HomeMy WebLinkAboutPermit PG16-0086 - SEATTLE CHOCOLATE - RESTROOM REMODEL, WATER HEATERS ETCSEATTLE CHOCOLATE
1180 ANDOVER PARK W
PG16-0086
City of Tukwila
• Department of Community Development
• 6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.Tul(wilaWA.gov
PLUMBING/GAS PIPING PERMIT
Parcel No: 3523049085 Permit Number: PG16-0086
Address: 1180 ANDOVER PARK W Issue Date: 7/22/2016
Permit Expires On: 1/18/2017
Project Name: SEATTLE CHOCOLATE
Owner:
Name: DANELLIE LLC
Address:
1180 ANDOVER PARK WEST,
National Electrical Code:
TUKWILA, WA, 98188
Contact Person:
2015
Name:
HENRY KURASAKI
Address:
1101 SECOND AVE, SUITE 100,
WAC 296-466:
SEATTLE, WA, 98101
Contractor:
2015
Name:
TRISQUARE CONSTRUCTION LLC
Address:
PO BOX 626, LAKE STEVENS, WA,
98258
License No:
TRISQCL894BO
Lender:
Name:
Address:
Phone: (206) 962-6513
Phone: (425) 610-7424
Expiration Date: 1/31/2017
DESCRIPTION OF WORK:
REMODEL OF EXISTING TOILET ROOMS WITH NEW FIXTURES AND WATER HEATERS. REPLACE EXISTING KITCHEN
SINK IN REMODELED AREA. NEW HAND SINK IN NEW FLEX SPACE.
Valuation of Work: $34,000.00
Water District: TUKWILA
Sewer District: TUKWILA
Fees Collected: $436.16
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2015
National Electrical Code:
2014
International Residential Code Edition:
2015
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2015
WAC 296-466:
2014
Uniform Plumbing Code Edition:
2015
WA State Energy Code:
2015
International Fuel Gas Code:
2015
Permit Center Authorized Signature: �' Date: '
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development perpit and agree to the conditiorls aXtached to this permit.
Signatu
Print M
Date: C
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS***
2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the
Tukwila Building Division.
3: All permits, inspection records and applicable plans shall be maintained at the job and available to the
plumbing inspector.
4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and
the Fuel Gas Code.
5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved.
6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and
Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of
the holder of the permit to make sure that the work will stand the test prescribed before giving notification
that the work is ready for inspection.
7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall
unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes
installed outside the conditioned space shall be insulated to minimum R-3.
8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing
shall be protected by steel nail plates not less than 18 guage.
9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No
plumbing piping shall be directly embedded in concrete or masonry.
10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected
in accordance with the requirements of the building code.
11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin
layers to twelve inches above the top of the piping with clean earth, which shall not contain stones,
boulders, cinderfill, frozen earth, or construction debris.
12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or
an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other
ordinance of the jurisdiction:
13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit.
14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of
plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies
that use significant quantities of water shall comply with Washington States Water Efficiency ad
Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section
402 of Washington State Amendments
15: Prior to permit issue applicant shall submit and sign NON-RESIDENTIAL SEWER USE CERTIFICATION listing
all new plumbing fixtures to be installed under this permit. do not list fixtures to be replaced in kind.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
8004 GROUNDWORK
1900 PLUMBING FINAL
8005 ROUGH -IN PLUMBING
CITY OF TUKWILA
Community Development Department
' Permit Center
• 6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
httt)://www.TukwilaWA.gov
SITE LOCATION
Plumbing/Gas Permit No.3t f b coo
Project No.
Date Application Accepted: %g 4-77 fO
Date Application Expires:
use
PLUMBING / GAS PIPING PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
"Please Print"
Site Address: 1180 ANDOVER PARK WEST
Tenant Name: SEATTLE CHOCOLATE
PROPERTY OWNER
Name: JEAN THOMPSON
Address: 11.80 ANDOVER PARK WEST
City: SEATTLE State: WA Zip: 98065
CONTACT PERSON — person receiving all project
communication
Name: HENRY KURASAKI (MG2)
Address: 11.01 2ND AVE; SUITE 100
City: SEATTLE State: WA Zip: 98101
Phone: (206) 962-6513 Fax:
Email: henry.kurasaki@mg2.com
King Co Assessor's Tax No.:
Suite Number: Floor:
New Tenant: ❑ .....Yes O..No
PLUMBING CONTRACTOR INFORMATION
Company Name: TBD
Address:
City: State: Zip:
Phone: Fax:
Contr Reg No.: Exp Date:
Tukwila Business License No.:
Valuation of Project (contractor's -bid price): $ �>4, 030 .
Scope of Work (please provide detailed information):
Remodel of existing toilet rooms with new fixtures and water heater. Replace existing kitchen sink in remodeled area. New hand
sink in new Flex Space.
Building Use (per Int'I Building Code):
Occupancy (per Int'l Building Code). t S A F!>/ t'l {'soS7oG)
Utility Purveyor: Water:
Sewer:
H: ApplicationsTorms-Applications On 1-ine\2011 Applications\Plumbing Permit Application Revised 8-9-11.do"
Revised: August 2011 Page 1 of 2
bh
Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below:
Fixture Type
Qty
Bathtub or combination
bath/shower
2
Dishwasher, domestic with
1
independent drain
4
Shower, sinpje head trap
2
Sinks
2
Rain water system — per
drain (inside building)
Grease interceptor for
commercial kitchen (>750
gallon capacity)
Each additional medical
gas inlets/outlets greater
than 5
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections 1-5
Fixture Type
Qty
Bidet
Drinking fountain or water
2
cooler(per head
1
Lavatory
4
Urinal
2
Water heater and/or vent
2
Repair or alteration of
water piping and/or water
treatment equipment
Backflow protective device
other than atmospheric -
type vacuum breakers 2
inch (51 mm) diameter or
smaller
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections over 5
PERMIT APPLICATION NOTES -
Fixture Type
Qty
Clothes washer,
domestic
2
Food -waste grinder,
1
commercial
Wash fountain
Water closet
2
Industrial waste
treatment interceptor,
including trap and vent,
except for kitchen type
ease interceptors
Repair or alteration of
drainage or vent piping
Backflow protective
device other than
atmospheric -type
vacuum breakers over 2
inch 51 mm diameter
Gas piping outlets
Fixture Type
Qty
Dental unit, cuspidor
Floor drain
2
Receptor, indirect waste
1
Building sewer and each
trailer park sewer
Each grease trap
(connected to not more
than 4 fixtures - <750
gallon capacity
Medical gas piping
system serving 1-5
inlets/outlets for a specific
gas
Each lawn sprinkler
system on any one meter
including backflow
protection devices
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing
and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER PR AUT D AGENT:
Sienature: r
Print
6•2q• l
Day Telephone: Z06 �IE,Z (�SI?j
Mailing Address: 1 lo\ `Zx.,A> me, 5L4(Tr-2 lLr--> SV_A'"rTL_r_ wA 9e l' �
City State Zip
H:Wpplicationc\Fotms-Applications On Line\2011 Applications\Plumbing Permit Application Revised 8-9.1 l.dom
Revised: August 2011 Page 2 of 2
bb
AM`
DESCRIPTIONS
PermitTRAK
•
QUAWITY
$3,861.57
D16-0180 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$2,109.33
DEVELOPMENT
$2,009.10
PERMIT FEE
R000.322.100.00.00
0.00
$2,004.60
WASHINGTON STATE SURCHARGE
B640.237.114
0.00
$4.50
TECHNOLOGY FEE
$100.23
TECHNOLOGY FEE
R000.322.900.04.00
0.00
$100.23
EL16-0589 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$1,095.83
ELECTRICAL
$1,043.65
PERMIT FEE MULTI-FAM/COMM
R000.322.101.00.00
0.00
$1,043.65
TECHNOLOGY FEE
$52.18
TECHNOLOGY FEE
R000.322.900.04.00
0.00
$52.18
M16-0110 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$304.13
MECHANICAL
$289.65
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
PERMIT FEE
R000.322.100.00.00
0.00
$257.15
TECHNOLOGY FEE
$14.48
TECHNOLOGY FEE
R000.322.900.04.00
0.00
$14.48
PG16-0086 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$352.28
PLUMBING
$335.50
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
PERMIT FEE
R000.322.100.00.00
0.00
$303.00
TECHNOLOGY FEE
$16.78
TECHNOLOGY FEE
R000.322.900.04.00
0.00
$16.78
Date Paid: Friday, July 22, 2016
Paid By: RONALD WOLFF
Pay Method: CREDIT CARD 022956
Printed: Friday, July 22, 2016 12:11 PM 1 of 1
DESCRIPTIONS
PermitTRAK
ACCOUNTQUANTITY
PAID
$1,720.19
D16-0180 Address: 1180 ANDOVER PARK W
Apn 3523049085
$1,302.99
DEVELOPMENT
$1,302.99
PLAN CHECK FEE
R000.345.830.00.00 0.00
$1,302.99
EL16-0589 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$260.91
ELECTRICAL
$260.91
PLAN CHECK FEE
R000.345.832.00.00 T 0.00
$260.91
M16-0110 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$72.41
MECHANICAL
$72.41
PLAN CHECK FEE
R000.322.102.00.00 0.00
$72.41
PG16-0086 Address: 1180 ANDOVER PARK W
Apn: 3523049085
$83.88
PLUMBING
$83.88
PLAN CHECK FEE
R000.322.103.00.00 0.00
$83.88
TOTAL PAID BY RECEIPT: R8828
$1,720.19
Date Paid: Monday, lune 27, 2016
Paid By: HENRY KURASAKI
Pay Method: CREDIT CARD 49138D
Printed: Monday, lune 27, 2016 7:49 AM 1 of 1 � SYSTEM5
INSPEI
Retain a
I TION NO.
:TION RECORD
copy with permit (1t)0&
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Proj t:
�ZATTW
T of Inspection:
I3 /1flm!=
Address:
I
Date Called:
Special Instructions:
Date Want a.m.
I 23A/ p.m.
lRequestyll.
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
Inspector: Date:,
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection.
INSPECTION RECORD��
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Pro' ct:
Typpf� of Inspection:
Address:
tom, � - � Pix
Date Called:
Special Instructions:
Date Wa ta.m.
7'%
Requestef
Phone No:
4Approved per applicable codes. 11 Corrections required prior to approval.
3
I paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
3
INSPECTION RECORD�� g
nf Retain a copy with permit
IN ION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
S647rLe-
I01kC 6*TZ9-
Type of Inspection:
�()AjDwoyg<
Address:
11
AleK
Date Called:
Special Instructions:
Date Want Qd: a.m.
.m.
lRequesterl
Phone No:
- 0-
9 - Zq
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: PG16-0086 DATE: 06/27/16
PROJECT NAME: SEATTLE CHOCOLATE
SITE ADDRESS: 1180 ANDOVER PARK W
X Original Plan Submittal Revision # before Permit Issued
Response to Correction Letter # Revision # after Permit Issued
DEPARTMENTS:
Bui!'ding Division Fire Prevention F-1Planning Division —1
QTS +I `/1.1• t�
ltc orks Structural ❑ Permit Coordinator
PRELIMINARY REVIEW:. DATE: 06/28/16
Not Applicable ❑ Structural Review Required ❑
(no approval/review required)
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
Corrections Required ❑
(corrections entered in Reviews)
Notation:
DUE DATE
Approved with Conditions 9
Denied ❑
(ie: Zoning Issues)
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
07/26/16
ivisrzois
TRISQUARE CONSTRUCTION I T r
Home EsptiioI Contact
Safety & Health Claims & Insurance
Washington State Departiiient of
Labor & Industries
TRISQUARE CONSTRUCTION LLC
Owner or tradesperson
Principals
WOLFF, DANIEL JOHN, PARTNER/MEMBER
Doing business as
TRISQUARE CONSTRUCTION LLC
WA UBI No.
603 074 598
License
PO BOX 626
LAKE STEVENS, WA 98258
425-610-7424
SNOHOMISH County
Business type
Limited Liability Company
Page 1 of 2
Search L&I 4it<ca�
A -'L Index help My L&I
Workplace Rights Trades & Licensing
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor. Active.
..........................................................................
Meets current requirements.
License specialties
$1,000,000.00
GENERAL
License no.
TRISOCL894BO
Effective date
Effective — expiration
01/18/2016
01120/2011— 01/31/2017
Expiration date
Bond
.................
01/18/2017
Developers Surety & Indem Co
$12,000.00
Bond account no.
256039C
Received by L&I
Effective date
03/30/2012
04/01/2012
Expiration date
Until Canceled
Bond history
Insurance
Ohio Security Ins Co
$1,000,000.00
Policy no.
BKS57065230
Received by L&I
Effective date
01/18/2016
01/18/2016
Expiration date
01/18/2017
Insurance history
Savings
......................
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
.........................................
No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=603074598&LIC=TRISQCL894BO&SAW= 07/22/2016
F
E
C
n
ABBREVIATIONS:
0
DIAMETER, PHASE
ABV
ABOVE
AC
AIR CONDITIONING UNIT
AD
AREA DRAIN, ACCESS DOOR
ADA
AMERICANS WITH DISABILITIES ACT
AFF
ABOVE FINISHED FLOOR
AFUE
ANNUAL FUEL UTILIZATION EFFICIENCY
AHJ
AUTHORITY HAVING JURISDICTION
AHU
AIR HANDLING UNIT
ALT
ALTERNATE
ALUM
ALUMINUM
APPROX
APPROXIMATE
ARCH
ARCHITECT
HD
AMERICAN SOCIETY OF HEATING, REFRIGERATION
ASHRAE
AND AIR-CONDITIONING ENGINEERS, INC.
ATM
ATMOSPHERE
AV
ACID RESISTANT (CHEMICAL) VENT
AW
ACID RESISTANT (CHEMICAL) WASTE
BF
BELOW FLOOR
BFF
BELOW FINISHED FLOOR
BHP
BRAKE HORSEPOWER
BLDG
BUILDING
BLW
BELOW
BOP
BOTTOM OF PIPE
BOT
BOTTOM
BTU
BRITISH THERMAL UNIT
BTUH
BRITISH THERMAL UNIT PER HOUR
C
CONDENSATE DRAIN PIPING
CAP
CAPACITY
CBV
CIRCUIT BALANCING VALVE
CC
COOLING COIL
CD
CEILING DIFFUSER
CI
CAST IRON
CL
CENTER LINE
CLG
CEILING
CMU
CONCRETE MASONRY UNIT
CO
CLEANOUT
COMB
COMBUSTION, COMBINATION
COND
CONDENSATE
CONN
CONNECTION
CONT
CONTINUE, CONTROL
CONTR
CONTRACTOR
COP
COEFFICIENT OF PERFORMANCE
CP
CONDENSATE PUMP
CT
COOLING TOWER
CV
CHECK VALVE, CONSTANT VOLUME
CW
DOMESTIC COLD WATER
DB
DRY BULB
DEPT
DEPARTMENT
DEG
DEGREE
DF
DRINKING FOUNTAIN
DFU
DRAINAGE FIXTURE UNIT
DI
DUCTILE IRON
DIA
DIAMETER
DIAG
DIAGRAM
DIFF
DIFFERENTIAL
DIM
DIMENSION
DN
DOWN
DWG
DRAWING
DWP
DOMESTIC WATER PUMP
(E)
EXISTING
EA
EACH, EXHAUST AIR
EAT
ENTERING AIR TEMPERATURE
ECG
EGGCRATE GRILLE
EDH
ELECTRIC DUCT HEATER
EER
ENERGY EFFICIENCY RATIO
EF
EXHAUST FAN
EFF
EFFICIENCY
EG
EXHAUST GRILLE
EJ
EXPANSION JOINT
ELEC
ELECTRIC
ELEV
ELEVATION
EMCS
ENERGY MANAGEMENT CONTROL SYSTEM
EQUIP
EQUIPMENT
ESP
EXTERNAL STATIC PRESSURE
ET
EXPANSION TANK
ETC
AND SO FORTH
EUH
ELECTRIC UNIT HEATER
EVAP
EVAPORATOR, EVAPORATIVE
EW
EYE WASH
EWC
ELECTRIC WATER COOLER
EWH
ELECTRIC WATER HEATER
EX
EXHAUST
EXT
EXTERIOR, EXTERNAL
F
FIRE SPRINKLER
OF
DEGREES FAHRENHEIT
FCO
FLOOR CLEANOUT
FCU
FAN COIL UNIT
FD
FLOOR DRAIN
F/D
FIRE DAMPER
FDC
FIRE DEPARTMENT CONNECTION
FFD
FUNNEL FLOOR DRAIN
FLA
FULL LOAD AMPS
FLR
FLOOR
FLEX
FLEXIBLE
FPM
FEET PER MINUTE
FPS
FEET PER SECOND
FS
FLOOR SINK
FIS/D
COMBINATION FIRE SMOKE DAMPER
FT
FEET, FINNED TUBE
G
GAS
GAL
GALLON
GALV
GALVANIZED
GC
GENERAL CONTRACTOR
GRD
GALLONS PER DAY
GPH
GALLONS PER HOUR
GPM
GALLONS PER MINUTE
GPR
GAS PRESSURE REGULATOR
GR
GRILLE
GRD
GRILLES, REGISTERS, AND DIFFUSERS
GW
GREASE WASTE
GWB
GYPSUM WALLBOARD
HB
HOSE BIBB
HD
HEAD
HP
HEAT PUMP, HORSEPOWER
HR
HOUR
HT
HEIGHT
HVAC
HEATING, VENTILATION & AIR CONDITIONING
HW
DOMESTIC HOT WATER
HWC
DOMESTIC HOT WATER CIRCULATING
IAQ
INDOOR AIR QUALITY
I.E.
INVERT ELEVATION
IN
INCH
INCL
INCLUDING
INV
INVERT
KW
KILOWATT
L
LENGTH
LAT
LEAVING AIR TEMPERATURE
LAV
LAVATORY
LB
POUND
LD
LINEAR DIFFUSER
LF
LINEAR FEET
LVR
LOUVER
LWT
LEAVING WATER TEMPERATURE
MAX
MAXIMUM
MBH
THOUSANDS OF BTUH
MCA
MINIMUM CIRCUIT AMPACITY
MECH
MECHANICAL
MED
MEDIUM
MFR
MANUFACTURER
MIN
MINIMUM
MISC
MISCELLANEOUS
MOCP
MAXIMUM OVERCURRENT PROTECTION
MPG
MEDIUM PRESSURE GAS
MS
MOP SINK
MTD
MOUNTED
MUA
MAKEUP AIR UNIT
(N)
NEW
NA, N/A
NOT APPLICABLE -
NC
NOISE CRITERIA, NORMALLY CLOSED
NEG
NEGATIVE
NO
NORMALLY OPEN
NO.
NUMBER
NP
NON -POTABLE
NPW
NON -POTABLE WATER
NTS
NOT TO SCALE
OC
ON CENTER
ORWL
OVERFLOW RAIN WATER LEADER
OSA
OUTSIDE AIR
P
PRESSURE,PUMP
PH
PHASE
POC
POINT OF CONNECTION
PRESS
PRESSURE
PRV
PRESSURE REDUCING VALVE
PSI
POUNDS PER SQUARE INCH
PTRV
PRESSURE/TEMPERATURE RELIEF VALVE
PU
PUMP
PVC
POLYVINYL CHLORIDE
QTY
QUANTITY
RCP
REFLECTED CEILING PLAN
RD
ROOF DRAIN
REF
REFERENCE
REG
REGISTER
REL
RELIEF
REQD
REQUIRED
ROD
ROOF OVERFLOW DRAIN
RPBA
REDUCED PRESSURE BACKFLOW ASSEMBLY
RPBP
REDUCED PRESSURE BACKFLOW PREVENTER
RPM
REVOLUTIONS PER MINUTE
RTU
ROOFTOP UNIT
RV
RELIEF VALVE
RWL
RAIN WATER LEADER
SCH
SCHEDULE
SCHEM
SCHEMATIC
SPEC
SPECIFICATION
SQ
SQUARE
SRV
SAFETY RELIEF VALVE
SS
STAINLESS STEEL
ST
STORAGE TANK, SOUND TRAP
STD
STANDARD
STM
STEAM
STIR
STARTER,STRUCTURAL
SUCT
SUCTION
SUP
SUPPLY
MECHANICAL SHEET LIST
REFERENCE SYMBOLS
GENERAL NOTES:
TEMP TEMPERATURE
PLUMBING SCHEDULES
GENERAL:
UNDERGROUND PLUMBING PLAN
NEW PLUMBING WORK
PLUMBING FLOOR PLAN
TOF TOP OF FOOTING
1. COORDINATE MECHANICAL WORK WITH ELECTRICAL,
TOP TOP OF PIPE
EXISTING PLUMBING WORK
ARCHITECTURAL, STRUCTURAL, CIVIL AND LANDSCAPE
TPRV TEMPERATURE/PRESSURE RELIEF VALVE
EXISTINGPLUMBING WORK TO
WORK SHOWN ON OTHER CONTRACT DOCUMENTS. PROVIDE
i i i i i i i
ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION
TSP TOTAL STATIC PRESSURE
BE DEMOLISHED
WHERE REQUIRED.
T'STAT THERMOSTAT
��----- ENLARGED PLAN BORDER
2. COORDINATE HVAC, PLUMBING AND FIRE PROTECTION
TYP TYPICAL
WORK PRIOR TO INSTALLATION. DUCTWORK AND
MATCHLINE
EQUIPMENT ACCESS TAKES PRECEDENCE OVER PIPING
UH UNIT HEATER
FOR AVAILABLE SPACE.
3. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH
UNOCC UNOCCUPIED
1
SECTION IDENTIFIER
AND INSTALL".
URN URINAL
PX.X
4. COORDINATE EQUIPMENT CONNECTIONS WITH
MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND
V VENT, VOLTS
1
PROVIDE DUCT AND PIPING TRANSITIONS REQUIRED FOR
DETAIL OR DRAWING IDENTIFIER
FINAL EQUIPMENT CONNECTIONS TO FURNISHED
VB VACUUM BREAKER
PX.X
EQUIPMENT. FIELD VERIFY AND COORDINATE DUCT AND
VEL VELOCITY
PIPING DIMENSIONS BEFORE FABRICATION.
VFD VARIABLE FREQUENCY DRIVE
REVISION CLOUD INDICATES WHERE
5. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE
VTR VENT THRU ROOF
SECTION APPEARS
PROPER INSTALLATION OF MECHANICAL SYSTEMS.
6. LOCATE VALVES, WATER HAMMER ARRESTERS, CLEANOUTS
W WASTE, WATT, WIDTH
Q INDICATES REVISION &NUMBER
AND SIMILAR COMPONENTS SO THAT THEY ARE ACCESSIBLE.
PROVIDE ACCESS DOORS FOR MECHANICAL EQUIPMENT
W/ WITH
INSTALLED BEHIND WALLS, ABOVE INACCESSIBLE CEILINGS
WC WATER CLOSET
FLAG NOTE
AND BELOW FLOORS. COORDINATE ACCESS DOOR
LOCATIONS WITH ARCHITECTIENGINEER. INSTALL TAG ON
WCO WALL CLEANOUT
CEILING GRID FRAME TO INDICATE LOCATION AND TYPE OF
WH WATER HEATER
P -XXX EQUIPMENT IDENTIFIER
EQUIPMENT THAT REQUIRES MAINTENANCE. PROVIDE 16 GA,
WM WATER METER
STEEL, FLUSH TYPE ACCESS DOOR WITH CONCEALED HINGE
POINT OF CONNECTION
AND SLOT SCREWDRIVER TYPE CAM LATCH. PROVIDE
W/O WITHOUT
FACTORY PRIMED IN PAINTED SURFACE AREAS FOR FIELD
WPD WATER PRESSURE DROP
PAINTING. PROVIDE STAINLESS STEEL FOR ALL OTHER
WSEC WASHINGTON STATE ENERGY CODE
NORTH ARROW
AREAS. PROVIDE UL LISTED AND LABELED DOOR WHERE
FIRE -RESISTANCE RATING IS INDICATED ON DRAWINGS.
WSFU WATER SUPPLY FIXTURE UNIT
ACCESS DOOR SHALL BE SIZED SO THAT ADJACENT
WT WEIGHT
EQUIPMENT IS ACCESSIBLE. PROVIDE ACUDOR, ELMDOR,
-1
MILCOR, OR APPROVED.
MECHANICAL ACCESS
7. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY
THAT ATTACHMENT POINTS ON EQUIPMENT AND STRUCTURE
CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS IMPOSED.
8. REFER TO TYPICAL DETAILS PROVIDED IN THIS DWG SET FOR
PLUMBING LINE
DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
CONTRACTOR IS RESPONSIBLE FOR CONFORMANCE WITH
DESIGNATION SYMBOLS
DETAILS.
9. LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF
OPENINGS SHALL BE COORDINATED WITH OTHER TRADES
- DOMESTIC COLD WATER (POTABLE)
INVOLVED. INCLUDE IN THE COST OF MECHANICAL WORK,
CUTTING, CORING, PATCHING AND PAINTING OF EXISTING
- - DOMESTIC HOT WATER (POTABLE)
WALLS, CEILINGS, FLOORS AND ROOFS AS REQUIRED TO
ACCOMMODATE WORK AS INDICATED IN THE MECHANICAL
DOMESTIC HOT WATER CIRCULATING
CONTRACT DOCUMENTS, UNLESS SPECIFICALLY SHOWN ON
(POTABLE)
ARCHITECTURAL DRAWINGS.
SANITARY SEWER ABOVEGROUND
10. PROVIDE ELASTOMERIC FOAM MATERIAL ON MECHANICAL
SANITARY SEWER UNDERGROUND
EQUIPMENT THAT PRESENT A SAFETY HAZARD.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
- - - - - - - VENT PIPING
SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE.
GREASE WASTE ABOVEGROUND
OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF
PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL
- - GREASE WASTE UNDERGROUND
CONDITIONS.
12. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE
G LOW PRESSURE NATURAL GAS
PREMISES ANY DIRT AND DEBRIS CAUSE BY THE
MEDIUM PRESSURE NATURAL GAS
PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.
BEFORE SUBSTANTIAL COMPLETION, CLEAN EQUIPMENT,
FIXTURES, EXPOSED DUCTS, PIPING AND SIMILAR ITEMS.
PIPING E L E M E N TS/VALV I N G
13. PROVIDE EQUIPMENT THAT FITS INTO THE SPACE ALLOTTED
AND ALLOWS ADEQUATE ACCEPTABLE CLEARANCE FOR
INSTALLATION, REPLACEMENT, ENTRY, SERVICING AND
VALVE
MAINTENANCE. COORDINATE WITH OTHER TRADES TO
ENSURE NO CONFLICT WITH REQUIRED CLEARANCES.
CHECK VALVE
14. PROVIDE OFFSETS IN PIPING WHERE PLUMBING/PIPING WALL
BALANCING VALVE
IS LOCATED DIRECTLY ABOVE STRUCTURE. OFFSET PIPING
INTO CASEWORK OR SHAFT TIGHT TO WALL AND BACK INTO
-f.r- SOLENOID VALVE
WALL ONCE BELOW STRUCTURE. REFER TO STRUCTURAL
DRAWINGS.
-�Q-- PRESSURE REDUCING VALVE (PRV)
15. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL
tw
AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP
4� TEMPERATURE/PRESSURE RELIEF VALVE
DRAWING SO ROUTING IS COORDINATED WITH OTHER
DISCIPLINES.
RELIEF/SAFETY VALVE
16. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE
OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN
DIRECTION OF FLOW
25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50
R D
WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
DIRECTION OF PITCH -RISE OR DROP
STRAINER
PLUMBING:
1. DOMESTIC WATER TUBE, PIPE, FITTINGS, JOINING
MATERIALS, SPECIALTIES, PLUMBING EQUIPMENT, PLUMBING
- UNION
FIXTURES, PLUMBING FITTINGS AND ALL OTHER
APPURTENANCES IN CONTACT WITH DRINKING WATER SHALL
BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN
PRESSURE GAUGE
SECTION 3874 OF THE SAFE WATER DRINKING ACT.
THERMOMETER
LEAD-FREE SHALL MEAN (A) NOT CONTAINING MORE THAN
4
0.2 PERCENT LEAD WHEN USED WITH RESPECT TO SOLDER
AQUASTAT
AND FLUX; AND (B) NOT MORE THAN A WEIGHTED AVERAGE
OF 0.25 PERCENT LEAD WHEN USED WITH RESPECT TO
GAUGE WITH GAUGE COCK
WETTED SURFACES OF DOMESTIC WATER TUBE, PIPE,
& SIPHON (STEAM)
FITTINGS, JOINING MATERIALS, SPECIALTIES, PLUMBING
gg
EQUIPMENT, PLUMBING FIXTURES, AND PLUMBING FITTINGS.
GAS PRESSURE REGULATOR
2. PROVIDE WATER HAMMER ARRESTORS IN DOMESTIC WATER
PIPING IN ACCORDANCE WITH PD1 -WH 201.
EXPANSION JOINT
3. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH
BACKFLOW PREVENTER, WATER PRESSURE REDUCING
FLEXIBLE CONNECTOR
VALVE, CONTROL VALVE, SOLENOID VALVE AND PUMP.
PROVIDE SHUTOFF VALVE ON EACH SIDE OF STRAINER.
WATER METER
4. VALVES, EXPANSION FITTINGS/LOOPS, AND PIPING
GM GAS METER
SPECIALTIES SHALL BE FULL SIZE OF PIPE UNLESS NOTED
OTHERWISE.
-�� PUMP
NON-STRUCTURAL MECHANICAL COMPONENTS:
1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE
2012 INTERNATIONAL BUILDING CODE AND FROM THE
WATER HAMMER ARRESTER
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD
HOSE BIBB
7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR
ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER
ROOF DRAIN
DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO
REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN
Q FLOOR DRAIN
BID,
FLOOR SINK
2. 2012 IBC 1613.1 SCOPE: ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT
FCO CLEAN-OUT (FLOOR)
ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR
-MWCO CLEAN-OUT (WALL)
SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND
CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE
CO CLEAN-OUT
MOTIONS IN ACCORDANCE WITH ASCE 7-10, EXCLUDING
CHAPTER 14 AND APPENDIX 11A.
PIPE CONTINUES
3. 2012 IBC 1705.11 CONTRACTOR RESPONSIBILITY: THE
PIPE CAP
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN
AND CONSTRUCTION OF A SEISMIC -FORCE -RESISTING
OVTR VENT THRU ROOF
SYSTEM, DESIGNATED SEISMIC SYSTEM, OR
SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT
® TRENCH DRAIN
OF SPECIAL INSPECTIONS.
PIPE RISING UP
4. HANGERS AND SEISMIC BRACING FOR THE MECHANICAL
9 PIPE DROPPING DOWN
SYSTEMS SHALL BE DESIGNED AND PROVIDED BY THE
MECHANICAL CONTRACTOR. REFER TO CONTRACTOR SHOP
PIPE CONNECTION
DRAWINGS FOR LOCATIONS OF EQUIPMENT AND HUNG
MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR
PIPE CONNECTION DOWN
SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN
LOADS FOR HUNG MECHANICAL SYSTEMS WITH THE
GENERAL CONTRACTOR AND OTHER TRADES THAT MAY BE
IMPACTED.
MECHANICAL SHEET LIST
P0.1
PLUMBING LEGEND AND NOTES
P0.2
PLUMBING SCHEDULES
P1.0
UNDERGROUND PLUMBING PLAN
P1.1
PLUMBING FLOOR PLAN
r
SEP„DATE PE, -111,11T
REQU1RED FOR:
VeMachanical
Electrical
Plumbing
❑ Gas Piping
Ci�j of Tukwila
DIVISION
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
9180 ANDOVER PARK WEST
TUKWILA, WA 98065
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 082016
i`&)�
Ci of Tukwila
BUILDING DIVISION
R COPY
e it r4o,
Nik-0 4
Plan review approval is subject to errors and omissio;s.
l
Approval of construction documents does not aWlhori a
the violation of any adopted Code or ordinance. Recoipt
Of approved Field opy nd Conditions i a k wled ed:
t3y:
Date:_ 7
City of Tukwila
BUILDING DIVISION
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a nc4�i p!an submittal
and may include additional plan mvisw fees ,
CITY or. z n
,SUN 27 2016
PER CIT CENTER
0 DATE DESCRIPTION
06/24/16 Permit Bid Set
c�
0
N
O
CL
0
U
ti
N
O
O
r
r
O
a
ui
J
a
c*)
cli
cc
T
0
N
N
W
t
w
Q
0
Z
z
Q
O
0
B
w
Y
M
[D
D
w
r
O
J
a
F
E
U
C
N
I.1
PLUMBING FIXTURE SCHEDULE
TAG
TAG
LOCATION
TAG
CAPACITY
GAL
FIXTURE
MANUFACTURER / MODEL
FAUCET
NOTES
CONNECTIONS
OPERATING
WEIGHT
(LBS
NOTES
W
V
CW
HW
P-1
3
HAND WASH SINK
REJUVENATION / ALAPE BUCKET SINK
KINGSTON BRASS / KS213SN
1-1/2"
1-1/2"
1/2"
1/2"
1,2
P-2
WATER CLOSET
KOHLER / HIGHLINE K-3493
-
4"
2"
1-1/2"
-
1,3
P-3
URINAL
KOHLER / DEXTER K-5016
-
2"
2"
3/4"
-
1,6
P4
TROUGH SINK
SONOMA CAST STONE / TS -1654
AMERICAN STANDARD / HERITAGE 7295.252
1-1/2"
1-1/2"
1/2"
1/2"
1,2
P-5
KITCHEN SINK
ELKAY / ELRAD2521
AMERICAN STANDARD / CADET 841 OF
1-1/2"
1-1/2"
1/2"
1/2"
1,2,8
P-6
HIGH - LOW WATER COOLER
SUNROC / ADA8ACB
-
1-1/2"
1-1/2"
1/2"
-
1,2
TP
TRAP PRIMER
PPP, INC. / P-2
-
-
-
1/2"
-
4
FD
FLOOR DRAIN
JAY R. SMITH / 2010
-
2"
2"
-
-
5
FS
FLOOR SINK
JAY R. SMITH / 3100
-
2"
2"
-
-
7
FCO
FLOOR CLEANOUT
JAY R. SMITH / 4020
-
-
-
-
-
NOTES:
1) REFER TO ARCH. DRAWINGS FOR CLEARANCES AND MOUNTING HEIGHTS.
2) ALL PLUMBING FITTINGS AND FIXTURES SHALL BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN SECTION 3874 OF THE SAFE WATER DRINKING ACT.
3) PROVIDE WITH SLOAN "ROYAL" 111 -1.28 -SMO FLUSH VALVEAND BEMIS 1955CT SEAT.
4) PROVIDE WITH 12"x12" STAINLESS STEEL ACCESS PANEL.
5) PROVIDE WITH NICKEL BRONZE, SQUARE TOP.
6) PROVIDE WITH SLOAN "ROYAL" 8111 -SMO URINAL FLUSH VALVE.
7) PROVIDE WITH NICKEL BRONZE HALF GRATE.
8) PROVIDE WITH 5.5" BOWL DEPTH AND THREE FAUCET HOLES.
9) PROVIDE WITH GE GLDA696FSS DISHWASHER OR EQUIVALENT. PROVIDE ALL ACCESSORIES INCLUDING SUPPLY AND DRAIN CONNECTIONS WITH AIR GAP AT SINK.
ELECTRIC WATER HEATER SCHEDULE
TAG
TAG
LOCATION
MANUFACTURER / MODEL
CAPACITY
GAL
CAPACITY
KW
CW
INLET
IN
HW
OUTLET
IN
NOTES
DIMENSIONS
(DIAxHT)
(INAN)
OPERATING
WEIGHT
(LBS
NOTES
VOLTAGE/PHASE
to)
EWH-1
UTILITY ROOM
A.O. SMITH / DEL -20
20
3
3/4
3/4
208/3
22x22
300
1,2
NOTES:
1) PROVIDE WITH EXPANSION TANK (ET -1), HEAT TRAPS AND TEMPERATURE AND PRESSURE RELIEF VALVE PIPED FULL SIZE TO FLOOR SINK.
2) INSTALL WATER HEATER ON HOUSEKEEPING PAD WITH DRAIN PAN.
INSTANTANEOUS WATER HEATER SCHEDULE
TAG
LOCATION
MANUFACTURER / MODEL
CAPACITY
KW
ACTIVATION
GPM)
MANUFACTURER/ MODEL
DIMENSIONS
(LxWxH)
(INAN)
OPERATING
WEIGHT
(LBS
NOTES
AMPS
VOLTAGE
M
EWH-2
TASTING ROOM
CHRONOMITE / M-40-208
8.3
0.65
48
208
10x3x7
5
1
NOTES:
1) INSTALL WATER HEATER IN CABINETRY ADJACENT TO HAND WASH SINK. COORDINATE WITH CASEWORK INSTALLER.
EXPANSION TANK SCHEDULE
TAG
SYSTEM
SERVED
LOCATION
MANUFACTURER/ MODEL
VOLUME
GAL
ACCEPTANCE
VOLUME
GAL
SYSTEM
CONN
IN)
DIMENSIONS
(DIAxHT)
(INAN)
OPERATING
WEIGHT
(LBS
ET -1
DOMESTIC HOT WATER
UTILITY ROOM
AMTROL / ST -5C
2
0.9
3/4
8x14
40
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
R
EVIE DC FOR
coDE ICOM VEfl CE
A PPRO
8 2016
ti. JUL �
.
City ot-ru"ila
BUI1rDING DIVISION
REcEnjE-D
CITE' OFI WKWil-A
JUN 2-7 2016
PERFAIT CENTER
DATE DESCRIPTION
06/24/16 Permit Bid Set
A
E
Is
J
C
F
FLAG NOTES:
FIELD VERIFY ROUTING AND SIZE OF WASTE PIPING PRIOR
TO START OF CONSTRUCTION.
2 CONNECT 2" W TO (E) 4" W ROUTED BELOW FLOOR. FIELD
VERIFY EXACT ROUTING AND SIZE OF WASTE PIPING PRIOR
TO START OF CONSTRUCTION.
r�•
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
RE L ANNE
aCODAPPROVED
u- D 8 2016
. CItY Of `fukWila
gU1LD1_� iV�oN
WMEIVE
CITE' OF TUK11 inL:
JUN 2'7 2016
PERMIT CENTER
DATE DESCRIPTION
06/24/16 Permit Bid Set
UNDERGROUND
PLUMBING PLAN
❑
T
CL
6
U
ti
N
O
coi
r
NCD
J
a
ui
LL
a
N
N
of
co
r
O
N
N
CO
W
t
W
0
Z
Z
Q
O
w
m
W
O
J
d
F
E
0
C
101
0
GENERAL NOTES:
1. ALL DOMESTIC WATER PIPING SHALL BE TYPE M FOR ALL
SIZES.
2. COLD & HOT WATER PIPING SHALL BE INSULATED WITH
MINIMUM 1" THINK FIBERGLASS INSULATION (R-6).
FLAG NOTES:
CONNECT 3/4" CW TO CW PIPING SERVING EXISTING TOILET
ROOMS. FIELD VERIFY ROUTING AND SIZE OF DOMESTIC
WATER PIPING PRIOR TO START OF CONSTRUCTION.
[2�> ROUTE 1-1/2" WASTE LINE IN WALL. DROP WASTE LINE
DOWN TO (E) WASTE LINE BELOW FLOOR. REFER TO P-1.0
FOR ADDITIONAL INFORMATION.
CONNECT 2" CW TO (E) 2" CW. FIELD VERIFY ROUTING AND
SIZE OF EXISTING DOMESTIC WATER PIPING DURING
TOILET ROOM DEMOLITION.
PROVIDE MINIMUM 4" HOUSEKEEPING PAD FOR WATER
HEATER.
I t3Utl.DtNG 0
RECEIVED,
CITY OF WKWILA
JUN 27 2016
PERMIT CENTER
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
A DATE DESCRIPTION
06/24/16 Permit Bid Set
PLUMBING
FLOOR PLAN
F
E
C
n
ABBREVIATIONS:
0
DIAMETER, PHASE
ABV
ABOVE
AC
AIR CONDITIONING UNIT
AD
AREA DRAIN, ACCESS DOOR
ADA
AMERICANS WITH DISABILITIES ACT
AFF
ABOVE FINISHED FLOOR
AFUE
ANNUAL FUEL UTILIZATION EFFICIENCY
AHJ
AUTHORITY HAVING JURISDICTION
AHU
AIR HANDLING UNIT
ALT
ALTERNATE
ALUM
ALUMINUM
APPROX
APPROXIMATE
ARCH
ARCHITECT
HD
AMERICAN SOCIETY OF HEATING, REFRIGERATION
ASHRAE
AND AIR-CONDITIONING ENGINEERS, INC.
ATM
ATMOSPHERE
AV
ACID RESISTANT (CHEMICAL) VENT
AW
ACID RESISTANT (CHEMICAL) WASTE
BF
BELOW FLOOR
BFF
BELOW FINISHED FLOOR
BHP
BRAKE HORSEPOWER
BLDG
BUILDING
BLW
BELOW
BOP
BOTTOM OF PIPE
BOT
BOTTOM
BTU
BRITISH THERMAL UNIT
BTUH
BRITISH THERMAL UNIT PER HOUR
C
CONDENSATE DRAIN PIPING
CAP
CAPACITY
CBV
CIRCUIT BALANCING VALVE
CC
COOLING COIL
CD
CEILING DIFFUSER
CI
CAST IRON
CL
CENTER LINE
CLG
CEILING
CMU
CONCRETE MASONRY UNIT
CO
CLEANOUT
COMB
COMBUSTION, COMBINATION
COND
CONDENSATE
CONN
CONNECTION
CONT
CONTINUE, CONTROL
CONTR
CONTRACTOR
COP
COEFFICIENT OF PERFORMANCE
CP
CONDENSATE PUMP
CT
COOLING TOWER
CV
CHECK VALVE, CONSTANT VOLUME
CW
DOMESTIC COLD WATER
DB
DRY BULB
DEPT
DEPARTMENT
DEG
DEGREE
DF
DRINKING FOUNTAIN
DFU
DRAINAGE FIXTURE UNIT
DI
DUCTILE IRON
DIA
DIAMETER
DIAG
DIAGRAM
DIFF
DIFFERENTIAL
DIM
DIMENSION
DN
DOWN
DWG
DRAWING
DWP
DOMESTIC WATER PUMP
(E)
EXISTING
EA
EACH, EXHAUST AIR
EAT
ENTERING AIR TEMPERATURE
ECG
EGGCRATE GRILLE
EDH
ELECTRIC DUCT HEATER
EER
ENERGY EFFICIENCY RATIO
EF
EXHAUST FAN
EFF
EFFICIENCY
EG
EXHAUST GRILLE
EJ
EXPANSION JOINT
ELEC
ELECTRIC
ELEV
ELEVATION
EMCS
ENERGY MANAGEMENT CONTROL SYSTEM
EQUIP
EQUIPMENT
ESP
EXTERNAL STATIC PRESSURE
ET
EXPANSION TANK
ETC
AND SO FORTH
EUH
ELECTRIC UNIT HEATER
EVAP
EVAPORATOR, EVAPORATIVE
EW
EYE WASH
EWC
ELECTRIC WATER COOLER
EWH
ELECTRIC WATER HEATER
EX
EXHAUST
EXT
EXTERIOR, EXTERNAL
F
FIRE SPRINKLER
OF
DEGREES FAHRENHEIT
FCO
FLOOR CLEANOUT
FCU
FAN COIL UNIT
FD
FLOOR DRAIN
F/D
FIRE DAMPER
FDC
FIRE DEPARTMENT CONNECTION
FFD
FUNNEL FLOOR DRAIN
FLA
FULL LOAD AMPS
FLR
FLOOR
FLEX
FLEXIBLE
FPM
FEET PER MINUTE
FPS
FEET PER SECOND
FS
FLOOR SINK
FIS/D
COMBINATION FIRE SMOKE DAMPER
FT
FEET, FINNED TUBE
G
GAS
GAL
GALLON
GALV
GALVANIZED
GC
GENERAL CONTRACTOR
GRD
GALLONS PER DAY
GPH
GALLONS PER HOUR
GPM
GALLONS PER MINUTE
GPR
GAS PRESSURE REGULATOR
GR
GRILLE
GRD
GRILLES, REGISTERS, AND DIFFUSERS
GW
GREASE WASTE
GWB
GYPSUM WALLBOARD
HB
HOSE BIBB
HD
HEAD
HP
HEAT PUMP, HORSEPOWER
HR
HOUR
HT
HEIGHT
HVAC
HEATING, VENTILATION & AIR CONDITIONING
HW
DOMESTIC HOT WATER
HWC
DOMESTIC HOT WATER CIRCULATING
IAQ
INDOOR AIR QUALITY
I.E.
INVERT ELEVATION
IN
INCH
INCL
INCLUDING
INV
INVERT
KW
KILOWATT
L
LENGTH
LAT
LEAVING AIR TEMPERATURE
LAV
LAVATORY
LB
POUND
LD
LINEAR DIFFUSER
LF
LINEAR FEET
LVR
LOUVER
LWT
LEAVING WATER TEMPERATURE
MAX
MAXIMUM
MBH
THOUSANDS OF BTUH
MCA
MINIMUM CIRCUIT AMPACITY
MECH
MECHANICAL
MED
MEDIUM
MFR
MANUFACTURER
MIN
MINIMUM
MISC
MISCELLANEOUS
MOCP
MAXIMUM OVERCURRENT PROTECTION
MPG
MEDIUM PRESSURE GAS
MS
MOP SINK
MTD
MOUNTED
MUA
MAKEUP AIR UNIT
(N)
NEW
NA, N/A
NOT APPLICABLE -
NC
NOISE CRITERIA, NORMALLY CLOSED
NEG
NEGATIVE
NO
NORMALLY OPEN
NO.
NUMBER
NP
NON -POTABLE
NPW
NON -POTABLE WATER
NTS
NOT TO SCALE
OC
ON CENTER
ORWL
OVERFLOW RAIN WATER LEADER
OSA
OUTSIDE AIR
P
PRESSURE,PUMP
PH
PHASE
POC
POINT OF CONNECTION
PRESS
PRESSURE
PRV
PRESSURE REDUCING VALVE
PSI
POUNDS PER SQUARE INCH
PTRV
PRESSURE/TEMPERATURE RELIEF VALVE
PU
PUMP
PVC
POLYVINYL CHLORIDE
QTY
QUANTITY
RCP
REFLECTED CEILING PLAN
RD
ROOF DRAIN
REF
REFERENCE
REG
REGISTER
REL
RELIEF
REQD
REQUIRED
ROD
ROOF OVERFLOW DRAIN
RPBA
REDUCED PRESSURE BACKFLOW ASSEMBLY
RPBP
REDUCED PRESSURE BACKFLOW PREVENTER
RPM
REVOLUTIONS PER MINUTE
RTU
ROOFTOP UNIT
RV
RELIEF VALVE
RWL
RAIN WATER LEADER
SCH
SCHEDULE
SCHEM
SCHEMATIC
SPEC
SPECIFICATION
SQ
SQUARE
SRV
SAFETY RELIEF VALVE
SS
STAINLESS STEEL
ST
STORAGE TANK, SOUND TRAP
STD
STANDARD
STM
STEAM
STIR
STARTER,STRUCTURAL
SUCT
SUCTION
SUP
SUPPLY
MECHANICAL SHEET LIST
REFERENCE SYMBOLS
GENERAL NOTES:
TEMP TEMPERATURE
PLUMBING SCHEDULES
GENERAL:
UNDERGROUND PLUMBING PLAN
NEW PLUMBING WORK
PLUMBING FLOOR PLAN
TOF TOP OF FOOTING
1. COORDINATE MECHANICAL WORK WITH ELECTRICAL,
TOP TOP OF PIPE
EXISTING PLUMBING WORK
ARCHITECTURAL, STRUCTURAL, CIVIL AND LANDSCAPE
TPRV TEMPERATURE/PRESSURE RELIEF VALVE
EXISTINGPLUMBING WORK TO
WORK SHOWN ON OTHER CONTRACT DOCUMENTS. PROVIDE
i i i i i i i
ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION
TSP TOTAL STATIC PRESSURE
BE DEMOLISHED
WHERE REQUIRED.
T'STAT THERMOSTAT
��----- ENLARGED PLAN BORDER
2. COORDINATE HVAC, PLUMBING AND FIRE PROTECTION
TYP TYPICAL
WORK PRIOR TO INSTALLATION. DUCTWORK AND
MATCHLINE
EQUIPMENT ACCESS TAKES PRECEDENCE OVER PIPING
UH UNIT HEATER
FOR AVAILABLE SPACE.
3. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH
UNOCC UNOCCUPIED
1
SECTION IDENTIFIER
AND INSTALL".
URN URINAL
PX.X
4. COORDINATE EQUIPMENT CONNECTIONS WITH
MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND
V VENT, VOLTS
1
PROVIDE DUCT AND PIPING TRANSITIONS REQUIRED FOR
DETAIL OR DRAWING IDENTIFIER
FINAL EQUIPMENT CONNECTIONS TO FURNISHED
VB VACUUM BREAKER
PX.X
EQUIPMENT. FIELD VERIFY AND COORDINATE DUCT AND
VEL VELOCITY
PIPING DIMENSIONS BEFORE FABRICATION.
VFD VARIABLE FREQUENCY DRIVE
REVISION CLOUD INDICATES WHERE
5. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE
VTR VENT THRU ROOF
SECTION APPEARS
PROPER INSTALLATION OF MECHANICAL SYSTEMS.
6. LOCATE VALVES, WATER HAMMER ARRESTERS, CLEANOUTS
W WASTE, WATT, WIDTH
Q INDICATES REVISION &NUMBER
AND SIMILAR COMPONENTS SO THAT THEY ARE ACCESSIBLE.
PROVIDE ACCESS DOORS FOR MECHANICAL EQUIPMENT
W/ WITH
INSTALLED BEHIND WALLS, ABOVE INACCESSIBLE CEILINGS
WC WATER CLOSET
FLAG NOTE
AND BELOW FLOORS. COORDINATE ACCESS DOOR
LOCATIONS WITH ARCHITECTIENGINEER. INSTALL TAG ON
WCO WALL CLEANOUT
CEILING GRID FRAME TO INDICATE LOCATION AND TYPE OF
WH WATER HEATER
P -XXX EQUIPMENT IDENTIFIER
EQUIPMENT THAT REQUIRES MAINTENANCE. PROVIDE 16 GA,
WM WATER METER
STEEL, FLUSH TYPE ACCESS DOOR WITH CONCEALED HINGE
POINT OF CONNECTION
AND SLOT SCREWDRIVER TYPE CAM LATCH. PROVIDE
W/O WITHOUT
FACTORY PRIMED IN PAINTED SURFACE AREAS FOR FIELD
WPD WATER PRESSURE DROP
PAINTING. PROVIDE STAINLESS STEEL FOR ALL OTHER
WSEC WASHINGTON STATE ENERGY CODE
NORTH ARROW
AREAS. PROVIDE UL LISTED AND LABELED DOOR WHERE
FIRE -RESISTANCE RATING IS INDICATED ON DRAWINGS.
WSFU WATER SUPPLY FIXTURE UNIT
ACCESS DOOR SHALL BE SIZED SO THAT ADJACENT
WT WEIGHT
EQUIPMENT IS ACCESSIBLE. PROVIDE ACUDOR, ELMDOR,
-1
MILCOR, OR APPROVED.
MECHANICAL ACCESS
7. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY
THAT ATTACHMENT POINTS ON EQUIPMENT AND STRUCTURE
CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS IMPOSED.
8. REFER TO TYPICAL DETAILS PROVIDED IN THIS DWG SET FOR
PLUMBING LINE
DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
CONTRACTOR IS RESPONSIBLE FOR CONFORMANCE WITH
DESIGNATION SYMBOLS
DETAILS.
9. LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF
OPENINGS SHALL BE COORDINATED WITH OTHER TRADES
- DOMESTIC COLD WATER (POTABLE)
INVOLVED. INCLUDE IN THE COST OF MECHANICAL WORK,
CUTTING, CORING, PATCHING AND PAINTING OF EXISTING
- - DOMESTIC HOT WATER (POTABLE)
WALLS, CEILINGS, FLOORS AND ROOFS AS REQUIRED TO
ACCOMMODATE WORK AS INDICATED IN THE MECHANICAL
DOMESTIC HOT WATER CIRCULATING
CONTRACT DOCUMENTS, UNLESS SPECIFICALLY SHOWN ON
(POTABLE)
ARCHITECTURAL DRAWINGS.
SANITARY SEWER ABOVEGROUND
10. PROVIDE ELASTOMERIC FOAM MATERIAL ON MECHANICAL
SANITARY SEWER UNDERGROUND
EQUIPMENT THAT PRESENT A SAFETY HAZARD.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
- - - - - - - VENT PIPING
SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE.
GREASE WASTE ABOVEGROUND
OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF
PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL
- - GREASE WASTE UNDERGROUND
CONDITIONS.
12. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE
G LOW PRESSURE NATURAL GAS
PREMISES ANY DIRT AND DEBRIS CAUSE BY THE
MEDIUM PRESSURE NATURAL GAS
PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.
BEFORE SUBSTANTIAL COMPLETION, CLEAN EQUIPMENT,
FIXTURES, EXPOSED DUCTS, PIPING AND SIMILAR ITEMS.
PIPING E L E M E N TS/VALV I N G
13. PROVIDE EQUIPMENT THAT FITS INTO THE SPACE ALLOTTED
AND ALLOWS ADEQUATE ACCEPTABLE CLEARANCE FOR
INSTALLATION, REPLACEMENT, ENTRY, SERVICING AND
VALVE
MAINTENANCE. COORDINATE WITH OTHER TRADES TO
ENSURE NO CONFLICT WITH REQUIRED CLEARANCES.
CHECK VALVE
14. PROVIDE OFFSETS IN PIPING WHERE PLUMBING/PIPING WALL
BALANCING VALVE
IS LOCATED DIRECTLY ABOVE STRUCTURE. OFFSET PIPING
INTO CASEWORK OR SHAFT TIGHT TO WALL AND BACK INTO
-f.r- SOLENOID VALVE
WALL ONCE BELOW STRUCTURE. REFER TO STRUCTURAL
DRAWINGS.
-�Q-- PRESSURE REDUCING VALVE (PRV)
15. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL
tw
AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP
4� TEMPERATURE/PRESSURE RELIEF VALVE
DRAWING SO ROUTING IS COORDINATED WITH OTHER
DISCIPLINES.
RELIEF/SAFETY VALVE
16. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE
OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN
DIRECTION OF FLOW
25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50
R D
WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
DIRECTION OF PITCH -RISE OR DROP
STRAINER
PLUMBING:
1. DOMESTIC WATER TUBE, PIPE, FITTINGS, JOINING
MATERIALS, SPECIALTIES, PLUMBING EQUIPMENT, PLUMBING
- UNION
FIXTURES, PLUMBING FITTINGS AND ALL OTHER
APPURTENANCES IN CONTACT WITH DRINKING WATER SHALL
BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN
PRESSURE GAUGE
SECTION 3874 OF THE SAFE WATER DRINKING ACT.
THERMOMETER
LEAD-FREE SHALL MEAN (A) NOT CONTAINING MORE THAN
4
0.2 PERCENT LEAD WHEN USED WITH RESPECT TO SOLDER
AQUASTAT
AND FLUX; AND (B) NOT MORE THAN A WEIGHTED AVERAGE
OF 0.25 PERCENT LEAD WHEN USED WITH RESPECT TO
GAUGE WITH GAUGE COCK
WETTED SURFACES OF DOMESTIC WATER TUBE, PIPE,
& SIPHON (STEAM)
FITTINGS, JOINING MATERIALS, SPECIALTIES, PLUMBING
gg
EQUIPMENT, PLUMBING FIXTURES, AND PLUMBING FITTINGS.
GAS PRESSURE REGULATOR
2. PROVIDE WATER HAMMER ARRESTORS IN DOMESTIC WATER
PIPING IN ACCORDANCE WITH PD1 -WH 201.
EXPANSION JOINT
3. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH
BACKFLOW PREVENTER, WATER PRESSURE REDUCING
FLEXIBLE CONNECTOR
VALVE, CONTROL VALVE, SOLENOID VALVE AND PUMP.
PROVIDE SHUTOFF VALVE ON EACH SIDE OF STRAINER.
WATER METER
4. VALVES, EXPANSION FITTINGS/LOOPS, AND PIPING
GM GAS METER
SPECIALTIES SHALL BE FULL SIZE OF PIPE UNLESS NOTED
OTHERWISE.
-�� PUMP
NON-STRUCTURAL MECHANICAL COMPONENTS:
1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE
2012 INTERNATIONAL BUILDING CODE AND FROM THE
WATER HAMMER ARRESTER
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD
HOSE BIBB
7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR
ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER
ROOF DRAIN
DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO
REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN
Q FLOOR DRAIN
BID,
FLOOR SINK
2. 2012 IBC 1613.1 SCOPE: ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT
FCO CLEAN-OUT (FLOOR)
ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR
-MWCO CLEAN-OUT (WALL)
SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND
CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE
CO CLEAN-OUT
MOTIONS IN ACCORDANCE WITH ASCE 7-10, EXCLUDING
CHAPTER 14 AND APPENDIX 11A.
PIPE CONTINUES
3. 2012 IBC 1705.11 CONTRACTOR RESPONSIBILITY: THE
PIPE CAP
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN
AND CONSTRUCTION OF A SEISMIC -FORCE -RESISTING
OVTR VENT THRU ROOF
SYSTEM, DESIGNATED SEISMIC SYSTEM, OR
SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT
® TRENCH DRAIN
OF SPECIAL INSPECTIONS.
PIPE RISING UP
4. HANGERS AND SEISMIC BRACING FOR THE MECHANICAL
9 PIPE DROPPING DOWN
SYSTEMS SHALL BE DESIGNED AND PROVIDED BY THE
MECHANICAL CONTRACTOR. REFER TO CONTRACTOR SHOP
PIPE CONNECTION
DRAWINGS FOR LOCATIONS OF EQUIPMENT AND HUNG
MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR
PIPE CONNECTION DOWN
SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN
LOADS FOR HUNG MECHANICAL SYSTEMS WITH THE
GENERAL CONTRACTOR AND OTHER TRADES THAT MAY BE
IMPACTED.
MECHANICAL SHEET LIST
P0.1
PLUMBING LEGEND AND NOTES
P0.2
PLUMBING SCHEDULES
P1.0
UNDERGROUND PLUMBING PLAN
P1.1
PLUMBING FLOOR PLAN
r
SEP„DATE PE, -111,11T
REQU1RED FOR:
VeMachanical
Electrical
Plumbing
❑ Gas Piping
Ci�j of Tukwila
DIVISION
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
9180 ANDOVER PARK WEST
TUKWILA, WA 98065
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 082016
i`&)�
Ci of Tukwila
BUILDING DIVISION
R COPY
e it r4o,
Nik-0 4
Plan review approval is subject to errors and omissio;s.
l
Approval of construction documents does not aWlhori a
the violation of any adopted Code or ordinance. Recoipt
Of approved Field opy nd Conditions i a k wled ed:
t3y:
Date:_ 7
City of Tukwila
BUILDING DIVISION
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a nc4�i p!an submittal
and may include additional plan mvisw fees ,
CITY or. z n
,SUN 27 2016
PER CIT CENTER
0 DATE DESCRIPTION
06/24/16 Permit Bid Set
c�
0
N
O
CL
0
U
ti
N
O
O
r
r
O
a
ui
J
a
c*)
cli
cc
T
0
N
N
W
t
w
Q
0
Z
z
Q
O
0
B
w
Y
M
[D
D
w
r
O
J
a
F
E
U
C
N
I.1
PLUMBING FIXTURE SCHEDULE
TAG
TAG
LOCATION
TAG
CAPACITY
GAL
FIXTURE
MANUFACTURER / MODEL
FAUCET
NOTES
CONNECTIONS
OPERATING
WEIGHT
(LBS
NOTES
W
V
CW
HW
P-1
3
HAND WASH SINK
REJUVENATION / ALAPE BUCKET SINK
KINGSTON BRASS / KS213SN
1-1/2"
1-1/2"
1/2"
1/2"
1,2
P-2
WATER CLOSET
KOHLER / HIGHLINE K-3493
-
4"
2"
1-1/2"
-
1,3
P-3
URINAL
KOHLER / DEXTER K-5016
-
2"
2"
3/4"
-
1,6
P4
TROUGH SINK
SONOMA CAST STONE / TS -1654
AMERICAN STANDARD / HERITAGE 7295.252
1-1/2"
1-1/2"
1/2"
1/2"
1,2
P-5
KITCHEN SINK
ELKAY / ELRAD2521
AMERICAN STANDARD / CADET 841 OF
1-1/2"
1-1/2"
1/2"
1/2"
1,2,8
P-6
HIGH - LOW WATER COOLER
SUNROC / ADA8ACB
-
1-1/2"
1-1/2"
1/2"
-
1,2
TP
TRAP PRIMER
PPP, INC. / P-2
-
-
-
1/2"
-
4
FD
FLOOR DRAIN
JAY R. SMITH / 2010
-
2"
2"
-
-
5
FS
FLOOR SINK
JAY R. SMITH / 3100
-
2"
2"
-
-
7
FCO
FLOOR CLEANOUT
JAY R. SMITH / 4020
-
-
-
-
-
NOTES:
1) REFER TO ARCH. DRAWINGS FOR CLEARANCES AND MOUNTING HEIGHTS.
2) ALL PLUMBING FITTINGS AND FIXTURES SHALL BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN SECTION 3874 OF THE SAFE WATER DRINKING ACT.
3) PROVIDE WITH SLOAN "ROYAL" 111 -1.28 -SMO FLUSH VALVEAND BEMIS 1955CT SEAT.
4) PROVIDE WITH 12"x12" STAINLESS STEEL ACCESS PANEL.
5) PROVIDE WITH NICKEL BRONZE, SQUARE TOP.
6) PROVIDE WITH SLOAN "ROYAL" 8111 -SMO URINAL FLUSH VALVE.
7) PROVIDE WITH NICKEL BRONZE HALF GRATE.
8) PROVIDE WITH 5.5" BOWL DEPTH AND THREE FAUCET HOLES.
9) PROVIDE WITH GE GLDA696FSS DISHWASHER OR EQUIVALENT. PROVIDE ALL ACCESSORIES INCLUDING SUPPLY AND DRAIN CONNECTIONS WITH AIR GAP AT SINK.
ELECTRIC WATER HEATER SCHEDULE
TAG
TAG
LOCATION
MANUFACTURER / MODEL
CAPACITY
GAL
CAPACITY
KW
CW
INLET
IN
HW
OUTLET
IN
NOTES
DIMENSIONS
(DIAxHT)
(INAN)
OPERATING
WEIGHT
(LBS
NOTES
VOLTAGE/PHASE
to)
EWH-1
UTILITY ROOM
A.O. SMITH / DEL -20
20
3
3/4
3/4
208/3
22x22
300
1,2
NOTES:
1) PROVIDE WITH EXPANSION TANK (ET -1), HEAT TRAPS AND TEMPERATURE AND PRESSURE RELIEF VALVE PIPED FULL SIZE TO FLOOR SINK.
2) INSTALL WATER HEATER ON HOUSEKEEPING PAD WITH DRAIN PAN.
INSTANTANEOUS WATER HEATER SCHEDULE
TAG
LOCATION
MANUFACTURER / MODEL
CAPACITY
KW
ACTIVATION
GPM)
MANUFACTURER/ MODEL
DIMENSIONS
(LxWxH)
(INAN)
OPERATING
WEIGHT
(LBS
NOTES
AMPS
VOLTAGE
M
EWH-2
TASTING ROOM
CHRONOMITE / M-40-208
8.3
0.65
48
208
10x3x7
5
1
NOTES:
1) INSTALL WATER HEATER IN CABINETRY ADJACENT TO HAND WASH SINK. COORDINATE WITH CASEWORK INSTALLER.
EXPANSION TANK SCHEDULE
TAG
SYSTEM
SERVED
LOCATION
MANUFACTURER/ MODEL
VOLUME
GAL
ACCEPTANCE
VOLUME
GAL
SYSTEM
CONN
IN)
DIMENSIONS
(DIAxHT)
(INAN)
OPERATING
WEIGHT
(LBS
ET -1
DOMESTIC HOT WATER
UTILITY ROOM
AMTROL / ST -5C
2
0.9
3/4
8x14
40
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
R
EVIE DC FOR
coDE ICOM VEfl CE
A PPRO
8 2016
ti. JUL �
.
City ot-ru"ila
BUI1rDING DIVISION
REcEnjE-D
CITE' OFI WKWil-A
JUN 2-7 2016
PERFAIT CENTER
DATE DESCRIPTION
06/24/16 Permit Bid Set
A
E
Is
J
C
F
FLAG NOTES:
FIELD VERIFY ROUTING AND SIZE OF WASTE PIPING PRIOR
TO START OF CONSTRUCTION.
2 CONNECT 2" W TO (E) 4" W ROUTED BELOW FLOOR. FIELD
VERIFY EXACT ROUTING AND SIZE OF WASTE PIPING PRIOR
TO START OF CONSTRUCTION.
r�•
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
RE L ANNE
aCODAPPROVED
u- D 8 2016
. CItY Of `fukWila
gU1LD1_� iV�oN
WMEIVE
CITE' OF TUK11 inL:
JUN 2'7 2016
PERMIT CENTER
DATE DESCRIPTION
06/24/16 Permit Bid Set
UNDERGROUND
PLUMBING PLAN
❑
T
CL
6
U
ti
N
O
coi
r
NCD
J
a
ui
LL
a
N
N
of
co
r
O
N
N
CO
W
t
W
0
Z
Z
Q
O
w
m
W
O
J
d
F
E
0
C
101
0
GENERAL NOTES:
1. ALL DOMESTIC WATER PIPING SHALL BE TYPE M FOR ALL
SIZES.
2. COLD & HOT WATER PIPING SHALL BE INSULATED WITH
MINIMUM 1" THINK FIBERGLASS INSULATION (R-6).
FLAG NOTES:
CONNECT 3/4" CW TO CW PIPING SERVING EXISTING TOILET
ROOMS. FIELD VERIFY ROUTING AND SIZE OF DOMESTIC
WATER PIPING PRIOR TO START OF CONSTRUCTION.
[2�> ROUTE 1-1/2" WASTE LINE IN WALL. DROP WASTE LINE
DOWN TO (E) WASTE LINE BELOW FLOOR. REFER TO P-1.0
FOR ADDITIONAL INFORMATION.
CONNECT 2" CW TO (E) 2" CW. FIELD VERIFY ROUTING AND
SIZE OF EXISTING DOMESTIC WATER PIPING DURING
TOILET ROOM DEMOLITION.
PROVIDE MINIMUM 4" HOUSEKEEPING PAD FOR WATER
HEATER.
I t3Utl.DtNG 0
RECEIVED,
CITY OF WKWILA
JUN 27 2016
PERMIT CENTER
SEATTLE CHOCOLATES
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
SEATTLE CHOCOLATES
CHOCOLATE FACTORY TOUR
1180 ANDOVER PARK WEST
TUKWILA, WA 98065
A DATE DESCRIPTION
06/24/16 Permit Bid Set
PLUMBING
FLOOR PLAN