HomeMy WebLinkAboutReg 2021-06-21 Item 7B - Resolution - 2022-2027 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS
---------------------------------- Initials
Meefinga Date
Prepared by Mayor's review Council review
06/14/21
JR
06/21/21
JR
® Resolution
Utg Date 06/21/21
❑ Ordinance
Utg Date
❑ Bid Award
Utg Date
❑ Public Hearing
Utg Date
ITEM INFORMATION
ITEM NO.
67
STAFF SPONSOR: CYNDY KNIGHTON
ORIGINAL AGENDA DATE: 06/14/21_
AGENDA ITEM TITLE Resolution for Six -Year Transportation Improvement Program (2022 - 2027)
CATEGORY ® Discussion
,Utg Date 06/14/21
❑ Motion
Utg Date
® Resolution
Utg Date 06/21/21
❑ Ordinance
Utg Date
❑ Bid Award
Utg Date
❑ Public Hearing
Utg Date
❑ Otber
Utg Date
SPONSOR ❑Council ❑Mayor [:]HR ❑DCD ❑Finance ❑Fire ❑TS ❑P&R ❑Police ®Pim ❑Court
SPONSOR'S This Resolution is to update the Transportation Improvement Program (TIP) required by
SLTMNLARY the RCW. The TIP generally lists only those transportation -related projects planned within
the next six years that are deemed regionally significant or that have grant funding
awarded or expected. Five new projects were added, and one project was removed because
it is expected to be completed before July 1, 2021. Council is being asked to approve the
Resolution for the 2022 - 2027 Six -Year Transportation Improvement Program.
REVIE','ED BY ® Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 05/24/21 COMMITTEE CHAIR: VERNA SEAL
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMITTEE Forward to Committee of the Whole and Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: No FISCAL IMPACT
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
06/14/21
06/21/21
MTG. DATE
ATTACHMENTS
06/14/21
Informational Memorandum dated 05/21/2021
Draft Resolution
Draft 2022-2027 TIP Summary
2022 — 2027 "Draft" Transportation Improvement Program
Current Adopted 2021— 2026 TIP
Minutes from Transportation and Infrastructure Committee meeting of 05/24/2021
06/21/21
Final Resolution
67
Cl*ty of Tukwi*la
•
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2022-
2027), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
en su i ng six calen dar years (2022-2027); and
WHEREAS, on June 14, 2021, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendaryears 2022 to 2027, attached hereto as ExhibitA, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, togetherwith the exhibitattached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
CCALeg islafive Development\"W 2022-2027 5-10-21
CK:bjs Review and analysis by Barbara Saxton Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regu lar Meetin g thereof this day of 2021.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
Office of the City Attorney
Kate Kruller, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2022 to 2027
CCALegislative Development\11P2022-2027 5-10-21
CK:bjs Review and analysis by Barbara Saxton
70
Page 2 of 2
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status
Phase
m
Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2022
STP
1,500,000
0
0
1,500,000
P
CN
2024
STP(BR)
12,000,000 TIB
3,000,000
0
a
O
P
CN
R'
0
STP
m
500,000
A. PIN/Project No. B. STIP ID
5,529,000
o B
Totals
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
05
TUK-62
06/14/21
06/21/21
2024
11
0.100
DCE
Yes
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, right-of-way, and construction phases. The new
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through -lanes, possibly a turn pocket, and include
sidewalks.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2022
STP
1,500,000
0
0
1,500,000
P
CN
2024
STP(BR)
12,000,000 TIB
3,000,000
0
15,000,000
P
CN
2024
STP
2,000,000 FMSIB
500,000
3,029,000
5,529,000
Totals
15,500,000
3,500,000
3,029,000
22,029,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 750,000 1,250,000 0 0 0
CN 0 0 9,450, 000 9,450, 000 0
Totals 750,000 1,250,000 9,450,000 9,450,000 0
_11 Report Date: June 15, 2021 Page 1
Washington state
N0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Phase
1st
2nd
3rd 4th 5th & 6th
Status
Phase
m
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
85,000
265,000
P
RW
2023
0
SRTS
230,000
20,000
a
O
P
CN
R'
0
0
m
1,865,000
A. PIN/Project No. B. STIP ID
2,065,000
o B
0
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
19
WA -11113
06/14/21
06/21/21
2024
05
0.370
Yes
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
Funding
Phase
1st
2nd
3rd 4th 5th & 6th
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
85,000
265,000
P
RW
2023
0
SRTS
230,000
20,000
250,000
P
CN
2024
0
SRTS
1,865,000
200,000
2,065,000
Totals
0
2,275,000
305,000
2,580,000
Expenditure Schedule
Phase
1st
2nd
3rd 4th 5th & 6th
PE
265,000
0
0 0 0
RW
0
250,000
0 0 0
CN
0
0
2,065,000 0 0
Totals
265,000
250,000
2,065,000 0 0
Report Date: June 15, 2021 Page 2
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2022 0 0 285,000
285,000
Totals 0 0 285,000
285,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA -05405
06/14/21
06/21/21
2024
06
No
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2022 0 0 285,000
285,000
Totals 0 0 285,000
285,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 35,000 50,000 50,000 50,000 100,000
Totals 35,000 50,000 50,000 50,000 100,000
W Report Date: June 15, 2021 Page 3
Washington State
A t of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Phase
1st
2nd 3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
m
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
a
O
0
1,570,000
R'
0
m
Totals
A. PIN/Project No. B. STIP ID
0
1,714,000
1,714,000
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
16
WA -07746
06/14/21
06/21/21
2024
03
C G O P S
No
TW
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
Funding
Phase
1st
2nd 3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd 3rd 4th 5th & 6th
PE
134,000
0 0 0 0
RW
10,000
0 0 0 0
CN
0
1,570,000 0 0 0
Totals
144,000
1,570,000 0 0 0
Report Date: June 15, 2021 Page 4
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2022 0 0 1,075,000
1,075,000
Totals 0 0 1,075,000
1,075,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
14
WA -03731
06/14/21
06/21/21
2024
06
No
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2022 0 0 1,075,000
1,075,000
Totals 0 0 1,075,000
1,075,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 75,000 200,000 200,000 200,000 400,000
Totals 75,000 200,000 200,000 200,000 400,000
CT! Report Date: June 15, 2021 Page 5
Washington state
Cr) A t of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2022 0 0 8,850,000
8,850,000
Totals 0 0 8,850,000
8,850,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
16
WA -03733
06/14/21
06/21/21
2024
06
C G O P S
No
TW
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S ALL 2022 0 0 8,850,000
8,850,000
Totals 0 0 8,850,000
8,850,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000
Totals 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000
Report Date: June 15, 2021 Page 6
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P PE 2027 0 0 100,000
100,000
Totals 0 0 100,000
100,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA05409
06/14/21
06/21/21
2024
18
EIS
No
BNSF Regional Center Access Study
to
Study access to the BNSF Regional Distribution Center.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P PE 2027 0 0 100,000
100,000
Totals 0 0 100,000
100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 100,000
Totals 0 0 0 0 100,000
4 Report Date: June 15, 2021 Page 7
Washington state
00 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 Ped/Bike Program 66,000 8,000 74,000
P CN 2023 0 Ped/Bike Program 900,000 300,000 1,200,000
Totals 0 966,000 308,000 1,274,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 74,000 0 0 0 0
CN 0 1,200,000 0 0 0
Totals 74,000 1,200,000 0 0 0
Report Date: June 15, 2021 Page 8
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA -11115
06/14/21
06/21/21
2024
28
0.140
DCE
No
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved
trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 Ped/Bike Program 66,000 8,000 74,000
P CN 2023 0 Ped/Bike Program 900,000 300,000 1,200,000
Totals 0 966,000 308,000 1,274,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 74,000 0 0 0 0
CN 0 1,200,000 0 0 0
Totals 74,000 1,200,000 0 0 0
Report Date: June 15, 2021 Page 8
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
m
N m
Z
c
a
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
�,
o
a
m
a
o B
o
z
o
a
O
m
I
m
-
,i
n
a.
N
0
m
m
m
R'
0
m
m
m
�
;0
.0
C.
00
Totals 0 840,000 0
TUK-63
06/14/21
06/21/21
2024
44
0.000
No
Keeping South King County Moving with TDM
South King County
Various to Various
This project will help people access sustainable transportation options that reduce
drive -alone travel and traffic congestion in South King County. TDM programming
and services will be provided to residents, workers, visitors, employers, property
managers, and students in Tukwila and the partnering jurisdictions of Burien, Des
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea -Tac Airport. The TDM Program will work in
partnership with transit agencies, nonprofits, employers, and community
organizations to reach priority populations through trusted channels. The project
aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P
ALL 2022 0 OTHER 672,000 0
672,000
S
ALL 2022 0 OTHER 168,000 0
168,000
Totals 0 840,000 0
840,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 210,000 210,000 210,000 210,000 0
Totals 210,000 210,000 210,000 210,000 0
(0 Report Date: June 15, 2021 Page 9
v4shingto" stato
• e ,
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 400,000
Status
Phase
m
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40,000
400,000
P
RW
2022
0
Ped/Bike Program
90,000
10,000
a
O
P
CN
R'
0
0
m
2,800,000
A. PIN/Project No. B. STIP ID
3,100,000
o B
0
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
17
WA -11110
06/14/21
06/21/21
2024
04
0.350
DCE
No
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 400,000
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40,000
400,000
P
RW
2022
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2023
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
Expenditure Schedule
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 400,000
0 0 0
RW
0 100,000
0 0 0
CN
0 0
3,100, 000 0 0
Totals
0 500,000
3,100,000 0 0
Report Date: June 15, 2021 Page 10
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P CN 2024 0 0 200,000
200,000
Totals 0 0 200,000
200,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA -13494
06/14/21
06/21/21
2024
06
0.040
No
S 119th St Pedestrian Bridge Painting
S 119th Street
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P CN 2024 0 0 200,000
200,000
Totals 0 0 200,000
200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 200,000 0 0
Totals 0 0 200,000 0 0
00
—11 Report Date: June 15, 2021 Page 11
Washingtono state
N A t of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
m
State Funds
Local Funds
Total Funds
P
PE
2027
0
0
150,000
150,000
P
RW
2027
0
0
50,000
50,000
P
CN
2027
a
O
0
1,200,000
R'
0
m
Totals
A. PIN/Project No. B. STIP ID
0
1,400,000
1,400,000
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
14
WA -09873
06/14/21
06/21/21
2024
04
C G P S T
0.100
DCE
Yes
W
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
Funding
Phase
1st 2nd
3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
0
150,000
150,000
P
RW
2027
0
0
50,000
50,000
P
CN
2027
0
0
1,200,000
1,200,000
Totals
0
0
1,400,000
1,400,000
Expenditure Schedule
Phase
1st 2nd
3rd 4th 5th & 6th
PE
0 150,000
0 0 0
RW
0 50,000
0 0 0
CN
0 0
1,200,000 0 0
Totals
0 200,000
1,200,000 0 0
Report Date: June 15, 2021 Page 12
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 SRTS 400,000 0 43,000 443,000
Totals 400,000 0 43,000 443,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 443,000 0 0 0
Totals 0 443,000 0 0 0
00
W Report Date: June 15, 2021 Page 13
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
17
WA03782
06/14/21
06/21/21
2024
28
0.250
No
S 144th St Bridge Sidewalks
S 144th Street
51 st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 SRTS 400,000 0 43,000 443,000
Totals 400,000 0 43,000 443,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 443,000 0 0 0
Totals 0 443,000 0 0 0
00
W Report Date: June 15, 2021 Page 13
stato
'o"
Dep ,,
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 SRTS 2,340,000 260,000 2,600,000
Totals 0 2,340,000 260,000 2,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 2,600,000 0 0 0
Totals 0 2,600,000 0 0 0
Report Date: June 15, 2021 Page 14
m
a
O
R'
O
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
19
WA -11112
06/14/21
06/21/21
2024
05
0.300
No
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 SRTS 2,340,000 260,000 2,600,000
Totals 0 2,340,000 260,000 2,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 2,600,000 0 0 0
Totals 0 2,600,000 0 0 0
Report Date: June 15, 2021 Page 14
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2023 CMAQ 450,000 OTHER 60,750 15,000 525,750
Totals 450,000 60,750 15,000 525,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 100,000 175,000 175,000 75,750 0
Totals 100,000 175,000 175,000 75,750 0
Cb
CT! Report Date: June 15, 2021 Page 15
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
TUK-64
06/14/21
06/21/21
2024
24
0.000
CE
No
South King County TDM
South King County
N/A to N/A
This project will provide TDM programming and services at selected activity centers
in Tukwila and partnering South King County jurisdictions. Activity centers include
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea -Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, and
community organizations.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2023 CMAQ 450,000 OTHER 60,750 15,000 525,750
Totals 450,000 60,750 15,000 525,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 100,000 175,000 175,000 75,750 0
Totals 100,000 175,000 175,000 75,750 0
Cb
CT! Report Date: June 15, 2021 Page 15
v4shingto" stato
• e ,
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P
PE 2022 0 TIB 50,000 50,000 100,000
P
CN 2023 0 TIB 500,000 400,000 900,000
Totals 0 550,000 450,000 1,000,000
m
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
04
WA -13495
06/14/21
06/21/21
2024
21
No
Southcenter Blvd/65th Avenue S Signal
Southcenter Boulevard
65th Avenue S to
Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue
S intersection to improve level of service and safety.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P
PE 2022 0 TIB 50,000 50,000 100,000
P
CN 2023 0 TIB 500,000 400,000 900,000
Totals 0 550,000 450,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 0 900,000 0 0 0
Totals 100,000 900,000 0 0 0
Report Date: June 15, 2021 Page 16
Washington stato
Vo 0epaAment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
ALL 2022 0 WSDOT 74,204 0
74,204
P
m
148,408
Totals 0 222,612 0
222,612
a
O
R'
0
m
A. PIN/Project No. B. STIP ID
o B
-
0
m
�
z
C. Project Title
m
m
,i
m
;0
c
D. Road Name or Number
m
o
a
o
n
m
m
.0
a
E. Begin & End Termini
�,
a
z
I
a.
C.
N m
F. Project Description G. Structure ID
o
m
N
m
00
WA -13491
06/14/21
06/21/21
2024
44
0.000
No
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reduction -affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
ALL 2022 0 WSDOT 74,204 0
74,204
P
ALL 2022 0 WSDOT 148,408 0
148,408
Totals 0 222,612 0
222,612
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 37,102 37,102 37,102 37,102 74,204
Totals 37,102 37,102 37,102 37,102 74,204
00
4 Report Date: June 15, 2021 Page 17
v4shingto" stato
•. e ,
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2022 to 2027
Y Inside N Outside
m
N m
z
c
a
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
�,
o
a
m
a
o B
o
z
o
a
O
m
I
m
-
,i
n
a.
N
0
m
m
m
R'
0
m
m
m
�
;0
.0
C.
03
/0181(019) TUK-60
06/14/21
06/21/21
2024
28
0.170
DCE
No
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
West end of planned Green River Bridge to Longacres Way
The West Valley Highway/Longacres Way project modifies northbound
channelization between Strander Boulevard and S 156th Street. A 600ft section of
general-purpose lane will be added, north of Strander. The existing dedicated NB
turn lane at Longacres will change to a thru-right lane, transitioning into 2 NB thru
lanes on the north leg as the existing inside lane will be changed to a dedicated NB
left turn lane. Sidewalks will be added to the east side of the roadway where there
are currently none. A wider, shared -use path will replace the existing sidewalk on the
west side of the road between Longacres Way and the new sidewalks installed for
the Pedestrian -Bicycle bridge. A new two-way cycle track will be added to Longacres
Way from WVH to the Tukwila Station, including new street and pedestrian
illumination. A pedestrian signal crossing of WVH near the landing of the Ped -Bike
bridge and a rapid flashing beacon on Longacres at the Interurban Trail crossing will
be added.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2022 0 TIB 100,000 40,000 140,000
Totals 0 100,000 40,000 140,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 140,000 0 0 0 0
Totals 140,000 0 0 0 0
Report Date: June 15, 2021 Page 18
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
16,350,000
14,104,362
18,424,000
48,878,362
Report Date: June 15, 2021 Page 18