Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit PL13-023 - L13-031 TUKWILA VILLAGE ASSOCIATES - SPECIAL PERMISSION
TUKWILA VILLAGE TIB &S144T"ST PL13-023 L13-0044 DESIGN REVIEW E13-011 SEPA L13-030 DESIGN REVIEW L13-031 SEPC PERMISSION L13-021 LAND DIVISION L13-031 SEPC PERMISSION Moira Bradshaw From: Joanna Spencer Sent: Monday, February 29, 2016 9:30 AM To: Moira Bradshaw Subject: FW: draft easement and drawing for electrical service for King County library at 144th St. and SR 99 in Tukwila Attachments: KingCoLibraryDistribEsmtDrwg.pdf; CityTukwila_distribEs 1230415-3-021.doc LJ3See attached email from Derek.3 1 peetalsca° �V Joanna Set From: Derek Speck Sent: Friday, February 26, 2016 5:21 PM To: Joanna Spencer Subject: FW: draft easement and drawing for electrical service for King County library at 144th St. and SR 99 in Tukwila Joanna, Do you know if the KCLS library permits assumed that SCL would get an easement as shown on the attached? It would be s 30' x 5' area on the Tukwila Village (not library) property. Before I check with the developer, I'm hoping to trace it back to the library's permit so that I can check with the library on whether they got the developer's permission. Derek From: Davis, Mary [mailto:Mary.Davis@seattle.gov] Sent: Tuesday, February 16, 2016 11:49 AM To: Derek Speck <Derek.Speck@TukwilaWA.gov> Subject: draft easement and drawing for electrical service for King County library at 144th St. and SR 99 in Tukwila Hi Derek, As we discussed this morning, here are the easement and drawing. I need to have the easement across a small area of the property that the City of Tukwila currently owns. I understand that the City of Tukwila will be selling this property to a private developer, but the sale has not closed yet however, the easement must be signed by the property owner of record at the time that the easement is granted. If title to this property is going to change very soon, I could possibly wait for the new owner to sign the easement, if that is easier than having the City of Tukwila sign off on it. We do not offer any compensation for the easement. It is the responsibility of the customer who needs the new service to get the necessary party(ies) to sign a distribution easement. Please let me know what works best. Thanks, MARY DAVIS I SENIOR REAL PROPERTY AGENT SEATTLE CITY LIGHT ENVIRONMENTAL AFFAIRS AND REAL ESTATE DIVISION 1 sMAumary.davis@aeattlegow 206'684-3328 Seattle City Light Real Estate Services 700 — 5th Ave., Suite 3200, Room 3338 P.O.Box 34O23 Seattle, WA 98124-4023 2 When recorded, return to: SEATTLE CITY LIGHT Real Estate Services 700 Fifth Avenue SMT 3338 P.O. Box 34023 Seattle, WA 98124-4023 EASEMENT- (Underground Electric) Reference #: 230415-3-021 Grantor: City of Tukwila Short Legal: Lot A of City of Tukwila Lot Consolidation No. L13-021, Rec. No. 20150428900001, King County Tax Parcel #: 152304-9242 THIS EASEMENT is made this day of , 2016, between CITY OF TUKWILA, a Washington municipal corporation, hereinafter called the Grantor; and the CITY OF SEATTLE, a Washington municipal corporation, acting by and through its CITY LIGHT DEPARTMENT, hereinafter called the Grantee; AS FOLLOWS: That the Grantor, for and in consideration of the sum of One Dollar (1.00) and other valuable consideration, receipt and sufficiency of which is hereby acknowledged, hereby grants to the Grantee, its successors and assigns, the right, privilege and authority (an "Easement") to install, construct, improve, remove, erect, alter, repair, energize, operate and maintain underground electric distribution facilities which are limited to: vaults, handholes, risers, ducts, conduits, cables, underground wires and other convenient appurtenances necessary to make said underground facilities an integrated electric system ("Electric System") upon, under, across and through the following described lands and premises ("Property") situated in the County of King, State of Washington: PARCEL A OF CITY OF TUKWILA LOT CONSOLIDATION L13-021 AS RECORDED UNDER RECORDING NUMBER 20150428900001, IN KING COUNTY, STATE OF WASHINGTON. Except as otherwise set forth herein, Grantee's rights shall be exercised upon that portion ("Easement Area") of the Property described as follows: THE SOUTHERN 30 FEET OF THE WESTERLY 5 FEET OF THE ABOVE DESCRIBED REAL PROPERTY. Page 1 of 3 Together with the right at all times to the Grantee, its successors and assigns, of ingress to and egress from the Easement Area across and through the Property of the Grantor for the purposes set forth herein. Together with the right at all times to the Grantee, its successors and assigns, to cut and trim brush, trees or other plants standing or growing upon the Easement Area, which, in the opinion of Grantee, interfere with the maintenance or operation of Grantee' s Electric System. The Grantor, their heirs, executors, administrators, successors and assigns, hereby covenant and agree that no structure or fire hazards will be erected or permitted within the Easement Area; that no digging will be done or permitted within the Easement Area which will in any manner disturb the Electric System or its solidity or unearth any portion thereof; and that no blasting or discharge of any explosives will be permitted within fifty (50) feet of the Electric System. The City of Seattle is to be responsible, as provided by law, for any damage to the Grantor through its negligence in the construction, maintenance and operation of its Electric System. The rights, title, privileges and authority hereby granted shall continue and be in force until such time as the Grantee, its successors and assigns shall permanently remove all of its Electric System from the Easement Area or shall permanently abandon the Easement Area, at which time all such rights, title, privileges and authority shall terminate without further action required from Grantor or Grantee. IN WITNESS WHEREOF, this instrument has been executed the day and year first above written. GRANTOR: CITY OF TUKWILA By Printed Name and Title: Page 2 of 3 STATE OF WASHINGTON ) ) ss. COUNTY OF KING ) I certify that I know or have satisfactory evidence that signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as the of CITY OF TUKWILA to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year above written. (notary seal) Signature: Print name: Notary Public in and for the State of Washington Residing at: My commission expires: Page 3 of 3 z OiEO65Wel S z m m n 0) m E m z v m n r Z606ti0£Z9 6#13O2:dd ZtZ6i0£Z9I.#13O2Nd te Curved Steel `blades' Overhang ROW 4'-6" Max. 6'-8 1/2" Lowest elevation above grade where Artwork crosses ROW. 17'-6" 4 -6 ' I x Line of ROW --I Existing power vault 1.41 4 Existing Street Light ti •IdiIIppp.110'-9" X 7'-2" Conc. footing ;44, of ROW (26) Sculptural steel blades, 7" x 1 1/2" at base, 7"x 1/2"attop Sloping Conc. Slab flush with Existing Sidewalk 10'-9" X 7'-2" Conc. footing 6" North of ROW Library Building Below grade Storm Water Detention System44 ROW (26) Sculptural steel blades overhang ROW 4'-6" Max. Existing Conc. Curb & Sidewalk Seattle City Light Proposed Easement NORTH SOUTH 144TH STREET EXHIBIT 'A' Artwork Right -of -Way Encroachment N.T.S. PARCEL#1523049092 NEW EASEMENT DETAIL NTS SR#1 510340 „ . • • •:itt• PARCEL#152394924• I , Xct I , m NEW =1.1 EASEMENT , -13 5' rrl it • ,4 , RMINATION H 11-720), PARCEL#1523049092 ” • t -c1/41/4---- • 10' cc ti- V662 CC 4 st \N•••: •. • c„ 1/47, \ 1/4. Vl •1/4,,1/4 c, \ 1/4 '1/41/4 1/4 ":1/4‘• k `'• •••• -;• V686 +7 NEW EASEMENT DETAIL NTS SR#1510340 Derek Speck From: Moira Bradshaw Sent: Wednesday, May 06, 2015 9:16 AM To: Derek Speck Cc: Minnie Dhaliwal Subject: RE: Tukwila Village / Declaration of Access and Shared Parking Easements Derek — DCD does not have any input on maintenance of the parking. We've carefully reviewed the Parking Decision that has a finding that the parking "should" be shared (not "shall") across all the parcels; therefore, if the easement contains language about "dedicated" or "reserved" stalls, then so be it. Active management of the parking and limited signage to avoid visual blight and walking hazards and confusion will be important. Thinking ahead, Bryan will be negotiating leases for each of the spaces and presumably will have language about the parking. Not sure If there will be a "lease" to the non-profit and what it will say about parking. Ultimately we want what will make all the tenants successful, including the nonprofit who will be programming the indoor and outdoor area. Thanks for including us in the email string. Moira From: Derek Speck Sent: Tuesday, May 05, 2015 10:16 PM To: Bryan Park; Jeffrey M. Hawkinson; Stokke, Diane Cc: Moira Bradshaw; 'Gregory Smith' Subject: RE: Tukwila Village / Declaration of Access and Shared Parking Easements Hi everyone, After speaking with Bryan tonight, I think we're close to a deal but if we're going to use relative trip generation, it raises some issues that I think we need to resolve in person. Can you let me know when you're available to meet in Tukwila? If a time works, I'II get back to everyone. If we can even meet Wednesday, that would be great. Derek From: Bryan Park [BryanP@housing4seniors.com] Sent: Tuesday, May 05, 2015 6:14 PM To: Jeffrey M. Hawkinson; Stokke, Diane Cc: Moira Bradshaw; Derek Speck; 'Gregory Smith' Subject: RE: Tukwila Village / Declaration of Access and Shared Parking Easements Jeff, Derek and Diane, Now that the City has restored the exclusive parking easement for the 12 -stalls for KCLS, it should likewise recognize the exclusive parking easements for TVDA that were the subject of lengthy negotiations between KCLS and TVDA as reflected Cita of J u;tuviea Department Of Community Development AFFIDAVIT OF DISTRIBUTION I, Teri Svedahl , HEREBY DECLARE THAT: Project Number: PL13-023 L -JS '40t`it/ Associated File Number (s): L13-031 Notice of Application X Notice of Decision Mailer's signature: Notice of Public Hearing £/& Notice of Public Meeting Determination of Non- Significance Mitigated Determination of Non - Significance Determination of Significance & Scoping Notice Short Subdivision Agenda Notice of Application for Shoreline Mgmt Permit Shoreline Mgmt Permit Board of Appeals Agenda Packet Board of Adjustment Agenda Packet Official Notice -- —_ Notice of Action x L13-031 PARKING STANDARD 10% COMPLIMENTARY PARKING APPROVAL, SHARED PARKING Other: Was mailed to each offth e addresses listed/attached on this 14 day of _October , _2013_ Project Name: TUKWILA VILLAGE Project Number: PL13-023 L -JS '40t`it/ Associated File Number (s): L13-031 Mailing requested by: Moira Br s Mailer's signature: % £/& W:\USERS\TERI\TEMPLATES-FORMS\AFFIDAVIT OF DISTRIBUTION.DOC OVA AGENCY FEDERAL TRANSIT ADMIN US E.P.A. US DEPT OF H.U.D OFFICE OF ARCHAEOLOGY WSDOT NW REGION WA STATE COMMUNITY DEV WA FISHERIES & WILDLIFE WASH DEPT OF SOCIAL/HEALTH -- DEPT OF ECOLOGY E' -PC WA DEPT OF ECOLOGY WA STATE ATTORNEY GENERAL OFFICE OF HEARING EXAMINER KC ASSESSOR'S OFFICE KC HEALTH DEPT PORT OF SEATTLE KC DEV & ENVIRON SERVICES KC METRO TRANSIT/SEPA OFFICIAL KC LIBRARY SYSTEM FOSTER LIBRARY WESTFIELD MALL LIBRARY TUKWILA SCHOOL DISTRICT ATTN JACKSON FEDERAL BLDG DEVELOPMENT SERVICES NW REGIONAL OFFICE SEPA REVIEW ECOLOGY DEPARTMENT CITY OF SEATTLE ACCOUNTING DIVISION PERMITS SEPA INFO CENTER ENVIRONMENTAL PLANNING ADDRESS 915 2nd AVE, STE 3142 1200 6th AVE 909 1st AVE, STE 200 PO BOX 48343 PO BOX 330310, MS 240 PO BOX 48300 16018 MILL CREEK BLVD PO BOX 1788 3190 160th AVE SE PO BOX 47703 PO BOX 40117 PO BOX 94729 500 4th AVE, RM# 709A 401 FIFTH AVE, STE 1100 PO BOX 1209 900 OAKSDALE AVE SW 201 S JACKSON ST., MS KSC-TR-0431 960 NEWPORT WAY NW 4060 S 144th STREET 1386 SOUTHCENTER MALL 4640 S 144th STREET wrylc�r• o)R I CITY ST ZIP SEATTLE WA SEATTLE WA SEATTLE WA OLYMPIA WA SEATTLE WA OLYMPIA WA MILL CREEK WA OLYMPIA WA BELLEVUE WA OLYMPIA WA LACEY WA SEATTLE WA SEATTLE WA SEATTLE WA SEATTLE WA RENTON WA SEATTLE WA ISSAQUAH WA TUKWILA WA TUKWILA WA TUKWILA WA 98174 98101 98104 98504 98133 98504 98012 98504 98008 98504 98504 98104 98104 98104 98111 98055 98104 98027 98168 98188 98168 re City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director October 9, 2013 Notice of Decision Parking Standard for a Use not specified; 10% Complimentary Parking Approval; Shared Parking To: Bryan Park, Applicant King County Assessor, Accounting Division Agencies with Jurisdiction All Parties of Record This letter serves as a notice of decision and is issued pursuant to the Permit Application Types and Procedures Chapter of the Zoning Code (TMC 18.104.170) on the following project and permit approval. I. PROJECT INFORMATION Project File Number: L13-031 Applicant: Bryan Park Type of Permit Applied for: Variance from Parking Standards (Type 2 Permit) Project Description: Tukwila Village — Phases 1-3 Location: East side of Tukwila International Boulevard (TIB) on the north and south sides of the S. 144 Street and TIB intersection Associated Files: L13-017 — Design Review — King County Library L13-020 — Parking Standard Determination — King County Library L13-021 — Boundary Line Adjustment/Lot Consolidation L13-030 — Design Review — Tukwila Village Site Plan — Phases 1-3 and Elevations Phase 1 Comprehensive Plan Neighborhood Commercial Center and High Density Residential and Urban Designation/Zoning Renewal Overlay District: II. DECISION SEPA Determination: The SEPA Responsible Official has previously determined that the project, as proposed, does not create a probable significant environmental impact and issued a Determination of Non -Significance (DNS.) Decision on Substantive Permit: Based on the staff report dated October 9, 2013, the Community Development Director has made the following determinations: 1. Approved a parking standard for the live/work units of one space per unit; 2. Approved a 10% complementary use allowance; 3. Approved shared parking across proposed parcels A, B, C, D and E with the following conditions: a) Modify Boundary Line Adjustment/Lot Consolidation application (Land Use File # L13-021) to include reciprocal parking access and maintenance easements across all lots. b) Adhere to the relevant procedures of the City's Commute Trip Reduction Program (Tukwila Municipal Code 9.44,) in order to implement the required Transportation Management Plan. The Tukwila Village Development Associates, LLC and its successor, shall perform the role of Employee Transportation Coordinator (ETC) and perform that role for all businesses on the Tukwila Village site. This role shall include providing information and incentives for alternatives modes of transportation such as transit, carpool etc. Annual reports of the efforts and results shall be provided to the city's CTR coordinator. The Tukwila Village Project site includes proposed parcels A, B, C, D, E and the Library parcel (Library Parking Standard Land Use File No. L13-021.) c) Information signage shall be developed in accordance with the City's Sign Code (TMC 19) and submitted for review and approval as part of the design review application for Phase 3. d) Any temporary parking approved as part of the phasing plan shall be required to obtain all applicable permits; comply with surface and storm water management requirement; and address maintenance and performance measures. III. YOUR APPEAL RIGHTS The Decision on this Parking Determination Permit Application is a Type 2 decision pursuant to Tukwila Municipal Code (TMC 18.104.010.) Other land use applications related to this project are still be pending. One administrative appeal of this decision to the Hearing Examiner is permitted. Unless an appeal of the Director's decision on this application is timely and properly filed to the City Council, the Director's decision on this permit shall be final. A party who is not satisfied with the Hearing Examiner's determination on any such appeal may appeal to King County Superior Court under the procedures set forth in the Land Use Petition Act (RCW 36.70C.) IV. PROCEDURES AND TIME FOR APPEALING Deadline for appeal In order to appeal the Community Development Director's decision on this application, a written Notice of Appeal must be filed with the Department of Community Development within 14 calendar days from the date of the issuance of this Notice of Decision, that is by 5:00 p.m. on. Page 2 of 3 Content of appeal The requirements for such appeals are set forth in the Appeal Processes Chapter of the Tukwila Municipal Code (TMC 18.116.) All Notice of Appeal materials must be submitted to the Department of Community Development and must include: 1. The name of the appealing party. 2. The address and phone number of the appealing party; and if the appealing party is a corporation, association or other group, the address and phone number of a contact person authorized to receive notices on the appealing party's behalf. 3. A statement identifying: a) the decision being appealed b) the specific errors of fact or errors in application of the law in the decision being appealed; c) the harm suffered or anticipated by the appellant, and d) the relief sought. 4. Appeal fee per the current Land Use Fee Schedule, additional hourly charges may apply. In addition all hearing examiner costs will be passed through to the appellant. V. APPEAL HEARINGS PROCESS Any administrative appeal regarding this Decision shall be conducted as an open record hearing before the Hearing Examiner based on the testimony and documentary evidence presented at the open record hearing. The Hearing Examiner decision on the appeal is the City's final decision. Any party wishing to challenge the Hearing Examiner decision on this application must file an appeal pursuant to the procedures and time limitations set forth in Judicial Review of Land Use Decision Chapter of the Revised Code of Washington (RCW 36.70C.) An appeal challenging the DNS may be included in such an appeal. If no appeal of the Hearing Examiner decision is properly filed in Superior Court within such time limit, the Decision on this Decision will be final. The City's decision to issue a DNS, an MDNS or an EIS is final for this permit and any other pending permit applications for the development of the subject property. VI. INSPECTION OF INFORMATION ON THE APPLICATION Project materials including the application, any staff reports, and other studies related to the decision are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday between 8:30 a.m. and 5:00 p.m. The project planner is Moira Carr Bradshaw, who may be contacted at 206-431-3651 for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact the King County Assessor's Office for further information regarding property tax valuation changes. Departme IIof Community Development City of Tu Vila W:\Long Range Projects\Tukwila Village\PL13-023\parking\Parking Determination NOD.doc Page 3 of 3 Staff Report to the Director of Community Development October 9, 2013 File Number: L13-031 Request: 1. Parking Standard Determination for a Live/Work housing unit; 2. 10% Complimentary Use Allowance; and 3. Shared Use for parking of five proposed lots on four parcels. Location: The NE and SE corners of the intersection of Tukwila International Boulevard and S. 144 Street; Associated Approval: E12-011 Tukwila Village SEPA Decision; L13-017 Library Design Review; L13-030 Tukwila Village Design Review; L13- 020 Tukwila Library Parking Standard Applicant: Owner : Notification: Bryan Park City of Tukwila Notice of Application for this Type 2 permit was mailed to surrounding properties and posted on the site on June 26, 2013. An informational meeting was held on July 10, 2013. No comments were made regarding the parking. Comprehensive Plan Designation: Neighborhood Commercial Center and High Density Residential Zoning District: SEPA Decision: Decision: Staff: Attachments: Neighborhood Commercial Center and High Density Residential — Urban Renewal Overlay A Determination of NonSignificance was issued on August 7, 2013 for all three phases of the Tukwila Village Development Approve with condition Moira Carr Bradshaw A. Tukwila Village Development Phasing Plan B. Tukwila Village Site Plan with Parking Summary by Phase C. Applicant's Parking Summary Table Staff Report L13-031 Page 1 of 12 D. Traffic Impact Analysis Parametrix (November 2012) E. Tukwila Village Development Schedule (October 2013) F. Response to Parking Questions G. Staff's Parking Phasing Summary Table H. Temporary Parking on proposed Lot B Findings I. Relevant Information The following information was considered as part of the review of this application: 1. King County Library Design Review Application (File No. L13-017) 2. Off -Street Parking and Loading Regulations, Tukwila Zoning Code, (TMC 18.56) 3. Minimum Number of Off -Street Parking Spaces, Tukwila Zoning Code, Figure 18-7 4. Tukwila Comprehensive Land Use Policy Plan 5. Tukwila Village Development Proposal Project Description May 28, 2013 6. Tukwila Village SEPA Checklist (Park, May 28,2013) 7. Disposition and Development Agreement by and between the City of Tukwila and Tukwila Village Development Associates, LLC; dated 10/30/2012 (City of Tukwila Contract 12-129) 8. Development Agreement for the Tukwila Village Development Project; approved 10/22/2012 (City of Tukwila Contract 12-176) NOTE: Plans, codes, technical reports and attachments referenced above may be reviewed and/or obtained by contacting Moira Carr Bradshaw, Senior Planner, 6300 Southcenter Boulevard, Tukwila, Washington, 98188; Phone: 206-431-3670. Existing Development The subject site on the north side of S. 144 Street is vacant of any buildings. 40 Ave. S. a short local access street runs north south through the site and ends in a cul-de-sac that provides access to parking for an apartment building that fronts on 42 Ave. S. The subject site on the south side of the S. 144 Street contains a vacant commercial building, a separate small building that is used as a barber shop, a utility storage yard, a basketball court and accessory parking for the King County Housing Authority. Surrounding Land Use Within the north block, in the southeast corner is the existing 5,200 square foot Foster Library. The current proposal does not include any redevelopment of the existing library building. In the immediate vicinity are a number of public uses such as the high and middle schools, public pool, and a neighborhood park; a church and mosque; neighborhood retail such as drug stores, grocery store, laundromats, and dry cleaners; and a variety of food establishments. There are numerous residential uses in the area from motels, apartments to single family homes. Staff Report L13-031 Page 2 of 12 Project Description Tukwila Village is a 6.4 acre project that will straddle a two lane collector arterial and will be developed in three phases. The City of Tukwila, the property owner, entered into a Disposition and Development Agreement (DDA) giving Tukwila Village Development Associates the right to develop the property according to an approved conceptual plan. The City also approved a Development Agreement that waived certain Code requirements. Shared parking was approved as part of those Agreements. The concept of shared parking is that separate parcels of land (and therefore potential ownership) and the uses and buildings on those parcels, may share parking stalls. Shared parking allows for parking on one parcel to be used by the businesses located on a separate parcel or to allow for demand for the stalls to vary during the time of day or the seasons of the year. Within the DDA, under section 2.4 "D. Additional Approvals - The City shall have the right to require and approve easements for utilities vehicular access pedestrian access shared parking and shared maintenance for each Development Phase to ensure that the entire Development functions as an Integrated whole even if the Development Parcels and/or Development Phases come under Separate ownership and management. " Approval for shared parking is therefore not required by this decision. Attachment A shows the three phases of development. The entire project contains: • Four residential and commercial buildings with a total of 403 housing units (80 market rate apartments, 4 live/work apartments, 319 senior units;) 30,000 square feet of commercial/office space; and a 2,000 square foot community policing station. • A new 10,000 square foot King County Library System neighborhood library. • A new 4,200 square foot community building and cafe adjacent to a half acre outdoor plaza. • A total of 450 on-site structured and surface parking stalls. The site plan (Attachment B) shows parking location and totals per Phase as well as the overall site layout for buildings, driveways, and sidewalks. Phase 1 contains: Building A, which is a seven story structure, includes: • two levels of structured parking of 85 parking stalls on two separate levels and with restricted access, • approximately 8,200 gross rentable square feet of commercial/retail space and four live - work studio loft dwelling units on street level; and • five levels of 80 residential dwelling units containing a mix of studio, one -bedroom and two-bedroom apartments, and • 53 surface parking stalls and one loading stall for the library's use. Staff Report L13-031 Page 3 of 12 Building C, which is an approximate 4,210 square foot, one story community building adjacent to a 32,000 square foot community plaza, consists of a wide variety of landscaped and hardscaped areas. The community building includes: • a large flex assembly space containing approximately 1,711 gross square feet, • a catering kitchen containing approximately 368 gross square feet of space, • storage space, reception space, men's & women's public restroom space, • a cafe / coffee shop containing approximately 1,268 gross square feet of retail space, including a seating area, kitchen area, refrigeration area and office area; and • an indoor/outdoor fireplace and outdoor seating area and 11 surface parking stalls. Tukwila Library is a new one story 10,000 gross square foot neighborhood branch of the King County Library System. The total number of parking stalls provided for Phase 1 on the surface and under Building "A" is 149 stalls. Phase 2 contains: Building D, which is approximately 134,960 square feet, includes: • One level of below grade structured parking containing 49 garage parking stalls • One level of approximately 13,000 square feet of rentable commercial office space; • Five levels of residential dwelling units for seniors (70 total units) containing a mix of one -bedroom and two-bedroom apartments; and • approximately 19 surface parking stalls for commercial office use. Building E, which is approximately 134,960 square feet, includes: • 103 structured parking stalls • approximately 1,150 gross rentable square feet of commercial/retail space, and approximately 2,000 gross rentable square feet of police resource center space, • four levels of residential dwelling units for seniors (125 total units) containing a mix of one -bedroom and two-bedroom apartments, semi -private outdoor landscaped courtyard; and • approximately 11 surface parking stalls for commercial/retail use. The total parking provided for Phase 2 on Parcel D and E is 182 stalls. Phase 3, located north of S. 144 Street and adjacent and on the eastern edge of Phase 1 Building B includes: • one level of structured parking containing 86 parking stalls for residential use only and 1,800 square feet of rentable commercial/retail space, Staff Report L13-031 Page 4of12 • four levels of residential dwelling units for seniors (125 total units) containing a mix of one -bedroom and two-bedroom apartments, and • approximately 34 surface parking stalls for commercial/retail and flex use. Phase 3 parking calculation The total parking provided for Phase 3 on Parcel B is 120 stalls. II. Summary of Proposed Action 1. Parking Standard for a Use not Specified The required number of parking stalls for a Live/Work residential unit is not specified under the City's parking regulations. Under the "Uses Not Specified" section of the Off -Street Parking Chapter, (TMC 18.56.100) the Director shall determine the required number of parking stalls for uses that are not specified in the City's parking regulations. A Parking Standard Determination must be made following a Type 2 process as described in the Permit Application Types and Procedures Chapter (TMC 18.104.) The Director's Determination shall be based upon the requirements for the most comparable uses specified in the Off -Street Parking Chapter. The applicant has submitted a table showing the parking requirements by use, including the requested 1 stall per Live/Work unit. (Attachment C) 2. Complimentary Use The following definition of a complementary use is from the Tukwila Zoning Code: "A complementary use is a portion of the development that functions differently than the primary use but is designed to serve or enhance the primary land use without creating additional parking needs for the primary traffic generator. Up to 10% of the usable floor area of a building or facility may be occupied by a complementary use without providing parking spaces in addition to the number of spaces for the principal use. Examples of complementary uses include pharmacies in hospitals or medical offices, food courts or restaurants in a shopping center or retail establishments." (TMC 18.56.070 (D) Cooperative Parking Facility) For Tukwila Village the residential units are considered the primary use. The applicant is requesting that the City approve 10 % of the usable floor area from the non-residential uses be considered complementary uses and therefore not subject to the parking supply requirement. Staff Report L13-031 Page 5 of 12 3. Shared Use The concept of complementary use is that a parking space can serve two or more individual land uses without conflict or encroachment and is possible because of two conditions: • Variation in the accumulation of vehicles by hour, by day or by season at the individual land use; and • Relationships among the land uses that result in visiting multiple land uses on the same auto trip. The concept of shared parking has similarities with complimentary parking but also is used to describe two or more parcels: • with no physical separation but connected with sidewalks allowing free pedestrian movement between buildings; and • collectively satisfy the parking requirement but individually one or more of the parcels are not able to meet the Code requirements. Applications for shared, covenant or complementary parking are allowed and must be processed as Type 2 decisions per the Cooperative Parking Facility Section of the Zoning Code. (TMC 18.56.070(E.) There are no specific decision criteria for complimentary and shared parking. III. Decision Authority The purpose of the Off-street Parking and Loading regulations chapter is to provide for adequate, convenient, and safe off-street parking areas for the different land uses described in the City's Zoning Code. (TMC 18.56.010 Purpose) At the time any building or structure is erected, enlarged or at the time there is a change in its principal use, off-street parking and loading spaces must be provided as an accessory use in all zones in accordance with the requirements of the Off -Street Parking Chapter. (TMC 18.56.020 Chapter Application) The Chapter includes a table that lists the required number of parking spaces for automobiles and bicycles. The Minimum Number of Off-street Parking Spaces Table is shown on Figure 18-7 of the TMC. The table provides specific parking requirements for a number of common land uses. For example, fast food restaurants are required to have one parking stall for every 50 square feet of usable floor area and retail requires 2.5 stalls for every 1,000 square feet of usable floor area. The minimum number of parking stalls must be maintained over the life of the use. Any additional uses, either secondary or accessory in nature, must have parking available that does not impact the minimum parking of the original or primary use. (TMC 18.56.050 Required Number of Parking Spaces) Staff Report L13-031 Page 6 of 12 1. Parking for a Use Not Specified The Director's Determination shall be based upon the requirements for the most comparable uses specified in the Off -Street Parking Chapter. Comparable Uses The most comparable use for a Live Work unit is a mixed use residential unit, which has a parking requirement of one stall for every dwelling unit. The applicant surveyed the adjacent Cities of Renton and Seattle and found that their respective standard is one stall or less. The applicant submitted a Traffic Impact Analysis (Parametrix, November 2012) that references the Institute of Traffic Engineers (ITE) Parking Generation Manual, 4th Edition. The Analysis shows less than one stall per unit for the peak parking period for the residential use. 2. Complimentary Use The Director may use his/her discretion in deciding whether to grant a 10% allowance for complementary uses. This project clearly will have a dominant use, which is residential with a total of 403 residential units. The remaining floor area will be generally 15,000 gross square feet of commercial space, a 10,000 square foot library, and 15,000 square feet of office space. This area of the City is encouraged to develop with a mix of uses. The types of uses are such that there is an expectation that site users will use more than one "business" while on the site. For example, on office worker will get lunch at a restaurant, a resident will visit the library, a customer will go to more than one store. 3. Shared Parking The Director may use his/her discretion in deciding whether to grant approval for shared use of parking. The proposal for the project is for the proposed six lots (A, B, C, D,. E and the Library Parcel) to share the parking available throughout the five lots (A, B, C, D and E.) No criteria exist for the decision maker other than an assumption that the ability to share remains and works for the life of the project. Assurance can be given via reciprocal easements over the five lots for the users of the six lots. The City of Tukwila owns the property that will be sold to Tukwila Village Associates, LLC and to the KCLS. The Project has been envisioned as a mixed use project that functions as a whole. There are many references both within the DDA and the Development Agreement to sharing driveways, parking and other amenities and accessory uses in order to obtain a high-quality, pedestrian oriented development. Staff Report L13-031 Page 7 of 12 Comprehensive Plan Policy A related policy from the Comprehensive Plan: 1.8.8 Encourage facilities and improvements that support transit use in new development, redevelopment, and street projects. The Tukwila City Council made the following findings during their deliberations on the Tukwila Village Development proposal. Within the Development Agreement is the following: 1. "Goal 8.2.22 of the City s Comprehensive Plan provides for the establishment of an overlay district in the designated urban renewal area generally between South 140'x' Street, 42nd Avenue South, South 146th Street, and 37th Avenue South that may allow increased building heights, reduced residential parking requirements, and other alternative development standards subject to specific criteria, in order to encourage well designed compact transit oriented and pedestrian friendly redevelopment to activate the community along Tukwila International Boulevard." 2. "The adoption of supplemental development standards and criteria providing for taller building heights and reduced parking requirements was intended to make urban densities and amenities more likely while the impact upon residential areas resulting therefrom would be lessened by requiring development along Tukwila International Boulevard, more significant structured parking and pedestrian friendly amenities;" Engineering Analysis Within the Traffic Impact Analysis prepared by Parametrix (May 2013,) (Attachment D) is a description (pages 14-16) on peak parking demand. The author cites the Institute of Traffic Engineers (ITC) Parking Generation Manual. The analysis does not consider the phasing of the uses but instead considers the uses in total. The peak parking demand analysis (Table 9) is not absolutely relevant because the parking supply is not completely shared. All the parking for the residential units is within the garage spaces, which are not accessible to the commercial use customers; however, excess stalls are available for employees in some of the secured garage areas. This employee parking, when not in use by the employees during the evening and on weekends, will be available for "overflow" parking demand. Among the other uses — retail space, library, office and community policing — the estimated peak parking period would be noon during a weekday. The authors did not consider weekend parking demand. The higher amount of office space relative to the commercial space, which has a peak parking demand during the week mid-morning, relative to the commercial, which has a peak during mid- day, provides a greater opportunity for sharing to occur because of the difference in the peak demand periods. Of note, the Parametrix report states that although they did not analyze internal capture rates between the uses that they typically estimate a 10% internal capture rate. That means that 10% of the parkers on site typically will use more than one use without using their car for another trip. Staff Report L13-031 Page 8 of 12 Phasing Plan and Parking Supply Because this is a large project that will be built over two — three years, (Attachment E) staff considered the implications of parking demand and supply during the phasing period. Attachment F shows that parking supply requirements, per the Zoning Code, are not evenly distributed between the five lots — hence the need for a shared parking decision. The applicant respond with the following solutions. (Attachment G) Phase 1 has the largest deficit of spaces. The Phase 1 - 73 stall deficit - becomes reduced by a 30 stall surplus produced by Phase 2 completion on the south side of S. 144 Street. Phase 3 completion brings the project into compliance and creates a 2 stall surplus. To mitigate the temporary Code shortage, the applicant discusses the construction of 18 on -street parking stalls in S. 144m Street, which is to be completed as part of Phase 1; their proposal to have temporary parking on proposed Lot B that would be available upon Phase 1 completion (Attachment H;) and the seven month absorption period for Phase 1 residential units and 17 month absorption for all the commercial space in Building A. The currently proposed completion of Phase 2 is within five months of the completion of Phase 1 and Phase 3 is within 12 months. It is not until all three phases are built that the project will meet the requirements of the Parking Code. In the end, at full build -out, the project meets the Code requirements for parking supply. Per the DDA, the City as property owner, must approve a phasing plan for development and can consider any parking issues related in the long term to a phase plan of development. (See Section 2.4 of the DDA Phasing; Development Parcels) Parking Supply Alternatives Transportation options Two Metro Bus Routes provide immediate access to the site. Route 128 stops on S. 144 Street and travels approximately every 15 minutes between West Seattle and Southcenter and serves the Light Rail station. Route 124 stops on Tukwila International Blvd (TIB) and travels approximately every 15 minutes during peak periods between the Light Rail station at Southcenter Boulevard and downtown Seattle. The intention of the requirement for a Transportation Demand Management Plan (discussed below) is to assist site residents and users in taking these transportation alternatives. Transportation Demand Management The project is within the Urban Renewal Overlay District and the developer has chosen to utilize the standards of the overlay zone. Those standards come with a requirement to submit a Transportation Management Plan, with is a transportation demand management tool. The Code says, "The property owner/manager shall prepare a Transportation Management Plan (TMP) to encourage alternatives to automobile use, and that provides each residential and commercial tenant with materials that may range from offering information about transit and Staff Report L13-031 Page 9 of 12 bicycle options to providing transit tickets and passes." (TMC 18.43.070 Specific Urban Renewal Overlay Development Standards and Criteria) The City routinely administers TMPs through its Commute Trip Reduction Program, which is a program focused on sites with 100 or more employees. It is unlikely that this project will have an employer who is an "affected employer;" however, the CTR program could provide a framework for guiding and administering the transportation management plan for the site. Conclusions 1. Parking Standard for Live/Work Parking supply is per the City standards for all the residential units except the live work, for which there is no standard. The parking standard of one stall per Live/Work unit is comparable or exceeds the standard of adjacent jurisdictions and is consistent with the national standard per the ITE manual. 2. Complimentary Parking This large scale mixed use development is an exemplary project for demonstrated the potential to reduce vehicular trips. The ability to walk between multiple businesses or from home to business is the purpose of complimentary allowances. The design guidelines and standards for the area are created to encourage pedestrians to walk between buildings and uses and not to view the properties and their uses as isolated stand-alone fixtures in the neighborhood. Approval for the 10% complementary parking reduction is appropriate given the range of uses on the site, the differing peak parking demand periods as discussed in the Transportation Analysis and the potential for the internal capture of trips on the site. In addition, on -street parking will be available on the western half of the S. 144 Street block as part of Phase 1 street improvement. On street parking is currently available around the corner on 42 Avenue S. The parking on 42 Avenue S. however is not visible or obvious to visitors who are not familiar with the neighborhood. Surface lots across TIB that serve commercial business will be obvious, which may result in some unsanctioned off-site parking. 3. Shared Parking Staff has reviewed the parking by phases and determined that when the development is complete, the project will meet the Zoning Code requirements for parking per the decisions above. Parking demand for special events could create a greater demand than supply. King County Library System (KCLS,) and the nonprofit organized to market and schedule the community space events, are users who will potentially have events that generate higher demand than currently considered. They will need to be involved in an association that coordinates the parking demand for all the site users. Staff Report L13-031 Page 10 of 12 Users should be allowed access to all surface parking in order to maximize the site's flexibility to meet the variable needs throughout the day or a week. Sharing of some of the secure parking may also need to occur to balance the parking needs/demands across all five parcels or to provide overflow parking during special events. In order to manage the needs, the Transportation Management Plan will be a useful tool, and the administrator of that Plan, will play an important role in parking for the site. Circling and extra exiting/entering movements on City streets could occur if the parking is full on either the north or south side of S. 144 Street. Informational signage for parking could assist with this way finding need. In order to assure shared parking is available in perpetuity, reciprocal access and parking easements will be recorded against the five proposed lots. Staff's analysis of the phasing plan shows that a deficit of parking may occur depending on the absorption of the newly built space. The applicant also anticipates this parking variability by phase and shows an option for temporary parking on proposed Parcel B is developing on -street parking within the S 144 Street right of way and identifies the possibility of approaching surrounding property owners, such as the KCLS or the Tukwila School District, for use of their off-site parking when available. The deficit of parking stalls due to the phasing of the development shall be addressed by the Development Phasing Plan approved per the Disposition and Development Agreement. Any temporary parking approved as part of the phasing plan shall be required to obtain all applicable permits; comply with surface and storm water management requirement; and address maintenance and performance measures. Recommendation 1. Approve the application for a parking standard for the live/work units of one space per unit; 2. Approve a 10% complementary use allowance; 3. Approve shared parking across proposed parcels A, B, C, D and E subject to the following conditions: Prior to issuance of the construction permits for Phase 1, the applicant shall: a) Modify Boundary Line Adjustment/Lot Consolidation application (Land Use File # L13-021) to include reciprocal parking access and maintenance easements across all lots. b) Adhere to the relevant procedures of the City's Commute Trip Reduction Program (Tukwila Municipal Code 9.44,) in order to implement the required Transportation Management Plan. The Tukwila Village Development Associates, LLC and its successor, shall perform the role of Employee Transportation Coordinator (ETC) Staff Report L13-031 Page 11 of 12 and perform that role for all businesses on the Tukwila Village site. This role shall include providing information and incentives for alternatives modes of transportation such as transit, carpool etc. Annual reports of the efforts and results shall be provided to the city's CTR coordinator. The Tukwila Village Project site includes proposed parcels A, B, C, D, E and the Library parcel (Library Parking Standard Land Use File No. L13- 021.) c) Information signage shall be developed in accordance with the City's Sign Code (TMC 19) and submitted for review and approval as part of the design review application for Phase 3. d) Any temporary parking approved as part of the phasing plan shall be required to obtain all applicable permits; comply with surface and storm water management requirement; and address maintenance and performance measures. W:\Long Range Projects\Tukwila Village\PL13-023\parking\complementary and use standard STAFH1tEPORT.doc Staff Report L13-031 Page 12 of 12 Dmubilpua Duel D,rmmimie eem.D.n 6uNwgE Duel.. o11p!Pn1sv1e p n�x�ausD:� �ms,v�na�, .10.1111 131f/Ar111010,111011VNIDINIV11.11111 30V -111A V1IMNl11 0_ 0 Z w 0 w —J 8 = m 0 w = m *77/e,rnur � 79 luewpll9ue pueI OJnl�e114we adeuspuel 6uryueid pInI „o!Pnisy1 I4 eas _s �3 �jowl A VTn v1IMNnl Oa ... 3NI1AIY3dONd K 3 7P rn � S' TUKWILA VILLAGE PARKING N 1 x a z a 0 htMehtitteltir PARKING SUMMARY SHEET - TUKWILA VILLAGE Project Tukwila Village City of Tukwila, WA date 9/16/2013 Client Bryan Park -Pacific Northern Construction Address Tukwila International Blvd &South 144th Street Tukwila, WA lot size 267,139 Isf Urban Renewal Overlay Zone zoning NCC HDR PARKING REQUIRED BY LAND USE CODE - **COMPLIMENTARY PARKING 18.56.070.D. & ADMIN. VARIANCE 5% *** Code Required Parking Admin. Variance *** Parking Provided North of South 144th St count parking parking (5%commercial reduction) Land Use sq feet ratio stalls Building A (84 units) PHASE 1 Residential non -Senior 2 bed (Bldg. A) 31 1.5 47 Residential non -Senior 1 bed (Bldg. A) 39 1 39 85 Garage- Bldg A Residential non -Senior studio (Bldg. A) 10 1 10 15 Surface - Parcel A Residential Live Work (Bldg. A) 4 1 4 100 Residential 0.95 100 100 Total Residential Retail General 4,052 SF* (Bldg. A) 3,647 0.0025 9 23 Surface - Parcel A Restaurant 2,885 SF* (Bldg. A) ..................................... 2,452 0.01 25 0 Surface - Parcel B Cafe 1,228 SF* (Bldg A.) 1,044 ** ** 9 Garage - Parcel B Employee Cafe outdoor seating 235 SF (bldg A) 118 ** ** 34 Commercial 0.95 32 32 Total Commercial Subtotal 134 132 132 Total Provided Building B (125 units) PHASE 3 70 Garage - Bldg. B Residential Senior first 15 (Bldg. B) 15 1 15 0 Surface -Parcel B Residential Senior (Bldg. B) 110 0.5 55 70 Residential 70 70 Total Residential Retail General 1,800 sf* (Bldg B) 1,620 0.0025 I 4 4 Commercial 0.95 4 3 Surface -ParcelB - commercial 1 Garage - Parcel B Employee Subtotal 1 74 74 1 74 Total Provided Community Commons / Library / Plaza (0 units) PHASE 1 Coffee Shop1,015 SF (Commons)1,015 ** : ** 11 Surface -Parcel A Coffee Shop outdoor seating 250 SF 125 ** ** 30 Surface - Parcel 8 Community Center 1,711 SF (Assembly) 1,711 1 0.01 17 11 Surface - Parcel C Library 10,000 SF 10,000 i 0.004 40 4 Garage Parcel B Employee Subtotal 57 Commercial 0.95 54 56 Total Provided *assume 90% useable floor area / 85% useable floor area for restaurant use ** Complimentary use - 10% of total useable area may be complimentary (no parking required) Total useable area- north parcels '21,732 i 0.1 2,173 Complimentary exempt 2 Surface Parcel A Principal uses : general retail, commons, library, restaurant 1 Surface Parcel B Complimentary use - cafe / coffeshop 2,302 129 0.02 3 0.95 3 3 Total Provided (i.e. "fast food") provided - exempt 170 Residential 170 170 Residential Provided 98 Commercial 0.95 93 *** 95 Commercial Provided 1 car share 1 per 200 units 209 2 2 2 Garage Parcel B tandem loading 2 2 2 Surface Parcel A loading Grand Total (North) 272 Required 267 Req'd 269 North Total Provided w/ Comp. pkg. w/ Comp pkg & Admin. Variance 171 Total Garage Stalls 98 Total Surface Stalls *** Administrative Variance for 5% reduction of commercial 13 On -street stalls N side 144th Justification = 13 on -street stalls provided at north side of 144th 282 Total including on -street Total Provided including these stalls > that Total Required (+10 stalls) Transit & Pedestrian Oriented Development I I 4 I I PHASE 2 Code Required Parking No variance required Parking Provided South of South 144th St count parking parking Land Use sq feet ratio stalls i Building D (70 Units) Residential Senior first 15 (Bldg D) 15 1 15 Residential Senior (Bldg D) 55 0.5 28 43 Residential 43 Garage -Building D Office 13,000 * ................ 11,700 0.003 35 35 Commercial 6 Garage Building -D Employee Subtotal 78 19 Bldg. D Surface Lot Employee/Guest 10 Surface Drive Commercial 78 Total Provided Building E (125 units) Residential Senior first 15 (Bldg E) • 15 1 15 35 Garage Building E -mezzanine Residential Senior (Bldg E) 110 0.5 55 70 35 Garage Building E - main Community Police - 2,000 SF* 1,800 0.003 5 7 Garage Building E - main Retail General -1,150 SF* 1,035 0.0025 3 8 1 Surface Drive- accessible *assume 90% useable floor area 78 78 Total Provided KCHA Parking Easement 18 18 Surface Stalls - easement Car share 1 per 200 uinits 195 1 1 Garage Building E - main Grand Total (South) 175 175 Overflow - shared/event 25 Building E - garage main 152 Total Garage Stalls 48 Total Surface Stalls 5 On -street stalls S side 144th 205 Total including on -street TOTAL COMBINED PHASES TUKWILA VILLAGE PARKING w/ Admin. Variance *** Code Required Parking North Site Only Parking Provided Total On -Site Parking Required 447 ] 442 469 On -Site 18 On -street 487 Combined Grand Total PARKING PROPOSED TO BE PROVIDED - BOTH ON-SITE & IN STREET ROW'S: 1 ON-SITE PARKING North South Total STREET PARKING North I South Total Surface 98 48 146 Tuk Int Blvd 0 0 0 Garage 171 152 323 S 144th Street 13 ; 5 18 Total 269 200 469 Total 13 j 5 18 1 + Total combined parking provided I 282 1 205 ] 487 1 i 4 Para metrix ENGINEERING . PLANNING . ENVIRONMENTAL SCIENCES 411 108th AVENUE NE, SUITE 1800 BELLEVUE, 'WA 98004-5571 T. 425.458.6200 F. 425.458.6363 www.parametrix.com TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM - Date: November 12, 2012 To: Dave McPherson From: Carter Danne Subject: Traffic Impact Analysis cc: Bryan Park Project Number: 554-6892-001 Project Name: Tukwila Village INTRODUCTION Project Description Tukwila Village Development Associates LP intends to develop a mixed-use neighborhood center designed to provide residences as well as neighborhood retail and resources. The developer plans to build the project in two phases and construct five buildings in total that provide the uses shown in Table 1; buildingletters are shown on the attached site plan. Table 1. Proposed Uses and Development Phasing Proposed Uses Family Apartment Units Senor ious n Building Location Phase Letter On Site Oty. Unit of Measure A Northwest 84 Dwelling Units (DU) fiche Uni ied Dweiling D Southwest 60 ODU 2 B Northeast 122 ODU 2 E Southeast 128 ODU etal Space' 000 ;SquarefFeet S 1 A Northwest 11,000 SF 1 C Commons 3,000 SF 2 B Northeast 1,800 SF 2 E Southeast 1,200 SF Medical Office 1 D Southwest 22,500 SF • Community Policing 1 D Southwest 2,000 SF /ImtiCimieur D TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) In addition, it is anticipated that the King County Library System (KCLS) will relocate the nearby Foster Library onto the site into a 10,000 SF building constructed by KCLS in a west -central location and dedicated for their sole use. The project site is located in the northeast and southeast quadrant of the Tukwila International Boulevard Scope of Analysis This technical memorandum addresses the following: • Traffic Volumes & Parking Projections • Transportation System Conditions • Mitigation Fee Requirements • Conclusions & Recommendations Tukwila Village Development Associates LP Traffic Impact Analysis 2 Figure 1 Site Vicinity Map 554-6892-001 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) TRAFFIC VOLUMES & PARKING PROJECTIONS Existing Traffic Volumes Turning movement volumes were gathered on Thursday, June 14, 2012 prior to school being out of session. The counts were conducted from 2:30 PM to 6:00 PM and the peak hours at the TIB intersections occurred from 4:30 PM to 5:30 PM and at the S 144th Street intersections from 4:15 PM to 5:15 PM. These traffic volumes are shown on Figure 2: Figure 2 Existing 2012 PM Peak Hour Turning Movement Volumes Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 3 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Future Baseline 2016 Traffic Volumes The City of Tukwila provided historic traffic volume data on Tukwila International Boulevard north of S 139th Street from the year 2006 through 2011. The annual growth from 2006 has varied year to year as is seen in Table 2 below. Additionally, a forecast of the average daily traffic (ADT) for the project horizon year of 2016 was used to help develop an assumed annual growth rate. Table 2. Historic Growth in Traffic Volumes (TIB north of S 139th Street) Data Years of Growth Average Daily Annual Growth Year from 2006 Traffic (ADT) from 2006 2006 - 17,100 - 2007 1 17,300. 1.2% 2008 2 17,400 0.9% 2009 3 16,800 -0.6% 2010 4 15,500 -2.4% 2011 5 19,100 2.2% 2016 (Forecast) 10 18,057* 0.5%* *Forecast using linear regression After reviewing the above information, a 1 percent annually compounding traffic growth rate was determined to be a reasonable assumption for the traffic growth anticipated on the streets near Tukwila Village. Figure 3 shows the future 2016 baseline traffic volumes during the weekday PM peak hour, which were grown from the volumes summarized in Figure 2. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 4 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Figure 3 Future 2016 Baseline PM Peak Hour Turning Movement Volumes Trip Generation The 8th Edition of ITE's Trip Generation was used to estimate the amount of traffic generated by the proposed site uses. Table 3 below summarizes the gross trips projected with the proposed development. Gross trips represent the trip generation of land uses as if they were standalone uses and do not account for the trip reductions typically experienced with mixed-use sites. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 5 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 3. Weekday Gross Trip Generation Proposed Uses Compatible Land Use Code Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out Family Apartment Units 220 — Apartment Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Medical Office 720 — Medical -Dental Office Building Community Policing 730 — Govemment Office Building Subtotal of Phase 1 nottncluding Lrbrary Library 590 — Library 1 A 84 DU 633 45 9 36 122 77 45 1 D 60 ODU 209 9 3 6 11 7 4 2 B 122 ODU 425 18 6 • 12 23 14 9 2 E 128 ODU 445 18 7 11 24 14 10 1 A 11,000 SF 1,389 35 21 14 126 61 65 1 C 3,000 SF . 379 10 6 4 34 17 17 2 B 1,800 SF 227 6 3 3 21 10 11 2 E 1,200 SF 151 3 3 0 13 1 D 22,500 SF 705 52 41 11 2,000 SF 138 .12 10 2 ,mob, 3433 163 90 7` 1 (by KCLS) 10,000 SF 764 7 5 2 1D 7 6 76 21 55 2 1 1 149 164 73 35 38 r Subtotal of Phase 1 with`L'ibrary 4.217 170. 95 7 184 202 Subtotal of Phase 2 45 19 8' 4§,g'A. 36 Total with Full Build -Out` '\ Full Build-Ou 5,465 , 215 , ;1 After the gross trip generation was projected, adjustments were made to account for the mixed-use nature of the site and estimatesof internal trips within the site. The ITE Trip Generation Handbook contains a procedure by which to do this and that methodology was followed to project the internal capture summarized in Table 4. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 6 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 4. Weekday Internal Trip Generation (Capture) Proposed Uses Phase & Compatible Land Use Code Building Letter Qty. Daily AM Peak Hour PM Peak Hour Total Total In Out Total In Out Family Apartment Units 220 — Apartment Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Medical Office 720 — Medical -Dental Office Building Community Policing 730 — Government Office Building SU610tai of Phase 1 not including Library Library 590 — Library Subtoot401 Phase 1 with 1A 84 DU 78 1 0 1 10 7 3 1 D 60 ODU 26 0 0 0 2 1 1 2 B 122 ODU 52 0 0 0 4 2 2 2 E 128 ODU 55 1 1 0 4 3 1 A 11,000 SF 168 3 1 2 15 5 10 1 C 3,000 SF 46 1 1 0 4 1 3 2 B 1,800 SF 27 0 0 0 2 1 1 2 E 1,200 SF 18 0 0 0 2 1 1 1 D 22,500 SF 35 1 1 0 2,000 SF 7 1D' 3 1 2 1 0 1 0 0 0 1 (by KCLS) 10,000 SF 38 0 0 0 2 2 0 Subtotal of. Phasew2 Total, with Full Build Ou < 2'. Full Budd Out With the internal trip capture projected, the external trips (trips that would appear at the driveways) were calculated by subtracting the internal trips (Table 4) from the gross trips (Table 3). Table 5 summarizes below the anticipated total driveway trips. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 7 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 5. Weekday External Trip Generation (Total Driveway Trips) Proposed Uses Compatible Land Use Code Family Apartment Units 220 — Apartment Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out 1 A 84 DU 555 44 9 35 54 35 19 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached 1 D 60 ODU 183 9 3 6 9 6 3 2 B 122 ODU 373 18 6 12 19 12 7 Senior Housing - Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center 2 E 128 ODU 390 17 6 11 20 11 9 1 A 11,000 SF 1,221 32 20 12 111 56 55 Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Medical Office 720 — Medical -Dental Office Building 1 C 3,000 SF 333 9 5 4 30 16 14 2 B 1,800 SF 200 6 3 3 19 9 10 2 E 1,200 SF 133 3 3 0 11 6 5 1 D 22,500 SF 670 51 40 11 73 20 53 Community Policing 730 — Government Office Building Subtotal of Phase 1 nol ncluding L ibrary' Library 590 — Library 1D 2,000 SF 131 11 10 1 2 1 1 3,093 1'56 z 87 69 279. 134. 145 1 (by KCLS) 10,000 SF 726 7 5 2 71 33 38 Subtotal.0Phase 1 with Library 3,819; 3 92 356 - 183 Subtotal of Phase 2 €. 1 096 18 26 69 38 31 Total with Full Build -Out Full Build -00,, 4,915 207 419 245 214 The external trip generation summarized above contains vehicle trips of two types: pass -by trips and new trips. Pass -by trips are trips to/from sites where the vehicle was already on the street and as it is passing by the site, the driver turns into the site to make a stop before resuming their original trip. New trips are the remaining trips, where the primary purpose of the vehicle trip was to travel to and from the site. Only the 17,000 SF of retail uses are expected to attract pass -by trips. The pass -by trip reductions applied to the retails uses were as follows: . • 65 percent for the PM peak hour (based on the regression equation found for Shopping Center in the ITE Trip Generation Handbook), • 55 percent for daily (although no data exists, it has been assumed to be somewhat less than during the peak hours), and • 65 percent for the AM peak hour (although no data exists, it has been assumed to mirror the PM peak hour trend). The regression equation was used rather than the average pass -by percentage because the pass -by data for shopping centers indicate that the pass -by rate exponentially increases as the square footage of the retail decreases. This presumably occurs because larger shopping centers are more of a regional destination rather than a local neighborhood center, where someone might drop by on the way home in the evening or to the office in the morning (i.e., a pass -by trip). The result of applying the above pass -by rates to the external trip generation for the retail uses is summarized in Table 6 below. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 8 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 6. Weekday Pass -By Trip Generation Proposed Uses Compatible Land Use Code Family Apartment Units 220 — Apartment Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space ' 820 — Shopping Center Retail Space 820 — Shopping Center Medical Office 720 — Medical -Dental Office Building Community Policing 730 — Government Office Building Subtotal of Phase 1 not including Library Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out 1 A 84 DU 0 0 0 0 0 0 0 1 D 60 ODU 0 0 0 0 0 0 0 2 B 122 ODU 0 0 0 0 0 0 0 2 E 128 ODU 0 0 0 0 0 0 0 1 A 11,000 SF 672 21 13 8 72 37 35 1 C 3,000 SF 183 6 4 2 20 10 10 2 B 1,800 SF 110 3 2 1 12 6 6 2 E 1,200 SF 73 3 1 2 7 4 3 1 D 22,500 SF 0 0 0 0 0 0 0 1 D 2,000 SF 0 0 0 0 0 0 0 1 855 27 17 10 92 47 45 Library 590 — Library Subtotal of Phase 1 with Library 1 (by KCLS) 10,000 SF 0 0 0 0 0 0 0 1 855 27 17 10 92 47 45 Subtotal of Phase 2 2 183 6 3 3 19 10 9 1 Total with Full Build -Out Full Build -Out 1,038 33 20 13 111 57 54 The proposed Tukwila Village development would attract 1,038 daily pass -by trips, of which 33 would occur during AM peak hour and 111 would occur during the PM peak hour. As mentioned previously, after accounting for internal trip capture and pass -by trips, the remaining trips are referred to as new trips. The new trips summarized below in Table 6 are the result of subtracting the pass -by trips in Table 5 from the external trips in Table 7. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 9 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 7. Weekday New Trip Generation Proposed Uses Compatible Land Use Code Phase & Building Letter Qty. Daily AM Peak Hour PM Peak Hour Total Total In Out Total In Out Family Apartment Units 220 — Apartment Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center 1 A 84 DU 555 44 9 35 54 35 19 1 D 60 ODU 183 9 3 6 9 6 3 2 B 122 ODU 373 18 6 12 19 12 7 2 E 128 ODU 390 17 6 11 20 11 9 1 A 11,000 SF 549 11 7 4 39 19 20 Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center 1 C 3,000 SF 97 3 2 1 10 6 4 2B 1,800 SF 10 2 1 1 7 3 4 2 E 1,200 SF 193 1 1 0 4 2 2 Medical Office 720 — Medical -Dental Office Building Community Policing ' 1 D 22,500 SF 670 51 40 11 73 20 53 730 — Government Office Building 1 D Subtotal; of Phase 1 not including Library 1 2,000 SF 131 11 10 1 2 1 1 ,185 1265C,71'''''''' 58i4187 87 100; Library 1 (by KCLS) 590 — Library Subtotal of Phase 1 with Libra 10,000 SF 726 7 5 2 71 33 38 1 2,91.1' .136 258 120 138:= Subtotal of Phase 2 966 38 14 28 22 Total with Full Build-Ou Full Build -Out 3.877 308 160` The proposed Tukwila Village development would generate 3,877 new daily trips, of which 174 would occur during the AM peak hour and 308 during the PM peak hour. Trip Distribution and Assignment Based on the land use patterns in the general vicinity of the project, knowledge of the local transportation system, professional engineering judgment, and traffic counts along Tukwila International Boulevard, distribution and assignment of the project trips were estimated. The new project trip distribution is shown on Figure 4. New trips are estimated to travel to/from the site in the following pattern: • 25 percent to/from the north on TIB towards Seattle. • 25 percent to/from the west on S 144th Street towards nearby neighborhoods and Military Road S. • 25 percent to/from the east on S 144th Street towards nearby neighborhoods. • 25 percent to/from the south on TIB towards the City of SeaTac and State Route 518. Pass -by traffic to/from Tukwila Village is shown on Figure 5 and was assigned based on where the uses were located on the site as well as the volume being carried in the future baseline 2016 traffic streams on TIB and S 144th Street, which indicated the following distribution for the Phase 1 pass -by trips, which are likely to arrive from both TIB and S 144th Street: • 43 percent from southbound TIB Tukwila Village Development Associates LP . 554-6892-001 Traffic Impact Analysis 10 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) • 26 percent from northbound TIB • 17 percent from westbound S 144th Street • 14 percent from eastbound S 144th Street For Phase 2 pass -by trips, the uses are set -back from TIB and much more likely to draw traffic only from S 144th Street. Given that, the Phase 2 pass -by traffic was distributed as follows: • 54 percent from westbound S 144th Street • 46 percent from eastbound S 144th Street Lastly, because the project site provides non -motorized system improvements in project vicinity, crosswalk volumes were projected to increase by 50 pedestrians per hour with the completion of the project. For comparison, 50 pedestrians per hour represents the difference between the values suggested for assuming the number of pedestrians per hour in a rural area (zero pedestrians per hour) and a suburban area (50 pedestrians per hour). These values were documented in in the National Cooperative Highway Research Program (NCHRP) Report 599 — Default Values for Level of Service and Highway Capacity Analyses. The thought being the relative difference reflects the change from an undeveloped condition to a suburban development condition. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 11 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) $141STST S 142ND ST r0 t ©00 S 146TH ST Vvagawigamommepaima Trip Distribution Percentage Daily Trips Peak Hour Trips Tukwila Village Development Associates LP Traffic Impact Analysis 12 Figure 4 New Project Trips Distribution and Assignments 554-6892-001 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) 5 141ST ST Figure 5 Pass -By Project Trip Assignments Tukwila Village Development Associates LP Traffic Impact Analysis 13 November 12, 2012 554-6892-001 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Future 2016 With Project Volumes The trip assignments of new and pass -by traffic were added to the future 2016 baseline PM peak hour volumes shown on Figure 3, which resulted in the PM peak hour turning movement volumes shown in Figure 6. These volumes were used to assess the transportation system conditions with the project. Figure 6 Future 2016 with Full Build -Out PM Peak Hour Turning Movement Volumes Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 14 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Parking Generation ITE Parking Generation, 4th Edition was used to estimate the parking demand for the project. The proposed site uses were matched as close as possible to the data available. The parking demand estimates were compared to the • proposed parking supply. A total of 431 parking stalls would be provided on-site of which 293 would be in - building (garages) and 138 spaces would be surface parking stalls. Additionally, 23 on -street parking spaces would also be provided. Table 8 below summarizes the anticipated parking demand for a typical weekday. Table 8. Peak Parking Demand by Individual Use Proposed Uses (Compatible ITE Land Use Code) Family Apartment Units 84 Dwelling Units (Code 221 - Low/Mid-Rise Apartment) Senior Housing — Attached Units 310 Occupied Dwelling Units (Code 252 — Senior Adult Housing — Attached) Retail Space 17,000 Square Feet (SF) (Code 820 — Shopping Center) Library 10,000 SF (Code 590 — Library) Medical Office 22,500 SF (Code 720 — Medical -Dental Office Building) Community Policing 2,000 SF (Code 730 — Government Office Building) Peak Parking Demand Characteristics 1.42 spaces per dwelling unit minus 38 spaces 0.59 spaces per dwelling unit Peak Parking Demand Spaces 81 183 Hours of Day Parking Peaks Overnight (12:00 AM -5:00 AM) Overnight (12:00 AM -5:00 AM) 3.76 spaces per 1,000 SF 64 Noon -1:00 PM 3.14 spaces per 1,000 SF 3.40 spaces per 1,000 SF minus 13 spaces 4.15 spaces per 1,000 SF 31 7:00 PM -8:00 PM 10:00 AM -Noon 8 10:00 AM -11:00 AM The sum of the above peak parking demands for the individual uses total 431 parking spaces (and the amount of on-site parking satisfies that amount) and because parking peaks at different times of the day, the actual maximum peak parking demand is less than 431 parking spaces, and would peak at 281 parking spaces in use in the evening from 6:00 PM to 7:00 PM. Table 9 illustrates this by summarizing the parking demand as it varies throughout the day using data from ITE. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 15 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 9. Hourly Variation of Parking Demand Percent of Peak Parkins Demand Family Senior Medical- Site • Hour Apartment Housing- , Dental Community Parking Beginning Units' Attached2 Retails Library's Offices Policing6 Demand 12:00 AM 100% 100% 9% 270 1:00 AM 100% 100% 9% 270 2:00 AM 100% 100% 9% 270 3:00 AM 100% 100% 9% 270 4:00 AM 100% 100% 9% 270 5:00 AM 96% 96% 9% 257 6:00 AM 92% 92% 9% 246 7:00 AM 74% 74% 5% 18% 59% 215 8:00 AM 64% 64% 18% 16% 64% 79% 233 9:00 AM 34% 34% 38% 45% 85% 83% 189 10:00 AM 32% 32% 68% 52% 100% 100% 216 11:00 AM 31% 31% 91% 70% 100% 92% 233 12:00 PM 30% 30% 100% 58% 88% 77% 224 1:00 PM 31% 31% 97% 79% 81% 59% 225 2:00 PM 33% 33% 95% 78% 90% 71% 235 3:00 PM 37% 37% 88% 84% 93% 78% 246 4:00 PM 44% 44% 78% 58% 86% 72% 245 5:00 PM 59% 59% 62% 49% 52% 46% 248 Ei67.9% ;:ten 69% 64% �s50%63% . s 25%o`2$1 7 7:00 PM 66% 8:00 PM 75% 9:00 PM 77% 10:00 PM 92% 11:00 PM 94% 66% 75% 77% 92% 94% 9% 77% 100% 70% 72% 42% 9% 255 265 230 252 254 1 For the family apartment units, the daily distribution for Low/Mid-Rise Apartment (ITE Land Use 221) was used; however, that data has a gap between 9:00 AM and 4:00 PM and the daily distribution for Rental'Townhouse (ITE Land Use 224) was used for parking between 9:00 AM and 4:00 PM. 2 For the senior housing -attached units, no daily distribution data is available in ITE for Senior Housing -Attached (Land Use 252). Therefore, the assumed daily distribution for family apartment units was used. 3 For the retail uses, the daily distribution of parking demand for Shopping Center (ITE Land Use 820) for a non -Friday, non - December weekday was used. To account for live-in tenants at the live/work spaces, 9 percent of the peak parking demand was assumed, which amounts to 6 parking spaces and is equivalent to an increase of 4 apartment units generating additional overnight parking demand from 10:00 PM to 7:00 AM. 4 Used data for Library (ITE Land Use 590). 5 Used data for Medical -Dental Office Building (ITE Land Use 720). 6 Used data for Government Office Building (ITE Land Use 730), which provides data for the time period from 9:00 AM to 4:00 PM. That was supplemented with data from Office Building (ITE Land Use 701) for the hours from 7:00 AM to 9:00 AM and 4:00 PM to 7:00 PM. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 16 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Note that the above parking demand estimates have not been adjusted for the mixed-use nature of the site and the internal capture between uses, which would reduce the peak parking demand. The daily trip generation would experience a trip generation reduction of 10 percent due to internal capture and a similar reduction would likely occur for the peak parking demand. One other factor that may reduce the overall parking demand is the close proximity to King County Metro bus stops on Tukwila International Boulevard and S 144th Street in the site vicinity (see the Transportation System Conditions section for detailed information about the routes and stop locations). With the overall site peak parking demand peaking at 281 parking spaces, and 431 on-site parking spaces being provided, the proposed parking supply would be adequate. TRANSPORTATION SYSTEM CONDITIONS Street Descriptions The street characteristics in the project vicinity along the project frontage are described in Table 10. Table 10. Existing Street Characteristics in Project Vicinity Street Name Functional Classification Tukwila International Boulevard S 144th Street Principal Collector Posted Speed Limit 40 mph 25 mph Travel Lanes Two through lanes in each direction with left -turn lanes and right -turn pockets at S 144th Street. One through lane in each direction with left -turn lanes at TIB. Non -Motorized System Improvements Sidewalks on both sides of the street, but no bike lanes. Signalized crosswalks are provided at the east and west legs of the TIB/S 144th Street intersection. An unsignalized mid -block crosswalk with overhead flashing beacons is also provided north of S 144th Street across TIB. West of TIB, there are sidewalks and bike lanes on both sides. East of TIB, there is continuous sidewalk along the north side and intermittent sidewalk along the south side. There are no bike lanes currently along either side. Signalized crosswalks are provided at the north and south legs of the TIB/S 144th Street intersection. An unsignalized crosswalk is also provided at the east leg of the S 144th Street/41 st Avenue S intersection. Transit Service Options Bus stops for King County Metro Route 124 are located on the east side of TIB north of S 144th Street and on the west side of TIB south of S 144th Street. Metro Route 124 operates on 30 -minute headways on weekdays and connects to both SeaTac and downtown Seattle. Bus stops for King County Metro Route 128 are located on the north side of S 144th Street east of 42nd Avenue S and on the south side of S 144th Street west of TIB. Metro Route 128 operates on 30 -minute headways on weekdays and connects Tukwila to West Seattle. Crash History The five-year history of vehicle crashes in the project vicinity was reviewed to see if the crash rate appeared to be unusually high. None of the locations studied experienced crash rates in excess of 1.0 crash per million entering vehicle. In other words, the crash rates were less than one in million. Additionally, no crashes were severe enough to cause fatalities. Table 11 summarizes the five-year crash history. Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 17 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 11. Five -Year Crash History — Crash Rate and Severity Study Area Facilities Street Intersections: Total Crashes Exposure Rate Time (years) Est.2 Daily Volume (veh) Crashes per Year Severity Crashes per Million Property Entering Damage Personal Vehicles Only Injury Fatality Tukwila International Blvd. (TIB) at S 144th Street 22 5 20330 4.4 0.6 15 7 S 144th Street at 41st Avenue S 3 0 5 5810 0.0 0.0 Street Segments TIB between: S 142nd Street and S 144th Street 20 5 13180 4.0 0.8 16 4 TIB between: S 144th Street and S 146th Street 22 5 15120 4.4 0.8 14 8 S 144th Street between: TIB and 41st Avenue S 4 5 5700 0.8 0.4 3 1 S 144th Street between: 41st Avenue S and 42nd Avenue S 6 5 5560 1.2 0.6 1 1 City of Tukwila records from July 1, 2007 through June 30, 2012. 2 Assumes that the daily volume entering the intersection is approximately 10 times p.m. peak hour volume. 3 Last reported crash here occurred prior to this 5 -year reporting period. The types of crashes were also summarized and those have been summarized in Table 12. The most frequently occurring crash involved a rear -end collisions, which are typically due to driver inattention and stop -and -go traffic. Table 12. Five -Year Crash History — Crash Types Study Area Facilities Street Intersections Approach Turn Head On Crash Type Fixed Object or Parked Backing Vehicle Rear End Pedestrian Right Side- or Cyclist Angle swipe Involved Tukwila International Blvd. (TIB) at S 144th Street 3 3 4 S 144th Street at 41st Avenue S 3 Street Segments TIB between: • S 142nd Street and S 144th Street 1 16 1 2 TIB between: S 144th Street and S 146th Street 1 1 10 2 6 2 S 144th Street between: TIB and 41st Avenue S 1 3 S 144th Street between: 41st Avenue S and 42nd Avenue S 1 1 1 3 Study Area Total Crashes 4 1 2 3 411 6 12 5 Percent of Study Area Total Crashes 5% 1% 3% 4% 55% 8% 16% 7% Tukwila Village Development Associates LP Traffic Impact Analysis 554-6892-001 18 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Level of Service at Intersections Traffic operations were studied at the proposed site driveway intersections and the public street intersections of TIB/S 144th Street and S 144th Street/41 st Avenue S. The quality of traffic operations at intersections was ranked with a level of service (LOS) on an alphabetic scale from LOS A to LOS F, with LOS A being the best operations and LOS F being the worst operations. This is consistent with the Highway Capacity Manual published by the Transportation Research Board. The deterministic software, Synchro version 7 (Build 773, Revision 8), developed by Trafficware, was used to study the intersection operations. Using the intersection traffic volumes shown on Figures 2, 3, and 6, the LOS results were obtained and are summarized in Table 13 below. Table 13. Intersection Level of Service Conditions Existing 2012 Future 2016 Baseline Future 2016 with Project Intersection LOS Delay LOS Delay LOS Delay Tukwila International Boulevard at C 35.0 D 36.1 D 38.9 S 144th Street S 144'" Street at 41st Avenue S/East Drive Northbound Approach B 13.1 B 13.3 C 23.5 Southbound Approach B 12.1 B 13.2 C 23.9 Tukwila International Boulevard at at North Drive (Westbound Approach) Tukwila International Boulevard at at Main Drive (Westbound Approach) S 144m Street at South Drive (Northbound Approach) A 8.9 A 9.0 C 19.4 None of the intersections operate worse than LOS D. With Tukwila Village, the intersection LOS would degrade from LOS B to LOS C, however, LOS C is still an acceptable LOS. As identified in the City of Tukwila Comprehensive Plan, the LOS standard is LOS D in residential areas and LOS E in commercial areas. Therefore, all of the study intersections would meet the LOS standard and no specific mitigation is recommended to improve the LOS condition at the study intersections. Driveway Channelization The proposed driveways operate at acceptable LOS with the channelization shown on'the site plan. The Tukwila Infrastructure Design and Construction Standards do not contain specific channelization guidelines to follow for evaluating channelization proposed at driveways beyond LOS conditions, but do mention the City recognizes and uses the most current edition of A Policy on Geometric Design of Highways and Streets by the American Association of State Highway and Transportation Officials (AASHTO) for channelization guidelines. AASHTO does not have quantitative guidelines for recommending right -turn channelization and the City's standards indicate that the City recognizes the WSDOT Design Manual as a reference, which does have quantitative guidelines for right -turn channelization, therefore, that has been used to supplement the AASHTO reference. The greatest potential need for left -turn channelization on a public street to serve movements into the project site would occur at the S 144th Street/East Drive/41st Avenue S intersection. In reviewing the AASHTO guidelines and extrapolating for a 30 -mph operating speed, the combination of left -turn volumes, advancing and opposing volumes at the East Drive intersection do not warrant the a left -turn lane. The greatest potential need for right -turn channelization on a public street to serve movements into the project would occur at the TIB/Main Drive intersection. At this intersection, 62 vehicles would turn into the Main Drive with 526 vehicles traveling advancing northbound behind them. However, there are two northbound travel lanes Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 19 November 12, 2012 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) and the posted speed limit is 40 mph there. The WSDOT Design Manual only recommends using the Design Manual Exhibit 1310-19 in developing recommendations for right -turn lanes when multilane faeilities have posted speed limits of 45 mph or greater. Additionally, given that King County Metro has a bus pull-out in close proximity that would conflict with a right -turn lane, no right -turn lane is recommended on TIB at the Main Drive. Driveway Sight Distances The sight distance exhibits prepared by Barghausen Consulting Engineers indicate that the proposed driveway locations would have adequate sight distance per City standards. Therefore, no sight distance improvements are recommended. It is recommended that sight distance triangles be regularly maintained. Driveway Access Spacing & Corner Clearances The proposed driveways were located based on site constraints and access spacing and corner clearance requirements. Note: The East Drive/41st Avenue S was not checked because it exists in that location today. Table 14 summarizes the distances between intersection corners and accesses. Table 14. Access Spacing and Corner Clearance Access North Drive Corner Clearance 530 feet edge to edge from TIB (560 feet centerline to driveway center) 70 feet edge to edge from S 142nd Street (110 feet centerline to driveway center) Access Spacing 270 feet edge to edge from Main Drive Main Drive 230 feet edge to edge from S 144th Street (260 feet centerline to driveway center) 270 feet edge to edge from North Drive South Drive 140 feet edge to edge from TIB (195 feet centerline to driveway center) 180 feet edge to edge from East Drive/41st Avenue S MITIGATION FEE REQUIREMENTS Mitigation fees are due to the City at the time of building permit issuance to pay for the project's proportionate share of impacts. Additionally, the proposed development must pass the concurrency test conducted by the City of Tukwila. CONCLUSIONS & RECOMMENDATIONS The proposed Tukwila Village would not create significant adverse impact on the transportation system. The primary recommendations are: • Maintain clear sight triangles • Pay for the project's proportionate share impacts via the City's traffic impact fee program Tukwila Village Development Associates LP 554-6892-001 Traffic Impact Analysis 20 November 12, 2012 TUKWILA VILLAGE Revised PHASED DEVELOPMENT PLAN 10/04/2013 PROPOSED PHASED DEVELOPMENT SCHEDULE PHASE PHASE 1: PHASE 2: PHASE 3: Milestone Target Date Design Review Application Submittal 06/01/2013 Design Review Approval 10/31/2013 Grading & Foundation Permit Application Submittal 11/01/2013 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 11/01/2013 Building Permit Application Submittal 12/01/2013 Grading & Foundation Permit Issuance 02/01/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 02/01/2014 Commence Grading, Foundation & Engineering Work 02/15/2014 Building Permit issuance 04/01/2014 Commence Building Construction 05/01/2014 Construction Completion / Issuance of Certificate of Occupancy 04/30/2015 Design Review Application Submittal 11/01/2013 Design Review Approval 01/31/2014 Grading & Foundation Permit Application Submittal 02/01/2014 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 02/01/2014 Building Permit Application Submittal 03/01/2014 Grading & Foundation Permit Issuance 05/01/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 05/01/2014 Commence Grading, Foundation & Engineering Work 05/15/2014 Building Permit Issuance 07/01/2014 Commence Building Construction 08/01/2014 Construction Completion / Issuance of Certificate of Occupancy 09/30/2015 Grading & Foundation Permit Application Submittal 11/01/2013 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 11/01/2013 Grading & Foundation Permit Issuance 02/01/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 02/01/2014 Commence Grading, Foundation & Engineering Work 02/15/2014 Design Review Application Submittal 07/01/2014 Design Review Approval 09/30/2014 Building Permit Application Submittal 12/01/2014 Building Permit Issuance 04/01/2015 Commence Building Construction 05/01/2015 Construction Completion / Issuance of Certificate of Occupancy 04/30/2016 4> JOHNSON BRAUND INC RECEIVED 272013 September 18, 2013 Revised September 27, 2013 Moira Carr Bradshaw Senior Planner City of Tukwila / Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 RE: TUKWILA VILLAGE PHASE ONE B.A.R. PARKING COMMENTS SEP C;C)MFJIUNI 1 Y nEVLLUPMLNT Moira, Please see our responses in italics below to the parking comments dated August 07, 2012. Per our previous phone conversations about parking calculations, the attached parking summary has been revised to utilize the complimentary uses parking reduction as outlined in the Tukwila Zoning Code section 18.56.070.D. In addition to the complimentary uses we've also noted a request for a 5% administrative variance for the portion of the site north of S. 144th street only. Justification for the requested variance includes on -street parking stalls provided on 144th, walkable development with a large number of residents within the project itself and surrounding residential/multifamily neighborhood and the close proximity to available transit. 1. Parking standard for live work Applicant proposes 1.5 per unit - Is there any experience, documentation or support for this proposed standard? City of Seattle parking standard for Live -Work units (SMC 23.54.015 Table A- see attached) is 0 spaces for 1,500 sf or less and 1 space for units 1,500 sf to 2,500 sf. City of Renton parking standard for Live -Work units (RMC 04-04-080 — see attached) is a minimum and maximum of one per unit. (See also attached City of Renton staff report/recommendation for parking of Live/work units based on area of unit <2,500 sf = 1 stall.) The proposed Live -Work units in Building A are 465 sf on the ground floor and 200 sf on the mezzanine level = 865 sf total. We had originally calculated the residential portion of the unit at 1 stall per unit (1 bedroom) + an additional .5 stall for the non-residential portion, however given the precedent of other local jurisdictions with live -work parking quantity based on overall unit size, we propose reducing our parking to one stall per unit. See revised parking calculations attached. 2. Assumption on usable floor area Parking requirement is based upon definition of "Usable Floor area" which means that part of the floor area of any structure which is actually used from time to time for any commercial purposes, such as a sales area, display area, walkways or storage area. 15200 52nd Avenue South, Suite 300, Seattle, Washington 98188 Phone 206.766.8300 www.johnsonbraund.com ARCHITECTURE INTERIOR DESIGN Page 2 September 17, 2011 Parking calculation shall not include: • common corridors designed for the circulation of people at nonretail establishments, • restrooms, • elevator shafts and stairwells at each floor, • mechanical equipment rooms or attic spaces and • exterior covered loading docks. (TMC 18.06.863 Usable Floor Area) Please provide support for use of the 75% as a useable floor area per the definition above. The parking calculations have been revised to reflect a higher percentage of useable area. In reviewing the area of each tenant space and the anticipated use/layout (i. e. many of the small incubator space will simply have accessible unisex restroom) it was determined that the useable areas of the incubators spaces will be approx. 85-90% useable and the restaurant areas 80-85% useable. We have utilized the higher usable area in the parking calculations: 90% for general retail uses and 85% for restaurant uses. See revised parking calculations attached. 3. The Parking Demand Generation section of the Traffic Impact analysis by Parametrix raises the following questions: • The author uses the Shopping Center (Land Use 820) category to evaluate parking demand. The average size of the centers in the data base is 545,000 square feet, which is very different from this proposal which has a total of 17,500 square feet of commercial/retail space. Please support use of that database or use a combination of more appropriate land use codes. • Why are 38 spaces subtracted from the peak demand for the family units in Bldg.? A? (page 14) • What is the parking demand for community assembly space in Bldg. C.? See attached response from Parametrix dated 8-23-2013. 4. How will impacts to parking from community events be managed? Parking for community events will be managed by flexible/ shared parking between phases. After business hours (5 pm) and on weekends the surface parking behind Building D (19 stalls) and on the access driveway between D & E (11 stalls) will be available for use. The on -street parking (18 stalls) is also available for event use at all times during the day (total of 48 additional stalls). We have now planned for a mezzanine level of parking in the garage of Building E. This will allow for an additional 25 stalls to be available on the main floor garage level for overflow/flexible use for Tukwila Village as needed. Page 3 September 17, 2011 When large events are planned (in evenings and/or summer months), valet parking may be utilized and arrangements may also be made with Foster High School to allow for overflow off-site parking. 5. Please verify that housing occupants will be charged for structured parking. Have you anticipated on-site or off-site impacts and how they will be managed? Some of the housing occupants will be charged for structured parking based on affordability levels. The low-income senior units in Buildings D & E and the low- income/ affordable portion of the mixed -income units in Buildings A & B will not be charged for structured parking. The market rate units in Buildings A & B will be charged for structured parking. All residential tenants must register to park on site (either in a structured parking garage stall or a surface parking stall). No surface parking stall registrations will be allowed for residential tenants (with the possible exception of a reasonable accommodation under Fair Housing laws). The Developer's captive management company will monitor the use of garage parking stalls and surface parking stalls. If a residential tenant's vehicle is not registered or is parked in a surface stall, it will be towed. 6. Discuss the impact of reserved parking. Which stalls will be reserved, how will they be managed and show how will it affect the overall supply relative to demand. The 11 surface parking stalls + 1 loading stall located immediately to the north of the Library will be reserved for the Library use only. The stalls located off of T.I.B. adjacent to Building A and the surface stalls located immediately south of the Building A commercial frontage will be reserved for Building A commercial / retail customers. Several stalls in the parking garage of Building B will be reserved for use by employees of the commercial / retail tenants in Buildings A, B and C. Since the Library and commercial tenants of Building A are the largest/most constant uses for the project, reserving these stalls for these uses will not adversely affect supply relative to demand. There are 18 stalls west & south of Building E that are reserved (pursuant to an existing parking easement, to be amended) for the adjacent King County Housing Authority project (Riverton Terrace.) 7. Will the structured parking be assessable to office/retail/library tenants? The structured parking is to be secured with locked gates and controlled access cards. Building A garage is reserved for residential tenants only. All of residential parking for Building B is provided in the garage. Building B garage also has 16 additional stalls available for employee parking (employees from Building A, Page 4 September 17, 2011 B, and C) and 2 stalls for car-share/flex car parking. The employee parking will also be access controlled. Building D parking garage serves all of the residential tenants as well as a percentage of the Building D office tenant employees. Building E garage serves all of the residential tenants as well as the parking for the Neighborhood Police Resource Center and a percentage of the office tenant employees from Building D. Twenty five (25) additional parking stalls will also be available for overflow/special events parking on the main garage level. 8. Show how the phasing of the project and of the parking supply will affect parking demand. For example, if all of the calculations are accurate and supportable for Phase one, then the parking demand is 190 and yet only 150 are proposed for Phase one. My understanding is that 33 stalls on Parcel B could be made available in a temporary condition. There are issues of: • the code requirement that stipulates: The surface of any required off-street parking or loading facility shall be paved with asphalt, concrete or other similar approved material (s) and shall be graded and drained so as to dispose of all surface water, but not across sidewalks (TMC 18.56.040 (7) (a.) General Requirements. • the impact of construction of Building B and the temporary elimination of the 33 stalls. If the above points can be adequately resolved, please address any deficit from the standard of stalls. Phase 1 requires 190 stalls + 1 car share + 2 loading stalls. 100 of the stalls are for residential tenants and 93 are for commercial uses. Phase 1 provides 149 stalls total as follows: Parcel A/Phase 1: 85 garage stalls (for residents), 51 surface stalls and 2 loading stalls. Parcel C/Phase 1: 11 surface stalls. Until Phase 3 is constructed, the parking demand is short 44 stalls. 34 stalls will be made available on Parcel B in a temporary parking condition. The additional 10 required stalls can be satisfied by the available on -street parking stalls on the north side of S. 144th street (13 total). Disruptions to available parking on Parcel B during construction of Phase 3 can be offset by flexible shared uses with Phase 2. This includes 5 additional on -street parking on the south side of C. 144th street , as well as the overflow/shared event parking in the garage of Building E (25 stalls). Page 5 September 17, 2011 9. Please explain the sequence of the S 144 Street improvements and the potential availability of those on -street stalls. The construction schedule of the S 144`h street improvements is contingent upon the approval of a Transportation Improvement Board Grant application. However, the intention is that the north half of the street improvements will be completed with Phase 1 and the south half of the street improvements will be completed with Phase 2. Sincerely, JOHNSON BRAUND, INC. :Z7•72er-di L`2t Diana Keys, Director of ousing Attachments Revised Parking Calculations for Complimentary Uses dated 9-16-2013 City of Seattle parking standards for Live -Work City of Renton parking standards for Live -Work City of Renton staff report on Live -work parking Response letter from Parametrix PARKING SUMMARY SHEET - TUKWILA VILLAGE L Project Tukwila Village City of Tukwila, WA date 9/16/2013 Client Bryan Park - Pacific Northern Construction Address Tukwila International Blvd & South 144th Street 'Tukwila, WA lot size 267,139 sf zoning Urban Renewal Overlay Zone NCC 'HDR PARKING REQUIRED BY LAND USE CODE - **COMPLIMENTARY PARKING 18.56.070.D. & ADMIN. VARIANCE 5% *** Code Required Parking Admin. Variance *** Parking Provided North of South 144th St count parking 1 parking (5% commercial reduction) Land Use sq feet ratio l stalls Building A (84 units) PHASE 1 Residential non -Senior 2 bed (Bldg. A) 31 1.5 47 Residential non -Senior 1 bed (Bldg. A) 39 1 39 85 Garage- Bldg A Residential non -Senior studio (Bldg. A) 10 1 10 15 Surface - Parcel A Residential Live Work (Bldg. A) ................................................................................................. 4 1 4 100 Residential 0.95 100 100 Total Residential Retail General 4,052 SF* (Bldg. A) 3,647 0.0025 ': 9 23 Surface - Parcel A Restaurant 2,885 SF* (Bldg. A) 2,452 0.01 25 0 Surface - Parcel B Cafe 1,228 SF* (Bldg A.) 1,044 ** ** 9 Garage - Parcel B Employee Cafe outdoor seating 235 SF (bldg A) 118 ** ** 34 Commercial 0.95 32 32 Total Commercial Subtotal 134 132 132 Total Provided Building 6 (125 units) PHASE 3 70 Garage - Bldg. B Residential Senior first 15 (Bldg. B) 15 1 15 0 Surface - Parcel B Residential Senior (Bldg. B) 110 0.5 55 70 Residential 70 70 Total Residential Retail General 1,800 sf* (Bldg B) 1,620 0.0025 4 4 Commercial 0.95 4 3 Surface - Parcel B - commercial 1 Garage - Parcel B Employee Subtotal 74 74 74 Total Provided Community Commons / Library / Plaza (0 units) PHASE 1 Coffee Shop 1,015 SF (Commons) 1,015 i. i ** ** 11 Surface - Parcel A Coffee Shop outdoor seating 250 SF 125 i ** ** 30 Surface - Parcel B Community Center 1,711 SF (Assembly) 1,711 i 0.01 17 11 Surface - Parcel C Library 10,000 SF 10,000 0.004 i 40 4 Garage Parcel B Employee Subtotal 57 Commercial 0.95 54 56 1Total Provided *assume 90% useable floor area / 85% useable floor area for restaurant use I i- ** Complimentary use - 10% of total useable area may be complimentary (no parking required) Total useable area- northarcels 21,732 P 1 f 01 i 2,173 Complimentary exempt 2 Surface Parcel A Principal uses : general retail, commons, library, restaurant 1 Surface Parcel B Complimentary use - cafe / coffeshop 2,302 129 0.02 3 0.95 3 3 Total Provided (i.e. "fast food") provided - exempt 170 Residential 170 170 Residential Provided . 98 Commercial 0.95 93 *** 95 Commercial Provided car share 1 per 200 units 209 2 2 2 Garage Parcel B tandem loading 2 2 2 Surface Parcel A loading Grand Total (North) 272 Required 267 Req'd 269 North Total Provided w/ Comp. pkg. w/ Comp pkg & Admin. Variance 171 Total Garage Stalls 98 Total Surface Stalls *** Administrative Variance for 5% reduction of commercial T 13 On -street stalls N side 144th Justification = 13 on -street stalls provided at north side of 144th 282 Total including on -street Total Provided including these stalls > that Total (+10 stalls) Transit & Pedestrian Oriented Development 1 I- 1 PHASE 2 Code Required � �=���m� Parking Provided South o*South /^*mSt Land Use count sq feet parkingparking ratio stalls -r -4-' _-_--~--_.^ 4- ~~ --'^ ---_' ,uilmo opwUnits) r Residential 15 1 15 _-_--'�'-- '__ �_-_'^-_-__- �_--_— ~ _~-- --~ --�- - -- --- ----- Residential 55 0.5 28 43 Residential -__-- ___. _ ____� m 'Garage -Building D Office 13,00o^ 11,7000.003 -r 6 Garage Employee Subtotal78 ^. ^35 -Commercial --_- �_'- -- -'-- zo Employee/Guestu^- _35 -� m �u��onm | Commercial __'Total - + � -__ 78 «�«�x'u�"�� ' ��� �a��mmmfi����� 15 1 15 -�_ __--_- . � ��:��o�� Residential Senior Community Police - 2,000 SF* Retail Genera1,150 SF* 110 z�o 1,035 0.5 o»o 0.0025 55 5 70| 8 _ ,- ___ __ -I-_. �_ ---_.^ ------__�_ - -- __�_� Building -- - r mu" _ ' _�-'--- --__ 1 Surface�unm'oosume �o""e�m"�.u"o"�== _--'--_---_-'-'� �_' ro --------' '---'___ m --- Total -' -_- -,- _' - - - '-/ KCHA Parking Easement __� _�_� 18 -_ -_^ -__ ,- 18 Surface __- Car u,mo�zw,mo"mu 195 1 _�-i-_ 1 Garage Building E - main Grand Total (South) os 175 - --- -- __- '_ - - ��_ .-`' _� � � � -----1- _'-- - _, - --4-'- ~- _+ _ —,_ � ____ --'— - -- - '_--_-- --� _ T _-�, -- -t +_ -- '-- ---- |------ o��°'m���, 25 Building E'�m�m� ~ __-;-' --' � 152 ---_--, --- Total Garage Stalls _ - +- 48 _�_ Total Surface Stalls - �_. - 5 - On-streetstalls �� - '�—�_- -� os Total including on -street --- TOTAL COMBINED PHASES rvxw/u.vuAsEPARKING + ( y �� '- °yAdmin. varianc ° ~ -� —' c�"�numo,�u" � North Site OnIy Parking Provide Total On -Site Parking Required . 447 442 | 469 On -Site __ +__� . 18 On -street t ' __ _ [ - ' + - CombinedGrand Total =� +- _487 ` ._ PARKING PROPOSED TO BE PROVIDED - BOTH ON-SITE & IN STREET ROW'S | ! . i } ON-SITE pAnuNorthSouths | North South Total 1srnEErpAnmmm ' ' North South Total Surface ----- -- 98 48 146 naInt mm 0 0 0 -_� '- ^�"�v 171 152 323 S��m13 5 T 18 3 18 Total -269 ��9 200 469 I �v��' � � ,__ � __ ___+ —| � i -' ^ —+- -4-_. Totalprovided 282 205 | 487 | - — - - --^~---~~~'---- r ~ -� ----' - -- + -,--- --1--- --L -- ' Seattle Municipal Code Page 4 of 14 I. General Nonresidential Uses (other than institutions) A. B. AGRICULTURAL USES COMMERCIAL USES B.1. Animal shelters and kennels B.2. Eating and drinking establishments Entertainment Uses, general, except as noted below (1) 1 space for each 2,000 square feet 1 space for each 2,000 square feet 1 space for each 250 square feet For public assembly areas: 1 space for each 8 fixed seats, or B.3. 1 space for each 100 square feet of public assembly area not containing fixed seats 1 space for each 250 square feet Sports and recreation 1 space for each 500 uses square feet 1 space for each 2,000 square feet 1 space for each 1,500 square feet 1 space for each 4 rooms; For bed and breakfast facilities in single family B.6. Lodging uses and multifamily zones, 1 space for each dwelling unit, plus 1 space for each 2 guest rooms 1 space for each 500 square feet 1 space for each 1,000 square feet 1 space for each 2,000 square feet Sales and services, general, except as noted 1 space for each 500 below square feet 1 space for each 10 animals or 1 space for Pet Daycare Centers each staff member, (2) whichever is greater; plus 1 loading and unloading space for each 20 animals. 1 space for each 2,000 square feet 1 space for each 2,000 square feet C. HIGH IMPACT USES 1 space for each 2,000 square feet B.3.a Adult cabarets B.3.b B.4. Food processing and craft work B.5. Laboratories, research and development B.7. Medical services B.8. Offices B.9. Sales and services, automotive B.10. B.10.a. B.11. Sales and services, heavy B.12. Sales and services, marine ALIVE -WORK UNIT0 spaces for units with X1,500 square feet or less space for each unit', http://clerk.ci.seattle.wa.us/scripts/nph-brs.exe?d=CODE&s 1=23.54.015.snum.&Sect5=C... 9/10/2013 ' Section 4-4-080 Page 15 of 28 Bicycle parking: See minimum requirements in subsection F11 of this Section. RESIDENTIAL USES OUTSIDE OF CENTER DOWNTOWN ZONE: Detached dwellings: A minimum of 2 per dwelling unit, however, 1 per dwelling unit may be permitted for 1 bedroom or Tess dwelling units. Tandem parking is allowed. A maximum of 4 vehicles may be parked on a lot, including those vehicles under repair and restoration, unless kept within an enclosed building. Manufactured homes within a manufactured home park: A minimum of 2 per manufactured home site, plus a screened parking area shall be provided for boats, campers, travel trailers and related devices at a ratio of 1 screened space per 10 units. A maximum of 4 vehicles may be parked on a lot, including those vehicles under repair and restoration, unless kept within an enclosed building. Congregate residences: A minimum and maximum of 1 per sleeping room and 1 for the proprietor, plus 1 additional space for each 4 persons employed on the premises. Assisted living: A minimum and maximum of 1 space per residential unit of assisted living, plus dedicated parking spaces for facility fleet vehicles. Attached dwellings in RM -U, RM -T, RM -F, R-14 and R-10 Zones: A minimum and maximum of 1.6 per 3 bedroom or Targe dwelling unit; 1.4 per 2 bedroom dwelling unit; 1.0 per 1 bedroom or studio dwelling unit. Attached dwellings within all other zones: 1 per dwelling unit is required. A maximum of 1.75 per dwelling unit is allowed. Attached dwelling for low income: A minimum of 1 for each 4 dwelling units is required. A maximum of 1.75 per dwelling unit is allowed. Live -work uni.0esidential unit' A mirk mumrand,maximum'of 1 per u t Accessory dwelling unit: 1 per unit is required. A maximum of 2 per unit is allowed. RESIDENTIAL USES IN CENTER DOWNTOWN ZONE: I http://www.codepubl ish ing.com/wa/renton/htm 1/Renton04/Renton0404/Renton0404080.ht... 9/10/201 3 Whether capital improvements or expenditures are being made or completed as expected No specific capital improvements or expenditures are associated with this proposal. Consistency with GMA, the Plan, and Countywide Planning Policies This proposal is consistent with the GMA, Comprehensive Plan, and Countywide Planning Policies. Providing the live -work unit option in the CN and R-14 zones is consistent with policies of having a mix of uses and mixed-use structures spread throughout urban areas where people can both live and work and where services can be provided in closer distance to surrounding neighborhoods. Effect on critical areas and natural resource lands There is no foreseen effect on critical areas and natural resource lands. If there are such impacts with a live -work use, an environmental evaluation would be part of a project's review. Effect on other considerations None. Staff Recommendation Staff recommends that live -work units become a new use allowed in the CN and R-14 zones with the following standards: • Non-residential spaces in the units must meet commercial building standards so the space can be used for small scale business activity over the long term and fulfill the purpose of live -work, where a service is provided. • Live -work units should not be a permitted use outright, but should instead be processed through an Administrative Conditional Use Permit so conditions can be established based on local circumstances. • For the R-14 zone, live -work units should only be allowed along arterials (principal, minor, and collector) rather than allowed throughout the residential zone. This arterial criteria would limit the areas where a small business could receive clients and deliveries without negatively impacting residences. • A design standard should be required where the non-residential/business space should create a pedestrian oriented area. •j Parking requirements for live -work units should at minimum require one parking space, specifically for the residential space. For units 2,500 square feet or less, this one space would be the requirement for the whole unit. For units greater than 2,500 square feet,) required parking would be based on the parking standards for the non-residential use or, the closest similar use as determined by the Administrator.; Implementation Requirements Sections in the Development Regulations (Title IV) of the Renton Municipal Code would need to be changed including: creating a definition for live -work unit, adding live -work unit to the zoning use table, and establishing requirements that live -work units only be allowed adjacent to arterials in the R-14, and that the business/non-residential spaces are pedestrian oriented along the street and sidewalk. #D -I 1 Page 3 of 3 March 11, 2009 Parametrix ENGINEERING . PLANNING . ENVIRONMENTAL SCIENCES August 23, 2013 Parametrix Responses Comment 3. The Parking Demand Generation section of the Traffic Impact analysis by Parametrix raises the following questions: • The author uses the Shopping Center (Land Use 820) category to evaluate parking demand. The average size of the centers in the data base is 545,000 square feet, which is very different from this proposal which has a total of 17,500 square feet of commercial/retail space. Please support use of that database or use a combination of more appropriate land use codes. • Why are 38 spaces subtracted from the peak demand for the family units in Bldg.? A? (page 14) • What is the parking demand for community assembly space in Bldg. C.? Responses First Bullet: The primary intent behind using Shopping Center (Land Use 820) is that it permits the site to be flexible in offering leases to variety of tenants without having to have the exact commercial land uses identified as long as they fall within the uses listed under shopping center. Additionally, each of the commercial uses may peak at different times of the day and ITE does not have hourly variations in parking demand data for all these potential land uses. For example, a lunch -oriented deli may peak midday, but a dry cleaners may peak first thing in the morning and in the evening, but have little parking demand in the middle of the day. This helps prevent over -building parking and unnecessarily increasing impervious surface area. Second Bullet: The peak parking demand characteristics from ITE for Low/Mid-Rise Apartments shown are based on a formula rather than a rate. The formula is P = 1.42x — 38, where P is the peak period parked vehicles, x is the number of dwelling units, and -38 spaces (or vehicles) is the y -intercept of the formula. Based on the information in ITE Parking Generation, the formula is the most appropriate means estimating parking demand (the coefficient of determination, R2 , is 0.93, which indicates good correlation with the data). Third Bullet: The community assembly space in Bldg. C is included with the Shopping Center space. Shopping Centers often include assembly/gathering space for art festivals, fashion shows, and other community gatherings. The average parking demand for the community assembly space could be estimated as approximately 25 percent of the overall parking demand for shopping center. m Deficit/Surplus Parking Provided co N O N co N N Lfl lD m 0 LF � N 0l 1)1 N O O O O O N O O e-4 O O O O O Lfl N O 0 0 W N m N O N N O Lfl 0 0 O Ol t- 4 Useable Floor 03 L c CO tD m Lfl v 03 N O 0 0 W Y c 4) N a) CC Restaurant Fast Food less 118 ufa of outdoor c > o E E E a, Vf 0_ u ra 7, L c u 4) E JU 00 m 00 CO u 00 m 4' O fh C C aC W a m CO lD m N m r-1 m O O O N 0 O O O Lfl .-i N m Cr) 0 O Lfl m r-1 Lfl m 0 '--I LLJ (RS 0 00 m 4' v cc 00 fo (NI W H H ui LL 0 0 N 00 lD dr 00 S. 144 Street. 13 north side 5 south side New Street Parking POTENTIAL rn N N N. O1 North easement parking potential- PHASE 1 / PARCEL A TEMPORARY d M N m Existing Library TUKWILA VILLAGE Revised PHASED DEVELOPMENT PLAN 10/04/2013 PROPOSED PHASED DEVELOPMENT SCHEDULE PHASE PHASE 1: PHASE 2: PHASE 3: Milestone Target Date Design Review Application Submittal 06/01/2013 Design Review Approval 09/30/2013 Grading & Foundation Permit Application Submittal 11/01/2013 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 11/01/2013 Building Permit Application Submittal 12/01/2013 Grading & Foundation Permit Issuance 02/01/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 02/01/2014 Commence Grading, Foundation & Engineering Work 02/15/2014 Building Permit Issuance 04/01/2014 Commence Building Construction 05/01/2014 Construction Completion / Issuance of Certificate of Occupancy 04/30/2015 Design Review Application Submittal 11/01/2013 Design Review Approval 01/31/2014 Grading & Foundation Permit Application Submittal 02/01/2014 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 02/01/2014 Building Permit Application Submittal 03/01/2014 Grading & Foundation Permit Issuance 05/01/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 05/01/2014 Commence Grading, Foundation & Engineering Work 05/15/2014 Building Permit Issuance 07/01/2014 Commence Building Construction 08/01/2014 Construction Completion / Issuance of Certificate of Occupancy 09/30/2015 Grading & Foundation Permit Application Submittal 11/01/2013 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 11/01/2013 Grading & Foundation Permit Issuance 02/01/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 02/01/2014 Commence Grading, Foundation & Engineering Work o . 02/15/2014 Design Review Application Submittal 07/01/2014 Design Review Approval 09/30/2014 Building Permit Application Submittal 12/01/2014 Building Permit Issuance 04/01/2015 Commence Building Construction --05/01/2015 Construction Completion / Issuance of Certificate of Occupancy . 04/30/2016 / rte. z Phase- 3 5*r15 a /z2iq 5/7,011/ a/&# 517/D1 D�� 4/z415 9M/5". ' // Z6/49 SDA Section 2.4 Phasing; Development Parcels. A. In General. Developer shall have the right to develop the Property in multiple Development Phases to facilitate financing and ownership, to aid in the timing of and sequencing of construction, and to attain flexibility to adjust to market demand and other factors. In the event that Developer intends to develop the Property in multiple Development Phases, Developer shall submit its plan for phased development to the City (the "Phased Development Plan") for its review and approval prior to, or contemporaneous with, submittal of its proposed BLA application to the City. The Development Parcels that are associated with each Development Phase, including the Plaza Parcel, may be owned, operated and managed separately, although initially developed under the control of Developer or an Affiliate. B. City Review and Approval. The City shall have the right to review and approve the Phased Development Plan, including the development of the Plaza Parcel, for the purpose of ensuring compliance with this Agreement and to ensure that the Additional Development Work associated with each proposed Development Phase, as described at Section 5.2 of this Agreement, will fully support the Improvements associated with each Development Phase in the event that future Development Phases are delayed or not completed by Developer. The Phased Development Plan shall include and identify: 1. A summary of the site plan and design review elements listed in Section 2.3 (Site Plan and Design Review Submittals) to be included within each Development Phase; 2. A proposed Construction Schedule and sequencing for the acquisition of the affected Development Parcels and development of the Improvements for each Development Phase, including Developer Additional Work associated with each Development Phase (e.g., infrastructure improvements, utilities, driveways and Landscaping). C. Plaza Parcel; First Development Phase. Developer shall develop the Plaza Parcel contemporaneously with, and as part of, the development of the first Development Phase. D. Additional Approvals. The City shall have the right to require and approve easements for utilities, vehicular access, pedestrian access, shared parking, and shared maintenance for each Development Phase to ensure that the entire Development functions as an integrated whole even if the Development Parcels and/or Development Phases come under separate ownership and management. E. Library Parcel; Timing. The City shall use its best efforts to require the KCLS to submit a proposed site plan with respect to the Library Parcel and a conceptual architectural design for the proposed library branch building by the time Developer submits a design review application for the first Development Phase. This is to ensure the City and Developer have information on how the site plan and the architectural design for the proposed library branch building will be compatible with the overall Development, and in particular, the Improvements on the Development Parcels adjacent to the Library Parcel. 1.5 TUKWILA VILLAGE PHASED DEVELOPMENT PLAN PROPOSED PHASED DEVELOPMENT SCHEDULE PHASE Milestone PHASE 1: PHASE 2: PHASE 3: Target Date Design Review Application Submittal 6/1/2013 Design Review Approval 9/30/2013 Grading & Foundation Permit Application Submittal 10/1/2013 Engineering Permit Application Submittal (Utilities & Frontage Improvements) ‘ 10/1/2013 iikcil g Perm t Application Submittal::` O1/1/2013,?/ Grading & Foundation Permit Issuance 1/1/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) 1/1/2014 Commence Grading, Foundation & Engineering Work 1/15/2014 Building Permit Issuance 3/1/2014 Commence Building Construction 4/1/2014 Construction Completion / Issuance of Certificate of Occupancy 3/31/2015 Design Review Application Submittal Design Review Approval Grading & Foundation Permit Application Submittal Engineering Permit Application Submittal (Utilities & Frontage Improvements) 1B1101iff Permit Application Suk mittai'VM `t Grading & Foundation Permit Issuance Engineering Permit Issuance (Utilities & Frontage Improvements) Commence Grading, Foundation & Engineering Work Building Permit Issuance Commence Building Construction Construction Completion / Issuance of Certificate of Occupancy 9/1/2013 11/30/2013 12/1/2013 12/1/2013 T/1/2014 3/1/2014 3/1/2014 3/15/2014 5/1/2014 6/1/2014 7/31/2015 Grading & Foundation Permit Application Submittal 10/1/2013 Engineering Permit Application Submittal (Utilities & Frontage Improvements) 7 I 0 1 2013 fcGrading & Foundation Permit Issuance s l . iL' 1/1/2014 Engineering Permit Issuance (Utilities & Frontage Improvements) U 1/1/2014 Commence Grading, Foundation & Engineering Work 1/15/2014 Design Review Application Submittal 6/1/2014 Design Review Approval 8/31/2014 B Iu Idmgt'Permlt Ap Iltatfon;'SuE'mlttalr U/1/20 4-;.` Building Permit Issuance 2/1/2015 ...- Commence Building Construction 3/1/2015 Construction Completion / Issuance of Certificate of Occupancy 2/28/2016 / / -3/Fogy / ! zg(44/ 3a01 7-T tar umm. Wo111 ua Puel alll{bIRMC Od IMUSue, WlwcP puck „oipnisv a4;, iprpspr. 00:C .1111:1100 NUL. MIVil =HUM a>v.a�,:1era .n,aL 10ter 111n).V.,11[111110.3;g1,Z1121.-Y01011 'SULV13011,11.13Wan1A3C1 "3,111.n nuo.r). 30V1 -11A VIIMNf L O CIL e TUKWILA VILLAGE PARKING w x4 PARCEL E PARKING *Me -104w <11> JOHNSON BRAUND INC. September 17, 2013 Moira Carr Bradshaw Senior Planner City of Tukwila / Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 RE: TUKWILA VILLAGE PHASE ONE B.A.R. PARKING COMMENTS Moira, Please see our responses in italics below to the parking comments dated August 07, 2012. Per our previous phone conversations about parking calculations, the attached parking summary has been revised to utilize the complimentary uses parking reduction as outlined in the Tukwila Zoning Code section 18.56.070.D. In addition to the complimentary uses we've also noted a request for a 5% administrative variance for the portion of the site north of S. 144th street only. 1. Parking standard for live work Applicant proposes 1.5 per unit - Is there any experience, documentation or support for this proposed standard? City of Seattle parking standard for Live -Work units (SMC 23.54.015 Table A- see attached) is 0 spaces for 1,500 sf or less and 1 space for units 1,500 sitto 2,500 sf City of Renton parking standard for Live -Work units (RMC 04-04-080 — see attached) is a minimum and maximum of one per unit. (See also attached City of Renton staff report/recommendation for parking of Live/work units based on area of unit <2,500 sf =- 1 1 stall.) The proposed Live -Work units in Building A are 465 sf on the ground floor and 200 sf on the mezzanine level = 865 sf total. We had originally calculated the residential portion of the unit at 1 stall per unit (1 bedroom) + an additional .5 stall for the non-residential portion, however given the precedent of other local jurisdictions with live -work parking quantity based on overall unit size, we propose reducing our parking to one stall per unit. See revised parking calculations attached. 2. Assumption on usable floor area Parking requirement is based upon definition of "Usable Floor area" which means that part of the floor area of any structure which is actually used from time to time for any commercial purposes, such as a sales area, display area, walkways or storage area. 15200 52nd Avenue South, Suite 300, Seattle, Washington 98188 Phone 206.766.8300 www.johnsonbraund.com ARCHITECTURE INTERIOR DESIGN Page 2 September 17, 2011 Parking calculation shall not include: • common corridors designed for the circulation of people at nonretail establishments, • restrooms, • elevator shafts and stairwells at each floor, • mechanical equipment rooms or attic spaces and • exterior covered loading docks. (TMC 18.06.863 Usable Floor Area) Please provide support for use of the 75% as a useable floor area per the definition above. The parking calculations have been revised to reflect a higher percentage of useable area. In reviewing the area of each tenant space and the anticipated use/layout (i.e. many of the small incubator space will simply have accessible unisex restroom) it was determined that the useable areas of the incubators spaces will be approx. 85-90% useable and the restaurant areas 80-85% useable. We have utilized the higher usable area in the parking calculations: 90% for general retail uses and 85% for restaurant uses. See revised parking calculations attached 3. The Parking Demand Generation section of the Traffic Impact analysis by Parametrix raises the following questions: • The author uses the Shopping Center (Land Use 820) category to evaluate parking demand. The average size of the centers in the data base is 545,000 square feet, which is very different from this proposal which has a total of 17,500 square feet of commercial/retail space. Please support use of that database or use a combination of more appropriate land use codes. • Why are 38 spaces subtracted from the peak demand for the family units in Bldg.? A? (page 14) • What is the parking demand for community assembly space in Bldg. C.? See attached response from Parametrix dated 8-23-2013. 4. How will impacts to parkingfrom community events be managed? Parking for community events will be managed by flexible/ shared parking between phases. After business hours (5pm) and on weekends the surface parking behind building D (19 stalls) and on the access driveway between D & E (10 stalls) will be available for r Page 3 September 17, 2011 use. The on -street parking (18 stalls) is also available for event use at all times during the day (total of 47 additional stalls). We have now planned for a mezzanine level of parking in the garage of building E. This will provide an additional 33 stalls available for overflow/flexible use for Tukwila Village as needed. When large events are planned (in evenings and/or summer -months) arrangements may also be made with Foster High School to allow for over fow;bf-site parking. 5. Please verify that housing occupants will be charged for structured parking. Have you anticipated on-site or off-site impacts" and how they wil'l_be managed? Some of the housing occupants will be charger for structured parking bed on affordability levels. The low-income senior units in buildings D & E and tl e;low-income/ affordable portion of the mixed-ir come units in Buildmgs!A & B will not be'iharged for structured parking. The market rate units in building;,& B will be charged for structured parking. All residential ants must register'to park on site (in garage or on - surface). Only a limited number ofsutface parking registrations will be available (equal to the number of surface -residential stalls, provided}, f a residential tenant's car is not registered and parr an- ite,;ij,will be towed 6. Discuss the impact of reserved parking. Which stalls will be reserved, how will they be managed andsham/ how will it affect the overall supply relative to demand The 1,1,3urface parking°stalls + 1"loading stall located immediately to the north of the Library:wzll be reservectiO4r the Lilfra,y use only. The stallslocated off of T.113. and the surface stalls located immediately south of the Building A cdfnrnercial frontage will be reserved for Building A commercial customers. Stalls in the parllnfg garage of building B for employee use will be reserved. Since the library arid commercial tenants of building A are the largest/most constant uses for the project, reserving these stalls for these uses will not adversely affect supply relative to demand. There are 18 stalls west & south of Building E that are reserved (parking easement) for the adjacent King County Housing Authority project (Riverton Terrace.) Page 4 September 17, 2011 7. Will the structured parking be assessable to office/retail/library tenants? The structured parking is to be secured with locked gates and controlled access cards. Building A garage is reserved for residential tenants only. All of residential parking for building B is provided in the garage. Building B garage also has 16 additional stalls available for employee parking (building A, B, C & library employees) and (2) car-share/flex car parking. The employee parking will also be access controlled. Building D parking garage serves all of the residential tenants as well as a percentage of the office tenants. Building E garage serves all of the residential tenants as well as the parking for the Neighborhood Police Resource Center and a percentage of the office tenants in building D. Additional parking is also available for overflow/special events parking on a separate mezzanine level with separate access. 8. Show how the phasing of the project and of the parking supply will affect parking demand. For example, if all of the calculations are accurate and supportable for Phase one, then the parking demand is 190 and yet only 150 are proposed for Phase one. My understanding is that 33 stalls on Parcel B could be made available in a temporary condition. There are issues of: • the code requirement that stipulates: The surface of any required off-street parking or loading facility shall be paved with asphalt, concrete or other similar approved material (s) and shall be graded and drained so as to dispose of all surface water, but not across sidewalks (TMC 18.56.040 (7) (a.) General Requirements. • the impact of construction of Building B and the temporary elimination of the 33 stalls. If the above points can be adequately resolved, please address any deficit from the standard of stalls. Phase one requires 190 stalls + 1 car share + 2 loading stalls. 100 of the stalls are for residential tenants and 93 are for commercial uses. Phase 1 provides 149 stalls total as follows: 1 Page 5 September 17, 2011 Parcel A/Phase 1: 85 garage stalls (for residents), 51 surface stalls and 2 loading stalls. Parcel C/Phase 1: 11 surface stalls. Until phase 3 is constructed the parking demand is short 44 stalls. 34 stalls will be made available on Parcel B in a temporary parking condition. The additional 10 required stalls can be satisfied by the available on -street parking stalls on the north side of S. 144th street. (13 total.). Disruptions to available parking on Parcel B during construction of Phase 3 can be offset by flexible shared uses with Phase 2. This includes 5 additional on - street parking on the south side of C 144th street , as well as the mezzanine parking level in the garage of Building E (33 stalls). 9. Please explain the sequence of the S 144 Street improvements and the potential availability of those on -street stalls. The construction schedule of the S 144t street improvements is contingent upon the approvals of Grant applications, however the intention is that the north half of the street improvements will be complete with Phase 1 and the south ha(f of the street improvements will be complete with Phase 2. Sincerely, JOHNSON BRAUND, INC. Diana Keys, Director of Housing Attachment: attachment V: l ocat ion/location/location/name. doc Page 6 September 17, 2011 Parametrix August 23, 2013 Parametrix Responses Comment ENGINEERING . PLANNING . ENVIRONMENTAL SCIENCES 3. The Parking Demand Generation section of the Traffic Impact analysis by Parametrix raises the following questions: • The author uses the Shopping Center (Land Use 820) category to evaluate parking demand. The average size of the centers in the data base is 545,000 square feet, which is very different from this proposal which has a total of 17,500 square feet of commercial/retail space. Please support use of that database or use a combination of more appropriate land use codes. • Why are 38 spaces subtracted from the peak demand for the family units in Bldg.? A? (page 14) • What is the parking demand for community assembly space in Bldg. C.? Responses First Bullet: The primary intent behind using Shopping Center (Land Use 820) is that it permits the site to be flexible in offering leases to variety of tenants without having to have the exact commercial land uses identified as long as they fall within the uses listed under shopping center. Additionally, each of the commercial uses may peak at different times of the day and ITE does not have hourly variations in parking demand data for all these potential land uses. For example, a lunch -oriented deli may peak midday, but a dry cleaners may peak first thing in the morning and in the evening, but have little parking demand in the middle of the day. This helps prevent over -building parking and unnecessarily increasing impervious surface area. Second Bullet: The peak parking demand characteristics from ITE for Low/Mid-Rise Apartments shown are based on a formula rather than a rate. The formula is P = 1.42x — 38, where P is the peak period parked vehicles, x is the number of dwelling units, and -38 spaces (or vehicles) is the y -intercept of the formula. Based on the information in ITE Parking Generation, the formula is the most appropriate means estimating parking demand (the coefficient of determination, R2 , is 0.93, which indicates good correlation with the data). Third Bullet: The community assembly space in Bldg. C is included with the Shopping Center space. Shopping Centers often include assembly/gathering space for art festivals, fashion shows, and other community gatherings. The average parking demand for the community assembly space could be estimated as approximately 25 percent of the overall parking demand for shopping center. PARKING SUMMARY SHEET - TUKWILA VILLAGE L City of Tukwila, WA Project Tukwila Village date 9/16/2013 Client Bryan Park - Pacific Northern Construction Address Tukwila International Blvd & South 144th Street Tukwila, WA lot size 267,139 Isf l zoning Urban Renewal Overlay Zone NCC HDR PARKING REQUIRED BY LAND USE CODE - **COMPLIMENTARY PARKING 18.56.070.D. & ADMIN. VARIANCE 5% *** Code Required Parking Admin. Variance *** Parking Provided North of South 144th St count parking parking (5% commercial reduction) Land Use sq feet ratio stalls J Building A (84 units) PHASE 1 Residential non -Senior 2 bed (Bldg. A) 31 1.5 47 Residential non -Senior 1 bed (Bldg. A) 39 1 39 85 Garage- B dg A Residential non -Senior studio (Bldg. A) 10 1 10 15 Surface - Parcel A Residential Live Work (Bldg. A) 4 1 4 100 Residential 0.95 100 100 Total Residential Retail General 4,052 SF* (Bldg. A) 3,647 0.0025 9 23 Surface - Parcel A Restaurant 2,885 SF* (Bldg. A) 2,452 0.01 25 0 Surface - Parcel 8 Cafe 1,228 SF* (Bldg A.)1,.....-'1,044 - ** c ** _ 9 Garage - Parcel 8 Employee Cafe outdoor seating 235 SF (bldg A) 118 ** ** Commercial 0.95 32 32 Total Commercial Subtotal 134 132 132 Total Provided Building B (125 units) PHASE 3 70 Garage - Bldg. B Residential Senior first 15 (Bldg. B) 15 1 15 0 Surface - Parcel 6 Residential Senior (Bldg. B) 110 0.5 55 70 Residential 70 70 Total Residential Retail General 1,800 sr (Bldg B) 1,620 I 0.0025 4 4 Commercial 0.95 4 3 Surface - Parcel e - commercial 1 Garage - Parcel B Employee Subtotal 74 74 74 Total Provided Community Commons / Library / Plaza (0 units) PHASE ' -1} / 1,015 ' b ** ** 11 Surface - Parcel A Coffee Shop 1,015 SF (Commons) Coffee Shop outdoor seating 250 SF .... \.425, 3'7,711 "*i ** 0.01, 17 30 Surface - Parcel B Community Center 1,711 SF (Assembly) 11 Surface -Parcel C Library 10,000 SF 10,000 0.004 40 4 Garage Parcel B Employee Subtotal i 57 Commercial 0.95 54 56 Total Provided *assume 90% useable floor area / 85% useable floor area for restaurant use **Complimentaryarea-ma be com limenta use -10%of total useable p r�r.(no parking required) `- — �--- Surface Parcel A _4011. - 'Principal PareefrB r, Total useable area- north parcels 21,732 0.1' s 2,173 Complimentary exempt 's.. 2 1`+Surface Principal uses : general retail, commons, library, restauran Complimentary use - cafe / coffeshop 2,30 129 0.02 j 3 0.95 3 3 Total Provided (i.e. "fast food") provided -exempt f 170 Residential 170 170 Residential Provided 98 Commercial 0.95 93 *** 95 Commercial Provided car share 1 per 200 units i 209 2 2 2 Garage Parcel B tandem loading 2 2 2 Surface Parcel A loading Grand Total (North) 272 Required 267 Req'd 269 North Total Provided • w/ Comp. pkg. w/ Comp pkg & Admin. Variance 171 Total Garage Stalls 98 Total Surface Stalls *** Administrative Variance for 5% reduction of commercial 13 On -street stalls N side 144th Justification = 13 on -street stalls provided at north side of 144th 282 Total including on -street Total Provided including these stalls > that Total Required (+10 stalls) Transit & Pedestrian Oriented Development �- qSt i. /&9Ott I /1 / f`/ Parfet _ 5I PHASE 2 Code Required Parking No variance required Parking Provided South of South 144th St count parking parking t A - ... • 1 .4 a Land Use sq feet ratio stalls Building D (70 Units) Residential Senior first 15 (Bldg D) 15 1 15 Residential Senior (Bldg D) 55 0.5 28 43 Residential 43 Garage-Buliding 0 Office 13,000 • 11,700 0.003 35 35 Commercial _ 6 Garage Building -D Employee Subtotal 78 19 Bldg. 0 Surface Lot Employee/Guest 10 Surface Drive I Commercial 78 Total Provided Building E (125 units) r 35 Garage Building E -mezzanine Residential Senior first 15 (Bldg E) 15 1 15 Residential Senior (Bldg E) 110 0.5 55 70 35 Garage Building E -main_ Community Police - 2,000 SF" 1,800 0.003 5 1 7 Garage Building E - main Retail General -1,150 SF" 1,035 0.0025 J 3 8 1 Surface Drive- accessible `assume 90% useable floor area KCHA Parking Easement } Car share 1 per 200 uinits 195 , 78 78 Total Provided 18 18 Surface Stalls - easement 1 1 Garage Building E - main Grand Total (South) 175 175 _ ^ Overflow - shared/event 25 Building E - garage main 152 Total Garage Stalls 48 Total Surface Stalls 5 On -street stalls S side 144th 205 Total including on -street _ _ _ TOTAL COMBINED PHASES TUKWILA VILLAGE PARKING 1 w/ Admin. Variance """ i Code Required Parking North Site Only Parking Provided Total On -Site Parking Required 447 � 442 { 469 On -Site • 18 On -street 487Combined Grand Total PARKING PROPOSED TO BE PROVIDED - BOTH ON-SITE & IN STREET ROW'S: i ON-SITE PARKING j North South Total STREET PARKING North South Total Surface Garage 98_ 48 146 Tuk In_t Blvd ! 0 0 0 171 152 323 S 144th Street 1 13 5 18 Total 269 200 469 Total 5 18 _ _13 Total combined parking provided [ 282 I 205 I 487 I t Seattle Municipal Code Page 4 of 14 1. General Nonresidential Uses (other than institutions) A. B. C. D. AGRICULTURAL USES COMMERCIAL USES B.1. Animal shelters and kennels B.2. Eating and drinking establishments B.3. Entertainment Uses, general, except as noted below (1) B.3.a Adult cabarets B.3.b Sports and recreation uses B.4. Food processing and craft work B.5. Laboratories, research and development B.6. Lodging uses B.7. Medical services B.8. Offices B.9. Sales and services, automotive B.10. Sales and services, general, except as noted below B.10.a. Pet Daycare Centers (2) B.11. Sales and services, heavy B.I2. Sales and services, marine HIGH IMPACT USES LIVE -WORK UNITS 1 space for each 2,000 square feet 1 space for each 2,000 square feet 1 space for each 250 square feet For public assembly areas: 1 space for each 8 fixed seats, or 1 space for each 100 square feet of public assembly area not containing fixed seats 1 space for each 250 square feet 1 space for each 500 square feet 1 space for each 2,000 square feet 1 space for each 1,500 square feet 1 space for each 4 rooms; For bed and breakfast facilities in single family and multifamily zones, 1 space for each dwelling unit, plus 1 space for each 2 guest rooms 1 space for each 500 square feet 1 space for each 1,000 square feet 1 space for each 2,000 square feet 1 space for each 500 square feet 1 space for each 10 animals or 1 space for each staff member, whichever is greater; plus 1 loading and unloading space for each 20 animals. 1 space for each 2,000 square feet 1 space for each 2,000 square feet 1 space for each 2,000 square feet 0 spaces for units with 1,500 square feet or less; 1 space for each unit http://clerk.ci.seattle.wa.us/scripts/nph-brs.exe?d=CODE&s 1=23.54.015.snum.&Sect5=C... 9/10/2013 Section 4-4-080 Page 15 of 28 Bicycle parking: See minimum requirements in subsection F11 of this Section. RESIDENTIAL USES OUTSIDE OF CENTER DOWNTOWN ZONE: Detached dwellings: A minimum of 2 per dwelling unit, however, 1 per dwelling unit may be permitted for 1 bedroom or less dwelling units. Tandem parking is allowed. A maximum of 4 vehicles may be parked on a lot, including those vehicles under repair and restoration, unless kept within an enclosed building. Manufactured homes within a manufactured home park: A minimum of 2 per manufactured home site, plus a screened parking area shall be provided for boats, campers, travel trailers and related devices at a ratio of 1 screened space per 10 units. A maximum of 4 vehicles may be parked on a lot, including those vehicles under repair and restoration, unless kept within an enclosed building. Congregate residences: A minimum and maximum of 1 per sleeping room and 1 for the proprietor, plus 1 additional space for each 4 persons employed on the premises. Assisted living: A minimum and maximum of 1 space per residential unit of assisted living, plus dedicated parking spaces for facility fleet vehicles. Attached dwellings in RM -U, RM -T, RM -F, R-14 and R-10 Zones: A minimum and maximum of 1.6 per 3 bedroom or Targe dwelling unit; 1.4 per 2 bedroom dwelling unit; 1.0 per 1 bedroom or studio dwelling unit. Attached dwellings within all other zones: 1 per dwelling unit is required. A maximum of 1.75 per dwelling unit is allowed. Attached dwelling for low income: A minimum of 1 for each 4 dwelling units is required. A maximum of 1.75 per dwelling unit is allowed. Live -work unit, residential unit: A minimum and maximum of 1 per unit. Accessory dwelling unit: 1 per unit is required. A maximum of 2 per unit is allowed. RESIDENTIAL USES IN CENTER DOWNTOWN ZONE: http://www.codepubl ishing.com/wa/renton/html/Renton04/Renton0404/Renton0404080.ht... 9/10/2013 Whether capital improvements or expenditures are being made or completed as expected No specific capital improvements or expenditures are associated with this proposal. Consistency with GMA, the Plan, and Countywide Planning Policies This proposal is consistent with the GMA, Comprehensive Plan, and Countywide Planning Policies. Providing the live -work unit option in the CN and R-14 zones is consistent with policies of having a mix of uses and mixed-use structures spread throughout urban areas where people can both live and work and where services can be provided in closer distance to surrounding neighborhoods. Effect on critical areas and natural resource lands There is no foreseen effect on critical areas and natural resource lands. If there are such impacts with a live -work use, an environmental evaluation would be part of a project's review. Effect on other considerations None. Staff Recommendation Staff recommends that live -work units become a new use allowed in the CN and R-14 zones with the following standards: • Non-residential spaces in the units must meet commercial building standards so the space can be used for small scale business activity over the long term and fulfill the purpose of live -work, where a service is provided. • Live -work units should not be a permitted use outright, but should instead be processed through an Administrative Conditional Use Permit so conditions can be established based on local circumstances. • For the R-14 zone, live -work units should only be allowed along arterials (principal, minor, and collector) rather than allowed throughout the residential zone. This arterial criteria would limit the areas where a small business could receive clients and deliveries without negatively impacting residences. • A design standard should be required where the non-residential/business space should create a pedestrian oriented area. • Parking requirements for live -work units should at minimum require one parking space specifically for the residential space. For units 2,500 square feet or less, this one space would be the requirement for the whole unit. For units greater than 2,500 square feet, required parking would be based on the parking standards for the non-residential use or the closest similar use as determined by the Administrator. Implementation Requirements Sections in the Development Regulations (Title IV) of the Renton Municipal Code would need to be changed including: creating a definition for live -work unit, adding live -work unit to the zoning use table, and establishing requirements that live -work units only be allowed adjacent to arterials in the R-14, and that the business/non-residential spaces are pedestrian oriented along the street and sidewalk. #D-11 Page 3 of 3 March 11, 2009 iNOINEERINO . PLANNING . ENVIRONMe'NTAL .^,.CIENC' August 23, 2013 Parametrix Responses Comment 3. The Parking Demand Generation section of the Traffic Impact analysis by Parametrix raises the following questions: • The author uses the Shopping Center (Land Use 820) category to evaluate parking demand. The average size of the centers in the data base is 545,000 square feet, which is very different from this proposal which has a total of 17,500 square feet of commercial/retail space. Please support use of that database or use a combination of more appropriate land use codes. • Why are 38 spaces subtracted from the peak demand for the family units in Bldg.? A? (page 14) • What is the parking demand for community assembly space in Bldg. C.? Responses First Bullet: The primary intent behind using Shopping Center (Land Use 820) is that it permits the site to be flexible in offering leases to variety of tenants without having to have the exact commercial land uses identified as long as they fall within the uses listed under shopping center. Additionally, each of the commercial uses may peak at different times of the day and ITE does not have hourly variations in parking demand data for all these potential land uses. For example, a lunch -oriented deli may peak midday, but a dry cleaners may peak first thing in the morning and in the evening, but have little parking demand in the middle of the day. This helps prevent over -building parking and unnecessarily increasing impervious surface area. Second Bullet: The peak parking demand characteristics from ITE for Low/Mid-Rise Apartments shown are based on a formula rather than a rate. The formula is P = 1.42x — 38, where P is the peak period parked vehicles, x is the number of dwelling units, and -38 spaces (or vehicles) is the y -intercept of the formula. Based on the information in ITE Parking Generation, the formula is the most appropriate means estimating parking demand (the coefficient of determination, R2 , is 0.93, which indicates good correlation with the data). Third Bullet: The community assembly space in Bldg. C is included with the Shopping Center space. Shopping Centers often include assembly/gathering space for art festivals, fashion shows, and other community gatherings. The average parking demand for the community assembly space could be estimated as approximately 25 percent of the overall parking demand for shopping center. To: Bryan Park From: Moira Carr Bradshaw Date: 7 August 2013 Subject: Tukwila Village Parking In order to complete the review on the parking decision for the project, the following information is needed. I will be back in the office on Wednesday August 14, 2013 and be available to go over any questions that you might have regarding the questions. 1. Parking standard for live work Applicant proposes 1.5 per unit - Is there any experience, documentation or support for this proposed standard? 2. Assumption on usable floor area Parking requirement is based upon definition of "Usable Floor area" which means that part of the floor area of any structure which is actually used from time to time for any commercial purposes, such as a sales area, display area, walkways or storage area. Parking calculation shall not include: • common corridors designed for the circulation of people at nonretail establishments, • restrooms, • elevator shafts and stairwells at each floor, • mechanical equipment rooms or attic spaces and • exterior covered loading docks. (TMC 18.06.863 Usable Floor Area) Please provide support for use of the 75% as a useable floor area per the definition above. 3. The Parking Demand Generation section of the Traffic Impact analysis by Parametrix raises the following questions: • The author uses the Shopping Center (Land Use 820) category to evaluate parking demand. The average size of the centers in the data base is 545,000 square feet, which is very different from this proposal which has a total of 17,500 square feet of commercial/retail space. Please support use of that database or use a combination of more appropriate land use codes. • Why are 38 spaces subtracted from the peak demand for the family units in Bldg.? A? (page 14) • What is the parking demand for community assembly space in Bldg. C.? 4. How will impacts to parking from community events be managed? 5. Please verify that housing occupants will be charged for structured parking. Have you anticipated on-site or off-site impacts and how they will be managed? 6. Discuss the impact of reserved parking. Which stalls will be reserved, how will they be managed and show how will it affect the overall supply relative to demand. 7. Will the structured parking be assessable to office/retail/library tenants? 8. Show how the phasing of the project and of the parking supply will affect parking demand. For example, if all of the calculations are accurate and supportable for Phase one, then the parking demand is 190 and yet only 150 are proposed for Phase one. My understanding is that 33 stalls on Parcel B could be made available in a temporary condition. There are issues of: • the code requirement that stipulates: The surface of any required off-street parking or loading facility shall be paved with asphalt, concrete or other similar approved material (s) and shall be graded and drained so as to dispose of all surface water, but not across sidewalks (TMC 18.56.040 (7) (a.) General Requirements. • the impact of construction of Building B and the temporary elimination of the 33 stalls. If the above points can be adequately resolved, please address any deficit from the standard of stalls. 9. Please explain the sequence of the S 144 Street improvements and the potential availability of those on -street stalls. JOHNSON BRAUND INC. May 28, 2013 Re: Request for Administrative Variance for 10% parking reduction Site Address: Tukwila Village Per our previous meetings with planning staff, we are requesting a parking reduction for parking requirements at Tukwila Village. As discussed the requested reduction is for 10% of the non- residential uses only. See attached calculations showing each proposed use, square footage, code required parking and 10% reduction calculation. The calculations are tabulated by location: i.e. north of S. 144th street and south of 144th street. With the proposed 10% reduction, the north portion of the site would require 267 stalls. 269 stalls are provided on-site for the north portion of the project. An additional 13 on -street parking stalls are to be provided along the north side of S. 144th street, bringing the provided parking on the north portion of the project to 282 stalls. The combined total of on-site & on -street parking exceeds the full code required parking of 277. The proposed south portion of the project has a total of 158 parking stalls provided on-site and an additional 5 stalls on -street. The code required parking (without reduction) is 150 stalls. A reduction in parking requirements is not required for the south portion of the site. The surface parking for the south portion of the site serves office uses which will have limited (work day) hours. This parking will be available in the evenings and on weekends to supplement the potential parking demand for the Library and the Community Commons. See attached for the Traffic Impact Analysis prepared by Parametrix. Table 8 and 9 estimates the parking demand for the project and concurs that the proposed parking for the project will meet the demand. Please contact me if you have any questions or comments. Sincerely, JOHNSON BRAUND, INC. C=��( N 2 Diana Keys, Project Manager Attachments: Parking calculations dated 5-28-2013 Proposed Site Plan P1.0, dated 5-28-2013 Traffic Study by Parametrix, dated 5-28-2013 15200 52nd Avenue South, Suite 300, Seattle, Washington 98188 Phone 206.766.8300 www.johnsonbraund.com ARCHITECTURE INTERIOR DESIGN PARKING SUMMARY SHEET - TUKWILA VILLAGE Project Client Address lot size zoning Tukwila Village City of Tukwila, WA Bryan Park - Pacific Northern Construction Tukwila International Blvd & South 144th Street Tukwila, WA 250,000 sf Urban Renewal Overlay Zone PARKING REQUIRED BY LAND USE CODE - WITH & WITHOUT REDUCTION SHOWN FOR NON-RESIDENTIAL: North of South 144th St Land Use Residential Senior first 15 Residential Senior Residential non -Senior 2 bed Residential non -Senior 1 bed Residential non -Senior studio Residential non -Senior LW Retail General 7,000 SF* Restaurant 5,000 SF* Coffee Shop 1,200 SF* Community Center 2,500 SF* Library *assume 75% useable floor area South of South 144th St Land Use Residential Senior first 15 Residential Senior Townhomes Retail General - 2,000 SF* Community Police - 2,200 SF* Global to Local - 2,500 SF* HealthPoint Offices - 20,000 SF* *assume 75% useable floor area Total Parking Required Code Required Parking count parking parking sq feet ratio stalls 15 113 29 41 1 0.5 1.5 1 15 57 44 41 8 1 8 4 1 4 168 5,250 3,750 900 1,875 0.0025 0.01 0.005 0.01 13 38 5 19 10,000 0.004 40 114 282 Code Required Parking count parking parking sq feet ratio stalls 15 1 159 0.5 5 1 1,500 0.004 15 80 5 100 6 1,500 0.003 5 1,875 0.003 6 15,000 0.003 I 45 61 161 Code Required Parking 443 10% Shared Pkng Redux count parking parking sq feet ratio stalls 15 1 113 0.5 29 1.5 41 1 8 1 15 57 44 41 8 4 1 4 date 5/21/2012 (for commercial only) no reduction for any residential parking Residential 168 5,250 0.00225 3,750 12 0.009 i 34 900 0.0045 4 1,875 0.009 17 10,000 0.0036 36 10% reduction for commercial parking Commercial 102 I 270 10% Shared Pkng Redux count parking parking sq feet ratio stalls 15 1 159 0.5 5 1,500 1 0.0036 15 80 (for commercial only) no reduction for any residential parking 5 5 1,500 0.0027 4 1,875 0.0027 5 Residential 10% reduction for commercial parking 100 15,000 0.0027 41 55 I 155 10% Shared Pkng Redux PARKING PROPOSED TO BE PROVIDED - BOTH ON-SITE & IN STREET ROW'S: ON-SITE PARKING Surface Garage Total North 85 160 245 South Total 40 125 140 300 180 I 425 QLios 0 -706 mo-"? O pothtc m ( P () 9C 304 LO- (1s s J7 q AErtfo 7K I 425 Commercial for commercial only) STREET PARKING Tuk Int Blvd 5 144th Street Total North 7 13 20 South 0 5 5 Total 7 18 25 PARKING SUMMARY SHEET - TUKWILA VILLAGE Project Tukwila Village City of Tukwila, WA date 2/7/2012 Client Bryan Park - Pacific Northern Construction Address Tukwila International Blvd & South 144th Street Tukwila, WA lot size 250,000 sf zoning Urban Renewal Overlay Zone North of South 144th St Land Use Residential Senior first 15 Residential Senior Residential non -Senior 2 bed Residential non -Senior 1 bed Residential non -Senior studio Residential non -Senior LW Retail General 7,360 SF* Restaurant 4,720 SF* Coffee Shop 1,330 SF* Community Center 2,275 SF* Library *assume 75% useable floor area PARKING PROVIDED Surface Garage Total compact South of South 144th St Land Use Residential Senior Live/Work Retail General Community Police Office Global to Local Offices Community Health Offices Code Required Parking 10% Shared Pkng Redux count parking parking count parking sq feet ratio stalls sq feet ratio parking stalls 15 1 117 29 0.5 15 59 1.5 44 41 1 41 8 1 8 4 1 4 5,520 0.0025 14 3,540 0.01 998 i 0.005 1,706 35 15 0.9 14 53 39 117 0.45 29 1.35 41 8 4 5,520 3,540 0.9 37 0.9 7 0.9 4 0.00225 12 0.009 32 5 0.01 17 998 0.0045 4 1,706 10,000 0.004 40 10,000 0.009 15 0.0036 36 281 106 160 266 Current Site Plan 71 27% 253 10% Shared Pkng Redux count i, parking parking count parking parking sq feet ratio stalls sq feet i ratio stalls 186 0.5 93 9 0 1 9 0.004 2,000 0.003 0 6 4,800 0.003 14 20,000 0.003 60 186 0.5 9 0 2,000».... 4,800 20,000 1 0.003 93 9 0 0.003 5 0.003 13 0.003. 54 182 174 Code Required Parking Shared Parking Reduction Total Parking Required 464 427 (18 additional parking stalls are required to accommodate the KCHA parking easement on the south parcel) Parking Targets count parking parking sq feet ratio stalls 132 0.6 79 29 1.5 44 41 1 41 8 1 4 5,520 1 0.00225 8 4 12 3,540 998 0.009 32 0.0045 4 1,706 0.009 10,000 15 .6 for senior no reduction for non -senior 176 10% reduction for commercial parking 0.0036 36 100 276 targets Residential Commercial PARKING SUMMARY SHEET - TUKWILA VILLAGE Project Client Address lot size zoning North of South 144th St Land Use Residential Senior first 15 Residential Senior Residential non -Senior 2 bed Residential non -Senior 1 bed Residential non -Senior studio Residential non -Senior LW Retail General 7,360 SF* Restaurant 4,720 SF* Coffee Shop 1,330 SF* Community Center 2,275 SF* Library //assume 75% useable floor area_-„_ L-MIt ONG-PROVIDED— Surface Garage Total compact g°'-'3% 7 Tukwila Village City of Tukwila, WA Bryan Park - Pacific Northern Construction Tukwila International Blvd & South 144th Street Tukwila, WA 250,000 sf .010 (D) Urban Renewal Overlay Zone 0 Code Required Parking count parking parking sq feet 15 117 29 ratio 1 0.5 1.5 stalls 15 59 44 41 1 41 8 4 5,520 3,540 1 8 1 0.0025 0.01 998 1,706 0.005 0.01 10,000 0.004 4 14 35 5 17 40 106 160 266 71 27% Parking Targets count ` parking parking sq feet ratio stalls 132 0.6 79 29 1.5 44 41 8 1. 1 41 8 8/17/2011 .6 for senior no reduction for non -senior 4 5,520 3,540 1 0.00225 0.009 4 176 12 32 998 0.0045 4 1,706 0.009 15 4......._._._._.........$ 10,000 0.0036 36 10% reduction for commercial parking 100 276 targets Residential Commercial 41 i0'W1 1 Et 44 (-40 -76‘ -T300 Jot Ei e raurd Corm Figure 18-7 - Required Number of Parking Spaces for Automobiles and Bicycles Use Automobile Standard Bicycle Standard Single-family and multi- family dwellings 2 for each dwelling unit that contains up to 3 bedrooms. 1 additional space for every 2 bedrooms in excess of 3 bedrooms in a dwelling unit. Additional parking may be required for home occupations and accessory dwelling units as otherwise proved by this title. For multi -family, 1 space per 10 parking stalls, with a minimum of 2 spaces. No requirement for single family. Multi -family and Mixed- Use residential (in the Urban Renewal Overlay (URO)) One for each dwelling unit that contains up to one bedroom. 0.5 additional spaces for every bedroom in excess of one bedroom in a multi -family dwelling unit. At least 75% of required residential parking is provided in an enclosed structure (garage or podium). The structure must be screened from view from public rights of way. One automobile space at no .charge to a car sharing program (if available) for every 50 to 200 residential units o •te. An additional space shall be provided for One secure, covered, ground -level bicycle parking space shall be provided for every four residential units in a mixed-use or multi -family development. developments ith over 200 residential units. All car share spaces are in addition to required residential parking. If car sharing programs are not available when the building is constructed, an equivalent number of guest parking spaces shall be provided. These shall be converted to dedicated car -sharing spaces when the program becomes available. Senior Citizen Housing For 15 units or less, 1 space per dwelling unit. For dwellings with more than 15 units, a minimum of 15 spaces are required, plus 1 space per 2 dwelling units. 1 space per 50 parking stalls, with a minimum of 2 spaces. Religious facilities, mortuaries and funeral homes 1 for each 4 fixed seats 1 space per 50 parking stalls, with a minimum of 2 spaces. Colleges, Universities, Vocational Schools and other post -secondary educational institutions Shall be determined by Planning Commission, based on an evaluation of information concerning traffic generated by proposed use. 1 space per 50 parking stalls, with a minimum of 2 spaces. Convalescent/ nursing/rest homes 1 for every 4 beds with a minimum of 10 stalls 1 space per 50 parking stalls, with a minimum of 2 spaces. Food stores and markets 1 for each 300 square feet of usable floor area 1 space per 50 parking stalls, with a minimum of 2 spaces. High schools 1 for each staff member plus 2 for every 5 students or visitors 1 space per 50 parking stalls, with a minimum of 2 spaces. Hospitals 1 for each bed 1 space per 50 parking stalls, with a minimum of 2 spaces. Hotels, motels and extended stay 1 for each room, plus one employee space for each 20 rooms, rounded to the next highest figure 1 space per 50 parking stalls, with a minimum of 2 spaces. Manufacturing 1 for each 1,000 square feet of usable floor area _ 1 space per 50 parking stalls, with a minimum of 2 spaces. Page 1 Use Automobile Standard Bicycle Standard Places of public assembly, including auditoriums, exhibition halls, community clubs, community centers, and private clubs The Director shall determine the number of required parking spaces, with a minimum of 1 space for every 100 square -feet of assembly area. To ensure parking adequacy for each proposal, the Director may consider the following: a. A parking study or documentation paid for by the applicant and administered by the City regarding the actual parking demand for the proposed use, or b. Evidence in available planning and technical studies relating to the proposed use. 1 space per 50 parking stalls, with a minimum of 2 spaces. Post offices 3 for each 1,000 square feet of usable floor area 1 space per 50 parking stalls, with a minimum of 2 spaces. Restaurant 1 for each 100 square feet of usable floor area 1 space per 50 parking stalls, with a minimum of 2 spaces. Restaurant, Fast food 1 for each 50 square feet of usable floor area. Fifty percent of any outdoor seating area will be added to the usable floor area for parking requirement calculations. 1 space per 50 parking stalls, with a minimum of 2 spaces. Retail Sales, Bulk 2.5 for each 1,000 square feet of usable floor area. 1 space per 50 parking stalls, with a minimum of 2 spaces. Retail sales, General ;¢� /0T 4 for each 1,000 square feet of usable floor area if located within the TUC or TVS zoning districts; 2.5 for each 1,000 square feet of usable floor area if located in any other zoning district. 1 space per 50 parking stalls, with a minimum of 2 spaces. Schools, Elementary & Junior High 1.5 for each staff member 1 space per classroom Shopping center (mall), planned, per usable floor area size, as listed below: 500,000 sq. ft. or larger 5 for every 1,000 sq. ft. 1 space per 50 parking stalls, with a minimum of 2 spaces. 25,000 — 499,999 sq. ft. 4 for every 1,000 sq. ft. 1 space per 50 parking stalls, with a minimum of 2 spaces. Tavems 1 for every 4 persons based on occupancy load. 1 space per 50 parking stalls, with a minimum of 2 spaces. Theaters 1 for every 4 fixed seats. If seats are not fixed, 1 per 3 seats, with concurrence of Fire Chief, consistent with maximum allowed occupancy 1 space per 100 seats, with a minimum of 2 spaces. Warehousing 1 for every 2,000 square feet of usable floor area. 1 space per 50 parking stalls, with a minimum of 2 spaces. Rev. April 2012 Page 2 of 2 South of South 144th St ........................................................................... Land Use Building D (70 Units) ........................................................................................... Residential Senior first 15 (Bldg D) ........................................................................................... Residential Senior (Bldg D) .......................................................................................... Office 13,000 ......................................................................................... Subtotal Building E (124 units) ......................................................................................... Residential Senior first 15 (Bldg E) ......................................................................................... Residential Senior (Bldg E) ......................................................................................... Community Police - 2,000 SF* ......................................................................................... Retail General -1,150 SF* *assume 75% useable floor area (Grand Total (South) Code Required Parking count ................... sq feet parking parking ratio stalls 15 ............... 55 ............... 9,750 1 ............... 0.5 ............... 0.003 15 28 29 15 1 15 43 29 72 109 0.5 55 70 1,500 0.003 5 863 0.004 3 8 78 10% Shared Pkng Redux count parking sq feet ratio parking stalls 15 55_.. .............. 9,750 1 0.5..... .................. 0.0027 15 28 26 (for commercial only) no reduction for any residential parking 43 Residential BIKES 2 26 Commercial 2 15 1 15 109 0.5 55 1,500 0.0027 4 863 0.0027 2 69 70 Residential 2 6 commercial 2 76 150 145 Code Required Parking 10% Shared Pkng Redux 8 Total Parking Required 427 412 I 37 'PARKING PROPOSED TO BE PROVIDED - BOTH ON-SITE & IN STREET ROW'S: ON-SITE PARKING Surface Garage Total Total combined parking provided 18 stalls for KCHA Parking Easement North South X98 29 171✓ 129 269 158 282 Total 127 300 427 Bi 163 1445 ✓1 18 463 STREET PARKING Tuk Int Blvd S 144th Street Total North South Total 0 0 0 13 5 18 13 5 18 TUKWILA VILLAGE Phase 1 Parking Requirments & Absorption Phase 1 Phase 3 Construction Construction Required Completion Start Units or Parking Usable (After Admin. Floor Area Variance) Building A - Residential 84 Building A - Retail _ 3,647 Building A - Restaurant 2,452 Building A - Fast Food 1,162 Building C - Fast Food 1,140 7W 18 ------- Building C- Community Assembly 1,711 14 14 Library 10,000 32 32 Phase 2 Construction Completion Phase 3 Construction Completion r 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Apr -2015 May -2015 Jun -2015 Jul -2015 Aug -2015 Sep -2015 Oct -2015 Nov -2015 g, Dec -2015 Jan -2016 Feb -2016 Mar -2016 Apr -2016 May -2016 Jun -2016 Jul -2016 Aug -2016 Sep -2016 Total 100 14 14 14 14 14 7 — 2 20 Total / New Demand Based on Absorption Cumulative Demand Based on Absorption On -Site Parking Provided - Phase 1 Off -Site Parking Provided - Phase 2 Off -Site Parking Provided - Phase 3 Off -Site Parking Provided - S. 144th Street - North Side Off -Site Parking Provided - S. 144th Street - South Side Temporary Parking Provided - Phase 3 (Parcel B) Temporary Parking Provided - Existing Library New Demand Based on Absorption Cumulative Demand Based on Absorption 18 14 20 19 14 2 0 0 0 0 0 0 0 100 2 1 7 210 60lee / 60 f 74 108 122 1 Et /Ole 148 13 5 54 34 -54 l 1)6 53 14 4 0 189 203 207 207 (35 13 34 a 0 0 0 207 207 207 20 19 18 14 32 2 0 0 0 0 1 210 209 209 209 209 209 210 47 -34 254 -54 0 0 0 254 200 200 200 200 34 0 0 0 0 0 0 234 234 234 234 234 234 234 148 34 47 13 5 0 0 13 0 0 0 0 0 247 247 247 247 247 247 247 Surplus (Shortage) of Parking Provided 194 126 92 78 64 45 31 27 27 27 27 27 38 38 38 38 38 37 Moira Bradshaw From: Robin Tischmak Sent: Monday, September 30, 2013 1:47 PM To: Moira Bradshaw Cc: Minnie Dhaliwal Subject: RE: S. 144 Street Frontage improvements Moira - Okay. Should be no problem. Those appear to be pretty easy answers to give to you. Robin From: Moira Bradshaw Sent: Monday, September 30, 2013 10:19 AM To: Robin Tischmak Cc: Minnie Dhaliwal Subject: S. 144 Street Frontage improvements Robin — Attached is a response from Tukwila Village Development regarding their parking variance request. In number 8 of their response, they state that construction of the on -street parking being shown on S. 144 Street, is contingent upon receipt of a TIB grant. "However, the intention is that the north half of the street improvements will be completed with Phase 1 and the south half of the street improvements will be completed with Phase 2." The TV development schedule shows application for frontage improvements on October 12013 and commencement and completion of construction of Phase 1 on April 2014 and March 2015 respectively. I will set up a meeting to get your response to the following issues: SPS QUOVA3 ‘2°11.,itilct 1. Has the City applied for the TIB grant? And if not when will the City apply for it in future? 2. What is the time frame for that grant? 3. Can the applicant construct the street without the funds from the gra4That is, does the applicant have sufficient direction and can the applicant develop construction drawings that will satisfy City criteria. See the drawings that have been submitted with Design Review Application. 4. Can the completion of the street be divided so that the north half of the street is completed prior to the south half? Moira Carr Bradshaw, Senior Planner Community Development Department 6300 Southcenter Boulevard Tukwila, WA 98188 The City of opportunity, the community of choice www.tukwilawa.gov (206) 431— 3651 I M - TH, 8:30 — 5:00 1 Minnie Dhaliwal From: Minnie Dhaliwal Sent: Wednesday, August 07, 2013 3:51 PM To: Moira Bradshaw Subject: FW: Tukwila Village parking Attachments: Tuk Village parking cal.pdf Here is the very first analysis. From: Minnie Dhaliwal Sent: Thursday, February 02, 2012 1:59 PM To: Jack Pace Cc: Nora Gierloff; Moira Bradshaw; Derek Speck Subject: Tukwila Village parking Jack, Based on my review of the parking calculations that you received from Johnson Braund here are my comments: 1. Overall the numbers are pretty close and it may be premature to lock ourselves into how many parking stalls are required as the site plan will evolve as the project moves forward. The code allows complementary parking where up to 10% if the usable floor area may be occupied by a complementary use without providing parking spaces in addition to the principal use (TMC 18.56.070D). I think this is what Johnson Braund is referencing in the second column, where they have reduced the parking ratio by 10% ,instead of reducing the overall floor area by 10%. Also, the code allows administrative variance for up to 10% parking reduction (TMC 18.56.140), which is referenced in the third column. One of the criteria for this reduction is that the site is at least 300 feet away from a single family zone. 2. The parking calculation for residential units is correct and it meets all the requirements including the one that requires 75% to be in an enclosed structure. There is one category called out as "residential non -senior LW". I am assuming it is live -work. The table shows 4 such units and one parking space for them. Since it is such a small component of the overall site plan that I am not sure it is of much concern at this time. Also, the code requires two additional spaces for car sharing program that are not included. 3. The parkinig calculations for the different commercial uses are correct except that a coffee shop is considered fast food (disposable containers) under our code, which requires 1 space for 50 sq. ft. So for 998 sq. ft. coffee shop thejcode requires 20 parking stalls and the table shows 5. I think a case could be made that not all users are going to drive therefore complementary parking waiver could apply. Even if we required 20 stalls the total required parking will not exceed 10% parking reduction. 4. The figure 18-7 in the zoning code states that the parking requirements for a library are to be determined by Planning Commission. However there is no process or criteria. I could include this lin the Housekeeping Code Amendments to make it Type 2 Director's approval or specify that it will be Type 4 PC approval. I will need dirJection on this issue no later than the first part of next week. The table shows 40 parking stalls for 10,000 square feet library and I am assuming that came from what the library wants not what it needs. 5. Oierall their analysis shows 281 are required by code and their target is 276. Assuming we kept the library pa king at 40 and changed the parking for coffee shop from 5 to 20 and required a couple more for residential - the total would be 298, with 10% reduction the total required would be 269 and they are targeting for 276. Therefore I don't think parking is an issue. Johnson Braund understands the parking requirements and I sure hope we will be flexible where code allows us to be. Minnie 1 Minnie Dhaliwal From: Sent: To: Subject: Minnie Dhaliwal Wednesday, August 07, 2013 3:42 PM Moira Bradshaw FW: Tukwila Village comments These were our initial comments and I think the understanding at the time was that parking was going to be addressed as part of development agreement. From: Minnie Dhaliwal Sent: Friday, March 16, 2012 3:08 PM To: Derek Speck Cc: Moira Bradshaw; Jack Pace; Nora Gierloff; Bob Benedicto Subject: Tukwila Village comments Derek, This is to follow up on our meeting yesterday. Listed below are comments from Planning and Building: Planning Comments: 1. It may be helpful to label the buildings with numbers or names eg. 1-5 2. There was discussion about required setbacks and modulation to break up the building mass and soften the facades along the east property line for building 2 (phasel). There is a 20 foot required setback for the 2"d floor and above. The current site plan does not appear to meet the standard setbacks, so this item will need to be addressed as part of the development agreement. The city could let the covered porches extend into the required setback and let the setback standard be averaged along the facades as long as the design intent of breaking up the mass are met . The city stated that 1/3 of the building length could be allowed 20 foot setback if 213rd of the building was setback 30 feet. It was decided that it is not feasible to have 1/3 or 2/3 proportions set at this time. Joe had previously stated that they could look into adding another story to modulate the upper floors and add some terraces. This is acceptable method of modulating the upper floors, however it is hard to agree on the design based on just the site plan. It was agreed that the developer's team would propose some language for the agreement to address this issue. 3. The driveway entrance to the garage along S 144th Street was discussed. Staff proposed eliminating the entrance and instead wrapping that portion of the building with residential units, similar to what the developer has proposed along a portion of the west facade. There may be opportunity to extend on -street parking in this area if the driveway is eliminated. Joe was agreeable on this issue and wanted to discuss it further with the developer and his team. 4. There was discussion about required setbacks, building massing and possibility of breaking up one Targe plaza into two/three smaller plazas for building 3 (phase2). Plazas facing east could take advantage of territorial views and plazas facing north could overlook the Village Green, but may not get as much sunshine. One option was to make the building mass "H" by sliding a portion of the building west. Fire raised an issue about ladder access to the top of the building. It was decided that fire access will be calculated to determine how much the building could be pushed back. The second floor for a portion of this building is setback 15 feet and does not meet the required setback. Joe asked for a relief from the setback along the NE corner of the building in exchange for larger setback in another area. This item will need to be addressed as part of the development agreement. Applicant to propose some language. 1 5. The pedestrian circulation arc . Phase 2 was discussed and it was decidh . needed more work. The details of the location and design of paths could be addressed as part of the design review process. It was clarified that the underground garage extended under the surface parking lot of phase 2 and the garage wall may pose some limitations on the location of landscaping. 6. It was clarified by staff that the 10% parking reduction for shared parking does not apply to the residential uses, therefore if the developer desires some flexibility in the parking standards it should be addressed in the development agreement. Since an administrative decision will be required for the library parking, staff suggested that the development agreement could include language stating that the developer will generally comply with parking regulations but the Director of Community Development is authorized to grant up to 10% par mg re•uctio 7. The site plan as proposed does not meet interior parking lot landscaping requirements and does not show landscaping along the south side S. 144TH St. If the developer seeks any relief from landscaping standards they should be addressed in the development agreement. 8. Major and minor modification of the site plan should be defined and process for reviewing and approving these modifications should be addressed in the development agreement. 9. Both driveways along TIB are right in/right out, which may impact the viability of retail. Southbound traffic on TIB will need to enter the site from S. 144th St. The access easement along the north property line was discussed. Also, opportunity to make a U-turn at TIB/144th intersection was discussed. It was decided that the developer's traffic engineer should look into opportunity to allow left turns along the northern driveway along TIB. 10. The development agreement includes a schedule and has completion dates, however the obligations of different parties should be clarified. 11. Although we did not discuss this but there are open space requirements for residential units. 100 sf/unit for senior housing and 200sf/unit for non -senior. The developer should be made aware of this requirement so they can make sure they are not going to run into any issues with this standard. Building Comments: 1. the development agreement — Under entitlements and Vesting — should include language that states that the developer is vested to the codes and ordinances in effect at the time that the permit application is deemed complete, provided that the permit application remains valid and is not expired by limitation. 2. Joe questioned whether the State provisions for five story Type VA construction would apply to Tukwila Village or the local ordinance. Ans: The local ordinance for Five story Type VA construction is more restrictive and therefore would supersede the State version of five story Type VA construction. 3. Joe questioned whether or not he could have both five story and four story Type VA construction in the same building for the purpose of not having to apply the five story requirements to the four story portion. Ans: Yes, but there needs to be definitive area breakup for the transition of applicable requirements. All five story areas must be in one block and all four story areas in another block of apartments. 4. For the purpose of vertical modulation both Bryan and Joe talked about potential six story portions of the East Building. I did not comment on this, but I do want to point out at this time, that would eliminate this building from the five story Type VA construction provisions and make them eligible for the Fire Department's Mid Rise Ordinance and all that entails. 2 Moira Bradshaw From: Diana Keys <dianak@johnsonbraund.com> Sent: Wednesday, July 24, 2013 6:10 PM To: Moira Bradshaw; Bryan Park (BryanP@housing4seniors.com) Cc: Melvin Easter; ChrisP Subject: RE: Parking for Tukwila village Attachments: LA1113 - P1.O_Overall Site Pian-redline.pdf Moira, I will respond to your parking count questions, see my responses in italics below. Please let me know if you have any further questions or concerns. Thanks, Diana Keys 1 Director of Housing 1 LEED AP JOHNSON BRAUND, Inc. 15200 52nd Ave S Seattle, WA 98188 T 206-766-8300 dianak@iohnsonbraund.com www.iohnsonbraund.com From: Moira Bradshaw[mailto:Moira.BradshawTukwilaWA.gov] Sent: Wednesday, July 24, 2013 4:44 PM To: Bryan Park (BryanP@housing4seniors.com) Cc: Diana Keys Subject: Parking for Tukwila village Hi Bryan — I am reviewing the parking numbers for the project and came up with the following count discrepancies: 1. The project description submitted for the TV said that there are 70 stalls in the garage of Bldg E. while Sheet P1.0 in the Johnson Braund Drawings say 80. If you could verify which is the accurate number. There are 80 stalls in building E garage. 2. I counted 81 surface stalls plus 2 loading stalls on Parcel A and C versus 93 , which is the total listed on Sheet P1.0. Where are those 10 other stalls? Per the CS summary and site plan graphics, there are 51 surface stalls + 2 loadin s stalls on parcel A nd 11 surface stalls on parcel C for a total of 64 surface stalls for phase 1. This count is consistent with the site plan graphics on P1.0, however there is a typo on the parking stall text for Parcel A surface parking — the total tally is correct. See attached pdf. 3. The 18 stalls in the southeast corner are on an easement for the King County Housing Authority, so they won't be included in the calculations for the project unless you have arranged for a shared use? We have not included the KCHA parking stalls in our counts to satisfy our required parking. Thanks for your help with my math. Moira Carr Bradshaw Senior Planner Department of Community Development 1 6300 Southcenter Boulevard _ Tukwila, WA 98188 www.tukwilawa.gov The City of opportunity, the community of choice (206) 431- 3651 M,T,W 8:30 — 5:00 1,/v /47 Pha.st, s/ (ino- 3 .4, 33 ,4.- Po/6,e 1 2 Pa rametrix Date: To: From: Subject: cc: Project Number: Project Name: ENGINEERING • PLANNING • ENVIRONMENTAL SCIENCES 411 108th AVENUE NE, SUITE 1800 BELLEVUE, WA 98004-5571 T. 425.458.6200 F. 425.458.6363 www.param et rix.com TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM - May 28, 2013 Dave McPherson Carter Danne Traffic Impact Analysis 13ryan Park 554-6892-001 Tukwila Village RECEIVED JUN 12 2013 COMMtNI I r DLVLLOPMLNT RECI lVIP JUN 142013 TUI�V1►il� PUBLIC WORKS p �, A. 4 8��013 INTRODUCTION Project Description Tukwila Village Development Associates LLC intends to develop a mixed use neighborhood center designed to provide residences as well as neighborhood retail and resources. The developer plans to build the project in three phases and construct five buildings in total that provide the uses shown in Table 1; building letters are shown on the attached site plan. The developer plans to complete Phase 1 in year 2014, followed by Phases 2 and 3 in year 2015. Table 1. Proposed Uses and Development Phasing Proposed Uses ...... Family Apartment Units Senior Housing —Attached Units Phase 1 Total 2 3 Building Letter s, A Location On Site Northwest ✓ D Southwest v B Northeast Qty. Unit of Measure "(84) Dwelling Units (DU) 19 Occupied Dwelling Units (ODU) 70 1 ODU 125 ODU 2 i E Southeast 124) ODU Retail Space Total '17,000\ Square Feet (SF) 1 ✓ A Northwest t 8,100 F 1 .i C Commons \ 4,250 3 ✓ B Northeast 11,800 fSF 2 E Southeast 1,200) SF Office 2 J D Southwest'03,0-00 SF Community Policing 2 ,i E Southeast 2,000 SF In addition, it is anticipated the he King County Librarystem (KCLS) will relocate the nearby Foster Library onto the site into a 10 000 SF,building constructed by KCLS in a west -central location and dedicated for their sole use. The project site is located in the northeast and southeast quadrant of the Tukwila International Boulevard (TIB)/S 144th Street intersection in Tukwila, WA. The project site is shown on Figure 1. 1 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) 5141ST ST 5 142ND ST Scope of Analysis This technical memorandum addresses the following: • Traffic Volumes & Parking Projections • Transportation System Conditions • Mitigation Fee Requirements • Conclusions & Recommendations TRAFFIC VOLUMES & PARKING PROJECTIONS S 142ND ST 1 Figure 1 Site. Vicinity Map Existing Traffic Volumes Turning movement volumes were gathered on Thursday, June 14, 2012 prior to school being out of session. The counts were conducted from 2:30 PM to 6:00 PM and the peak hours at the TIB intersections occurred from 4:30 PM to 5:30 PM and at the S 144th Street intersections from 4:15 PM to 5:15 PM. These traffic volumes are shown on Figure 2. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 2 May 28, 2013 1 1 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Figure 2 Existing 2012 PM Peak Hour Turning Movement Volumes Future Baseline 2015 Traffic Volumes The City of Tukwila provided historic traffic volume data on Tukwila International Boulevard north of S 139th Street from the year 2006 through 2011. The annual growth from 2006 has varied year to year as is seen in Table 2 below. Additionally, a forecast of the average daily traffic (ADT) for the project horizon year of 2015 was used to help develop an assumed annual growth rate. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 3 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 2. Historic Growth in Traffic Volumes (TIB north of S 139th Street) Data Years of Growth Average Daily Annual Growth Year from 2006 Traffic (ADT) from 2006 2006 17,100 2007 1 17,300 1.2% 2008 2 17,400 0.9% 2009 3 16,800 -0.6% 2010 4 15,500 -2.4% 2011 5 19,100 2.2% 2015 (Forecast) 9 17,943*- 0.5%* `Forecast using linear regression After reviewing the above information, a 1 percent annually compounding traffic growth rate was determined to be a reasonable assumption for the traffic growth anticipated on the streets near Tukwila Village. Figure 3 shows the future 2015 baseline traffic volumes during the weekday PM peak hour, which were grown from the volumes summarized in Figure 2. S 142ND ST 5142ND ST Tukwila Village Development Associates LLC Traffic Impact Analysis 4 Figure 3 Future 2015 Baseline PM Peak Hour Turning Movement Volumes 554-6892-001 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Trip Generation The 8th Edition of ITE's Trip Generation was used to estimate the amount of traffic generated by the proposed site uses. Table 3 below summarizes the gross trips projected with the proposed development. Gross trips represent the trip generation of land uses as if they were standalone uses and do not account for the trip reductions typically experienced with mixed-use sites. Table 3. Weekday Gross Trip Generation Daily AM Peak Hour PM Peak Hour Proposed Uses Phase & Compatible Land Use Code Building Letter Qty. Total Total In Out Total In Out Family Apartment Units 220 — Apartment 1 A v 84 DU 633 45 9 36 64 42 22 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center 2 D ' 70 ODU 244 11 4 7 13 8 5 3 B si 125 ODU 435 18 7 11 24 14 10 2 E 124 ODU 431 18 6 12 23 14 9 1 A 9,960 SF 1,252 32 20 12 113 56 57 1 C 4,250 SF 534 14 8 6 48 24 24 Retail Space 820— Shopping Center Retail Space 820 — Shopping Center 313 i 1,800 SF 226 6 4 2 20 10 10 2 E -/ 1,200 SF 152 3 2 1 15 6 9 Office 2 0 , 13,000 SF 277 37 33 4 93 16 77 710 — General Office Building Community Policing 730 — Government Office Building 2 E 2,000 SF 138 12 10 2 2 1 1 Subtotal of Phase 1 not including Library 1 2,419 91 37 54 225 122 103 Library 590 — Library 1 (by KCLS) 10,000 SF 764 7 5 2 73 35 38 Subtotal of Phase 1 with Library 1 3,183 98 42 56 298 157 141 Subtotal of Phase 2 2 1,242 81 55 26 146 45 101 Subtotal of Phase 3 3 661 24 11 13 44 24 20 Total with Full Build -Out Full Build -Out 5,086 203 108 95 488 226 262 After the gross trip generation was projected, adjustments were made to account for the mixed-use nature of the site and estimates of internal trips within the site. The ITE Trip Generation Handbook contains a procedure by which to do this and that methodology was followed to project the internal capture summarized in Table 4. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 5 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 4. Weekday Internal Trip Generation (Capture) Proposed Uses Compatible Land Use Code Family Apartment Units 220 — Apartment Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out 1A 84 DU 76 1 0 1 10 7 3 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached 2 D 70 0DU 29 0 0 0 2 1 1 3 B 125 ODU 52 1 1 0 4 2 2 2 E 124 0DU 52 0 0 0 4 3 1 Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center 1 A 9,960 SF 146 2 1 1 13 5 8 1 C 4,250 SF 62 1 0 1 6 2 4 3B 1,800 SF 26 0 0 0 2 1 1 Retail Space 820 — Shopping Center Office 710 — General Office Building 2E 1,200 SF 19 1 1 0 2 0 2 2 D 13,000 SF 16 1 1 0 3 1 2 Community Policing 730 — Government Office Building 2 E 2,000 SF 8 1 0 1 0 0 0 Subtotal of Phase 1 not including Library 1 284 4 1 3 29 14 15 Library 590 — Library 1 (by KCLS) 10,000 SF 44 0 0 0 2 2 0 Subtotal of Phase 1 with Library 1 328 47 1 3 31 16 15 Subtotal of Phase 2 2 124 3 2 1 11 5 6 Subtotal of Phase 3 3 78 1 1 0 6 3 3 Total with Full Build -Out Full Build -Out 530 8 4 4 48 24 24 With the internal trip capture projected, the external trips (trips that would appear at the driveways) were calculated by subtracting the internal trips (Table 4) from the gross trips (Table 3). Table 5 summarizes below the anticipated total driveway trips. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 6 May 18, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 5. Weekday External Trip Generation (Total Driveway Trips) Proposed Uses Compatible Land Use Code Family Apartment Units 220 — Apartment Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out 1 A 84 DU 557 44 9 35 54 35 19 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached 2 D 70 ODU 215 11 4 7 11 7 4 3 B 125 ODU 383 17 6 11 20 12 8 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center 2 E 124 ODU 379 18 6 12 19 11 8 1 A 9,960 SF 1,106 30 19 11 100 51 49 Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center Retail Space 820 — Shopping Center 1 C 4,250 SF 472 13 8 5 42 22 20 3 B 1,800 SF 200 6 4 2 18 9 9 2 E 1,200 SF 133 2 1 1 13 6 7 Office 710 — General Office Building 2 D 13,000 SF 261 36 32 4 90 15 75 Community Policing 730 — Government Office Building Subtotal of Phase 1 not including Library 2 E 2,000 SF 130 11 10 1 2 1 1 1 2,135 87 36 51 196 108 88 Library 590 — Library 1 (by KCLS) 10,000 SF 720 7 5 2 71 33 38 Subtotal of Phase 1 with Library 1 2,855 94 41 53 267 141 126 Subtotal of Phase 2 2 1,118 78 53 25 135 40 95 Subtotal of Phase 3 3 583 23 10 13 38 21 17 Total with Full Build -Out Full Build -Out 4,556 195 104 91 440 202 238 The external trip generation summarized above contains vehicle trips of two types: pass -by trips and new trips. Pass -by trips are trips to/from sites where the vehicle was already on the street and as it is passing by the site, the driver turns into the site to make a stop before resuming their original trip. New trips are the remaining trips, where the primary purpose of the vehicle trip was to travel to and from the site. Only the 17,210 SF of retail uses are expected to attract pass -by trips. The pass -by trip reductions applied to the retails uses were as follows: • 65 percent for the PM peak hour (based on the regression equation found for Shopping Center in the ITE Trip Generation Handbook), • 55 percent for daily (although no data exists, it has been assumed to be somewhat less than during the peak hours), and • 65 percent for the AM peak hour (although no data exists, it has been assumed to mirror the PM peak hour trend). The regression equation was used rather than the average pass -by percentage because the pass -by data for shopping centers indicate that the pass -by rate exponentially increases as the square footage of the retail decreases. This presumably occurs because larger shopping centers are more of a regional destination rather than a local neighborhood center, where someone might drop by on the way home in the evening or to the office in the Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 7 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) morning (i.e., a pass -by trip). The result of applying the above pass -by rates to the external trip generation for the retail uses is summarized in Table 6 below. Table 6. Weekday Pass -By Trip Generation Proposed Uses Compatible Land Use Code Family Apartment Units 220 — Apartment Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out 1A 84 DU 0 0 0 0 0 0 0 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached 2 D 70 ODU 0 0 0 0 0 0 0 Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached 3 B 125 0DU 0 0 0 0 0 0 0 2 E 124 ODU 0 0 0 0 0 0 0 Retail Space 820 — Shopping Center 1 A 9,960 SF 608 19 12 7 65 33 32 Retail Space 820 — Shopping Center 1 C 4,250 SF 260 8 5 3 28 14 14 Retail Space 820 — Shopping Center 3B 1,800 SF 110 3 2 1 12 6 6 Retail Space 820 — Shopping Center Office 710 — General Office Building 2 E 1,200 SF 73 3 2 1 7 4 3 2 D 13,000 SF 0 0 0 0 0 0 0 Community Policing 730 — Government Office Building 2 E 2,000 SF 0 0 0 0 0 0 0 Subtotal of Phase 1 not including Library 1 868 27 17 10 93 47 46 Library 590 — Library 1 (by KCLS) 10,000 SF 0 0 0 0 0 0 0 Subtotal of Phase 1 with Library 1 868 27 17 10 93 47 46 Subtotal of Phase 2 2 73 3 2 1 7 4 3 Subtotal of Phase 3 3 110 3 2 1 12 6 6 Total with Full Build -Out Full Build -Out 1,051 33 21 12 112 57 55 The proposed Tukwila Village development would attract 1,051 daily pass -by trips, of which 33 would occur during AM peak hour and 112 would occur during the PM peak hour. As mentioned previously, after accounting for internal trip capture and pass -by trips, the remaining trips are referred to as new trips. The new trips summarized below in Table 6 are the result of subtracting the pass -by trips in Table 5 from the external trips in Table 7. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 8 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 7. Weekday New Trip Generation Proposed Uses Compatible Land Use Code Family Apartment Units 220 — Apartment Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Senior Housing — Attached Units 252 — Senior Adult Housing -Attached Retail Space 820 — Shopping Center (Retail Space 820 — Shopping Center Retail Space - 820 — Shopping Center Retail Space 820 — Shopping Center Office 710 — General Office Building Community Policing 730 — Government Office Building Subtotal of Phase 1 not including Library Library 590 — Library Subtotal of Phase 1 with Library Daily AM Peak Hour PM Peak Hour Phase & Building Letter Qty. Total Total In Out Total In Out 1 A E; 84 DUy 557 44 9 35 r 54, 35 19 2' ) , -- 70 OM • 215 11 4 7 11 7 4 3Bv—1250DU• 383 17 6 11 20 12 8 2 E J — 124 0DU ' 379 18 6 12 19 11 8 1, A 9,960 SF 498 10 6 4 35 18 17 ,.1:C` " l 4,250 SF : 123 4 3 1 14 8 6 3 B J 1,800 SF 13 2 1 1 6 3 3 2 E j 1,200 SF 226 2 1 1 6 2 4 2 D „ — 13,000 SF . 261 36 32 4 90 j 15 75 2 E _ 2,000 SF' 130 11 10 1 /2 1 1 1 1 1,178 58 18 41i x.1103 61 42 1 (by KCLS) . 10,000 SF 720 7 5 71 33 38 1 1,898 65 23 42 174 94 80 Subtotal of Phase 2 Subtotal of Phase 3 2 1,211 78 53 25 te 128 fi 36 92 3 396 19 7 1,2 w 26 11 15 11 Total with Full Build -Out Full Build -Out 3,505 162 83 79 328J J 145 183 \6'2,y./I,a The proposed Tukwila Village development would generate 3,505 new daily trips, of which 10 1 d occur'r-1 during the AM peak hour and 328 during the PM e kliour t VAILA /2 51 Trip Distribution and Assignment e`""' o2 Based on the land use patterns in the general vicinity of the project, knowledge of the local transportation system, professional engineering judgment, and traffic counts along Tukwila International Boulevard, distribution and assignment of the project trips were estimated. The new project trip distribution is shown on Figure 4. New trips are estimated to travel to/from the site in the following pattern: • 25 percent to/from the north on TIB towards Seattle. • 25 percent to/from the west on S 144th Street towards nearby neighborhoods and Military Road S. • 25 percent to/from the east on S 144th Street towards nearby neighborhoods. • 25 percent to/from the south on TIB towards the City of SeaTac and State Route 518. Pass -by traffic to/from Tukwila Village is shown on Figure 5 and was assigned based on where the uses were located on the site as well as the volume being carried in the future baseline 2015 traffic streams on TIB and S 144th Street, which indicated the following distribution for the Phase 1 pass -by trips, which are likely to arrive from both TIB and S 144th Street: Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 9 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) • 43 percent from southbound TIB • 26 percent from northbound TIB • 17 percent from westbound S 144th Street • 14 percent from eastbound S 144th Street For Phase 2 pass -by trips, the uses are set -back from TIB and much more likely to draw traffic only from S 144th Street. Given that, the Phase 2 pass -by trafficwas distributed as follows: • 54 percent from westbound S 144th Street • 46 percent from eastbound S 144th Street Lastly, because the project site provides non -motorized system improvements in project vicinity, crosswalk volumes were projected to increase by 50 pedestrians per hour with the completion of the project. For comparison, 50 pedestrians per hour represents the difference between the values suggested for assuming the number of pedestrians per hour in a rural area (zero pedestrians per hour) and a suburban area (50 pedestrians per hour). These values were documented in in the National Cooperative Highway Research Program (NCHRP) Report 599 — Default Values for Level of Service and Highway Capacity Analyses. The thought being the relative difference reflects the change from an undeveloped condition to a suburban development condition. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 10 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) legend 25 Trip Distribution Percentage xxx Daily Trips x.r—►x Peak Hour Trips Traffic Impact Analysis 11 Figure 4 New Project Trips Distribution and Assignments May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) PROJECT SITE o-) o—► 0 000 0 S 142ND ST 7 Figure 5 Pass -By Project Trip Assignments Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 12 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Future 2015 With Project Volumes The trip assignments of new and pass -by traffic were added to the future 2015 baseline PM peak hour volumes shown on Figure 3, which resulted in the PM peak hour turning movement volumes shown in Figure 6. These volumes were used to assess the transportation system conditions with the project. us m 5 142ND ST TUKWILA S 144TH ST 5 141ST ST PROJECT SITE •• • • -11 301—► \moi 11—(1111.4 5146TH ST 1k. 65 J 269-1 6� S142NDST MEMO Figure 6 Future 2015 with Full Build -Out PM Peak Hour Turning Movement Volumes Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 13 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Parking Generation ITE Parking Generation, 4th Edition was used to estimate the parking demand for the project. The proposed site uses were matched as close as possible to the data available. The parking demand estimates were compared to the proposed parking supply. A total of 427 parking stalls would be provided on-site of which 300 would be in - building (garages) and 127 spaces would be surface parking stalls. Additionally, 18 on -street parking spaces would also be provided. Table 8 below summarizes the anticipated parking demand for a typical weekday. Table 8. Peak Parking Demand by Individual Use f,a( ,St Proposed Uses (Compatible ITE Land Use Code) Family Apartment Units 84 Dwelling Units (Code 221 - Low/Mid-Rise Apartment) Peak Parking Demand Ch s Peak Parking Demand Spaces 1.42 spaces per dwelling u aces 81 Hours of Day Parking Peaks Overnight (12:00 AM -5:00 AM) Senior Housing — Attached Units 319 Occupied Dwelling Units (Code 252 — Senior Adult Housing — Attached) 0.59 spaces per dwelling unit 188 Overnight (12:00 AM -5:00 AM) Retail Space 17,210 Square Feet (SF) (Code 820 — Shopping Center) 3.76 spaces per 1,000 SF 65 Noon -1:00 PM Library 10,000 SF (Code 590 — Library) 3.14 spaces per 1,000 SF 31 7:00 PM -8:00 PM Office 13,000 SF (Code 720 — Medical -Dental Office Building) 2.51 spaces per 1,000 SF 64 10:00 AM -Noon plus 26 spaces Community Policing 2,000 SF (Code 730 — Government Office Building) 4.15 spaces per 1,000 SF 8 10:00 AM -11:00 AM The sum of the above peak parking demands for the individual uses total 432 parking spaces (and the amount of on-site parking is very near that amount) and because parking peaks at different times of the day, the actual maximum peak parking demand is less than 432 parking spaces, and would peak at 270 parking spaces in use in the evening from 8:00 PM to 9:00 PM. Table 9 illustrates this by summarizing the parking demand as it varies throughout the day using data from ITE. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 14 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 9. Hourly Variation of Parking Demand Percent of Peak Parking Demand Family Senior Site Hour Apartment Housing- Community Parking Beginning Units Attached2 Retail3 Library's Office Policing6 Demand 12:00 AM 100% 100% 269 1:00 AM 100% 100% 269 2:00 AM 100% 100% 269 3:00 AM 100% 100% 269 4:00 AM 100% 100% 269 5:00 AM 96% 96% 258 6:00 AM 92% 92% 247 7:00 AM 74% 74% 5% 59% 59% 199 8:00 AM 64% 64% 18% 16% 79% 79% 172 193 9:00 AM 34% 34% 38% 45% 95% 83% 10:00 AM 32% 32% 68% 52% 100% 100% 213 11:00 AM 31% 31% 91% 70% 98% 92% 229 12:00 PM 30% 30% 100% 58% 90% 77% 223 1:00 PM 31% 31% 97% 79% 77% 59% 221 2:00 PM 33% 33% 95% 78% 84% 71% 230 3:00 PM 37% 37% 88% 84% 81% 78% 237 4:00 PM 44% 44% 78% 58% 72% 72% 235 5:00 PM 59% 59% 62% 49% 46% 46% 245 6:00 PM 69% 69% 64% 50% 25% 25% 259 1 7:00 PM 66% 66% 77% 100% 259 8:00 PM 75% 75% 70% 72% 270 9:00 PM 77% 77% 42% 234 10:00 PM 92% 92% 247 11:00 PM 94% 94% 253 1 For the family apartment units, the daily distribution for Low/Mid-Rise Apartment (ITE Land Use 221) was used, however, that data has a gap between 9:00 AM and 4:00 PM and the daily distribution for Rental Townhouse (ITE Land Use 224) was used for parking between 9:00 AM and 4:00 PM. 2 For the senior housing -attached units, no daily distribution data is available in ITE for Senior Housing -Attached (Land Use 252). Therefore, the assumed daily distribution for family apartment units was used. 3 For the retail uses, the daily distribution of parking demand for Shopping Center (ITE Land Use 820) for a non -Friday, non - December weekday was used. 4 Used data for Library (ITE Land Use 590). 5 Used data for Office Building (ITE Land Use 701). 6 Used data for Government Office Building (ITE Land Use 730), which provides data for the time period from 9:00 AM to 4:00 PM. That was supplemented with data from Office Building (ITE Land Use 701) for the hours from 7:00 AM to 9:00 AM and 4:00 PM to 7:00 PM. Note that the above parking demand estimates have not been adjusted for the mixed-use nature of the site and the internal capture between uses, which would reduce the peak parking demand. The daily trip generation would Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 15 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) experience a trip generation reduction of 10 percent due to internal capture and a similar reduction would likely occur for the peak parking demand. One other factor that may reduce the overall parking demand is the close proximity to King County Metro bus stops on Tukwila International Boulevard and S 144th Street in the site vicinity (see the Transportation System Conditions section for detailed information about the routes and stop locations). With the overall site peak parking demand peaking at 270 parking spaces, and 427 on-site parking spaces being provided, the proposed parking supply would be adequate. TRANSPORTATION SYSTEM CONDITIONS Street Descriptions The street characteristics in the project vicinity along the project frontage are described in Table 10. Table 10. Existing Street Characteristics in Proje-Vicinity Street Name Functional Classification Tukwila International Boulevard Principal S 144th Street Collector Posted Speed Limit 40 mph 25 mph Travel Lanes Two through lanes in each direction with left -turn lanes and right -turn pockets at S 144th Street. One through lane in each direction with left -turn lanes at TIB. Non -Motorized System Improvements Sidewalks on both sides of the street, but no bike lanes. Signalized crosswalks are provided at the east and west legs of the TIB/S 144th Street intersection. An unsignalized mid -block crosswalk with overhead flashing beacons is also provided north of S 144th Street across TIB. Transit Service Options Bus stops for King County Metro Route 124 are located on the east side of TIB north of S 144th Street and on the west side of TIB south of S 144th Street. Metro Route 124 operates on 30 -minute headways on weekdays and connects to both SeaTac and downtown Seattle. West of TIB, there are sidewalks and bike lanes on both sides. East of TIB, there is continuous sidewalk along the north side and intermittent sidewalk along the south side. There are no bike lanes currently along either side. Signalized crosswalks are provided at the north and south legs of the TIB/S 144th Street intersection. An unsignalized crosswalk is also provided at the east leg of the S 144th Street/41st Avenue S intersection. Bus stops for King County Metro Route 128 are located on the north side of S 144th Street east of 42nd Avenue S and on the south side of S 144th Street west of TIB. Metro Route 128 operates on 30 -minute headways on weekdays and connects Tukwila to West Seattle. Crash History The five-year history of vehicle crashes in the project vicinity was reviewed to see if the crash rate appeared to be unusually high. None of the locations studied experienced crash rates in excess of 1.0 crash per million entering vehicle. In other words, the crash rates were less than one in million. Additionally, no crashes were severe enough to cause fatalities. Table 11 summarizes the five-year crash history. Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 16 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Table 11. Five -Year Crash History — Crash Rate and Severity Study Area Facilities Street Intersections Exposure Rate Severity Est.2 Crashes Daily Crashes per Million Property Total Time Volume per Entering Damage Personal Crashes (years) (veh) Year Vehicles Only Injury Fatality Tukwila International Blvd. (TIB) at S 144th Street 22 5 20330 4.4 0.6 15 7 S 144th Street at 41st Avenue S 3 0 5 5810 0.0 0.0 Street Segments TIB between: S 142nd Street and S 144th Street 20 5 13180 4.0 0.8 16 4 TIB between: S 144th Street and S 146th Street 22 5 15120 4.4 0.8 14 8 S 144th Street between: TIB and 41st Avenue S 4 5 5700 0.8 0.4 3 1 S 144th Street between: 41st Avenue S and 42nd Avenue S 6 5 5560 1.2 0.6 5 1 1 City of Tukwila records from July 1, 2007 through June 30, 2012. 2 Assumes that the daily volume entering the intersection is approximately 10 times p.m. peak hour volume. 3 Last reported crash here occurred prior to this 5 -year reporting period. The types of crashes were also summarized and those have been summarized in Table 12. The most frequently occurring crash involved a rear -end collisions, which are typically due to driver inattention and stop -and -go traffic. Table 12. Five -Year Crash History — Crash Types Study Area Facilities Street Intersections Crash Type Fixed Object Pedestrian Approach Head or Parked Rear Right Side- or Cyclist Tum On Backing Vehicle End Angle swipe Involved Tukwila International Blvd. (TIB) at S 144th Street 3 9 3 4 3 S 144th Street at 41st Avenue S 3 Street Segments TIB between: S 142nd Street and S 144th Street 1 16 1 2 TIB between: S 144th Street and S 146th Street 1 1 10 2 6 2 S 144th Street between: TIB and 41st Avenue S 1 3 S 144th Street between: 41st Avenue S and 42nd Avenue S 1 1 1 3 Study Area Total Crashes 4 1 2 3 41 6 12 5 Percent of Study Area Total Crashes 5% 1% 3% 4% 55% 8% 16% 7% Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 17 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Level of Service at Intersections Traffic operations were studied at the proposed site driveway intersections and the public street intersections of TIB/S 144th Street and S 144th Street/41 st Avenue S. The quality of traffic operations at intersections was ranked with a level of service (LOS) on an alphabetic scale from LOS A to LOS F, with LOS A being the best operations and LOS F being the worst operations. This is consistent with the Highway Capacity Manual published by the Transportation Research Board. The deterministic software, Synchro version 7 (Build 773, Revision 8), developed by Trafficware, was used to study the intersection operations. Using the intersection traffic volumes shown on Figures 2, 3, and 6, the LOS results were obtained and are summarized in Table 13 below. Table 13. Intersection Level of Service Conditions Existing 2012 Future 2015 Baseline Future 2015 with Project Intersection LOS Delay LOS Delay LOS Delay Tukwila International Boulevard at C 35.0 D 35.9 D 38.9 S 144th Street S 144`" Street at 41st Avenue S/East Drive Northbound Approach B 13.1 B Southbound Approach B 12.1 B 13.3 12.3 C 23.5 C 23.9 Tukwila International Boulevard at at North Drive (Westbound Approach) A 8.9 Tukwila International Boulevard at at Main Drive (VVestbound Approach) A 9.0 S 144`" Street at South Drive (Northbound Approach) C 20.1 None of the intersections operate worse than LOS D. With Tukwila Village, the intersection LOS would degrade from LOS B to LOS C, however, LOS C is still an acceptable LOS. As identified in the City of Tukwila Comprehensive Plan, the LOS standard is LOS D in residential areas and LOS E in commercial areas. Therefore, all of the study intersections would meet the LOS standard and no specific mitigation is recommended to improve the LOS condition at the study intersections. Driveway Channelization The proposed driveways operate at acceptable LOS with the channelization shown on the site plan. The Tukwila Infrastructure Design and Construction Standards do not contain specific channelization guidelines to follow for evaluating channelization proposed at driveways beyond LOS conditions, but do mention the City recognizes and uses the most current edition ofA Policy on Geometric Design of Highways and Streets by the American Association of State Highway and Transportation Officials (AASHTO) for channelization guidelines. AASHTO does not have quantitative guidelines for recommending right -turn channelization and the City's standards indicate that the City recognizes the WSDOT Design Manual as a reference, which does have quantitative guidelines for right -turn channelization, therefore, that has been used to supplement the AASHTO reference. The greatest potential need for left -turn channelization on a public street to serve movements into the project site would occur at the S 144th Street/East Drive/41 st Avenue S intersection. In reviewing the AASHTO guidelines and extrapolating for a 30 -mph operating speed,,the combination of left -turn volumes, advancing and opposing volumes at the East Drive intersection do not warrant the a left -turn lane. The greatest potential need for right -turn channelization on a public street to serve movements into the project would occur at the TIB/Main Drive intersection. At this intersection, 62 vehicles would turn into the Main Drive with 528 vehicles traveling advancing northbound behind them. However, there are two northbound travel lanes and the posted speed limit is 40 mph there. The WSDOT Design Manual only recommends using the Design Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 18 May 28, 2013 TRAFFIC IMPACT ANALYSIS - TECHNICAL MEMORANDUM (CONTINUED) Manual Exhibit 1310-19 in developing recommendations for right -turn lanes when multilane facilities have posted speed limits of 45 mph or greater. Additionally, given that King County Metro has a bus pull-out in close proximity that would conflict with a right -turn lane, no right -turn lane is recommended on TIB at the Main Drive. Driveway Sight Distances The sight distance exhibits prepared by Barghausen Consulting Engineers indicate that the proposed driveway locations would have adequate sight distance per City standards. Therefore, no sight distance improvements are recommended. It is recommended that sight distance triangles be regularly maintained. Driveway Access Spacing & Corner Clearances The proposed driveways were located based on site constraints and access spacing and corner clearance guidelines. The City Engineer has reviewed preliminary plans and found the location of the proposed driveways to be acceptable. MITIGATION FEE REQUIREMENTS Mitigation fees are due to the City at the time of building permit issuance to pay for the project's proportionate share of impacts. Additionally, the proposed development must pass the concurrency test conducted by the City of Tukwila. CONCLUSIONS & RECOMMENDATIONS The proposed Tukwila Village would not create significant adverse impact on the transportation system. The primary recommendations are: • Maintain clear sight triangles • Pay for the project's proportionate share impacts via the City's traffic impact fee program Tukwila Village Development Associates LLC 554-6892-001 Traffic Impact Analysis 19 May 28, 2013 Attachment A Trip Generation t` TripGen & Volumes 2013-05-20.xlsx per td E m g 2 N 8' ^ i N8�OERE F 3 EgE2 , �°(IOEii Ei fi ^ N tE O F Z N 2 n m R t') F NNP 2 A A B E E F 4, f N R N E o v^ ' gg 2� 1p N ^ 1 2ERF O� CA FHA iE$ g F g 1P0 E O 0 O O O 0 0 0 0 0 0.0 O O O 0 0 0 0 0 0 0 0 0 0 6 a o 0 0 0 0 0000.. 0 0 0 0 0 0 0 0 00 H 0 0 0 0 0 0 000000 0 0 000000 0000 {I00 Eu" g 0 0 0 ----Zr 0 0 ,t. lh,,mN 0 0 0 al 0p'02 URNS 0 0 0 0 a om00 O 0 0p'og SSg� m fo -o 0 0 0 0 E20p00 0 0 00000^ IRE EL g e E g U€ N� f6 '' iE N .O- ^ T � E Omi � N t09 6 0 � m b 0^ v � �i N N N'l ' �6 o ' 1� e -Y 2 �_ 5 2 a wNo m '°9N'w 0 3g� E ;;NN^ "m m % o .R r of Q R N n SAFF2' N F.'E6Raa� 'HER �) Tri Gene internal pipe $ 131 ggi g 3 5 22 R ^ ' me^i:'-'w2 m n 71 &4 m.-n4L6,4 s- W 2 2 m 2 0N::^;N m N N &S744d 222q 30 F 0 N P. 2 2 2 N '422.0224 m 0 § 4V2VY.' Cron w Variable x Gross Trip Rate 8 In & Out % dr. ^m N N N p N o .6N7 nR 8 1p HwmNF,g22R mEg e q N g N a N g Egg^&g F 81 ,�m`SgAR ^1�'OtR ^ e H ^ `g `a cAi a E `vNY c n v`�i Y.' `A^ E m 'vS g n ^ F N g €l tW = E 'E e1 f; 0 �xp �X! d b b xx b E 188 II ESE. i b b 50% po lone s have been e m neratlon. se, and Coma 50% 50% 50% 50% 1 i n g Win Senior Fam 50% 50% pro s have on. thin. 0.65 Ln(X) ♦ 5.83 62.0.70. Rab 42.91 Gross trips have been pro use variable. Internal trip based on the gross trip ge of Ubrary, 011 10(1).0.69 Lo(X) + 5.05 Ln(T) - 0.77 LM(X) 4. 3.65 Trip Rate! Trip Equation Sum el Se 7.6.06(X»123.56 3.48 Gross trips have been pr gg WTI 8 88888 1 E'i Si Zi Si .1 .J .. .. .. gg H.... a Al �A EEp m 8UN C Land Use Apartment Serbr Adult Housing - Attached Senior Adult Housing - Attached as 1• 4) m as 0 S Hgt t8 v ci 11 N N N S . Center I'r6 .1111111 General Office Building d' Y O p E SEEE S^ g 2d 'R 4 E N (see above) (see above) (see above) (see above) (see above) (see above) (sea 06008) (seo above) (see above) l l QN 4Q) fLLQQ/) 25 S S r,,, :-..<,--- ^ QNQ $Ng E S 2$i 9 Ff tgLLg/l 2s5 E � QN X Q N gN X225 E N z m e w � w E* j -A' g� D I 0 686 0 � 7 060666 i m EEpww S 3 QQ a Q_ 8 8 L 8iiii 2 3i w W :,,z,, <0.0 m 2 0 IEEE �' 1.0.0 0 4a m m a w '° .-.-O.-NN ,- NM ^^ n n a g N N .- n � N N- N N PROPOSED LAND USE ACTIONS Total Residential (tor Internal Trip Capture) Family Apartment Units Senior Housing - Attached Senior Housing - Attached Seta Hotshg - Attached a 1 = Taal Retail (la Internal Trip Capture) LivolWork units, Coffee Shop, Small Restaurants Community Commons Bolding Retain Misc. RotaN: Misc. Total 011ke (la ktemal Trip Capture) Library Office Space 1 a € 3rWamm UOw s i ffiq 2 6911. S, g=m m a s 3 g m n LL r Phase 2 Phase 3 t` TripGen & Volumes 2013-05-20.xlsx TripGeneration TripGen & Volumes 2013-05-20.xlsx o� i£ E r 0 0 0 e 0 .7.0n- .0 g- n - mA2^ ¢' se F g . - - - - -'"I' n - - ^x0) en 22RV o n o 0 0 0 0 0 0 0 0 0 0 0 0 0 o n 0 0 0000 I-2 j o 12 E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Stt yTj Ei E, 9 0 0 0 0 0 0 0 000 0 0 0 0 0 0 00000 e000 90 e 0 0 0 0 - I,(1.--00 0 0 N 0,•-.0.- 00--0 nal TO loped I w -By l S O 0 0 0 0 ON N VI N N O O 0 0 N of O N N _ 1 O 0 0 0 0 0 2- 0)0)00 0 0 2 09mm.m wHnn 5 * g b m' 0 h H - ^NN-nN v - q tS.N-o'^' Q yNN n I:: - -m e e neeR - $ N-n- na20nve - - - .:-0n--eo mmnN T9°'o - 0 0 0 O E24 lk HI Imes 2 N- - .-- 0 0 - 0 NON 0 v- v-0 0.v--- N e - rxg � n n r N . N- m N - v N mN0--� n v Si N N- e 18 E 0 - n e e xN 00 2- 0&'00.0 0en- a.e >¢ r m a •000)0000. E 'VX422 0)0)00 $o ton c -"t q� 22'9 N 6 L -"3 n E b g g g g g g 0) g g _ from ITE Tile Generation repo. Trip Rotel Trip Equation in Sum of Senior & Fee port(o have on. 81% ,portio s have inerati keand 71% 88% 84% I so abm se also se *lbw se ebm se eba se ab0l se ebur ae ebm se ebw se abol T. 0.49 (X) +3.73 7.0.19 (X). 13.86 use variable. Internal trips on the gross trip generati .ass rips ave •een pr use variable. Intemal trip based on the gross trip g Sun of Libra , OII Ln(T) . 0.80 Ln(X) ♦ 1.55 5.88 Compatible ITE Classifications Code Land Use t 1M V Senior Adult Housing - Attached Senior Adult Housing -Attached Senior Adult Housing - Attached Shopping Cerner Shopping Center s.E3 coy Stropping Center Library General OIOce BuildingGovernment Of lice Building (see above) (see above) (see above) (see above) (see above) (see above) (see above) (see above) (see above) (see above) g N m EEEE 2 0. BUILDING Ltr. Location Gly. Untie see belay EL, 1- 3� g7 n poN La°, j }j 7 0= li E y lib Li - gg' L E „ N 1,',11,11,- a- Q Q gag ! gS H pN$r'i Q Q $$S $go 1.200 1,000 SF see bele. 10.000 1,000 SF 13.000 1,000 SF 2.000 1,000 SF (see above) (see above) (see above) (see 050.0) (see above) (see above) (see above) (see above) (see above) (see above) (see above) Z 9 N N a o ww 3 N N £ o ?3Z E IIII wpM; w E E E ¢ 0 b m O W W 0) b 6 <U U m W 0 w Z¢ m U O w v v S -- o .. 1' N NN b--n-NN --Nn •v PROPOSED LAND USE ACTIONS Total Residential (tor Internal Trip Capture) Family Apartment Units Senior Housing - Attached yyy .0 x 4NN1t2 y. 1 5 I N §. 11 x ] _,8 r r RotaI: Misc. Total Office (for internal Trip Capture) Library Office Space Community Policing TOTAL FULL BUILD -OUT Trips by Building LlbrarX Building A Building B Building C Belding D Bulidbg E Trips by Phase Phase 1 not Including Library Phase 1 with Library Phase 2 Phase 3 TripGeneration TripGen & Volumes 2013-05-20.xlsx Weekday PM Peak Hour Trip Generation g6 6 g '.2 R m o m n t=:nQ' n R" ' R Rn::iOn2 emm= < nm ^ 3 g 3 2 8 R 2 m g.1 mE'n R N E 22:1§ Eo} 1 R i$. pcc 3 1 LI �"a! a E=, o i l tg 9. E°- 9 U 0 0 0 0 0 0 0 000000 0 0 0 0 0 0 0 0 0 00 0 ,G 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 000000 0000 0 0 0 0 0 0 :n, m.6b3 b m.p,,..,:,_.,•,-.4,43 n: 5 0 0 0 0 0 0 g^: a o 0 0 : o g m' o v e v : 3 o 0 0 0 0 0 i° N 0 0 0 : 0 0 n m m � eEm o o '' N m o : m <Rm :18 g' N 88:=8g2 28g:: s = - ' N 22&222 r 8 R _ g 8em2mg R N < gxResA giigg S F S it - tiln i-� Q 3 n n 0 - r 00.-61,40 0 O N 0:,0000 0000 � � m N - n m N- - o N �n d:n N N n n f R 0 _ N a N n o 0 NR:::: R&^: Gross Trips os- oma^ Er Mei : !y N 0 : n g ti0000 I ' N RR'00 0 "d'aeR s g e n 2 0 _ m 200002 0' N 00NNNN Pi°N 3 . 2 $ N N ! eR00 2 0 0 P000O 0004 E e t m C use variable. Internal trips have been proportioned based on the gross trip generation. gp__Q_ _ iiiiii sii$ 888818 8188 a E �T 5 Trip Generation Charecte I E -(ti E 2 xg< it 0 0 1x0 g g ssE 6 .g 6 49% pa fie have meratl a, and 48% 17% 31% B g C C t 1 FF c W 5 C F 7O 5 • f. ¢ g m d !- _� e3 8a0. ry , r Aj S m F m a= 0 U Uy! C � g I 9 F i< J. 1< I. S II 31 Shopping g Canter Shopping g Center N i g g s p N � O U I (see above) (see above) (see above) (see above) (see above) (see above) - - (see above) (see above) (see above) 8 FIR R N R m mmm' E n O Qty. Units see halos Dwe0ng Units g O j 7 n 8 l U UE 8 7 00R 8 b 000 LL LL mQ IQQgQQNm a S ry RUO 000+^4+'1 LL LL S g U LL LL LL LL Em N gmg t ° g S S $ $ $ N gF m I 8 HIM � b"moo m 1 1 1 1 118888 8811 _"__ e 2 N N 4 2 V Tv 1 3 N : _ i Z U y h B q m- 1111 Q m b m O W W <Ub Q U 0 W. . W 2 _ m 2¢ m U m W _ 6 NN n N N ' .- n N N b v....M NN ...-NM PROPOSED LAND USE ACTIONS _ Total Residential (ler haemal Trip Capture) Famly Apartment Units Senior Housing - Attached 1 a S Senior Housing - Attached 1 a 1n h Total Real (tor Internal Trip Capture) LNenNork unite, Col lee Shop, Smal Restaurants 11ijI a V g sE s 'TOTAL FULL BUILD -OUT Tape by Building, Library Building A Building B Balding C Balding 0 Building E Trips by Phase Phase 1 not Including Library Phase 1 with Library Phase 2 Phase 3 0 m a TripGeneratIon TripGen & Volumes 2013-05-20.xlsx 4. i Internal Trip Calculation Worksheet Time Period: from Gross Trip OFFICE Generation RETAIL RESIDENTIAL OFFICE OFFICE RETAIL RETAIL RESIDENTIAL RESIDENTIAL Unconstrained OFFICE Trip OFFICE Capture RETAIL RETAIL RESIDENTIAL RESIDENTIAL OFFICE OFFICE RETAIL RETAIL RESIDENTIAL RESIDENTIAL Unconstrained Internal !Capture Rates 1 Weekday Daily Constrained Trip ;Capture Trip Origins to all destinations all destinations all destinations to Retail to Residential to Office to Residential to Office to Retail to Retail to Residential to Office to Residential to Office to Retail to Retail to Residential to Office to Residential to Office to Retail to 589 trips to OFFICE 1082 trips to RETAIL 8.7.1 trips to RESIDENTIAL 22% to RETAIL 2% to RESIDENTIAL 3% to OFFICE 11% to RESIDENTIAL N/A to OFFICE 38% to RETAIL 130 trips to RETAIL 12 trips to RESIDENTIAL 32 trips to OFFICE 119 trips to RESIDENTIAL 0 trips to OFFICE 3.31 trips to RETAIL 24 trips 12 trips. 32 trips 119 trips 0 trips 78 trips Gross Trips Net Internal Trip Destinations from all origins all origins all origins Office Office Retail Retail Residential Residential Office Office Retail Retail Residential Residential Daily Trips Total Site Office Retail Residential Total Site 590 trips 1082 trips 872 trips 4% 3% 15% 33% N/A, 9% 24 trips 18 trips 162 trips 357 trips 0 trips 78 trips Total In Out 5086 2544 2542 68 32 36 253 102 151 209 131 78 530 265 265 Net Internal Capture Rate = 10% Internal Trip Calculation Worksheet Time Period: Weekday AM Peak Hour of Adj. St. Traffic from Gross Trip OFFICE Generation RETAIL RESIDENTIAL Unconstrained OFFICE Internal Capture Rates Unconstrained Trip Capture Constrained Trip Capture Trip Origins to to all destinations 8 trips to OFFICE all destinations 21 trips to RETAIL all destinations 66 trips to RESIDENTIAL to Retail 20% to RETAIL OFFICE to Residential 0% to RESIDENTIAL RETAIL to Office 3% to OFFICE RETAIL to Residential 7% to RESIDENTIAL RESIDENTIAL to Office N/A to OFFICE RESIDENTIAL to Retail 34% to RETAIL OFFICE to Retail 2 trips to RETAIL OFFICE to Residential 0 trips to RESIDENTIAL RETAIL to Office 1 trips to OFFICE RETAIL to Residential 1 trips to RESIDENTIAL RESIDENTIAL to Office 0 trips to OFFICE RESIDENTIAL to Retail 2.2 trips to RETAIL OFFICE to Retail 1 trips! OFFICE to Residential 0 trips RETAIL to Office 1 trips. RETAIL to Residential 1 trips: RESIDENTIAL to Office 0 trips, RESIDENTIAL to Retail 1 tripsi Trip Destinations from all origins all origins all origins Office Office Retail Retail Residential Residential Office Office Retail Retail Residential Residential AM Peak Hour Trips Gross Trips Total Site Net Internal Office Retail Residential Total Site Net Internal Capture Rate = 4% 48 trips 34 trips 26 trips 2%1 0% 15% 31% N/A 5%; 1 trips 0 trips 5 trips 11 trips 0 trips 1 trips Total In Out 203 108 95 2 1 1 4 2 2 2 1 1 8 4 4 13 Internal Trip Calculation Worksheet Time Period: Gross Trip Generation Unconstrained Internal Capture Rates Unconstrained Trip Capture ;Constrained (Trip 'Capture Weekday PM Peak Hour of Adj. St. Traffic fro m OFFICE RETAIL RESIDENTIAL OFFICE OFFICE RETAIL RETAIL RESIDENTIAL RESIDENTIAL OFFICE OFFICE RETAIL RETAIL RESIDENTIAL RESIDENTIAL OFFICE OFFICE RETAIL RETAIL RESIDENTIAL RESIDENTIAL Trip Origins to all destinations all destinations all destinations to Retail. to Residential to Office to Residential to Office to Retail to Retail to Residential to Office to Residential to Office to Retail to Retail to Residential to Office to Residential to Office to Retail to 116 trips to OFFICE 100 trips to RETAIL 46 trips to RESIDENTIAL 23% to RETAIL 2% to RESIDENTIAL 3% to OFFICE 12% to RESIDENTIAL N/A to OFFICE 53% to RETAIL 27 trips to RETAIL 2 trips to RESIDENTIAL 3 trips to OFFICE 12 trips to RESIDENTIAL 0 trips to OFFICE 24 trips to RETAIL 1 trips 1 trips 3 trips 12 trips 0 trips 7 trips Trip Destinations from all origins all origins all origins Office Office Retail Retail Residential Residential Office Office Retail Retail Residential Residential PM Peak Hour Trips Gross Trips Total Site Net Internal Office Retail Residential Total Site 52 trips 96 trips 78 trips 2% 2% 31% 31%al 0%'i 9%1 1 trips 1 trips 30 trips 30 trips 0 trips 7 trips Total In Out 488 226 262 5 3 2 23 8 15 20 13 7 48 24 24 Net Internal Capture Rate = 10% Attachment B Channelization Needs Assessment 14- Evaluation of Need for Left -Turn Lanes Volume Conditions to Evaluate: 25 -mph Posted Speed 30 -mph Operating Speed (Assumed) 65 Left Turns 345 Opposing Volume 340 Advancing Volume 19% Left Turns from AASHTO Green Book Table 9-23. Guide for Left -Turn Lanes on Two -Lane Highways U.S. Customary Opposing Volume (veh/h) Advancing Volume (veh/h) 5% Left Turns 10% Left Turns 20% Left Turns 30% Left Turns 40 -mph Operating Speed 800 330 240 180 160 600 410 305 225 200 400 510 380 275 245 200 640 470 350 305 100 720 515 390 340 50 -mph Operating Speed 800 280 210 165 135 600 350 260 195 170 400 430 320 240 210 200 550 400 300 270 100 615 445 335 295 Linear extrapolation and interpolation for 30 -mph Operating Speed U.S. Customary Opposing Volume (veh/h) Advancing Volume (veh/h) 5% Left Turns 10% Left Turns 20% Left Turns 30% Left Turns 30 -mph Operating Speed 800 380 270 195 185 600 470 350 255 230 400 590 440 310 280 200 730 540 400 340 100 825 585 445 385 Linear interpolation for Left Turn Percentage and Opposing Volume U.S. Customary Opposing Volume (veh/h) Advancing Volume (veh/h) 10% Left Turns 20% Left Turns 19% Left Turns 30 -mph Operating Speed 400 440 310 323.0 200 540 400 414.0 345 467.5 334.75 L 348.0 Is the advancing volume the highlighted volume above? No. Therefore, a left -turn lane is not recommended. Attachment C Level of Service — Existing Conditions iti Queues 4: S 144th Street & Tukwila International Blvd 10/22/2012 it 4-- 4\ t p '/ r'rVl_, f I L3, i` PA:"3 Lane Group Flow (vph) 74 243 107 202 151 421 67 55 721 76 u/c Ratio 0.46 0.67 0.38 0.37 0.63 0.47 0.16 0.15 0.69 0.19 Control Delay 59.3 45.4 48.8. 34.4. 57.5 39.7 14.5 34.9 36.4 23.2 pueue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.3 45.4 48.8 34.4 57.5 39.7 14.5 34.9 36.4 23.2 ueue Length 50th (ft) 47 137 60 102 95 133 5 29 220 25 Queue Length 95th (ft) 113 261 149 223 194 226 47 71 343 72 ntemal Link Dist (ft) 447 125 620 182 Tum Bay Length (ft) 150 100 100 125 50 Base Capacity(vph) 382 569 384 592 466 1865 796 510 1874 714 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.19 0.43 0.28 0.34 0.32 0.23 0.08 0.11 0.38 0.11 Weekday PM Peak Hour LOS 4:45 pm 10/22/2012 Existing 2012 Conditions %user_name% Synchro 7 - Report Page 1 HCM Signalized Intersection Capacity Analysis 4: S 144th Street & Tukwila International Blvd --► c 4-- 4s- 4\ 10/22/2012 P 4, o,- - t BL 1 . _ B n:i 'B7 1r :R B .:7T I BRcat B- Lane Configurations ) 1 I 1 1' t 1 ++ r Volume (vph) 71 130 104 103 169 25 145 404 64 53 692 73 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 `Grade (%) -3% 2% 0% 1% Total Lost time (s) 4.5 5.0 4.5 5.0 4.5 5.5 5.5 4.5 5.5 5.5 Lane UtiI. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.06 Frpb, ped/bikes 1.00 0.98 1.00 0.99 1.00 1.00 0.94 1.00 1.00 0.88 flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.93 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1796 1736 1752 1793 1752 3505 1472 1761 3522 1386 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1796 1736 1752 1793 1752 3505 1472 1761 3522 1386 Peak -hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Adj. Flow (vph) 74 135 108 107 176 26 151 421 67 55 721 76 r2TOR Reduction (vph)_ 0 20 0 0 4 0 0 0 43 0 0 16 Lane Group Flow (vph) 74 223 0 107 198 0 151 421 24 55 721 60 onfl. Peds. (#/hr)_ 54 24 24 54 44 18 18 44, Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 3% 3% 3% 2% 2% 2% [rum Type Prot Prot Prot Perm Prot Perni Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases Actuated Green, G (s) 7.4 20.1 17.5 30.2 13.8 25.8 25.8 19.5 31.5 31.5 Effective Green, g (s) 7.4 20.1 17.5 30.2 13.8 25.8 25.8 19.5 31.5 31.5 Actuated g/C Ratio 0.07 0.20 0.17 0.29 0.13 0.25 0.25 0.19 0.31 0.31 Cle narace Time (s) 4.5 5.0 4.5 5.0 4.5 5.5 5.5 4.5 5.5 5.5 Vehicle Extension (s) 2.0 3.0 2.0 3.0 2.0 4.0 4.0 2.0 4.0 4.0 )ane Grp Cap (vph) 130 341 299 529 236 883 371 335 1083 426. v/s Ratio Prot 0.04 c0.13 0.06 c0.11 c0.09 0.12 0.03 c0.20 CA Ratio Perm 0.02 0.04. v/c Ratio 0.57 0.65 0.36 0.38 0.64 0.48 0.07 0.16 0.67 0.14 ;Uniform Delay, d1 46.0 37.9 37.5 28.6 41.9 32.6 29.1 34.6 30.9 25.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.4 4.5 0.3 0.4 4.1 0.6 0.1 0.1 1.7 0.2 Delay (s) 49.3 42.4 37.8 29.1 46.1 33.1 29.2 34.7 32.6 2.5.9 DCCCCC' 32.1 D C D C -] 2 6 Tel of Service Approach Delay (s) Approach LOS D D 44.0 D C 32.1 35.8 n ersec ion Summary )-ICM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization natysis Period (min) c Critical Lane Group 35.0 0.58 102.4 70.3% 15 HCM Level of Service C Sum of lost time (s) 15.0 ICU Level of Service C Weekday PM Peak Hour LOS 4:45 pm 10/22/2012 Existing 2012 Conditions %user_name% Synchro 7 - Report Page 2 1V 1 HCM Unsignalized Intersection Capacity Analysis 6: S 144th Street & East Drive 10/22/2012 f k- t 1 4/ }dlovement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBI Lane Configurations 4 ;Volume (veh/h) _ _ 6 249 Sign Control Free Grade -2% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 dourly flow rate (vph) 7 271 7 2 322 1 8 0 7 2 0 7 Pedestrians ane Width ft Walking Speed (ft/s) rercent Blockage Right turn flare (veh) Median type Median storage veh) upstream signal (ft) pX, platoon unblocked conflicting volume 371 ` _ _ _ 299 vC1, stage 1 conf vol C-2, stage 2 conf vol vCu, unblocked vol 371 299 tC, single (s) 4.1 -- - - tC, 2 stage (s) _ LF1(s)__ _T - 2.2 -- - -- 2.2 p0 queue free % 99 cM capacity (veh/h)_ 1140 1239 4+ 6 2 296 1 7 Free 1% 4+ 0 6 2 Stop 2% 4+ 0 Stop 0% None 24 22 12.0 4.0 2 12.0 4.0 2 388 _ __ None _ 642 - 48 12.0 4.0 684 320 692 _ 687 370 642 684 320 692 687 370 -4.1 - T --'T 7.1 - 6.5 6.2 7.1 6.5 - 6.2 3.5 4.0 3.3 3.5 4.0 3.3 100 98 100 99 99 100 99 pirection, Lane # EB 1 WB 1 NB 1 SB 1 357 347 693 317 346 648 Volume Total 284 325 14 9 Volume Left 7 2 8 2 Volume Right _ 7 ___ 1 _ _ 7 _ 7 _ cSH 1140 _1239 460 514 _ o ume to CapaciittyT 0.01 0.00 0.03 _ 0.02 Queue Length 95th (ft) 0 0 2 1 Control Delay (s) 0.2 0.1 13.1 12.1 Lane LOS A A BB Approach Delay (s) ! _ 0.2 0.1 13.1 12.1 - Approach LOS B B intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.6 33.1% ICU Level of Service A 15 Weekday PM Peak Hour LOS 4:45 pm 10/22/2012 Existing 2012 Conditions %user name% Synchro 7 - Report Page 3 Attachment D Level of Service — Future 2015 Baseline Conditions 11 Queues 4: S 144th Street & Tukwila International Blvd 5/17/2013 -10 '- 4\ t r• ' 1 4' ?'I "kV ' . `r�J_SJ 'MT Atr l ;,,51 ; s Lane Group Flow (vph) %/c Ratio Control Delay P-ueue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Tum Bay Length (ft) [Base Capacity (vph) Starvation Cap Reductn_ Spillback Cap Reductn Storage Cap Reductn [Reduced v/c Ratio 76 251 0.47 0.68 61.5 46.8 0.0 0.0 61.5 46.8 49 144 119 280 447 110 208 155 433 69 57 743 0.41 0.39 0.64 0.47 0.16 0.15 0.69 0.19 50.8 35.6 59.2 40.4 12.2 35.9 37.0 24.1 0.0 0.0 0.0 '0.0 0.0 0.0 50.8 35.6 59.2 40.4 12.2 35.9 37.0 24.1 63 109 99 138 2 30 230 27 158 235 206 240 44 76 368 76 125 78 620 182 150 100 100 125 269 625 353 706 444 2211 936 409 1748 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.28 0.40 0.31 0.29 0 0 50 667 0 0 0 0 0 0 0 0 0.14 0.43 0.12 0 0 0 0.35 0.20 0.07 Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 Baseline Conditions %user_name% Synchro 7 - Report Page 1 35.9 HCM Level of Service D J 0.59 105.3 Sum of lost time (s) 15.0 71.1% ICU Level of Service Analysis Period (min) 15 J c Critical Lane Group HCM Signalized Intersection Capacity Analysis 4: S 144th Street & Tukwila International Blvd Lane Configurations Volume (vph) 5/1712013 Ar.k VIS- Mk MR la /1 I,++ r ft r 73 134 107 106 174 26 149 416 66 55 713 75 Ideal Flow (vphpl) ;Grade (%) Total Lost time (s) 4.5 5.0 4.5 5.0 4.5 5.5 5.5 4.5 5.5 5.5 lane U61. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00', Frpb, ped/bikes 1.00 0.98 1.00 0.99 1.00 1.00 0.94 1.00 1.00 0.88 EIpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00, Frt 1.00 0.93 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85 Pit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1796 1737 1752 1792 1752 3505 1470 1761 3522 1381 Flt P m tted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00, Satd. Flow (perm) 1796 1737 1752 1792 1752 3505 1470 1761 3522 1381 Peak -hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Adj. Flow (vph) 76 140 111 110 181 27 155 433 69 57 743 78 TOR Reduction (vph) 0 21 0 0 4 0 0 0 48 0 0 15, Lane Group Flow (vph) 76 230 0 110 204 0 155 433 21 57 743 63 Confl Peds. (#/hr) 54 24 24 54 44 18 18 44 Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 3% 3% 3% 2% 2% 2% Tum Type Prot Prot Prot Perm Prot Perni Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 6 1900 1900 -3% 1900 1900 1900 2% 1900 1900 1900 1900 1900 1900 1900 0% 1% Actuated Green, G (s) 7.6 20.8 Effective Green, g (s) 7.6 20.8 Actuated g/C Ratio 0.07 0.20 Clearance lime (s) 4.5 5.0 Vehicle Extension (s) 2.0 3.0 )ane Grp Cap (vph) 130 343 v/s Ratio Prot 0.04 c0.13 17.5 30.7 14.3 27.2 27.2 20.3 33.2 33.2 17.5 30.7 14.3 27.2 27.2 20.3 33.2 33.2 0.17 0.29 0.14 0.26 0.26 0.19 0.32 0.32 4.5 5.0 4.5 5.5 5.5 4.5 5.5 5.5 2.0 3.0 2.0 4.0 4.0 2.0 4.0 4.0 291 522 238 905 380 339 1110 435 v/s Ratio Perm 0.06 c0.11 c0.09 0.12 0.03 c0.21 0.01 005 v/c Ratio lniform Delay, dl 0.58 0.67 47.3 39.1 0.38 0.39 0.65 0.48 0.05 0.17 0.67 0.14 39.1 29.8 43.1 33.0 29.4 35.5 31.3 25.9 Progression Factor ncremental Delay, d2 Delay (s) evel of Service Approach Delay (s) Approach LOS 1.00 1.00 4.3 5.1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 51.6 44.2 D D 0.3 0.5 4.8 0.5 0.1 0.1 1.7 0.2 39.4 30.3 47.9 33.6 29.5 35.5 33.0 26.1 D C DCCDC C' 45.9 D 33.4 36.5 32.5 C D C 1 nterse io Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization C Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 Baseline Conditions %user_name% Synchro 7 - Report Page 2 14 HCM Unsignalized Intersection Capacity Analysis 6: S 144th Street & East Drive 5/17/2013 s --. c ♦- k- 4\ t P 1 4/ Lane Configurations 4. ` 4 Volume (veh/h) 6 257 6 2 305 1 7 0 6 2 0 6 Sign -Control Free Free Stop Stop Grade -2% 1% 2% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.9.2 Hourly flow rate (vph) 7 279 7 2 3.32 1 8 0 7 2 0 7 Pedestrians 24 22 48 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.04.0 4.0 Fercent Blockage 2 2 4 Right turn flare (veh) ,Median type None None Median storage veh) Upstream signal (ft) 388 pX, platoon unblocked VC, conflicting volume 381 308 661 703 329 711 7.05 380 vC1, stage 1 conf vol 'C2, stage 2 conf vol vCu, unblocked vol 381 308 IC, single (s) 4.1 4.1 tC, 2 stage (s) tF (s) 2.2 2.2 p0 queue free % 99 _ 100 OA capacity (veh/h) 1131 1230 pirection, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 661 703 329 7.11 7.05 380 7.1 6.5 6.2 7.1 6.5 6.2 3.5 4.0 98 100 347 338 3.3 3.5 99 99 4.0 3.3 100 99 686 308 337 640 292 7 7 1131 0.01 0 0.2 A 0.2 335 14 9 2 8 2 1 7 7 1230 450 505 0.00 0.03 0.02 0 2 1 0.1 13.3 12.3 A B B 0.1 13.3 12.3 B B intersection Summary Average Delay intersection Capacity Utilization Analysis Period (min) 0.6 33.5% 15 ICU Level of Service Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 Baseline Conditions %user name% Synchro 7 - Report Page 3 Attachment E Level of Service — Future 2015 with Project Conditions !� HCM Unsignalized Intersection Capacity Analysis 2: North Drive & Tukwila International Blvd 5/17/2013 Povemnt._.,. -.Vy611; WBR: NBPd..._NBR, SBL.:_SB Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor r n+ 0 10 542 10 0 867 Stop Free 0% -1% Free 4% 0.92 0.92 0.92 0.92 0.92 0.92 )icy flow rate (vph) 0 11 589 11 0 942 Pedestrians 19 Lane Width (ft) 12.0 Walking Speed (ft/s_) 4.0 _ percent Blockage �� 2_ ____ Right tum_ flare (veh) _ Median type - - None Median storage veh) _ Upstream signal (ft) pX, platoon unblocked 0.90 0.90 `vC, conflicting volume 1085 319 vC1, stage 1 conf vol v 2, stage 2 conf vol- _ _ _ _ _ _ vCu, unblocked vol_ 870 19 __ 352 tC, single (s) 6.8 6.9 - .... 4.1 550 None 0.90 619 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 3.5 3.3 100 _ 99 257 934 2.2 100 1065 pirection, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total 11 393 207 471 471 Volume Left 0 0 0 0 0 Volume Right 11 0 11 0 0 cSH 934 1700 1700 1700 1700 Volume to Capacity 0.01 0.23 0.12 0.28 0.28 Queue Length 95th (ft) 1 0 0 0 O Control Delay (s) 8.9 0.0 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 8.9 0.0 0.0 Approach LOS A intersection Summary Average Delay intersection Capacity Utilization Analysis Period (min) 0.1 27.3% 15 ICU Level of Service Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 with Project Full Build -Out Conditions %user name% Synchro 7 - Report Page 1 HCM Unsignalized Intersection Capacity Analysis 3: Main Drive & Tukwila International Blvd 5/17/2013 oen Lane Configurations Volume (veh/h) Sign Control prade Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 ,_ E r 0 24 528 62 0 867 Stop Free Free 0% 0% 1% Hourly flow rate (vph) 0 26 574 67 0 942 Pedestrians 27 ane Width (ft) 12.0 Walking Speed (ft/s) 4.0 percent Blockage 2 Right tum flare (veh) Median type None None Median storage veh) Upstream signal (ft) 262 pX, platoon unblocked 0.89 0.89 0.89 (rC,conflicting volume 1106 348 668 vC1, stage 1 conf vol a stage 2 conf vol vCu, unblocked vol 860 4 366 IQ, single (s) tC, 2 stage (s) 1F (s) 3.5 33 2.2 6.8 6.9 4.1 1 p0 queue free M capacity (veh/h) 100 97 100 255 933 1029 Direction, Lane,# WB 1 NB 1 NB SB 1 SB 2 ;Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 26 0 26 933 0.03 2 9.0 A 383 0 0 1700 0.23 0 0.0 259 0 67 1700 0.15 0 0.0 471 0 0 1700 0.28 0 0.0 471 0 0 1700 0.28 0 0.0 1 9.0 0.0 0.0 A ntersecbon Summary Average Delay intersection Capacity Utilization Analysis Period (min) 0.1 27.3% 15 ICU Level of Service Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 with Project Full Build -Out Conditions %user_name% Synchro 7 - Report Page 2 20 Queues 4: S 144th Street & Tukwila International Blvd 5/17/2013 4/ Lane Group Flow (vph) 103 261 179 288 155 460 78 117 722 78 /c Ratio 0.57 0.62 0.69 0.57 0.66 0.60 0.25 0.33 0.71 0.24 Control Delay 66.1 43.6 63.5 39.7 64.0 44.9 17.4 43.6 41.1 27.8 ;Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 66.1 43.6 63.5 39.7 64.0 44.9 17.4 43.6 41.1 27.8 Queue Length 50th (ft) 72 148 125 166 108 162 10 72 247 31 Queue Length 95th (ft) 156 306 242 326 214 262 59 150 382 84 internal Link Dist (ft) 447 125 620 182 100 125 50 603 402 1549 481 Tum Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Deduced v/c Ratio 150 100 289 559 419 698 385 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.36 0.47 0.43 0.41 0.40 1.67.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.27 0.13 0.29 0.47 0.16 Intersection Summary Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 with Project Full Build -Out Conditions %user_name% Synchro 7 - Report Page 3 HCM Signalized Intersection Capacity Analysis 4: S 144th Street & Tukwila International Blvd 5/17/2013 -► �i '` ~ *`` 41 I p \* i '1 - -enl 1 BL '•Bi .BR Lane Configurations 111% 11 I let r 1 ft, l 99 144 107 172 219 58 149 442 75 112 693 75'. Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grime (%) -3% 2% 0% 1% Total Lost time (s) 4.5 5.0 4.5 5.0 4.5 5.5 5.5 4.5 5.5 5.5 Lane UUI. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00', Frpb, ped/bikes 1.00 0.96 1.00 0.97 1.00 1.00 0.82 1.00 1.00 0.75 Jpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.94 1.00 0.97 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1796 1702 1752 1741 1752 3505 1279 1761 3522 1186 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1796 1702 1752 1741 1752 3505 1279 1761 3522 1186 Oeak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Adj. Flow (vph) 103 150 111 179 228 60 155 460 78 117 722 78 PTOR Reduction (V -ph) 0 18 0 0 6 0 0 0 48 0 0 16 Lane Group Flow (vph) 103 243 0 179 282 0 155 460 30 117 722 62 Con Pfi eds. (#/hr) 104 74 74 104 94 68 68 94, Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 3% 3% 3% 2% 2% 2% Tum Type Prot Prot Prot Perm Prot Perm Protected Phases 7 4 3 8 5 2 1 6 permitted Phases nit B- '1B 1.B3 :L j3 CB Volume (vph) 2 6 Actuated Green, G (s) 11.1 26.5 16.2 31.6 14.7 24.0 24.0 22.3 31.6 31.6 affective Green, g (s) 11.1 26.5 16.2 31.6 14.7 24.0 24.0 22.3 31.6 31.6, Actuated g/C Ratio 0.10 0.24 0.15 0.29 0.14 0.22 0.22 0.21 0.29 0.29 Clearance lime (s) 4.5 5.0 4.5 5.0 4.5 5.5 5.5 4.5 5.5 5.5 Vehicle Extension (s) 2.0 3.0 2.0 3.0 2.0 4.0 4.0 2.0 4.0 4.0 Lane Grp Cap(vph) 184 416 262 507 237 775 283 362 1026 345 v/s Ratio Prot 0.06 c0.14 c0.10 0.16 0.09 c0.13 0.07 c0.21 v/s Ratio Perm v/c Ratio 0.56 0.58 0.68 0.56 0.65 0.59 0.11 0.32 0.70 0.18 lniform Delay, d1 46.4 36.1 43.7 32.5 44.5 37.9 33.7 36.7 34.3 28.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.02 0.05 Incremental Delay, d2 Delay (s) )_evel of Service 2.1 2.1 5.8 1.3 48.5 38.2 49.5 33.8 D D Approach Delay (s) 41.1 D Approach LOS 4.9 1.4 0.2 0.2 2.4 0.3 49.4 39.3 33.9 36.9 36.7 29.1 D C DDC D DC 39.8 41.0 36.0 D D D n ersec ion ummary )-ICM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group 38.9 HCM Level of Service D 0.67 108.5 Sum of lost time (s) 77.5% ICU Level of Service 15 20.5 D Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 with Project Full Build -Out Conditions %user_name% Synchro 7 - Report Page 4 2� HCM Unsignalized Intersection Capacity Analysis 5: S 144th Street & South Drive 5/17/2013 Lane Configurations T Volume (veh/h) 301 Sign Control Grade Free -3% p 4 f 29 11 390 71 24 Free Stop 2% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right tum flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked VC, conflicting volume vC1, stage 1 conf vol 327 32 12 424 77 26 1 50 72 12.0 12.0 4.0 4.0 4 6 None 205 None 431 863 465 vC' 2 stage 2 conf vol vCu, unblocked vol _ 431 863 465 tC, single (e)__ _ 4.1 6.4 6.2 tC, 2 stage (s) tF (s) p0 queue free % cM capacity(veh/h) 2.2 99 1061 3.5 3.3 74 95 302 538 1 1 lirection, Lane,# EB1 B1 NB1 Volume Total Volume Left volume Right cSH 359 436 103 0 12 77 32 0 26 1700 1061 340 Volume to Capacity 0.21 0.01 0.30 Queue Length 95th (ft) 0 1 31 Control Delay (s) 0.0 0.4 20.1 Lane LOS A C it.kpproach Delay (s) 0.0 0.4 20.1 Approach LOS C ntersection ummary Average Delay Intersection Capacity Utilization Analysis Period (min) E_ 2.5 48.1 % 15 ICU Level of Service Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 with Project Full Build -Out Conditions %user_name% Synchro 7 - Report Page 5 HCM Unsignalized Intersection Capacity Analysis 6: S 144th Street & East Drive 5/17/2013 rove en' 1:8 •BT ; BR nBI �'.��[ SBR BL NBR B CB; Lane Configurations Volume (veh/h) Sign Control trade 4+ 65 269 Free -2% 4+ 6 2 311 Free 4+ 4 32 7 0 6 34 0 83 Stop Stop 2% 0% 1 Peak Hour Factor 0.92 0.92 )sourly flow rate (vph) 71 292 50 Lane Width (ft) 12.0 Pedestrians 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 7 2 338 35 8 0 7 37 0 90 74 72 98 12.0 12.0 12.0 J Walking Speed (ft/s) 4.0 percent Blockage 4 Right tum flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked conflicting volume vC1, stage 1 conf vol w C2, stage 2 conf vol None 4.0 4.0 4.0 6 6 8 None 388 471 371 1009 984 442 975 970 503; 371 1009 984 442 975 970 503 single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 vCu, unblocked vol 471 tC, 2 stage (s) LFF (s) T 2.2 2.2 p0 queue free % 93 100 cM capacity (veh/h)_ 1002 1116 3.5 4.0 3.3 3.5 94 100 99 78 137 199 543 166 4.0 3.33 100 82 20305 0 irection, Lane,! EB1 B1 _B1 SB1 Volume Total 370 375 14 127 Volume Left 71 2 8 37 Volume Right 7 35 7 90 cSH 1002 1116 209 316 Volume to Capacity 0.07 0.00 0.07 0.40 Queue Length 95th (ft) 6 0 5 47 Control Delay (s) 2.3 0.1 23.5 23.9 Lane LOS A A CC Approach Delay (s) 2.3 0.1 23.5 23.9 Approach LOS C C 7 n'erse 'on imma. Average Delay ntersection Capacity Utilization 59.9% ICU Level of Service Analysis Period (min) n 4.8 15 Weekday PM Peak Hour LOS 4:45 pm 5/17/2013 Future 2015 with Project Full Build -Out Conditions %user_name% Synchro 7 - Report Page 6 o ti TIB from S 146 ST to S 142 ST Report Period: Monday, January 01, 2007 to Wednesday, July 04, 2012 TIB at S 146 ST 0 U 0 Vehicle INehilce 2 U 0 0. 0 0 0 .-7 � E U F .0 Q O co a) u U M N — N N N N N N SB Left /NB Thru Approach Turn S 146 ST at TIB X XXXXX SB Right / EB Thru 0. cn b S 146 ST at TIB Fixed Object/Parked Vehicle WB Thru / SB Thru EB Left / NB Thru WB Thru / NB Thru WB Thru / SB Thru EB Left/NB Thru WB Thru / NB Thru EB Thru /NB Thru EB Thru /NB Left a) a) O 0 `0 V N 00 0 • '0 0 0 0 0000 0. 4= 4 uj Q Q Q Q .' .0 1. L 1- to , no vs.0 coo.0 .G - y NB Left / SB Thru Approach Turn SB Right / NB Thru Pedestrian/Cyclist Involved W 0 W 0 07 0 0.l CO Lel W 0 F F F F F F I— F F F F c0 cat A 0 O m 0 0 0 0 co 0 F F F F F F F F F F F • to to V) to to to to to ti CI) to \0 1 1/40 1 V) VI N V) V) V) N N Cn C/1 (ID SB Thru / SB Thru 0 0 w u CC S 146 ST at TIB Fixed Object/Parked Vehicle S 146 ST at TIB 222 22 a < 0...< 00 < a a d0' O V1 ▪ vt e� 1 ▪ M N1 M • VI '� o M O V. N O M M 2 O O O O — • p O O co C —- N_ N 0 0 0 0 0 0 O O 0 0 - 0 0 0 0 0 O: 0 0 0 O 0 0 0 0 r•IQ 000cp-tNc N _- 0 O 00 CO CO 0'O — ` M — (M• 00 N ▪ N N • - 0 V et M 00 h Oo - 00000}— 0000 00 •(i 0 7 0 (i 7 7 0 0 7 0 (i .0 .0 7 7 V) to 2 cn F `n F F F F 00 00 t' — CO 0. 00 ON — c0 t- N v1 N 7 at CO c!1 N 7 10 N 00 M ▪ 'O O V1 O vO c0 0 cr I— N v1 0 ON t� t� N '0 NO Vl a co 00 00 O O O O `0' V1 en'0 Vl O M ▪ M M• O M M ▪ • M • M M M M M N M M N VI V1 00 ON t- 00 0 0 O\ N — N 00 ON 0 N 0 V1 N !` et r- V1 v1 N cO H N t— et O M N Tr M O1 00 cO n tt N VO er V1 1- 0 00 v1 cr N 00 O t'- '0 N N — — Vf 1 N 1 O O O O O O 0' O1 O. O 0) a 15 Crash Record System JB Technology Inc. TIB at S 146 ST (cont) Case Report Day Of Crash Number Number Week Date Crash Time Location Corridor Report City of Tukwila Tuesday, August 21, 2012 Type of Crash Direction Severity Tot Vehicle 1/Vehilce 2 Fat Inj PDO Vch 09-4413 09-4219 09-3924 09-03685 08-7044 08-6277 08-5102 07-3 884 07-3159 07-2486 07-2124 2770612 3115859 3115730 3309582 3311426 2663660 3310927 2663650 2523666 2663704 2524184 Sat 07/04/2009 Fri 06/26/2009 Fri 06/12/2009 Mon 06/01/2009 Sat Thu Sat Tue Mon Fri Sat 07:27 AM 09:02 PM 08:51 PM 05:35 PM S 146 ST at TIB S 146 ST at TIB S 146 ST at TIB S 146 ST at TIB 11/01/2008 08:10 PM S 146 ST at TIB 10/02/2008 10:35 AM S 146 ST at TIB 08/16/2008 09:54 PM S 146 ST at TIB 05/29/2007 04/30/2007 04/06/2007 03/24/2007 10:15 AM 02:41 PM 08:35 PM 02:11 AM S 146 ST at TIB S 146 ST at TIB S 146 ST at TIB S 146 ST at TIB Right Angle Right Angle Right Angle Pedestrian/Cyclist Involved Pedestrian/Cyclist Involved Right Angle Fixed Object/Parked Vehicle Approach Turn Sideswipe Fixed Object/Parked Vehicle Right Angle WB Thru / SB Thru SB Left/NB Thru EB Thru / S13 Thru EB Right / NB Thru NB Thru / EB Thru WB Thru / SB Thru SB Thru / NB Left / SB Thru EB Thru / SB Thru SB Thru / WB Thru / S13 Thru X 2 2 2 X 4 1 1 1 1 X 2 X 1 X 2 X 2 X I X 2 Between S 146 ST and S 144 ST Case Report Day Of Crash Number Number Week Date Crash Time Location Type of Crash Direction Severity Tot Vehicle INehilce 2 Fat lnj PDO Veh 09-6190 2770717 Sat 09/19/2009 09:40 PM TIB, 10 ft. East ofS 146 ST 10-07359 3114967 Tue 11/02/2010 06:30 PM TIB, 30 ft. North ofS 146 ST 09-3440 3309616 Thu 05/21/2009 04:35 PM TIB. 100 ft. East ofS 146 ST 09-8594 3311565 Wed 12/30/2009 05:28 PM TIB. 200 ft. North ofS 146 ST Right Angle Pedestrian/Cyclist Involved Rear End Sideswipe WB Thru / SB Thru NB Thru / WB Thru NB Thru /NB Thru NB Thru / NB Thru 2 1 2 2 Page 2 Between S 146 ST and S 144 ST (cont) o 0 0 0 Vehicle 1/Vehilce 2 F. 0 0 O. F 0 O ea 0 w W E U E-' L U 0 0 i 3 t' L ea ea z N N X x x EB Left /NB Thru N M N N N N NN N M N et 2 F to m 00 0 0 z 2 2 E- 4 0 E- 03 m c Lo z X X X X X X X NB Thru / NB Thru NB Thru /NB Thru SB Thru / SB Thru SB Thru / SB Thru S13 Thru / SB Thru NB Thru / NB Thru SB Thru./ SB Thru NB Thru / NB Thru Bckng / SB Thru 6) as 0 o > 0 .o 0 .. Y I.A T .' as 0 0 a ea. c a 0 8.c c c c c c aao 3 <•a. c 3 w w w w w w w 3 N N N y L H L L L L L L Y 'as el O 'O DA 0 d d O O c0 m fa 0 R7 07 .O U VI [n Ce 0. cn Lt a 0 cd cn m TIB, 300 ft. North of S 146 ST E— rn 00 00 ... et 'et ee cn . 0) 0) 0) C N V) C/) L. 4.. 4.. W '- cr 4. 0_ cr O 0 0 0 O 0 0 0 0 0 .0 = .0 .0 .0 t t .0 .0 5 0 0 5; 5 5 5 5 5 o in 0/) C/7 3 in !n° 00 - C/O) !n cn d a=Cda: d 0 0 0 en en 0 NN 00 N N m fa m m o'1 o LL1 CZ ct oZ F F F 1- 1- F F F E- E-- 2 .o< aaa 0.0a00.0. 0.. a . < , < . p 0 .-. M C — V) N N 0 O 7 0 0 OO -. O O O .-. O 0' ^ O O O O 0 TIB. 125 ft. South of S 144 ST TIB, 100 ft. South of S 144 ST TIB, 1001L South of S 144 ST TIB. 100 ft. South of S 144 ST TIB. 100 ft. South of S 144 ST SB Thru/ WB Thru Pedestrian/Cyclist involved TIB, 100 ft. South of S 144 ST h NN 0 ^ ON 00 0 00 N 0 CO CO 0 0 00 00 l',.OO 0 O_OOO 0 OO OOOOOOO N N N N N N N N N N N N '''Q N N N — 0 NO 00 %D et V) m M N et N .-. 0 N 00 O_ -0 o O O O O O O O O O 0 0 .0 .0 0 o 0) to 0n rs [- ti L.L. F F0- o FL - F F F F i 2 t� h ON ON 00 h 0 r- (V an et et ON M -- N 'D ON M et M CO N M V1 h et M CO et 00 00 00 0 N %O 0 0 O 0 --N N L --N v> N M V) — M M — ten M et — 0 0 0 ^ - sl)et N N en N N M en N M M' N N M M en N N NO ON 00 r -en N en 0 0 tO tel n N et VY O en M' M en NO c0 '.0 O N N et 00 00 O n 00 M N, M M ^ ^ n "D O O e 1 1 1 e t 1 A1 1 CO 00 0 NO OO O O O 0 0• 00 00 00 00 O Vr 0 Z. m Between S 146 ST and S 144 ST (cont) 0 0 0 •L 00 tri Vehicle 1/Vehilce 2 U 0 tu O O N 4) U U 0 Q7 d a E N N N N N X x x x 2 2 2 2 H F F F z z z zz 2 2 2 2 F 1— F F z z z CO z CO c -io c ° c w w w N N co 0 to V 17 0: V) 0: ' N VOi m B, 20 ft. South of S 144 ST 1- F F F F Q a Q a a en 0 In 00 0 O an M O o 0 0 0 O 00 h O O O O O 0 0 0 0 — b ' M N 0 0 0 0 0 N 0)) 7 7 3 3 F F F [� 0 0 .ca T M N N 0 0 u un 0 0 N N M N N N M r4 d' — sr, teaN CA d' m ^- O% m r- c• oo t- O 0 0 0 0 TIB at S 144 ST 0 U 0 E. 0 0 A Vehicle lNehilce 2 •E_ F Q aJ 3 N N N N N M N N N SB Thru / E13 Thru NB Thru / NB Left W13 Thru / WB Thru SB Thru / SB Thru 111 EB Right / EB Right NB Thru /NB Thru NB Left/NB Thru a) c c c 17 a 3 w w .3 w 3 L H L L N L N aa) 9 as ,d cC en W CC en CC S 144 ST at TIB S I44STatT113 n CO CO CO CO F F F F E- 0 0 0 0 td a7 F F F F F Cq Cn C/I C/] C/I � . '7' d' •c 'ch 'cf V) en en en EB Right / WB Thru Pedestrian/Cyclist Involved S 144 ST at TIB SBThru/SBThru S 144 ST at TIB a 0. a a 2.. < < < < 0 00 M N ON 0 O M r I- O M tn M s: c;-; cO 7 0 0 0 0 O O O O N N Co— O_ 0 0 0 0 O 0 0 0 0 C2 Q el N 0..:11 0 0' in 00 0 V) cO N O OO O N 0 0 — el 0 0 0 0 00 0 O 0 0 = L 0 0 an an F 2 2 F u "' 3 M 7 Vl d' c0 0 0 M 0 M 00 t'- 00 cO 00 O Cr, - 4/) h 4/) 00 N.. 0 O 0 M V1 V1 V1 un M M M M M mane/10M M M N CO C\ 00 7 Oc V1 0 M � N N C V— 1 N— cO c0 v1 M N R M N N 0 0 Crash Record System JB Technology Inc. TIB at S 144 ST (cont) Case Report Day Of Crash Number Number Week Date Crash Time Location Corridor Report City of Tukwila Tuesday, August 21, 2012 Type of Crash Direction Severity Tot Vehicle INehilce 2 Fat Inj PDO Veh 09-7955 09-4557 09-3555 09-3332 09-3121 08-3724 08-2991 08-0297 07-8215 07-7838 07-7075 07-5380 07-4786 07-0028 3115006 3116078 2770710 3311280 3311024 2707373 2707521 2707735 2523744 2523541 2664227 2663029 2663751 2783829 Thu Sat Wed Sat Wed Fri Sat Sun Thu Mon Wed Sun Wed Tue 12/03/2009 07/11/2009 05/27/2009 05/16/2009 05/06/2009 06/13/2008 05/10/2008 01/13/2008 11/29/2007 11/12/2007 10/10/2007 07/29/2007 07/04/2007 01/02/2007 03:00 PM 10:57 AM 01:45 AM 10:24 PM 07:31 PM 07:42 PM 04:55 PM 10:25 PM 02:31 PM 02:44 PM 07:00 PM 06:15 PM 10:51 PM 04:50 AM S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144STatTIB Pedestrian/Cyclist Involved Approach Turn Right Angle Rear End Right Angle Rear End Rear End Approach Turn Sideswipe Pedestrian/Cyclist Involved Rear End Rear End Approach Turn Backing SB Thru / WB Thru WB Left / EB Thru WB Thru /NB Thru NB Thru / NB Thru NBThru/EBThru SB Thru / SB Thru NB Thru / NB Thru SB Thru / NB Left EB Thru / EB Thru SB Right / EB Thru EB Thru / EB Thru SB Thru/ SB Thru WB Left / EB Thru Bckng'./ NB Thru 2 1 X 2 X 2 2 X 2 X 3 X 2 X 2 X 2 X 2 X 3 2 X 2 X 2 Between S 144 ST and S 142 ST Case Report Day Of Crash Number Number Week Date Crash Time Location Type of Crash Direction Severity Tot Vehicle 1Nehilce 2 Fat Inj PDO Veh 09-2727 3116232 Sun 04/19/2009 12:26 PM TIB. 20 ft. North of S 144 ST Rear End 07-6420 2523764 Wcd 09/12/2007 07:45 AM TIB, 20 ft. North of S 144 ST Rear End SB Thru / SB Thru SB Thru / SB Thru X 2 X 2 Page 5 • 4 N_ ° O A x N E -H .°dpQ •ry Zti °V U C Between S 144 ST and S 142 ST (cont) 0 0 O U .0 U e:. 0 0 0 0 N E 0) Q 0) 3 n. _ t:G Z N N N N M •• N N N N N N N N N N X x x x x x x x x x x >< SB Thru / SB Thru SB Thru / SB Thru SB Thru / SB Thru NB Thru / NB Thru NB Thru / NB Thru NB Thru / NB Thru NB Thru / NB Thru SB Thru / SB Thru NB Thru / NB Thru NB Thru / NB Thru NB Thru / NB Thru NB Thru / NB Thru C "0 •o •o 0 0 o 0 0 o o c a _0 C C 0 0 0 0 C C C C C C Q •' C t:] L•] 41 42 W CO 4] W 41 to] to] 4] 4] el e0 (0 (0 M N X00 @ .•00 r1tu t� W 04 f4 cC ts' rL �n Fp EB Right/ SB Thru 0 SB Right / SB Thru NB Thru / NB Thru WB Thru / SB Thru F F F F ti ti fn N N F F d' etN N N N N N N N et ci) ch dd' ? V' 'J er V' er et V' a V '-. - V) N 00 Cn 00 to fn to 00 00 00 00 N to fn fn w c.. w w w w w w w w w w w w w a.. 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O t .0 t .0 .0 .0 .0 L .0 L t t.' t t O O O 0 0 0 O O O O O O 0 Z z z z Z Z cn 00 to 00 N o? d=C 0 0 C o u 0 0 0 0 0 0 0 0 0 vl vl 0 0 V'1 0 0 O 0 T 0 O O Yl V'1 f N n _ 0 N M V'1 c-4 N M M M ^ q C� fn [7} fir q m 0 C:'J m CO m m C1 m b F F 1- E- E- F F F F E [- F 1 I 0_ c < Q a a 0 0. Q 0 co O .o .O ten O 7 in y. 0 co - M er N M O V1 O O N N Ft h '7 h N M 00 00 p N N Vl N N N N N N N 0 O 0 O 0 0 0 0 0 O 0 0 0 0 N (� 00 0 N - 0 0' 0 0 O. 0' -_ N - O 0 O 0 0 0 0 0 0 o O O O O 0 0 /1 .0 0 t - M 7 00 O 0 N N O ^ 0^ -0 0 M - 0 M V1 .O t� N .O M V1 ^ i M V1 O V 0 0 0 0 '-- .c 0 CO 0 - 0 0 0 0 - 0 0 .c ti .Oe 0) O 4`. = ami t epi ti F F a `n E- 3 F 3 3 .- .0 00 00 en 0 O+ n 0 [. V• - 00 ere 0 co 1 N 0 0- Os N 'O 0- N Cl N h M d' ^ - - .O ere 0 0 N 0 - 0 M M M 0 N N 00N in a O - h O O0 N - O - - M en l� 0 V1 0 M M 0 M N - M h ^ M N M N 0 M 0 M M 0 M N M M M M 00 .O N N N - M M N N. 0 M N - N V' 00 V' 0 0 r- ? 0' [� N 0 .O N O. f` 0 ^ N M V' O V' •O vl N O 0 N 00 l� O M V' d' 00 M 1-;- - M N i---, •D N N -:, N O O O 0 �^ - C O 0 0 0 0 - ^ OO —• — — z CO 00 r) O 0— W A N ry a W 0 00 -- ON '� V 0 Vi ON 00 g -g J Cr. J Thi n o -71 o o c _. c c 0 ON N A. -- -4 -4 Vi. N O 0 0_ 0 0 CD 00 000 O — w OD O 'V N v. 0 U O -- 00 U > -0 > III.L Ie .LS V [ S Ell Ie.LSZVI S II II le .LS ZV I S II l.L 1e .LS ZV l S II l L 1e ,LS ZV l S 70 M (Yu F:a s a a O_ a' Oo 000 00 C CD 5 5 -O o- (0 will IIS/110'1II3 N4LES/110183 N4.LBS/101El] N 11-14.1. ON. / l4$!11 aa x x >< x N N N N � o (D O 0 n Z 00I!40A/I 010140A 0 < 0 IS ZVI S In gid. QT V 0 0 00 J W U1,3 W OV 0 A CD OVI N O\ 00 O 0 0 0 0 V. 0 P3 NO 40 O 0_ 0 0 0 0 J 0 �1 — N 00 ? IJI vVi so -4- > > - a MMX —3 —3 G7 W U -4 O U P P V] V] O O C C S ? O O cn N A .A Ncn c/o N --1 —3 is ZVl Seo 411OS 13 001 `ULL C(D ((0 C 0 (D p -I -01 -, -I n m m 0. a 0. 14$!11 fl(`l / mull au mall IIS / n'4.L IIS mull IIS / ru4.L US -LS ZVl S.lo 41noS '11001 '$LL Fixed Object/Parked Vehicle SB Thru / z 3 ((0 CD Po (D C7) pd (0 S t O S 0 0) O 0 Z 331140A/I 0I0140A (0 O CD o S - Between S 144 ST and S 142 ST (cont) C9 l 1 0 Sy �• k. Eia-, 0 A: a, yil = ),..,,.N N Fg -r rg N ri- n 3 0 Z!v 0 N IS Z171. STV 1SZ171.SPUe1S17171.Suaampe 1S 17171.. S w 1S 17171. S PUe 1S 9171. S uaatu►le N m G) m z 0 O 0 0 0 0 0 0 0 0 D N -4 CO (R. rn z C m cn V V v D) V U1 N W N v LS Zfii S IS 9171 S uio1J HLL TOTALS At S 142 ST Between S 144 ST and S 142 ST Between S 146 ST and S 144 ST At S 144 ST AtS146ST SEGMENT 03 0 W N -► N N 0 N 78 N A U1 -+ O) 2011 ha —1, —. c.n N v O) 2010 56 ..► 17 13 OTHERS N 0 A NN 26 N TOTALS W 01 N W -I 0 IDa 1.e Ot.G CL 0.1 CD CD 0 Pr C Ami N rier O_ o N IS Z171 S 01.LS 9171 S wog HLL A A 0 c- m O 0 0 2—i Crash Record System Corridor Report City of Tukwila Tuesday, August 21, 2012 Corridor: S 144 ST from TIB to 42 AVE S Report Period: Monday, January 01, 2007 to Wednesday, July 04, 2012 S 144 ST at TIB Case Number Report Day Of Crash Number Week Date Crash Time Location Type of Crash J8 Technology Inc. Direction Severity Tot Vehicle INehilce 2 Fat lnj PDO Veh 12-2641 3309313 Sun 04/15/2012 10:08 PM S 144 ST at TIB 12-1382 3514804 Sun 02/26/2012 06:13 PM S 144 ST at TIB 11-6728 3558035 Sun 10/09/2011 11-6119 3558084 Thu 09/15/2011 11-5208 3558076 Mon 08/08/2011 11-3674 0112680 Mon 06/06/2011 11-2209 3309060 Tue 04/05/2011 03:02 PM 06:49 PM 04:36 PM 07:50 AM 04:53 AM S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB 10-4905 3309483 Sat 07/24/2010 01:17 AM S 144 ST at TIB 10-3512 3309301 Wed 05/26/2010 09:37 AM S 144 ST at TIB 09-7955 3115006 Thu 12/03/2009 09-4557 3116078 Sat 07/11/2009 09-3555 2770710 Wed 05/27/2009 09-3332 3311280 Sat 05/16/2009 09-3121 3311024 Wed 05/06/2009 03:00 PM 10:57 AM 01:45 AM 10:24 PM 07:31 PM S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB S 144 ST at TIB 08-3724 2707373 Fri 06/13/2008 07:42 PM S 144 ST at TIB 08-2991 2707521 Sat 05/10/2008 04:55 PM S 144 ST at TIB Right Angle Sideswipe Rear End Rear End Sideswipe Rear End Sideswipe Pedestrian/Cyclist Involved Rear End Pedestrian/Cyclist Involved Approach Tum Right Angle Rear End Right Angle Rear End Rear End SB Thru / EB Thru NBThru /NB Left WB Thru / WB Thru SB Thru / SB Thru EB Right / EB Right NB Thru /NB Thru NB Left/NBThru EB Right / WB Thru SB Thru / SB Thru SB Thru / WB Thru WB Left / EB Thru WB Thru / NB Thru NB Thru / NB Thru NBThru/EBThru SB Thru / SB Thru NB Thru /NB Thru 1 1 1 1 1 2 X 2 X 2 2 2 X 3 X 2 2 X 2 1 X 2 X 2 2 X 2 X 3 X 2 Page 1 oo Crash Record System JB Technology Inc. S 144 ST at TIB (cont) Case Number Report Day Of Crash Number Week Date Crash Time Location Corridor Report City of Tukwila Tuesday, August 21, 2012 Type of Crash Direction Severity Tot Vehicle INehilce 2 Fat lnj PDO Veh 08-0297 2707735 Sun 01/13/2008 07-8215 2523744 Thu 07-7838 2523541 Mon 07-7075 2664227 Wed 07-5380 2663029 Sun 07-4786 2663751 Wed 07-0028 2783829 Tue 11/29/2007 11/12/2007 10/10/2007 07/29/2007 07/04/2007 01/02/2007 10:25 PM S 144 ST at TIB 02:31 PM 02:44 PM 07:00 PM 06:15 PM 10:51 PM 04:50 AM S 144 ST at TIB S144STatTIB S 144 ST at TIB S 144 ST at TI B S 144 STatTIB S 144 ST atT1B Approach Turn Sideswipe Pedestrian/Cyclist Involved Rear End Rear End Approach Turn Backing SB Thru / NB Left EB Thru / EB Thru S13 Right / EB Thru EB Thru / EB Thru SBThru/SBThru WB Left /EBThru Bckng / NB Thru 2 X 2 X X X X X 2 2 3 2 2 2 Between TIB and 41 AVE S Case Number Report Day Of Crash Number Week Date Crash Time Location Type of Crash Direction Severity Tot Vehicle 1Nehilce 2 Fat lnj PDO Veh 10-4672 3115459 Thu 07/15/2010 07-1432 2707754 Mon 02/26/2007 09-4396 2663671 Fri 07/03/2009 08-3197 2664137 Mon 05/19/2008 11-1104 3115610 Wed 02/16/2011 02:13 AM 03:57 PM 02:05 PM 01:38 PM S 144 ST, 10 ft. East of T1B S 144 ST, 30 ft. East of TIB S 144 ST, 50 ft. East of TIB S 144 ST, 50 ft. East of TIB 04:20 PM S 144 ST, 75 ft. East of TIB Backing Pedestrian/Cyclist Involved Rear End Rear End Rear End Bckng / WB Thru SB Left / SB Thru 1 WB Thru / WB Thru WB Thru / WB Thru WB Thru / WB Thru X 2 1 X 3 X 2 1 2 Page 2 Crash Record System JB Technology Inc. S 144 ST at 41 AVE S Case Report Day Of Crash Number Number Week Date Crash Time Location Corridor Report City of Tukwila Tuesday, August 21, 2012 Type of Crash Direction Severity Tot Vehicle 1Nehilce 2 Fat lnj PDO Veh 07-3715 2663649 Thu 05/24/2007 04:00 PM 41 AVE S at S 144 ST Rear End EB Thru / EB Thru X 2 Between 41 AVE S and 42 AVE S Case Report Day Of Crash Number Number Week Date Crash Time Location Type of Crash Direction Severity Tot Vehicle 1Nehilce 2 Fat lnj PDO Veh 11-5856 3558526 Sun 09/04/2011 09-3446 3115708 Thu 05/21/2009 10-2426 3115307 Sun 04/11/2010 08-0687 2664242 Thu 01/31/2008 07-8196 2664004 Wed 11/28/2007 10-8036 3309430 Mon 11/29/2010 08:19 PM S 144 ST, 75 ft. East of 41 AVE S 08:48 PM S 144 ST, 500 ft. West of 42 AVE S 11:20 AM S 144 ST, 200 ft. West of 42 AVE S 06:28 PM S 144 ST, 100 ft. West of 42 AVE S 05:25 PM S 144 ST, 100 ft. West of 42 AVE S 05:47 PM S 144 ST, 25 ft. West of 42 AVE S Head On WB Thru / Prk Veh Fixed Object/Parked Vehicle EB Left / Rear End Approach Turn Rear End Rear End EB Thru / EB Thru EB Left / WB Thru EB Thru / EB Thru EB Thru / EB Thru 1 2 X 1 X 2 X 2 X 2 X 2 S 144 ST at 42 AVE S Case Report Day Of Crash Number Number Week Date Crash Time Location Type of Crash Direction Severity Tot Vehicle 1Nehilce 2 Fat lnj PDO Veh 11-6810 3558284 Thu 10/13/2011 09:30 AM 42 AVE S at S 144 ST 11-4757 3310395 Thu 07/21/2011 10:43 AM 42 AVE S at S 144 ST Right Angle Right Angle EB Thru / NB Left WB Thru / NB Thru X 2 1 2 Page 3 o 0 0 `0000 U A J U 0000 O - NO N ▪ 0J N -1 N 00 N ,./0W CO - 00 - Us W v W W 0 Wy .0. ▪ O - A • L VI N NO ▪ W 1.4 '0 O U W W 0 -r J 00 LA N —• A Vs ON U W CO 00 ON co 0. 0 Li. = 0 0 =. a 0 0 N O 00s 0 0 - OW ? N N_ J �O U '.O 'O W -4 NO • O— W O O • O O O O • O O O_ 0 0 0 V 0 0 '.0 NO 0 0 0 0 O 0 0 N N 0 A ...- 0 IJ W N - A 1.4 �. W W W 00 0 O N V• yy' O V W IS 114S1sSHAV ZV IS VVI SlsS3AVZb IS S1sS3AVZV .LS VVI S 1B S 3AV ZV X ? a A co 0- S co -.S a a 0 a 00 00 o 00 w4LIIK/w4LII3 UN./ lam wall IIN/wall UN wall /w4LII3 ISbblS1sS3AVZV wn j 4zeaddy 801 IIIA / w41 IIS .LS VVI S W S 3AV Zi? .LS VVI S 1s S 3AV ZV IS VVI S 1s S 3AV ZV JSVVIS1sS3AVZV IS 141S1sS3AVZ17 S ? S • S S a a a a a o 00 00 o 00 Fr Fr n F milli UM / 1P-1 IIK will U11 / ILISM GM wall II3/UolON. w4.1.IIld/w41IIM X x x x XX x x N N N N N N N N N N z C 9 y eo 0 � v • O n v tsj 0) CD 5 r1 n co S r 0 0) 0 Z 23114aA/I °I3R A w n 0 <<o 0 -- 0uo3) S HAV Z1' le IS P11 S TOTALS At 42 AVE S Between 41 AVE S and 42 AVE S At 41 AVE S Between TIB and 41 AVE S > SEGMENT —I co 0 o 0 0 0 0 FATALS — 0 0 0 0 0 0 Ga" � INJURIES A W J - O f3 0o Ca PDO A CO CT -- C) 0) V N CA " CA W TOTALS S 3AV Z17 01 HI.L uiog ZS tbt7t S ZTOZ `tz lsn2ny `kepsans 0 0 I Awa N Z,CU NN toi 0 Q i•l ..r "FA ca,) U H S 144 ST from TIB to 42 AVE S Monday, January 01, 2007 to Wednesday, July 04, 2012 3� Attachment G Traffic Volumes Peak Hour Summary All Traffic Data Mat1o,o,.o Mark Skaggs (206) 251-0300 Tukwila International Blvd & S 144th St S 144th St Bikes 1 4:30 PM to 5:30 PM Thursday, June 14, 2012 818 73 692 53 � y y 500 387 305 Bikes 1 71 130 104 4 a Peds 54 899 Approach PHF HV% Volume EB 0.94 1.6% 305 WB 0.91 1.7% 297 NB 0.90 2.6% 613 SB 0.92 2.1% 818 Intersection 0.96 2.1% 2,033 Count Period: 2:30 PM to 6:00 PM Peds 24 R • 71 145 404 64 613 Bikes 1 E 25 169 103 Bikes 0 297 247 S 144th St 3i Total Vehicle Summary All Traffic Data 0 0 01111010110 Mark Skaggs (206) 251-0300 Tukwila International Blvd & S 144th St Thursday, June 14, 2012 2:30 PM to 6:00 PM 15 -Minute Interval Summary 2:30 PM to 6:00 PM Out 387 In 305 In Out 818 500 73 692 53 .� 1 4 HV 1.7% PHF 0.91 71 J 130 -4 104 l HV 1.6% PI -IF 0.94 t 25 ♦.169 r 103 4.1 t b m 145 404 64 ni Out In 899 613 0. Peak Hour Summary 4:30 PM to 5:30 PM 297 In 247 Out Interval Start Time L Northbound Tukwila International T Blvd R HV 1 Bikes Southbound Tukwila International L T 1 R Blvd HV Bikes L Eastbound S T 144th St 1 R 1 HV Bikes L Westbound S T 144th R St HV 1 Bikes Interval Total Pedestrians Crosswalk North 1 South East 1 West 2:30 PM 2:45 PM 29 35 108 95 14 4 1 11 3 1 0 0 16 1 117 ' 16 9 129 1 13 7 0 5 0 --' 10 19 20 32 15 19 1 3 1 1 0 0 12 19 40 32 i 10 1 4 1 0 1 0 407 417 439 76 5L4_16 24�� 25 21 25 1 34 7 8 8 7 9 1 5 4 1 7 2 i 16 3:00 PM 34 90 22 5 0 12 134 11 9 0 19 26 25 1 0 14 47 5 2 1 0 3:15 PM __ -2 3:30 PM 3:45 PM 29 30 23 67 92 72 14 16 14 5 4 ! 5 3 T 0 1 0 19 15 10 18 _ 148 126 141 146 22 i 22 , 18 1 22 _ 7 0 4 0 6 0 19 27 16 20 19 34 33 37 22 19 29 26 2 5 I 2 1 2 0 0 0 25 20 23 49 38 30 11 8 8 3 1 2 0 1 0 444 447 417 4 I B 4 4 9 1 9 7 -i 11 4:00 PM 31 68 13 0 7 0 0 15 44 7 r 0 0 447 16 2 _4.15 PM 4:30 PM 30 _..__ , 31 92 L 105 21 16 6 1 3 1 0 _. 0 21 11 129 161 27 _._ 20 4 5 0 0 22 16 41 29 30 26 __ 5 0 0 1 23 29 41 45 7 8 r 1 0 ._.____........__.97__.... 1 1 1 0 484 497 7 18 1 ( 2 3 i 3__ 7 1 3 4:45 PM 5:00 PM 33 33 96 93 14 21 i 11 8 0 14 16 173 192 1 24 15 2 4 0 0 20 17 30 35 28 29 1 2 1 2 0 0 24 27 38 47 5 7 2 1 0 2 1 0 499 532 17 14 5-+ 1 8 9 2 1 14 7 i 17 5:15 PM 48 110 13 4 1 0 12 1 166 ' 14 6 1 18 36 21 1 1 0 23 39 5 0 1 0 505 5 2 10 _ 5:30 PM 5:45 PM _ 32 .a. 26 94 92 1 13 15 4 1 ---8--1 0 0 9 14 136 ' 13 106 1 10 4 - 1 - 1? 0 _ 0 19 13 37 35 39 - 23 _ 2 0 0 0 11 19 26 28 11 4 2 0 0 _ 0 440 385 6 • 7 5 T 2 11 2 ---5--- 1--8-- Total Survey 444 1,274 217 61 2 196 2,0041 247 71 1 255 444 351 28 1 284 544 100 18 1 6,360 317 1 116 76 i 117 Peak Hour Summary 4:30 PM to 5:30 PM By Approach Volume %HV PHF Northbound Tukwila International Blvd In I Out Total HV ?Bikes 613 1 899 1,512 16 1 1 2.6% 0.90 Southbound Tukwila International Blvd In 1 Out TotalI-1V 1 Bikes 818. 500 1,3181 17 1 1 2.1% Eastbound S 144th St 0.92 In Out 1 Total 1 HV Bikes 305 387 692 1 5 1.6% 0.94 Westbound S 144th St__ In--1--Out 1 Total HV -Bikes 297 1247 544 5 1 0 1.7% Total Pedestrians Crosswalk 0.91 2,033 2.1% 0.96 By Movement Northbound Tukwila International Blvd Southbound Tukwila International Blvd Southbound Tukwila Intemati Eastbound S 144th St Westbound S 144th St Total L' T R 'Total L T R Total L T R 'Total R 1 1 Bikes Volume PHF 145 0.76 404 0.92 64 0.76 ' 613 I' 0 53 0.83 692 0.90 1 73 0.76 1818 t0.92 _ 71 0.89 130 0.90 104 0.90 1305 10.94 _ 103L _169T 0.89, 0.90 25R _I297Total 0.78 ;0.91 2,033 0.96 Rolling Hour Summary 2:30 PM to 6:00 PM North ' South 1 East ! West 54 ; 24 1 18 I 44 Interval Start Time Northbound Tukwila International Blvd Southbound Tukwila Intemati nal Blvd Eastbound S 144th St Westbound S 144th St Interval Total Pedestrians Crosswalk L T 1 R HV 1 Bikes L T' R HV ' Bikes L 1 T R 1 HV Bikes L T 1 R HV ' Bikes North 1 South I East 1 West 2:30 PM 127 360 61 17 I 0 56 528 1 62 537 768 28 1 0 67 97 81 1 7 9 10 11 14 0 0 0 0 0 70 78 82 83 81 168 I 30 7 I 0 1,707 183 1 65 1 19 1 36 2:45 PM 128 344 63 17 1 55 T 25 0 84 111 85 1 1661_28_ 164 161 153 7 1,747 1,747 1,755 1,795 128 1 39 95 30 87 1 25 69 ' 18 66 12-1 58 , 13 56 ' 20 I 14 i 35 3:OO PM 3:15 PM 3:30 PM 116 113 114 321 299 324 66 57 64 19 �_1 _--__ 17 I 1 18 1 56 62 64 549 4 73 561 84 542 1 89 Ijj 26 241 21 , 0 0 0 81 82 85 112 123 145 95 96� 104 1 32 34 1 30 8 6 i 4 1 __ 1 1 1 F19 24 23 1 26 r 1._19 I ____.,. 1 19 1 37 32 27 26 31 _ 37 3:45 PM 115 337 64 17 0 60 577 1 87 22 1 0 74 140 111 ' 9 1 90 160 30 4 I 0 0 0 1,845 1,927 ____._____.. 2,012 4:00 PM 4:15 PM 125 127 361 386 64 72 13 18 1 1 64 62 6091 93 655 1 86 16 a 15 I 0 0 78 75 137 135 110 113 9 9 1 1 91 103 168 171 4 jj 27 a____.__ .........._.._. 27 6 4:30 PM 4:45 PM 5:00 PM 145 146 404 393 64 61 16 1 17 1 1 1 0 53 51 51 69273 667 I 66 60-0-1- 52 17 1 16 I 15 1 1 1 1 71 74 67 130 138 143 104 1 5 117 I 7 11212 j 5 1 0 0 103 85 80 169 25 5 1 150 I 28 6 i 140 1, 27 4 , 0 0 0 2,033 1,976 1,862 54 1 42 ' 30 1 24 29 23 18 ' 44 I 22 I 43 1 25 1 37 139 389 62 22 1 Peak Hour Summary All Traffic Data 1=.1111s1o.o1ro rasa In, Mark Skaggs (206) 251-0300 Tukwila International Blvd & Mid -Block Crossing 0 Bikes 0 Bikes 0 4:30 PM to 5:30 PM Thursday, June 14, 2012 806 806 491 Peds 16 Peds 0 806 Approach PHF HV% Volume EB 0.00 0.0% 0 WB 0.00 0.0% 0 NB 0.91 2.2% 491 SB 0.90 2.0% 806 Intersection 0.96 2.1% 1,297 Count Period: 2:30 PM to 6:00 PM T 491 491 0 N d a 03 To O Bikes 0 E Bikes 0 Total Vehicle Summary All Traffic Data O O Q a■ 1010110 Ser -Area Mark Skaggs (206) 251-0300 Tukwila International Blvd & Mid -Block Crossing Thursday, June 14, 2012 2:30 PM to 6:00 PM 15 -Minute Interval Summary 2:30 PM to 6:00 PM Out 0 In 0 In Out m 806 491 806 .1 ♦ 4 HV 0.0% PHF 0.00 HV 0.0% PHF 0.00 t rm 491 ,4 d Out In 806 491 a Peak Hour Summary 4:30 PM to 5:30 PM 0 In 0 Out Interval Start Thee Tukwila Northbound International T Blvd I4V 1 Bikes Tukwila Southbound Intemational Blvd T HV I Bikes Total Eastbound Mid -Block Crossing 1 Bikes Total Westbound Mid -Block Crossing 1 Bi es Interval Total Pedestrians Crosswalk North i So th East 1 West 2:30 PM 2:45 PM 0 116 119 4 0 6 1 0 _ PHF ----� 0.91 , 142 60 147 7 0 0.90 1 0 0 r 10.00 --- 0.96 1,069 1 i 258 266 7 i 10 4 0 I 0 0 I 0 3:00 PM 20 105 5 0 167 B 0 ! 1,118 1 112 1,119 1,144 1,139 1,208 -------_- 1 ,268 1,297 1,271 0 27 0 0 24 0 0 22 ' 0 0 20 0 0 13 i 0 I 0 13 , 0 1 _ 16 1 0 0 24 0 I 0 i 3:00 PM 3:15 PM 3:30 PM 435 426 452 272 10 , 0 1 0 5—'— 3 9 23 24 23 0 0 01 0 0 1 0 _3:15 PM 3:30 PM 3:45 PM 100 136 94 3 6 9 0 0 0 173 171 ! 166 i 183 , 5 0 5 ! 0 5 1 0 9 , 0 1 17 0 ' 703 1 21 0 0 0 �___ ._..__.__..___. __ J I __._—_ 4:00 PM 4:15 PM -1 , i 273 307 260 279 298 302 7 746 1 786 1-�-- 806 'I 765 1 684 r— 0 , 0 4:30 PM 4:45 PM 491 506 0 110 12 10 � 14 [ 4:00 PM 96 3 r 0 3 1 1 29 0 I 0 0 1 0 0 j 0 .__ 489 11 __ _ ... - 1 .._ 0.._. 0 '--- 4:15 PM 4:30 PM 126_.. 120 31 0 2 1 0 172 182 ..__. 4 J 0 3 1 0 4:45 PM 5:00 PM 120 116 1 1 0 4 1 0 209 223 i 3 1 0 3 I 0 i 0--____._----329 0 —' I 339 2 1 7 ' 0 i 0 _ 0 1 0 5:15 PM 135 4 0 192 ! 7 0 0 327 6 0 7 0 530 PM _ 5:45 PM 135 103 3 0 ---5 10 141 I 128 , 3 0 1 10 0 0 r 1 276 231 9 7 0 0 0 I 0 Total Survey 1,621 58 0 2,3961 69 0 0 0 4,017 86 0 0 1 0 Peak Hour Summary 4:30 PM to 5:30 PM By Approach Volume %HV PHF Northbound Tukwila Intemational Blvd In Out TotalHV ! Bikes 491 806 1,297 I 11 I 0 2.2% Southbound Tukwila Intemational Blvd In OutTotal HV Bikes 806 491 11,297 16 I 0 2.0% 0.91 0.90 Eastbound Mid -Block Crossing_ In I OOut 1 Total I pikes 0.0% Westbound Mid -Block Crossing In T 00 I Tottal1 Bikesk 00.0%I 0.00 0.00 Total 1,297 2.1% 0.96 B Northbound y Tukwila Intemational Blvd Southbound Tukwila Intemational Blvd Eastbound Mid -Block Crossing Westbound Mid -Block Crossing Total Movement T Total North ; South 1 East 1 West T Total Total I 1Total Volume 491 491 806 806 0 0 1,297 _ PHF ----� 0.91 _ 0.91 0.90 0.90 ---- ---- -- ;0.00 r 10.00 --- 0.96 Rolling Hour Summary 2:30 PM to 6:00 PM Pedestrians Crosswalk North , South I East ! West 16 10 0 1 0 Interval Start Time Northbound Tukwila Intemational Blvd Southbound Tukwila International Blvd Eastbound Mid -Block Crossing Westbound Mid -Block Crossing Interval Total Pedestrians Crosswalk North ; South 1 East 1 West T HV 1 Bikes T 1 HV -1 Bi es Bi es I Bikes r 2:30 PM 440 18 1 0 629 1 26 1 I 1 0 1,069 32 ' 0 1 0 j 2:45 PM 460 20 0 658 I 25 10 ! 1,118 1 112 1,119 1,144 1,139 1,208 -------_- 1 ,268 1,297 1,271 28 0 1 0 27 0 0 24 0 0 22 ' 0 0 20 0 0 13 i 0 I 0 13 , 0 1 _ 16 1 0 0 24 0 I 0 i 3:00 PM 3:15 PM 3:30 PM 435 426 452 23 21 21 0 0 0 677 693 692 23 24 23 ! ---�--- , J_ -_—__--_--� _ 0 0 1 0 : -t 0 0 �___ 0 _--� 0 10 3:45 PM 436 1 17 0 ' 703 1 21 �___ ._..__.__..___. __ J I __._—_ 4:00 PM 4:15 PM 462 482 9 0 10 0 746 1 786 1-�-- 806 'I 765 1 684 r— 19 13 16 I 16 1 4:30 PM 4:45 PM 491 506 110 12 10 � 14 1,173 29 0 I 0 5:00 PM 489 16 I 0 Peak Hour Summary Mark Skaggs (206) 251-0300 41st Ave S S 144th St 41st Ave S & S 144th St Bikes 0 4:15 PM to 5:15 PM Thursday, June 14, 2012 8 6 0 2 g y y 7 309 261 Bikes 0 6 249 6 4 0 N a Peds 48 Peds 22 E 1 296 2 Bikes 0 299 257 8 Approach PHF HV% Volume EB 0.86 2.3% 261 WB 0.91 2.0% 299 NB 0.54 0.0% 13 SB 0.50 0.0% 8 Intersection 0.92 2.1% 581 Count Period: 2:30 PM to 6:00 PM 7 0 6 13 Bikes 3 41st Ave S S 144th St 33 Total Vehicle Summary All Traffic Data o O ICI a 1 0101 1 0 S-.^.1cer..:nc Mark Skaggs (206) 251-0300 41st Ave S & S 144th St Thursday, June 14, 2012 2:30 PM to 6:00 PM 15 -Minute Interval Summary 2:30 PM to 6:00 PM Out 309 In 261 In Out 8 7 6 0 2 40 t 4 6� 249 .♦ 6"1 HV 2.3% PHF 0.86 HV 2.0% PHF 0.91 L1 4-. 296 r2 t 7 0 6 Out In 8 13 3 > LL =a. Peak Hour Summary 4:15 PM to 5:15 PM 299 In 257 Out Interval Start Time L Northbound 41st T Ave R S HV Bikes L Southbound 41st T Ave R S HV Bikes Eastbound S L I T 144th St R HV Bikes L Westbound S 144th St T 1 R HV i Bikes Interval Total Pedestrians Crosswalk North j South East 1 West 2:30 PM 2:45 PM 1 1 0 0 0 0 0 0 0 I 0 #I 0 0 2 0 0 0 0 0 1 46 1 1 54 0 2 1 0 0 0 0 0 61 0 62 10 1 0 1 0 111 120 118 144 136 118 54 47 23 _ 16 20 14 28 18 7 4 1 11 _--8 8 28 T 0 19 O 5 0 4 1__0 __ 11 0 5 1 0 0 -T 50 4 2 0 1 1 56 1 1 79 I 1 2) 0 1 0 3:00 PM 4 0 0 '- 0 1 1 0 0 0 3:15 PM 3:30 PM 3:45 PM 3 - 2 0 1 1 1 0 1 0 0 3 2 0 0 01 0 0 4 0 0 '- 1 1 1 0 4 51 2 1 61 � 2 1 52 1 1 3 1 1 2 0 0 0 _ __ 1 0 __ 64 1 ,r 56 1 0 1 0 1 0 _1 10 i 5 5 i 0 4:00 PM 3 1 0 1 2 4 0 0 2 1 62 4 0 0 2 53 i- 3 0 f 1 137 _4:15 PM 4:30 PM 3 1 ....._0 5 1 -_ 1 0 2 0 0 2 20 0 0 04_ 1 73 58 2 0 3 0 0 0 077 0 0. 75 1 0 1 a. 1' 158 _ 147 122 154 4 i_.,.6,-._.._10_1 12 5 15 ; 6 17 15 7 1 5 0 4 0 6 1 0 4 1 0 4' 1 4:45 PM 5:00 PM 2 1 1 0 1 0 0 0 0 0 1 1 0 0 0 0 0 I 50 1 1 68 3 1 1 2 0 0 1 1 64 1 0 80 1 1 2 2 i 5:15 PM 3 0 0 0 0 1 0 0 1 1 59 0 0 0 1 55 10 _0 I 120 _ 5:30 PM 5:45 PM ......2 01 _ 0 .1-___ 0 .__0 0 0 0 .__ 0 _.r_ 1 O_-.. D 0 0 1__ O __ 3' 56 . 4 1 61 2_ 3 0 0 0 0 0 _.. 0 47 1 _ 56 1 0 __.__2 0 _ I 111 ._..__._126 5 2 5 1 1 0 0- __ 0 1 Total Survey 26 0 11 1 4 9 3 19 1 2 26 1801 26 13 0 8 885 18 15 I 1 1,822 249 111 105 I 1 Peak Hour Summary 4:15 PM to 5:15 PM By Approach Volume %HV PHF Northbound _ 41st Ave S In T Out T TotalT HV 1 Bikes 13 8 1 21 0 3 0.0% 0.54 Southbound 41st AveS In Out Total HV 1 Bikes 8 �7 I 15 10 I 0 0.0% Eastbound S 144th St InOut [Total HV rBikes 261 I 309570 1 6 0 2.3% 0.50 Westbound S 144th St In Out 1 Total HV Bikes 299 7 257 1556 6 I 0 2.0% Total 0.86 0.91 581 2.1% 0.92 By Northbound 41st AveS Southbound 4 st AveS Eastbound S 144th St Westbound S 144th St Total Movement L T R L 1 T R 'Total L T R L T I R (Total Volume PHF 7 0 0.580.00 6 13iTotal 0.30 10.54 2 _ 0 0.25 j 0.00 6 18 0.75 0.50 Iota! 6 249 6_.1�2.61 0.38 1 .85 10.50 ;0.86 2 0.50 296 1 299 0.93 0.25 0.91 581 __ 0.92 Rolling Hour Summary 2:30 PM to 6:00 PM Pedestrians Crosswalk North i South East 1 West 48 ; 22 24 1 0 Interval Start Time Northbound 41st Ave S R J HV Bikes Southbound 41st AveS Eastbound S144th St Westbound S 144th St Interval Total _ North Pedestrians Crosswalk SouthT East 1 West L T L T R HV 1 Bikes L T R' HV Bikes L T 1 R If HV Bikes 2:30 PM 9 0 1 i 1 1 1 4 1 2 0 1 1 6 201 7 1 4 I 0 2 258 1 2 I 5 I 0 493 140 ; 57 56 1 0 2:45 PM 10 0 2 1 1 6 1 1 0 2 7 216 8 I 4 0 3 261 1 3 5 0 518 106 1 40 36 i 0 3:00 PM 3:15 PM 3:30 PM 9 8 8 0 0 0 3 4 3 1 _-+--__- 1 0 1 1 1 6 6 3 1 2 2 5 9 11 1 a 1 1 1 2 2 1 8 10 7 I 214 226 248 9 6 a 9 4 10 1 6 0 0 1 0 3 4 3 2 3 2 255 252 250 1 261 r 269 lj 296 3 5 4 5 0 516 535 549 73 1__30__ 60 48 1 28 30 _22_ 22 28 ;_0 1 0 1 0 3 3 i 1 1 3:45 PM 7 0 0* 0 7 7 6 6 2 0 2 3 i 2 12 1 0 1 0 0 0 0 9 1 7 6 245 243 249 9 9 6 5 4 6 1 0 L 0 10 3 3 1 3 1 4 6 1 1 0 560 564 581 40 1 24 41 1 22 46 1 22 24 25 24 1 0 i 0 i 0 4:00 PM 4:15 PM 9 7 1 0 L ..__....__.__ 0 0 0 3 3 2 1 3 2 2 0 9 -. 6 4:30 PM 4:45 PM 7 6 0 0 2 0 0 0 5 10 I 4 0 1 0 0 6 I 5 1 235 233 4 6 3 3 0 1 0 0 3 3 274 246 I i 1 2 5 i 6 1 0 0 543 507 511 51 ; 44 34 : 21 18 13 18 1 1 17 I 1 11 1 1 5:00 PM 6 0 1 0 0 -7-1 0 T 3 0 1 0 9' 244 ---6--1-2 2 238 ' 2 4 1 0 RECEI\ , _,D CITY OF TUKWILA JUN 12 213 cOMMONI I Y Department of Community Developme vt�LoPMENT 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 FAX: (206) 431-3665 E-mail: planning(TukwilaWA.gov SPECIAL PERMISSION - DIRECTOR APPLICATION FOR STAFF USE ONLY Permits Plus Type: P -SP Planner: File Number: Z-43 a( Application Complete Date: Project File Number: . T�J 1 2 Application Incomplete Date: Other File Numbers: NAME OF PROJECT/DEVELOPMENT: Tukwila Village LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. Tukwila International Boulevard & S. 144th Street LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement). See attached DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the owner/applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City to whom all notices and reports will be sent. Name: Bryan M. Park Address: 201 - 27th Avenue SE, Building A, Suite 300 Puyallup, WA 98374 Phone: (253) 231-5001 de/436914W FAX: (253) 231-5010 E-mail: bryanp@housing4seniors.com Signature: A - Date: 05/28/2013 gn - H:\Land Use Applications in PDPSpecial Permission Director -March 2011.doc TUKWILA VILLAGE Tax Parcel Nos: 152304-9092 155420-0010 152304-9096 155420-0015 152304-9242 155420-0020 004000-0145 155420-0025 004000-0146 155420-0030 004000-0180 155420-0033 004000-0191 155420-0034 004000-0194 155420-0035 004000-0196 155420-0036 004000-0198 155420-0037 155420-0005 15255.007 PARKING LEGEND ® NUMBER OF STALLS IN ROW c COMPACT STALL THE SAMARA APARTMENTS PEDESTRIAN CONNECTION ROUTE, TYP. EASEMENT(( 10' WIDE TYPE II LANDSCAPE PERIMETER 10' WIDE" TYPE IILANDSCAPE PERIMETER (5' PLA0 TING$ 5' SIDEWALK) `I NORMANDY COURT APARTMENTS S 144th STREET LANDSCAPE PLAN 10 WIDETYPE If -- SEE -SHEET -P3:30— LANDSCAPE PERIMETER PRQPERTYLINE.._ „ _ r I -I r tr----� UPPER BUILDING OUTLINE, TYP. — r.J rJ 1 BUILDING B UNITS -125 LI GARAGE PARKING STALLS - 86 1 1 1 - 41ST AVE S TO BE VACATED The Village ARTwalk The Village ARTwalk will feature numerous forms of art, sculpture and photography created by members of the local art community. These art pieces will be prominently displayed at designated locations throughout Tukwila Village. ARTwalk will present art, sculpture and photography that are unique to the various cultures represented in this community. This could include the Foster High School art program and other local or regional art programs such as King County's "4Culture" programs. ARTwalk guide brochures can be produced for each new exhibit, illustrate the locations of the various art and sculpture work along with a description of the piece and a bio about the artist that created them. The ARTwalk work will be rotated on a schedule determined by the community management group. The work will be a combination temporary and permanent installations. RIVERTON TERRACE PEDESTRIAN CONNECTION ROUTE TYP. FIRE ACCESS LANE .�}..• ...... tulip •elm 1 Bi PARKING EASEMENT FOR KING COUNTY HOUSING AUTHORITY o PROPERTY LINE • • --En__E2-=-LST---Z-L1-T_ ' UPPER BUILDING OUTLINE, TYP. BUILDING A UNITS 84 GARAGE PARKING STALLS - 85 BUILDING E ;'s`\\'s`NI UNITS - 124 ARAG,E PARKING STALLS - 80 „.\\\ 10' WIDE TYPE II LANDSCAPE PERIMETER 0'-2. /:, LOADING STALL -- / z\r BUILDING A SITE PLAN - SEE SHEET P2.0 f.XISTING BUILDING TO^14 . BE REMOVED. TUKWILA VILLAGE PARKING PHASE 1 PHASE 2 PARCEL A PARKING GARAGE =85 SURFACE =93 TOTAL = 138 PARCEL C PARKING GARAGE =0 SURFACE =11 TOTAL = 11 LIBRARY - PARCEL D SHARE PARKING ON PARCELS A,B,C PHASE 1 TOTAL = 149 STALLS PARCEL E PARKING v BUILDING UNITS, 'r 70 GE ARKt 1G STALLS - 49 111 ,.. PEDESTRIAN CONNECTION ROUTE TYP. 10'-4; k GARAGE =49+80 = 129 SURFACE = 29 SURFACE (KCHA) = 18 PHASE 2 TOTAL = 176 PHASE 3 PARCEL B PARKING GARAGE = 86 SURFACE =34 PHASE 3 TOTAL = 120 S. 144TH ON STREET PARKING = 18 STALLS SITE TOTALS = 445 + 18 (KCHA) = 463 STALLS PLAZA SITE PLAN - SEE SHEET P3.0 GREAT BEAR MOTOR INN OVERALL SITE PLAN CD 15 30 60 90 L/3 -03/ ssSN Eo°TO WASHINGTON REGIA REO LAND EARCHrTECT MELVjNc8. ASSTa eR Issue Dates Rev. Date Desc. 05/28/13 EAR SUBMITTAL 0 F 3 5 od oD r§ 4 ,1 A a g = 5� F4 9 G ov o N ' G . 'z;` a5k'" ,a PROJECT #: LA -1113 FILENAME: LA1113-P1.0 DRAWN BY: CP/LPIMB OVERALL SITE PLAN P1.0 BAR SUBMITTAL