Loading...
HomeMy WebLinkAboutPermit PG16-0085 - BOEING #9-101 - STEAM CONVERTERBOEING #9-101 STEAM CONVERTER 9725 E MARGINAL WAY S PG16-0085 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov Parcel No: 0003400018 PLUMBING/GAS PIPING PERMIT Permit Number: PG16-0085 Address: 9725 E MARGINAL WAYS BLDG 9-101 Issue Date: 7/6/2016 Permit Expires On: 1/2/2017 Project Name: BOEING #9-101- STEAM CONVERTER Owner: Name: BOEING COMPANY THE Address: PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 Contact Person: 2015 Name: AMANDA MOORE Address: 11621 E MARGINAL WAY S, TUKWILA, WA Cities Electrical Code: WA, 98168 Contractor: 2015 Name: P S F MECHANICAL INC Address: 11621 E MARGINAL WAY S SUITE A, WA State Energy Code: TUKWILA, WA, 98168-1965 License No: PSFMEI*090NZ Lender: Name: Address: Date: 071 Phone: (206) 812-7683 Phone: (206) 764-9663 Expiration Date: 10/5/2017 DESCRIPTION OF WORK: ADD (4) NEW FLOOR DRAINS AND ASSOCIATED WASTE PIPING Valuation of Work: $8,500.00 Fees Collected: $181.36 Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 Date: 071 Permit Center Authorized Signature: / / V I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development perm t and agree to the conditions attached to this permit. Sign ature• // Date: Print Name: 6m=& mwyy This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. S: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 8004 GROUNDWORK 1900 PLUMBING FINAL 8005 ROUGH -IN PLUMBING CITY OF TUKWI. Community Development*Uepartment Pennit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 " hq://www.TukwilaWA.gov ''YuMb ng/Gas Permit No.-�"G 16— Q Prgect No. Date Application Accepted: Date Application Expires:'` - use PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.. 0003400018 Site Address: 9725 E MARGINAL WAY S, BLDG 9-101 Suite Number: Floor: 2ND Tenant Name: BOEING New Tenant: ❑ .....Yes IZ..No PROPERTY OWNER Name: THE BOEING COMPANY Address: PO BOX 3707 City: SEATTLE State: WA Zip: 98124 CONTACT PERSON — person receiving all project communication Name: AMANDA MOORE Address: 11621 E MARGINAL WAY S City: SEATTLE State: WA Zip: 98168 Phone: (206) 812-7683 Fax: (206) 762-8381 Email: permits@psfinech.com Valuation of Project (contractor's bid price): PLUMBING CONTRACTOR INFORMATION Company Name: PSF MECHANICAL Address: 11621 E MARGINAL WAY S City: SEATTLE State: WA Zip: 98168 Phone: (206) 812-7683 Fax: (206) 762-8381 Contr Reg No.: PSFMEI*090NZ Exp Date: 10/05/2017 Tukwila Business License No.: BUS -0996384 Scope of Work (please provide detailed information): ADD (4) NEW FLOOR DRAINS AND ASSOCIATED WASTE PIPING. Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: COMMERCIAL GROUB B TUKWILA Sewer: TUKWILA SEWER SERVICE H:Wpplications\forms-Applications On Linc\2011 Applications\Plumbing Pcmtit Application Rcvised 8.9-1 l.docx Reviscd: August 2011 Page 1 of 2 bh Indicate type of plumbing fixtures and/or , piping outlets being installed and the quantity ow: Fixture Type Qty Bathtub or combination bath/shower 4 Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system - per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) Fixture Type Qty Bidet Drinking fountain or water 4 cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic 4 Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type ease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 nun) diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain 4 Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific as Each lawn sprinkler system on any one meter including backflow protection devices PERMIT APPLICATION NOTES - Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Print Name: 'AMANDA MOORE Mailing Address: 11621 E MARGINAL WAYS Date: 06/24/2016 Day Telephone: (206) 812-7683 SEATTLE WA 98168 City State Zip H:\Applications\Forms-Applications On Line\2011 Applications\Plumbing Permit Application Revised 8-9-1 Ldocx Revised: August 2011 Page 2 of 2 bh DESCRIPTIONS PermitTRAK PAID $181.36 PG16-0085 Address: 9725 E MARGINAL WAY S BLDG 9-101 Apn: 0003400018 $181.36 PLUMBING $174.38 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $107.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $34.88 TECHNOLOGY FEE $6.98 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R000.322.900.04.00 0.00 $6.98 Date Paid: Friday, June 24, 2016 Paid By: AMANDA MOORE Pay Method: CREDIT CARD 723063 Printed: Friday, June 24, 2016 2:07 PM 1 of 1 11 1 !- AA IlYSTEMS INSPECTION RECORD *" Retain a copy with permit 1,6g " DU g I PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 n ( 06) 31-367 Permit Inspection Request Line (206) 438-9350 FC Kqf Project: #- ,.1f6- 9 - io T pe of Inspection: n /'-J Ru &/A& Address: Date Called: 7 fi&iJA - 5 Special Instructions:Date SDG /d I Wanted: a. 7 // /6 p.m. S7r� Req (es er: _/� V�� C�t;12 rE✓Z Phone No: 206- 1J \ /I 4 % w REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. PERMIT COOPD COPY. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG16-0085 DATE: 06/24/16 PROJECT NAME: BOEING #9-101- STEAM CONVERTER SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Revision # before .Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Bui4din Division Fire Prevention Plannin Division g ❑ g ❑ V" KAL U.2i Public Works Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 06/28/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07/26/16 Approved ❑ Approved with Conditions Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2017 P S F MECHANICAL INC Home Espanol Contact. Safety & Health Washington State Department of ' Labor & Industries P S F MECHANICAL INC Owner or tradesperson Principals REYNOLDS, JAMES P, PRESIDENT READ, ANDREW A, PRESIDENT BEARDSLEY, WARREN SCOTT, SECRETARY CRITCHLOW, JAMES D (End: 09/27/2011) Doing business as P S F MECHANICAL INC Page 1 of 2 Search L&I A-7 Index Relp My L&1 Claims & Insurance Workplace Rights Trades & Licensing 11621 E Marginal Way S Suite A SEATTLE, WA 98168 206-764-9663 KING County WA UBI No. Business type 601 318 369 Corporation Governing persons ANDREW AARON READ JAMES P REYNOLDS; JIM BEARDSLEY; WARREN S BEARDSLEY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. .......................................................... Meets current requirements. License specialties GENERAL License no. PSFMEI*090NZ Effective — expiration 08/09/1991-10/05/2017 Bond Travelers Cas & Surety Co $12,000.00 Bond account no. 105975899q Received by L&I Effective date 03/13/2014 03/13/2014 Expiration date Until Canceled Bond history Insurance ....................... Liberty Mutual Fire Insurance $1,000,000.00 Policy no. TB2Z91452741025 Received by L&I Effective date https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=6013183 69&LIC=PSFMEI* 090NZ&SAW= 7/5/2016 �' i'�'R'82�Y ftiSit�'ST,&tl6'l4tiGY"v "�l �y'^",t i t¢, t4kS?r�1`RimPJ`� n`�W:2, t4� ky p,ru✓°<,�> nmy, ''d � '{�S .a.,a �1; x.m .r<P;',. �Y..s"" e"'�,Y. �'� xi+�,. r�,�a Ax,�n;�e,;~T l'b�*. ,�v r, ,,m wns.n':»,�,t '3,xk;,ew�.rc ^`�?�: �'�'sz,�, »•»f"' � 3 �` �:mw,m ' § E33�,1 D;a. � �+u'�.o, x~wt � (. �, '�SrfY;'a''w'b , 3rosx,re".rx..nu,a. r.S M; a :;• x.�»nW,mx;.,,.o-,rem "2rzwcs t ,..rwu<'e :+; 1,.• �x. y '' ;'"` `gs. 1. 1. '"� a { 'mv: � mo-, ,n ��t.. r)` ' 7 Wiwi the violation of any adopted code or ordinance. Raccipt By: �Y .E"Uf ,f r, }• Y '„' ,� � �.'��3 u. �'4 „t,"` +ti's �a ka �t aj . u' .� t ir2"�" $ F ,�:'t ° �y, V, xw",•,sn, 'm. % �z �, 4 f� �dx°1 ""Wtrauz�.m,�,� °.i.n. m.,n,".w t!at` ,�c`,i�.c,.uma..w.w+msmm ,�' YF. '• .. �! Vii_ n Date: rr at LQ City of a BUILDINGDIVISION REVISIONS No changes shall beam de to the scope of work without prior approval of Tukwila Building Division, NOTE: Revisions will require a new plan submittal and may include additional plan review fees. rr f+ � 1 �# �s wt DrEE-V $,o,.,Kqg .,�n,9i `,. ';. any�' �i NT I-. 'SU 1`'a'0, .dt` �.. �ms�� "'a1i"."" as ;.. LOPM'�NTAL 9 EPXV�* M1_%r,%A,:;1NAL ` qi t WAY 1'` , UT coo; oms'o -A 0 "owl TUIN"WILA, WA"'HING"FON 1 VICINITY MAP FROM DOWNTOWN SEATTLE 5 \\\\ 900 CODE SUMMARY TYPE OF APPLICATION: No ALTERA❑ON AD[a ION TENANT IMPR MEN PROJECT DESCRIPTION: PROJECT IS TO COMPLETELY REPLACE STEAM CONVERTER STATION #2. THIS REPLACEMENT INCLUDES INSTALLATION OF A NEW STEAM PRESSURE REDUCING STATION, (3) THREE HEAT EXCHANGE MODULES EACH WITH TWO VARIABLE SPEED HEATING WATER CIRCULATING PUMPS, UPGRADED HEATING WATER FILTRATION SYSTEM, TWO-WAY CONTROL VALVES, NEW ISOLATION VALVES AND REMOVAL OF A REMOTE STEAM -POWERED CONDENSATE PUMP. CODES: 2012 WA WITH AMENDMENTS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. CONTRACTOR &STATE NUMBER; THE BOEING CO. BOE INC �E 294ML(OV2009) BOEING PROJECT ENGINEER, BRIAN HARR BOEING CONTACT:JOHN MURDOCH PHONE: 253-773-0444 FAX NUMBER. 253-773-0119 E—MAIL; iohn,s,murdoch@boeing.com OCCUPANCY GROUP: GROUP B AND GROUP F, DIVISION I (OFFICE AND FACTORY) CONSTRUCTION TYPE; TYPE II —B, NON—COMBUSTIBLE SEPARATION 60 FEET (MINIMUM ALL SIDES) ZON I NG: ALLOWABLE AREA INCREASE: FULLY AUTOMATIC, F/S CLASS I SPRINKLERS THROUGHOUT NG INDEX ARCHITECTURAL - CIVIL DRAWING NUMBER REV I DRAWING TITLE 09-101—GO — COVER SHEET 09-101 —CWA1 7R A CATWALK PLAN.— REMOVAL 09-101—CWA17 A CATWALK PLAN 09-101—A353 B DOOR &HARDWARE SCHEDULES NOTESIYPES&DETAILS 09-101—A581 — ARCHITECTURAL DETAILS SEP�kRPLTE PERMIT Eff Electrical ❑ Plumbing Gas Piping CODES AND PERMITS PROJECT TITLE: 9-101,2 REPLACE STEAM CONVERTER STATION #2 JOB NUMBER: 16069 QUANTITY SUBMITTED: ❑ 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT ❑ 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) REV ❑ 3 SETS: FIRE PROTECTION/SPRINKLERS 09-101—M 1 B IM 2 SETS: TENANT IMPROVEMENT (REVISION) PIPING LEGEND SUBMITTED FOR PERMIT & REVIEW: A ❑ BUILDING ❑ GRADING ❑ ELECTRICAL ❑ PLUMBING ❑ LANDSCAPE ❑ FIRE PROTECTION MECHANICAL IM DEMOLITION ❑ CANTILEVER RACKS STRUCTURAL 1771 - - �E TO BE REVIEWED UNDER SEPARATE PERMIT CONVERTER STATION 2—SECTIONS—REMOVAL WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE -APPROACHES A COMPLIANCE OPTION PRESCRIPTIVE Fj LPA ANALYSIS IM NA / SPECIAL INSPECTIONS REQUIRED: ❑ WELD ❑ CONCRETE ❑ REBAR ❑ ANCHOR BOLTS ❑ STRUCTURAL BOLTING ❑ STRUCTURAL OBSERVATION ❑ OTHER CALCULATIONS TYPE: N/A ATTACHED (YES) (NO) OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE -� (TABLE 10-A) STRUCTURAL 99 EXIT oxeoW GE EXIT 158 OFFICES OCC, BLDG GROSS I , 116 , 306 SF SQ FT DRAWING NUMBER REV DRAWING TITLE 158 STORAGE OCC. TUNNEL 50,910 SF SQ FT OXBOW LOT d LABORATORY occ, FIRST FLOOR 713,829 SF SQ FT 09-101—S2H-1 — STRUCTURAL NOTES & ABBREVIATIONS ELECTRICAL s CANOPY occ. IST FLR MEZZ 55,689 SF SQ FT 09-101—S2H-2 — STRUCTURAL NOTES S BOEING ACCESS RD 09-101—EO — LEGEND ABBREVIATIONS NOTES OTHER OCC. 2ND FLOOR 295,878 SF SQ FT 09-101—S2H-3 — STRUCTURAL NOTES 2ND FLOOR MEZZ SQ FT F RE PROJECT PAREA 950 SF SQ T Q� 09-101—CWS539R — CONVERTER STATION N0.2 LAYOUT —REMOVAL 09-101—CWE17R A LIGHTING — REMOVAL I I I FT 09-101—RFS 17R — ROOF PLAN — REMOVAL 09-101—CWE67R A 208Y 120V POWER — REMOVAL BUILDING HEIGHT ; (ACTUAL) 09-101 —CWE1 17R B 480 VOLT POWER — REMOVAL STOR I ES : 2 MEZZAN I NE ? (YES) ❑ (NO) SQ FT 55,689 SF 09-101—CWS539 — CONVERTER STATION NO.2 LAYOUT 09-101—E582R B MCC DETAILS — CONVERATION STATION 2 — REMOVAL 09-101—RFS17 — ROOF PLAN Q� 157 F I RE PROTECT I ON: SPR I NKLERED THROUGHOUT PER NFPA 13 ? ( YES) F] (NO) 09-101—S467 — ENLARGED PLANS 09-101—CWE17 A LIGHTING EXIT SEPARATION 09-101—S652 — MISCELLANEOUS SECTIONS & DETAILS 09-101—CWE61 C 208Y 120V POWER PLAN REF ONLY 157 09-101—CWE67 A 208Y 120V POWER EXTERIOR WALL (NON-BEARING) HOUR RATING 09-101 —CWE1 11 B 480 VOLT POWER REF ONLY EXTTER I OR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING 09-101 —CWE1 17 B 480 VOLT POWER INTERIOR WALL (BEARING) HOUR RATING 09-101—E582 B MCC DETAILS — CONVERATION STATION J2 DEMOUNTABLE PARTITIONS HOUR RATING 599 STRUCTURAL FRAME HOUR RATING TUKWILA FROM KENT 900 FLOOR/CEILINGS HOUR RATING EAST MARGINAL WAY & AUBURN ROOF CONSTRUCTION HOUR RATING CORPORATE PARK (` 5 1 99 ACRFFMAN 1 N E E k SEISMIC DESIGN: ZONE ' D" IDS 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 FROM SEATTLE—TACOMA AIRPORT coffman.com DESIGN LOADS: (CHAPTER 16) ph 206.623.07171 fax 206.624.3775 LASTING creativityreauna relationships ROOF: LIVE ( SNOW) (PSF) N FLOOR: OFFICE EXISTING, NO CHANGES (PSF) MECH/STOR (PSF)_ CITY OF TU ��� ILA 100% SUBMITTAL DEVELOPMENTAL CENTER NO SCALE STAIRS (PSF) CONCENTRATED: JUN 24 2016 ISSUE TOR CONSTRUCTION co WIND: EXPOSURE C M �'ERMIT CENTER DR DATE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �L S� ACCEPTABILITY CEI N 10.06.14 SUBTITLE CURRENT REVISION SYMBOL DATE REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 ti G�►r�r1 THIS DESIGN AND/OR K COVER SHEET 16069 — 10.06.14 0 SPECIFICATION IS APPROVED MS 10.06.14 SHEET o ® APPROVED BY DEPT. DATE TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED GO 36611 BUILDING 9-101 JOB N0. APPROVED � COMP N0. N �Io 16069 joNAL APPROVED ARCHITECTURAL MASTER COL. DEV. CENTER, WA ' NWG o. 9-101—GO l u/t)/14 DRAWING INDEX MECHANICAL DRAWING NUMBER REV DRAWING TITLE 09-101—M 1 B — PIPING LEGEND 09-101—M504 A SCHEDULES 09-101—M567 B SCHEDULES 09-101—M560R D CONVERTER STATION 2—PARTIAL PLAN—REMOVAL 09-101—M561 R A CONVERTER STATION 2—SECTIONS—REMOVAL 09-101—M562R A CONVERTER STATION 2—SECTIONS—REMOVAL 09-101—M563R A CONVERTER STATION 2—SECTIONS—REMOVAL 09-101—M564R B CONVERTER STATION 2—SECTIONS—REMOVAL 09-101—M566R A PARTIAL SECOND FLOOR PLAN & SECTIONS—REMOVAL 09-101-2M317ER A CONVERTER STATION 2—DMS CONTROLS—REMOVAL 09-101-2M317FR A CONVERTER STATION 2—DMS CONTROLLERS — REM OVA 09-101-2M317GR A CONVERTER STATION 2—TYPICAL WIRING DETAILS—REMOVAL 09-101—M541 B TOILET ROOM #6 PLUMBING PLAN 09-101—M560 D CONVERTER STATION 2—PARTIAL PLAN 09-101—M561 A CONVERTER STATION 2—SECTIONS 09-101—M562 A CONVERTER STATION 2—SECTIONS 09-101—M564 B CONVERTER STATION 2—SECTIONS 09-101—M565 A CONVERTER STATION 2—FLOW DIAGRAMS 09-101—M566 A PARTIAL SECOND FLOOR & SECTIONS 09-101—M628 ORIG DETAILS 09-101—M629 ORIG DETAILS 09-101—RFM 17 F ROOF PLAN — HVAC & PIPING 09-101-2M317E A CONVERTER STATION 2—DMS CONTROLS 09-101-2M317F A CONVERTER STATION #2—DMS CONTROLLERS OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE -� (TABLE 10-A) STRUCTURAL 99 EXIT oxeoW GE EXIT 158 OFFICES OCC, BLDG GROSS I , 116 , 306 SF SQ FT DRAWING NUMBER REV DRAWING TITLE 158 STORAGE OCC. TUNNEL 50,910 SF SQ FT OXBOW LOT d LABORATORY occ, FIRST FLOOR 713,829 SF SQ FT 09-101—S2H-1 — STRUCTURAL NOTES & ABBREVIATIONS ELECTRICAL s CANOPY occ. IST FLR MEZZ 55,689 SF SQ FT 09-101—S2H-2 — STRUCTURAL NOTES S BOEING ACCESS RD 09-101—EO — LEGEND ABBREVIATIONS NOTES OTHER OCC. 2ND FLOOR 295,878 SF SQ FT 09-101—S2H-3 — STRUCTURAL NOTES 2ND FLOOR MEZZ SQ FT F RE PROJECT PAREA 950 SF SQ T Q� 09-101—CWS539R — CONVERTER STATION N0.2 LAYOUT —REMOVAL 09-101—CWE17R A LIGHTING — REMOVAL I I I FT 09-101—RFS 17R — ROOF PLAN — REMOVAL 09-101—CWE67R A 208Y 120V POWER — REMOVAL BUILDING HEIGHT ; (ACTUAL) 09-101 —CWE1 17R B 480 VOLT POWER — REMOVAL STOR I ES : 2 MEZZAN I NE ? (YES) ❑ (NO) SQ FT 55,689 SF 09-101—CWS539 — CONVERTER STATION NO.2 LAYOUT 09-101—E582R B MCC DETAILS — CONVERATION STATION 2 — REMOVAL 09-101—RFS17 — ROOF PLAN Q� 157 F I RE PROTECT I ON: SPR I NKLERED THROUGHOUT PER NFPA 13 ? ( YES) F] (NO) 09-101—S467 — ENLARGED PLANS 09-101—CWE17 A LIGHTING EXIT SEPARATION 09-101—S652 — MISCELLANEOUS SECTIONS & DETAILS 09-101—CWE61 C 208Y 120V POWER PLAN REF ONLY 157 09-101—CWE67 A 208Y 120V POWER EXTERIOR WALL (NON-BEARING) HOUR RATING 09-101 —CWE1 11 B 480 VOLT POWER REF ONLY EXTTER I OR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING 09-101 —CWE1 17 B 480 VOLT POWER INTERIOR WALL (BEARING) HOUR RATING 09-101—E582 B MCC DETAILS — CONVERATION STATION J2 DEMOUNTABLE PARTITIONS HOUR RATING 599 STRUCTURAL FRAME HOUR RATING TUKWILA FROM KENT 900 FLOOR/CEILINGS HOUR RATING EAST MARGINAL WAY & AUBURN ROOF CONSTRUCTION HOUR RATING CORPORATE PARK (` 5 1 99 ACRFFMAN 1 N E E k SEISMIC DESIGN: ZONE ' D" IDS 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 FROM SEATTLE—TACOMA AIRPORT coffman.com DESIGN LOADS: (CHAPTER 16) ph 206.623.07171 fax 206.624.3775 LASTING creativityreauna relationships ROOF: LIVE ( SNOW) (PSF) N FLOOR: OFFICE EXISTING, NO CHANGES (PSF) MECH/STOR (PSF)_ CITY OF TU ��� ILA 100% SUBMITTAL DEVELOPMENTAL CENTER NO SCALE STAIRS (PSF) CONCENTRATED: JUN 24 2016 ISSUE TOR CONSTRUCTION co WIND: EXPOSURE C M �'ERMIT CENTER DR DATE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �L S� ACCEPTABILITY CEI N 10.06.14 SUBTITLE CURRENT REVISION SYMBOL DATE REPLACE STEAM CONVERTER STATION #2 16069 CEI MS 10.06.14 ti G�►r�r1 THIS DESIGN AND/OR K COVER SHEET 16069 — 10.06.14 0 SPECIFICATION IS APPROVED MS 10.06.14 SHEET o ® APPROVED BY DEPT. DATE TITLE REPLACE STEAM CONVERTER STATION #2 CHECKED GO 36611 BUILDING 9-101 JOB N0. APPROVED � COMP N0. N �Io 16069 joNAL APPROVED ARCHITECTURAL MASTER COL. DEV. CENTER, WA ' NWG o. 9-101—GO l u/t)/14 use ra HOT WATER CIRCULATING PUMPS (PU) SCHEDULE EQUIPMENT LOCATION FLUID.F TEMP CAPACI SIZE (IN) CONSTRUCTION MOTOR PUMP TYPE MANUFACTURER REMARKS C-1 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 - SKID MOUNTED PACKAGE WITH CP -1, CC -1, P -1A AND P-113 C-2 M560 5,000,000 250 U 180 50 CONVERTER STATION #2 - SKID MOUNTED PACKAGE WITH CP -2, CC -2, P -2A AND P -2B C-3 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 - SKID MOUNTED PACKAGE WITH CP -3, CC -3, P -3A NAD P-313 WAS CO -3)7 140 0, 18 1 L 2 P -1A M560 WATER 180 250 95 4" 4" CONVERTER STATION #3 FLANGED DIRECT COUPLED 10 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION2 - PROVIDED WITH VFD AS PART OF C-1 SKID MOUNTED PACKAGE # P -1B M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 10 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-1 SKID MOUNTED PACKAGE P -2A M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 10 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-2 SKID MOUNTED PACKAGE P -2B M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 10 460 3 60 1750 CENTRIFUGAL - GRUNFOS CR 64-11 CONVERTER STATION 2 - PROVIDED WITH VFD AS PART OF C-2 SKID MOUNTED PACKAGE # P -3A M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 10 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION #2 - PROVIDED WITH VFD AS PART OF C-3 SKID MOUNTED PACKAGE P-38 M560 WATER 180 250 95 4" 4" FLANGED DIRECT COUPLED 10 460 3 60 1750 CENTRIFUGAL GRUNFOS CR 64-1-1 CONVERTER STATION 2 - PROVIDED WITH VFD AS PART OF C-3 SKID MOUNT PACKAGE ;• #4...- . U WATER 20 7 / I• G DRIVE 1 1 0 T GA 1 P761 0 E A 0 C RC 10 PU2E12A M573 DOMEST WA WATER 120 4.8 7 1 /2 1 /2 C.I. FLANGED MAGNETIC DR VE 1 /20 115 1 60 1750 CENTRIFUGAL 1 P761 CONVERTER STATION #3 DOMESTIC HOT WATER RECIRCULATION PU2F13A WAS CP -6 M570 WATER 250 50 50 2 2 C.I. NPT INDIRECT COUPLED 2 460 3 60 1750 CENTRIFUGAL PACO 1570-1 CONVERTER STATION #3 WEST HIGH BAY LOOP PU2F13B M570 WATER 250 40 35 2 2 C.I. NPT INDIRECT 5 460 3 60 1750 CENTRIFUGAL PACO CONVERTER STATION #3 1 ST FLOOR AHU SOUTH LOOP WAS CP -7 COUPLED 1570-1 (WAS CP -8) M570 - - - - CONVERTER STATION #3 2ND FLR RAD LOOP PUMP & PIPIPING DEMO'D PU2F13D M570 WATER 250 255 60 4 4 C.I. FLANGED INDIRECT 7 1/21 460 3 60 1750 CENTRIFUGAL PACO CONVERTER STATION #3 2ND FLOOR AHU SOUTH LOOP WAS CP -9 COUPLED 2095-3 STEAM CONVERTERS HX SCHEDULE EQUIPMENT U LOCATION SMP CAPACITY REMARKS ENT. WATER G LVG. WATER P. STEAM PRESS. REMARKS E T TEMP. C-1 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 - SKID MOUNTED PACKAGE WITH CP -1, CC -1, P -1A AND P-113 C-2 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 - SKID MOUNTED PACKAGE WITH CP -2, CC -2, P -2A AND P -2B C-3 M560 5,000,000 250 140 180 50 CONVERTER STATION #2 - SKID MOUNTED PACKAGE WITH CP -3, CC -3, P -3A NAD P-313 WAS CO -3)7 140 0, 18 1 4 2 0 HX2F13B WAS CO -3A M571 7,720,000 * 180 161 240 50 CONVERTER STATION #3 * CAPACITY INCLUDES COMBINATION OF STEAM CONVERTER WITH CONDENSATE COOLER. CONDENSATE COOLERS HX SCHEDULES EQUIPMENT LOCATION CONDENSATE WATER REMARKS STEAM INLET PRESS. PSIG EN TE LV TE REMARKS E T TEMP. CC -1 M560 - 10,800 10 250 143 140 CONVERTER STATION #2 - PROVIDE AS PART OF C-1 SKID MOUNTED PACKAGE CC -2 M560 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR 100 250 143 140 CONVERTER STATION #2 - PROVIDE AS PART OF C-2 SKID MOUNTED PACKAGE CC -3 M560 - 1-1/2 10 250 143 140 CONVERTER STATION #2 - PROVIDE AS PART OF C-3 SKID MOUNTED PACKAGE WAS COC -3 7 - 2 10 0 _ SPIR3XXSARCO PROVIDE AS PART OF C-2 SKID MOUNTED PACKAGE HX2F13D WAS COC -3A M570 7450 298 200 180 153 161 CONVERTER STATION #3 CONDENSATE RECEIVER & PUMP SETS CP SCHEDULE EQUIPMENT NUMBER LOCATION (SHT NO.) CAPACITY BACK PRESSUPSIG RE STEAM INLET PRESS. PSIG REC,R GAPS MANUFACTURER AND MODEL REMARKS GPM LBS/HR CP2E13A M570 - 10,800 10 50 _ SPIR3XXSARCO CONVERTER STATION #3 4" 20-5/8" 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR 100 NALCO BLADDER SPIR SA 0 211 CP -1 M560 - 1-1/2 10 50 _ SPIR3X/�SARCO PROVIDE AS PART OF C-1 SKID MOUNTED PACKAGE CP -2 M560 - 10 10 50 _ SPIR3XXSARCO PROVIDE AS PART OF C-2 SKID MOUNTED PACKAGE CP -3 M560 - 140-190 10 50 _ SPIR3XXS2RCO PROVIDE AS PART OF C-3 SKID MOUNTED PACKAGE CP -4 M560 - 2,000 10 50 _ SPIRAX SARCO PPEC WITH 1" STAINLESS STEEL CHECK VALVE SIZE AIR SEPARATOR AS SCHEDULE MARK SYSTEM MIN. CAPACITY OVERALL DIMINSIONS OUTLET/INLET INLET/OUTLET FACE TO FACE APPROX. OPERATING REMARKS NUMBER J.R. SMITH 2010 W/ TRAP PRIMER GPM (INCHES) SIZE/CLASS DIM. (INCHES) WEIGHT (LBS) N/A AS -1 WATER 170 8.5" X 23.7" 4" 20-5/8" 107 AIR SEPERATOR TO ACT AS SIDE STREAM AIR SEPATATOR FLOOR DRAIN SCHEDULE MARK NUMBER SYSTEM CW OUTLET REMARKS FD -1 WASTE 1/2" 4" J.R. SMITH 2010 W/ TRAP PRIMER FFD -1 j WASTE 1/2" 1 41 J.R. SMITH 2010 W/ TRAP PRIMER & FIG 3591 FUNNEL DRAIN SYM I REVISION RECORD DRAWING A PUR/INST MOD. CLEAN ROOM #546610-01 B REPLACE STEAM CONVERTER STATION #2 BY APPROVED DATE SYM SR GS KR 05.28.93 C. HARRAH RWS 10.01.04 160691 CEI I MS 1 10.06.14 REVISION BY I APPROVED I DATE STEAM PRESSURE REDUCING VALVE SCHEDULE MARk LOCATION CAPACITY (LBS/HR) VALVE SIZE (IN) INLET PRESS (PSI) DISCH PRESS (PSI) STRAINER SIZE (IN) BASIS OF DESIGN SPIRAX SARCO DATE OF SERVICE PRV-1 CONVERTER STATION #2 17,500 Y 150 50 N/A SPIRA-TROL PSI WF -F7 WATERCARTRIDGE SIDE -STREAM NALCO 36 X 54 2 X 2 100 NALCO BLADDER NOTE: WATER FILTER SCHEDULE MARK NUMBER SYSTEM SERVED TYPE VO VOLUMERATED DIMENSIONS CONNECTIONS FULL WEIGHT MANUFACTURER REMARKS FULL WEIGHT MANUFACTURER REMARKS 170<1-1/2" HxL (IN) HxL (IN) (LBS) (GAL) PSI WF -F7 WATERCARTRIDGE SIDE -STREAM NALCO 36 X 54 2 X 2 100 NALCO BLADDER EXPANSION TANK SCHEDULE MARK NUMBER SYSTEM SERVED TYPE TAN K CAPACITY TAN K ACCEPTANCE CHARGE PRESSURE RELIEF PRESSURE DIMENSIONS CONNECTION FULL WEIGHT MANUFACTURER REMARKS 170<1-1/2" 1-1/270<4 , 4 TO<8" (GAL) (GAL) PSI PSI HxL (IN) (IN) (LBS) 5 ET -1 WATER BLADDER 211 211 10 50 30 X 82 1-1/2 543 AMTROL EXTROL 800-L ASME ET -2 WATER BLADDER 211 211 10 50 30 X 82 1-1/2 543 AMTROL EXTROL 800-L ASME PIPE INSULATION SCHEDULE FLUID TYPE OPERATING TEMP. ('F) THERMAL CONDUCTIVITY (BTU IN/HR SF 'F) MEAN TEMPERATURE RATING (F) NOMINAL PIPE OR TUBE SIZE (IN) INSULATION THICKNESS PER WASHINGTON NREC (2013) NOTES: <111 170<1-1/2" 1-1/270<4 , 4 TO<8" 150 PSIG STM FIBERGLASS 354-410 0.32 -0.34 250 4.5 5 5 5 1, 3, 4 50 PSIG STM FIBERGLASS 248-353 0.31 250 3 4 4.5 4.5 1, 3, 4 CONDENSATE -ALL FIBERGLASS 141-200 0.25 170 1-1/2 1-1/2 1-1/2 1-1/2 HEATING WATER FIBERGLASS 140-190 0.25 - 0.29 170 1-1/2 1 1-1/2 2 2 2, 4 1. PROVIDE METAL JACKET FOR ALL STEAM PIPES LOCATED BETWEEN FLOOR AND 8 FOOT ABOVE FLOOR 2. PROVIDE PVC JACKET FOR ALL HOT WATER PIPES LOCATED BETWEEN FLOOR AND 8 FOOT ABOVE FLOOR 3. DO NOT INSULATE STEAM TRAP ASSEMBLIES. 4. SEE SPECIFICATION 230700 FOR OTHER INSULATION REQUIREMENTS. I eta, 00 f3 E ACCEPTABILITY IK.60H THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED S.ROSSE APPROVED BY DEPT. I DATE S.ROSSE CHECKED G.SMITH APPROVED K.RAMSEY 61L SUBTITLE SCHEDULES TITLE REPLACE STEAM CONVERTER STATION BUILDING 9-101 4.23.92 IMECHANICAL MASTER COL. R lE p�OF COD COMPL1AAcE �u` p 1 2016 c,w ®leu+la IgLU1L.01 G DO'S,Ot4 RECEIVED CITY OF l'UK'VVILA JUN 24 2016 PERMIT CENTER 1601 Fifth Avenue, Suite 9001 Seattle, WA 98101 ph 206.623.07171 fax 206.624.3775 coffman.com LASTING mauvity I resufle I relatlonshlps I.VRRGIV I RLVIJIVIV JTMOVL UHI t 16069 B 10.06.14 SHEET M567 JOB N0. COMP NO. DEV. CENTER, WA DWG NO. 09-101-M567 Q co 0 N 0 LEGEND ------------ VENT QE F E DF --- SANITARY WASTE BELOW FLR — SAN — SANITARY WASTE ABOVE FLR —CW— DOMESTIC COLD WATER —HW— DOMESTIC HOT WATER — HWC — DOMESTIC HOT WATER CIRC CO CLEAN OUT WCo � WALL CLEAN OUT 00�0� �� �4)i BALL VALVE (NO) WATER HAMMER ARRESTER PDI SIZE C ■ e WATER HAMMER ARRESTER PDI SIZE C WATER HAMMER 2 1/2" 3"CW UP 2 1/2" DN WATER HAMMER ARRESTER PDI SIZE C 2" WATER HAMMER ARRESTER PDI SIZE C I SYM REVISION TOILET ROOM SCALE: I/4"=1'-0" RECORD DRAWING A AUTO FLUSH RETROFIT 55595900 B REPLACE STEAM CONVERTER STATION #2 me TOILET ROOM SCALE: I/4"=1'-0" , A . k11% 0 s e)" cei\I nt\I ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED K. BUN UH - K -ED A. KILLIP rpumnlr— M. CAUNITIS APPROVED BY DEPT. DATE CHECKED G. SMITH — 1 1 /2"SAN FOR CONTINUATION SEE SHEET 2M67 CONNECT 1 1 /2"SAN TO 4"SAN BELOW FLOOR 1 1/2 stv 4"SAN BELOW FLOOR 2 1/2" 4" cl 3" 5"VTR 4"V FROM MEZZ. 4"SAN BELOW FLOOR 4" SAN DN W/ 2"V & (2) 4" SAN CONNECTIONS 4"SAN 2 1/2 1 1/2"V =-- 2"SAN SUBTITLE (-"F-NI F -D A I KInTE-C Q���Q�NIn� nQninil�lr�c I-\GvlGvvlw I wl% ;ODE: COMPLIANCE APPROVED JUL 01 2016 �� in OfTTuwllla rONICTf-)I IPTInNI NInTE-C PROVIDE NEW 3" WASTE PIPING. PROVIDE NEW 2" VENT PIPING. PROVIDE NEW FUNNEL FLOOR DRAIN. T �y RECEIVED CITY OF TUKWILA JUN 24 2016 PERMIT CENTER TOILET ROOM #6 PLUMBING PLAN TITLE REPLACE STEAM CONVERTER STATION #2 BUILDING 9-101 4.23.92 IMECHANICAL MASTER COL. E -F/7-8 DEV. CENTER, WA 9-101 KEY PLAN N SCALE: N.T.S. X071 VIJIVIV B 6069 JiMOVL p UHIt 1 10.06.14 M541 COMP NO. 09-101—M541