop000po0 .•••oFWAShi ••./s °O ❑°off o g:Za �© 179 1009 OD 1 6 °Orinnnoa° a7 Rowt-snsoN ENGINEERING, INC 19401 40TH AVE W, SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL / 425835-0098 FAx PROJECT INFORMATION INTERIOR & EXTERIOR RENOVATION Homewood Suites Tukwila 6955 Fort Dent Way Tukwila, WA 98188-2554 U a c a c m PROJECT NUMBER: 032609.000 R s U SHEET INFORMATION MEETINGm ROOM -BLDG I LEVEL 2 3 O MECHANICAL 2 LL O a WD FOR Q DRAWN BY: K, AS APPROVED CL 0 U REVIEWED B RR OCT 2 5 2016 N SCALE: VARAA S m 0 AUTHORIZE ��1ii, It", RVIp#ISIC)�1 m M2mOm C S N O K J 2 G F E 11 C A 1 1 #10 St TWO P 3/8" t WI TH r (MIN) 3"X3" TWO P CONCR THAN SIDES, 2 3 4 5 g 7 8 2 K CONDENSING UNIT, CONCRETE PAD MOUNTED DETAIL SCALE: NONE 4 5 0 7 '2' MO -4 E:3 10 11 ROOFING AN INSTALLED F MANUFACTUI REQUIREMEN 12 13 T SIZED PER PLANS 14 DUCT PENETRATION THROUGH ROOF DETAIL SCALE: NONEM4.0