HomeMy WebLinkAboutPED 2020-11-16 Item 1B - Resolution - 2021 Consolidated Permit Fee Schedule City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Planning and Economic Development Committee FROM: Jack Pace, DCD Director BY: Minnie Dhaliwal, Deputy DCD Director CC: Mayor Ekberg DATE: November 10, 2020 SUBJECT: Updated DCD and PW Permit Fees ISSUE Should Tukwila increase its land use, Public Works and Building permit fees and hourly inspection rates to reflect increased costs to provide development review services? BACKGROUND The City has previously adopted development permit fees on a two-year cycle. Additionally, since 2017, to offset the city’s costs for processing credit card payments for permit applications the City began charging a 3% convenience fee on permit fees paid by credit card. Technology fee of 5% is collected to provide for online permitting software upgrade/maintenance and converting paper records to digital records. Further the City contracts for the hearing examiner services and these are pass through costs collected with the land use applications. Also, some permits incur additional costs for the Fire Department review (Resolution 1967 adopted fees charged by the Fire Department and those fees are in addition to the fees listed in the attached resolution). DISCUSSION Staff is suggesting that the fees increase at 1.5% to reflect the City’s labor and benefit costs. Salaries for represented employees will likely increase in 2021 and 2022 by 90% of the Seattle Consumer Price Index (CPI-W). The CPI-W was 1% for the June 2020 period and additional cost increases are anticipated with the employee benefit costs. Additionally, staff is suggesting that hourly inspection fees and after hour inspections should be increased from approximately $70 to $105 per hour to recover costs associated with inspections. Also, the rate for credit card fees and technology fees should be maintained the same as the past year. The pass-through costs associated with the hearing examiner fees should also be maintained. FINANCIAL IMPACT The proposed fee increases will keep pace with the City’s costs to provide these necessary services. RECOMMENDATION The Council is being asked to approve the fee resolution and consider this item at the November 23, 2020 Committee of the Whole meeting and subsequent December 7, 2020 Regular Meeting. ATTACHMENTS Draft Public Works, Land Use and Building/Electrical/Plumbing/Mechanical Permit Fee Resolution 85 86 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 1 of 12 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REPEALING RESOLUTION NO. 1947, AND ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE. WHEREAS, the City Council adopted Resolution No. 1947 in 2018, establishing the City’s current consolidated construction fee schedule; and WHEREAS, the City intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, the City Council wishes to recover a portion of the City’s costs for review and processing of permit applications; and WHEREAS, the City has adopted a biennial budget process; and WHEREAS, the City’s primary cost for permit processing is employee salaries and benefits; and WHEREAS, the Seattle Consumer Price Index (CPI-W) was 1% for the June 2020 period; and WHEREAS, the cost for employee benefits has risen by an even larger percentage; and WHEREAS, increasing flat fee permits by 1.5% will enable revenues to track with City labor costs; and WHEREAS, as more permit applicants are paying by credit card, and there is a surcharge on the fees paid by credit card, the City intends to pass this convenience fee through to the permit applicants; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Repealer. Resolution No. 1947 is hereby repealed, effective January 1, 2021. 87 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 2 of 12 Section 2. For 2021 and 2022, the Technology Fee shall be set at 5% of the applicable permit fee. Section 3. Public Works fees will be charged according to the following schedule: PUBLIC WORKS FEE SCHEDULE PERMIT DESCRIPTION CURRENT FEE Type A (Short-Term Non-profit) $50.00 $51.00 + Technology Fee Type B (Short-Term Profit) $100.00 $102.00 + Technology Fee Type C (Infrastructure and Grading on Private Property and City Right-of- Way and Disturbance of City Right- of-Way) $250.00 $254.00 application base fee, Technology Fee, plus four components based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review See Public Works Bulletin A1 for fee schedule. Type D (Long-Term) $100.00 $102.00 + Technology Fee Type E (Potential Disturbance of City Right-of-Way) $100.00 $102.00 + Technology Fee Type F (Blanket Permits) $250.00 $254.00 processing fee, plus $5,000.00 $5,075.00 cash deposit, withdraw $100.00 $102.00 per instance for inspection Franchise – Telecommunications $5,000.00 $5,075.00 administrative fee Franchise – Cable $5,000.00 $5,075.00 plus 5% of total revenue Street Vacation $1,200.00 $1,218.00 Latecomer’s Agreements $500.00 $507.50 processing fee, plus 17% administrative fee, plus $500.00 $507.50 segregation fee Flood Zone Control Permit $50.00 $51.00 + Technology Fee Public Works Inspector Safety, Investigation or Re-inspection Fee $70.00 $71.00 per hour Public Works inspection outside of normal business hours (three four- hour minimum charge) $105.00 $106.50 per hour Section 4. Land use permit and processing fees will be charged according to the following schedule: 88 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 3 of 12 LAND USE FEE SCHEDULE All peer review fees will be passed through to the applicant per TMC Section 18.50.200. Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee Plus Hearing Examiner Fee Plus Technology Fee (TF) APPEALS Appeal of Type 1, 2 and 4 Decisions $645 $665 $675 $685 SEPA MDNS Appeal $645 $665 $675 $685 Appeal of Sign Code Decision $645 $665 $675 $685 Impact Fee Appeals: Appeal of Fire Impact Fees $645 $665 $675 $685 Appeal of Parks Impact Fees $645 $665 $675 $685 Appeal of Transportation Impact Fees $645 $665 $675 $685 SIGNS Permit (TMC Chapter 19) Permanent $265 $275 $279 $283 + TF Temporary $45 $45 $46 $46 + TF Pole/Banner Initial Application $265 $275 $279 $283 + TF Special Event $115 $120 $122 $123 + TF Pole/Banner Annual Renewal $60 $60 $61 $62 + TF New Billboard $645 $665 $675 $685 + TF Master Sign Program—Admin $2,380 $2,455 $2,492 $2,529 + TF Master Sign Program—BAR $3,800 $3,930 $3,989 $4,049 + TF TUC ZONE MODIFICATIONS Modification to TUC Corridor Standards (TMC Section 18.28.130.C) $645 $665 $675 $685 + TF Modification to TUC Open Space Regulations (TMC Section 18.28.250.D.4.d) $645 $665 $675 $685 + TF Transit Reduction to Parking Requirements (TMC Section 18.28.260.B.5.b) $645 $665 $675 $685 + TF DESIGN REVIEW (TMC Section 18.60.030) Administrative $2,450 $2,525 $2,563 $2,601 + TF Public Hearing $4,390 $4,525 $4,593 $4,662 + TF Major Modification $1,500 $1,550 $1,573 $1,597 + TF Minor Modification $680 $705 $716 $726 + TF 89 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 4 of 12 Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee Plus Hearing Examiner Fee Plus Technology Fee (TF) PARKING VARIANCES AND SPECIAL PERMISSIONS Administrative Parking Variance (Type 2—TMC Section 18.56.140) $645 $665 $675 $685 + TF Parking Variance (Type 3—TMC Section 18.56.140) $1,060 $1,095 $1,111 $1,128 + HE + TF Parking Standard for use not specified (TMC Section 18.28.250.D.4.d.1 and TMC Section 18.56.100) $635 $655 $665 $675 + TF Residential Parking Reduction (TMC Section 18.56.065) $645 $665 $675 $685 + TF Shared, covenant, Complementary Parking Reduction (TMC Section 18.56.070) $645 $665 $675 $685 + TF Parking Lot Restriping (TMC Section 18.56.120) $645 $665 $675 $685 + TF VARIANCES, SPECIAL PERSMISSIONS AND SITE PLAN REVIEW Variances (TMC Section 18.72) $3,100 $3,195 $3,243 $3,291 + HE + TF Environmentally Sensitive Areas Deviation, Buffer Reduction (TMC Chapter 18.45) $1,640 $1,690 $1,715 $1,741 + TF Reduced fee for LDR home- owners, no associated short plat $645 $665 $675 $685 Reasonable Use Exception (TMC Section 18.45.180) $3,275 $3,380 $3,431 $3,482 + HE + TF Exception from Single Family Design Standard (TMC Section 18.50.055) $645 $665 $675 $685 + TF Special Permission Cargo Container (TMC Section 18.50.060) $645 $665 $675 $685 + TF Residential Tree Permit for single family residential properties (TMC Chapters 18.44, 18.45 and 18.54, including shoreline and critical areas tree permits) $115 $120 $121 $124 Tree Permit and Commercial Landscape Modification Permit and Exceptions for non-single family residential properties (TMC Chapter Section 18.52.100, and Chapters 18.44, 18.45 and 18.54, including shoreline and critical areas tree permits) $645 $665 $675 $685 + TF 90 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 5 of 12 Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee Plus Hearing Examiner Fee Plus Technolog y Fee (TF) LOT CREATION AND CONSOLIDATION Boundary Line Adjustment (TMC Chapter 17.08) $1,835 $1,895 $1,923 $1,952 + TF Lot Consolidation (TMC Chapter 17.08) $680 $705 $716 $726 + TF Short Plat (2-4 lots) (TMC Chapter 17.12) $4,180 $4,315 $4,380 $4,445 + TF Short Plat (5-9 lots) (TMC Chapter 17.12) $4,760 $4,910 $4,984 $5,058 + TF Subdivision: Subdivision Preliminary Plat (10+ lots) (TMC Section 17.14.020) $5,460 $5,635 $5,719 $5,805 + HE + TF Subdivision Final Plat (10+ lots) (TMC Section 17.12.030) $3,275 $3,380 $3,431 $3,482 + TF Binding Site Improvement Plan (TMC Chapter 17.16) $4,180 $4,315 $4,380 $4,445 + TF Planned Residential Development: Planned Residential Development— Administrative (TMC Section 18.46.110) $2,380 $2,455 $2,492 $2,529 + TF Planned Residential Development— Public Hearing (TMC Section 18.46.110) $5,460 $5,635 $5,719 $5,805 + TF Planned Residential Development— Minor Modification (TMC Section 18.46.130) $645 $665 $675 $685 + TF Planned Residential Development— Major Modification (TMC Section 18.46.130) $2,655 $2,740 $2,781 $2,823 + TF WIRELESS COMMUNICATION FACILITY (TMC Chapter 18.58.050) Minor (Type 1) $645 $665 $675 $685 + TF Administrative (Type 2) $1,835 $1,895 $1,923 $1,952 + TF Major or Height Waiver (Type 3) $3,670 $3,790 $3,847 $3,905 + HE + TF SEPA AND ENVIRONMENTAL Checklist $1,870 $1,930 $1,959 $1,988 + TF SEPA EIS $3,275 $3,380 $3,431 $3,482 + TF SEPA Planned Action $645 $665 $675 $685 + TF SEPA Addendum $645 $665 $675 $685 + TF SEPA Exemption Letter $380 $395 $401 $407 + TF Sensitive Area Master Plan Overlay (TMC Section 18.45.160) $5,460 $5,635 $5,719 $5,805 + TF 91 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 6 of 12 Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee Plus Hearing Examiner Fee Plus Technology Fee (TF) SHORELINE PERMITS Substantial Development Permit: (TMC Chapter 18.44) Project value: $5,000 - $10,000 $1,295 $1,335 $1,355 $1,375 + TF $10,001 - $50,000 $3,025 $3,125 $3,172 $3,219 + TF $50,001 - $500,000 $4,825 $4,980 $5,055 $5,130 + TF More than $500,000 $6,120 $6,315 $6,410 $6,506 + TF Permit Exemption Letter, Shoreline $265 $275 $279 $283 + TF Shoreline Permit Revision $670 $690 $700 $711 + TF Conditional Use Permit, Shoreline (TMC Section 18.44.050) $4,250 $4,385 $4,451 $4,517 + HE + TF Shoreline Tree Permit (TMC Chapter 18.44) $115 $120 + TF Shoreline Environment Redesignation $3,275 $3,380 $3,431 $3,482 + TF NOISE VARIANCES (TMC Section 8.22.120) Type I $530 $545 $553 $561 + TF Type II $715 $740 $751 $762 + TF Type III $1,595 $1,645 $1,670 $1,695 + HE + TF USE PERMITS Conditional Use Permit (TMC Section 18.64.020) $4,250 $4,385 $4,451 $4,517 + HE + TF Unclassified Use Permit (TMC Chapter 18.66) $5,460 $5,635 $5,719 $5,805 + TF TSO Special Permission Use (TMC Section 18.41.060) $1,060 $1,095 $1,111 $1,128 + HE + TF COMPREHENSIVE PLAN CHANGES (TMC Chapter 18.84) Rezone (Map Change— separate Comprehensive Plan amendment fees also apply) $3,820 $3,945 $4,004 $4,064 + TF Comprehensive Plan Amendment $4,370 $4,505 $4,572 $4,641 + TF Zoning Code Text Amendment $4,965 $5,125 $5,202 $5,280 + TF MISCELLANEOUS SERVICES AND CHARGES Development Agreement $2,185 $2,255 $2,289 $2,323 + TF Code Interpretation (TMC Section 18.90.010) $380 $395 $401 $407 + TF Zoning Verification Letter $380 $395 $401 $407 + TF Legal Lot Verification $615 $630 $639 $649 + TF 92 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 7 of 12 Decision Type 2019 Fees 2020 Fees 2021 Fee 2022 Fee Plus Hearing Examiner Fee Plus Technology Fee (TF) Preapplication Meeting $530 $545 $553 $561 + TF In-lieu Tree Replacement Fee $400 $410 $416 $422 Mailing Fee to Generate Labels, per project $500 $515 $523 $530 Public Notice Mailing Fee per address for each mailing $1 $1 $1 $1 Section 5. Building permit fees will be charged according to the following schedule: BUILDING PERMIT FEE SCHEDULE Total Valuation Building Permit Fees $1 to $500 $66.30 $67.29 + Technology Fee $501 to $2,000 $66.30 $67.29 for the first $500, plus $4.39 $4.45 for each additional $100, or fraction thereof, to and including $2,000, + Technology Fee $2,001 to $25,000 $132.09 $134.07 for the first $2,000, plus $19.99 $20.29 for each additional $1,000, or fraction thereof, to and including $25,000, + Technology Fee $25,001 to $50,000 $612.41 $621.60 for the first $25,000, plus $15.61 $15.84 for each additional $1,000, or fraction thereof, to and including $50,000, + Technology Fee $50,001 to $100,000 $1,002.92 $1,017.96 for the first $50,000, plus $10.81 $10.97 for each additional $1,000, or fraction thereof, to and including $100,000, + Technology Fee $100,001 to $500,000 $1,541.83 $1,564.95 for the first $100,000, plus $8.67 $8.80 for each additional $1,000, or fraction thereof, to and including $500,000, + Technology Fee $500,001 to $1,000,000 $5,004.43 $5,079.49 for the first $500,000, plus $7.14 $7.24 for each additional $1,000, or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 to $5,000,000 $8,612.12 $8,741.30 for the first $1,000,000, plus $4.79 $4.86 for each additional $1,000, or fraction thereof, to and including $5,000,000, + Technology Fee $5,000,001 and up $27,788.12 $28,204.94 for the first $5,000.000, plus $4.59 $4.65 for each $1,000 or fraction thereof, + Technology Fee 93 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 8 of 12 A. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. B. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan review fee shall be charged. The structural plan review fee shall be 35% of the calculated non-structural plan review fee. C. Total Value of All Construction Work. The latest Building Data Valuation that is updated twice a year by the International Code Council shall be used for the purposes of calculating value of the construction work. Section 6. Mechanical permit fees will be charged according to the following schedule: MECHANICAL PERMIT FEE SCHEDULE Valuation of Work (Total Contract Amount) Mechanical Permit Fee $33.15 $33.64 for issuance of each permit (base fee) + Technology Fee $250 or less $66.30 $67.29 + Technology Fee $251 to $500 $66.30 $67.29 for first $250, plus $7.99 $8.10 for each $100 or fraction thereof, to and including $500, + Technology Fee $501 to $1,000 $86.29 $87.58 for the first $500, plus $8.87 $9.00 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 to $5,000 $130.66 $132.61 for the first $1,000, plus $9.84 $9.98 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 to $50,000 $170.03 $172.58 for the first $5,000, plus $10.25 $10.40 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee $50,001 to $250,000 $651.98 $661.75 for the first $50,000, plus $8.57 $8.69 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 to $1,000,000 $2,365.58 $2,401.06 for the first $250,000, plus $7.55 $7.66 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 and up $8,026.58 $8,146.97 for the first $1,000,000, plus $6.83 $6.93 for each $1,000 or fraction thereof, + Technology Fee 94 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 9 of 12 Section 7. Plumbing permit fees will be charged according to the following schedule: PLUMBING PERMIT FEE SCHEDULE Permit Issuance—Issuance of each permit (base fee) $35.00 $35.52 + Technology Fee Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) $68.00 $69.02 + Technology Fee For each additional fixture $15.00 $15.22 + Technology Fee For each building sewer and each trailer park sewer $25.00 $25.37 + Technology Fee Rain water system – per drain (inside building) $15.00 $15.22 + Technology Fee For each water heater and/or vent $15.00 $15.22 + Technology Fee For each industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors $30.00 $30.45 + Technology Fee For each grease interceptor for commercial kitchens $30.00 $30.45 + Technology Fee For each repair or alteration of water piping and/or water treating equipment, each occurrence $15.00 $15.22 + Technology Fee For each repair or alteration of drainage or vent piping, each fixture $15.00 $15.22 + Technology Fee For each medical gas piping system serving one to five inlets/outlets for a specific gas $85.00 $86.27 + Technology Fee For each additional medical gas inlets/outlets $17.00 $17.22 + Technology Fee For each lawn sprinkler system on any one (1) meter including backflow protection devices therefor. $30.00 $30.45 + Technology Fee For atmospheric-type vacuum breakers not included in lawn sprinkler backflow protection: 1 to 5 ........ $15.00 $15.22 + Technology Fee Over 5 ...... $15.00 $15.22 for first 5 plus $3.25 $3.29 for each additional + Technology Fee For each backflow protective device other than atmospheric type vacuum breakers: 2-inch diameter and smaller ...... $30.00 $30.45 + Technology Fee Over 2-inch diameter: ............... $33.00 $33.49 + Technology Fee Section 8. Fuel Gas Piping permit fees will be charged according to the following schedule: FUEL GAS PIPING PERMIT FEE SCHEDULE Permit Issuance For issuing each permit (base fee): ($0 if permit is in conjunction with a plumbing permit for an appliance with both plumbing and gas connection.) $35.00 $35.52 + Technology Fee Unit Fee Schedule For each gas piping system of one to five outlets $68.00 $69.02 + Technology Fee For each additional gas piping system outlet, per outlet $15.00 $15.22 + Technology Fee 95 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 10 of 12 Section 9. Electrical permit fees will be charged according to the following schedule: ELECTRICAL PERMIT FEE SCHEDULE 1. NEW SINGLE-FAMILY DWELLINGS New single-family dwellings (including a garage) $180.00 $180.70 + Technology Fee Garages, pools, spas and outbuildings $120.00 $121.80 + Technology Fee Low voltage systems $60.00 $60.90 + Technology Fee 2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES Service change or alteration—no added/altered circuits $120.00 $121.80 + Technology Fee Service change $100.00 $100.50 with added/altered circuits, plus $10.00 $10.15 for each added circuit (maximum permit fee $160.00 $162.40) $100.00 $100.50 + Technology Fee Circuits added/altered without service change (includes up to 5 circuits) $60.00 $60.90 + Technology Fee Circuits $60.00 $60.90 added/altered without service change (more than 5 circuits); $10.00 $10.15 for each added circuit (maximum permit fee $100.00 $100.50+ Technology Fee) $60.00 $60.90 + Technology Fee Meter/mast repair $80.00 $81.20 + Technology Fee Low voltage systems $60.00 $60.90 + Technology Fee 3. MULTI-FAMILY AND COMMERCIAL (including low voltage) Valuation of Work (Total Contract Amount) Permit Fee $250 or less $66.30 $67.29 + Technology Fee $251 - $1,000 $66.30 $67.29 for the first $250 plus $4.39 $4.45 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 - $5,000 $98.94 $100.42 for the first $1,000 plus $22.03 $22.36 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 - $50,000 $186.97 $189.77 for the first $5,000 plus $18.05 $18.32 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee $50,001 - $250,000 $998.73 $1,013.71 for the first $50,000 plus $13.16 $13.35 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 - $1,000,000 $3,638.54 $3,693.11 for the first $250,000 plus $9.33 $9.46 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee Over $1,000,000 $10,649.51 $10,809.25 plus 0.5% of cost over $1,000,000, + Technology Fee 96 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 11 of 12 4. MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) $60.00 $105.00 + Technology Fee Temporary service/generators $90.00 $105.00 + Technology Fee Manufactured/mobile home parks and RV park sites, each service and feeder $100.00 $105.00 + Technology Fee Carnivals:  Base fee $100.00 $105.00 + Technology Fee  Each concession fee $11.00 $11.16 + Technology Fee  Each ride and generator truck $11.00 $11.16 + Technology Fee Inspections or plan review not specified elsewhere (one hour minimum). $60.00 $105.00 per hour Safety inspections, plan revisions $60.00 $105.00 per hour Adult family home inspection (paid at the time of scheduling the inspection) $60.00 $105.00 for each inspection Disaster recovery emergency repair permit (residential structures only) $20.00 $20.30 Section 10. Other inspections and fees will be charged according to the following schedule: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (three four hour minimum charge) $105.00 $106.57 per hour Re-inspection fee (minimum charge one hour) $70.00 $105.00 per hour Inspection for which no fee is specifically indicated—investigations or safety inspections $70.00 $105.00 per hour Additional plan review required by changes, additions, or revisions to approved plans $70.00 $105.00 per hour Work commencing before permit issuance shall be subject to an investigation fee equal to 100% of the permit fee. 100% of the permit fee Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliance with the code. Work covered prior to inspection or work not ready at the time of inspection may be charged a re-inspection fee of $105.00 $106.57. Expired permit final – includes two inspections $140.00 $142.10 Expired permit final – each additional inspection $70.00 $71.05 Minor residential remodel plan review and permit (projects up to $20,000) $20.00 $20.30 Certificate of Occupancy replacement $105.00 97 CC: \Legislative Development\Consolidated permit fee schedule 2021-2022 strike-thru 11-5-20 MD:bjs Review and analysis by Barbara Saxton Page 12 of 12 Section 11. Credit Card Surcharge. If payment is made by credit card, a processing fee of 3% will be added to the total order. Section 12. Effective Date. This resolution and the fee schedules contained herein shall be effective January 1, 2021. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this _________ day of __________________, 2020. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk De’Sean Quinn, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Office of the City Attorney 98