Loading...
HomeMy WebLinkAboutTIS 2021-04-26 Item 2C - Update - Neighborhood Traffic Calming ProgramCity of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director BY: Cyndy Knighton, Senior Program Manager Scott Bates, Traffic Engineering Project Manager CC: Mayor Ekberg DATE: April 23, 2021 SUBJECT: 2020 Neighborhood Traffic Calming Program Update Project No. 82010301 ISSUE Provide a status update for the Neighborhood Traffic Calming Program (NTCP). BACKGROUND The NTCP was adopted at the end of 2018 to address neighborhood concerns with traffic safety with an initial budget of $400,000 per year. The Council wanted to ensure that traffic calming and safety decisions were based on technical engineering and applied in a uniform and consistent manner. With the funding challenges due to COVID-19, the available budget was reduced to approximately $50,000 in 2020. DISCUSSION Staff continues to collect requests for traffic calming treatments and other improvements in residential areas. Requests for calming treatments and other safety improvements are submitted to staff primarily through: • Enrollment requests from the City's website • Other Departments • Email inquiries • Elected officials • Phone calls When the NTCP began in 2018, staff had a list of 22 requests. In 2019, a total of 60 individual requests for improvements were submitted, while only six were requested in 2020 and one to date in 2021. Currently, there are 28 issues that are either waiting for action, waiting for funding, or are reoccurring complaints that staff have left open for continued reference. Highlights of the 2020 NTCP include: • 150 feet of guardrail along 54th Ave S • One 1 -way stop to all -way stop conversion • One newly marked crosswalk with signs • 15 parking restriction/prohibition signs • Traffic revision/ped path on 53rd/52nd Ave S • More features designed into 2021 Overlay • 2 new LED stop signs • One 2 -way stop to all -way stop conversion The 2020 on-call contract with KPG was extended through 2021 but with no additional budget. The KPG contract is to assist staff with engineering and other needs that support the NTCP Program. City staff time and resources have been utilized when possible, to save on the installation costs and to expedite work. RECOMMENDATION Discussion only. Attachments: 2021/2022 CIP Page 2 2020 NTCP List of Accomplishments 15 https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2021 Agenda Items/TIC 04-26-21/c. NTCP update/INFO MEMO - NTCP 2021 Update 4-15-21.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Traffic Calming/Residential Safety Improvements Project No. 8xx10301 Programmatic approach to addressing neighborhood traffic concerns through a variety of methods. DESCRIPTION: Residential street improvements with sidewalks, safety improvements, and bike facilities. JUSTIFICATION: Neighborhood revitalization by improving residential streets. STATUS: Future candidates are listed in the citywide comprehensive update and safety -based prioritization of residential street improvements, sidewalks, and bike lanes. MAINT. IMPACT: Varies, depends on treatment(s) used. COMMENT: Residential improvements and traffic calming features to reduce speeds and improve pedestrian and bicycle safety such as the speed cushions, RRFB crossings, LED enhanced signs, Radar driver feedback signs, etc. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Design 63 50 113 Land (R/W) 0 Const. Mgmt. 37 37 Construction 148 0 148 TOTAL EXPENSES 248 50 0 0 0 0 0 0 0 298 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 248 50 0 0 0 0 0 0 0 298 TOTAL SOURCES 248 50 0 0 0 0 0 0 0 298 2021 - 2026 Capital Improvement Program 2 16 2020 NTCP STATUS -UPDATE January 1, 2020 - April 15, 2021 Location Safety issue(s) Requester Status Level Complete? Rapid Rectangular Flashing Beacons S.150th at 46th Ave S Pedestrian crossing safety Resdients Narrowed bulb -out RRFB crossing designed for 2021 2 7/1/2021 65th Ave S at Southcenter Blvd Pedestrian crossing safety Staff/Historical Design drafted -Working with King County Metro/Bike 2 LED Enhanced Stop Signs 53rd Ave S at 52nd Ave S Failure to obey stop sign Residents 1 sign installed for NB 1 ✓ 12/1/2020 S.170th at 53rd Failure to obey stop sign Tuk-Works 1 sign installed for WB 1 ✓ 2/1/2020 New Stop Signs Installed 56th Ave S at S.133rd Speeding Residents 2 stop signs installed for east/west with stop lines 1 ✓ 2/1/2020 44th At S.140th St Failure to yield ROW Residents New stop sign to be installed in 2021 Overlay project 1 7/1/2021 S.144th at 58th Ave S Speeding Residents 2 stop signs installed on N/S legs with stop/xwalk lines 1 ,(2/1/2020 Driver Speed Feedback Signs Non -purchased or installed in 2020 No inventory stocked 1 Speed Cushions None installed I Speeding I Inventory stocked 2 School Zones S.144th School speed zone cams School Zone safety TSD/PD Design/permits completed -installed soon 2 7/1/2021 Miscellaneous 54th Ave S Guard rail Steep Slope/no shoulder Staff/Historical New/revised guardrail installed w/2020 Overlay program 2 ✓ 8/1/2020 53rd/52nd Trafffic circulation revision Pedestrian/Bicycle safety Staff/Historical Striping in 2020 by staff with ped path only. (Sidewalk & other revisions to be done with 2021 Overlay program.) 2 ✓ 9/1/2020 Location of Issue Issues under review or waiting for action/funding Issue/Complaint reported Requester Status # Reported 14741 62nd Ave S Speeding Taylor Attisha Confirmed for school zone only 5/3/2019 4024 S.148th St Speeding Karen Wendt Traffic Counts do not confirm 8/21/2019 14221 58th Ave S Speeding Tony Daniel Traffic Counts do not confirm/new 4 -way stop 8/26/2019 13765 56th Ave S Failure to stop Daniel Canady Needs more review/not confirmed 10/10/2019 13935 56th PI S 53rd revision complaint James Felker Been discussed/contacted 10/5/2020 13344 56th Ave S Speeding Margaret Huisinga Traffic Counts do not confirm/new 3 -way stop 11/14/2019 13919 42nd Ave s Parking on sidewalk Diane Myers On-going/ referred to PD for enforcement 12/11/2019 5026 S.146th Yield/Stop sign request R. San Agustin Needs study/good visiblity 3/27/2020 15849 47th Av S Deadend sign requested Steven Kuntz Relocated existing sign 10/2/2020 3519 S.137th St Speeding/Aggressive driving Drew Hood Traffic Counts needed 8/4/2020 4435 S144th ST Speeding Mary Geros School speed cams coming soon 2/17/2021 14015 43rd Ave Speeding Erica Post Traffic Counts do not confirm/ongoing 3/5/2019 125th between S124th and 50th Speeding David Santos Confirmed/recommend road closure at 50th 11/16/2020 Macadam between 144th-Scblvd Speeding CM Johnson Confirmed 2/7/2020 13415 Macadam rd Speeding Keisha Scott Confirmed 10/23/2019 S152nd St east of Macadam rd Speeding Jaimee Shaug Not confirmed/reoccuring issue/need more counts 8/29/2019 S.135th at 37th Speeding/sidewalks requested Charlotte McClure Need counts/funding for sidewalks? 8/22/2019 S.150th 42nd to east end Speeding Ken Musser Need counts/Speed cushions requested 4/1/2021 EMW Sat S.130th Truck traffic on S.130th Ian Hamad Not confirmed/signed/requested enforcement 8/23/2019 Alley between 59th/58th so of 147th Speeding Hubert Crawley Private/ not confirmed/neighboor dispute 8/22/2019 S.140th at TIB Safety/sight distance Adele Wisdom Confirmed 3 Accidents in 2019 8/21/2019 S.130th between TIB-Emw Speeding Heidi Watters Speed sign installed/enforcement requested 8/21/2019 40th between 42nd/EMW Speeding N/A Traffic Counts do not confirm/ongoing 5/16/2019 147th/57th and 62nd/149th School Flashing crossings needed Staff unfunded 12/1/2019 S.140th between 42nd -45th Speeding N/A Not confirmed/requested enforcement/ongoing 1/1/2019 48th between Macadam/S134thpl Speeding N/A Not confirmed/requested enforcement/ongoing 1/1/2019 S.152nd between TIB -42nd Speeding David Puki Confirmed/enforcement/grants applied for sidewalks 1/1/2019 42nd at S.160th Speeding/Safety Multiple Joint project w/Seatac to install 4 -way stop in 2021 12/1/2018 17