Resolution No. ZCD 2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2022-
2027), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2022-2027); and
WHEREAS, on June 14, 2021, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2022 to 2027, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
CC:\Leg islative Development \T1P 2022-2027 5-10-21
CK:bjs Review and analysis by Barbara Saxton Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this Z 51" day of 7fuce. , 2021.
ATI-EST/AUTHENTICATED:
ekAzde, 4?tahe/te9
"""" ,VecOacl 5003£06,761,..24,44,96.15r
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
eStr,rnect via ,aemIrraeDoc,con,
„e.
Office of the City Attorney
Filed with the City Clerk: 6 - I 5 Z.I
Passed by the City Council: 6- 2i —
Resolution Number: 2.0211
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2022 to 2027
CC:legislative Dev elopment VflP 2022-2027 5-10-21
CK:bjs Review and analysis by Barbara Saxton Page 2 of 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
STP
TUK-62
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, right-of-way, and construction phases. The new
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through -lanes, possibly a turn pocket, and include
sidewalks.
06/14/21
06/21/21
0
2024
11
CN
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2022
STP
1,500,000
0
0
1,500,000
P
CN
2024
STP(BR)
12,000,000
TIB
3,000,000
0
15,000,000
P
CN
2024
STP
2,000,000
FMSIB
500,000
3,029,000
5,529,000
Totals
15,500,000
9,450,000
3,500,000
3,029,000
22,029,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
750,000
1,250,000
0
0
0
CN
0
0
9,450,000
9,450,000
0
Totals
750,000
1,250,000
9,450,000
9,450,000
0
Report Date: June 15, 2021
Page 1
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/14/21
06/21/21
85,000
2024
05
RW
0.370
0
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
85,000
265,000
P
RW
2023
0
0
SRTS
230,000
20,000
250,000
P
CN
2024
0
SRTS
1,865,000
200,000
2,065,000
Totals
0
2,275,000
305,000
2,580,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
265,000
0
0
0
0
RW
0
250,000
0
0
0
CN
0
0
2,065,000
0
0
Totals
265,000
250,000
2,065,000
0
0
Report Date: June 15, 2021
Page 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/14/21
06/21/21
285,000
2024
06
0
50,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2022
4th
0
5th & 6th
0
285,000
285,000
Totals
0
50,000
0
285,000
285,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
35,000
50,000
50,000
50,000
100,000
Totals
35,000
50,000
50,000
50,000
100,000
Report Date: June 15, 2021
Page 3
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/14/21
06/21/21
134,000
2024
03
C G O P S
TW
2022
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
0
0
10,000
10,000
P
CN
2023
0
0
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
134,000
0
0
0
0
RW
10,000
0
0
0
0
CN
0
1,570,000
0
0
0
Totals
144,000
1,570,000
0
0
0
Report Date: June 15, 2021
Page 4
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
4th
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/14/21
06/21/21
1,075,000
2024
06
0
200,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2022
4th
0
5th & 6th
0
1,075,000
1,075,000
Totals
0
200,000
0
1,075,000
1,075,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
75,000
200,000
200,000
200,000
400,000
Totals
75,000
200,000
200,000
200,000
400,000
Report Date: June 15, 2021
Page 5
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
4th
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/14/21
06/21/21
8,850,000
2024
06
C G O P S
TW
1,400,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2022
4th
0
5th & 6th
0
8,850,000
8,850,000
Totals
0
1,400,000
0
8,850,000
8,850,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,400,000
1,400,000
1,400,000
1,500,000
3,150,000
Totals
1,400,000
1,400,000
1,400,000
1,500,000
3,150,000
Report Date: June 15, 2021
Page 6
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA05409
BNSF Regional Center Access Study
to
Study access to the BNSF Regional Distribution Center.
06/14/21
06/21/21
100,000
2024
18
0
0
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
4th
0
5th & 6th
0
100,000
100,000
Totals
0
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
100,000
Totals
0
0
0
0
100,000
Report Date: June 15, 2021
Page 7
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -11115
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved
trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
06/14/21
06/21/21
8,000
2024
28
CN
0.140
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
66,000
8,000
74,000
P
CN
2023
0
0
Ped/Bike Program
900,000
300,000
1,200,000
Totals
0
0
966,000
308,000
1,274,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
74,000
0
0
0
0
CN
0
1,200,000
0
0
0
Totals
74,000
1,200,000
0
0
0
Report Date: June 15, 2021
Page 8
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
TUK-63
Keeping South King County Moving with TDM
South King County
Various to Various
This project will help people access sustainable transportation options that reduce
drive -alone travel and traffic congestion in South King County. TDM programming
and services will be provided to residents, workers, visitors, employers, property
managers, and students in Tukwila and the partnering jurisdictions of Burien, Des
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea -Tac Airport. The TDM Program will work in
partnership with transit agencies, nonprofits, employers, and community
organizations to reach priority populations through trusted channels. The project
aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled.
06/14/21
06/21/21
0
2024
44
ALL
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2022
0
OTHER
672,000
0
672,000
S
ALL
2022
0
OTHER
168,000
0
168,000
Totals
0
840,000
0
840,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
210,000
210,000
210,000
210,000
0
Totals
210,000
210,000
210,000
210,000
0
Report Date: June 15, 2021
Page 9
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/14/21
06/21/21
40,000
2024
04
RW
0.350
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40,000
400,000
P
RW
2022
0
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2023
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
400,000
0
0
0
RW
0
100,000
0
0
0
CN
0
0
3,100,000
0
0
Totals
0
500,000
3,100,000
0
0
Report Date: June 15, 2021
Page 10
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -13494
S 119th St Pedestrian Bridge Painting
S 119th Street
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
06/14/21
06/21/21
200,000
2024
06
0
0.040
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2024
0
0
200,000
200,000
Totals
0
0
0
200,000
200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
200,000
0
0
Totals
0
0
200,000
0
0
Report Date: June 15, 2021
Page 11
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -09873
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/14/21
06/21/21
150,000
2024
04
C G P S T
W
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
0
150,000
150,000
P
RW
2027
0
0
0
0
50,000
50,000
P
CN
2027
0
0
0
1,200,000
1,200,000
Totals
0
0
1,400,000
1,400,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
150,000
0
0
0
RW
0
50,000
0
0
0
CN
0
0
1,200,000
0
0
Totals
0
200,000
1,200,000
0
0
Report Date: June 15, 2021
Page 12
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
SRTS
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
06/14/21
06/21/21
43,000
2024
28
400,000
0.250
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
SRTS
400,000
0
43,000
443,000
Totals
400,000
0
0
43,000
443,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
443,000
0
0
0
Totals
0
443,000
0
0
0
Report Date: June 15, 2021
Page 13
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
06/14/21
06/21/21
260,000
2024
05
0
0.300
2,340,000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2023
0
SRTS
2,340,000
260,000
2,600,000
Totals
0
2,340,000
260,000
2,600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
2,600,000
0
0
0
Totals
0
2,600,000
0
0
0
Report Date: June 15, 2021
Page 14
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
CMAQ
TUK-64
South King County TDM
South King County
N/A to N/A
This project will provide TDM programming and services at selected activity centers
in Tukwila and partnering South King County jurisdictions. Activity centers include
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea -Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, and
community organizations.
06/14/21
06/21/21
15,000
2024
24
450,000
0.000
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2023
CMAQ
450,000
OTHER
60,750
15,000
525,750
Totals
450,000
100,000
60,750
15,000
525,750
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
100,000
175,000
175,000
75,750
0
Totals
100,000
175,000
175,000
75,750
0
Report Date: June 15, 2021
Page 15
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA -13495
Southcenter Blvd/65th Avenue S Signal
Southcenter Boulevard
65th Avenue S to
Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue
S intersection to improve level of service and safety.
06/14/21
06/21/21
50,000
2024
21
CN
2023
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
TIB
50,000
50,000
100,000
P
CN
2023
0
TIB
500,000
400,000
900,000
Totals
0
CN
550,000
450,000
1,000,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
CN
0
900,000
0
0
0
Totals
100,000
900,000
0
0
0
Report Date: June 15, 2021
Page 16
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -13491
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reduction -affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
06/14/21
06/21/21
0
2024
44
ALL
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2022
0
WSDOT
74,204
0
74,204
P
ALL
2022
0
WSDOT
148,408
0
148,408
Totals
0
222,612
0
222,612
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
37,102
37,102
37,102
37,102
74,204
Totals
37,102
37,102
37,102
37,102
74,204
Report Date: June 15, 2021
Page 17
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2022 to 2027
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
/0181(019) TUK-60
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 &Longacres Way
West end of planned Green River Bridge to Longacres Way
The West Valley Highway/Longacres Way project modifies northbound
channelization between Strander Boulevard and S 156th Street. A 600ft section of
general-purpose lane will be added, north of Strander. The existing dedicated NB
turn lane at Longacres will change to a thru-right lane, transitioning into 2 NB thru
lanes on the north leg as the existing inside lane will be changed to a dedicated NB
left turn lane. Sidewalks will be added to the east side of the roadway where there
are currently none. A wider, shared -use path will replace the existing sidewalk on the
west side of the road between Longacres Way and the new sidewalks installed for
the Pedestrian -Bicycle bridge. A new two-way cycle track will be added to Longacres
Way from WVH to the Tukwila Station, including new street and pedestrian
illumination. A pedestrian signal crossing of WVH near the landing of the Ped -Bike
bridge and a rapid flashing beacon on Longacres at the Interurban Trail crossing will
be added.
06/14/21
06/21/21
40,000
2024
28
0
0.170
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2022
0
TIB
100,000
40,000
140,000
Totals
0
140,000
100,000
40,000
140,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
140,000
0
0
0
0
Totals
140,000
0
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
16,350,000
14,104, 362
18,424,000
48,878,362
Report Date: June 15, 2021
Page 18
Ana Le
From: Millar, Roger <MillarR@wsdot.wa.gov>
Sent: Tuesday, June 29, 2021 12:13 PM
To: Christy O'Flaherty
Cc: Cyndy Knighton
Subject: Re: [EXTERNAL] Tukwila Transportation Improvement Program 2022-2027
Acknowledging receipt. Thank you!
Roger
Roger Millar, PE, FASCE, FAICP
Secretary of Transportation (he/him/his)
Washington State Department of Transportation
310 Maple Park Ave SE
PO Box 47316
Olympia, WA 98504-7316
Office: 360-705-7054
95 %I
Washtnigtoni State,
Department of Transportation
From: Christy O'Flaherty <Christy.OFlaherty@TukwilaWA.gov>
Sent: Tuesday, June 29, 202111:49 AM
To: Millar, Roger <MillarR@wsdot.wa.gov>
Cc: Cyndy Knighton <Cyndy. Knighton @Tu kwi laWA.gov>
Subject: [EXTERNAL] Tukwila Transportation Improvement Program 2022-2027
WARNING: This email originated from outside of WSDOT. Please use caution with links and attachments.
June 29, 2021
TO: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
RE: CITY OF TUKWILA 2022-2027 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2024 passed June 21, 2021, adopting the Transportation
Improvement Program for 2022-2027.
Res 2024 — 2022-2027 Transportation Improvement Program
Please contact me with any questions.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC, Records Governance Manager/City Clerk
xc: Cyncly Knighton, Transportation Engineer
CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click
links from an unknown or suspicious origin.
Ana Le
From:
Andi Markley <AMarkley@psrc.org>
Sent:
Tuesday, June 29, 2021 11:50 AM
To:
Christy O'Flaherty
Cc:
Cyndy Knighton
Subject:
RE: Tukwila Transportation Improvement Program 2022-2027
Hi. Yes, this email was received.
Best regards,
Andi Markley
Aurm&l Ill airlllcley 11. iibirairy Mauna� elr/PUUiic Records Of iiceir I Inc get °uwc Lund Regiior4l C0U11Ciill
1011 Western Avenue, Suite 500 1 Seattle, WA 98104
206-464-7532 arnarklgy.@ sr:ceoEg I w y..psrceorg
From: Christy O'Flaherty <Christy.OFlaherty@TukwilaWA.gov>
Sent: Tuesday, June 29, 202111:47 AM
To: Andi Markley <AMarkley@psrc.org>
Cc: Cyndy Knighton <Cyndy. Knighton @Tu kwi laWA.gov>
Subject: Tukwila Transportation Improvement Program 2022-2027
Importance: High
June 29, 2021
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2022-2027 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2024 passed June 21, 2021, adopting the Transportation
Improvement Program for 2022-2027.
Res 2024 — 2022-2027 Transportation Improvement Program
Please contact me with any questions.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC, Records Governance Manager/City Clerk
xc: Cyndy Knighton, Transportation Engineer
NOTICE OF PUBLIC DISCLOSURE: This e-mail account is public domain. Any correspondence from or to this e-mail
account may be a public record. Accordingly, this e-mail, in whole or in part, may be subject to disclosure pursuant to
RCW 42.56, regardless of any claim of confidentiality or privilege asserted by an external party.
1
CAUTION; This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click
links from an unknown or suspicious origin.
Ana Le
From:
Christy O'Flaherty
Sent:
Tuesday, June 29, 2021 11:45 AM
To:
'GregA@TIB.wa.gov'
Cc:
Cyndy Knighton
Subject:
RE: Tukwila Transportation Improvement Program 2022-2027
Importance: High
The date below should be June 29, 2021.
From: Christy O'Flaherty <Christy.OFlaherty@TukwilaWA.gov>
Sent: Tuesday, June 29, 202111:43 AM
To:'GregA@TIB.wa.gov' <GregA@TIB.wa.gov>
Cc: Cyndy Knighton <Cyndy. Knighton @Tu kwi laWA.gov>
Subject: Tukwila Transportation Improvement Program 2022-2027
Importance: High
TO: TRANSPORTATION IMPROVEMENT BOARD
RE: CITY OF TUKWILA 2022-2027 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2024 passed June 21, 2021, adopting the Transportation
Improvement Program for 2022-2027.
...... es 2024..::::::...2022„- 7.......1"ra p.2! t 1 .0....11irtr�..l�i�
Please contact me with any questions.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC, Records Governance Manager/City Clerk
xc: Cyndy Knighton, Transportation Engineer
1