HomeMy WebLinkAboutCOW 2020-11-23 Item 4H - Purchase - Aid Unit for $280,000 (Fire Department)COUNCIL AGENDA SYNOPSIS
Initials
fleeting Date
Prepared Ig
Mayor's review
Council review
11/23/20
JCW
ITEM INFORMATION
ITEM No.
4.H. &
Spec 2.E.
219
STAFF SPONSOR: JAY C WITTWER
ORIGINAL AGENDA DATE: 11/23/20
AGENDA ITEM TITLE Fire Department - Purchase new Aid Car.
CATEGORY 0Discussion
11/23/20
❑ Motion
Mtg Date
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance Fire ❑ TS ❑ P&R ❑ Police ❑ PIF
SPONSOR'S The Fire Department is seeking to adjust the PSP plan to purchase a replacement Aid Car in
SUMMARY Dec 2020. The current plan reflects this purchase to take place in 2021 and another Aid car
to be purchased in 2022. The Fire Department is requesting to purchase this Aid Car in
2020 to realize the pricing for 2020, estimates show that increases could be 10 for 2021.
REVIEWED BY ❑ Trans&Infrastructure ❑ CommunitySvs/Safety
❑ LTAC ❑ Arts Comm.
DATE: 11/23/2020
1 Finance
Com ❑ Planning/Economic Dev.
Comm. ❑ Planning Comm.
CHAIR SEAL
❑ Parks
COMMITTEE
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
Jay C Wittwer / Fire Department
Finance to support this adjustment to the plan
Fund Source is from the PSP
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$280,000
Fund Source: PUBLIC SAFETY BOND AND THE PUBLIC SAFETY PLAN (PSP)
Comments: There will be a surplus of funds at the end of 2020 and 2021
MTG. DATE
RECORD OF COUNCIL ACTION
11/23/20
MTG. DATE
ATTACHMENTS
11/23/20
Informational Memorandum
JR10105 Proposal Price
PSP Equip & App Plan
219
220
City of Tukwila
Allan Ekberg, Mayor
Fire Department - Jay C. Wittwer, Chief
TO: Finance Committee
FROM: Jay C. Wittwer, Fire Chief
Garron Herdt, Fleet Services Manager
Charles Engle, Fleet Services
Marty Roberts, Fire Battalion Chief
BY: Marty Roberts, Battalion Chief
CC: Mayor Allan Ekberg
City Administrator David Cline
DATE: November 16, 2020
SUBJECT: Adiust PSP planned budget for Aid Unit (Unit 5903)
CURRENT STATUS
The Public Safety Plan (PSP) apparatus schedule is to be adjusted to accommodate the quoted
purchase price of the budgeted Aid Car replacement. Two Aid Cars are funded in the plan, one for
2021 and one for 2022. The total budgeted for these two units is $560,000.00 This adjustment calls
for purchasing one Aid Car in Dec 2020 to save on the price increase that will take place in 2021. The
amount for that unit is $280,000.00 The second Aid Car will be pushed out to a further date. Only one
Aid Car is to be purchased in 2020 and none in 2021 or 2022.
BACKGROUND
The Public Safety Bond was voter approved in 2016 and includes funding for Fire apparatus and
equipment. A committee including Fire, Finance, Administration, Public Works and Fleet Services
manages the replacement and funding schedule.
DISCUSSION
As part of the original Public Safety Plan, a new Aid Unit was budgeted to replace the current 1998 Aid
Unit in 2017. Due to service level and staffing evaluations, the purchase was delayed/carried over in
the budget until 2020.
A joint ad hoc committee that included Fire and Fleet personnel convened earlier this year and created
specifications that model the recent Aid Unit purchases made by our neighboring departments,
Enumclaw, Renton and Puget Sound Regional Fire Authority. The model proposed has a Dodge Ram
Cab paired with the Cummins 6.7 diesel engine providing the City with optimal performance, longevity
and ROI.
The proposed Aid Unit will be purchased using the existing HGAC purchasing consortium contract and
pricing. The quoted price is approximately $280,000. The Fire Department will also retain the current
1998 Aid Unit as a reserve, thus ensuring that an Aid Car will always be available.
FISCAL IMPACT
Fire apparatus purchases under the PSP Bond have been under budget due to cost savings and
efficiencies found in not replacing and/or surplus under-utilized equipment. It is estimated that the
apparatus/vehicle portion of the PSP will have a fund balance at the end of 2020.
Tukwila City Hall • 6200 Sauthcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
221
Title or Addressee
Date
Page 2
RECOMMENDATION
Staff recommends that this purchase and plan are approved by the Community Services and Safety
Committee and forwarded to the COW on November 23, 2020. It is recommended that final approval is
provided during the Special Session following the COW on November 23, 2020.
ATTACHMENTS
PSP Equipment and Apparatus Spending plan
JR10105 Proposal Price
Phone: 206-4334800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
222
Fire Equipment &
2019
Actual
N
c1'
e -I
54,118 I
CO
in
d'
l0
LO
N -I
ri
r`
01
O
N
193,738
LD
CO
r
r`
i -I
lD
% -I
N
92,549 I
LD
00
Ol
in
134,580
328,318
Revised
Budget
20,000
22,772
r`
00
N
i -I
00
M
,-I
i --I
00
Ol
M
r-1
m
01
al
p
O
O
.-I
190,000
300,000
r-1
m
01
rn
Cr
to OJ
00
FO on1
.i =
O m
O
0
o
O
c -I
20,000
O
0
Ln
N
O
0
0
O
0
0
O
in
R
Lo
0
J
n
in
049,500
c_
C;
r-
r---
o
M
r`
rl
2,286,300
0
o0
M
in
Lfl
N
2018
_
f0
u
a
l0
r`
Q1
00
M
i --I
M
M
r -I
18,414
01
00
O
01
l0
NI
N
�
01
r,
1,561,974
Ol
m
r`
r`
Ol
r,
3,282,931
3,373,824
Revised
Budget
22,109
d-
lc)
I-,
00
In
l0
i-1
r.1
M
in
(.6.
N
33,200
1,800,000
1,547,625
in
N
00
00
M
M
l0
Lfl
M
n
0
Cr
M
f0 d
00M
C. -0
L m
20,000
2,500
N.
M
I
N
N
L0
r`
Ci'
in
ri
in
N
01
N
0
l0
`-I
N
01
L01
Na
Lo
,-i'
2017
Actual
363,683
46,218
r,
r
i -I
m
413,078
Crl
N
l0
lO
m
N
107,088
53,485
160,573
-
Lfl
l0
M
N
Lfl
Revised
Budget
495,159
21,465
m
00
II)
N
o
rn
r,
00
N
e-1
o
-
l0
ri
649,707
107,325
85,860
Lfl
CO
r-1
M
01
,-1
842,892
Original
Proposal
495,159
'
in
l0
d'
N
M
CO
1.0
O
Ol
r,
N
x --I
O
,--I
1.0
N
0
N
4.0
n
N
'o
0
.-I
203,900
85,860
"7
-0
Yo
A
0
0
r-
N --I
493,645
Ll1
m
m
V
.--1
spending plan
FIRE EQUIPMENT
SCBA/SABA
SCBA Fill Station
Hose
v
N
N
0
z
Defibrillators
Thermal Imaging (TIC)
Bunker Gear
Helmets
Extrication Equipment
Mobile Data Computer (MDC)
Body Armor
Sub -Total EQUIPMENT
Equipment Carryover Budget
FIRE APPARATUS
Admin Vehicle
Aerial (Replace every 12 years)
Aid Car
Battalion Chief Vehicle
EOC Admin Vehicle
EOC Utility (Trailers/Gator)
Explorer/Refresh vehicle
Fire Marshal Vehicle
Hazmat Trailer
Prevention Vehicle
Pumper (Replace every 10 years)
Rescue
Utility
Sub -Total APPARATUS
TOTAL EQUIP + APPARATUS
GENERAL LEDGER
305.98.594.220.64.00
305.98.594.220.64.00
305.98.522.220.35.00
305.98.522.220.35.00
305.98.522.220.35.00
305.98.594.220.64.00
305.98.522.220.35.00
305.98.522.220.35.00
305.98.594.220.64.00
305.98.522.220.42.00
305.98.522.220.35.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
5 01.0 2.5 94.4 80.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
501.02.594.480.64.00
PROJECT ACCOUNTING
91630401.5118.338
91630401.5118.339
91630401.5118.340
91630401.5118.341
91630401.5118.342
91630401.5118.343
91630401.5118.344
91630401.5118.345
91630401.5118.346
91630401.5118.347
91630401.5118.348
91630401.5117.325
91630401.5117.326
91630401.5117.327
91630401.5117.328
91630401.5117.329
91630401.5117.330
91630401.5117.331
91630401.5117.332
91630401.5117.333
91630401.5117.334
91630401.5117.335
91630401.5117.336
91630401.5117.337
Lfl
N
0l
Lfl
O1
N
L0
O
Lfl
N
L0
N
m
Apparatus Carryover Budget
223
Fire Equipment &
224
2023
Actual
1
1
1
Revised
Budget
25,630
d.
0
N
M
21,000
N
N
61
.-I
51,756
32,000
0
0
61
LO
n
70,000
80,000
258,900
310,656
co 4c -D'
00
.00 "O
i 7
0m
20,000
O
O
Lr
N
o
o
Lf1
.--I
32,000
76,900
O
O
d'
(Na'
In
O
O
d'
Lf1
r -I
476,700
O
O
N
O
0
Lf)
2022
1137
Y
U
a
Revised
Budget
49,768
87,093
24,884
O
.—I
.--I
M
21,000
O
CO
rI
187,721
7 340,000
26,000
1. 26,000
392,000
N
N
CC'
N
VI
113 tinLr1
C
00 "6
i 7
0m
40,000
70,000
20,000
O
O
N
O
O
134,000
342,200
0
O
N
006 0
0
t
74,700
1,505,600
v
O
LO
M
W
'-I
.-1
N
0
N
as
Y
U
a
Revised
Budget
45,000
0
N
0
M
21,000
N
.-I
CO
.-I
70,832
55,000
220,000
65,000
340,000
N
M
CO
O
.1
Ct
Original
Budget
20,000
0
O
Ln
N
U
O
0
O
N
r
v
0
L/)
O
0
d'I.
—
_)
0
LC)
00
C:
0
0
r-
I)
O
c I
(...D
0
N
d--
N
C
0
N
01
111
.-i
c -I'
0
I",
M
0
M
.i
2020
Actual
51,988
O
N
M
61
LO
61
O
.1
N
N
M
M
LO
LO
N
61
n
LD
N
18,218
.-1
00
n
.--
01
01
01
O1
.-I
83,326
Revised
Budget
125,247
23,455
2,932
LI)
h
153,393
124,500
65,000
189,500
342,893
as 0)
00
00 "0
L 0
0 m
20,000
G
LGh
N
...)
Lr
LO
L
00
61
82,100
0
CO
01
334,200
0
0
Lf)
fw
spending plan
FIRE EQUIPMENT
SCBA/SABA
SCBA Fill Station
0)
Ln
0
s
0)
v
N
N
0
z
Defibrillators
Thermal Imaging (TIC)
Bunker Gear
Helmets
Extrication Equipment
Mobile Data Computer (MDC)
Body Armor
Sub -Total EQUIPMENT
Equipment Carryover Budget
FIRE APPARATUS
Admin Vehicle
Aerial (Replace every 12 years)
Aid Car
Battalion Chief Vehicle
EOC Admin Vehicle
EOC Utility (Trailers/Gator)
Explorer/Refresh vehicle
Fire Marshal Vehicle
Hazmat Trailer
Prevention Vehicle
Pumper (Replace every 10 years)
Rescue
Utility
Sub -Total APPARATUS
TOTAL EQUIP + APPARATUS
LO
N
Lr1
LO
Apparatus Carryover Budget
Fire Equipment &
2026
113
U
a
1
1
1
Revised
Budget
98,024
rl
o
0
N.
28,007
0
In
ni
21,000
101'Z
222,650
1,200,000
0
0
o
o
0
N
c-
1,422,650
raOJ
.L
pm
__
O
0
O
i::;i
O
0
O
O
O
0
O
O
O
v1
(-NI.
0
O
In
i=:.`
O
0
4
J
O
0
O
70,00(.
v
0
O
2025
RS
Y
U
a
Revised
Budget
cn
N.
N
M
rri.
21,000
0
Ni-
La
M
in
la
M
III
Original
Budget
)00`02
0
In
Ni
O
0
O
N
O
rI
0
0
4
V1
-.
O
00
O
'''
0
O1
00
d"
0
N
O1
Q1
188,900
0
Q1
N
M
00
2024
Actual
Revised
Budget
O
01
M
l0
N
0
0
M
rri.
21,000
Cr)
01
%--I
LO
00
01
00
tO
Ol
O
0
l0
Lri
0
O
0
Cr)
Ol
t
%--I
105,600
0
0
rl
e-1
M
e -I
00
01
O1
N
Cr
N
rts +,
N
OA
OA -
0 m
O
0
0
N
O
V1
r:.
0
0
ui
M
0
111
R
III
C,
LC
Ir.
0
,-
C%
Ol
G;
0
n^
105, 600
O
O
.--I
e4
N
V1
,J
O
Lc)
00
I".
in
Ni
spending plan
FIRE EQUIPMENT
SCBA/SABA
SCBA Fill Station
CU
'C' -.3
0
1
Ln
a.)
N
N
0
z
Defibrillators
Thermal Imaging (TIC)
Bunker Gear
Helmets
Extrication Equipment
Mobile Data Computer (MDC)
Body Armor
Sub -Total EQUIPMENT
Equipment Carryover Budget
FIRE APPARATUS
Admin Vehicle
Aerial (Replace every 12 years)
Aid Car
Battalion Chief Vehicle
EOC Admin Vehicle
EOC Utility (Trailers/Gator)
Explorer/Refresh vehicle
Fire Marshal Vehicle
Hazmat Trailer
Prevention Vehicle
Pumper (Replace every 10 years)
Rescue
Utility
Sub -Total APPARATUS
TOTAL EQUIP + APPARATUS
Apparatus Carryover Budget
225
Fire Equipment &
226
Apparatus Carryover Budget
Actual
Revised
Budget
N
N
LC)
.-I
M
O
c1'
ail
M
d.
l0
M
N
37,826
86,686
126,088
110,327
0
a -I
ID
R
Ln
480,711
518,538
Original
Budget
31,522
3,940
m
N
1.0
000
1:
M
LID
LOO
l0
00
00
00
lfl
N
-
r.
m
O
a1
r -I
0
l`OD
N
Lt)
a• -I
,-I
N
O
00
CO
Cr)
00
l
Lf1
(0
7
4,
U
a
Revised
Budget
61,208
c.
r1
a-1
R
O
a -i
30,604
Ln
N
00
M
183,624
53,557
a -I
M
01
cr
m
V
61,208
M
lD
cY
Ol
01
2,677,843
157,610
2,996,124
3,436,056
},
a d
. 00
d0 "6
LN
� CD
00
ON
ri
t..0D
d'
a -I -I
n
O
.--1
d'
1.0
O
M
111
00
M
183,624
53,557
00
ON
‘-i'
VD
99,463
2,677,843
O
lD
Rl0
Lf1
aN-I
01
01
O
0
m
Cr
M
Tu
7
4,
U
a
Revised
Budget
'
Cr)
i--1
1•-•
Ol
N
d.
c -I
n
M
2,228
35,655
44,569
Cr)
a -i
n
0l
N
74,281
l0
m
01
Ol
0
a- I
Original
Budget
M
a -I
NN
01
N
`
M
2,228
35,655
J
LO
Ll1
Ci
29,713
00
N
CP
N
m
01
Ol
0
Actual
I
Revised
Budget
,
00
00
N
l0
to
M
cr
lD
N
34,617
144,236
396,648
o
CO
111
c
a --I
Cil
00
Ill
a --I
a --I
a..1
lD
lo
a-1
N
N
806,277
as tu.Ctips
to
M
'ao -6
�L
0 m
28,847
0
UD
M
-y.
UD
ai
N
34,617
144,236
00
CI"
tD
01
M
D.,
00
M
a�-I
•-1
6l
00
CI)VIN
ai.mi
r1
lD
N-
N
0
spending plan
FIRE EQUIPMENT
SCBA/SABA
SCBA Fill Station
CU
'C' -.3
0
1
Ln
a.)
N
N
0
z
Defibrillators
Thermal Imaging (TIC)
Bunker Gear
Helmets
Extrication Equipment
Mobile Data Computer (MDC)
Body Armor
Sub -Total EQUIPMENT
Equipment Carryover Budget
FIRE APPARATUS
Admin Vehicle
Aerial (Replace every 12 years)
Aid Car
Battalion Chief Vehicle
EOC Admin Vehicle
EOC Utility (Trailers/Gator)
Explorer/Refresh vehicle
Fire Marshal Vehicle
Hazmat Trailer
Prevention Vehicle
Pumper (Replace every 10 years)
Rescue
Utility
Sub -Total APPARATUS
TOTAL EQUIP + APPARATUS
Apparatus Carryover Budget
Fire Equipment &
Apparatus Carryover Budget
227
113
4,
U
a
Revised
Budget
34,445
4,306
206,670
M
00
Ln
N
248,004
43,056
103,335
473,619
l0
l0
O
N
640,677
888,681
4,76C'
as •0A
00 "0
'i 7
pm
Li)
d'
m
liJ
0
M
U-
r
lO
O
-
CO
V)
N
48,00z
43,056
u 1
M
Cr)
0
Ild)
c-1
lc)
r,
?1
LO
l0
r
I-,t�
N
l0
Kt
--
00
l0
00
CO
(757
Y
U
a
Revised
Budget
802,602
33,442
0
00
4.
CO
0
N
842,732
459,824
Ln
M
O
O
01
el
O
'.0
L/1
ea
CO
N
O
Cr
r1
Original
Budget
O
l0
N
0
33,44'
CO
rl
0
V)
N
M
N
N
Ct
N
CO
Ol
ul
N
Cr)
O
0
d'
e-1
O
CO
00
N
0
e-1
Actual
Revised
Budget
CO
Q0
�1-
m
00
in
O
Ln
M
t.
N
e -I
l0
01
00
CO
2,922,093
O
N
in
in
0
rl
32,468
3,060,081
3,099,042
+,
OA
' 00 "0
i 3
0 m
00
LO
d'
(h
c;
L'
c
M
d'
N
l0
01
CO
CT)
0
N0
CT
N
PV
in
d
32,46,_
00
0
l0
0
M
Cf
0
O1
0
M
spending plan
FIRE EQUIPMENT
SCBA/SABA
SCBA Fill Station
CU
VI
0
s
Ifl
a.)
N
N
0
z
Defibrillators
Thermal Imaging (TIC)
Bunker Gear
Helmets
Extrication Equipment
Mobile Data Computer (MDC)
Body Armor
Sub -Total EQUIPMENT
Equipment Carryover Budget
FIRE APPARATUS
Admin Vehicle
Aerial (Replace every 12 years)
Aid Car
Battalion Chief Vehicle
EOC Admin Vehicle
EOC Utility (Trailers/Gator)
Explorer/Refresh vehicle
Fire Marshal Vehicle
Hazmat Trailer
Prevention Vehicle
Pumper (Replace every 10 years)
Rescue
Utility
Sub -Total APPARATUS
TOTAL EQUIP + APPARATUS
Apparatus Carryover Budget
227
Fire Equipment &
228
TOTAL
Actual
434,866 I
o
00
Cr)
a--1
152,324
2,289 I
M
N
CO
Oi
a-1
50,354 I
761,036
107,880
1,564,143
,
r
l0
r
O
a-1
a-1
CO
0o
M
LC)
1,761,413 I
3,598,084
4,359,120
Revised
Budget
a -I
LO
r•
R
<-I
M
r -I
a -I
(.0
N
N
M
M
98,024
r•
a -I
0
O
r,
186,253
325,943
597,613
l0
61
0
N
r.
291,253
645,083
236,308
4,172,614
736,320
4,722,093
1,606,472
N
0
I -I
00
rn
dr
257,707
61
l0
r•
O
M
<-1
0
N
1I)
u1
o
.-1
180,389
246,012
164,463
M
N
r•
61
0o
l0
6i
811,556
C1'
l0
61
r•
0
r•
19,947,089
M
O
n
01
r-1
a -I
N
Original
Budget
1
.7
v
r,
61
N
I
317,014
70,000
50,000
10
00
Cra-I
1p
h
a-1
308,850
00
1.0
N
CO
In
66,521
N
01
CO
N
r•
N
M
00
0
01%
In
N
217,600
4,072,872
O
N
M
111
N
4,971,593
1,402,572
N
0
N
l0
Cr
298,507
126,869
0
N
O
Tr
00
a1
201,249
305,612
00
1p
Cr
M
N
a--1
11,785,423
lD
01
CO
M
01
N
a--1
V
10
N
Ql
01
01
01
d'
l0
O
1.0
01
N
ewe
27,033,522
(0
7
U
a
Revised
Budget
207,014
r•
N
111
r-,
M
h
a--1
M
M
l0
r•
Cr)
4,705
N
CO
N
01
a--1
0.,-
In
94,097
56,458
150,556
609,751
0ns Q.0
• 00 70
L
0 m
C
e-:
o
O
75,278
l0
Cr)
r,
M
—I
61
Cr)
lD
N
L
O
r,
cr
M
N
oo
NiI'
In
01
ti
v01
c7
61
O
CO
56,458
111
I.nN
000
1A
O
(75
Y
U
a
Revised
Budget
36,543
00a�
LO
r•
N
43,851
65,777
133,381
00
00
rr
01
01
1-1
243,009
Original
Budget
36,543
C:.
LC)
Ln
Cr
N
Cr
N.
N
1--1
Ln
03
ev
er
65,777
-1
00
M
M
M
--I
00
in
N
c
01
c -s
0
0
M'
a
N
Actual
Revised
Budget
35,478
4,435
N
Cr)
M
R
r•
a -I
62,087
N
01
M
01
N
N
141,913
3,104, 355
141,913
3,388,181
CO
N
V1
n
l0
1.0
CO'
at +,
000
-6
0 m
00
N61
Tr
i.
COr,
4,435
C.
M
(,
a --I
61
cr
a-
LI)
01
M
000
r1
M
:f)
c -i
61
3,388,18
N
v1
l^0
Lc,L
M
spending plan
FIRE EQUIPMENT
SCBA/SABA
SCBA Fill Station
CU
VI
0
2
0
a1
N
N
0
z
Defibrillators
Thermal Imaging (TIC)
Bunker Gear
Helmets
Extrication Equipment
Mobile Data Computer (MDC)
Body Armor
Sub -Total EQUIPMENT
Equipment Carryover Budget
FIRE APPARATUS
Admin Vehicle
Aerial (Replace every 12 years)
Aid Car
Battalion Chief Vehicle
EOC Admin Vehicle
EOC Utility (Trailers/Gator)
Explorer/Refresh vehicle
Fire Marshal Vehicle
Hazmat Trailer
Prevention Vehicle
Pumper (Replace every 10 years)
Rescue
Utility
Sub -Total APPARATUS
TOTAL EQUIP + APPARATUS
Apparatus Carryover Budget
HUGHES FIRE EQUIPMENT
October 1, 2020
Tukwila Fire Department, WA
One (1) Dodge RAM 4500 4X4 Paraliner Type 1
Life Line Ambulance
Build Location: Sumner, Iowa
Proposal Price $ 252,900.00
Washington State sales tax @ 10.00%
Washington State motor vehicle tax @ 0.30%
51.
LIFE LINE
FMERG FNCY VFMICLas
25,290.00
758.70
Total Bid Price Including Sales Tax $ 278,948.70
Terms:
Delivery: The unit would be ready for delivery from the factory within 170 to 230 days after receipt of fully executed
Purchase Contract, order submission to the manufacturer, drawing approval between the manufacturer/dealer and the
customer and receipt of chassis from manufacturer. Delivery is subject to change prior to order placement. This time
does not include any possible delays that may be caused by national disasters or pandemic.
Proposal Expires: The above discount recap will be valid for 60 days.
Payment Terms: Final payment due prior to the unit leaving the factory for delivery.
Performance Bond: A performance bond is not included in the above pricing.
Transportation: Transportation of the unit to be driven from the factory is included in the pricing. However, if we are
unable to obtain necessary permits, due to the weight of the unit, and the unit must be transported on a flat bed,
additional transportation charges will be the responsibility of the purchaser. We will provide pricing at that time if
necessary. If customer elects to drive the units from the factory, $4,500.00 (per unit) may be deducted from the
purchase price.
Inspection Trip: One (1) factory inspection trip for two (2) fire department customer representatives is included in the
above pricing. The inspection trip will be scheduled at a time mutually agreed upon between the manufacture's
representative and the customer. Airfare, lodging and meals while at the factory are included. If the Department elects to
forgo an inspection trip $1,600.00 per traveler (per trip) will be deducted from the final invoice.
Acceptance of Proposal: If the customer wishes to purchase the proposed apparatus Hughes Fire Equipment will
provide the Customer its form of Purchase Agreement for the Customer's review and signature. If the Customer desires
to use its standard form of purchase order as the Purchase Agreement, the purchase order is subject to review for any
required revisions prior to acceptance. All purchase orders shall be made out to Hughes Fire Equipment Inc.
Page 1 of 1 229