HomeMy WebLinkAboutTIS 2021-05-24 Item 2C - Resolution - 2022-2027 Transportation Improvement ProgramTO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/ City Engineer
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor Ekberg
DATE: May 21, 2021
SUBJECT: Resolution for Six -Year Transportation Improvement Program (2022 - 2027)
ISSUE
Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program
for 2022 - 2027.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code
of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level
and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for
projects competing for grants. Any project submitted for federal grant funding must be included in the
local, regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources:
grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design
and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related
projects. The TIP generally lists only those transportation -related projects planned within the next six
years that are deemed regionally significant or that have grant funding awarded or expected. The TIP
is scheduled for adoption on June 21, 2021.
ANALYSIS
The attached spreadsheet is the "Draft" 2022 - 2027 TIP and was created by modifying the 2021 - 2026
TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of
projects is presented in alphabetical order. Prioritization of projects is reflected in the current CIP. Five
new projects were added, and one project was removed because it is expected to be completed before
July 1, 2021.
New: Keeping South King County Moving with TDM, South King County Regional TDM, Transportation
Demand Management Implementation, S 119th Street Pedestrian Bridge Painting, Southcenter Blvd/651h
Avenue S Signal
Deleted: BAR over Airport Way Bridge Seismic Retrofit.
FINANCIAL IMPACT
None.
RECOMMENDATION
Council is being asked to approve the Resolution for the 2022 - 2027 Six -Year Transportation
Improvement Program and consider this item at a Public Hearing at the June 14, 2021 Committee of
the Whole and subsequent June 21, 2021 Regular Meeting.
ATTACHMENTS: Draft Resolution
Draft 2022-2027 TIP Summary
2022— 2027 "Draft" Transportation Improvement Program
Current Adopted 2021 — 2026 TIP
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/pw drop box/01 tic agenda/2021 agenda items/tic 05-24-21/c. 2022-2027
six year tip/info memo tip 2022.docx 17
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2022-
2027), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2022-2027); and
WHEREAS, on June 14, 2021, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2022 to 2027, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
CC:\Legislative Development\TIP 2022-2027 5-10-21
CK:bjs Review and analysis by Barbara Saxton Page 1 of 2
18
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
day of , 2021.
Kate Kruller, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2022 to 2027
CC:\Legislative Development\TIP 2022-2027 5-10-21
CK:bjs Review and analysis by Barbara Saxton Page 2 of 2
19
DRAFT 2022 - 2027 TIP SUMMARY
2021-2026
CIP Sheet
PROJECT TITLE
2022
Project Costs in Thousands of Dollars
2023 2024 2025 2026
2027
TOTAL
9
42nd Avenue S Bridge Replacement
750
1,250
9,450
9,450
0
0
20,900
4
46th Avenue Safe Routes to School
265
250
2,065
0
0
0
2,580
14
ADA Improvements
35
50
50
50
50
50
285
20
APE/Minkler Blvd Intersection
144
1,570
0
0
0
0
1,714
13
Annual Bridge Inspections and Repairs
75
200
200
200
200
200
1,075
12
Annual Overlay and Repair Program
1,400
1,400
1,400
1,500
1,500
1,650
8,850
-
BNSF Regional Center Access
0
0
0
0
0
100
100
11
Green River Trail
74
1,200
0
0
0
0
1,274
-
Keeping South King County Moving with TDM
210
210
210
210
0
0
840
5
Macadam Road S Complete Streets Project
0
500
3,100
0
0
0
3,600
18
S 119th St Pedestrian Bridge Painting
0
0
200
0
0
0
200
-
S 140th St Intersection Improvements
0
200
1,200
0
0
0
1,400
21
S 144th St Bridge Sidewalks
0
443
0
0
0
0
443
3
S 152nd Street Safe Routes to School
0
2,600
0
0
0
0
2,600
-
South King County Regional TDM
100
175
175
76
0
0
526
19
Southcenter Blvd/65th Avenue S Signal
100
900
0
0
0
0
1,000
-
Transportation Demand Management Impleme
37
37
37
37
37
38
223
8
West Valley Highway/Longacres Way
140
0
0
0
0
0
140
May 19, 2021
FUNDING SOURCES
Federal State/TIB Unsecured
15,500 3,500 17,500
2,275 2,275
400
450
966 966
840 672
3,250 3,250
1,400
400
2,340 2,340
76
550 550
223 148
100
City
1,900
305
285
1,714
1,075
8,850
100
308
350
200
1,400
43
260
0
450
0
40
TOTAL 3,330 10,985 18,087 11,523 1,787 2,0381 47,7501 16,350 14,120 29,501 17,280
PROJECTS REVISED FROM 2021-2027 TIP
New
Keeping South King County Moving with TDM
S 119th St Pedestrian Bridge Painting
South King County Regional TDM
Southcenter Blvd/65th Avenue S Signal
Transportation Demand Management Implementation
Deleted/Completed:
BAR over Airport Wy Bridge Seismic Retrofit
20
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status
Phase
m
Federal Fund Code
Fede unds St Fund Code
State Funds
Local Funds
Total Funds
S
PE
2022
a
O
5
0
R'
0
1,500,000
m
CN
A. PIN/Project No. B. STIP ID
STP(BR)
01000 TIB
3,000,000
o
15,000,000
P
0
m
�
2,63 FMSIB
w
z
C. Project Title
5,529,000
m
m
500460
m
3,029,000
22,029,000
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
05
TUK-62
06/14/21
1/
11
0.100
DCE
Yes
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
VIII\\
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
IIIIII
preliminary engineer design, right-of-way, and construction phases. The new
I
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through -lanes, possibly a turn pocket, and include
sidewalks.
p�
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fede unds St Fund Code
State Funds
Local Funds
Total Funds
S
PE
2022
STP
5
0
0
1,500,000
P
CN
2024
STP(BR)
01000 TIB
3,000,000
0
15,000,000
P
CN
2024
STP
2,63 FMSIB
w
500,000
3,029,000
5,529,000
Tot
500460
3,500,000
3,029,000
22,029,000
Expenditure Schedule
Phase 1st 2nd 4th 5th & 6th
PE 750,000 1,250,000 0 0 0
CN 0 0 9,450, 000 9,450, 000 0
Totals 750,000 1,250,000 9,450,000 9,450,000 0
Report Date: May 19, 2021 Page 1 21
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Im 1111" f6NNUMffpffvu"".,.wIIP'r
Funding
11h,`
Phase
1st
2nd
3rd 4th 5th & 6th
Status
Phase
m
0 0 0
Fund Code
State Funds
Local Funds
Total Funds
P
P
P
PE
RW
CN
2022
2023
2024
0
SRTS
SRTS
SRTS
180,000
230,000
1,865,000
85,000
20,000
200,000
265,000
250,000
2,065,000
Totals
0
2,275,000
305,000
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
19
WA -11113
06/14/21
1/
05
0.370
Yes
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
VIII\\
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
IIIIII
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
I
I
crosswalk across S 144th Street with RRFB.
�ff�
Im 1111" f6NNUMffpffvu"".,.wIIP'r
Funding
11h,`
Phase
1st
2nd
3rd 4th 5th & 6th
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal F
0 0 0
Fund Code
State Funds
Local Funds
Total Funds
P
P
P
PE
RW
CN
2022
2023
2024
0
SRTS
SRTS
SRTS
180,000
230,000
1,865,000
85,000
20,000
200,000
265,000
250,000
2,065,000
Totals
0
2,275,000
305,000
2,580,000
A110" "miuUR wiui
Expenditure Schedule
Phase
1st
2nd
3rd 4th 5th & 6th
PE
265,000
0
0 0 0
RW
0
250,000
0 0 0
CN
0
0
2,065,000 0 0
Totals
265,000
250,000
2,065,000 0 0
Report Date: May 19, 2021 Page 2 22
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
S ALL 2022 0 285,000
285,000
Totals 0 285,000
'All A MUM[ 1111111111111
285,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
00
WA -05405
06/14/21
1/
06
No
Americans with Disabilities Act (ADA) Improvements
Qu
IIIIIIIIIIII�i�U^
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
IIIIII
with a City developed plan.
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
S ALL 2022 0 285,000
285,000
Totals 0 285,000
'All A MUM[ 1111111111111
285,000
Expenditure Schedule
Phase 1st 2nd 4th 5th & 6th
ALL 35,000 50,000 0,06511",50,000 100,000
Totals 35,000 50,000 ����Ul�o0,0001 50,000 100,000
Report Date: May 19, 2021 Page 3 23
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Phase
1st
2nd 3rd 4th 5th & 6th
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal Fun 011.11, and C e
State Funds
m
Total Funds
P
PE
2022
0
134,000
134,000
P
RW
2022
0
10,000
10,000
P
CN
2023
0
1,570,000
1,570,000
a
O
Totals 0
0
R'
0
1,714,000
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
16
WA -07746
06/14/21
1/
03
C G O P S
No
�
TW
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
IIIIIIIIIII
Construct left turn lanes on Andover Park East and reconstruct traffic signal
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Phase
1st
2nd 3rd 4th 5th & 6th
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal Fun 011.11, and C e
State Funds
Local Funds
Total Funds
P
PE
2022
0
134,000
134,000
P
RW
2022
0
10,000
10,000
P
CN
2023
0
1,570,000
1,570,000
Totals 0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd 3rd 4th 5th & 6th
PE
134,000
0 0 0 0
RW
10,000
0 0 0 0
CN
0
1,570,000 0 0 0
Totals
144,000
1,570,000 0 0 0
Report Date: May 19, 2021 Page 4 24
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
S ALL 2022 0 1,075,000
1,075,000
Totals 0 1,075,000
'di A MUM[ 1111111111111
1,075,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
14
WA -03731
06/14/21
1/
06
No
Annual Bridge Inspections and Repairs
Qu
Various City Street��
to
Perform load ratings and bi-annual inspections as well as construct necessary
IIIIII
repairs and maintenance
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
S ALL 2022 0 1,075,000
1,075,000
Totals 0 1,075,000
'di A MUM[ 1111111111111
1,075,000
Expenditure Schedule
Phase 1st 2nd 4th 5th & 6th
ALL 75,000 200,000 0,00 200,000 400,000
Totals 75,000 200,000 ����Ill�o0,0001 200,000 400,000
Report Date: May 19, 2021 Page 5 25
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
S ALL 2022 0 8,850,000
8,850,000
Totals 0 8,850,000
'di A MUM[ 1111111111111
8,850,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
16
WA -03733
06/14/21
1/
06
C G O P S
No
�
TW
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program Ad
111111
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
S ALL 2022 0 8,850,000
8,850,000
Totals 0 8,850,000
'di A MUM[ 1111111111111
8,850,000
Expenditure Schedule
Phase 1st 2nd 4th 5th & 6th
ALL 1,400, 000 1,400, 000 0, 00 1,500,000 3,150, 000
Totals 1,400,000 1,400,000 ����Ill�o1 0,0001 1,500,000 3,150,000
Report Date: May 19, 2021 Page 6 26
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
P PE 2027 0 100,000
100,000
Totals 0 100,000
'All A MUM[ 1111111111111
100,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
00
WA05409
06/14/21
1/
08
EIS
No
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
IIIIII
900+ daily truck trips from residential streets in Allentown.
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds
Total Funds
P PE 2027 0 100,000
100,000
Totals 0 100,000
'All A MUM[ 1111111111111
100,000
Report Date: May 19, 2021 Page 7 27
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
N w
Funding 11h,`
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal F Fund Code State Funds Local Funds Total Funds
P PE 2022 Pe ike Program 66,000 8,000 74,000
P CN 2023 212 ike Program 900,000 300,000 1,200,000
Totals 0 966,000 308,000 1,274,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 74,000 0 0 0 0
CN 0 1,200,000 0 0 0
Totals 74,000 1,200,000 0 0 0
Report Date: May 19, 2021 Page 8 28
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
00
WA -11115
06/14/21
1/
28
0.140
DCE
No
Green River Trail
Green River Trail
Christensen Road to Green River
VIII\\
Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved
IIIIII
trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and
AJJJ
I
I
pedestrian plaza.
N w
Funding 11h,`
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal F Fund Code State Funds Local Funds Total Funds
P PE 2022 Pe ike Program 66,000 8,000 74,000
P CN 2023 212 ike Program 900,000 300,000 1,200,000
Totals 0 966,000 308,000 1,274,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 74,000 0 0 0 0
CN 0 1,200,000 0 0 0
Totals 74,000 1,200,000 0 0 0
Report Date: May 19, 2021 Page 8 28
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
m
n
m 0
N m
Z
c
a
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
�.
o Q�
m
c
o
o
z
o
a
O
m
I
m
n
a.
N
0
m
m
m
R'
0
m
m
m0.
�
C.
00
Totals 0 840,000 0
TUK-63
06/14/21
1/
44
0.000
No
Keeping South King County Moving with TDM
South King County
Various to Various
VIII]\\
This project will help people access sustainable transportation options that reduce
IIIIII
drive -alone travel and traffic congestion in South King County. TDM programming
I
and services will be provided to residents, workers, visitors, employers, property
managers, and students in Tukwila and the partnering jurisdictions of Burien, Des
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea -Tac Airport. The TDM Program will work in
partnership with transit agencies, nonprofits, employers, and community
organizations to reach priority populations through trusted channels. The project
aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled. I
Funding
w
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal FJds State Fund Code State Funds Local Funds
Total Funds
P
ALL 2022 0 OTHER 672,000 0
672,000
S
ALL 2022 0 OTHER 168,000 0
168,000
Totals 0 840,000 0
840,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 210,000 210,000 210,000 210,000 0
Totals 210,000 210,000 210,000 210,000 0
Report Date: May 19, 2021 Page 9 29
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Im 1111"Wfliftmm,"..wIIP'r
Funding
11h,`
1st 2nd
3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal F
m
State Funds
Local Funds
Total Funds
P
P
P
PE
RW
CN
2022
2022
2023
Pe ike Program
222ike Program
0 Ped/Bike Program
360,000
90,000
2,800,000
40,000
10,000
300,000
400,000
100,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
17
WA -11110
06/14/21
1/
04
0.350
DC E
No
Macadam Rd S Complete Streets Project
Qu
IIIIIIIIIIII�i�U^
Macadam Road
S 150th Street to S 144th Street
VIII]\\
���\�n�
Design and construction of a complete street on Macadam Road. Road widening
IIIIII
and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of
I
I
the roadway. Includes illumination, curb, and storm drainage.
�ff�
Im 1111"Wfliftmm,"..wIIP'r
Funding
11h,`
1st 2nd
3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal F
th Fund Code
State Funds
Local Funds
Total Funds
P
P
P
PE
RW
CN
2022
2022
2023
Pe ike Program
222ike Program
0 Ped/Bike Program
360,000
90,000
2,800,000
40,000
10,000
300,000
400,000
100,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
A110" "miuUR wiui
Expenditure Schedule
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 400,000
0 0 0
RW
0 100,000
0 0 0
CN
0 0
3,100, 000 0 0
Totals
0 500,000
3,100,000 0 0
Report Date: May 19, 2021 Page 10 30
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase
P CN
vIW
Phase Start Year (YYYY) Federal Fund Code Federal F Fund Code State Funds Local Funds
2024 0 200,000
Totals IIIUUUUUU��JJNNa�������r 0 200,000
Expenditure Schedule�I�IIVIUIIIIIIUIUR
Phase 1st 2nd 3rd Vii 4th 5th & 6th
CN 0 0 0,000 0 0
Totals 0 0 0 0
Total Funds
200,000
200,000
Report Date: May 19, 2021 Page 11 31
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
00
WA -13494
06/14/21
1/
06
0.040
No
S 119th St Pedestrian Bridge Painting
S 119th Street
I�
West bank Duwamish River to East bank Duwamish River
VIII
01
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
IIIIII
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
I
I
needed.
llhhll
Funding
Status Phase
P CN
vIW
Phase Start Year (YYYY) Federal Fund Code Federal F Fund Code State Funds Local Funds
2024 0 200,000
Totals IIIUUUUUU��JJNNa�������r 0 200,000
Expenditure Schedule�I�IIVIUIIIIIIUIUR
Phase 1st 2nd 3rd Vii 4th 5th & 6th
CN 0 0 0,000 0 0
Totals 0 0 0 0
Total Funds
200,000
200,000
Report Date: May 19, 2021 Page 11 31
'or Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
000000 "'WW"IO)"11,1111.._ 1111EZ1111
Funding���
Phase
1st 2nd
3rd 4th 5th & 6th
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal F hi Fund Code
State Funds
m
Total Funds
P
P
PE
RW
2027
2027
0
0
150,000
50,000
150,000
50,000
P
CN
2027 0
0
1,200,000
1,200,000
Totals 0
0
1,400,000
1,400,000
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
14
WA -09873
06/14/21
1/
04
C G P S T
0.100
DCE
Yes
Qu
W
S 140th St Intersection Improvements
S 140th Street,.
Tukwila International Blvd to
IIIIIIIIIII
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
000000 "'WW"IO)"11,1111.._ 1111EZ1111
Funding���
Phase
1st 2nd
3rd 4th 5th & 6th
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal F hi Fund Code
State Funds
Local Funds
Total Funds
P
P
PE
RW
2027
2027
0
0
150,000
50,000
150,000
50,000
P
CN
2027 0
0
1,200,000
1,200,000
Totals 0
0
1,400,000
1,400,000
AMINO 11hnO, 111ZZRIPII
Expenditure Schedule
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 150,000
0 0 0
RW
0 50,000
0 0 0
CN
0 0
1,200,000 0 0
Totals
0 200,000
1,200,000 0 0
Report Date: May 19, 2021 Page 12 32
x
CD
O
O
v
m
v
N
0
N
CD
w
w
w
po40111,
-1 r M
o -
TA c
Cl) 1
sselo
4
leuog3unj
aagwnN /C;uoud
j
cn
cn
mmoo>
D
a'
a'
�. 10
m
<
CM
m g a m�
cn
z'
ET
m
W
OMB Vim'
W
(Q
ANY C. N N '-«
m
a
m
cn
' m" o
aMz
v<
0-
o B a
M
m
'• a
cn
m
o
N
a
Q
m
0
m
N
0-
(D
9
(D
(D
7
N_
fA
D
m
cn
v
C
CL
N
W
Q
D
m
cn
0
N
.f
= W
D
0 N
O
-4
c -I
m
00
N
E5V E5
O
N
IIIIIIIIIIIIIIIII
6uueaH
I��U��.
�iopb'
IIIIII��U°
;uawpuawv
'ON uognlosaN
N
O0
adAiJUaWanoadual
sapoo /C3min
436ua-i lelol
0
N
N
O
adAi le;uawuoalnu3
o
paambaN MU
po40111,
-1 r M
o -
TA c
Cl) 1
M
L
Q
m
►i
O
Q
(D
0
CDN
N
N
0
MI.
m
a
m
MI.
N
0 0
N�
IQ
O
"4
v
CD
ru
9
p o40111,
;o 0
O � �
TA c
Cl) 1
sselo
(D
leuog3unj
aagwnN /C;uoud
OD
cn
cn
-nrn p 5)
(D
n
n
m g' a. m -0
n
cn
cn
.t Q, m o
v �m
0
3 0
N
(^'
(^'
0
N m
0
cn
z
0 =
60
92
�
=
n
cr
m
o
(mn
o
a'
o
0 m
n
cn
0
c v
0�
D
s
0
CL
m
o
0 0
? Q
c
0 m
m ni
m
cn
77
� 0
v 0
� o
v 0
(D
_.
m m
� 0
o 0
Q(Q
m
0 0:
N m
m �.
m�
O
N
.f
C W
C
D
0 cn
j
c —I
m
N
v v
0
rn
6uueaH
IIIIIIIIIIIIIIIII���U"
Illl�i�)U°
j�
III
�iopb'
IIIIII��U°
;uawpuawv
'ON uognlosaN
0
O1
adAiJUaWanoadual
sapoo /C3min
436ua-i lelol
0
w
0
0
adAi le;uauauoalnu3
o
paambaN MU
p o40111,
;o 0
O � �
TA c
Cl) 1
5
Q
m
O
Q
m
0
CDN
N
N
0
MI.
m
a
m
MI.
N
0 0
N
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding 111"",,._
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal ds State Fund Code State Funds Local Funds Total Funds
S ALL 2023 CMAQ 450,000 OTHER 60,750 15,000 525,750
Totals 450,000 60,750 15,000 525,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 100,000 175,000 175,000 75,750 0
Totals 100,000 175,000 175,000 75,750 0
Report Date: May 19, 2021 Page 15 35
m
m
A. PIN/Project No. B. STIP ID
o
a
O
0
R'
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
00
TUK-64
06/14/21
1/
24
0.000
CE
No
South King County TDM
South King County
N/A to N/A
VIII]\\
This project will provide TDM programming and services at selected activity centers
IIIIII
in Tukwila and partnering South King County jurisdictions. Activity centers include
I
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea -Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, and o
community organizations.
Funding 111"",,._
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal ds State Fund Code State Funds Local Funds Total Funds
S ALL 2023 CMAQ 450,000 OTHER 60,750 15,000 525,750
Totals 450,000 60,750 15,000 525,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 100,000 175,000 175,000 75,750 0
Totals 100,000 175,000 175,000 75,750 0
Report Date: May 19, 2021 Page 15 35
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun
and C e State Funds Local Funds Total Funds
P PE 2022
TIB 50,000 50,000 100,000
P CN 2023t
TIB 500,000 400,000 900,000
JL
Totals
550,000 450,000 1,000,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
04
WA -13495
06/14/21
1/
21
No
Southcenter Blvd/65th Avenue S Signal
Qu
IIIIIIIIIIII�i�U^
Southcenter Boulevard
65th Avenue S to
VIII\\
���\�n�
Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue
IIIIII
S intersection to improve level of service and safety.
+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun
and C e State Funds Local Funds Total Funds
P PE 2022
TIB 50,000 50,000 100,000
P CN 2023t
TIB 500,000 400,000 900,000
JL
Totals
550,000 450,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 0 900,000 0 0 0
Totals 100,000 900,000 0 0 0
Report Date: May 19, 2021 Page 16 36
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
INNAA\2101"' . 'WNCdNNpCCdNUB"
Funding
'16111
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal ds S Fund Code State Funds Local Funds
Total Funds
S
ALL 2022 VVSDOT 74,204 0
74,204
m
ALL 2022 0 WSDOT 148,408 0
148,408
Totals 0 222,612 0
222,612
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o
0
m
�
z
C. Project Title
m
m
m
c
D. Road Name or Number
m
o Q�
c
o
n
m
m
n
m 0
a
E. Begin & End Termini
�.
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m0.
00
WA -13491
06/14/21
1/
44
0.000
No
Transportation Demand Management Implementation
Qu
llllllllllll����j��,.
to
VIII
����
��,\\��
Provision of TDM services to Commute Trip Reduction -affected employment sites.
IIIIII
Facilitate employer reporting and records associated with biennial CTR survey.
I
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
INNAA\2101"' . 'WNCdNNpCCdNUB"
Funding
'16111
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal ds S Fund Code State Funds Local Funds
Total Funds
S
ALL 2022 VVSDOT 74,204 0
74,204
P
ALL 2022 0 WSDOT 148,408 0
148,408
Totals 0 222,612 0
222,612
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 37,102 37,102 37,102 37,102 74,204
Totals 37,102 37,102 37,102 37,102 74,204
Report Date: May 19, 2021 Page 17 37
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
m
n
m 0
N m
z
c
a
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
�.
o Q�
m
c
o
o
z
o
a
O
m
I
m
n
a.
N
0
m
m
m
R'
0
m
m
m0.
�
C.
03
/0181(019) TUK-60
06/14/21
1/
28
0.170
DCE
No
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
West end of planned Green River Bridge to Longacres Way
VIII
01
I�
The West Valley Highway/Longacres Way project modifies northbound
IIIIII
channelization between Strander Boulevard and S 156th Street. A 600ft section of
I
general-purpose lane will be added, north of Strander. The existing dedicated NB
turn lane at Longacres will change to a thru-right lane, transitioning into 2 NB thru
lanes on the north leg as the existing inside lane will be changed to a dedicated NB
left turn lane. Sidewalks will be added to the east side of the roadway where there
are currently none. A wider, shared -use path will replace the existing sidewalk on the
west side of the road between Longacres Way and the new sidewalks installed for
the Pedestrian -Bicycle bridge. A new two-way cycle track will be added to Longacres
Way from WVH to the Tukwila Station, including new street and pedestrian
illumination. A pedestrian signal crossing of WVH near the landing of the Ped -Bike
a rapid flashing beacon on Longacres at the Interurban Trail crossin ' I
bbridge
e addend ��
ANIFF ��Iplllllllllll��,. vllllllllllllllllii��
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal F ds State Fund Code State Funds Local Funds Total Funds
S CN 2022 0 TIB 100,000 40,000 140,000
Totals 0 100,000 40,000 140,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 140,000 0 0 0 0
Totals 140,000 0 0 0 0
Report Date: May 19, 2021 Page 18 38
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
16,350,000
14,104,362
18,424,000
48,878,362
Report Date: May 19, 2021 Page 18 38
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2021 STP(UL) 1,500,000 0 1,078,000 2,578,000
Totals 1,500,000 0 1,078,000 2,578,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 2,578,000 0 0 0 0
Totals 2,578,000 0 0 0 0
Report Date: May 12, 2021 Page 1 39
m
a
0
q
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
0
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
B
z
I
0.
C.
N m
F. Project Description G. Structure ID
o
m
0
m
05
TUK-62
11
0.100
DCE
Yes
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, right-of-way, and construction phases. The new
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through -lanes, possibly a turn pocket, and include
sidewalks.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2021 STP(UL) 1,500,000 0 1,078,000 2,578,000
Totals 1,500,000 0 1,078,000 2,578,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 2,578,000 0 0 0 0
Totals 2,578,000 0 0 0 0
Report Date: May 12, 2021 Page 1 39
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 270,000
Status
Phase
m
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
90,000
270,000
P
RW
2022
0
SRTS
232,000
24,000
a
O
P
CN
R'
0
0
m
1,865,000
A. PIN/Project No. B. STIP ID
2,070,000
o B
0
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
19
WA -11113
06/22/20
07/06/20
1993
05
0.370
Yes
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 270,000
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
90,000
270,000
P
RW
2022
0
SRTS
232,000
24,000
256,000
P
CN
2023
0
SRTS
1,865,000
205,000
2,070,000
Totals
0
2,277,000
319,000
2,596,000
Expenditure Schedule
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 270,000
0 0 0
RW
0 256,000
0 0 0
CN
0 0
2,070,000 0 0
Totals
0 526,000
2,070,000 0 0
Report Date: May 12, 2021 Page 2 40
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2021 0 0 1,200,000
1,200,000
Totals 0 0 1,200,000
1,200,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA -05405
06/22/20
07/06/20
1993
06
No
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2021 0 0 1,200,000
1,200,000
Totals 0 0 1,200,000
1,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 200,000 200,000 200,000 200,000 400,000
Totals 200,000 200,000 200,000 200,000 400,000
Report Date: May 12, 2021 Page 3 41
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
m
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
a
O
0
1,570,000
R'
0
m
Totals
A. PIN/Project No. B. STIP ID
0
1,714,000
1,714,000
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
16
WA -07746
06/22/20
07/06/20
1993
03
C G O P S
No
TW
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 134,000
0 0 0
RW
0 10,000
0 0 0
CN
0 0
1,570,000 0 0
Totals
0 144,000
1,570,000 0 0
Report Date: May 12, 2021 Page 4 42
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2021 0 0 2,380,000
2,380,000
Totals 0 0 2,380,000
2,380,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
14
WA -03731
06/22/20
07/06/20
1993
06
No
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2021 0 0 2,380,000
2,380,000
Totals 0 0 2,380,000
2,380,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 335,000 335,000 405,000 405,000 900,000
Totals 335,000 335,000 405,000 405,000 900,000
Report Date: May 12, 2021 Page 5 43
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2021 0 0 11,800,000
11,800,000
Totals 0 0 11,800,000
11,800,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
16
WA -03733
06/22/20
07/06/20
1993
06
C G O P S
No
TW
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2021 0 0 11,800,000
11,800,000
Totals 0 0 11,800,000
11,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 1,850,000 1,850,000 1,950,000 2,050,000 4,100,000
Totals 1,850,000 1,850,000 1,950,000 2,050,000 4,100,000
Report Date: May 12, 2021 Page 6 44
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P PE 2026 0 0 100,000
100,000
Totals 0 0 100,000
100,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA05409
06/22/20
07/06/20
1993
08
EIS
No
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P PE 2026 0 0 100,000
100,000
Totals 0 0 100,000
100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 100,000
Totals 0 0 0 0 100,000
Report Date: May 12, 2021 Page 7 45
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 Ped/Bike Program 1,146,000 128,000 1,274,000
Totals 0 1,146,000 128,000 1,274,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 74,000 1,200,000 0 0 0
Totals 74,000 1,200,000 0 0 0
Report Date: May 12, 2021 Page 8 46
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA -11115
06/22/20
07/06/20
1993
28
0.140
DCE
No
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved
trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 Ped/Bike Program 1,146,000 128,000 1,274,000
Totals 0 1,146,000 128,000 1,274,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 74,000 1,200,000 0 0 0
Totals 74,000 1,200,000 0 0 0
Report Date: May 12, 2021 Page 8 46
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Phase
1st 2nd 3rd
4th 5th & 6th
PE
0 0 400,000
Status
Phase
m
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40,000
400,000
P
RW
2022
0
Ped/Bike Program
90,000
10,000
a
O
P
CN
R'
0
0
m
2,800,000
A. PIN/Project No. B. STIP ID
3,100,000
o B
0
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
17
WA -11110
06/22/20
07/06/20
1993
04
0.350
DCE
No
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
Funding
Phase
1st 2nd 3rd
4th 5th & 6th
PE
0 0 400,000
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40,000
400,000
P
RW
2022
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2023
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
Expenditure Schedule
Phase
1st 2nd 3rd
4th 5th & 6th
PE
0 0 400,000
0 0
RW
0 0 100,000
0 0
CN
0 0 0
3,100, 000 0
Totals
0 0 500,000
3,100,000 0
Report Date: May 12, 2021 Page 9 47
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Phase
1st 2nd 3rd
4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
m
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
150,000
150,000
P
RW
2023
0
0
50,000
50,000
P
CN
2024
a
O
0
1,200,000
R'
0
m
Totals
A. PIN/Project No. B. STIP ID
0
1,400,000
1,400,000
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
14
WA -09873
06/22/20
07/06/20
1993
04
C G P S T
0.100
DCE
Yes
W
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
Funding
Phase
1st 2nd 3rd
4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
150,000
150,000
P
RW
2023
0
0
50,000
50,000
P
CN
2024
0
0
1,200,000
1,200,000
Totals
0
0
1,400,000
1,400,000
Expenditure Schedule
Phase
1st 2nd 3rd
4th 5th & 6th
PE
0 0 150,000
0 0
RW
0 0 50,000
0 0
CN
0 0 0
1,200,000 0
Totals
0 0 200,000
1,200,000 0
Report Date: May 12, 2021 Page 10 48
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 SRTS 400,000 0 43,000 443,000
Totals 400,000 0 43,000 443,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 443,000 0 0
Totals 0 0 443,000 0 0
Report Date: May 12, 2021 Page 11 49
m
a
0
q
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
0
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
0.
C.
N m
F. Project Description G. Structure ID
o
m
0
m
17
WA03782
06/22/20
07/06/20
1993
28
0.250
No
S 144th St Bridge Sidewalks
S 144th Street
51 st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 SRTS 400,000 0 43,000 443,000
Totals 400,000 0 43,000 443,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 443,000 0 0
Totals 0 0 443,000 0 0
Report Date: May 12, 2021 Page 11 49
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2021 0 0 369,000
369,000
P
m
2,600,000
Totals 0 2,340,000 629,000
2,969,000
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
19
WA -11112
06/22/20
07/06/20
1993
05
0.300
No
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2021 0 0 369,000
369,000
P
CN 2022 0 SRTS 2,340,000 260,000
2,600,000
Totals 0 2,340,000 629,000
2,969,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 369,000 0 0 0 0
CN 0 2,600,000 0 0 0
Totals 369,000 2,600,000 0 0 0
Report Date: May 12, 2021 Page 12 50
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S CN 2021 0 OTHER 200,000 0
200,000
Totals 0 200,000 0
200,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
Z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
m
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
TUK-63
24
0.000
CE
No
South King County Regional TDM for Centers and Corridors
South King County
Various to Various
The project will focus on providing TDM services at selected activity centers (e.g.
business parks, commercial and residential multi -tenant buildings, educational
institutions) and/or congested corridors in Tukwila, Renton, SeaTac, and Kent to
reduce drive alone travel and traffic congestion in south King County. A key strategy
will include the development of partnerships with embedded organizations in the
communities we are serving to facilitate more effective outreach and improve long-
term program outcomes.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S CN 2021 0 OTHER 200,000 0
200,000
Totals 0 200,000 0
200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 200,000 0 0 0 0
Totals 200,000 0 0 0 0
Report Date: May 12, 2021 Page 13 51
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
N m
z
c
a
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
�,
o
a
m
a
B
o B
o
z
o
a
O
m
I
m
-
,i
n
a.
N
0
m
m
m
R'
0
m
m
m
�
;0
.0
C.
03
/0181(019) TUK-60
28
0.170
DCE
No
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
West end of planned Green River Bridge to Longacres Way
The West Valley Highway/Longacres Way project modifies northbound
channelization between Strander Boulevard and S 156th Street. A 600ft section of
general-purpose lane will be added, north of Strander. The existing dedicated NB
turn lane at Longacres will change to a thru-right lane, transitioning into 2 NB thru
lanes on the north leg as the existing inside lane will be changed to a dedicated NB
left turn lane. Sidewalks will be added to the east side of the roadway where there
are currently none. A wider, shared -use path will replace the existing sidewalk on the
west side of the road between Longacres Way and the new sidewalks installed for
the Pedestrian -Bicycle bridge. A new two-way cycle track will be added to Longacres
Way from WVH to the Tukwila Station, including new street and pedestrian
illumination. A pedestrian signal crossing of WVH near the landing of the Ped -Bike
bridge and a rapid flashing beacon on Longacres at the Interurban Trail crossing will
be added.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2021 0 TIB 2,260,000 2,995,000 5,255,000
Totals 0 2,260,000 2,995,000 5,255,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 5,255,000 0 0 0 0
Totals 5,255,000 0 0 0 0
Report Date: May 12, 2021 Page 14 52
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
1,900,000
11,473,000
24,136,000
37,509,000
Report Date: May 12, 2021 Page 14 52