Loading...
HomeMy WebLinkAboutPermit PG16-0184 - ROSS SPACE - MOP SINKROSS SPACE 3311 S 120 PL SUITE 160 PG16-0184 City of Tukwila • 4. 'µ Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov PLUMBING/GAS PIPING PERMIT Parcel No: 1023049078 Permit Number: PG16-0184 Address: 3311 S 120TH PL 160 Issue Date: 1/17/2017 Permit Expires On: 7/16/2017 Project Name: ROSS SPACE Owner: Name: SABEY CORPORATION Address: 12201 TUKWILA INTL BLVD 4TH FL, SEATTLE, WA, 98168 Contact Person: 2015 Name: JOYCE COPLEY Address: 7717 DETROIT AVE SW, SEATTLE, WA, WA Cities Electrical Code: 98106 Contractor: 2015 Name: MACDONALD/MILLER FAC SOL INC Address: PO BOX 47983, SEATTLE, WA, 98146- WA State Energy Code: 7983 License No: MACDOFS980RU Lender: Name: Address: DESCRIPTION OF WORK: REPLACE EXISTING JANITOR SINK WITH NEW MOP SINK Phone: (206) 407-2614 Phone: (206) 768-4180 Expiration Date: 1/4/2019 Valuation of Work: $2,500.00 Fees Collected: $163.16 Water District: 125,TUKWILA Sewer District: VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 �� O Permit Center Authorized Signature: / Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. l am authorized to sign and obtain this development permit and agree to the co-ditions attached to this permit. Date: I 19 Ob) 9 Print This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1900 PLUMBING FINAL 8005 ROUGH -IN PLUMBING f CITY OF MIMI- _ Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TtikwilaWA.pov Plumbing/Gas Permit No. Project No. 'n Date Application Accepted: Date Application Expires: or office use only PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "Please Print" SITE LOCATION King Co Assessor's Tax No.: 102304-9078 Site Address: 3311 S 120TH PLACE Tenant Name: ROSS SPACE PROPERTY OWNER Name: INTERNATIONAL'GATEWAY EAST LLC Address: 12201 TUKWILA INTL BLVD City: SEATTLE State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Joyce Copley Address: City: State: Zip: Phone: (206) 407-261.4 Fax: Email: joyce.copley@inacmiller.com Valuation of Project (contractor's bid price): $ 2,500 Scope of Work (please provide detailed information): Replace existing janitor sink with new mop sink. Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Suite Number: 160A New Tenant: Floor: l ©.....Yes F-1. No PLUMBING CONTRACTOR INFORMATION Company Name: MacDonald Miller Address: 7717 Detroit Ave SW City: SEATTLE State: WA Zip: 98106 Phone: (206) 763-9400 Fax: Contr Reg No.: MACDOFS980RU Exp Date: 12/31/2016 Tukwila Business License No.: BUS -0994318 Sewer: H:\Applications\Forms-Applications On Line\2011 Applications\Plumbing Permit Application Revised 8-9-1 I.docx Revised: August 2011 Pagel of 2 bh Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity uelow: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system — per drain (inside building) I Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections 1-5 Fixture Type Qty Bidet Drinking fountain or water cooler(per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water I treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 PERMIT APPLICATION NOTES - Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet industrial waste treatment interceptor, including trap and vent, except for kitchen type ease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch 51 mm diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific as Each lawn sprinkler system on any one meter including backflow protection devices Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: � � �2 Date: 12/21/2016 Print Name: Joyce Copley Day Telephone: (206) 407-2614 Mailing Address: 7717 Detroit Ave SW Seattle WA 98106 City State Zip H:\Applications\Forms-Applications On Linc\2011 Applications\Plumbing Permit Application Revised 8-9-1 Ldocz Revised: August 2011 Page 2 of 2 bh DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $578.90 M16-0190 Address: 3311 S 120TH PL 160 Apn: 1023049078 $415.74 MECHANICAL $399.75 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $287.30 PLAN CHECK FEE R000.322.102.00.00 0.00 $79.95 TECHNOLOGY FEE $15.99 TECHNOLOGY FEE R000.322.900.04.00 0.00 $15.99 PG16-0184 Address: 3311 S 120TH PL 160 Apn: 1023049078 $163.16 PLUMBING $156.88 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $93.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $31.38 TECHNOLOGY FEE $6.28 TECHNOLOGY FEE TOTAL1 1 : R000.322.900.04.00 0.00 $6.28 • 1 Date Paid: Wednesday, December 21, 2016 Paid By: MACDONALD-MILLER FACILITY SOLLI Pay Method: CHECK 4569 Printed: Wednesday, December 21, 2016 9:05 AM 1 of 1 SYSTEMS t el INSPECTION RECORD Retain a copy with permit I PG INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: -3311 S, 120-/7,iP4, !(QO Type of Inspection: PL,)Mbr1A & rhyll-L Address: Date Called: Special instructions: Date Wanted: <2D .2.-27-17 p.m. Requester: Phone No: a 2-d Z/iL 7& q Approved per applicable codes. 1-1 Corrections required prior to approval. nspector: 2/2--7/l 7 F] REINSPECTION FEE REQUIRED. Prior to next inspektion, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Q16 -0/6q Retain a copy with permit INSPECTION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 ProjecTy a of Inspection: Q'm (31 S S S� CL-= - AJ Address:Date 2` Called: Special Instructions: Date Wanted: ` m. o Z 7 _ P Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 10A0 ✓<,b 101-0146ly6L- FZ4W1 IInspector: (Date: v;2 Lg/7 I REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PERMIT COORD COPY, PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG16-0184 DATE: 12/21/16 PROJECT NAME: ROSS SPACE SITE ADDRESS: 3311 S 120 PL - SUITE 160 X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: K'�/ kwtl lj� Building Division Fire Prevention ❑ Planning Division ❑ �Slss 1jjA' Public Works Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 12/22/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/19/17 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ (corrections entered in Reviews) . • Notation REVIEWER'S INITIALS: Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 MACDONALD/MILLER FAC SOL INC Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of Labor & Industries MACDONALD/MILLER FAC SOL INC Owner or tradesperson PO BOX 47983 Principals SEATTLE, WA 98106 206-768-4180 SIMONDS, DERRICK R, PRESIDENT KING County WEBSTER, MARK E, VICE PRESIDENT GEBHARDT, STEPHANIE WETTACH. TREASURER HOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01/04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01/04/2011) HACK, RICHARD, SECRETARY (End: 01/04/2011) KOPET, TYLER, TREASURER (End: 01 /04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01 /04/2011) GOUGH, DAVID ANTHONY, DIRECTOR (End: 08/29/2014) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. Business type 602 254 260 Corporation Governing persons FREDRIC J SIGMUND STEVE C LOVELY; TYLER C KOPET; License Page 1 of 3 Search L&I ; S r4;h1 A-% Index Help My I'm Workplace Rights Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Con.....struc...tion..Co.....ntracto.....r. Active. .................................. Meets current requirements. License specialties GENERAL License no. MACDOFS980RU Effective — expiration 12/31/2002— 01/04/2019 Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 1/10/2017 M a. .r M 0 N 0 N a N .x FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PLUMBING LEGEND PLUMBING ABBREVIATIONS SYMBOL DESCRIPTION ABBREVIATION FULL NAME BALANCING VALVE BALV 14 BACKFLOW PREVENTER BFP `jL) CHECK VALVE CV - - - - - . -- ------ - - --------- GATE VALVE - - - -- - - - --- - GV --- - - ------ LIQUID PROPANE GAS GLOBE VALVE GLV IE BALL VALVE BV BACKFLOW PREVENTER PRESSURE REDUCING VALVE PRV --- -- --- --------------------------- - ._ -- — --------- ---- ---- ---._­ - --------------------- COLD WATER CW - -- - - --- --- -- - -- - ---- - -- - - - --- - - --- HOT WATER PIPING - -- HW - --- - - - - -- - -- - - -- ---------------------- - -- -- - -- -- - - - - - -- -- - --- - - - - ----- ----- HOT WATER CIRCULATING HWC --------------- ----- NP ----- --- - NON -POTABLE WATER -- ---- - - -- - - --- --- --- -- NP ------ - --- - TW _._------ ---------------- TEMPERED WATER - __-_ -._ - ---- __--_ TW SD - - - - -- - - -- STORM DRAIN BELOW GRADE - - ----- - ----- -- - -- ------------- - ---------- SD PRV SANITARY SEWER ABOVE GRADE SANITARY W DOUBLE CHECK BACKFLOW PREVENTER SANITARY SEWER BELOW GRADE SS --- --------------------------- -------------------------- ----------------------- --------------------------------------RL RL ---------------------------------------- -.... -------------------------------------- --------------- -------------------- RAIN LEADER ABOVE GRADE RAIN -- - - -- -- ----.._..----------------------------------------------- - --- - - ----------------------------------------------- ---- ---- RL - ------------ --- ------ -- ------------------------ - - - ----- ORL --- - -------------------------------------------- -------------------------------------- OVERFLOW RAIN LEADER - - - - - - - ..._._..----------- - - -- -- --- - - --- - -- -- ORL - ---- -- ----- - - — ----------- VENT PIPING V -------------------------------------- 0 VTR - VENT THRU ROOF VTR FD FLOOR CLEAN OUT FCO W WALL CLEAN OUT -------- WCO -------------------------- ----------------------- IND INDIRECT DRAIN IND G ------------------- ------ GAS PIPING LOW PRESSURE G MG GAS PIPING MEDIUM PRESSURE MG ------- ---------- - -- ------------------------------------ HG ----------------- ---- --- -- ------ ----- ---- -- ---- ------------ GAS PIPING HIGH PRESSURE -- -- -- ------------- --- HG - - - - - -- --- ----------- --- -- - -- - - -- ------------------ ---- --- -------------- --- ------------- LPG - ---------------- ----------------------- -- - ----------- ----- - --- ----- ----------- LIQUID PROPANE GAS --- -- ----- ---- -- --- --- -- -- ------------------- --- LPG -- --- -- -- ---------------- -- --- VACUUM VAC --- ..-------------AW -- ACID WASTE AW -----AV----- ACID VENT AV -- ---- - - ---- ----- ------ O OXYGEN O A COMPRESSED AIR A DE DEIONIZED WATER DE DO FLOOR DRAIN FD -------- ------- - - ------ --------------------- - - - ---/-�-- --- - -- -- - -- - T - -- ___.. ----------------------------------------------------------- - ------ -- -- - - ---- --- ------------------- HOSE BIBB --- -- ---- - - - -- ------ --- HB FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: PLUMBING ABBREVIATIONS ABBV FULL NAME ABBV FULL NAME A - - - - COMPRESSED AIR LINE - _ HWR HOT WATER RETURN AFF ABOVE FINISHED FLOOR HWS HOT WATER SUPPLY AV ACID VENT LPG LIQUID PROPANE GAS AW ACID WASTE IE INVERT ELEVATION BFP BACKFLOW PREVENTER MH MANHOLE CB CATCH BASIN MG MEDIUM PRESSURE GAS Cl CAST IRON OFD OVERFLOW DRAIN CO CLEAN OUT ORL OVERFLOW RAIN LEADER CW COLD WATER POC POINT OF CONNECTION CV CHECK VALVE PRV PRESSURE REDUCING VALVE DCBP DOUBLE CHECK BACKFLOW PREVENTER RD ROOF DRAIN ELEV ELEVATION RL RAIN LEADER F FIRE SD STORM DRAIN FCO FLOOR CLEAN OUT SS SANITARY SEWER FD FLOOR DRAIN TOG TOP OF GATE G NATURAL GAS (LOW PRESSURE) TP TRAP PRIMER GI GREASE INTERCEPTOR UNO UNLESS NOTED OTHERWISE GLV GLOBE VALVE V VENT HB HOSE BIBB VTR VENT THRU ROOF HW HOT WATER W WASTE HWC HOT WATER CIRCULATING WCO WALL CLEAN OUT FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: LOCATION PIPING SIZE MATERIAL (FOOTNOTE) JOINT DOMESTIC WATER ! 1/2° TO 1" PEX (a, b, d, k) i MFR APPROVED DOMESTIC WATER 1-1/4" TO 2° COPPER TYPE L (c, k) I PRESSED MECH JOINT DOMESTIC WATER 2-1/2" AND LARGER I 304L STAINLESS STEEL SCH 10 (e, k) I WELDED ABOVE GROUND SANITARY WASTE 1-112" TO 4° PVC DWV/ABS SCH 40 (m, n, o, r) SOLVENT CEMENT SANITARY WASTE 6" AND LARGER CAST IRON (I, m, r) i NO HUB SANITARY VENT ( 1-1/2" TO 4° PVC DWV/ABS SCH 40 (o, r) SOLVENT CEMENT SANITARY VENT I 6" AND LARGER I CAST IRON (I, r) NO HUB ABOVE GROUND TRAP PRIMER 1/2° j PEX (a, b, d, j) I I MFR APPROVED FOOTNOTES: (a) ACCEPTABLE FOR PLENUM USE IN SIZES 1/2" THROUGH 1". (b) PIPES SHALL BE SUPPORTED IN CHANNEL IN ACCORADANCE WITH THE PIX MANFUCATURERS INSTALLATION INSTRUCTIONS. (c) PRESSURE LIMIT OF 200 PSI (d) LIMITED TO 80 PSI @ 200° F (e) GROOVED FIELD JOINTS (USE 316L STAINLESS STEEL COUPLINGS FOR UNDERGROUND INSTALLATION) (r) SEE VICTAULIC PUBLICATION 17.09 FOR PRESSURE APPLICATIONS OF STYLE 07,107, AND 89 COUPLINGS (9) PRE -SLEEVED FROM FACTORY (h) USE SS 316 COUPLINGS (i) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS 0) CITY OF BELLEVUE ONLY: TRAP PRIMERS TO BE COPPER (k) PIPE TO BE SUPPORTED DIRECTLY ON HANGERS (NO INSERT OR SHIELD REQUIRED) INSULATION TO BE APPLIED OVER HANGERS (1) STANDARD NO -HUB BANDS (m) HOTEL APPLICATIONS TO USE SOVENT IF POSSIBLE (n) MAY NEED TO CONSIDER ACCOUSTICAL REQUIREMENTS (o) FLAMEISMOKE SPREAD REQUIREMENTS MAY PRECLUDE USE (p) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS (q) USE SS316 COUPLINGS (r) CITY OF BELLEVUE REQUIRES EITHER W&V MATERIAL BE OF THE SAME TYPE, OR THAT ALL PENETRATIONS THROUGH DECK BE PVC/ABS (s) ONLY OUTSIDE BUILDING FOOTPRINT PIPING INSULATION SCHEDULE PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE SIZE TYPE ; THICKNESS , RANGE OVERHEAD COLD WATER ALL i FIBERGLASS j 1/2" - EXPOSED TO SIGHT COLD WATER ALL FIBERGLASS j 1/2" i - COLD WATER WITHIN WALLS NOT REQUIRED 1/2' -1-1/4° FIBERGLASS 1" 0.24-0.28 HOT WATER AND RECIRC (UP TO 140"F) 1-112"- 6" j FIBERGLASS j 1-1/2" I 0.24-0.28 HOT WATER UNDERGROUND 1/2"-2" THERMA-CEL 1" I 0.24-0.28 HORIZONTAL COIL CONDENSATE PIPING ALL ARMAFLEX j 112" ALL PIPING INSULATION SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE ENERGY CODE, 2015 EDITION, TABLE C403.2.9 ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION. - INSULATE THE OVERFLOW DRAIN BODY AND PIPE 10 FEET DOWN STREAM FROM THE DRAIN. - PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAYBE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2' MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE AS AMENDED BY THE STATE OF WASHINGTON. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING WASTE PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313 AND TABLE 313.3 OF THE 2015 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. 6. PROVIDE STOPS OR ANGLE VALVES AT ALL FIXTURES 7. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 8. PLUMBING EQUIPMENT, VALVES AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 9. THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 10. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING PIPING AND EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2015 IBC AND ASCE 7. 11. LIMITATION OF HOT WATER TEMPERATURE TO PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH CHAPTER 4 OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. cov z - e� t,\ APN# 102304-9078 LEGAL DESCRIPTION: PORTION OF GOV LOT 15 IN SW 1/4 OF SECTION 10-23-04 AND THE NE 1/4 OF SE 1/4 OF SECTION 09-23-04 BEGIN NW CORNER OF SW 1/4 OF SECTION 10-23-04 TH S 01-46-02 W 107.22 FT TH S87-33-12 E 512.24 FT TH S 01-46-02 W 402.93 FT TH N 88-13-58 W 616.22 FT TH S 85-07-17 W 170.45 FT TO ELY MARGIN OF PRIMARY STATE HIGHWAY NO 1 SSR 99 PACIFIC HIGHWAY SOUTH TH N 86-04-33 W 5.00 FT TH N 03-55-27 E 120.50 FT TH N 37-36-51 E 90.14 FT TH N 03-55-27 E 150 FT TH N 86-0433 W 10.00 FT TH N 03-05-27 E 61.90 FT TO BEGINNING OF 1266 FOOT RADIUS CURVE CONCAVE TO WEST TH N ALONG SAID CURVE 126.11 FT THRU C/A OF 05-42-27 TO A POINT ON SAID CURVE & A POINT ON E -W CIL OF SAID SECTION 9 TH S 89-16-45 E 224.58 FT TO E -W CORNER OF SAID SECTION 9 & POINT OF BEGINNING - LOT 2 OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L2000-072 RECORDING NO 20001213900008 TITLE NAME COMPANY PHONE NUMBER EMAIL PROJECT ENGINEER TRICIA DRAKE MACDONALD MILLER 206-768-4072 TRICIA.DRAKE@MACMILLER.COM ACCOUNT MANAGER STEVE FLINK MACDONALD MILLER 253-680-3172 STEVE.FLINK@MACMILLER.COM SHEET METAL SUPERINTENDENT NATHAN WAAGEN MACDONALD MILLER 206-786-8157 NATHAN.WAAGEN@MACMILLER.COM PLUMBING SUPERINTENDENT KELLY KING MACDONALD MILLER 206-768-3962 KELLY.KING@MACMILLER.COM REPLACE EXISTING JANITOR SINK WITH NEW MOP SINK. NAME TITLE NAME TITLE TP0.01 SCHEDULES - PLUMBING TP2.01 1ST FLOOR PLAN TP0.01S SITE PLAN CITI F T UKWILA LLI Q 0 LAST REVISED: O M Z O ti � r DATE PLOTTED: B GEZON •� t Q co 3t ISSUE DATE: D LAMBERT 12-20-16 U) Uj I f ` 5X 0 LL SHEET NUMBER: eR) J) LcUID 0 >r {O m v E oc m ��v t2 ct Qco Z U oo 14 CU Q 1-- C o ti LLI Q 0 U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW Z O DATE PLOTTED: B GEZON >Ln CAD: ISSUE DATE: D LAMBERT 12-20-16 Uj I O N 0 1 N SHEET NUMBER: U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DATE: D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: + REVIEDNE6 FOR CODE COMPLIANCE (; APPROVED. - JAN. 0 PPROVED.- JAN.0 6 2017 7- r— City of Tukwila.. BUILDING DIVISION J o co 0) co tM 04 O ID 0 a CL co 0 0 V) 0 Im LJ rn to rn 2 a. c; N 599 S 120TH PL S 124TH ST CEIVED DEC 212016 PERMIT CENTER 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An (0 CO (D C) 0 r— rto- n,) W U) z < (0 0 U) 05 0) I B c4 E T) W 0 Oq (IUD cxu U) U - 0 (c)00 n gIrl- LIJ cu LJ ry) MJ C—) C< Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: 0 DRAKW 12-20-16 > CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 < (0 z ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: 9 (0 0 C-2369-73166960-00 cu <,- 04 < T 0.01 0 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 0 C) W U) z 0 U) C) I ry W 0 < LU (c)00 n gIrl- LIJ 00 < c/) MJ =U) 04 Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 CAD: ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: T 0.01 S REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 2 EL M N i; [O N 0 N F >' !CITY OF T UMILA DEC 21 2016 PERMIT CENTER 09 1 1/8" = V-0- I i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J LAST REVISED: T DRAKE 12-20-16 im_ oil - W 12-20-16 rn :D ISSUE DAM - ry �. 11-1 Q (D Cn SHEET NUMBER: 10� a?�J o-) N E U) 1 1 mX011_ y t NmUO O cu.1U /V�/ ` , W M P! fn O L) Q C: i� �z fQ c G � O co O lam, 0 WOE Z — m �_...._..�__; Z _ °o U cu J 0 a-- O � d i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 i :D ISSUE DAM D LAMBERT 12-20-16 ry 11-1 r` Cn SHEET NUMBER: r O 1 y W O /V�/ ` , W M co �`` i W co co co CN WOE — m �_...._..�__; Z ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DAM D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: L) FOR CODE COMPLIANCE APPROVED JAN 06 2U1� City of Tukwila BUILDING CiVISION M a. .r M 0 N 0 N a N .x FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PLUMBING LEGEND PLUMBING ABBREVIATIONS SYMBOL DESCRIPTION ABBREVIATION FULL NAME BALANCING VALVE BALV 14 BACKFLOW PREVENTER BFP `jL) CHECK VALVE CV - - - - - . -- ------ - - --------- GATE VALVE - - - -- - - - --- - GV --- - - ------ LIQUID PROPANE GAS GLOBE VALVE GLV IE BALL VALVE BV BACKFLOW PREVENTER PRESSURE REDUCING VALVE PRV --- -- --- --------------------------- - ._ -- — --------- ---- ---- ---._­ - --------------------- COLD WATER CW - -- - - --- --- -- - -- - ---- - -- - - - --- - - --- HOT WATER PIPING - -- HW - --- - - - - -- - -- - - -- ---------------------- - -- -- - -- -- - - - - - -- -- - --- - - - - ----- ----- HOT WATER CIRCULATING HWC --------------- ----- NP ----- --- - NON -POTABLE WATER -- ---- - - -- - - --- --- --- -- NP ------ - --- - TW _._------ ---------------- TEMPERED WATER - __-_ -._ - ---- __--_ TW SD - - - - -- - - -- STORM DRAIN BELOW GRADE - - ----- - ----- -- - -- ------------- - ---------- SD PRV SANITARY SEWER ABOVE GRADE SANITARY W DOUBLE CHECK BACKFLOW PREVENTER SANITARY SEWER BELOW GRADE SS --- --------------------------- -------------------------- ----------------------- --------------------------------------RL RL ---------------------------------------- -.... -------------------------------------- --------------- -------------------- RAIN LEADER ABOVE GRADE RAIN -- - - -- -- ----.._..----------------------------------------------- - --- - - ----------------------------------------------- ---- ---- RL - ------------ --- ------ -- ------------------------ - - - ----- ORL --- - -------------------------------------------- -------------------------------------- OVERFLOW RAIN LEADER - - - - - - - ..._._..----------- - - -- -- --- - - --- - -- -- ORL - ---- -- ----- - - — ----------- VENT PIPING V -------------------------------------- 0 VTR - VENT THRU ROOF VTR FD FLOOR CLEAN OUT FCO W WALL CLEAN OUT -------- WCO -------------------------- ----------------------- IND INDIRECT DRAIN IND G ------------------- ------ GAS PIPING LOW PRESSURE G MG GAS PIPING MEDIUM PRESSURE MG ------- ---------- - -- ------------------------------------ HG ----------------- ---- --- -- ------ ----- ---- -- ---- ------------ GAS PIPING HIGH PRESSURE -- -- -- ------------- --- HG - - - - - -- --- ----------- --- -- - -- - - -- ------------------ ---- --- -------------- --- ------------- LPG - ---------------- ----------------------- -- - ----------- ----- - --- ----- ----------- LIQUID PROPANE GAS --- -- ----- ---- -- --- --- -- -- ------------------- --- LPG -- --- -- -- ---------------- -- --- VACUUM VAC --- ..-------------AW -- ACID WASTE AW -----AV----- ACID VENT AV -- ---- - - ---- ----- ------ O OXYGEN O A COMPRESSED AIR A DE DEIONIZED WATER DE DO FLOOR DRAIN FD -------- ------- - - ------ --------------------- - - - ---/-�-- --- - -- -- - -- - T - -- ___.. ----------------------------------------------------------- - ------ -- -- - - ---- --- ------------------- HOSE BIBB --- -- ---- - - - -- ------ --- HB FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: PLUMBING ABBREVIATIONS ABBV FULL NAME ABBV FULL NAME A - - - - COMPRESSED AIR LINE - _ HWR HOT WATER RETURN AFF ABOVE FINISHED FLOOR HWS HOT WATER SUPPLY AV ACID VENT LPG LIQUID PROPANE GAS AW ACID WASTE IE INVERT ELEVATION BFP BACKFLOW PREVENTER MH MANHOLE CB CATCH BASIN MG MEDIUM PRESSURE GAS Cl CAST IRON OFD OVERFLOW DRAIN CO CLEAN OUT ORL OVERFLOW RAIN LEADER CW COLD WATER POC POINT OF CONNECTION CV CHECK VALVE PRV PRESSURE REDUCING VALVE DCBP DOUBLE CHECK BACKFLOW PREVENTER RD ROOF DRAIN ELEV ELEVATION RL RAIN LEADER F FIRE SD STORM DRAIN FCO FLOOR CLEAN OUT SS SANITARY SEWER FD FLOOR DRAIN TOG TOP OF GATE G NATURAL GAS (LOW PRESSURE) TP TRAP PRIMER GI GREASE INTERCEPTOR UNO UNLESS NOTED OTHERWISE GLV GLOBE VALVE V VENT HB HOSE BIBB VTR VENT THRU ROOF HW HOT WATER W WASTE HWC HOT WATER CIRCULATING WCO WALL CLEAN OUT FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: LOCATION PIPING SIZE MATERIAL (FOOTNOTE) JOINT DOMESTIC WATER ! 1/2° TO 1" PEX (a, b, d, k) i MFR APPROVED DOMESTIC WATER 1-1/4" TO 2° COPPER TYPE L (c, k) I PRESSED MECH JOINT DOMESTIC WATER 2-1/2" AND LARGER I 304L STAINLESS STEEL SCH 10 (e, k) I WELDED ABOVE GROUND SANITARY WASTE 1-112" TO 4° PVC DWV/ABS SCH 40 (m, n, o, r) SOLVENT CEMENT SANITARY WASTE 6" AND LARGER CAST IRON (I, m, r) i NO HUB SANITARY VENT ( 1-1/2" TO 4° PVC DWV/ABS SCH 40 (o, r) SOLVENT CEMENT SANITARY VENT I 6" AND LARGER I CAST IRON (I, r) NO HUB ABOVE GROUND TRAP PRIMER 1/2° j PEX (a, b, d, j) I I MFR APPROVED FOOTNOTES: (a) ACCEPTABLE FOR PLENUM USE IN SIZES 1/2" THROUGH 1". (b) PIPES SHALL BE SUPPORTED IN CHANNEL IN ACCORADANCE WITH THE PIX MANFUCATURERS INSTALLATION INSTRUCTIONS. (c) PRESSURE LIMIT OF 200 PSI (d) LIMITED TO 80 PSI @ 200° F (e) GROOVED FIELD JOINTS (USE 316L STAINLESS STEEL COUPLINGS FOR UNDERGROUND INSTALLATION) (r) SEE VICTAULIC PUBLICATION 17.09 FOR PRESSURE APPLICATIONS OF STYLE 07,107, AND 89 COUPLINGS (9) PRE -SLEEVED FROM FACTORY (h) USE SS 316 COUPLINGS (i) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS 0) CITY OF BELLEVUE ONLY: TRAP PRIMERS TO BE COPPER (k) PIPE TO BE SUPPORTED DIRECTLY ON HANGERS (NO INSERT OR SHIELD REQUIRED) INSULATION TO BE APPLIED OVER HANGERS (1) STANDARD NO -HUB BANDS (m) HOTEL APPLICATIONS TO USE SOVENT IF POSSIBLE (n) MAY NEED TO CONSIDER ACCOUSTICAL REQUIREMENTS (o) FLAMEISMOKE SPREAD REQUIREMENTS MAY PRECLUDE USE (p) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS (q) USE SS316 COUPLINGS (r) CITY OF BELLEVUE REQUIRES EITHER W&V MATERIAL BE OF THE SAME TYPE, OR THAT ALL PENETRATIONS THROUGH DECK BE PVC/ABS (s) ONLY OUTSIDE BUILDING FOOTPRINT PIPING INSULATION SCHEDULE PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE SIZE TYPE ; THICKNESS , RANGE OVERHEAD COLD WATER ALL i FIBERGLASS j 1/2" - EXPOSED TO SIGHT COLD WATER ALL FIBERGLASS j 1/2" i - COLD WATER WITHIN WALLS NOT REQUIRED 1/2' -1-1/4° FIBERGLASS 1" 0.24-0.28 HOT WATER AND RECIRC (UP TO 140"F) 1-112"- 6" j FIBERGLASS j 1-1/2" I 0.24-0.28 HOT WATER UNDERGROUND 1/2"-2" THERMA-CEL 1" I 0.24-0.28 HORIZONTAL COIL CONDENSATE PIPING ALL ARMAFLEX j 112" ALL PIPING INSULATION SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE ENERGY CODE, 2015 EDITION, TABLE C403.2.9 ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION. - INSULATE THE OVERFLOW DRAIN BODY AND PIPE 10 FEET DOWN STREAM FROM THE DRAIN. - PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAYBE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2' MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE AS AMENDED BY THE STATE OF WASHINGTON. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING WASTE PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313 AND TABLE 313.3 OF THE 2015 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. 6. PROVIDE STOPS OR ANGLE VALVES AT ALL FIXTURES 7. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 8. PLUMBING EQUIPMENT, VALVES AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 9. THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 10. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING PIPING AND EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2015 IBC AND ASCE 7. 11. LIMITATION OF HOT WATER TEMPERATURE TO PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH CHAPTER 4 OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. cov z - e� t,\ APN# 102304-9078 LEGAL DESCRIPTION: PORTION OF GOV LOT 15 IN SW 1/4 OF SECTION 10-23-04 AND THE NE 1/4 OF SE 1/4 OF SECTION 09-23-04 BEGIN NW CORNER OF SW 1/4 OF SECTION 10-23-04 TH S 01-46-02 W 107.22 FT TH S87-33-12 E 512.24 FT TH S 01-46-02 W 402.93 FT TH N 88-13-58 W 616.22 FT TH S 85-07-17 W 170.45 FT TO ELY MARGIN OF PRIMARY STATE HIGHWAY NO 1 SSR 99 PACIFIC HIGHWAY SOUTH TH N 86-04-33 W 5.00 FT TH N 03-55-27 E 120.50 FT TH N 37-36-51 E 90.14 FT TH N 03-55-27 E 150 FT TH N 86-0433 W 10.00 FT TH N 03-05-27 E 61.90 FT TO BEGINNING OF 1266 FOOT RADIUS CURVE CONCAVE TO WEST TH N ALONG SAID CURVE 126.11 FT THRU C/A OF 05-42-27 TO A POINT ON SAID CURVE & A POINT ON E -W CIL OF SAID SECTION 9 TH S 89-16-45 E 224.58 FT TO E -W CORNER OF SAID SECTION 9 & POINT OF BEGINNING - LOT 2 OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L2000-072 RECORDING NO 20001213900008 TITLE NAME COMPANY PHONE NUMBER EMAIL PROJECT ENGINEER TRICIA DRAKE MACDONALD MILLER 206-768-4072 TRICIA.DRAKE@MACMILLER.COM ACCOUNT MANAGER STEVE FLINK MACDONALD MILLER 253-680-3172 STEVE.FLINK@MACMILLER.COM SHEET METAL SUPERINTENDENT NATHAN WAAGEN MACDONALD MILLER 206-786-8157 NATHAN.WAAGEN@MACMILLER.COM PLUMBING SUPERINTENDENT KELLY KING MACDONALD MILLER 206-768-3962 KELLY.KING@MACMILLER.COM REPLACE EXISTING JANITOR SINK WITH NEW MOP SINK. NAME TITLE NAME TITLE TP0.01 SCHEDULES - PLUMBING TP2.01 1ST FLOOR PLAN TP0.01S SITE PLAN CITI F T UKWILA LLI Q 0 LAST REVISED: O M Z O ti � r DATE PLOTTED: B GEZON •� t Q co 3t ISSUE DATE: D LAMBERT 12-20-16 U) Uj I f ` 5X 0 LL SHEET NUMBER: eR) J) LcUID 0 >r {O m v E oc m ��v t2 ct Qco Z U oo 14 CU Q 1-- C o ti LLI Q 0 U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW Z O DATE PLOTTED: B GEZON >Ln CAD: ISSUE DATE: D LAMBERT 12-20-16 Uj I O N 0 1 N SHEET NUMBER: U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DATE: D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: + REVIEDNE6 FOR CODE COMPLIANCE (; APPROVED. - JAN. 0 PPROVED.- JAN.0 6 2017 7- r— City of Tukwila.. BUILDING DIVISION J o co 0) co tM 04 O ID 0 a CL co 0 0 V) 0 Im LJ rn to rn 2 a. c; N 599 S 120TH PL S 124TH ST CEIVED DEC 212016 PERMIT CENTER 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An (0 CO (D C) 0 r— rto- n,) W U) z < (0 0 U) 05 0) I B c4 E T) W 0 Oq (IUD cxu U) U - 0 (c)00 n gIrl- LIJ cu LJ ry) MJ C—) C< Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: 0 DRAKW 12-20-16 > CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 < (0 z ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: 9 (0 0 C-2369-73166960-00 cu <,- 04 < T 0.01 0 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 0 C) W U) z 0 U) C) I ry W 0 < LU (c)00 n gIrl- LIJ 00 < c/) MJ =U) 04 Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 CAD: ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: T 0.01 S REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 2 EL M N i; [O N 0 N F >' !CITY OF T UMILA DEC 21 2016 PERMIT CENTER 09 1 1/8" = V-0- I i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J LAST REVISED: T DRAKE 12-20-16 im_ oil - W 12-20-16 rn :D ISSUE DAM - ry �. 11-1 Q (D Cn SHEET NUMBER: 10� a?�J o-) N E U) 1 1 mX011_ y t NmUO O cu.1U /V�/ ` , W M P! fn O L) Q C: i� �z fQ c G � O co O lam, 0 WOE Z — m �_...._..�__; Z _ °o U cu J 0 a-- O � d i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 i :D ISSUE DAM D LAMBERT 12-20-16 ry 11-1 r` Cn SHEET NUMBER: r O 1 y W O /V�/ ` , W M co �`` i W co co co CN WOE — m �_...._..�__; Z ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DAM D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: L) FOR CODE COMPLIANCE APPROVED JAN 06 2U1� City of Tukwila BUILDING CiVISION ROSS SPACE 3311 S 120 PL SUITE 160 PG16-0184 City of Tukwila • 4. 'µ Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov PLUMBING/GAS PIPING PERMIT Parcel No: 1023049078 Permit Number: PG16-0184 Address: 3311 S 120TH PL 160 Issue Date: 1/17/2017 Permit Expires On: 7/16/2017 Project Name: ROSS SPACE Owner: Name: SABEY CORPORATION Address: 12201 TUKWILA INTL BLVD 4TH FL, SEATTLE, WA, 98168 Contact Person: 2015 Name: JOYCE COPLEY Address: 7717 DETROIT AVE SW, SEATTLE, WA, WA Cities Electrical Code: 98106 Contractor: 2015 Name: MACDONALD/MILLER FAC SOL INC Address: PO BOX 47983, SEATTLE, WA, 98146- WA State Energy Code: 7983 License No: MACDOFS980RU Lender: Name: Address: DESCRIPTION OF WORK: REPLACE EXISTING JANITOR SINK WITH NEW MOP SINK Phone: (206) 407-2614 Phone: (206) 768-4180 Expiration Date: 1/4/2019 Valuation of Work: $2,500.00 Fees Collected: $163.16 Water District: 125,TUKWILA Sewer District: VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: 2015 National Electrical Code: 2014 International Residential Code Edition: 2015 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2015 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2015 WA State Energy Code: 2015 International Fuel Gas Code: 2015 �� O Permit Center Authorized Signature: / Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. l am authorized to sign and obtain this development permit and agree to the co-ditions attached to this permit. Date: I 19 Ob) 9 Print This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1900 PLUMBING FINAL 8005 ROUGH -IN PLUMBING f CITY OF MIMI- _ Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TtikwilaWA.pov Plumbing/Gas Permit No. Project No. 'n Date Application Accepted: Date Application Expires: or office use only PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "Please Print" SITE LOCATION King Co Assessor's Tax No.: 102304-9078 Site Address: 3311 S 120TH PLACE Tenant Name: ROSS SPACE PROPERTY OWNER Name: INTERNATIONAL'GATEWAY EAST LLC Address: 12201 TUKWILA INTL BLVD City: SEATTLE State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Joyce Copley Address: City: State: Zip: Phone: (206) 407-261.4 Fax: Email: joyce.copley@inacmiller.com Valuation of Project (contractor's bid price): $ 2,500 Scope of Work (please provide detailed information): Replace existing janitor sink with new mop sink. Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Suite Number: 160A New Tenant: Floor: l ©.....Yes F-1. No PLUMBING CONTRACTOR INFORMATION Company Name: MacDonald Miller Address: 7717 Detroit Ave SW City: SEATTLE State: WA Zip: 98106 Phone: (206) 763-9400 Fax: Contr Reg No.: MACDOFS980RU Exp Date: 12/31/2016 Tukwila Business License No.: BUS -0994318 Sewer: H:\Applications\Forms-Applications On Line\2011 Applications\Plumbing Permit Application Revised 8-9-1 I.docx Revised: August 2011 Pagel of 2 bh Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity uelow: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system — per drain (inside building) I Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections 1-5 Fixture Type Qty Bidet Drinking fountain or water cooler(per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water I treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 PERMIT APPLICATION NOTES - Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet industrial waste treatment interceptor, including trap and vent, except for kitchen type ease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch 51 mm diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific as Each lawn sprinkler system on any one meter including backflow protection devices Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: � � �2 Date: 12/21/2016 Print Name: Joyce Copley Day Telephone: (206) 407-2614 Mailing Address: 7717 Detroit Ave SW Seattle WA 98106 City State Zip H:\Applications\Forms-Applications On Linc\2011 Applications\Plumbing Permit Application Revised 8-9-1 Ldocz Revised: August 2011 Page 2 of 2 bh DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $578.90 M16-0190 Address: 3311 S 120TH PL 160 Apn: 1023049078 $415.74 MECHANICAL $399.75 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $287.30 PLAN CHECK FEE R000.322.102.00.00 0.00 $79.95 TECHNOLOGY FEE $15.99 TECHNOLOGY FEE R000.322.900.04.00 0.00 $15.99 PG16-0184 Address: 3311 S 120TH PL 160 Apn: 1023049078 $163.16 PLUMBING $156.88 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $93.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $31.38 TECHNOLOGY FEE $6.28 TECHNOLOGY FEE TOTAL1 1 : R000.322.900.04.00 0.00 $6.28 • 1 Date Paid: Wednesday, December 21, 2016 Paid By: MACDONALD-MILLER FACILITY SOLLI Pay Method: CHECK 4569 Printed: Wednesday, December 21, 2016 9:05 AM 1 of 1 SYSTEMS t el INSPECTION RECORD Retain a copy with permit I PG INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: -3311 S, 120-/7,iP4, !(QO Type of Inspection: PL,)Mbr1A & rhyll-L Address: Date Called: Special instructions: Date Wanted: <2D .2.-27-17 p.m. Requester: Phone No: a 2-d Z/iL 7& q Approved per applicable codes. 1-1 Corrections required prior to approval. nspector: 2/2--7/l 7 F] REINSPECTION FEE REQUIRED. Prior to next inspektion, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Q16 -0/6q Retain a copy with permit INSPECTION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 ProjecTy a of Inspection: Q'm (31 S S S� CL-= - AJ Address:Date 2` Called: Special Instructions: Date Wanted: ` m. o Z 7 _ P Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 10A0 ✓<,b 101-0146ly6L- FZ4W1 IInspector: (Date: v;2 Lg/7 I REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PERMIT COORD COPY, PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG16-0184 DATE: 12/21/16 PROJECT NAME: ROSS SPACE SITE ADDRESS: 3311 S 120 PL - SUITE 160 X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: K'�/ kwtl lj� Building Division Fire Prevention ❑ Planning Division ❑ �Slss 1jjA' Public Works Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 12/22/16 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/19/17 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ (corrections entered in Reviews) . • Notation REVIEWER'S INITIALS: Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 MACDONALD/MILLER FAC SOL INC Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of Labor & Industries MACDONALD/MILLER FAC SOL INC Owner or tradesperson PO BOX 47983 Principals SEATTLE, WA 98106 206-768-4180 SIMONDS, DERRICK R, PRESIDENT KING County WEBSTER, MARK E, VICE PRESIDENT GEBHARDT, STEPHANIE WETTACH. TREASURER HOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01/04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01/04/2011) HACK, RICHARD, SECRETARY (End: 01/04/2011) KOPET, TYLER, TREASURER (End: 01 /04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01 /04/2011) GOUGH, DAVID ANTHONY, DIRECTOR (End: 08/29/2014) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. Business type 602 254 260 Corporation Governing persons FREDRIC J SIGMUND STEVE C LOVELY; TYLER C KOPET; License Page 1 of 3 Search L&I ; S r4;h1 A-% Index Help My I'm Workplace Rights Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Con.....struc...tion..Co.....ntracto.....r. Active. .................................. Meets current requirements. License specialties GENERAL License no. MACDOFS980RU Effective — expiration 12/31/2002— 01/04/2019 Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 1/10/2017 M a. .r M 0 N 0 N a N .x FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PLUMBING LEGEND PLUMBING ABBREVIATIONS SYMBOL DESCRIPTION ABBREVIATION FULL NAME BALANCING VALVE BALV 14 BACKFLOW PREVENTER BFP `jL) CHECK VALVE CV - - - - - . -- ------ - - --------- GATE VALVE - - - -- - - - --- - GV --- - - ------ LIQUID PROPANE GAS GLOBE VALVE GLV IE BALL VALVE BV BACKFLOW PREVENTER PRESSURE REDUCING VALVE PRV --- -- --- --------------------------- - ._ -- — --------- ---- ---- ---._­ - --------------------- COLD WATER CW - -- - - --- --- -- - -- - ---- - -- - - - --- - - --- HOT WATER PIPING - -- HW - --- - - - - -- - -- - - -- ---------------------- - -- -- - -- -- - - - - - -- -- - --- - - - - ----- ----- HOT WATER CIRCULATING HWC --------------- ----- NP ----- --- - NON -POTABLE WATER -- ---- - - -- - - --- --- --- -- NP ------ - --- - TW _._------ ---------------- TEMPERED WATER - __-_ -._ - ---- __--_ TW SD - - - - -- - - -- STORM DRAIN BELOW GRADE - - ----- - ----- -- - -- ------------- - ---------- SD PRV SANITARY SEWER ABOVE GRADE SANITARY W DOUBLE CHECK BACKFLOW PREVENTER SANITARY SEWER BELOW GRADE SS --- --------------------------- -------------------------- ----------------------- --------------------------------------RL RL ---------------------------------------- -.... -------------------------------------- --------------- -------------------- RAIN LEADER ABOVE GRADE RAIN -- - - -- -- ----.._..----------------------------------------------- - --- - - ----------------------------------------------- ---- ---- RL - ------------ --- ------ -- ------------------------ - - - ----- ORL --- - -------------------------------------------- -------------------------------------- OVERFLOW RAIN LEADER - - - - - - - ..._._..----------- - - -- -- --- - - --- - -- -- ORL - ---- -- ----- - - — ----------- VENT PIPING V -------------------------------------- 0 VTR - VENT THRU ROOF VTR FD FLOOR CLEAN OUT FCO W WALL CLEAN OUT -------- WCO -------------------------- ----------------------- IND INDIRECT DRAIN IND G ------------------- ------ GAS PIPING LOW PRESSURE G MG GAS PIPING MEDIUM PRESSURE MG ------- ---------- - -- ------------------------------------ HG ----------------- ---- --- -- ------ ----- ---- -- ---- ------------ GAS PIPING HIGH PRESSURE -- -- -- ------------- --- HG - - - - - -- --- ----------- --- -- - -- - - -- ------------------ ---- --- -------------- --- ------------- LPG - ---------------- ----------------------- -- - ----------- ----- - --- ----- ----------- LIQUID PROPANE GAS --- -- ----- ---- -- --- --- -- -- ------------------- --- LPG -- --- -- -- ---------------- -- --- VACUUM VAC --- ..-------------AW -- ACID WASTE AW -----AV----- ACID VENT AV -- ---- - - ---- ----- ------ O OXYGEN O A COMPRESSED AIR A DE DEIONIZED WATER DE DO FLOOR DRAIN FD -------- ------- - - ------ --------------------- - - - ---/-�-- --- - -- -- - -- - T - -- ___.. ----------------------------------------------------------- - ------ -- -- - - ---- --- ------------------- HOSE BIBB --- -- ---- - - - -- ------ --- HB FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: PLUMBING ABBREVIATIONS ABBV FULL NAME ABBV FULL NAME A - - - - COMPRESSED AIR LINE - _ HWR HOT WATER RETURN AFF ABOVE FINISHED FLOOR HWS HOT WATER SUPPLY AV ACID VENT LPG LIQUID PROPANE GAS AW ACID WASTE IE INVERT ELEVATION BFP BACKFLOW PREVENTER MH MANHOLE CB CATCH BASIN MG MEDIUM PRESSURE GAS Cl CAST IRON OFD OVERFLOW DRAIN CO CLEAN OUT ORL OVERFLOW RAIN LEADER CW COLD WATER POC POINT OF CONNECTION CV CHECK VALVE PRV PRESSURE REDUCING VALVE DCBP DOUBLE CHECK BACKFLOW PREVENTER RD ROOF DRAIN ELEV ELEVATION RL RAIN LEADER F FIRE SD STORM DRAIN FCO FLOOR CLEAN OUT SS SANITARY SEWER FD FLOOR DRAIN TOG TOP OF GATE G NATURAL GAS (LOW PRESSURE) TP TRAP PRIMER GI GREASE INTERCEPTOR UNO UNLESS NOTED OTHERWISE GLV GLOBE VALVE V VENT HB HOSE BIBB VTR VENT THRU ROOF HW HOT WATER W WASTE HWC HOT WATER CIRCULATING WCO WALL CLEAN OUT FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: LOCATION PIPING SIZE MATERIAL (FOOTNOTE) JOINT DOMESTIC WATER ! 1/2° TO 1" PEX (a, b, d, k) i MFR APPROVED DOMESTIC WATER 1-1/4" TO 2° COPPER TYPE L (c, k) I PRESSED MECH JOINT DOMESTIC WATER 2-1/2" AND LARGER I 304L STAINLESS STEEL SCH 10 (e, k) I WELDED ABOVE GROUND SANITARY WASTE 1-112" TO 4° PVC DWV/ABS SCH 40 (m, n, o, r) SOLVENT CEMENT SANITARY WASTE 6" AND LARGER CAST IRON (I, m, r) i NO HUB SANITARY VENT ( 1-1/2" TO 4° PVC DWV/ABS SCH 40 (o, r) SOLVENT CEMENT SANITARY VENT I 6" AND LARGER I CAST IRON (I, r) NO HUB ABOVE GROUND TRAP PRIMER 1/2° j PEX (a, b, d, j) I I MFR APPROVED FOOTNOTES: (a) ACCEPTABLE FOR PLENUM USE IN SIZES 1/2" THROUGH 1". (b) PIPES SHALL BE SUPPORTED IN CHANNEL IN ACCORADANCE WITH THE PIX MANFUCATURERS INSTALLATION INSTRUCTIONS. (c) PRESSURE LIMIT OF 200 PSI (d) LIMITED TO 80 PSI @ 200° F (e) GROOVED FIELD JOINTS (USE 316L STAINLESS STEEL COUPLINGS FOR UNDERGROUND INSTALLATION) (r) SEE VICTAULIC PUBLICATION 17.09 FOR PRESSURE APPLICATIONS OF STYLE 07,107, AND 89 COUPLINGS (9) PRE -SLEEVED FROM FACTORY (h) USE SS 316 COUPLINGS (i) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS 0) CITY OF BELLEVUE ONLY: TRAP PRIMERS TO BE COPPER (k) PIPE TO BE SUPPORTED DIRECTLY ON HANGERS (NO INSERT OR SHIELD REQUIRED) INSULATION TO BE APPLIED OVER HANGERS (1) STANDARD NO -HUB BANDS (m) HOTEL APPLICATIONS TO USE SOVENT IF POSSIBLE (n) MAY NEED TO CONSIDER ACCOUSTICAL REQUIREMENTS (o) FLAMEISMOKE SPREAD REQUIREMENTS MAY PRECLUDE USE (p) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS (q) USE SS316 COUPLINGS (r) CITY OF BELLEVUE REQUIRES EITHER W&V MATERIAL BE OF THE SAME TYPE, OR THAT ALL PENETRATIONS THROUGH DECK BE PVC/ABS (s) ONLY OUTSIDE BUILDING FOOTPRINT PIPING INSULATION SCHEDULE PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE SIZE TYPE ; THICKNESS , RANGE OVERHEAD COLD WATER ALL i FIBERGLASS j 1/2" - EXPOSED TO SIGHT COLD WATER ALL FIBERGLASS j 1/2" i - COLD WATER WITHIN WALLS NOT REQUIRED 1/2' -1-1/4° FIBERGLASS 1" 0.24-0.28 HOT WATER AND RECIRC (UP TO 140"F) 1-112"- 6" j FIBERGLASS j 1-1/2" I 0.24-0.28 HOT WATER UNDERGROUND 1/2"-2" THERMA-CEL 1" I 0.24-0.28 HORIZONTAL COIL CONDENSATE PIPING ALL ARMAFLEX j 112" ALL PIPING INSULATION SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE ENERGY CODE, 2015 EDITION, TABLE C403.2.9 ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION. - INSULATE THE OVERFLOW DRAIN BODY AND PIPE 10 FEET DOWN STREAM FROM THE DRAIN. - PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAYBE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2' MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE AS AMENDED BY THE STATE OF WASHINGTON. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING WASTE PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313 AND TABLE 313.3 OF THE 2015 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. 6. PROVIDE STOPS OR ANGLE VALVES AT ALL FIXTURES 7. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 8. PLUMBING EQUIPMENT, VALVES AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 9. THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 10. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING PIPING AND EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2015 IBC AND ASCE 7. 11. LIMITATION OF HOT WATER TEMPERATURE TO PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH CHAPTER 4 OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. cov z - e� t,\ APN# 102304-9078 LEGAL DESCRIPTION: PORTION OF GOV LOT 15 IN SW 1/4 OF SECTION 10-23-04 AND THE NE 1/4 OF SE 1/4 OF SECTION 09-23-04 BEGIN NW CORNER OF SW 1/4 OF SECTION 10-23-04 TH S 01-46-02 W 107.22 FT TH S87-33-12 E 512.24 FT TH S 01-46-02 W 402.93 FT TH N 88-13-58 W 616.22 FT TH S 85-07-17 W 170.45 FT TO ELY MARGIN OF PRIMARY STATE HIGHWAY NO 1 SSR 99 PACIFIC HIGHWAY SOUTH TH N 86-04-33 W 5.00 FT TH N 03-55-27 E 120.50 FT TH N 37-36-51 E 90.14 FT TH N 03-55-27 E 150 FT TH N 86-0433 W 10.00 FT TH N 03-05-27 E 61.90 FT TO BEGINNING OF 1266 FOOT RADIUS CURVE CONCAVE TO WEST TH N ALONG SAID CURVE 126.11 FT THRU C/A OF 05-42-27 TO A POINT ON SAID CURVE & A POINT ON E -W CIL OF SAID SECTION 9 TH S 89-16-45 E 224.58 FT TO E -W CORNER OF SAID SECTION 9 & POINT OF BEGINNING - LOT 2 OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L2000-072 RECORDING NO 20001213900008 TITLE NAME COMPANY PHONE NUMBER EMAIL PROJECT ENGINEER TRICIA DRAKE MACDONALD MILLER 206-768-4072 TRICIA.DRAKE@MACMILLER.COM ACCOUNT MANAGER STEVE FLINK MACDONALD MILLER 253-680-3172 STEVE.FLINK@MACMILLER.COM SHEET METAL SUPERINTENDENT NATHAN WAAGEN MACDONALD MILLER 206-786-8157 NATHAN.WAAGEN@MACMILLER.COM PLUMBING SUPERINTENDENT KELLY KING MACDONALD MILLER 206-768-3962 KELLY.KING@MACMILLER.COM REPLACE EXISTING JANITOR SINK WITH NEW MOP SINK. NAME TITLE NAME TITLE TP0.01 SCHEDULES - PLUMBING TP2.01 1ST FLOOR PLAN TP0.01S SITE PLAN CITI F T UKWILA LLI Q 0 LAST REVISED: O M Z O ti � r DATE PLOTTED: B GEZON •� t Q co 3t ISSUE DATE: D LAMBERT 12-20-16 U) Uj I f ` 5X 0 LL SHEET NUMBER: eR) J) LcUID 0 >r {O m v E oc m ��v t2 ct Qco Z U oo 14 CU Q 1-- C o ti LLI Q 0 U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW Z O DATE PLOTTED: B GEZON >Ln CAD: ISSUE DATE: D LAMBERT 12-20-16 Uj I O N 0 1 N SHEET NUMBER: U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DATE: D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: + REVIEDNE6 FOR CODE COMPLIANCE (; APPROVED. - JAN. 0 PPROVED.- JAN.0 6 2017 7- r— City of Tukwila.. BUILDING DIVISION J o co 0) co tM 04 O ID 0 a CL co 0 0 V) 0 Im LJ rn to rn 2 a. c; N 599 S 120TH PL S 124TH ST CEIVED DEC 212016 PERMIT CENTER 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An (0 CO (D C) 0 r— rto- n,) W U) z < (0 0 U) 05 0) I B c4 E T) W 0 Oq (IUD cxu U) U - 0 (c)00 n gIrl- LIJ cu LJ ry) MJ C—) C< Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: 0 DRAKW 12-20-16 > CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 < (0 z ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: 9 (0 0 C-2369-73166960-00 cu <,- 04 < T 0.01 0 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 0 C) W U) z 0 U) C) I ry W 0 < LU (c)00 n gIrl- LIJ 00 < c/) MJ =U) 04 Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 CAD: ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: T 0.01 S REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 2 EL M N i; [O N 0 N F >' !CITY OF T UMILA DEC 21 2016 PERMIT CENTER 09 1 1/8" = V-0- I i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J LAST REVISED: T DRAKE 12-20-16 im_ oil - W 12-20-16 rn :D ISSUE DAM - ry �. 11-1 Q (D Cn SHEET NUMBER: 10� a?�J o-) N E U) 1 1 mX011_ y t NmUO O cu.1U /V�/ ` , W M P! fn O L) Q C: i� �z fQ c G � O co O lam, 0 WOE Z — m �_...._..�__; Z _ °o U cu J 0 a-- O � d i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 i :D ISSUE DAM D LAMBERT 12-20-16 ry 11-1 r` Cn SHEET NUMBER: r O 1 y W O /V�/ ` , W M co �`` i W co co co CN WOE — m �_...._..�__; Z ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DAM D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: L) FOR CODE COMPLIANCE APPROVED JAN 06 2U1� City of Tukwila BUILDING CiVISION M a. .r M 0 N 0 N a N .x FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PLUMBING LEGEND PLUMBING ABBREVIATIONS SYMBOL DESCRIPTION ABBREVIATION FULL NAME BALANCING VALVE BALV 14 BACKFLOW PREVENTER BFP `jL) CHECK VALVE CV - - - - - . -- ------ - - --------- GATE VALVE - - - -- - - - --- - GV --- - - ------ LIQUID PROPANE GAS GLOBE VALVE GLV IE BALL VALVE BV BACKFLOW PREVENTER PRESSURE REDUCING VALVE PRV --- -- --- --------------------------- - ._ -- — --------- ---- ---- ---._­ - --------------------- COLD WATER CW - -- - - --- --- -- - -- - ---- - -- - - - --- - - --- HOT WATER PIPING - -- HW - --- - - - - -- - -- - - -- ---------------------- - -- -- - -- -- - - - - - -- -- - --- - - - - ----- ----- HOT WATER CIRCULATING HWC --------------- ----- NP ----- --- - NON -POTABLE WATER -- ---- - - -- - - --- --- --- -- NP ------ - --- - TW _._------ ---------------- TEMPERED WATER - __-_ -._ - ---- __--_ TW SD - - - - -- - - -- STORM DRAIN BELOW GRADE - - ----- - ----- -- - -- ------------- - ---------- SD PRV SANITARY SEWER ABOVE GRADE SANITARY W DOUBLE CHECK BACKFLOW PREVENTER SANITARY SEWER BELOW GRADE SS --- --------------------------- -------------------------- ----------------------- --------------------------------------RL RL ---------------------------------------- -.... -------------------------------------- --------------- -------------------- RAIN LEADER ABOVE GRADE RAIN -- - - -- -- ----.._..----------------------------------------------- - --- - - ----------------------------------------------- ---- ---- RL - ------------ --- ------ -- ------------------------ - - - ----- ORL --- - -------------------------------------------- -------------------------------------- OVERFLOW RAIN LEADER - - - - - - - ..._._..----------- - - -- -- --- - - --- - -- -- ORL - ---- -- ----- - - — ----------- VENT PIPING V -------------------------------------- 0 VTR - VENT THRU ROOF VTR FD FLOOR CLEAN OUT FCO W WALL CLEAN OUT -------- WCO -------------------------- ----------------------- IND INDIRECT DRAIN IND G ------------------- ------ GAS PIPING LOW PRESSURE G MG GAS PIPING MEDIUM PRESSURE MG ------- ---------- - -- ------------------------------------ HG ----------------- ---- --- -- ------ ----- ---- -- ---- ------------ GAS PIPING HIGH PRESSURE -- -- -- ------------- --- HG - - - - - -- --- ----------- --- -- - -- - - -- ------------------ ---- --- -------------- --- ------------- LPG - ---------------- ----------------------- -- - ----------- ----- - --- ----- ----------- LIQUID PROPANE GAS --- -- ----- ---- -- --- --- -- -- ------------------- --- LPG -- --- -- -- ---------------- -- --- VACUUM VAC --- ..-------------AW -- ACID WASTE AW -----AV----- ACID VENT AV -- ---- - - ---- ----- ------ O OXYGEN O A COMPRESSED AIR A DE DEIONIZED WATER DE DO FLOOR DRAIN FD -------- ------- - - ------ --------------------- - - - ---/-�-- --- - -- -- - -- - T - -- ___.. ----------------------------------------------------------- - ------ -- -- - - ---- --- ------------------- HOSE BIBB --- -- ---- - - - -- ------ --- HB FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: PLUMBING ABBREVIATIONS ABBV FULL NAME ABBV FULL NAME A - - - - COMPRESSED AIR LINE - _ HWR HOT WATER RETURN AFF ABOVE FINISHED FLOOR HWS HOT WATER SUPPLY AV ACID VENT LPG LIQUID PROPANE GAS AW ACID WASTE IE INVERT ELEVATION BFP BACKFLOW PREVENTER MH MANHOLE CB CATCH BASIN MG MEDIUM PRESSURE GAS Cl CAST IRON OFD OVERFLOW DRAIN CO CLEAN OUT ORL OVERFLOW RAIN LEADER CW COLD WATER POC POINT OF CONNECTION CV CHECK VALVE PRV PRESSURE REDUCING VALVE DCBP DOUBLE CHECK BACKFLOW PREVENTER RD ROOF DRAIN ELEV ELEVATION RL RAIN LEADER F FIRE SD STORM DRAIN FCO FLOOR CLEAN OUT SS SANITARY SEWER FD FLOOR DRAIN TOG TOP OF GATE G NATURAL GAS (LOW PRESSURE) TP TRAP PRIMER GI GREASE INTERCEPTOR UNO UNLESS NOTED OTHERWISE GLV GLOBE VALVE V VENT HB HOSE BIBB VTR VENT THRU ROOF HW HOT WATER W WASTE HWC HOT WATER CIRCULATING WCO WALL CLEAN OUT FIXTURE CONNECTION SCHEDULE NO. FIXTURE LOCAL CONNECTION WASTE VENT HOT COLD ------------------------- --------------------- ------------ ------------ -._...------ ..------------------- --------- - — JS -1 ! JANITOR SINK - MUSTEE 63M 2424 MOP BASIN, W/CHICAGO 897 -CP SERVICE FAUCET WM/ALL BRACKET AND VACUUM BREAKER, 3' 1 1/2" 1/2" ; 1/2" MUSTEE 65.700 HOSE & WALL BRACKET. I f S 120TH P G� SITE a S 124TH S C W a LO o N VICINITY MAP NO SCALE ,SE ,rr;I1.=PE.--,M IT E�'�iP`ED FOR: Vj vlochanical Electrical [� Plumbing ErGaS Piping City of Tukwila $UILDINIG DIVISION FRE COPY Permit: No. Plan.`_J i "Ubiect to errors 0,11d c.–.-: Appro*.'aI oicorj8,ta L_* 11r :i;>lsi.t:_t"t{� the via' ation of any adopted cc -do or rrr?i�anc of appr -ved Fieid Copy and condit."uns is ael.-t;� d: Date: City Of Tul ila 13UILDING DIVISION REVISIONSNo changes shell hi made to the scope of work withol.t prior approval of Tula:-riia Building Division. MOTE: PiovisiCns Will require a ns`,v plan submittal and may invciude additional plan review fees. , PLUMBING GE RAL N1 T, PIPING MATERIAL SCHEDULE: LOCATION PIPING SIZE MATERIAL (FOOTNOTE) JOINT DOMESTIC WATER ! 1/2° TO 1" PEX (a, b, d, k) i MFR APPROVED DOMESTIC WATER 1-1/4" TO 2° COPPER TYPE L (c, k) I PRESSED MECH JOINT DOMESTIC WATER 2-1/2" AND LARGER I 304L STAINLESS STEEL SCH 10 (e, k) I WELDED ABOVE GROUND SANITARY WASTE 1-112" TO 4° PVC DWV/ABS SCH 40 (m, n, o, r) SOLVENT CEMENT SANITARY WASTE 6" AND LARGER CAST IRON (I, m, r) i NO HUB SANITARY VENT ( 1-1/2" TO 4° PVC DWV/ABS SCH 40 (o, r) SOLVENT CEMENT SANITARY VENT I 6" AND LARGER I CAST IRON (I, r) NO HUB ABOVE GROUND TRAP PRIMER 1/2° j PEX (a, b, d, j) I I MFR APPROVED FOOTNOTES: (a) ACCEPTABLE FOR PLENUM USE IN SIZES 1/2" THROUGH 1". (b) PIPES SHALL BE SUPPORTED IN CHANNEL IN ACCORADANCE WITH THE PIX MANFUCATURERS INSTALLATION INSTRUCTIONS. (c) PRESSURE LIMIT OF 200 PSI (d) LIMITED TO 80 PSI @ 200° F (e) GROOVED FIELD JOINTS (USE 316L STAINLESS STEEL COUPLINGS FOR UNDERGROUND INSTALLATION) (r) SEE VICTAULIC PUBLICATION 17.09 FOR PRESSURE APPLICATIONS OF STYLE 07,107, AND 89 COUPLINGS (9) PRE -SLEEVED FROM FACTORY (h) USE SS 316 COUPLINGS (i) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS 0) CITY OF BELLEVUE ONLY: TRAP PRIMERS TO BE COPPER (k) PIPE TO BE SUPPORTED DIRECTLY ON HANGERS (NO INSERT OR SHIELD REQUIRED) INSULATION TO BE APPLIED OVER HANGERS (1) STANDARD NO -HUB BANDS (m) HOTEL APPLICATIONS TO USE SOVENT IF POSSIBLE (n) MAY NEED TO CONSIDER ACCOUSTICAL REQUIREMENTS (o) FLAMEISMOKE SPREAD REQUIREMENTS MAY PRECLUDE USE (p) USE STANDARD GALVANIZED DUCTILE IRON COUPLINGS (q) USE SS316 COUPLINGS (r) CITY OF BELLEVUE REQUIRES EITHER W&V MATERIAL BE OF THE SAME TYPE, OR THAT ALL PENETRATIONS THROUGH DECK BE PVC/ABS (s) ONLY OUTSIDE BUILDING FOOTPRINT PIPING INSULATION SCHEDULE PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE SIZE TYPE ; THICKNESS , RANGE OVERHEAD COLD WATER ALL i FIBERGLASS j 1/2" - EXPOSED TO SIGHT COLD WATER ALL FIBERGLASS j 1/2" i - COLD WATER WITHIN WALLS NOT REQUIRED 1/2' -1-1/4° FIBERGLASS 1" 0.24-0.28 HOT WATER AND RECIRC (UP TO 140"F) 1-112"- 6" j FIBERGLASS j 1-1/2" I 0.24-0.28 HOT WATER UNDERGROUND 1/2"-2" THERMA-CEL 1" I 0.24-0.28 HORIZONTAL COIL CONDENSATE PIPING ALL ARMAFLEX j 112" ALL PIPING INSULATION SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE ENERGY CODE, 2015 EDITION, TABLE C403.2.9 ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION. - INSULATE THE OVERFLOW DRAIN BODY AND PIPE 10 FEET DOWN STREAM FROM THE DRAIN. - PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAYBE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2' MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE AS AMENDED BY THE STATE OF WASHINGTON. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING WASTE PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313 AND TABLE 313.3 OF THE 2015 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. 6. PROVIDE STOPS OR ANGLE VALVES AT ALL FIXTURES 7. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 8. PLUMBING EQUIPMENT, VALVES AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 9. THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 10. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING PIPING AND EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2015 IBC AND ASCE 7. 11. LIMITATION OF HOT WATER TEMPERATURE TO PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH CHAPTER 4 OF THE 2015 EDITION OF THE UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. cov z - e� t,\ APN# 102304-9078 LEGAL DESCRIPTION: PORTION OF GOV LOT 15 IN SW 1/4 OF SECTION 10-23-04 AND THE NE 1/4 OF SE 1/4 OF SECTION 09-23-04 BEGIN NW CORNER OF SW 1/4 OF SECTION 10-23-04 TH S 01-46-02 W 107.22 FT TH S87-33-12 E 512.24 FT TH S 01-46-02 W 402.93 FT TH N 88-13-58 W 616.22 FT TH S 85-07-17 W 170.45 FT TO ELY MARGIN OF PRIMARY STATE HIGHWAY NO 1 SSR 99 PACIFIC HIGHWAY SOUTH TH N 86-04-33 W 5.00 FT TH N 03-55-27 E 120.50 FT TH N 37-36-51 E 90.14 FT TH N 03-55-27 E 150 FT TH N 86-0433 W 10.00 FT TH N 03-05-27 E 61.90 FT TO BEGINNING OF 1266 FOOT RADIUS CURVE CONCAVE TO WEST TH N ALONG SAID CURVE 126.11 FT THRU C/A OF 05-42-27 TO A POINT ON SAID CURVE & A POINT ON E -W CIL OF SAID SECTION 9 TH S 89-16-45 E 224.58 FT TO E -W CORNER OF SAID SECTION 9 & POINT OF BEGINNING - LOT 2 OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L2000-072 RECORDING NO 20001213900008 TITLE NAME COMPANY PHONE NUMBER EMAIL PROJECT ENGINEER TRICIA DRAKE MACDONALD MILLER 206-768-4072 TRICIA.DRAKE@MACMILLER.COM ACCOUNT MANAGER STEVE FLINK MACDONALD MILLER 253-680-3172 STEVE.FLINK@MACMILLER.COM SHEET METAL SUPERINTENDENT NATHAN WAAGEN MACDONALD MILLER 206-786-8157 NATHAN.WAAGEN@MACMILLER.COM PLUMBING SUPERINTENDENT KELLY KING MACDONALD MILLER 206-768-3962 KELLY.KING@MACMILLER.COM REPLACE EXISTING JANITOR SINK WITH NEW MOP SINK. NAME TITLE NAME TITLE TP0.01 SCHEDULES - PLUMBING TP2.01 1ST FLOOR PLAN TP0.01S SITE PLAN CITI F T UKWILA LLI Q 0 LAST REVISED: O M Z O ti � r DATE PLOTTED: B GEZON •� t Q co 3t ISSUE DATE: D LAMBERT 12-20-16 U) Uj I f ` 5X 0 LL SHEET NUMBER: eR) J) LcUID 0 >r {O m v E oc m ��v t2 ct Qco Z U oo 14 CU Q 1-- C o ti LLI Q 0 U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW Z O DATE PLOTTED: B GEZON >Ln CAD: ISSUE DATE: D LAMBERT 12-20-16 Uj I O N 0 1 N SHEET NUMBER: U) H 6i Z O w N a. _ W V LJ ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DATE: D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: + REVIEDNE6 FOR CODE COMPLIANCE (; APPROVED. - JAN. 0 PPROVED.- JAN.0 6 2017 7- r— City of Tukwila.. BUILDING DIVISION J o co 0) co tM 04 O ID 0 a CL co 0 0 V) 0 Im LJ rn to rn 2 a. c; N 599 S 120TH PL S 124TH ST CEIVED DEC 212016 PERMIT CENTER 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An (0 CO (D C) 0 r— rto- n,) W U) z < (0 0 U) 05 0) I B c4 E T) W 0 Oq (IUD cxu U) U - 0 (c)00 n gIrl- LIJ cu LJ ry) MJ C—) C< Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: 0 DRAKW 12-20-16 > CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 < (0 z ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: 9 (0 0 C-2369-73166960-00 cu <,- 04 < T 0.01 0 6i Z 0 V) 0 L U) 6i Z 0 CL 1 1 1 1 1 1 la � Ono 101 An REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 0 C) W U) z 0 U) C) I ry W 0 < LU (c)00 n gIrl- LIJ 00 < c/) MJ =U) 04 Uj 0 C/) (D ry CIO �- ENGINEER: LAST REVISED: T DRAKW 12-20-16 CHECKED BY: DATE PLOTTED: G NANADJANIAN 12-20-16 CAD: ISSUE DAM - D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: T 0.01 S REVIEkPrED FOR CODE COMPLIANCE APPROVED JAN .0.6 2017 City of Tukwila RIJILDING PiVISION,, 2 EL M N i; [O N 0 N F >' !CITY OF T UMILA DEC 21 2016 PERMIT CENTER 09 1 1/8" = V-0- I i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J LAST REVISED: T DRAKE 12-20-16 im_ oil - W 12-20-16 rn :D ISSUE DAM - ry �. 11-1 Q (D Cn SHEET NUMBER: 10� a?�J o-) N E U) 1 1 mX011_ y t NmUO O cu.1U /V�/ ` , W M P! fn O L) Q C: i� �z fQ c G � O co O lam, 0 WOE Z — m �_...._..�__; Z _ °o U cu J 0 a-- O � d i T a i w W Ia W Q (;7 Z O V) Of a t ►o �J ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 i :D ISSUE DAM D LAMBERT 12-20-16 ry 11-1 r` Cn SHEET NUMBER: r O 1 y W O /V�/ ` , W M co �`` i W co co co CN WOE — m �_...._..�__; Z ENGINEER: LAST REVISED: T DRAKE 12-20-16 CHECKED BY: DATE PLOTTED: B GEZON 12-20-16 CAD: ISSUE DAM D LAMBERT 12-20-16 DRAWING NUMBER: C-2369-73166960-00 SHEET NUMBER: L) FOR CODE COMPLIANCE APPROVED JAN 06 2U1� City of Tukwila BUILDING CiVISION