Loading...
HomeMy WebLinkAboutTIC 2021-02-08 Item 2D - Discussion - 2021 Committee Work Plan: Transprotation and Infrastructure ServiceCity Co uncil Transportation & Infrastructure Services Committee – 2021 Work Plan Updated January 28, 2021 1 City of Tukwila Verna Seal, Chair; De’Sean Quinn, Thomas McLeod Description Qtr Action or Briefing Status Transportation 1. 42nd Avenue South Phase III/Gilliam Creek Culvert Project Closeout 1 A 2. 53rd Avenue S (S 137th – S 144th St) & Water/Sewer/SSWM Project Closeout 1 A 3. S 152nd St Safe Routes to School Design Consultant Contract 2 A RFP for design issued in 1Q with award of design expected in 2Q. No funding for construction at this time. 4. Neighborhood Traffic Calming Program/Residential Safety Various activities/updates As needed B Unfunded for 2021. 5. Annual Overlay and Repair Program Bid Award for 2021 Project 2 A 2022 Design Contract 4 A 6. Annual Bridge Inspections and Repairs Annual contract 1 B Work order for 2021 inspections is in progress. 7. West Valley Hwy (I-405-Strander) Bid Award 1 A 90% PS&E done. Ad date dependent on WSDOT approval and permit approvals. 8. Boeing Access Road over Airport Way Seismic Retrofit Project Closeout 3 A Project is currently under construction. 9. 42nd Ave S Bridge Replacement Project Update at 30% Design 2 B TranTech has been hired to perform the 30% design. 10. Transportation Element of the Comp Plan/Walk & Roll Consultant Agreement 3 A Beginning Fall 2021. Adoption by June 2024. 73 City Co uncil Transportation & Infrastructure Services Committee – 2021 Work Plan Updated January 28, 2021 2 City of Tukwila 11. Green River Trail Improvements Design Contract 3 A 12. OTHER Grant Applications and Acceptances 1-4 A Ongoing Transportation Demand Management Programs Updates & Grants 1-4 A, B As needed Transportation Improvement Program Resolution 2 A Adoption by June 30 each year Facility Improvements 2 A As needed. Surplus Equipment Resolution - Fleet 2 A As needed. Utilities 1. Water Reservoir and Pump Station Land 2 A Design contract 4 A 2. Macadam Rd S Water Upgrade Design contract 1 A Completed 1/25/21 3. CBD Sanitary Sewer Rehabilitation Design contract 1 A Construction award 3 A 4. Water & Sewer Comprehensive Plans Data collection and modeling ongoing 4 A 5. GIS Inventory of Water/Sewer/SWM System Consultant Agreement 4 A Ongoing 6. Sewer Lift Stations and Generator Upgrades Design and Const Mgmt contract 1 A Completed 2/8/21 Bid Award 3 A 7. Annual Small Drainage Program Bid Award 2021 2 A Design contract for 2022 4 A 8. East Marginal Way S Stormwater Outfalls Closeout 4 A 9. Tukwila 205 Levee Certification Status Update 2 B 10. Stormwater Quality Retrofit Project Approve DOE grant application 3 A 74 City Co uncil Transportation & Infrastructure Services Committee – 2021 Work Plan Updated January 28, 2021 3 City of Tukwila 11. Gilliam Creek Fish Barrier Removal Approve grant application (target new King County grant program) 1-4 A If it becomes available 12. Riverton Creek Flapgate Removal Contract close-out Alia 4 A Depending on progress Contract close-out At Work! 4 A Depending on progress 13. Green the Green Applied Ecology contract close-out 1 A Award 2-year maintenance contract 1 A Approve (CFT) grant application for acquisition 1 A Depends on availability 14. Nelsen Side Channel Approve grant application (target new King County grant program) 1-4 A If it comes available 15. Chinook Wind Award design contract (trail) 2 A 16. Surface Water Comprehensive Plan Consultant contract 2 A 17. S 131st Place Drainage Improvements Consultant Agreement 2 A 18. Other Franchise utility agreements and approvals (SCL, Century Link, Comcast, Cascade Water, Sewer district) As needed 19. Standard Reports/Briefings Waste Management Update A n n u a l PW NPDES A n n u a l PW 20. Public Works Facilities Monthly Update 1-4 B Ongoing Bid Award & Options 1 A Possible development agreement 75