Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL16-0834 - HOLIDAY INN EXPRESS - ELECTRICAL FOR NEW HOTEL
HOLIDAY INN EXPRESS 90 ANDOVER PARK E ELl 6=0834 City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov ELECTRICAL PERMIT Parcel No: 0223000040 Permit Number: EL16-0834 Address: 90 ANDOVER PARK E Issue Date: 12/15/2016 International Residential Code Edition: Permit Expires On: 6/13/2017 Project Name: HOLIDAY INN EXPRESS 2014 Owner: 2015 Name: TUKWILA TSD LLC 2014 Address: 21109 66TH AVE S, KENT, WA, 98032 2015 Contact Person: 2015 Name: DALE SWEENEY Phone: (425) 260-8969 Address: 5715 143 PL SE, BELLEVUE, WA, 98006 Contractor: Name: ACE ELECTRIC INC Phone: (509) 366-9723 Address: 1165 COLUMBIA PARK TRAIL, RICHLAND, WA, 99352 License No: ACEELI*003CM Expiration Date: 8/11/2018 Lender: Name: Address: DESCRIPTION OF WORK: ELECTRICAL FOR A NEW 92 UNIT HOTEL Valuation of single family: $0.00 Fees Collected: $7,206.68 Valuation of mf/comm: $466,000.00 Type of Work: NEW Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-4613: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Permit Center Authorized Signature: �A Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signa Print Date: Z / S / This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: 'ELECTRICAL PERMIT CONDITIONS' 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.Pov Electrical Permit No.Z-,� Project No. Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review Applications will not be accepted through the mail or by fax. "Please Print" SITE LOCATION Q J_ King Co Assessor's Tax No.: O Z Z3 00 �d Site Address: 90 '4ndoyrl- / Q/7� a' Suite Number: Floor: Tenant Name: New Tenant: 0 .....Yes ❑..No PROPERTY OWNER Name: S D L Address: O Avg C� City: State: Zip: 60� 21 CONTACT PERSON — person receiving all project communication Name: r Address: City: //evU� State: 1 rl V Zip: 1 I Phone: 25 �� �y Fax: �YZ3 7G, DM 7 [� Email:Emai �i c • y�S � � �'I�f•�• LO.yi ELECTRICAL CONTRACTOR INFORMATION Company Name: Ce Address: ! (V 5 ' CO / , T )Oa l -k . ! . City:State: u/ .�1 f Zip: �35 n Phone: �� d 04- 9 Fax:. yy. Contr Reg Date: Tukwila Business License No.; 605 0�? -7213 v Valuation of Project (contractor's bid price): $_±006i , M/ 6/ / 1 Scope of Work (please provide detailed information): /z'GT/�CQ ( >`(�,r �'{ 4ny (� Ute//*T C/ ok Will service be altered? ❑ Yes Type of Use: Iype of work: IB/New ❑ Addition ❑ Low Voltage ❑ Generator Property Served by: ❑ Puget Sound Energy ❑ ❑ No ❑ Service Change ❑ Fire Alarm Seattle City Light H:\Applications\Forms-Applications On Line\2014 Applications0ectrical Permit Applicatinn Revised 1-1-14.docx Revised: January 2014 bb Adding more than 50 amps? ❑ Remodel ❑ Telecommunication ❑ Yes ❑ No ❑ Tenant Improvement ❑ Temporary Service Page I of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings ...................................$152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings ........................$81.90 ea ❑ Low voltage systems (alarm, furnace thermostat).................................$59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration .......................................$81.90 MISCELLANEOUS FEES (no added/altered circuits) ❑ ❑ Service change with added/altered circuits.................$81.90 ❑ Temporary service (generator) ................................... number of added circuits .......................$1 1.55 ea ❑ Circuits added/altered without service change ............ $54.60 (excluding garage or outbuilding) (up to 5 circuits) ❑ ❑ Circuits added/altered without service change ............ $54.60 Number of concessions ......................... (6 or more circuits)...............................................$7.65 ea ❑ Meter/mast repair ........................................................$68.25 ❑ Low voltage systems .................................................$59.85 (alarm, furnace thermostat) PERMIT APPLICATION NOTES - MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) .................................. $65.00 ❑ Temporary service (generator) ................................... $80.90 ❑ Manufactured/mobile home service ........................... $86.25 (excluding garage or outbuilding) ❑ Carnivals....................................................................$80.60 Number of concessions ......................... $10.80 ea Each ride and generator truck................$10.80 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Date:! Print Name: -t- / Day Telephone: 7-05- Z60 5 %iv l Mailing Address: J7 15- , 7 3��/��Ql� �� �Ilri'UC City State Zip o H:\Applications\Forms-Applications On Line\2014 Applications\Electrical Pemit Application Revised 1-1-14.docx Revised: July 2013 bh Page 2 of 2 DESCRIPTIONS PAID PermitTRAK $69.87 EL16-0834 Address: 90 ANDOVER PARK E Apn: 0223000040 $69.87 Credit Card Fee $2.04 Credit Card Fee R000.369.908.00.00 0.00 $2.04 ELECTRICAL $67.83 ADDITIONAL PLAN REVIEW TOTAL FEES PAID ' 11000.345.830.00.00 1.00 $67.83 6. .87 Date Paid: Monday, November 13, 2017 Paid By: EDWARD A WHITE Pay Method: CREDIT CARD 09478A Printed: Monday, November 13, 2017 9:26 AM 1 of 1 R SYSTEMS DESCRIPTIONS ACCOUNTQUANTITY PAID PermitTRAK $134.66 EL16-0834 Address: 90 ANDOVER PARK E Apn: 0223000040 $67.83 ELECTRICAL $67.83 ADDITIONAL PLAN REVIEW R000.345.830.00.00 1.00 $67.83 PG16-0091 Address: 90 ANDOVER PARK E Apn: 0223000040 $66.83 PLUMBING $66.83 ADDITIONAL PLAN REVIEW TOTAL PAIDBY RECEIPT:, R000.345.830.00.00 1.00 $66.83 .66 Date Paid: Monday, May 01, 2017 Paid By: E A WHITE CONSTRUCTION Pay Method: CASH Printed: Monday, May 01, 20171:31 PM 1 of 1 CR SYSTEMS DESCRIPTIONS PermitTRAK PAID $5,820.78 EL16-0834 Address: 90 ANDOVER PARK E Apn: 0223000040 $5,820.78 ELECTRICAL $5,543.60 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $5,543.60 TECHNOLOGY FEE $277.18 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R9676 R000.322.900.04.00 0.00 $277.18 $5,820.78 Date Paid: Tuesday, October 18, 2016 Paid By: TUKWILA TSD LLC Pay Method: CHECK 1025 Printed: Tuesday, October 18, 2016 3:29 PM 1 of 1 (�r771"T SYSTEMS Date Paid: Tuesday, September 13, 2016 Paid By: TUKWILA TSD LLC Pay Method: CHECK 1023 Printed: Tuesday, September 13, 2016 1:51 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3 Permit Inspection Request Line (206) 438-9350 Project: ` A Type of Inspection: ^ Address: q0 4 Date Called: Special In tructions: Date Wanted: a. 5 (� p.m. Requester: Phone No: 2�– Approved per applicable codes. E Corrections required prior to approval. &-70 nspector: F] REINSPECTION(FEE REQUIRED. Prior to next inspection, lee most be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Q Retain a copy with permit INSPEC ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 Permit Inspection Request Line (206) 438-9350 Project:Type Ajj of Inspection: r . Address:�1 Y J n� Date Called: Special Instructions: Date Wanted: m. AY p. Y. k�r 61- cc Requester: Phone No: YK CNO Approved per applicable codes. I`J Corrections required prior to approval. A �i O 1Is� i i `-I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PER N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-36 Permit Inspection Request Line (206) 438-9350 Project: AL-'( Type of Inspection: Address: IL/ tor Date Called: Special Instru tions: 1 Date Wanted: M. P. Requester: Phone No: nApproved per applicable codes. LJ Corrections required prior to approval. `---J paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit IOU 117 --Oki I INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 116Lr f Type of inspection: Address:© ry l• Date Called: Special Instructions: Date Wanted: a. p.ni Requester: Phone No: 7 5k ❑ Approved per applicable codes. LJ Corrections required prior to approval. I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. �'j INSPECTION RECORD �J Retain a copy with permit "� INSPECTION N0. PERma N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., 4100, Tukwila. WA 98188 (206) 431 - Permit Inspection Request Line (206) 438-9350 Project: e r r Type f nspe tion: 6' I �Ij tT Address: toe 1,, Date Call d: Special Instruct' ns: Date Wanted: C a.m. Requester: Phone No:� 75'6-� u Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: J nspector: Date: N REINSPECTION FEE REQUIRED. Prior to next inspection,'fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. �� INSPECTION RECORD Retain a copy with permit ful, --09 3V, INSPECTION N0. PrRMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 4 Permit Inspection Request Line (206) 438-9350 Project: ^ � Type of Inspection: i Address: s^ q0 c Date Called: Special Instructions: Date Wanted: a.m. .m. Requester: Phone No: ❑ Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: t r -'t I n .y nspector: F1 REINSPECTI0O FEE REQUIRED. Prior to next inspectidn, fee'must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit tAY 'A A: INSPECTION N0. PE MIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project:/ r / 1 ASI Type of Inspection: Address: 44) A& Date Called: - Special In ructions: Date Wanted: a. p.m. Requester: Phone No: 759 Approved per applicable codes. EJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD QQ?� Retain a copy with permit INSPECTION NO. P RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3 1 Permit Inspection Request Lin1 e (206) 438-9350 Project: AD" � Type of Inspection: Address: DO EY Date Called: Special In tructions: Date Wanted: ap p.m. Requester: Phone No: Oy RApproved per applicable codes. LJ Corrections required prior to approval. COMMENTS: °a or ,be �A (Inspector: ///I�,WA� IDate: U / 7118 REINSPECTIgN FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 outhcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit l 6�� INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: /4014� % Type of Inspection: Address: n Date Called: Special Instructions: Date Wanted: a.m.. p.m. Requester: Phone No: QApproved per applicable codes. LJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECT ON N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: t>n AW Type of Inspection: / Address: w 06 Date Called: Special Instructions: Date Wanted: a.m m. Requester: 1z I- [> Phone No: FlApproved per applicable codes. LJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -36 - Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection:., , Address: r Date Called: Special Instructions: J Date Wanted: p ® a.m p.m. Requester: Phone No: ✓` ✓ f', nApproved per applicable codes. LJ Corrections required prior to approval. " paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit 'o INSPECTlOfN N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project:(� �. �� 0 ofI ,pe` n Address: YO ate Called: Special Instructions: �g ` f t / 30 �f�. Date Wanted: y Requester: Phone No: 0 7� ❑ Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: d' s• � DOO � s l.���V ' IInspector: \,//p I //PI �I ( ;, L,IIz Iuate:t9/ / 0 I/ El REINSPECTICIN FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION N0, PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 140 �'''✓' 11d Type of Inspection: Address: 70 Date Called: Special Instructions: Date Wanted: a.m.. Requester: Pgj Phone No: ❑ Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: Pgj I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMfT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: � � /� / Type of Inspection: � r t� Address: Date Called: Special Instru tions: �n4LO6 Date Wanted: rU0p.m. a. Requester: Phone No: ol zq ElApproved per applicable codes. E Corrections required prior to approval. J 7— Ilnspector:� %j�Fy_"'" L'� 1Date: 0 f/QJ El REINSPECTIpN FEE REQUIRED. Prior to next inspection, fee must be paid at 630015outhcenter Blvd.. Suite 100. Call to schedule reinspection. ' INSPECTION RECORD Retain a copy with permit r INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: #01'nd A Type of Inspection: Address: LO a Date Called: ---/ Special Instr tions: Date Wanted: I Cm r Requester: Phone No: P�0 NO- DApproved per applicable codes. t—J Corrections required prior to approval. F] REINSPECTIONrEE REQUIRED. Prior to next inspection."fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD V Retain a copy with permit OS INSPECTION NO. P RMIT NO. CITY OF TUKWILA BUILDING DIVISION - 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-36 0 Permit Inspection Request Line (206) 438-9350 Project: ( Type of Inspection: Address: /A."7, Date Called: . I Special Instr ctions: Date Wanted: l ` p.m. Requester: Phone No: F] Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: ' tl Al t7- 'IL000 t - Tp �L7 l� paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. INSPECTION RECORD8 N -,, Retain a copy with permit i✓v� INSPEC ION NOPERMIT NOCITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:/ �r Type Type of Inspection: oL)1, r Address:V toe Called: Special Instructions: Date Wanted: lc)� rp�mw-' Lt-65COLe D4©Z5 Requester: ZPhone No: 5-01 HO ❑Approved per applicable codes. LJ Corrections required prior to approval. I' paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD l a l� Retain a copy with permit -4 4 INSPECTION NO.. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: PM / �1 AIW Type of Inspection:do / l fl Address: Date Called: Special Instru ions: Date Wanted: a.m. / C)A-0 Requester: Phone No:.7 Y � g EJApproved per applicable codes. LJ Corrections required prior to approval. 17 1 INSPECTION RECORD I Retain a copy with permit o b -o- INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Address: v Date Called: Special Instructions: Date Wanted: a.m .m. Requester: Phone No: � s O Approved per applicable codes. LJ Corrections required prior to approval. I paid at 6300 Southcenter Blvd., Suite 100. Catl to schedule reinspection. l` INSPECTION RECORD/ (i� Retain a copy with permit X lVO INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: � � Type of Inspection: '1 Address: � AP Date Called: Special Instructions: Date Wanted: /0 Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Ilnspector: — 714 ')N f� IDate: oloI / �.7 F] REINSPECTIOA FEE REQUIRED. Prior to next inspection, fee "must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD F -K Retain a copy with permit INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:H�, D Al D4y A Type of Inspecti U( Address: � n� Bate Called: Special Instructions: Date Wanted: 1drn. ®L0 p. Requester: Phone No: u Approved per applicable codes. LJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: VI � � Type of Inspection*� Address: / Date Called: Special Instructions: Date Wanted: a.m Requester: Phone No: 08 7gy, ❑ Approved per applicable codes. LJ Corrections required prior to approval. /V paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit 1(,,6 J -00y ' , INSPECTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:/� DAI Type of Inspection:A14 Address: Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: RApproved per applicable codes. LJ Corrections required prior to approval. LJ paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. /INSPECTION RECORD Retain a copy with permit 1% ' '-0, INSPECTION NO. PERMIT NOiq . CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Q 1 Address: o Date Called: Special �In�s actions: Date Wanted: a.m. Requester: Phone No: FlApproved per applicable codes. LJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. If INSPECTION RECORD y� 1 Retain a copy with permit INSPECTION NO. P RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: ' rT Type of Inspection: Address: V date Called: Special Instructions: Date Wanted: a.m .m. Requester: Phone No: nApproved per applicable codes. LJ Corrections required prior to approval. " paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD 0 Retain a copy with permit ]" INSP CTION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 ress s: uate wanteo:a.rp G7 � •m - Eeque Approved per applicable codes. EI Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORDU14 Retain a. copy with permit a INSP CTION NO. PER N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: AUbAl Type of Inspection: Address: Date Called: Special Instructions: Date Wanted: 6:m. p.m Requester: � w �(`"► 4k&? Phone No: �� 7 na. a nApproved per applicable codes. LJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. �Q INSPECTION RECORD u Retain a copy with permit��� INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 St' P i ho A. Project: � Type of Inspection: 40A4 1 Address: Date Called: Special In ructions. Date Wanted: a. .m. Requester: Phone No: �—D f U1 g723 Approved per applicable codes. Corrections required prior to approval. COMMENTS: o/ EL) St' P i ho A. e L-J� P i I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPEC ION NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 0 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: r Type of Inspection: Address: V-0 Date Called: Special Instru tions: Date Wanted: Cm Requester: Phone No: ElApproved per applicable codes. 1-1 Corrections required prior to approval. I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD1 7 ✓���� Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3 Permit Inspection Request Line (206) 438-9350 Project-. 44DAi&J- Type of inspection: of 1 Address: &00—e Date Called: Special Instr ctions: Date Wanted: / Requester. Phone No: 7'v(—'P y DApproved per applicable codes. LJ Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD (� Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Address: Date Called: Special. Instructions: Date Wanted:a.m. m. Requester: Phone No: LWApproved per applicable codes. EJ Corrections required prior to approval. nspector. ate: El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORDmb— INSPECTION Retain a copy with permit �NO. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: r Address: �� Date Called: Special Instructions: Date Wanted: a. ��/_Ulo p.m. �� Requester: L 6 Phone No: '5—DJ 34�72, Approved per applicable codes. Corrections required prior to approval. COMMENTS: A110 Doe" [ mt;z�Q(Aj 11 A-1 X � ' 3 ®o • p�NW n1 tA/ (Inspector: ` � (Date: o 6h cl / 1-7 El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD r, - Ua Retain a copy with permit -00J INSPECTION NO. P RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: PAO Type of Inspection: Address: 41 tv Date Called: Special Instructions: Date Wanted: a: p.m. Requester: Phone No: ❑ Approved per applicable codes. E Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD"E. Retain a copy with permitINSPECTION NO. CITY OF TUKWILA BUILDING D6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: 8 W Address: Date Called: Special Instructions: Date Wanted: g ra-M, Requester: Phone No: Approved per applicable codes. E Corrections required prior to approval. COMMENTS: 61dI 1A .T() I paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION N0. PERMIT N10. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: /AN Type of Inspection: Address: 11-1Date G Called: Special Instructions: Date Wanted: a qLo z Requester: Phone No: ❑ Approved per applicable codes. 1-1 Corrections required prior to approval. U paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD � I Retain a copy with permit U��—a INSPECTION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:� �y p Type of Inspection:4/1 �� Address: LO Date Called: Special Inst uctions: Date Wanted: S a.m. Requester: (���` Phone No: �! 5— paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director September 15, 2017 DALE SWEENEY 5715 143 PL SE BELLEVUE, WA 98006 RE: Correction Letter # 1 to Revision #2 ELECTRICAL Permit Application Number ELI 6-0834 HOLIDAY INN EXPRESS - 90 ANDOVER PARK E Dear DALE SWEENEY, This letter is to inform you .of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: PW - R DEPARTMENT: Joanna Spencer at 206-431-2440 if you have questions regarding these comments. • 1. Sheet E0.2 shows the generator, however there is no conduit showing where it connects to. 2) PL2 and PL1 and conduit between them on the west side of Christensen Rd shall be inside the private property and not in the right of way. 3) Show existing 2 street lights and conduit on the east side of Christensen Rd per attached As -Built. 4) On east side of Christensen Rd instead of PLIs install three (3) ped lights same as on Andover Pk East. 5) See attached mark-up for additional comments. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two 2 sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. EL16-0834 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 VRMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL16-0834 DATE: 10/19/17 PROJECT NAME: HOLIDAY INN EXPRESS SITE ADDRESS: 90 ANDOVER PARK E Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # 1 X Revision # 2 after Permit Issued DEPARTMENTS: Building Division ❑ Fire Prevention ❑ Planning Division ❑ 3)s AP I � Public Works Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 10/24/17 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11/21/17 Approved Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 �ERMIY COORD COPY. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL16-0834 DATE: 08/23/17 PROJECT NAME: HOLDAY INN EXPRESS SITE ADDRESS: 90 ANDOVER PARK E Original Plan Submittal Revision # Response to Correction Letter # X Revision # 2 before Permit Issued after Permit Issued DEPARTMENTS: ,�s A1C, 61"17 Building Division ❑ Fire Prevention ❑ Planning Division ,-�S CorfI2 q"L"7 _ Public Works C Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 08/29/17 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 09/26/17 Approved ❑ Approved with Conditions ❑ Corrections Required Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVI:EWER'S INITIALS: DATE: Permit Center Use Only (� 1 c CORRECTION LETTER MAILED: —! - `V 1 Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW E" Staff Initials: VV ` 12/18/2013 PERMIT COORD COPY, PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL16-0834 DATE: 04/18/17 PROJECT NAME: HOLIDAY INN EXPRESS SITE ADDRESS: 90 ANDOVER PARK E Original Plan Submittal Revision # before Pen -nit Issued Response to Correction Letter # X Revision # 1 after Permit Issued DEPARTMENTS: J � �ilding Division Fire Prevention ❑ Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 04/20/17 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05/18/17 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 eERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL16-0834 DATE: 09/12/16 PROJECT NAME: HOLIDAY INN EXPRESS SITE ADDRESS: 90 ANDOVER PARK E X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: J? APF �1 Building Division Fire Prevention ❑ Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 09/13/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: DATE: DUE DATE: 10/11/16 Approved with Conditions ❑ Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PROJECT NAME-MG� Inn 14 PERMIT NO: SITE ADDRESS: a ZYPAM 6 ORIGINAL ISSUE DATE: 1 I REVISION LOG REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS ( -� Summary of Revision: 0 Received b / REVISION NO. DATE RECEIVED STAFF INITI LS ISSUED DATE STAFF INITIALS ,1 Summaiy of Revision: ?-A61 W dv V Received please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.cov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: ❑ Response to Incomplete Letter # Response to Correction Letter # J_ �— Revision # 1- after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: Z. -,m ,CXnrrss Project Address: 4e '„Ave r- Contact Person: Phone Number: Alf -4-e38 Summary of Revision: /j 9 oo 71-0 4 - RECEIVED CITY OF TUKWILA PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: —�C-. �?4 Entered in TRAKiT on ` W\Permit CenteffemplatesTorms\Revision Submittal Form. doc Revised: August 2015 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.cov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 5—;Z -V - / 7 ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # Plan Check/Permit Number: E1 I b- Dg 3 ® Revision # 2 _ after Permit is Issued [ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal.# Project Name: 1161(A"d i� ►. 'Exo rcSs Project Address: & 14K1l o a.,r At- x e �-w Contact Person: Xi,� &v %uGr Phone Number: TD.1? Summary of Revision: v� /c r -f- P e O i S-Pgl Flec N4,,k r Xr-P C- 2 ` 2Po��rl�rc�r.. %co A/ RECEIVED CITY OF TUKWILA AUG 2 3 2017 Rmfr CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision C Received at the City of Tukwila Permit Center by: �— Entered in TRAKiT on 00'!-�'f W:\Fermit Center7emplates\Forms\Revision Submittal Form.doc. Revised: August 2015 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http:Hwww.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: `I �8 — Plan Check/Permit Number: IFF I Z — 093 Ll ❑ Response to Incomplete Letter # Response to Correction Letter # �— Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: o Project Address: S Contact Person: leer- Phone Number: SO 3 9/f - 0e3Y Summary of Revision: RECEer�U CITY OF TUKWILA PERMIT CENTER Sheet Number(s): ��_ "Cloud" or highlight all areas of revision including date of rev' ion r Received at the City of Tukwila Permit Center by: [�r —Entered in TRAKiT on 1-t�( 1 W:\Permit CenterUemplatesTorms\Revision Submittal Formdoc Revised: August 2015 ACE ELECTRIC INC kiWashington State Department of Labor & Industries ACE ELECTRIC INC Owner or tradesperson Principals Gutzmer, Roger Gregory, PRESIDENT Gutzmer, Lora L, VICE PRESIDENT GUTZMER, ROGER GREGORY, AGENT Doing business as ACE ELECTRIC INC 1 -tome Espahol Contact Safety & Health Claims & Insurance 1165 COLUMBIA PARK TRAIL RICHLAND, WA 99352 509-366-9723 BENTON County WA UBI No. Business type 601 985 206 Corporation Governing persons LEO R GUTZMER ROGER GREGORY GUTZMER; License Page 1 of 2 Search L&1 A -Z Index Help my I'm Workplace Rights Trades & Licensing Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. ............................................................... Meets current requirements. License specialties GENERAL License no. ACEELI'003CM Effective — expiration 02/14/2000— 08/11/2018 Designated administrator GUTZMER, ROGEf2'GREGORY License type Electrical Administrator Bond ................ Wesco Insurance Co Bond account no. 46-WBO79867 Received by L&I 09/19/2016 Bond history Savings Ne'savings accounts during the previous 6 year period. License Violations No'iicerise violations during the previous 6 year period. Active. Meets current requirements. License no. GUTZMRGO92RG $4,000.00 Effective date 09/21/2016 Expiration date Until Canceled Help us improve https://secure.Ini.wa.gov/verify/Detail.aspx?UBI=601985206&LIC=ACEELI*003CM&SAW= 12/15/2016 ACE ELECTRIC INC Page 2 of 2 Workers' comp 1 Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 574,404-03 ................................. Doing business as ACE ELECTRIC INC Estimated workers reported Quarter 3 of Year 2016 "11 to 20 Workers" L&I account representative T4 / MELVINA RAMSDELL (360)902-4814 - Email: RAMM235@lni.wa.gov Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. 0 Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve 1 I https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=601985206&LIC=ACEELI*003CM&SAW= 12/15/2016 F. /, - i 10 { C 13 "I + > . i - VIA LCP , : r - I - ✓ - _ REVISIONS t� made to th,'sco MO changes n p P. I ; I I 9 I f 4�brk `� Ithai.. -)r�r approval f I r r;. F� � - �1 I {{ t A II , 1 1 . �l a � 'la �t1 C1i1"1Division. ;, iJ r, r s r ... w_. , 4 P`v.11sicns 4vifL require a neva plan submittal 10 . --_ and may include. additional plan review fees- NORTH SITE PLAN_Y Y FLAG NOTES li::> PROVIDE 2"C(PVC SCHED 40),2#8,1#8 GND(CU) BETWEEN LUMINAIRES. R�> PULL/SPICE BOX LOCATION IS APPROXIMATE. FIELD VERIFY BOX LOCATION PRIOR TO UNDERGROUND CONDUIT INSTALLATION. CONNECT NEW LUMINAIRES TO EXISTING STREET LIGHT. R�> DISCONNECT AND REMOVE EXISTING STEET LIGHT LUMINAIRE. DISPOSITION OF REMOVED FIXTURE TO BE DETERMINED BY CITY OF T,� PUBLIC WORKS. PROVIDE WEATHERPROOF SPLICE BOX AT REMOVED LUMINAIRE LOCATION — SPLICE REMAINING CONDUCTORS TO RETAIN EXISTING CIRCUIT CONTINUITY. 40W BRACKET MOUNT PEDESTRIAN AREA LIGHT MOUNTED ON 16' POLE. VERIFY EXACT FIXTURE 'AND REQUIREMENTS WITH CITY OF TUKWILA. (TYPICAL FOR 4 LUMINAIRES). RECEIVED CITY OF y UKWILA AUG 23 2017 PERMIT CENTER 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: SITE PLAN Designed By: RB Drawn By: MB Project No: 16195 Date: 05/19/2017 Sheet Number: 11W FORAGE a 11:, n , S OkAGL SERVER �.� P1A-15 PIA 17 �_MG _� —22,2 L �P18 4 COP _ ELEVATOR L I *P1 B 26 H CHE C!<_IN �Permit LOBE` - - ! _ 1 _ P18-13 (A rALJ n�ty �io��_ P1A-19 I.�— P B 15 � P1A 23 WPI;,F16-177 E10 101 P16 '28 P1D-20,22 ! - ❑cR I------� P18-13 P1B-19 .,...- P.Ft? ,�, 'r ,c 'r . ;; " _ - _ , , •.,,... , I �I , • = of to error ? i �© �,[[.�,, 1 c o Pl�r or con �£, ., k.�U� tir�� ; P1D-18 MADNKF • "— p1A-23 i Approval cf iiIS Ci^���� P1B-11 E 10� l i LUGGAGE I the violation ofr� , CORRIDOR l PtA-21 SIORf�GL j i', , � - _ _ j !��tf3 ®� C3t'�.�?�,_..w.ti. P1D-2 ( _ 1 i --J [-111. - - - - -- -L� —of -app oved-Fi Copy' a it r ...dld o � o cod P1 D py itiii ea:.�ar:G:'v�t�f'r d: I C0� ions .4 �. f 131 D-2 I 1Dif , 8 H -_, P16-9 _- P1D-4 FCU 4A i OP1D-10 Date: 7 "�" 7 i 1 4W *P1D-3 _ P1B' 7� P1B1 s'� _ I'�I BUILDING DIVISION t RECEIVE® CITY OF TUKWILA APR 18 2017 -- --���� PERMIT CENTER Holiday Inn Express Tukwila, WA Sheet Title: LEVEL 1 POWER & COMMUNICATIONS PLAN Designed By: RB Drawn By: MB Project No: 16195 Date' 09/07/2016 -- -------- -- 0 NFPA 70 - N(4 �iANtheet Number: I NORTH FLOOR '• • • t APR 2 � 2017 C ty of Tukwila RUILDIN! P1 l l ►N 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PANEL'P1A' PANEL'P1B' PANEL'P1C' Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAIVE HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: PROJECT # 16195 PROJECT #: 16195 LOCATION: ELECTRICAL ROOM TUKWLA, WA TUKVMLA, WA FED FROM:NOTE MDP FED FROM MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G NOTE CKT NO. CKT CIRCUIT NAME NO. CBSIZE 8 AMIJ P R LOAD(KVA) I H I M L K G O TOTAL PANEL DESCRIPTION 1 RSCS - MEETING ROOM 129 A 20 1 0.5 1 1 0.5 PANEL AMPS : 200 3 RE'S - MEETING ROOM 129 B 20 1 0.5 RECS- LOUNGE 102 C 0.5 FEEDER AMPS L- L VOLTS L- NVOLTS PHASE: : 200 : 208 : 120 3 1_51 RBCS - MEETING ROOM 129 C 20 1 0.5 0.5 7 RBCS - PRE FUNCTION 130, STORAGE 131 A 20 1 0.4 0.4 9 RE'S - REST RMS 132 & 133 B 20 1 0.4 r 0.4 11 REES - SALES OFFICE 117 Cl20 7 REFS - LOUNGE 102 A 20 1 0.5 0.5 1 0.4 1 0.3 0.7 WIRE: 4 13 RECS - GEN MAN. 115 A 20 1 0.5 0.3 0.8 15 RECS- WORK AREA 113 B 20 1 0.4 1 17 REO- MARKET 109 C 20 1 1.0 1,0 0.4 M.L.O. X 17 RE3CS - WORK AREA 113 C 20 1 0.4 0.4 19 RECS - CHECK IN 110 A 20 1 0.2 0.2 21 RSCS- CHEEK -IN 110 B 20 1 0.4 ML.O. MAIN CB X 0.4 MAIN CB FLUSH SURFACE X REES- SEWER 112 23 RBCS- CHECK-IN 110 C 20 1 0.4 0.4 25 SPARE A 20 1 27 SPARE B 20 1 1.5 FLUSH SURFACE X A ISO GID FEED-THRU 27 - B 29 SPARE C 20 1 31 SPARE A 20 1 2.6 ISO GND 1.0 1.0 29 TO -1 33 SPACE ONLY B - 1 0.1 FEED-THRU 0.1 FEED-THRU 1 35 33 35 SPACE ONLY C - 1 37 SPlACEONLY A - 1 C 0.1 1 0.4 0.1 LOADSUMMARY (TOTAL,ALL SECTIONS) 39 SPIACEONLY B - 1 1 41 SPACE ONLY C - 1 - 1 LOADSUMMARY 20 RW KVA : 5.6 2 WASHER - LAUNDRY 123 A 20 3 1.2 4 - B - A - 1.2 41 ISRAFE 1 0.2 HEAT KVA 20 6 - C - SPACE ONLY C 1.2 1 4 MOTOR KVA : 18.9 8 WASHE32-LAUNDRY 123 A 20 3 4 1.2 812. 20 LIGHTING KVA KITCHEN KVA 0.5 10 - B - - 1.2 12 - C - - 6 RE ES- CORRIDOR C1 20 1 0.4 0.4 1.2 0.8 2.0 GEN LTG KVA : 0.8 14 WASHER- LAUNDRY 123 A 20 3 1,0 1.2 0.8 2.0 OTHER KVA : 6.8 16 - B - - 0.5 1.2 0.5 1.7 PHASEA KVA : 10.6 18 - C - 1 1.0 1.2 0.5 1.7 AMPS PHASE KVA AMPS PHASE C KVA : 88.2 : 10.4 : 86.3 : 11.2 20 WASHER- LAUNDRY 123 A 20',-3 1.2 1,2 22 - B - - 1.2 0.2 1.4 24 - C - - 1.2 0.8 2.0 26 DRYER- LAUNDRY 123 A 20 1 1.1 AMPS : 1.1 AMPS : 93.1 28 DRYER- LAUNDRY 123 B 20 1 1.1 PHASE B KVA : AMPS : 1.1 22 DRYER- GUEST LAUNDRY 107 B 30 2 2.0 0.5 2.5 24 - 30 DRYER- LAUNDRY 123 C 20 1 1.1 PHASE C KVA : 1.1 26 WASHER - GUEST LAUNDRY 107 32 DRYER- LAUNDRY 123 A 20 1 1.5 1.1 1.5 1.1 CONNEETEDLOAD 34 REFRIGERATOR - BREAK 125 B 20 1 20 0.8 OONNECTED LOAD 0.8 KVA : 32.1 36 RE3rS- BREAK 125,121,119N C 20 1 0.7 20 1 0.7 AMPS : 89.1 38 SPARE A 20 11 SPARE B 20 1 D9VANDLOAD 40 SPARE B 20 1 33.4 36 SRARE C KVA : 32.0 42 SPARE C 20 IT---- AMPS: 92.6 38 SPACE ONLY AMPS : 88.8 NOTESIRBNARKS : I. 2. 3. 1 SPARE DE3VIAND / DIVERSITY FACTORS LOAD DESCRIPTION R RE�CB3TACLBS- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER 20 1 DEMAND 100% = 5.6 50% _ 100% _ 100% = 17.7 125% = 1.5 125% _ 65% _ PER NEC 220.44 = 0.4 100% = 6.8 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL'P1B' PANEL'P1C' Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: PROJECT # 16195 LOCATION: PROJECT#: 16195 LOCATION: TUKVMLA, WA NOTE CKT NO. FED FROM MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G NOTE CKT NO. CIRCUITNAME NOTE CKT NO. CIRCUIT NAME CBSIZE 8 A P R LOAD (KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 RECS - BUSINESS CENTER 101 A 20 1 0.4 1 3 0.4 PANEL AMPS : FEEDER AMPS : 200 200 3 . RECS- BUSINESS CENTER 101 B 20 1 0.4 0.4 5 RECS- LOUNGE 102 C 20 1 0.4 C 20 0.4 L- L VOLTS : L- NVOLTS : PHASE: WIRE: 208 120 3 4 7 REFS - LOUNGE 102 A 20 1 0.5 0.5 9 RBCS - LOUNGE 102 B 20 1 0.5 0.5 11 TV- LOUNGE 102 C 20 1 1.0 1.0 13 REQ- E LEV LOBBY 108, STORAGE 111 A 20 1 0.4 1 1.2 0.4 WIRE : 4 15 RM- MARKET 109 B 20 1 1.0 1.0 17 REO- MARKET 109 C 20 1 1.0 1,0 19 REC-MARKET 109 A 20 1 20 1 1,0 1.0 ML.O. MAIN CB X CLG HTR - EMERG RM 128 21 RBCS - SERVER 112 B 20 1 1.5 1.5 23 REES- SEWER 112 C 20 1 20 1 1.5 1.5 FLUSH SURFACE X A 25 CU -1 A 40 2 2.6 2.6 27 - B - - 1 2.6 SPACE 2.6 ISO GND 1.0 1.0 29 TO -1 C 15 2 C 0.1 FEED-THRU 0.1 FEED-THRU 1 35 33 31 - A - - C 0.1 1 0.4 0.1 - 37 33 SPARE BI 20 1 35 SPACE ONLY C - 1 LOADSUMMARY 20 39 ISPARE B 20 37 SPACEONLY A - 1 41 ISRAFE 1 0.2 C 20 LOADSLIMMARY (TOTAL.ALL SECTIONS( 39 ISPACEONLY B - 1 41 SPACE ONLY C - 1 4 LIGHTS - GROUND FLOOR CORRIDORS B 20 RIS✓ KVA : 4.0 2 RECS - RR 134 A 20 1 0.4 0.4 4 RETS - CORRIDOR BI 20 1 0.5 20 11 0.5 HEAT KVA : MOTOR KVA : LIGHTING KVA 13.4 9.0 6 RE ES- CORRIDOR C1 20 1 0.4 0.4 8 RE3r- POOL 119S Al20 1 0.2 0.2 10 RED- FITNESS 118 BI 20 Ill 104.6 1.0 1.0 1,0 KITCHEN KVA 0.3 12 REC - FITNESS 118 C 20 11 20 1 1.0 0.5 1.0 GEN LTG KVA 3.8 14 RM- FITNESS 118 A 20 1 1 1.0 1.0 OTHER KVA : PHASEA KVA : 7.0 10.5 16 RM- FITNESS 118 B 20 1 1.0 1.0 18 DRYER- GUEST LAUNDRY 107 C 30 2 1 2.0 0.5 1 2.5 AMPS : 87.5 20 - A - 20 1 2.0 0.5 2.5 PHASE B KVA : AMPS : 12.5 104.5 22 DRYER- GUEST LAUNDRY 107 B 30 2 2.0 0.5 2.5 24 - C - - - 1 2.0 0.5 2.5 PHASE C KVA : 10.3 26 WASHER - GUEST LAUNDRY 107 Al20 20 1 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER 1.5 1.5 AMPS : 86.0 28 WASHER - GUEST LAUNDRY 107 B 20 1 1.5 1.5 30 SPEARE C 20 1 OONNECTED LOAD 34 SPARE B 20 32 SPARE A 20 1 36 ISPARE C CONNECTED D LOAD 34 SPARE B 20 1 38 SPARE A KVA : 33.4 36 SRARE C 20 1 40 SPARE B 20 AMPS: 92.6 38 SPACE ONLY Al20 1 SPARE C 20 1 DEMAND LOAD 40 SPACE ONLY B 20 1 DEMAND 100% 50% _ 100% = 100% _ 125% _ 125% = 65% PER NEC 220.44 = 100% = 16.9 0.3 KVA : 33.7 42 SPfAC E30NLY ICI 20 11 1 1 1 1 r AMPS : 93.6 NOTES,.IREtAARKS : 1. 2, 3, DEMAND / DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% = 4.0 50% _ 100% = 13.4 100% = 7.5 125% = 1.9 125% _ 65% _ PER NEC 220.44 = � 100% = 7.0 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL 'PID' PANEL'P1C' Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: PROJECT # 16195 LOCATION: TUKWILA, WA LOCATION: FED FROM: NOTE CKT NO. FED FROM: MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G NOTE CKT NO. CIRCUITNAME CBSIZE 6 AMP P R LOAD(KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 1 PARKING LOT LIGHTS - EAST A 20 2 0.6 0.6 PANEL AMPS : 200 1 3 - - - B -- CINNAMON WARMER- BREAKFAST 103 0.6 0.6 FEEDER A NPS : 200 1 5 PARKING LOT LIGHTS - WEST C 20 2 0.3 0.3 L- L VOLTS : L - NVOLTS : PHASE: 208 120 3 1 7 — A -- 0.3 0.3 9 LIGHTING CONTROL PANEL B 20 1 0.3 0.3 2 11 BUILDING SIGN- SOUTHWEST FACE Cl20 1.0 1 1.2 1.2 WIRE : 4 2 13 BUILDING SIGN- SOUTHEAST FACE Al20 1 1,2 1.2 2 15 BUILDING SIGN- SOUTH FACE B 20 1 1.2 1.2 2 17 BUILDING SIGN- NORTH FACE C 20 1 1.2 1.2 29 SPARE C 20 1 19 SPARE A 20 1 - 0.9 M.L.O. MAIN CB FLUSH X CLG HTR - EMERG RM 128 2 21 LIGHTS - PORTE OOCFERE B 20 11 1 0.5 0.5 23 LIGHTS -POOL AREAS, FITNESS C 20.11 1,2 1.2 --- 25 SPARE A 20 1 23 CLG HTR- POOL EQUIP 121 Cl15 2 1.0 1.0 25 - - - Al-- - 1.0 1.0 SURFACE X A 2 - 27 SPARE B 20 1 39 SPACE ISO GND 2 1.0 1.0 29 SPARE C 20 1 C 1.0 FEED-THRU - 31 SPARE A 20 1 1 35 33 SPARE B 20 1 RECS - BOARD 105 C 20 1 0.4 35 SPARE C 20 1 - 37 SPARE A 20 1 12 PREP TA BLE RECS - PA NTRY 104 LOADSUMMARY 20 39 ISPARE B 20 1 10 WATER HEATER IGNITION CIRCJT B 20 1 0.2 0.2 14 I T O T A L, A L L S E C T 10 N S1 A 41 ISRAFE 1 0.2 C 20 1 OTHER KVA 16 --- B -- - 0.8 0.8 REC KVA SPARE 2 SPARE A 20 1 20 4 LIGHTS - GROUND FLOOR CORRIDORS B 20 1 0.5 0.5 9 HEAT KVA FCU-4A,B,C,D A 6 LTS - UTILITY, BREAK RM, EMP REST RM C 20 11 0.7 0.7 MOTOR KVA LIGHTING KVA : KITCHEN KVA 13.5 8 LTS - FR DESK MARKET,FEATWALL,OFFIC A 20 1 1.0 1.0 10 LTS - LOBBY, BUSINESS AREA B 20 1 0.8 0.8 0.8 12 LTS -BOARD RM, PANTRY,BREAKFAST Cl20 104.6 1 1.0 1.0 GEN LTG KVA OTHER KVA : 0.3 14 LTS - LAUNDRY A 20 1 0.7 0.7 A 60 16 LTS - MEETING RM., REST ROOMS B 20 1 0.5 0.5 PHASEA KVA : 3.8 5.4 18 SPARE C 20 1 - AMPS : PHASE BKVA : AMPS : 31.6 4.4 36.8 20 SPARE A 20 1 22 SPARE B 20 1 B 20 24 ISPARE C 20 1 1 PHASE CKVA : 5.6 CONNECTED LOAD 26 SPARE A 20 1 AMPS : 46.8 37.2 103.4 28 SPARE B 20 1 DEMANDLOAD 30 SPARE C 20 1 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% PER NEC 220.44 = 100% = KVA : 32 SPARE A 20 1 OONNECTED LOAD 34 SPARE B 20 1 DEMAND/DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAININGOI/ER10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER KVA : 13.8 36 ISPARE C 20 1 AMPS : 38.4 38 SPARE A 20 1 DEMAND LOAD 40 SPARE B 20 1 KVA : 17.2 42 SPARE C 20 1 AMPS : 47.7 NOTES/REMARKS: 1. CONNECT THRU 4P CONTACTOR AT LCP 2. CONNECT THRU LIGHTING CONTROL PANEL RELAY 3, DEMAND/DIVER TYFACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC 0 OTHER DEMAND 100% 50% _ 100% = 100% _ 125% _ 125% = 65% PER NEC 220.44 = 100% = 16.9 0.3 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL 'PID' 16195 Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAIVE: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA PROJECT It 16195 LOCATION: TMMLA, WA NOTE CKT NO. FED FROM: MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G O TOTAL PANEL DESCRIPTION NOTE CKT NO. CIRCUIT NAME CB SIZE OFAMP P R LOAD (WA) H M L K G O TOTAL PANEL DESCRIPTION 1 REFRIGERATOR- BREAKFAST 103 A 20 1 3.0 0.4 0.4 PANEL AMPS : 200 3 CINNAMON WARMER- BREAKFAST 103 B 20 1 : 208 0.7 0.7 FEEDER AMPS : L - L VOLTS : L- NVOLTS : PHASE : WIRE : 200 208 120 3 4 5 HOT WATER- BREAKFAST 103 C 20 1 1.0 1.0 7 HOT FOOD- BREAKFAST 103 A 2011 1.7 1.7 9 TOASTER- BREAKFAST 103 B 20 11 1.8 1.8 11 PANCAKE MACHINE- BREAKFAST 103 C 20 1 1.7 1.7 13 JUICE MACHINE- BREAKFAST 103 A 20 1 0.4 0.4 15 AIRPOT RACK- BREAKFAST 103 B 20 1 PHASE WRE 1.0 1.0 M.L.O. IVAINCB X FLUSH SURFACE X ISO GND FEED•THRU 15 17 AIRPOT RACK- LOUNGE 102 C 20 1 1.0 1.0 19 FCU -5,6,7,8 A 20 1 1.1 1.1 21 --- B -- - 1.1 1.1 23 SPARE C 20 1 1 25 SPARE A 20 1 27 SPARE B 20 1 29 SPARE C 20 1 31 BATH DCH FAN BEF-1 A 20 13 0.9 0.9 33 --- B -- - 0.9 27 SPACE B 0.9 CLG HTR - EMERG RM 128 AI 15 35 --- C -- - 0.9 31 SPACE A 0.9 23 CLG HTR- POOL EQUIP 121 Cl15 2 1.0 1.0 25 - - - Al-- - 1.0 1.0 37 SPACE A 2 - 0.9 9 0,9 .9 ISOGND HR LOADSUMMARY (TO TA L, ALL SEC TIO N S I LOADSUMMARY 39 SPACE B 2 1.0 1.0 39 --- B -- - 9.5 9.5 REC KVA HEAT KVA MOTOR KVA : LIGHTING KVA ITO TAL.ALL SECTIONS ) 41 SPACE C 1.0 1.0 - B 1 35 REC KVA : HEAT KVA : 1.4 4.2 2 RSCS - BOARD 105 A 20 1 0.5 0.5 4 RSCS - BOARD 105 B 20 1 0.4 0.4 6 RECS - BOARD 105 C 20 1 0.4 A -- - 0.4 MOTOR KVA : LIGHTING KVA KITCHEN KVA : 20.0 11.6 8 UC TABLE- PANTRY 104 A 20 1 0.5 0.5 10 UCTABLE- PANTRY 104 B 20 1 0.5 0.5 12 PREP TA BLE RECS - PA NTRY 104 C 20 1 KV 0. HEAT KVA : 28.0 MOTOR KVA : 23.2 LIGHTING KVA : 0.3 KITCHEN KVA 1.0 1.0 GEN LTG KVA 10 WATER HEATER IGNITION CIRCJT B 20 1 0.2 0.2 14 RECS - PANTRY 104 A 20 1 0.2 0.2 GEN LTG KVA OTHERKVA PHASEA KVA 0.2 OTHER KVA 16 --- B -- - 0.8 0.8 16 SPARE B 20 1 0.8 A MPS : 150.0 PHASEA KVA : AMPS : 11.8 98.3 18 EH -2 C 20 1 1.5 1.5 20 FCU-4A,B,C,D A 20 2 0.8 24 - - - C - - 0.8 PHASEB KVA : 12.6 22 - B - - 0.8 0.2 0.8 AMPS : 104.6 24 HP -4 C 50 3 5.4 A 60 5.4 PHASE KVA : 12.9 26 - A - - 5.4 5.4 5.4 AMPS : 107.4 28 - B - 5.4 DEMAND LOAD 5.4 ISPARE B 20 30 ISPARE C 20 1 32 1 SPARE A 20 1 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC O OTHER CONNECTED LOAD 34 SPARE B 20 1 KVA : AMPS : 37.2 103.4 36 SPARE C 20 1 38 SPACE A DEMANDLOAD 96,6 268.1 40 SPACE B DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% PER NEC 220.44 = 100% = KVA : 34.5 42 SPACE C AMPS : 95.8 NOTESIREMARKS : 1. 2 3. DEMAND/DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAININGOI/ER10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 1000/0 = 500/0 _ 1000/0 = 1000A = 125% = 125% _ 65% = PER NEC 220.44 = 100% _ 1.4 4.2 14.6 6.8 7.6 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL'P5E' 16195 Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: MDP FED FROM: P1 TUKW LA, WA NOTE CKT NO. CIRCUITNAME CBSIZE 0 AMPI P R LOAD (WA) H M L K G O TOTAL PANEL DESCRIPTION 1 HP1 A 40 2 3.0 3.0 PANEL AMPS : 200 3 - - - B -_ 3 - B - - 2.1 2.1 3.0 3.0 FEEDER AMPS : 200 5 HPR2 A 40 2 3.0 3.0 L - L VOLTS : 208 7 --- B -- 20 3.0 3.0 L- NVOLTS ; 120 9 DCU-1 POOL UNIT A 15 2 10.7 0.7 PHASE WRE : 3 : 4 11 _ B -- - 0.7 0.7 13 WALL HEATER EVVH-I (STAIR2) A 20 11 1.5 1.5 15 HR -3 B 40 2 3.0 3.0 17 --- C -- X 3.0 3.0 25 SPACE A 27 SPACE B 19 CLG HTR - EMERG RM 128 AI 15 2 1.0 1.0 M.L.O. MAIN CB FLUSH SURFACE X -K 31 SPACE A 21 - - - B - - - 1.0 1.0 23 CLG HTR- POOL EQUIP 121 Cl15 2 1.0 1.0 25 - - - Al-- - 1.0 1.0 27 29 FAN COIL 1,2,3 --- B 15 -- 2 - 0.9 9 0,9 .9 ISOGND HR LOADSUMMARY (TO TA L, ALL SEC TIO N S I B 1 31 POOL CIRCULATING PUMP A 20 2 1.0 1.0 39 --- B -- - 9.5 9.5 REC KVA HEAT KVA MOTOR KVA : LIGHTING KVA 33 --- B -- - 1.0 1.0 - B 1 35 POOL NICHE LIGHT C 20 1 0.3 0.3 12 - C - 2.1 2.1 14 SPARE Al20 1 37 --- A -- - 24 SPACE C 26 SPACE A LOADSUMMARY (TOTAL, ALL SECTIONS ) 39 POOL CHEMICAL FEED RECEPTACLES B 20 1 0.5 0.5 41 POOL HEATER CONTROLS C 26 1 1 0.5 0.5 KV 0. HEAT KVA : 28.0 MOTOR KVA : 23.2 LIGHTING KVA : 0.3 KITCHEN KVA 2 YI&ZM AN 2 1 0, 2 4 WATER HEATER IGNITION CIRCJIT B 20 1 0.2 0.2 6 WATER HEATER IGNITION aRCJIT C 20 1 0.2 1 0.2 8 WATER HEATER IGNITION CIROJTT A 20 1 0.2 1 0.2 10 WATER HEATER IGNITION CIRCJT B 20 1 0.2 0.2 12 CLG EXH FAN- POOL RR, EMPLOYEE RR C 15 1 0.2 0.2 GEN LTG KVA OTHERKVA PHASEA KVA : 0.5 : 18.0 14 RCP1 DOMESTIC HOTWATER?UMP A 15 3 0.8 0.8 16 --- B -- - 0.8 0.8 18 - - - C -_ 0.8 0.8 A MPS : 150.0 20 SPARE A 15 3 KVA ; PHASEB KVA AMPS PHASE C KVA AMPS : 17.6 : 146.7 : 16.9 : 140.8 22 - - - B -- - 24 - - - C - - 26 BATH EACH FAN BEP2 A - - - 0.9 0.9 28 --- B -- - 0.9 0.9 1 0.2 30 --- C -- - 0.9 0.9 SPARE 32 POOL AREA HEATING UNIT DE aI-1 A 60 3 5.4 5.4 CONNECTED LOAD 34 - - - B - - - 5.4 5.4 WA : 52.5 A MPS : 145.7 36 - - - C -_ 5.4 5.4 38 SPARE A 20 1 DEMAND LOAD 40 ISPARE B 20 1 36 SPACE KVA : 53.3 AMPS : 148.0 42 ISPAFE C 20 11 NOTESIREMIARKG4 : 1. PROVIDEGFCI CIRCUIT BREAKER 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 0.5 500/0 _ 100% = 28.0 100% = 20.2 125% = 3.8 125% = 0.4 65% _ PER NEC 220.44 = 100% = 0.5 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: MB PANEL'P5E' 16195 Date: 09/07/2016 PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: 16195 LOCATION: 4TH FLOOR TUKWILA, WA PROJECT #: 16195 FED FROM: P1 TUKW LA, WA FED FROM: MDP/GENSETVIA TRANSFER SWITCH NOTE CKT NO. CIRCUIT NAME CBSIZE 8 A1VF1P R LOAD(KVA) H M L K G 0 TOTAL PANEL DESCRIPTION 1 ELEVATOR PRESSURIZATION FAN A 35 3 2.1 2.1 PANIEL AMPS : FEEDER A MPS : I L- L VOLTS : 100 100 208 3 - B - - 2.1 2.1 5 - C - - 2.1 . 7 STAIRVVELL PRESSURIZATION FAN S A 35 3 2.1 2.1 L- N VOLTS: PHASE : WIRE : 120 3 4 9 - B - - 2.1 2.1 11 - C - - 2.1 2.1 13 SPARE A 20 1 15 SP1 B 20 1 1.1 1.1 17 SP -2 C 20 1 1.1 1.1 19 SPACE 15 SPARE B 20 1 17 SPAM C 20 1 19 SPACE A M.L.O. MAIN CB FLUSH X X 400A M.L.O. X 25 SPACE AlSURFACE 21 SPACE B MAIN CB FLUSH SURFACE ISO GND FEED-THRU X 23 SPACE C 25 SPACE A 27 SPACE B 29 SPACE C A FEED THRU 31 SPACE A 33 SPACE B B C C A LOADSUMMARY (TO TA L, ALL SEC TIO N S I B PANEL P5E- ROOF MECHANICAL FANS A 100 3 C 9.5 LOADSUMMARY (TOTAL, ALL SECTIONS( 39 --- B -- - 9.5 9.5 REC KVA HEAT KVA MOTOR KVA : LIGHTING KVA 28.5 2 OORRDORSMOKECONTROLIXHAUSTFAN A 50 3 3.1 3.1 4 - B - 3.1 3.1 6 - C - - 3.1 3.1 8 STAIRWELL PRE SSUREATION FAN N A 35 3 2.1 2.1 10 - B - - 2.1 2.1 KITCHEN KVA GEN LTG KVA OTHER MVA PHASEA KVA : AMPS : B KVA : AMPS : PHASE C KVA : AMPS : 9.5 79.1 9.5 79,1 9.5 79.1 12 - C - 2.1 2.1 14 SPARE Al20 1 16 SPAM B 1 20 1 18 SPARE C1 20 1 20 SPACE AlPHASE 22 SPACE B 24 SPACE C 26 SPACE A 28 ISPACE B 30 ISPACE C 1 0.2 A 0.2 LIGHTING KVA : KTTCFE N KVA GEN LTG KVA OTHER KVA : 4.4 1.3 10 ELEVATOR ROOM LIGHTS B 20 1 0.2 0.2 CONNECTED D LOAD 14 EMERGENCY LTS - LOBBY, W OORRIDORS A 20 1 0.5 0.5 16 B B 20 1 KVA : AMPS : 28.5 79.0 C 30.2 251.6 29.4 18 EMERGENGY LTS - SW STAIRS C 20 1 1.5 1.5 A 22 EMERGENCY EGRESS LTS - 2ND FLR DEMAND LOAD 0.2 0.2 B 244,9 24 EMERGENCY EGRESS LTS - 3RD FLR KVA ; 29.2 0.2 C PHASECKVA : AMPS : 31.4 261.6 §B20 26 EMERGENCY EGRESS LTS - 4TH FLR 1 0.2 0.2 28 AMPS : 81.2 NOTES/REMARKS: 1. 2. 3. 1 0.2 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER 0.2 DEMAND 100% - 50% - 100% _ 100% = 125% = 125% _ 65% _ PER NEC 220.44 = 100% _ 25.4 3.8 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: MB PANEL'P1E' 16195 Date: 09/07/2016 PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKW LA, WA FED FROM: MDP/GENSETVIA TRANSFER SWITCH NOTE CKT NO. CIRCUIT NAME CB SIZE 01AMJ P R LOAD (KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 ELEVATOR A 300 3 18.0 18.0 PANIELAMPS : 400 3 - - - B -- - 18.0 18.0 FEEDER AMPS : L - L VOLTS : L- NVOLTS : PHASE : WRE: 400 208 120 3 4 5 - - - C -_ - 18.0 18.0 7 SPARE A 20 1 9 SPARE B 20 1 11 SMOKE/RREDAMPERS -WEST C 20 1 0.4 0.4 13 SMOKE/FIRE DAMPERS - EAST A 20 1 0.4 0.4 15 SP1 B 20 1 1.1 1.1 17 SP -2 C 20 1 1.1 1.1 19 SPACE A M.L.O. MAIN CB FLUSH X X 400A 21 SPACE BI 23 ISPACE C1 25 SPACE AlSURFACE 27 SPACE B ISO GND 29 SPACE C FEED THRU 31 SPACE A 33 SPACE B 35 SPACE C 37 PANEL P5E- ROOF MECHANICAL FANS A 100 3 9.5 9.5 LOADSUMMARY (TOTAL, ALL SECTIONS( 39 --- B -- - 9.5 9.5 41 --- C -- 9.5 9.5 REC KVA : HEAT KVA : 0.6 2.2 2 IRMEPTACLIES/LIGHTS - ELEVATOR PITS A 20 1 0.4 0.3 0.7 4 RECEPTACLE- ELEVATOR EQUIP RM B 20 1 0.2 0.2 6 ELEVATOR CAB LIGHTS C 20 1 0.2 0.2 MOTOR KVA : 82.5 8 ELEVATOR CAB LIGHTS A 20 1 0.2 0.2 LIGHTING KVA : KTTCFE N KVA GEN LTG KVA OTHER KVA : 4.4 1.3 10 ELEVATOR ROOM LIGHTS B 20 1 0.2 0.2 12 FACP C 20 1 0.5 0.5 14 EMERGENCY LTS - LOBBY, W OORRIDORS A 20 1 0.5 0.5 16 EMERGENCY LTS - N CORRIDORS, UTILITY B 20 1 PHASE A KVA : AMPS : PHASE B I(VA : 30.2 251.6 29.4 18 EMERGENGY LTS - SW STAIRS C 20 1 1.5 1.5 20 EMERGENCY LTS -NORTH STAIRS A 20 1 0.7 0.7 22 EMERGENCY EGRESS LTS - 2ND FLR 1 0.2 0.2 AMPS : 244,9 24 EMERGENCY EGRESS LTS - 3RD FLR 1 0.2 0.2 PHASECKVA : AMPS : 31.4 261.6 §B20 26 EMERGENCY EGRESS LTS - 4TH FLR 1 0.2 0.2 28 EMERGENCY EGRESS LTS - 5TH FLR 1 0.2 0.2 30 SPARE 1 32 SPACE A CONNBCTED LOAD 34 SPACE B KVA : 91.0 36 SPACE C AMPS : 252.5 38 SPACE A DEMAND LOAD 40 SPACE IBI KVA : AMPS : 96,6 268.1 42 ISPACE ICI NOTESIREMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% PER NEC 220.44 = 100% = 0.6 2.2 64.5 22.5 S.I ® Co"G 1.3 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 MN.17 21312 W t sn ;tin State l rr€err Code Cc mpliance Forms R2,& R3 over 3 stales arra a':.191 Revised fl. n v 2G13 Project: Wa Pr,fjectAd €rens HOLIDAY #flit EXPRESS Date 9./29fr2€I1£` Compliance 91 Af€DOVIER,PARK EAST For Building Department Use #3ri 3s FTli Tfaf lCo.inpliance Option T#i09ILA, WA egrrf a ❑J Ef€iCacyp-,801umenslYna' ❑ Contrdlledby motionsensor Pass" rd to . use, tnstr4ctbt " Exterior Lizhtin.gAlterations Apt keit # ame: CASE Eis G11,1E€RING andcatuL-Vag F, Ti-adable I axmi €nt Allowed LightingWattage Base SiteAllowance ir Applicant Address_ 1$51 t ORTii CREEK PIS dAY, SUITE #2 BOTHEL L V. t Pro ected Surface Besc4iptiofl A pp. Itoa ntPhizne: 425-4o2-9490 JProject Descri tion ❑ ilE N Building Addi#ion, V Alteration Plans IncIlided Lighting Compliance Patti 0 LiiiOtingPovier0ensitri alwldtions TotaiBuildn€Perfdrmance Clear 0..10Fff2. (if TOla? B?3'iUbg Perilon-,3an-ethen'onyfLGT-CPKis rv_=gLxjod L1gtiting ,BDN zer AlloWance _2: 46 ( } Building Area #method =Race- -cpare#,ettad. Q - eap INIethod SeP-ChbnreguTedtp EU Ynab1-LP,A fora,) 4 interior Lighting System Select Taste C4(J5,5:2(1) Bui ding .area from drop dd.w.n rnena Total Description Total Allow ed TradableWafts: Briefly describe R'ghting 145 syster1we ani# features.. 2044 Additions and Change of Space Use (C'101.4.3 & C101.4.4) allowed and proposed (includia e rrst ng i€aopllcable) lighting t aftage ofAddr rare dr Charge of Use -pace, F ovide ao l cabfe. R r . controls per 0405,2 ani commissioning o€lighting controls per 0405.13. .Alterations,, Renovations.and.Repairs (0101.43.1) Proyidv BORdtP4 Area 41eitod (LTG -WT -BLDG or Sp- ace- Sy -Space f,:retirod rLTG- 11,iT SPACE) Cornp,'ranee Form, Do vinanf maximat',t ORO iied.ttattage?t°s in The Iightitg retrofft spaca In 'riaixama r AR ed.l-t?adeoa fable a,nd pr opose, (incluling exis iris ligliling wa tage in To , s,eeWattae tatle. Pe7rfi aad non -retrofit spaces shad by docrnatelv usingmtfigple foros. Less pace replaced -mvide, a separate S'Pacw By -Space NWhod CLTG4NT-SPACE) Carnpllance'Form par this re`brof t area: Docur,7ent , Fisting total weltage applicable Manual Ugh irg Controls rG405,2.1), ocrupancy senors (C405.2.2.2)daylight tore controls CC405.2.2 3l, specific apolicatidn controls Forms Project Address: EXPRESS:. Date 91 ANDOVER PARK EAST For Building Department Use Tit l VWLA, WA Ap.p.lica itName CA SE ENGINEERING A.pplicartAddi: 19545HORTHCREEKPIKIIi#AY,SUITE 0.21:130THELL Ap pi#cant Phone: 425402-9490 Project Desalption ❑ k<J%q Building ❑ Addition 0 Alteration ❑ Plan.) Included Lighting Zane Aszpao; dbyjrlrrsdktbn. ZoneUaiecriori req used to enable LTE'-Sff Liana 0 .Zone,t 0. Zone2 Zone.3 Zrne4 0 Clear lCo.inpliance Option 0 Lighting Power DensityCalculatirons Total Building,Performa:nce Clear Building Grounds Applies ko fumiraires - 100 13effs ❑J Ef€iCacyp-,801umenslYna' ❑ Contrdlledby motionsensor ❑ Exemption (list"') Exterior Lizhtin.gAlterations ❑ No. changesarebei'ngmad elotheexistingexteriorlirghting. ❑ f=lei s}raring.instage.dto!;e6eaddedfiAaresin,dforfixturesrelocat ,,dtohn--ercircUt ProvilesppRab aer.tenortighting;contrni-.per+r405.2>tand:comr,,.is.stontngper Ti-adable I axmi €nt Allowed LightingWattage Base SiteAllowance 750 Tradable Surfaces Surface Besc4iptiofl A€€owed.Watts per ft! or pe:r If Area (ft=), perimeter t Ifp or # of"items Allo wed, 'Wafts x ft or X If) Uncovered Parking and Parking 0..10Fff2. 53574 5157drives _2: 46 80 Hotel EU F5 4 S:G Select Taste C4(J5,5:2(1) Bui ding .area from drop dd.w.n rnena Total 1388-6 Total Allow ed TradableWafts: 01 r dahle Proposed Lighting Wattage wse rifgrns ea rna imum input watf 'ce tor.lurrrira re.) Tnial prdposadtrsdeble waffs rosy no,'exc the sUM0ffbrataaibly<rfradable Total Proposed Tradab.1a V. tfatts: 1411,8 t.ajfs p'u's the ; ase )pie mics, ante. Vin{ fie sr#s s ri=: r e ncrrae ri io rraa.t tradab.Ae Ivatscompta cat) beappt;ed#aira ,Idualnon-fr uabtecsVgories. Non -Tradable MaximumAllDwed Li hiliWattage BaseSite All owa:nce.Rema:ining:. 1'so Number of Wattsf Watts Tradable Sur face: Fixture Description Fixtures Fbdure proposed Un covered P arking and PL1 8 140 1120 drives c.£coirurnentt?+?at,tri:turesandeltexrUtrragtraremain fixture inthePa~ap?osedLighd6gtad.le. 850 d lNes.sthen 60% of exp trngf1N,tures wf4berep.laced, usa,LTG.4?4T-SRAiCEforrap; E1.2.. Uncovered Parking and PL 1 280 280 drives 1.3888 .16888 _2: 46 80 Hotel EU F5 4 S:G Tnial prdposadtrsdeble waffs rosy no,'exc the sUM0ffbrataaibly<rfradable Total Proposed Tradab.1a V. tfatts: 1411,8 t.ajfs p'u's the ; ase )pie mics, ante. Vin{ fie sr#s s ri=: r e ncrrae ri io rraa.t tradab.Ae Ivatscompta cat) beappt;ed#aira ,Idualnon-fr uabtecsVgories. Non -Tradable MaximumAllDwed Li hiliWattage BaseSite All owa:nce.Rema:ining:. 1'so Allo w e:d M atte t<tcn-T€ dzlb;e. Urfa s Surface Description per ft'- or par If .Area. (ft-), perimeter (IQ or # a f items. ;Alla:wed. "Natts: X ft= (or xcif) Bldg. Facade (bg: area) Q ..15 1,11 ftr2 6158 924 a. Ltghfrng n tares €n a .t;uttdtrag ai ditron rr7'aycomp i , as a stand at6ete prr tact. ortheu.r ey be 39 cora?binedwith theov raitexfstingbtdt2;Lighting!odemo:nsfratocopliarace. RefertoGt6f:a.3. b. Forretrofits"andbuttdtrg additibm, dire:alype, andgr£ "v"inferbrareas io the 1950 A axiaraurn .A it toed L:rg ting table. ff a buffidng addition wN ompiy asp, urnbined with the oyr•c,ratV E1.2: Non-;Tfadahlep pose Lighting Wattage Nott -Tradable Suf face Number of Fixture Description Fixtures Wattaf Watts Fcdure Proposed Bldg. Facade. (bj:area) PL3 7 31 217 Notes: E1.2, a. Ltghfrng n tares €n a .t;uttdtrag ai ditron rr7'aycomp i , as a stand at6ete prr tact. ortheu.r ey be 39 cora?binedwith theov raitexfstingbtdt2;Lighting!odemo:nsfratocopliarace. RefertoGt6f:a.3. b. Forretrofits"andbuttdtrg additibm, dire:alype, andgr£ "v"inferbrareas io the 1950 Nbn-tradabe¢arpcsedtratsrYaaynot eeceada,b%,ed wa its f,ranyk?d;6koluat Total excess (~ion -'tradable watts: Q sttrf>atie un.Aessffhe tri#at excess P ariz tr lno. n frsda&e Sue, a. areiess"thaxa the ter esnan uea"o,°aexa£r: Site ,Allowance Balance: 751 Aeric L, titin OMPLI S VVITH. SITE ALLOWANCE :I` State En erau Code G ainb liance ver Yu Dnii Prc,ject Addres-s HOLIDAYINN: EXPRESS Date 8/2-9/2016 Lighting Alt<eratio s, Renovations &. B ildi.ng .r dd itio s For 8 u€ldin g Department Use Lessthan0 60% or more Stand alone Addition . fixtures :replaced fixtures. replaced bldg, addition conibinedaap1cmist Clear Watts proposed. Notes: E1.2, a. Ltghfrng n tares €n a .t;uttdtrag ai ditron rr7'aycomp i , as a stand at6ete prr tact. ortheu.r ey be 39 cora?binedwith theov raitexfstingbtdt2;Lighting!odemo:nsfratocopliarace. RefertoGt6f:a.3. b. Forretrofits"andbuttdtrg additibm, dire:alype, andgr£ "v"inferbrareas io the 1950 A axiaraurn .A it toed L:rg ting table. ff a buffidng addition wN ompiy asp, urnbined with the oyr•c,ratV E1.2: eh. istintgt?0idnag, inctuda att arzpts able'exrUttng.Buttdrn# .Area type:sand rr+ stnteiiorarets:. 17 c.£coirurnentt?+?at,tri:turesandeltexrUtrragtraremain fixture inthePa~ap?osedLighd6gtad.le. 850 d lNes.sthen 60% of exp trngf1N,tures wf4berep.laced, usa,LTG.4?4T-SRAiCEforrap; E1.2.. l' A)dAt m Allowed L hgTatt",a e Location; ("pIon #, Allo ed Gross Interior WattsAllowed Bu€IdingArea* maim#,.arALL) Area. Description litratts:per ft= Area inW (Watt;stfta.Xarea] Hotel ALL. HOTEL:- ENTIRE.FACILITY 1<,U&j 1.3888 .16888 _2: 46 80 Hotel EU F5 4 S:G Select Taste C4(J5,5:2(1) Bui ding .area from drop dd.w.n rnena Total 1388-6 Proposed Lightinz Wattage BuildingArea " Location (pla'n #Y room #, arA:LL) Fixture DescriptionR NuMber 6f: Fractures Watts'? Fixture Watts proposed. Hotel E1.2, F1< 39 50 1950 Hotel E1.2: F2 17 50 850 Hotel E1.2.. F3 14; 31r 504 Hotel E1.2;EZ.1 F4 _2: 46 80 Hotel EU F5 4 S:G 144 Hotel EL2.E2.1 01 145 14 2044 Hotel E1.2 DV 44. 14 616. Hotel E1.2.. RS' 4 100 480 Hotel E1.2 1721 7 56 392 DISC DISCONNECT ® TRANSFER SWITCH V RECESSED WALLWASHER DISP DISPOSER E.C. ELECTRICAL CONTRACTOR ® SURFACE LINEAR EMERGENCY EGRESS FIXTURE UTILITY TRANSFORMER Select Tabic G405.52(i) Building.A<reatiomdroo d6w.n. nanU.. l nude ex{sttrag to .t mdfnht -pr ongzndexempttpi. €ngequibimen per-notevbeidw, + a;:.rl:uisance by Buildinz Area building Area 11>ga:rnings T¢talf-tllovted f gaits TatalProposed i3"A is Interior Lighting. Power Allowance Ho tel Confirm all fixtures are reported under proposed ;lighting - IoY;Yatts relative to maximum alloyed. .; ; ~ 4 _ s0 COR41PLtF; FT= DEMO DEVICE MOUNTING & EMERGENCY EGRESS INFORMATION ONLY. AF(200AF) (AFTER A NUMBER) = FUSE SIZE IN AMPS EXISTING DEVICE REFER TO FIXTURE DESIGNATIONS & LIGHTING FIXTURE NEW DEVICE SCHEDULE FOR LAMP TYPE & OTHER FIXTURE SPECIFICS. AFF ABOVE FINISHED FLOOR ----- EXISTING CONDUIT O SURFACE CEILING MOUNTED DOWNLIGHT AHJ AUTHORITY HAVING JURISDICTION NEW CONDUIT O o RECESSED DOWNLIGHT (ROUND) AL ALUMINUM 13888 55+80! Notes: Prop1. se, izlatta eforeachBr,:tfd .Great es:halfnoteiaceed':f , rn ne Jc aa rd Watt e for" t at Bu'1 :' , .: g _ g Rp ` to rdr ag Are #R . Tradrng aafta:cl ..he#a.ee.#a B.W rag .Area ypies is not'ag6vied under bb Bcittdtng Area kFethod comas iarmepaath 2.FrogUsed t, ;tr.res must:ire &ste tic The fruttdfrg area in i€ahn h they :occur. }ractude ai t proprased kittxtr.'rg fn:tures • 3. fa#oretype, , f -p? > number ftarraos z? he rfiure,and bdtt ttyre ftnot de : . Frrts.g. T tracklig.hting, iis t the length of the track (fn fae):,en' addition to the rapture;, tamp, anrt.dattesC €ntiarmattori. 4For Y ed iaft rFrtr? use Wattage ortte`xtrre t" t rop? the ta a.o wattage) and other,rrtt>rra a^ )reit fedrri Seco. n 040515,1, Perlin voitagek6c* t h#Drag r t-ttae g. reatsrofactuahl6minatre v attage ter ?entgtt3 safik C mu.: t, ,ted hp<. art ora s.aoplicabte, The veattaage of currenfii'lmftrng detvii<es'dreffthe trap tb rrrra.r Fsar.ti tt, o{olie e:fYa£#.lghtrng ftsf:The trar formEt rued ;dttcge: 5. Forlfghttng equ.0-nentefigibre forexempatidrperG405.5.1 note e: exceoti5nnumber;ndieavebtank. 5.Eso£"rlhaeraterixtingto:rarnarn>ir tures,fn.F`rriaosedLrgtafrf st,abkai thesa ?mann r.avneer-rktares.tdent:ifi,asext;xtingrn1&:turedesc.rPbon. ELECTRICAL LEGEND LIGHT FIXTURES & CONTROLS ABBREVIATIONS LINE STYLES AND WEIGHTS NOTE: LIGHTING FIXTURE SYMBOLS SHOW LENGTH, A (200A) (AFTER A NUMBER) = AMPS FT= DEMO DEVICE MOUNTING & EMERGENCY EGRESS INFORMATION ONLY. AF(200AF) (AFTER A NUMBER) = FUSE SIZE IN AMPS EXISTING DEVICE REFER TO FIXTURE DESIGNATIONS & LIGHTING FIXTURE NEW DEVICE SCHEDULE FOR LAMP TYPE & OTHER FIXTURE SPECIFICS. AFF ABOVE FINISHED FLOOR ----- EXISTING CONDUIT O SURFACE CEILING MOUNTED DOWNLIGHT AHJ AUTHORITY HAVING JURISDICTION NEW CONDUIT O o RECESSED DOWNLIGHT (ROUND) AL ALUMINUM SERVICE GEAR - AS SHOWN ON PLANS ❑ RECESSED DOWNLIGHT (SQUARE) ATS AUTOMATIC TRANSFER SWITCH WALL SCONCE B KR BREAKER CIRCUIT BREAKER PANELBOARD SURFACE MOUNTED LINEAR FIXTURE C CONDUIT LOAD CENTERCKT ® RECESSED LINEAR FIXTURE CIRCUIT G LIGHTING CONTROL PANELCL PENDANT MOUNTED LINEAR FIXTURE CENTERLINE Eii EXISTING PANELBOARD TO REMAINCLG SURFACE MOUNTED LINEAR FIXTURE (NARROW BODY) CEILING o TERMINAL CABINET C.O. CONDUIT ONLY WALL MOUNTED LINEAR FIXTURE SWITCHBOARD OR MOTOR CONTROL CENTER, SIZE CRP CONTROL RELAY PANEL AS SHOWN ON PLANS WALL MOUNTED STRIP FIXTURE CU COPPER T DRY TYPE TRANSFORMER (SEE NOTES &RISER WALL MOUNTED INDUSTRIAL LINEAR FIXTURE DIA DIAMETER DIAGRAM FOR SIZE) RECESSED LINEAR WALLWASHER DISC DISCONNECT ® TRANSFER SWITCH V RECESSED WALLWASHER DISP DISPOSER E.C. ELECTRICAL CONTRACTOR ® SURFACE LINEAR EMERGENCY EGRESS FIXTURE UTILITY TRANSFORMER ECB ENCLOSED CIRCUIT BREAKER RECESSED LINEAR EMERGENCY EGRESS FIXTURE (E) EXISTING (USED AS SYMBOL DESIGNATION) METER 2'x4' FIXTURE SPLIT BETWEEN NORMAL &EMERGENCY EMT ELECTRICAL METALLIC TUBING EGRESS WITH UL924 RELAY. DUAL CIRCUITS SHOWN ON GROUND BAR H -3/X-23 PLANS. EXTG EXISTING (USED AS ABBREVIATION IN TEXT) <O WEATHERHEAD (PLAN VIEW) ❑® QQ RECESSED EMERGENCY EGRESS DOWNLIGHT FAAP FIRE ALARM ANNUNCIATOR PANEL FACP FIRE ALARM CONTROL PANEL PPO UTILITY POWER POLE (SITE PLAN) 0 SURFACE EMERGENCY EGRESS DOWNLIGHT FLR FLOOR ® GROUND ROD LOCATION ® UNIVERSAL/CEILING MOUNTED EXIT SIGN F.O.I.C. FURNISHED BY OTHERS, INSTALLED ® HANDHOLE OR PULLBOX (SITE PLAN) E91 WALL MOUNTED EXIT SIGN BY ELECTRICAL CONTRACTOR ® ® DIRECTIONAL EXIT SIGN (ARROWS INDICATE ONE OR FSD FIRE SMOKE DAMPER TWO SIDES AND DIRECTION INDICATED) CONDUITS AND CIRCUITING 'Egf FUT FUTURE EMERGENCY EXIT SIGN WITH DUAL PATHWAY HEADS GEN GENERATOR WIRING LOCATED IN CEILING OR WALL 'e DUAL HEAD EMERGENCY EGRESS FIXTURE GFCI GROUND FAULT CIRCUIT INTERRUPTER - — — - WIRING CONCEALED UNDER FLOOR OR UNDERGROUND GND GROUND S SINGLE POLE LIGHT SWITCH s- CONDUIT HOME -RUN HTR HEATER - SLASHES ACROSS CONDUIT INDICATE NUMBER OF S3 THREE POLE LIGHT SWITCH kCMIL THOUSANDS OF CIRCULAR MILS WIRES WITHIN - SHORT = HOT, LONG = NEUTRAL S4 FOUR POLE LIGHT SWITCH KVA 1000 VOLT AMPERES PI II• GROUND WIRE S DIMMER SWITCH KW 1000 WATTS Al — CONDUIT STUB -UP S OCCUPANCY SENSOR LIGHT SWITCH LCP LIGHTING CONTROL PANEL tl7 CONDUIT BREAK S VACANCY SENSOR LIGHT SWITCH LT LIGHT Of —3 CONDUIT CONTINUES ELSEWHERE (NOTED ON PLAN) S LOW VOLTAGE SWITCH CONTROLLED BY ROOM SENSOR LTS(LTG) LIGHTS (LIGHTING) CONDUIT WITH BELL END vs CEILING MOUNTED VACANCY SENSOR LV LOW VOLTAGE E->( :E CONDUIT TO BE REMOVED MCB MAIN CIRCUIT BREAKER O S CEILING MOUNTED OCCUPANCY SENSOR EQUIPMENT CONNECTIONS & CONTROLS pc PHOTOCELL LIGHT SENSOR MECH MECHANICAL MH MANHOLE ® EQUIPMENT CONNECTION PP SENSOR POWER PACK MLO MAIN LUGS ONLY WALL MOUNTED EQUIPMENT CONNECTION ® PHOTOCELL AIMED NORTH, MOUNTED ON BUILDING EXTERIOR N3R NEMA 3R C MOTOR CONNECTION SP LIGHT SWITCH WITH PILOT LIGHT NIC NOT IN CONTRACT SK g FAN CONNECTION KEYED SWITCH NREC NON-RESIDENTIAL ENERGY CODE INTERCOM/CLOCK SYSTEM DEVICES (p a, ELECTRIC WALL HEATER CONTROLLED BY WALL OS SPEAKER, CEILING MOUNTED OC ON CENTER MOUNTED THERMOSTAT OH OVERHEAD ❑ DISCONNECT SWITCH p SPEAKER, WALL MOUNTED OS OCCUPANCY SENSOR QI FUSED DISCONNECT SWITCH 1 9>1 SPEAKER, WALL MOUNTED, EXTERIOR PNL PANELBOARD V VOLUME SWITCH PIV POST INDICATOR VALVE POWER RECEPTACLES & OUTLETS P.O.S. POINT OF SALE Q DUPLEX RECEPTACLE NOTES AND MISCELLANEOUS SYMBOLS PP POWER POLE/POWER PACK (SEE PLAN LOCATION) k® DOUBLE DUPLEX RECEPTACLE FLAGNOTE - IDENTIFIES A SPECIFIC ITEM ON A DRAWIN!=. PSE PUGET SOUND ENERGY k9 DUPLEX GFCI RECEPTACLE F > COORESPONDS TO A SCHEDULE IN THE ELECTRICAL SET PUD PUBLIC UTILITY DISTRICT DOUBLE DUPLEX GFCI RECEPTACLE THAT EXPLAINS DETAILS OR FEATURES OF THAT ITEM. PV PHOTOVOLTAIC k DUPLEX GFCI RECEPTACLE MOUNTED . ABOVE FF -3 MECHANICAL FLAG - DEFINES MECHANICAL EQUIPMENT AND REC RECEPTACLE(S) COUNTER OR BACKSPLASH, WHEN PRESENT SENT (U.O.N.) COORESPONDS TO DESIGNATIONS IN MECHANICAL PLANS AND REF REFRIGERATOR SCHEDULES. COORESPONDS MECHANICAL CONNECTION k® DOUBLE DUPLEX GFCI RECEPTACLE MOUNTED +4"O.C. ABOVE SCHEDULE IN THE ELECTRICAL SET. (R) RELOCATED EXISTING COUNTER OR BACKSPLASH, WHEN PRESENT (U.O.N.) RQMTS REQUIREMENTS QJ JUNCTION BOX WITH BLANK 200 EQUIPMENT FLAG - DEFINES SPECIAL (IE: COOKING) SCL COVER EQUIPMENT ON A PLAN AND COORESPONDS TO DESIGNATIONS SEATTLE CITY LIGHT IN AN EQUIPMENT SCHEDULE IN THE ELECTRICAL SET. SNOPUD SNOHOMISH PUBLIC UTILITY DISTRICT REVISION CLOUD AND FLAG - CLOUD SURROUNDS SQ SQUARE INFORMATION THAT HAS BEEN REVISED. FLAG IDENTIFIES SW SWITCH THE REVISION IN WHICH THE CHANGES WERE MADE. ,.,,_ SEPI P -M. I L: pi,:RmI 1 TBD TO BE DETERMINED Ili.QU►RED FOR• O DETAIL NUMBER - APPEARS IN FRONT OF A TITLE ON TYP TYPICAL DRAWINGS WITH MORE THAN ONE ILLUSTRATION. UG UNDERGROUND efMechanical 3 IDENTIFICATION SYMBOL - CROSS REFERENCES INFORMATION UL UNDERWRITER'S LABORATORY El lectrical E#.1 IN ONE AREA WITH A DETAIL (TOP #) AND SHEET (BOTTOM #) U.O.N. UNLESS OTHERWISE NOTED U Plumbing IN ANOTHER IN THE ELECTRICAL SET. elGas Piping UTIL UTILITY NOTE: ALL FIXTURES AND EQUIPMENT SHOWN ON PLANS IN STANDARD VA VOLT AMPERES City of Tukwila (HEAVY) LINE WEIGHT ARE NEW OR RELOCATED WORK. FIXTURES AND VS VACANCY SENSOR BUIL11 ING DIVISION EQUIPMENT SHOWN IN LIGHT LINE WEIGHT WITH (E) NEXT TO THEM W WATTS INDICATE EXISTING TO REMAIN. SYMBOLS SHOWN AS DASHED INDICATE ITEMS TO BE REMOVED OR DEMOLISHED. THIS APPLIES UNLESS NOTED WP WEATHERPROOF OTHERWISE ON PLANS. RECEIVED XFMR TRANSFORMER CITY OF TUKWILA SEP 12 2016 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 his tCASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 FILL7 7777 ""..-.-,r, 7:tg V` 1 !0 t 9 iii , ,. 7 «..L„>i VV n review C":'3'0 and omissions. y Droval of call 4 ; , _ .:; ('.:oto not authoriz violation of any ad,7,p%o--', ...,,, , ' lance. Receipt Proved v e d Fto I d Copy d i ... i 'acknowledged: B: Y fit t Date: City Of Tukwila BUILDING DIVISION FiEVIF'."nl 910 Changes I da tri rhe SCW Of Work till#hr T( ki,r;r t~i(lyding D vi i()"i. NOTE: Revisionlvi:l F.quiro ,."v Ca'an submittal and may incittds at+c. itit rt!an rwvi3W tees REVIEWED .FOR— COMPLIANCE WITH NEPA 70 - NEC SEP 2 6 2016 City of Tukwila BUILDING DIVISION I DRAWING INDEX I EO.1 ELECTRICAL LEGEND, SCHEDULES, & NREC EO.2 SITE PLAN EO.3 RISER DIAGRAM EO.4 PANEL SCHEDULES EO.5 PANEL SCHEDULES EO.6 PANEL SCHEDULES EO.7 PANEL SCHEDULES ED.8 MECHANICAL, LIGHTING SCHEDULE El.1 LEVEL 1 POWER & COMMUNICATIONS PLAN E1.2 LEVEL 2-5 POWER, LIGHTING, & COMMUNICATIONS PLAN E1.3 ATTIC AREA MECHANICAL CONNECTION PLAN E2.1 LEVEL 1 LIGHTING PLAN Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA — Sheet Title: ELECTRICAL LEGEND, FIXTURE e2 Fl SCHEDULE, & NREC EXISTING STREET LIGHTING PULL/ SPLICE BOX — 100KW GENSET IN WEATHERPROOF ENCLOSURE – SEE RISER DIAGRAM C -5,7(R48) VIA LC _:, :,.P SE::WD:: M O U N T 1' TRANSFORMER – SEE RISER "',--.DIAGRAM-- SHEET EO.3 #10 i #10 1- .. is 1: "• • ff' .. ` " 5 PL1PL1 ii 5' C -13(R4) . C-1,3(R4A) f :f .....................::......... ....................................................................... «:. «.:. #10. »»».:...... ..............,� ...::: »:.::. " f :> .:<. r..., . .___ : r : ..,......:. .>.....:.....; ...............,...... .........;,:•.:::":::::."" : : " : :• :. • : l : : : :. " • • : r •i •r , : ` r ` ` , a L : • :. ,. : :• ' v ' : • v 4 n c : .: .: ,: n .• r : ' : ' : : : s " , : Y : , • f • v : ,. FLAG NOTES [�> PROVIDE 2°C(PVC SCHED 40),2#8,1#8 GND(CU) BETWEEN LUMINAIRES. 2 > PULL/SPICE BOX LOCATION IS APPROXIMATE. FIELD VERIFY BOX LOCATION PRIOR TO UNDERGROUND CONDUIT INSTALLATION. CONNECT NEW LUMINAIRES TO EXISTING STREET LIGHT. f i r 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: t 1 Jill fc 4 t on 1 -' _. _" -_____ _ __. �' __ I PGE STANDARDS XL_� AVAILABLE FAULT CURRENT (IN AMPS) j..,j. SHADING INDICATES NEW DISTRIBUTION EQUIPMENT THAT REQUIRES SELECTIVE OVERCURRENT COORDINATION. RISER DIAGRAM NOT TO SCALE 'ROUND #8 Cu #6 CU #4 CU #3 CU 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED FO�T,, COMPLIANCEWW�ER DIAGRAM NFPA70-NEC; . SEP 2 6 2016 City of Tukwila BUILDING DTVI RECEIVED CITY OF TUKWILA SEP 12 2016 PERMIT CENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 PANEL'P1A' FROM: MDP PANEL'P1B' PANEL'P1C' CIRCUIT NAME PROJECT NAME HOLIDAY INN EXPRESS LOAD (KVA) PROJECT NAIVE HOLIDAY INN EXPRESS 6 AMP P R H M L K G 0 TOTAL PROJECT#: IF 16195 LOCATION: ELECTRICAL ROOM TUKWILA, WA FED FROM: MDP FED FROM: FED FROM: MDP PANEL AMPS : 200 3.0 NOTE CKT CIRCUIT NAME NO. CBSIZE CKT NO. LOAD (KVA) CBSIZE 6 AMP PI R PANEL DESCRIPTION 6 AMP R H M L K G O TOTAL 1 I RBCS - MEETING ROOM 129 A 20 1 0.5 20 1 0.5 PANEL AMPS': 200 0.4 3 RBCS - MEETING ROOM 129 B 20 1 0.5 3 REQS - BUSINESS CENTER 101 0.5 FEEDER AMPS : 200 0.4 5 RHS - MEETING ROOM 129 C 20 1 0.5 FEEDER AMPS : 200 0.5 L- L VOLTS : 208 C 7 RECS - PRE- FUNCTION 130, STORAGE 131 A 20 1 0.4 1 0.4 0.4 L- N VOLTS : 120 1 9 RECS - REST RMS 132 & 133 B 20 1 0.4 9 RECS- LOUNGE 102 0.4 PHASE: 3 0.5 11 RECS - SALES OFFICE 117 C 20 1 0.4 PHASE : 0.3 0.7 WIRE: 4 C 13 REM - GEN MAN. 115 A 20 1 0.5 3 0.3 0.8 WIRE: 4 20 15 RSCS - WORK AREA 113 B 20 1 0.4 20 1 0.4 4 2 0.4 17 RES - WORK AREA 113 C 20 1 0.4 15 RED- MARKET 109 0.4 20 1 1 19 RBCS- CHECK-IN 110 A 20 1 0.2 BUILDING SIGN- SOUTH FACE B 0.2 M.L.O. X C 20 21 REM - CHECK-IN 110 B 20 1 0.4 1.0 1.0 0.4 MAIN CB 20 19 REC- MARKET109 23 RSCS- CHECK-IN 110 C 20 1 0.4 B 15 2 0.4 FLUSH M.L.O. X 20 25 SPARE A 20 1 RECS - SERVER 112 B 20 11 SURFACE -K 1.5 1.5 27 SPARE B 20 1 0.5 --- 23 REES - SERVER 112 ISO GND 20 11 1.2 29 SPARE C 20 1 1.5 FLUSH B 20 1 FEED THRU 25 CU -1 A 31 SPARE A 20 1 SPARE 2.6 (TO TAL.ALL SECTIONS 2.6 SURFACE X C 33 SPACE ONLY B - 1 B - - 1 2.6 A 20 2.6 35 SPACE ONLY C - 1 B 20 4 29 AGI C 15 2 37 SPACEONLY A - 1 6 0.1 FEED-THRU FEED-THRU LOADSUMMARY 0.4 39 SPACE ONLY B - 1 A - - 1 (TO TA L, ALL SEC TIO NSj 0.5 41 SPACE ONLY C - 1 UC TABLE- PANTRY 104 B 20 33 SPARE REC KVA : 5.6 20 2 WASHER- LAUNDRY 123 A 20 3 1.2 1.2 1 4 - B GEN LTG KVA 1.2 0.5 1.7 HEAT KVA 1 0.2 6 - C - - A 1.2 0.5 1.7 MOTOR KVA : 18.9 A 8 WASHER - LAUNDRY 123 A 20 3 39 1.2 0.8 2.0 LIGHTING KVA KITCHEN KVA 1.5 39 10 - B - - 1.2 0.8 2.0 2 12 - C - - C 1.2 0.8 2.0 GEN LTG KVA : 0.8 C 14 WASHER- LAUNDRY 123 A 20 3 B -- 1.2 0.8 2.0 OTHER KVA : 6.8 4 7-6- B - - 20 1.2 0.5 1.7 PHASE A KVA : 10.6 0.5 18 - C - - 0.5 1.2 0.5 1.7 AMPS : 88.2 C 20 WASHER - LAUNDRY 123 A 20 3 0.4 1.2 1.2 PHASE B KVA : 10.4 1.0 22 - B - - A 1.2 0.2 1.4 AMPS : 86.3 0.2 24 - C - - - 1.2 0.8 2.0 PHASE C KVA : 11.2 1 26 DRYER- LAUNDRY 123 A 20 1 1.0 1 1.1 GEN LTG KVA 1.1 AMPS : 93.1 C 28 DRYER- LAUNDRY 123 B 20 1 1 1.1 40 1.1 GEN LTG KVA OTHER KVA : 0.3 30 DRYER- LAUNDRY 123 C 20 1 A 1.1 1 1.1 1.0 31.4 1.0 32 DRYER -LAUNDRY 123 A 20 1 3.8 1.1 REC- FITNESS 118 1.1 CONNECTED LOAD 1 34 REFRIGERATOR- BREAK 125 B 20 1 C -_ 0.8 PHASEA KVA : 0.8 KVA : 32.1 18 36 RES- BREAK 125,121,119N C 20 1 0.7 2 1 0.7 AMPS : 89.1 AMPS : 38 SPARE A 20 1 20 - A - DEMAND LOAD 40 SPARE B 20 1 2.5 PHASE B KVA : 12.5 1 KVA : 32.0 DRYER- GUEST LAUNDRY 107 42 ISPARE C 20 1 2 DEMAND/ 2.0 0.5 SPARE AMPS : 88.8 NOTEVREMARKS : I. IF 2. 3. DEMAND/ DIVERSITY FACTORS . LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEALING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER - C DEMAND 100% = 5.6 50% _ 100% _ 100% = 17.7 125% = 1.5 125% _ 65% _ PER NEC 220.44 = 0.4 100% = 6.8 PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TLKWI LA, WA FED FROM: MDP PANEL'P1B' PANEL'P1C' CIRCUIT NAME CBSIZE LOAD (KVA) PROJECT NAIVE HOLIDAY INN EXPRESS 6 AMP P R H M L K G 0 TOTAL PROJECT #: 16195 PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: FED FROM: MDP PANEL AMPS : 200 3.0 3 NOTE NOTE CKT NO. CIRCUIT NAME CBSIZE 6 AMP PI R LOAD (KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 1 RECS - BUSINESS CENTER 101 A 20 1 0.4 A 20 1 0.4 PANEL AMPS : 200 1 3 REQS - BUSINESS CENTER 101 B 20 1 0.4 DCU-1 POOL UNIT 11 0.4 FEEDER AMPS : 200 1 5 RD'S - LOUNGE 102 C 20 1 0.4 1 0.4 0.4 L - L VOLTS : L- N VOLTS : 208 120 1 7 RETS - LOUNGE 102 A 20 1 0.5 0.5 A -- 9 RECS- LOUNGE 102 B 20 1 0.5 120 1 0.5 PHASE : 3 20 11 TV - LOUNGE 102 C 20 1 PHASE : 3 1.0 1.0 WIRE: 4 20 "IT RED- ELEV LOBBY 108, STORAGE 111 A 20 1 0.4 4 2 0.4 BUILDING SIGN- SOUTHEAST FACE A 20 15 RED- MARKET 109 B 20 1 1 CLG HTR- POOL EQUIP 121 1.0 1.0 BUILDING SIGN- SOUTH FACE B 20 17 Ri3✓-MARKET 109 C 20 1 - - - ISO GND 1.0 1.0 BUILDING SIGN- NORTH FACE C 20 19 REC- MARKET109 A 20 1 B 15 2 1.0 1.0 M.L.O. X 20 1 21 RECS - SERVER 112 B 20 11 X - 1.5 1.5 MAIN CB 3.1 0.5 --- 23 REES - SERVER 112 C 20 11 1.2 37 1.5 1.5 FLUSH B 20 1 LOADSUMMARY 25 CU -1 A 40 21 SPARE 2.6 (TO TAL.ALL SECTIONS 2.6 SURFACE X C 37 27 - B - - 1 2.6 A 20 2.6 ISO GND ISO GND B 20 4 29 AGI C 15 2 1 0.1 6 0.1 FEED-THRU FEED-THRU 0.4 0.4 31 - A - - 1 0.1 0.5 0.1 10 UC TABLE- PANTRY 104 B 20 33 SPARE B 20 1 1 PREP TA BLE RECS - PANTRY 104 C 20 1 1.0 1.0 GEN LTG KVA 35 SPACE ONLY C - 1 0.2 37 SPARE A 20 1 B 20 37 SPACEONLY A - 11 39 1 B 20 LOADSUMMARY 1.5 39 SPACE ONLY B - I 2 41 SPARE C (TOTAL, ALL SECTIONS) 1 - 41 SPACE ONLY C - 1 B -- 2 SPARE A 20 1 C 50 REC KVA : 4.0 4 2 RSCS - RR 134 A 20 1 0.4 0.4 20 4 RE3:.',S - CORRIDOR B 20 1 0.5 20 28 0.5 HEAT KVA : 13.4 20 6 RBCS - CORRIDOR C 20 1 0.4 1 0.4 MOTOR KVA : 9.0 1.0 8 RED- POOL 119S A 20 1 0.2 0.8 34 0.2 LIGHTING KVA KITCHEN KVA - 10 REr- FITNESS 118 B 20 1 1 1.0 B -- 1.0 KITCHEN KVA GEN LTG KVA 38 12 RED- FITNESS 118 C 20 1 1 1.0 40 1.0 GEN LTG KVA OTHER KVA : 0.3 14 REC- FITNESS 118 A 20 1 1 1.0 31.4 1.0 OTHER KVA : 7.0 3.8 16 REC- FITNESS 118 B 20 1 1 1.0 C -_ 1,0 PHASEA KVA : 10.5 31.6 18 DRYER- GUEST LAUNDRY 107 C 30 2 1 2.0 0.5 30 2.5 AMPS : 87.5 4.4 36.8 20 - A - - 2.0 0.5 SPARE 2.5 PHASE B KVA : 12.5 1 22 DRYER- GUEST LAUNDRY 107 B 30 2 DEMAND/ 2.0 0.5 SPARE 2.5 AMPS : 104.5 24 - C -_ - C 2.0 0.5 SPARE 2.5 PHASE C KVA : 10.3 AMPS : 26 WASHER - GUEST LAUNDRY 107 A 20 1 1.5 SPARE 1.5 AMPS : 86.0 28 WASHER - GUEST LAUNDRY 107 B 20 111 1 1.5 1.5 SPACE 30 SPARE C 20 1 A 20 1 42 SPACE 32 SPARE A 20 1 20 1 0.6 2.2 64.5 22.5 5.5 1.3 CONNECTED LOAD 34 SPARE B 20 1 C 20 1 KVA : 33.4 36 SPARE C 20 1 A 20 1 AMPS : 92.6 38 SPACE ONLY A 20 1 B 20 1 DEMAND LOAD 40 SPACE ONLY BI 20 1 C 20 1 KVA : 33.7 42 SPAC EONLY C 20 1 DEMAND 100% _ 50% _ 100% _ 100% _ 125% _ 125% = 65% _ PER NEC 220.44 = 100% = 16.9 0.3 AMPS : 93.6 NOTES/REMARKS: 1. 2. 3. DHVIANDI DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA RE]VIAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEVIAND 100% = 4.0 50% _ 100% = 13.4 100% = 7.5 125% = 1.9 125% _ 65% _ PER NEC 220.44 = r 100% = 7.0 PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TLKWI LA, WA FED FROM: MDP NOTE PANEL'P1C' CIRCUIT NAME CBSIZE LOAD (KVA) PROJECT NAME: HOLIDAY INN EXPRESS 6 AMP P R H M L K G 0 TOTAL PROJECT #: 16195 LOCATION: TUKWILA, WA 1 FED FROM: 0.4 PANEL AMPS : 200 3.0 3 NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD (KVA) FEEDERAMPS : 200 PANEL DESCRIPTION 6 AMPI P R H M L K G O TOTAL 1 1 PARKING LOT LIGHTS - EAST A 20 2 0.6 A 20 1 0.6 PANEL AMPS : 200 1 3 - - - B -- - 0.6 DCU-1 POOL UNIT 11 0.6 FEEDER AMPS : 200 1 5 PARKING LOT LIGHTS - WEST C 20 2 0.3 1 0.4 0.3 L - L VOLTS : 208 1 7 --- A -- - 0.3 1.5 PHASE : 0.3 L- NVOLTS : 120 1 9 LIGHTING CONTROL PANEL B 20 1 A 2011 --- 0.3 0.3 PHASE : 3 2 11 BUILDING SIGN- SOUTHWEST FACE C 20 1 1.2 1.1 MAIN CB FLUSH 1.2 WIRE : 4 2 13 BUILDING SIGN- SOUTHEAST FACE A 20 1 1.2 25 SPARE 1.2 1 CLG HTR- POOL EQUIP 121 2 15 BUILDING SIGN- SOUTH FACE B 20 1 1.2 B 20 11 1.2 - - - ISO GND 2 17 BUILDING SIGN- NORTH FACE C 20 1 1 1.2 1FEED-THRU 27 1 1.2 B 15 2 0.9 19 SPARE A 20 1 0.9 29 - - - 33 M.L.O. MAIN CB X - 2 21 LIGHTS - PORTE COCHERE B 20 1 0.5 3.1 0.5 --- 23 LIGHTS - POOL AREAS, FITNESS C 20 1 1.2 37 SPACE 1.2 FLUSH B 20 1 LOADSUMMARY 25 SPARE A 20 1 SPARE C 20 (TO TAL.ALL SECTIONS 31 SURFACE X C 37 27 SPARE BI 20 1 RECS - BOARD 105 A 20 1 0.5 ISO GND B 20 4 RECS - BOARD 105 29 SPARE C 20 1 SPARE 6 RBCS - BOARD 105 C 20 FEED-THRU 0.4 0.4 MOTOR KVA : 20.0 LIGHTING KVA 31 SPARE A 20 1 0.5 0.5 9.5 10 UC TABLE- PANTRY 104 B 20 1 33 SPARE B 20 1 PREP TA BLE RECS - PANTRY 104 C 20 1 1.0 1.0 GEN LTG KVA 0.2 35 SPARE C 20 1 A 20 1 0.2 37 SPARE A 20 1 B 20 1 B 20 11 LOADSUMMARY 6 39 SPARE B 20 1 1.5 AMPS : 98.3 0.2 20 (TOTAL. ALL SECTIONS) A 20 2 41 SPARE C 20 1 - B - - 0.8 REC KVA AMPS : 104.6 B -- 2 SPARE A 20 1 C 50 3 5.4 4 LIGHTS - GROUND FLOOR CORRIDORS B 20 1 0.5 - 5.4 0.5 HEAT KVA 20 28 6 LTS - UTILITY, BREAK RM, EMP REST RM C 20 1 0.7 16 30 0.7 MOTOR KVA LIGHTING KVA : 13.5 8 LTS - FR DESK,MIARKET,FEAT WA LL,OFFICES A 20 1 1.0 PHASE A KVA : 1.0 SPARE 10 LTS - LOBBY, BUSINESS AREA B 20 1 0.8 34 SPARE 0.8 KITCHEN KVA - 0.9 12 LTS - BOARD RM, PANTRY, BREAKFAST C 20 1 1.0 B -- - 1.0 GEN LTG KVA 38 SPACE 14 LTS - LAUNDRY A 20 1 0.7 40 SPACE 0.7 OTHER KVA : 0.3 POOL AREA HEATING UNIT DHU-I 16 LTS - MEETING RM., REST ROOMS B 20 1 0.5 31.4 34.--- 0.5 PHASEA KVA : 3.8 LOAD DESCRIPTION DEMAND 18 SPARE C 20 1 - - - C -_ - 5.4 AMPS: 31.6 AMPS : 136.6 20 SPARE A 20 1 30 SPARE DEMAND LOAD PHASE B KVA : AMPS : 4.4 36.8 SPARE 22 SPARE B 20 1 24 SPARE C 20 1 1 CONNECTED LOAD PHASE CKVA : 5.6 DEMAND/ 26 SPARE A 20 1 KVA : 91.0 AMPS : 46.8 C 28 SPARE B 20 1 AMPS : 252.5 38 SPACE Aj 30 SPARE C 20 1 40 SPACE 4B_ 32 SPARE A 20 1 42 SPACE CONNECTED LOAD 34 SPARE B 20 1 0.6 2.2 64.5 22.5 5.5 1.3 KVA : 13.8 36 SPARE C 20 1 AMPS : 38.4 38 SPARE A 20 1 DEMAND LOAD 40 SPARE B 20 1 KVA : 17.2 42 SPARE C 20 1 AMPS : 47.7 NOTES/REMARKS: 1. CONNECTTHRU4P CONTACTORAT LCP 2. CONNECT THRU LIGHTING CONTROL PANEL RELAY 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC O OTHER DEMAND 100% _ 50% _ 100% _ 100% _ 125% _ 125% = 65% _ PER NEC 220.44 = 100% = 16.9 0.3 PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TLKWI LA, WA FED FROM: MDP NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD (KVA) PANEL DESCRIPTION 6 AMP P R H M L K G 0 TOTAL TOTAL 1 REFRIGERATOR- BREAKFAST 103 A 20 1 0.4 0.4 PANEL AMPS : 200 3.0 3 CINNAMON WARMER- BREAKFAST 103 B 20 1 0.7 0.7 FEEDERAMPS : 200 7 STAIRWELL PRESSURIZATION FAN S A 35 3 5 HOT WATER- BREAKFAST 103 C 20 1 1.0 1.0 L - L VOLTS : 208 L - N VOLTS : 120 3.0 7 HOT FOOD- BREAKFAST 103 A 20 1 1.7 1.7 B -- 9 TOASTER- BREAKFAST 103 B 20 1 1.8 1.8 PHASE : 3 DCU-1 POOL UNIT 11 PANCAKEMACHINE- BREAKFAST 103 C 20 1 1.7 1.7 WIRE : 4 11 13 JUICE MACHINE- BREAKFAST 103 A 20 1 0.4 0.4 WIRE : 4 X 15 AIRPOT RACK- BREAKFAST 103 B 20 1 1.0 1.0 1.5 PHASE : 17 AIRPOT RACK- LOUNGE ID2 C 20 1 1.0 1.0 3.0 19 FCU -5,6,7,8 A 2011 --- 1.1 1.1 M.L.O. SMOKE/FIRE CAMPERS - EAST 3.0 20 21 --- B -- - 1.1 1.1 MAIN CB FLUSH X M. L.O. MAIN CB X 23 SPARE C 20 1 1 - 1.0 25 SPARE A 20 1 CLG HTR- POOL EQUIP 121 C 15 SURFACE X 1.0 27 SPARE B 20 11 25 - - - ISO GND - 1.0 LOADSUMMARY 29 SPARE C 20 1 1FEED-THRU 27 FAN COIL 1,2,3 B 15 2 0.9 31 BATH EXH FAN BEF-1 A 20 3 0.9 0.9 29 - - - 33 --- B -- - 0.9 0.9 6 - C - - 3.1 35 --- C -- - 0.9 0.9 2.1 37 SPACE A SPARE B 20 1 LOADSUMMARY 12 - C - - 39 SPACE B 35 SPARE C 20 (TO TAL.ALL SECTIONS 31 41 SPACE C 37 SPARE A 20 REC KVA : 1.4 PHASEA KVA : 9.5 2 RECS - BOARD 105 A 20 1 0.5 0.5 B 20 4 RECS - BOARD 105 B 20 1 0.4 0.4 HEAT KVA : 4.2 SPARE 6 RBCS - BOARD 105 C 20 11 0.4 0.4 MOTOR KVA : 20.0 LIGHTING KVA 2 8 UC TABLE- PANTRY 104 A 20 1 0.5 0.5 9.5 10 UC TABLE- PANTRY 104 B 20 1 0.5 0.5 KITCHEN KVA : 11.6 HEAT KVA : 28.0 12 PREP TA BLE RECS - PANTRY 104 C 20 1 1.0 1.0 GEN LTG KVA 0.2 14 RECS - PANTRY 104 A 20 1 0.2 0.2 OTHER KVA 2 16 SPARE B 20 1 B 20 11 PHASEA KVA : 11.8 6 18 EH -2 C 20 1 1.5 1.5 AMPS : 98.3 0.2 20 FCU-4A,B,C,D A 20 2 0.8 0.8 PHASE KVA : 12.6 3 22 - B - - 0.8 0.8 AMPS : 104.6 B -- 24 HP -4 C 50 3 5.4 5.4 PHASE C KVA : 12.9 --- 26 - A - - 5.4 5.4 AMPS : 107.4 20 28 - B - - 5.4 5.4 PHASE B KVA : 16.1 AMPS : 134.2 16 30 SPARE C 20 1 PHASE A KVA : 32 SPARE A 20 1 CI 20 CONNECTED LOAD PHASE CKVA : 16.1 34 SPARE B 20 1 - 0.9 KVA : 37.2 0.9 36 SPARE C 20 1 B -- - AMPS : 103.4 38 SPACE A 30 --- C -- DEMANDLOAD 0.9 40 SPACE B 24 32 POOL AREA HEATING UNIT DHU-I KVA : 34.5 3 42 SPACE C CONNECTED LOAD 31.4 34.--- AMPS : 95.8 NOTES/REMARKS: 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION DEMAND R RECEPTACLES - TO 10KVA 100% = 1.4 REMAINING OVER 10KVA 50% _ H HEATING 100% = 4.2 M MOTORS 100% = 14.6 LM LARGEST MOTOR 125% = 6.8 L LIGHTING 125% _ K KITCHEN 65% = 7.6 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% = PANEL 'P1 M' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: MDP NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD (KVA) PANEL DESCRIPTION 6 AMPI P R H M L K G 0 TOTAL 2.1 1 HP -1 A 40 12 3.0 2.1 3.0 PANEL AMPS: 200 5 - C - - 3 - - - B - - - 3.0 7 STAIRWELL PRESSURIZATION FAN S A 35 3 3.0 FEEDER AMPS : 200 2.1 5 HP -2 A 40 2 3.0 2.1 3.0 L - L VOLTS : 208 2.1 7 --- B -- - 3.0 - 3.0 L- NVOLTS : 120 18.0 9 DCU-1 POOL UNIT A 15 2 0.7 C -_ 0.7 PHASE: 3 11 --- B -- - 0.7 SPARE 0.7 WIRE : 4 X 13 WALL HEATEREWH-1 (STAIR2) A 20 1 1.5 1.5 PHASE : 15 HP -3 B 40 2 3.0 20 3.0 X 0.4 17 --- C -- - 3.0 SMOKE/FIRE CAMPERS - EAST 3.0 20 1 19 CLG HTR - EMERG RM 128 A 15 2 1.0 29 SPACE C 1.0 M. L.O. MAIN CB X FEED -THRUM 17 21 --- B -- - 1.0 1.0 23 CLG HTR- POOL EQUIP 121 C 15 2 1.0 1.0 FLUSH M.L.O. 25 - - - A - - - 1.0 LOADSUMMARY 1.0 SURFACE -K 27 FAN COIL 1,2,3 B 15 2 0.9 SPACE 0.9 ISO GND 2 CORRIDOR SMOKE CONTROL EXHA UST FAN A 50 3 3.1 A 29 - - - C - - - 0.9 3.1 0.9 FEED-THRU 6 - C - - 3.1 SPACE 31 SPARE A 20 1 2.1 1 2.1 10 - B - - 33 SPARE B 20 1 12 - C - - 2.1 2.1 35 SPARE C 20 1 31 SPACE OTHER KVA 37 SPARE A 20 1 PHASEA KVA : 9.5 18 SPARE C 20 1 LOADSUMMARY SPACE 39 SPARE B 20 1 (TOTAL, ALL SECTIONS) 41 SPARE C 20 1 AMPS : 79.1 PHASE C KVA : 9.5 24 SPACE C REC KVA 2 WATER HEATER IGNITION CIRCUIT A 20 1 0.2 9.5 0.2 9.5 4 WATER HEATER IGNITION CIRCUIT B 20 1 0.2 -- 0.2 HEAT KVA : 28.0 6 WATER HEATER IGNITION CIRCUIT C 20 1 0.2 --- 0.2 MOTOR KVA : 21.2 LIGHTING KVA 9.5 8 WATER HEATER IGNITION ORCUIT A 20 1 0.2 2 0.2 A 20 1 0.4 0.3 0.7 10 WATER HEATER IGNITION CIRCUIT B 20 11 0.2 6 0.2 KITCHEN KVA DEMAND LOAD 12 CLG EXH FAN - POOL RR, EMPLOYEE RR C 15 1 0.2 KVA : 29.2 0.2 GEN LTG KVA ELEVATOR CAB LIGHTS 14 RCP -1 DOMESTIC HOT WATER PUMP A 15 3 0.8 0.2 0.8 OTHER KVA 16 --- B -- - 0.8 0.2 0.8 PHASEA KVA : 17.0 KITCHEN KVA GEN LTG KVA 18 --- C -- - 0.8 0.8 AMPS : 141.7 A 20 SPARE A 15 3 0.5 OTHER KVA : 1.3 PHASE B KVA : 16.1 AMPS : 134.2 16 22 - - - B -- - PHASE A KVA : 24 --- C -- - CI 20 11 PHASE CKVA : 16.1 26 BATH EXH FAN BEF 2 A - - - 0.9 EMERGENCY LTS - NORTH STAIRS 0.9 AMPS : 134.2 1 28 --- B -- - 0.9 0.9 EMERGENCY EGRESS LTS - 2ND FLR BI 30 --- C -- - 0.9 AMPS : 0.9 24 32 POOL AREA HEATING UNIT DHU-I A 60 3 5.4 5.4 CONNECTED LOAD 31.4 34.--- 26 B -- - 5.4 11 5.4 KVA : 49.2 0.2 36 - - - C -_ - 5.4 B 5.4 AMPS : 136.6 0.2 38 SPARE A 20 1 30 SPARE DEMAND LOAD 20 40 SPARE B 20 1 KVA : 50.0 SPACE 42 SPARE C 20 1 CONNECTED LOAD AMPS : 138.6 NOTES/REMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION DEMAND R RECEPTACLES - TO 10KVA 100% _ REMAINING OVER 10KVA 50% _ H HEATING 100% = 28.0 M MOTORS 100% = 18.2 LM LARGEST MOTOR 125% = 3.8 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAC PER NEC 220.44 = O OTHER 100% _ PANEL 'PSE' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: 4TH FLOOR TUKWILA, WA FED FROM: P1 NOTE CKT CIRCUIT NAME CBSIZE NO. 8 AMP P LOAD(KVA) PANEL DESCRIPTION R H M L K G 0 TOTAL 1 ELEVATOR PRESSURIZATION FAN A 35 3 2.1 2.1 PANEL AMPS : 100 LOCATION: 3 - B - - 2.1 FED FROM: 2.1 FEEDER AMPS : 100 5 - C - - 2.1 CKT NO. 2.1 L- L VOLTS : 208 LOAD (KVA) 7 STAIRWELL PRESSURIZATION FAN S A 35 3 2.1 PANEL DESCRIPTION 2.1 L- N VOLTS : 120 PHASE: 3 1 9 - B - 1-1 2.1 18.0 2.1 18.0 11 - C - - 2.1 2.1 WIRE : 4 B 13 SPARE Al20 1 - 18.0 18.0 F®ERA MPS : 15 SPARE B 20 1 5 - - - C -_ - 17 SPARE C 20 1 18.0 L - L VOLTS : L- N VOLTS : 208 120 19 SPACE A 7 SPARE A 20 1 M.L.O. X SPARE B 21 SPACE B 1 MAIN CB PHASE : 3 23 SPACE C SMOKE/FIRE CAMPERS - WEST C 20 FLUSH SURFACE X 0.4 0.4 25 SPACE A 4 _ 13 SMOKE/FIRE CAMPERS - EAST 27 SPACE B 20 1 ISO GND 0.4 29 SPACE C 15 SP -1 B 20 1 1.1 1.1 FEED -THRUM 17 SP -2 C A _ 1.1 1.1 B 19 SPACE A C M.L.O. A 21 SPACE LOADSUMMARY B (T O T A L .ALL SECTIONS I X C 23 SPACE REC KVA 2 CORRIDOR SMOKE CONTROL EXHA UST FAN A 50 3 3.1 A 3.1 4 - B - - 3.1 3.1 HEAT KVA 6 - C - - 3.1 SPACE 3.1 MOTOR KVA : 28.5 LIGHTING KVA 8 STAIRWELL PRESSURIZATION FAN N A 35 3 2.1 1 2.1 10 - B - - 2.1 29 2.1 KITCHEN KVA 12 - C - - 2.1 2.1 GEN LTG KVA 14 SPARE A 20 1 31 SPACE OTHER KVA 16 SPARE B 20 1 PHASEA KVA : 9.5 18 SPARE C 20 1 33 SPACE B AMPS : 79.1 20 SPACE A PHASE B KVA : 9.5 22 SPACE B SPACE C AMPS : 79.1 PHASE C KVA : 9.5 24 SPACE C 26 SPACE A PANE. P5E- ROOF MECHANICAL FANS A 100 3 9.5 AMPS : 79.1 9.5 28 SPACE B 39 --- B -- 30 SPACE C 95 95 (TOTAL, ALL SECTIONS j A 41 --- C -- CONNECTED LOAD 9.5 B 9.5 REC KVA : HEAT KVA : 0.6 2.2 KVA : 28.5 2 C A 20 1 0.4 0.3 0.7 4 AMPS : 79.0 B 20 1 0.2 0.2 A 6 ELEVATOR CAB LIGHTS C DEMAND LOAD 1 B 0.2 MOTOR KVA : KVA : 29.2 C ELEVATOR CAB LIGHTS A 20 AMPS : 81.2 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 25.4 LM LARGEST MOTOR 125% = 3.8 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAD PER NEC 220.44 = O OTHER 100% _ , Mp 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 r CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express TukwRa, WA Sheet Title: PANEL SCHEDULES 40LIANCL. NFPA 70 - NI SET' 2 6 bib r PANEL 'P1E' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: MDP/GENSETV[A TRA NSFERSWITCH NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 6 AMP P R H M L K G O TOTAL 1 ELEVATOR A 300 3 18.0 18.0 PA NEL AMPS : 400 3 - - - B - - - 18.0 18.0 F®ERA MPS : 400 5 - - - C -_ - 18.0 18.0 L - L VOLTS : L- N VOLTS : 208 120 7 SPARE A 20 1 9 SPARE B 20 1 PHASE : 3 11 SMOKE/FIRE CAMPERS - WEST C 20 1 0.4 0.4 WIRE : 4 13 SMOKE/FIRE CAMPERS - EAST A 20 1 0.4 0.4 15 SP -1 B 20 1 1.1 1.1 17 SP -2 C 20 1 1.1 1.1 19 SPACE A M.L.O. 21 SPACE B MAIN CB FLUSH X 400A 23 SPACE C 25 SPACE A SURFACE X 27 SPACE B ISO GND 29 SPACE C FEED -THRUM 31 SPACE A 33 SPACE B 35 SPACE C 37 PANE. P5E- ROOF MECHANICAL FANS A 100 3 9.5 9.5 LOADSUMMARY 39 --- B -- - 95 95 (TOTAL, ALL SECTIONS j 41 --- C -- - 9.5 9.5 REC KVA : HEAT KVA : 0.6 2.2 2 RECEPTACLES/LIGHTS - ELEVATOR PITS A 20 1 0.4 0.3 0.7 4 RECEPTACLE- ELEVATOR EQUIP RM B 20 1 0.2 0.2 6 ELEVATOR CAB LIGHTS C 20 1 0.2 0.2 MOTOR KVA : 82.5 8 ELEVATOR CAB LIGHTS A 20 1 0.2 0.2 LIGHTING KVA : 4.4 10 ELEVATOR ROOM LIGHTS B 20 1 0.2 0.2 KITCHEN KVA GEN LTG KVA 12 FACP C 20 1 0.5 0.5 14 EMERGENCY LTS - LOBBY, W CORRIDORS A 20 1 0.5 0.5 OTHER KVA : 1.3 16 EMERGENCY LTS - N CORRIDORS, UTILITY B 20 1 PHASE A KVA : 30.2 18 EMERGENCY LTS - SW STAIRS CI 20 11 1.5 1.5 AMPS : 251.6 20 EMERGENCY LTS - NORTH STAIRS Al20 1 0.7 0.7 PHASE B KVA : 29.4 22 EMERGENCY EGRESS LTS - 2ND FLR BI 20 1 0.2 0.2 AMPS : 244.9 24 EMERGENCY EGRESS LTS - 3RD FLR C1 20 1 0.2 0.2 PHASE C KVA : 31.4 26 EMERGENCY EGRESS LTS - 4TH FLR Al20 11 0.2 0.2 AMPS : 261.6 28 EMERGENCY EGRESS LTS - 5TH FLR B 20 1 0.2 0.2 30 SPARE C 20 1 32 SPACE A CONNECTED LOAD 34 SPACE B KVA : 91.0 36 SPACE C AMPS : 252.5 38 SPACE Aj DEMAND LOAD 40 SPACE 4B_ KVA : AMPS : 96.6 268.1 42 SPACE NOTES/REMARKS : 1. 2. RECEIVED 3. CITY OF TUKWILA SEP 12 2016 PERMIT (PERMIT CENTER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN ? G GENERAL LIGHTING LOAC O DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% _ PER NEC 220.44 = 100% = 0.6 2.2 64.5 22.5 5.5 1.3 , Mp 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 r CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express TukwRa, WA Sheet Title: PANEL SCHEDULES 40LIANCL. NFPA 70 - NI SET' 2 6 bib r PANEL 'PG4' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 8 AM P P R H M L K G O TOTAL [TMP P 1 218 - GENERAL LTS/REC A 20 1 0.8 0.8 PANEL AMPS : 200 1 3 218 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 FEEDER AMPS : 200 BI "'-5-.218 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 L - N VOLTS : 120 212 - BATHROOM 7 1218 - PTAC A 20 2 1.6 1.6 9 - B - - 1.6 1.6 PHASE: 3 B 20 11 318 - GENERAL LTS/REC C 20 1 0.8 0.8 WIRE : 4 PHASE : 3 13 318 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 0.8 0.8 15 318 - BATHROOM B 20 1 0.2 0.2 1 1.1 17 318 - PTAC C 20 2 1.6 1.6 BI 20 1 19 - A - - 1.6 1.6 M. L.O. MA IN CB X 20 2 1.6 21 418 - GENERAL LTS/REC B 20 1 0.8 0.8 A 23 418 - REFRIGERATORIMICROWAVE C 20 1 1.1 1.1 FLUSH A 20 21 412 - GENERAL LTS/REC 25 418 - BATHROOM A 20 1 0.2 0.2 SURFACE X B 20 23 27 418 - PTAC B 20 2 1.6 1.6 ISO GND FEED-THRU 17 1306 - PTAC C 20 29 - C - - 1.6 1.6 0.2 31 518 - GENERAL LTS/REC A 20 1 0.8 0.8 412 - PTAC B 33 518 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 21 406 - GENERAL LTS/REC 35 518 - BATHROOM C 20 1 0.2 0.2 1.6 MAIN CB FLUSH 37 518 - PTAC A 20 2 1.6 1.6 0.8 25 406 -BATHROOM 39 - B - - 1.6 1.6 1.1 1.1 41 220 - GENERAL LTS/REC C 20 1 0.8 0.8 20 1 0.2 43 220 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 A 20 2 45 220 - BATHROOM B 20 1 1 0.2 0.2 - B 47 220 - PTAC C 20 2 1.6 1.6 41 214 - GENERAL LTS/REC 49 - A - - 1.6 1.6 1.1 43 51 320 - GENERAL LTS/REC B 20 1 0.8 0.8 53 320 - REFRIGERATORIMICROWAVE C 20 1 1.1 1.1 0.2 0.2 55 320 - BATHROOM A 20 1 0.2 0.2 20 2 1.6 57 320 - PTAC B 20 2 1.6 1.6 A - - 59 - C - - 1.6 1.6 314 - GENERAL LTS/REC 2 420 - GENERAL LTS/REC A 20 1 0.8 0.8 LOAD SUM MARY 314-REFRIGERATORWICROWAVE 4 420 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 (TOTAL ,ALL SECTIONS j 55 6 420 - BATHROOM C 20 1 0.2 0.2 8 420 - PTAC A 20 2 1.6 1.6 1.6 - 10 - B - - 1.6 1.6 REC KVA 1.6 12 520 - GENERAL LTS/REC C 20 1 0.8 0.8 HEAT KVA MOTOR KVA : 37.2 LIGHTING KVA 0.9 14 520 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 20 1 16 520 - BATHROOM B 20 1 0.2 0.2 414 - BATHROOM 18 520 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 8 20 - A - - 1.6 1.6 GEN LTG KVA : 11.3 2 22 222 - GENERAL LTS/REC B 20 1 0.8 0.8 OTHER KVA REC KVA 24 222 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 0.9 0.9 26 222- BATHROOM A 20 1 0.2 0.2 PHASEA KVA : 20.4 1.1 28 222 - PTAC B 20 2 1.6 1.6 AMPS : 169.7 0.2 30 - C - - 1.6 1.6 PHASE B KVA : 19.0 20 2 32 322 - GENERAL LTS/REC A 20 1 0.8 0.8 AMPS : 158.3 A 34 322 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 PHASE KVA : 20.4 AMPS : 169.7 216 - GENERAL LTS/REC 36 322 - BATHROOM C 20 1 0.2 0.2 38 322 - PTAC A 20 21 1.6 1 1 1.6 _771- 1.6 40 - B - - 1.6 1.6 OONNECTED LOAD 0.2 42 422 - GENERAL LTS/REC C 20 1 0.8 0.8 KVA : 61.1 AMPS : 169.6 1.6 44 422 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 C 46 422 - BATHROOM B 20 1 0.2 0.2 DEMAND LOAD 316 -GENERAL LTS/REC 48 422 - PTAC C1 20 2 1.6 1.6 KVA : 51.4 34 50 - A - - 1.6 1.6 AMPS : 142.7 KITCHEN KVA : 52 522 - GENERAL LTS/REC B 20 11 0.8 1 0.8 0.2 AMPS : 172.0 54 522 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 1.6 1.6 56 522 - BATHROOM A 20 1 0.2 0.2 - - 1.6 58 522 - PTAC B 20 2 1.6 1.6 C 20 1 60 - C1 1.6 1.6 416-REFRIGERATORIMICROWAVE NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 35.7 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% _ K KITCHEN 65% = 8.2 G GENERAL LIGHTING LOAD PER NEC 220.44 = 5.6 0 OTHER 100% _ PANEL 'PG3' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE _6 LOAD (KVA) PANEL DESCRIPTION [TMP P R H M L K G 0 TOTAL 1 212 - GENERAL LTS/REC Al20 1 0.8 0.8 PANEL AMPS : 200 3 212 - REFRIGERATOR/MICROWAVE BI 20 1 1.1 1.1 FEEDER AMPS : 200 5 212 - BATHROOM C1 20 1 0.2 0.2 L - L VOLTS : 208 L - N VOLTS : 120 7 212 - PTAC A 20 2 1.6 1.6 B 20 9 - B - - 1.6 1.6 PHASE : 3 11 312 - GENERAL LTS/REC C1 20 11 0.8 0.8 WIRE : 4 L - L VOLTS : 13 312-REFRIGERATOR/MICROWAVE Al20 1 1.1 1.1 15 312 - BATHROOM BI 20 1 0.2 0.2 - 1.6 17 312 - PTAC C1 20 2 1.6 1.6 11 306 - GENERAL LTS/REC C 20 19 - A - - 1.6 1.6 M.L.O. X 13 306-REFRIGERATOR/MICROWAVE A 20 21 412 - GENERAL LTS/REC B 20 11 0.8 0.8 MAIN CB 15 306 - BATHROOM B 20 23 412-REFRIGERATOR/MICROWAVE C 20 11 1.1 1.1 FLUSH 17 1306 - PTAC C 20 25 412 - BATHROOM A 20 1 0.2 0.2 SURFACE X 19 - A - 27 412 - PTAC B 20 2 1.6 1.6 ISO GND FEED-THRU 21 406 - GENERAL LTS/REC 29 - C - - 1.6 1.6 MAIN CB FLUSH 31 512 - GENERAL LTS/REC A 20 1 0.8 0.8 25 406 -BATHROOM A 20 33 512 - REFRIGERATOR(MICROWAV E Bl 20 1 1.1 1.1 X 35 512 - BATHROOM C 20 1 0.2 0.2 1.6 37 512 - PTAC A 20 2 j 1.6 1.6 - 1.6 39 - B - - 1.6 1.6 31 506 - GENERAL LTS/REC A 20 1 0.7 0.7 41 214 - GENERAL LTS/REC C 20 1 0.9 0.9 1.1 43 214 - REFRIGERATORIMICROWAVE A 20 1 1.1 1.1 45 214 - BATHROOM B 20 1 0.2 0.2 A 20 2 47 214 - PTAC C 20 2 1.6 1.6 39 - 49 - A - - 1.6 1.6 0.7 51 314 - GENERAL LTS/REC B 20 1 0.9 0.9 1 53 314-REFRIGERATORWICROWAVE C 20 1 1.1 1.1 45 208 - BATHROOM 55 314 - BATHROOM A 20 1 0.2 0.2 57 314 - PTAC B 20 2 1.6 1.6 - 1.6 59 - C - - 1.6 1.6 51 308 - GENERAL LTS/REC 2 414 - GENERAL LTS/REC Al20 1 0.9 0.9 LOAD SUMMARY 4 414 - REFRIGERATOR(MICROWAVE B 20 1 1.1 1.1 ( TOTAL, ALL SECTIONS) 1.1 6 414 - BATHROOM C 20 1 0.2 0.2 8 414 - PTAC A 20 2 1.6 1.6 B 20 2 10 - B - .-1 1.6 1.6 REC KVA 59 - 12 514 -GENERAL LTS/REC C 20 1 0.9 0.9 HEAT KVA MOTOR KVA : 37.2 14 514 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 0.7 16 514 - BATHROOM B 20 1 0.2 0.2 LIGHTING KVA 1.1 0. 18 514 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 20 - A - - 1.6 1.6 GEN LTG KVA : 11.9 A 20 22 216 - GENERAL LTS/REC B 20 1 70.8 0.8 OTHER KVA 24 216-REFRIGERATOR/MICROWAVE C 20 1 1.1 _771- 1.6 REC KVA '26 216 - BATHROOM A 20 1 0.2 0.2 PHASEA KVA : 20.5 0.7 28 216- PTAC B 20 2 1.6 11.6 AMPS : 170.9 30 - C - - 1.6 1.6 PHASE B KVA : 19.2 B 20 32 316 -GENERAL LTS/REC A 20 1 0.8 0.8 AMPS : 159.8 34 316 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 PHASE C KVA : 20.6 KITCHEN KVA : 36 316 -BATHROOM C 20 ill 0:2 0.2 AMPS : 172.0 38 316 - PTAC A 20 2 1.6 1.6 1 40-- 0.7 B - - 1.6 1.6 CONNECTED LOAD C 20 42 416- GENERAL LTS/REC C 20 1 0.8 0.8 KVA : 61.7 AMPS : 171.3 44 416-REFRIGERATORIMICROWAVE A 20 1 1.1 1.1 1.6 46 416 - BATHROOM B 20 1 0.2 0.2 DEMAND LOAD C - 48 416 - PTAC C 20 12 1.6 1.6 KVA : 51.7 50 - A - - 1.6 1.6 AMPS : 143.6 AMPS : PHASE C KVA : 52 516 - GENERAL LTS/REC B 20 1 0.8 0.8 C 20 1 54 516 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 38 310 - PTAC 56 516 - BATHROOM A 20 1 0.2 0.2 58 1516 - PTAC B 201-- 1.6 1.6 60 - -q-- 1.6 1.6 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAININGOVER10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 35.7 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% _ K KITCHEN 65% = 8.2 G GENERAL LIGHTING LOAD PER NEC 220.44 = r 6.0 0 OTHER 100% _ REC CITY OF 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 tf; CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED.FOR COMPLIANCE WI EL SCHEDULES NFPA70 - NEC SEP 12 2016 SEP 2 6 2016 City of Tukwila PERMIT CENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG2' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT CIRCUIT NAME NO. CBSIZE LOAD (KVA) PANEL DESCRIPTION 8 AMP P R H M L K G 0 TOTAL 1 206 - GENERAL LTS/REC A 20 1 0.7 0.7 PANEL AMPS : 200 3 206 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 FEEDER AMPS : 200 .r-5-.206 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 7 206 - PTAC A 20 2 1.6 1.6 L - N VOLTS : 120 9 - B - - 1.6 1.6 PHASE : 3 11 306 - GENERAL LTS/REC C 20 1 0.7 0.7 WIRE : 4 13 306-REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 15 306 - BATHROOM B 20 1 0.2 0.2 17 1306 - PTAC C 20 2 1.6 1.6 19 - A - - 1.6 1.6 M.L.O. X 21 406 - GENERAL LTS/REC B 20 1 0.7 0.7 MAIN CB FLUSH 23 406-REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 25 406 -BATHROOM A 20 1 0. 2 0.2 SURFACE X 27 406 - PTAC B 20 2 1.6 1.6 ISO GND 29 - C - - 1.6 1.6 FEED-THRU 31 506 - GENERAL LTS/REC A 20 1 0.7 0.7 33 506-REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 35 506 - BATHROOM C 20 1 0.2 0.2 37 506 - PTAC A 20 2 1.6 1.6 39 - B - - 1.6 1.6 41 208 - GENERAL LTS/REC C 20 1 0.7 0.7 43 208 - REFRIGERATORIMICROWAVE A 20 1 1.1 1.1 45 208 - BATHROOM B20 1 0.2 0.2 47 208 - PTAC C 20 2 1.6 1.6 49 - A - - 1.6 1.6 51 308 - GENERAL LTS/REC B 20 1 0.7 0.7 53 308 - REFRIGERATORIMICROWAVE C 20 1 1.1 1.1 55 308 - BATHROOM A 20 1 0.2 0.2 57 308 - PTAC B 20 2 1.6 1.6 59 - C - - 1.6 1.6 2 408 - GENERAL LTS/REC A 20 1 0.7 0.7 LOAD SUM MARY 4 408 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 ( TOTAL, ALL SECTIONS) 6 408 - BATHROOM C 20 1 0.2 0.2 8 408 - PTAC A 20 2 1.6 11.6 10 - B - - 1.6 1.6 REC KVA 12 508- GENERAL LTS/REC C 20 1 0.7 0.7 HEAT KVA 14 508 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 MOTOR KVA : 37.2 16 508 - BATHROOM B 20 1 0.2 0.2 LIGHTING KVA 18 508 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 20 - A - - 1.6 1.6 GEN LTG KVA : 10.1 22 210- GENERAL LTS/REC B 20 1 0.7 0.7 OTHER KVA 24 210-REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 PHASEA KVA : 20.0 26 210 - BATHROOM A 20 1 0.2 0.2 28 210-PTAC B 20 12 1.6 1.6 AMPS : 166.3 30 - C - - 1.6 1.6 PHASE B KVA : 18.6 32 310 - GENERAL LTS/REC A 20 1 0.7 0.7 AMPS : PHASE C KVA : 154.9 20.0 34 310 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 36 310 - BATHROOM C 20 1 0.2 0.2 AMPS : 166.3 38 310 - PTAC A 20 2 1.6 1.6 40 - B - - 1.6 1.6 CONNECTED LOAD 42 410 - GENERAL LTS/REC C 20 1 0.7 0.7 KVA : 59.9 44 410-REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 AMPS : 166.2 46 410 -BATHROOM B 20 1 0.2 0.2 DEMAND LOAD 48 410 -PTAC C 20 2 1.61.6 KVA : 50.8 50 - A - - 1.6 1.6 AMPS : 141.1 52 510 - GENERAL LTS/REC B 20 1 0.7 0.7 54 510 - REFRIGERATOR/MICROWAV E C 20 1 1.1 1.1 56 510 -BATHROOM A 20 1 0.2 0.2 58 510 - PTAC B 20 2 1.6 1.6 60 - C - - 1.6 1.6 NOTES/REMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10 KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOA 0 OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.0 100% _ REC CITY OF 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 tf; CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED.FOR COMPLIANCE WI EL SCHEDULES NFPA70 - NEC SEP 12 2016 SEP 2 6 2016 City of Tukwila PERMIT CENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG4' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: IF 16195 LOCATION: TUKWILA,WA FED FED FROM.- ROM:NOTE FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) LOAD (KVA) PANEL DESCRIPTION -61 TMP R H M L K G O TOTAL R H M L K I G O 1 218 - GENERAL LTS/REC A 20 1 1 0.8 0.8 PANEL AMPS : 200 FEEDER AMPS : 200 10.7 3 218 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 B 20 1 5 218 - BATHROOM C 20 1 20 1 0.2 0.2 L - L VOLTS : 208 0.2 7 218 - PTAC A 20 2 1.6 2 1.6 1.6 L - N VOLTS : 120 1.6 9 - B - - 1.6 - 1.6 1.6 PHASE: 3 1.6 11 318 - GENERAL LTS/REC C 20 1 20 1 0.8 0.8 WRE : 4 0.7 13 318- REFRIGERATOR/MICROWAVE A 20 1 20 1.1 1.1 15 318 - BATHROOM B 20 1 20 1 0.2 0.2 0.2 0.2 17 318 - PTAC C 20 21 11.6 .21 1.6 1 1.6 1.6 19 - A - - 1.6 1-1 1.6 1.6 M.L.O. X 1.6 M.L.O. 21 418 - GENERAL LTS/REC B 20 1 20 F 0.8 0.8 MAIN CB 0.7 MAIN CB 23 418 - REFRIGERATOR/MICROWAVE C 20 1 20 1.1 1.1 FLUSH 1.1 FLUSH 25 418 - BATHROOM A 20 1 1 0.2 0.2 SURFACE X 0.2 SURFACE 27 418 - PTAC BI 20 211 1.6 1 1 1.6 1.6 ISO GND 1.6 ISO GND 29 - C - - 1.6 - 1.6 1.6 FEED-THRU 1.6 FEED-THRULJ 31 518 - GENERAL LTS/REC A 20 1 20 1 0.8 0.8 0.7 0.7 33 518 - REFRIGERATOR/MICROWAV E B 20 1 20 1.1 1.1 1.1 35 518 - BATHROOM C 20 1 20 1 0.2 0.2 0.2 0.2 37 518 - PTA C A 20 21 1.6 2 1.6 1.6 1.6 39 - B - - 1.6 - 1.6 1.6 1.6 41 220 - GENERAL LTS/REC C 20 1 0.7 1 0.7 0.8 43 226-REFRIGERATOR/MICROWAVE 0.8 20 1 43 220 - REFRIGERATOR/MICROWAVE A 20 1 1.1 45 226 - BATHROOM 1.1 20 1 45 220 - BATHROOM B 20 1 1 0.2 1 47 226 - PTAC 0.2 20 2 47 220 - PTAC C 20 21 1.6 49 - 1.6 - 49 - A - - 1.6 51 326 - GENERAL LTS/REC 1.6 0.7 0.7 51 320 - GENERAL LTS/REC B 20 1 0.8 0.8 53 329- REFRIGERATOR/MICROWAVE 53 320 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 55 326 - BATHROOM 1.1 11 55 329- BATHROOM 55 320 - BATHROOM A 20 1 0.2 0.2 57 326 - PTAC 0.2 20 21 57 329- PTAC 57 320 - PTAC B 20 211 1.6 59 - 1.6 - - 59 - 59 - C - - 1.6 2 426- GENERAL LTS/REC 1.6 20 1 2 429- GENERAL LTS/REC 2 420 -GENERAL LTS/REC A 20 1 LOADSUMMARY 1.1 0.8 B 0.8 LOADSUMMARY 4 429 - REFRIGERATOR/MICROMV E 4 420 - REFRIGERATOR/MICROWAVE B 20 1 (TOTAL. ALL SECTIO 1.1 6 426 - BATHROOM 1.1 ITO T A L, ALL SECTIONS 1 6 420 - BATHROOM C 20 1 1 1 0.2 7TO.2 0.2 A 20 2 8 420 - PTAC A 20 2 1.6 1.6 B - - 10 - B - - 1.6 REC KVA F 1.6 REC KVA 20 1 12 520 - GENERAL LTS/REC C 20 1 0.7 HEAT KVA 0.8 0.8 HEAT KVA 20 1 14 520 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 37.2 1.1 MOTOR KVA : 37.2 1 16 520 - BATHROOM B 20 1 0,2 LIGHTING KVA 0.2 0.2 LIGHTING KVA 20 2 18 520 - PTAC C 20 2 1.6 KITCHEN KVA : 1 r-1.6 KITCHEN KVA : 12.6 - 20 - A - - 1.6 GEN LTG KVA : 10.1 1.6 GEN LTG KVA : 11.3 1 22 222 - GENERAL LTS/REC B 20 1 0.7 OTHER KVA 0.8 0.8 OTHER KVA 20 1 24 222 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 1.1 A 20 1 26 222 - BATHROOM A 20 1 0.2 PHASE AKVA : 0.2 0.2 PHASEA KVA : 20.4 2 28 222 - PTAC B 20 2 1.6 AMPS : PHASE B KVA : 166.4 18.6 1.6 AMPS PHASE B KVA : 169.7 : 19.0 1.6 30 - C - - 1.6 1.6 1 32 322 -GENERAL LTS/REC A 20 1 0.7 AMPS : 0.8 0.7 0.8 AMPS : 158.3 1 34 322 - REFRIGERATOR/MICROWAVE B 20 1 01 1.1 1.1 20.0 1.1 1.1 PHASE C KVA : 20.4 1 36 322 -BATHROOM C 20 1 0.2 AMPS : 0.2 0.2 0.2 AMPS : 169.7 2 38 322 - PTAC A 20 2 1.6 1.6 1.6 B - - 40 - B - - 1.6 CONNECTED LOAD 42 428 - GENERAL LTS/REC 1.6 CONNECTED LOAD 1 42 422 - GENERAL LTS/REC C 20 1 0.7 KVA : 0.8 0.7 0.8 KVA : 61.1 1 44 422 - REFRIGB: ATOR/MICROWAVE A 20 1 1.1 1.1 166.2 1.1 1.1 AMPS : 169.6 1 46 422 - BATHROOM B 20 1 0.2 DEMAND LOAD 0.2 0.2 0.2 DEMAND LOAD 20 48 422 - PTAC C 20 2 1.6 1.6 KVA : AMPS : 50.8 141.1 1.6 KVA : 51.4 AMPS : 142.7 A - - 50 - A - - 1.6 1.6 B 52 522 - GENERAL LTS/REC B 20 1 0.7 0.8 0.8 54 528-REFRIGERATOR/MICROWAVE C 54 522 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 1.1 56 528 - BATHROOM A 56 522 - BATHROOM A 20 1 0.2 0.2 0.2 58 528 - PTAC B 58 522 - PTAC B 20 21--r-l- 1.6 r 1.6 1.6 60 - C - - 60 - ic] - - 1.6 1.6 NOTES/REMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 101<VA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.9 100% _ DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.6 100% _ RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG5' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA,WA FED FED FROM: NOTE NOTE CKT CIRCUIT NAME NO. CB SIZE LOAD(KVA) LOAD (KVA) PANEL DESCRIPTION PANEL DESCRIPTION 8 AMP PI R H M L K I G O TOTAL A 1 224 - GENERAL LTS/REC A 20 1 0.7 0.7 PANEL AMPS : FEEDERAMPS : 10.7 PANEL AMPS : FEEDER AMPS : 200 200 1.1 3 224 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 20 5 224 - BATHROOM C 20 1 0.2 0.2 0.2 208 0.2 L - L VOLTS : 208 20 7 224 - PTAC A 20 2 1.6 1.6 L - N VOLTS : 120 1.6 L- N VOLTS : 120 - 9 - B - - 1.6 1.6 PHASE: 3 1.6 PHASE : 3 20 11 324 - GENERAL LTS/REC C 20 1 0.7 0.7 0.7 4 0.7 WRE : 4 20 13 324 - REFRIGERATOR/MICROWAVE A 20 1 1.1 15 330 - BATHROOM B 1 20 15 324 - BATHROOM B 20 1 0.2 0.2 0.2 0.2 17 330 - PTAC C 20 17 324 - PTAC C 20 .21 1.6 1 1.6 1.6 19 - A - 1-19-- A - 1-1 1.6 1.6 M.L.O. X 1.6 M.L.O. X B 20 21 424 - GENERAL LTS/REC BI 20 1 0.7 0.7 0.7 0.7 MAIN CB 23 430- REFRIGERATOR/MICROWAVE C 20 23 424 - REFRIGERATOR/MICROWAVE C1 20 1 1.1 FLUSH 1.1 FLUSH 25 430- BATHROOM A 20 25 424 - BATHROOM Al20 1 0.2 0.2 0.2 X 0.2 SURFACE X B 20 27 424 - PTAC BI 20 2 1.6 1.6 ISO GND 1.6 ISO GND 29 - C - 29 - C - - 1.6 1.6 FEED-THRU 1.6 FEED-THRULJ 31 530- GENERAL LTS/REC A 20 31 524 - GENERAL LTS/REC A 20 1 0.7 0.7 0.7 0.7 33 530 - REFRIGERATOR/MICROWAV E B 20 33 524 - REFRIGBRATORIMICROWAV E B 20 1 1.1 1.1 35 530 - BATHROOM C 20 35 524 -BATHROOM C 20 1 0.2 0.2 0.2 0.2 37 530 - PTAC A 20 37 524 - PTAC A 20 2 1.6 1.6 1.6 39 - B - 39 - B - - 1.6 1.6 1.6 41 229- GENERAL LTS/REC C 20 41 226 - GENERAL LTS/REC C 20 1 0.7 1 0.7 1.1 43 226-REFRIGERATOR/MICROWAVE A 20 1 43 229 - REFRIGERATOR/MICROWAV E 1.1 20 1 1.1 1.1 45 226 - BATHROOM B 20 1 45 229- BATHROOM B 0.2 1 0.2 0.2 47 226 - PTAC C 20 2 1.6 C 20 2 1.6 1.6 49 - Al- - 11.6 A - - 1.6- 1.6 51 326 - GENERAL LTS/REC BI 20 1 0.7 0.7 53 326-REFRIGERATOR/MICROWAVE C1 20 1 53 329- REFRIGERATOR/MICROWAVE C 1.1 1 1.1 1.1 55 326 - BATHROOM Al20 11 55 329- BATHROOM A 20 0.2 0.2 0.2 57 326 - PTAC B 20 21 57 329- PTAC 1.6 20 2 1.6 59 - C - - 59 - 1.6 - - 1.6 2 426- GENERAL LTS/REC A 20 1 2 429- GENERAL LTS/REC A 20 0.7 0.7 LOADSUMMARY 1.1 4 426 - REFRIGERATOR/MICROWAVE B 20 1 4 429 - REFRIGERATOR/MICROMV E B 1.1 1 1.1 (TOTAL. ALL SECTIO IJ S 6 426 - BATHROOM C 20 1 6 429- BATHROOM C 20 0.2 0.2 0.2 7TO.2 8 426 - PTAC A 20 2 8 429- PTAC 1.6 20 2 1.6 10 - B - - 10 - 1.6 - - 1.6 REC KVA 12 526 - GENERAL LTS/REC C 20 1 12 529- GENERAL LTS/REC C 20 0.7 0.7 HEAT KVA 1.1 14 526 - REFRIGERATOR/MICROWAV E A 20 1 14 529- REFRIGERATOR/MICROWAVE A 1.1 1 1.1 MOTOR KVA : 37.2 16 526 - BATHROOM B 20 1 16 529- BATHROOM B 20 0.2 0,2 LIGHTING KVA 0.2 18 526 - PTAC C 20 2 18 529 - PTAC 1.6 20 2 1.6 KITCHEN KVA : 12.6 20 - A - - 20 - 1.6 - - 1.6 GEN LTG KVA : 10.1 22 228 - GENERAL LTS/REC BI 20 1 22 227- GENERAL LTS/REC B 20 0.7 0.7 OTHER KVA 0.7 24 228 - REFRGERATOR/MICROWAV E C1 20 1 24 227 - REFRIGERATOR/MICROWAV E C 1.1 1 1.1 26 228 -BATHROOM A 20 1 26 227- BATHROOM A 20 0.2 0.2 PHASE AKVA : 20.0 28 228 - PTAC B 20 2 28 227- PTAC 1.6 20 2 1.6 AMPS : PHASE B KVA : 166.4 18.6 30 - C - - 1.6 1.6 30 - C - - 32 328- GENERAL LTS/REC A 20 1 A 20 1 0.7 0.7 AMPS : 154.9 0.7 34 328 - REFRIGERATOR/MICROWAVE B 20 1 B 20 1.1 01 1.1 PHASE C KVA : 20.0 1.1 36 328 - BATHROOM C 20 1 C 20 1 0.2 0.2 AMPS : 166.4 0.2 38 328 - PTAC A 20 2 A 1.6 2 1.6 1.6 1.6 40 - B - - B 1.6 - 1.6 1.6 CONNECTED LOAD 42 428 - GENERAL LTS/REC C 20 1 C 20 1 0.7 0.7 KVA : 59.9 0.7 44 428-REFRIGERATOR/MICROWAVE A 20 1 A 20 1.1 1.1 AMPS : 166.2 1.1 46 428 - BATHROOM B 20 1 B 20 1 0.2 0.2 DEMAND LOAD 0.2 48 428 - PTAC C 20 2 C 1.6 2 1.6 1.6 KVA : AMPS : 50.8 141.1 1.6 50 - A - - 1.6 1.6 1.6 52 528 - GENERAL LTS/REC B 20 1 20 1 0.7 0.7 0.7 54 528-REFRIGERATOR/MICROWAVE C 20 1 20 1 1.1 1.1 1.1 1.1 56 528 - BATHROOM A 20 1 20 1 0.2 0.2 0.2 58 528 - PTAC B 20 2 20__2 1.6 1.6 r 1.6 1.6 60 - C - - 1 1 1.6 r 1.6 NOTES/REMARKS : 1. 2. 3. NOTES/REMARKS: 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 101<VA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = ' 5.0 100% _ RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG6' PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT CIRCUIT NAME NO. CB SIZE 9 AMP P LOAD(KVA) PANEL DESCRIPTION R H M L K G O TOTAL 1 230- GENERAL LTS/REC A 20 1 0.7 0.7 PANEL AMPS : FEEDERAMPS : 200 200 3 230- REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 5 230 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 7 230 - PTAC A 20 2 1.6 1.6 L - N VOLTS : 120 9 - B - I - 1.6 1.6 PHASE: 3 11 330- GENERAL LTS/REC C1 20 1 0.7 0.7 WRE : 4 13 330 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 15 330 - BATHROOM B 1 20 11 0.2 0.2 17 330 - PTAC C 20 2 1.6 1.6 19 - A - - 1.6 1.6 M.L.O. X 21 430 - GENERAL LTS/REC B 20 1 0.7 0.7 MAIN CB 23 430- REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 FLUSH 25 430- BATHROOM A 20 1 0.2 0.2 SURFACE X 27 430 - PTAC B 20 2 1.6 1.6 ISO GND 29 - C - - 1.6 1.6 FEED-THRU 31 530- GENERAL LTS/REC A 20 1 0.7 0.7 33 530 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 35 530 - BATHROOM C 20 1 0.2 0.2 37 530 - PTAC A 20 2 1.6 1.6 39 - B - - 1.6 1.6 41 229- GENERAL LTS/REC C 20 1 1.1 1.1 43 229 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 45 229- BATHROOM B 20 1 0.2 0.2 47 229 - PTAC C 20 2 1.6 1.6 49 - A - - 1.6 1.6 51 329- GENERAL LTS/REC B 20 1 1.1 1.1 53 329- REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 55 329- BATHROOM A 20 11 0.2 0.2 57 329- PTAC B 20 2 1.6 1.6 59 - C - - 1.6 1.6 2 429- GENERAL LTS/REC A 20 1 1.1 LOADSUMMARY 4 429 - REFRIGERATOR/MICROMV E B 20 1 1.1 ( TOTAL ,ALL SECTIONS J 6 429- BATHROOM C 20 1 0.2 7TO.2 8 429- PTAC A 20 2 1.6 10 - B - - 1.6 . REC KVA 12 529- GENERAL LTS/REC C 20 1 1.1 1.1 HEAT KVA 14 529- REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 MOTOR KVA : 37.2 16 529- BATHROOM B 20 1 0.2 0.2 LIGHTING KVA 18 529 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 20 - A - - 1.6 1.6 GEN LTG KVA : 11.8 22 227- GENERAL LTS/REC B 20 1 0.7 0.7 OTHER KVA 24 227 - REFRIGERATOR/MICROWAV E C 20 1 26 227- BATHROOM A 20 1 0.2 0.2 PHASE KVA : 20.4 28 227- PTAC B 20 2 1.6 1.6 AMPS : PHASE B KVA : 170.3 19.0 30 - C - - 1.6 1.6 32 327- GENERAL LTS/REC A 20 1 r0.7 0.7 AMPS : 158.5 34 327 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 PHASE C KVA : 20.8 36 327- BATHROOM C 20 1 0.2 0.2 AMPS : 173.2 38 327 - PTAC A 20 2 1.6 1.6 40 - B - - 1.6 1.6 CONNECTED LOAD 42 427- GENERAL LTS/REC C 20 1 0.7 0.7 KVA : 61.6 44 427 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 AMPS : 171.0 46 427 - BATHROOM B 20 1 0.2 0.2 DEMAND LOAD 48 427 - PTAC C 20 2 1.6 1.6 KVA : AMPS : 51.7 143.5 50 - A - - 1.6 1.6 52 527 - GENERAL LTS/REC B 20 1 0.7 0.7 54 527 - REFRIGERATOR/MICROWAV E C 20 1 1.1 1.1 56 527- BATHROOM 1A 20 1 0.2 0.2 58 527- PTAC JBI 20__2 1.6 1.6 60 - C - - 1.6 1.6 NOTES/REMARKS: 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.9 100% _ RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG7' PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: r 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CIRCUIT NAME CBSIZE 6 AMP P LOAD(KVA) PANEL DESCRIPTION R H M L K G 0 TOTAL R H M L K G O 201 - GENERAL LTS/REC A 20 1 1 0.80.8 A 20 1 PANELAMPS : 200 0.7 201 - REFRIGERATOR/MICROWAVE B 20 1 1.1 207 - REFRIGERATOR/MICROWAV E 11 FEEDERAMPS : 200 1.1 201- BATHROOM C 20 1 5 0.2 0.2 L - L VOLTS : 208 0.2 [CKT 201 - PTAC A 20 2 1.6 207 - PTAC 1.6 L - NVOLTS : 120 1.6 - B - - 1.6 B - - 16 PHASE: 3 PHASE : 3 301- GENERAL LTS/REC C 20 1 307 - GENERAL LTS/REC 0.8 0.8 VMR= : 4 WRE : 4 301- REFRIGERATOR/MICROWAVE A 20 1301 307 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 X - BATHROOM B 20 1 307 - BATHROOM 0.2 0.2 0.2 301- PTAC C 20 2 1.6 C 20 2 1.6 1.6 X - A - - 1.6 A - - 1.6 M.L.O. MAIN CB X X 21 401 - GENERAL LTS/REC B 20 1 407 - GENERAL LTS/RBC 0.8 0.8 0.7 23 401- REFRIGERATOR/MICROWAVE C 20 1 1.1 C 20 1 1.1 FLUSH FLUSH B 20 1 0.9 25 401 - BATHROOM A 20 1 407 - BATHROOM 0.2 0.2 SURFACE -K X C 20 1 27 401- PTAC B 20 21 1 1.6 B 20 21 1.6 ISO GND ISO GND 25 SPARE 29 - C - - 1.6 C - - 1.6 FEED•THRU FEED-THRU 31.4 27 31 501 - GENERAL LTS/REC A 20 1 507- GENERAL LTS/REC 0.8 0.8 0.7 29 33 501- REFRIGERATORIMICROWAVE B 20 1 1.1 B 20 1 1.1 1.1 C - - - 35 501- BATHROOM C 20 1 C 20 1 0.2 0.2 37 501- PTAC A 20 21 1 1.6 1.6 1.6 B 20 1 C - - - 39 - B - - 1.6 1.6 1.6 SPARE C 20 1 41 203- GENERAL LTS/REC C 20 1 C 20 1 0.8 0.8 37 SPARE 43 203- REFRIGERATOR/MICROWAVE A 20 1 1.1 12.4 7.6 1.1 A - - - 39 45 203 - BATHROOM B 20 1 B 20 1 0.2 0.2 41 47 203 - PTAC C 20 21 1 1.6 20.0 1.6 REC KVA : 7.2 49 - A - - 1.6 A 20 1 1.6 LIGHTING KVA : 19.4 KVA : 84.0 51 303- GENERAL LTS/REC B 20 1 B 20 1 0.8 0.8 KITCHEN KVA : 11.6 14 53 303 - REFRIGERATOR/MICROWAV E C 20 1 1.1 SPARE 1.1 GEN LTG KVA: 184.0 B -- - 55 303- BATHROOM A 20 1 A 20 1 0.2 0.2 A 20 1 1.3 57 303 - PTAC B 20 21 1 1.6 10 1.6 B 20 1 0.9 59 - C - - 1.6 12.4 8.0 1.6 400 FLOOR REC N 2 403- GENERAL LTS/REC A 20 1 A 20 1 0.8 0.8 LOADSUMMARY 14 4 403 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 1.1 ( T O T A L ,ALL SECTIONS A MPS : 3051.2 6 403 - BATHROOM C 20 1 CI 20 1 0.2 0.2 20.0 PHASEA KVA : 6.4 8 403 - PTAC A 20 2 1.6 1.6 1.6 20.4 1.3 10 - B - - 1.6 1.6 1.6 REC KVA HEAT KVA 12 503- GENERAL LTS/REC C 20 1 C 20 1 0.8 0.8 0.9 14 503 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 1.1 MOTOR KVA : 37.2 C 20 1 16 503- BATHROOM B 20 1 B 20 1 0.2 0.2 LIGHTING KVA SPARE 18 503 - PTAC C 20 2 1.6 1.6 1.6 KITCHEN KVA : 12.6 28 20 - A - - 1.6 1.6 1.6 GEN LTG KVA : 10.8 20.0 22 205- GENERAL LTS/REC B 20 1 B 20 1 0.7 0.7 OTHER KVA 18.8 24 205 - REFRIGERATOR/MICROWAV E C 20 1 1.1 1.1 1.1 PHASE KVA : 20.2 CONNECTED LOAD 26 205- BATHROOM A 20 1 1 0.2 0.2 28 205- PTAC B 20 2 1.6 1.6 1.6 AMPS : 168.7 30 - C - - 1.6 1.6 1.6 PHASE B KVA : 18.8 A20 1 32 305- GENERAL LTS/REC A 20 1 A 20 1 0.7 0.7 AMPS : 156.5 SPARE 34 305 - REFRIGERATOR/MICROVVAVE B 20 1 1.1 1.1 1.1 PHASE C KVA : 20.2 36 305- BATHROOM C 20 1 C 20 1 0.2 0.2 AMPS : 168.7 NOTESIREMARKS : DEMAND! DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 6.5 K KITCHEN 65% = 2.0 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ 38 305 - PTAC A 20 2 1.6 1.6 1.6 40 - B - - 1.6 B - - 1.6 CONNECTED LOAD CONNECTED LOAD 42 405- GENERAL LTS/REC C 20 1 SPARE 0.7 0.7 KVA : 60.6 KVA : 55.3 44 405- REFRIGERATOR/MICROWAVE A 20 1 1.1 A 20 1 1.1 AMPS : 168.3 AMPS : 153.6 46 405 - BATHROOM B 20 1 SPARE 0.2 0.2 DEMAND LOA D DEMAND LOAD 48 405- PTAC C 20 2 1.6 C 20 1 1.6 KVA : 51.2 KVA : 42.5 50 - A - - 1.6 A 20 1 1.6 AMPS : 142.1 AMPS : 117.9 52 505- GENERAL LTS/REC B 20 1 SPARE 0.7 0.7 54 505- REFRIGERATOR/MICROWAVE C 20 1 1.1 C 20 1 1.1 56 505 - BATHROOM A 20 1 PANEL PG9 0.2 0.2 6.4 58 505 - PTAC B 20 2 1.6 B - - 1.6 3.6 60 - IT - -1 j1.6 1 1 1 11.6 1.8 r r 2.6 r 1.0 r r 5.4 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 35.7 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% _ K KITCHEN 65% = 8.2 G GENERAL LIGHTING LOAD PER NEC 220.44 = 5.4 0 OTHER 100% _ PANEL 'PG8' PROJECT NAME HOLT DAY IIIN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA,NA FED FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD(KVA) PANEL DESCRIPTION 0 AMP P R H M L K G O TOTAL PANEL P1A 1 207 - GENERAL LTS/REC A 20 1 r 0,7 0.7 PANEL AMPS : 200 PANELAMPS : 100 3 207 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 FEEDER AMPS : 200 P1.3 5 207 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 L - N VOLTS : 120 PANEL P1 B 7 207 - PTAC A 20 2 1.6 1.6 1.3 9 - B - - 1.6 1.6 PHASE : 3 B 20 1 11 307 - GENERAL LTS/REC C 20 1 0.7 0.7 WRE : 4 200 FLOOR REC N 13 307 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 X 13 15 307 - BATHROOM B 20 1 0.2 0.2 17 307-PTAC C 20 2 1.6 1.6 X 4 19 - A - - 1.6 1.6 M.L.O. MAIN CB X 21 407 - GENERAL LTS/RBC B 20 1 0.7 0.7 0.9 23 407 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 FLUSH B 20 1 0.9 25 407 - BATHROOM A 20 1 0.2 0.2 SURFACE X C 20 1 X 27 407-PTAC B 20 21 1 1.6 1.6 ISO GND 25 SPARE A 20 1 29 - C - - 1.6 1.6 FEED-THRU 31.4 27 SPARE 31 507- GENERAL LTS/REC A 20 1 0.7 0.7 29 SPARE 33 507 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 C - - - 35 507 - BATHROOM C 20 1 1 0.2 0.2 37 1507 - PTAC A 20 2 1.6 1.6 B 20 1 C - - - 39 - B - - 1.6 1.6 SPARE C 20 1 41 SPARE C 20 1 13.2 22.9 36.1 37 SPARE 43 SPARE A 20 1 12.4 7.6 LOADSUMMARY I TOTAL,ALL SECTIONS( A - - - 39 45 SPA RE B 20 1 1 20.0 HEAT KVA : 89.4 41 47 SPARE CI 20 1 20.0 MOTOR KVA : 546.7 REC KVA : 7.2 rifl SPARE A 20 1 A 20 1 20.5 LIGHTING KVA : 19.4 KVA : 84.0 51 SPARE B 20 1 B 20 1 20.5 KITCHEN KVA : 11.6 14 53 SPARE C 20 1 SPARE C 20 1 GEN LTG KVA: 184.0 B -- - 55 SPARE A 20 1 8 400 FLOOR LTS A 20 1 1.3 57 SPARE B 20 1 10 400 FLOOR REC S B 20 1 0.9 59 SPARE C 20 1 12.4 8.0 12 400 FLOOR REC N 2 209 - GENERAL LTS/REC A 20 1 0.7 0.7 LOADSUMMARY 14 4 209 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 (TOTAL ,ALL SECTIONS A MPS : 3051.2 6 209 - BATHROOM CI 20 1 0.2 0.2 20.0 PHASEA KVA : 6.4 8 209 - PTAC A 20 2 1.6 1.6 20.4 1.3 10 - B - - 1.6 1.6 REC KVA : 7.2 HEAT KVA 12 309 - GENERAL LTS/REC C 20 1 0.7 0.7 0.9 14 309 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 MOTOR KVA : 24.8 C 20 1 16 309 - BATHROOM B 20 1 0.2 0.2 LIGHTING KVA : 5.2 SPARE 18 309 - PTAC C 20 21 1.6 1.6 KITCHEN KVA : 11.4 28 20 - A - - 1.6 1.6 GEN LTG KVA : 6.7 20.0 22 409 - GENERAL LTS/REC B 20 1 0.7 B -- - OTHER KVA 18.8 24 409 - REFRIGERATOR/MICROWAVE C 20 1 1.1 15.0 PHASEA KVA : 20.8 CONNECTED LOAD 26 409- BATHROOM A 20 1 0.2 FO.7 409 - PTAC B 20 2 1.6 SPARE AMPS : 173.4 30 - C - - 1.6 1.6 PHASE B KVA : 21.6 A20 1 32 509 -GENERAL LTS/REC A 20 1 0.7 0.7 AMPS: 179.8 SPARE 34 509-REFRIGERATORIMICROWAVE B 20 1 1.1 1,1 PHASE CKVA : 15.7 36 509 - BATHROOM C 20 1 0.2 0.2 AMPS : 131.2 NOTESIREMARKS : DEMAND! DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 6.5 K KITCHEN 65% = 2.0 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ 38 509 - PTAC A 20 2 1.6 1.6 40 - B - - 1.6 1.6 CONNECTED LOAD 42 SPARE C 20 1 KVA : 55.3 44 SPARE A 20 1 AMPS : 153.6 46 SPARE B 20 1 DEMAND LOAD 48 SPARE C 20 1 KVA : 42.5 50 SPARE A 20 1 AMPS : 117.9 52 SPARE B 20 1 54 SPARE C 20 1 56 PANEL PG9 A 100_3""18 2.6 2.0 6.4 58 - B - - 3.6 3.6 60 - C - - 1.8 r r 2.6 r 1.0 r r 5.4 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 23.3 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% = 6.5 K KITCHEN 65% = 7.4 G GENERAL LIGHTING LOAD PER NEC 220.44 = 3.4 0 OTHER 100% _ PANEL 'PG9' PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT NO. CIRCUIT NAME C13 SIZE LOAD(KVA) PANEL DESCRIPTION 6 AMP P R H M L K G 1 PANEL P1A 1 SPARE A 20 1 PANEL AMPS: 2500 --- C -- - 18.0 18.0 PANELAMPS : 100 B -- - 3 SPARE B 20 1 L- N VOLTS : 120 PHASE: 3 --- P1.3 FEEDERAMPS : 100 L- L VOLTS : 208 2.3 5.9 2.9 5 SPARE C 20 1 2 PANEL P1 B A 200 31.8 4.7 3.0 1.0 7 200 FLOOR LTS A 20 1 1.3 --- B -- - L - NVOLTS : 120 12.5 9 200 FLOOR REC S B 20 1 0.9 C -- - 0.7 4.1 2.0 3.5 PHASE: 3 WIRE: 4 11 200 FLOOR REC N C 20 1 0.9 3.8 0.9 WRE : 4 X 13 200 FLOOR ICE MACHINE A 20 1 1.0 4.4 1.0 15 SPARE B 20 1 5.6 SURFACE X 4 PANEL P1 D 17 300 FLOOR LTS C 20 1 1.3 1.3 19 300 FLOOR REC S A 20 1 0.9 MAIN CB 0.9 M.L.O. X A - - - --- 21 300 FLOOR REC N B 20 1 0.9 0.9 MAIN CB 5 PANEL PIE A 400 3 23 300 FLOOR ICE MACHINE C 20 1 X - - - B _ _ _ FLUSH - - - B - - - 0.2 1.1 27.5 0.6 25 SPARE A 20 1 8 POOL AREA AUXILIARY HEATER A 110 3 110.0 10.0 SURFACE GND X 1.1 27.5 1.9 0.9 31.4 27 SPARE B 20 1 6 1ISO A 200 3 29 SPARE C 20 1 --- B -- - 12.4 7.8 FEED•THRU C - - - --- 31 SPARE A 20 1 7 PANEL P1M A 200 3 33 SPARE B 20 1 C - - - AMPS : 233.3 --- B -- - 13.2 29.3 35 SPARE C 20 1 --- C -- - 13.2 22.9 36.1 37 SPARE A 20 1 PANELPG2 A 200 3 12.4 7.6 LOADSUMMARY I TOTAL,ALL SECTIONS( A - - - 39 SPARE B 20 1 12.4 7.6 1 20.0 HEAT KVA : 89.4 41 SPARE C 20 1 12.4 7.6 20.0 MOTOR KVA : 546.7 REC KVA : 7.2 9 'r SPARE A 20 1 20.5 LIGHTING KVA : 19.4 KVA : 84.0 4 SPARE B 20 1 20.5 KITCHEN KVA : 11.6 14 HEAT KVA - - - 6 SPARE C 20 1 GEN LTG KVA: 184.0 B -- - 10 MOTOR KVA LIGHTING KVA : 5.2 A 200 3 8 400 FLOOR LTS A 20 1 1.3 1,3 B - - - 10 400 FLOOR REC S B 20 1 0.9 0.9 KITCHEN KVA : 3.0 12.4 8.0 12 400 FLOOR REC N C 20 1 0.9 PANEL PG5 0.9 GEN LTG KVA 20.0 14 400 FLOOR ICE MACHINE A 20 1 1.0 B - - - 1.0 OTHER KVA A MPS : 3051.2 16 SPARE B 20.1 C - - - 12.4 7.6 20.0 PHASEA KVA : 6.4 18 500FLOORLTS C 20 1 1.3 20.4 1.3 AMPS : 53.3 PHASE B KVA : 3.6 20 500 FLOOR REC S A 20 1 0.9 0.9 22 500 FLOOR REC N B 20 1 0.9 0.9 AMPS : 30.0 PANEL PG7 24 500 FLOOR ICE MACHINE C 20 1 1.0 1.0 PHASE C KVA : 5.4 B -- - 26 SPARE A 20 1 - - - AMPS : 45.0 12.4 7.8 28 SPARE B 20 1 14 PANEL PG8 A 200 3 2.9 9.3 1 0.8 7.1 20.0 30 SPARE C 20 1 - - - B -- - 3.6 _933F_5.9 18.8 32 SPARE A 20 1 2.9 6.2 0.8 5.1 15.0 NOTES/REMARKS : DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 10.0 3• REMAINING OVER 10KVA 50% = 5.5 4. H HEATING 100% = 89.4 5. M MOTORS 100% = 517.4 6. LM LARGEST MOTOR 125% = 36.6 L LIGHTING 125% = 24.3 K KITCHEN 65% = 7.6 G GENERAL LIGHTING LOAD PER NEC 220.44 = 67.2 0 OTHER 100% = 15.4 CONNECTED LOAD 34 SPARE B 20 1 KVA : 15.4 36 SPARE C 20 1 AMPS : 42.7 SPARE A20 1 DEMAND LOAD L42 SPARE B 20 1 KVA : 15.7 SPARE C 20 1 AMPS : 43.4 NOTESIREMARKS : DEMAND! DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 6.5 K KITCHEN 65% = 2.0 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ PANEL: MDP -SECTION 1 PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: PSE PAD MOUNT TRANSFORMER NOTE CKT NO. CIRCUIT NAME ICBSIZE LOAD(KVA) PANEL DESCRIPTION 61AMPIPI R I H M L K G O TOTAL ELEVATOR 1 PANEL P1A A 200 3 1.6 7.1 1.9 10.6 PANEL AMPS: 2500 --- C -- - 18.0 18.0 - - - B -- - 1.6 5.9 0.8 2.0 10.4 FEEDER AMPS : 2300 L- N VOLTS : 120 PHASE: 3 --- - - - C -- - 2.3 5.9 2.9 11.2 L - L VOLTS : 208 VMRE: 4 2 PANEL P1 B A 200 31.8 4.7 3.0 1.0 10.5 L - N VOLTS : 120 --- --- B -- - 1.4 4.6 4.0 2.5 12.5 PHASE: 3 C -- - --- C -- - 0.7 4.1 2.0 3.5 10.3 WIRE: 4 3 PANEL P1 A 100 3 3.8 3.8 MAIN CB X --- B -- - 4.1 0.3 4.4 FLUSH --- C -- - 5.6 5.6 SURFACE X 4 PANEL P1 D A 200 3 0.7 0.9 7.3 2.9 11.8 M.L.O. - - - B - - - 0.4 0.9 7.3 4.0 12.6 MAIN CB X 2300A SPACE A - - - --- C -- - 0.4 2.4 5.4 4.7 12.9 FLUSH --- C -- - 5 PANEL PIE A 400 3 0.4 27.5 1.9 0.4 30.2 SURFACE X - - - B _ _ _ (T O T A L .ALL SECTIONS - - - B - - - 0.2 1.1 27.5 0.6 29.4 ISO GND 8 POOL AREA AUXILIARY HEATER A 110 3 110.0 10.0 - - - C - - - 1.1 27.5 1.9 0.9 31.4 FEED-THRUIJ - - - C - - - 10.0 10.0 6 PANEL PG1 - - -- A 200 3 12.4 7.8 20.2 --- B -- - 12.4 7.8 20.2 C - - - --- C -- - 12.4 7.8 20.2 7 PANEL P1M A 200 3 13.2 25.0 38.2 LOADSUMMARY C - - - AMPS : 233.3 --- B -- - 13.2 29.3 42.5 (TO TAL.ALL SECTIONS I --- C -- - 13.2 22.9 36.1 REC KVA : 20.9 --- 8 PANELPG2 A 200 3 12.4 7.6 20.0 A - - - AMPS : 233.3 - - - B - - - 12.4 7.6 1 20.0 HEAT KVA : 89.4 - - - C - - - 12.4 7.6 20.0 MOTOR KVA : 546.7 SPACE 9 PANEL PG3 A 200 3 12.4 8.1 20.5 LIGHTING KVA : 19.4 KVA : 84.0 - - - B - - - 12.4 8.1 20.5 KITCHEN KVA : 11.6 14 SPACE - - - C - - - 12.4 8.2 20.6 GEN LTG KVA: 184.0 B -- - 10 PANEL PG4 A 200 3 12.4 8.0 20.4 OTHER KVA : 15.4 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES- TO 10KVA 100% _ 3• REMAINING OVER 10KVA 50% _ 4. H HEATING 100% = 30.0 5. M MOTORS 100% = 30.0 6. LM LARGEST MOTOR 125% = 2!.5 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ - - - B - - - 12.4 8.0 20.4 PHASE A KVA : 294.7 - - - C - - - 12.4 8.0 20.4 A MPS : 2456.0 11 PANEL PG5 A 200 3 12.4 7.6 20.0 PHASE B KVA : 366.1 - - - B - - - 12.4 7.6 20.0 A MPS : 3051.2 - - - C - - - 12.4 7.6 20.0 PHASE C KVA : 292.7 12 PANEL PG6 A 200 3 1 1 12.4 8.0 20.4 A MPS : 2438.9 --- B -- - 12.4 8.0 20.4 --- C -- - 12.4 8.4 20.8 13 PANEL PG7 A 200 3 12.4 7.8 20.2 CONNECTED LOAD - - - B -- - 12.4 7.7 20.1 KVA : 887.5 - - - C -- - 12.4 7.8 20.2 AMPS: 2463.6 14 PANEL PG8 A 200 3 2.9 9.3 1 0.8 7.1 20.0 DEMAND LOAD - - - B -- - 3.6 _933F_5.9 18.8 KVA : 773.4 AMPS : 2146.7 --- C -- - 2.9 6.2 0.8 5.1 15.0 NOTES/REMARKS : DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 10.0 3• REMAINING OVER 10KVA 50% = 5.5 4. H HEATING 100% = 89.4 5. M MOTORS 100% = 517.4 6. LM LARGEST MOTOR 125% = 36.6 L LIGHTING 125% = 24.3 K KITCHEN 65% = 7.6 G GENERAL LIGHTING LOAD PER NEC 220.44 = 67.2 0 OTHER 100% = 15.4 PANEL: MDP -SECTION 2 PROJECT NAME PROJECT #: LOCATION: FED FROM: NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD(KVA) PANEL DESCRIPTION 8 AMP P R H M L K G O TOTAL 15 ELEVATOR A 300 3 18.0 18.0 PANEL AMPS : 2500 FEEDER AMPS : 2300 - - - B -- - 18.0 18.0 --- C -- - 18.0 18.0 L - LVOLTS : 208 16 SPACE A - - - L- N VOLTS : 120 PHASE: 3 --- B -- - --- C -- - VMRE: 4 3 SPACE A - - --- B -- - --- C -- - 4 SPACE Al-- - M.L.O. --- _ B -- - MAIN CB X --- C -- - FLUSH 5 SPACE A - - - SURFACE X - - - B - - - ISO GND - - - C - - - FEED•THRU 6 SPACE A - - - --- B -- - --- C -- - 7 SPACE A -- - LOADSUMMARY - - - B _ _ _ (T O T A L .ALL SECTIONS REC KVA 8 POOL AREA AUXILIARY HEATER A 110 3 110.0 10.0 --- -- - 10.0 10.0 HEAT KVA : 30.0 MOTOR KVA : 54.0 - - - C - - - 10.0 10.0 9 SPACE A - - - LIGHTING KVA - - - KITCHEN KVA GEN LTG KVA: - - - C - - - 10 SPACE A - - - OTHER KVA - - - B - - - 66.0 PHASE A KVA : 28.0 - - - C - - - AMPS : 233.3 11 SPACE A - - - PHASE B KVA : 94.0 --' B -- - AMPS : 783.3 --- C -- - PHASE CKVA : 28.0 12 SPACE A - - - AMPS : 233.3 --- B -- - --- C -- - 13 SPACE A - - - CONNECTED LOAD --- B -- - KVA : 84.0 - - - C - - - AMPS : 233.2 14 SPACE A - - - DEMAND LOAD --- B -- - KVA : 88.5 - - - C - - - AMPS : 245.7 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES- TO 10KVA 100% _ 3• REMAINING OVER 10KVA 50% _ 4. H HEATING 100% = 30.0 5. M MOTORS 100% = 30.0 6. LM LARGEST MOTOR 125% = 2!.5 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ E A LY", *_J 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 II9;rRrn11"I f } Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED q MPLI, nL SCHEDULES NFPA 70 - NEC SEP 2 6 2016 City ofTuWla BUILDING f RECEIVED CITY OF TUKWILA SEP 12 2016 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: ELECTRCIAL 054 LCP DIMMING PANEL LOAD SCHEDULE PANEL NAME: PANEL UNIT 1 LUTRON MODEL NO.: LCP-4X6T— 1 20FT PANEL ADDRESS / LOCATION: 1 / ELECTRICAL 054 Stat Circuit Current AREA/ROOM CUSTOMER CIRCUIT # MOD LUTRON CIRCUIT # CIRCUIT DESCRIPTI❑N LOAD TYPE ACTUAL LOAD (W/VA) MAX. LOAD BRKR SIZE PHASE MAIN LOBBY PIC -10 1 (XP) SH1 TVM 1 LOBBY/BUSINESS AREA DOWNLIGHTS LED — 0-10V 800 1920 FEED THRU — SPARE SPARE SH2 TVM 2 SPARE LED — 0-10V 208 1920 FEED THRU — BREAKFAST/DINING PIC -12 SH3 TVM 3 BREAKFAST/DINING AREA LED — 0-10V 364 1920 FEED THRU — SPARE SPARE SH4 TVM 4 SPARE LED — 0-10V 46,284.31 1920 FEED THRU — CHECK IN/ FEATURE WALL P1C-8 2 (XP) SH5 TVM 5 CHECK IN/ FEATURE WALL. LED — 0-10V 120 1920 FEED THRU 70 SPARE SPARE SH6 TVM 6 SPARE FL — 0-10V PG8 1920 FEED THRU — CORNER MARKET PIC -8 SH7 TVM 7 CORNER MARKET HALOGEN — 0-10V 60 1920 FEED THRU — SPARE SPARE SH8 TVM 8 SPARE LED — 0-10V FAN COIL UNIT 2.8 1920 FEED THRU — EXTERIOR BUILDING SIGN SW PIC -11 3 (XP) SH9 EXTERIOR BUILDING SIGN SW FACE LED — NON—DIM 1200 1920 FEED THRU — EXTERIOR BUILDING SIGN SE PIC -13 SH10 EXTERIOR BUILDING SIGN SE FACE LED — NON—DIM 1200 1920 FEED THRU — EXTERIOR BUILDING SIGN SOUTH PIC -15 SH11 EXTERIOR BUILDING SIGN SOUTH FACE LED — NON—DIM 1200 1920 FEED THRU — EXTERIOR BUILDING SIGN NORTH PIC -17 SH12 EXTERIOR BUILDING SIGN NORTH FACE LED — NON—DIM 1200 1920 FEED THRU — SOUTH, EAST PARKING AREAS P1C-1,3 4 (XP) SH13 EAST EXTERIOR POLE LIGHTS (VIA 2—POLE LTG CONTACTOR) LED — NON—DIM — 1920 FEED THRU — NORTH, WEST PARKING AREAS P1C-5,7 SH14 WEST EXTERIOR POLE, BOLLARD LIGHTS (VIA 2—POLE LTG CONTACTOR) LED — NON DIM FAN COIL UNIT .7KW 1920 FEED THRU — PORTE COCHERE PIC -21 SH15 PORTE COCHERE LIGHTS LED — NON—DIM 600 1920 FEED THRU — POOL AREA P1C-23 SH16 POOL AREA LIGHTS LED — NON—DIM 300 1920 FEED THRU — 208/3 10 www.lutron.com Toll Free: 800 523 9466 PROJECT NAME: HOLIDAY INN EXPRESS — TUKWILA, WASHINGTON SYSTEM: NEW SYSTEM 1 LOCATION: 91 ANDOVER PARK, TUKWILA, WASHINGTON DESIGN BY: PROJECT #: 16195 PROJECT FILENAME: LUTRON LCP PANEL DATE: 27—JULY-2016 1/2"C, 2#12, 1#12 GND Fault Current Cakulations Project: Hull Inn Express Tukwila J00 # '16196 Vie: 91612016 Fault on Load Side of Transformer with lnfinits Shot Circuit Current on Primary Available. AFC Node t tEVA L -L Vott 0, %Z Short Circuit Cuftent PSE SeNce XF.1R 268 Fault Current atthe End of a Run of C able. 3 - 6f3:300:t6 C�ncftxturs Cc uctor Raceway Short Cl€suit Current at Per € tease 0 TypeType Wii-e Size End of ale Run Aluminum .* Nan f4a5tli+ t v 750kcm13 :Alt rdnumT mei ebc + 250 kcmii .� _.... ..._._� _.... _.., 24,1i4.6t .1 3 ; Aluminum . Vlamebc I .F 250 kcm:i 1€ ,291.27 ...... ......... 1 3 Aluminum.- tlagr�ebr �, 1A':iG 4,570( 29 ...... __.. _.... 1 3 Alum: nu�ri t9agnetie m 25t�1cmisl v' 6s, 84.40 1cw• 2 3 Aluminum +r 0agnebc 2,so kcm, 11 33,128.89 3 Aliirtsrtum �. 1 gnebc 2st71c�nil `.' 25,786_98 3 Alii itrinum 14acnebrc I v 250 kmil 3 A1imhum .' Tia retic + 250kcmil 14,34 . .. :. 1 3 A1,,mu�ui3, .� Magneto,F 25tD1cmil... `' 1�,343Li<3 a d• 3 Aluminum I ebc 250 kcrnil 14:,348.cr;8 1 3 I Aluminum Y . P9agn etic ; +s! 25(1 kcm>j 14, 348.88 1 3 I Aluminum -•w I Magnetic ` w 2s01<. 'i 1 3 : Aluminum :. magnet, * 250 Pcmil +�._ 14,34 .38 1 3 ; Aluminum a twgnebr 253 kcmtl 1 3 Aluminum um't4agn elic *r' i , �-VG wr 12, 713.68 1 3 1Alurfun trt ; flagnetic �Iwu:f, i s> 7,259,24 Stat Circuit Current Length Node # at Beginning. of Run of Run L -L Vdi N!DP 60,300,00 85 208 PIA 46,284.31 27 203 P113 46,284.3`1 119 2088 .Pic 46.,284U31 110 208 PID 4C>,.284, 31 180 208 '� 1465,284,31 PANEL PIM 25 2'Xt pIN1 46.284.31 25 203 PG1 46,2U31 70 208 PG2 46,284,31 70. 20 P 3 46,284.31 76 208 PG4 46,284.31 78 2138 PG.5 46,284.31 70. 29r8 PG6 46,284.31 70 2178 FG7 46=284.31 70 203 PG8 46,284.31 70 208 PG9 14,348.68 5. 208 P5E i33,12G 39 60 2CQ 3 - 6f3:300:t6 C�ncftxturs Cc uctor Raceway Short Cl€suit Current at Per € tease 0 TypeType Wii-e Size End of ale Run Aluminum .* Nan f4a5tli+ t v 750kcm13 :Alt rdnumT mei ebc + 250 kcmii .� _.... ..._._� _.... _.., 24,1i4.6t .1 3 ; Aluminum . Vlamebc I .F 250 kcm:i 1€ ,291.27 ...... ......... 1 3 Aluminum.- tlagr�ebr �, 1A':iG 4,570( 29 ...... __.. _.... 1 3 Alum: nu�ri t9agnetie m 25t�1cmisl v' 6s, 84.40 1cw• 2 3 Aluminum +r 0agnebc 2,so kcm, 11 33,128.89 3 Aliirtsrtum �. 1 gnebc 2st71c�nil `.' 25,786_98 3 Alii itrinum 14acnebrc I v 250 kmil 3 A1imhum .' Tia retic + 250kcmil 14,34 . .. :. 1 3 A1,,mu�ui3, .� Magneto,F 25tD1cmil... `' 1�,343Li<3 a d• 3 Aluminum I ebc 250 kcrnil 14:,348.cr;8 1 3 I Aluminum Y . P9agn etic ; +s! 25(1 kcm>j 14, 348.88 1 3 I Aluminum -•w I Magnetic ` w 2s01<. 'i 1 3 : Aluminum :. magnet, * 250 Pcmil +�._ 14,34 .38 1 3 ; Aluminum a twgnebr 253 kcmtl 1 3 Aluminum um't4agn elic *r' i , �-VG wr 12, 713.68 1 3 1Alurfun trt ; flagnetic �Iwu:f, i s> 7,259,24 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 "M Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 MW Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED .FOR COMPLIANCE U?7kNEL SCHEDULES RIFPA 70 - RIEi SEP 2 6 2016 City of -Tukwila RECEMBUILDING DIVI CITY OF TUKWILA SEP 12 2016 PERMIT CENTER SheetNumber: MECHANICAL EQUIPMENT CONNECTION SCHEDULE TAG DESCRIPTION HP /KW /VA VOLTS / FLA/ FUSE PHASE MCA (MOCP) DISC. SWITCH STARTER CIRCUIT FEEDER SIZE TAG REMARKS NOTES HP -1 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1M 1/2"C, 2#10, 1#10 GND HP -1 HP -2 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL PIM 1/2"C, 2#10, 1#10 GND HP -2 HP -3 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL PIM 1/2"C, 2#10, 1#10 GND HP -3 HP -4 HEAT PUMP UNIT 208/3 45 50 60/3 PANEL P1D 3/4"C, 3#8, 1#10 GND HP -4 HP -5 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1F 1/2"C, 2#10, 1#10 GND HP -5 HP -6 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1F 1/2"C, 2#10, 1#10 GND HP -6 HP -7 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1F 1/2"C, 2#10, 1#10 GND HP -7 HP -8 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL PIF 1/2"C, 2#10, 1#10 GND HP -8 FCU -1 FAN COIL UNIT 3.3 208/1 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND FCU -1 FCU -2 FAN COIL UNIT 2.8 208/1 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND FCU -2 FCU -3 FAN COIL UNIT 1.2 208/1 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND FCU -3 FCU -4A FAN COIL UNIT 7.7 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -4A FCU -4B FAN COIL UNIT .64 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -4B FCU -4C FAN COIL UNIT 2.3 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -4C FCU -41D FAN COIL UNIT .64 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -41D FCU -5 FAN COIL UNIT .7KW 208/1 Sm2 PANEL PID 1/2"C, 2#12, 1#12 GND FCU -5 2ND FLR, W OF ELEVATORS FCU -6 FAN COIL UNIT .7KW 208/1 TS PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -6 3RD FLR, W OF ELEVATORS FCU -7 FAN COIL UNIT .7KW 208/1 TS PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -7 4TH FLR, W OF ELEVATORS FCU -8 FAN COIL UNIT .7KW 208/1 TS PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -8 ATTIC AREA BEF-1 BATH EXHAUST FAN -ATTIC 2HP 208/3 10 30/3 SIZE 0 PANEL P1M 1/2"C, 2#12, 1#12 GND BEF-1 BEF-2 BATH EXHAUST FAN -ATTIC 2HP 208/3 10 30/3 SIZE 0 PANEL P1M 1/2"C, 2#12, 1#12 GND BEF-2 EF -1 EXHAUST FAN - CEILING .1 120/1 TS PANEL P1M 1/2"C, 2#12, 1#12 GND EF -1 EF -2 EXHAUST FAN - CEILING .2 120/1 TS PANEL P1M 1/2"C, 2#12, 1#12 GND EF -2 5 SPF -1 STAIR PRESSURIZATION FAN 5HP 208/3 17.5 30 30/3 VFD PANEL PIE 3/4"C, 3#10, 1#10 GND SPF -1 SPF -2 STAIR PRESSURIZATION FAN 5HP 208/3 17.5 30 30/3 VFD PANEL P1E 3/4"C, 3#10, 1#10 GND SPF -2 EPF ELEVATOR PRESS FAN 5HP 208/3 17.5 30 30/3 VFD PANEL P1E 3/4"C, 3#8, 1#10 GND EPF CEF-1 CORRIDOR SMOKE EXH FAN 7.5HP 208/3 25.3 40 60/3 VFD PANEL P1E 1 "C, 3#6, 1#10 GND CEF-1 PT -1 THRU WALL PTAC W/HEAT 3.IKW 208/1 19 20 ROOM UNIT PNL 1/2"C, 2#12, 1#12 GND PT -1 GUEST ROOM UNIT PT -2 THRU WALL PTAC W/HEAT 3.1 KW 208/1 19 20 ROOM UNIT PNL 1/2"C, 2#12, 1#12 GND PT -2 GUEST ROOM UNIT CU -1 SPLIT SYSTEM 208/1 25 40 30/2 PANEL P1B 1/2"C, 2#10, 1#10 GND CU -1 1 EDH-1 ELECTRIC DUCT HEATER 2.2KW 208/1 13.2 60 60/3 1 "C, 3#6, 1#10 GND EDHA AUX-1 AUX POOL AREA HEATER 30.OKW 208/3 104 110 200/3 MDP 1 1/4"C, 3#2, 1#8 GND AUX-1 DCU-1 POOL FAN COIL UNIT 208/1 6 15 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND DCU-1 DHU-1 POOL DEHUMIDIFICATION UNIT 208/3 45 60 60/3 PANEL P1M 1 "C, 3#6, 1#10 GND DHU-1 RCP -1 I DOM HOT WTR CIRC PUMP 1.5HP 208/3 15 30/3 SIZE 0 PANEL P1M 1/2"C, 3912, 1#12 GND RCP -1 WH -1 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -1 WH -2 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -2 WH -3 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -3 WH -4 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -4 WH -5 WATER HTR IGNITION UNIT 216W 120/1 PANEL PIM 1/2"C, 2912, 1#12 GND WH -5 EWH-1 ELECTRIC WALL HEATER 1.5KW 120/1 15 P1M 1/2"C, 21#12, 1#12 GND EWH-1 EWH-2 ELECTRIC WALL HEATER 1.5KW 1 120/1 15 P1D 1/2"C, 2#12, 1#12 GND EWH-2 GENERALNOTES (APPLIES TO ALL EQUIPMENT LISTED IN SCHEDULE) A. THE ABOVE INFORMATION IS FOR A SPECIFIC MANUFACTURER. THE ACTUAL MANUFACTURER FOR THE EQUIPMENT MAYBE DIFFERENT. COORDINATE WITH MECHANICAL EQUIPMENT SUBMITTALS FOR ACTUAL LOADS, CIRCUIT AMPACITY AND OVERCURRENT PROTECTION REQUIREMENTS PRIOR TO ELECTRICAL ROUGH -IN. B. LOCATE ALL DISCONNECTING MEANS PER NEC AND AHJ REQUIREMENTS. STARTERS ARE SEPARATELY MOUNTED UNLESS OTHERWISE NOTED. C. ABBPEVIATIONS: HRS: HORSEPOWER RATED MOTOR DISCONNECT SWITCH WITH OVERLOAD PROTECTION, 16 -AMP MINIMUM, RED PILOT LIGHT. PROVIDE 1 -POLE OR 2 -POLE AS REQUIRED. Sn: MOTOR RATED TOGGLE SWITCH. TS: TOGGLE SWITCH, 16 -AMP MINIMUM, RED PILOT LIGHT. PROVIDE 1 -POLE OR 2 -POLE AS REQUIRED. D. ALL DISCONNECTS ARE 3 POLE UNLESS NOTED OTHERWISE. E. PROVIDE A ROOFTOP WEATHERPROOF GFI DUPLEX RECEPTACLE WITHIN 25 FEET OF ALL ROOF MOUNTED HVAC UNITS AS REQUIRED BY NEC. F. CONNECT FIRE SMOKE DAMPERS TO A 120VAC 20 AMP CIRCUIT ROUTED THROUGH A RELAY CONTACT (N.C.) IN THE FIRE ALARM CONTROL PANEL. REFER TO MECHANICAL DRAWINGS FOR ALL FIRE SMOKE DAMPER LOCATIONS AND QUANTITIES. PROVIDE ALL APPURTENANCES AS REQUIRED. PROVIDE DISCONNECT TOGGLE SWITCH WITHIN SIGHT OF THE DAMPER MOTOR CONTROLLER AND DAMPER MOTOR. SCHEDULE NOTES (APPLIES TOSPECIFIC EQUIPMENT AS NOTED IN "NOTES" COLUMN) 1. PROVIDE 1/2"C, 4#14 FROM OUTDOOR UNIT TO POWER FRACTIONAL HP INDOOR UNIT FAN - PROVIDE 2 POLE TOGGLE SWITCH DISCONNECT 2. CONTROLS BY DIVISION 23 CONTRACTOR. 3. PROVIDE MOTOR RATED TOGGLE SWITCH, NEMA 3R ENCLOSURE 4. FURNISH DUCT SMOKE DETECTOR(S) FOR INSTALLATION BY DIVISION 23 CONTRACTOR. HVAC UNITS OVER 2,000 CFM TO HAVE DUCT DETECTOR IN RETURN AIR DUCT. UNITS OVER 15,000 CFM TO HAVE DUCT DETECTORS IN RETURN AND SUPPLY AIR DUCTS. COORDINATE WITH DIVISION 23 FOR QUANTITY REQUIRED. PROVIDE CONNECTION AT THE HVAC UNIT FOR SHUTDOWN ON ALARM. PROVIDE CONNECTION TO THE FIRE ALARM CONTROL PANEL AS REQUIRED. ALL WIRING TO BE IN EMT CONDUIT. 5. PROVIDE SWITCH NEXT TO RESTROOM LIGHT SWITCH. 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 "M Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 MW Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED .FOR COMPLIANCE U?7kNEL SCHEDULES RIFPA 70 - RIEi SEP 2 6 2016 City of -Tukwila RECEMBUILDING DIVI CITY OF TUKWILA SEP 12 2016 PERMIT CENTER SheetNumber: ............. . .......... . ................ ...... .. ............ . . ............ ................. ....... ... ............. . .......... . ................ ...... ................. ....... .......... - -- ------------------------- . ...................................................... -3 > PJ'A-3 M MDP �X, DHU P 1 M -27,29 :X . ... ... X** �H A, >f ;X: X. AUX_�i X ROD: �x, "s", �1.111, ;< i".. / I 1� :- 41 > < Ix, A K? >< X PlAH >/ ...................................... . ... . . . .. s�., . .... .......... J ................................. ........... ...................................................................................................................... > .......... ........ ................ .... . ......... ...... ........... - - -- ------- ...... . .............................. .......... ----- - - .:::: :; . ........ . ...... . . . �FCU:::T 4 - : ................ ......... ....... . .... IA OP, -36 _F *X X Pli M . ........... ................... ".. . ..%. '; '>.': `x'. _.. � 111�=] .................................................... .. . ........................ ....... ................... ...... ...... .......................... ...... ......................... . ................... X X . "K. < P; A43 EF -_1 X. 777 J El -2- .......... X, K < < > . . ... ... .. dd "s' X. X" L -3 4. ......... -J, 4 >; -H P PIA X 1A.3,2, ......... . . ... Y. W P x -7 ............ X 'X L '34 36 >< .................................. �f .................. . ..... ..... . ............. ............. i -HP-f.. .... . . . .................. ; ....... ........ .......... ............................... ............ PlA-5cNs -5,7 -26 'PlA VP P 1 M -27,29 PIM -30 IM P OP18-4 ...... . ........ . ............ ................ ................... H -5 PlA-5 #10 ........... ............. ........................... 1A-8,10,12 P 1 A-20,22,24 .......... ............... ... ....... . . . . . . . . . . ..................... ........... 2 :A: 2, . ..... .... . . . ...... . . ...... ........ ......... . ... . . . . . . ...... . ... ........ ..... ......... . ............. ................ ....... ...................... '01; T: N G, 0,0 M ....... .............................. . . ..... PM -15,17 -2,4, PlA-14,16,18 PlB-44 A PlA . ... . . ..... . .. . ... PlA-7 . ........... ............... ....... . . ....... V2 # 1,b iWP ........... ....... ................. IEEE) PG1 ............. ...... ........... .......... ......... .. ... ............. . .... .. ................... . ................ PG2 P 1 M -27,29 ......... PG3 .......... ........ . ...... F FCU -2 B-6 ............. ....... .. G5. . ....... FG5 ............... ; . . .. .. ........ ... .. .. ... ... ........................... . ........................ ............... .............. ................ ...... ....... .................. MP1 PG4 ...................... ..... ....... ........ .................. .... . .... "I—__ . .......... . ................ .......................... P113 -25,27 P113-1 f '*PlA PG6 -11 13 ............ 1.1 . ........ �i PlA .......... PI.B-14* . . ............ ............................. ......... ........................ PiB; P1,8- 12 s> PG7 10P113-6 Pic .................... ............................. PlA-1 PIC 15 PG8 a � ............. ...... LCP .......... ................................ ........ . ............ .......... . ......... ................ PG9 . . ................... .................... ............................................... .................... . .. . ...... ..... .......... N PiA-13 ...................... ........... . . ........ . . ................................................ ................. ... . ....... .............. P1 B-8 H ................. �G ......................................... ............... ................ ... ........ ....... .... . .... ..... . ....... .................. . ......... ............. .... I ................. ..... ....... i i i P lt�_4z ........... ........ -- - - ------- ....... ..... ................... . ..... .................. . .. ....... ..... ............ ..... ... ................. ..... ... . ......... .. . ....... ... ...... ............ .............. ........................... P1B- ................. 0-18 20 1301 ......... . .. . .. 11A-21 api .. ....... .......... lei 17 .......... R ........... .......... .......................... .... .......... . . . . - - - P16-22,24 PlA 15 PIA X .s......... . .............. . ... ............. . ... ... ... . ....... .. .................. .......................... .. ... ............ E_ 10 PlA . . . . . . . . . . . . . . . . . . . . . . . P 1 B -16 J — . .. I'll. .......... PIA -19 2' H . ...... 6 P I ........... 0,22 P -2 ............ ........... ; j: ; ii�. � 1 .......... ................................................... .................... ................ P1134-�28 ......... . ... ............. .. ..................... ............... .......... ............ .. MAKU . . ..... < 1 El -3 TV 1 c 0. PlD-18 PlB-11 .......... . . ....... . -21 PlD-2 ..... ...... . ......... ... . ..... . .......... .......... .......... .......... .......... .......... .......... .......... .......... ... ......... .. ..... / , . ...... ....... .......................... ....... ......................... ....... ........ ............ .... ............................ . .... .......... .............. ............... ..................... P1D ........... ........... ...................................... .. ....... . .......... .......... .......... .......... .......... ........... .......... ......... ............. :X ......... .......... . ... ..... .............. ..... ..... .......... ...... PlD-2 P113-9 .................... ......... * ......................... X ..... ........... ......... ............... -4 ........... . ...... H Abpl B-9 pio ............... . ...... .... .............. ............... . .......... .... ...... ............ . ........ .... . . . . .. ......................................... OPM-1 4DPI -10 D F I............. B I *Plb-3 1 B FC -413 .............. P 1 . .... ..... L _J 2 P1 PlDL17 ....... .................... ... ....... .................. s.... ................ .. .... ....... ........... .............. ....... .......................... ....... ................... ..... ....... .......................... ....... ........................ ....... .......................... ....... ..................... ....................... ....... ........... ....... ......................... ............. . ....... ...... . ............ I . %. ..., ............ ............ .......... . ..... .. .......... ....... ..... X ................. P 1 6-� 2 d, PlD-2 ............. .......... ............ .................... PlD-4 *Pib 7 P11-19 ............ P 1 D-20,22.1i,;:s:::,!! ...... . ......... PlD P10-9 ... . ... .... ............. ........... Inc .......... . Li cf, Pip CR > . . ........... ............... ....... . .. ... ............. ............... . ........... X Pi 0. ..... ... H 12 ................... ................ . ............. P ................. P1 D-26,28,30 ................... Pi B PlD-14 P 1 B-3 .......... ........ X ................ ......... ...... ........ ..... . . . ...... ....... ... ............................... . ... ........ ......................... .................. ............ �P L ....... ..... ........ ................. ....... .... . ....... ..... ...... ... .................... 92. ............. ............... ....... .......................... . ...... ..... .... ...... ............ . . .......... ............. ..... ............................ ........ ... .. ..... .. . . ..... ....................... .... ........... ........ ... ...................................... ..................................... .......... ............ . .................... .................... . ............. ... .. . ...... P 1B F .................. ....... ......................... ....... ......................... ....... ........................ ... ......... ........ HP -4 ............... f', -5 P11 B P18-1 .......... ........ .......... .......... .... .... .......... .......... ......... ..... ......... ..... I ........... ................. .................................... ........... . ..................................... ....................... ..................................... " ............ . .... . ....... ............ ............. ; K ............... ..... ....... .................. _< . ........ .............. . ....... ............... < K . ......... .............. ....... ............ .................................. ....... .............. < ............. ... .......... ... *.1111111.1.1.1.7.1 ......... 11 ........................ ............. . . . ....................... ........... .................. ........................... 7.7.7.*.' ................................. .... ...... . ... .......... . .... .............. ......... ........... .......................... ................... . . ....... .............. ..... ........... ...... . ............... ............. ...... .......... ... .............................. ............ . ... . .... . .... ............. %. .... . ........ . ... . ....................... . ..................... ............................................... ....... . ...... ....................... .. . ..................... ............... ........ . . ..... .......... .............. ............... ..... ...................... 9 L 5) 2_ ......... ..... PAE�2 ............... ........ .......... .......... . ... ............................................................. .................. * ... . ... ... .......... ............................. . ......... ...... . .. . ....... "'I ........... . ................ ............. ..................... ....... .................................. ............................................. ......................................................... ...................................................... .................................. :: ....................................................... ...................................................... ......................................................................................... .............................................. ........................ .................. ...... ..... ............ .................................. I ST FLOOR POWER/COMMUNICATIONS PLAN SCALE: 1/8" = V-0" a F WOR, 4 COMPLIAN P. ITH NFPA 70 - NEC SEP 2 6 2016 QtY of -TuWla BUILDING DIVISION ............... RECEIVED -ry nc T"IM A 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn Express Tukwila, WA Title: ILEVEL 1 POWER & COMMUNICATIONS PLAN tot SEP 12 2016 Designed By: RB PERMIT CENTER Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: ................ ...... - -- ------------------------- . ...................................................... -3 > PJ'A-3 M MDP �X, DHU P 1 M -27,29 :X . ... ... X** �H A, >f ;X: X. AUX_�i X ROD: �x, "s", �1.111, ;< i".. / I 1� :- 41 > < Ix, A K? >< X PlAH >/ ...................................... . ... . . . .. s�., . .... .......... J ................................. ........... ...................................................................................................................... > .......... ........ ................ .... . ......... ...... ........... - - -- ------- ...... . .............................. .......... ----- - - .:::: :; . ........ . ...... . . . �FCU:::T 4 - : ................ ......... ....... . .... IA OP, -36 _F *X X Pli M . ........... ................... ".. . ..%. '; '>.': `x'. _.. � 111�=] .................................................... .. . ........................ ....... ................... ...... ...... .......................... ...... ......................... . ................... X X . "K. < P; A43 EF -_1 X. 777 J El -2- .......... X, K < < > . . ... ... .. dd "s' X. X" L -3 4. ......... -J, 4 >; -H P PIA X 1A.3,2, ......... . . ... Y. W P x -7 ............ X 'X L '34 36 >< .................................. �f .................. . ..... ..... . ............. ............. i -HP-f.. .... . . . .................. ; ....... ........ .......... ............................... ............ PlA-5cNs -5,7 -26 'PlA VP P 1 M -27,29 PIM -30 IM P OP18-4 ...... . ........ . ............ ................ ................... H -5 PlA-5 #10 ........... ............. ........................... 1A-8,10,12 P 1 A-20,22,24 .......... ............... ... ....... . . . . . . . . . . ..................... ........... 2 :A: 2, . ..... .... . . . ...... . . ...... ........ ......... . ... . . . . . . ...... . ... ........ ..... ......... . ............. ................ ....... ...................... '01; T: N G, 0,0 M ....... .............................. . . ..... PM -15,17 -2,4, PlA-14,16,18 PlB-44 A PlA . ... . . ..... . .. . ... PlA-7 . ........... ............... ....... . . ....... V2 # 1,b iWP ........... ....... ................. IEEE) PG1 ............. ...... ........... .......... ......... .. ... ............. . .... .. ................... . ................ PG2 P 1 M -27,29 ......... PG3 .......... ........ . ...... F FCU -2 B-6 ............. ....... .. G5. . ....... FG5 ............... ; . . .. .. ........ ... .. .. ... ... ........................... . ........................ ............... .............. ................ ...... ....... .................. MP1 PG4 ...................... ..... ....... ........ .................. .... . .... "I—__ . .......... . ................ .......................... P113 -25,27 P113-1 f '*PlA PG6 -11 13 ............ 1.1 . ........ �i PlA .......... PI.B-14* . . ............ ............................. ......... ........................ PiB; P1,8- 12 s> PG7 10P113-6 Pic .................... ............................. PlA-1 PIC 15 PG8 a � ............. ...... LCP .......... ................................ ........ . ............ .......... . ......... ................ PG9 . . ................... .................... ............................................... .................... . .. . ...... ..... .......... N PiA-13 ...................... ........... . . ........ . . ................................................ ................. ... . ....... .............. P1 B-8 H ................. �G ......................................... ............... ................ ... ........ ....... .... . .... ..... . ....... .................. . ......... ............. .... I ................. ..... ....... i i i P lt�_4z ........... ........ -- - - ------- ....... ..... ................... . ..... .................. . .. ....... ..... ............ ..... ... ................. ..... ... . ......... .. . ....... ... ...... ............ .............. ........................... P1B- ................. 0-18 20 1301 ......... . .. . .. 11A-21 api .. ....... .......... lei 17 .......... R ........... .......... .......................... .... .......... . . . . - - - P16-22,24 PlA 15 PIA X .s......... . .............. . ... ............. . ... ... ... . ....... .. .................. .......................... .. ... ............ E_ 10 PlA . . . . . . . . . . . . . . . . . . . . . . . P 1 B -16 J — . .. I'll. .......... PIA -19 2' H . ...... 6 P I ........... 0,22 P -2 ............ ........... ; j: ; ii�. � 1 .......... ................................................... .................... ................ P1134-�28 ......... . ... ............. .. ..................... ............... .......... ............ .. MAKU . . ..... < 1 El -3 TV 1 c 0. PlD-18 PlB-11 .......... . . ....... . -21 PlD-2 ..... ...... . ......... ... . ..... . .......... .......... .......... .......... .......... .......... .......... .......... .......... ... ......... .. ..... / , . ...... ....... .......................... ....... ......................... ....... ........ ............ .... ............................ . .... .......... .............. ............... ..................... P1D ........... ........... ...................................... .. ....... . .......... .......... .......... .......... .......... ........... .......... ......... ............. :X ......... .......... . ... ..... .............. ..... ..... .......... ...... PlD-2 P113-9 .................... ......... * ......................... X ..... ........... ......... ............... -4 ........... . ...... H Abpl B-9 pio ............... . ...... .... .............. ............... . .......... .... ...... ............ . ........ .... . . . . .. ......................................... OPM-1 4DPI -10 D F I............. B I *Plb-3 1 B FC -413 .............. P 1 . .... ..... L _J 2 P1 PlDL17 ....... .................... ... ....... .................. s.... ................ .. .... ....... ........... .............. ....... .......................... ....... ................... ..... ....... .......................... ....... ........................ ....... .......................... ....... ..................... ....................... ....... ........... ....... ......................... ............. . ....... ...... . ............ I . %. ..., ............ ............ .......... . ..... .. .......... ....... ..... X ................. P 1 6-� 2 d, PlD-2 ............. .......... ............ .................... PlD-4 *Pib 7 P11-19 ............ P 1 D-20,22.1i,;:s:::,!! ...... . ......... PlD P10-9 ... . ... .... ............. ........... Inc .......... . Li cf, Pip CR > . . ........... ............... ....... . .. ... ............. ............... . ........... X Pi 0. ..... ... H 12 ................... ................ . ............. P ................. P1 D-26,28,30 ................... Pi B PlD-14 P 1 B-3 .......... ........ X ................ ......... ...... ........ ..... . . . ...... ....... ... ............................... . ... ........ ......................... .................. ............ �P L ....... ..... ........ ................. ....... .... . ....... ..... ...... ... .................... 92. ............. ............... ....... .......................... . ...... ..... .... ...... ............ . . .......... ............. ..... ............................ ........ ... .. ..... .. . . ..... ....................... .... ........... ........ ... ...................................... ..................................... .......... ............ . .................... .................... . ............. ... .. . ...... P 1B F .................. ....... ......................... ....... ......................... ....... ........................ ... ......... ........ HP -4 ............... f', -5 P11 B P18-1 .......... ........ .......... .......... .... .... .......... .......... ......... ..... ......... ..... I ........... ................. .................................... ........... . ..................................... ....................... ..................................... " ............ . .... . ....... ............ ............. ; K ............... ..... ....... .................. _< . ........ .............. . ....... ............... < K . ......... .............. ....... ............ .................................. ....... .............. < ............. ... .......... ... *.1111111.1.1.1.7.1 ......... 11 ........................ ............. . . . ....................... ........... .................. ........................... 7.7.7.*.' ................................. .... ...... . ... .......... . .... .............. ......... ........... .......................... ................... . . ....... .............. ..... ........... ...... . ............... ............. ...... .......... ... .............................. ............ . ... . .... . .... ............. %. .... . ........ . ... . ....................... . ..................... ............................................... ....... . ...... ....................... .. . ..................... ............... ........ . . ..... .......... .............. ............... ..... ...................... 9 L 5) 2_ ......... ..... PAE�2 ............... ........ .......... .......... . ... ............................................................. .................. * ... . ... ... .......... ............................. . ......... ...... . .. . ....... "'I ........... . ................ ............. ..................... ....... .................................. ............................................. ......................................................... ...................................................... .................................. :: ....................................................... ...................................................... ......................................................................................... .............................................. ........................ .................. ...... ..... ............ .................................. I ST FLOOR POWER/COMMUNICATIONS PLAN SCALE: 1/8" = V-0" a F WOR, 4 COMPLIAN P. ITH NFPA 70 - NEC SEP 2 6 2016 QtY of -TuWla BUILDING DIVISION ............... RECEIVED -ry nc T"IM A 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn Express Tukwila, WA Title: ILEVEL 1 POWER & COMMUNICATIONS PLAN tot SEP 12 2016 Designed By: RB PERMIT CENTER Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: .. .......................... ...... .......................... ....... .........5...............;....... ...... ................ ......... ....... ......... ... .. ....... .................. P 1 E-20' .......... ......................................... ....... ............ ........ ... ....... ................ .... ...... .......................... ....... .......................... ....... ......................... ....... .................. ..................................... ............................................... . ..... .... 22 ......................... ........................ .......................... ....... ........... .............. ....... ......................... .... ...... ........... ........ .... .............. ......................... DIX. . . ...... .1 BE I'll, R 0 0 M 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ;;P I E-18 ...... ................ ......... ....... ................. ...... ....... ............. P 1 E-20' .......... ......................................... .... ... .... ........... ......... .... 01 x ....... ......... DIX j L --- I .... .... .... ... LJ F4 ..... "" ........ ..... ..... ......... ....... .............. . ..... . ........ . . .... .... ............. . ..................................... ..... . ...... 0.7 "V ...... ...... . bi ............ ,1_1 T1 ........... ..... .... .. 1 X............ ...... .... Dix ............ ..... .. .. .. . .. .. . tet .......... ................ L 2�2 ... .......... laxi 9 ................. ................. .M 9 22 22 22 ..... ..... . 55 :x 07 07 bix D1 DIX D1 DIX A. .... ...... I D I x 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ............. ....... ......................... ....... .... '1U P 1 E-20' .......... ....................... ....... ................ .................... ...... ... J .................... ...... F4 F4 X1 22 1, D ..... ...... ............. `:' ................ ................. 0.7 ...... ...... . bi ............ ...... ........... ..... .... ............ ........... '6: .......... ................. ................. .M -1-1-111 ..... ..... . 55 :x .... ...... I D I x ...... ....... . ........... . ................. ...... ...... ................... ....... ... ..................... ....... ....................... ... ............ ....... .................. . ........... @7 ....... ............ ... ......... .......................... ...... .......................... ....... ... ........... D 1 HA f I IMiri S -nr. 55 ................ .............. Dix .......... . . ... .. ......... ...... .... ........ ....... ................ ...... .... . . . . . . . . . . . . . . . ..................... 44 ... ....... ......................... ...... ......... j . .. ... .. .... 07 .... ..... .... I M. ... 01 ............... U:": DOis ..... ..... 22 [jMx1 H .............. ................................... 022 ................... .... ......................... ...... ... ...... ................ D In ........... ? 07 QUALL ............... D1 M .......... . M:.. 55. ... .......I . 22 Xl [K] . .. ................ .... .. —'..3 .............. ....... .... .... . . .............. . ....... """, ....... . ........ ............ .................... .... 55 ...............=t Dix. ........... ..... . ........... ....... . . 07 D1 .. . ........... ............ ........... ....... ..................... ... ... . ... ....::»v. . .... ........... F3 . ....... .......................... ....... ............ 7a 7a F3 22 D x 'H K . .. . . .............. 5 .................. 7 ............... ............. I ................... ....... --- 07 51 ................. . .. . D1 . ........... . ... ... ... . ............ .......... ..J.. . ......................... ....... ............... . ................. is ' .....................................................................................................,.>. . ......................... ........... ............ . 22 0 . ........ . . ... .. 22 00 7,. 07 0 DIX DOI D1 DIX ............. 23 _2 ............. ..... ...... .............. 22 22 22 22 )7 0 1: 07 D1 07 07 'I DIX D1 DIX x I Dix D1 DIX 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ............. ....... ......................... ....... .... '1U ....................... ....... ................ .................... ...... ... J .................... ...... .................. ..................... ....... ........... ..... ...... 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' ........:.,... f S S f � i MECHANICAL I : BUILDING DIVISION �T CONNECTIONS RECEIVED PLAN CITY OF TUKWILA f , PERMIT (:ENTER 5 f ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' S f S S f � MECHANICAL I : BUILDING DIVISION �T CONNECTIONS RECEIVED PLAN CITY OF TUKWILA SEP 12 2016 PERMIT (:ENTER 5 Drawn By: MB Project No: 16195 Date: 09/07/2016 i iii : ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' S f S S f ATTIC AREA MECHANICAL City of Tukwila : BUILDING DIVISION �T ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' COMPLIANCE W14--. NEPA 70 m NFr, Sheet Title: SEP 2 6 216 ATTIC AREA MECHANICAL City of Tukwila BUILDING DIVISION �T CONNECTIONS RECEIVED PLAN CITY OF TUKWILA SEP 12 2016 PERMIT (:ENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 .............................. ....... .......... ... ........ .... ................ ...... ............ ................. ....... DIX DI ..................... ...... .............. . ........ PIE: 16 ....... ... I. ......... .................... . . .......... ........... PlE-16 .............. D1 IF I X xi ........... F21 . .... 4 PlE-16 .............. F21 F21 ............ .......... .......... .... �.s ............... D1X .. . ........ .................. ............ ....... . ........................ ........... . ........... F3 F1 APPROXIMATE LOCATION ON EXTERIOR FACE OF BUILDING FOR ILLIMINATED SIGN. VERIFY EXACT SIGN LOCATIONS, ELEVATIONS AND CONNECTION REQUIREMENTS WITH SIGN SUPPLIER PRIOR TO ELECTRICAL ROUGH IN. . . . . ... . . .. ... 4 14: 2 IPlE-14 .......... ............ D1 Dix D1 GENERAL LIGHTING CONNECTION NOTES 04 40 ........... ...................... ........... ............ .. . ............ ....... ... ... .......... ...... . . ... ..... ... ....... ................ ....... ... ................ ... ............... ....... ......... . ..... ...... I.. . .... . . ............. .................. . .............. . . .... ..... . . . . . . . . . . . . . . . I ............... ...................... .......... .............. ...... . . ........ ........... .......... ..... .......... .......... . ........... F1 i F1 F1 F3 _F F1 F1 Ul8 -14 DIX IPIE 23 23: 236 25 81 0 .. .......... ... ........... ...... . ....... . ......... ........... ........... ..................... .......... .... .......... ... hl'i 8 8jj F1 F1 . . . ......................................... Dix ........... . .... . 14 ... .......... . ........ ... IPlE-14 ................ ......... . ............ ........... ... ......... .. ............. ........ .. . .. ........... . ..... . . ............ I I ........... ...... . ......... .............. P? S: ............................................ ............ ..................... . . .................. . ....... FIX F1 F1 23b Z3 23 i Dix SX, Fi F1 X i F1 ! i ............. .. ......... ... ...... ........ . Pill ..... ..... . .............................................. 4 ........... - ........... ........ ............ . . . ........... ..... ...... . ......... ... .... .. I .......... ....................... ...... ........... ....................... ........... .......... < ......... 1 PIE -1 S D1 .......... ........................................ ............ .. ..... ... . ............... ....... ...... .. ................ . . ..... .............................. F .... ............. ........... ........ ....... ....... . P E-14 N . . ........ .. ....... P1 - 8� 'PlE-18�, ...... .... .......... .................... ...... ........ . ........ .... ........ .. ............... ..................... . ....... ... .................. M ............. .......... . ............ . ............ .............. 4 8 1V 0 F3 0 *� . ............... F Dix Dix DIX 8 I............ T1 > ............... ... ..... . ..... . .... . ......................................... .. ........... . D 1 .................... 8 14 PIE- ........... ................. ..... . .......... .. ....... :% I .............. ...... . ....... . F01 F2 ........................................... ........... . I N18 ...... ..... ............. ................ .......... 8/R2o 8/R a X , `/ m 0 ......... ........... 2.J ........... .......... d R2 D1 ..,2 DW DWEI.FVAM� �TlE -1 8' D 1 DIX D 1 .......................................... Hi ik L J. � :: TWR D1X PlE-14 F3 xi.. ...... . . J 045 a 40 0, R2a F3 P 1 E- 1 8,' PlE-14 DW 8/ 2c I. ....... .... Qu 10241 On 12 94 DW >/ 4 . ....... D1 D I . .. . .. ....... ... . . .. . .. . . �§ I " ................................ ..................................................................... .. ........ .......... . .. ........... i ............ D1 ............. s x ......P'IE-14 !86R2a (94 8/R2c FIXTURE TYPE (TYPICAL) 8/R2a 8/R2a 8/R2a 8/R2a 8/R2a n no 0 PlE-14 D 1 8/R2C 1 0 Pil�_140 4@ .......................................... : .. ........ D I X Dix D1 T X1 i i� R 11 I � E . : PTE., 4 04 GP1E-14 GME -14 DIX DW DW DW DW DW e ..... ........... .......... .......... .......... ....... ..... ..... ....... X1 I .......... .......... .......... .......... ... .......... ........... D 1 D 1 DIX D 1 .. ........ ..................... ...... .......................... ......................... xi ........................ ....... ......................... ....... ......................... ....... .......................... ....... ............... .......... ..................... ........... PIE-14 EPCJ ............... I.......... .......... ....... ..... ........... ........... ... E*::� 1 4 PIE -1. -14 PfE 14r Mli J ......... . . ........ . .......... ...... . . . . .... 2 .......... .......... .......... .......... ......... 010 PIE Pi .... .... I ...... ...... VS D D . ................ 010 0 0 .21 /R4c X, .......... :1 12 6P1E 010 01 010 �,2 x GP1E-14 .. ............. Dix ................ JX DIX D 1 012 012 f - 1 DIX Di 0 21 /R� .......... DIX ................... D I'll', Dix D 1 D 1 F2 021 /R4c 021 /R4c DW DW D2 D2 .... . ..... YPICAL) 10 12 D1 D1 012 0 D2 12 F1 LCP CONTROL RELAY (T iiO PlE-14 PANEL P1C CIRCUIT (TYPICAL) 12 D 1 D 1 12 DW I12 012 @12 .......... 010 DW ! OP 4 @10 109 10 d ........... ..... .... 010 12 012 . ......... Di D I 1 D 2 D I DIX X. (§)l D1 Di 0 12 Dix D�/ > D I D I Di bw EO ............. 021 /R4c 021 /R4c 021 /R, 12 012 410 010 012 F1 DW ....... ....... ... ........... ............. ....... ....... ....... P.1 . ....... .... D.1 'P1 EL:�',14 .............. ...... ............... ... ME -1-4 ......................... 4';-_- .................. ... P 1- El"f4w., 010 ja , 10 7� .......... ............ -PTE T ............. :. �, DW F1 D2 D2 D2 ............... f1__-----..,........:..� . ....... ..... �r .......... f01-27h_@T2_g PlE ............... 12h ............. r ii -2 2p I ! �eo I OW 12m @10 �Dl DI X 2�_P! 12k ............. /* DIX x D 1 )< D1X!' D1 Dix D1 12h (01 2q D 1 D 1 .... ........ j ............. ... ; 0 1 I x x I*, 12 -14 X W DW PIE 12 12 12 01 2g 0 12g .......... D1 DW DW � AIrl @21 /R4c @21 /R4c (D21 /4 ......... . .......... D1 D1 PIE -1, ix D 12 N D2 D2 21) .................. @11 2m . 10 010t. 110t i0loy 1010X ........... .... @ �0, I O IX D2 DW DW 11 01ox ............................................. D1 DI -@"F 0�12e DI ..................... ....................... D 1 D 1 D D1 ==bi D1 ............. DW i�� DW 012i en,o�p,q F1 F1 P i ............ b 12 1 2f D I 02- I�x D1 D1 nc DI @12j —e,ftglh 12 012e 012f ............ D 1 D 1 PlE-14 1E-1 W 12 12e 021 /R4c 021 /R4c 021 /R4 . ...................... 2 X 1 OVO ..1 2i' X2 ...... ........ OlOr 1 2i f 12 K D2 D2 .Ci 01 2n OlOr ov @> 11 5 D2 r%1 r%1 ni r%1 r% V %�v R W X REVIEWEDFOR COMPLIANCE WITH NFPA 70 - NEC SEP 2 6 2016 City of -TukWila BUILDING DIVISION 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn of Express Tukwfla, WA Sheet Title: LEVEL 1 LIGHTING PLAN L) I U-1 U I i U ........ . . . . . . � . . . . . . . . . . . ... ... ... .......... . . .... ................... ... ... ........ ....... ....................... .... ....... ..... ............ ........ ...... ................... .............. ... ... ........... ........... 1 DW.., .................................. .............. ... ...... ....... .............. .............. . . . . . . . . . . . ......... .............................. .................. I I . ........... i ............ 1 /R4c ................ . ......... .......... ........... I § �; � I f .: ...................... ....... ....................... ....... ......................... ....... .......................... ...................................... .................................. . ..... ........ . . .......... ........ ............. .............. .... ...................... .................... . . . . . . ..... ........ ................ .... .......................... ....... ............... C: i'-, RECEIVED ................. C— 13 ; .... .......... .......... .......... .......... .......... ....... .......... .......... ......... ........... ..... . ........... ............... .......... "',-'CITY OF TUKWILA .............. .......................................... ......... ....... .......... . ........ . .................... ....................... ............... .................. ................ ... .................................... ........................................ :,.� ........................ .................................. .................... . . . . ... ....... ..... ..... .... . ..... . ....... ............... ....... ..... / ........ ... . ........ .............. . ....... 1; ................ ..... ... .... .......... ; ................. . . ....... . ............... ........ .......... ............. ...................... ................ .... ....... . ... ..... . �e .............. ............ ............ .............................. .. . . ................... ............ ................. ........................ . . ............... .......... ........... ............................. ... . .............. . ..................... Pl� 1 5 Designed By: RB ............... ........... ..... . . .... .. . ....... . ....... . .............. ........ ..... ......... ................... . ............... . ...... . ... ............... ... ....................... I ............. .......................................... ...... :,. . ............ ............... ........ . ...... . ......................................... ........... ................ .................. ...... . ... ... .............................. .............. ........... . ....... ............... ........... ... ........ SEP 12 2016 MB Drawn By: PERMIT CENTER Project No: 16195 .............. .............. --- — ------- ;, ; --;- .......... I ..... ....... . ................ . ......... ........... . ......... .......... .. .............. ............ .. . .. ......... ............ 1'e_!.-.-111:1_, I........... .......... . .. . ..... . ..... ............................................. : ............. : ................. . ..................... ...................................................... ...................................................... ................................................ .......................................... .................................................................................................................................................. .............................. ...................................................... ....................................................... ..................................... ............ ........................ ............ ............... ............. .. . ...... .............. ............... ............. ................ .......... ................ ...... DIX DI ..................... ...... .............. . ........ PIE: 16 ....... ... I. ......... .................... . . .......... ........... PlE-16 .............. D1 IF I X xi ........... F21 . .... 4 PlE-16 .............. F21 F21 ............ .......... .......... .... �.s ............... D1X .. . ........ .................. ............ ....... . ........................ ........... . ........... F3 F1 APPROXIMATE LOCATION ON EXTERIOR FACE OF BUILDING FOR ILLIMINATED SIGN. VERIFY EXACT SIGN LOCATIONS, ELEVATIONS AND CONNECTION REQUIREMENTS WITH SIGN SUPPLIER PRIOR TO ELECTRICAL ROUGH IN. . . . . ... . . .. ... 4 14: 2 IPlE-14 .......... ............ D1 Dix D1 GENERAL LIGHTING CONNECTION NOTES 04 40 ........... ...................... ........... ............ .. . ............ ....... ... ... .......... ...... . . ... ..... ... ....... ................ ....... ... ................ ... ............... ....... ......... . ..... ...... I.. . .... . . ............. .................. . .............. . . .... ..... . . . . . . . . . . . . . . . I ............... ...................... .......... .............. ...... . . ........ ........... .......... ..... .......... .......... . ........... F1 i F1 F1 F3 _F F1 F1 Ul8 -14 DIX IPIE 23 23: 236 25 81 0 .. .......... ... ........... ...... . ....... . ......... ........... ........... ..................... .......... .... .......... ... hl'i 8 8jj F1 F1 . . . ......................................... Dix ........... . .... . 14 ... .......... . ........ ... IPlE-14 ................ ......... . ............ ........... ... ......... .. ............. ........ .. . .. ........... . ..... . . ............ I I ........... ...... . ......... .............. P? S: ............................................ ............ ..................... . . .................. . ....... FIX F1 F1 23b Z3 23 i Dix SX, Fi F1 X i F1 ! i ............. .. ......... ... ...... ........ . Pill ..... ..... . .............................................. 4 ........... - ........... ........ ............ . . . ........... ..... ...... . ......... ... .... .. I .......... ....................... ...... ........... ....................... ........... .......... < ......... 1 PIE -1 S D1 .......... ........................................ ............ .. ..... ... . ............... ....... ...... .. ................ . . ..... .............................. F .... ............. ........... ........ ....... ....... . P E-14 N . . ........ .. ....... P1 - 8� 'PlE-18�, ...... .... .......... .................... ...... ........ . ........ .... ........ .. ............... ..................... . ....... ... .................. M ............. .......... . ............ . ............ .............. 4 8 1V 0 F3 0 *� . ............... F Dix Dix DIX 8 I............ T1 > ............... ... ..... . ..... . .... . ......................................... .. ........... . D 1 .................... 8 14 PIE- ........... ................. ..... . .......... .. ....... :% I .............. ...... . ....... . F01 F2 ........................................... ........... . I N18 ...... ..... ............. ................ .......... 8/R2o 8/R a X , `/ m 0 ......... ........... 2.J ........... .......... d R2 D1 ..,2 DW DWEI.FVAM� �TlE -1 8' D 1 DIX D 1 .......................................... Hi ik L J. � :: TWR D1X PlE-14 F3 xi.. ...... . . J 045 a 40 0, R2a F3 P 1 E- 1 8,' PlE-14 DW 8/ 2c I. ....... .... Qu 10241 On 12 94 DW >/ 4 . ....... D1 D I . .. . .. ....... ... . . .. . .. . . �§ I " ................................ ..................................................................... .. ........ .......... . .. ........... i ............ D1 ............. s x ......P'IE-14 !86R2a (94 8/R2c FIXTURE TYPE (TYPICAL) 8/R2a 8/R2a 8/R2a 8/R2a 8/R2a n no 0 PlE-14 D 1 8/R2C 1 0 Pil�_140 4@ .......................................... : .. ........ D I X Dix D1 T X1 i i� R 11 I � E . : PTE., 4 04 GP1E-14 GME -14 DIX DW DW DW DW DW e ..... ........... .......... .......... .......... ....... ..... ..... ....... X1 I .......... .......... .......... .......... ... .......... ........... D 1 D 1 DIX D 1 .. ........ ..................... ...... .......................... ......................... xi ........................ ....... ......................... ....... ......................... ....... .......................... ....... ............... .......... ..................... ........... PIE-14 EPCJ ............... I.......... .......... ....... ..... ........... ........... ... E*::� 1 4 PIE -1. -14 PfE 14r Mli J ......... . . ........ . .......... ...... . . . . .... 2 .......... .......... .......... .......... ......... 010 PIE Pi .... .... I ...... ...... VS D D . ................ 010 0 0 .21 /R4c X, .......... :1 12 6P1E 010 01 010 �,2 x GP1E-14 .. ............. Dix ................ JX DIX D 1 012 012 f - 1 DIX Di 0 21 /R� .......... DIX ................... D I'll', Dix D 1 D 1 F2 021 /R4c 021 /R4c DW DW D2 D2 .... . ..... YPICAL) 10 12 D1 D1 012 0 D2 12 F1 LCP CONTROL RELAY (T iiO PlE-14 PANEL P1C CIRCUIT (TYPICAL) 12 D 1 D 1 12 DW I12 012 @12 .......... 010 DW ! OP 4 @10 109 10 d ........... ..... .... 010 12 012 . ......... Di D I 1 D 2 D I DIX X. (§)l D1 Di 0 12 Dix D�/ > D I D I Di bw EO ............. 021 /R4c 021 /R4c 021 /R, 12 012 410 010 012 F1 DW ....... ....... ... ........... ............. ....... ....... ....... P.1 . ....... .... D.1 'P1 EL:�',14 .............. ...... ............... ... ME -1-4 ......................... 4';-_- .................. ... P 1- El"f4w., 010 ja , 10 7� .......... ............ -PTE T ............. :. �, DW F1 D2 D2 D2 ............... f1__-----..,........:..� . ....... ..... �r .......... f01-27h_@T2_g PlE ............... 12h ............. r ii -2 2p I ! �eo I OW 12m @10 �Dl DI X 2�_P! 12k ............. /* DIX x D 1 )< D1X!' D1 Dix D1 12h (01 2q D 1 D 1 .... ........ j ............. ... ; 0 1 I x x I*, 12 -14 X W DW PIE 12 12 12 01 2g 0 12g .......... D1 DW DW � AIrl @21 /R4c @21 /R4c (D21 /4 ......... . .......... D1 D1 PIE -1, ix D 12 N D2 D2 21) .................. @11 2m . 10 010t. 110t i0loy 1010X ........... .... @ �0, I O IX D2 DW DW 11 01ox ............................................. D1 DI -@"F 0�12e DI ..................... ....................... D 1 D 1 D D1 ==bi D1 ............. DW i�� DW 012i en,o�p,q F1 F1 P i ............ b 12 1 2f D I 02- I�x D1 D1 nc DI @12j —e,ftglh 12 012e 012f ............ D 1 D 1 PlE-14 1E-1 W 12 12e 021 /R4c 021 /R4c 021 /R4 . ...................... 2 X 1 OVO ..1 2i' X2 ...... ........ OlOr 1 2i f 12 K D2 D2 .Ci 01 2n OlOr ov @> 11 5 D2 r%1 r%1 ni r%1 r% V %�v R W X REVIEWEDFOR COMPLIANCE WITH NFPA 70 - NEC SEP 2 6 2016 City of -TukWila BUILDING DIVISION 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn of Express Tukwfla, WA Sheet Title: LEVEL 1 LIGHTING PLAN L) I U-1 U I i U ........ . . . . . . � . . . . . . . . . . . ... ... ... .......... . . .... ................... ... ... ........ ....... ....................... .... ....... ..... ............ ........ ...... ................... .............. ... ... ........... ........... 1 DW.., .................................. .............. ... ...... ....... .............. .............. . . . . . . . . . . . ......... .............................. .................. I I . ........... i ............ 1 /R4c ................ . ......... .......... ........... I § �; � I f .: ...................... ....... ....................... ....... ......................... ....... .......................... ...................................... .................................. . ..... ........ . . .......... ........ ............. .............. .... ...................... .................... . . . . . . ..... ........ ................ .... .......................... ....... ............... C: i'-, RECEIVED ................. C— 13 ; .... .......... .......... .......... .......... .......... ....... .......... .......... ......... ........... ..... . ........... ............... .......... "',-'CITY OF TUKWILA .............. .......................................... ......... ....... .......... . ........ . .................... ....................... ............... .................. ................ ... .................................... ........................................ :,.� ........................ .................................. .................... . . . . ... ....... ..... ..... .... . ..... . ....... ............... ....... ..... / ........ ... . ........ .............. . ....... 1; ................ ..... ... .... .......... ; ................. . . ....... . ............... ........ .......... ............. ...................... ................ .... ....... . ... ..... . �e .............. ............ ............ .............................. .. . . ................... ............ ................. ........................ . . ............... .......... ........... ............................. ... . .............. . ..................... Pl� 1 5 Designed By: RB ............... ........... ..... . . .... .. . ....... . ....... . .............. ........ ..... ......... ................... . ............... . ...... . ... ............... ... ....................... I ............. .......................................... ...... :,. . ............ ............... ........ . ...... . ......................................... ........... ................ .................. ...... . ... ... .............................. .............. ........... . ....... ............... ........... ... ........ SEP 12 2016 MB Drawn By: PERMIT CENTER Project No: 16195 .............. .............. --- — ------- ;, ; --;- .......... I ..... ....... . ................ . ......... ........... . ......... .......... .. .............. ............ .. . .. ......... ............ 1'e_!.-.-111:1_, I........... .......... . .. . ..... . ..... ............................................. : ............. : ................. . ..................... ...................................................... ...................................................... ................................................ .......................................... .................................................................................................................................................. .............................. ...................................................... ....................................................... ..................................... ............ ........................ ............ ............... ............. .. . ...... .............. ............... ............. F. /, - i 10 { C 13 "I + > . i - VIA LCP , : r - I - ✓ - _ REVISIONS t� made to th,'sco MO changes n p P. I ; I I 9 I f 4�brk `� Ithai.. -)r�r approval f I r r;. F� � - �1 I {{ t A II , 1 1 . �l a � 'la �t1 C1i1"1Division. ;, iJ r, r s r ... w_. , 4 P`v.11sicns 4vifL require a neva plan submittal 10 . --_ and may include. additional plan review fees- NORTH SITE PLAN_Y Y FLAG NOTES li::> PROVIDE 2"C(PVC SCHED 40),2#8,1#8 GND(CU) BETWEEN LUMINAIRES. R�> PULL/SPICE BOX LOCATION IS APPROXIMATE. FIELD VERIFY BOX LOCATION PRIOR TO UNDERGROUND CONDUIT INSTALLATION. CONNECT NEW LUMINAIRES TO EXISTING STREET LIGHT. R�> DISCONNECT AND REMOVE EXISTING STEET LIGHT LUMINAIRE. DISPOSITION OF REMOVED FIXTURE TO BE DETERMINED BY CITY OF T,� PUBLIC WORKS. PROVIDE WEATHERPROOF SPLICE BOX AT REMOVED LUMINAIRE LOCATION — SPLICE REMAINING CONDUCTORS TO RETAIN EXISTING CIRCUIT CONTINUITY. 40W BRACKET MOUNT PEDESTRIAN AREA LIGHT MOUNTED ON 16' POLE. VERIFY EXACT FIXTURE 'AND REQUIREMENTS WITH CITY OF TUKWILA. (TYPICAL FOR 4 LUMINAIRES). RECEIVED CITY OF y UKWILA AUG 23 2017 PERMIT CENTER 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: SITE PLAN Designed By: RB Drawn By: MB Project No: 16195 Date: 05/19/2017 Sheet Number: 11W FORAGE a 11:, n , S OkAGL SERVER �.� P1A-15 PIA 17 �_MG _� —22,2 L �P18 4 COP _ ELEVATOR L I *P1 B 26 H CHE C!<_IN �Permit LOBE` - - ! _ 1 _ P18-13 (A rALJ n�ty �io��_ P1A-19 I.�— P B 15 � P1A 23 WPI;,F16-177 E10 101 P16 '28 P1D-20,22 ! - ❑cR I------� P18-13 P1B-19 .,...- P.Ft? ,�, 'r ,c 'r . ;; " _ - _ , , •.,,... , I �I , • = of to error ? i �© �,[[.�,, 1 c o Pl�r or con �£, ., k.�U� tir�� ; P1D-18 MADNKF • "— p1A-23 i Approval cf iiIS Ci°���� P1B-11 E 10� l i LUGGAGE I the violation ofr� , CORRIDOR l PtA-21 SIORf�GL j i', , � - _ _ j !��tf3 ®� C3t'�.�?�,_..w.ti. P1D-2 ( _ 1 i --J [-111. - - - - -- -L� —of -app oved-Fi Copy' a it r ...dld o � o cod P1 D py itiii ea:.�ar:G:'v�t�f'r d: I C0� ions .4 �. f 131 D-2 I 1Dif , 8 H -_, P16-9 _- P1D-4 FCU 4A i OP1D-10 Date: 7 "�" 7 i 1 4W *P1D-3 _ P1B' 7� P1B1 s'� _ I'�I BUILDING DIVISION t RECEIVE® CITY OF TUKWILA APR 18 2017 -- --���� PERMIT CENTER Holiday Inn Express Tukwila, WA Sheet Title: LEVEL 1 POWER & COMMUNICATIONS PLAN Designed By: RB Drawn By: MB Project No: 16195 Date' 09/07/2016 -- -------- -- 0 NFPA 70 - N(4 �iANtheet Number: I NORTH FLOOR '• • • t APR 2 � 2017 C ty of Tukwila RUILDIN! P1 l l ►N 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PANEL'P1A' PANEL'P1B' PANEL'P1C' Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAIVE HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: PROJECT # 16195 PROJECT #: 16195 LOCATION: ELECTRICAL ROOM TUKWLA, WA TUKVMLA, WA FED FROM:NOTE MDP FED FROM MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G NOTE CKT NO. CKT CIRCUIT NAME NO. CBSIZE 8 AMIJ P R LOAD(KVA) I H I M L K G O TOTAL PANEL DESCRIPTION 1 RSCS - MEETING ROOM 129 A 20 1 0.5 1 1 0.5 PANEL AMPS : 200 3 RE'S - MEETING ROOM 129 B 20 1 0.5 RECS- LOUNGE 102 C 0.5 FEEDER AMPS L- L VOLTS L- NVOLTS PHASE: : 200 : 208 : 120 3 1_51 RBCS - MEETING ROOM 129 C 20 1 0.5 0.5 7 RBCS - PRE FUNCTION 130, STORAGE 131 A 20 1 0.4 0.4 9 RE'S - REST RMS 132 & 133 B 20 1 0.4 r 0.4 11 REES - SALES OFFICE 117 Cl20 7 REFS - LOUNGE 102 A 20 1 0.5 0.5 1 0.4 1 0.3 0.7 WIRE: 4 13 RECS - GEN MAN. 115 A 20 1 0.5 0.3 0.8 15 RECS- WORK AREA 113 B 20 1 0.4 1 17 REO- MARKET 109 C 20 1 1.0 1,0 0.4 M.L.O. X 17 RE3CS - WORK AREA 113 C 20 1 0.4 0.4 19 RECS - CHECK IN 110 A 20 1 0.2 0.2 21 RSCS- CHEEK -IN 110 B 20 1 0.4 ML.O. MAIN CB X 0.4 MAIN CB FLUSH SURFACE X REES- SEWER 112 23 RBCS- CHECK-IN 110 C 20 1 0.4 0.4 25 SPARE A 20 1 27 SPARE B 20 1 1.5 FLUSH SURFACE X A ISO GID FEED-THRU 27 - B 29 SPARE C 20 1 31 SPARE A 20 1 2.6 ISO GND 1.0 1.0 29 TO -1 33 SPACE ONLY B - 1 0.1 FEED-THRU 0.1 FEED-THRU 1 35 33 35 SPACE ONLY C - 1 37 SPlACEONLY A - 1 C 0.1 1 0.4 0.1 LOADSUMMARY (TOTAL,ALL SECTIONS) 39 SPIACEONLY B - 1 1 41 SPACE ONLY C - 1 - 1 LOADSUMMARY 20 RW KVA : 5.6 2 WASHER - LAUNDRY 123 A 20 3 1.2 4 - B - A - 1.2 41 ISRAFE 1 0.2 HEAT KVA 20 6 - C - SPACE ONLY C 1.2 1 4 MOTOR KVA : 18.9 8 WASHE32-LAUNDRY 123 A 20 3 4 1.2 812. 20 LIGHTING KVA KITCHEN KVA 0.5 10 - B - - 1.2 12 - C - - 6 RE ES- CORRIDOR C1 20 1 0.4 0.4 1.2 0.8 2.0 GEN LTG KVA : 0.8 14 WASHER- LAUNDRY 123 A 20 3 1,0 1.2 0.8 2.0 OTHER KVA : 6.8 16 - B - - 0.5 1.2 0.5 1.7 PHASEA KVA : 10.6 18 - C - 1 1.0 1.2 0.5 1.7 AMPS PHASE KVA AMPS PHASE C KVA : 88.2 : 10.4 : 86.3 : 11.2 20 WASHER- LAUNDRY 123 A 20',-3 1.2 1,2 22 - B - - 1.2 0.2 1.4 24 - C - - 1.2 0.8 2.0 26 DRYER- LAUNDRY 123 A 20 1 1.1 AMPS : 1.1 AMPS : 93.1 28 DRYER- LAUNDRY 123 B 20 1 1.1 PHASE B KVA : AMPS : 1.1 22 DRYER- GUEST LAUNDRY 107 B 30 2 2.0 0.5 2.5 24 - 30 DRYER- LAUNDRY 123 C 20 1 1.1 PHASE C KVA : 1.1 26 WASHER - GUEST LAUNDRY 107 32 DRYER- LAUNDRY 123 A 20 1 1.5 1.1 1.5 1.1 CONNEETEDLOAD 34 REFRIGERATOR - BREAK 125 B 20 1 20 0.8 OONNECTED LOAD 0.8 KVA : 32.1 36 RE3rS- BREAK 125,121,119N C 20 1 0.7 20 1 0.7 AMPS : 89.1 38 SPARE A 20 11 SPARE B 20 1 D9VANDLOAD 40 SPARE B 20 1 33.4 36 SRARE C KVA : 32.0 42 SPARE C 20 IT---- AMPS: 92.6 38 SPACE ONLY AMPS : 88.8 NOTESIRBNARKS : I. 2. 3. 1 SPARE DE3VIAND / DIVERSITY FACTORS LOAD DESCRIPTION R RE�CB3TACLBS- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER 20 1 DEMAND 100% = 5.6 50% _ 100% _ 100% = 17.7 125% = 1.5 125% _ 65% _ PER NEC 220.44 = 0.4 100% = 6.8 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL'P1B' PANEL'P1C' Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: PROJECT # 16195 LOCATION: PROJECT#: 16195 LOCATION: TUKVMLA, WA NOTE CKT NO. FED FROM MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G NOTE CKT NO. CIRCUITNAME NOTE CKT NO. CIRCUIT NAME CBSIZE 8 A P R LOAD (KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 RECS - BUSINESS CENTER 101 A 20 1 0.4 1 3 0.4 PANEL AMPS : FEEDER AMPS : 200 200 3 . RECS- BUSINESS CENTER 101 B 20 1 0.4 0.4 5 RECS- LOUNGE 102 C 20 1 0.4 C 20 0.4 L- L VOLTS : L- NVOLTS : PHASE: WIRE: 208 120 3 4 7 REFS - LOUNGE 102 A 20 1 0.5 0.5 9 RBCS - LOUNGE 102 B 20 1 0.5 0.5 11 TV- LOUNGE 102 C 20 1 1.0 1.0 13 REQ- E LEV LOBBY 108, STORAGE 111 A 20 1 0.4 1 1.2 0.4 WIRE : 4 15 RM- MARKET 109 B 20 1 1.0 1.0 17 REO- MARKET 109 C 20 1 1.0 1,0 19 REC-MARKET 109 A 20 1 20 1 1,0 1.0 ML.O. MAIN CB X CLG HTR - EMERG RM 128 21 RBCS - SERVER 112 B 20 1 1.5 1.5 23 REES- SEWER 112 C 20 1 20 1 1.5 1.5 FLUSH SURFACE X A 25 CU -1 A 40 2 2.6 2.6 27 - B - - 1 2.6 SPACE 2.6 ISO GND 1.0 1.0 29 TO -1 C 15 2 C 0.1 FEED-THRU 0.1 FEED-THRU 1 35 33 31 - A - - C 0.1 1 0.4 0.1 - 37 33 SPARE BI 20 1 35 SPACE ONLY C - 1 LOADSUMMARY 20 39 ISPARE B 20 37 SPACEONLY A - 1 41 ISRAFE 1 0.2 C 20 LOADSLIMMARY (TOTAL.ALL SECTIONS( 39 ISPACEONLY B - 1 41 SPACE ONLY C - 1 4 LIGHTS - GROUND FLOOR CORRIDORS B 20 RIS✓ KVA : 4.0 2 RECS - RR 134 A 20 1 0.4 0.4 4 RETS - CORRIDOR BI 20 1 0.5 20 11 0.5 HEAT KVA : MOTOR KVA : LIGHTING KVA 13.4 9.0 6 RE ES- CORRIDOR C1 20 1 0.4 0.4 8 RE3r- POOL 119S Al20 1 0.2 0.2 10 RED- FITNESS 118 BI 20 Ill 104.6 1.0 1.0 1,0 KITCHEN KVA 0.3 12 REC - FITNESS 118 C 20 11 20 1 1.0 0.5 1.0 GEN LTG KVA 3.8 14 RM- FITNESS 118 A 20 1 1 1.0 1.0 OTHER KVA : PHASEA KVA : 7.0 10.5 16 RM- FITNESS 118 B 20 1 1.0 1.0 18 DRYER- GUEST LAUNDRY 107 C 30 2 1 2.0 0.5 1 2.5 AMPS : 87.5 20 - A - 20 1 2.0 0.5 2.5 PHASE B KVA : AMPS : 12.5 104.5 22 DRYER- GUEST LAUNDRY 107 B 30 2 2.0 0.5 2.5 24 - C - - - 1 2.0 0.5 2.5 PHASE C KVA : 10.3 26 WASHER - GUEST LAUNDRY 107 Al20 20 1 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER 1.5 1.5 AMPS : 86.0 28 WASHER - GUEST LAUNDRY 107 B 20 1 1.5 1.5 30 SPEARE C 20 1 OONNECTED LOAD 34 SPARE B 20 32 SPARE A 20 1 36 ISPARE C CONNECTED D LOAD 34 SPARE B 20 1 38 SPARE A KVA : 33.4 36 SRARE C 20 1 40 SPARE B 20 AMPS: 92.6 38 SPACE ONLY Al20 1 SPARE C 20 1 DEMAND LOAD 40 SPACE ONLY B 20 1 DEMAND 100% 50% _ 100% = 100% _ 125% _ 125% = 65% PER NEC 220.44 = 100% = 16.9 0.3 KVA : 33.7 42 SPfAC E30NLY ICI 20 11 1 1 1 1 r AMPS : 93.6 NOTES,.IREtAARKS : 1. 2, 3, DEMAND / DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% = 4.0 50% _ 100% = 13.4 100% = 7.5 125% = 1.9 125% _ 65% _ PER NEC 220.44 = � 100% = 7.0 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL 'PID' PANEL'P1C' Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: PROJECT # 16195 LOCATION: TUKWILA, WA LOCATION: FED FROM: NOTE CKT NO. FED FROM: MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G NOTE CKT NO. CIRCUITNAME CBSIZE 6 AMP P R LOAD(KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 1 PARKING LOT LIGHTS - EAST A 20 2 0.6 0.6 PANEL AMPS : 200 1 3 - - - B -- CINNAMON WARMER- BREAKFAST 103 0.6 0.6 FEEDER A NPS : 200 1 5 PARKING LOT LIGHTS - WEST C 20 2 0.3 0.3 L- L VOLTS : L - NVOLTS : PHASE: 208 120 3 1 7 — A -- 0.3 0.3 9 LIGHTING CONTROL PANEL B 20 1 0.3 0.3 2 11 BUILDING SIGN- SOUTHWEST FACE Cl20 1.0 1 1.2 1.2 WIRE : 4 2 13 BUILDING SIGN- SOUTHEAST FACE Al20 1 1,2 1.2 2 15 BUILDING SIGN- SOUTH FACE B 20 1 1.2 1.2 2 17 BUILDING SIGN- NORTH FACE C 20 1 1.2 1.2 29 SPARE C 20 1 19 SPARE A 20 1 - 0.9 M.L.O. MAIN CB FLUSH X CLG HTR - EMERG RM 128 2 21 LIGHTS - PORTE OOCFERE B 20 11 1 0.5 0.5 23 LIGHTS -POOL AREAS, FITNESS C 20.11 1,2 1.2 --- 25 SPARE A 20 1 23 CLG HTR- POOL EQUIP 121 Cl15 2 1.0 1.0 25 - - - Al-- - 1.0 1.0 SURFACE X A 2 - 27 SPARE B 20 1 39 SPACE ISO GND 2 1.0 1.0 29 SPARE C 20 1 C 1.0 FEED-THRU - 31 SPARE A 20 1 1 35 33 SPARE B 20 1 RECS - BOARD 105 C 20 1 0.4 35 SPARE C 20 1 - 37 SPARE A 20 1 12 PREP TA BLE RECS - PA NTRY 104 LOADSUMMARY 20 39 ISPARE B 20 1 10 WATER HEATER IGNITION CIRCJT B 20 1 0.2 0.2 14 I T O T A L, A L L S E C T 10 N S1 A 41 ISRAFE 1 0.2 C 20 1 OTHER KVA 16 --- B -- - 0.8 0.8 REC KVA SPARE 2 SPARE A 20 1 20 4 LIGHTS - GROUND FLOOR CORRIDORS B 20 1 0.5 0.5 9 HEAT KVA FCU-4A,B,C,D A 6 LTS - UTILITY, BREAK RM, EMP REST RM C 20 11 0.7 0.7 MOTOR KVA LIGHTING KVA : KITCHEN KVA 13.5 8 LTS - FR DESK MARKET,FEATWALL,OFFIC A 20 1 1.0 1.0 10 LTS - LOBBY, BUSINESS AREA B 20 1 0.8 0.8 0.8 12 LTS -BOARD RM, PANTRY,BREAKFAST Cl20 104.6 1 1.0 1.0 GEN LTG KVA OTHER KVA : 0.3 14 LTS - LAUNDRY A 20 1 0.7 0.7 A 60 16 LTS - MEETING RM., REST ROOMS B 20 1 0.5 0.5 PHASEA KVA : 3.8 5.4 18 SPARE C 20 1 - AMPS : PHASE BKVA : AMPS : 31.6 4.4 36.8 20 SPARE A 20 1 22 SPARE B 20 1 B 20 24 ISPARE C 20 1 1 PHASE CKVA : 5.6 CONNECTED LOAD 26 SPARE A 20 1 AMPS : 46.8 37.2 103.4 28 SPARE B 20 1 DEMANDLOAD 30 SPARE C 20 1 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% PER NEC 220.44 = 100% = KVA : 32 SPARE A 20 1 OONNECTED LOAD 34 SPARE B 20 1 DEMAND/DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAININGOI/ER10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER KVA : 13.8 36 ISPARE C 20 1 AMPS : 38.4 38 SPARE A 20 1 DEMAND LOAD 40 SPARE B 20 1 KVA : 17.2 42 SPARE C 20 1 AMPS : 47.7 NOTES/REMARKS: 1. CONNECT THRU 4P CONTACTOR AT LCP 2. CONNECT THRU LIGHTING CONTROL PANEL RELAY 3, DEMAND/DIVER TYFACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC 0 OTHER DEMAND 100% 50% _ 100% = 100% _ 125% _ 125% = 65% PER NEC 220.44 = 100% = 16.9 0.3 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL 'PID' 16195 Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAIVE: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA PROJECT It 16195 LOCATION: TMMLA, WA NOTE CKT NO. FED FROM: MDP CBSIZE 0 AMPI P R LOAD (WA) H M L K G O TOTAL PANEL DESCRIPTION NOTE CKT NO. CIRCUIT NAME CB SIZE OFAMP P R LOAD (WA) H M L K G O TOTAL PANEL DESCRIPTION 1 REFRIGERATOR- BREAKFAST 103 A 20 1 3.0 0.4 0.4 PANEL AMPS : 200 3 CINNAMON WARMER- BREAKFAST 103 B 20 1 : 208 0.7 0.7 FEEDER AMPS : L - L VOLTS : L- NVOLTS : PHASE : WIRE : 200 208 120 3 4 5 HOT WATER- BREAKFAST 103 C 20 1 1.0 1.0 7 HOT FOOD- BREAKFAST 103 A 2011 1.7 1.7 9 TOASTER- BREAKFAST 103 B 20 11 1.8 1.8 11 PANCAKE MACHINE- BREAKFAST 103 C 20 1 1.7 1.7 13 JUICE MACHINE- BREAKFAST 103 A 20 1 0.4 0.4 15 AIRPOT RACK- BREAKFAST 103 B 20 1 PHASE WRE 1.0 1.0 M.L.O. IVAINCB X FLUSH SURFACE X ISO GND FEED•THRU 15 17 AIRPOT RACK- LOUNGE 102 C 20 1 1.0 1.0 19 FCU -5,6,7,8 A 20 1 1.1 1.1 21 --- B -- - 1.1 1.1 23 SPARE C 20 1 1 25 SPARE A 20 1 27 SPARE B 20 1 29 SPARE C 20 1 31 BATH DCH FAN BEF-1 A 20 13 0.9 0.9 33 --- B -- - 0.9 27 SPACE B 0.9 CLG HTR - EMERG RM 128 AI 15 35 --- C -- - 0.9 31 SPACE A 0.9 23 CLG HTR- POOL EQUIP 121 Cl15 2 1.0 1.0 25 - - - Al-- - 1.0 1.0 37 SPACE A 2 - 0.9 9 0,9 .9 ISOGND HR LOADSUMMARY (TO TA L, ALL SEC TIO N S I LOADSUMMARY 39 SPACE B 2 1.0 1.0 39 --- B -- - 9.5 9.5 REC KVA HEAT KVA MOTOR KVA : LIGHTING KVA ITO TAL.ALL SECTIONS ) 41 SPACE C 1.0 1.0 - B 1 35 REC KVA : HEAT KVA : 1.4 4.2 2 RSCS - BOARD 105 A 20 1 0.5 0.5 4 RSCS - BOARD 105 B 20 1 0.4 0.4 6 RECS - BOARD 105 C 20 1 0.4 A -- - 0.4 MOTOR KVA : LIGHTING KVA KITCHEN KVA : 20.0 11.6 8 UC TABLE- PANTRY 104 A 20 1 0.5 0.5 10 UCTABLE- PANTRY 104 B 20 1 0.5 0.5 12 PREP TA BLE RECS - PA NTRY 104 C 20 1 KV 0. HEAT KVA : 28.0 MOTOR KVA : 23.2 LIGHTING KVA : 0.3 KITCHEN KVA 1.0 1.0 GEN LTG KVA 10 WATER HEATER IGNITION CIRCJT B 20 1 0.2 0.2 14 RECS - PANTRY 104 A 20 1 0.2 0.2 GEN LTG KVA OTHERKVA PHASEA KVA 0.2 OTHER KVA 16 --- B -- - 0.8 0.8 16 SPARE B 20 1 0.8 A MPS : 150.0 PHASEA KVA : AMPS : 11.8 98.3 18 EH -2 C 20 1 1.5 1.5 20 FCU-4A,B,C,D A 20 2 0.8 24 - - - C - - 0.8 PHASEB KVA : 12.6 22 - B - - 0.8 0.2 0.8 AMPS : 104.6 24 HP -4 C 50 3 5.4 A 60 5.4 PHASE KVA : 12.9 26 - A - - 5.4 5.4 5.4 AMPS : 107.4 28 - B - 5.4 DEMAND LOAD 5.4 ISPARE B 20 30 ISPARE C 20 1 32 1 SPARE A 20 1 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC O OTHER CONNECTED LOAD 34 SPARE B 20 1 KVA : AMPS : 37.2 103.4 36 SPARE C 20 1 38 SPACE A DEMANDLOAD 96,6 268.1 40 SPACE B DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% PER NEC 220.44 = 100% = KVA : 34.5 42 SPACE C AMPS : 95.8 NOTESIREMARKS : 1. 2 3. DEMAND/DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAININGOI/ER10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 1000/0 = 500/0 _ 1000/0 = 1000A = 125% = 125% _ 65% = PER NEC 220.44 = 100% _ 1.4 4.2 14.6 6.8 7.6 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: PAIIIEL'P1M' PANEL'P5E' 16195 Date: PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: MDP FED FROM: P1 TUKW LA, WA NOTE CKT NO. CIRCUITNAME CBSIZE 0 AMPI P R LOAD (WA) H M L K G O TOTAL PANEL DESCRIPTION 1 HP1 A 40 2 3.0 3.0 PANEL AMPS : 200 3 - - - B -_ 3 - B - - 2.1 2.1 3.0 3.0 FEEDER AMPS : 200 5 HPR2 A 40 2 3.0 3.0 L - L VOLTS : 208 7 --- B -- 20 3.0 3.0 L- NVOLTS ; 120 9 DCU-1 POOL UNIT A 15 2 10.7 0.7 PHASE WRE : 3 : 4 11 _ B -- - 0.7 0.7 13 WALL HEATER EVVH-I (STAIR2) A 20 11 1.5 1.5 15 HR -3 B 40 2 3.0 3.0 17 --- C -- X 3.0 3.0 25 SPACE A 27 SPACE B 19 CLG HTR - EMERG RM 128 AI 15 2 1.0 1.0 M.L.O. MAIN CB FLUSH SURFACE X -K 31 SPACE A 21 - - - B - - - 1.0 1.0 23 CLG HTR- POOL EQUIP 121 Cl15 2 1.0 1.0 25 - - - Al-- - 1.0 1.0 27 29 FAN COIL 1,2,3 --- B 15 -- 2 - 0.9 9 0,9 .9 ISOGND HR LOADSUMMARY (TO TA L, ALL SEC TIO N S I B 1 31 POOL CIRCULATING PUMP A 20 2 1.0 1.0 39 --- B -- - 9.5 9.5 REC KVA HEAT KVA MOTOR KVA : LIGHTING KVA 33 --- B -- - 1.0 1.0 - B 1 35 POOL NICHE LIGHT C 20 1 0.3 0.3 12 - C - 2.1 2.1 14 SPARE Al20 1 37 --- A -- - 24 SPACE C 26 SPACE A LOADSUMMARY (TOTAL, ALL SECTIONS ) 39 POOL CHEMICAL FEED RECEPTACLES B 20 1 0.5 0.5 41 POOL HEATER CONTROLS C 26 1 1 0.5 0.5 KV 0. HEAT KVA : 28.0 MOTOR KVA : 23.2 LIGHTING KVA : 0.3 KITCHEN KVA 2 YI&ZM AN 2 1 0, 2 4 WATER HEATER IGNITION CIRCJIT B 20 1 0.2 0.2 6 WATER HEATER IGNITION aRCJIT C 20 1 0.2 1 0.2 8 WATER HEATER IGNITION CIROJTT A 20 1 0.2 1 0.2 10 WATER HEATER IGNITION CIRCJT B 20 1 0.2 0.2 12 CLG EXH FAN- POOL RR, EMPLOYEE RR C 15 1 0.2 0.2 GEN LTG KVA OTHERKVA PHASEA KVA : 0.5 : 18.0 14 RCP1 DOMESTIC HOTWATER?UMP A 15 3 0.8 0.8 16 --- B -- - 0.8 0.8 18 - - - C -_ 0.8 0.8 A MPS : 150.0 20 SPARE A 15 3 KVA ; PHASEB KVA AMPS PHASE C KVA AMPS : 17.6 : 146.7 : 16.9 : 140.8 22 - - - B -- - 24 - - - C - - 26 BATH EACH FAN BEP2 A - - - 0.9 0.9 28 --- B -- - 0.9 0.9 1 0.2 30 --- C -- - 0.9 0.9 SPARE 32 POOL AREA HEATING UNIT DE aI-1 A 60 3 5.4 5.4 CONNECTED LOAD 34 - - - B - - - 5.4 5.4 WA : 52.5 A MPS : 145.7 36 - - - C -_ 5.4 5.4 38 SPARE A 20 1 DEMAND LOAD 40 ISPARE B 20 1 36 SPACE KVA : 53.3 AMPS : 148.0 42 ISPAFE C 20 11 NOTESIREMIARKG4 : 1. PROVIDEGFCI CIRCUIT BREAKER 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 0.5 500/0 _ 100% = 28.0 100% = 20.2 125% = 3.8 125% = 0.4 65% _ PER NEC 220.44 = 100% = 0.5 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: MB PANEL'P5E' 16195 Date: 09/07/2016 PROJECT NAME HOLIDAY INN EXPRESS PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: 16195 LOCATION: 4TH FLOOR TUKWILA, WA PROJECT #: 16195 FED FROM: P1 TUKW LA, WA FED FROM: MDP/GENSETVIA TRANSFER SWITCH NOTE CKT NO. CIRCUIT NAME CBSIZE 8 A1VF1P R LOAD(KVA) H M L K G 0 TOTAL PANEL DESCRIPTION 1 ELEVATOR PRESSURIZATION FAN A 35 3 2.1 2.1 PANIEL AMPS : FEEDER A MPS : I L- L VOLTS : 100 100 208 3 - B - - 2.1 2.1 5 - C - - 2.1 . 7 STAIRVVELL PRESSURIZATION FAN S A 35 3 2.1 2.1 L- N VOLTS: PHASE : WIRE : 120 3 4 9 - B - - 2.1 2.1 11 - C - - 2.1 2.1 13 SPARE A 20 1 15 SP1 B 20 1 1.1 1.1 17 SP -2 C 20 1 1.1 1.1 19 SPACE 15 SPARE B 20 1 17 SPAM C 20 1 19 SPACE A M.L.O. MAIN CB FLUSH X X 400A M.L.O. X 25 SPACE AlSURFACE 21 SPACE B MAIN CB FLUSH SURFACE ISO GND FEED-THRU X 23 SPACE C 25 SPACE A 27 SPACE B 29 SPACE C A FEED THRU 31 SPACE A 33 SPACE B B C C A LOADSUMMARY (TO TA L, ALL SEC TIO N S I B PANEL P5E- ROOF MECHANICAL FANS A 100 3 C 9.5 LOADSUMMARY (TOTAL, ALL SECTIONS( 39 --- B -- - 9.5 9.5 REC KVA HEAT KVA MOTOR KVA : LIGHTING KVA 28.5 2 OORRDORSMOKECONTROLIXHAUSTFAN A 50 3 3.1 3.1 4 - B - 3.1 3.1 6 - C - - 3.1 3.1 8 STAIRWELL PRE SSUREATION FAN N A 35 3 2.1 2.1 10 - B - - 2.1 2.1 KITCHEN KVA GEN LTG KVA OTHER MVA PHASEA KVA : AMPS : B KVA : AMPS : PHASE C KVA : AMPS : 9.5 79.1 9.5 79,1 9.5 79.1 12 - C - 2.1 2.1 14 SPARE Al20 1 16 SPAM B 1 20 1 18 SPARE C1 20 1 20 SPACE AlPHASE 22 SPACE B 24 SPACE C 26 SPACE A 28 ISPACE B 30 ISPACE C 1 0.2 A 0.2 LIGHTING KVA : KTTCFE N KVA GEN LTG KVA OTHER KVA : 4.4 1.3 10 ELEVATOR ROOM LIGHTS B 20 1 0.2 0.2 CONNECTED D LOAD 14 EMERGENCY LTS - LOBBY, W OORRIDORS A 20 1 0.5 0.5 16 B B 20 1 KVA : AMPS : 28.5 79.0 C 30.2 251.6 29.4 18 EMERGENGY LTS - SW STAIRS C 20 1 1.5 1.5 A 22 EMERGENCY EGRESS LTS - 2ND FLR DEMAND LOAD 0.2 0.2 B 244,9 24 EMERGENCY EGRESS LTS - 3RD FLR KVA ; 29.2 0.2 C PHASECKVA : AMPS : 31.4 261.6 §B20 26 EMERGENCY EGRESS LTS - 4TH FLR 1 0.2 0.2 28 AMPS : 81.2 NOTES/REMARKS: 1. 2. 3. 1 0.2 DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER 0.2 DEMAND 100% - 50% - 100% _ 100% = 125% = 125% _ 65% _ PER NEC 220.44 = 100% _ 25.4 3.8 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: MB PANEL'P1E' 16195 Date: 09/07/2016 PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKW LA, WA FED FROM: MDP/GENSETVIA TRANSFER SWITCH NOTE CKT NO. CIRCUIT NAME CB SIZE 01AMJ P R LOAD (KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 ELEVATOR A 300 3 18.0 18.0 PANIELAMPS : 400 3 - - - B -- - 18.0 18.0 FEEDER AMPS : L - L VOLTS : L- NVOLTS : PHASE : WRE: 400 208 120 3 4 5 - - - C -_ - 18.0 18.0 7 SPARE A 20 1 9 SPARE B 20 1 11 SMOKE/RREDAMPERS -WEST C 20 1 0.4 0.4 13 SMOKE/FIRE DAMPERS - EAST A 20 1 0.4 0.4 15 SP1 B 20 1 1.1 1.1 17 SP -2 C 20 1 1.1 1.1 19 SPACE A M.L.O. MAIN CB FLUSH X X 400A 21 SPACE BI 23 ISPACE C1 25 SPACE AlSURFACE 27 SPACE B ISO GND 29 SPACE C FEED THRU 31 SPACE A 33 SPACE B 35 SPACE C 37 PANEL P5E- ROOF MECHANICAL FANS A 100 3 9.5 9.5 LOADSUMMARY (TOTAL, ALL SECTIONS( 39 --- B -- - 9.5 9.5 41 --- C -- 9.5 9.5 REC KVA : HEAT KVA : 0.6 2.2 2 IRMEPTACLIES/LIGHTS - ELEVATOR PITS A 20 1 0.4 0.3 0.7 4 RECEPTACLE- ELEVATOR EQUIP RM B 20 1 0.2 0.2 6 ELEVATOR CAB LIGHTS C 20 1 0.2 0.2 MOTOR KVA : 82.5 8 ELEVATOR CAB LIGHTS A 20 1 0.2 0.2 LIGHTING KVA : KTTCFE N KVA GEN LTG KVA OTHER KVA : 4.4 1.3 10 ELEVATOR ROOM LIGHTS B 20 1 0.2 0.2 12 FACP C 20 1 0.5 0.5 14 EMERGENCY LTS - LOBBY, W OORRIDORS A 20 1 0.5 0.5 16 EMERGENCY LTS - N CORRIDORS, UTILITY B 20 1 PHASE A KVA : AMPS : PHASE B I(VA : 30.2 251.6 29.4 18 EMERGENGY LTS - SW STAIRS C 20 1 1.5 1.5 20 EMERGENCY LTS -NORTH STAIRS A 20 1 0.7 0.7 22 EMERGENCY EGRESS LTS - 2ND FLR 1 0.2 0.2 AMPS : 244,9 24 EMERGENCY EGRESS LTS - 3RD FLR 1 0.2 0.2 PHASECKVA : AMPS : 31.4 261.6 §B20 26 EMERGENCY EGRESS LTS - 4TH FLR 1 0.2 0.2 28 EMERGENCY EGRESS LTS - 5TH FLR 1 0.2 0.2 30 SPARE 1 32 SPACE A CONNBCTED LOAD 34 SPACE B KVA : 91.0 36 SPACE C AMPS : 252.5 38 SPACE A DEMAND LOAD 40 SPACE IBI KVA : AMPS : 96,6 268.1 42 ISPACE ICI NOTESIREMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN GENERAL LIGHTING LOAC O OTHER DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% PER NEC 220.44 = 100% = 0.6 2.2 64.5 22.5 S.I ® Co"G 1.3 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 kyt. '_: �ws Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 RECEIVED CITY OF TUKWILA APR 18 2017 PERMIT CENTER. Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: PANEL SCHEDULES Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 MN.17 21312 W t sn ;tin State l rr€err Code Cc mpliance Forms R2,& R3 over 3 stales arra a':.191 Revised fl. n v 2G13 Project: Wa Pr,fjectAd €rens HOLIDAY #flit EXPRESS Date 9./29fr2€I1£` Compliance 91 Af€DOVIER,PARK EAST For Building Department Use #3ri 3s FTli Tfaf lCo.inpliance Option T#i09ILA, WA egrrf a ❑J Ef€iCacyp-,801umenslYna' ❑ Contrdlledby motionsensor Pass" rd to . use, tnstr4ctbt " Exterior Lizhtin.gAlterations Apt keit # ame: CASE Eis G11,1E€RING andcatuL-Vag F, Ti-adable I axmi €nt Allowed LightingWattage Base SiteAllowance ir Applicant Address_ 1$51 t ORTii CREEK PIS dAY, SUITE #2 BOTHEL L V. t Pro ected Surface Besc4iptiofl A pp. Itoa ntPhizne: 425-4o2-9490 JProject Descri tion ❑ ilE N Building Addi#ion, V Alteration Plans IncIlided Lighting Compliance Patti 0 LiiiOtingPovier0ensitri alwldtions TotaiBuildn€Perfdrmance Clear 0..10Fff2. (if TOla? B?3'iUbg Perilon-,3an-ethen'onyfLGT-CPKis rv_=gLxjod L1gtiting ,BDN zer AlloWance _2: 46 ( } Building Area #method =Race- -cpare#,ettad. Q - eap INIethod SeP-ChbnreguTedtp EU Ynab1-LP,A fora,) 4 interior Lighting System Select Taste C4(J5,5:2(1) Bui ding .area from drop dd.w.n rnena Total Description Total Allow ed TradableWafts: Briefly describe R'ghting 145 syster1we ani# features.. 2044 Additions and Change of Space Use (C'101.4.3 & C101.4.4) ❑ Addiio areaorG angeof Space Jseare ompliesYrtthallapplirabteproAsionsass#andslanepr¢{e d. ❑ A:ddition area is.cwbinedWithexisting building lighting systemstb demonstratecompliance%,ithalfappiimble provisions p erC1 1, .' 6 T rC L'. z C- ': -rou€cte r ii,IttrngArea fs e,hrsd (LTG-#tf..BL 'r o, apace -i1,= sce fi,4e fi^£+z rLT ,-!r•#T 3r?AGir3. Con;pfanc~e Ferns. Dacum. rnaxtmu allowed and proposed (includia e rrst ng i€aopllcable) lighting t aftage ofAddr rare dr Charge of Use -pace, F ovide ao l cabfe. R r . p 9.. controls per 0405,2 ani commissioning o€lighting controls per 0405.13. .Alterations,, Renovations.and.Repairs (0101.43.1) Q 60%ormore ©flumirlaairesinspace replaced Proyidv BORdtP4 Area 41eitod (LTG -WT -BLDG or Sp- ace- Sy -Space f,:retirod rLTG- 11,iT SPACE) Cornp,'ranee Form, Do vinanf maximat',t ORO iied.ttattage?t°s in The Iightitg retrofft spaca In 'riaixama r AR ed.l-t?adeoa fable a,nd pr opose, (incluling exis iris ligliling wa tage in To , s,eeWattae tatle. Pe7rfi aad non -retrofit spaces shad by docrnatelv usingmtfigple foros. ❑ Less thanc0%ofluminakesins pace replaced -mvide, a separate S'Pacw By -Space NWhod CLTG4NT-SPACE) Carnpllance'Form par this re`brof t area: Docur,7ent , Fisting total weltage k"fi {n:t sa lj h11n .retofft sp acein cell proOdle 6 ig the ,taflov d Wawa. vf8b6e . Do Wn?eTit P rO "SjJf".?06,n 1't1,4'{Jt ng 1} IJ,,'ti wav,wge in #fit <rt3r'£3 'tsf l tfsitta jL` tablas_ ., . . F] Lamp ,andtorballastrepiaeem€s t>ar#iiinexisting iirrninsuasonly- ea:ls#ingtotalntercar€err.=.11dmg'wattagenot inereased ❑ ileiv,,virnginstalledtoserreaddediaxturesandtorfixtures relecatedtone c. iroust i=?rovfaa applicable Manual Ugh irg Controls rG405,2.1), ocrupancy senors (C405.2.2.2)daylight tore controls CC405.2.2 3l, specific apolicatidn controls C 5.2_1sk and,cornm issibriqg ofiightirg cortrols Def C405, 't,? 0 #•Je*rflrmflvedlign#angpanel protide alt aF{p#tca.b'le tghring, controls a9 noted for liv,,. I }r Frig, a,utomafac tine sirflch controls (G4005,2,21:arsd com.pn ssron}ng OF <alhting cont ots per 0405.12, C . papelstecortfigured-luminairesunrngedormQar'danly r? tide all a li £au{¢ li to#ir n[r, 'iIs as nuted,o; f i t 1 %I rn• :rid -o misv of l . , f fighting ri ^ t _. pp . g . 2 c ra. , z 7 ,sail r onrso,,. per ' fg: El t+#ochanges are being made tothe interior l ghtingandspaceorsenotchinged. Forms N Protl?c t Info Project Address: tt€ UDAY tflft EXPRESS:. Date 91 ANDOVER PARK EAST For Building Department Use Tit l VWLA, WA Ap.p.lica itName CA SE ENGINEERING A.pplicartAddi: 19545HORTHCREEKPIKIIi#AY,SUITE 0.21:130THELL Ap pi#cant Phone: 425402-9490 Project Desalption ❑ k<J%q Building ❑ Addition 0 Alteration ❑ Plan.) Included Lighting Zane Aszpao; dbyjrlrrsdktbn. ZoneUaiecriori req used to enable LTE'-Sff Liana 0 .Zone,t 0. Zone2 Zone.3 Zrne4 0 Clear lCo.inpliance Option 0 Lighting Power DensityCalculatirons Total Building,Performa:nce Clear Building Grounds Applies ko fumiraires - 100 13effs ❑J Ef€iCacyp-,801umenslYna' ❑ Contrdlledby motionsensor ❑ Exemption (list"') Exterior Lizhtin.gAlterations ❑ No. changesarebei'ngmad elotheexistingexteriorlirghting. ❑ f=lei s}raring.instage.dto!;e6eaddedfiAaresin,dforfixturesrelocat ,,dtohn--ercircUt ProvilesppRab aer.tenortighting;contrni-.per+r405.2>tand:comr,,.is.stontngper Ti-adable I axmi €nt Allowed LightingWattage Base SiteAllowance 750 Tradable Surfaces Surface Besc4iptiofl A€€owed.Watts per ft! or pe:r If Area (ft=), perimeter t Ifp or # of"items Allo wed, 'Wafts x ft or X If) Uncovered Parking and Parking 0..10Fff2. 53574 5157drives _2: 46 80 Hotel EU F5 4 S:G Select Taste C4(J5,5:2(1) Bui ding .area from drop dd.w.n rnena Total 1388-6 Total Allow ed TradableWafts: 01 r dahle Proposed Lighting Wattage wse rifgrns ea rna imum input watf 'ce tor.lurrrira re.) Tnial prdposadtrsdeble waffs rosy no,'exc the sUM0ffbrataaibly<rfradable Total Proposed Tradab.1a V. tfatts: 1411,8 t.ajfs p'u's the ; ase )pie mics, ante. Vin{ fie sr#s s ri=: r e ncrrae ri io rraa.t tradab.Ae Ivatscompta cat) beappt;ed#aira ,Idualnon-fr uabtecsVgories. Non -Tradable MaximumAllDwed Li hiliWattage BaseSite All owa:nce.Rema:ining:. 1'so Number of Wattsf Watts Tradable Sur face: Fixture Description Fixtures Fbdure proposed Un covered P arking and PL1 8 140 1120 drives c.£coirurnentt?+?at,tri:turesandeltexrUtrragtraremain fixture inthePa~ap?osedLighd6gtad.le. 850 d lNes.sthen 60% of exp trngf1N,tures wf4berep.laced, usa,LTG.4?4T-SRAiCEforrap; E1.2.. Uncovered Parking and PL 1 280 280 drives 1.3888 .16888 _2: 46 80 Hotel EU F5 4 S:G Tnial prdposadtrsdeble waffs rosy no,'exc the sUM0ffbrataaibly<rfradable Total Proposed Tradab.1a V. tfatts: 1411,8 t.ajfs p'u's the ; ase )pie mics, ante. Vin{ fie sr#s s ri=: r e ncrrae ri io rraa.t tradab.Ae Ivatscompta cat) beappt;ed#aira ,Idualnon-fr uabtecsVgories. Non -Tradable MaximumAllDwed Li hiliWattage BaseSite All owa:nce.Rema:ining:. 1'so Allo w e:d M atte t<tcn-T€ dzlb;e. Urfa s Surface Description per ft'- or par If .Area. (ft-), perimeter (IQ or # a f items. ;Alla:wed. "Natts: X ft= (or xcif) Bldg. Facade (bg: area) Q ..15 1,11 ftr2 6158 924 a. Ltghfrng n tares €n a .t;uttdtrag ai ditron rr7'aycomp i , as a stand at6ete prr tact. ortheu.r ey be 39 cora?binedwith theov raitexfstingbtdt2;Lighting!odemo:nsfratocopliarace. RefertoGt6f:a.3. b. Forretrofits"andbuttdtrg additibm, dire:alype, andgr£ "v"inferbrareas io the 1950 A axiaraurn .A it toed L:rg ting table. ff a buffidng addition wN ompiy asp, urnbined with the oyr•c,ratV E1.2: Non-;Tfadahlep pose Lighting Wattage Nott -Tradable Suf face Number of Fixture Description Fixtures Wattaf Watts Fcdure Proposed Bldg. Facade. (bj:area) PL3 7 31 217 Notes: E1.2, a. Ltghfrng n tares €n a .t;uttdtrag ai ditron rr7'aycomp i , as a stand at6ete prr tact. ortheu.r ey be 39 cora?binedwith theov raitexfstingbtdt2;Lighting!odemo:nsfratocopliarace. RefertoGt6f:a.3. b. Forretrofits"andbuttdtrg additibm, dire:alype, andgr£ "v"inferbrareas io the 1950 Nbn-tradabe¢arpcsedtratsrYaaynot eeceada,b%,ed wa its f,ranyk?d;6koluat Total excess (~ion -'tradable watts: Q sttrf>atie un.Aessffhe tri#at excess P ariz tr lno. n frsda&e Sue, a. areiess"thaxa the ter esnan uea"o,°aexa£r: Site ,Allowance Balance: 751 Aeric L, titin OMPLI S VVITH. SITE ALLOWANCE :I` State En erau Code G ainb liance ver Yu Dnii Prc,ject Addres-s HOLIDAYINN: EXPRESS Date 8/2-9/2016 Lighting Alt<eratio s, Renovations &. B ildi.ng .r dd itio s For 8 u€ldin g Department Use Lessthan0 60% or more Stand alone Addition . fixtures :replaced fixtures. replaced bldg, addition conibinedaap1cmist Clear Watts proposed. Notes: E1.2, a. Ltghfrng n tares €n a .t;uttdtrag ai ditron rr7'aycomp i , as a stand at6ete prr tact. ortheu.r ey be 39 cora?binedwith theov raitexfstingbtdt2;Lighting!odemo:nsfratocopliarace. RefertoGt6f:a.3. b. Forretrofits"andbuttdtrg additibm, dire:alype, andgr£ "v"inferbrareas io the 1950 A axiaraurn .A it toed L:rg ting table. ff a buffidng addition wN ompiy asp, urnbined with the oyr•c,ratV E1.2: eh. istintgt?0idnag, inctuda att arzpts able'exrUttng.Buttdrn# .Area type:sand rr+ stnteiiorarets:. 17 c.£coirurnentt?+?at,tri:turesandeltexrUtrragtraremain fixture inthePa~ap?osedLighd6gtad.le. 850 d lNes.sthen 60% of exp trngf1N,tures wf4berep.laced, usa,LTG.4?4T-SRAiCEforrap; E1.2.. l' A)dAt m Allowed L hgTatt",a e Location; ("pIon #, Allo ed Gross Interior WattsAllowed Bu€IdingArea* maim#,.arALL) Area. Description litratts:per ft= Area inW (Watt;stfta.Xarea] Hotel ALL. HOTEL:- ENTIRE.FACILITY 1<,U&j 1.3888 .16888 _2: 46 80 Hotel EU F5 4 S:G Select Taste C4(J5,5:2(1) Bui ding .area from drop dd.w.n rnena Total 1388-6 Proposed Lightinz Wattage BuildingArea " Location (pla'n #Y room #, arA:LL) Fixture DescriptionR NuMber 6f: Fractures Watts'? Fixture Watts proposed. Hotel E1.2, F1< 39 50 1950 Hotel E1.2: F2 17 50 850 Hotel E1.2.. F3 14; 31r 504 Hotel E1.2;EZ.1 F4 _2: 46 80 Hotel EU F5 4 S:G 144 Hotel EL2.E2.1 01 145 14 2044 Hotel E1.2 DV 44. 14 616. Hotel E1.2.. RS' 4 100 480 Hotel E1.2 1721 7 56 392 DISC DISCONNECT ® TRANSFER SWITCH V RECESSED WALLWASHER DISP DISPOSER E.C. ELECTRICAL CONTRACTOR ® SURFACE LINEAR EMERGENCY EGRESS FIXTURE UTILITY TRANSFORMER Select Tabic G405.52(i) Building.A<reatiomdroo d6w.n. nanU.. l nude ex{sttrag to .t mdfnht -pr ongzndexempttpi. €ngequibimen per-notevbeidw, + a;:.rl:uisance by Buildinz Area building Area 11>ga:rnings T¢talf-tllovted f gaits TatalProposed i3"A is Interior Lighting. Power Allowance Ho tel Confirm all fixtures are reported under proposed ;lighting - IoY;Yatts relative to maximum alloyed. .; ; ~ 4 _ s0 COR41PLtF; FT= DEMO DEVICE MOUNTING & EMERGENCY EGRESS INFORMATION ONLY. AF(200AF) (AFTER A NUMBER) = FUSE SIZE IN AMPS EXISTING DEVICE REFER TO FIXTURE DESIGNATIONS & LIGHTING FIXTURE NEW DEVICE SCHEDULE FOR LAMP TYPE & OTHER FIXTURE SPECIFICS. AFF ABOVE FINISHED FLOOR ----- EXISTING CONDUIT O SURFACE CEILING MOUNTED DOWNLIGHT AHJ AUTHORITY HAVING JURISDICTION NEW CONDUIT O o RECESSED DOWNLIGHT (ROUND) AL ALUMINUM 13888 55+80! Notes: Prop1. se, izlatta eforeachBr,:tfd .Great es:halfnoteiaceed':f , rn ne Jc aa rd Watt e for" t at Bu'1 :' , .: g _ g Rp ` to rdr ag Are #R . Tradrng aafta:cl ..he#a.ee.#a B.W rag .Area ypies is not'ag6vied under bb Bcittdtng Area kFethod comas iarmepaath 2.FrogUsed t, ;tr.res must:ire &ste tic The fruttdfrg area in i€ahn h they :occur. }ractude ai t proprased kittxtr.'rg fn:tures • 3. fa#oretype, , f -p? > number ftarraos z? he rfiure,and bdtt ttyre ftnot de : . Frrts.g. T tracklig.hting, iis t the length of the track (fn fae):,en' addition to the rapture;, tamp, anrt.dattesC €ntiarmattori. 4For Y ed iaft rFrtr? use Wattage ortte`xtrre t" t rop? the ta a.o wattage) and other,rrtt>rra a^ )reit fedrri Seco. n 040515,1, Perlin voitagek6c* t h#Drag r t-ttae g. reatsrofactuahl6minatre v attage ter ?entgtt3 safik C mu.: t, ,ted hp<. art ora s.aoplicabte, The veattaage of currenfii'lmftrng detvii<es'dreffthe trap tb rrrra.r Fsar.ti tt, o{olie e:fYa£#.lghtrng ftsf:The trar formEt rued ;dttcge: 5. Forlfghttng equ.0-nentefigibre forexempatidrperG405.5.1 note e: exceoti5nnumber;ndieavebtank. 5.Eso£"rlhaeraterixtingto:rarnarn>ir tures,fn.F`rriaosedLrgtafrf st,abkai thesa ?mann r.avneer-rktares.tdent:ifi,asext;xtingrn1&:turedesc.rPbon. ELECTRICAL LEGEND LIGHT FIXTURES & CONTROLS ABBREVIATIONS LINE STYLES AND WEIGHTS NOTE: LIGHTING FIXTURE SYMBOLS SHOW LENGTH, A (200A) (AFTER A NUMBER) = AMPS FT= DEMO DEVICE MOUNTING & EMERGENCY EGRESS INFORMATION ONLY. AF(200AF) (AFTER A NUMBER) = FUSE SIZE IN AMPS EXISTING DEVICE REFER TO FIXTURE DESIGNATIONS & LIGHTING FIXTURE NEW DEVICE SCHEDULE FOR LAMP TYPE & OTHER FIXTURE SPECIFICS. AFF ABOVE FINISHED FLOOR ----- EXISTING CONDUIT O SURFACE CEILING MOUNTED DOWNLIGHT AHJ AUTHORITY HAVING JURISDICTION NEW CONDUIT O o RECESSED DOWNLIGHT (ROUND) AL ALUMINUM SERVICE GEAR - AS SHOWN ON PLANS ❑ RECESSED DOWNLIGHT (SQUARE) ATS AUTOMATIC TRANSFER SWITCH WALL SCONCE B KR BREAKER CIRCUIT BREAKER PANELBOARD SURFACE MOUNTED LINEAR FIXTURE C CONDUIT LOAD CENTERCKT ® RECESSED LINEAR FIXTURE CIRCUIT G LIGHTING CONTROL PANELCL PENDANT MOUNTED LINEAR FIXTURE CENTERLINE Eii EXISTING PANELBOARD TO REMAINCLG SURFACE MOUNTED LINEAR FIXTURE (NARROW BODY) CEILING o TERMINAL CABINET C.O. CONDUIT ONLY WALL MOUNTED LINEAR FIXTURE SWITCHBOARD OR MOTOR CONTROL CENTER, SIZE CRP CONTROL RELAY PANEL AS SHOWN ON PLANS WALL MOUNTED STRIP FIXTURE CU COPPER T DRY TYPE TRANSFORMER (SEE NOTES &RISER WALL MOUNTED INDUSTRIAL LINEAR FIXTURE DIA DIAMETER DIAGRAM FOR SIZE) RECESSED LINEAR WALLWASHER DISC DISCONNECT ® TRANSFER SWITCH V RECESSED WALLWASHER DISP DISPOSER E.C. ELECTRICAL CONTRACTOR ® SURFACE LINEAR EMERGENCY EGRESS FIXTURE UTILITY TRANSFORMER ECB ENCLOSED CIRCUIT BREAKER RECESSED LINEAR EMERGENCY EGRESS FIXTURE (E) EXISTING (USED AS SYMBOL DESIGNATION) METER 2'x4' FIXTURE SPLIT BETWEEN NORMAL &EMERGENCY EMT ELECTRICAL METALLIC TUBING EGRESS WITH UL924 RELAY. DUAL CIRCUITS SHOWN ON GROUND BAR H -3/X-23 PLANS. EXTG EXISTING (USED AS ABBREVIATION IN TEXT) <O WEATHERHEAD (PLAN VIEW) ❑® QQ RECESSED EMERGENCY EGRESS DOWNLIGHT FAAP FIRE ALARM ANNUNCIATOR PANEL FACP FIRE ALARM CONTROL PANEL PPO UTILITY POWER POLE (SITE PLAN) 0 SURFACE EMERGENCY EGRESS DOWNLIGHT FLR FLOOR ® GROUND ROD LOCATION ® UNIVERSAL/CEILING MOUNTED EXIT SIGN F.O.I.C. FURNISHED BY OTHERS, INSTALLED ® HANDHOLE OR PULLBOX (SITE PLAN) E91 WALL MOUNTED EXIT SIGN BY ELECTRICAL CONTRACTOR ® ® DIRECTIONAL EXIT SIGN (ARROWS INDICATE ONE OR FSD FIRE SMOKE DAMPER TWO SIDES AND DIRECTION INDICATED) CONDUITS AND CIRCUITING 'Egf FUT FUTURE EMERGENCY EXIT SIGN WITH DUAL PATHWAY HEADS GEN GENERATOR WIRING LOCATED IN CEILING OR WALL 'e DUAL HEAD EMERGENCY EGRESS FIXTURE GFCI GROUND FAULT CIRCUIT INTERRUPTER - — — - WIRING CONCEALED UNDER FLOOR OR UNDERGROUND GND GROUND S SINGLE POLE LIGHT SWITCH s- CONDUIT HOME -RUN HTR HEATER - SLASHES ACROSS CONDUIT INDICATE NUMBER OF S3 THREE POLE LIGHT SWITCH kCMIL THOUSANDS OF CIRCULAR MILS WIRES WITHIN - SHORT = HOT, LONG = NEUTRAL S4 FOUR POLE LIGHT SWITCH KVA 1000 VOLT AMPERES PI II• GROUND WIRE S DIMMER SWITCH KW 1000 WATTS Al — CONDUIT STUB -UP S OCCUPANCY SENSOR LIGHT SWITCH LCP LIGHTING CONTROL PANEL tl7 CONDUIT BREAK S VACANCY SENSOR LIGHT SWITCH LT LIGHT Of —3 CONDUIT CONTINUES ELSEWHERE (NOTED ON PLAN) S LOW VOLTAGE SWITCH CONTROLLED BY ROOM SENSOR LTS(LTG) LIGHTS (LIGHTING) CONDUIT WITH BELL END vs CEILING MOUNTED VACANCY SENSOR LV LOW VOLTAGE E->( :E CONDUIT TO BE REMOVED MCB MAIN CIRCUIT BREAKER O S CEILING MOUNTED OCCUPANCY SENSOR EQUIPMENT CONNECTIONS & CONTROLS pc PHOTOCELL LIGHT SENSOR MECH MECHANICAL MH MANHOLE ® EQUIPMENT CONNECTION PP SENSOR POWER PACK MLO MAIN LUGS ONLY WALL MOUNTED EQUIPMENT CONNECTION ® PHOTOCELL AIMED NORTH, MOUNTED ON BUILDING EXTERIOR N3R NEMA 3R C MOTOR CONNECTION SP LIGHT SWITCH WITH PILOT LIGHT NIC NOT IN CONTRACT SK g FAN CONNECTION KEYED SWITCH NREC NON-RESIDENTIAL ENERGY CODE INTERCOM/CLOCK SYSTEM DEVICES (p a, ELECTRIC WALL HEATER CONTROLLED BY WALL OS SPEAKER, CEILING MOUNTED OC ON CENTER MOUNTED THERMOSTAT OH OVERHEAD ❑ DISCONNECT SWITCH p SPEAKER, WALL MOUNTED OS OCCUPANCY SENSOR QI FUSED DISCONNECT SWITCH 1 9>1 SPEAKER, WALL MOUNTED, EXTERIOR PNL PANELBOARD V VOLUME SWITCH PIV POST INDICATOR VALVE POWER RECEPTACLES & OUTLETS P.O.S. POINT OF SALE Q DUPLEX RECEPTACLE NOTES AND MISCELLANEOUS SYMBOLS PP POWER POLE/POWER PACK (SEE PLAN LOCATION) k® DOUBLE DUPLEX RECEPTACLE FLAGNOTE - IDENTIFIES A SPECIFIC ITEM ON A DRAWIN!=. PSE PUGET SOUND ENERGY k9 DUPLEX GFCI RECEPTACLE F > COORESPONDS TO A SCHEDULE IN THE ELECTRICAL SET PUD PUBLIC UTILITY DISTRICT DOUBLE DUPLEX GFCI RECEPTACLE THAT EXPLAINS DETAILS OR FEATURES OF THAT ITEM. PV PHOTOVOLTAIC k DUPLEX GFCI RECEPTACLE MOUNTED . ABOVE FF -3 MECHANICAL FLAG - DEFINES MECHANICAL EQUIPMENT AND REC RECEPTACLE(S) COUNTER OR BACKSPLASH, WHEN PRESENT SENT (U.O.N.) COORESPONDS TO DESIGNATIONS IN MECHANICAL PLANS AND REF REFRIGERATOR SCHEDULES. COORESPONDS MECHANICAL CONNECTION k® DOUBLE DUPLEX GFCI RECEPTACLE MOUNTED +4"O.C. ABOVE SCHEDULE IN THE ELECTRICAL SET. (R) RELOCATED EXISTING COUNTER OR BACKSPLASH, WHEN PRESENT (U.O.N.) RQMTS REQUIREMENTS QJ JUNCTION BOX WITH BLANK 200 EQUIPMENT FLAG - DEFINES SPECIAL (IE: COOKING) SCL COVER EQUIPMENT ON A PLAN AND COORESPONDS TO DESIGNATIONS SEATTLE CITY LIGHT IN AN EQUIPMENT SCHEDULE IN THE ELECTRICAL SET. SNOPUD SNOHOMISH PUBLIC UTILITY DISTRICT REVISION CLOUD AND FLAG - CLOUD SURROUNDS SQ SQUARE INFORMATION THAT HAS BEEN REVISED. FLAG IDENTIFIES SW SWITCH THE REVISION IN WHICH THE CHANGES WERE MADE. ,.,,_ SEPI P -M. I L: pi,:RmI 1 TBD TO BE DETERMINED Ili.QU►RED FOR• O DETAIL NUMBER - APPEARS IN FRONT OF A TITLE ON TYP TYPICAL DRAWINGS WITH MORE THAN ONE ILLUSTRATION. UG UNDERGROUND efMechanical 3 IDENTIFICATION SYMBOL - CROSS REFERENCES INFORMATION UL UNDERWRITER'S LABORATORY El lectrical E#.1 IN ONE AREA WITH A DETAIL (TOP #) AND SHEET (BOTTOM #) U.O.N. UNLESS OTHERWISE NOTED U Plumbing IN ANOTHER IN THE ELECTRICAL SET. elGas Piping UTIL UTILITY NOTE: ALL FIXTURES AND EQUIPMENT SHOWN ON PLANS IN STANDARD VA VOLT AMPERES City of Tukwila (HEAVY) LINE WEIGHT ARE NEW OR RELOCATED WORK. FIXTURES AND VS VACANCY SENSOR BUIL11 ING DIVISION EQUIPMENT SHOWN IN LIGHT LINE WEIGHT WITH (E) NEXT TO THEM W WATTS INDICATE EXISTING TO REMAIN. SYMBOLS SHOWN AS DASHED INDICATE ITEMS TO BE REMOVED OR DEMOLISHED. THIS APPLIES UNLESS NOTED WP WEATHERPROOF OTHERWISE ON PLANS. RECEIVED XFMR TRANSFORMER CITY OF TUKWILA SEP 12 2016 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 his tCASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 FILL7 7777 ""..-.-,r, 7:tg V` 1 !0 t 9 iii , ,. 7 «..L„>i VV n review C":'3'0 and omissions. y Droval of call 4 ; , _ .:; ('.:oto not authoriz violation of any ad,7,p%o--', ...,,, , ' lance. Receipt Proved v e d Fto I d Copy d i ... i 'acknowledged: B: Y fit t Date: City Of Tukwila BUILDING DIVISION FiEVIF'."nl 910 Changes I da tri rhe SCW Of Work till#hr T( ki,r;r t~i(lyding D vi i()"i. NOTE: Revisionlvi:l F.quiro ,."v Ca'an submittal and may incittds at+c. itit rt!an rwvi3W tees REVIEWED .FOR— COMPLIANCE WITH NEPA 70 - NEC SEP 2 6 2016 City of Tukwila BUILDING DIVISION I DRAWING INDEX I EO.1 ELECTRICAL LEGEND, SCHEDULES, & NREC EO.2 SITE PLAN EO.3 RISER DIAGRAM EO.4 PANEL SCHEDULES EO.5 PANEL SCHEDULES EO.6 PANEL SCHEDULES EO.7 PANEL SCHEDULES ED.8 MECHANICAL, LIGHTING SCHEDULE El.1 LEVEL 1 POWER & COMMUNICATIONS PLAN E1.2 LEVEL 2-5 POWER, LIGHTING, & COMMUNICATIONS PLAN E1.3 ATTIC AREA MECHANICAL CONNECTION PLAN E2.1 LEVEL 1 LIGHTING PLAN Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA — Sheet Title: ELECTRICAL LEGEND, FIXTURE e2 Fl SCHEDULE, & NREC EXISTING STREET LIGHTING PULL/ SPLICE BOX — 100KW GENSET IN WEATHERPROOF ENCLOSURE – SEE RISER DIAGRAM C -5,7(R48) VIA LC _:, :,.P SE::WD:: M O U N T 1' TRANSFORMER – SEE RISER "',--.DIAGRAM-- SHEET EO.3 #10 i #10 1- .. is 1: "• • ff' .. ` " 5 PL1PL1 ii 5' C -13(R4) . C-1,3(R4A) f :f .....................::......... ....................................................................... «:. «.:. #10. »»».:...... ..............,� ...::: »:.::. " f :> .:<. r..., . .___ : r : ..,......:. .>.....:.....; ...............,...... .........;,:•.:::":::::."" : : " : :• :. • : l : : : :. " • • : r •i •r , : ` r ` ` , a L : • :. ,. : :• ' v ' : • v 4 n c : .: .: ,: n .• r : ' : ' : : : s " , : Y : , • f • v : ,. FLAG NOTES [�> PROVIDE 2°C(PVC SCHED 40),2#8,1#8 GND(CU) BETWEEN LUMINAIRES. 2 > PULL/SPICE BOX LOCATION IS APPROXIMATE. FIELD VERIFY BOX LOCATION PRIOR TO UNDERGROUND CONDUIT INSTALLATION. CONNECT NEW LUMINAIRES TO EXISTING STREET LIGHT. f i r 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: t 1 Jill fc 4 t on 1 -' _. _" -_____ _ __. �' __ I PGE STANDARDS XL_� AVAILABLE FAULT CURRENT (IN AMPS) j..,j. SHADING INDICATES NEW DISTRIBUTION EQUIPMENT THAT REQUIRES SELECTIVE OVERCURRENT COORDINATION. RISER DIAGRAM NOT TO SCALE 'ROUND #8 Cu #6 CU #4 CU #3 CU 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED FO�T,, COMPLIANCEWW�ER DIAGRAM NFPA70-NEC; . SEP 2 6 2016 City of Tukwila BUILDING DTVI RECEIVED CITY OF TUKWILA SEP 12 2016 PERMIT CENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 PANEL'P1A' FROM: MDP PANEL'P1B' PANEL'P1C' CIRCUIT NAME PROJECT NAME HOLIDAY INN EXPRESS LOAD (KVA) PROJECT NAIVE HOLIDAY INN EXPRESS 6 AMP P R H M L K G 0 TOTAL PROJECT#: IF 16195 LOCATION: ELECTRICAL ROOM TUKWILA, WA FED FROM: MDP FED FROM: FED FROM: MDP PANEL AMPS : 200 3.0 NOTE CKT CIRCUIT NAME NO. CBSIZE CKT NO. LOAD (KVA) CBSIZE 6 AMP PI R PANEL DESCRIPTION 6 AMP R H M L K G O TOTAL 1 I RBCS - MEETING ROOM 129 A 20 1 0.5 20 1 0.5 PANEL AMPS': 200 0.4 3 RBCS - MEETING ROOM 129 B 20 1 0.5 3 REQS - BUSINESS CENTER 101 0.5 FEEDER AMPS : 200 0.4 5 RHS - MEETING ROOM 129 C 20 1 0.5 FEEDER AMPS : 200 0.5 L- L VOLTS : 208 C 7 RECS - PRE- FUNCTION 130, STORAGE 131 A 20 1 0.4 1 0.4 0.4 L- N VOLTS : 120 1 9 RECS - REST RMS 132 & 133 B 20 1 0.4 9 RECS- LOUNGE 102 0.4 PHASE: 3 0.5 11 RECS - SALES OFFICE 117 C 20 1 0.4 PHASE : 0.3 0.7 WIRE: 4 C 13 REM - GEN MAN. 115 A 20 1 0.5 3 0.3 0.8 WIRE: 4 20 15 RSCS - WORK AREA 113 B 20 1 0.4 20 1 0.4 4 2 0.4 17 RES - WORK AREA 113 C 20 1 0.4 15 RED- MARKET 109 0.4 20 1 1 19 RBCS- CHECK-IN 110 A 20 1 0.2 BUILDING SIGN- SOUTH FACE B 0.2 M.L.O. X C 20 21 REM - CHECK-IN 110 B 20 1 0.4 1.0 1.0 0.4 MAIN CB 20 19 REC- MARKET109 23 RSCS- CHECK-IN 110 C 20 1 0.4 B 15 2 0.4 FLUSH M.L.O. X 20 25 SPARE A 20 1 RECS - SERVER 112 B 20 11 SURFACE -K 1.5 1.5 27 SPARE B 20 1 0.5 --- 23 REES - SERVER 112 ISO GND 20 11 1.2 29 SPARE C 20 1 1.5 FLUSH B 20 1 FEED THRU 25 CU -1 A 31 SPARE A 20 1 SPARE 2.6 (TO TAL.ALL SECTIONS 2.6 SURFACE X C 33 SPACE ONLY B - 1 B - - 1 2.6 A 20 2.6 35 SPACE ONLY C - 1 B 20 4 29 AGI C 15 2 37 SPACEONLY A - 1 6 0.1 FEED-THRU FEED-THRU LOADSUMMARY 0.4 39 SPACE ONLY B - 1 A - - 1 (TO TA L, ALL SEC TIO NSj 0.5 41 SPACE ONLY C - 1 UC TABLE- PANTRY 104 B 20 33 SPARE REC KVA : 5.6 20 2 WASHER- LAUNDRY 123 A 20 3 1.2 1.2 1 4 - B GEN LTG KVA 1.2 0.5 1.7 HEAT KVA 1 0.2 6 - C - - A 1.2 0.5 1.7 MOTOR KVA : 18.9 A 8 WASHER - LAUNDRY 123 A 20 3 39 1.2 0.8 2.0 LIGHTING KVA KITCHEN KVA 1.5 39 10 - B - - 1.2 0.8 2.0 2 12 - C - - C 1.2 0.8 2.0 GEN LTG KVA : 0.8 C 14 WASHER- LAUNDRY 123 A 20 3 B -- 1.2 0.8 2.0 OTHER KVA : 6.8 4 7-6- B - - 20 1.2 0.5 1.7 PHASE A KVA : 10.6 0.5 18 - C - - 0.5 1.2 0.5 1.7 AMPS : 88.2 C 20 WASHER - LAUNDRY 123 A 20 3 0.4 1.2 1.2 PHASE B KVA : 10.4 1.0 22 - B - - A 1.2 0.2 1.4 AMPS : 86.3 0.2 24 - C - - - 1.2 0.8 2.0 PHASE C KVA : 11.2 1 26 DRYER- LAUNDRY 123 A 20 1 1.0 1 1.1 GEN LTG KVA 1.1 AMPS : 93.1 C 28 DRYER- LAUNDRY 123 B 20 1 1 1.1 40 1.1 GEN LTG KVA OTHER KVA : 0.3 30 DRYER- LAUNDRY 123 C 20 1 A 1.1 1 1.1 1.0 31.4 1.0 32 DRYER -LAUNDRY 123 A 20 1 3.8 1.1 REC- FITNESS 118 1.1 CONNECTED LOAD 1 34 REFRIGERATOR- BREAK 125 B 20 1 C -_ 0.8 PHASEA KVA : 0.8 KVA : 32.1 18 36 RES- BREAK 125,121,119N C 20 1 0.7 2 1 0.7 AMPS : 89.1 AMPS : 38 SPARE A 20 1 20 - A - DEMAND LOAD 40 SPARE B 20 1 2.5 PHASE B KVA : 12.5 1 KVA : 32.0 DRYER- GUEST LAUNDRY 107 42 ISPARE C 20 1 2 DEMAND/ 2.0 0.5 SPARE AMPS : 88.8 NOTEVREMARKS : I. IF 2. 3. DEMAND/ DIVERSITY FACTORS . LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEALING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER - C DEMAND 100% = 5.6 50% _ 100% _ 100% = 17.7 125% = 1.5 125% _ 65% _ PER NEC 220.44 = 0.4 100% = 6.8 PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TLKWI LA, WA FED FROM: MDP PANEL'P1B' PANEL'P1C' CIRCUIT NAME CBSIZE LOAD (KVA) PROJECT NAIVE HOLIDAY INN EXPRESS 6 AMP P R H M L K G 0 TOTAL PROJECT #: 16195 PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: FED FROM: MDP PANEL AMPS : 200 3.0 3 NOTE NOTE CKT NO. CIRCUIT NAME CBSIZE 6 AMP PI R LOAD (KVA) H M L K G O TOTAL PANEL DESCRIPTION 1 1 RECS - BUSINESS CENTER 101 A 20 1 0.4 A 20 1 0.4 PANEL AMPS : 200 1 3 REQS - BUSINESS CENTER 101 B 20 1 0.4 DCU-1 POOL UNIT 11 0.4 FEEDER AMPS : 200 1 5 RD'S - LOUNGE 102 C 20 1 0.4 1 0.4 0.4 L - L VOLTS : L- N VOLTS : 208 120 1 7 RETS - LOUNGE 102 A 20 1 0.5 0.5 A -- 9 RECS- LOUNGE 102 B 20 1 0.5 120 1 0.5 PHASE : 3 20 11 TV - LOUNGE 102 C 20 1 PHASE : 3 1.0 1.0 WIRE: 4 20 "IT RED- ELEV LOBBY 108, STORAGE 111 A 20 1 0.4 4 2 0.4 BUILDING SIGN- SOUTHEAST FACE A 20 15 RED- MARKET 109 B 20 1 1 CLG HTR- POOL EQUIP 121 1.0 1.0 BUILDING SIGN- SOUTH FACE B 20 17 Ri3✓-MARKET 109 C 20 1 - - - ISO GND 1.0 1.0 BUILDING SIGN- NORTH FACE C 20 19 REC- MARKET109 A 20 1 B 15 2 1.0 1.0 M.L.O. X 20 1 21 RECS - SERVER 112 B 20 11 X - 1.5 1.5 MAIN CB 3.1 0.5 --- 23 REES - SERVER 112 C 20 11 1.2 37 1.5 1.5 FLUSH B 20 1 LOADSUMMARY 25 CU -1 A 40 21 SPARE 2.6 (TO TAL.ALL SECTIONS 2.6 SURFACE X C 37 27 - B - - 1 2.6 A 20 2.6 ISO GND ISO GND B 20 4 29 AGI C 15 2 1 0.1 6 0.1 FEED-THRU FEED-THRU 0.4 0.4 31 - A - - 1 0.1 0.5 0.1 10 UC TABLE- PANTRY 104 B 20 33 SPARE B 20 1 1 PREP TA BLE RECS - PANTRY 104 C 20 1 1.0 1.0 GEN LTG KVA 35 SPACE ONLY C - 1 0.2 37 SPARE A 20 1 B 20 37 SPACEONLY A - 11 39 1 B 20 LOADSUMMARY 1.5 39 SPACE ONLY B - I 2 41 SPARE C (TOTAL, ALL SECTIONS) 1 - 41 SPACE ONLY C - 1 B -- 2 SPARE A 20 1 C 50 REC KVA : 4.0 4 2 RSCS - RR 134 A 20 1 0.4 0.4 20 4 RE3:.',S - CORRIDOR B 20 1 0.5 20 28 0.5 HEAT KVA : 13.4 20 6 RBCS - CORRIDOR C 20 1 0.4 1 0.4 MOTOR KVA : 9.0 1.0 8 RED- POOL 119S A 20 1 0.2 0.8 34 0.2 LIGHTING KVA KITCHEN KVA - 10 REr- FITNESS 118 B 20 1 1 1.0 B -- 1.0 KITCHEN KVA GEN LTG KVA 38 12 RED- FITNESS 118 C 20 1 1 1.0 40 1.0 GEN LTG KVA OTHER KVA : 0.3 14 REC- FITNESS 118 A 20 1 1 1.0 31.4 1.0 OTHER KVA : 7.0 3.8 16 REC- FITNESS 118 B 20 1 1 1.0 C -_ 1,0 PHASEA KVA : 10.5 31.6 18 DRYER- GUEST LAUNDRY 107 C 30 2 1 2.0 0.5 30 2.5 AMPS : 87.5 4.4 36.8 20 - A - - 2.0 0.5 SPARE 2.5 PHASE B KVA : 12.5 1 22 DRYER- GUEST LAUNDRY 107 B 30 2 DEMAND/ 2.0 0.5 SPARE 2.5 AMPS : 104.5 24 - C -_ - C 2.0 0.5 SPARE 2.5 PHASE C KVA : 10.3 AMPS : 26 WASHER - GUEST LAUNDRY 107 A 20 1 1.5 SPARE 1.5 AMPS : 86.0 28 WASHER - GUEST LAUNDRY 107 B 20 111 1 1.5 1.5 SPACE 30 SPARE C 20 1 A 20 1 42 SPACE 32 SPARE A 20 1 20 1 0.6 2.2 64.5 22.5 5.5 1.3 CONNECTED LOAD 34 SPARE B 20 1 C 20 1 KVA : 33.4 36 SPARE C 20 1 A 20 1 AMPS : 92.6 38 SPACE ONLY A 20 1 B 20 1 DEMAND LOAD 40 SPACE ONLY BI 20 1 C 20 1 KVA : 33.7 42 SPAC EONLY C 20 1 DEMAND 100% _ 50% _ 100% _ 100% _ 125% _ 125% = 65% _ PER NEC 220.44 = 100% = 16.9 0.3 AMPS : 93.6 NOTES/REMARKS: 1. 2. 3. DHVIANDI DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA RE]VIAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEVIAND 100% = 4.0 50% _ 100% = 13.4 100% = 7.5 125% = 1.9 125% _ 65% _ PER NEC 220.44 = r 100% = 7.0 PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TLKWI LA, WA FED FROM: MDP NOTE PANEL'P1C' CIRCUIT NAME CBSIZE LOAD (KVA) PROJECT NAME: HOLIDAY INN EXPRESS 6 AMP P R H M L K G 0 TOTAL PROJECT #: 16195 LOCATION: TUKWILA, WA 1 FED FROM: 0.4 PANEL AMPS : 200 3.0 3 NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD (KVA) FEEDERAMPS : 200 PANEL DESCRIPTION 6 AMPI P R H M L K G O TOTAL 1 1 PARKING LOT LIGHTS - EAST A 20 2 0.6 A 20 1 0.6 PANEL AMPS : 200 1 3 - - - B -- - 0.6 DCU-1 POOL UNIT 11 0.6 FEEDER AMPS : 200 1 5 PARKING LOT LIGHTS - WEST C 20 2 0.3 1 0.4 0.3 L - L VOLTS : 208 1 7 --- A -- - 0.3 1.5 PHASE : 0.3 L- NVOLTS : 120 1 9 LIGHTING CONTROL PANEL B 20 1 A 2011 --- 0.3 0.3 PHASE : 3 2 11 BUILDING SIGN- SOUTHWEST FACE C 20 1 1.2 1.1 MAIN CB FLUSH 1.2 WIRE : 4 2 13 BUILDING SIGN- SOUTHEAST FACE A 20 1 1.2 25 SPARE 1.2 1 CLG HTR- POOL EQUIP 121 2 15 BUILDING SIGN- SOUTH FACE B 20 1 1.2 B 20 11 1.2 - - - ISO GND 2 17 BUILDING SIGN- NORTH FACE C 20 1 1 1.2 1FEED-THRU 27 1 1.2 B 15 2 0.9 19 SPARE A 20 1 0.9 29 - - - 33 M.L.O. MAIN CB X - 2 21 LIGHTS - PORTE COCHERE B 20 1 0.5 3.1 0.5 --- 23 LIGHTS - POOL AREAS, FITNESS C 20 1 1.2 37 SPACE 1.2 FLUSH B 20 1 LOADSUMMARY 25 SPARE A 20 1 SPARE C 20 (TO TAL.ALL SECTIONS 31 SURFACE X C 37 27 SPARE BI 20 1 RECS - BOARD 105 A 20 1 0.5 ISO GND B 20 4 RECS - BOARD 105 29 SPARE C 20 1 SPARE 6 RBCS - BOARD 105 C 20 FEED-THRU 0.4 0.4 MOTOR KVA : 20.0 LIGHTING KVA 31 SPARE A 20 1 0.5 0.5 9.5 10 UC TABLE- PANTRY 104 B 20 1 33 SPARE B 20 1 PREP TA BLE RECS - PANTRY 104 C 20 1 1.0 1.0 GEN LTG KVA 0.2 35 SPARE C 20 1 A 20 1 0.2 37 SPARE A 20 1 B 20 1 B 20 11 LOADSUMMARY 6 39 SPARE B 20 1 1.5 AMPS : 98.3 0.2 20 (TOTAL. ALL SECTIONS) A 20 2 41 SPARE C 20 1 - B - - 0.8 REC KVA AMPS : 104.6 B -- 2 SPARE A 20 1 C 50 3 5.4 4 LIGHTS - GROUND FLOOR CORRIDORS B 20 1 0.5 - 5.4 0.5 HEAT KVA 20 28 6 LTS - UTILITY, BREAK RM, EMP REST RM C 20 1 0.7 16 30 0.7 MOTOR KVA LIGHTING KVA : 13.5 8 LTS - FR DESK,MIARKET,FEAT WA LL,OFFICES A 20 1 1.0 PHASE A KVA : 1.0 SPARE 10 LTS - LOBBY, BUSINESS AREA B 20 1 0.8 34 SPARE 0.8 KITCHEN KVA - 0.9 12 LTS - BOARD RM, PANTRY, BREAKFAST C 20 1 1.0 B -- - 1.0 GEN LTG KVA 38 SPACE 14 LTS - LAUNDRY A 20 1 0.7 40 SPACE 0.7 OTHER KVA : 0.3 POOL AREA HEATING UNIT DHU-I 16 LTS - MEETING RM., REST ROOMS B 20 1 0.5 31.4 34.--- 0.5 PHASEA KVA : 3.8 LOAD DESCRIPTION DEMAND 18 SPARE C 20 1 - - - C -_ - 5.4 AMPS: 31.6 AMPS : 136.6 20 SPARE A 20 1 30 SPARE DEMAND LOAD PHASE B KVA : AMPS : 4.4 36.8 SPARE 22 SPARE B 20 1 24 SPARE C 20 1 1 CONNECTED LOAD PHASE CKVA : 5.6 DEMAND/ 26 SPARE A 20 1 KVA : 91.0 AMPS : 46.8 C 28 SPARE B 20 1 AMPS : 252.5 38 SPACE Aj 30 SPARE C 20 1 40 SPACE 4B_ 32 SPARE A 20 1 42 SPACE CONNECTED LOAD 34 SPARE B 20 1 0.6 2.2 64.5 22.5 5.5 1.3 KVA : 13.8 36 SPARE C 20 1 AMPS : 38.4 38 SPARE A 20 1 DEMAND LOAD 40 SPARE B 20 1 KVA : 17.2 42 SPARE C 20 1 AMPS : 47.7 NOTES/REMARKS: 1. CONNECTTHRU4P CONTACTORAT LCP 2. CONNECT THRU LIGHTING CONTROL PANEL RELAY 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAC O OTHER DEMAND 100% _ 50% _ 100% _ 100% _ 125% _ 125% = 65% _ PER NEC 220.44 = 100% = 16.9 0.3 PANEL 'P1 D' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TLKWI LA, WA FED FROM: MDP NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD (KVA) PANEL DESCRIPTION 6 AMP P R H M L K G 0 TOTAL TOTAL 1 REFRIGERATOR- BREAKFAST 103 A 20 1 0.4 0.4 PANEL AMPS : 200 3.0 3 CINNAMON WARMER- BREAKFAST 103 B 20 1 0.7 0.7 FEEDERAMPS : 200 7 STAIRWELL PRESSURIZATION FAN S A 35 3 5 HOT WATER- BREAKFAST 103 C 20 1 1.0 1.0 L - L VOLTS : 208 L - N VOLTS : 120 3.0 7 HOT FOOD- BREAKFAST 103 A 20 1 1.7 1.7 B -- 9 TOASTER- BREAKFAST 103 B 20 1 1.8 1.8 PHASE : 3 DCU-1 POOL UNIT 11 PANCAKEMACHINE- BREAKFAST 103 C 20 1 1.7 1.7 WIRE : 4 11 13 JUICE MACHINE- BREAKFAST 103 A 20 1 0.4 0.4 WIRE : 4 X 15 AIRPOT RACK- BREAKFAST 103 B 20 1 1.0 1.0 1.5 PHASE : 17 AIRPOT RACK- LOUNGE ID2 C 20 1 1.0 1.0 3.0 19 FCU -5,6,7,8 A 2011 --- 1.1 1.1 M.L.O. SMOKE/FIRE CAMPERS - EAST 3.0 20 21 --- B -- - 1.1 1.1 MAIN CB FLUSH X M. L.O. MAIN CB X 23 SPARE C 20 1 1 - 1.0 25 SPARE A 20 1 CLG HTR- POOL EQUIP 121 C 15 SURFACE X 1.0 27 SPARE B 20 11 25 - - - ISO GND - 1.0 LOADSUMMARY 29 SPARE C 20 1 1FEED-THRU 27 FAN COIL 1,2,3 B 15 2 0.9 31 BATH EXH FAN BEF-1 A 20 3 0.9 0.9 29 - - - 33 --- B -- - 0.9 0.9 6 - C - - 3.1 35 --- C -- - 0.9 0.9 2.1 37 SPACE A SPARE B 20 1 LOADSUMMARY 12 - C - - 39 SPACE B 35 SPARE C 20 (TO TAL.ALL SECTIONS 31 41 SPACE C 37 SPARE A 20 REC KVA : 1.4 PHASEA KVA : 9.5 2 RECS - BOARD 105 A 20 1 0.5 0.5 B 20 4 RECS - BOARD 105 B 20 1 0.4 0.4 HEAT KVA : 4.2 SPARE 6 RBCS - BOARD 105 C 20 11 0.4 0.4 MOTOR KVA : 20.0 LIGHTING KVA 2 8 UC TABLE- PANTRY 104 A 20 1 0.5 0.5 9.5 10 UC TABLE- PANTRY 104 B 20 1 0.5 0.5 KITCHEN KVA : 11.6 HEAT KVA : 28.0 12 PREP TA BLE RECS - PANTRY 104 C 20 1 1.0 1.0 GEN LTG KVA 0.2 14 RECS - PANTRY 104 A 20 1 0.2 0.2 OTHER KVA 2 16 SPARE B 20 1 B 20 11 PHASEA KVA : 11.8 6 18 EH -2 C 20 1 1.5 1.5 AMPS : 98.3 0.2 20 FCU-4A,B,C,D A 20 2 0.8 0.8 PHASE KVA : 12.6 3 22 - B - - 0.8 0.8 AMPS : 104.6 B -- 24 HP -4 C 50 3 5.4 5.4 PHASE C KVA : 12.9 --- 26 - A - - 5.4 5.4 AMPS : 107.4 20 28 - B - - 5.4 5.4 PHASE B KVA : 16.1 AMPS : 134.2 16 30 SPARE C 20 1 PHASE A KVA : 32 SPARE A 20 1 CI 20 CONNECTED LOAD PHASE CKVA : 16.1 34 SPARE B 20 1 - 0.9 KVA : 37.2 0.9 36 SPARE C 20 1 B -- - AMPS : 103.4 38 SPACE A 30 --- C -- DEMANDLOAD 0.9 40 SPACE B 24 32 POOL AREA HEATING UNIT DHU-I KVA : 34.5 3 42 SPACE C CONNECTED LOAD 31.4 34.--- AMPS : 95.8 NOTES/REMARKS: 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION DEMAND R RECEPTACLES - TO 10KVA 100% = 1.4 REMAINING OVER 10KVA 50% _ H HEATING 100% = 4.2 M MOTORS 100% = 14.6 LM LARGEST MOTOR 125% = 6.8 L LIGHTING 125% _ K KITCHEN 65% = 7.6 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% = PANEL 'P1 M' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: MDP NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD (KVA) PANEL DESCRIPTION 6 AMPI P R H M L K G 0 TOTAL 2.1 1 HP -1 A 40 12 3.0 2.1 3.0 PANEL AMPS: 200 5 - C - - 3 - - - B - - - 3.0 7 STAIRWELL PRESSURIZATION FAN S A 35 3 3.0 FEEDER AMPS : 200 2.1 5 HP -2 A 40 2 3.0 2.1 3.0 L - L VOLTS : 208 2.1 7 --- B -- - 3.0 - 3.0 L- NVOLTS : 120 18.0 9 DCU-1 POOL UNIT A 15 2 0.7 C -_ 0.7 PHASE: 3 11 --- B -- - 0.7 SPARE 0.7 WIRE : 4 X 13 WALL HEATEREWH-1 (STAIR2) A 20 1 1.5 1.5 PHASE : 15 HP -3 B 40 2 3.0 20 3.0 X 0.4 17 --- C -- - 3.0 SMOKE/FIRE CAMPERS - EAST 3.0 20 1 19 CLG HTR - EMERG RM 128 A 15 2 1.0 29 SPACE C 1.0 M. L.O. MAIN CB X FEED -THRUM 17 21 --- B -- - 1.0 1.0 23 CLG HTR- POOL EQUIP 121 C 15 2 1.0 1.0 FLUSH M.L.O. 25 - - - A - - - 1.0 LOADSUMMARY 1.0 SURFACE -K 27 FAN COIL 1,2,3 B 15 2 0.9 SPACE 0.9 ISO GND 2 CORRIDOR SMOKE CONTROL EXHA UST FAN A 50 3 3.1 A 29 - - - C - - - 0.9 3.1 0.9 FEED-THRU 6 - C - - 3.1 SPACE 31 SPARE A 20 1 2.1 1 2.1 10 - B - - 33 SPARE B 20 1 12 - C - - 2.1 2.1 35 SPARE C 20 1 31 SPACE OTHER KVA 37 SPARE A 20 1 PHASEA KVA : 9.5 18 SPARE C 20 1 LOADSUMMARY SPACE 39 SPARE B 20 1 (TOTAL, ALL SECTIONS) 41 SPARE C 20 1 AMPS : 79.1 PHASE C KVA : 9.5 24 SPACE C REC KVA 2 WATER HEATER IGNITION CIRCUIT A 20 1 0.2 9.5 0.2 9.5 4 WATER HEATER IGNITION CIRCUIT B 20 1 0.2 -- 0.2 HEAT KVA : 28.0 6 WATER HEATER IGNITION CIRCUIT C 20 1 0.2 --- 0.2 MOTOR KVA : 21.2 LIGHTING KVA 9.5 8 WATER HEATER IGNITION ORCUIT A 20 1 0.2 2 0.2 A 20 1 0.4 0.3 0.7 10 WATER HEATER IGNITION CIRCUIT B 20 11 0.2 6 0.2 KITCHEN KVA DEMAND LOAD 12 CLG EXH FAN - POOL RR, EMPLOYEE RR C 15 1 0.2 KVA : 29.2 0.2 GEN LTG KVA ELEVATOR CAB LIGHTS 14 RCP -1 DOMESTIC HOT WATER PUMP A 15 3 0.8 0.2 0.8 OTHER KVA 16 --- B -- - 0.8 0.2 0.8 PHASEA KVA : 17.0 KITCHEN KVA GEN LTG KVA 18 --- C -- - 0.8 0.8 AMPS : 141.7 A 20 SPARE A 15 3 0.5 OTHER KVA : 1.3 PHASE B KVA : 16.1 AMPS : 134.2 16 22 - - - B -- - PHASE A KVA : 24 --- C -- - CI 20 11 PHASE CKVA : 16.1 26 BATH EXH FAN BEF 2 A - - - 0.9 EMERGENCY LTS - NORTH STAIRS 0.9 AMPS : 134.2 1 28 --- B -- - 0.9 0.9 EMERGENCY EGRESS LTS - 2ND FLR BI 30 --- C -- - 0.9 AMPS : 0.9 24 32 POOL AREA HEATING UNIT DHU-I A 60 3 5.4 5.4 CONNECTED LOAD 31.4 34.--- 26 B -- - 5.4 11 5.4 KVA : 49.2 0.2 36 - - - C -_ - 5.4 B 5.4 AMPS : 136.6 0.2 38 SPARE A 20 1 30 SPARE DEMAND LOAD 20 40 SPARE B 20 1 KVA : 50.0 SPACE 42 SPARE C 20 1 CONNECTED LOAD AMPS : 138.6 NOTES/REMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION DEMAND R RECEPTACLES - TO 10KVA 100% _ REMAINING OVER 10KVA 50% _ H HEATING 100% = 28.0 M MOTORS 100% = 18.2 LM LARGEST MOTOR 125% = 3.8 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAC PER NEC 220.44 = O OTHER 100% _ PANEL 'PSE' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: 4TH FLOOR TUKWILA, WA FED FROM: P1 NOTE CKT CIRCUIT NAME CBSIZE NO. 8 AMP P LOAD(KVA) PANEL DESCRIPTION R H M L K G 0 TOTAL 1 ELEVATOR PRESSURIZATION FAN A 35 3 2.1 2.1 PANEL AMPS : 100 LOCATION: 3 - B - - 2.1 FED FROM: 2.1 FEEDER AMPS : 100 5 - C - - 2.1 CKT NO. 2.1 L- L VOLTS : 208 LOAD (KVA) 7 STAIRWELL PRESSURIZATION FAN S A 35 3 2.1 PANEL DESCRIPTION 2.1 L- N VOLTS : 120 PHASE: 3 1 9 - B - 1-1 2.1 18.0 2.1 18.0 11 - C - - 2.1 2.1 WIRE : 4 B 13 SPARE Al20 1 - 18.0 18.0 F®ERA MPS : 15 SPARE B 20 1 5 - - - C -_ - 17 SPARE C 20 1 18.0 L - L VOLTS : L- N VOLTS : 208 120 19 SPACE A 7 SPARE A 20 1 M.L.O. X SPARE B 21 SPACE B 1 MAIN CB PHASE : 3 23 SPACE C SMOKE/FIRE CAMPERS - WEST C 20 FLUSH SURFACE X 0.4 0.4 25 SPACE A 4 _ 13 SMOKE/FIRE CAMPERS - EAST 27 SPACE B 20 1 ISO GND 0.4 29 SPACE C 15 SP -1 B 20 1 1.1 1.1 FEED -THRUM 17 SP -2 C A _ 1.1 1.1 B 19 SPACE A C M.L.O. A 21 SPACE LOADSUMMARY B (T O T A L .ALL SECTIONS I X C 23 SPACE REC KVA 2 CORRIDOR SMOKE CONTROL EXHA UST FAN A 50 3 3.1 A 3.1 4 - B - - 3.1 3.1 HEAT KVA 6 - C - - 3.1 SPACE 3.1 MOTOR KVA : 28.5 LIGHTING KVA 8 STAIRWELL PRESSURIZATION FAN N A 35 3 2.1 1 2.1 10 - B - - 2.1 29 2.1 KITCHEN KVA 12 - C - - 2.1 2.1 GEN LTG KVA 14 SPARE A 20 1 31 SPACE OTHER KVA 16 SPARE B 20 1 PHASEA KVA : 9.5 18 SPARE C 20 1 33 SPACE B AMPS : 79.1 20 SPACE A PHASE B KVA : 9.5 22 SPACE B SPACE C AMPS : 79.1 PHASE C KVA : 9.5 24 SPACE C 26 SPACE A PANE. P5E- ROOF MECHANICAL FANS A 100 3 9.5 AMPS : 79.1 9.5 28 SPACE B 39 --- B -- 30 SPACE C 95 95 (TOTAL, ALL SECTIONS j A 41 --- C -- CONNECTED LOAD 9.5 B 9.5 REC KVA : HEAT KVA : 0.6 2.2 KVA : 28.5 2 C A 20 1 0.4 0.3 0.7 4 AMPS : 79.0 B 20 1 0.2 0.2 A 6 ELEVATOR CAB LIGHTS C DEMAND LOAD 1 B 0.2 MOTOR KVA : KVA : 29.2 C ELEVATOR CAB LIGHTS A 20 AMPS : 81.2 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 25.4 LM LARGEST MOTOR 125% = 3.8 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAD PER NEC 220.44 = O OTHER 100% _ , Mp 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 r CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express TukwRa, WA Sheet Title: PANEL SCHEDULES 40LIANCL. NFPA 70 - NI SET' 2 6 bib r PANEL 'P1E' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: MDP/GENSETV[A TRA NSFERSWITCH NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 6 AMP P R H M L K G O TOTAL 1 ELEVATOR A 300 3 18.0 18.0 PA NEL AMPS : 400 3 - - - B - - - 18.0 18.0 F®ERA MPS : 400 5 - - - C -_ - 18.0 18.0 L - L VOLTS : L- N VOLTS : 208 120 7 SPARE A 20 1 9 SPARE B 20 1 PHASE : 3 11 SMOKE/FIRE CAMPERS - WEST C 20 1 0.4 0.4 WIRE : 4 13 SMOKE/FIRE CAMPERS - EAST A 20 1 0.4 0.4 15 SP -1 B 20 1 1.1 1.1 17 SP -2 C 20 1 1.1 1.1 19 SPACE A M.L.O. 21 SPACE B MAIN CB FLUSH X 400A 23 SPACE C 25 SPACE A SURFACE X 27 SPACE B ISO GND 29 SPACE C FEED -THRUM 31 SPACE A 33 SPACE B 35 SPACE C 37 PANE. P5E- ROOF MECHANICAL FANS A 100 3 9.5 9.5 LOADSUMMARY 39 --- B -- - 95 95 (TOTAL, ALL SECTIONS j 41 --- C -- - 9.5 9.5 REC KVA : HEAT KVA : 0.6 2.2 2 RECEPTACLES/LIGHTS - ELEVATOR PITS A 20 1 0.4 0.3 0.7 4 RECEPTACLE- ELEVATOR EQUIP RM B 20 1 0.2 0.2 6 ELEVATOR CAB LIGHTS C 20 1 0.2 0.2 MOTOR KVA : 82.5 8 ELEVATOR CAB LIGHTS A 20 1 0.2 0.2 LIGHTING KVA : 4.4 10 ELEVATOR ROOM LIGHTS B 20 1 0.2 0.2 KITCHEN KVA GEN LTG KVA 12 FACP C 20 1 0.5 0.5 14 EMERGENCY LTS - LOBBY, W CORRIDORS A 20 1 0.5 0.5 OTHER KVA : 1.3 16 EMERGENCY LTS - N CORRIDORS, UTILITY B 20 1 PHASE A KVA : 30.2 18 EMERGENCY LTS - SW STAIRS CI 20 11 1.5 1.5 AMPS : 251.6 20 EMERGENCY LTS - NORTH STAIRS Al20 1 0.7 0.7 PHASE B KVA : 29.4 22 EMERGENCY EGRESS LTS - 2ND FLR BI 20 1 0.2 0.2 AMPS : 244.9 24 EMERGENCY EGRESS LTS - 3RD FLR C1 20 1 0.2 0.2 PHASE C KVA : 31.4 26 EMERGENCY EGRESS LTS - 4TH FLR Al20 11 0.2 0.2 AMPS : 261.6 28 EMERGENCY EGRESS LTS - 5TH FLR B 20 1 0.2 0.2 30 SPARE C 20 1 32 SPACE A CONNECTED LOAD 34 SPACE B KVA : 91.0 36 SPACE C AMPS : 252.5 38 SPACE Aj DEMAND LOAD 40 SPACE 4B_ KVA : AMPS : 96.6 268.1 42 SPACE NOTES/REMARKS : 1. 2. RECEIVED 3. CITY OF TUKWILA SEP 12 2016 PERMIT (PERMIT CENTER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN ? G GENERAL LIGHTING LOAC O DEMAND 100% = 50% _ 100% = 100% = 125% = 125% = 65% _ PER NEC 220.44 = 100% = 0.6 2.2 64.5 22.5 5.5 1.3 , Mp 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 r CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express TukwRa, WA Sheet Title: PANEL SCHEDULES 40LIANCL. NFPA 70 - NI SET' 2 6 bib r PANEL 'PG4' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 8 AM P P R H M L K G O TOTAL [TMP P 1 218 - GENERAL LTS/REC A 20 1 0.8 0.8 PANEL AMPS : 200 1 3 218 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 FEEDER AMPS : 200 BI "'-5-.218 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 L - N VOLTS : 120 212 - BATHROOM 7 1218 - PTAC A 20 2 1.6 1.6 9 - B - - 1.6 1.6 PHASE: 3 B 20 11 318 - GENERAL LTS/REC C 20 1 0.8 0.8 WIRE : 4 PHASE : 3 13 318 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 0.8 0.8 15 318 - BATHROOM B 20 1 0.2 0.2 1 1.1 17 318 - PTAC C 20 2 1.6 1.6 BI 20 1 19 - A - - 1.6 1.6 M. L.O. MA IN CB X 20 2 1.6 21 418 - GENERAL LTS/REC B 20 1 0.8 0.8 A 23 418 - REFRIGERATORIMICROWAVE C 20 1 1.1 1.1 FLUSH A 20 21 412 - GENERAL LTS/REC 25 418 - BATHROOM A 20 1 0.2 0.2 SURFACE X B 20 23 27 418 - PTAC B 20 2 1.6 1.6 ISO GND FEED-THRU 17 1306 - PTAC C 20 29 - C - - 1.6 1.6 0.2 31 518 - GENERAL LTS/REC A 20 1 0.8 0.8 412 - PTAC B 33 518 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 21 406 - GENERAL LTS/REC 35 518 - BATHROOM C 20 1 0.2 0.2 1.6 MAIN CB FLUSH 37 518 - PTAC A 20 2 1.6 1.6 0.8 25 406 -BATHROOM 39 - B - - 1.6 1.6 1.1 1.1 41 220 - GENERAL LTS/REC C 20 1 0.8 0.8 20 1 0.2 43 220 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 A 20 2 45 220 - BATHROOM B 20 1 1 0.2 0.2 - B 47 220 - PTAC C 20 2 1.6 1.6 41 214 - GENERAL LTS/REC 49 - A - - 1.6 1.6 1.1 43 51 320 - GENERAL LTS/REC B 20 1 0.8 0.8 53 320 - REFRIGERATORIMICROWAVE C 20 1 1.1 1.1 0.2 0.2 55 320 - BATHROOM A 20 1 0.2 0.2 20 2 1.6 57 320 - PTAC B 20 2 1.6 1.6 A - - 59 - C - - 1.6 1.6 314 - GENERAL LTS/REC 2 420 - GENERAL LTS/REC A 20 1 0.8 0.8 LOAD SUM MARY 314-REFRIGERATORWICROWAVE 4 420 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 (TOTAL ,ALL SECTIONS j 55 6 420 - BATHROOM C 20 1 0.2 0.2 8 420 - PTAC A 20 2 1.6 1.6 1.6 - 10 - B - - 1.6 1.6 REC KVA 1.6 12 520 - GENERAL LTS/REC C 20 1 0.8 0.8 HEAT KVA MOTOR KVA : 37.2 LIGHTING KVA 0.9 14 520 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 20 1 16 520 - BATHROOM B 20 1 0.2 0.2 414 - BATHROOM 18 520 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 8 20 - A - - 1.6 1.6 GEN LTG KVA : 11.3 2 22 222 - GENERAL LTS/REC B 20 1 0.8 0.8 OTHER KVA REC KVA 24 222 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 0.9 0.9 26 222- BATHROOM A 20 1 0.2 0.2 PHASEA KVA : 20.4 1.1 28 222 - PTAC B 20 2 1.6 1.6 AMPS : 169.7 0.2 30 - C - - 1.6 1.6 PHASE B KVA : 19.0 20 2 32 322 - GENERAL LTS/REC A 20 1 0.8 0.8 AMPS : 158.3 A 34 322 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 PHASE KVA : 20.4 AMPS : 169.7 216 - GENERAL LTS/REC 36 322 - BATHROOM C 20 1 0.2 0.2 38 322 - PTAC A 20 21 1.6 1 1 1.6 _771- 1.6 40 - B - - 1.6 1.6 OONNECTED LOAD 0.2 42 422 - GENERAL LTS/REC C 20 1 0.8 0.8 KVA : 61.1 AMPS : 169.6 1.6 44 422 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 C 46 422 - BATHROOM B 20 1 0.2 0.2 DEMAND LOAD 316 -GENERAL LTS/REC 48 422 - PTAC C1 20 2 1.6 1.6 KVA : 51.4 34 50 - A - - 1.6 1.6 AMPS : 142.7 KITCHEN KVA : 52 522 - GENERAL LTS/REC B 20 11 0.8 1 0.8 0.2 AMPS : 172.0 54 522 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 1.6 1.6 56 522 - BATHROOM A 20 1 0.2 0.2 - - 1.6 58 522 - PTAC B 20 2 1.6 1.6 C 20 1 60 - C1 1.6 1.6 416-REFRIGERATORIMICROWAVE NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 35.7 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% _ K KITCHEN 65% = 8.2 G GENERAL LIGHTING LOAD PER NEC 220.44 = 5.6 0 OTHER 100% _ PANEL 'PG3' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE _6 LOAD (KVA) PANEL DESCRIPTION [TMP P R H M L K G 0 TOTAL 1 212 - GENERAL LTS/REC Al20 1 0.8 0.8 PANEL AMPS : 200 3 212 - REFRIGERATOR/MICROWAVE BI 20 1 1.1 1.1 FEEDER AMPS : 200 5 212 - BATHROOM C1 20 1 0.2 0.2 L - L VOLTS : 208 L - N VOLTS : 120 7 212 - PTAC A 20 2 1.6 1.6 B 20 9 - B - - 1.6 1.6 PHASE : 3 11 312 - GENERAL LTS/REC C1 20 11 0.8 0.8 WIRE : 4 L - L VOLTS : 13 312-REFRIGERATOR/MICROWAVE Al20 1 1.1 1.1 15 312 - BATHROOM BI 20 1 0.2 0.2 - 1.6 17 312 - PTAC C1 20 2 1.6 1.6 11 306 - GENERAL LTS/REC C 20 19 - A - - 1.6 1.6 M.L.O. X 13 306-REFRIGERATOR/MICROWAVE A 20 21 412 - GENERAL LTS/REC B 20 11 0.8 0.8 MAIN CB 15 306 - BATHROOM B 20 23 412-REFRIGERATOR/MICROWAVE C 20 11 1.1 1.1 FLUSH 17 1306 - PTAC C 20 25 412 - BATHROOM A 20 1 0.2 0.2 SURFACE X 19 - A - 27 412 - PTAC B 20 2 1.6 1.6 ISO GND FEED-THRU 21 406 - GENERAL LTS/REC 29 - C - - 1.6 1.6 MAIN CB FLUSH 31 512 - GENERAL LTS/REC A 20 1 0.8 0.8 25 406 -BATHROOM A 20 33 512 - REFRIGERATOR(MICROWAV E Bl 20 1 1.1 1.1 X 35 512 - BATHROOM C 20 1 0.2 0.2 1.6 37 512 - PTAC A 20 2 j 1.6 1.6 - 1.6 39 - B - - 1.6 1.6 31 506 - GENERAL LTS/REC A 20 1 0.7 0.7 41 214 - GENERAL LTS/REC C 20 1 0.9 0.9 1.1 43 214 - REFRIGERATORIMICROWAVE A 20 1 1.1 1.1 45 214 - BATHROOM B 20 1 0.2 0.2 A 20 2 47 214 - PTAC C 20 2 1.6 1.6 39 - 49 - A - - 1.6 1.6 0.7 51 314 - GENERAL LTS/REC B 20 1 0.9 0.9 1 53 314-REFRIGERATORWICROWAVE C 20 1 1.1 1.1 45 208 - BATHROOM 55 314 - BATHROOM A 20 1 0.2 0.2 57 314 - PTAC B 20 2 1.6 1.6 - 1.6 59 - C - - 1.6 1.6 51 308 - GENERAL LTS/REC 2 414 - GENERAL LTS/REC Al20 1 0.9 0.9 LOAD SUMMARY 4 414 - REFRIGERATOR(MICROWAVE B 20 1 1.1 1.1 ( TOTAL, ALL SECTIONS) 1.1 6 414 - BATHROOM C 20 1 0.2 0.2 8 414 - PTAC A 20 2 1.6 1.6 B 20 2 10 - B - .-1 1.6 1.6 REC KVA 59 - 12 514 -GENERAL LTS/REC C 20 1 0.9 0.9 HEAT KVA MOTOR KVA : 37.2 14 514 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 0.7 16 514 - BATHROOM B 20 1 0.2 0.2 LIGHTING KVA 1.1 0. 18 514 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 20 - A - - 1.6 1.6 GEN LTG KVA : 11.9 A 20 22 216 - GENERAL LTS/REC B 20 1 70.8 0.8 OTHER KVA 24 216-REFRIGERATOR/MICROWAVE C 20 1 1.1 _771- 1.6 REC KVA '26 216 - BATHROOM A 20 1 0.2 0.2 PHASEA KVA : 20.5 0.7 28 216- PTAC B 20 2 1.6 11.6 AMPS : 170.9 30 - C - - 1.6 1.6 PHASE B KVA : 19.2 B 20 32 316 -GENERAL LTS/REC A 20 1 0.8 0.8 AMPS : 159.8 34 316 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 PHASE C KVA : 20.6 KITCHEN KVA : 36 316 -BATHROOM C 20 ill 0:2 0.2 AMPS : 172.0 38 316 - PTAC A 20 2 1.6 1.6 1 40-- 0.7 B - - 1.6 1.6 CONNECTED LOAD C 20 42 416- GENERAL LTS/REC C 20 1 0.8 0.8 KVA : 61.7 AMPS : 171.3 44 416-REFRIGERATORIMICROWAVE A 20 1 1.1 1.1 1.6 46 416 - BATHROOM B 20 1 0.2 0.2 DEMAND LOAD C - 48 416 - PTAC C 20 12 1.6 1.6 KVA : 51.7 50 - A - - 1.6 1.6 AMPS : 143.6 AMPS : PHASE C KVA : 52 516 - GENERAL LTS/REC B 20 1 0.8 0.8 C 20 1 54 516 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 38 310 - PTAC 56 516 - BATHROOM A 20 1 0.2 0.2 58 1516 - PTAC B 201-- 1.6 1.6 60 - -q-- 1.6 1.6 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAININGOVER10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 35.7 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% _ K KITCHEN 65% = 8.2 G GENERAL LIGHTING LOAD PER NEC 220.44 = r 6.0 0 OTHER 100% _ REC CITY OF 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 tf; CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED.FOR COMPLIANCE WI EL SCHEDULES NFPA70 - NEC SEP 12 2016 SEP 2 6 2016 City of Tukwila PERMIT CENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG2' PROJECT NAME: HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT CIRCUIT NAME NO. CBSIZE LOAD (KVA) PANEL DESCRIPTION 8 AMP P R H M L K G 0 TOTAL 1 206 - GENERAL LTS/REC A 20 1 0.7 0.7 PANEL AMPS : 200 3 206 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 FEEDER AMPS : 200 .r-5-.206 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 7 206 - PTAC A 20 2 1.6 1.6 L - N VOLTS : 120 9 - B - - 1.6 1.6 PHASE : 3 11 306 - GENERAL LTS/REC C 20 1 0.7 0.7 WIRE : 4 13 306-REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 15 306 - BATHROOM B 20 1 0.2 0.2 17 1306 - PTAC C 20 2 1.6 1.6 19 - A - - 1.6 1.6 M.L.O. X 21 406 - GENERAL LTS/REC B 20 1 0.7 0.7 MAIN CB FLUSH 23 406-REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 25 406 -BATHROOM A 20 1 0. 2 0.2 SURFACE X 27 406 - PTAC B 20 2 1.6 1.6 ISO GND 29 - C - - 1.6 1.6 FEED-THRU 31 506 - GENERAL LTS/REC A 20 1 0.7 0.7 33 506-REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 35 506 - BATHROOM C 20 1 0.2 0.2 37 506 - PTAC A 20 2 1.6 1.6 39 - B - - 1.6 1.6 41 208 - GENERAL LTS/REC C 20 1 0.7 0.7 43 208 - REFRIGERATORIMICROWAVE A 20 1 1.1 1.1 45 208 - BATHROOM B20 1 0.2 0.2 47 208 - PTAC C 20 2 1.6 1.6 49 - A - - 1.6 1.6 51 308 - GENERAL LTS/REC B 20 1 0.7 0.7 53 308 - REFRIGERATORIMICROWAVE C 20 1 1.1 1.1 55 308 - BATHROOM A 20 1 0.2 0.2 57 308 - PTAC B 20 2 1.6 1.6 59 - C - - 1.6 1.6 2 408 - GENERAL LTS/REC A 20 1 0.7 0.7 LOAD SUM MARY 4 408 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 ( TOTAL, ALL SECTIONS) 6 408 - BATHROOM C 20 1 0.2 0.2 8 408 - PTAC A 20 2 1.6 11.6 10 - B - - 1.6 1.6 REC KVA 12 508- GENERAL LTS/REC C 20 1 0.7 0.7 HEAT KVA 14 508 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 MOTOR KVA : 37.2 16 508 - BATHROOM B 20 1 0.2 0.2 LIGHTING KVA 18 508 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 20 - A - - 1.6 1.6 GEN LTG KVA : 10.1 22 210- GENERAL LTS/REC B 20 1 0.7 0.7 OTHER KVA 24 210-REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 PHASEA KVA : 20.0 26 210 - BATHROOM A 20 1 0.2 0.2 28 210-PTAC B 20 12 1.6 1.6 AMPS : 166.3 30 - C - - 1.6 1.6 PHASE B KVA : 18.6 32 310 - GENERAL LTS/REC A 20 1 0.7 0.7 AMPS : PHASE C KVA : 154.9 20.0 34 310 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 36 310 - BATHROOM C 20 1 0.2 0.2 AMPS : 166.3 38 310 - PTAC A 20 2 1.6 1.6 40 - B - - 1.6 1.6 CONNECTED LOAD 42 410 - GENERAL LTS/REC C 20 1 0.7 0.7 KVA : 59.9 44 410-REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 AMPS : 166.2 46 410 -BATHROOM B 20 1 0.2 0.2 DEMAND LOAD 48 410 -PTAC C 20 2 1.61.6 KVA : 50.8 50 - A - - 1.6 1.6 AMPS : 141.1 52 510 - GENERAL LTS/REC B 20 1 0.7 0.7 54 510 - REFRIGERATOR/MICROWAV E C 20 1 1.1 1.1 56 510 -BATHROOM A 20 1 0.2 0.2 58 510 - PTAC B 20 2 1.6 1.6 60 - C - - 1.6 1.6 NOTES/REMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10 KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOA 0 OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.0 100% _ REC CITY OF 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 tf; CASE ENGINEERING Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED.FOR COMPLIANCE WI EL SCHEDULES NFPA70 - NEC SEP 12 2016 SEP 2 6 2016 City of Tukwila PERMIT CENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG4' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: IF 16195 LOCATION: TUKWILA,WA FED FED FROM.- ROM:NOTE FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) LOAD (KVA) PANEL DESCRIPTION -61 TMP R H M L K G O TOTAL R H M L K I G O 1 218 - GENERAL LTS/REC A 20 1 1 0.8 0.8 PANEL AMPS : 200 FEEDER AMPS : 200 10.7 3 218 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 B 20 1 5 218 - BATHROOM C 20 1 20 1 0.2 0.2 L - L VOLTS : 208 0.2 7 218 - PTAC A 20 2 1.6 2 1.6 1.6 L - N VOLTS : 120 1.6 9 - B - - 1.6 - 1.6 1.6 PHASE: 3 1.6 11 318 - GENERAL LTS/REC C 20 1 20 1 0.8 0.8 WRE : 4 0.7 13 318- REFRIGERATOR/MICROWAVE A 20 1 20 1.1 1.1 15 318 - BATHROOM B 20 1 20 1 0.2 0.2 0.2 0.2 17 318 - PTAC C 20 21 11.6 .21 1.6 1 1.6 1.6 19 - A - - 1.6 1-1 1.6 1.6 M.L.O. X 1.6 M.L.O. 21 418 - GENERAL LTS/REC B 20 1 20 F 0.8 0.8 MAIN CB 0.7 MAIN CB 23 418 - REFRIGERATOR/MICROWAVE C 20 1 20 1.1 1.1 FLUSH 1.1 FLUSH 25 418 - BATHROOM A 20 1 1 0.2 0.2 SURFACE X 0.2 SURFACE 27 418 - PTAC BI 20 211 1.6 1 1 1.6 1.6 ISO GND 1.6 ISO GND 29 - C - - 1.6 - 1.6 1.6 FEED-THRU 1.6 FEED-THRULJ 31 518 - GENERAL LTS/REC A 20 1 20 1 0.8 0.8 0.7 0.7 33 518 - REFRIGERATOR/MICROWAV E B 20 1 20 1.1 1.1 1.1 35 518 - BATHROOM C 20 1 20 1 0.2 0.2 0.2 0.2 37 518 - PTA C A 20 21 1.6 2 1.6 1.6 1.6 39 - B - - 1.6 - 1.6 1.6 1.6 41 220 - GENERAL LTS/REC C 20 1 0.7 1 0.7 0.8 43 226-REFRIGERATOR/MICROWAVE 0.8 20 1 43 220 - REFRIGERATOR/MICROWAVE A 20 1 1.1 45 226 - BATHROOM 1.1 20 1 45 220 - BATHROOM B 20 1 1 0.2 1 47 226 - PTAC 0.2 20 2 47 220 - PTAC C 20 21 1.6 49 - 1.6 - 49 - A - - 1.6 51 326 - GENERAL LTS/REC 1.6 0.7 0.7 51 320 - GENERAL LTS/REC B 20 1 0.8 0.8 53 329- REFRIGERATOR/MICROWAVE 53 320 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 55 326 - BATHROOM 1.1 11 55 329- BATHROOM 55 320 - BATHROOM A 20 1 0.2 0.2 57 326 - PTAC 0.2 20 21 57 329- PTAC 57 320 - PTAC B 20 211 1.6 59 - 1.6 - - 59 - 59 - C - - 1.6 2 426- GENERAL LTS/REC 1.6 20 1 2 429- GENERAL LTS/REC 2 420 -GENERAL LTS/REC A 20 1 LOADSUMMARY 1.1 0.8 B 0.8 LOADSUMMARY 4 429 - REFRIGERATOR/MICROMV E 4 420 - REFRIGERATOR/MICROWAVE B 20 1 (TOTAL. ALL SECTIO 1.1 6 426 - BATHROOM 1.1 ITO T A L, ALL SECTIONS 1 6 420 - BATHROOM C 20 1 1 1 0.2 7TO.2 0.2 A 20 2 8 420 - PTAC A 20 2 1.6 1.6 B - - 10 - B - - 1.6 REC KVA F 1.6 REC KVA 20 1 12 520 - GENERAL LTS/REC C 20 1 0.7 HEAT KVA 0.8 0.8 HEAT KVA 20 1 14 520 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 37.2 1.1 MOTOR KVA : 37.2 1 16 520 - BATHROOM B 20 1 0,2 LIGHTING KVA 0.2 0.2 LIGHTING KVA 20 2 18 520 - PTAC C 20 2 1.6 KITCHEN KVA : 1 r-1.6 KITCHEN KVA : 12.6 - 20 - A - - 1.6 GEN LTG KVA : 10.1 1.6 GEN LTG KVA : 11.3 1 22 222 - GENERAL LTS/REC B 20 1 0.7 OTHER KVA 0.8 0.8 OTHER KVA 20 1 24 222 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 1.1 A 20 1 26 222 - BATHROOM A 20 1 0.2 PHASE AKVA : 0.2 0.2 PHASEA KVA : 20.4 2 28 222 - PTAC B 20 2 1.6 AMPS : PHASE B KVA : 166.4 18.6 1.6 AMPS PHASE B KVA : 169.7 : 19.0 1.6 30 - C - - 1.6 1.6 1 32 322 -GENERAL LTS/REC A 20 1 0.7 AMPS : 0.8 0.7 0.8 AMPS : 158.3 1 34 322 - REFRIGERATOR/MICROWAVE B 20 1 01 1.1 1.1 20.0 1.1 1.1 PHASE C KVA : 20.4 1 36 322 -BATHROOM C 20 1 0.2 AMPS : 0.2 0.2 0.2 AMPS : 169.7 2 38 322 - PTAC A 20 2 1.6 1.6 1.6 B - - 40 - B - - 1.6 CONNECTED LOAD 42 428 - GENERAL LTS/REC 1.6 CONNECTED LOAD 1 42 422 - GENERAL LTS/REC C 20 1 0.7 KVA : 0.8 0.7 0.8 KVA : 61.1 1 44 422 - REFRIGB: ATOR/MICROWAVE A 20 1 1.1 1.1 166.2 1.1 1.1 AMPS : 169.6 1 46 422 - BATHROOM B 20 1 0.2 DEMAND LOAD 0.2 0.2 0.2 DEMAND LOAD 20 48 422 - PTAC C 20 2 1.6 1.6 KVA : AMPS : 50.8 141.1 1.6 KVA : 51.4 AMPS : 142.7 A - - 50 - A - - 1.6 1.6 B 52 522 - GENERAL LTS/REC B 20 1 0.7 0.8 0.8 54 528-REFRIGERATOR/MICROWAVE C 54 522 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 1.1 56 528 - BATHROOM A 56 522 - BATHROOM A 20 1 0.2 0.2 0.2 58 528 - PTAC B 58 522 - PTAC B 20 21--r-l- 1.6 r 1.6 1.6 60 - C - - 60 - ic] - - 1.6 1.6 NOTES/REMARKS : 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 101<VA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.9 100% _ DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.6 100% _ RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG5' PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA,WA FED FED FROM: NOTE NOTE CKT CIRCUIT NAME NO. CB SIZE LOAD(KVA) LOAD (KVA) PANEL DESCRIPTION PANEL DESCRIPTION 8 AMP PI R H M L K I G O TOTAL A 1 224 - GENERAL LTS/REC A 20 1 0.7 0.7 PANEL AMPS : FEEDERAMPS : 10.7 PANEL AMPS : FEEDER AMPS : 200 200 1.1 3 224 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 20 5 224 - BATHROOM C 20 1 0.2 0.2 0.2 208 0.2 L - L VOLTS : 208 20 7 224 - PTAC A 20 2 1.6 1.6 L - N VOLTS : 120 1.6 L- N VOLTS : 120 - 9 - B - - 1.6 1.6 PHASE: 3 1.6 PHASE : 3 20 11 324 - GENERAL LTS/REC C 20 1 0.7 0.7 0.7 4 0.7 WRE : 4 20 13 324 - REFRIGERATOR/MICROWAVE A 20 1 1.1 15 330 - BATHROOM B 1 20 15 324 - BATHROOM B 20 1 0.2 0.2 0.2 0.2 17 330 - PTAC C 20 17 324 - PTAC C 20 .21 1.6 1 1.6 1.6 19 - A - 1-19-- A - 1-1 1.6 1.6 M.L.O. X 1.6 M.L.O. X B 20 21 424 - GENERAL LTS/REC BI 20 1 0.7 0.7 0.7 0.7 MAIN CB 23 430- REFRIGERATOR/MICROWAVE C 20 23 424 - REFRIGERATOR/MICROWAVE C1 20 1 1.1 FLUSH 1.1 FLUSH 25 430- BATHROOM A 20 25 424 - BATHROOM Al20 1 0.2 0.2 0.2 X 0.2 SURFACE X B 20 27 424 - PTAC BI 20 2 1.6 1.6 ISO GND 1.6 ISO GND 29 - C - 29 - C - - 1.6 1.6 FEED-THRU 1.6 FEED-THRULJ 31 530- GENERAL LTS/REC A 20 31 524 - GENERAL LTS/REC A 20 1 0.7 0.7 0.7 0.7 33 530 - REFRIGERATOR/MICROWAV E B 20 33 524 - REFRIGBRATORIMICROWAV E B 20 1 1.1 1.1 35 530 - BATHROOM C 20 35 524 -BATHROOM C 20 1 0.2 0.2 0.2 0.2 37 530 - PTAC A 20 37 524 - PTAC A 20 2 1.6 1.6 1.6 39 - B - 39 - B - - 1.6 1.6 1.6 41 229- GENERAL LTS/REC C 20 41 226 - GENERAL LTS/REC C 20 1 0.7 1 0.7 1.1 43 226-REFRIGERATOR/MICROWAVE A 20 1 43 229 - REFRIGERATOR/MICROWAV E 1.1 20 1 1.1 1.1 45 226 - BATHROOM B 20 1 45 229- BATHROOM B 0.2 1 0.2 0.2 47 226 - PTAC C 20 2 1.6 C 20 2 1.6 1.6 49 - Al- - 11.6 A - - 1.6- 1.6 51 326 - GENERAL LTS/REC BI 20 1 0.7 0.7 53 326-REFRIGERATOR/MICROWAVE C1 20 1 53 329- REFRIGERATOR/MICROWAVE C 1.1 1 1.1 1.1 55 326 - BATHROOM Al20 11 55 329- BATHROOM A 20 0.2 0.2 0.2 57 326 - PTAC B 20 21 57 329- PTAC 1.6 20 2 1.6 59 - C - - 59 - 1.6 - - 1.6 2 426- GENERAL LTS/REC A 20 1 2 429- GENERAL LTS/REC A 20 0.7 0.7 LOADSUMMARY 1.1 4 426 - REFRIGERATOR/MICROWAVE B 20 1 4 429 - REFRIGERATOR/MICROMV E B 1.1 1 1.1 (TOTAL. ALL SECTIO IJ S 6 426 - BATHROOM C 20 1 6 429- BATHROOM C 20 0.2 0.2 0.2 7TO.2 8 426 - PTAC A 20 2 8 429- PTAC 1.6 20 2 1.6 10 - B - - 10 - 1.6 - - 1.6 REC KVA 12 526 - GENERAL LTS/REC C 20 1 12 529- GENERAL LTS/REC C 20 0.7 0.7 HEAT KVA 1.1 14 526 - REFRIGERATOR/MICROWAV E A 20 1 14 529- REFRIGERATOR/MICROWAVE A 1.1 1 1.1 MOTOR KVA : 37.2 16 526 - BATHROOM B 20 1 16 529- BATHROOM B 20 0.2 0,2 LIGHTING KVA 0.2 18 526 - PTAC C 20 2 18 529 - PTAC 1.6 20 2 1.6 KITCHEN KVA : 12.6 20 - A - - 20 - 1.6 - - 1.6 GEN LTG KVA : 10.1 22 228 - GENERAL LTS/REC BI 20 1 22 227- GENERAL LTS/REC B 20 0.7 0.7 OTHER KVA 0.7 24 228 - REFRGERATOR/MICROWAV E C1 20 1 24 227 - REFRIGERATOR/MICROWAV E C 1.1 1 1.1 26 228 -BATHROOM A 20 1 26 227- BATHROOM A 20 0.2 0.2 PHASE AKVA : 20.0 28 228 - PTAC B 20 2 28 227- PTAC 1.6 20 2 1.6 AMPS : PHASE B KVA : 166.4 18.6 30 - C - - 1.6 1.6 30 - C - - 32 328- GENERAL LTS/REC A 20 1 A 20 1 0.7 0.7 AMPS : 154.9 0.7 34 328 - REFRIGERATOR/MICROWAVE B 20 1 B 20 1.1 01 1.1 PHASE C KVA : 20.0 1.1 36 328 - BATHROOM C 20 1 C 20 1 0.2 0.2 AMPS : 166.4 0.2 38 328 - PTAC A 20 2 A 1.6 2 1.6 1.6 1.6 40 - B - - B 1.6 - 1.6 1.6 CONNECTED LOAD 42 428 - GENERAL LTS/REC C 20 1 C 20 1 0.7 0.7 KVA : 59.9 0.7 44 428-REFRIGERATOR/MICROWAVE A 20 1 A 20 1.1 1.1 AMPS : 166.2 1.1 46 428 - BATHROOM B 20 1 B 20 1 0.2 0.2 DEMAND LOAD 0.2 48 428 - PTAC C 20 2 C 1.6 2 1.6 1.6 KVA : AMPS : 50.8 141.1 1.6 50 - A - - 1.6 1.6 1.6 52 528 - GENERAL LTS/REC B 20 1 20 1 0.7 0.7 0.7 54 528-REFRIGERATOR/MICROWAVE C 20 1 20 1 1.1 1.1 1.1 1.1 56 528 - BATHROOM A 20 1 20 1 0.2 0.2 0.2 58 528 - PTAC B 20 2 20__2 1.6 1.6 r 1.6 1.6 60 - C - - 1 1 1.6 r 1.6 NOTES/REMARKS : 1. 2. 3. NOTES/REMARKS: 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES - TO 10KVA REMAINING OVER 101<VA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = ' 5.0 100% _ RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG6' PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT CIRCUIT NAME NO. CB SIZE 9 AMP P LOAD(KVA) PANEL DESCRIPTION R H M L K G O TOTAL 1 230- GENERAL LTS/REC A 20 1 0.7 0.7 PANEL AMPS : FEEDERAMPS : 200 200 3 230- REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 5 230 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 7 230 - PTAC A 20 2 1.6 1.6 L - N VOLTS : 120 9 - B - I - 1.6 1.6 PHASE: 3 11 330- GENERAL LTS/REC C1 20 1 0.7 0.7 WRE : 4 13 330 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 15 330 - BATHROOM B 1 20 11 0.2 0.2 17 330 - PTAC C 20 2 1.6 1.6 19 - A - - 1.6 1.6 M.L.O. X 21 430 - GENERAL LTS/REC B 20 1 0.7 0.7 MAIN CB 23 430- REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 FLUSH 25 430- BATHROOM A 20 1 0.2 0.2 SURFACE X 27 430 - PTAC B 20 2 1.6 1.6 ISO GND 29 - C - - 1.6 1.6 FEED-THRU 31 530- GENERAL LTS/REC A 20 1 0.7 0.7 33 530 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 35 530 - BATHROOM C 20 1 0.2 0.2 37 530 - PTAC A 20 2 1.6 1.6 39 - B - - 1.6 1.6 41 229- GENERAL LTS/REC C 20 1 1.1 1.1 43 229 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 45 229- BATHROOM B 20 1 0.2 0.2 47 229 - PTAC C 20 2 1.6 1.6 49 - A - - 1.6 1.6 51 329- GENERAL LTS/REC B 20 1 1.1 1.1 53 329- REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 55 329- BATHROOM A 20 11 0.2 0.2 57 329- PTAC B 20 2 1.6 1.6 59 - C - - 1.6 1.6 2 429- GENERAL LTS/REC A 20 1 1.1 LOADSUMMARY 4 429 - REFRIGERATOR/MICROMV E B 20 1 1.1 ( TOTAL ,ALL SECTIONS J 6 429- BATHROOM C 20 1 0.2 7TO.2 8 429- PTAC A 20 2 1.6 10 - B - - 1.6 . REC KVA 12 529- GENERAL LTS/REC C 20 1 1.1 1.1 HEAT KVA 14 529- REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 MOTOR KVA : 37.2 16 529- BATHROOM B 20 1 0.2 0.2 LIGHTING KVA 18 529 - PTAC C 20 2 1.6 1.6 KITCHEN KVA : 12.6 20 - A - - 1.6 1.6 GEN LTG KVA : 11.8 22 227- GENERAL LTS/REC B 20 1 0.7 0.7 OTHER KVA 24 227 - REFRIGERATOR/MICROWAV E C 20 1 26 227- BATHROOM A 20 1 0.2 0.2 PHASE KVA : 20.4 28 227- PTAC B 20 2 1.6 1.6 AMPS : PHASE B KVA : 170.3 19.0 30 - C - - 1.6 1.6 32 327- GENERAL LTS/REC A 20 1 r0.7 0.7 AMPS : 158.5 34 327 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 PHASE C KVA : 20.8 36 327- BATHROOM C 20 1 0.2 0.2 AMPS : 173.2 38 327 - PTAC A 20 2 1.6 1.6 40 - B - - 1.6 1.6 CONNECTED LOAD 42 427- GENERAL LTS/REC C 20 1 0.7 0.7 KVA : 61.6 44 427 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 AMPS : 171.0 46 427 - BATHROOM B 20 1 0.2 0.2 DEMAND LOAD 48 427 - PTAC C 20 2 1.6 1.6 KVA : AMPS : 51.7 143.5 50 - A - - 1.6 1.6 52 527 - GENERAL LTS/REC B 20 1 0.7 0.7 54 527 - REFRIGERATOR/MICROWAV E C 20 1 1.1 1.1 56 527- BATHROOM 1A 20 1 0.2 0.2 58 527- PTAC JBI 20__2 1.6 1.6 60 - C - - 1.6 1.6 NOTES/REMARKS: 1. 2. 3. DEMAND/ DIVERSITY FACTORS LOAD DESCRIPTION R RECEPTACLES- TO 10KVA REMAINING OVER 10KVA H HEATING M MOTORS LM LARGEST MOTOR L LIGHTING K KITCHEN G GENERAL LIGHTING LOAD O OTHER DEMAND 100% _ 50% _ 100% _ 100% = 35.7 125% = 1.9 125% _ 65% = 8.2 PER NEC 220.44 = 5.9 100% _ RECEIVED CITY CSE TUKWILP SEP 12 2016 PERMIT CENTER R 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwfla, WA Sheet Title: .,tltVIEVVE aAA P L I .SEL SCHEDULES NFPA 70 - KIP" SEP 2 b 2(116 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: PANEL 'PG7' PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: r 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CIRCUIT NAME CBSIZE 6 AMP P LOAD(KVA) PANEL DESCRIPTION R H M L K G 0 TOTAL R H M L K G O 201 - GENERAL LTS/REC A 20 1 1 0.80.8 A 20 1 PANELAMPS : 200 0.7 201 - REFRIGERATOR/MICROWAVE B 20 1 1.1 207 - REFRIGERATOR/MICROWAV E 11 FEEDERAMPS : 200 1.1 201- BATHROOM C 20 1 5 0.2 0.2 L - L VOLTS : 208 0.2 [CKT 201 - PTAC A 20 2 1.6 207 - PTAC 1.6 L - NVOLTS : 120 1.6 - B - - 1.6 B - - 16 PHASE: 3 PHASE : 3 301- GENERAL LTS/REC C 20 1 307 - GENERAL LTS/REC 0.8 0.8 VMR= : 4 WRE : 4 301- REFRIGERATOR/MICROWAVE A 20 1301 307 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 X - BATHROOM B 20 1 307 - BATHROOM 0.2 0.2 0.2 301- PTAC C 20 2 1.6 C 20 2 1.6 1.6 X - A - - 1.6 A - - 1.6 M.L.O. MAIN CB X X 21 401 - GENERAL LTS/REC B 20 1 407 - GENERAL LTS/RBC 0.8 0.8 0.7 23 401- REFRIGERATOR/MICROWAVE C 20 1 1.1 C 20 1 1.1 FLUSH FLUSH B 20 1 0.9 25 401 - BATHROOM A 20 1 407 - BATHROOM 0.2 0.2 SURFACE -K X C 20 1 27 401- PTAC B 20 21 1 1.6 B 20 21 1.6 ISO GND ISO GND 25 SPARE 29 - C - - 1.6 C - - 1.6 FEED•THRU FEED-THRU 31.4 27 31 501 - GENERAL LTS/REC A 20 1 507- GENERAL LTS/REC 0.8 0.8 0.7 29 33 501- REFRIGERATORIMICROWAVE B 20 1 1.1 B 20 1 1.1 1.1 C - - - 35 501- BATHROOM C 20 1 C 20 1 0.2 0.2 37 501- PTAC A 20 21 1 1.6 1.6 1.6 B 20 1 C - - - 39 - B - - 1.6 1.6 1.6 SPARE C 20 1 41 203- GENERAL LTS/REC C 20 1 C 20 1 0.8 0.8 37 SPARE 43 203- REFRIGERATOR/MICROWAVE A 20 1 1.1 12.4 7.6 1.1 A - - - 39 45 203 - BATHROOM B 20 1 B 20 1 0.2 0.2 41 47 203 - PTAC C 20 21 1 1.6 20.0 1.6 REC KVA : 7.2 49 - A - - 1.6 A 20 1 1.6 LIGHTING KVA : 19.4 KVA : 84.0 51 303- GENERAL LTS/REC B 20 1 B 20 1 0.8 0.8 KITCHEN KVA : 11.6 14 53 303 - REFRIGERATOR/MICROWAV E C 20 1 1.1 SPARE 1.1 GEN LTG KVA: 184.0 B -- - 55 303- BATHROOM A 20 1 A 20 1 0.2 0.2 A 20 1 1.3 57 303 - PTAC B 20 21 1 1.6 10 1.6 B 20 1 0.9 59 - C - - 1.6 12.4 8.0 1.6 400 FLOOR REC N 2 403- GENERAL LTS/REC A 20 1 A 20 1 0.8 0.8 LOADSUMMARY 14 4 403 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 1.1 ( T O T A L ,ALL SECTIONS A MPS : 3051.2 6 403 - BATHROOM C 20 1 CI 20 1 0.2 0.2 20.0 PHASEA KVA : 6.4 8 403 - PTAC A 20 2 1.6 1.6 1.6 20.4 1.3 10 - B - - 1.6 1.6 1.6 REC KVA HEAT KVA 12 503- GENERAL LTS/REC C 20 1 C 20 1 0.8 0.8 0.9 14 503 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 1.1 MOTOR KVA : 37.2 C 20 1 16 503- BATHROOM B 20 1 B 20 1 0.2 0.2 LIGHTING KVA SPARE 18 503 - PTAC C 20 2 1.6 1.6 1.6 KITCHEN KVA : 12.6 28 20 - A - - 1.6 1.6 1.6 GEN LTG KVA : 10.8 20.0 22 205- GENERAL LTS/REC B 20 1 B 20 1 0.7 0.7 OTHER KVA 18.8 24 205 - REFRIGERATOR/MICROWAV E C 20 1 1.1 1.1 1.1 PHASE KVA : 20.2 CONNECTED LOAD 26 205- BATHROOM A 20 1 1 0.2 0.2 28 205- PTAC B 20 2 1.6 1.6 1.6 AMPS : 168.7 30 - C - - 1.6 1.6 1.6 PHASE B KVA : 18.8 A20 1 32 305- GENERAL LTS/REC A 20 1 A 20 1 0.7 0.7 AMPS : 156.5 SPARE 34 305 - REFRIGERATOR/MICROVVAVE B 20 1 1.1 1.1 1.1 PHASE C KVA : 20.2 36 305- BATHROOM C 20 1 C 20 1 0.2 0.2 AMPS : 168.7 NOTESIREMARKS : DEMAND! DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 6.5 K KITCHEN 65% = 2.0 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ 38 305 - PTAC A 20 2 1.6 1.6 1.6 40 - B - - 1.6 B - - 1.6 CONNECTED LOAD CONNECTED LOAD 42 405- GENERAL LTS/REC C 20 1 SPARE 0.7 0.7 KVA : 60.6 KVA : 55.3 44 405- REFRIGERATOR/MICROWAVE A 20 1 1.1 A 20 1 1.1 AMPS : 168.3 AMPS : 153.6 46 405 - BATHROOM B 20 1 SPARE 0.2 0.2 DEMAND LOA D DEMAND LOAD 48 405- PTAC C 20 2 1.6 C 20 1 1.6 KVA : 51.2 KVA : 42.5 50 - A - - 1.6 A 20 1 1.6 AMPS : 142.1 AMPS : 117.9 52 505- GENERAL LTS/REC B 20 1 SPARE 0.7 0.7 54 505- REFRIGERATOR/MICROWAVE C 20 1 1.1 C 20 1 1.1 56 505 - BATHROOM A 20 1 PANEL PG9 0.2 0.2 6.4 58 505 - PTAC B 20 2 1.6 B - - 1.6 3.6 60 - IT - -1 j1.6 1 1 1 11.6 1.8 r r 2.6 r 1.0 r r 5.4 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 35.7 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% _ K KITCHEN 65% = 8.2 G GENERAL LIGHTING LOAD PER NEC 220.44 = 5.4 0 OTHER 100% _ PANEL 'PG8' PROJECT NAME HOLT DAY IIIN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA,NA FED FROM: NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD(KVA) PANEL DESCRIPTION 0 AMP P R H M L K G O TOTAL PANEL P1A 1 207 - GENERAL LTS/REC A 20 1 r 0,7 0.7 PANEL AMPS : 200 PANELAMPS : 100 3 207 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 FEEDER AMPS : 200 P1.3 5 207 - BATHROOM C 20 1 0.2 0.2 L - L VOLTS : 208 L - N VOLTS : 120 PANEL P1 B 7 207 - PTAC A 20 2 1.6 1.6 1.3 9 - B - - 1.6 1.6 PHASE : 3 B 20 1 11 307 - GENERAL LTS/REC C 20 1 0.7 0.7 WRE : 4 200 FLOOR REC N 13 307 - REFRIGERATOR/MICROWAV E A 20 1 1.1 1.1 X 13 15 307 - BATHROOM B 20 1 0.2 0.2 17 307-PTAC C 20 2 1.6 1.6 X 4 19 - A - - 1.6 1.6 M.L.O. MAIN CB X 21 407 - GENERAL LTS/RBC B 20 1 0.7 0.7 0.9 23 407 - REFRIGERATOR/MICROWAVE C 20 1 1.1 1.1 FLUSH B 20 1 0.9 25 407 - BATHROOM A 20 1 0.2 0.2 SURFACE X C 20 1 X 27 407-PTAC B 20 21 1 1.6 1.6 ISO GND 25 SPARE A 20 1 29 - C - - 1.6 1.6 FEED-THRU 31.4 27 SPARE 31 507- GENERAL LTS/REC A 20 1 0.7 0.7 29 SPARE 33 507 - REFRIGERATOR/MICROWAV E B 20 1 1.1 1.1 C - - - 35 507 - BATHROOM C 20 1 1 0.2 0.2 37 1507 - PTAC A 20 2 1.6 1.6 B 20 1 C - - - 39 - B - - 1.6 1.6 SPARE C 20 1 41 SPARE C 20 1 13.2 22.9 36.1 37 SPARE 43 SPARE A 20 1 12.4 7.6 LOADSUMMARY I TOTAL,ALL SECTIONS( A - - - 39 45 SPA RE B 20 1 1 20.0 HEAT KVA : 89.4 41 47 SPARE CI 20 1 20.0 MOTOR KVA : 546.7 REC KVA : 7.2 rifl SPARE A 20 1 A 20 1 20.5 LIGHTING KVA : 19.4 KVA : 84.0 51 SPARE B 20 1 B 20 1 20.5 KITCHEN KVA : 11.6 14 53 SPARE C 20 1 SPARE C 20 1 GEN LTG KVA: 184.0 B -- - 55 SPARE A 20 1 8 400 FLOOR LTS A 20 1 1.3 57 SPARE B 20 1 10 400 FLOOR REC S B 20 1 0.9 59 SPARE C 20 1 12.4 8.0 12 400 FLOOR REC N 2 209 - GENERAL LTS/REC A 20 1 0.7 0.7 LOADSUMMARY 14 4 209 - REFRIGERATOR/MICROWAVE B 20 1 1.1 1.1 (TOTAL ,ALL SECTIONS A MPS : 3051.2 6 209 - BATHROOM CI 20 1 0.2 0.2 20.0 PHASEA KVA : 6.4 8 209 - PTAC A 20 2 1.6 1.6 20.4 1.3 10 - B - - 1.6 1.6 REC KVA : 7.2 HEAT KVA 12 309 - GENERAL LTS/REC C 20 1 0.7 0.7 0.9 14 309 - REFRIGERATOR/MICROWAVE A 20 1 1.1 1.1 MOTOR KVA : 24.8 C 20 1 16 309 - BATHROOM B 20 1 0.2 0.2 LIGHTING KVA : 5.2 SPARE 18 309 - PTAC C 20 21 1.6 1.6 KITCHEN KVA : 11.4 28 20 - A - - 1.6 1.6 GEN LTG KVA : 6.7 20.0 22 409 - GENERAL LTS/REC B 20 1 0.7 B -- - OTHER KVA 18.8 24 409 - REFRIGERATOR/MICROWAVE C 20 1 1.1 15.0 PHASEA KVA : 20.8 CONNECTED LOAD 26 409- BATHROOM A 20 1 0.2 FO.7 409 - PTAC B 20 2 1.6 SPARE AMPS : 173.4 30 - C - - 1.6 1.6 PHASE B KVA : 21.6 A20 1 32 509 -GENERAL LTS/REC A 20 1 0.7 0.7 AMPS: 179.8 SPARE 34 509-REFRIGERATORIMICROWAVE B 20 1 1.1 1,1 PHASE CKVA : 15.7 36 509 - BATHROOM C 20 1 0.2 0.2 AMPS : 131.2 NOTESIREMARKS : DEMAND! DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 6.5 K KITCHEN 65% = 2.0 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ 38 509 - PTAC A 20 2 1.6 1.6 40 - B - - 1.6 1.6 CONNECTED LOAD 42 SPARE C 20 1 KVA : 55.3 44 SPARE A 20 1 AMPS : 153.6 46 SPARE B 20 1 DEMAND LOAD 48 SPARE C 20 1 KVA : 42.5 50 SPARE A 20 1 AMPS : 117.9 52 SPARE B 20 1 54 SPARE C 20 1 56 PANEL PG9 A 100_3""18 2.6 2.0 6.4 58 - B - - 3.6 3.6 60 - C - - 1.8 r r 2.6 r 1.0 r r 5.4 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% = 23.3 LM LARGEST MOTOR 125% = 1.9 L LIGHTING 125% = 6.5 K KITCHEN 65% = 7.4 G GENERAL LIGHTING LOAD PER NEC 220.44 = 3.4 0 OTHER 100% _ PANEL 'PG9' PROJECT NAME HOLIDAY INN EXPRESS PROJECT#: 16195 LOCATION: TUKWILA, WA FED FROM: NOTE CKT NO. CIRCUIT NAME C13 SIZE LOAD(KVA) PANEL DESCRIPTION 6 AMP P R H M L K G 1 PANEL P1A 1 SPARE A 20 1 PANEL AMPS: 2500 --- C -- - 18.0 18.0 PANELAMPS : 100 B -- - 3 SPARE B 20 1 L- N VOLTS : 120 PHASE: 3 --- P1.3 FEEDERAMPS : 100 L- L VOLTS : 208 2.3 5.9 2.9 5 SPARE C 20 1 2 PANEL P1 B A 200 31.8 4.7 3.0 1.0 7 200 FLOOR LTS A 20 1 1.3 --- B -- - L - NVOLTS : 120 12.5 9 200 FLOOR REC S B 20 1 0.9 C -- - 0.7 4.1 2.0 3.5 PHASE: 3 WIRE: 4 11 200 FLOOR REC N C 20 1 0.9 3.8 0.9 WRE : 4 X 13 200 FLOOR ICE MACHINE A 20 1 1.0 4.4 1.0 15 SPARE B 20 1 5.6 SURFACE X 4 PANEL P1 D 17 300 FLOOR LTS C 20 1 1.3 1.3 19 300 FLOOR REC S A 20 1 0.9 MAIN CB 0.9 M.L.O. X A - - - --- 21 300 FLOOR REC N B 20 1 0.9 0.9 MAIN CB 5 PANEL PIE A 400 3 23 300 FLOOR ICE MACHINE C 20 1 X - - - B _ _ _ FLUSH - - - B - - - 0.2 1.1 27.5 0.6 25 SPARE A 20 1 8 POOL AREA AUXILIARY HEATER A 110 3 110.0 10.0 SURFACE GND X 1.1 27.5 1.9 0.9 31.4 27 SPARE B 20 1 6 1ISO A 200 3 29 SPARE C 20 1 --- B -- - 12.4 7.8 FEED•THRU C - - - --- 31 SPARE A 20 1 7 PANEL P1M A 200 3 33 SPARE B 20 1 C - - - AMPS : 233.3 --- B -- - 13.2 29.3 35 SPARE C 20 1 --- C -- - 13.2 22.9 36.1 37 SPARE A 20 1 PANELPG2 A 200 3 12.4 7.6 LOADSUMMARY I TOTAL,ALL SECTIONS( A - - - 39 SPARE B 20 1 12.4 7.6 1 20.0 HEAT KVA : 89.4 41 SPARE C 20 1 12.4 7.6 20.0 MOTOR KVA : 546.7 REC KVA : 7.2 9 'r SPARE A 20 1 20.5 LIGHTING KVA : 19.4 KVA : 84.0 4 SPARE B 20 1 20.5 KITCHEN KVA : 11.6 14 HEAT KVA - - - 6 SPARE C 20 1 GEN LTG KVA: 184.0 B -- - 10 MOTOR KVA LIGHTING KVA : 5.2 A 200 3 8 400 FLOOR LTS A 20 1 1.3 1,3 B - - - 10 400 FLOOR REC S B 20 1 0.9 0.9 KITCHEN KVA : 3.0 12.4 8.0 12 400 FLOOR REC N C 20 1 0.9 PANEL PG5 0.9 GEN LTG KVA 20.0 14 400 FLOOR ICE MACHINE A 20 1 1.0 B - - - 1.0 OTHER KVA A MPS : 3051.2 16 SPARE B 20.1 C - - - 12.4 7.6 20.0 PHASEA KVA : 6.4 18 500FLOORLTS C 20 1 1.3 20.4 1.3 AMPS : 53.3 PHASE B KVA : 3.6 20 500 FLOOR REC S A 20 1 0.9 0.9 22 500 FLOOR REC N B 20 1 0.9 0.9 AMPS : 30.0 PANEL PG7 24 500 FLOOR ICE MACHINE C 20 1 1.0 1.0 PHASE C KVA : 5.4 B -- - 26 SPARE A 20 1 - - - AMPS : 45.0 12.4 7.8 28 SPARE B 20 1 14 PANEL PG8 A 200 3 2.9 9.3 1 0.8 7.1 20.0 30 SPARE C 20 1 - - - B -- - 3.6 _933F_5.9 18.8 32 SPARE A 20 1 2.9 6.2 0.8 5.1 15.0 NOTES/REMARKS : DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 10.0 3• REMAINING OVER 10KVA 50% = 5.5 4. H HEATING 100% = 89.4 5. M MOTORS 100% = 517.4 6. LM LARGEST MOTOR 125% = 36.6 L LIGHTING 125% = 24.3 K KITCHEN 65% = 7.6 G GENERAL LIGHTING LOAD PER NEC 220.44 = 67.2 0 OTHER 100% = 15.4 CONNECTED LOAD 34 SPARE B 20 1 KVA : 15.4 36 SPARE C 20 1 AMPS : 42.7 SPARE A20 1 DEMAND LOAD L42 SPARE B 20 1 KVA : 15.7 SPARE C 20 1 AMPS : 43.4 NOTESIREMARKS : DEMAND! DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 7.2 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 6.5 K KITCHEN 65% = 2.0 G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ PANEL: MDP -SECTION 1 PROJECT NAME HOLIDAY INN EXPRESS PROJECT #: 16195 LOCATION: TUKWILA, WA FED FROM: PSE PAD MOUNT TRANSFORMER NOTE CKT NO. CIRCUIT NAME ICBSIZE LOAD(KVA) PANEL DESCRIPTION 61AMPIPI R I H M L K G O TOTAL ELEVATOR 1 PANEL P1A A 200 3 1.6 7.1 1.9 10.6 PANEL AMPS: 2500 --- C -- - 18.0 18.0 - - - B -- - 1.6 5.9 0.8 2.0 10.4 FEEDER AMPS : 2300 L- N VOLTS : 120 PHASE: 3 --- - - - C -- - 2.3 5.9 2.9 11.2 L - L VOLTS : 208 VMRE: 4 2 PANEL P1 B A 200 31.8 4.7 3.0 1.0 10.5 L - N VOLTS : 120 --- --- B -- - 1.4 4.6 4.0 2.5 12.5 PHASE: 3 C -- - --- C -- - 0.7 4.1 2.0 3.5 10.3 WIRE: 4 3 PANEL P1 A 100 3 3.8 3.8 MAIN CB X --- B -- - 4.1 0.3 4.4 FLUSH --- C -- - 5.6 5.6 SURFACE X 4 PANEL P1 D A 200 3 0.7 0.9 7.3 2.9 11.8 M.L.O. - - - B - - - 0.4 0.9 7.3 4.0 12.6 MAIN CB X 2300A SPACE A - - - --- C -- - 0.4 2.4 5.4 4.7 12.9 FLUSH --- C -- - 5 PANEL PIE A 400 3 0.4 27.5 1.9 0.4 30.2 SURFACE X - - - B _ _ _ (T O T A L .ALL SECTIONS - - - B - - - 0.2 1.1 27.5 0.6 29.4 ISO GND 8 POOL AREA AUXILIARY HEATER A 110 3 110.0 10.0 - - - C - - - 1.1 27.5 1.9 0.9 31.4 FEED-THRUIJ - - - C - - - 10.0 10.0 6 PANEL PG1 - - -- A 200 3 12.4 7.8 20.2 --- B -- - 12.4 7.8 20.2 C - - - --- C -- - 12.4 7.8 20.2 7 PANEL P1M A 200 3 13.2 25.0 38.2 LOADSUMMARY C - - - AMPS : 233.3 --- B -- - 13.2 29.3 42.5 (TO TAL.ALL SECTIONS I --- C -- - 13.2 22.9 36.1 REC KVA : 20.9 --- 8 PANELPG2 A 200 3 12.4 7.6 20.0 A - - - AMPS : 233.3 - - - B - - - 12.4 7.6 1 20.0 HEAT KVA : 89.4 - - - C - - - 12.4 7.6 20.0 MOTOR KVA : 546.7 SPACE 9 PANEL PG3 A 200 3 12.4 8.1 20.5 LIGHTING KVA : 19.4 KVA : 84.0 - - - B - - - 12.4 8.1 20.5 KITCHEN KVA : 11.6 14 SPACE - - - C - - - 12.4 8.2 20.6 GEN LTG KVA: 184.0 B -- - 10 PANEL PG4 A 200 3 12.4 8.0 20.4 OTHER KVA : 15.4 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES- TO 10KVA 100% _ 3• REMAINING OVER 10KVA 50% _ 4. H HEATING 100% = 30.0 5. M MOTORS 100% = 30.0 6. LM LARGEST MOTOR 125% = 2!.5 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ - - - B - - - 12.4 8.0 20.4 PHASE A KVA : 294.7 - - - C - - - 12.4 8.0 20.4 A MPS : 2456.0 11 PANEL PG5 A 200 3 12.4 7.6 20.0 PHASE B KVA : 366.1 - - - B - - - 12.4 7.6 20.0 A MPS : 3051.2 - - - C - - - 12.4 7.6 20.0 PHASE C KVA : 292.7 12 PANEL PG6 A 200 3 1 1 12.4 8.0 20.4 A MPS : 2438.9 --- B -- - 12.4 8.0 20.4 --- C -- - 12.4 8.4 20.8 13 PANEL PG7 A 200 3 12.4 7.8 20.2 CONNECTED LOAD - - - B -- - 12.4 7.7 20.1 KVA : 887.5 - - - C -- - 12.4 7.8 20.2 AMPS: 2463.6 14 PANEL PG8 A 200 3 2.9 9.3 1 0.8 7.1 20.0 DEMAND LOAD - - - B -- - 3.6 _933F_5.9 18.8 KVA : 773.4 AMPS : 2146.7 --- C -- - 2.9 6.2 0.8 5.1 15.0 NOTES/REMARKS : DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2. R RECEPTACLES - TO 10KVA 100% = 10.0 3• REMAINING OVER 10KVA 50% = 5.5 4. H HEATING 100% = 89.4 5. M MOTORS 100% = 517.4 6. LM LARGEST MOTOR 125% = 36.6 L LIGHTING 125% = 24.3 K KITCHEN 65% = 7.6 G GENERAL LIGHTING LOAD PER NEC 220.44 = 67.2 0 OTHER 100% = 15.4 PANEL: MDP -SECTION 2 PROJECT NAME PROJECT #: LOCATION: FED FROM: NOTE CKT NO. CIRCUIT NAME CBSIZE LOAD(KVA) PANEL DESCRIPTION 8 AMP P R H M L K G O TOTAL 15 ELEVATOR A 300 3 18.0 18.0 PANEL AMPS : 2500 FEEDER AMPS : 2300 - - - B -- - 18.0 18.0 --- C -- - 18.0 18.0 L - LVOLTS : 208 16 SPACE A - - - L- N VOLTS : 120 PHASE: 3 --- B -- - --- C -- - VMRE: 4 3 SPACE A - - --- B -- - --- C -- - 4 SPACE Al-- - M.L.O. --- _ B -- - MAIN CB X --- C -- - FLUSH 5 SPACE A - - - SURFACE X - - - B - - - ISO GND - - - C - - - FEED•THRU 6 SPACE A - - - --- B -- - --- C -- - 7 SPACE A -- - LOADSUMMARY - - - B _ _ _ (T O T A L .ALL SECTIONS REC KVA 8 POOL AREA AUXILIARY HEATER A 110 3 110.0 10.0 --- -- - 10.0 10.0 HEAT KVA : 30.0 MOTOR KVA : 54.0 - - - C - - - 10.0 10.0 9 SPACE A - - - LIGHTING KVA - - - KITCHEN KVA GEN LTG KVA: - - - C - - - 10 SPACE A - - - OTHER KVA - - - B - - - 66.0 PHASE A KVA : 28.0 - - - C - - - AMPS : 233.3 11 SPACE A - - - PHASE B KVA : 94.0 --' B -- - AMPS : 783.3 --- C -- - PHASE CKVA : 28.0 12 SPACE A - - - AMPS : 233.3 --- B -- - --- C -- - 13 SPACE A - - - CONNECTED LOAD --- B -- - KVA : 84.0 - - - C - - - AMPS : 233.2 14 SPACE A - - - DEMAND LOAD --- B -- - KVA : 88.5 - - - C - - - AMPS : 245.7 NOTES/REMARKS: DEMAND/ DIVERSITY FACTORS 1. LOAD DESCRPTION DEMAND 2. R RECEPTACLES- TO 10KVA 100% _ 3• REMAINING OVER 10KVA 50% _ 4. H HEATING 100% = 30.0 5. M MOTORS 100% = 30.0 6. LM LARGEST MOTOR 125% = 2!.5 L LIGHTING 125% _ K KITCHEN 65% _ G GENERAL LIGHTING LOAD PER NEC 220.44 = 0 OTHER 100% _ E A LY", *_J 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 II9;rRrn11"I f } Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED q MPLI, nL SCHEDULES NFPA 70 - NEC SEP 2 6 2016 City ofTuWla BUILDING f RECEIVED CITY OF TUKWILA SEP 12 2016 Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: ELECTRCIAL 054 LCP DIMMING PANEL LOAD SCHEDULE PANEL NAME: PANEL UNIT 1 LUTRON MODEL NO.: LCP-4X6T— 1 20FT PANEL ADDRESS / LOCATION: 1 / ELECTRICAL 054 Stat Circuit Current AREA/ROOM CUSTOMER CIRCUIT # MOD LUTRON CIRCUIT # CIRCUIT DESCRIPTI❑N LOAD TYPE ACTUAL LOAD (W/VA) MAX. LOAD BRKR SIZE PHASE MAIN LOBBY PIC -10 1 (XP) SH1 TVM 1 LOBBY/BUSINESS AREA DOWNLIGHTS LED — 0-10V 800 1920 FEED THRU — SPARE SPARE SH2 TVM 2 SPARE LED — 0-10V 208 1920 FEED THRU — BREAKFAST/DINING PIC -12 SH3 TVM 3 BREAKFAST/DINING AREA LED — 0-10V 364 1920 FEED THRU — SPARE SPARE SH4 TVM 4 SPARE LED — 0-10V 46,284.31 1920 FEED THRU — CHECK IN/ FEATURE WALL P1C-8 2 (XP) SH5 TVM 5 CHECK IN/ FEATURE WALL. LED — 0-10V 120 1920 FEED THRU 70 SPARE SPARE SH6 TVM 6 SPARE FL — 0-10V PG8 1920 FEED THRU — CORNER MARKET PIC -8 SH7 TVM 7 CORNER MARKET HALOGEN — 0-10V 60 1920 FEED THRU — SPARE SPARE SH8 TVM 8 SPARE LED — 0-10V FAN COIL UNIT 2.8 1920 FEED THRU — EXTERIOR BUILDING SIGN SW PIC -11 3 (XP) SH9 EXTERIOR BUILDING SIGN SW FACE LED — NON—DIM 1200 1920 FEED THRU — EXTERIOR BUILDING SIGN SE PIC -13 SH10 EXTERIOR BUILDING SIGN SE FACE LED — NON—DIM 1200 1920 FEED THRU — EXTERIOR BUILDING SIGN SOUTH PIC -15 SH11 EXTERIOR BUILDING SIGN SOUTH FACE LED — NON—DIM 1200 1920 FEED THRU — EXTERIOR BUILDING SIGN NORTH PIC -17 SH12 EXTERIOR BUILDING SIGN NORTH FACE LED — NON—DIM 1200 1920 FEED THRU — SOUTH, EAST PARKING AREAS P1C-1,3 4 (XP) SH13 EAST EXTERIOR POLE LIGHTS (VIA 2—POLE LTG CONTACTOR) LED — NON—DIM — 1920 FEED THRU — NORTH, WEST PARKING AREAS P1C-5,7 SH14 WEST EXTERIOR POLE, BOLLARD LIGHTS (VIA 2—POLE LTG CONTACTOR) LED — NON DIM FAN COIL UNIT .7KW 1920 FEED THRU — PORTE COCHERE PIC -21 SH15 PORTE COCHERE LIGHTS LED — NON—DIM 600 1920 FEED THRU — POOL AREA P1C-23 SH16 POOL AREA LIGHTS LED — NON—DIM 300 1920 FEED THRU — 208/3 10 www.lutron.com Toll Free: 800 523 9466 PROJECT NAME: HOLIDAY INN EXPRESS — TUKWILA, WASHINGTON SYSTEM: NEW SYSTEM 1 LOCATION: 91 ANDOVER PARK, TUKWILA, WASHINGTON DESIGN BY: PROJECT #: 16195 PROJECT FILENAME: LUTRON LCP PANEL DATE: 27—JULY-2016 1/2"C, 2#12, 1#12 GND Fault Current Cakulations Project: Hull Inn Express Tukwila J00 # '16196 Vie: 91612016 Fault on Load Side of Transformer with lnfinits Shot Circuit Current on Primary Available. AFC Node t tEVA L -L Vott 0, %Z Short Circuit Cuftent PSE SeNce XF.1R 268 Fault Current atthe End of a Run of C able. 3 - 6f3:300:t6 C�ncftxturs Cc uctor Raceway Short Cl€suit Current at Per € tease 0 TypeType Wii-e Size End of ale Run Aluminum .* Nan f4a5tli+ t v 750kcm13 :Alt rdnumT mei ebc + 250 kcmii .� _.... ..._._� _.... _.., 24,1i4.6t .1 3 ; Aluminum . Vlamebc I .F 250 kcm:i 1€ ,291.27 ...... ......... 1 3 Aluminum.- tlagr�ebr �, 1A':iG 4,570( 29 ...... __.. _.... 1 3 Alum: nu�ri t9agnetie m 25t�1cmisl v' 6s, 84.40 1cw• 2 3 Aluminum +r 0agnebc 2,so kcm, 11 33,128.89 3 Aliirtsrtum �. 1 gnebc 2st71c�nil `.' 25,786_98 3 Alii itrinum 14acnebrc I v 250 kmil 3 A1imhum .' Tia retic + 250kcmil 14,34 . .. :. 1 3 A1,,mu�ui3, .� Magneto,F 25tD1cmil... `' 1�,343Li<3 a d• 3 Aluminum I ebc 250 kcrnil 14:,348.cr;8 1 3 I Aluminum Y . P9agn etic ; +s! 25(1 kcm>j 14, 348.88 1 3 I Aluminum -•w I Magnetic ` w 2s01<. 'i 1 3 : Aluminum :. magnet, * 250 Pcmil +�._ 14,34 .38 1 3 ; Aluminum a twgnebr 253 kcmtl 1 3 Aluminum um't4agn elic *r' i , �-VG wr 12, 713.68 1 3 1Alurfun trt ; flagnetic �Iwu:f, i s> 7,259,24 Stat Circuit Current Length Node # at Beginning. of Run of Run L -L Vdi N!DP 60,300,00 85 208 PIA 46,284.31 27 203 P113 46,284.3`1 119 2088 .Pic 46.,284U31 110 208 PID 4C>,.284, 31 180 208 '� 1465,284,31 PANEL PIM 25 2'Xt pIN1 46.284.31 25 203 PG1 46,2U31 70 208 PG2 46,284,31 70. 20 P 3 46,284.31 76 208 PG4 46,284.31 78 2138 PG.5 46,284.31 70. 29r8 PG6 46,284.31 70 2178 FG7 46=284.31 70 203 PG8 46,284.31 70 208 PG9 14,348.68 5. 208 P5E i33,12G 39 60 2CQ 3 - 6f3:300:t6 C�ncftxturs Cc uctor Raceway Short Cl€suit Current at Per € tease 0 TypeType Wii-e Size End of ale Run Aluminum .* Nan f4a5tli+ t v 750kcm13 :Alt rdnumT mei ebc + 250 kcmii .� _.... ..._._� _.... _.., 24,1i4.6t .1 3 ; Aluminum . Vlamebc I .F 250 kcm:i 1€ ,291.27 ...... ......... 1 3 Aluminum.- tlagr�ebr �, 1A':iG 4,570( 29 ...... __.. _.... 1 3 Alum: nu�ri t9agnetie m 25t�1cmisl v' 6s, 84.40 1cw• 2 3 Aluminum +r 0agnebc 2,so kcm, 11 33,128.89 3 Aliirtsrtum �. 1 gnebc 2st71c�nil `.' 25,786_98 3 Alii itrinum 14acnebrc I v 250 kmil 3 A1imhum .' Tia retic + 250kcmil 14,34 . .. :. 1 3 A1,,mu�ui3, .� Magneto,F 25tD1cmil... `' 1�,343Li<3 a d• 3 Aluminum I ebc 250 kcrnil 14:,348.cr;8 1 3 I Aluminum Y . P9agn etic ; +s! 25(1 kcm>j 14, 348.88 1 3 I Aluminum -•w I Magnetic ` w 2s01<. 'i 1 3 : Aluminum :. magnet, * 250 Pcmil +�._ 14,34 .38 1 3 ; Aluminum a twgnebr 253 kcmtl 1 3 Aluminum um't4agn elic *r' i , �-VG wr 12, 713.68 1 3 1Alurfun trt ; flagnetic �Iwu:f, i s> 7,259,24 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 "M Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 MW Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED .FOR COMPLIANCE U?7kNEL SCHEDULES RIFPA 70 - RIEi SEP 2 6 2016 City of -Tukwila RECEMBUILDING DIVI CITY OF TUKWILA SEP 12 2016 PERMIT CENTER SheetNumber: MECHANICAL EQUIPMENT CONNECTION SCHEDULE TAG DESCRIPTION HP /KW /VA VOLTS / FLA/ FUSE PHASE MCA (MOCP) DISC. SWITCH STARTER CIRCUIT FEEDER SIZE TAG REMARKS NOTES HP -1 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1M 1/2"C, 2#10, 1#10 GND HP -1 HP -2 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL PIM 1/2"C, 2#10, 1#10 GND HP -2 HP -3 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL PIM 1/2"C, 2#10, 1#10 GND HP -3 HP -4 HEAT PUMP UNIT 208/3 45 50 60/3 PANEL P1D 3/4"C, 3#8, 1#10 GND HP -4 HP -5 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1F 1/2"C, 2#10, 1#10 GND HP -5 HP -6 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1F 1/2"C, 2#10, 1#10 GND HP -6 HP -7 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL P1F 1/2"C, 2#10, 1#10 GND HP -7 HP -8 HEAT PUMP UNIT 208/1 25 40 60/2 PANEL PIF 1/2"C, 2#10, 1#10 GND HP -8 FCU -1 FAN COIL UNIT 3.3 208/1 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND FCU -1 FCU -2 FAN COIL UNIT 2.8 208/1 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND FCU -2 FCU -3 FAN COIL UNIT 1.2 208/1 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND FCU -3 FCU -4A FAN COIL UNIT 7.7 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -4A FCU -4B FAN COIL UNIT .64 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -4B FCU -4C FAN COIL UNIT 2.3 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -4C FCU -41D FAN COIL UNIT .64 208/1 Sm2 PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -41D FCU -5 FAN COIL UNIT .7KW 208/1 Sm2 PANEL PID 1/2"C, 2#12, 1#12 GND FCU -5 2ND FLR, W OF ELEVATORS FCU -6 FAN COIL UNIT .7KW 208/1 TS PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -6 3RD FLR, W OF ELEVATORS FCU -7 FAN COIL UNIT .7KW 208/1 TS PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -7 4TH FLR, W OF ELEVATORS FCU -8 FAN COIL UNIT .7KW 208/1 TS PANEL P1D 1/2"C, 2#12, 1#12 GND FCU -8 ATTIC AREA BEF-1 BATH EXHAUST FAN -ATTIC 2HP 208/3 10 30/3 SIZE 0 PANEL P1M 1/2"C, 2#12, 1#12 GND BEF-1 BEF-2 BATH EXHAUST FAN -ATTIC 2HP 208/3 10 30/3 SIZE 0 PANEL P1M 1/2"C, 2#12, 1#12 GND BEF-2 EF -1 EXHAUST FAN - CEILING .1 120/1 TS PANEL P1M 1/2"C, 2#12, 1#12 GND EF -1 EF -2 EXHAUST FAN - CEILING .2 120/1 TS PANEL P1M 1/2"C, 2#12, 1#12 GND EF -2 5 SPF -1 STAIR PRESSURIZATION FAN 5HP 208/3 17.5 30 30/3 VFD PANEL PIE 3/4"C, 3#10, 1#10 GND SPF -1 SPF -2 STAIR PRESSURIZATION FAN 5HP 208/3 17.5 30 30/3 VFD PANEL P1E 3/4"C, 3#10, 1#10 GND SPF -2 EPF ELEVATOR PRESS FAN 5HP 208/3 17.5 30 30/3 VFD PANEL P1E 3/4"C, 3#8, 1#10 GND EPF CEF-1 CORRIDOR SMOKE EXH FAN 7.5HP 208/3 25.3 40 60/3 VFD PANEL P1E 1 "C, 3#6, 1#10 GND CEF-1 PT -1 THRU WALL PTAC W/HEAT 3.IKW 208/1 19 20 ROOM UNIT PNL 1/2"C, 2#12, 1#12 GND PT -1 GUEST ROOM UNIT PT -2 THRU WALL PTAC W/HEAT 3.1 KW 208/1 19 20 ROOM UNIT PNL 1/2"C, 2#12, 1#12 GND PT -2 GUEST ROOM UNIT CU -1 SPLIT SYSTEM 208/1 25 40 30/2 PANEL P1B 1/2"C, 2#10, 1#10 GND CU -1 1 EDH-1 ELECTRIC DUCT HEATER 2.2KW 208/1 13.2 60 60/3 1 "C, 3#6, 1#10 GND EDHA AUX-1 AUX POOL AREA HEATER 30.OKW 208/3 104 110 200/3 MDP 1 1/4"C, 3#2, 1#8 GND AUX-1 DCU-1 POOL FAN COIL UNIT 208/1 6 15 Sm2 PANEL P1M 1/2"C, 2#12, 1#12 GND DCU-1 DHU-1 POOL DEHUMIDIFICATION UNIT 208/3 45 60 60/3 PANEL P1M 1 "C, 3#6, 1#10 GND DHU-1 RCP -1 I DOM HOT WTR CIRC PUMP 1.5HP 208/3 15 30/3 SIZE 0 PANEL P1M 1/2"C, 3912, 1#12 GND RCP -1 WH -1 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -1 WH -2 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -2 WH -3 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -3 WH -4 WATER HTR IGNITION UNIT 216W 120/1 PANEL P1M 1/2"C, 2#12, 1#12 GND WH -4 WH -5 WATER HTR IGNITION UNIT 216W 120/1 PANEL PIM 1/2"C, 2912, 1#12 GND WH -5 EWH-1 ELECTRIC WALL HEATER 1.5KW 120/1 15 P1M 1/2"C, 21#12, 1#12 GND EWH-1 EWH-2 ELECTRIC WALL HEATER 1.5KW 1 120/1 15 P1D 1/2"C, 2#12, 1#12 GND EWH-2 GENERALNOTES (APPLIES TO ALL EQUIPMENT LISTED IN SCHEDULE) A. THE ABOVE INFORMATION IS FOR A SPECIFIC MANUFACTURER. THE ACTUAL MANUFACTURER FOR THE EQUIPMENT MAYBE DIFFERENT. COORDINATE WITH MECHANICAL EQUIPMENT SUBMITTALS FOR ACTUAL LOADS, CIRCUIT AMPACITY AND OVERCURRENT PROTECTION REQUIREMENTS PRIOR TO ELECTRICAL ROUGH -IN. B. LOCATE ALL DISCONNECTING MEANS PER NEC AND AHJ REQUIREMENTS. STARTERS ARE SEPARATELY MOUNTED UNLESS OTHERWISE NOTED. C. ABBPEVIATIONS: HRS: HORSEPOWER RATED MOTOR DISCONNECT SWITCH WITH OVERLOAD PROTECTION, 16 -AMP MINIMUM, RED PILOT LIGHT. PROVIDE 1 -POLE OR 2 -POLE AS REQUIRED. Sn: MOTOR RATED TOGGLE SWITCH. TS: TOGGLE SWITCH, 16 -AMP MINIMUM, RED PILOT LIGHT. PROVIDE 1 -POLE OR 2 -POLE AS REQUIRED. D. ALL DISCONNECTS ARE 3 POLE UNLESS NOTED OTHERWISE. E. PROVIDE A ROOFTOP WEATHERPROOF GFI DUPLEX RECEPTACLE WITHIN 25 FEET OF ALL ROOF MOUNTED HVAC UNITS AS REQUIRED BY NEC. F. CONNECT FIRE SMOKE DAMPERS TO A 120VAC 20 AMP CIRCUIT ROUTED THROUGH A RELAY CONTACT (N.C.) IN THE FIRE ALARM CONTROL PANEL. REFER TO MECHANICAL DRAWINGS FOR ALL FIRE SMOKE DAMPER LOCATIONS AND QUANTITIES. PROVIDE ALL APPURTENANCES AS REQUIRED. PROVIDE DISCONNECT TOGGLE SWITCH WITHIN SIGHT OF THE DAMPER MOTOR CONTROLLER AND DAMPER MOTOR. SCHEDULE NOTES (APPLIES TOSPECIFIC EQUIPMENT AS NOTED IN "NOTES" COLUMN) 1. PROVIDE 1/2"C, 4#14 FROM OUTDOOR UNIT TO POWER FRACTIONAL HP INDOOR UNIT FAN - PROVIDE 2 POLE TOGGLE SWITCH DISCONNECT 2. CONTROLS BY DIVISION 23 CONTRACTOR. 3. PROVIDE MOTOR RATED TOGGLE SWITCH, NEMA 3R ENCLOSURE 4. FURNISH DUCT SMOKE DETECTOR(S) FOR INSTALLATION BY DIVISION 23 CONTRACTOR. HVAC UNITS OVER 2,000 CFM TO HAVE DUCT DETECTOR IN RETURN AIR DUCT. UNITS OVER 15,000 CFM TO HAVE DUCT DETECTORS IN RETURN AND SUPPLY AIR DUCTS. COORDINATE WITH DIVISION 23 FOR QUANTITY REQUIRED. PROVIDE CONNECTION AT THE HVAC UNIT FOR SHUTDOWN ON ALARM. PROVIDE CONNECTION TO THE FIRE ALARM CONTROL PANEL AS REQUIRED. ALL WIRING TO BE IN EMT CONDUIT. 5. PROVIDE SWITCH NEXT TO RESTROOM LIGHT SWITCH. 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 "M Consulting Electrical Engineers 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 MW Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA Sheet Title: REVIEWED .FOR COMPLIANCE U?7kNEL SCHEDULES RIFPA 70 - RIEi SEP 2 6 2016 City of -Tukwila RECEMBUILDING DIVI CITY OF TUKWILA SEP 12 2016 PERMIT CENTER SheetNumber: ............. . .......... . ................ ...... .. ............ . . ............ ................. ....... ... ............. . .......... . ................ ...... ................. ....... .......... - -- ------------------------- . ...................................................... -3 > PJ'A-3 M MDP �X, DHU P 1 M -27,29 :X . ... ... X** �H A, >f ;X: X. AUX_�i X ROD: �x, "s", �1.111, ;< i".. / I 1� :- 41 > < Ix, A K? >< X PlAH >/ ...................................... . ... . . . .. s�., . .... .......... J ................................. ........... ...................................................................................................................... > .......... ........ ................ .... . ......... ...... ........... - - -- ------- ...... . .............................. .......... ----- - - .:::: :; . ........ . ...... . . . �FCU:::T 4 - : ................ ......... ....... . .... IA OP, -36 _F *X X Pli M . ........... ................... ".. . ..%. '; '>.': `x'. _.. � 111�=] .................................................... .. . ........................ ....... ................... ...... ...... .......................... ...... ......................... . ................... X X . "K. < P; A43 EF -_1 X. 777 J El -2- .......... X, K < < > . . ... ... .. dd "s' X. X" L -3 4. ......... -J, 4 >; -H P PIA X 1A.3,2, ......... . . ... Y. W P x -7 ............ X 'X L '34 36 >< .................................. �f .................. . ..... ..... . ............. ............. i -HP-f.. .... . . . .................. ; ....... ........ .......... ............................... ............ PlA-5cNs -5,7 -26 'PlA VP P 1 M -27,29 PIM -30 IM P OP18-4 ...... . ........ . ............ ................ ................... H -5 PlA-5 #10 ........... ............. ........................... 1A-8,10,12 P 1 A-20,22,24 .......... ............... ... ....... . . . . . . . . . . ..................... ........... 2 :A: 2, . ..... .... . . . ...... . . ...... ........ ......... . ... . . . . . . ...... . ... ........ ..... ......... . ............. ................ ....... ...................... '01; T: N G, 0,0 M ....... .............................. . . ..... PM -15,17 -2,4, PlA-14,16,18 PlB-44 A PlA . ... . . ..... . .. . ... PlA-7 . ........... ............... ....... . . ....... V2 # 1,b iWP ........... ....... ................. IEEE) PG1 ............. ...... ........... .......... ......... .. ... ............. . .... .. ................... . ................ PG2 P 1 M -27,29 ......... PG3 .......... ........ . ...... F FCU -2 B-6 ............. ....... .. G5. . ....... FG5 ............... ; . . .. .. ........ ... .. .. ... ... ........................... . ........................ ............... .............. ................ ...... ....... .................. MP1 PG4 ...................... ..... ....... ........ .................. .... . .... "I—__ . .......... . ................ .......................... P113 -25,27 P113-1 f '*PlA PG6 -11 13 ............ 1.1 . ........ �i PlA .......... PI.B-14* . . ............ ............................. ......... ........................ PiB; P1,8- 12 s> PG7 10P113-6 Pic .................... ............................. PlA-1 PIC 15 PG8 a � ............. ...... LCP .......... ................................ ........ . ............ .......... . ......... ................ PG9 . . ................... .................... ............................................... .................... . .. . ...... ..... .......... N PiA-13 ...................... ........... . . ........ . . ................................................ ................. ... . ....... .............. P1 B-8 H ................. �G ......................................... ............... ................ ... ........ ....... .... . .... ..... . ....... .................. . ......... ............. .... I ................. ..... ....... i i i P lt�_4z ........... ........ -- - - ------- ....... ..... ................... . ..... .................. . .. ....... ..... ............ ..... ... ................. ..... ... . ......... .. . ....... ... ...... ............ .............. ........................... P1B- ................. 0-18 20 1301 ......... . .. . .. 11A-21 api .. ....... .......... lei 17 .......... R ........... .......... .......................... .... .......... . . . . - - - P16-22,24 PlA 15 PIA X .s......... . .............. . ... ............. . ... ... ... . ....... .. .................. .......................... .. ... ............ E_ 10 PlA . . . . . . . . . . . . . . . . . . . . . . . P 1 B -16 J — . .. I'll. .......... PIA -19 2' H . ...... 6 P I ........... 0,22 P -2 ............ ........... ; j: ; ii�. � 1 .......... ................................................... .................... ................ P1134-�28 ......... . ... ............. .. ..................... ............... .......... ............ .. MAKU . . ..... < 1 El -3 TV 1 c 0. PlD-18 PlB-11 .......... . . ....... . -21 PlD-2 ..... ...... . ......... ... . ..... . .......... .......... .......... .......... .......... .......... .......... .......... .......... ... ......... .. ..... / , . ...... ....... .......................... ....... ......................... ....... ........ ............ .... ............................ . .... .......... .............. ............... ..................... P1D ........... ........... ...................................... .. ....... . .......... .......... .......... .......... .......... ........... .......... ......... ............. :X ......... .......... . ... ..... .............. ..... ..... .......... ...... PlD-2 P113-9 .................... ......... * ......................... X ..... ........... ......... ............... -4 ........... . ...... H Abpl B-9 pio ............... . ...... .... .............. ............... . .......... .... ...... ............ . ........ .... . . . . .. ......................................... OPM-1 4DPI -10 D F I............. B I *Plb-3 1 B FC -413 .............. P 1 . .... ..... L _J 2 P1 PlDL17 ....... .................... ... ....... .................. s.... ................ .. .... ....... ........... .............. ....... .......................... ....... ................... ..... ....... .......................... ....... ........................ ....... .......................... ....... ..................... ....................... ....... ........... ....... ......................... ............. . ....... ...... . ............ I . %. ..., ............ ............ .......... . ..... .. .......... ....... ..... X ................. P 1 6-� 2 d, PlD-2 ............. .......... ............ .................... PlD-4 *Pib 7 P11-19 ............ P 1 D-20,22.1i,;:s:::,!! ...... . ......... PlD P10-9 ... . ... .... ............. ........... Inc .......... . Li cf, Pip CR > . . ........... ............... ....... . .. ... ............. ............... . ........... X Pi 0. ..... ... H 12 ................... ................ . ............. P ................. P1 D-26,28,30 ................... Pi B PlD-14 P 1 B-3 .......... ........ X ................ ......... ...... ........ ..... . . . ...... ....... ... ............................... . ... ........ ......................... .................. ............ �P L ....... ..... ........ ................. ....... .... . ....... ..... ...... ... .................... 92. ............. ............... ....... .......................... . ...... ..... .... ...... ............ . . .......... ............. ..... ............................ ........ ... .. ..... .. . . ..... ....................... .... ........... ........ ... ...................................... ..................................... .......... ............ . .................... .................... . ............. ... .. . ...... P 1B F .................. ....... ......................... ....... ......................... ....... ........................ ... ......... ........ HP -4 ............... f', -5 P11 B P18-1 .......... ........ .......... .......... .... .... .......... .......... ......... ..... ......... ..... I ........... ................. .................................... ........... . ..................................... ....................... ..................................... " ............ . .... . ....... ............ ............. ; K ............... ..... ....... .................. _< . ........ .............. . ....... ............... < K . ......... .............. ....... ............ .................................. ....... .............. < ............. ... .......... ... *.1111111.1.1.1.7.1 ......... 11 ........................ ............. . . . ....................... ........... .................. ........................... 7.7.7.*.' ................................. .... ...... . ... .......... . .... .............. ......... ........... .......................... ................... . . ....... .............. ..... ........... ...... . ............... ............. ...... .......... ... .............................. ............ . ... . .... . .... ............. %. .... . ........ . ... . ....................... . ..................... ............................................... ....... . ...... ....................... .. . ..................... ............... ........ . . ..... .......... .............. ............... ..... ...................... 9 L 5) 2_ ......... ..... PAE�2 ............... ........ .......... .......... . ... ............................................................. .................. * ... . ... ... .......... ............................. . ......... ...... . .. . ....... "'I ........... . ................ ............. ..................... ....... .................................. ............................................. ......................................................... ...................................................... .................................. :: ....................................................... ...................................................... ......................................................................................... .............................................. ........................ .................. ...... ..... ............ .................................. I ST FLOOR POWER/COMMUNICATIONS PLAN SCALE: 1/8" = V-0" a F WOR, 4 COMPLIAN P. ITH NFPA 70 - NEC SEP 2 6 2016 QtY of -TuWla BUILDING DIVISION ............... RECEIVED -ry nc T"IM A 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn Express Tukwila, WA Title: ILEVEL 1 POWER & COMMUNICATIONS PLAN tot SEP 12 2016 Designed By: RB PERMIT CENTER Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: ................ ...... - -- ------------------------- . ...................................................... -3 > PJ'A-3 M MDP �X, DHU P 1 M -27,29 :X . ... ... X** �H A, >f ;X: X. AUX_�i X ROD: �x, "s", �1.111, ;< i".. / I 1� :- 41 > < Ix, A K? >< X PlAH >/ ...................................... . ... . . . .. s�., . .... .......... J ................................. ........... ...................................................................................................................... > .......... ........ ................ .... . ......... ...... ........... - - -- ------- ...... . .............................. .......... ----- - - .:::: :; . ........ . ...... . . . �FCU:::T 4 - : ................ ......... ....... . .... IA OP, -36 _F *X X Pli M . ........... ................... ".. . ..%. '; '>.': `x'. _.. � 111�=] .................................................... .. . ........................ ....... ................... ...... ...... .......................... ...... ......................... . ................... X X . "K. < P; A43 EF -_1 X. 777 J El -2- .......... X, K < < > . . ... ... .. dd "s' X. X" L -3 4. ......... -J, 4 >; -H P PIA X 1A.3,2, ......... . . ... Y. W P x -7 ............ X 'X L '34 36 >< .................................. �f .................. . ..... ..... . ............. ............. i -HP-f.. .... . . . .................. ; ....... ........ .......... ............................... ............ PlA-5cNs -5,7 -26 'PlA VP P 1 M -27,29 PIM -30 IM P OP18-4 ...... . ........ . ............ ................ ................... H -5 PlA-5 #10 ........... ............. ........................... 1A-8,10,12 P 1 A-20,22,24 .......... ............... ... ....... . . . . . . . . . . ..................... ........... 2 :A: 2, . ..... .... . . . ...... . . ...... ........ ......... . ... . . . . . . ...... . ... ........ ..... ......... . ............. ................ ....... ...................... '01; T: N G, 0,0 M ....... .............................. . . ..... PM -15,17 -2,4, PlA-14,16,18 PlB-44 A PlA . ... . . ..... . .. . ... PlA-7 . ........... ............... ....... . . ....... V2 # 1,b iWP ........... ....... ................. IEEE) PG1 ............. ...... ........... .......... ......... .. ... ............. . .... .. ................... . ................ PG2 P 1 M -27,29 ......... PG3 .......... ........ . ...... F FCU -2 B-6 ............. ....... .. G5. . ....... FG5 ............... ; . . .. .. ........ ... .. .. ... ... ........................... . ........................ ............... .............. ................ ...... ....... .................. MP1 PG4 ...................... ..... ....... ........ .................. .... . .... "I—__ . .......... . ................ .......................... P113 -25,27 P113-1 f '*PlA PG6 -11 13 ............ 1.1 . ........ �i PlA .......... PI.B-14* . . ............ ............................. ......... ........................ PiB; P1,8- 12 s> PG7 10P113-6 Pic .................... ............................. PlA-1 PIC 15 PG8 a � ............. ...... LCP .......... ................................ ........ . ............ .......... . ......... ................ PG9 . . ................... .................... ............................................... .................... . .. . ...... ..... .......... N PiA-13 ...................... ........... . . ........ . . ................................................ ................. ... . ....... .............. P1 B-8 H ................. �G ......................................... ............... ................ ... ........ ....... .... . .... ..... . ....... .................. . ......... ............. .... I ................. ..... ....... i i i P lt�_4z ........... ........ -- - - ------- ....... ..... ................... . ..... .................. . .. ....... ..... ............ ..... ... ................. ..... ... . ......... .. . ....... ... ...... ............ .............. ........................... P1B- ................. 0-18 20 1301 ......... . .. . .. 11A-21 api .. ....... .......... lei 17 .......... R ........... .......... .......................... .... .......... . . . . - - - P16-22,24 PlA 15 PIA X .s......... . .............. . ... ............. . ... ... ... . ....... .. .................. .......................... .. ... ............ E_ 10 PlA . . . . . . . . . . . . . . . . . . . . . . . P 1 B -16 J — . .. I'll. .......... PIA -19 2' H . ...... 6 P I ........... 0,22 P -2 ............ ........... ; j: ; ii�. � 1 .......... ................................................... .................... ................ P1134-�28 ......... . ... ............. .. ..................... ............... .......... ............ .. MAKU . . ..... < 1 El -3 TV 1 c 0. PlD-18 PlB-11 .......... . . ....... . -21 PlD-2 ..... ...... . ......... ... . ..... . .......... .......... .......... .......... .......... .......... .......... .......... .......... ... ......... .. ..... / , . ...... ....... .......................... ....... ......................... ....... ........ ............ .... ............................ . .... .......... .............. ............... ..................... P1D ........... ........... ...................................... .. ....... . .......... .......... .......... .......... .......... ........... .......... ......... ............. :X ......... .......... . ... ..... .............. ..... ..... .......... ...... PlD-2 P113-9 .................... ......... * ......................... X ..... ........... ......... ............... -4 ........... . ...... H Abpl B-9 pio ............... . ...... .... .............. ............... . .......... .... ...... ............ . ........ .... . . . . .. ......................................... OPM-1 4DPI -10 D F I............. B I *Plb-3 1 B FC -413 .............. P 1 . .... ..... L _J 2 P1 PlDL17 ....... .................... ... ....... .................. s.... ................ .. .... ....... ........... .............. ....... .......................... ....... ................... ..... ....... .......................... ....... ........................ ....... .......................... ....... ..................... ....................... ....... ........... ....... ......................... ............. . ....... ...... . ............ I . %. ..., ............ ............ .......... . ..... .. .......... ....... ..... X ................. P 1 6-� 2 d, PlD-2 ............. .......... ............ .................... PlD-4 *Pib 7 P11-19 ............ P 1 D-20,22.1i,;:s:::,!! ...... . ......... PlD P10-9 ... . ... .... ............. ........... Inc .......... . Li cf, Pip CR > . . ........... ............... ....... . .. ... ............. ............... . ........... X Pi 0. ..... ... H 12 ................... ................ . ............. P ................. P1 D-26,28,30 ................... Pi B PlD-14 P 1 B-3 .......... ........ X ................ ......... ...... ........ ..... . . . ...... ....... ... ............................... . ... ........ ......................... .................. ............ �P L ....... ..... ........ ................. ....... .... . ....... ..... ...... ... .................... 92. ............. ............... ....... .......................... . ...... ..... .... ...... ............ . . .......... ............. ..... ............................ ........ ... .. ..... .. . . ..... ....................... .... ........... ........ ... ...................................... ..................................... .......... ............ . .................... .................... . ............. ... .. . ...... P 1B F .................. ....... ......................... ....... ......................... ....... ........................ ... ......... ........ HP -4 ............... f', -5 P11 B P18-1 .......... ........ .......... .......... .... .... .......... .......... ......... ..... ......... ..... I ........... ................. .................................... ........... . ..................................... ....................... ..................................... " ............ . .... . ....... ............ ............. ; K ............... ..... ....... .................. _< . ........ .............. . ....... ............... < K . ......... .............. ....... ............ .................................. ....... .............. < ............. ... .......... ... *.1111111.1.1.1.7.1 ......... 11 ........................ ............. . . . ....................... ........... .................. ........................... 7.7.7.*.' ................................. .... ...... . ... .......... . .... .............. ......... ........... .......................... ................... . . ....... .............. ..... ........... ...... . ............... ............. ...... .......... ... .............................. ............ . ... . .... . .... ............. %. .... . ........ . ... . ....................... . ..................... ............................................... ....... . ...... ....................... .. . ..................... ............... ........ . . ..... .......... .............. ............... ..... ...................... 9 L 5) 2_ ......... ..... PAE�2 ............... ........ .......... .......... . ... ............................................................. .................. * ... . ... ... .......... ............................. . ......... ...... . .. . ....... "'I ........... . ................ ............. ..................... ....... .................................. ............................................. ......................................................... ...................................................... .................................. :: ....................................................... ...................................................... ......................................................................................... .............................................. ........................ .................. ...... ..... ............ .................................. I ST FLOOR POWER/COMMUNICATIONS PLAN SCALE: 1/8" = V-0" a F WOR, 4 COMPLIAN P. ITH NFPA 70 - NEC SEP 2 6 2016 QtY of -TuWla BUILDING DIVISION ............... RECEIVED -ry nc T"IM A 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn Express Tukwila, WA Title: ILEVEL 1 POWER & COMMUNICATIONS PLAN tot SEP 12 2016 Designed By: RB PERMIT CENTER Drawn By: MB Project No: 16195 Date: 09/07/2016 Sheet Number: .. .......................... ...... .......................... ....... .........5...............;....... ...... ................ ......... ....... ......... ... .. ....... .................. P 1 E-20' .......... ......................................... ....... ............ ........ ... ....... ................ .... ...... .......................... ....... .......................... ....... ......................... ....... .................. ..................................... ............................................... . ..... .... 22 ......................... ........................ .......................... ....... ........... .............. ....... ......................... .... ...... ........... ........ .... .............. ......................... DIX. . . ...... .1 BE I'll, R 0 0 M 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ;;P I E-18 ...... ................ ......... ....... ................. ...... ....... ............. P 1 E-20' .......... ......................................... .... ... .... ........... ......... .... 01 x ....... ......... DIX j L --- I .... .... .... ... LJ F4 ..... "" ........ ..... ..... ......... ....... .............. . ..... . ........ . . .... .... ............. . ..................................... ..... . ...... 0.7 "V ...... ...... . bi ............ ,1_1 T1 ........... ..... .... .. 1 X............ ...... .... Dix ............ ..... .. .. .. . .. .. . tet .......... ................ L 2�2 ... .......... laxi 9 ................. ................. .M 9 22 22 22 ..... ..... . 55 :x 07 07 bix D1 DIX D1 DIX A. .... ...... I D I x 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ............. ....... ......................... ....... .... '1U P 1 E-20' .......... ....................... ....... ................ .................... ...... ... J .................... ...... F4 F4 X1 22 1, D ..... ...... ............. `:' ................ ................. 0.7 ...... ...... . bi ............ ...... ........... ..... .... ............ ........... '6: .......... ................. ................. .M -1-1-111 ..... ..... . 55 :x .... ...... I D I x ...... ....... . ........... . ................. ...... ...... ................... ....... ... ..................... ....... ....................... ... ............ ....... .................. . ........... @7 ....... ............ ... ......... .......................... ...... .......................... ....... ... ........... D 1 HA f I IMiri S -nr. 55 ................ .............. Dix .......... . . ... .. ......... ...... .... ........ ....... ................ ...... .... . . . . . . . . . . . . . . . ..................... 44 ... ....... ......................... ...... ......... j . .. ... .. .... 07 .... ..... .... I M. ... 01 ............... U:": DOis ..... ..... 22 [jMx1 H .............. ................................... 022 ................... .... ......................... ...... ... ...... ................ D In ........... ? 07 QUALL ............... D1 M .......... . M:.. 55. ... .......I . 22 Xl [K] . .. ................ .... .. —'..3 .............. ....... .... .... . . .............. . ....... """, ....... . ........ ............ .................... .... 55 ...............=t Dix. ........... ..... . ........... ....... . . 07 D1 .. . ........... ............ ........... ....... ..................... ... ... . ... ....::»v. . .... ........... F3 . ....... .......................... ....... ............ 7a 7a F3 22 D x 'H K . .. . . .............. 5 .................. 7 ............... ............. I ................... ....... --- 07 51 ................. . .. . D1 . ........... . ... ... ... . ............ .......... ..J.. . ......................... ....... ............... . ................. is ' .....................................................................................................,.>. . ......................... ........... ............ . 22 0 . ........ . . ... .. 22 00 7,. 07 0 DIX DOI D1 DIX ............. 23 _2 ............. ..... ...... .............. 22 22 22 22 )7 0 1: 07 D1 07 07 'I DIX D1 DIX x I Dix D1 DIX 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ............. ....... ......................... ....... .... '1U ....................... ....... ................ .................... ...... ... J .................... ...... .................. ..................... ....... ........... ..... ...... 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Holiday Inn Express ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' ........:.,... f S S f � i MECHANICAL I : BUILDING DIVISION �T CONNECTIONS RECEIVED PLAN CITY OF TUKWILA f , PERMIT (:ENTER 5 f ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' S f S S f � MECHANICAL I : BUILDING DIVISION �T CONNECTIONS RECEIVED PLAN CITY OF TUKWILA SEP 12 2016 PERMIT (:ENTER 5 Drawn By: MB Project No: 16195 Date: 09/07/2016 i iii : ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' S f S S f ATTIC AREA MECHANICAL City of Tukwila : BUILDING DIVISION �T ATTIC AREA MECHANICAL CONNE SCALE: 1/8" = 1'-0" 1165 Columbia Park Trail Richland, Washington 99352 Phone: 509-366-9723 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Holiday Inn Express Tukwila, WA REVIEWED FlDt' COMPLIANCE W14--. NEPA 70 m NFr, Sheet Title: SEP 2 6 216 ATTIC AREA MECHANICAL City of Tukwila BUILDING DIVISION �T CONNECTIONS RECEIVED PLAN CITY OF TUKWILA SEP 12 2016 PERMIT (:ENTER Designed By: RB Drawn By: MB Project No: 16195 Date: 09/07/2016 .............................. ....... .......... ... ........ .... ................ ...... ............ ................. ....... DIX DI ..................... ...... .............. . ........ PIE: 16 ....... ... I. ......... .................... . . .......... ........... PlE-16 .............. D1 IF I X xi ........... F21 . .... 4 PlE-16 .............. F21 F21 ............ .......... .......... .... �.s ............... D1X .. . ........ .................. ............ ....... . ........................ ........... . ........... F3 F1 APPROXIMATE LOCATION ON EXTERIOR FACE OF BUILDING FOR ILLIMINATED SIGN. VERIFY EXACT SIGN LOCATIONS, ELEVATIONS AND CONNECTION REQUIREMENTS WITH SIGN SUPPLIER PRIOR TO ELECTRICAL ROUGH IN. . . . . ... . . .. ... 4 14: 2 IPlE-14 .......... ............ D1 Dix D1 GENERAL LIGHTING CONNECTION NOTES 04 40 ........... ...................... ........... ............ .. . ............ ....... ... ... .......... ...... . . ... ..... ... ....... ................ ....... ... ................ ... ............... ....... ......... . ..... ...... I.. . .... . . ............. .................. . .............. . . .... ..... . . . . . . . . . . . . . . . I ............... ...................... .......... .............. ...... . . ........ ........... .......... ..... .......... .......... . ........... F1 i F1 F1 F3 _F F1 F1 Ul8 -14 DIX IPIE 23 23: 236 25 81 0 .. .......... ... ........... ...... . ....... . ......... ........... ........... ..................... .......... .... .......... ... hl'i 8 8jj F1 F1 . . . ......................................... Dix ........... . .... . 14 ... .......... . ........ ... IPlE-14 ................ ......... . ............ ........... ... ......... .. ............. ........ .. . .. ........... . ..... . . ............ I I ........... ...... . ......... .............. P? S: ............................................ ............ ..................... . . .................. . ....... FIX F1 F1 23b Z3 23 i Dix SX, Fi F1 X i F1 ! i ............. .. ......... ... ...... ........ . Pill ..... ..... . .............................................. 4 ........... - ........... ........ ............ . . . ........... ..... ...... . ......... ... .... .. I .......... ....................... ...... ........... ....................... ........... .......... < ......... 1 PIE -1 S D1 .......... ........................................ ............ .. ..... ... . ............... ....... ...... .. ................ . . ..... .............................. F .... ............. ........... ........ ....... ....... . P E-14 N . . ........ .. ....... P1 - 8� 'PlE-18�, ...... .... .......... .................... ...... ........ . ........ .... ........ .. ............... ..................... . ....... ... .................. M ............. .......... . ............ . ............ .............. 4 8 1V 0 F3 0 *� . ............... F Dix Dix DIX 8 I............ T1 > ............... ... ..... . ..... . .... . ......................................... .. ........... . D 1 .................... 8 14 PIE- ........... ................. ..... . .......... .. ....... :% I .............. ...... . ....... . F01 F2 ........................................... ........... . I N18 ...... ..... ............. ................ .......... 8/R2o 8/R a X , `/ m 0 ......... ........... 2.J ........... .......... d R2 D1 ..,2 DW DWEI.FVAM� �TlE -1 8' D 1 DIX D 1 .......................................... Hi ik L J. � :: TWR D1X PlE-14 F3 xi.. ...... . . J 045 a 40 0, R2a F3 P 1 E- 1 8,' PlE-14 DW 8/ 2c I. ....... .... Qu 10241 On 12 94 DW >/ 4 . ....... D1 D I . .. . .. ....... ... . . .. . .. . . �§ I " ................................ ..................................................................... .. ........ .......... . .. ........... i ............ D1 ............. s x ......P'IE-14 !86R2a (94 8/R2c FIXTURE TYPE (TYPICAL) 8/R2a 8/R2a 8/R2a 8/R2a 8/R2a n no 0 PlE-14 D 1 8/R2C 1 0 Pil�_140 4@ .......................................... : .. ........ D I X Dix D1 T X1 i i� R 11 I � E . : PTE., 4 04 GP1E-14 GME -14 DIX DW DW DW DW DW e ..... ........... .......... .......... .......... ....... ..... ..... ....... X1 I .......... .......... .......... .......... ... .......... ........... D 1 D 1 DIX D 1 .. ........ ..................... ...... .......................... ......................... xi ........................ ....... ......................... ....... ......................... ....... .......................... ....... ............... .......... ..................... ........... PIE-14 EPCJ ............... I.......... .......... ....... ..... ........... ........... ... E*::� 1 4 PIE -1. -14 PfE 14r Mli J ......... . . ........ . .......... ...... . . . . .... 2 .......... .......... .......... .......... ......... 010 PIE Pi .... .... I ...... ...... VS D D . ................ 010 0 0 .21 /R4c X, .......... :1 12 6P1E 010 01 010 �,2 x GP1E-14 .. ............. Dix ................ JX DIX D 1 012 012 f - 1 DIX Di 0 21 /R� .......... DIX ................... D I'll', Dix D 1 D 1 F2 021 /R4c 021 /R4c DW DW D2 D2 .... . ..... YPICAL) 10 12 D1 D1 012 0 D2 12 F1 LCP CONTROL RELAY (T iiO PlE-14 PANEL P1C CIRCUIT (TYPICAL) 12 D 1 D 1 12 DW I12 012 @12 .......... 010 DW ! OP 4 @10 109 10 d ........... ..... .... 010 12 012 . ......... Di D I 1 D 2 D I DIX X. (§)l D1 Di 0 12 Dix D�/ > D I D I Di bw EO ............. 021 /R4c 021 /R4c 021 /R, 12 012 410 010 012 F1 DW ....... ....... ... ........... ............. ....... ....... ....... P.1 . ....... .... D.1 'P1 EL:�',14 .............. ...... ............... ... ME -1-4 ......................... 4';-_- .................. ... P 1- El"f4w., 010 ja , 10 7� .......... ............ -PTE T ............. :. �, DW F1 D2 D2 D2 ............... f1__-----..,........:..� . ....... ..... �r .......... f01-27h_@T2_g PlE ............... 12h ............. r ii -2 2p I ! �eo I OW 12m @10 �Dl DI X 2�_P! 12k ............. /* DIX x D 1 )< D1X!' D1 Dix D1 12h (01 2q D 1 D 1 .... ........ j ............. ... ; 0 1 I x x I*, 12 -14 X W DW PIE 12 12 12 01 2g 0 12g .......... D1 DW DW � AIrl @21 /R4c @21 /R4c (D21 /4 ......... . .......... D1 D1 PIE -1, ix D 12 N D2 D2 21) .................. @11 2m . 10 010t. 110t i0loy 1010X ........... .... @ �0, I O IX D2 DW DW 11 01ox ............................................. D1 DI -@"F 0�12e DI ..................... ....................... D 1 D 1 D D1 ==bi D1 ............. DW i�� DW 012i en,o�p,q F1 F1 P i ............ b 12 1 2f D I 02- I�x D1 D1 nc DI @12j —e,ftglh 12 012e 012f ............ D 1 D 1 PlE-14 1E-1 W 12 12e 021 /R4c 021 /R4c 021 /R4 . ...................... 2 X 1 OVO ..1 2i' X2 ...... ........ OlOr 1 2i f 12 K D2 D2 .Ci 01 2n OlOr ov @> 11 5 D2 r%1 r%1 ni r%1 r% V %�v R W X REVIEWEDFOR COMPLIANCE WITH NFPA 70 - NEC SEP 2 6 2016 City of -TukWila BUILDING DIVISION 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn of Express Tukwfla, WA Sheet Title: LEVEL 1 LIGHTING PLAN L) I U-1 U I i U ........ . . . . . . � . . . . . . . . . . . ... ... ... .......... . . .... ................... ... ... ........ ....... ....................... .... ....... ..... ............ ........ ...... ................... .............. ... ... ........... ........... 1 DW.., .................................. .............. ... ...... ....... .............. .............. . . . . . . . . . . . ......... .............................. .................. I I . ........... i ............ 1 /R4c ................ . ......... .......... ........... I § �; � I f .: ...................... ....... ....................... ....... ......................... ....... .......................... ...................................... .................................. . ..... ........ . . .......... ........ ............. .............. .... ...................... .................... . . . . . . ..... ........ ................ .... .......................... ....... ............... C: i'-, RECEIVED ................. C— 13 ; .... .......... .......... .......... .......... .......... ....... .......... .......... ......... ........... ..... . ........... ............... .......... "',-'CITY OF TUKWILA .............. .......................................... ......... ....... .......... . ........ . .................... ....................... ............... .................. ................ ... .................................... ........................................ :,.� ........................ .................................. .................... . . . . ... ....... ..... ..... .... . ..... . ....... ............... ....... ..... / ........ ... . ........ .............. . ....... 1; ................ ..... ... .... .......... ; ................. . . ....... . ............... ........ .......... ............. ...................... ................ .... ....... . ... ..... . �e .............. ............ ............ .............................. .. . . ................... ............ ................. ........................ . . ............... .......... ........... ............................. ... . .............. . ..................... Pl� 1 5 Designed By: RB ............... ........... ..... . . .... .. . ....... . ....... . .............. ........ ..... ......... ................... . ............... . ...... . ... ............... ... ....................... I ............. .......................................... ...... :,. . ............ ............... ........ . ...... . ......................................... ........... ................ .................. ...... . ... ... .............................. .............. ........... . ....... ............... ........... ... ........ SEP 12 2016 MB Drawn By: PERMIT CENTER Project No: 16195 .............. .............. --- — ------- ;, ; --;- .......... I ..... ....... . ................ . ......... ........... . ......... .......... .. .............. ............ .. . .. ......... ............ 1'e_!.-.-111:1_, I........... .......... . .. . ..... . ..... ............................................. : ............. : ................. . ..................... ...................................................... ...................................................... ................................................ .......................................... .................................................................................................................................................. .............................. ...................................................... ....................................................... ..................................... ............ ........................ ............ ............... ............. .. . ...... .............. ............... ............. ................ .......... ................ ...... DIX DI ..................... ...... .............. . ........ PIE: 16 ....... ... I. ......... .................... . . .......... ........... PlE-16 .............. D1 IF I X xi ........... F21 . .... 4 PlE-16 .............. F21 F21 ............ .......... .......... .... �.s ............... D1X .. . ........ .................. ............ ....... . ........................ ........... . ........... F3 F1 APPROXIMATE LOCATION ON EXTERIOR FACE OF BUILDING FOR ILLIMINATED SIGN. VERIFY EXACT SIGN LOCATIONS, ELEVATIONS AND CONNECTION REQUIREMENTS WITH SIGN SUPPLIER PRIOR TO ELECTRICAL ROUGH IN. . . . . ... . . .. ... 4 14: 2 IPlE-14 .......... ............ D1 Dix D1 GENERAL LIGHTING CONNECTION NOTES 04 40 ........... ...................... ........... ............ .. . ............ ....... ... ... .......... ...... . . ... ..... ... ....... ................ ....... ... ................ ... ............... ....... ......... . ..... ...... I.. . .... . . ............. .................. . .............. . . .... ..... . . . . . . . . . . . . . . . I ............... ...................... .......... .............. ...... . . ........ ........... .......... ..... .......... .......... . ........... F1 i F1 F1 F3 _F F1 F1 Ul8 -14 DIX IPIE 23 23: 236 25 81 0 .. .......... ... ........... ...... . ....... . ......... ........... ........... ..................... .......... .... .......... ... hl'i 8 8jj F1 F1 . . . ......................................... Dix ........... . .... . 14 ... .......... . ........ ... IPlE-14 ................ ......... . ............ ........... ... ......... .. ............. ........ .. . .. ........... . ..... . . ............ I I ........... ...... . ......... .............. P? S: ............................................ ............ ..................... . . .................. . ....... FIX F1 F1 23b Z3 23 i Dix SX, Fi F1 X i F1 ! i ............. .. ......... ... ...... ........ . Pill ..... ..... . .............................................. 4 ........... - ........... ........ ............ . . . ........... ..... ...... . ......... ... .... .. I .......... ....................... ...... ........... ....................... ........... .......... < ......... 1 PIE -1 S D1 .......... ........................................ ............ .. ..... ... . ............... ....... ...... .. ................ . . ..... .............................. F .... ............. ........... ........ ....... ....... . P E-14 N . . ........ .. ....... P1 - 8� 'PlE-18�, ...... .... .......... .................... ...... ........ . ........ .... ........ .. ............... ..................... . ....... ... .................. M ............. .......... . ............ . ............ .............. 4 8 1V 0 F3 0 *� . ............... F Dix Dix DIX 8 I............ T1 > ............... ... ..... . ..... . .... . ......................................... .. ........... . D 1 .................... 8 14 PIE- ........... ................. ..... . .......... .. ....... :% I .............. ...... . ....... . F01 F2 ........................................... ........... . I N18 ...... ..... ............. ................ .......... 8/R2o 8/R a X , `/ m 0 ......... ........... 2.J ........... .......... d R2 D1 ..,2 DW DWEI.FVAM� �TlE -1 8' D 1 DIX D 1 .......................................... Hi ik L J. � :: TWR D1X PlE-14 F3 xi.. ...... . . J 045 a 40 0, R2a F3 P 1 E- 1 8,' PlE-14 DW 8/ 2c I. ....... .... Qu 10241 On 12 94 DW >/ 4 . ....... D1 D I . .. . .. ....... ... . . .. . .. . . �§ I " ................................ ..................................................................... .. ........ .......... . .. ........... i ............ D1 ............. s x ......P'IE-14 !86R2a (94 8/R2c FIXTURE TYPE (TYPICAL) 8/R2a 8/R2a 8/R2a 8/R2a 8/R2a n no 0 PlE-14 D 1 8/R2C 1 0 Pil�_140 4@ .......................................... : .. ........ D I X Dix D1 T X1 i i� R 11 I � E . : PTE., 4 04 GP1E-14 GME -14 DIX DW DW DW DW DW e ..... ........... .......... .......... .......... ....... ..... ..... ....... X1 I .......... .......... .......... .......... ... .......... ........... D 1 D 1 DIX D 1 .. ........ ..................... ...... .......................... ......................... xi ........................ ....... ......................... ....... ......................... ....... .......................... ....... ............... .......... ..................... ........... PIE-14 EPCJ ............... I.......... .......... ....... ..... ........... ........... ... E*::� 1 4 PIE -1. -14 PfE 14r Mli J ......... . . ........ . .......... ...... . . . . .... 2 .......... .......... .......... .......... ......... 010 PIE Pi .... .... I ...... ...... VS D D . ................ 010 0 0 .21 /R4c X, .......... :1 12 6P1E 010 01 010 �,2 x GP1E-14 .. ............. Dix ................ JX DIX D 1 012 012 f - 1 DIX Di 0 21 /R� .......... DIX ................... D I'll', Dix D 1 D 1 F2 021 /R4c 021 /R4c DW DW D2 D2 .... . ..... YPICAL) 10 12 D1 D1 012 0 D2 12 F1 LCP CONTROL RELAY (T iiO PlE-14 PANEL P1C CIRCUIT (TYPICAL) 12 D 1 D 1 12 DW I12 012 @12 .......... 010 DW ! OP 4 @10 109 10 d ........... ..... .... 010 12 012 . ......... Di D I 1 D 2 D I DIX X. (§)l D1 Di 0 12 Dix D�/ > D I D I Di bw EO ............. 021 /R4c 021 /R4c 021 /R, 12 012 410 010 012 F1 DW ....... ....... ... ........... ............. ....... ....... ....... P.1 . ....... .... D.1 'P1 EL:�',14 .............. ...... ............... ... ME -1-4 ......................... 4';-_- .................. ... P 1- El"f4w., 010 ja , 10 7� .......... ............ -PTE T ............. :. �, DW F1 D2 D2 D2 ............... f1__-----..,........:..� . ....... ..... �r .......... f01-27h_@T2_g PlE ............... 12h ............. r ii -2 2p I ! �eo I OW 12m @10 �Dl DI X 2�_P! 12k ............. /* DIX x D 1 )< D1X!' D1 Dix D1 12h (01 2q D 1 D 1 .... ........ j ............. ... ; 0 1 I x x I*, 12 -14 X W DW PIE 12 12 12 01 2g 0 12g .......... D1 DW DW � AIrl @21 /R4c @21 /R4c (D21 /4 ......... . .......... D1 D1 PIE -1, ix D 12 N D2 D2 21) .................. @11 2m . 10 010t. 110t i0loy 1010X ........... .... @ �0, I O IX D2 DW DW 11 01ox ............................................. D1 DI -@"F 0�12e DI ..................... ....................... D 1 D 1 D D1 ==bi D1 ............. DW i�� DW 012i en,o�p,q F1 F1 P i ............ b 12 1 2f D I 02- I�x D1 D1 nc DI @12j —e,ftglh 12 012e 012f ............ D 1 D 1 PlE-14 1E-1 W 12 12e 021 /R4c 021 /R4c 021 /R4 . ...................... 2 X 1 OVO ..1 2i' X2 ...... ........ OlOr 1 2i f 12 K D2 D2 .Ci 01 2n OlOr ov @> 11 5 D2 r%1 r%1 ni r%1 r% V %�v R W X REVIEWEDFOR COMPLIANCE WITH NFPA 70 - NEC SEP 2 6 2016 City of -TukWila BUILDING DIVISION 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvement for: Hohday Inn of Express Tukwfla, WA Sheet Title: LEVEL 1 LIGHTING PLAN L) I U-1 U I i U ........ . . . . . . � . . . . . . . . . . . ... ... ... .......... . . .... ................... ... ... ........ ....... ....................... .... ....... ..... ............ ........ ...... ................... .............. ... ... ........... ........... 1 DW.., .................................. .............. ... ...... ....... .............. .............. . . . . . . . . . . . ......... .............................. .................. I I . ........... i ............ 1 /R4c ................ . ......... .......... ........... I § �; � I f .: ...................... ....... ....................... ....... ......................... ....... .......................... ...................................... .................................. . ..... ........ . . .......... ........ ............. .............. .... ...................... .................... . . . . . . ..... ........ ................ .... .......................... ....... ............... C: i'-, RECEIVED ................. C— 13 ; .... .......... .......... .......... .......... .......... ....... .......... .......... ......... ........... ..... . ........... ............... .......... "',-'CITY OF TUKWILA .............. .......................................... ......... ....... .......... . ........ . .................... ....................... ............... .................. ................ ... .................................... ........................................ :,.� ........................ .................................. .................... . . . . ... ....... ..... ..... .... . ..... . ....... ............... ....... ..... / ........ ... . ........ .............. . ....... 1; ................ ..... ... .... .......... ; ................. . . ....... . ............... ........ .......... ............. ...................... ................ .... ....... . ... ..... . �e .............. ............ ............ .............................. .. . . ................... ............ ................. ........................ . . ............... .......... ........... ............................. ... . .............. . ..................... Pl� 1 5 Designed By: RB ............... ........... ..... . . .... .. . ....... . ....... . .............. ........ ..... ......... ................... . ............... . ...... . ... ............... ... ....................... I ............. .......................................... ...... :,. . ............ ............... ........ . ...... . ......................................... ........... ................ .................. ...... . ... ... .............................. .............. ........... . ....... ............... ........... ... ........ SEP 12 2016 MB Drawn By: PERMIT CENTER Project No: 16195 .............. .............. --- — ------- ;, ; --;- .......... I ..... ....... . ................ . ......... ........... . ......... .......... .. .............. ............ .. . .. ......... ............ 1'e_!.-.-111:1_, I........... .......... . .. . ..... . ..... ............................................. : ............. : ................. . ..................... ...................................................... ...................................................... ................................................ .......................................... .................................................................................................................................................. .............................. ...................................................... ....................................................... ..................................... ............ ........................ ............ ............... ............. .. . ...... .............. ............... .............