Loading...
HomeMy WebLinkAbout2021-07-27 Bid Tabulations - 2021 Small Drainage ProgramCITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS 2021 Small Drainage Program BID TABS 07/27/21 LOW BIDDER 2nd Low Bidder Total Engineer's Estimate Titan Earthwork LLC Northwest Cascade, Inc. No. S coon Item Quantity Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost ROADWAY 1 1-04 Minor Changes 1 EST $12,000.00 $ 12,000 $12,000.00 $ 12,000 $12,000.00 $ 12,000.00 2 1-05 Roadway Surveying 1 LS $14,000.00 $ 14,000 $15,000.00 $ 15,000 $10,500.00 $ 10,500.00 3 1-05 Record Drawings (Minimum Bid $1,500) 1 LS $1,050.00 $ 1,050 $1,500.00 $ 1,500 $1,500.00 $ 1,500.00 4 1-09 Mobilization 1 LS $54,500.00 $ 54,500 $105,000.00 $ 105,000 $78,500.00 $ 78,500.00 5 1-10 Project Temporary Traffic Control 1 LS $37,500.00 $ 37,500 $94,365.00 $ 94,365 $98,000.00 $ 98,000.00 6 1-10 Contractor Provided Uniformed Police Officer 60 HR $100.00 $ 6,000 $125.00 $ 7,500 $87.00 $ 5,220.00 7 2-01 Clearing and Grubbing 1 LS $23,000.00 $ 23,000 $35,000.00 $ 35,000 $44,000.00 $ 44,000.00 8 2-02 Removal of Structure and Obstruction 1 LS $11,000.00 $ 11,000 $25,000.00 $ 25,000 $38,000.00 $ 38,000.00 9 2-02 Pavement Removal Incl. Haul 80 SY $50.00 $ 4,000 $90.00 $ 7,200 $30.00 $ 2,400.00 10 2-03 Unsuitable Foundation Excavation Incl. Haul 15 CY $75.00 $ 1,125 $100.00 $ 1,500 $260.00 $ 3,900.00 11 2-09 Shoring or Extra Excavation Class B 2650 SF $1.50 $ 3,975 $5.00 $ 13,250 $0.50 $ 1,325.00 12 4-04 Crushed Surfacing Top Course 420 TN $40.00 $ 16,800 $90.00 $ 37,800 $60.00 $ 25,200.00 13 5-04 HMA CI. 3/8" PG 58H-22 80 TN $160.00 $ 12,800 $300.00 $ 24,000 $475.00 $ 38,000.00 14 5-04 HMA Berm 690 LF $20.00 $ 13,800 $10.00 $ 6,900 $25.00 $ 17,250.00 15 7-09 Relocate Water Air and Vacuum Assembly 1 EA $1,500.00 $ 1,500 $4,000.00 $ 4,000 $3,650.00 $ 3,650.00 16 7-14 Adjust Hydrant Assembly 1 EA $1,500.00 $ 1,500 $3,500.00 $ 3,500 $2,250.00 $ 2,250.00 17 7-15 Adjust Water Service 2 EA $700.00 $ 1,400 $1,000.00 $ 2,000 $1,450.00 $ 2,900.00 18 8-01 Erosion Control and Water Pollution Prevention 1 LS $15,000.00 $ 15,000 $10,000.00 $ 10,000 $25,000.00 $ 25,000.00 19 8-04 Cement Conc. Traffic Curb and Gutter 25 LF $80.00 $ 2,000 $60.00 $ 1,500 $133.00 $ 3,325.00 20 8-14 Cement Conc. Sidewalk 15 SY $160.00 $ 2,400 $100.00 $ 1,500 $270.00 $ 4,050.00 21 8-22 Plastic Stop Line 12 LF $25.00 $ 300 $50.00 $ 600 $150.00 $ 1,800.00 ROADSIDE DEVELOPMENT 22 8-02 Topsoil Type A 23 CY $65.00 $ 1,495 $100.00 $ 2,300 $121.00 $ 2,783.00 23 8-02 Seeded Lawn Installation 105 SY $15.00 $ 1,575 $5.00 $ 525 $24.50 $ 2,572.50 24 8-02 Water Quality Seeding 165 SY $15.00 $ 2,475 $5.00 $ 825 $24.50 $ 4,042.50 25 8-02 Bark or Wood Chip Mulch 10 CY $55.00 $ 550 $100.00 $ 1,000 $121.00 $ 1,210.00 26 8-02 Fine Compost 20 CY $65.00 $ 1,300 $100.00 $ 2,000 $121.00 $ 2,420.00 27 8-02 PS Salix scouleriana/ Scouler's Willow; 5 Gal. Cont. 2 EA $100.00 $ 200 $60.00 $ 120 $60.50 $ 121.00 28 8-02 PS Thuja plicata/ Western Redcedar; 5 Gal. Cont. 2 EA $100.00 $ 200 $150.00 $ 300 $60.50 $ 121.00 29 8-02 PS Halodiscus discolor/ Oceanspray; 2 Gal. Cont. 11 EA $35.00 $ 385 $50.00 $ 550 $36.50 $ 401.50 30 8-02 PS Symphoricarpos albus/ Snowberry; 2 Gal. Cont. 20 EA $35.00 $ 700 $40.00 $ 800 $36.50 $ 730.00 31 8-02 PS Mahonia aquifolium/ Tall Oregon Grape; 2 Gal. Cont. 15 EA $35.00 $ 525 $40.00 $ 600 $36.50 $ 547.50 32 8-02 PS Mahonia nervosa/ Low Oregon Grape; 2 Gal. Cont. 5 EA $35.00 $ 175 $60.00 $ 300 $36.50 $ 182.50 33 8-02 PS Polystichum munitum/ Sword Fern; 1 Gal. Cont. 25 EA $25.00 $ 625 $40.00 $ 1,000 $36.50 $ 912.50 34 8-02 PS Gaultheria shallon/ Salal; 1 Gal. Cont. 5 EA $25.00 $ 125 $40.00 $ 200 $36.50 $ 182.50 35 8-02 PS Fragaria vesca/ Woodland Strawberry; 4" Pot. 25 EA $15.00 $ 375 $40.00 $ 1,000 $36.50 $ 912.50 36 8-02 Property Restoration 1 EST $5,000.00 $ 5,000 $5,000.00 $ 5,000 $5,000.00 $ 5,000.00 37 8-12 Chain Link Fence Type 4 50 LF $40.00 $ 2,000 $50.00 $ 2,500 $46.50 $ 2,325.00 38 8-15 Hand Placed Riprap 5 TON $200.00 $ 1,000 $100.00 $ 500 $414.00 $ 2,070.00 39 8-15 Quarry Spalls 4 TON $200.00 $ 800 $100.00 $ 400 $392.00 $ 1,568.00 STORM DRAINAGE 40 2-02 Remove/Abandon Existing Storm Sewer Pipe 186 LF $20.00 $ 3,720 $50.00 $ 9,300 $32.50 $ 6,045 41 7-01 Yard Drain 1 EA $1,500.00 $ 1,500 $2,000.00 $ 2,000 $1,090.00 $ 1,090 42 7-04 Storm Sewer Pipe 18 In. Diam. 180 LF $120.00 $ 21,600 $150.00 $ 27,000 $101.00 $ 18,180 43 7-04 Storm Sewer Pipe 24 In. Diam 8 LF $130.00 $ 1,040 $200.00 $ 1,600 $224.00 $ 1,792 44 7-04 Ductile Iron Storm Sewer Pipe 6 In. Diam. 6 LF $100.00 $ 600 $100.00 $ 600 $320.00 $ 1,920 45 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 290 LF $105.00 $ 30,450 $115.00 $ 33,350 $92.00 $ 26,680 46 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 244 LF $125.00 $ 30,500 $135.00 $ 32,940 $120.00 $ 29,280 47 7-05 Concrete Inlet 4 EA $1,500.00 $ 6,000 $1,800.00 $ 7,200 $1,675.00 $ 6,700 48 7-05 Debris Barrier 1 EA $1,500.00 $ 1,500 $2,000.00 $ 2,000 $1,185.00 $ 1,185 49 7-05 Catch Basin Type 1 6 EA $2,250.00 $ 13,500 $2,000.00 $ 12,000 $1,680.00 $ 10,080 50 7-05 Storm Manhole 48 In. Diam. Type 1 1 EA $6,000.00 $ 6,000 $10,000.00 $ 10,000 $4,850.00 $ 4,850 51 7-05 Catch Basin Type 2 48 In. Diam. with Overflow Debris Cag 1 EA $7,500.00 $ 7,500 $15,000.00 $ 15,000 $5,825.00 $ 5,825 52 7-05 New Pipe Connection to Existing Storm Drain Structure 5 EA $750.00 $ 3,750 $1,500.00 $ 7,500 $1,250.00 $ 6,250 53 7-05 57th Ave S SDMH, Complete 1 LS $15,000.00 $ 15,000 $27,500.00 $ 27,500 $6,100.00 $ 6,100 54 7-06 Pipe Repair 45 LF $125.00 $ 5,625 $50.00 $ 2,250 $535.00 $ 24,075 55 7-06 Grout Pipe Repair 4 EA $4,000.00 $ 16,000 $500.00 $ 2,000 $3,360.00 $ 13,440 56 7-06 Furnish and Install 12" Diam. CIPP 350 LF $250.00 $ 87,500 $100.00 $ 35,000 $142.00 $ 49,700 57 7-06 Furnish and Install 24" Diam. CIPP 285 LF $325.00 $ 92,625 $130.00 $ 37,050 $238.00 $ 67,830 58 7-10 Temporary Water Bypass System 1 LS $15,500.00 $ 15,500 $4,950.00 $ 4,950 $12,000.00 $ 12,000 59 8-31 Protect Utility Pole 1 LS $4,000.00 $ 4,000 $4,950.00 $ 4,950 $27,000.00 $ 27,000 60 8-32 Pothole Utility 11 EA $550.00 $ 6,050 $1,000.00 $ 11,000 $600.00 $ 6,600 61 8-32 Resolution of Utility Conflicts 1 EST $14,000.00 $ 14,000 $14,000.00 $ 14,000 $14,000.00 $ 14,000 BID Total 1 $ 639,115.00 Ir$ 728,225.00 11 1 $ 787,494.00