Loading...
HomeMy WebLinkAboutReg 2021-05-17 Item 6G - Bid Award / Contract - Sewer Lift Station #2 with McClure and Sons Inc for $1,554,397.31 (Plus Contingency and Sales Tax)COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 05/17/21 JR ITEM INFORMATION ITEM NO. 6.G. 105 STAFF SPONSOR: ADIB ALTALLAL ORIGINAL AGENDA DATE: 05/17/21 AGENDA ITEM TITLE Sewer Fund — Sewer Lift Station No. 2 Upgrades Bid Award to McClure and Sons, Inc. CATEGORY ❑ Discussion Mtg Date ❑ Motion Mtg Date ❑ Resolution Mtg Date ❑ Ordinance Mtg Date Award 05/17/21 ❑ Public Hearing Mtg Date ❑ Other Mtg Date 11 Bid Mtg Date SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ TS ❑ P&R ❑ Police 11 PW SPONSOR'S The Sewer Lift Station No. 2 Upgrade Project was advertised for bids on March 31 and April SUMMARY 7, 2021. Three bids were opened on April 15, 2021 with the apparent low bid of $1,554,397.31 from McClure and Sons, Inc. The contract includes installation of new pumps, motors, a control system, and a backup generator. Council is being asked to award the bid to McClure and Sons, Inc. in the amount of $1,554,397.31. REVIEWED BY Trans&Infrastructure ❑ CommunitvSvs/Safety ❑ Finance Com ❑ Planning/Economic Dev. ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: VERNA SEAL ❑ LTAC DATE: 05/10/21 RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Department of Public Works Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $1,554,397.31 $1,750,000.00 $ Fund Source: 402 Sewer Fund, 2021 CIP Pages 70 & 72 MTG. DATE RECORD OF COUNCIL ACTION 05/17/21 MTG. DATE ATTACHMENTS 05/17/21 Informational Memo dated 05/07/21 2021 CIP pages 70 & 72 Bid Tabulation Minutes from Transportation and Infrastructure Committee meeting of 05/10/21 105 106 TO: FROM: City of Tukwila Allan Ekberg, Mayor Ptthfir Works Ocpnrtment - Hari Ponnekanti, Director/Cry Engineer INFORMATIONAL MEMORANDUM Transportation and Infrastructure Services Committee Hari Ponnekanti, Public Works Director/City Engineer BY: Adib Altallal, Utilities Engineer CC: Mayor Allan Ekberg DATE: May 7, 2021 SUBJECT: Sewer Fund — Sewer Lift Station No. 2 Upgrades Project No. 90440205 Bid Award to McClure and Sons, Inc. ISSUE Award contract to McClure and Sons, Inc. for the Sewer Lift Station No. 2 Upgrades Project. BACKGROUND Sewer Lift Station No. 2 serves the Commercial Business District and appurtenances will be replaced and upsized to meet increasing demands. This project will install new pumps, motors, control system, and a backup generator. The sewer force main portion of the contract was added due to a sewer main break that was discovered by the City crew earlier this year that serves Sewer Lift Station No. 2. ANALYSIS A call for bids was advertised for the Sewer Lift Station No. 2 and force main improvements on March 31 and April 7, 2021. Three contractors returned bids to the City on April 15, 2021. The confirmed lowest bid was McClure and Sons, Inc. with a bid of $1,554,397.31. The Engineer's Estimate was $1,446,163.50. References were checked and McClure and Sons have completed this work satisfactorily by other jurisdictions. BUDGET AND BID SUMMARY McClure and Sons, Inc Portion CBD Sanitary Sewer Rehab Contingency 12% Grand Total Bid Amount $ 1,554,397.31 186,527.68 $ 1,740,924.99 Engineer's Estimate $ 1,446,163.50 $ 1,446,163.50 2021 Budget $ 950,000.00 800,000.00 $ 1,750,000.00 RECOMMENDATION Council is being asked to award the construction of Sewer Lift Station No. 2 Upgrades to McClure and Sons, Inc. for a total contract amount of $1,554,397.31 and grant budget authority to the Project Management Team up to the amount of $1,740,924.99 (12% contingency) and consider this item on the Consent Agenda at the May 17, 2021, Regular Meeting. Attachments: Pages 70 & 72 2021 CIP Bid Tabulation https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2021 Agenda Items/TIC 05-10-21/a. Sewer Lift Station #2 Bid Award/Info Memo Bid Award McClure and Sons, Inc.docx 107 108 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and DESCRIPTION: becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. JUSTIFICATION: If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. We have had four major pipe failures on Andover Park West and Andover Park East. STATUS: In 2014 and 2015, over 10,500 feet of asbestos sanitary sewer pipe were relined. In 2020 through 2024, 15,000 feet of asbestos sewer is scheduled to be relined. MAINT. IMPACT: Reduced maintenance and repair costs. COMMENT: A Public Works Trust Fund loan was successfully obtained in 2012 for $750k. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Project Location g,east 11 4,4 ,41,. I tl aea St Design 436 45 45 50 50 50 676 Land (R/W) 1 1 $ .. I N 111. I 4-V Upland pr41441 Welland De 7nl.`nor �. f/ n �J 1 Const. Mgmt. 429 120 150 120 50 50 919 Construction 2,418 1,100 1,500 1,000 450 450 6,918 TOTAL EXPENSES 3,284 1,265 1,695 1,170 550 550 0 0 0 8,514 FUND SOURCES Awarded Grant 0 PW Trust Fund 750 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 2,534 1,265 1,695 1,170 550 550 0 0 0 7,764 TOTAL SOURCES 3,284 1,265 1,695 1,170 550 550 0 0 0 8,514 2021 - 2026 Capital Improvement Program 70 109 Project Location g,east 11 4,4 ,41,. I tl aea St ^�wp ^^• J1 13 11111 - • i't i1Yae ®Ad nor - 1 $ .. I N 111. I 4-V Upland pr41441 Welland De 7nl.`nor �. f/ n �J �p �t. ifer lel, I , r_ 2021 - 2026 Capital Improvement Program 70 109 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAI NT. IMPACT: COMMENT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 Sewer Lift Station No. 2 Upgrades Project No. 90440205 Install new pumps, motors, control system, backup generator and 2,700 LF of force main from Minkler Blvd to Strander Blvd. Sewer Lift Station No. 2 upgrade will account for the future full development of Tukwila South. Generator replacement, concrete slab, pump upsizing, and replacement of pump's motor control system are scheduled for 2020/2021 Reduce liability if the existing slab breaks the power connection at the sewer lift station. See Tukwila South development agreement for future funding and ULID requirements. FINANCIAL (in $000's) Through Estimated 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Project Location f. L '— ‘1568t 1 Si ; _nli5.8 —�v 81tl0�6Tt p, L TW[w�l■ Design 102 30 „...„44.1,._,,,o-- r•. ■ SVsntl61 a InR Pullakkr. UT Q 88 a 100 232 Land (R/W) S s,et IlL ill 0 Const. Mgmt. 50 20 200 270 Construction 35 800 150 2,000 2,985 TOTAL EXPENSES 137 880 170 0 0 0 0 0 2,300 3,487 FUND SOURCES Awarded Grant 0 Proposed Bond/ULID 2,300 2,300 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 137 880 170 0 0 0 0 0 0 1,187 TOTAL SOURCES 137 880 170 0 0 0 0 0 2,300 3,487 110 2021 - 2026 Capital Improvement Program 72 Project Location f. L '— ‘1568t 1 Si ; _nli5.8 —�v 81tl0�6Tt p, L TW[w�l■ \ litt.NT” „...„44.1,._,,,o-- r•. ■ SVsntl61 a InR Pullakkr. UT Q 88 a S s,et IlL ill 110 2021 - 2026 Capital Improvement Program 72 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS Lift Station #2 and Forcemain Improvements BID TABULATION Tukwila Project # 90440205 Correction Apparent Low Bidder April 15, 2021 Engineer's Estimate McClure and Sons, Inc Razz Construction, Inc. Award Construction, Inc No. Item Qty Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Roadway 1 HMA 1/2" PG 58H-22 70 TN $ 250.00 $ 17,500.00 $ 278.00 $ 19,460.00 $ 250.00 $ 17,500.00 $ 240.00 $ 16,800.00 2 Crushed Surfacing Top Course 550 TN $ 50.00 $ 27,500.00 $ 65.00 $ 35,750.00 $ 60.00 $ 33,000.00 $ 75.00 $ 41,250.00 3 2" to 4" Base Rock 150 TN $ 50.00 $ 7,500.00 $ 62.00 $ 9,300.00 $ 75.00 $ 11,250.00 $ 95.00 $ 14,250.00 4 Roadway Surveying 1 LS $ 15,000.00 $ 15,000.00 $ 5,900.00 $ 5,900.00 $ 3,000.00 $ 3,000.00 $ 12,500.00 $ 12,500.00 5 2" Grind and Overlay 1590 SY $ 20.00 $ 31,800.00 $ 25.00 $ 39,750.00 $ 26.00 $ 41,340.00 $ 47.00 $ 74,730.00 Sidewalk 6 Cement Concrete Sidewalk 50 SY $ 90.00 $ 4,500.00 $ 230.00 $ 11,500.00 $ 90.00 $ 4,500.00 $ 100.00 $ 5,000.00 7 Curb and Gutter 125 LF $ 50.00 $ 6,250.00 $ 43.00 $ 5,375.00 $ 36.00 $ 4,500.00 $ 45.00 $ 5,625.00 8 Curb with No Gutter 65 LF $ 30.00 $ 1,950.00 $ 41.00 $ 2,665.00 $ 27.00 $ 1,755.00 $ 44.00 $ 2,860.00 Traffic Control Devices 9 Project Temporary Traffic Control 1 LS $ 12,000.00 $ 12,000.00 $ 43,000.00 $ 43,000.00 $ 160,000.00 $ 160,000.00 $ 100,000.00 $ 100,000.00 Roadside Development 10 Plantings 8 EA $ 250.00 $ 2,000.00 $ 1,900.00 I $ 15,200.00 $ 300.00 I $ 2,400.00 $ 600.00 I $ 4,800.00 Sanitary Sewer 11 Mobilization 1 LS $ 85,000.00 $ 85,000.00 $ 8,000.00 $ 8,000.00 $ 145,000.00 $ 145,000.00 $ 116,500.00 $ 116,500.00 12 Temporary Water Pollution/Erorsion Control 1 LS $ 7,500.00 $ 7,500.00 $ 1,050.00 $ 1,050.00 $ 15,000.00 $ 15,000.00 $ 20,000.00 $ 20,000.00 13 Unexpected Site Changes 1 FA $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 14 Generator Building 1 LS $ 50,000.00 $ 50,000.00 $ 37,000.00 $ 37,000.00 $ 40,000.00 $ 40,000.00 $ 28,000.00 $ 28,000.00 15 Generator Concrete Pad 1 LS $ 25,000.00 $ 25,000.00 $ 8,900.00 $ 8,900.00 $ 20,000.00 $ 20,000.00 $ 20,500.00 $ 20,500.00 16 Generator 1 LS $ 100,000.00 $ 100,000.00 $ 60,000.00 $ 60,000.00 $ 80,000.00 $ 80,000.00 $ 70,000.00 $ 70,000.00 17 Electrical 1 LS $ 336,000.00 $ 336,000.00 $ 176,450.00 $ 176,450.00 $ 170,000.00 $ 170,000.00 $ 100,000.00 $ 100,000.00 18 Modification to Ex. 96 -inch Dia. Manhole 1 LS $ 20,000.00 $ 20,000.00 $ 36,000.00 $ 36,000.00 $ 40,000.00 $ 40,000.00 $ 36,500.00 $ 36,500.00 19 24 -Foot Replacement Ladder 1 LS $ 5,000.00 $ 5,000.00 $ 9,700.00 $ 9,700.00 $ 7,500.00 $ 7,500.00 $ 7,200.00 $ 7,200.00 20 15 -Foot Replacement Ladder 1 LS $ 4,000.00 $ 4,000.00 $ 8,500.00 $ 8,500.00 $ 5,000.00 $ 5,000.00 $ 7,500.00 $ 7,500.00 21 Demolition of Existing Pumps/Piping 1 LS $ 15,000.00 $ 15,000.00 $ 50,000.00 $ 50,000.00 $ 20,000.00 $ 20,000.00 $ 24,000.00 $ 24,000.00 22 40HP Submersible Pump 3 EA $ 62,500.00 $ 187,500.00 $ 69,000.00 $ 207,000.00 $ 62,000.00 $ 186,000.00 $ 62,000.00 $ 186,000.00 23 New Piping and Valves within Lift Station 1 LS $ 75,000.00 $ 75,000.00 $ 210,000.00 $ 210,000.00 $ 138,000.00 $ 138,000.00 $ 185,000.00 $ 185,000.00 24 Reinstallation of Davit Arm Base 2 EA $ 500.00 $ 1,000.00 $ 245.00 $ 490.00 $ 1,500.00 $ 3,000.00 $ 450.00 $ 900.00 25 Socket Base Foundation 1 EA $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 5,000.00 $ 5,000.00 26 Permanent Sewer Bypass/Mag Meter Vault 1 LS $ 50,000.00 $ 50,000.00 $ 84,000.00 $ 84,000.00 $ 95,000.00 $ 95,000.00 $ 105,000.00 $ 105,000.00 27 Temporary Baypass Pumping 1 LS $ 30,000.00 $ 30,000.00 $ 83,000.00 $ 83,000.00 $ 40,000.00 $ 40,000.00 $ 78,500.00 $ 78,500.00 28 Geotextile 1 LS $ 1,000.00 $ 1,000.00 $ 315.00 $ 315.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 29 Demolition 1 LS $ 10,000.00 $ 10,000.00 $ 27,000.00 $ 27,000.00 $ 30,000.00 $ 30,000.00 $ 32,000.00 $ 32,000.00 30 Cleaning of Pump Station Wet Well 1 LS $ 2,500.00 $ 2,500.00 $ 16,000.00 $ 16,000.00 $ 7,500.00 $ 7,500.00 $ 4,000.00 $ 4,000.00 31 Painting 2,500 SF $ 5.00 $ 12,500.00 $ 5.00 $ 12,500.00 $ 5.00 $ 12,500.00 $ 10.75 $ 26,875.00 32 18 -Inch Magnetic Flow Meter 1 LS $ 7,500.00 $ 7,500.00 $ 15,500.00 $ 15,500.00 $ 20,000.00 $ 20,000.00 $ 14,000.00 $ 14,000.00 33 Shoring & Trench Safety 1 LS $ 50,000.00 $ 50,000.00 $ 20,600.00 $ 20,600.00 $ 10,000.00 $ 10,000.00 $ 30,000.00 $ 30,000.00 34 18" D.I. Forcemain 200 LF $ 375.00 $ 75,000.00 $ 550.00 $ 110,000.00 $ 375.00 $ 75,000.00 $ 460.00 $ 92,000.00 35 Connection to Existing Manhole 1 LS $ 12,500.00 $ 12,500.00 $ 15,900.00 $ 15,900.00 $ 12,000.00 $ 12,000.00 $ 25,000.00 $ 25,000.00 Sale Tax 10.1% 1 - $ 132,663.50 $ 142,592.31 $ 149,242.15 $ 153,286.69 TOTAL ESTIMATE 1,446,163.50 TOTAL BID $ 1,554,397.31 TOTAL BID $ 1,626,887.15 TOTAL BID $ 1,670,976.69 1 of 1 112 City of Tukwila City Council Transportation & Infrastructure Services Committee Meeting Minutes May 10, 2021 5:30 p.m. - Electronic Meeting due to COVID-19 Emergency Councilmembers Present:Verna Seal, Chair, De'Sean Quinn, Thomas McLeod Staff Present: David Cline, Hari Ponnekanti, Scott Bates, Cyndy Knighton, Adib Altallal, Brittany Robinson, Gail Labanara, Bryan Still, Chair Seal called the meeting to order at 5:30 p.m. I. BUSINESS AGENDA A. Bid Award: Sewer Lift Station No. 2 Upgrades Staff is seeking Council approval of a construction contract to McClure and Sons, Inc. in the *amount of $1,554,397.331 with a 12% contingency for the Sewer Lift Station No. 2 Upgrades project. Committee Recommendation Unanimous approval. Forward to May 17, 2021 Regular Consent Agenda B. Interlocal Agreement: 42nd Avenue South & South 164th St. ADA Ramps Staff is seeking Council approval of an interlocal agreement with the City of SeaTac for construction of two ADA compliant ramps at the intersection of 42nd Avenue South and South 164th Street. SeaTac will construct the ramps as part of its 2021 Overlay Project, and Tukwila will reimburse the cost, estimated at $14,059.00. Committee Recommendation Unanimous approval. Forward to May 17, 2021 Regular Consent Agenda C. Grant Acceptance: West Valley Highway/Longacres Way Project Staff is seeking Council approval of an agreement with Sound Transit to accept $2,064,000 in Systems Access Funding to construct a two-way cycle track and other pedestrian improvements along Longacres Way from West Valley Highway to Tukwila Station. Committee Recommendation Unanimous approval. Forward to May 17, 2021 Regular Consent Agenda D. Supplemental Agreement No. 2: West Valley Highway (1-405 - Strander Boulevard) Staff is seeking Council approval of a Supplemental Agreement with TranTech Engineering in the amount of $564,184 for additional design of the West Valley Highway (1-405 - Strander Boulevard) Project. Items needing follow-up: • Add presentation material to Regular Meeting packet. 113