Loading...
HomeMy WebLinkAbout21-024 - King County - Flood Reduction GrantProject Name: Recipient: Address: AMENDMENT TO GRANT AWARD South 131st Place Drainage Improvements City of Tukwila 6300 Southcenter Blvd Ste 100 Tukwila, WA 98188 AMENDMENT REQUESTED BY: 21-024(a) Council Approval N/A Agreement No.: Amendment Date: Amendment No.: AMENDMENT WRITTEN BY: 4.20.22 11/29/2022 1 Name: Brittany Robinson Name: Kim Harper Title: Public Works Analyst Title: KC WLRD Grant Administrator AMENDMENT EFFECTS: [J Change of Scope [J Distribution of Funds Among Tasks Ei Time of Performance LJ Compensation LJ Terms and Conditions LJ Results of Services CHANGE #1 Introductory Paragraph of Grant Agreement READS: This Agreement shall be in effect from the date of execution to December 31, 2022. TO READ: This Agreement shall be in effect from the date of execution to December 31, 2023. CHANGE #2 — Paragraph 3.5 of Grant Agreement READS: The Project shall be completed by no later than December 31, 2022. TO READ: The Project shall be completed by no later than December 31, 2023. IN WITNESS HEREOF, THE PARTIES HERETO HAVE CAUSED THIS AMENDMENT TO BE EXECUTED AND INSTITUTED ON THE DATE WRITTEN ABOVE. King County, Washington By Title Date RECIPIENT By S06ned ma SeamleeaDo0e.0om CYaff :66e' q Key: (20,100 0309 4f60 :.82d adf6342f36Z6 Title Mayor, City of Tukwila Date 12-01-2022 KLS HP DocuSIgn Enve1ope ID. 93CE1C6D-E0D2-4F40-91162-B8AEFBC3541C Project Name: South 131Place Drainage Improvements 21-024 Council Approval 2/1/21 Award Number: 4,20.22 AGREEMENT FOR AWARD OF FLOOD REDUCTION GRANT FUNDS BETWEEN THE CITY OF TUKWILA AND KING COUNTY This Agreement ("Agreement") is made between King County, a municipal corporation, and the City of Tukwila ("Recipient") (collectively referred to as the "parties" and in the singular '`party"), for the purposes set. :forth herein. This Agreement shall be in effect :from the date of execution to December 31, 2022. .Project Contacts: Contact for King County — Kim Harper, Grant Administrator, 206-477-6079, Kint.har r,er@kiii count r.gov. Contact for Recipient — .Ryan Larson, 206-431-2456, Ryan„larson@tukwilawa„..gov„ SECTION I. RECITALS Whereas, the King County Flood Control District ("District") is a quasi -municipal corporation of the State of Washington, authorized to provide funding for f..lood control. and stormwater protection projects and activities; and 1..2 Whereas King County is the service provider to the District under the terms of an. interlocal agreement ("ILA") by and between King County and the District, dated. February 17, 2009, as amended, and as service provider im.plem.ents the District's annual work program and budget; and 1,3 Whereas, on November 12, 2013, the District's Board of Supervisors passed Resolution VCD2013-11 which established a Flood Reduction Grant Program and criteria for awarding grant funding for projects, and on November 6,2019, the Board passed Resolution FCD2019-13, which authorized an allocation of $3,280.201 from the District's 2020 budget to fund flood reduction projects; and 1.4 Whereas, on September 9, 2020 the District's Board of Supervisors passed Resolution FCD2020-19, which approved the flood reduction projects described in Attachment A to that Resolution; and Whereas, in accordance with the terms of these Resolutions,. and in its capacity as service provider to the District, King County has established policies and procedures for administering the flood reduction grant program, a copy of which has been. furnished to Recipient and which is :incorporated herein by this reference (hereinafter "Grant Policies and Procedures"); and. 1.6 Whereas, the Recipient submitted an application to receive funds for a project to be funded by the Flood Reduction Grant Program; and ADT2306701.1XXA:1/13175.000001 Page 1 of 6 1/1 DocuSIgn Enve4ope ID. 93CE1C6D-E0D2-4F40-91162-B8AEFBC3541C Project Name: South 131Place Drainage Improvements Award Number: 4,20.22 1.7 Whereas, the District's Board of Supervisors approved funding of Recipient's application for the project ("Project"), as described in Attachment A to Resolution .FCD2020-19 in the amount of $60,000 ("Award"); and. 1.8 Whereas, King County has received a Scope of Work and a Budget for the Project from. the ,Recipient and has determined that the Scope of Work, attached hereto and incorporated herein as Exhibit B ("Scope of Work"), and the Budget, attached hereto and incorporated herein as Exhibit C ("Budget"), are consistent with the Grant Policies and Procedures, the Recipient's application for the Project, and Resolution FCD2020-19; and. 1.9 Whereas, King County and the Recipient desire to enter into this Agreement for the purpose of establishing the. terms and conditions under which King County will provide funding from the District in accordance with Resolution FCD2020-19 and the Grant Policies and Procedures, under which the Recipient will implement the Project. SECTION 2. AGREEMENT 2.1. The Recitals are an integral part of this Agreement and are incorporated herein by this reference. King County agrees to pay the Award amount to Recipient in the total amount of $60,000 from District funds. The Award shall be used by the Recipient solely for the performance of the Project, as described in Exhibit A to this Agreement. Exhibit A. attached hereto and incorporated herein by this reference, contains a description of the Project as described in Attachment A to Resolution ,FCD2020-19. King County shall. pay the Recipient in accordance with the terms of the Grant Policies and Procedures. 2.3. The Recipient represents and warrants that it will only use the Award for the Scope of Work of this .Agreement and in accordance with the Project Budget. The Recipient shall be required to refund to King County that portion of the Award which is used for work or tasks not includedi...n. the Scope of Work. Further, the Recipient agrees that King County m.ay retain any portion of the Award that is not expended or remains after completion of the Scope of Work and issuance of the Final Report, as further described in Section 2.6 'below. 2.4. Activities carried out for this Project and expenses ,incurred by the Recipient ,m.ay predate the execution date of this Agreement provided that 1) they have been id.entified •by Recipient as being within the scopes of numbers 2) and 3) below„ and have been approved by King County as being within such scopes,. 2) the activities are specified in the Scope of Work of this Agreement; 3) the expenses are incurred in carrying out the Scope of Work and are authorized by the Award as ,identifiedin the Budget of this Agreement; 4) the activities occur after the District passes a resolution approving an. award for the Project; 5) such activities and expenses otherwise comply with all ADT2.306701.DOCX:1/13175.000001 Page 2 of 6 DocuSIgn Enve4ope ID. 93CE1C6D-E0D2-4F40-91162-B8AEFBC3541C Project :Name: South13.1" Place :DrainageIrnprovements Award Number: 420:22 other terms of this Agreement; and 6) reimbursements shall be paid to the Recipient only after this Agreement has been fuUy executed. 2.5. The Recipient sha1.1. invoice King County .for incurred expenses using the ,Request for Payment form and Progress Report form. for those documented anal allowable expenses identified in the Budget and according to the rules set forth in the Grant Policies and. Procedures. Blank Forms sh.allbe provided to the Recipient by King County upon. execution of this Agreement. A progress report (with or without a request for payment) shall be made no less frequently than every six months after the effective date of this Agreement nor more frequently than every three months after the aforem.entioned date. A. Progress Report form shall be submitted. with all payment requests. A one- time advance of no more than 25% of the Award amount may be allowed, in the discretion of King County, for expenses anticipated to be incurred in the three .months oHowtng the date of submission of the advance Request. for Payment only for work that is in.cluded in the Scope of Work of this Agreement and identified as such in the advance Request for Payment. Documentation of payments made from the advance payment shall be submitted to King County prior to any further requests for payment. 6. The Recipient shall be required to submit to :King County a FinaReport which documents the Recipient's completion of the work described in Scope of Work in conformance with the terms of this .Agreement within. thirty (30) days after the completion of the work. The Final..Report may 'be submitted on the Closeout Report form. unless a more detailed Final Report is specified in the Scope of Work. A blank form shall be provided to the .Recipient by King County upon executionof this Agreement. The Final. Report shall include a sumrn.ary of the Project's successes and shall address the flood reduction benefits accomplished by the work. 2.7. The Recipient's expenditures of Award funds shall be separately identified in the Recipient's accounting records. If requested, the Recipient shall comply with other reasonable requests made by King County with respect to the manner in which Project expenditures are tracked and accounted for in the Recipient's accounting books and. records. The Recipient shall maintainsuch records of expenditures as may be necessary 10 conform to generally accepted accounting principles as further described in Section 2.8 below, and to meet the requirements of aU applicable state and federal laws. 8. The Recipient shall be required to track Project expenses using the Budget Accounting and Reporting System for the State of Washington ("BARS") or Generally Accepted Accounting Principles set forth by the Financial. Accounting Standards Board or •by the Governmental Accounting Standards Board., King County or its representative, and the District or its representative, shall have the right fromtime to time, at reasonable intervals, to audit the .Recipient's books and records in order to .verify compliance with the terms of this Agreement. The Recipient shall cooperate with King County and the District in any such audit. i'sAyr2306701.rxx:x,1/1.31 75 00000 I/ Page 3 of 6 DocuSIgn Enve4ope ID. 93CE1C6D-E0D2-4F40-91162-B8AEFBC3541C Project :Name: South13.1" Place :DrainageIrnprovements Award Number: 420:22 2.10. The Recipient shall retainall accounting records and project files relating to this Agreement in accordance with criteria establishedby the Washington State Archivist Local Government Common Records Retention Schedule (CORE) as revised. 2.11... The Recipient sball. ensure that all work performed by its etnployees„ agents, contractors or subcontractors is performed in a rirtartn.er which protects and safeguards the environment and natural resources and which is in compliance with local, state and. federal laws and regulations. The Recipient shall implement an appropriate .monitoring system. or program to ensure compliance with this provision. 2.12. The Recipient agrees to indemnify, defend and hold harmless King County, and the District, their elected or appointed officials, employees and agents, from all claims, allegedliability„ damages, losses to or death of person or damage to property arising out of any acts or omissions, of the Recipient, its employees, agents, contractors or subcontractors in performing its obligations under the terms of this Agreement, 2.13. The Recipient agrees to acknowledge the District as a source of funding for the Project on all literature, signage or press releases related to the Project. The Recipient may obtain. from King County a District logo that may be used in the acknowledgement., SECTION 3. GENERAL PROVISIO 3.1. This Agreement shall he binding upon and inure to the benefit of the parties and their respective successors and assigns.. 3.2. This Agreement constitutes the entire agreement between the parties with respect to the subject .matter hereof. No prior or contemporaneous representation, inducement, promise or agreement between. or among the parties which relate to the suhject matter hereof which are not embodied in this Agreement shall be of any force or effect. 3.3. No amendment to this .Agreement shall be binding on any of the parties unless such. amendment is in writing and is executed by the parties. The parties contemplate that this Agreement may from. time to time he modified by written amendment which shall be executed by duly authorized representatives of the parties and attached to this Agreement., 3.4. Each party warrants and represents that such party has full and complete authority to enter into this Agreement and each person executing this Agreement on behalf of a party warrants and represents that he/she has been fully authorized to execute this Agreement on behalf of suchparty and that such party is bound .by the signature of such. representative. 3.5. The Project shall be completed by no later than December 31, 2022. In the event that the Project is not completed by this date, King County has the discretion, but not the obligation, to terminate this Agreement and retain any unexpended Award funds. 3.6. This Agreement may be signed in multiple counterparts. Atyr2306701 o(x:x,1/131 75 00000 I/ Page 4 of 6 DocuSIgn Enve4ope ID. 93CE1C6D-E0D2-4F40-91162-B8AEFBC3541C Project :Name: South13.1" Place :DrainageIrnprovements Award Number: 420:22 3.7. If any provision of this Agreement shall be wholly or partially invalid or .unenforceable under applicable law, such provision wiH be ineffective to that extent only„, without in any way affecting the remaining parts or provision of. this Agreement, and the remaining provisions of this .Agreement shall continue to be in effect. 3.8. The amount of the Award has been fully funded by the District. To th.e extent that funding of the Award requires future appropriations by the District, King County's obligations are contingent upon the appropriation of sufficient funds by the Board of Supervisors of the District to complete the Scope of Work. if no suchappropriation is made, this Agreement will terminate at the close of the appropriation year for which the last appropriation that provides funds under this Agreement was made. KING COUNTY: 1 DocuSigned by: 111 __L_ 207AF318BFOB4B6 arae Josh BakiT Title Division Director, WLRD, DNRP Date 2/8/2021 RECIPIENT: Name AIIan Ekber Title Date a or 02/04/2021 Approved as to Form 5 -ed Office of the City Attorney ADT2306701.130CX:,1/13175.000001/ 1 Page 5 of 6 HP DocuSIgn Enve4ope ID. 93CE1C6D-E0D2-4F40-91162-B8AEFBC3541C Project Name: South 131' Place Drainage Improvements EXHIBIT A: PROJECT DESCRIPTION Award Number: 420./2 PROJECT NAME RECIPIENT DESCRIPTION LEVERAGE AWARD South 131t Place Drainage improvements City of Tukwila Southgate Creek overtops its banks approximately twice annually and flows down a private driveway resulting in nuisance flooding, debris cleanup, and minor property damage. This project will replace an undersized 48" culvert under S. 131s1Piace, raise the roadway along the creek or construct a concrete wail to provide additional freeboard to keep the creek in its bank, provide added water quallity for the City roadway, and work with a downstream property owner on private stream maintenance. $1,190,000 $60,000 EXHIBIT B: SCOPE OF WORK TASKS ACTIVITIES AND DELIVERABLES APPROX. PERCENT OF AWARD REQUEST MONTH/YEAR TASK WILL BE COMPLETED Task 1: Project Administration (Required task) Submit reimbursement request forms, backup documentation for Willing, and progress reports at least every 6 months. Submit a Fiscal Closeout form and a Closeout Report form with the final reimbursement request. 0% December 2021 Task 2: Project Design and Permitting Advertise, interview, and select a design consultant to design the improvements and assist City staff members in project permits. Deliverable wili be complete, bid ready, Plans, Specifications and Estimate. 100% Sept 2021 Task 3: Construction Task 4: Construction Hire a contractor to replace the existing 48" concrete cross culvert with a box culvert, arch culvert, or other design approved by the WDFW for fish passage. Deliverabie wiii be as built drawings. Hire a contractor to rake roadway grade or install a concrete wall to increase freeboard of Southgate Creek. Deliverable wine be as Ibuiit drawings. 0% 0% December 2022 December 2022 EXHIBIT C: BUDGET BUDGET ITEM STAFFING COMMERCIAL SERVICES AND CREWTIME TOTAL GRANT AWARD REQUEST 0 60,000 FINANCIAL L VERAGE (not required) SOURCE NAM City of Tukwila AMOUNT 50,000 1,140,000 ,190,000 LEVERAGE TOTAL 50,000 1,140,000 $1,190,000 TOTAL (Grant + Leverage) 50,000 1,200,000 $1,250,000 A'DI'2306701.DIX:X.,1/1.3175.000001/ Page 6 of 6 DocuSign Envelope ID: 93CE1C6D-E0D2-4F4D-9162-B8AEFBC3541C Project Name: South 131Place Drainage hnprovements 21-024 Council Approval 2/1/21 Award Number: 4.20.22 AGREEMENT FOR AWARD OF FLOOD REDUCTION GRANT FUNDS BETWEEN THE CITY OF TUKWILA AND KING COUNTY This Agreement ("Agreement") is made between King County, a municipal corporation, and the City of Tukwila ("Recipient") (collectively referred to as the "parties" and in the singular "party"), for the purposes set forth herein. This Agreement shall be in effect from the date of execution to December 31, 2022. Project Contacts: Contact for King County — Kim. Harper, Grant Administrator, 206-477-6079, Kitmhar vr@kinIcount ov Contact for Recipient — Ryan Larson, 206-431-2456, Ryantarson@tukwillawagov. SECTION 1. RECITALS Whereas, the King County Flood Control District ("District") is a quasi -municipal corporation of the State of Washington, authorized to provide funding for flood control. and stormwater protection projects and activities; a.nd Whereas King County is the service provider to the District under the terms of an. interlocal agreement ("ILA') by and between King County and the District, dated February 17, 2009, as amended, and as service provider implements the District's annual work program and budget; and 13 Whereas, on November 12, 2013, the District's Board of Supervisors passed Resolution FCD200 3- 4 which established a Flood Reduction Grant Program and criteria for awarding gram funding for projects, and on November 6, 2019, the Board passed Resolution FCD2019-13, which authorized an allocation of S3,280,20 from the District's 2020 b udget to fund flood reduction projects; and 1.4, Whereas, on September 9, 2020 the District's Board of Supervisors passed Resolution FCD2020- .19, which approved, the flood reduction projects described, in Attachment A to that Resolution; and, 1.5 Whereas, in accordance with the terms of these Resolutions, and in its capacity as service provider to the District, King County has established policies and procedures for administering the flood reduction grant program., a copy of which has been furnished to Recipient and which is incorporated herein by this reference hereinafter "Grant Policies and Procedures"); and 1.6 Whereas, the Recipient submitted an application to receive funds for a project to be funded by the Flood Reduction Grant Program; and C.ADT23067M .DfX.A., UR 3 75.00900U } Pap 1 of 6 1/1 DocuSign Envelope ID: 93CE1C6D-E0D2-4F4D-9162-B8AEFBC3541C Project Name: South 131 Place Drainage hnprovements Award Number: 4.20.22. 1..7 Whereas, the District's Board of Supervisors approved funding of Recipient's application for the project ("Project"), as described in Attachment A to Resolution ,FCD2020-19 in. the amount of $60,000 ("Award"); and .1.8 Whereas, King County has received a Scope of Work and a Budget for the Project ,from the Recipient and has determined that the Scope of Work, attached hereto and incorporated herein as ,Exhibit B ("Scope of Work"), and the Budget, attached hereto and incorporated herein as ,Exhibit C ("Budget"), are consistent with the Grant Policies and Procedures, the Recipient's application for the Project, and Resolution ,FCD2020-19; and 1.9 Whereas, King County and the Recipient desire to enter into this Agreement for the purpose of establishing the terms and conditions under which King County will provide funding from the District in accordance with Resolution ,FCD2020-19 and the Grant Policies and Procedures, under which the Recipient will implement the Project. SECTION 2. AGREEMENT 2.1. The Recitals are an integral part of this Agreement and are incorporated herein by this reference, 2.2. King County agrees to pay the Award amount to Recipient in the total amount of $60,000 from District funds. The Award shall be used by the Recipient solely for the performance of the Project, as described in Exhibit A to this Agreement. Exhibit A. attached hereto and incorporated herein by this reference, contains a description of th.e Project as described in Attachment A to Resolution ,FCD2020-19. King County shall pay the Recipient in accordance with th.e terms of the Grant Policies and Procedures. 7.3. The Recipient represents and warrants that it will only use the Award for the Scope of Work of this Agreem.ent and in accordance with the Project Budget. The Recipient shall. be required to refund to King County that portion of the Award which is used for work or tasks not included in the Scope of Work. Further, the Recipient agrees that King County m.ay retain any portion of the Award that is not expended or remains after completion of the Scope of Work and issuance of the Final. Repoli., as ,further described in Section 2.6 below. 2.4. Activities carried out for this Project and expenses incurred by the Recipient may predate the execution date of this Agreement provided that 1) they have been identified by Recipient as being within the scopes of numbers 2) and 3) below, and have been. approved by King County as being within such scopes; 2) the activities are specified in. the Scope of Work of this Agreement; 3) the expenses are incurred in carrying out the Scope of Work and are authorized by the Award as identified in the Budget of th.i.s Agreement; 4) the activities occur after the District passes a resolution approving an. award for the Project; 5) such activities and expenses otherwise comply with aU C.ADT230670.1MX.A.,UR3U75.00900U I Page 2 of 6 DocuSign Envelope ID: 93CE1C6D-E0D2-4F4D-9162-B8AEFBC3541C Project Name: South 131Place Drainage hnprovements Award Number: 4.20.22. other terms of this Agreement; and 6) reimbursements shall be paid to the Reci.pi.ent only after this Agreement has been FuUy executed. 2.5. The Recipient shall invoice King County for incurred expenses using the Request for Payment forni. and Progress Report lbrrnor those documented and allowable expenses identified in the Budget and according to the rules set forth in the Grant Policies and Procedures. Blank fornis shall be provided to the Recipient by King County upon. execution of this Agreement. A progress report (with or without a request for payment) shall be made no less frequently than every six months after the effective date of this Agreement nor more frequently than every three months after the aforementioned date. A Progress Report form. shall be submitted with all payment requests. A one- time advance of no more than 25% of the Award amount may be allowed, in the discretion of King County, for expenses anticipated to be incurred in the three months following the date of submission of the advance Request for Payment only for work that is included in the Scope of Work of this Agreement and identified as such in the advance Request for Payment. Documentation of payments made froni. the advance payment shall be submitted to King County prior to any Further requestslbr payment. 2.6. The Recipient shall be required to submit to King County a Final. Report which. documents the Recipient's completion of the work described in Scope of Work in. conformance with the terms of this Agreement within thirty (30) days after the completion of the work. The Final. Report may be submitted on the Closeout Report forin unless a more detailed Final Report is specified in the Scope of Work. A blank form shall be provided to the Recipient by King County upon execution of this Agreement. The Final. Report shall include a summary of th.e Project's successes and shall address the flood reduction benefits accomplished by the work. 2.7. The Recipient's expenditures of Award funds shall. be separately identified in the Recipient's accounting records. Ifrequesled, the Recipient shall compl.y with other reasonable requests made by King County with respect to the manner in which Project expenditures are tracked and accounted for in the Recipient's accounting books and records. The Recipient shall maintain such records of expenditures as may be necessary to conform. to generally accepted accounting principes as Further described in Section 2.8 below, and to meet the requirements of aU applicable state and federal 2.8. The Recipient shall be required to track Project expenses using the Budget Accounting and Reporting System for the State of Washington ("BARS") or Generally Accepted Accounting Principles set forth by the Financial Accounting Standards Board or by the Governmental Accounting Standards Board. 2.9. King County or its representative, and the District or its representative, shall have the right from time to time, at reasonable intervals, to audit the Recipient's books and records in order to verify compliance with the terms of this Agreement. The Recipient shall cooperate with King County and the District in any such audit. C.ADT230670 1 .1XX.A., 1R . 175.00900U } Page 3 of 6 DocuSign Envelope ID: 93CE1C6D-E0D2-4F4D-9162-B8AEFBC3541C Project Name: South 131 Place Drainage hnprovements Award Number: 4.20.22. 2.10. The Recipient shall retain all accounting records and project ,files relating to this Agreement in accordance with criteria, established by the Washington State Archivist Local Government Common Records Retention Schedule (CORE) as revised. 2.11. The Recipient shall ensure that all work performed by its em.ployees, agents, contractors or subcontractors is performed in a manner which protects and safeguards the environment and natural resources and which is in compliance with local, state and federal laws and regulations. The Recipient shall implem.ent an appropriate monitoring system or program to ensure compliance with this provision. 2.12. The Recipient agrees to indemnify, defend and hold harmless King County, and the District, their elected or appointed officials, employees and agents, ,fromall claims, alleged ,liability, damages, losses to or death of person or damage to property arising out of any acts or omissions of the Recipient, its em.ployees, agents, contractors or subcontractors in performing its obligations under the terms of this Agreement. 2.13. The Recipient agrees to acknowledge the District as a source of funding for the Project on all ,literature, signage or press releases related to the Project. The Recipient may obtain from King County a District logo that m.ay be used in the acknowledgem.ent. SECTION 3. GENERAL PROVISIONS 3.1. This Agreement shall be binding upon and inure to the benefit of the parties and their respective successors and assigns. 3.2. This Agreement constitutes the entire agreement between the parties with respect to the subject matter hereof. No prior or contemporaneous representation, i.nducem.ent, promise or agreement between or among the parties which relate to the subject matter hereof which are not embodied in this Agreement shall be of any force or effect. 3.3. No amendment to this Agreement shall be binding on any of the parties unless such. amendment is in writing and is executed by the parties. The parties contemplate that this Agreement may ,fromtime to time be modified by written amendment which sh.a.1.1 be executed by duly authorized representatives of the parties and attached to this Agreement. 3.4. Each party warrants and represents that such party has ,full and complete authority to enter into this Agreement and each person executing this Agreement on behalf of a party warrants and represents that he/she has been ,fully authorized to execute this Agreement on behalf of such party and that such party is bound by the signature of such. representative. 3.5. The Project sh.a.1.1 be completed by no later than December 31, 2022. In the event that the Project is not completed by this date, King County has the discretion, but not the obligation, to terminate this Agreement and retain any unexpended Award funds. 3.6. This Agreement may be signed in multiple counterparts. ADT230670 3 75.0090(H/ } Page 4 of 6 DocuSign Envelope ID: 93CE1C6D-E0D2-4F4D-9162-B8AEFBC3541C Project Name: South 131Place Drainage hnprovements Award Number: 4.20.22. 33. If any provision of this Agreement shall be wholly or partially invalid or unenforceable under applicable .haw, such provision will be ineffective to that extent only, without in any way affecting the remaining parts or provision of this Agreement, and the remaining provisions of this Agreement shall continue to be in effect. The amount of the Award has been fully funded by the District. To the extent that funding of the Award requires future appropriations by the District, King Comity's obligations are contingent upon the appropriation of sufficient funds by the Board of Supervisors of the District to complete the Scope of Work. If no such appropriation is made, this Agreement will terminate at the close of the appropriation year for which the hist appropriation that provides funds under this Agreement was made. KING COUNTY: By (--DocuSigned by: 207AF316BF0B4136... Name Josh BaIdi Title Division Director, WLRD, DNRP Date 2/8/2021 By RECIPIENT: Name AIIan Ekber Title Date a or 02/04/2021 Approved as to Form c e(r`e_e; q.„5-)awee- Office of the City Attorney C.ADT230670.DfX.A.,UR3U75.00900U 1 Page 5 of 6 HP 000uSignEnvelope ID: nocE1coo'E000-4F4oe162-oaAEFocon41c .Project Name: South 131' Place Drainage hnprovements EXHIBIT A: PROJECT DESCRIPTION Award Number: 4.2822 PROJECTNE RECIPIENT DESCRIPTION LEVERAGE AWARD South l3l"P|ace Drainage Improvements City of Tukw[lla Southgate Creek overtops its banks approximately twice annua[lyand flows down aprivate driveway resulting [nnuisance flooding, debris cLeanup'and mnor property damage. Ths project wII replace an � undersized 48^cuivertunder Sl3l�P|ace'ra[se the roadway aiong the creek or construct a concrete wall to provde addtonaI freeboard to keep the creek n ts bank, provde added water quaHty for the Cty roadway, and work wth a downstream property owner on prvate stream mantenance. $l180,000 $60\000 EXHIBIT B: SCOPE OF WORK EXHIBIT C: BUDGET BUDGET ITEM STAFFING ACTK/D[hESAND DELIVERABLES APPROX. PERCENT OF AWARD REQUEST MONTH/YEAR TASK WILL 8E COMPLETED Task 1: Project Administration (Required task) Submit reimbursement request forms, backup documentation for bflHng, and progress reports at Ieast every 6 months. Submit a F[scall C[oseoutfornn and a Closeout Report form with theGnai reimbursement request. 0% December 2021 Task 2: Project Design and Permitting Advertise, interview, and select adesign consu[tanttodesign the mprovements and assst Cty staff members n project permits. De|iverabllew[ll be complete, Ib[d ready, Pians, Specifications and Estimate. 10096 Sept 2021 Task 3: Construction Task4: Construction Hl[reacontractortorep|acetheex[st[n048~concretecross cu|vertw[thaboxcuivert'archculvert'orotherdes[gnapproved by the WDFW for fish passage. DeL[verab|ewill beasbu[|t drawings. Hire acontractor toraise roadway grade or[nstaUaconcrete wall to ncrease freeboard of Southgate Creek. De|[verabiew[U be as Ibu[llt drawings. 0% 0% December 2022 December 2022 EXHIBIT C: BUDGET BUDGET ITEM STAFFING GMANT---'-- AWARD REQUEST FINANCIAL LEVERAGE (not required) TOTAL TOTAL (Grant + Leverage) �-------�LEVERAGE City of Tukw[|a NAME AMOUNT 0 50\000 50,000 _____ 50,000 COMMERCIAL SERVICES AND CREW TIME 60'000 1,140\000 1'140'000 1'200,000 TOTAL 60,000 ,190'000 'lyC\OOO '250\000 �xoT230*70 3/75.0090u> Page 6 of 6