HomeMy WebLinkAboutPED 2020-11-16 Item 1B - Resolution - 2021 Consolidated Permit Fee Schedule
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Planning and Economic Development Committee
FROM: Jack Pace, DCD Director
BY: Minnie Dhaliwal, Deputy DCD Director
CC: Mayor Ekberg
DATE: November 10, 2020
SUBJECT: Updated DCD and PW Permit Fees
ISSUE
Should Tukwila increase its land use, Public Works and Building permit fees and hourly
inspection rates to reflect increased costs to provide development review services?
BACKGROUND
The City has previously adopted development permit fees on a two-year cycle. Additionally,
since 2017, to offset the city’s costs for processing credit card payments for permit applications
the City began charging a 3% convenience fee on permit fees paid by credit card. Technology
fee of 5% is collected to provide for online permitting software upgrade/maintenance and
converting paper records to digital records. Further the City contracts for the hearing examiner
services and these are pass through costs collected with the land use applications. Also, some
permits incur additional costs for the Fire Department review (Resolution 1967 adopted fees
charged by the Fire Department and those fees are in addition to the fees listed in the attached
resolution).
DISCUSSION
Staff is suggesting that the fees increase at 1.5% to reflect the City’s labor and benefit costs.
Salaries for represented employees will likely increase in 2021 and 2022 by 90% of the Seattle
Consumer Price Index (CPI-W). The CPI-W was 1% for the June 2020 period and additional
cost increases are anticipated with the employee benefit costs.
Additionally, staff is suggesting that hourly inspection fees and after hour inspections should be
increased from approximately $70 to $105 per hour to recover costs associated with
inspections. Also, the rate for credit card fees and technology fees should be maintained the
same as the past year. The pass-through costs associated with the hearing examiner fees
should also be maintained.
FINANCIAL IMPACT
The proposed fee increases will keep pace with the City’s costs to provide these necessary
services.
RECOMMENDATION
The Council is being asked to approve the fee resolution and consider this item at the
November 23, 2020 Committee of the Whole meeting and subsequent December 7, 2020
Regular Meeting.
ATTACHMENTS
Draft Public Works, Land Use and Building/Electrical/Plumbing/Mechanical Permit Fee
Resolution 85
86
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 1 of 12
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, REPEALING RESOLUTION NO. 1947,
AND ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE.
WHEREAS, the City Council adopted Resolution No. 1947 in 2018, establishing the
City’s current consolidated construction fee schedule; and
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City’s costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, the City’s primary cost for permit processing is employee salaries and
benefits; and
WHEREAS, the Seattle Consumer Price Index (CPI-W) was 1% for the June 2020
period; and
WHEREAS, the cost for employee benefits has risen by an even larger percentage;
and
WHEREAS, increasing flat fee permits by 1.5% will enable revenues to track with
City labor costs; and
WHEREAS, as more permit applicants are paying by credit card, and there is a
surcharge on the fees paid by credit card, the City intends to pass this convenience fee
through to the permit applicants;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Repealer. Resolution No. 1947 is hereby repealed, effective January
1, 2021.
87
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 2 of 12
Section 2. For 2021 and 2022, the Technology Fee shall be set at 5% of the
applicable permit fee.
Section 3. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION CURRENT FEE
Type A (Short-Term Non-profit) $50.00 $51.00 + Technology Fee
Type B (Short-Term Profit) $100.00 $102.00 + Technology Fee
Type C
(Infrastructure and Grading on
Private Property and City Right-of-
Way and Disturbance of City Right-
of-Way)
$250.00 $254.00 application base fee, Technology
Fee, plus four components based on construction
value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
See Public Works Bulletin A1 for fee schedule.
Type D (Long-Term) $100.00 $102.00 + Technology Fee
Type E (Potential Disturbance of
City Right-of-Way) $100.00 $102.00 + Technology Fee
Type F (Blanket Permits) $250.00 $254.00 processing fee, plus $5,000.00
$5,075.00 cash deposit, withdraw $100.00 $102.00
per instance for inspection
Franchise – Telecommunications $5,000.00 $5,075.00 administrative fee
Franchise – Cable $5,000.00 $5,075.00 plus 5% of total revenue
Street Vacation $1,200.00 $1,218.00
Latecomer’s Agreements $500.00 $507.50 processing fee, plus 17%
administrative fee, plus $500.00 $507.50 segregation
fee
Flood Zone Control Permit $50.00 $51.00 + Technology Fee
Public Works Inspector Safety,
Investigation or Re-inspection Fee $70.00 $71.00 per hour
Public Works inspection outside of
normal business hours (three four-
hour minimum charge)
$105.00 $106.50 per hour
Section 4. Land use permit and processing fees will be charged according to the
following schedule:
88
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 3 of 12
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Decision Type 2019 Fees 2020
Fees 2021 Fee 2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
APPEALS
Appeal of Type 1, 2 and 4 Decisions $645 $665 $675 $685
SEPA MDNS Appeal $645 $665 $675 $685
Appeal of Sign Code Decision $645 $665 $675 $685
Impact Fee Appeals:
Appeal of Fire Impact Fees $645 $665 $675 $685
Appeal of Parks Impact Fees $645 $665 $675 $685
Appeal of Transportation Impact Fees $645 $665 $675 $685
SIGNS Permit (TMC Chapter 19)
Permanent $265 $275 $279 $283 + TF
Temporary $45 $45 $46 $46 + TF
Pole/Banner Initial Application $265 $275 $279 $283 + TF
Special Event $115 $120 $122 $123 + TF
Pole/Banner Annual Renewal $60 $60 $61 $62 + TF
New Billboard $645 $665 $675 $685 + TF
Master Sign Program—Admin $2,380 $2,455 $2,492 $2,529 + TF
Master Sign Program—BAR $3,800 $3,930 $3,989 $4,049 + TF
TUC ZONE MODIFICATIONS
Modification to TUC Corridor
Standards
(TMC Section 18.28.130.C) $645 $665
$675
$685 + TF
Modification to TUC Open Space
Regulations
(TMC Section 18.28.250.D.4.d) $645 $665
$675
$685 + TF
Transit Reduction to Parking
Requirements
(TMC Section 18.28.260.B.5.b) $645 $665
$675
$685 + TF
DESIGN REVIEW (TMC Section 18.60.030)
Administrative $2,450 $2,525 $2,563 $2,601 + TF
Public Hearing $4,390 $4,525 $4,593 $4,662 + TF
Major Modification $1,500 $1,550 $1,573 $1,597 + TF
Minor Modification $680 $705 $716 $726 + TF
89
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 4 of 12
Decision Type 2019 Fees 2020
Fees 2021 Fee 2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
PARKING VARIANCES AND SPECIAL PERMISSIONS
Administrative Parking Variance
(Type 2—TMC Section 18.56.140) $645 $665
$675
$685 + TF
Parking Variance
(Type 3—TMC Section 18.56.140) $1,060 $1,095
$1,111
$1,128 + HE + TF
Parking Standard for use not
specified
(TMC Section 18.28.250.D.4.d.1 and
TMC Section 18.56.100) $635 $655
$665
$675 + TF
Residential Parking Reduction
(TMC Section 18.56.065) $645 $665
$675
$685 + TF
Shared, covenant, Complementary
Parking Reduction
(TMC Section 18.56.070) $645 $665
$675
$685 + TF
Parking Lot Restriping
(TMC Section 18.56.120) $645 $665
$675
$685 + TF
VARIANCES, SPECIAL PERSMISSIONS AND SITE PLAN REVIEW
Variances
(TMC Section 18.72) $3,100 $3,195 $3,243 $3,291 + HE + TF
Environmentally Sensitive Areas
Deviation, Buffer Reduction
(TMC Chapter 18.45) $1,640 $1,690 $1,715 $1,741 + TF
Reduced fee for LDR home-
owners, no associated short plat $645 $665 $675 $685
Reasonable Use Exception
(TMC Section 18.45.180) $3,275 $3,380 $3,431 $3,482 + HE + TF
Exception from Single Family Design
Standard
(TMC Section 18.50.055) $645 $665 $675 $685 + TF
Special Permission Cargo Container
(TMC Section 18.50.060) $645 $665 $675 $685 + TF
Residential Tree Permit for single
family residential properties
(TMC Chapters 18.44, 18.45 and
18.54, including shoreline and critical
areas tree permits) $115 $120 $121 $124
Tree Permit and Commercial
Landscape Modification Permit and
Exceptions for non-single family
residential properties
(TMC Chapter Section 18.52.100, and
Chapters 18.44, 18.45 and 18.54,
including shoreline and critical areas
tree permits) $645 $665 $675 $685 + TF
90
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 5 of 12
Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technolog
y Fee (TF)
LOT CREATION AND CONSOLIDATION
Boundary Line Adjustment
(TMC Chapter 17.08) $1,835 $1,895 $1,923 $1,952 + TF
Lot Consolidation
(TMC Chapter 17.08) $680 $705 $716 $726 + TF
Short Plat (2-4 lots)
(TMC Chapter 17.12) $4,180 $4,315 $4,380 $4,445 + TF
Short Plat (5-9 lots)
(TMC Chapter 17.12) $4,760 $4,910 $4,984 $5,058 + TF
Subdivision:
Subdivision Preliminary Plat (10+ lots)
(TMC Section 17.14.020) $5,460 $5,635 $5,719 $5,805 + HE + TF
Subdivision Final Plat (10+ lots)
(TMC Section 17.12.030) $3,275 $3,380 $3,431 $3,482 + TF
Binding Site Improvement Plan
(TMC Chapter 17.16) $4,180 $4,315 $4,380 $4,445 + TF
Planned Residential Development:
Planned Residential Development—
Administrative
(TMC Section 18.46.110) $2,380 $2,455 $2,492 $2,529 + TF
Planned Residential Development—
Public Hearing
(TMC Section 18.46.110) $5,460 $5,635 $5,719 $5,805 + TF
Planned Residential Development—
Minor Modification
(TMC Section 18.46.130) $645 $665 $675 $685 + TF
Planned Residential Development—
Major Modification
(TMC Section 18.46.130) $2,655 $2,740 $2,781 $2,823 + TF
WIRELESS COMMUNICATION FACILITY (TMC Chapter 18.58.050)
Minor (Type 1) $645 $665 $675 $685 + TF
Administrative (Type 2) $1,835 $1,895 $1,923 $1,952 + TF
Major or Height Waiver (Type 3) $3,670 $3,790 $3,847 $3,905 + HE + TF
SEPA AND ENVIRONMENTAL
Checklist $1,870 $1,930 $1,959 $1,988 + TF
SEPA EIS $3,275 $3,380 $3,431 $3,482 + TF
SEPA Planned Action $645 $665 $675 $685 + TF
SEPA Addendum $645 $665 $675 $685 + TF
SEPA Exemption Letter $380 $395 $401 $407 + TF
Sensitive Area Master Plan Overlay
(TMC Section 18.45.160) $5,460 $5,635 $5,719 $5,805 + TF
91
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 6 of 12
Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
SHORELINE PERMITS
Substantial Development Permit: (TMC Chapter 18.44)
Project value: $5,000 - $10,000 $1,295 $1,335 $1,355 $1,375 + TF
$10,001 - $50,000 $3,025 $3,125 $3,172 $3,219 + TF
$50,001 - $500,000 $4,825 $4,980 $5,055 $5,130 + TF
More than $500,000 $6,120 $6,315 $6,410 $6,506 + TF
Permit Exemption Letter, Shoreline $265 $275 $279 $283 + TF
Shoreline Permit Revision $670 $690 $700 $711 + TF
Conditional Use Permit, Shoreline
(TMC Section 18.44.050) $4,250 $4,385 $4,451 $4,517 + HE + TF
Shoreline Tree Permit
(TMC Chapter 18.44) $115 $120 + TF
Shoreline Environment Redesignation $3,275 $3,380 $3,431 $3,482 + TF
NOISE VARIANCES (TMC Section 8.22.120)
Type I $530 $545 $553 $561 + TF
Type II $715 $740 $751 $762 + TF
Type III $1,595 $1,645 $1,670 $1,695 + HE + TF
USE PERMITS
Conditional Use Permit
(TMC Section 18.64.020) $4,250 $4,385 $4,451 $4,517 + HE + TF
Unclassified Use Permit
(TMC Chapter 18.66) $5,460 $5,635 $5,719 $5,805 + TF
TSO Special Permission Use
(TMC Section 18.41.060) $1,060 $1,095 $1,111 $1,128 + HE + TF
COMPREHENSIVE PLAN CHANGES (TMC Chapter 18.84)
Rezone (Map Change—
separate Comprehensive Plan
amendment fees also apply) $3,820 $3,945 $4,004 $4,064 + TF
Comprehensive Plan Amendment $4,370 $4,505 $4,572 $4,641 + TF
Zoning Code Text Amendment $4,965 $5,125 $5,202 $5,280 + TF
MISCELLANEOUS SERVICES AND CHARGES
Development Agreement $2,185 $2,255 $2,289 $2,323 + TF
Code Interpretation
(TMC Section 18.90.010) $380 $395 $401 $407 + TF
Zoning Verification Letter $380 $395 $401 $407 + TF
Legal Lot Verification $615 $630 $639 $649 + TF
92
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 7 of 12
Decision Type 2019
Fees 2020 Fees 2021 Fee 2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
Preapplication Meeting $530 $545 $553 $561 + TF
In-lieu Tree Replacement Fee $400 $410 $416 $422
Mailing Fee to Generate Labels,
per project $500 $515 $523 $530
Public Notice Mailing Fee per address
for each mailing $1 $1 $1 $1
Section 5. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation Building Permit Fees
$1 to $500 $66.30 $67.29 + Technology Fee
$501 to $2,000 $66.30 $67.29 for the first $500, plus $4.39 $4.45 for each additional
$100, or fraction thereof, to and including $2,000, + Technology Fee
$2,001 to $25,000 $132.09 $134.07 for the first $2,000, plus $19.99 $20.29 for each
additional $1,000, or fraction thereof, to and including $25,000, +
Technology Fee
$25,001 to $50,000 $612.41 $621.60 for the first $25,000, plus $15.61 $15.84 for each
additional $1,000, or fraction thereof, to and including $50,000, +
Technology Fee
$50,001 to $100,000 $1,002.92 $1,017.96 for the first $50,000, plus $10.81 $10.97 for each
additional $1,000, or fraction thereof, to and including $100,000, +
Technology Fee
$100,001 to $500,000 $1,541.83 $1,564.95 for the first $100,000, plus $8.67 $8.80 for each
additional $1,000, or fraction thereof, to and including $500,000, +
Technology Fee
$500,001 to $1,000,000 $5,004.43 $5,079.49 for the first $500,000, plus $7.14 $7.24 for each
additional $1,000, or fraction thereof, to and including $1,000,000, +
Technology Fee
$1,000,001 to $5,000,000 $8,612.12 $8,741.30 for the first $1,000,000, plus $4.79 $4.86 for each
additional $1,000, or fraction thereof, to and including $5,000,000, +
Technology Fee
$5,000,001 and up $27,788.12 $28,204.94 for the first $5,000.000, plus $4.59 $4.65 for each
$1,000 or fraction thereof, + Technology Fee
93
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 8 of 12
A. Non-Structural Plan Review Fee. A non-structural plan review fee shall be
paid at the time of submitting plans and specifications for review. The non-structural
plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee
schedule. The non-structural plan review fee specified herein is a separate fee from the
permit fee and is in addition to the permit fee.
B. Structural Plan Review Fee. Where a structural plan review is deemed
necessary, a structural plan review fee shall be charged. The structural plan review fee
shall be 35% of the calculated non-structural plan review fee.
C. Total Value of All Construction Work. The latest Building Data Valuation that
is updated twice a year by the International Code Council shall be used for the purposes
of calculating value of the construction work.
Section 6. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Contract Amount)
Mechanical Permit Fee
$33.15 $33.64 for issuance of each permit (base fee) + Technology Fee
$250 or less $66.30 $67.29 + Technology Fee
$251 to $500 $66.30 $67.29 for first $250, plus $7.99 $8.10 for each $100 or fraction
thereof, to and including $500, + Technology Fee
$501 to $1,000 $86.29 $87.58 for the first $500, plus $8.87 $9.00 for each $100 or
fraction thereof, to and including $1,000, + Technology Fee
$1,001 to $5,000 $130.66 $132.61 for the first $1,000, plus $9.84 $9.98 for each $1,000
or fraction thereof, to and including $5,000, + Technology Fee
$5,001 to $50,000 $170.03 $172.58 for the first $5,000, plus $10.25 $10.40 for each
$1,000 or fraction thereof, to and including $50,000, + Technology Fee
$50,001 to $250,000 $651.98 $661.75 for the first $50,000, plus $8.57 $8.69 for each $1,000
or fraction thereof, to and including $250,000, + Technology Fee
$250,001 to $1,000,000 $2,365.58 $2,401.06 for the first $250,000, plus $7.55 $7.66 for each
$1,000 or fraction thereof, to and including $1,000,000, + Technology
Fee
$1,000,001 and up $8,026.58 $8,146.97 for the first $1,000,000, plus $6.83 $6.93 for each
$1,000 or fraction thereof, + Technology Fee
94
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 9 of 12
Section 7. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance—Issuance of each permit (base fee) $35.00 $35.52 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) $68.00 $69.02 + Technology Fee
For each additional fixture $15.00 $15.22 + Technology Fee
For each building sewer and each trailer park sewer $25.00 $25.37 + Technology Fee
Rain water system – per drain (inside building) $15.00 $15.22 + Technology Fee
For each water heater and/or vent $15.00 $15.22 + Technology Fee
For each industrial waste pretreatment interceptor, including its
trap and vent, except for kitchen type grease interceptors $30.00 $30.45 + Technology Fee
For each grease interceptor for commercial kitchens $30.00 $30.45 + Technology Fee
For each repair or alteration of water piping and/or water treating
equipment, each occurrence $15.00 $15.22 + Technology Fee
For each repair or alteration of drainage or vent piping, each
fixture $15.00 $15.22 + Technology Fee
For each medical gas piping system serving one to five
inlets/outlets for a specific gas $85.00 $86.27 + Technology Fee
For each additional medical gas inlets/outlets $17.00 $17.22 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
backflow protection devices therefor. $30.00 $30.45 + Technology Fee
For atmospheric-type vacuum breakers not included in lawn
sprinkler backflow protection:
1 to 5 ........ $15.00 $15.22 + Technology Fee
Over 5 ...... $15.00 $15.22 for first 5 plus $3.25 $3.29 for each
additional + Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2-inch diameter and smaller ...... $30.00 $30.45 +
Technology Fee
Over 2-inch diameter: ............... $33.00 $33.49 +
Technology Fee
Section 8. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
$35.00 $35.52 + Technology Fee
Unit Fee Schedule
For each gas piping system of one to five outlets $68.00 $69.02 + Technology Fee
For each additional gas piping system outlet, per outlet $15.00 $15.22 + Technology Fee
95
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 10 of 12
Section 9. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE-FAMILY DWELLINGS
New single-family dwellings (including a garage) $180.00 $180.70 + Technology
Fee
Garages, pools, spas and outbuildings $120.00 $121.80 + Technology
Fee
Low voltage systems $60.00 $60.90 + Technology Fee
2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration—no added/altered circuits $120.00 $121.80 + Technology
Fee
Service change $100.00 $100.50 with added/altered circuits, plus
$10.00 $10.15 for each added circuit (maximum permit fee $160.00
$162.40)
$100.00 $100.50 + Technology
Fee
Circuits added/altered without service change (includes up to
5 circuits) $60.00 $60.90 + Technology Fee
Circuits $60.00 $60.90 added/altered without service change (more
than 5 circuits); $10.00 $10.15 for each added circuit (maximum permit
fee $100.00 $100.50+ Technology Fee)
$60.00 $60.90 + Technology Fee
Meter/mast repair $80.00 $81.20 + Technology Fee
Low voltage systems $60.00 $60.90 + Technology Fee
3. MULTI-FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$250 or less $66.30 $67.29 + Technology Fee
$251 - $1,000 $66.30 $67.29 for the first $250 plus $4.39 $4.45 for each $100 or fraction
thereof, to and including $1,000, + Technology Fee
$1,001 - $5,000 $98.94 $100.42 for the first $1,000 plus $22.03 $22.36 for each $1,000 or
fraction thereof, to and including $5,000, + Technology Fee
$5,001 - $50,000 $186.97 $189.77 for the first $5,000 plus $18.05 $18.32 for each $1,000 or
fraction thereof, to and including $50,000, + Technology Fee
$50,001 - $250,000 $998.73 $1,013.71 for the first $50,000 plus $13.16 $13.35 for each $1,000 or
fraction thereof, to and including $250,000, + Technology Fee
$250,001 - $1,000,000 $3,638.54 $3,693.11 for the first $250,000 plus $9.33 $9.46 for each $1,000 or
fraction thereof, to and including $1,000,000, + Technology Fee
Over $1,000,000 $10,649.51 $10,809.25 plus 0.5% of cost over $1,000,000, + Technology Fee
96
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 11 of 12
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential) $60.00 $105.00 + Technology
Fee
Temporary service/generators $90.00 $105.00 + Technology
Fee
Manufactured/mobile home parks and RV park sites, each service and
feeder
$100.00 $105.00 + Technology
Fee
Carnivals:
Base fee $100.00 $105.00 + Technology
Fee
Each concession fee $11.00 $11.16 + Technology Fee
Each ride and generator truck $11.00 $11.16 + Technology Fee
Inspections or plan review not specified elsewhere (one hour
minimum). $60.00 $105.00 per hour
Safety inspections, plan revisions $60.00 $105.00 per hour
Adult family home inspection (paid at the time of scheduling the
inspection)
$60.00 $105.00 for each
inspection
Disaster recovery emergency repair permit (residential structures only) $20.00 $20.30
Section 10. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three four hour minimum charge) $105.00 $106.57 per
hour
Re-inspection fee (minimum charge one hour) $70.00 $105.00 per
hour
Inspection for which no fee is specifically indicated—investigations or safety
inspections $70.00 $105.00 per
hour
Additional plan review required by changes, additions, or revisions to approved
plans $70.00 $105.00 per
hour
Work commencing before permit issuance shall be subject to an investigation fee
equal to 100% of the permit fee.
100% of the permit fee
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order
to document compliance with the code.
Work covered prior to inspection or work not ready at the time of inspection may
be charged a re-inspection fee of $105.00 $106.57.
Expired permit final – includes two inspections $140.00 $142.10
Expired permit final – each additional inspection $70.00 $71.05
Minor residential remodel plan review and permit (projects up to $20,000) $20.00 $20.30
Certificate of Occupancy replacement $105.00
97
CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20
MD:bjs Review and analysis by Barbara Saxton Page 12 of 12
Section 11. Credit Card Surcharge. If payment is made by credit card, a
processing fee of 3% will be added to the total order.
Section 12. Effective Date. This resolution and the fee schedules contained
herein shall be effective January 1, 2021.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this _________ day of __________________, 2020.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk De’Sean Quinn, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
98