HomeMy WebLinkAboutTIS 2021-08-09 Item 2A - Grant Application - Transportation Improvement Board Grant for Macadam Road South Sidewalk Improvements ProjectCity of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/City Engineer
BY: Brittany Robinson, Public Works Grant Analyst
Adib Altallal, Utilities Engineer
CC: Mayor Ekberg
DATE: August 6, 2021
SUBJECT: Macadam Road South Sidewalk Improvements Project
Project No. 90440105 & 91710302
Transportation Improvement Board Grant Application
ISSUE
Authorize the submittal of a Transportation Improvement Board (TIB) grant application to fund sidewalk improvements along
Macadam Road South.
BACKGROUND
Macadam Road South has two projects prioritized in the 2021-2026 Capital Improvement Plan, the Macadam Road South
Water Upgrade and the Macadam Road South Complete Street Project. As part of the Macadam Road South Water Upgrade,
roadways and sidewalks being torn out to replace the waterline will be replaced, and the entire length of Macadam will have
new or existing sidewalks except for 1,200 linear feet by the completion of the project. The Macadam Road South Complete
Street Project will fill this gap by supporting sidewalk construction along Macadam Rd. S. from S. 150th St. to S 144th St.
DISCUSSION
The City has the opportunity to apply for funding from the Transportation Improvement Board Urban Sidewalk Program to
construct new sidewalks, gutters, and curbs along Macadam Road South, creating a clean connection between new and
existing sidewalks from Southcenter Boulevard to S 144th St, and filling all sidewalk gaps. The Transportation Improvement
Board's call for projects to improve arterials and sidewalks in Washington State is currently open.
FISCAL IMPACT
Grant applications are due by August 13, 2021, with projects selected in November 2021 and funding allocated in early 2022.
A preliminary cost estimate for $400,000 has been prepared to construct 1,200 linear feet of sidewalks, curbs, and gutters.
The grant application indicates that a 20% local city match, or $80,000, is required. The city match can be allocated from the
Macadam Rd South Complete Street Project, which shares the common goal of constructing sidewalks along Macadam Rd
South from S 150th St. to S 144th St.
Project Fee/Estimate
Water Upgrades $ 2,206,164.00
Sidewalk Improvements 400,000.00
Fund Source
Utility Revenue
City Revenue
TIB Grant
Amount
$ 2,206,164.00
80,000.00
320,000.00
Project Budgets
$ 2,418,000.00
3,600,000.00
Total $ 2,606,164.00
$ 2,606,164.00
$6,018,000.00
RECOMMENDATION
The Transportation and Infrastructure Services Committee is being asked to approve the application for the Transportation
Improvement Board sidewalk improvements grant and required City match.
ATTACHMENTS: CIP Pages, 5 & 61
Preliminary Cost Estimate
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
1
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Macadam Rd South Complete Street Project No. 91710302
Construction of a complete street design for Macadam Rd South between South 144th St and S 150th St.
DESCRIPTION: The project will require roadway widening and re-channelization to add 5 -foot bike lanes and 5 -foot sidewalks
on both sides of the roadway, and includes illumination, curb, and storm drainage.
JUSTIFICATION: Enhance safety for students walking to Foster High School and Showalter Middle School and encourages
transportation choices for the neighborhood.
STATUS:
MAI NT. IMPACT:
COMMENT:
New sidewalk and pavement will need to be maintained.
WSDOT Pedestrian/Bicycle grant submitted in April 2018, but unsuccessful. Match will be the Water
Improvements. Apply for same grant in 2020 for design and 2022 for construction.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
F Project Location
II
v
\lc'iiii `�,
Design
400
A.,
ri
400
Land (R/W)
11111
100
\
\
;),-4,,
Lim �����
100
Const . Mgmt.
ANN�
s i as
Sty
sr ,�
tt
400
��
RE
47
97
``♦
400
Construction
2,700
91666[ `st.N
� �pQf �e'�/ ;
2,700
TOTAL EXPENSES
0
0
0
500
3,100
0
0
0
0
3,600
FUND SOURCES
Awarded Grant
0
Proposed Grant
450
2,800
3,250
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
0
50
300
0
0
0
0
350
TOTAL SOURCES
0
0
0
500
3,100
0
0
0
0
3,600
2021 - 2026 Capital Improvement Program
5
2
F Project Location
II
v
\lc'iiii `�,
A.,
ri
111
11111
\
\
;),-4,,
Lim �����
2
ANN�
s i as
Sty
sr ,�
tt
mg
��
RE
47
97
``♦
91666[ `st.N
� �pQf �e'�/ ;
st
<oi
OHLI
.;Li\`tom-
,GIS
2021 - 2026 Capital Improvement Program
5
2
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Macadam Rd S Water Upgrade Project No. 90440105
DESCRIPTION: Design and construct 4,300 LF of 10" waterline in Macadam Rd S from S 144th St to Southcenter Blvd.
JUSTIFICATION: Improve fire flow water quality to the north side of Tukwila Hill.
STATUS: Project now scheduled for 2021/2022.
MAINT. IMPACT: The new waterline will eliminate maintenance time for flushing the dead end line while increasing service
reliability.
COMMENT: Pedestrian/Bicycle Program grant for sidewalks unsuccessful in 2018, with water funds used as a match.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
S
Project Location
12:.
Is13ost
;28
pA., , `/♦
Design
68
100
50
50
�fN
�
Apt
IN'
268
Land (R/W)
,
0
Const. Mgmt.
m
fn 5144 St `
250
50
300
r`��1ff
600
Construction
St
5
m
Co
300
300
950
,
1,550
TOTAL EXPENSES
68
0
650
400
1,300
0
0
0
0
2,418
FUND SOURCES
vir:h fhC.7 _ 91
S158
St
Awarded Grant
A
5 160
St
� �1l11 Tukwila - r"11-
. I j i
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
68
0
650
400
1,300
0
0
0
0
2,418
TOTAL SOURCES
68
0
650
400
1,300
0
0
0
0
2,418
2021 - 2026 Capital Improvement Program
61
3
S
Project Location
12:.
Is13ost
;28
pA., , `/♦
n'
wIwil,
�fN
�
Apt
IN'
,
'p6
m
fn 5144 St `
co;
S143 St •
��
r`��1ff
5 146
St
5
m
Co
•,
m
m
.
,
var
150 SI
`
5 156 5t \`L
vir:h fhC.7 _ 91
S158
St
l
A
5 160
St
� �1l11 Tukwila - r"11-
. I j i
2021 - 2026 Capital Improvement Program
61
3
CITY OF TUKWILA
MACADAM ROAD SOUTH Sidewalk Improvements
BUDGETARY COST ESTIMATE
July 12, 2021
L Sidewalk Improvements
B-1
1-04
Minor Changes
1
FA
$40,000.00
$40,000.00
B-2
2-01
Clearing and Grubbing
1
LS
$5,000.00
$5,000.00
B-3
2-02
Tree Removal
2
EA
$5,000.00
$10,000.00
B-4
2-02
Remove Concrete Curb and Gutter
30
LF
$60.00
$1,800.00
B-5
2-02
Remove Concrete Sidewalk
16
SY
$60.00
$960.00
B-6
2-03
Gravel Borrow, Incl. Haul.
250
TN
$55.00
$13,750.00
B-7
2-03
Roadway Excavation Incl. Haul.*
175
CY
$35.00
$6,125.00
B-8
4-04
Crushed Surfacing Base Course*
245
TN
$45.00
$11,025.00
B-9
5-04
HMA CL. 1/2" PG 64-22*
540
TN
$180.00
$97,200.00
B-10
7-09
Adjust Existing Utility to Finished Grade
3
EA
$500.00
$1,500.00
B-11
8-04
Cement Concrete Traffic Curb and Gutter
1085
LF
$50.00
$54,250.00
B-12
8-06
Residential Driveway
70
SY
$60.00
$4,200.00
B-13
8-14
Cement Concrete Sidewalk
570
SY
$60.00
$34,200.00
B-14
8-24
Concrete Block Retaining Wall
1080
LF
$60.00
$64,800.00
Construction Subtotal 1 $344,810.00
15% Contingency
Construction Total
Project Total
$51,721.50
$344,810.00
$396,531.50