Loading...
HomeMy WebLinkAboutPlanning 2021-01-28 COMPLETE AGENDA PACKET Planning Commission Virtual Meeting Agenda January 28, 2021 - 6:30 . To listen to the meeting, dial: 1-253-292-9750, Access Code 391448173# To view the meeting, join at this link: Join Microsoft Teams Meeting I. Elect 2021 Chair and Vice-Chair. (new Chair shall preside over the meeting following election) II. Adopt the December 10, 2020 minutes. III. The City Council has recommended that at each Planning Commission meeting a land acknowledgement statement shall be recited as follows: “The City of Tukwila is located on the ancestral lands of the Coast Salish people. We acknowledge their continuing connections to land, water, and culture. We pay our respect to their elder’s past, present and emerging.” IV. Tukwila South presentation by Mike Pruett representing Segale Properties. V. PC Training facilitated by Karen Reed, from Karen Reed Consulting, LLC, and the City Attorney. CITY OF TUKWILA PLANNING COMMISSION (PC) PUBLIC HEARING MINUTES Date: December 10, 2020 Time: 6:30 PM Location: Virtual meeting via Microsoft Teams Present: Chair Heidi Watters; Vice Chair Louise Strander; Commissioners Dennis Martinez, Karen Simmons, Dixie Stark, and Andrea Reay Excused Absence: Commissioner Sharon Mann Staff: Department of Community Development (DCD) Deputy Director Minnie Dhaliwal, Associate Planner Meredith Sampson, Council Member Kathy Hougardy and Planning Commission Secretary Wynetta Bivens Agenda: Transit Oriented Housing Action Plan Briefing Adopt: Commissioner Reay moved to adopt the 11/12/20 minutes Minutes: Commissioner Martinez seconded the motion. Motion passed. Chair Watters called the meeting to order. Meredith Sampson, DCD Associate Planner, gave the presentation for staff. She provided background information on what the Transit Oriented Development Housing Strategies Plan is, where it came from and the process for the plan creation. She provided background information about HB 1923 and the grant opportunities that it gave to local jurisdictions. Through the HB 1923 legislation Tukwila was awarded $100,000 from the Department of Commerce to complete a Housing Action Plan. Following are the HB 1923 required guidelines that a Housing Action Plan must meet: • Quantify existing and projected housing needs for all income levels. • Develop strategies to increase the supply of housing and variety of housing types. • Consider strategies to minimize displacement of low-income residents. • Review and evaluate the current housing element. The announcement of HB 1923 brought the following six South King County jurisdictions together: Renton, Burien, Kent, Federal Way, Auburn and Tukwila. These jurisdictions will pursue collaborative efforts on the first portions of each city’s Housing Action Plan to discover broad trends in the South King County housing market. The second portion of the Housing Action Plan is Tukwila-specific and is focused on the Transit Oriented Development area around the Tukwila International Boulevard Link Light Rail Station. Highlights from the South King County Collaboration: - South King County needs over 63,000 new homes to be built before 2040, to compensate for the existing and projected housing deficit. - Current production rates fall short of the anticipated annual demand by approximately 1,000 homes per year. 1 PC Public Meeting 12/10/20 Page 2 Approximately 20% of all households, or over 54,000 families in the sub-region are cost-burdened by rent or mortgage. Tukwila-Specific Highlights from the South King County Collaboration: - It is projected that Tukwila needs to build 4,224 new housing units by 2040. Approximately 1,100 should be affordable housing, for those earning between 0-50% of the Area Median Income (AMI) which would serve households making up to $51,700 income annually. - There was a 31% increase in the average 2-bedroom apartments between 2013 - 2020, ($1,047 - $1,374). - There was a 126% increase in median home sales prices between 2013 - 2020, ($182,500 - $412,00). - Of the six South King County Cities, Tukwila’s rent increased the least, but the median home sales price increased the most. - 60% of owner-occupied households and 84% of renter-occupied households making 0-50% of the AMI are cost-burdened (they spend more than 30% of their income on housing). - 34% of owner-occupied households and 47% of renter-occupied households making 0-50% of the AMI are severely cost-burdened (they spend more than 50% of their income on housing). Tukwila’s Individual Portion of the Plan: - A Public Engagement Plan has been developed as a joint effort between the consultant and City staff. Public outreach is currently being conducted with stakeholders in one-on-one interviews and focus groups. - Approximately 25 to 30 people are being interviewed to understand what they are seeing on the ground in terms of housing affordability and quality around Tukwila International Boulevard as well as what they think are the greatest housing needs. - A public engagement summary will be completed as well as a housing assessment and housing policy framework, and an opportunity and barriers mitigation report. - Additional outreach including a virtual open house will be conducted in late February or early March. Next Steps: - Staff will provide the PC with an update, first quarter of 2021. - In March, the PC will hold a public hearing. - Staff will provide the PC with recommendations to consider. - The PC will forward their recommendations to the City Council, by April 2021. - The Plan must be adopted by June 2021, which is required based on the grant guidelines. Staff also answered several questions for the PC and offered to meet one-on-one with the PC if interested. Following are some questions and comments from the PC: - Commissioner Strander asked if the 4,224 new housing units that need to be built is citywide? - Commissioner Stark asked for clarification on how the structures should look. - Commissioner Simmons asked for clarification on the housing strategy elements listed on pages 39-49 of the packet? - Commissioner Reay inquired on the timeline regarding community engagement, and whether this item will come back to PC in February? Staff noted they will hold a virtual open house, 2 PC Public Meeting 12/10/20 Page 3 prior to the PC public hearing in March and offered to brief the PC in February or provide updated packet documentation. - Commissioner Watters asked about the history for defining the TOD when it was established and whether there was community feedback? - Commissioner Watters asked staff their thoughts on which strategies might be potentially important for Tukwila and to provide budget expenses? - Commissioner Watters also asked about specific efforts regarding anti-displacement? Comments and suggestions: - Commissioner Martinez said investing in rehabilitating facades along TIB needs to be part of the conversation – to try and get a better imagine of some of the housing on the off streets along the TIB, which encourages development. - Commissioner Simmons thanked staff for a very thorough packet, which she said covered every aspect of housing strategy possibilities for residents in Tukwila, as well as South King County. She pointed out she particularly liked the strategy regarding the regional revolving loan plan. - Commissioner Watters was in consensus with Commissioner Simmons comments regarding the strategies listed in the packet. Requests: 1. Commissioner Strander requested that staff coordinate with her as the incoming Chair to set meeting agendas in 2021. 2. She asked for consensus from the Commissioners to distribute the workload better, so the meetings are not so long, and the agenda is not overloaded. 3. She also asked for consensus from the Commissioners to request that the City Attorney attends the PC public hearings, so the PC can ask questions during the meetings. Minnie Dhaliwal, DCD Deputy Director thanked Commissioner Strander for her suggestions. Pertaining to request (# 2) staff said a quarterly meeting agenda schedule can be provided ahead of time for projects coming to the Commission. It was noted that staff does not have control over when projects are received for private development, so flexibility will be necessary for those agenda items. However, staff can provide the long-range planning agenda schedule for the whole 2021 year, which are Tukwila South Design Standards and the Housing Action Plan. Pertaining to request (#3) staff said they will raise it with the Administration and will need to determine what the contract stipulations are for the City Attorney to attend evening PC meetings and follow up with the PC. Commissioners Martinez and Watters were in consensus with Commissioner Stander’s request #2 and #3 Commissioner Martinez said the City Attorney should attend for major development projects. Commissioner Watters said she likes the idea of the City Attorney attending for major development projects – and asked to know the cost involved to have the City Attorney attend meetings, she said that it should be a consideration when the budget is tight. Commissioner Simmons, Stark, and Reay did not comment. Staff answered Commissioner Martinez's previously raised questions regarding how many projects were approved by the Planning Commission for projects that have 501(c)(3) status. Ms. Dhaliwal thanked everyone and said it has been interesting transitioning from in-person to virtual meetings, saying they came a long way. She said a few months were lost when virtual meetings were 3 PC Public Meeting 12/10/20 Page 4 started and stopped (due to COVID), and as a result it affected the schedule. She said she appreciated everyone’s time and commitment. In terms of efficiencies, she said there is always room for improvements, and staff is open for suggestions. She said some of the key takeaways from staff’s standpoint are, time is critical and if the meetings are running long and some of the comments are being repeated that it may be because of the virtual format. The PC are given the opportunity to ask questions after every step, and maybe they should reconsider how that is done. Staff is open regarding how to streamline the process and be more efficient. She said last year the year was kicked off with training with the City Attorney, and staff provided everyone a binder of the training materials. There was discussion regarding open meeting act, difference between quasi-judicial and legislative items etc. The PC were informed that for quasi-judicial matters Commissioners are not supposed to talk to each other outside the public hearing, or to the applicant. Those limitations do not exist for legislative matters for which the PC are making a recommendation to the City Council. She also asked the PC to please let staff know if they feel the sample motions that staff provides should be revised, or other ways staff can assist them make the meetings more efficient. She also asked if staff needs to include more training. Commissioner Watters made some final remarks as the outgoing Chair for the year. She said there was so much that went on this year. She said hopefully this will be their one and only crash course in virtual Planning Commission business, and pandemic conduct. She thanked everyone for the grace, patience, creativity, and fortitude through all of it, and said they got a lot done despite everything. They heard a lot of public comments, tackled a lot of tricky issues, and looked at packet material on the computer. She said she really appreciated everyone’s willingness to be flexible, the consideration, and how much they got done was a big accomplishment this year. She said she was glad that even though things were tough that they were able to make a lot of important decisions for the City, and think critically about strategies, and everyone brought their perspective, she always appreciated learning from all of them. She said with the virtual setup and with all the help that staff gave them she hopes everyone was able to feel heard, and the process worked for them. And that they are getting better at it. She wished everyone a happy holiday, and to be safe. She closed by welcoming Commissioner Strander as the 2021 Chair. Adjourned 7:45 p.m. Submitted by: Wynetta Bivens Planning Commission Secretary 4 City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Planning Commission FROM: Brandon Miles, Business Relations Manager CC: Mayor Ekberg DATE: January 15, 2021 SUBJECT: Tukwila South Presentation ISSUE Presentation by Segale Properties (“Segale”) on Tukwila South. BACKGROUND In February the Planning Commission is scheduled to begin review of residential design guidelines for Tukwila South. Prior to the February meeting, the City wants to provide a briefing to the Planning on the extensive entitlement history and construction history of Tukwila South. Attached to the to this memorandum is a document and presentation prepared by Segale regarding Tukwila South. These documents provide a high-level understanding of the history of Tukwila South. No action is required by the Planning Commission at the January meeting. ATTACHMENTS 1. Memo from Segale Properties, dated January 15, 2021. 2. PowerPoint Slides, prepared by Segale Properties. 5 6 Page 1 of 5 JANUARY 15, 2021 TO: CITY OF TUKWILA PLANNING COMMISSION FROM: MIKE PRUETT SUBJECT: SUMMARY OF TUKWILA SOUTH PROJECT APPROVALS AND PERMITS In February the Planning Commission will begin review of proposed residential design standards and guidelines for Tukwila South. Tukwila South has an extensive project history and the information below provides a general overview. Tukwila South was planned and approved to be one of the largest mixed-use projects in the Puget Sound region. At over 500 acres, and with up to 10,000,000 million square feet of allowable development, it is similar in size to South Lake Union and is perhaps third in size behind Issaquah Highlands and Snoqualmie Ridge in terms of overall size for recent master planned developments. The Tukwila South lands were purchased by the Segale family over several decades. The idea to create something different started back in the early 2000’s. Tukwila South was, and still is, the largest contiguous bare land property in the Puget Sound region and deserved to be developed into something special, something that contributed to the economic growth and prominence of the Tukwila area within the region. After close to a decade of substantial planning, engineering and entitlement work, Tukwila South was approved. The Tukwila South approval is not just one approval or permit, it is a myriad of approvals and permits from multiple jurisdictions and agencies that provided the Segale family the ability and flexibility to implement the Tukwila South vision. Obtaining the entitlements and constructing the primary infrastructure took a long period of time to complete. Consequently, many of the City’s decision-makers and staff that were involved in permitting, and familiar with what Tukwila South was approved to become, are no longer with the City. Segale believes it is important for the new City decision-makers to become familiar with the project, all that has been accomplished to date, the land use context of the various approvals and permits, and where the project is going in the coming years. This memorandum briefly summarizes the various approvals and permits that together provide the opportunity for Tukwila South to be built into one of the most unique and beneficial developments in the Puget Sound area. This summary of work completed to date was prepared to better inform Planning Commission, City Council, and staff as to what has been completed to date and what efforts remain to help make the project a reality. 7 Page 2 of 5 I. Tukwila South Approvals and Primary Permits Segale is working diligently to bring the Tukwila South vision to life. Below is an abbreviated list of the myriad of approvals and permits associated with each of these efforts. It is important for City of Tukwila decision-makers to understand the amount of work that has been completed to date and what is still needed to build the first projects in Tukwila South. A. Annexation to improve Tukwila’s tax base was approved. Tukwila South includes 260 acres of property that Segale and the City agreed to annex into the City of Tukwila from unincorporated King County. B. Environmental Impacts have been Evaluated and Mitigated. An overlay zone was proposed over the Tukwila South property to create the land use flexibility and density opportunities necessary to support a mixed-use development. A full Environmental Impact Statement (EIS) was required by the City of Tukwila to assess the potential environmental impacts as a result of the proposed overlay and resulting development. An EIS is the most comprehensive analysis of potential environmental impacts. A preferred alternative, as well as alternative development scenarios were prepared and reviewed. All project impacts associated with development of the overlay area were identified and addressed in a published Final EIS, including the requirements for wetland fill and mitigation work, mitigation of stream and wetland impacts along the Green River, mitigation of past drainage impacts including the relocation of Johnson Creek, mitigation for site grading work and associated levee/grading work in the shoreline area, and mitigation that included a fish habitat creation project along the Green River. The analysis of environmental impacts was extensive, and the identified impacts have been fully mitigated. C. The Development Agreement assures that both Segale and the City have certainty over development outcomes. The buildout of Tukwila South is governed by a Development Agreement between the City of Tukwila and Segale Properties LLC. The Development Agreement provides additional information on what is allowed within Tukwila South, how Tukwila South will develop and under what stipulations, and the responsibilities of each party (the City and Segale) as Tukwila South moves forward. The Development Agreement expires in June 2024, but its expiration does not negate or dissolve the related Tukwila South Overlay district (TSO), described below, or any of the land use standards associated with the TSO. Upon the expiration of the Development Agreement, the TSO development standards in the Code will govern the buildout of Tukwila South. D. Tukwila South Zoning Overlay largely matches the Development Agreement, and provides continuity for development into the future, including after the Development Agreement expires. Approval of the EIS and other associated documents created a new land use and zoning overlay within the City of Tukwila. The Code and zoning map were amended to create the new TSO designation and set of development standards for all of Tukwila South. Chapter 18.41 of the Tukwila Municipal Code details the TSO, including the design review process required for all non-exempt uses within the TSO, and basic development standards for developments within the TSO. The TSO is 8 Page 3 of 5 essentially new zoning and development standards for the overlay area. The only way to change the land use rules set for the TSO is to complete a Comprehensive Plan Amendment and rezone, or to adopt amendments to the TSO standards. E. The Tukwila South Master Plan describes the conceptual vision for Tukwila South. The Tukwila South Master Plan is a conceptual master plan document that paints the vision for what the Segale family hopes to achieve through the Development Agreement and TSO. Specifically, the “Master Plan document defines the goals, objectives, and vision of Segale Properties to transition almost 500 acres of mostly undeveloped property in Tukwila, Washington, to a memorable regional destination that can compete nationally and internationally for employers and goods and services.” The Master Plan further clarified that “[b]because of the sheer size of the site, the implementation of this vision will span many development cycles over 25 to 30 years.” The Master plan provides information on the types of land uses envisioned on the site, which include office, commercial/retail, and housing, and the overall potential densities associated with these land uses. It provides the land use framework for what Tukwila South can become. While the Master Plan provides some conceptual locations for specific types of land uses within the project, it does not define specific areas for such uses and limits on any one kind of use. The intent of the Master Plan is to provide for land use flexibility and intense use of developable areas to create a “live, work, play” mixed-use district within Tukwila South. F. Army Corps of Engineers 404 Permit authorized now completed work and mitigation affecting wetlands. Segale received a US Army Corps of Engineers 404 permit for impacts to wetlands and required mitigation to federally protected wetlands and to complete other in-water work. G. Washington State Department of Ecology Section 401 Water Quality Permit /NPDES permit authorized now completed work and mitigation affecting wetlands, and stormwater controls. In addition to the Federal 404 permit referenced above, Segale received a permit from the Washington Department of Ecology for impacts and mitigation to wetlands as well as the already developed storm water collection, treatment, and detention system for the Tukwila South site. Building the storm water collection and treatment system provides significant benefits and incentives to development interested in locating within the City of Tukwila. Individual projects locating within the TSO do not need to do individual stormwater collection and treatment. The stormwater collection and treatment system has been approved by the Washington State Department of Ecology under their 401 Permit for Water Quality Certification. A National Pollution Discharge Elimination System (NPDES) permit was also issued for Tukwila South related to the projects stormwater collection, treatment, and discharge system. H. City of Tukwila Sensitive Area Master Plan (SAMP) authorized now completed work and mitigation affecting wetlands, steep slopes and other sensitive areas. In addition to Federal and State reviews and permits, a Sensitive Area Master Plan (SAMP) addressing how Segale would meet the City’s requirements for preserving sensitive areas, steep slopes, and fully mitigating for impacts to wetlands and other sensitive areas was approved. Segale 9 Page 4 of 5 filled 8.26 acres of wetlands and provided 49.19 acres of wetland mitigation and buffers. Mitigation projects under the SAMP are constructed and successfully operating. I. Washington Department of Fish and Wildlife Hydraulic Project Approval (HPA) authorized now completed work and mitigation affecting streams. As part of the mitigation work associated with the Tukwila South development, Segale daylighted a stream, creating a new fish friendly system, and connecting the stream to the Green River. J. Tukwila Shoreline Substantial Development Permit, authorized grading work along the Green River. The City of Tukwila approved a shoreline substantial development permit authorizing grading and mitigation work within certain shoreline areas of Tukwila South. K. City of Tukwila Grading Permits, authorized grading work throughout the site, along the Green River levee. Grading permits were issued to Segale by the City of Tukwila to fill and grade the site into its current configuration and improve river levees up to Army Corp of Engineers standards. L. Southcenter Parkway Land Dedication was made so roadway could be expanded. Segale dedicated the land to the City of Tukwila necessary to build the 5-lane Southcenter Parkway Arterial. M. Relocation of 178th / Dedication of Land to City of Tukwila for Fire Station, plus contribution of $4.75 million for City fire facilities. As part of Tukwila South’s development, the Segale family agreed to relocate and construct 178th Street, creating a less steep/hazardous entry into Tukwila South from the adjacent jurisdiction of SeaTac. Relocation of the roadway created a new parcel which was dedicated to the City of Tukwila for a new fire station which recently opened. Segale also contributed $4.75 million to the City for new fire facilities. N. City of Tukwila Preliminary Plat was approved to enable the next step in development: the creation of transferrable legal lots. Tukwila South has an approved and valid Preliminary Plat for creation of 45 developable lots, 5 Sensitive Area Tracts (SAT’s), 2 Regional Detention (RD) Tracts, 2 Open Space (OS) Tracts, and 1 Non- Buildable Tract (NBT). Unlike a typical Preliminary Plat, the Tukwila South Preliminary Plat was approved after substantial review and approval of engineering work related to Tukwila South’s road and utility improvements. That work was all completed, and road and utility improvements are in place, with the exception of two future private streets shown on the Preliminary Plat. The Preliminary Plat was approved in October 2017 and is valid until October 2022. O. City of Tukwila Final Plat was approved creating three transferrable legal lots, and 14 Future Development Tracts. 10 Page 5 of 5 Tukwila South has an approved and recorded Phase 1 Final Plat that created 3 legal lots, 14 Future Development Tracts (FDTs), and 5 Sensitive Area Tracts, 2 Open Space Tracts and a No-Build tract. Future final plats for the FDTs will utilize the underlying Preliminary Plat lot pattern to create additional legal lots, so long as the Preliminary Plat is still valid at the time of final platting. II. Upcoming Approvals/Permits A. Residential Design Guidelines and Standards. In February the Planning Commission is scheduled to review draft Design Guidelines and Standards for residential projects within Tukwila South (TSO Residential Guidelines). The TSO Residential Guidelines are implementation tools, which will provide the City the guidance to complete design review on upcoming residential projects in the TSO. Residential development in the TSO is required to comply with the TSO Residential Guidelines, therefore, residential projects cannot obtain permit approvals until the TSO Residential Guidelines are adopted by the City. Segale submitted the TSO Residential Guidelines for review in December of 2019. III. Conclusion The Segale family appreciates the efforts of the Planning Commission and the work they do to ensure that the City of Tukwila develops in thoughtful and prudent manner. We understand Tukwila South is a complicated project. As you can see by review of this document, the Segale family has completed an enormous amount of work to bring Tukwila South this far. Building construction is poised to begin, but the Segale family needs the City’s help with the final implementing pieces that will allow such development to move forward. The Tukwila South project is unique in its ability to create a first-class “live, work, play” district that will bring a myriad of benefits to the City of Tukwila for decades to come. To this end, we welcome all opportunities to engage in a dialogue and answer any questions the City may have and to work with City officials towards the common goal of completing the vision that is Tukwila South. 11 12 January 15, 2021Tukwila South Background and History CONCEPTUAL 13 14 1.Tukwila South Development Overview CONTENT 1/15/2021 2 15 16 Tukwila South Overview 1/15/2021 3 •Tukwila City Council approved the Tukwila South Project Development Agreement in 2009 •391 total acres (250 development acres) owned and managed by Segale Properties •Approval allows for 10.3 million square feet of mixed- use development; intended to be regional economic hub and live-work-play community •Tukwila South approved uses include office/R&D, manufacturing/flex space, residential, and retail •Segale Properties is pursuing development partners to help realize this long-term vision •Seeking residential design standards approval to allow first residential project to move forward 17 18 Development Agreement –Key Provisions 1/15/2021 4 –Submitted in November 2019 –forthcoming with adjacent development 19 20 Development Opportunities and Challenges 1/15/2021 5 Opportunities Challenges 21 22 Scarcity of Large Development Sites 1/15/2021 6 23 24 Segale Properties Development Strategy 1/15/2021 7 25 26 1/15/2021 8 Phased Density Strategy Segale Properties Development Strategy Conceptual Depiction: Not a Site Plan Conceptual Depiction: Not a Site Plan 27 28 Potential Catalyst Developments 1/15/2021 9 29 30 Recreation Space Conceptual Open and Recreation Space at Tukwila South •FDT-10 and Cross Levy areas will be developed as parks •Recreation space will be provided along Green River oxbow/trail area 31 32