HomeMy WebLinkAboutTIS 2021-11-08 COMPLETE AGENDA PACKETCity of Tukwila
Transportation and
Infrastructure Services
Committee
❖ Verna Seal, Chair
❖ De'Sean Quinn
❖ Thomas McLeod
AGENDA
Distribution:
V. Seal
D. Quinn
T. McLeod
K. Kruller
C. Hougardy
H. Ponnekanti
S. Kim (email)
G. Lerner (email)
City Attorney (email)
Clerk File Copy
Place pkt pdf on SharePoint:
Z Trans & Infra Agendas
email cover to: F. Ayala,
A. Le, C. O'Flaherty, A.
Youn, B. Saxton, S. Norris,
L. Humphrey
MONDAY, NOVEMBER 08, 2021 — 5:30 PM
Virtual Meeting - Members of the public may listen by dialing 1-253-292-9750 and entering conference ID 832324833#
Click here to join the meeting
)
Item
Recommended Action
Page
1. PRESENTATIONS
2. BUSINESS AGENDA
a) Public Works Fleet and Facilities Tenant Improvements
a) Information only
Pg. 1
Project Update (H. Ponnekanti)
b) Neighborhood Traffic Calming Program
b) Forward to the 11/15/21 Regular
Pg. 19
Project Update (S. Bates)
Consent Agenda
c) Annual Bridge Inspections and Repairs
c) Information only
Pg. 29
2021 Presentation (A. Cox)
d) Surface Water Fund — Duwamish River Basin Steward
d) Discussion only
Pg. 49
Draft Proposal (M. Perfetti)
e) Surface Water Fund - Gilliam Creek Fish Barrier Removal
e) Forward to the 11/15/21 Regular
Pg. 61
Acceptance of KC Flood Reduction Grant Funds (M. Perfetti)
Consent Agenda
f) 2022 Legislative Agenda (R. Bianchi)
f) Forward to the 11/22/21 Committee of
the Whole and 12/6/21 Regular Consent
Pg. 69
Agenda
3. MISCELLANEOUS
Future Agenda:
Next Scheduled Meeting: Monday, November 22, 2021
SThe City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206-433-0179 for assistance.
TO:
FROM:
CC:
DATE:
SUBJECT:
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/CityEragineer
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Services Committee
Hari Ponnekanti, Public Works Director/ City Engineer
Mayor Allan Ekberg
November 5, 2021
Public Works Fleet and Facilities Tenant Improvements
Project No. 91630601
Project Update
Issue
Project update on the construction progress for the tenant improvements at the Public Works - Fleet & Facilities Shop
and next steps.
Background
At the March 15, 2021 Regular Meeting, Council approved the contract with Lincoln Construction for the Public Works
Fleet and Facilities Tenant Improvement Project including contingency totaling $5,849,244.39. The contract scope
includes seismic upgrades, plumbing and electrical, fire protection, HVAC upgrades, and interior offices, locker rooms,
and showers. The anticipated project completion date is December 2021, and the contractor is currently on schedule as
of October 26, 2021 and projected to be within budget. However, there will likely be potential delays due to Covid -19
related supply chain material delays; we are in the process of understanding how much of an impact this will bring to the
project completion schedule. The project team is working together to minimize the cost and schedule impact.
After the completion of tenant improvement work, there will be two additional scopes of work scheduled to be completed
by different contractors; exterior envelope repair and painting scope, and covered parking structure construction at the
south end of the western property. These scopes of work, which are budgeted, will be executed by smaller contractors
hired from the Job Order Contracting roster or via low -bid process and to be completed by the fall of 2022.
On October 5, 2021, City of Tukwila received approval from the Department of Ecology on the relief request from the
Shoreline Management Act (SMA) and the Tukwila Shoreline Master Program (SMP) under RCW 90.58.580. This will
allow construction of some structures located within those portions of the property that are not already in shoreline
jurisdiction prior to the restoration construction and anticipated change to the Ordinary High Water Mark, caused by the
development of the new park, Chinook Winds. This is an important milestone in the overall plan for the Public Works
campus development, as it preserves the buildable area for the property, as long as the shoreline regulations do not
change in the near future.
Analysis:
The Tenant Improvements Project is on schedule and is approximately 82% complete. 68% of the project budget being
expended to date. Currently no delays are expected. Please see attached monthly progress report for more detailed
information on construction status.
The attached "Tukwila Maintenance and Fleet Building Renovation CPM Schedule" provides the timeline for construction
progress. To date, we have completed all demolition work, all seismic reinforcement work involving upgraded
foundations, new steel brace frames, and strengthening of existing steel frames; all of the framing and drywall installation
Tukwila City Hall • 6200 Southcentor Boulovar d • Tukwila, WA 98158 • 206.433-3800 • Website: TukwilaWA.gav
1
INFORMATIONAL MEMO
Page 2
in the administrative offices area including the restrooms and locker rooms, and installation of cabinets and finishes have
commenced.
Next Steps
The City is not immediately able to move forward with demolition of the existing UPS building until the property transfer
that occurs in late 2023. However, it is strongly recommended to start preparing for eventual construction of the
structures that will be located within the shoreline jurisdiction buffer areas — thereby securing the Public Works
department's full potential for buildable areas. As project design, permitting and bidding process can take up to two years
on a substantial development of a new building, it is recommended that the Administration building (which is planned in
the shoreline jurisdiction area) design process begin as soon as possible.
As a reminder, the Administration building will be shared by enterprise and general fund divisions, meaning both funds
will be responsible for funding design and construction of the new building. Staff will return to Council in early 2022 to
present opportunities to move forward, maintain project momentum and ensure the City is prepared for the property
transfer in the last quarter of 2023.
Financial Impact and Expenditure Summary
Contract Amount Construction Budget
Lincoln Construction Inc. $5,331,752.13 $6,082,547.92
Invoiced to date 3,692,145.69
Remaining Contract $1,639,606.44
Recommendation
Information only — please see attached monthly construction progress report (Tenant Improvement project) with photos.
Attachments: October Monthly Budget Report
October Monthly Construction Report
Five Week Schedule
Wetland Buffer Maps
2021 CIP Page 56
Phone; 2O6-433-1200 • Email: Mayorta]TukwilaWA,gov + Website: TukwilaWA.gov
2
City of Tukwila - Public Works Fleet & Facilities
TOTAL PROJECT
MONTHLY Budget Report
(REVISED Budget; D-20 Plan Adopted by Council)
Life to Date Costs
as of October 25, 2021 (reconciled w/acctg thru July 11, 2021 GL)
3
COUNCIL REPORTING SUMMARY-
PUBLIC WORKS
Original Budget
Budget Transfers
Current Budget
Committed Budget
Life to Date Costs
Remain'g Committed Remaining Budget
A/E Services (Design & CA)
$ 670,768
$ -
$ 670,768
$ 611,393
$ 524,996
$ 86,397
$ 59,375
Permits/Fees
$ 130,000
$ -
$ 130,000
$ 114,222
$ 74,222
$ 40,000
$ 15,778
Construction
$ 6,715,000
$ (184,077)
$ 6,530,923
$ 5,208,650
$ 3,662,959
$ 1,545,691
$ 1,322,273
Construction (Tax)
$ 662,618
$ -
$ 662,618
$ 516,868
$ 337,241
$ 179,627
$ 145,750
Construction Related Costs
$ 378,186
$ 39,135
$ 417,321
$ 274,845
$ 205,431
$ 69,414
$ 142,476
PM Services (incl Other Professional Svcs)
$ 350,000
$ 93,900
$ 443,900
$ 413,746
$ 349,813
$ 63,933
$ 30,154
Contingency (incl Construction & Project)
$ 843,437
$ 51,042
$ 894,479
$ -
$ -
$ -
$ 894,479
SUBTOTAL -CURRENT MANAGED PROJECT
$ 9,750,009
$ -
$ 9,750,009
$ 7,139,724
$ 5,154,662
$ 1,985,062
$ 2,610,285
Previously Managed Svcs (Land,A/E,Bond,Demo)
$ 25,949,992
$ -
$ 25,949,992
$ 25,936,198
$ 25,936,198
$ -
$ 13,794
TOTAL -COMBINED PROJECT
$ 35,700,000
$ -
$ 35,700,000
$ 33,075,922
$ 31,090,860
$ 1,985,062
$ 2,624,079
3
TUKWILA PUBLIC SAFETY PROJECTS
Public Works
SOJ
Construction Management Monthly Report
October 2021
Report Reviewed by: Justine Kim
Owner's Representative: Shiels Obletz Johnsen (SOJ)
Architect: SH KS Architects
Development Progress:
• Offices and bathrooms ceiling grid installed
• Office fleet offices framed & upper-level storage stair installed
• Office carpet tile installed
• Hazardous material shed roof framed
• Lunchroom counters installed
• Majority of slab pour -backs complete
Upcoming Construction Activities:
• Complete machine and welding shop partition walls
• Frame floor of surplus parts storage space
• Complete framing of file storage and telecom
• South parking lot slab pour -backs over re-routed sewer line
Budget Status:
• Revised contract amount now $4,842,645
Change Order Status:
• Total Change Orders (1-5) approved to date: $415,424
• Change Order No. 6 is pending approval for $42,068
Schedule Status:
• See attached 5 -week schedule. Final completion date remains unchanged.
Critical Issues:
• None
Tukwila Public Safety Plan - Public Works - Monthly Report
1
4
Framing in West Building
Tukwila Public Safety Plan - Public Works - Monthly Report
2
5
Framing in West Building
Tukwila Public Safety Plan - Public Works - Monthly Report
3
6
Hallway to Lunch Room
Tukwila Public Safety Plan - Public Works - Monthly Report
4
7
Installing Upper Level Storage Staircase
Tukwila Public Safety Plan - Public Works - Monthly Report
5
8
Framing Fleet Offices
Tukwila Public Safety Plan - Public Works - Monthly Report
6
9
Office Room Carpeted
Tukwila Public Safety Plan - Public Works - Monthly Report
7
10
Office Space in Northwest Side of Building
Tukwila Public Safety Plan - Public Works - Monthly Report
8
11
South Side of Building — Shed Roof
Tukwila Public Safety Plan - Public Works - Monthly Report
9
12
Lunchroom Counters
Tukwila Public Safety Plan - Public Works - Monthly Report
10
13
FIVE WEEK CONSTRUCTION SCHEDULE
Project: Tukwila Fleet
#1239
Date:
10/18/2021
Period: 10/18 - 11/19
CONTRACTOR: LINCOLN CONSTRUCTION INC
SUPERINTENDENT: Casey Neuman
PREPARED BY: Casey Neuman
ACTIVITY
MTWT
FSSMTWT
FSSMTWTFSSMTWT
FSSMTWT
F
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
1011
12
13
14
15
16
17
18
19
Seahurst - Fleet office rough in
X
XXX
X
Seahurst - Bath/Locker lighting rough in
X
X
X
XX
Seahurst - 1st floor trim
XXX
X
X
X
X
XX
X
Seahurst - Backup Generator rough -in
X
X
X
XX
Smith Fire - Rough in 1st floor
X
X
XX
X
Rubenstein's - 1st floor base/transitions
Rubenstein's - Fleet Office
Resolve Industrial - Fall Arrest install
X
XXXX
splay Mfg - FRP bath/shower
XX
XXX
binets/countertops
X
X
X
X
X
Pipe - Air/Water reinstall
XXX
X
X
X
XXXX
XX
XXX
Pipe - Unistrut install
XXXXX
XX
X
X
X
X
XX
X
X
Pipe - Bathroom Fixture Installation
Pipe - Trench drain install
X
X
XXX
Overhead Innovations - OH door install
Todd Robinson Paint - 2nd Floor Walls
XXX
X
X
Todd Robinson Paint - 1st Floor ceilings
Todd Robinson Paint - Iron Beams W. shop
X
X
X
X
X
X
X
XX
X
Acoustics NW - 1st floor tile install
X
X
XXX
Acoustics NW - Fleet Office
X
X
X
XX
Stanely Security - 1st floor offices
Cascade Const. - CMU Header
XXXX
X
Lci - Rebar Epoxy East shop
XX
XXX
Lci - Framing on grid line #4
X
X
XX
X
Lci - Fleet Office Framing
X
XXX
X
Lci - Concrete Slab pours
Grizzly Bar - Trench Drain
X
X
14
FIVE WEEK CONSTRUCTION SCHEDULE
Project: Tukwila Fleet
#1239
Date:
10/18/2021
Period: 10/18 - 11/19
CONTRACTOR: LINCOLN CONSTRUCTION INC
SUPERINTENDENT: Casey Neuman
PREPARED BY: Casey Neuman
ACTIVITY
MTWT
FSSMTWT
FSSMTWTFSSMTWT
FSSMTWT
F
Northshore Exteriors - Louvers 2nd floor
X
X
X
X
X
Northshore Exteriors - Shed roof
X
X
X
X
X
Northshore Exteriors - Exterior Walls
X
X
X
X
X
Moe's Welding - Column/I-beam East Shop
X
X
X
X
X
Moe's Welding - Shed roof pandecking
X
X
X
X
X
X
X
XXX
Capitol H&C - Rough in 1 st/2nd Floors
X
X
X
X
X
Capitol H&C - Overhead Piping shop area
X
X
XXX
CIS - Exterior walls
X
X
XX
X
CIS - Gridline #4
XX
XXX
CIS - Fleet Office
X
X
XX
X
WBF - (4) Exterior walls Framing
X
XXXX
WBF - 2nd floor Telecom ceiling Framing
X
X
XX
X
WBF - Gridline #4 & fleet office GWB
X
X
XX
X
X
X
XXX
WBF - Bath/Locker ceiling GWB
X
X
X
XX
15
The Watershed Company
Tukwila Public Works
March 25, 2021
15' BUILDING SETBACK
300' WETLAND BUFFER
(APPROXIMATELY)
Figure 7. Extent of combined wetland buffers/setbacks on the TPW parcels (with existing conditions shown on
the TPW parcels).
16
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Public Works Shops Project No. 91630601
DESCRIPTION: Construct a new City Public Works maintenance and operations center, combining all operational functions
at one location. Facility may also include a City Clerk & Police Records Center and Police evidence storage.
Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current
JUSTIFICATION: land for staging dirt and vactor materials is only temporary. Project includes selling dirt/vactor land, Minkler Shops,
and George Long Shops to acquire the real estate to build an equipment operations center that meets current
codes.
STATUS: Separate from the Public Safety Plan. Was formerly known as City Maintenance Facility.
MAINT. IMPACT: Improves safety and efficiency for First Responders and maintenance operations.
COMMENT:
Based on usage and benefits, it is estimated that the Water, Sewer, and Surface water enterprise funds will
fund 50% of the Public Works Shops with the other 50% funded by Streets, Facilities, & Equipment Rental.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
' Project Location
%(j ---------r
'
.7.
III.
,V
Design/PM
722
300
_
500
,
Ai- 1,,
moi
: N
1,522
Land (R/W)
25,462
r,
11111111k
%\.1
25,462
Const. Mgmt.
11
1,050
�R
+�'' j GIS
/
rgt..1
`AIN
30 St i"" • `' / \*
1,061
Construction
14
624
7,517
20,000
20,000
48,155
TOTAL EXPENSES
26,209
924
8,567
0
500
20,000
20,000
0
0
76,200
FUND SOURCES
Enterprise Funds
8,572
462
4,284
250
20,000
33,568
Councilmatic Bond
5,572
20,000
25,572
REET/ Funds
3,000
3,000
6,000
General Fund
462
1,283
250
1,995
306 Fund Balance
9,065
0
0
0
0
(20,000)
20,000
0
0
9,065
TOTAL SOURCES
26,209
924
8,567
0
500
20,000
20,000
0
0
76,200
2021 - 2026 Capital Improvement Program
56
17
' Project Location
%(j ---------r
'
.7.
III.
,V
_
,
Ai- 1,,
moi
: N
14 q
I r
r,
11111111k
%\.1
`
�R
+�'' j GIS
/
rgt..1
`AIN
30 St i"" • `' / \*
2021 - 2026 Capital Improvement Program
56
17
18
City of Tukwila
Alcan Ekberg, Mayor
Public Works Deaartrrrent — I -k ri ParMrrekanti, £ frectar/City Frrgrrreer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/ City Engineer
BY: Cyndy Knighton, Senior Program Manager
Scott Bates, Traffic Engineering Project Manager
CC: Mayor Ekberg
DATE: November 5, 2021
SUBJECT: Neighborhood Traffic Calming Program Project Update
Project No. 82110301
ISSUE
To bring forward Neighborhood Traffic Calming Program (NTCP) expenditures for 2021 and proposed projects for 2022.
BACKGROUND
At the October 18, 2021 Council Meeting, $100,000 in American Rescue Plan Act (ARPA) funding was allocated to the NTCP
program for 2021 and an additional $400,000 was allocated for 2022. Staff are presenting a detailed update on the status of the
program and proposed projects for 2021 and 2022.
DISCUSSION
Staff proposes to use the 2021 funding to make purchases of ten Radar Driver Feedback signs plus two portable Radar Driver
Feedback signs, and two Rectangular Rapid Flashing Beacon Crosswalk systems (RRFB). The radar signs wit be utilized at five
locations on the NTCP priority list (typically one for each direction). The two portable radar signs will be used as temporary
deployments as needed. The RRFB systems will be used at the two existing crosswalks on S.124th Street near the Tukwila
Community Center (additional design and construction costs will be required in 2022 for the RRFB installation).
For 2022, staff is still proposing to utilize the Top -10 NTCP Projects list (attached) to identify and implement traffic calming projects
and treatments within the allocated funding. The top ten projects were discussed in the August 23, 2021 TISC meeting, and due
to feedback from public comments an additional project was added — the Macadam Road South Sidewalk Improvements project.
A grant application has been submitted to the Transportation Improvement Board's Sidewalk Program for funding for the Macadam
Road South. Staff will continue to bring updates quarterly to the Transportation and Infrastructure Committee.
FINANCIAL IMPACT
Cost Estimates
Traffic Logix Radar signs $46,682.40
Western Systems RRFB units 26,414.68
Speed Cushions & Signs (previous purchase) 17,706.39
Total $90,803.47
2021 Budget
$100,000
RECOMMENDATION
Council is being asked to approve the Neighborhood Traffic Calming Program (NTCP) planned expenditures for 2021 and consider
this item on the Consent Agenda at the November 15, 2021 Regular Meeting.
ATTACHMENTS: Page 2, 2021 CIP
NTCP Priority Projects List
NTCP Priority Projects Map
Traffic Logix Quote
Western Systems Quote
19
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Traffic Calming/Residential Safety Improvements Project No. 8xx10301
Programmatic approach to addressing neighborhood traffic concerns through a variety of methods.
DESCRIPTION: Residential street improvements with sidewalks, safety improvements, and bike facilities.
JUSTIFICATION: Neighborhood revitalization by improving residential streets.
STATUS: Future candidates are listed in the citywide comprehensive update and safety -based prioritization of
residential street improvements, sidewalks, and bike lanes.
MAINT. IMPACT: Varies, depends on treatment(s) used.
COMMENT: Residential improvements and traffic calming features to reduce speeds and improve pedestrian and bicycle
safety such as the speed cushions, RRFB crossings, LED enhanced signs, Radar driver feedback signs, etc.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
Design
63
50
113
Land (R/W)
0
Const. Mgmt.
37
37
Construction
148
0
148
TOTAL EXPENSES
248
50
0
0
0
0
0
0
0
298
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
248
50
0
0
0
0
0
0
0
298
TOTAL SOURCES
248
50
0
0
0
0
0
0
0
298
2021 - 2026 Capital Improvement Program
2
20
Staff Top -10 Recommended NTCP Projects
Modified 11/2/2021
21
Project
Details Potential Treatment Options Estimated Cost Range
A
Allentown Neighborhood Speed and
Safety Study
Since 2018, five individual requests for traffic calming have been recorded in the NTCP list of requests; however, traffic complaints have
been made to the City over prior years. Addressing traffic safety concerns in Allentown is a top priority for the City.
Study neighborhood -wide volume, speed, classification
and safety issues. Design plan for Level 1 and Level 2
treatments throughout Allentown.
Level 1: Improved signage; radar feedback signs;
pavement marking modifications
Level 2: Curb extensions
$50,000-80,000
B
Tukwila Elementary School Safety
Since 2018, 12 traffic calming requests have been made in the Cascade View neighborhood, with a significant number of them near Tukwila
Improvements
Elementary School. Common complaints have been over speeding and crosswalk or pedestrian safety. Additionally, the Council has asked for
proactively addressing or anticipating concerns, specifically around school zones. Some improvements have been made around Tukwila
Elementary School already but more improvements are needed.
Address speeding and crosswalk safety concerns.
Level 1: Improved signage; radar feedback signs;
pavement marking modifications
$30,000-80,000
Level 2: Curb extensions; RRFB installation; ADA ramp
upgrades; improved illumination
C
Impact Charter School Safety
A request specific to the newly opened Impact Charter School was received in 2019. The request was to provide a signed school zone, which
Improvements
Tukwila has provided along with signs marking school crossings on 5 148th Street. ADA -compliant ramps have not been installed at the
marked school crossings. The charter school has expanded their site to the north with a need for consideration of a school zone on S 146th
Street and other potential improvements for children's safety. Additionally, the Council has asked for proactively addressing or anticipating
concerns, specifically around school zones.
Provide school crossing improvements, establish school
zone on 5 146th Street, if needed. Provide school crossing
improvements, observe operating speeds, if necessary
establish speed zone.
Level 1: Improved signage for school zones on 5 148th
Street and 5 146th Street; crosswalk installation
Level 2: ADA ramp improvements; curb extensions
$8,000-15,000
D
Cascade View Elementary School Safety
Since 2018, the Tukwila Hill neighborhood has seen 9 requests for traffic calming. Four of the locations are around the speeding, school
Improvements
crossing and pedestrian safety around the Cascade View Elementary School. 85th Percentile speeds of —30MPH in the 25MPH zones have
been recorded, but analysis to separate whether the speed'ng is even more than the posted school zone has not been done. Additionally, the
Council has asked for proactively addressing or anticipating concerns, specifically around school zones.
Upgrade School Zone signing, design and install
pedestrian crossing improvements.
Level 1: Improved signage for school zones on 5 148th
Street and 5 146th Street; crosswalk installation
$8,000-15,000
Level 2: ADA ramp improvements; curb extensions
E
Tukwila Community Center Pedestrian
The City Council has expressed desire for the NTCP to have a proactive element in addressing traffic calming and safety needs throughout
Crossing Safety Improvements
the City. The TCC is a well -utilized facility by the Allentown neighborhood as well as the entire City and surrounding area. Concerns over the
pedestrian crossings on 5 124th Street have been raised by staff and residents in the past, along with the larger complaints of speeding in
Allentown. Increasing pedestrian visibility to improve safety in this high -use area is a recommended top priority for the NTCP.
Design and install mid -block pedestrian safety
improvements on 5 124th Street.
Level 1: Improve pedestrian crossing signage
Level 2: RRFB installations; upgrade ADA ramps; curb
extensions; improved illumination
$80,000-100,000
F
Macadam Road Speed and Safety
At least five requests for traffic calming, specific to speeding (and some secondary reasons) have been made since 2018. A radar feedback
Improvements
sign was placed near the 13700 block in 2019 but requests have continued to be made. Additional analysis is warranted to determine what
other improvements could be used to address the speeding, especially where Macadam has extremely limited sight distance due to the curvy
nature of the roadway.
Design and install treatments addressing speeding and
curve safety north of S 144th Street.
Level 1: Improved signage; LED chevron signs;
channelization modifications
$10,000 - 30,000
Level 2:
G
Southcenter Boulevard/65th Avenue S
Staff identified the need for improvement pedestrian safety at this location several years ago. Southcenter Boulevard is a 5 -lane roadway
Pedestrian Safety Improvements
with known speeding issues along with curves that restrict sight distance. A high pedestrian usage at this intersection accessing the King
County Metro bus stop that services both the Rapid Ride F -Line and Route 150, both workhorses of the south County transit network, justifies
improving pedestrian crossing safety. This intersection is slated for full signalization in the future, but interim pedestrian safety
improvements should be considered sooner.
Design and install pedestrian safety improvements
Level 1: Improved signage for pedestrian crossing
$50,000-$90,000
Level 2: RRFB installation; ADA ramp upgrades; improved
illumination
H
City-wide Residential Speed Limit Review
As part of the City Council's expressed desire to proactively look at traffic calming needs, a full review of the residential street posted speed
limits is recommended by staff. State law establishes city speed limits at 25MPH unless an engineering study is completed to justify higher
speed limits. Most residential streets are posted at 25MPH today, but there are many that are posted at 30MPH or 35MPH. Likely, those
speed limits are legacies of past annexation areas, where a speed study was completed by King County. The general impression Staff has is
that most residents and elected officials would be happier with lower speed limits. City of Seattle has also recently lowered all speed limits
nearly city-wide to be 25MPH.
Identify residential streets with speed limits currently
above 25MPH. Conduct volume, speed and safety review.
Level 1: Modify speed limit ordinance; as needed; install
new signs; as needed.
$5,000-8,000
Recommend changes to speed limits, as necessary.
Level 2:
I
S Ryan Way Pedestrian Safety
Two requests for traffic calming to address speeding and pedestrian crossing safety in the Ryan Hill area have been made in 2021. New
Improvements
developments are coming forward that will increase the residential population of this part of the City with multi family developments. The
speed concerns, especially along S Ryan Way, coupled with the new housing developments increasing the likelihood of increased pedestrian
activity, warrants this analysis be recommended as a top priority.
Safety study on S Ryan Way from MLK Jr. Way to east city
limits, focusing on speeding and pedestrian safety.
Level 1: Improved signage
Level 2: Curb extension, improved illumination
$10,000-100,000
Recommend Level 1 and Level 2 improvements. Design
and construct improvements.
J
5 144th Street/46th Avenue S ADA Ramps
The Tukwila School District requested school crossing safety improvements at this intersection in 2017. A new Rectangular Rapid Flashing
Beacon was installed in early 2019. At the time the RRFB was installed, the City was also submitting a grant application for the 46th Avenue
5 Safe Routes to School project, which would improve pedestrian safety between this intersection south to 5 150th Street, and would include
either a raised pedestrian crosswalk at the RRFB or install ADA -compliant curb ramps. The grant was not awarded. State law requires ADA
ramps be brought up to current standards anytime a new signal, including the RRFB, is installed. Since grant monies for the larger
improvement are not expected in the short term, staff recommends this as a priority to comply with all state and federal laws regarding
Americans with Disabilities Act requirements.
Design and install ADA -compliant ramps at the
intersection.
Level 1:
Level 2: ADA upgrades to ramps at RRFB (not done at time
of RRFB installation due to budget constraints)
$15,000-20,000
K
PROPOSED
The City's watermain replacement project along Macadam Road between Southcenter Boulevard and 5 144th Street has been on the City's
Macadam Road S Watermain/Sidewalk
work plan for several years. In 2020, staff was directed to design the sidewalks for the missing sections along the east side of the road. In
Improvements Project
summer of 2021, the City submitted an application to the Transportation Improvement Board Pedestrian Safety grant as a way to fund the
construction of the sidewalks. Grant awards will be announced on or after November 19, 2021. The current plan is to advertise for
construction on November 29, 2021 with construction to begin in 2022. If the grant is not awarded to the City, funding for the sidewalk
construction is proposed to come from the 2022 NTCP budget. (Project added 11/2021)
Construct new sidewalks to complete gaps in the system,
including ADA compliant ramps at intersection
Level 1:
Level 2: Sidewalk construction with ADA compliant ramps
$240,000-345,000
Total Cost Range $506,000 - 822,000
21
Lake Washington
U:\PW Eng \GIS General Maps \Streets_11 x17_Sept2018.mxd
Date: 09/09/18 By: R. Linsao
City of
Tukwila
S
Not to Scale
Vicinity Map
King County
Disclaimer:
The location of features and boundaries
are approximate and are intended for
reference only. Data is based on best
information available.
TRAFFIC!
Traffic Logix Corporation
3 Harriett Lane
Spring Valley, NY 10977 USA
Tel: (866) 915-6449
Fax: (844) 405-6449
www.trafficlogix.com
Page I 1
Quote Number QUO-16991-Z7W5Y0
Created Date 10/26/2021
Expiration Date 11/26/2021
Prepared by Brett Ferrin
QUOTATION
Contact: Scott Bates
Phone: (206) 431-2193
Email: scott.bates@tukwilawa.gov
Shipping Address:
6200 Southcenter Boulevard
Tukwila, Washington 98188
United States
City of Tukwila, WA
Standard Features (Included) — Evolution Signs
• The Evolution radar feedback signs come with 1 year of unlimited cloud access. At the end of
this 12 month period the customer has the option to either renew the cloud at a cost of $400
per sign or resort back to a Bluetooth option at no cost.
• Sign powers down when no traffic present
• Programmable Speed Violator Flashing Strobe Light
• Ambient Light Sensor and Automatic Brightness adjustment
• Banding Mount Bracket
• Safe Pace Management Software
• Bluetooth
Special Notes
Sourcewell Contract # 070821-LGX City of Tukwila vendor ID# 37531
Quote Line Items — All Prices shown are in $USD
Product
Product Code
Quantity
Sales Price
Total Price
Evolution 15 Solar - Full Matrix - Includes
UMB
EV15FMEYL-SOLLA
10.00000
$3,500.00
$35,000.00
Radar sign dolly for mobile radar sign
use
SPDolly
2.00000
$800.00
$1,600.00
Evolution 12 Solar - Full Matrix - Inc.
Solar panel and battery
EV12FMEYL-SOLLA
2.00000
$2,900.00
$5,800.00
Totals
Subtotal
Freight
Sales Tax
Grand Total
$42,400.00
Included
$4,282.40
$46,682.40
23
TRAFFICL0(
Traffic Logix Corporation
3 Harriett Lane
Spring Valley, NY 10977 USA
Tel: (866) 915-6449
Fax: (844) 405-6449
www.trafficlogix.com
Page 12
Quote Number QUO-16991-Z7W5Y0
Created Date 10/26/2021
Expiration Date 11/26/2021
Prepared by Brett Ferrin
Terms: 1% - 10 Days - Net 30 We also accept: MC - VISA - AMEX
IF TAX EXEMPT: Please Provide Tax Exempt Certificate with Order
Delivery Requirements
Please Indicate the availability of the following as this determines the freight costs:
1. Do You have a Loading Dock? - Yes/No
2. Do you have a Fork Lift and Pallet Jack to unload? - Yes/No
3. Can access be gained by a 53 foot truck for delivery? - Yes/No
4. Is the delivery address a Construction site? - Yes/No
5. Is the delivery address a Military site? - Yes/No
6. If shipping to Military site, is a U.S. Driver required? - Yes/No
Quote Acceptance Information
Signature
Name
Title
Date
Thank you for choosing Traffic Logix. Please sign and return to:
bferrin@trafficlogix.com
Brett Ferrin
North America Sales Manager
(801) 391-8784
Please complete to set up new account: https://trafficlogix.com/business-application-form/
24
Western Systems
Innovative Transportation Solutions
1122 Industry Street, Bldg. B, Everett, WA 98203
Phone: (425) 438-1133 Fax: (425) 438-1585
Quotation
Date
Quote #
Rev #
11/01/21
Q-06652
Project
Agency:
Carmanah RRFBs (AC/Solar Mix)
City of Tukwila
Prepared For:
To place an order:
Contact: Scott Bates Phone: (206) 431-2193
Company: City of Tukwila
Email: scott.bates@tukwilawa.gov
Address: Attn: Accounts Payable600 Minkler Boulevard
City/State: Tukwila, WA 98188
Contact: Jason Spencer
Phone: +1 5039793042
Fax: (425) 438-1585
Email: jspencer@westernsystems-inc.com
This order is subject to the terms & conditions
Qty
Part #
Description
2.00
8530030054
CONTROL CABINET (SC315-G) AC, NATURAL FINISH
4.00
8530080115
LIGHTBAR WITH CONFIRMATION LIGHTS (INCLUDES UNIVERSAL MOUNTING
BRACKET) (BLACK)
4.00
8530080117
HARNESS,16FT, TERMINAL BLOCK TO LIGHT BAR, RRFB, SC315, TPE
2.00
7220083901
PUSHBUTTON iNX XWALK PPB W/9X12 R10-25 SIGN, NO BRAILLE, STANDARD
MESSAGE, BLACK (NO CONTROLLER REQUIRED)
2.00
8530038027
HARNESS, 16FT, POLARA iNX OR CAMPBELL GUARDIAN BUTTON,G- SERIES
2.00
8530030050
CONTROL CABINET (SC315-G) SOLAR, NATURAL FINISH
2.00
8530010300
BATTERY 35AH
2.00
8530010290
20 WATT SOLAR PANEL
2.00
8530010295
SIDE OF POLE MOUNT FOR 20 & 50 WATT SOLAR PANELS
2.00
8530010289
SOLAR PANEL HARNESS, MC4 TO SPADE TERMINALS, 8'
4.00
8530080115
LIGHTBAR WITH CONFIRMATION LIGHTS (INCLUDES UNIVERSAL MOUNTING
BRACKET) (BLACK)
4.00
8530080117
HARNESS,16FT, TERMINAL BLOCK TO LIGHT BAR, RRFB, SC315, TPE
2.00
7220083901
PUSHBUTTON iNX XWALK PPB W/9X12 R10-25 SIGN, NO BRAILLE, STANDARD
MESSAGE, BLACK (NO CONTROLLER REQUIRED)
2.00
8530038027
HARNESS, 16FT, POLARA iNX OR CAMPBELL GUARDIAN BUTTON,G- SERIES
1.00
Bundle - Pelco
4.00
7520010380
POLE SPUN ALUMINUM 4-1/2" SCHEDULE 40 14' LENGTH
4.00
7520030030
PEDESTAL BASE ALUMINUM SQUARE WITH ALUMINUM DOOR NO LOGO,
4.00
7520030200
COLLAR ASSEMBLY ALUMINUM FOR SQUARE BASE
4.00
7520040030
ANCHOR BOLT KIT 3/4" #10, SET OF (4) GALVANIZED
4.00
7520050110
POLE CAP DOME 4-1/2" OD ALUMINUM
8.00
7710030022
SIGN (CROSSING WALKING MAN) 36" X 36" FLUORESCENT YELLOW GREEN 3M VIP
SERIES 3983 (W11-2) .080 ALUMINUM
4.00
7710030042
SIGN (ARROW) 18" X 30" FLUORESCENT YELLOW GREEN 3M VIP SERIES 3983 (W16-
7PL) LEFT DOWN ARROW (W16-7PL) .080 ALUMINUM
1 of 4
25
4.00
7710030047
SIGN (ARROW) 18" X 30" FLUORESCENT YELLOW GREEN 3M VIP SERIES 3983 (W16-
7PR) RIGHT DOWN ARROW (W16-7PR) .080 ALUMINUM
Terms:
Freight Terms:
Material Lead Time:
Net 30
FOB DstFrt PP&ADD
See General Conditions below for exceptions and
changes to freight and lead time policies
Subtotal
Shipping
Tax 10.10%
Grand Total
$24,414.68
$0.00
$2,465.88
$26,880.56
2 of 4 26
All information contained within this quote is valid for 30 days from the date of the quotation. Thereafter, all prices and applicable charges
are subject to change. The acceptance of this quotation implies the acceptance of the following terms and conditions which cannot be
varied or waived except by express written authorization by a Western Systems representative. These terms govern the sale of goods and
services supplied by Western Systems. Differing terms from Buyer in any purchase order or written communication shall not be binding on
Western Systems.
Purchase Order: All purchases require a formal purchase order. Emails or verbal communication does not constitute an acceptable
purchase order.
Material lead time date is based after the release of the order. During the Covid-19 outbreak, Western Systems lead time dates will
be estimates based on our best information available.
Clarification on Shipping During Covid-19; FOB Destination and FOB Destination, Prepay & Add terms as quoted imply that the
customer will be available to receive material deliveries. Any repeated delivery attempts, trucking reroutes, en -route cancellations or
product factory returns which incur additional shiping costs shall be billed to the customer will be passed onto the purchaser.
Taxes/Fees: Unless current resale certificate is on file with Western Systems, purchaser shall be responsible for all tariffs, duties,
sales or use taxes in addition to the quoted prices herein. Any taxes listed are estimated totals and should be verified against local
requirements.
Payment Terms are based on approval of credit.
Western Systems imposes a surcharge of 2% on the transaction amounts when paying with a Visa or MasterCard. We are unable
to accept other credit cards for payment options. All prices are quotes in USD funds.
Non -Payment Penalties: If payment has not been received within terms, the purchaser will be considered in default. Western
Systems will be entitled, without prejudice to our other rights, without serving notice of default, to charge the purchaser for all costs
incurred such as administration, storage, legal advice etc. The unpaid portion of any amount due to Western Systems will bear
interest at the rate of 1.5% per month simple interest. Western Systems reserves the right to hold goods until customer balances
their account.
Western Systems will not be subject to any project retainage of any kind. Material purchases are due and payable upon receipt.
Unpaid balances will be subject to Non -Payment Penalties.
Collections: Upon Buyer default of these terms, Western Systems may, in addition to any other rights or remedies at contract or law,
declare the entire balance of Buyer's account immediately due and payable. If unpaid balance is referred for collections, Buyer
agrees to pay Western Systems, to the extent permitted by law, reasonable attorney fees in addition to all damages otherwise
available, plus any court costs or expenses incurred by Western Systems, plus any finance charges accrued on any unpaid balance
owed by Purchaser.
Deferment or Cancellation Policy: Order deferment or cancellation once materials have been released will be subject to cancellation
and/or restocking fees.
Documentation: Any operational documentation supplied as a part of this quotation remains the property of Western Systems and
may not be copied, reproduced, transmitted or communicated to 3rd parties without the express written consent of Western
Systems.
On -Site Services: On-site services such as signal or video system turn -on support shall be scheduled three weeks in advance. If
services need to be cancelled or postponed, any non -reimbursable travel expenses will be billed to purchaser. This quotation does
not provide nor imply any on-site support services unless mentioned specifically herein. If on-site support services are required, and
not included as part of this proposed scope of work, please contact Western Systems for a revised quotation.
Warranty: Standard one-year warranty on material goods manufactured or supplied by Western Systems from the date of
manufacturers factory shipment, unless superseded by an additional manufacturer's warranty, provided such goods are maintained
and operated in accordance with manufacturers standard method of operation. For additional information on Western Systems
warranty, please send an email to info@westernsystems-inc.com.
Return and Restocking Policy: Western Systems will be the sole source in determining whether any item is eligible for return. To be
eligible the item(s) must be standard product models, new and unused, in the original packaging, and invoiced within the last 90
days.
Restocking fees are applied to all returns and can vary between 20-50% based on annual sales activity. In no case will Western
Systems be obligated to take returns for materials, including items that are obsolete, custom orders, or past the 90 -day invoice
period.
3 of 4 27
Delivery Inspection: All materials deliveries must be inspected upon receipt from freight carrier. Any freight damages must be
reported to the carrier at the time of receipt of goods. Any materials shortages or inaccuracies in shipment must be reported to
Western Systems within ten days receipt of goods. Thereafter, any discrepancies will be considered incidental and the responsibility
of the receiver.
Force Majeure: Western Systems, Inc. shall in no event be responsible for delays in performance due to actions beyond its
reasonable control including without limitation acts of God, strikes, labor shortage or disturbance, fire, accident, war, civil
disturbance or carrier delays. Western Systems, Inc. accepts no liability for errors or omissions or the accuracy or the completeness
of this quotation. It has been prepared to the best of our knowledge per plans, specifications, documentation and communications
provided but we do not guarantee these to be accurate or of the latest revision. Determination of accuracy of this quotation and final
quantities are the sole responsibility of recipient. Western Systems, Inc. shall in no event be liable for any special, consequential,
incidental or liquidated damages (including without limitation damages for loss of use of facilities or equipment, loss of revenue, loss
of profits or loss of goodwill), regardless of whether seller (a) has been informed of the possibility of such damages or (b) is
negligent.
4 of 4 28
City of Tukwila
Allan Ekberg, Mayor
Pit be Works Deportment - Barr Parrnew rntl, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/City Engineer
BY: Adam Cox, Transportation Project Manager
CC: Mayor Allan Ekberg
DATE: November 5, 2021
SUBJECT: Annual Bridge Inspections and Repairs
Project No. 91610402
2021 Presentation on the State of the City's Bridges
ISSUE
Provide the Transportation and Infrastructure Services Committee with information about the status of the City's bridge
program and inventory, showing the overall condition of the City's bridges after completion of the 2021 inspections.
BACKGROUND
The Federal Highway Administration (FHWA) and Washington State Department of Transportation (WSDOT) require
regularly -scheduled inspections of all the City's vehicle -carrying bridge structures. The City extends this effort to include
its pedestrian bridges. This requirement allows for continuity in reporting, as well as the opportunity to identify and
potentially fund bridges in need of replacement and rehabilitation.
ANALYSIS
The City currently owns 23 bridges (16 traffic bearing and 7 pedestrian). Of those, two are jointly owned jurisdictional
bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent (S 196th/200). The bridge
structure types vary from steel through truss, pre -cast concrete girders, cast -in-place concrete girders, steel girder, wood
girder, and steel tied arch spans. The discussion will focus on why the City inspects its bridges, where the City stands
with respect to the state and the country, and recommendations for additional steps that can be taken to address known
issues. There were no new key findings or major concerns observed during the 2021 inspections.
The following structures were inspected in 2021:
Bridge Number
Bridge Name
Date Inspected
Tukwila 01
Macadam Road Bridge
4/27/2021
Tukwila 02
42nd Ave S Frank Zepp
4/7/2021
Tukwila 03
Lois T Newton Bridge
5/19/2021
Tukwila 06
Foster 56 Ave S Bridge
4/22/2021
Tukwila 07
51st Ave S Bridge
4/22/2021
Tukwila 08
Grady Way Bridge
4/13/2021
Tukwila 09
East Marginal Way Bridge
4/13/2021
Tukwila 11
Boeing Access Road over Airport Way
8/02/2021
Tukwila 12
Boeing Access Road over BNRR Bridge
4/14/2021
Tukwila 13
Beacon Ave S Bridge
4/8/2021
Tukwila 14
42nd Ave S Bridge
4/20/2021
Tukwila 16
S 119th Street Bridge
4/27/2021
Tukwila 24
Klickitat Bridge
4/22/2021
4001
196th/200th Street Bridge
4/7/2021
https://tukwilawa.sharepoint.com/sites/publicworks/engineeringlPW Drop Box/01 TIC Agenda/2021 Agenda Items/TIC 11-08-21/3. 2021 State of Bridges/Info Memo_State of Tukwila's Bridge's_2021 11 08.docx
29
Three bridge's sufficiency rating (SR) increased after the 2021 inspection cycle. The bridges that had an increase in SR
are the Boeing Access over Airport Way (Tuk 11), Boeing Access over BNRR (Tuk 12), and 196th/200th Street (4001).
Please refer to the following table for previous and current SR.
Bridge Number
Bridge Name
Previous SR
Current SR
Tukwila 11
Boeing Access over Airport Way
39.80
47.22
Tukwila 12
Boeing Access over BNRR
37.19
62.15
4001
196th/200th Street
59
89.80
FISCAL IMPACT
The cost for King County to perform the 2021 inspections was $30,469.40.
King County
Expended to date
Remaining Contract
RECOMMENDATION
Discussion only.
Contract Amount
$34,210.00
- 30,469.40
Attachments: Annual Bridge Inspection Report Summary
2021 City of Tukwila Bridge Inspection Letter
Map of Tukwila's Bridges
Annual Bridge Repair & Maintenance CIP page
$3,740.60
2021 Budget
$75,000
Phone; 2O6-433-1200 • Email: Mayor@TukwillaWA.gov + Website: TukwilaWA.gov
30
CITY OF TUKWILA
CITY ENGINEER'S BRIDGE INSPECTION REPORT
November 2021
Tukwila Urban Center Pedestrian Bridge
31
City of Tukwila
Public Works Department
6300 Southcenter Blvd
Tukwila, WA 98188
CITY ENGINEER'S BRIDGE
INSPECTION REPORT
November 2021
Hari Ponnekanti, P.E., PW Director/City Engineer
32
Table of Contents
Executive Summary
Forward
ii
Quick Bridge Reference iv
Bridges Recommended for Replacement/Rehabilitation 1
Bridges recommended for Major Maintenance 2
Posted Bridges 3
Bridges Recommended for Rail Retrofit 4
Bridges Repair Recommendations for Repair S
ADT (Average Daily Traffic) 6
Bridges Maintenance and Repair History 7
Annual Bridge Maintenance and Repair In-house Labor Hours 8
33
Executive Summary
The City currently has ownership of 23 bridges (16 traffic bearing and 7 pedestrian). Of those, two are jointly
owned jurisdictional bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent
(S 196th/200). The different types of bridge configuration vary from steel through truss, pre -cast concrete girders,
cast -in-place concrete girders, steel girder, wood girder, and steel tied arch spans.
Currently the City has a total of six (6) bridges that have a sufficiency rating between 80 to 100; seven (7) bridges
that have a sufficiency rating between 60 to 79; two (2) bridges that have a sufficiency rating between 40 to 59;
and one (1) bridge (42nd Ave S Bridge) that have a sufficiency rating of 39 or less. Note, pedestrian bridges do not
receive a sufficiency rating. Please refer to the Quick Bridge Reference sheet for the break down of city owned
bridges and the assigned sufficiency rating.
The sufficiency rating formula provides a method of evaluating highway bridge data by calculating four (4)
separate factors to obtain a numeric value which is indictive of bridge sufficiency to remain in service. The result
of this method is a percentage in which 100 percent would represent an entirely sufficient bridge and zero (0)
percent would represent an entirely insufficient or deficient bridge. The formula considers the structural
adequacy, functional obsolescence, level of service and essentiality for public use.
ii 34
Forward
The City Engineer's Bridge Inspection Report, dated November 2021, is published by the City of Tukwila Public
Works Department, and the information contained herein is the best available at the time of publication. It is to
be used as an information tool for planning and maintenance activities, and reflects the general condition of the
City's bridges. The repairs indicated are summarized for brevity from actual bridge inspection reports.
Background
The FHWA (Federal Highway Administration) issued the NBIS (National Bridge Inspection Standards) in 1971.
These standards established a comprehensive inspection for all federal highway system bridges. Minimum
qualifications were set forth for bridge inspectors. Specific types and frequencies of inspections for bridges were
established, and the reporting of certain standard information about each bridge was required. In 1978, these
requirements were extended to all public bridges carrying vehicular traffic.
A national bridge inspection program has been in place ever since, and state and local agencies have performed
bridge inspection in accordance with these guidelines. Inspections for the City of Tukwila's bridges are
conducted every two years unless conditions warrant additional inspections or frequencies as dictated by the
NBIS.
iii 35
Bridge Quick Check Informational Sheet
Bridge Number
Name
Year Built
Suff.
Rating
WSDOT Bridge
ID
ADT
Next
ADT
Reqd
Last Inspection
Next Inspection
Date
UBIT
Required
Last UBIT
Inspection
Next UBIT
Insp Reqd
Fracture
Critical
Special Notes
Tukwila 01
Macadam Road
1997
80.58
08674200
3,600
2024
4/27/2021
2023
N
-
-
N
Tukwila 02
Frank Zepp
1968
75.37
08561400
36,000
2022
4/7/2021
2023
Y
2021
2025
N
Tukwila 03
Lois T Newton
1973
79.56
08544400
18,900
2021
4/27/2021
2023
Y
2017
2023
N
Tukwila 05
South -center
Blvd
1994
4
96.98
00142690
10,616
2023
8/4/2020
2022
Y
2020
2026
N
Tukwila 06
Foster 56th Ave
1985
58.05
08166200
2,850
2024
4/22/2021
2023
Y
2017
2023
N
Tukwila 07
51st Ave South
1996
69.09
08634500
4,600
2024
4/22/2021
2023
N
-
-
N
Tukwila 08
Grady Way
1986
6F06
08543600
26,000
2024
4/13/2021
2023
Y
2018
2023
N
Jointly owned with City of Renton
Tukwila 09
E Marginal Way
1989
89.83
08110200
13,000
2024
4/13/2021
2023
Y
2017
2023
N
Tukwila 11Way
BAR Airport
1952
47.22
SD
08001800
40,000
2024
4/14/2021
2023
N
-
-
N
*See note below
Tukwila 12
BAR BNSF
1945
62.15
FO
08002500
40,000
2021
4/14/2021
2023
Y
2017
2023
N
*See note below
Tukwila 13
Beacon Ave S
1971
78.36
7996800
500
2020*
4/8/2021
2023
N
2017
2019
Y
Tukwila 14
42nd Ave S
1949
7.56
SD
86.36
08651500
10,300
2023
4/20/2021
2022
Y
2021
2023
Y
Awarded $1.5M for design in June 2021 and
$12M for construction in July 2021
Tukwila 15
Pacific Hwy
2000
08651500
30,300
2021
8/4/2020
2022
Y
2020
2026
N
Tukwila 16
S 119th
1965
--
08104300
NA
NA
4/27/2021
2023
N
-
-
N
Tukwila 17
Foster Golf
Course
1987
--
08584100
NA
NA
4/11/2019
2024
N
-
-
N
Tukwila 18
Green River
Ped & Utility
1983
--
08584200
NA
NA
8/18/2020
2026
N
-
-
N
Tukwila 19
Inter-urban
Trail
2006
--
08742500
NA
NA
9/11/2018
2023
N
-
-
N
Tukwila 20
180th Street
Trail
2001
--
08742600
NA
NA
8/19/2020
2026
Y
2016
2022
Y
Tukwila 21
Fort Dent Road
1975
63.00
08328300
1,115
2023
8/19/2020
2022
Y
2014
2020*
N
*Unable to perform UBIT inspection in 2020
due to COVID availability, will reschedule
Tukwila 22
Fort Dent Trail
2002
--
8718400
NA
NA
8/19/2020
2026
N
-
-
N
Tukwila 24
Klickitat
2012
lir
9FO93
08853600
14,024
2023
4/25/2019
2021
N
-
-
N
Tukwila
25
TUC Ped
Bridge
2018
-
8919000
-
-
2020
2025
Y
2019
2024
Y
4001
196-200th
1998
SFOO
Joi
08712100
17,406
2023
4/7/2021
2023
Y
2021
2027
N
Jointly owned with City of Kent
NOTES:
Sufficiency Rating is out of 100.
SD - Indicates the bridge structure is "Structural Deficient" as defined by the WSDOT (Washington State Department of Transportation) bridge inspection program. The structure is still safe for use by the public and the condition is being
monitored.
FO - Indicates the bridge structure is "Functionally Obsolete" as defined by the WSDOT (Washington State Department of Transportation) bridge inspection program. This designation only indicates the roadway geometrics do not meet
current standards for bridge design.
UBIT - Under Bridge Inspection Truck. This indicates the bridge needs special equipment in order to reach portions of the structure for inspection.
ADT - Average Daily Traffic
NA - Sufficiency ratings are not given on pedestrian facilities since they are not a part of the NBI system, a Suff. Rating of NA is given in that location.
All pedestrian bridges do not have a calculated sufficiency rating - they are not traffic loaded bridges and the rating numbers are not calculated per Federal Requirements.
*Traffic counts were not recorded in 2020 due to inconsistencies in traffic volumes.
iv
36
Bridges Recommended for Replacement or Rehabilitation
Bridge Number
Bridge Name
Location
Reason
Tukwila 14
42nd Ave South*
Allentown (42nd Ave)
Deteriorating Structural Condition of the steel superstructure
Note: See individual bridge reports in Public Works for detailed repair work.
* The City has been awarded two federal grants from PSRC and the Local Bridge Program for a total of $13.5M
1 37
Bridges Recommended for Major Maintenance
Bridge Number
Bridge Name
Location
Reason
Tukwila 16
South 119th Pedestrian Bridge
119th Str (Allentown)
Painting/Epoxy of entire structure with possible rot repair
as encountered
Tukwila 18
Green River Pedestrian and Utility
Interurban Trail near 180th
Rehabilitation of structure coating and timber rot repair
and replacement
2 38
Posted Bridges
Bridge Number
Bridge Name
Location
Reason
Tukwila 14
42nd Ave South
Allentown
Bridge is posted for reduced truck speed and posted for
reduced loading on AASHTO Type 3 trucks and 6 and 7
axle vehicles.
Note: See individual bridge reports in Public Works for detailed repair work.
3 39
Bridges Recommended for Rail Retrofit
Bridge Number
Bridge Name
Location
Reason
Tukwila 1
Macadam
Macadam Road
Provide Guardrail, terminal and transitions that meet current
standards
Tukwila 2
Frank Zepp
180th Street
Provide bridge rail that meet current standards
Tukwila 3
Lois T Newton
Stander Boulevard
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 6
Foster 56th Ave South
56th Avenue South
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 8
Grady Way
Grady Way
Provide Guardrail, terminal and transitions that meet current
standards
Tukwila 9
East Marginal Way
East Marginal Way
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 11
Boeing Access Road - Airport Way
Boeing Access Road
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 13
Beacon Ave South
Victor Street
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 14
42nd Avenue South
42nd Avenue South
Provide Guardrail, terminal and transitions that meet current
standards
Note: See individual bridge reports in Public Works for detailed repair work.
4
40
Bridges Repair Recommendations
PRIORITY CODE 'A'
Highest Priority - Structural integrity and safety involved.
PRIORITY CODE 'B'
Regular Priority - General bridge structural repair work not requiring immediate response.
PRIORITY CODE 'C'
Low Priority - General minor maintenance or other work to be accomplished as time and money permit.
PRIORITY CODE 'M
Monitor - The repair or item described needs to be monitored at the rate indicated.
Note: See individual
bridge reports in Public Works for detailed repair work.
Bridge Number
Bridge Name
Location
Repair Recommendations
Priority
Inspection
Date
Tukwila 1
Macadam
Macadam
1. No repairs recommended at this time.
NA
27 -Apr -21
Tukwila 2
Frank Zepp
180th Street
1. Remove timber planks and plywood between stringers at span 3.
2. Replace bearings at Pier 3 girders I, J, and K
B
B
7 -Apr -21
Tukwila 3
Lois Newton
Strander Blvd
1. No repairs recommended at this time.
NA
27 -Apr -21
Tukwila 5
South center
Blvd
SC Blvd
1. Rreplace missing block spacer on guardrail post
2. Fix broken light above pile 2c
3. Trim the trees on the north side of the bridge.
C
B
B
4 -Aug -20
Tukwila 6
Foster 56th
Ave S
56th Ave S
1. Fill scour void under SE wingwall
2. Replace expansion joint material
3. Repair damaged guardrail terminal end
4. Develop scour action plan
B
B
B
B
22 -Apr -21
Tukwila 7
51st Ave S
51st Ave S
1. Apply deck sealer to prevent ponding water to leak in to the box girders
2. Repair spalls at north expansion joint
3. Investigate waterline in box girder
4. Repair northwest rail terminal
5. Remove trees at Pier 2
B
B
A
B
B
22 -Apr -21
Tukwila 8
(Renton -Tukwila
Joint Ownership)
Grady Way
Grady Way
1. Repair vertical sliding surfaces on columns
2. Repair damage bridge rail (spalling and delamination's)
3. Clean plugged Drains at NW approach
4. Repair pedestrian fencing
5. Clear out material between bearings at Abutment 1
6. Repair metal bridge rail at NW approach
7. Remove vegetation on retaining wall
8. Clear sidewalk debris
B
B
B
B
B
B
C
C
13 -Apr -21
Tukwila 9
E Marginal
Wa y
E Marginal Way
1. Replace compression seals at expansion joints
2. Develop scour plan
3. Secure access hatch at south side
B
C
A
13 -Apr -21
Tukwila 11
BAR Airport
Way
Boeing Access
Road
1. Repair bridge rail damage
2. Roughen approach slabs
B
C
14 -Apr -21
Tukwila 12
BAR BNSF
Boeing access
road
1. Repair the southeast approach rail.
2. Clean bridge deck and sidewalk
B
M
14 -Apr -21
Tukwila 13
Beacon Ave
South
At Victor Street
1. Repair interior lighting.
B
8 -Apr -21
Tukwila 14
42nd Ave S
42nd Ave 5
1. Clean out open joints over floor beams thoroughly and fill with a flexible sealant, priority 1 due to corrosion at top flanges of floor beams from leaking
joints.
2. Rework the sliding plate expansion joint so it is smooth with sidewalk and patch spalls near panel points, seal open cracks.
3. Replace missing guard rail and terminal at SW corner, replace damaged rail at SE corner, reset NW rail and posts to bring rail up to standard height.
4. Thoroughly pressure wash clean truss of all dirt/algae/guano, prepare surface, paint bridge to encapsulate pack rust and protect truss members. Add bird
deterrent at all panel points, upper and lower chords.
5. Replace steel sliding plate expansion joints with either a strip seal with steel header or modular joint to eliminate water intrusion onto steel bearings.
6. Recommend design seismic retrofit steel collar and construct around bearing columns, anchored to cap, then fill tight with epoxy.
7. FRP wrap columns 4 A -C. Reinforce west wingwall. Add quarry spall along abutment 4 and under span 3 to retain fill and discourage transient activity.
8. Replace missing riprap along banks and in front of piers.
9. Recommend raising portals and sways due to the high volume of truck traffic and existing damage to sway members.
10. Replace sliding plates with elastomeric dynamic isolation bearings.
11. Chip any delaminated concrete from exposed rebar, clean and seal exposed bar and patch spalls. Sack honeycombed areas throughout soffit. Shotblast
deck surface, patch spelled areas and apply epoxy overlay.
12. Replace broken gas pipe couplers.
h CO CO CO 03 CO 03 CO 03 CO CO 03 CO
20 -Apr -21
Tukwila 15
Pacific Hwy
Pacific/TIB at
Duwamish
1. Repair leaky pipe inside the west girder
2. Arrest channel erosion along the south bank
3. Repair the approach guardrails at the southwest, southeast, and northeast ends
4. Apply epoxy overlay on the bridge deck
5. Spot paint at slice locations to extend paint life
< < 03 U CO
4 -Aug -20
Tukwila 16
S 119th
Pedestrian
5 119th Street
1. Repair warped and twisted deck planks, deck has non-skid coating but timber is still weathered
2. Major rehabilitation or replacement in near future
3. Special inspection requested to inspect the underside of the superstructure
4. Replace areas of top boards
B
A
A
A
27 -Apr -21
Tukwila 17
Foster Golf
Course
Foster GC
1. Monitor bearing movement at Abutment 1
2. Remove blackberry bushes under the bridge
M
C
11 -Apr -19
Tukwila 18
Green River
Interurban trail
near 180th
1. Monitor utility pipe alignment
2. Repair chord patching material debonding
3. Repair and replace rotting timber pedestrian rail
4. Paint entire superstructure
5. Perform in-depth inspection
M
B
B
B
M
19 -Aug -20
Tukwila 19
Interurban Trail
Interurban Trail
1. No repairs noted
11 -Sep -18
Tukwila 20
180th Ped
Interurban trail
at 180th
1. Monitor leaching cracks in abutment and retaining walls
2. Remove debris from bearing seat
3. Repair approach settlement
4. Repair broken conduit splices
5. Replace and repair approach bollards
M
C
B
B
B
19 -Aug -20
Tukwila 21
Fort Dent Road
Fort Dent Road
1. Trim vegetation overhanging along sidewalk
2. Repair/replace wire cover plate at the NE approach
3. Post clearance at trail undercrossing under Span 3
C
C
C
19 -Aug -20
Tukwila 22
Fort Dent Trail
Interurban trail
1. Trim overgrowing vegetation at approaches
2. Remove debris on chords of bridge girders
3. Replace missing safety chains at corners of bridge
4. Replace popped bolts at diagonal bracing
5. Smooth out approach pathway at approach header
C
M
B
B
B
19 -Aug -20
Tukwila 24
Klickitat Drive
Klickitat Drive
1. No repairs noted
NA
22 -Apr -21
Tukwila 25
Tuk Urban Ped
Bridge
Green River
Trail
1. No repairs noted
NA
27 -Oct -20
4001 (Kent-
Tukwila Joint
Ownership)
196 -200th
196th Street
1. Repair joints and seals
2. Clean deck drains
B
B
7 -Apr -21
5
41
Bridge Average Daily Traffic (ADT)
Bridge
Number
Name
Year Built
Structure ID
ADT
Next ADT Reqd
(5 yr Cycle)
Tukwila 01
Macadam Road
1997
08674200
3,600
2024
Tukwila 02
Frank Zepp
1968
08561400
36,000
2022
Tukwila 03
Lois T Newton
1973
08544400
18,900
2021
Tukwila 05
South -center Blvd
1994
0014269D
10,616
2023
Tukwila 06
Foster 56th Ave
1985
08166200
2,850
2024
Tukwila 07
51st Ave South
1996
08634500
4,600
2024
Tukwila 08
Grady Way
1986
08543600
26,000
2024
Tukwila 09
E Marginal Way
1989
08110200
13,000
2024
Tukwila 11
BAR Airport Way
1952
08001800
40,000
2024
Tukwila 12
BAR BNSF
1945
08002500
40,000
2021
Tukwila 13
Beacon Ave S
1971
7996800
550
2020*
Tukwila 14
42nd Ave S
1949
08651500
10,300
2023
Tukwila 15
Pacific Hwy
2000
08651500
30,300
2021
Tukwila 21
Fort Dent Road
1975
08328300
1,115
2023
Tukwila 24
Klickitat
2012
08853600
14,024
2023
4001
196 -200th
1998
08712100
17,406
2023
*Traffic counts were not recorded in 2020 due to inconsistencies in traffic volumes.
6
42
2010 - 2020 Bridges Maintenance and Repair History
Bridge
Number
Bridge Name
Year
Amount
Repair/Maintenance
Tukwila 2
Frank Zepp
2015
$2.6M
Paint steel, deck overlay, replace deck joint,
seismic protection
Tukwila 8
Grady Way
2015
$350K
Seismic protection
Tukwila 11
Boeing Access
Road - Airport
Way
2021
$1.6M
Siesmic Retro Fit
Tukwila 12
Boeing Access
Road BNRR
2019
$10M
Siesmic Retrofit and deck repair
Tukwila 13
Beacon Ave
South
2015
$1.1M
Replace bridge deck and paint steel
Tukwila 14
42nd Avenue
South
1994
*
Paint Truss
Tukwila 14
42nd Avenue
South
2017
$17k
42nd Ave S Bridge Structural Assessment
Tukwila 14
42nd Avenue
South
2020
$39K
In-depth inspection beyond the King County
inspections
Tukwila 16
S 119th St
2015
$100K
Paint and timber repair,
Tukwila 18
Green River
2007
$100K
Paint and timber repair
Tukwila 18
Green River
2008
$126K
Paint and timber repair
4001
196th/200th
2019
$500K
Approach Slab repair
* Unable to verify cost as project cost data is typical kept for 6 years and project was performed before the City's
current project tracking system
7 43
Annual Bridge Maintenance and Repair In-
house Labor Hours
Year
Hours
2011
45
2012
35
2013
167
2014
108
2015
131
2016
283
2017
121
2018
126
2019
151
2020
62
Annual Average
122.9
Total
1229
8
44
DocuSign Envelope ID: 197832D5 -6C1 E-45C0-A9A2-4A4C3281 BC3E
King County
Road Services Division
Department of Local Services
201 South Jackson Street
KSC-LS-0315
Seattle, WA 98104-3856
www.metrokc.gov/roads
September 3, 2021
Hari Ponnekanti
Public Works Director
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188-2544
RE: Inspection of City of Tukwila Bridges
Dear Mr. Ponnekanti:
King County bridge engineers inspect the bridges owned by the City of Tukwila, in
accordance with agreements between the City of Tukwila and King County Depai linent of
Local Services. The bridge inspections were conducted as follows:
Under Bridge Inspection Truck (UBIT)
April 7, 2021 No. TUKxNx02, Frank Zepp Bridge
No. 4001 196th — 200th Street Bridge
April 20, 2021 No. TUKxNx14, 42nd Ave South Bridge (FC)
Fracture Critical (FC) Inspections
April 08, 2021 No. TUKxNx13, Beacon Ave South Bridge (FC)
Routine Inspections
April 13, 2021
No. TUKxNx09, East Marginal Way Bridge
No. TUKxNx08, Grady Way Bridge
April 14, 2021 No. TUKxNx12, Boeing Access Road
No. TUKxNx11, S Bar Over Airport Way
April 22, 2021 No. TUKxNx24, Klickitat Bridge
No. TUKxNx06, Foster 56th Ave South Bridge
No. TUKxNx07, 51' Ave South Bridge
April 27, 2021 No. TUKxNx01, Macadam Road Bridge
No. TUKxNx03, Lois T Newton Bridge
No. TUKxPx16, South 119th Ped Bridge
August 02, 2021 No. TUKxNx11, S Bar Over Airport Way
45
DocuSign Envelope ID: 197832D5 -6C1 E-45C0-A9A2-4A4C3281 BC3E
Hari Ponnekanti
September 3, 2021
Page 2
Enclosed are the reports from the bridge inspections and the actions we recommend you take
to maintain the bridges. We submit the data in the report to Washington State Department of
Transportation (WSDOT), in accordance with state and federal laws, to inform them of the
bridge's condition and to assure them the bridge has been inspected on a timely basis. The
information is incorporated into state and federal databases.
The bridge inspection report is divided into three main sections. The first section consists of
three parts: the National Bridge Inspection Standards (NBIS) elements, Load Capacity
Information, and Inspections Performed. The NBIS fields, which are numbered 1657 to 1687
are used for rating the components of the bridge. In general, the codes rate the components
from eight (best) to one (worst); however, other rating scales apply to some of the fields in
this first section. Explanations of these codes are found in the Washington State Bridge
Inspection Manual (http://www.wsdot.wa.gov/TA/Operations/BRIDGE/BIC.html).
The second section of the report, Bridge Management System (BMS) Elements, lists
quantities and rates them, breaking down the condition of each component into categories that
indicate how widespread a component is deteriorated. State 1 is best; State 4 is worst.
The third section consists of three parts: Notes, Repairs, and Inspection Resources Required.
The Notes section is comprised of information that provides details of the numbered fields in
the first two sections. Please note that any deficiencies listed in the "Repairs" section are
prioritized between 1 - High priority, and 3 - Low priority. The Resources Required section
indicates any special equipment or tools used to inspect the bridge.
I hope this letter helps you in reviewing these inspection reports. We recommend that the City
of Tukwila bridges continue to be inspected on a 24 -month schedule. Our next scheduled
inspections of the City of Tukwila Bridges will be in spring 2022. Please call Margaret
Germeaux at 206-477-3539 if you need any additional information. We appreciate assisting
your city with bridge engineering and inspection services.
Sincerely,
DocuSigned by: ''''
1 j ra U``
38420FF2A3BC444...
Larry Jaramillo, P.E.
Managing Engineer
Bridge and Structural Design Unit
LJ:MH:mr
Enclosures
cc: Rey Sugui, Program Analyst, Road Services Division (RSD), Department of
Local Services (DLS)
Margaret Germeaux, Engineer III, Bridge and Construction Unit, RSD, DLS
(w/ enclosures)
46
f
III
s
SEATTLE
L
Nth
414L,
B URIEN
S 128th
H
I
S 160th Ste)
e)
5164
aIS 161s
1
IIF
168th St
Wig BlvdCorporat
Crporat
Minkler Blk'd
Js
� = i
3
1 RENTON
Upland Dr
Midland D
Costco Dr
Triland Dr
0
180th St
Dr
U:\PW Eng \ GIS \General Maps\Bridges_24x36_Aug2018.mxd
Date: 09/04/18 By: R. Lingo
KENT
City of
Tukwila
Bridges
S
Not to Scale
NBIS Vehicle Bridges
1) Macadam Road
2) Frank Zepp Bridge (S 180th St)
3) Louis T. Newton Bridge (Strander Blvd)
4) Southcenter Green River Bridge
5) Foster 56th Ave S
6) 51st Ave S
7) East Marginal Way
8) Boeing Access Road Bridge over Airport Way
9) Boeing Access Road Bridge over BNSF
10) Beacon Ave S
11)42nd Ave S
12) Pacific Highway/TIB
13) Fort Dent Park Bridge
14) Klickitat Drive
Jointly Owned NBIS Vehicle Bridges
15) Grady Way (Renton)
16) S 196th SLS 200th St (Kent)
Pedestrian Bridges
17) S 119th Pedestrian Bridge
18) Foster Golf Course Bridge
19) Green River Pedestrian and Utility Bridge
20) Interurban Trail Bridge
21) S 180th Pedestrian Bridge
22) Fort Dent Trail Bridge
23) TUC Pedestrian Bridge
24) Klickitat Elevated Walkway
Vicinity Map
Disclaimer:
The location of features and boundaries
are approximate and are intended for
reference only. Data is based on best
information available.
CITY 0 TUKW LA CAPITAL PRO ECT SUM RY
2021 o 026
PRO ECT: nnual Bridge Inspections and Repairs Project No. 9XX10402
DESCRIPTION: 0 going program of bi-annual inspections, repairs, painting and rehabilitation of the 22 City bridges.
Federally required program identifies safety or repair needs in the early stages to m nim ze hazards and
JUSTIFICATIO : costs. The num er of bridge inspections necessary each year can vary year to year. Inspection frequencies
vary from bridge to bridge and King County has provided som inspection services.
STATUS: Construction projects will be determ ned from inspection reports and noted deficiencies/problem .
M INT. IM ACT: Reduces m intenance costs.
CO NT: 0 going project, only one year actuals are shown in the first colum .
FINANCIAL
(in $000's)
hrough stim ted
2019 2020
021 022 023 024 025 026 BEYO D 0 AL
EXPENSES
Inspections
111
5
5
5
10
15
20
25
30
906
Land (R/W
0
Const. M .
3
0
5
5
5
5
5
158
Construction
314
50
5
0
5
0
5
889
TO AL EXPENSES
68
35
5
5
00
00
00
00
00
,953
FUND SO RCES
Awarded G ant
Proposed G ant
0
M tigation Actual
0
M tigation Expected
0
City 0 er. Revenue
68
35
5
5
00
00
00
00
00
,953
TO AL SO RCES
68
35
5
5
00
00
00
00
00
,953
2021 - 2026 Capital Im rovem nt Program
13
48
City of Tukwila
Allan Ekberg, Mayor
Prlbk Works 0Epartrnent - Harr Pcrrpekcwntr, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/City Engineer
BY: Mike Perfetti, Surface Water Sr. Program Manager
CC: Mayor Ekberg
DATE: November 5, 2021
SUBJECT: Surface Water Fund — Duwamish River Basin Steward
Draft Proposal for a Duwamish Basin Steward
ISSUE
To bring forward a draft proposal for the City to be party to an interlocal agreement supporting a new Duwamish Basin
Steward position.
BACKGROUND
King County's Basin Stewards are a team of professionals knowledgeable about community and natural resources in specific
King County watersheds. They work with communities to steward natural resources, protect and restore habitat and
coordinate volunteer efforts.
DISCUSSION
The Duwamish Basin Steward would work to develop and implement Chinook salmon habitat restoration projects in the
Duwamish River in coordination with tribes, landowners, local jurisdictions, agencies and non-profit partners. The position
would support efforts to acquire property (fee or easement) and restore shallow water rearing habitat, leveraging available
funding to maximize the environmental benefits. The steward would serve to coordinate partners and add to partner capacity
toward common goals, communicate to the public about salmon recovery, and serve as a point person for Duwamish projects
and planning efforts. Additionally, the steward would work to ensure the interests of underserved communities within the
Duwamish Basin are represented in conservation and habitat restoration projects.
FISCAL IMPACT
The projected loaded cost of the Duwamish Basin Steward position, including a support budget, is $210,000. It is anticipated
that Tukwila's annual contribution would be $26,000. For 2022, $10,000 of this position will funded by remaining budget in the
WRIA 9 2021/2022 CIP and $15,000 from Surface Water Enterprise Fund. Starting in 2023, ongoing costs for this position will
be included in the Surface Water budget process.
ILA Partner
Annual Contribution
2022 Contribution
King Co.
$79,000
$66,500
Seattle
$79,000
$66,500
Tukwila
$26,000
$26,000
Port of Seattle
$26,000
$26,000
WRIA 9
$0
$25,000
Total
$210,000
$210,000
RECOMMENDATION
Discussion only.
Attachments: King County Basin Stewards web page
Duwamish Stewardship Proposal, July 2021
2021 CIP Page 81
49
King County Basin Stewards - King County https://kingcounty.gov/services/environment/watersheds/general-informa...
kig King County
King County Basin Stewards
Water and Land Resources Division
Who are the Basin Stewards?
Greg
Rabourn
y �r
1'.• ,rr
Judy Blanco
Denise
_Pi Sang
Katie
Beaver
Gmer,
,rat
L.
c_
Judy Blanco
6•sam c,,r,
Andrea Mojzak
low, Snoqu A r, e
Josh Kahan
South Folk Skykatmh
Denise Di Santo
Uppn 5410pue m,e
Snoqualmie River downstream of Snoqualmie Falls
Andrea Mojzak, 206-263-7934
................................
Snoqualmie River Forks, South Fork Skykomish River, Bear Creek
Denise Di Santo, 206-263-0259
Cedar River, Issaquah Creek in unincorporated areas
Judy Blanco, 206-263-8445
Middle Green River, White River in unincorporated areas
Josh Kahan, 206-477-4721
Lower Green River
Katie Beaver, 206-263-0951
�r-
50
1 of 3 10/26/2021, 3:15 PM
King County Basin Stewards - King County https://kingcounty.gov/services/environment/watersheds/general-informa...
Miller/Walker Creeks
Stewardship jointly funded by King County, Burien, Normandy Park, SeaTac, and Port of Seattle.
Matt Goehring, 206-263-6826
Vashon Island & Maury Island
Greg Rabourn, 206-477-4805
For stewardship information regarding other parts of King County or to learn more about the
overall basin stewardship program, contact Janne Kaje, Watershed Stewardship Program
Manager at 206-477-4078.
What is the Basin Steward Program?
Basin Stewards are a team of Water and Land Resources (WLR) Division professionals
knowledgeable about community and natural resources in specific King County watersheds.
They use a number of approaches to work with landowners and other public agency officials to
protect local habitats:
• Responding to residents requests for information regarding stream basin health and
conditions.
• Providing direct "on -the -ground" technical service to rural community members to
improve and protect watersheds, streams, and rivers.
• Building relationships with community members that make construction of restoration and
other capital projects possible.
• Working closely with community members and staff from other public agencies to
implement WRIA and other conservation plans by coordinating and obtaining grant
funding for important habitat protection and restoration projects.
How the Stewards can help you:
Stewardship
The Basin Stewards work with residents to answer questions about best management practices,
regulations, wildlife concerns, land conservation, habitat restoration, and water quality
concerns.
Habitat protection and restoration
The Basin Stewards work with residents and technical staff to develop and implement priority
habitat protection and restoration projects in critical habitat areas along our rivers and streams.
They can help streamside landowners identify resources including funding for habitat
protection.
Volunteer opportunities
The Basin Stewards work with other County staff to coordinate volunteer efforts to restore
streamside habitat areas.
• Sign-up for volunteer announcements
51
2 of 3 10/26/2021, 3:15 PM
King County Basin Stewards - King County https://kingcounty.gov/services/environment/watersheds/general-informa...
[Enter email address Subscribe
Get in touch with your WLR Basin Steward. They are
there for you!
• Let the WLR Division know if you have an idea that might improve or protect surface
water resources near your home
• Learn about volunteer opportunities in your watershed
• Learn about ways to protect habitat
Related information
• King County watersheds map
• King County environment
Related agencies
• Department of Natural Resources and Parks
..................................................................................................................................................................
• Water and Land Resources Division
• Parks and Recreation Division
Last Updated October 23, 2020
52
3 of 3 10/26/2021, 3:15 PM
Duwamish Stewardship Proposal
July 20, 2021
Duwamish Stewardship Gap
The Green/Duwamish and Central Puget Sound Watershed (WRIA 9) includes five distinct geographic
sub watersheds: Upper Green, Middle Green, Lower Green, Duwamish, and Vashon/Maury Island. King
County basin stewards currently serve the Middle Green basin, Lower Green basin, Vashon/Maury
Island, and a subbasin—Miller/Walker Creek (See Figure 1). Stewards are not working in the Upper
Green or the Duwamish River. This request focuses on the Duwamish as a priority.
The Duwamish River—the lowest eleven miles of the Green/Duwamish River watershed-- lies mainly
within incorporated areas. The Duwamish basin is unique in many ways, including its critical
transitionary role for juvenile salmon adapting to salt water conditions; its mostly industrial land use;
history of contamination and ongoing clean-up efforts; its diverse and historically marginalized
communities; and unique challenges for habitat enhancement or creation because of extensive
urbanization.
Stewards' duties vary from basin to basin, and can include planning and prioritizing open space
acquisitions and habitat restoration projects, coordinating with local jurisdictions and non-profit
partners, pursuing grants and other restoration funding sources, coordinating community science and
monitoring efforts, and engaging the public both to convey and receive input on priority work. These
roles are critical for advancing salmon recovery in the watershed. Without a Duwamish Basin Steward,
opportunities for land acquisition and habitat restoration have been left untended and have been lost to
development of incompatible uses.
Currently, there is no coordinated approach to salmon recovery and project implementation in the
Duwamish basin beyond the watershed -wide work of the WRIA 9 team. While the WRIA 9 team can
support and help fund projects, the WRIA 9 team is not designed to drive project development and
implementation without both willing landowners and engaged project sponsors'. Because of the
complex and unique nature of the basin, the stewardship duties cannot simply be added to an existing
steward's workload. Despite the work of multiple entities implementing habitat related improvements
in the Duwamish (i.e., Seattle, Tukwila, Port of Seattle), there is no one entity focused on coordination
and collaboration to leverage efforts to maximize ecological lift. Given the collective investment
projected within the watershed over the next decade, a steward would help maximize the opportunities
and benefits to the watershed.
Role of Duwamish Basin Steward
The Duwamish Basin Steward would develop and implement Chinook salmon habitat restoration
projects in the lower eleven miles of the Green-Duwamish River in coordination with tribes, willing
landowners, the local jurisdictions, the Port of Seattle, Boeing, WRIA 9, and non-profit partners. Salmon
recovery priorities in the Duwamish include enhancing juvenile salmon rearing and off -channel refuge
1 Project sponsors initiate projects and manage to completion all aspects of project development and
implementation, including communication and coordination of stakeholders, strategic phasing and sequencing,
and grant writing and funding strategy development.
53
habitat, removing bank armor when feasible, adding large wood, and planting native riparian
vegetation. The position would help support efforts to acquire property (fee or easement)2 and restore
shallow water rearing habitat, leveraging available funding to maximize the environmental benefits of
both NRDA-driven habitat projects and locally sponsored, plan driven projects. Additionally, a steward
could work with private business to promote creative solutions for stormwater management, riparian
restoration, and conservation easement options. The Duwamish Basin Steward would also serve to
coordinate partners and add to partner capacity toward common goals, communicate to the public
about salmon recovery, and serve as a point person for Duwamish projects and planning efforts.
Additionally, the steward would work to ensure the interests of underserved communities within the
Duwamish Basin are represented in conservation and habitat restoration projects.
Duwamish Steward Position Description
The Duwamish Basin Steward would identify opportunities to protect and restore habitat along the
Duwamish River and its associated tributaries, working collaboratively with key partners and engaging
with the community. The ideal candidate would have excellent communication skills, be politically savvy,
and comfortable working with a wide variety of stakeholders including businesses and federal partners.
Job duties would include:
- Coordinate salmon recovery and habitat protection in the Duwamish with key salmon recovery
partners, working to implement the Duwamish Blueprint, the WRIA 9 Salmon Habitat Plan,
SCAP, WQBE and other County priorities
- Coordinate with diverse partners to achieve common goals including acquisition, riparian
restoration, noxious weed management, shallow water habitat creation, stormwater solutions,
and clean-up of legacy contamination
- Support open space preservation and capital project priorities in partnership with jurisdictions
Identify funding sources and write grants for acquisition, revegetation, and habitat restoration
- Focus on equity and social justice and work closely with the City of Seattle and Duwamish
community to advance equity through their Duwamish Valley Action Plan, with Port of Seattle
through their Duwamish Valley Community Equity Program, and the City of Tukwila's Equity
Policy
Serve as point person for Duwamish-related planning efforts and priorities as they arise
- Manage and track restoration projects and environmental monitoring efforts occurring
throughout the basin with the goal of increased coordination across multiple partners
Help identify efficiencies in permitting and partnerships, especially where restoration is multi -
jurisdictional
- Accelerate riparian revegetation work in the Duwamish and its tributaries
- Work with business and residential landowners to take voluntary action along their shoreline,
including riparian planting and stormwater retrofits
Build relationships with community groups actively engaging underserved communities in the
service area
Proposed Geographic Scope of Work:
2 Property would not be held by King County in incorporated areas.
54
The Duwamish Basin Steward position would focus on the Duwamish basin, highlighted in yellow in
Figure 1. The position would work on the lower eleven miles of the Green-Duwamish River and the
Duwamish tributaries.
King County has a related interest in bringing stewardship capacity to its urban unincorporated areas of
North Highline and Skyway, focused on property acquisition and habitat restoration. If the scope of this
position were to include those responsibilities, an expanded geographic scope is shown below in dark
blue.
I Greg
Rabou
Duwamish River
Basin
MiIIer/walkel
Bas1n Katie
Beaver
North Highline & Skyway
unincorporated areas
Josh Kahan
Figure 1. Proposed geographic extent of Duwamish Steward position
Key Partners and Programs
...rosy..`
Considering the nature of the basin, the Duwamish Steward position must work closely and
collaboratively with many partners. Key Duwamish basin partners include: City of Seattle, City of
Tukwila, King County, WRIA 9, Port of Seattle, Boeing, business and residential landowners, tribes, and
non-profit groups (e.g. DRCC, ECOSS, Duwamish Alive Coalition, Puget Soundkeeper, EarthCorps). Lo
In addition to working collaboratively with basin partners, the Steward position would be
knowledgeable of Duwamish programs, plans, and initiatives including:
• Duwamish Blueprint, WRIA 9
• Salmon Habitat Plan, WRIA 9
55
• Re -Green the Green Revegetation Strategy, WRIA 9
• Duwamish Valley Action Plan, City of Seattle
• Lower Duwamish Waterway Group efforts
• Lower Duwamish River Habitat Restoration Plan, Port of Seattle
• Lower Duwamish River NRDA Restoration Plan, NOAA
• Our Green/Duwamish Implementation Plan
• RainWise and stormwater retrofit efforts, King County & City of Seattle
• North Highline (White Center) Subarea Plan, King County Local Services
• King County Land Conservation Initiative, Strategic Climate Action Plan, and the Clean Water and
Healthy Habitat Strategic Plan
Funding
The fully loaded cost of a King County basin steward is approximately $185,000 per year.' Including an
additional $25,000 per year for consultant support and monitoring, the funding need is approximately
$210,000. Funding for on the ground implementation (e.g., restoration or acquisition) will need to be
supported through multiple other fund sources and grants.
The Duwamish Steward position, like the Lower Green and Miller/Walker stewards, would most likely be
funded through a combination of partners. The following scenarios include cost -shares among the three
jurisdictions and Port of Seattle. In addition to these funding partners, there is potential to seek start-up
funding from other partners including WRIA 9, South Central Local Integrating Organization (LIO),
Boeing, and Vulcan.
Option 1: Even Split
Option 2: Geographic Weighting, based on geographic area within the Duwamish Basin (Figure 2)
This scenario double -counts area owned by Port of Seattle. An alternative approach is to come up with a
contribution for Port of Seattle and subtract from the other partners. The Port of Seattle's tax district
extends throughout the basin.
Geographic weighting
Annual Contribution
City of Seattle
$ 52,500
City of Tukwila
$ 52,500
King County
$ 52,500
Port of Seattle
$ 52,500
TOTAL
$ 210,000
Option 2: Geographic Weighting, based on geographic area within the Duwamish Basin (Figure 2)
This scenario double -counts area owned by Port of Seattle. An alternative approach is to come up with a
contribution for Port of Seattle and subtract from the other partners. The Port of Seattle's tax district
extends throughout the basin.
Geographic weighting
Acres
Percent of
total area
Annual
Contribution
City of Seattle
7,810
49.06%
$ 103,027.83
City of Tukwila
3,096
19.45%
$ 40,841.76
King County
4,099
25.75%
$ 54,073.12
3 Assumes Project/Program Manager III, plus benefits and overhead.
56
Port of Seattle
TOTAL
914
5.74% $ 12,057.29
$210,000
Option 3: Split by Work Plan
Cost share allocations would be based on each partner's interaction with various parts of a proposed
work plan. Below is a representation of a potential work plan split that includes general program
coordination (A) and three geographic sub -areas (B, C, D). Under this funding model, we assume that
King County will be solely responsible for funding the work program within the unincorporated urban
area (North Highline and Skyway). All other percentages will need to be developed jointly with partners.
Next Steps
King County has convened several meetings with the proposed cost share partners. All partners have
expressed interest in establishing a Duwamish Basin Steward; however, a final cost share allocation
needs to be agreed to by partners. King County will be convening partners in late July/early August to
evaluate potential cost share allocations. Once partners agree to an allocation formula, a formal ILA will
need to be executed. As with most other ILAs for watershed services, annual inflationary adjustments
will be built in to the agreement. The ILA can also include provisions for adding additional partners in the
future. For example, Burien and SeaTac combined represent approximately 7% of the Duwamish Basin.
57
Work program elements
All work
plan (A%)
Unincorporated
Urban (B%)
Lower
Duwamish
(C%)
Upper
Duwamish
(D%)
%
contribution
of total
Annual
Contribution
City of
Seattle
%
%
%
City of
%Tukwila
King
County
%
100%
%
%
Port of
Seattle
%
100%
$210,000
Next Steps
King County has convened several meetings with the proposed cost share partners. All partners have
expressed interest in establishing a Duwamish Basin Steward; however, a final cost share allocation
needs to be agreed to by partners. King County will be convening partners in late July/early August to
evaluate potential cost share allocations. Once partners agree to an allocation formula, a formal ILA will
need to be executed. As with most other ILAs for watershed services, annual inflationary adjustments
will be built in to the agreement. The ILA can also include provisions for adding additional partners in the
future. For example, Burien and SeaTac combined represent approximately 7% of the Duwamish Basin.
57
Duwamish Subbasin
Discussion Map
Duwarnish-Subbasin
Duwana is h_Su bbasi n+un Inco rp c r ate d
Duwamish Subbasin Jurisdictions
-Sullen
King COun'
Renton
- SeaTac
Seattle
Tukwila
Jurisdiction
Renton
5eaTac
Buri en
Tukwila
King County
Seattle
Totals
Acres
42
372
856
3,096
4,099
7,810
16,275
0%
2% 0!6
2%
5%
19%
25%
48%
Figure 2. Geographic distribution of proposed steward territory by jurisdiction
58
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: WRIA 9 Watershed Planning Project No. 91641205
DESCRIPTION: City participation in an Interlocal Agreement with WRIA 9 jurisdictions and administered by King County.
Endangered Species Act (ESA) related project. Services provided by King County Dept. of Natural
JUSTIFICATION: Resources (KCDNRP) under an Interlocal agreement between participating jurisdictions in Water
Resource Inventory Area 9 (WRIA 9) and King County.
STATUS: Interlocal Agreement has been adopted by all cities with an extension through 2025.
MAINT. IMPACT: Policies and recommendations will impact maintenance.
COMMENT: Ongoing project, only one year actuals are shown in the first column.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
Design
13
20
20
21
21
21
22
23
23
184
Land (R/W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
13
20
20
21
21
21
22
23
23
184
FUND SOURCES
King Conservation District
13
14
14
15
15
16
16
103
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
13
20
7
7
7
6
7
7
7
81
TOTAL SOURCES
13
20
20
21
21
21
22
23
23
184
Project Location:
Entire System
2021 - 2026 Capital Improvement Program
81
59
60
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
TO:
FROM:
BY:
CC:
DATE:
SUBJECT:
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Services Committee
Hari Ponnekanti, Public Works Director/City Engineer
Mike Perfetti, Habitat Project Manager
Mayor Ekberg
November 5, 2021
Surface Water Fund - Gilliam Creek Fish Barrier Removal
Project No. 99830105
Acceptance of King County Flood Reduction Grant Funds
ISSUE
Authorize the Mayor to sign a grant agreement with King County.
BACKGROUND
The primary goals of this project are to restore fish passage between Gilliam Creek and the Green
River, restore salmon habitat, and maintain or improve flood protection. The 108" flapgate would
be removed and replaced with flood protection more suitable to fish passage.
DISCUSSION
In May, staff submitted a grant application to the King County Flood Control District (KCFCD)
requesting funds from its new Flood Reduction Grant that targets culvert replacement and fish
passage. In October, the City was notified by the District that it is being awarded the full request.
This funding will be used to support preliminary design, stakeholder involvement and design
development.
FISCAL IMPACT
The City has $1,937,000 earmarked for design in the CIP, including $561,000 in surface water
funds through 2023. While there is no match requirement, the City identified $300,000 in other
grant funds as leverage.
Grant
Award
Leverage
KCFCD Grant
$300,000
CWM-2021 Grant
......................................................................................................................................................................................................................................................................................................................................................................................................................................................
CWM-2020 Grant
$200,000
$100,000
Total
$300,000
$300,000
RECOMMENDATION
Council is being asked to authorize the mayor to sign the Agreement for Award of Flood Reduction
Grant Funds between the City of Tukwila and King County for the Gilliam Creek Fish Barrier Removal
Project and consider this item on the Consent Agenda at the November 15, 2021 Regular Meeting.
Attachments: 2021-2026 CIP Pg. 85
Agreement for Award of Flood Reduction Grant Funds Between the City of Tukwila and King County 4.21.24
61
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
Gilliam Creek Fish Barrier Removal
Project No. 99830105
Construct fish passage improvements at existing flap gate and restore salmonid habitat; replace flap gate
which may include a self-regulating tide gate or flood wall.
Enable fish access to lower Gilliam Creek under wider range of flow conditions; fish barrier per WDFW and
City; WRIA 9 salmon habitat project.
Analysis of lower Gilliam Creek is being conducted in 2018 to determine the best solution for fish passage
and to address potential flooding.
Likely a shift in maintenance commitments with potential elimination of flapgate maintenance.
In 2020, SRFB listed as Project of Concern, WRIA pulling funding from this cycle; BA Fish Barrier Board -
scored 63 of 94; outcomes yet to be determined; $100K allocated in CWM via WRIA 9.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022 2023 2024 2025 2026 BEYOND TOTAL
EXPENSES
Project Location
shit
®n
sR
\ -
N
r
0
r
Design
60
936
536
405
Mill
Min
\
1,937
Land (R/W)
14
u
111
A
S
%Mr
0
Monitoring
/,,14;1"'*;
WINNIMI
0
Const. Mgmt.
h
7 . i
VANN
alpALUM
752
400
1152
Construction
•p
YukwHa Pkwy
5,200
2,000
,s�
seo4
7,200
TOTAL EXPENSES
60
0
936
536
405
5,952
2,400
0
0
10,289
FUND SOURCES
Awarded Grant
0
Proposed Grant
708
350
258
4,760
1,000
7,076
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
60
0
228
186
147
1,192
1,400
0
0
3,213
TOTAL SOURCES
60
0
936
536
405
5,952
2400
0
0
10,289
2021 - 2026 Capital Improvement Program
85
62
Project Location
shit
®n
sR
\ -
N
r
0
r
- I . � r� ..
� W' `
Mill
Min
\
I
14
u
111
A
S
%Mr
/,,14;1"'*;
WINNIMI
h
7 . i
VANN
alpALUM
.4\1,, _Ai4.7s. :it:L.\ 7,----\ ,
•p
YukwHa Pkwy
,s�
seo4
2021 - 2026 Capital Improvement Program
85
62
Project Name: Gilliam Creek Fish Passage & Habitat Enhancement Award Number: 4.21.24
AGREEMENT FOR AWARD OF
FLOOD REDUCTION GRANT FUNDS
BETWEEN THE CITY OF TUKWILA AND KING COUNTY
This Agreement is made between King County, a municipal corporation, and the City of
Tukwila ("Recipient") (collectively referred to as the "parties" and in the singular "party"), for
the purposes set forth herein. This Agreement shall be in effect from the date of execution to
December 31, 2024.
Project Contacts:
Contact for King County — Kim Harper, Grant Administrator, 206-477-6079,
Kim.harper@kingcounty.gov.
Contact for Recipient — Mike Perfetti, 206-550-4930, Mike.perfetti@tukwilawa.gov.
1.1
SECTION 1. RECITALS
Whereas, the King County Flood Control District ("District") is a quasi -municipal
corporation of the State of Washington, authorized to provide funding for flood control
and stormwater protection projects and activities; and
1.2 Whereas King County is the service provider to the District under the terms of an
interlocal agreement ("ILA") by and between King County and the District, dated
February 17, 2009, as amended, and as service provider implements the District's annual
work program and budget; and
1.3 Whereas, on November 12, 2013, the District's Board of Supervisors passed Resolution
FCD2013-14 which established a Flood Reduction Grant Program and criteria for
awarding grant funding for projects, and on November 4, 2020, the Board passed
Resolution FCD2020-22, which authorized an allocation of $12,000,000 from the
District's 2021 budget to fund flood reduction projects; and
1.4 Whereas, on September 14, 2021 the District's Board of Supervisors passed Resolution
FCD2021-10, which approved the flood reduction projects described in Attachment A to
that Resolution; and
1.5 Whereas, in accordance with the terms of these Resolutions, and in its capacity as
service provider to the District, King County has established policies and procedures for
administering the flood reduction grant program, a copy of which has been furnished to
Recipient and which is incorporated herein by this reference (hereinafter "Grant Policies
and Procedures"); and
1.6 Whereas, the Recipient submitted an application to receive funds for a project to be
funded by the Flood Reduction Grant Program; and
Page 1 of 6
63
Project Name: Gilliam Creek Fish Passage & Habitat Enhancement Award Number: 4.21.24
1.7 Whereas the District's Board of Supervisors approved funding of Recipient's application
for the project ("Project"), as described in Attachment A to Resolution FCD2021-10 in
the amount of $300,000 ("Award"); and
1.8 Whereas King County has received a Scope of Work and a Budget for the Project from
the Recipient and has determined that the Scope of Work, attached hereto and
incorporated herein as Exhibit B ("Scope of Work"), and the Budget, attached hereto and
incorporated herein as Exhibit C ("Budget"), are consistent with the Grant Policies and
Procedures, the Recipient's application for the Project, and the Resolution approving
funding for the Project; and
1.9 Whereas, King County and the Recipient desire to enter into this Agreement for the
purpose of establishing the terms and conditions under which King County will provide
funding from the District in accordance with Resolution FCD2021-10, and the Grant
Policies and Procedures, and under which the Recipient will implement the Project.
SECTION 2. AGREEMENT
2.1. The Recitals are an integral part of this Agreement and are incorporated herein by this
reference.
2.2. King County agrees to pay the Award amount to Recipient in the total amount of
$300,000 from District funds. The Award shall be used by the Recipient solely for the
performance of the Project, as described in Exhibit A to this Agreement. Exhibit A,
attached hereto and incorporated herein by this reference, contains a description of the
Project as described in Attachment A to Resolution FCD2021-10. King County shall
pay the Recipient in accordance with the terms of the Grant Policies and Procedures.
2.3. The Recipient represents and warrants that it will only use the Award for the Scope of
Work of this Agreement and in accordance with the Project Budget. The Recipient shall
be required to refund to King County that portion of the Award which is used for work or
tasks not included in the Scope of Work. Further, the Recipient agrees that King County
may retain any portion of the Award that is not expended or remains after completion of
the Scope of Work and issuance of the Final Report, as further described below.
2.4. Activities carried out for this Project and expenses incurred by the Recipient may predate
the execution date of this Agreement provided that 1) they have been identified by
Recipient as being within the scopes of numbers 2) and 3) below, and have been
approved by King County as being within such scopes; 2) the activities are specified in
the Scope of Work of this Agreement; 3) the expenses are incurred in carrying out the
Scope of Work and are authorized by the Award as identified in the Budget of this
Agreement; 4) the activities occur after the District passes a resolution approving an
award for the Project; 5) such activities and expenses otherwise comply with all
Page 2 of 6
64
Project Name: Gilliam Creek Fish Passage & Habitat Enhancement Award Number: 4.21.24
other terms of this Agreement; and 6) reimbursements shall be paid to the Recipient only
after this Agreement has been fully executed.
2.5. The Recipient shall invoice King County for incurred expenses using the Request for
Payment form and Progress Report form for those documented and allowable expenses
identified in the Budget and according to the rules set forth in the Grant Policies and
Procedures. Blank forms shall be provided to the Recipient by King County upon
execution of this Agreement. A progress report (with or without a request for payment)
shall be made no less frequently than every six months after the effective date of this
Agreement nor more frequently than every three months after the aforementioned date. A
Progress Report form shall be submitted with all payment requests. A one- time advance
of no more than 25% of the Award amount may be allowed, in the discretion of King
County, for expenses anticipated to be incurred in the three months following the date of
submission of the advance Request for Payment only for work that is included in the
Scope of Work of this Agreement, and identified as such in the Request for Payment.
Documentation of payments made from the advance payment shall be submitted to King
County prior to any further requests for payment.
2.6. The Recipient shall be required to submit to King County a final report which documents
the Recipient's completion of the work in conformance with the terms of this Agreement
within thirty (30) days after the completion of the work. The final report may be
submitted on the Closeout Report form unless a more detailed final report is specified in
the scope of work. A blank form shall be provided to the Recipient by King County upon
execution of this Agreement. The final report shall include a summary of the Project's
successes and shall address the flood reduction benefits accomplished by the work.
2.7. The Recipient's expenditures of Award funds shall be separately identified in the
Recipient's accounting records. If requested, the Recipient shall comply with other
reasonable requests made by King County with respect to the manner in which Project
expenditures are tracked and accounted for in the Recipient's accounting books and
records. The Recipient shall maintain such records of expenditures as may be necessary
to conform to generally accepted accounting principles as further described in Section 2.8
below, and to meet the requirements of all applicable state and federal laws.
2.8. The Recipient shall be required to track project expenses using the Budget Accounting
and Reporting System for the State of Washington ("BARS") or Generally Accepted
Accounting Principles set forth by the Financial Accounting Standards Board or by the
Governmental Accounting Standards Board.
2.9. King County or its representative, and the District or its representative, shall have the
right from time to time, at reasonable intervals, to audit the Recipient's books and records
in order to verify compliance with the terms of this Agreement. The Recipient shall
cooperate with King County and the District in any such audit.
Page 3 of 6
65
Project Name: Gilliam Creek Fish Passage & Habitat Enhancement Award Number: 4.21.24
2.10. The Recipient shall retain all accounting records and project files relating to this
Agreement in accordance with criteria established by the Washington State Archivist
Local Government Common Records Retention Schedule (CORE) as revised.
2.11. The Recipient shall ensure that all work performed by its employees, agents, contractors
or subcontractors is performed in a manner which protects and safeguards the
environment and natural resources and which is in compliance with local, state and
federal laws and regulations. The Recipient shall implement an appropriate monitoring
system or program to ensure compliance with this provision.
2.12. The Recipient agrees to indemnify, defend and hold harmless King County, and the
District, their elected or appointed officials, employees and agents, from all claims,
alleged liability, damages, losses to or death of person or damage to property arising out
of any acts or omissions of the Recipient, its employees, agents, contractors or
subcontractors in performing its obligations under the terms of this Agreement.
2.13. The Recipient agrees to acknowledge the District as a source of funding for the Project
on all literature, signage or press releases related to the Project. The Recipient may
obtain from King County a District logo that may be used in the acknowledgement.
SECTION 3. GENERAL PROVISIONS
3.1. This Agreement shall be binding upon and inure to the benefit of the parties and their
respective successors and assigns.
3.2. This Agreement constitutes the entire agreement between the parties with respect to the
subject matter hereof. No prior or contemporaneous representation, inducement, promise
or agreement between or among the parties which relate to the subject matter hereof
which are not embodied in this Agreement shall be of any force or effect.
3.3. No amendment to this Agreement shall be binding on any of the parties unless such
amendment is in writing and is executed by the parties. The parties contemplate that this
Agreement may from time to time be modified by written amendment which shall be
executed by duly authorized representatives of the parties and attached to this Agreement.
3.4. Each party warrants and represents that such party has full and complete authority to
enter into this Agreement and each person executing this Agreement on behalf of a party
warrants and represents that he/she has been fully authorized to execute this Agreement
on behalf of such party and that such party is bound by the signature of such
representative.
3.5. The Project shall be completed by no later than December 31, 2024. In the event that the
Project is not completed by this date, King County has the discretion, but not the
obligation, to terminate this Agreement and retain any unexpended Award funds.
3.6. This Agreement may be signed in multiple counterparts.
Page 4 of 6
66
Project Name: Gilliam Creek Fish Passage & Habitat Enhancement Award Number: 4.21.24
3.7. If any provision of this Agreement shall be wholly or partially invalid or unenforceable
under applicable law, such provision will be ineffective to that extent only, without in any
way affecting the remaining parts or provision of this Agreement, and the remaining
provisions of this Agreement shall continue to be in effect.
3.8. The amount of the Award has been fully funded by the District. To the extent that
funding of the Award requires future appropriations by the District, King County's
obligations are contingent upon the appropriation of sufficient funds by the Board of
Supervisors of the District to complete the Scope of Work. If no such appropriation is
made, this Agreement will terminate at the close of the appropriation year for which the
last appropriation that provides funds under this Agreement was made.
KING COUNTY: RECIPIENT:
By By
Name Name
Title Title
Date Date
Page 5 of 6
67
Project Name: Gilliam Creek Fish Passage & Habitat Enhancement
EXHIBIT A: PROJECT DESCRIPTION
Award Number: 4.21.24
PROJECT NAME
RECIPIENT
DESCRIPTION
LEVERAGE
AWARD
Gilliam Creek
Fish Passage &
Habitat
Enhancement
City of
Tukwila
The Gilliam Creek Fish Barrier Removal and Habitat
Enhancement Project will restore fish passage between
Gilliam Creek and the Green River and improve habitat
conditions within lower Gilliam Creek. Gilliam Creek is
mostly inaccessible to aquatic species due to the
presence of a 1960s era 108" -diameter flapgate at the
outlet of a 207 -foot long culvert beneath 66th Ave. S.
$300,000
$300,000
EXHIBIT B: SCOPE OF WORK
TASKS
ACTIVITIES AND DELIVERABLES
APPROX.
PERCENT OF
AWARD
MONTH/YEAR
TASK WILL BE
COMPLETED
TOTAL
(Grant +
Leverage)
SOURCE NAME
2020
CWM
2021
CWM
Task 1: Project
Administration
(Required task)
Submit reimbursement request forms, backup documentation
for billing, and progress reports at least every 6 months.
Submit a Fiscal Closeout form and a Closeout Report form with
the final reimbursement request.
1%
October, 2024
Task 2: Design
Development
(match
contributions)
We hired a professional design consulting team to finalize
preliminary feasibility work and develop three conceptual
design alternatives. Deliverable will be the selection of the
chosen alternative.
1%
October, 2022
Task 3:
Permitting
We will hire a professional design consulting team to execute
permitting for the preferred alternative up to 60%, 90% or
100% design, depending on alternative selected. Deliverables
will be the permits for design and construction.
38%
October, 2023
Task 4:
60%/90%/100%
Design
We will hire a professional design consulting team to execute
design for the preferred alternative up to 60%, 90% or 100%
design, depending on the alternative selected. Deliverable will
be plans, specifications, and cost estimates to prepare the
project for the construction phase.
60%
October 2024
EXHIBIT C: BUDGET
BUDGET ITEM
GRANT
AWARD
REQUEST
FINANCIAL LEVERAGE (not required)
LEVERAG
E TOTAL
TOTAL
(Grant +
Leverage)
SOURCE NAME
2020
CWM
2021
CWM
AMOUNT
STAFFING
$1,500
$543
$1,326
$1,869
$3,369
PROJECT SUPPLIES
COMMERCIAL SERVICES
AND CREW TIME
$298,500
$99,457
$198,674
$298,131
$596,631
TOTAL
$300,000
$100,000
$200,000
$300,000
$600,000
Page 6 of 6
68
TO:
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
Transportation & Infrastructure Committee
Finance & Governance Committee
FROM: Rachel Bianchi, Deputy City Administrator
CC: Mayor Ekberg
DATE: October 25, 2021
SUBJECT: 2022 Legislative Agenda
ISSUE
The City of Tukwila develops an annual legislative agenda for use in Olympia during the
legislative session.
BACKGROUND
The City's Legislative Agenda provides direction to staff and consensus among the elected
officials as to what policy positions are taken on behalf of the City of Tukwila during the
legislative session.
RECOMMENDATION
The Transportation & Infrastructure and Finance & Governance Committees are being asked to
provide comment and feedback, which will be incorporated into the agenda for discussion at the
November 22, 2021, Committee of the Whole meeting. The full Council is being asked to
formally adopt the agenda at the December 6 Regular Meeting. The City's lobbyist, David
Foster, will provide a legislative update at the November 22 Committee of the Whole meeting.
ATTACHMENTS
Resolution in draft form
Attachment A — Legislative Agenda
69
DRAFT
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A LEGISLATIVE AGENDA FOR USE
DURING THE 2022 WASHINGTON STATE LEGISLATIVE SESSION.
WHEREAS, the City Council has agreed to pursue certain legislative issues for 2022;
and
WHEREAS, the City Council recognizes this agenda is not all encompassing, in that
certain additional items may arise during the legislative session that require support or
opposition; and
WHEREAS, a legislative agenda outlines the priority issues that elected officials may
discuss when speaking to members of the Washington State Legislature; and
WHEREAS, the City Council agreed to these priorities at the City Council Meeting on
December 6, 2021;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
The Tukwila City Council has identified priorities for the 2022 Washington State
Legislative Session that provide a framework for advocacy on behalf of the community.
The City of Tukwila 2022 Legislative Agenda is hereby incorporated by reference as
Attachment A.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2021.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Kate Kruller, Council President
APPROVED AS TO FORM BY:
Office of the City Attorney
Attachment A: City of Tukwila 2022 Legislative Agenda
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Page 1 of 1
70
ATTACHMENT A
DRAFT
City of Tukwila 2022 Legislative Agenda
Transportation & Infrastructure
• Provide funding for critical local infrastructure, including the Allentown Bridge, which is
Structurally Deficient and Functionally Obsolete.
• Create stable, reliable infrastructure assistance funding for cities to assist in repairing
roads, bridges and other public infrastructure that support economic development.
Housing & Human Services
• Address the housing stability crisis by providing additional tools for rental assistance,
foreclosure/eviction prevention and capital construction of affordable housing.
• We strongly encourage the state to adequately fund human services programs for the health
of the safety net.
Advancing Equity
• Develop and implement a racial equity toolkit for legislation, policies and programs to advance
racial equity in Washington.
• Ensure affordable, high-quality broadband internet access is available to all households
and businesses to provide educational, entrepreneurial, business and accessibility equity for all
Washingtonians to access the internet.
• Enact a financial inclusion law that will address the public safety and equal access issues
caused by bank de -risking.
Shared Revenue
• Include local governments in any new statewide revenues to ensure the long-term health of
municipalities.
• The State must continue its role as a partner with cities, including reinstating funding for the
Public Works Assistance Account and Community Economic Revitalization Board.
session remain funded and identify a longer term funding strategy beyond the 2020/2021
biennium.
Revenue Reform
• Allow cities the authority and flexibility to address the fact that growth in the cost of services
continue to outstrip revenues.
• The state should amend the law that limits annual property tax growth to 1 percent and work
with cities to authorize additional funding flexibility and opportunities at the local level.
Education
• Implement needs based funding for allocation of social emotional student support resources
and expand funding for learning opportunities for summer school students.
• Increase funding for homeless students and secondary ELL students.
• Incorporate early learning for low income students as a part of Basic Education.
Preserve Lodging Tax Flexibility
• Ensure the definition of "tourist" in Washington State remains flexible to allow jurisdictions and
Lodging Tax Advisory Committees to distribute lodging tax dollars in a manner that best serves
each individual community.
71
Preparing for Our Future
• Enact policies to prepare to combat climate change, including adequately budgeting for its
effects and providing tools to cities to prepare and address the ramifications of flooding,
pollution and other key factors.
• Continue to invest in workforce education and job training to ensure Washingtonians have
access to high-quality career and technical education opportunities.
• Support a permanent policy that allows greater flexibility for local governments to hold
virtual meetings without a physical location.
Police Reform
• Enact police reforms identified by the Association of Washington Cities:
Develop a statewide standard for use of force that preserves the right of local
jurisdictions to enact more restrictive standards based on community input.
Create a database to track officers who have been fired for misconduct and make it
accessible to departments in their recruitment and hiring processes.
Expand grounds for decertification to include use of force violations.
Require that officer misconduct investigations be completed, regardless of an officer's
resignation.
misconduct or illegal activity by a fellow police officer.
Require that all officers receive regular support for vicarious trauma and mental well
screenings. Officers involved in any fatal use of force must undergo a mental health
screening prior to returning to duty.
Law Enforcement Use of Force
• Support clarification of the civil standards for use of force requirements so law
enforcement can better understand the state requirements and know when they can use force
to intervene in a situation, including a mental health crisis where a crime is not being committed.
72