Loading...
HomeMy WebLinkAboutTIS 2021-06-14 Item 2D - Update - Public Works Fleet and Facilities Tenant Improvement INFORMATIONAL MEMORANDUM TO:Transportation and Infrastructure Services Committee FROM:Hari Ponnekanti, Public Works Director/ City Engineer CC:Mayor Allan Ekberg DATE:June 11, 2021 SUBJECT:Public Works Fleet and Facilities Tenant Improvement Project Project No. 91630601 ProjectUpdate Issue Project update on the construction progress for the tenant improvements at the Public Works Fleet & Facilities Shop. Background At the March 15, 2021 Regular Meeting, Council approved the contract with Lincoln Construction for the Public Works Fleet and Facilities Tenant Improvement Project including contingency totaling $5,849,244.39. The contract scope includes seismic upgrades, plumbing and electrical, fire protection, HVAC upgrades, and interior offices, locker rooms, and showers. The anticipated project completion date is December 2021. Analysis: The Tenant Improvements Project is on schedule and is approximately 25% complete. 9.5% of the project budget being expended to date. No delays are expected. progress. To date, construction has included continued demolition work, cutting and capping sprinkler lines, forming column footings and outdoor compressors, developing roofing solution options, testing contaminated soils, analyzing underground structure, and removal of non-structural steel elements in pile zones. Financial Impact and Bid Summary Contract Amount Project Budget Lincoln Construction Inc. $5,849,244.39$6,082,547.92 Expended to Date 554,301.75 554,301.75 Remaining Budget $5,294,942.64 $5,528,246.17 Recommendation Information only. Attachments: 2021 CIP Page 56 Construction Schedule 39 INFORMATIONAL MEMO Page 2 Project Photos SLAB TRANSITION STRIP SECTION OF NON-STRUCTURAL BEAM TO BE REMOVED 40 INFORMATIONAL MEMO Page 3 REINFORCING DISCOVERY IN EASTERN BUILDING FOOTINGS OFFICE FRAMING UNDERWAY 41 INFORMATIONAL MEMO Page 4 OFFICE AREA FOOTING FORMS IN PLACE EXISTING WATER LINE DISCOVERY IN COMPRESSOR BUILDING FOOTING ZONE 42 INFORMATIONAL MEMO Page 5 FOOTING EXCAVATION AT COMPRESSOR BUILDING EXTERIOR FOOTING FORMS 43 INFORMATIONAL MEMO Page 6 EXCAVATED CONTAMINATED SOILS AWAITING TESTING RESULTS HELICAL PILES ON SIT 44 45 46