HomeMy WebLinkAboutRes 2012 - 2021-2022 Consolidated Permit Fee Schedule (Repealed by Res 2058)of Tukwila
Washington.
Cover page to Resolution 2012
The full text of the resolution follows this cover page.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
T"U WILA, WASHINGTON, REPEALING RESOLUTION NO, 1947,
AND ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE.
Resolution 2012 was amended or repealed by the
following resolutions.
ea
AMENDED
ion(s) Amended
A
tided by, Res
2021
4
2046
ion(s) Rep al
Repealed by Res #
2058
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, REPEALING RESOLUTION NO. 1947,
AND ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE.
WHEREAS, the City Council adopted Resolution No. 1947 in 2018, establishing the
City's current consolidated construction fee schedule; and
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, the City's primary cost for permit processing is employee salaries and
benefits; and
WHEREAS, the Seattle Consumer Price Index (CPI -W) was 1% for the June 2020
period; and
WHEREAS, the cost for employee benefits has risen by an even larger percentage;
and
WHEREAS, increasing flat fee permits by 1.5% will enable revenues to track with
City labor costs; and
WHEREAS, as more permit applicants are paying by credit card, and there is a
surcharge on the fees paid by credit card, the City intends to pass this convenience fee
through to the permit applicants;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1.. Repealer. Resolution No. 1947 is hereby repealed, effective January
1, 2021.
CC: \Leg is I ative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 1 of 11
Section 2. For 2021 and 2022, the Technology Fee shall be set at 5% of the
applicable permit fee.
Section 3. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
CURRENT FEE
Type A (Short -Term Non-profit)
$51.00 + Technology Fee
Type B (Short -Term Profit)
$102.00 + Technology Fee
Type C
$254.00 application base fee, Technology Fee, plus
(Infrastructure and Grading on Private Property
fourcomponents based on construction value:
and City Right -of -Way and Disturbance of City
1) Plan Review
Right -of -Way)
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
See Public Works Bulletin A 1 for fee schedule.
Type D (Long -Term)
$102.00 + Technology Fee
Type E (Potential Disturbance of
$102.00 +Technology Fee
Cit Right -of -Way)
$254.00 processing fee, plus $5,075.00 cash deposit,
Type F (Blanket Permits)
withdraw $102.00 per instance for inspection
Franchise —Telecommunications
$5,075.00 administrative fee
Franchise — Cable
$5,075.00 plus 5% of total revenue
Street Vacation
$1,218.00
$507.50 processing fee, plus 17% administrative fee,
Latecomer's Agreements
plus $507.50 segregation fee
Flood Zone Control Permit
$51.00 + Technology Fee
Public Works Inspector Safety, Investigation or
$71.00 per hour
Re -inspection Fee
Public Works inspection outside of normal
$106.50 per hour
business hours four-hour minimum charge)
CC: \Legislative Develop ment\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 2 of 11
Section 4. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Decision Type
2021 Fee
2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
APPEALS
Appeal of Type 1, 2 and 4 Decisions
$675
$685
SEPA MDNS Appeal
$675
$685
Appeal of Sign Code Decision
$675
$685
Appeal of Fire Impact Fees
$675
$685
Appeal of Parks Impact Fees
$675
$685
Appeal of Transportation Impact Fees
$675
$685
SIGNS (TMC Chapter 19)
Permanent
$279
$283
+ TF
Temporary
$46
$46
+ TF
Pole/Banner Initial Application
$279
$283
+ TF
Special Event
$122
$123
+ TF
Pole/Banner Annual Renewal
$61
$62
+ TF
New Billboard
$675
$685
+ TF
Master Sign Program—Admin
$2,492
$2,529
+ TF
Master Sign Program—BAR
$3,989
$4,049
+ TF
TUC MODIFICATIONS
Modification to TUC Corridor Standards
(TMC Section 18.28.130.C)
$675
$685
+ TF
Modification to TUC Open Space
Regulations
TMC Section 18.28.250.D.4.d
$675
$685
+ TF
Transit Reduction to Parking Requirements
(TMC Section 18.28.260.B.5.b)
$675
$685
+ TF
DESIGN REVIEW (TMC Section 18.60.030)
Administrative
$2,563
$2,601
+TF
Public Hearing
$4,593
$4,662
+ TF
Major Modification
$1,573
$1,597
+TF
Minor Modification
$716
$726
+TF
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and anafyss by Barbara Saxton Page 3 of 11
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analyss by Barbara Saxton Page 4 of 11
Plus
Plus
Decision Type
2021 Fee
2022 Fee
Hearing
Examiner
Technology
Fee
Fee (TF)
PARKING VARIANCES AND SPECIAL PERMISSIONS
Administrative Parking Variance
(Type 2—TMC Section 18.56.140
$675
$685
+ TF
Parking Variance
(Type 3—TMC Section 18.56.140)
$1,111
$1,128
+ HE
+ TF
Parking Standard for use not specified
(TMC Section 18.28.250. D.4. d.1 and TMC
$665
$675
+ TF
Section 18.56. 100)
Residential Parking Reduction
$675
$685
+ TF
TMC Section 18.56.065
Shared, covenant, Complementary Parking
Reduction
$675
$685
+ TF
TMC Section 18.56.070
Parking Lot Restriping
$675
$685
+ TF
TMC Section 18.56.120
VARIANCES, SPECIAL PERMISSIONS AND SITE PLAN REVIEW
Variances
TMC Section 18.72
$3,243
$3,291
+ HE
+ TF
Environmentally Sensitive Areas Deviation,
Buffer Reduction
$1, 715
$1, 741
+ TF
(TMC Chapter 18.45)
Reduced fee for LDR homeowners,
$675
$685
no associated short plat
Reasonable Use Exception
$3,431
$3,482
+ HE
+ TF
TMC Section 18.45.180
Exception from Single Family Design
Standard
$675
$685
+ TF
TMC Section 18.50.055
Special Permission Cargo Container
$675
$685
+ TF
(TMC Section 18.50.060)
Tree Permit forsinglefamily residential
properties
(TMC Chapters 18.44, 18.45 and 18.54,
$121
$124
including shoreline and critical areas tree
permits
Tree Permit and Landscape Modification
Permit and Exceptions for non -single family
residential properties
(TMC Section 18.52.100, and Chapters
$675
$685
+ TF
18.44, 18.45 and 18.54, including shoreline
and critical areas treepermits)
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analyss by Barbara Saxton Page 4 of 11
CC: \Leg is I ative Development\Consolidated permit fees ch edule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 5 of 11
Plus
Plus
Decision Type
2021 Fee
2022 Fee
Hearing
Examiner
Technology
Fee
Fee (TF)
LOT CREATION AND CONSOLIDATION
Boundary Line Adjustment
$1,923
$1,952
+ TF
TMC Chapter 17.08
Lot Consolidation
$726
+ TF
TMC Chapter 17.08)$716
Short Plat (2-4 lots)
$4,380
$4,445
+ TF
TMC Chapter 17.12
Short Plat (5-9 lots)
$4, 984
$5, 058
+ TF
TMC Chapter 17.12
Subdivision Preliminary Plat (10+ lots)
$5,719
$5,805
+ HE
+ TF
TMC Section 17.14.020
Subdivision Final Plat (10+ lots)
$3,431
$3,482
+ TF
TMC Section 17.12.030
Binding Site Improvement Plan
$4,380
$4,445
+ TF
TMC Chapter 17.16
Planned Residential Development—
Administrative
$2,492
$2,529
+ TF
(TMC Section 18.46. 110)
Planned Residential Development— Public
Hearing
$5,719
$5,805
+ TF
(TMC Section 18.46. 110)
Planned Residential Development— Minor
Modification
$675
$685
+TF
(TMC Section 18.46.130)
Planned Residential Development— Major
Modification
$2,781
$2,823
+ TF
(TMC Section 18.46.130)
WIRELESS COMMUNICATION FACILITY (TMC Chapter 18.58.050)
Minor (Type 1)
$675
$685
+ TF
Administrative (Type 2)
$1,923
$1,952
+TF
Major or Height Waiver (Type 3)
$3,847
$3,905
+ HE
+ TF
SEPA AND ENVIRONMENTAL
Checklist
$1,959
$1,988
+TF
SEPA EIS
$3,431
$3,482
+ TF
SEPA Planned Action
$675
$685
+ TF
SEPA Addendum
$675
$685
+ TF
SEPA Exemption Letter
$401
$407
+ TF
Sensitive Area Master Plan Overlay
$5,719
$5,805
+ TF
TMC Section 18.45.160
CC: \Leg is I ative Development\Consolidated permit fees ch edule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 5 of 11
Decision Type
2021 Fee
2022 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
SHORELINE PERMITS
Project value: $5,000 -$10,000
$1,355
$1,375
+ TF
$10,001 - $50,000
$3,172
$3,219
+ TF
$50,001 - $500,000
$5,055
$5,130
+ TF
More than $500,000
1$6,410
$6,506
+ TF
Permit Exemption Letter, Shoreline
$279
$283
+ TF
Shoreline Permit Revision
$700
$711
+ TF
Conditional Use Permit, Shoreline (TMC
Section 18.44.050
$4,451
$4,517
+ HE
+ TF
Shoreline Environment Redesignation
$3,431
$3,482
+ TF
NOISE VARIANCES (TMC Section 8.22.120)
Type
$553
$561
+ TF
Type II
$751
$762
+ TF
Type 111
$1,670
$1,695
+HE
+TF
USE PERMITS
Conditional Use Permit
TMC Section 18.64.020
$4,451
$4,517
+ HE
+ TF
Unclassified Use Permit
TMC Chapter 18.66
$5,719
$5,805
+ TF
TSO Special Permission Use
TMC Section 18.41.060
$1,111
$1,128
+ HE
+TF
COMPREHENSIVE PLAN CHANGES (TMC Chapter 18.84)
Rezone (Map Change -
separate Comprehensive Plan amendment
fees also apply)
$4,004
$4,064
+ TF
Comprehensive Plan Amendment
$4,572
$4,641
+ TF
Zoning Code Text Amendment
$5,202
$5,280
+ TF
MISCELLANEOUS SERVICES AND CHARGES
Development Agreement
$2,289
$2,323
+TF
Code Interpretation
TMC Section 18.90.010
$401
$407
+ TF
Zoning Verification Letter
$401
$407
+ TF
Legal Lot Verification
$639
$649
+ TF
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 6 of 11
Section 5. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
Plus
Plus
Decision Type
2021 Fee
2022 Fee
Hearing
TechnologyTechnology
fraction thereof, to and including $25,000, + Technology Fee
$25,001 to $50,000
Fee
Fee (TF)
Preapplication Meeting
$553
$561
+ TF
In -lieu Tree Replacement Fee
$416
$422
fraction thereof, to and including $500,000, + Technology Fee
$500,001 to $1,000,000
Mailing Fee to Generate Labels, per project
$523
$530
$1,000,001 to $5,000,000
$8,741.30 forthe first $1,000,000, plus $4.86 foreach additional $1,000,
Public Notice Mailing Fee per address for
$1
$1
$28,204.94 forthe first $5,000.000, plus $4.65 foreach $1,000 orfraction
each mailing
Section 5. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$67.29 + Technology Fee
$501 to $2,000
$67.29 forthefirst$500, plus $4.45 foreach additional $100, orfraction
thereof, to and including $2,000, + Technology Fee
$2,001 to $25,000
$134.07 for the first $2,000, plus $20.29 for each additional $1,000, or
fraction thereof, to and including $25,000, + Technology Fee
$25,001 to $50,000
$621.60 forthe first $25,000, plus $15.84 foreach additional $1,000, or
fraction thereof, to and including $50,000, + Technology Fee
$50,001 to $100,000
$1,017.96 forthe first $50,000, plus $10.97 foreach additional $1,000, or
fraction thereof, to and including $100,000, + Technology Fee
$100,001 to $500,000
$1,564.95 forthe first $100,000, plus $8.80 foreach additional $1,000, or
fraction thereof, to and including $500,000, + Technology Fee
$500,001 to $1,000,000
$5,079.49 forthe first $500,000, plus $7.24 foreach additional $1,000, or
fraction thereof, to and including $1,000,000, + Technology Fee
$1,000,001 to $5,000,000
$8,741.30 forthe first $1,000,000, plus $4.86 foreach additional $1,000,
or fraction thereof, to and including $5,000,000, + Technology Fee
$5,000,001 and up
$28,204.94 forthe first $5,000.000, plus $4.65 foreach $1,000 orfraction
thereof, + Technology Fee
A. Non -Structural Plan Review Fee. A non-structural plan review fee shall be
paid at the time of submitting plans and specifications for review. The non-structural
plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee
schedule. The non-structural plan review fee specified herein is separate fee from the
permit fee and is in addition to the permit fee.
B. Structural Plan Review Fee. Where a structural plan review is deemed
necessary, a structural plan review fee shall be charged. The structural plan review fee
shall be 35% of the calculated non-structural plan reviewfee.
C. Total Value of All Construction Work. The latest Building Data Valuation that
is updated twice a year by the International Code Council shall be used forthe purposes
of calculating value of the construction work.
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 7 of 11
Section 6. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
$35.52 + Technology Fee
Work (Total
Mechanical Permit Fee
Contract Amount)
For each additional fixture
$15.22 + Technology Fee
$33.64 for issuance of each permit (base fee) + Technology Fee
$250 or less
$67.29 + Technology Fee
$251 to $500
$67.29 forf irst$250, plus $8.10 for each $100 orf raction thereof,
$15.22 + Technology Fee
to and including $500, + Technology Fee
$501 to $1,000
$87.58 forthefirst $500, plus $9.00 foreach $100 orfraction thereof,
$30.45 + Technology Fee
to and including $1,000, + Technology Fee
$1,001 to $5,000
$132.61 forthe first $1,000, plus $9.98 foreach $1,000 orfraction
$15.22 + Technology Fee
thereof, to and including $5,000, + Technology Fee
$5,001 to $50,000
$172.58 forthe first $5,000, plus $10.40 foreach $1,000 or fraction
thereof, to and including $50,000, +Technology Fee
$50,001 to $250,000
$661.75 forthefirst$50,000, plus$8.69 foreach$1,000 orfraction
thereof, to and including $250,000, + Technology Fee
$250,001 to $1,000,000
$2,401.06 forthe first $250,000, plus $7.66 foreach $1,000 orfraction
thereof, to and including $1,000,000, + Technology Fee
$1,000,001 and up
$8,146.97 forthe first $1,000,000, plus $6.93 foreach $1,000 or
fraction thereof, + Technology Fee
Section 7. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance—Issuance of each permit (base fee)
$35.52 + Technology Fee
Unit Fee Schedule (in additionto base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$69.02 + Technology Fee
For each additional fixture
$15.22 + Technology Fee
For each building sewer and each trailer park sewer
$25.37 + Technology Fee
Rain water system — per drain (inside building)
$15.22 + Technology Fee
For each water heater and/or vent
$15.22 + Technology Fee
For each industrial waste pretreatment interceptor, including its
trap and vent, except for kitchen type grease interceptors
$30.45 + Technology Fee
For each grease interceptor for commercial kitchens
$30.45 + Technology Fee
For each repair or alteration of water piping and/or water treating
equipment, each occurrence
$15.22 + Technology Fee
For each repair or alteration of drainage or vent piping, each
fixture
$15.22 + Technology Fee
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 8 of 11
For each medical gas piping system serving one to five
$86.27 +Technology Fee
inlets/outlets for a specific as
Unit Fee Schedule
For each additional medical gas inlets/outlets
$17.22 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
$30.45 + Technology Fee
backflow protection devices therefor.
For atmospheric -type vacuum breakers not included in lawn
sprinkler backflow protection:
1 to 5 ....... $15.22 + Technology Fee
Over 5...... $15.22 forfirst 5 plus $3.29 for each additional +
Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2 -inch diameter and smaller ....... $30.45 + Technology Fee
Over 2 -inch diameter: ............... $33.49 + Technology Fee
Section 8. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.
$35.52 + Technology Fee
Unit Fee Schedule
For each gas piping system of one to five outlets
$69.02 + Technology Fee
For each additional gas piping system outlet, per outlet
$15.22 + Technology Fee
Section 9. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
NEW SINGLE-FAMILY DWELLINGS
New single-family dwellings (including a garage)
$180.70 + Technology Fee
Garages, pools, spas and outbuildings
$121.80 + Technology Fee
Low voltage systems
$60.90 + Technology Fee
CC: \Legislative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysis by Barbara Saxton Page 9 of 11
2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration -no added/altered circuits
$121.80 +Technology Fee
Service change $100.50 with added/altered circuits, plus $10.15 for
+Technology Fee
each added circuit maximum permit fee $162.40)$100.50
$105.00 + Technology Fee
Circuits added/altered without service change (includes up to
$60.90 + Technology Fee
5 circuits
$67.29 forthe first $250 plus $4.45 foreach $100 or fraction thereof, to and
Circuits $60.90 added/altered without service change (more than 5
$60.90 + Technology Fee
circuits); $10.15 foreach added circuit (maximum permit fee $100.50+
$100.42 forthe first $1,000 plus $22.36 for each $1,000 or fraction thereof,
Technology Fee)
to and including $5,000, + Technology Fee
Meter/mast repair
$81.20 + Technology Fee
Low voltage systems
$60.90 + Technology Fee
MULTI -FAMILY AND COMMERCIAL (including low voltage)
Valuation of
$105.00 + Technology Fee
Work (Total
Permit Fee
Contract Amount
$105.00 + Technology Fee
$250 or less
$67.29 + Technology Fee
$251 - $1,000
$67.29 forthe first $250 plus $4.45 foreach $100 or fraction thereof, to and
• Each concession fee
including $1,000, +Technology Fee
$1,001 -$5,000
$100.42 forthe first $1,000 plus $22.36 for each $1,000 or fraction thereof,
Inspections or plan review not specified elsewhere (one hour
minimum).
to and including $5,000, + Technology Fee
$5,001 -$50,000
$189.77 forthe first $5,000 plus $18.32 for each $1,000 or fraction thereof,
Adultfamily home inspection (paid at the time of scheduling the
inspection)
to and including $50,000, + Technology Fee
$50,001 - $250,000
$1,013.71 forthe first $50,000 plus $13.35 foreach $1,000 orf raction thereof,
to and including $250,000, + Technology Fee
$250,001 -$1,000,000
$3,693.11 forthe first $250,000 plus $9.46 foreach $1,000 orfraction thereof,
to and including $1,000,000, + Technology Fee
Over $1,000,000
$10,809.25 plus 0.5% of cost over$1,000,000, + Technology Fee
MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$105.00 + Technology Fee
Temporary service/generators
$105.00 + Technology Fee
Manufactured/mobile home parks and RV park sites, each service and
feeder
$105.00 + Technology Fee
Carnivals:
• Base fee
$105.00 + Technology Fee
• Each concession fee
$11.16 + Technology Fee
• Each ride and generator truck
$11.16 + Technology Fee
Inspections or plan review not specified elsewhere (one hour
minimum).
$105.00 per hour
Safety inspections, plan revisions
$105.00 per hour
Adultfamily home inspection (paid at the time of scheduling the
inspection)
$105.00 foreach inspection
Disaster recovery emergency repair permit (residential structures only)
$20.30
CC: \Leg i s I ative Development\Consolidated permit fee schedule 2021-202211-30-20
MD:bjs Review and analysts by Barbara Saxton Page 10 of 11
Section 10. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (four hour minimum charge)
$106.57 per hour
Re -inspection fee (minimum charge one hour)
$105.00 per hour
Inspection f orwhich no fee is specifically indicated—investigations or safety
inspections
$105.00 per hour
Additional plan review required by changes, additions, or revisions to approved
plans
$105.00 per hour
Work commencing before permit issuance shall be subject to an investigation fee
equal to 100% of the permit fee.
100% of the permit fee
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order
to document compliance with the code.
Work covered prior to inspection or work not ready at the time of inspection may
be charged a re -inspection fee of $106.57.
Expired permit final – includes two inspections
$142.10
Expired permit final – each additional inspection
$71.05
Minor residential remodel plan review and permit (projects up to $20,000)
$20.30
Certificate of Occupancy replacement
$105.00
Section 11. Credit Card Surcharge. If payment is made by credit card, a
processing fee of 3% will be added to the total order.
Section 12. Effective Date. This resolution and the fee schedules contained
herein shall be effective January 1, 2021.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this '3+vday of _PcCex-�oe-4-- _, 2020.
ATTEST/AUTHENTICATED:
Christy O'Flah erty, MMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
De' can Quinn, Council President
Filed with the City Clerk: 12 - Z-10
Passed by the City Council: 12 -7 -?-0
Resolution Number: 06912
CC: \Leg i s I a tiv e D eve to p m e n ACon sof id ated permit fee schedule 2021-202211-30-20
MD:bjs Review and anaysls by Barbara Saxton Page 11 of 11