HomeMy WebLinkAboutSpecial 2020-12-14 Item 2D - Final Acceptance - 2020 Overlay and Repair with Miles Resources for $277,220.01COUNCIL AGENDA SYNOPSIS
Initials
fleeting Date
Prepared by
Mayor's review
Council review
12/14/20
JR
ITEM INFORMATION
ITEM No.
Spec 2.D.
157
STAFF SPONSOR: SCOTT BATES
ORIGINAL AGENDA DATE: 12/14/20
AGENDA ITEM TITLE 2020
Project
Overlay and Repair Project
Completion and Acceptance
CATEGORY ❑ Discussion
Mtg Date
Motion
Date 12/14/20
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
a
Mtg
SPONSOR ❑Council ❑Mayor HR ❑DCD ❑Finance ❑Fire TS ❑PcR ❑Police
OPif ❑Court
SPONSOR'S The Notice to Proceed for Contract No. 20-068 with Miles Resources, LLC was issued on
SUNLV RY August 24, 2020. The physical contruction of the street overlay improvements on S 158th St
from 39th PI S to 42nd Ave S and 54th Ave S from S 166th St to Slade Way were completed
on September 25, 2020. Council is being asked to accept and finalize the contract with
Miles Resources, LLC in the final amount of $277,220.01.
REVIEWED BY
0 Trans&Infrastructure
❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev.
❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
COMMITTEE CHAIR: C. DELOSTRINOS JOHNSON
❑ LTAC
DATE: 12/07/2020
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMII
Public Works Department
Approval; Forward to Special Consent Agenda
IEE Unanimous
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$277,220.01 $314,421.50 $0.00
Fund Source: 104 ARTERIAL STREETS
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
12/07/20
MTG. DATE
ATTACHMENTS
12/07/20
Informational Memorandum dated 12/04/20
Notice of Completion Contract No. 20-068
Minutes from Transportation and Infrastructure Committee meeting of 12/07/20
157
158
City of Tukwila
Public Works Department - Hari PonnekanInterim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Had Ponnekanti, Interim Public Works Director
BY: Scott Bates, Traffic Engineering Project Manager
CC: Mayor Ekberg
DATE: December 4, 2020
SUBJECT: 2020 Overlay and Repair Project
Project No. 92010401, Contract No. 20-068
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of performance bond.
Allan Ekberg, Mayor
BACKGROUND
The Notice to Proceed for Contract No. 20-068 with Miles Resources, LLC of Puyallup, Washington
was issued on August 24, 2020 for the 2020 Overlay and Repair Project. This overlay project provided
hot mix asphalt (HMA) paving on S 158th St from 39th PI S to 42nd Ave S and 54th Ave S from S 166th St
to Slade Way. The street improvements included: pavement grinding; asphalt paving; removing and
replacing concrete curbs, gutters, driveways, and ADA ramps; adjusting surface utilities to grade; and
installation of guardrail and roadway channelization.
ANALYSIS
Construction was physically completed on September 25, 2020. The budget for the 2020 Overlay &
Repair construction was $314,421.50 and included a 5% contingency, which was not utilized. Under -
runs were primarily due to fewer quantities needed during the roadway excavation, and the haul and
repair phase of the project.
Construction Contract Amount $ 299,449.05
Additions/Change Orders 0.00
Under -runs (22,229.04)
Total Amount Paid $ 277,220.01
RECOMMENDATION
Council is being asked to formally accept and authorize the release of the performance bond, subject to
standard claim and lien release procedures, for the 2020 Overlay and Repair Project construction
contract with Miles Resources in the final amount of $277,220.01 and consider this item on the Consent
Agenda at the December 14, 2020 Special Meeting.
Attachment: Notice of Completion Contract No. 20-068
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2020 Agenda Items/TIC 12-07-2020 Last/2020 Overlay closeout/Info memo 2020 Overlay Closeout .docx
159
160
g Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: 11-2-2020
Contractor's UBI Number: 602870349
Name & Mailing Address of Public Agency
City of Tukwila
6200 Southcenter Blvd Tukwila, WA 98188
UBI Number: 91-6001519
Department Use Only
Assigned to:
Date Assigned:
Notice is hereby given relative to the completion of contract or project described below
Project Name
2020 Annual Overlay & Repair Program 92010401
Contract Number
20-068
Job Order Contracting
Yes V No
Description of Work Done/Include Jobsite Address(es)
Hot Mix Asphalt (HMA) Overlay at two sites within the City of Tukwila
Federally funded transportation project? Yes V No (if yes, provide Contract Bond Statement below)
Contractor's Name
Miles Resources, LLC
E-mail Address
mandy.young@milesresourcd
Affidavit ID*
1078866 (intent only)
Contractor Address
400 Valley Ave NE PUYALLUP, WA, 98372
Telephone #
253-383-3585
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
Retainage Bond ❑ Contract/Payment bond (valid for federally funded transportation projects)
Name: Liberty Mutual Insurance Company Bond Number: 023215124
Date Contract Awarded
7-16-2020
Date Work Commenced
8-24-2020
Date Work Completed
9-25-2020
Date Work Accepted
9-25-2020
Were Subcontracters used on this project? If so, please complete Addendum A. [Yes No
Affidavit ID* - No L&I release will be granted until all affidavits are listed.
Contract Amount
Additions (+ )
Reductions (- )
Sub -Total
Sales Tax Rate n/a Rule1id %
(If various rates apply, please send a breakdown)
Sales Tax Amount
TOTAL
$ 299,449.05
$ 22,229.04
$ 277,220.01
$
$ 277.220.01
Liquidated Damages $ 0.00
Amount Disbursed $ 277,220.01
Amount Retained $ 0.00
NOTE: These two totals must be equal
TOTAL $ 277,220.01
Comments:
Rule 171, sales tax included.
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name: Scott Bates
Email Address: Scott.Bates@tukwilawa.gov
Department of Revenue
Public Works Section
4.1 (360) 704-5650
PWC@dor.wa.gov
REV 31 0020e (10/26/15) F215-038-000 10-2014
Washington State Department of
Labor & hidustriies
Contract Release
(855) 545-8163, option # 4
ContractRelease@LNI . WA. GOV
Title: Project Manager
Phone Number: 206-431-2193
Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360) 902-9450
publicworks@esd.wa.gov
161
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
Apergis Transportation
602867001
1084604
CARLI TRUCKING BY LOOKER LLC
604280337
1086245
EVERGREEN CONCRETE CUTTING INC
601605667
1080275
Hayes D. Trucking & Repair Inc.
603307120
1086225
JANKE TRUCKING INC
602862253
1085716
MILES RESOURCES LLC
602870349
1078866
Miles Sand & Gravel Company
171004760
1084031
NORTHWEST TRAFFIC INC
602140049
1081601
O'Bunco Engineering Intl. Inc
602045762
1081795
PAVEMENT MAINTENANCE OF WA LLC
603075530
1085841
Strong Trucking, Inc.
601777166
1086602
TRANSPORTATION SYSTEMS INC
602726209
1080375
For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
RFS,) 34 0020e Addendum (10/26/15) F215-038-000 10-2014
I OL
City of Tukwila
City Council Transportation & Infrastructure Committee
Meeting Minutes
December 7, 2020 - 5:30 p.m. - Electronic Meeting due to COVID-19 Emergency
Councilmembers Present: Cynthia Delostrinos Johnson, Chair, Verna Seal, Kate Kruller
Staff Present:
Guest:
Rachel Bianchi, Hari Ponnekanti, Scott Bates, Cyndy Knighton, and
Gail Labanara
Emily Moon
Chair Delostrinos Johnson called the meeting to order at 5:30 p.m.
I. BUSINESS AGENDA
Project Completion: 2020 Overlay & Repair Project
Staff is seeking Council approval of project completion and release of retainage with Miles
Resources, in the amount of $277,220.01 for the 2020 Overlay & Repair Project.
Committee Recommendation
Unanimous approval. Forward to December 14, 2020 Special Consent agenda.
B. Consultant Agreement: 2021 Overlay and Repair Project
Staff is seeking Council approval of a contract with KPG, Inc. in the amount of $149,912.00 for
design of the 2021 Overlay & Repair Program, which will include locations not completed in
2020 and four additional from the Pavement Management Survey priority list. It includes
design of the 53rd Ave S traffic revisions (with sidewalks) and King County improvements near
the Bow Lake Transfer Station.
Committee Recommendation
Unanimous approval. Forward to December 14, 2020 Special Consent agenda.
II. Miscellaneous
a. 53rd Ave S Street Improvements - Councilmembers and staff discussed a recent public
comment letter regarding the project.
Committee follow up: Chair Delostrinos Johnson would like staff to reach out to the
residents that met on site to give them an update on the signs. Additional outreach
requested on Tukwila Talk, Hazelnut, or our website to inform residents that more signs are
coming. Once design is finalized in Spring 2021, conduct outreach to entire neighborhood
on the new revisions that include sidewalks.
b. For the Metropolitan Water Pollution Abatement Advisory Committee (MWPAAC),
representation by City staff is needed. Hari will contact the appropriate Public Works staff.
c. TIB Bus stop video posted this morning, 12/7/20. Public Works staff responded with the
cleaning schedule of Mondays and Fridays. There are ongoing issues at bus stops being
used for permanent shelter.
163