Loading...
HomeMy WebLinkAboutPermit M16-0149 - BOEING EMPLOYEES CREDIT UNION (BECU) - EXHAUST FANBECU 12770 GATEWAY DR M16-0149 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 2716000075 Permit Number: M16-0149 Address: 12770 GATEWAY DR Issue Date: 11/16/2016 WA Cities Electrical Code: 2014 Permit Expires On: 5/15/2017 Project Name: BECU 2014 Owner: 2015 WA State Energy Code: Name: BOEING EMPLOYEES CREDIT UNI 2015 Address: PO BOX 97050, SEATTLE, WA, 98124 Permit Center Authorized Signature: Contact Person: Name: KAYLENE NELSON Phone: (253) 359-7147 Address: 1221 SECOND AVE N, KENT, WA, 98032 Contractor: Name: HERMANSON COMPANY LLP Phone: (206) 575-9700 Address: 1221 2ND AVE N, KENT, WA, 98032- 2945 License No: HERMACLO05BJ Expiration Date: 8/25/2018 Lender: Name: Address: DESCRIPTION OF WORK: PROVIDE AND INSTALL (1) EXHAUST FAN WITH MOTORIZED DAMPER AT WALL AND (1) WALL HEATER. Valuation of Work: $1,562.00 Fees Collected: $221.32 Type of Work: NEW Electrical Service Provided by: SEATTLE CITY LIGHT Fuel type: ELECT Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws � regulating construction or the performance of work. I am authorized to sign and obtain this development Pei t and agree to the conditions attached to this permit. Signature,'e Print Name: Date:' This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 5: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 7: `MECHANICAL PERMIT CONDITIONS' 8: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKWIL Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA. og_v SITE LOCATION Mechanical Permit No. M 4 b— 0 1 H Project No. q Date Application Accepted: Date Application Expires: e2 3 1� use MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** King Co Assessor's Tax No.: 2716000075 Site Address: 1.2770 Gateway Dr Tukwila, WA 98168 Suite Number: Cafe Floor: 1 Tenant Name: BECU New Tenant: ❑ .....Yes ®.. No PROPERTY OWNER Name: Boeing Employees Credit Union Address: 327 Tukwila Parkway City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Kaylene Nelson Address: 1221 2nd Avenue N City: Kent State: WA Zip: 98032 Phone: (253) 359-7147 Fax: Email: Kaylene.nelson@hermanson.com Valuation of project (contractor's bid price): $ 1,562 Describe the scope of work in detail: MECHANICAL CONTRACTOR INFORMATION Company Name: Hermanson Company Address: 1221 2nd Avenue N City: Kent State: WA Zip: 98032 Phone: (253) 359-7147 Fax: Contr Reg No.: HERMACL005BJ Exp Date: 08/25/2018 Tukwila Business License No.: BUS -0994464 Provide and install (1) exhaust fan with motorized damper at wall and (1) wall heater. Use: Residential: New .......... ❑ Replacement ........ ❑ Commercial: New .......... ® Replacement ........ ❑ Fuel Type: Electric..... ® Gas....... ❑ Other: HrApplicationsTO—s-Applications On Line\2011 ApplicationslMechanical Permit Application Revised 8-9-1 I.docs Revised: August 2011 Page 1 of 2 bh Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor 1 mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit 1 <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial PERMIT APPLICATION NOTES - Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency enerator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 h /500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+h /1,750,000 btu Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT BUILDING OWNPMRAUTHO9rZED AGENT: Signature: Print Name: Mailing Address: 1221 2nd Avenue N Date: 09/23/2016 Day Telephone: (253) 359-7147 Kent City WA 98032 State Zip H:Applications,Forms-Applications On Ltn6201 I Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 Page 2 of 2 bh DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $457.28 M16-0149 Address: 12770 GATEWAY DR Apn: 2716000075 $221.32 MECHANICAL $212.81 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $137.75 PLAN CHECK FEE R000.322.102.00.00 0.00 $42.56 TECHNOLOGY FEE $8.51 TECHNOLOGY FEE R000.322.900.04.00 0.00 $8.51 PG16-0144 Address: 12770 GATEWAY DR Apn: 2716000075 $235.96 PLUMBING $226.88 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $149.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $45.38 TECHNOLOGY FEE $9.08 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R9481 R000.322.900.04.00 0.00 $9.08 $457.28 Date Paid: Friday, September 23, 2016 Paid By: KAYLENE NELSON Pay Method: CREDIT CARD 301650 Printed: Friday, September 23, 2016 10:47 AM 1 of 1 07 SY57EM5 INSPECTION RECORD 16 - 0 Retain a copy with permit G> y g INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 981 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 ZIM4 s /AI Proje Type of Inspection: R "rtoL) IM&WAAAA rMAL Address: ]Date Called: Instructions: ne No: WApproved per applicable codes. LJ Corrections required prior to approval. `—I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. � o (0 13'i (a - (03 a'-12 �l INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 4'cf it::,91 is/Ml- Project: Type of Inspection: Address: Date Called: z 770 64TnuIPY DR, Special Instructions: Date Wanted: a.m , 2-1Y-17 p.m. Requester: Gam' IQ tLC. r Phone No: 42-5 — &8 RApproved per applicable codes. LJ Corrections required prior to approval. L inspector: Date: l REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit /�lI& 14,q INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: J Type of Inspection: A606W-IN MJEeH}/J ICA - Address 7C3 6?tT9W fy DR, Date Called: Special Instructions: Date Wanted: a.m. ,?--i I .17 p.m. Requester: Phone No: ElApproved per applicable codes. LJ Corrections required prior to approval. L— REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection, HERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M16-0149 DATE: 09/23/16 PROJECT NAME: BECU SITE ADDRESS: 12770 GATEWAY DR X Original Plan Submittal Revision # Response to Correction Letter # DEPARTMENTS: 049J a ]ding Division �� `B1 Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: before Permit Issued Revision # after Pen -nit Issued Avi NJA q y�-I � Fire Prevention 0 Planning Division ❑ Structural ❑ Permit Coordinator 11 DATE: 09/27/16 Structural Review Required ❑ DATE: DUE DATE: 10/25/16 Approved with Conditions Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 HERMANSON COMPANY LLP 1I011e Espanol Contact Safety & Health Claims & Insurance inWashington State Department of Labor & Industries HERMANSON COMPANY LLP Owner or tradesperson Principals NICOLAISEN, KNUT H, PARTNER/MEMBER BROCK, DANIEL L, PARTNER/MEMBER FOX, DEAN M, PARTNER/MEMBER HENGEL, STEPHEN A, PARTNER/MEMBER DYCKMAN,KENNETH A, PARTNER/MEMBER ROBINETT, PAUL J, PARTNER/MEMBER HERMANSON, RICHARD L, PARTNER/MEMBER ALMON, KEVIN, PARTNER/MEMBER (End: 08/05/2010) MACDONALD, JAMES, PARTNER/MEMBER (End: 08/05/2010) Doing business as HERMANSON COMPANY LLP 1221 2ND AVE N KENT, WA 98032-2945 206-575-9700 KING County WA UBI No. Business type 602 004 844 Limited Liability Partnership Governing persons CORP HERMANSON LLC HERMANSON GROUP; License Page 1 of 3 Search L&I A-1 Index I lelp M.N11 L&I Workplace Rights Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. HERMACL005BJ Effective — expiration 01/11/2000— 08/25/2018 Bond ............ WESTERN SURETY CO $12,000.00 Bond account no. 929381801 Received by L&I Effective date 1210112005 01101/2006 Expiration date Until Canceled Trades & Licensing Help us improve https://secure.Ini.wa.gov/verify/Detail.aspx?UBI=602004844&LIC=HERMACL005BJ&SAW= 10/3/2016 A AMPS IBC INTERNATIONAL BUILDING CODE AC AIR CONDITIONING ICW INDUSTRIAL COLD WATER ACH AIR CHANGES PER HOUR ID INSIDE DIAMETER/DIMENSION ACT ACOUSTICAL CEILING TILE IE INVERT ELEVATION AD ACCESS DOOR IEER INTEGRATED ENERGY EFFICIENCY RATIO ADD'L ADDITIONAL IMC INTERNATIONAL MECHANICAL CODE AFF ABOVE FINISHED FLOOR IN INCHES AFG ABOVE FINISHED GRADE IN WG INCHES WATER GAUGE AHU AIR HANDLING UNIT IPLV INTEGRATED PART LOAD VALUE ALUM ALUMINUM KW KILOWATTS AMP/AMPS AMPERAGE LAT LEAVING AIR TEMPERATURE AP ACCESS PANEL LB/LBS POUND/POUNDS ARCH ARCHITECT LF/LIN FT LINEAL FOOT/FEET BC BEADED COLLAR LPG LIQUID PROPANE GAS BDD BACKDRAFT DAMPER LPS LOW PRESSURE STEAM BF BELOW FLOOR LVG LEAVING BHP BRAKE HORSEPOWER LWA SOUND POWER RATING LEVEL (IN DB) BLDG BUILDING LWG LOW WALL GRILLE BOD BOTTOM OF DUCT LWT LEAVING WATER TEMPERATURE BOP BOTTOM OF PIPE MAX MAXIMUM BOT BOTTOM MAU MAKE UP AIR UNIT BS BIRD SCREEN / BLACK STEEL MBH 1000 BRITISH THERMAL UNITS/HOUR BTU BRITISH THERMAL UNIT MCA MINIMUM CIRCUIT AMPACITY BTUH BRITISH THERMAL UNITS PER HOUR MD MOTORIZED DAMPER CAP CAPACITY MFR MANUFACTURER CSD CALIBRATED BALANCING DAMPER MISC MISCELLANEOUS CC CONTROLS CONTRACTOR MIN MINIMUM/MINUTE CD CEILING DIFFUSER/CONDENSATE DRAIN MPS MEDIUM PRESSURE STEAM CDWR CONDENSER WATER RETURN MT MOUNT CDWS CONDENSER WATER SUPPLY MTD MOUNTED CFM CUBIC FEET PER MINUTE MUW MAKE-UP WATER CHWR CHILLED WATER RETURN NA NOT APPLICABLE CHWS CHILLED WATER SUPPLY NC NORMALLY CLOSED/NOISE CRITERIA CLG CEILING NG/NGAS NATURAL GAS COL COLUMN NIC NOT IN CONTRACT CONIC CONCRETE NO NORMALLY OPEN/NUMBER COND CONDENSATE NPW NON -POTABLE WATER CONN CONNECT/CONNECTED/CONNECTION N -R NON-RESIDENTIAL CONT CONTINUOUS/CONTINUATION OA/OSA OUTSIDE AIR CONTR CONTRACTOR OBD OPPOSED BLADE DAMPER COORD COORDINATE OD OUTSIDE DIAMETER/DIMENSION COP COEFFICIENT OF PERFORMANCE PCF POUNDS PER CUBIC FOOT CT COOLING TOWER PD PRESSURE DROP CU CUBIC/CONDENSER UNIT PH PHASE CW DOMESTIC COLD WATER/CONDENSER WATER POC POINT OF CONNECTION DB DUCTBOARD/DRY BULB/DECIBEL P/PRESS PRESSURE DDC DIRECT DIGITAL CONTROL PSI POUNDS PER SQUARE INCH DEFL DEFLECTION PSIG POUNDS PER SQUARE INCH GAUGE DEG DEGREE/DEGREES QTY QUANITY DIA DIAMETER R RETURN GRILLE/RELOCATED/RETURN DMPR DAMPER RA RETURN AIR DN DOWN RD/RND ROUND DOAS DEDICATED OUTSIDE AIR SYSTEM REF REFERENCE DWG DRAWING REQ REQUIRED EXH EXHAUST RESID RESIDENTIAL EA EACH RF RELIEF EAT ENTERING AIR TEMPERATURE RG REFRIGERANT DISCHARGE GAS EC EGGCRATE GRILLE/END CAP/ELEC CONTRACTOR RL REFRIGERANT LIQUID EER ENERGY EFFICIENT RATING RPM REVOLUTIONS PER MINUTE EF EXHAUST FAN RS REFRIGERANT SUCTION EFF EFFICIENCY S SUPPLY EL ELEVATION SA SUPPLY AIR ELEC/ELECT ELECTRICAL/ELECTRIC SAT SATURATION/SUPPLY AIR TEMPERATURE EMCS ENERGY MANAGEMENT CONTROL SYSTEM SD SMOKE DETECTOR ENT ENTERING S/D SLIP & DRIVE CONNECTION EQUIP EQUIPMENT S -C SEATTLE --- CODE ESP EXTERNAL STATIC PRESSURE SEER SEASONAL ENERGY EFFICIENCY RATING EWT ENTERING WATER TEMPERATURE SENS SENSIBLE EXIST EXISTING SL SOUND LINED EXH EXHAUST SM SHEETMETAL F FAHRENHEIT SPEC SPECIFICATION FAC FIRE ALARM CONTRACTOR SO SCREENED OPENING FD FIRE DAMPER SOG SLAB ON GRADE FDC FIRE DEPARTMENT CONNECTION SP STATIC PRESSURE FF FINISHED FLOOR SF SQUARE FEET FIC FURNISHED AND INSTALLED BY CONTRACTOR SS STAINLESS STEEL FIO FURNISHED AND INSTALLED BY OWNER STRUC STRUCTURAL FLA FULL LOAD AMPS TA TRANSFER AIR FLEX FLEXIBLE TEMP TEMPERATURE/TEMPORARY FLR FLOOR TSD TO BE DETERMINED FOB FLAT ON BOTTOM TOD TOP OF DUCT FOIC FURNISHED BY OTHERS, TOS TOP OF STEEL/TOP OF SLAB INSTALLED BY CONTRACTOR TOT TOTAL FOS FLAT ON SIDE TSP TOTAL STATIC PRESSURE FOT FLAT ON TOP TSTAT THERMOSTAT FP FIRE PROTECTION TYP TYPICAL FPM FEET PER MINUTE UH UNIT HEATER FSD FIRE/SMOKE DAMPER UNO UNLESS NOTED OTHERWISE FT FOOT/FEET V VOLT FUT FUTURE VD VOLUME DAMPER FV FACE VELOCITY VEL VELOCITY G GRILLE VERT VERTICAL GA GAUGE/GALLON VFD VARIABLE FREQUENCY DRIVE GALV GALVANIZED VOL VOLUME GC GENERAL CONTRACTOR W WRAPPED DUCT GPM GALLONS PER MINUTE WB WET BULB GRD GRILLE/REGISTER/DIFFUSER WG WATER GAUGE GWB GYPSUM WALL BOARD W/ WITH HD HEAD W/0 WITHOUT HORIZ HORIZONTAL W/SF WATTS PER SQUARE FOOT HP HORSEPOWER WSEC WASHINGTON STATE ENERGY CODE HR HOUR HSPF HEATING SEASONAL PERFORMANCE FACTOR HT HEIGHT HWTG HIGH WALL TRANSFER GRILLE HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER HZ HERTZ MECHANICAL LEGEND 10X10 10x- 10� 10x10 10x` Z 1OX10 10`�r_1 10X0 11�10 10`x_1 100 10 - 10000 S12X100G) 12X100 E10 � 100 100 100 100 100 10}--�� �r �r RECT SUPPLY AIR DUCT UP/TOWARD MECHANICAL GENERAL NOTES 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE 2015 IBC, 2015 WSEC, & 2015 IMC. WITH WASHINGTON STATE AMENDMENTS 2. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNO. RECT SUPPLY AIR DUCT 3. LOCATION AND DETAILS OF EQUIPMENT, DUCT ROUTING, AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH DN/AWAY DUCT LOCATION (IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM) OTHER TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. RECT EXHAUST OR RETURN DUCT 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. UP/TOWARD 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME SUPPLY & RETURN PLUG OR CAP AS FOR OTHER SIMILAR WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE ENGINEER PRIOR TO PROCEEDING. RECT EXHAUST OR RETURN DUCT DN/AWAY 6, ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNO. ROUND DUCT - UP/TOWARD ROUND DUCT - DN/ AWAY FLATOVAL DUCT - UP/ TOWARD FLATOVAL DUCT - DN/ AWAY DUCT OVERLAP BOOT TAP 45' TAP VOLUME DAMPER CALIBRATED BALANCING DAMPER RISE(R) & DROP(D) TRANSITION TURNING VANES/SPLITTERS DUCT MOUNTED SMOKE DETECTOR BACK DRAFT DAMPER FLEXIBLE DUCT AIR FLOW (FORCED AIR) COMBINATION FSD FIRE DAMPER SMOKE DAMPER MOTOR OPERATED DAMPER ACCESS DOORS SOUND TRAP FLEX CONNECTION 16X16ODSL ACOUSTICALLY LINED DUCT OD = OUTSIDE DIMENSIONS SL = SOUND LINING (THICKNESS) MMM FABRIC DUCT CLEARANCE ® SUPPLY AIR DIFFUSER (WITH CORE BLANKOFF) ® CEILING RETURN, TRANSFER OR EXHAUST AIR GRILLE ® SLOTTED DIFFUSER (PLAN VIEW) x REVISION CLOUD & TRIANGLE ##0 ROUND DUCT SYMBOL #x� FLATOVAL DUCT SYMBOL ##° DEGREES SYMBOL POINT OF CONNECTION CD1-100 GRD TAG IDENTIFIER = TYPE -CFM 80 SIZE T T'STAT/TEMP SENSOR c@2o CARBON DIOXIDE H HUMIDITY SENSOR SENSOR sD SMOKE DETECTOR co CARBON MONOXIDE sP STATIC PRESSURE SENSOR SENSOR 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4 CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DAMPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS BEFORE SOUND LINING HAS BEEN ACCOUNTED FOR (SOUND LINING ® 1", UNO) 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY VENTS, STREETS, LOADING DOCK, NEIGHBORING LOT LINES & FUEL BURNING EQUIPMENT OR 3 FEET BELOW OR 25' ABOVE ANY CONTAMINANT SOURCE WITHIN 10 FEET. 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING PER C403.3.1 & C403.2.4.7: -0% TO 100% OF THE DESIGN SUPPLY AIR WITH FAULT DE-ECTION & DIAGNOSTIC REPORTING. -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE CLASS 1 AND EQUIPPED WITH MOTORIZED (OR GRAVITY PER EXCEPTIONS IN C403.2.4.3) DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE, UNO FOR SMOKE CONTROL SYSTEM OPERATION 13. THE CONTROL SYSTEM SHALL MEET C403 AND BE PROGRAMMABLE, CAPABLE OF BEING SET FOR DIFFERENT DAY TYPES PER WEEK, DEADBAND SETTING OF AT LEAST 5'F (107 FOR RESIDENTIAL)) BETWEEN THE HEATING AND COOLING SETPOINTS AND SETBACK TEMPERATURES WITH OPTIMAL START CONTROL. CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF VARYING FLOWS AND RESETTING SUPPLY AIR & WATER TEMPERATURES BY REPRESENTATIVE BUILDING LOADS WHERE REQUIRED IN C403.4. 14. WHERE REQUIRED BY C408, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE, SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT METHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING >2000 CFM (INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH A TOTAL SUPPLY >2000 CFM) OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WIRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. VAV BOX (WITH FAN) SHUTDOWN CAN BE THROUGH CONTROLS SYSTEM. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM. 22. FOR ALL "SEALED AIR TIGHT" OR PRESSURIZED SHAFTS/ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE CONSTRUCTION SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE. -ANY PENETRATIONS OF THE CONSTRUCTION (DUCTWORK CONDUIT PIPING ...) SHALL BE SEALED ON BOTH SIDES -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS AND THRESHOLD SWEEPS, AND OPEN AGAINST THE DIRECTION OF PRESSURE. -USE SECTION 909.5 OF THE 2012 IBC FOR MAX ALLOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. 23. ALL ADHESIVES, SEALANTS, PAINTS AND COATINGS USED DURING THE INSTALLATION/FINISH WORK SHALL MEET THE LEED REQUIREMENTS FOR IEQ. 24. MAXIMUM STANDARD LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET; UP TO 25' MAXIMUM LENGTH IS ACCEPTABLE IF; FLEX DUCT UL -181 TESTED & NOT "CONNECTOR") IS USED DUCT 0 IS INCREASED BY 1 NOMINAL SIZE & BENDS DO NOT EXCEED 235' TOTAL. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENT`S. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 AND SMOKE DEVELOPED RATING SHALL BE < 50. USE THERMAFLEX MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATIONS OR APPROVED EQUAL. 25. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION WITH A VISIBLE DISPLAY/NOTIFICATION READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED. EXISTING DUCTWORK LAST UPDATED DEMO DUCTWORK DUCT TYPE DUCT LOCATION (IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM) WALL -MOUNTED GRILLE REMARKS PIPE ELBOW UP NOT WITHIN CONDITIONED SPACE: OUTSIDE BUILDING PIPE ELBOW DN 1,2,3 DIRECTION OF FLOW ----------- "' DIRECTION OF SLOPE DOWN 1,2,3,4,5 SUPPLY & RETURN PLUG OR CAP R-6 PRESS REDUCING ASSEMBLY z----�-= SOLENOID VALVE z----O---� PUMP 2-CHWS/CHWR-5 CHILLED WATER SUPPLY/RETURN z- RL/RS--s REFRIGERANT LIQUID/SUCTION 2---- NG -3 NATURAL GAS 2--- LPG -s LIQUID PROPANE GAS �-CDWS /CDWR-S CONDENSER WATER SUPPLY/RETURN 2-HWS/HWR-5 HEATING WATER SUPPLY/RETURN �- COND -s CONDENSATE z- FOV ----s FUEL OIL VENT �-- FOS / FOR -s FUEL OIL SUPPLY/RETURN 2 RDG -s REFRIGERANT DISCHARGE GAS 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4 CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DAMPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS BEFORE SOUND LINING HAS BEEN ACCOUNTED FOR (SOUND LINING ® 1", UNO) 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY VENTS, STREETS, LOADING DOCK, NEIGHBORING LOT LINES & FUEL BURNING EQUIPMENT OR 3 FEET BELOW OR 25' ABOVE ANY CONTAMINANT SOURCE WITHIN 10 FEET. 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING PER C403.3.1 & C403.2.4.7: -0% TO 100% OF THE DESIGN SUPPLY AIR WITH FAULT DE-ECTION & DIAGNOSTIC REPORTING. -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE CLASS 1 AND EQUIPPED WITH MOTORIZED (OR GRAVITY PER EXCEPTIONS IN C403.2.4.3) DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE, UNO FOR SMOKE CONTROL SYSTEM OPERATION 13. THE CONTROL SYSTEM SHALL MEET C403 AND BE PROGRAMMABLE, CAPABLE OF BEING SET FOR DIFFERENT DAY TYPES PER WEEK, DEADBAND SETTING OF AT LEAST 5'F (107 FOR RESIDENTIAL)) BETWEEN THE HEATING AND COOLING SETPOINTS AND SETBACK TEMPERATURES WITH OPTIMAL START CONTROL. CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF VARYING FLOWS AND RESETTING SUPPLY AIR & WATER TEMPERATURES BY REPRESENTATIVE BUILDING LOADS WHERE REQUIRED IN C403.4. 14. WHERE REQUIRED BY C408, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE, SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT METHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING >2000 CFM (INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH A TOTAL SUPPLY >2000 CFM) OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WIRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. VAV BOX (WITH FAN) SHUTDOWN CAN BE THROUGH CONTROLS SYSTEM. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM. 22. FOR ALL "SEALED AIR TIGHT" OR PRESSURIZED SHAFTS/ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE CONSTRUCTION SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE. -ANY PENETRATIONS OF THE CONSTRUCTION (DUCTWORK CONDUIT PIPING ...) SHALL BE SEALED ON BOTH SIDES -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS AND THRESHOLD SWEEPS, AND OPEN AGAINST THE DIRECTION OF PRESSURE. -USE SECTION 909.5 OF THE 2012 IBC FOR MAX ALLOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. 23. ALL ADHESIVES, SEALANTS, PAINTS AND COATINGS USED DURING THE INSTALLATION/FINISH WORK SHALL MEET THE LEED REQUIREMENTS FOR IEQ. 24. MAXIMUM STANDARD LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET; UP TO 25' MAXIMUM LENGTH IS ACCEPTABLE IF; FLEX DUCT UL -181 TESTED & NOT "CONNECTOR") IS USED DUCT 0 IS INCREASED BY 1 NOMINAL SIZE & BENDS DO NOT EXCEED 235' TOTAL. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENT`S. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 AND SMOKE DEVELOPED RATING SHALL BE < 50. USE THERMAFLEX MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATIONS OR APPROVED EQUAL. 25. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION WITH A VISIBLE DISPLAY/NOTIFICATION READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED. ..��.wa�a_r ra_I„a l 11LJV f� fVJ vr� rpt JIVLIV I IML V'40IMLLH1lUNZI 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.8.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (AND Z" THICK INSULATION MIN. TO PREVENT CONDENSATION ON DUCTS IN PLENUM UP TO THE HEATING OR COOLING EQUIPMENT) 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEIEL IF: DEDICATED OUTSIDE AIR SYSTEM AND <2,800 CFM SUPPLY AIR MINIMUMPIPE INSULATION MINIMUM DUCT INSULATION LAST UPDATED 07/11/16 DUCT TYPE DUCT LOCATION (IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM) INSULATION R -VALUE REMARKS SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE: OUTSIDE BUILDING R-8 1,2,3 OUTSIDE AIR WITHIN CONDITIONED SPACE: INSIDE BUILDING SEE NOTES 4 & 5 1,2,3,4,5 SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE: INSIDE BUILDING R-6 1,2 SUPPLY AIR <550 OR >1050 WITHIN CONDITIONED SPACE i I]GCCI'f TP1 !`AA7 '1 A rrn rnTl ern nr�, ,rn rw.rw.T.. n R-3.3 1,2 ..��.wa�a_r ra_I„a l 11LJV f� fVJ vr� rpt JIVLIV I IML V'40IMLLH1lUNZI 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.8.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (AND Z" THICK INSULATION MIN. TO PREVENT CONDENSATION ON DUCTS IN PLENUM UP TO THE HEATING OR COOLING EQUIPMENT) 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEIEL IF: DEDICATED OUTSIDE AIR SYSTEM AND <2,800 CFM SUPPLY AIR MINIMUMPIPE INSULATION LAST UPDATED: 07/11/16 FLUID DESIGN INSULATION CONDUCTIVITY NOMINAL PIPE DIAMETER INCH O OPERATING TEMP°F CONDUCTIVITY RANGE MEAN TEMP RATING °F <1 1 TO�1�4/2O T<1-1/2 4TO <8 >8 HEATING SYSTEMS STEAM, CONDENSATE, HYDRONIC HOT WATER, DOMESTIC HOT WATER & RECIRC) a r >350 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0 251-350 0.29-0.32 200 3.0 4.0 4.5 4,5 4.5 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 141-200 0.25-0.29 125 1,5 1,5 2.0 2.0 2.0 105-140 0.21-0.28 1 100 1 1.0 1 1.0 1 1.5 1.5 1.5 DOMESTIC COLD WATER AND HORIZONTAL RAIN LEADERS TO FIRST VERTICAL RAIN LEADER (TO PREVENT CONDENSATION) N/A 1 0.21-0.27 1 75 1 0.5 1 0.5 1 0.5 1 0.5 1 0.5 COOLING SYSTEMS (CHILLED WATER, BRINE AND REFRIGERANT, WATERSIDE ECONOMIZER SYSTEMS)** 40-60 0.21-0.27 1 75 1 0.5 0.5 1 1.0 1 1.0 1.0 <40 0.20-0.26 1 75 1 0.5 1.0 1 1.0 1 111 P1Tr. 1.0 1.5 * NOT REQUIRED FOR STRAINERS, CONTROL VALVES & BALANCING VALVES ASSOCIATED WITH PIPING 1" OR LESS IN DIA. ** TYPICAL CONDENSER WATER PIPE IN NON -ECONOMIZER SYSTEMS IS NOT INSULATED SEE R403 FOR RESIDENTIAL INSTALLATIONS. Of REVIEWED FO (DDE COMPLIAt APPROVED SEP 2 9 2 /�S Ciiy Of Tuhh# BUILDIMR- DRAWING INDEX SHEET NO. SHEET TITLE CURRENT MO.00 LEGEND, ABBREVIATIONS, GENERAL NOTES, & SHEET INDEn - HVAC REVISION M2.01 1ST FLOOR PLAN & SCHEDULE - HVAC REVISIONS No changes shall be made to the scope ~ Of v:ork �vifho,_it prior approval c 'rut <1441,3 Building Division. NOTE: >`rfevisians will require a new plan submittal L_.! nd may include additional clan rAwim , i,,,,,, APN NUMBER 2716000075 S1 -I^ RRATE PERMIT RE-0UIRED FOF; Q me l E mm, FOV LEGAL DESCRIPTION GATEWAY CORPORATE CENTER PARCEL A OF CITY OF TUKWILA SHORT PLAT NO 89 -1 -SS RECORDING NO 8904120877 SD SHORT PLAT DAF - LOT 7 OF GATEWAY CORPORATE CENTER Shorewood' 1 v- Boulevard Park � ` Rwrron 12M p s�eerolrl SGr,3t r Riverton Ileights s Bryn Mawr 4 � .,e n Tacana r1 � - ,� srr w -,l a L c �:ormandy Park i 5 �•� r rf SITE MAP Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg #: HERMACL0058J TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 M ;!5"\ 36149 O �'O FGISIER� F✓4� iL'ONAL r0� Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05582 Project Number 11-15-05682 Issue Date 09/08/15 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC r I, - f R a Skyway r,r O iateway Ct S, a r a 3 . s. s w' 4 � .,e n Tacana r1 � - ,� srr w -,l a L c �:ormandy Park i 5 �•� r rf SITE MAP Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg #: HERMACL0058J TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 M ;!5"\ 36149 O �'O FGISIER� F✓4� iL'ONAL r0� Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05582 Project Number 11-15-05682 Issue Date 09/08/15 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC r VIA 1 ST FLOOR PLAN - HVAC SCALE: 1/2" LAST UPDATED: 09/07/16 UNIT TAG LOCATION AREA SERVED BASIS OF DESIGN MOUNTING TYPE LOCATION CFM ESP IN WG MOTCR VFD SYSTEM DAMPER ELECT VPH SOUND WEIGHT LBS REMARKS BHP HP LWA EF -1 CEILING EXPRESSO GRNHCK SP -A710 -VG CABINET CEILING 590 0.1 0.019 1/4 - MD 115/1 47 36 1,2,3,4,5,6 i -���.i ru�n� �.Vw IV7l.i vr� v rlwvtvl_ 3� LR rRV i C1.I 1VIV rum r-yui'I"IC:IV i m..) rcqujKCU CST IVHI 1UNAL =t- I KILAL WUt. MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM) INSIDE CONTROL PANEL AS REQUIRED BY NATIONAL ELECTRICAL CODE. 2 ELECTRICAL DISCONNECT AND MOTOR STARTER (AS REQUIRED) BY ELECTRICAL CONTRACTOR 3 CONTROLLED VIA LINE VOLTAGE T'STAT SET AT 850 (JOHNSON MODEL A19BBC-2C OR EQUAL, PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR) 4 MOTORIZED DAMPER (LINE VOLTAGE, INTERLOCKED WITH FAN OPERATION BY ELECTRICAL CONTRACTOR) 5 BOTTOM INLET WITH INTERAL GRILLE AND SIDE DISCHARGE 6 INTERLOCK MOTORIZED DAMPERS FOR BOTH LOUVERS L-1 AND L-2 ELECTRIC HEATER SCHEDULE LAST UPDATED: 08/23/16 UNIT TAG AREA BASIS OF LOCATION SERVED DESIGN KW CFM STAGES ELEC WEIGHT FLA V/PH LBS REMARKS EH -1 WALL EXPRESSO KING LPW2045T-BN 2.75 185 1 13.2 208/1 40 1,2,3 AREA LOCATION SERVED BASIS OF DESIGN I tLtL I KICAL cON I RAU I OK i O PROVIDE 5CCR PROTECTION FOR EQUIPMENT AS REQUIRED BY NATIONAL ELECTRICAL CODE. MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM) INSIDE CONTROL PANEL AS REQUIRED BY NEC 2 UL APPROVED. PROVIDE WITH: FAN FORCED AIRFLOW, RECESSED CAN, INTEGRAL T'STAT (SET AT 68°F) 3 STANDARD FINISH 1 NKUV1Ut W1 I N b1KUS1-KttN, UKA1NAbLt ULAUt AND FKAME CONSTRUCTION 2 INSTALL BLANK OFF PLATE BEHIND ANY UNUSED PORTION OF LOUVER, INSULATE TO BUILDING ENVELOPE R VALUE (R-17 MIN) L-2 41, REVIEWED FOR CODE COMPLIANCE APPROVED SEP 2 9 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 2 3 2016 PERMIT CENTER ISSUE FOR PERMIT yry Hermanson Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg J: HERI�9. ACLO05BJ TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 lEODOR of WASrri F� 36149 SSIpNAL SCG Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05682 Project Number 11-15-05682 Issue Date 09/08/16 1 ST FLOOR PLAN & SCHEDULE - HVAC LOUVER SCHEDULE LAST UPDATED: 09/07/16 UNIT TAG AREA LOCATION SERVED BASIS OF DESIGN SERVICE MIN FREE CFM AREA SF W INCH H INCH VELOCITY FPM REMARKS L-1 1ST FLR EXPRESSO GREENHECK ESD -635 INTAKE 590 1.3 18 24 465 1,2 L-2 1ST FLR EXHAUST FAN GREENHECK ESD -635 EXHAUST 590 1.3 18 24 465 1,2 1 NKUV1Ut W1 I N b1KUS1-KttN, UKA1NAbLt ULAUt AND FKAME CONSTRUCTION 2 INSTALL BLANK OFF PLATE BEHIND ANY UNUSED PORTION OF LOUVER, INSULATE TO BUILDING ENVELOPE R VALUE (R-17 MIN) L-2 41, REVIEWED FOR CODE COMPLIANCE APPROVED SEP 2 9 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 2 3 2016 PERMIT CENTER ISSUE FOR PERMIT yry Hermanson Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg J: HERI�9. ACLO05BJ TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 lEODOR of WASrri F� 36149 SSIpNAL SCG Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05682 Project Number 11-15-05682 Issue Date 09/08/16 1 ST FLOOR PLAN & SCHEDULE - HVAC A AMPS IBC INTERNATIONAL BUILDING CODE AC AIR CONDITIONING ICW INDUSTRIAL COLD WATER ACH AIR CHANGES PER HOUR ID INSIDE DIAMETER/DIMENSION ACT ACOUSTICAL CEILING TILE IE INVERT ELEVATION AD ACCESS DOOR IEER INTEGRATED ENERGY EFFICIENCY RATIO ADD'L ADDITIONAL IMC INTERNATIONAL MECHANICAL CODE AFF ABOVE FINISHED FLOOR IN INCHES AFG ABOVE FINISHED GRADE IN WG INCHES WATER GAUGE AHU AIR HANDLING UNIT IPLV INTEGRATED PART LOAD VALUE ALUM ALUMINUM KW KILOWATTS AMP/AMPS AMPERAGE LAT LEAVING AIR TEMPERATURE AP ACCESS PANEL LB/LBS POUND/POUNDS ARCH ARCHITECT LF/LIN FT LINEAL FOOT/FEET BC BEADED COLLAR LPG LIQUID PROPANE GAS BDD BACKDRAFT DAMPER LPS LOW PRESSURE STEAM BF BELOW FLOOR LVG LEAVING BHP BRAKE HORSEPOWER LWA SOUND POWER RATING LEVEL (IN DB) BLDG BUILDING LWG LOW WALL GRILLE BOD BOTTOM OF DUCT LWT LEAVING WATER TEMPERATURE BOP BOTTOM OF PIPE MAX MAXIMUM BOT BOTTOM MAU MAKE UP AIR UNIT BS BIRD SCREEN / BLACK STEEL MBH 1000 BRITISH THERMAL UNITS/HOUR BTU BRITISH THERMAL UNIT MCA MINIMUM CIRCUIT AMPACITY BTUH BRITISH THERMAL UNITS PER HOUR MD MOTORIZED DAMPER CAP CAPACITY MFR MANUFACTURER CSD CALIBRATED BALANCING DAMPER MISC MISCELLANEOUS CC CONTROLS CONTRACTOR MIN MINIMUM/MINUTE CD CEILING DIFFUSER/CONDENSATE DRAIN MPS MEDIUM PRESSURE STEAM CDWR CONDENSER WATER RETURN MT MOUNT CDWS CONDENSER WATER SUPPLY MTD MOUNTED CFM CUBIC FEET PER MINUTE MUW MAKE-UP WATER CHWR CHILLED WATER RETURN NA NOT APPLICABLE CHWS CHILLED WATER SUPPLY NC NORMALLY CLOSED/NOISE CRITERIA CLG CEILING NG/NGAS NATURAL GAS COL COLUMN NIC NOT IN CONTRACT CONIC CONCRETE NO NORMALLY OPEN/NUMBER COND CONDENSATE NPW NON -POTABLE WATER CONN CONNECT/CONNECTED/CONNECTION N -R NON-RESIDENTIAL CONT CONTINUOUS/CONTINUATION OA/OSA OUTSIDE AIR CONTR CONTRACTOR OBD OPPOSED BLADE DAMPER COORD COORDINATE OD OUTSIDE DIAMETER/DIMENSION COP COEFFICIENT OF PERFORMANCE PCF POUNDS PER CUBIC FOOT CT COOLING TOWER PD PRESSURE DROP CU CUBIC/CONDENSER UNIT PH PHASE CW DOMESTIC COLD WATER/CONDENSER WATER POC POINT OF CONNECTION DB DUCTBOARD/DRY BULB/DECIBEL P/PRESS PRESSURE DDC DIRECT DIGITAL CONTROL PSI POUNDS PER SQUARE INCH DEFL DEFLECTION PSIG POUNDS PER SQUARE INCH GAUGE DEG DEGREE/DEGREES QTY QUANITY DIA DIAMETER R RETURN GRILLE/RELOCATED/RETURN DMPR DAMPER RA RETURN AIR DN DOWN RD/RND ROUND DOAS DEDICATED OUTSIDE AIR SYSTEM REF REFERENCE DWG DRAWING REQ REQUIRED EXH EXHAUST RESID RESIDENTIAL EA EACH RF RELIEF EAT ENTERING AIR TEMPERATURE RG REFRIGERANT DISCHARGE GAS EC EGGCRATE GRILLE/END CAP/ELEC CONTRACTOR RL REFRIGERANT LIQUID EER ENERGY EFFICIENT RATING RPM REVOLUTIONS PER MINUTE EF EXHAUST FAN RS REFRIGERANT SUCTION EFF EFFICIENCY S SUPPLY EL ELEVATION SA SUPPLY AIR ELEC/ELECT ELECTRICAL/ELECTRIC SAT SATURATION/SUPPLY AIR TEMPERATURE EMCS ENERGY MANAGEMENT CONTROL SYSTEM SD SMOKE DETECTOR ENT ENTERING S/D SLIP & DRIVE CONNECTION EQUIP EQUIPMENT S -C SEATTLE --- CODE ESP EXTERNAL STATIC PRESSURE SEER SEASONAL ENERGY EFFICIENCY RATING EWT ENTERING WATER TEMPERATURE SENS SENSIBLE EXIST EXISTING SL SOUND LINED EXH EXHAUST SM SHEETMETAL F FAHRENHEIT SPEC SPECIFICATION FAC FIRE ALARM CONTRACTOR SO SCREENED OPENING FD FIRE DAMPER SOG SLAB ON GRADE FDC FIRE DEPARTMENT CONNECTION SP STATIC PRESSURE FF FINISHED FLOOR SF SQUARE FEET FIC FURNISHED AND INSTALLED BY CONTRACTOR SS STAINLESS STEEL FIO FURNISHED AND INSTALLED BY OWNER STRUC STRUCTURAL FLA FULL LOAD AMPS TA TRANSFER AIR FLEX FLEXIBLE TEMP TEMPERATURE/TEMPORARY FLR FLOOR TSD TO BE DETERMINED FOB FLAT ON BOTTOM TOD TOP OF DUCT FOIC FURNISHED BY OTHERS, TOS TOP OF STEEL/TOP OF SLAB INSTALLED BY CONTRACTOR TOT TOTAL FOS FLAT ON SIDE TSP TOTAL STATIC PRESSURE FOT FLAT ON TOP TSTAT THERMOSTAT FP FIRE PROTECTION TYP TYPICAL FPM FEET PER MINUTE UH UNIT HEATER FSD FIRE/SMOKE DAMPER UNO UNLESS NOTED OTHERWISE FT FOOT/FEET V VOLT FUT FUTURE VD VOLUME DAMPER FV FACE VELOCITY VEL VELOCITY G GRILLE VERT VERTICAL GA GAUGE/GALLON VFD VARIABLE FREQUENCY DRIVE GALV GALVANIZED VOL VOLUME GC GENERAL CONTRACTOR W WRAPPED DUCT GPM GALLONS PER MINUTE WB WET BULB GRD GRILLE/REGISTER/DIFFUSER WG WATER GAUGE GWB GYPSUM WALL BOARD W/ WITH HD HEAD W/0 WITHOUT HORIZ HORIZONTAL W/SF WATTS PER SQUARE FOOT HP HORSEPOWER WSEC WASHINGTON STATE ENERGY CODE HR HOUR HSPF HEATING SEASONAL PERFORMANCE FACTOR HT HEIGHT HWTG HIGH WALL TRANSFER GRILLE HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER HZ HERTZ MECHANICAL LEGEND 10X10 10x- 10� 10x10 10x` Z 1OX10 10`�r_1 10X0 11�10 10`x_1 100 10 - 10000 S12X100G) 12X100 E10 � 100 100 100 100 100 10}--�� �r �r RECT SUPPLY AIR DUCT UP/TOWARD MECHANICAL GENERAL NOTES 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE 2015 IBC, 2015 WSEC, & 2015 IMC. WITH WASHINGTON STATE AMENDMENTS 2. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNO. RECT SUPPLY AIR DUCT 3. LOCATION AND DETAILS OF EQUIPMENT, DUCT ROUTING, AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH DN/AWAY DUCT LOCATION (IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM) OTHER TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. RECT EXHAUST OR RETURN DUCT 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. UP/TOWARD 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME SUPPLY & RETURN PLUG OR CAP AS FOR OTHER SIMILAR WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE ENGINEER PRIOR TO PROCEEDING. RECT EXHAUST OR RETURN DUCT DN/AWAY 6, ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNO. ROUND DUCT - UP/TOWARD ROUND DUCT - DN/ AWAY FLATOVAL DUCT - UP/ TOWARD FLATOVAL DUCT - DN/ AWAY DUCT OVERLAP BOOT TAP 45' TAP VOLUME DAMPER CALIBRATED BALANCING DAMPER RISE(R) & DROP(D) TRANSITION TURNING VANES/SPLITTERS DUCT MOUNTED SMOKE DETECTOR BACK DRAFT DAMPER FLEXIBLE DUCT AIR FLOW (FORCED AIR) COMBINATION FSD FIRE DAMPER SMOKE DAMPER MOTOR OPERATED DAMPER ACCESS DOORS SOUND TRAP FLEX CONNECTION 16X16ODSL ACOUSTICALLY LINED DUCT OD = OUTSIDE DIMENSIONS SL = SOUND LINING (THICKNESS) MMM FABRIC DUCT CLEARANCE ® SUPPLY AIR DIFFUSER (WITH CORE BLANKOFF) ® CEILING RETURN, TRANSFER OR EXHAUST AIR GRILLE ® SLOTTED DIFFUSER (PLAN VIEW) x REVISION CLOUD & TRIANGLE ##0 ROUND DUCT SYMBOL #x� FLATOVAL DUCT SYMBOL ##° DEGREES SYMBOL POINT OF CONNECTION CD1-100 GRD TAG IDENTIFIER = TYPE -CFM 80 SIZE T T'STAT/TEMP SENSOR c@2o CARBON DIOXIDE H HUMIDITY SENSOR SENSOR sD SMOKE DETECTOR co CARBON MONOXIDE sP STATIC PRESSURE SENSOR SENSOR 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4 CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DAMPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS BEFORE SOUND LINING HAS BEEN ACCOUNTED FOR (SOUND LINING ® 1", UNO) 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY VENTS, STREETS, LOADING DOCK, NEIGHBORING LOT LINES & FUEL BURNING EQUIPMENT OR 3 FEET BELOW OR 25' ABOVE ANY CONTAMINANT SOURCE WITHIN 10 FEET. 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING PER C403.3.1 & C403.2.4.7: -0% TO 100% OF THE DESIGN SUPPLY AIR WITH FAULT DE-ECTION & DIAGNOSTIC REPORTING. -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE CLASS 1 AND EQUIPPED WITH MOTORIZED (OR GRAVITY PER EXCEPTIONS IN C403.2.4.3) DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE, UNO FOR SMOKE CONTROL SYSTEM OPERATION 13. THE CONTROL SYSTEM SHALL MEET C403 AND BE PROGRAMMABLE, CAPABLE OF BEING SET FOR DIFFERENT DAY TYPES PER WEEK, DEADBAND SETTING OF AT LEAST 5'F (107 FOR RESIDENTIAL)) BETWEEN THE HEATING AND COOLING SETPOINTS AND SETBACK TEMPERATURES WITH OPTIMAL START CONTROL. CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF VARYING FLOWS AND RESETTING SUPPLY AIR & WATER TEMPERATURES BY REPRESENTATIVE BUILDING LOADS WHERE REQUIRED IN C403.4. 14. WHERE REQUIRED BY C408, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE, SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT METHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING >2000 CFM (INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH A TOTAL SUPPLY >2000 CFM) OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WIRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. VAV BOX (WITH FAN) SHUTDOWN CAN BE THROUGH CONTROLS SYSTEM. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM. 22. FOR ALL "SEALED AIR TIGHT" OR PRESSURIZED SHAFTS/ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE CONSTRUCTION SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE. -ANY PENETRATIONS OF THE CONSTRUCTION (DUCTWORK CONDUIT PIPING ...) SHALL BE SEALED ON BOTH SIDES -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS AND THRESHOLD SWEEPS, AND OPEN AGAINST THE DIRECTION OF PRESSURE. -USE SECTION 909.5 OF THE 2012 IBC FOR MAX ALLOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. 23. ALL ADHESIVES, SEALANTS, PAINTS AND COATINGS USED DURING THE INSTALLATION/FINISH WORK SHALL MEET THE LEED REQUIREMENTS FOR IEQ. 24. MAXIMUM STANDARD LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET; UP TO 25' MAXIMUM LENGTH IS ACCEPTABLE IF; FLEX DUCT UL -181 TESTED & NOT "CONNECTOR") IS USED DUCT 0 IS INCREASED BY 1 NOMINAL SIZE & BENDS DO NOT EXCEED 235' TOTAL. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENT`S. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 AND SMOKE DEVELOPED RATING SHALL BE < 50. USE THERMAFLEX MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATIONS OR APPROVED EQUAL. 25. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION WITH A VISIBLE DISPLAY/NOTIFICATION READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED. EXISTING DUCTWORK LAST UPDATED DEMO DUCTWORK DUCT TYPE DUCT LOCATION (IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM) WALL -MOUNTED GRILLE REMARKS PIPE ELBOW UP NOT WITHIN CONDITIONED SPACE: OUTSIDE BUILDING PIPE ELBOW DN 1,2,3 DIRECTION OF FLOW ----------- "' DIRECTION OF SLOPE DOWN 1,2,3,4,5 SUPPLY & RETURN PLUG OR CAP R-6 PRESS REDUCING ASSEMBLY z----�-= SOLENOID VALVE z----O---� PUMP 2-CHWS/CHWR-5 CHILLED WATER SUPPLY/RETURN z- RL/RS--s REFRIGERANT LIQUID/SUCTION 2---- NG -3 NATURAL GAS 2--- LPG -s LIQUID PROPANE GAS �-CDWS /CDWR-S CONDENSER WATER SUPPLY/RETURN 2-HWS/HWR-5 HEATING WATER SUPPLY/RETURN �- COND -s CONDENSATE z- FOV ----s FUEL OIL VENT �-- FOS / FOR -s FUEL OIL SUPPLY/RETURN 2 RDG -s REFRIGERANT DISCHARGE GAS 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED, LOW PRESSURE DUCTWORK (DOWNSTREAM OF VAV BOXES, CONSTANT VOLUME AC SYSTEMS, TOILET EXHAUSTS, ETC.) TO MEET 2" CONSTRUCTION STANDARDS WITH SEAL CLASS C. MEDIUM PRESSURE DUCTWORK (UPSTREAM OF VAV BOXES, HIGH VELOCITY EXHAUSTS, ETC.) TO MEET 4 CONSTRUCTION STANDARDS WITH SEAL CLASS A. DUCT RISERS IN SHAFTS WITH DAMPERED PENETRATIONS TO MEET 6" CONSTRUCTION STANDARDS WITH SEAL CLASS A. 8. ALL CEILING DIFFUSERS ARE 4 -WAY THROW UNLESS NOTED OTHERWISE. 9. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS BEFORE SOUND LINING HAS BEEN ACCOUNTED FOR (SOUND LINING ® 1", UNO) 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY VENTS, STREETS, LOADING DOCK, NEIGHBORING LOT LINES & FUEL BURNING EQUIPMENT OR 3 FEET BELOW OR 25' ABOVE ANY CONTAMINANT SOURCE WITHIN 10 FEET. 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING PER C403.3.1 & C403.2.4.7: -0% TO 100% OF THE DESIGN SUPPLY AIR WITH FAULT DE-ECTION & DIAGNOSTIC REPORTING. -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE CLASS 1 AND EQUIPPED WITH MOTORIZED (OR GRAVITY PER EXCEPTIONS IN C403.2.4.3) DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE, UNO FOR SMOKE CONTROL SYSTEM OPERATION 13. THE CONTROL SYSTEM SHALL MEET C403 AND BE PROGRAMMABLE, CAPABLE OF BEING SET FOR DIFFERENT DAY TYPES PER WEEK, DEADBAND SETTING OF AT LEAST 5'F (107 FOR RESIDENTIAL)) BETWEEN THE HEATING AND COOLING SETPOINTS AND SETBACK TEMPERATURES WITH OPTIMAL START CONTROL. CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF VARYING FLOWS AND RESETTING SUPPLY AIR & WATER TEMPERATURES BY REPRESENTATIVE BUILDING LOADS WHERE REQUIRED IN C403.4. 14. WHERE REQUIRED BY C408, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF THE DATE OF SYSTEM ACCEPTANCE PER THE ENERGY CODE. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE, SMACNA AND ASCE 7. ALL LIFE SAFETY OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip=1.5 FOR RESTRAINT METHODS OR AS NOTED ON THE DRAWINGS. REFER TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. 17. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE. 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN UL APPROVED FIRE CAULKING. 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED FOR HVAC EQUIPMENT DELIVERING >2000 CFM (INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH A TOTAL SUPPLY >2000 CFM) OR EACH STORY OF RETURN SYSTEMS OVER 15,000 CFM IN A MULTI -STORY INSTALLATION, PER CODE. SMOKE DETECTORS SHALL BE FIC (ELEC) UNO. POWER -WIRING AND INTERLOCK TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. VAV BOX (WITH FAN) SHUTDOWN CAN BE THROUGH CONTROLS SYSTEM. 20. MECHANICAL ACCESS PANELS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE MINIMUM. 22. FOR ALL "SEALED AIR TIGHT" OR PRESSURIZED SHAFTS/ROOMS, THE FOLLOWING SHALL OCCUR: -ALL VERTICAL JOINTS & CORNERS SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE JOINT (BY GC). -TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH (BY GC). -ANY FLOOR DECKING PERPENDICULAR TO THE CONSTRUCTION SHALL BE CAULKED (BY GC). FILLING WITH ROCK WOOL IS NOT ACCEPTABLE. -ANY PENETRATIONS OF THE CONSTRUCTION (DUCTWORK CONDUIT PIPING ...) SHALL BE SEALED ON BOTH SIDES -ALL DOORS SHALL BE PROVIDED WITH TIGHT FITTING GASKETS AND THRESHOLD SWEEPS, AND OPEN AGAINST THE DIRECTION OF PRESSURE. -USE SECTION 909.5 OF THE 2012 IBC FOR MAX ALLOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT CONSTRUCTION. 23. ALL ADHESIVES, SEALANTS, PAINTS AND COATINGS USED DURING THE INSTALLATION/FINISH WORK SHALL MEET THE LEED REQUIREMENTS FOR IEQ. 24. MAXIMUM STANDARD LENGTH OF FLEXIBLE DUCT SHALL BE 12 FEET; UP TO 25' MAXIMUM LENGTH IS ACCEPTABLE IF; FLEX DUCT UL -181 TESTED & NOT "CONNECTOR") IS USED DUCT 0 IS INCREASED BY 1 NOMINAL SIZE & BENDS DO NOT EXCEED 235' TOTAL. REFER TO INSTALLATION DETAILS FOR SUPPORT REQUIREMENT`S. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 AND SMOKE DEVELOPED RATING SHALL BE < 50. USE THERMAFLEX MODEL G -KM FOR LOW AND MEDIUM PRESSURE APPLICATIONS OR APPROVED EQUAL. 25. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION WITH A VISIBLE DISPLAY/NOTIFICATION READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED. ..��.wa�a_r ra_I„a l 11LJV f� fVJ vr� rpt JIVLIV I IML V'40IMLLH1lUNZI 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.8.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (AND Z" THICK INSULATION MIN. TO PREVENT CONDENSATION ON DUCTS IN PLENUM UP TO THE HEATING OR COOLING EQUIPMENT) 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEIEL IF: DEDICATED OUTSIDE AIR SYSTEM AND <2,800 CFM SUPPLY AIR MINIMUMPIPE INSULATION MINIMUM DUCT INSULATION LAST UPDATED 07/11/16 DUCT TYPE DUCT LOCATION (IN HEATED AND MECHANICALLY COOLED DUCT SYSTEM) INSULATION R -VALUE REMARKS SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE: OUTSIDE BUILDING R-8 1,2,3 OUTSIDE AIR WITHIN CONDITIONED SPACE: INSIDE BUILDING SEE NOTES 4 & 5 1,2,3,4,5 SUPPLY & RETURN NOT WITHIN CONDITIONED SPACE: INSIDE BUILDING R-6 1,2 SUPPLY AIR <550 OR >1050 WITHIN CONDITIONED SPACE i I]GCCI'f TP1 !`AA7 '1 A rrn rnTl ern nr�, ,rn rw.rw.T.. n R-3.3 1,2 ..��.wa�a_r ra_I„a l 11LJV f� fVJ vr� rpt JIVLIV I IML V'40IMLLH1lUNZI 2 INSULATED COOLED DUCTS REQUIRED A VAPOR RETARDER (PERM < 0.5) AND SEALED JOINTS 3 WEATHERPROOF BARRIER REQUIRED AROUND DUCTWORK TO MAINTAIN WATER TIGHTNESS 4 INSULATE OUTSIDE AIR DUCTS TO BUILDING EXTERIOR WALL LEVEL PER ENERGY CODE SECTION: C403.2.8.1 UNTIL CONNECTED TO EQUIPMENT SERVED OR TO THE CODE REQUIRED SHUTOFF DAMPER (AND Z" THICK INSULATION MIN. TO PREVENT CONDENSATION ON DUCTS IN PLENUM UP TO THE HEATING OR COOLING EQUIPMENT) 5 R-7 CAN BE USED IN LIEU OF BUILDING ENVELOPE INSULATION LEIEL IF: DEDICATED OUTSIDE AIR SYSTEM AND <2,800 CFM SUPPLY AIR MINIMUMPIPE INSULATION LAST UPDATED: 07/11/16 FLUID DESIGN INSULATION CONDUCTIVITY NOMINAL PIPE DIAMETER INCH O OPERATING TEMP°F CONDUCTIVITY RANGE MEAN TEMP RATING °F <1 1 TO�1�4/2O T<1-1/2 4TO <8 >8 HEATING SYSTEMS STEAM, CONDENSATE, HYDRONIC HOT WATER, DOMESTIC HOT WATER & RECIRC) a r >350 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0 251-350 0.29-0.32 200 3.0 4.0 4.5 4,5 4.5 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 141-200 0.25-0.29 125 1,5 1,5 2.0 2.0 2.0 105-140 0.21-0.28 1 100 1 1.0 1 1.0 1 1.5 1.5 1.5 DOMESTIC COLD WATER AND HORIZONTAL RAIN LEADERS TO FIRST VERTICAL RAIN LEADER (TO PREVENT CONDENSATION) N/A 1 0.21-0.27 1 75 1 0.5 1 0.5 1 0.5 1 0.5 1 0.5 COOLING SYSTEMS (CHILLED WATER, BRINE AND REFRIGERANT, WATERSIDE ECONOMIZER SYSTEMS)** 40-60 0.21-0.27 1 75 1 0.5 0.5 1 1.0 1 1.0 1.0 <40 0.20-0.26 1 75 1 0.5 1.0 1 1.0 1 111 P1Tr. 1.0 1.5 * NOT REQUIRED FOR STRAINERS, CONTROL VALVES & BALANCING VALVES ASSOCIATED WITH PIPING 1" OR LESS IN DIA. ** TYPICAL CONDENSER WATER PIPE IN NON -ECONOMIZER SYSTEMS IS NOT INSULATED SEE R403 FOR RESIDENTIAL INSTALLATIONS. Of REVIEWED FO (DDE COMPLIAt APPROVED SEP 2 9 2 /�S Ciiy Of Tuhh# BUILDIMR- DRAWING INDEX SHEET NO. SHEET TITLE CURRENT MO.00 LEGEND, ABBREVIATIONS, GENERAL NOTES, & SHEET INDEn - HVAC REVISION M2.01 1ST FLOOR PLAN & SCHEDULE - HVAC REVISIONS No changes shall be made to the scope ~ Of v:ork �vifho,_it prior approval c 'rut <1441,3 Building Division. NOTE: >`rfevisians will require a new plan submittal L_.! nd may include additional clan rAwim , i,,,,,, APN NUMBER 2716000075 S1 -I^ RRATE PERMIT RE-0UIRED FOF; Q me l E mm, FOV LEGAL DESCRIPTION GATEWAY CORPORATE CENTER PARCEL A OF CITY OF TUKWILA SHORT PLAT NO 89 -1 -SS RECORDING NO 8904120877 SD SHORT PLAT DAF - LOT 7 OF GATEWAY CORPORATE CENTER Shorewood' 1 v- Boulevard Park � ` Rwrron 12M p s�eerolrl SGr,3t r Riverton Ileights s Bryn Mawr 4 � .,e n Tacana r1 � - ,� srr w -,l a L c �:ormandy Park i 5 �•� r rf SITE MAP Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg #: HERMACL0058J TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 M ;!5"\ 36149 O �'O FGISIER� F✓4� iL'ONAL r0� Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05582 Project Number 11-15-05682 Issue Date 09/08/15 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC r I, - f R a Skyway r,r O iateway Ct S, a r a 3 . s. s w' 4 � .,e n Tacana r1 � - ,� srr w -,l a L c �:ormandy Park i 5 �•� r rf SITE MAP Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg #: HERMACL0058J TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 M ;!5"\ 36149 O �'O FGISIER� F✓4� iL'ONAL r0� Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05582 Project Number 11-15-05682 Issue Date 09/08/15 LEGEND, ABBREVIATION, GENERAL NOTES & SHEET INDEX -HVAC r VIA 1 ST FLOOR PLAN - HVAC SCALE: 1/2" LAST UPDATED: 09/07/16 UNIT TAG LOCATION AREA SERVED BASIS OF DESIGN MOUNTING TYPE LOCATION CFM ESP IN WG MOTCR VFD SYSTEM DAMPER ELECT VPH SOUND WEIGHT LBS REMARKS BHP HP LWA EF -1 CEILING EXPRESSO GRNHCK SP -A710 -VG CABINET CEILING 590 0.1 0.019 1/4 - MD 115/1 47 36 1,2,3,4,5,6 i -���.i ru�n� �.Vw IV7l.i vr� v rlwvtvl_ 3� LR rRV i C1.I 1VIV rum r-yui'I"IC:IV i m..) rcqujKCU CST IVHI 1UNAL =t- I KILAL WUt. MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM) INSIDE CONTROL PANEL AS REQUIRED BY NATIONAL ELECTRICAL CODE. 2 ELECTRICAL DISCONNECT AND MOTOR STARTER (AS REQUIRED) BY ELECTRICAL CONTRACTOR 3 CONTROLLED VIA LINE VOLTAGE T'STAT SET AT 850 (JOHNSON MODEL A19BBC-2C OR EQUAL, PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR) 4 MOTORIZED DAMPER (LINE VOLTAGE, INTERLOCKED WITH FAN OPERATION BY ELECTRICAL CONTRACTOR) 5 BOTTOM INLET WITH INTERAL GRILLE AND SIDE DISCHARGE 6 INTERLOCK MOTORIZED DAMPERS FOR BOTH LOUVERS L-1 AND L-2 ELECTRIC HEATER SCHEDULE LAST UPDATED: 08/23/16 UNIT TAG AREA BASIS OF LOCATION SERVED DESIGN KW CFM STAGES ELEC WEIGHT FLA V/PH LBS REMARKS EH -1 WALL EXPRESSO KING LPW2045T-BN 2.75 185 1 13.2 208/1 40 1,2,3 AREA LOCATION SERVED BASIS OF DESIGN I tLtL I KICAL cON I RAU I OK i O PROVIDE 5CCR PROTECTION FOR EQUIPMENT AS REQUIRED BY NATIONAL ELECTRICAL CODE. MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM) INSIDE CONTROL PANEL AS REQUIRED BY NEC 2 UL APPROVED. PROVIDE WITH: FAN FORCED AIRFLOW, RECESSED CAN, INTEGRAL T'STAT (SET AT 68°F) 3 STANDARD FINISH 1 NKUV1Ut W1 I N b1KUS1-KttN, UKA1NAbLt ULAUt AND FKAME CONSTRUCTION 2 INSTALL BLANK OFF PLATE BEHIND ANY UNUSED PORTION OF LOUVER, INSULATE TO BUILDING ENVELOPE R VALUE (R-17 MIN) L-2 41, REVIEWED FOR CODE COMPLIANCE APPROVED SEP 2 9 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 2 3 2016 PERMIT CENTER ISSUE FOR PERMIT yry Hermanson Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg J: HERI�9. ACLO05BJ TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 lEODOR of WASrri F� 36149 SSIpNAL SCG Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05682 Project Number 11-15-05682 Issue Date 09/08/16 1 ST FLOOR PLAN & SCHEDULE - HVAC LOUVER SCHEDULE LAST UPDATED: 09/07/16 UNIT TAG AREA LOCATION SERVED BASIS OF DESIGN SERVICE MIN FREE CFM AREA SF W INCH H INCH VELOCITY FPM REMARKS L-1 1ST FLR EXPRESSO GREENHECK ESD -635 INTAKE 590 1.3 18 24 465 1,2 L-2 1ST FLR EXHAUST FAN GREENHECK ESD -635 EXHAUST 590 1.3 18 24 465 1,2 1 NKUV1Ut W1 I N b1KUS1-KttN, UKA1NAbLt ULAUt AND FKAME CONSTRUCTION 2 INSTALL BLANK OFF PLATE BEHIND ANY UNUSED PORTION OF LOUVER, INSULATE TO BUILDING ENVELOPE R VALUE (R-17 MIN) L-2 41, REVIEWED FOR CODE COMPLIANCE APPROVED SEP 2 9 2016 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 2 3 2016 PERMIT CENTER ISSUE FOR PERMIT yry Hermanson Building Today, Defining Tomorrow Hermanson Company LLP 1221 2nd Avenue North Kent, Washington 98032 Tel: (206) 575-9700 Fax: (205) 575-9800 www.hermanson.com Contractor Reg J: HERI�9. ACLO05BJ TUKWILA CORPORATE OFFICE - COFFEE KIOSK NEIGHBORHOOD FINANCIAL CENTER 12770 GATEWAY DR S TUKWILA, WA 98168 lEODOR of WASrri F� 36149 SSIpNAL SCG Revisions 09/08/16 DWN ISSUE FOR PERMIT No. Data By Description Design Team Design DWN Drawn FVP Checked DTN Scale AS NOTED Drawing Number C-0195-05682 Project Number 11-15-05682 Issue Date 09/08/16 1 ST FLOOR PLAN & SCHEDULE - HVAC